Back to Wyoming
Wyoming2010Enacted

SF0036

Gillette Madison Water Project

Last scannedOct 18, 2026, 2:19 AM

In one sentence

This law authorizes the construction of Phase I of the Gillette Madison pipeline project and provides $24.5 million in state funding through a grant and a loan.

What it does

  • Authorizes the state commission to contract with the project sponsor for the construction engineering and construction of Phase I, which includes five wells, pumps, and piping.
  • Sets the total project budget at $217,600,000.
  • Provides a grant of up to $16,415,000 from the water development account III.
  • Provides a loan of up to $8,085,000 from the permanent Wyoming mineral trust fund.
  • Requires the loan to be repaid over 30 years at a 4% annual interest rate.
  • Requires unspent grant funds to return to the budget reserve account on July 1, 2015.

Who it affects

  • The project sponsor responsible for building the pipeline.
  • The state commission that manages the contract and funds.
  • The state treasurer who releases funds from the mineral trust fund.
  • The governor, who must recommend reimbursement for spent grant funds.

Limits and unknowns

  • The grant is limited to 67% of actual costs or $16,415,000, whichever is less.
  • The loan is limited to 33% of actual development costs or $8,085,000, whichever is less.
  • The source text does not specify the exact timeline for completing the construction.

Plain language

Terms to know

Phase I
The first stage of the project, which includes an expanded Madison well field with five wells, pumps, piping, and the southwest treated water transmission pipeline.
Water development account III
A state fund used to provide grants for water projects.
Permanent Wyoming mineral trust fund
A state fund that provides loans for development projects.

Official record

Sources

Source checked
Read the official summary

Bill No.: <billno> Drafter: <drafterinit> Bill No.: SF0036 Drafter: MQ LSO No.: 10LSO-0229 Effective Date: Enrolled Act No.: SEA0050 Chapter No.: Prime Sponsor: Senator Hines Catch Title: Gillette Madison water project. Subject: Authorizes the construction and financing of the Gillette Madison pipeline project. Summary/Major Elements: Authorizes the construction engineering and construction for Phase I of the project including 5 wells, pumps and pipeline. Authorizes $24,500,000 of a total funding of $217,600,000 for the project ($16,415,000 grant from water development account III and $8,085,000 loan from the permanent Wyoming mineral trust fund).

Public statements

Why lawmakers voted

Last checked Aug 8, 10:40 PM

Voted Yes

Why they voted this way

The speaker supports the concurrence because it ensures funds over a specific cap are placed on the governor's budget for consideration, potentially speeding up reimbursement. He also argues that Water Account 3 statutes prohibit funding this type of project without legislative approval and believes the amendment sends a message to Campbell County to seek alternative funding sources like local taxes or AML funds.

Public statementFloor statement at 46:37 Watch the statement
Voted Yes

Why they voted this way

The speaker explains that a compromise was reached to delete an amendment regarding earmarking and instead allow reimbursement from available surplus funds, prioritizing the project in future budget requests.

Public statementFloor statement at 10:24 Watch the statement
Voted No

Why they voted this way

The speaker argues that the House amendment changes how severance taxes are distributed in statute, which is uncommon for this type of bill. They also state that following the proposed repayment schedule would likely result in paying double back to Water Account 3 compared to expectations.

Public statementFloor statement at 44:51 Watch the statement

Wyoming roll calls

Recorded votes

10 roll calls

H Adopted JCC01 54-2-4-0-02010-03-05 · House54 yes 2 no
S Adopted JCC01 28-1-1-0-02010-03-04 · Senate28 yes 1 no
S Did Not Concur 0-30-0-0-02010-03-03 · Senate0 yes 30 no
H Passed 3rd Reading 47-9-4-0-02010-03-02 · House47 yes 9 no
H02 Recommended Do Pass 6-0-1-0-02010-02-23 · House6 yes 0 no
H05 Recommended Do Pass 8-1-0-0-02010-02-23 · House8 yes 1 no
S Passed 3rd Reading 29-1-0-0-02010-02-18 · Senate29 yes 1 no
S02 Recommended Do Pass 5-0-0-0-02010-02-16 · Senate5 yes 0 no
S05 Recommended Amend and Do Pass 5-0-0-0-02010-02-12 · Senate5 yes 0 no
S Introduced and Referred to S05 29-1-0-0-02010-02-09 · Senate29 yes 1 no

Official activity

Bill history

  1. Assigned Chapter Number - 115LSO
  2. Governor Signed SEA0050Governor
  3. H Speaker Signed SEA No. 0050House
  4. S President Signed SEA No. 0050Senate
  5. Assigned Number SEA0050LSO
  6. H Adopted SF0036JC01House
  7. S Adopted SF0036JC01Senate
  8. H Appointed JCC01 MembersHouse
  9. S Appointed JCC01 MembersSenate
  10. S Did Not ConcurSenate
  11. S Received for ConcurrenceSenate
  12. H Passed 3rd ReadingHouse
  13. H Passed 2nd ReadingHouse
  14. Amendment FailedHouse
  15. Amendment AdoptedHouse
  16. H Passed CoWHouse
  17. H Amendments AdoptedHouse
  18. Amendment AdoptedHouse
  19. H Placed on General FileHouse
  20. H02 Recommended Do PassHouse

Changes

Amendments

3 stored

SF0036H2001

Adopted 2nd reading by ANDERSON,R

SF0036H2002

Failed 2nd reading by STEWARD

SF0036HW001

Adopted Committee of the Whole by ANDERSON,R