Back to District of Columbia

CA26-0063 • 2025

Proposed Contract between the District of Columbia Housing Authority and Irreno Construction Company Inc. (Langston Terrace)

Proposed Contract between the District of Columbia Housing Authority and Irreno Construction Company Inc. (Langston Terrace)

Budget Housing
Active

The official status still shows this bill as active or still awaiting another formal step.

Sponsor
at the request of the District of Columbia Housing Authority
Last action
2025-02-20
Official status
Deemed Approved
Effective date
Not listed

Plain English Breakdown

The official source material does not provide specific details on how the contract's performance will be monitored or the exact timeline for its implementation.

Proposed Contract for Langston Terrace Renovation

This contract proposes that Irreno Construction Company Inc. will renovate vacant units at Langston Terrace in Washington, DC, using capital funds from the District's budget.

What This Bill Does

  • Proposes a contract between DCHA and Irreno Construction Company Inc. to renovate vacant units at Langston Terrace.
  • Sets the total cost for the project at $1,496,052.98 using capital funds from the District's budget.
  • Uses a Job Order Contracting method where DCHA gives detailed work plans and Irreno provides cost estimates based on a catalog of construction tasks.

Who It Names or Affects

  • The District of Columbia Housing Authority (DCHA)
  • Irreno Construction Company Inc.

Terms To Know

Job Order Contracting
A method where a contractor is selected for multiple projects over several years based on their ability to complete detailed work plans and provide cost estimates.

Limits and Unknowns

  • The exact timeline for when the contract will be finalized and work begins is not specified.
  • Details on how the performance of Irreno Construction Company Inc. will be monitored are not provided.

Bill History

  1. 2025-02-20 Council of the District of Columbia LIMS

    Retained by the Council with comments from the Committee on Housing

  2. 2025-02-19 Council of the District of Columbia LIMS

    CA26-0063 Introduced by Chairman Mendelson at Office of the Secretary

Official Summary Text

Proposed Contract between the District of Columbia Housing Authority and Irreno Construction Company Inc. (Langston Terrace)

Current Bill Text

Read the full stored bill text
February 19, 2025
The Honorable Phil Mendelson
Chairman
Council of the District of Columbia
1350 Pennsylvania Avenue, N.W., Suite 504
Washington, DC 20004
Dear Chairman Mendelson:
Pursuant to D.C. Code §2-352.02 (b)(2), I have enclosed for consideration by the District Council (“Council”), the
Council Contract Summary for a proposed contract, in the amount of One Million Four Hundred Ninety-Six Thousand
Fifty-Two and 98/00 Dollars ($1,496,052.98) between the District of Columbia Housing Authority
(“DCHA”) and Irreno Construction Company, Inc. (“Irreno”). This proposed contract is for additional va cant
units at Langston Terrace located at 711 21 st Street, NE, Washington, DC (the “Project”).
DCHA plans to enter into the cont ract with Irreno and finance the Project using an allocation of $1,496,052.98 in
capital funds appropriated by the Council of the District of Columbia in the District of Columbia FY 2025 Approved
Budget and Financial Plan.
DCHA procured Irreno pursuant to DCHA Solicitation Number 0008-2019, a Request for Job Order Contractors. Under a
Job Order Contracting (“JOC”) contract, DCHA awards an approved contractor a Detailed Scope of Work and the
contractor prepares a cost proposal using a construction catalog, which contains a range of construction and
construction related tasks and prices. DCHA awarded Irreno a one-year contract with four (4) additional one-year
options. Pending approval by the Council, DCHA proposes to award to Irreno a contract to complete the Projects. As
always, I am available to discuss any questions you may have regarding the proposed contract. In order to facilitate a
response to any questions concerning this action, please have your staff contact Hammere Gebreyes, Director of
External Affairs and Senior Advisor, at (202) 207-4694.
I look forward to your favorable consideration of this proposed contract.
Sincerely,
Keith Pettigrew
Ex
ecutive Director
Enclosures
NB/m
m
cc: Nyasha Smith, Secretary to the Council

{0030164 -}
COUNCIL CONTRACT SUMMARY
Pursua
nt to D.C. Official Code § 2-352.02(c), as amended, the following is provided:
(1) T
he name of the proposed contractor, the contract/loan amount, and the term of
the proposed contract:
Contractor: Irreno Construction Company, Inc.
Contract Amount: $1,496,052.98.00
Contract Term(s): 307 days
Source Selection Method: Job Order Contracting Procurement
(2) Description of the Goods and Services to be provided:
Pursuant to D.C. Official Code § 2-352.02(b)(2), as amended, I have enclosed for
consideration the Job Order Contract ("JOC") for Additional Vacant Unit Work at
Langston Terrace, located at 711 21 Street in the Northwest quadrant of Washington,
DC (the “Project”).
(3) A description of the selection process, including the number of offerors, the
evaluation
criteria, the evaluation results, and the basis for selecting the proposed
co
ntractor:
DCHA has determined that the proposed contract meets the procurement and
selection requirements applicable to DCHA. The JOC procurement is a duly recognized
procurement method that allows DCHA to select numerous construction contractors for
multi-year contracts. This method allows DCHA to undertake a wide variety of
renovation, repair and construction projects throughout its portfolio without having to
specify the projects on which a particular contractor will work. Under the JOC, the
contractor receives from DCHA an approved Detailed Scope of Work and the contractor
prepares a cost proposal using a construction catalog which contains a range of
construction and construction-related
tasks and prices. Each task has a complete and
detailed description, an established unit of measure, and an established unit price. The
unit price includes the direct cost of labor, materials, and equipment.
April 15, 2029, DCHA issued “Solicitation Numbers, 0007-2019 through 0019-2019, a
Request for Job Order Contractors.” The procurement solicited bids from qualified
construction companies who had the capacity, experience, staff, and ability to undertake
numerous
projects. In addition, the solicitation stated that DCHA would award a one-year
base contract with options to award four additional one-year contracts, based on
s
atisfactory performance. In response to the 2019 solicitation, DCHA received eighty-
seven (87) bids from firms and made thirteen (13) awards. Among those selected, DCHA
awarded a JOC to Irreno Construction Company Inc. under Solicitation Number
0008-2019 for a one-year base contract. Subsequently, DCHA has exercised its
contractual option and awarded 3 one-year contracts to Irreno Construction Company. Inc.
{0030164 -}
Accordingly, DCHA has an existing JOC with Irreno Construction Company, Inc. and
has provided Irreno Construction Company Inc. with a Detailed Scope of Work for the
Project. Irreno Construction Company
. Inc. has evaluated the scope of work and has
submitted a price
of $1,496,052.98 to construct the Project.
The initiation and completion of the required work are clearly within the scope of
the
services to be provided by the procured contractor. The scope of work for the Project
contains sufficient details and plans. DCHA will
pay for such services with proceeds
from the DCHA21C Fund as described below.
(4) Backgro und and qualifications of the proposed contractor:
Since award of the JOC to Irreno Construction Company, Inc. on May 30, 2019, DCHA
has awarded 17 individual task orders with a total value of $10,899,253.59. Irreno
Construction Company, Inc. has successfully completed this work on time and within
budget for these projects.
(5) Performan ce standards and expected outcomes of the proposed contract:
DCHA expects that the Project will be constructed according to approved construction
documents and consistent with all District code and building regulations. The contractor
is also responsible for meeting LSBDE subcontracting goals and employment goals as
required by DCHA and
the District.
(6) Description of the funding source for the proposed agreement and a
ce
rtification that the proposed agreement is consistent with the
District's financial plan and budget :
The funding source s
for the proposed contract are the capital funds in the FY
2024 financial plan and budget adopted by the Council of the District of
Columbia and made available to DCHA to be administered in FY 2025.
{0030164 -}
requirements.
(7) A certification of legal sufficiency:
The Legal Suff
iciency Memorandum is attached.
(8) A certification that the proposed contractor's/proposed owner is in
compliance with District tax laws:
The District tax
law compliance certification is attached.
(9) The status of the proposed contractor as a certified local, small or
disadvantaged business
enterprise .
Irre no Construction C ompany , Inc. is a CBE, MBE , & WBE
business. Irreno will be responsible for 36.14% of the proposed
contract work as more particular set forth in the Utilization
Compliance Report attached to the proposed contract.
(
10) A statement indicating whether the proposed contractor is currently
debarred from
providing services or good to the District or federal
government:
DCHA’s Office of Administrative Service has conducted a federal and local
search of Irreno Construction Company, Inc. and has found no evidence of
federal or District debarment.
(
11) Where the contract, if executed, will be made available online:
Contact DCHA at FOIA, foia@dchousing.org
THIS IS TO CERTIFY that all applicable provisions of the District of Columbia Business
Organizations Code (Title 29) have been complied with and accordingly, this CERTIFICATE OF
GOOD STANDING is hereby issued to
C E R T I F I C A T E
IRRENO CONSTRUCTION CO. Inc.
IN TESTIMONY WHEREOF I have hereunto set my hand and caused the seal of this office to
be affixed as of 11/20/2024 12:45 PM
Business and Professional Licensing Administration
Tracking #: zYfmXYJ8
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF LICENSING AND CONSUMER PROTECTION
CORPORATIONS DIVISION
WE FURTHER CERTIFY that the foreign entity is registered to do business in the District on
07/20/1990 ; that all fees, and penalties owed to the District for entity filings collected through the
Mayor have been paid and Payment is reflected in the records of the Mayor; The entity's most
recent biennial report required by § 29-102.11 has been delivered for filing to the Mayor; and the
entry's registration has not been terminated. This office does not have any information about the
entity¶s business practices and financial standing and this certificate shall not be construed as the
entity¶s endorsement.
Initial File #: 902603
Entity Type: For-ProfitCorporation
ICCI
The undersigned hereby certifies that lrreno Construction Company, Inc. is currently not, and
will not be, in violation of District of Columbia Code §1-1163.34a, which provides a covered contractor
shall not contribute to a prohibited recipient during the prohibited period.
By: I ~eflrreno ~
Title: VP of Construction
NOTARY:
I hereby certify that on this /2/,,< day of December 2024, Ivan lrreno personally appeared
and signed this document and acknowledged that he was the Secretary of lrreno Construction Company,
Inc.
State/County/District of Columbia
IC C I
IRR E:\:O C:O:\:STRLTTIO:\ CO . l'.\C:.
l:!O': i1 I'll .,1 RU . I°"'". \\'.\\Ill~(; ro,. J>l ,!1)0111
Certification Regarding Federal Taxes
The undersigned hereby certifies that it is current with the federal taxes or has worked out
and is current with a payment schedule approved by the federal Government.
lrreno onstruction Co., Inc.
1207 34th Street, NW 20007
Date:_/-+/ /2~i)..D_/ ~_a._'1 __ _
Notary
I hereby certify that on this day~..«of #~~that Lupe lrreno personally
appeared and signed this document and acknowledged she was a member of the
Corporation.
State/County/District: .L)C­
Expiration: ~.::?£' /O<P//-9'
Notary Public:
District of Columbia
1207 34th Street, NW, Washington, DC 20007 • OFFICE 202-298-7527 • FAX 202-298-7529
IC C I
IRRE'-:0 CO.\STRl "CTIO:'\ CO . l.\C.
J111-; H TII ·"' I R I Lr'" • \\'.\'-II II\"(; r( ,.,·. I)(. Juun;
Certification Regarding No Pending litigation
The undersigned hereby certifies that the contractor has no pending claims against the
District.
lrreno Construction Co., Inc.
1207 34th Street, NW 20007
Date:, _ __,_/'-'"/ }'J.V=-1-/..w:::o?P,:....,~c...vf.L...--__
Notary
I hereby certify that on this da~ of ~~that Lupe lrreno personally
appeared and signed this document and acknowledged she was a member of the
Corporation.
State/County/District: LJ (!_
Expiration: M //~..:!4:?6
District 61<2!-&fXn~M bl ic:
1207 34th Street, NW, Washington, DC 20007 • OFFICE 202-298-7527 • FAX 202-298-7529
Additional Vacant Unit Renovations @ langston Terrace
DJ69-28.01
Abode, Inc.
ADU Appliances
HB Builders
J&P Home Solutions
1101 4th Street, SW
Washington, DC 20024
Date of Notice: February 11, 2025 L0013282038Notice Number:
FEIN: **-***9175
Case ID: 18479405
Government of the District of Columbia
Office of the Chief Financial Officer
Office of Tax and Revenue
IRRENO CONSTRUCTION COMPANY INC
1207 34TH ST NW
WASHINGTON DC 20007-3224
Branch Chief, Collection and Enforcement Administration
Authorized By Melinda Jenkins
To validate this certificate, please visit MyTax.DC.gov. On the MyTax DC homepage, click the
“Validate a Certificate of Clean Hands” hyperlink under the Clean Hands section.
CERTIFICATE OF CLEAN HANDS
As reported in the Clean Hands system, the above referenced individual/entity has no outstanding
liability with the District of Columbia Office of Tax and Revenue or the Department of Employment
Services. As of the date above, the individual/entity has complied with DC Code § 47-2862, therefore
this Certificate of Clean Hands is issued.
TITLE 47. TAXATION, LICENSING, PERMITS, ASSESSMENTS, AND FEES
CHAPTER 28 GENERAL LICENSE
SUBCHAPTER II. CLEAN HANDS BEFORE RECEIVING A LICENSE OR PERMIT
D.C. CODE § 47-2862 (2006)
§ 47-2862 PROHIBITION AGAINST ISSUANCE OF LICENSE OR PERMIT
1101 4th Street SW, Suite W270, Washington, DC 20024/Phone: (202) 724-5045/MyTax.DC.gov
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
Keith Pettigrew
Executive Director
Andrea Powell
Deputy General Counsel
February 19, 2025
Proposed Contract for Additional Vacant Units at the Langston Terrace Project between DCHA and
Irreno Construction Company Inc. (“Irreno”) to be submitted to the Council for the District of Columbia
for approval pursuant to D.C. Official Code § 2-352.02(a)(1), as amended
1. Procur
ement Process
I have e
nclosed for consideration by the Council of the District of Columbia, the Council Contract Summary for a
proposed contract, in the amount of One Million Four Hundred Ninety-Six Thousand Fifty-Two and 98/00 Dollars
($1,496,052.98) between the District of Columbia Housing Authority (“DCHA”) and Irreno. This proposed contract is
for additional vacant units for DCHA’s Langston Terrace project. DCHA plans to enter into the contract with Irreno for
additional vacant units at Langston Terrace using capital funds appropriated by the Council of the District of Columbia
in the FY25 Approved Budget and Financial Plan.
On Sund
ay, April 14, 2019, DCHA advertised an Invitation for Bid in the local newspapers with Solicitation Number,
IFB-2019, a Request for Job Order Contractors. The DCHA procurement solicited bids from qualified construction
companies who had the capacity, experience, staff, and ability to undertake numerous projects. In addition, the
solicitation stated that DCHA would award a one-year base contract with options to award four additional one-year
contracts, based on satisfactory performance.
In respo
nse to the IFB-2019 solicitation, DCHA received eighty-seven (87) bids and made thirteen (13) awards.
DCHA determined that Irreno met the technical requirements and has relevant experience working on multifamily
housing projects similar to the housing developments owned by DCHA and therefore is qualified and capable of
providing DCHA’s required construction, repair and replacement services.
2. Descrip
tion of Proposed Contract
The pr
oposed Job Order Contract (JOC Project Number DJ69-DC28.01) between DCHA and Irreno (“Contract”) is for
additional vacant units at DCHA’s Langston Terrace project located at 711 21 Street, SE, Washington, DC. The Contract
will be up to a maximum amount of One Million Four Hundred Ninety-Six Thousand Fifty-Two and 98/00 Dollars
($1,496,052.98). The length of the Contract will be a one year base contract with four optional annual contract
renewals. The scope of work in the Contract contains sufficient details and plans. DCHA will fund the Contract with
funds appropriated by the Council of the District of Columbia in the FY25 Approved Budget and Financial Plan.
3. Legal Revi
ew
The DC
HA Office of the General Counsel (OGC) has reviewed the proposed Contract with Irreno for legal sufficiency.
The review indicates that DCHA followed a competitive process in making the award to Irreno. OGC’s review of the
Contract indicated that it is legally sufficient. In addition, we are not aware of any pending legal claims of Irreno
against DCHA.
The Co
ntract term is not to exceed one year and the Contract will be funded with an allocation from capital funds
appropriated by the Council of the District of Columbia in the District of Columbia FY 2025 Approved Budget and
Financial Plan. Accordingly, the Contract must be submitted to the District Council for review and approval in
accordance with D.C. Code § 2-352.02(a)(1).
APPROVE
D AS TO LEGAL SUFFICIENCY:
Andrea P
owell
Deputy General Counsel
District of Columbia Housing Authority

CERTIFICATION S
I hereby certify that the proposed Job Order Contract Number DJ69-DC28.01 between the District of
Columbia Housing Authority (“DCHA”) and Irreno Construction Company Inc. to provide funding for the
additional vacant units at Langston Terrace located at 711 21ˢᵗ Street, NE, Washington, D.C. in the
amount of One Million Four Hundred Ninety-Six Thousand Fifty-Two and 98/00 Dollars ($1,496,052.98)
from capital funds allocated to DCHA in the Fiscal Year 2025 budget, is in compliance with the
applicable Federal and District of Columbia Regulations and DCHA’s policies and procedures.
____________________________ Dated: February 19, 2025
Keith Pettig
rew
Executive Director, DCHA
I have reviewed this proposed action. DCHA will make available to Irreno Construction Company Inc.
One Million Four Hundred Ninety-Six Thousand Fifty-Two and 98/00 Dollars ($1,496,052.98) to provide
funding for the additional vacant units at Langston Terrace located at 711 21ˢᵗ Street, NE,
Washington, D.C. This action is within the appropriated DCHA budget authority for the Fiscal Year 2025
and is consistent with the financial plan and budget adopted by the District of Columbia and such funds
are available for administration by DCHA in the Fiscal Year 2025 budget.
Dated: February 19, 2025 ______________________________
Heather Mueller
Chief Financial Officer, DCHA

RESOLUTION 19-20
TO AUTHORIZE THE EXECUTION OF MULTIPLE JOB ORDER CONTRACTING
{JOC) CONTRACTS
WHEREAS, Districtof Columbia Housing Authority(‘DCHA’), itsinstrumentalities
and affitiatesrequirea largecapacityofcontractstoaccomplishvariousprojectsfor
repair,alteration,modernization, maintenance, rehabilitation,demolition,construction
andenvironmentalservicesatvariousproperties;
WHEREAS,onApril14,2019,DCHA advertisedanInvitationforBid(‘IFB")inThe WashingtonPost,AfroAmerican,The CurrentNewspaper,The Washingtoninformer,HillRag,ElTiempoLatinoandEastoftheRiver.CopieswereemailedtoallDistrictGovernmentCertifiedBusinessEntitymembersandallDistrictofColumbia
DepartmentofHousingandCommunityDevelopment("DHCD")Section3vendors
WHEREAS, on April15, 2019, SolicitationNo.’s0007-2019, 0008-2019, 0009-
2019, 0010-2019, 0011-2019, 0012-2019, 0013-2019, 0014-2019, 0015-2019, 0016-
2019, 0017-2019, 0018-2019 and 0019-2019 for Job Order Contract (JOC) General
Construction,Electrical,Mechanical, Asbestos Testing & Abatement and Lead Testing
& Abatement for repair, alteration,modernization, maintenance, rehabilitation,
demolitionandconstructionofinfrastructure,buildingsandstructuresbymeansofJob
Orders issued under JOC indefiniteDelivery IndefiniteQuantity (IDIQ)}contracts(“JOC
Contract")was issued to the Department of Smail and Locat Business Development,
bidders interested in doing business with DCHA, posted to the DCHA Website and
issueddirectlytothirteen(13)firms:
WHEREAS,onApril30,2019,DCHA hosteda mandatorypre-bidconference,andseventy-one(71)interestedfirmsattended;
WHEREAS,byMay30,2019,DCHA receivedeighty-seven(87)bids;
WHEREAS,thesolicitationstatedthatmultipleawardswouldbemadetothefirmswithreasonableandcompetitivelybidadjustmentfactorsinaccordancewiththe
requirementsofthesolicitation;limitedtoonlyone(1)awardtoanysingleContractor;
WHEREAS,basedonthebidsandtheresultsofthebidreviewandvalidationprocess,DCHA determinedthatthirteen(13)Contractors:TMG,MiconConstructionInc.,PadulaConstructionCompany,IrrenoConstructionCo.,Inc.,Gonsys,Inc.,Vigil
Contracting,inc.,AutumnGeneralContracting,LLC,Montage,Inc.,CentennialContractors,Mo Construction,© & A Electric,Inc.,RSC Electrical& MechanicalandALL.Merton,Inc.metthereasonableandcompetitivebidrequirementsoftheIFBandqualifiedascapableofprovidingJOCservicesforthetradesbid;and
{0034663-}
RESOLUTION19.20
‘TOAUTHORIZETHEEXECUTIONOFMULTIPLEJOBORDERCONTRACTING(oe)CONTRACTS
WHEREAS, DCHA performed a review of the Federal Systems Award
Management and the District'sExcluded PartiesListon June 18, 2019, and has
determined thatabove listedfirmsdo not appear on thatlist.
NOW, THEREFORE,BE ITRESOLVED,thattheBoardofCommissionersofDistrictofColumbiaHousingAuthorityherebyauthorizestheExecutiveDirectortoexecutethirteen(13)contractsto providerepair,alteration,modernization,maintenance,rehabilitation,demolitionandconstructionofinfrastructure,buildingsandstructuresbymeansofJobOrdersissuedunderJOC IndefiniteDeliveryIndefiniteQuantity(1D1Q)contracts(“JOCContract”)atvariouspropertiesownedbyordoneonbehalfof,theAuthorityoranyofitsinstrumentaiitiesoraffiliates,fora periodofuptofive(5)years,baseduponone(1)baseyearwithfour(4)one-yearoptions,intheminimumaggregateamountofThreeHundredTwenty-FiveThousandDollars$325,000.00nottoexceedthemaximumaggregateamountofThreeHundredEightyMilionDollars$380,000,000.00,subjecttotheavailabilityoffundingasfollows:
LETT ES TT

eens ee Cee I TEST arte CoC Nein ROauNea Ct)
0007-2019| TMG $25,000 $10,000,000|$50,000,000
0007-2019| MiconConstructioninc. $28,000 $10,000,000| $50,000,000
0007-2019| PadulaConstructionCompany $25,000 $10,000,000| $50,000,000
0008-2019|IrrenoConstructionCa.,Ine. $25,000 $7,000,000| $36,000,000
0008-2019| Cansys,Inc. $25,000 $7,000,000| $35,000,000
0009-2012|VigitContracting,inc. |$25,000| $5,090,000| $25,000,000
0008-2019| AutumnGeneralContracting,LLC $28,000 ‘$5,000,000| $25,000,000
0040-2019| Montage,inc. $28,000 $3,000,000| $15,000,000
0010-2019| CentennialContractors "$25,000 $3,000,000$16,000,000
0011-2019|Mo Construction $25,000|$1,000,000|$6,000,000
©0012-2019|G&AEleatrc,nc "$28,000|$6,000,000$25,000,000
0013-2019| NoAward $26,000|$3,000,000| $16,000,000
0014-2019RSC Electrical& Mechanical $25,000 $6,000,000$25,000,000
0014-2019| ALL.Merton,Inc. 25,000 | $5,000,000| $25,000,000
40034663-}
RESOLUTION19-20
TOAUTHORIZETHEEXECUTIONOFMULTIPLEJOBORDERCONTRACTINGWoC}CONTRACTS
(ITN esenters OU amnesic RETDTT aera to Wels So eICMNEIT
0015-2019| NoAward $25,000|$3,000,000| $15,000,000 louse |NoAward |$25,000| $10,000,000S22
joorzere No Award $25,000| $5,000,000| $25,000,000
0018-2019| NoAward leas ier $50,000,000
0019-2019NoAward 21 000 $25.00|828.000 | $6,000, $25,000,000
PROVIDED HOWEVER, that,notwithstandiigthe Maximum Contract Values setforth above, the Executive Directorshall not initiateany work under any contractauthorizedhereunder,unlessthe costof such work isfullyfunded by (i)funds in-hand,and/or(ji)fundscommitted,inwritingbyfinancialinstitutionorgovernmentalauthority,or allocatedby publicbody, and expected to be received before a task order isissued toinitiatesuch work; and
PROVIDEDFURTHER,thatDCHA hason-hand,includingas a partofitsapprovedDistrictandFederalCapitalFundsBudgets,fundsintheaggregateamountofFiftyTwo MillionThirty-FiveThousandDollars($52,035,000.00),fromwhichitexpecttofundworkundercontractsauthorizedherebyforthebalanceofFY 2019:and,inaddition,theCounciloftheDistrictofColumbiahasapprovedanallocationofTwenty-FourMillionFiveHundredThousandDollars($24,500,000.00},ofwhich,DCHA expects$23,500,000.00tobeavailabieinFY2019(DCHAcurrentlyanticipates$6,038,755incapitalfunds,inFY20,fromvarioussources.);and
PROVIDED FURTHER, that this Resolution 19-20 does not authorize theExeoutiveDirector(0initiateanyredevelopment,majorrehabilitation,orother“portfoliotepositioning”without the express authorization of the Board ofCommissioners.
{0034663 -}
ADOPTED, by the Board of Commissioners and signed in open session in
authenticationofthispassageonthis10"dayofJuly2019.

ATTEST: Ze APPROVED:
LF handtbs‘TyroneNariel Y NeilAlbert
ExecutiveDireCtor/Secfétary Chairman

ORM AND LEGAL SUFFICIENCY:

Kenneth S, Slaughter
GeneralCounsel
{0034663-}
Checklistof Documents Included:
Summary Cost Sheet
Noticeto Proceed
Requisition
Wage Determination
ProjectScope of Work
UtilizationCompliance Report
Summary of Cost Project
ID# DJ69-DC28.01
AdditionalVacant Units
at Langston Terrace

Item# DescriptionofTask Value ‘Comments.
1_ | AdditionalVacantUnitsatLangstonTerrace $1,496,052.98]
2 |JOCProgramLicensingFee $30,669.09}

TOTAL $1,526,722.07|
District of Columbia Housing Authority
Job Order/Notice To Proceed (NTP)
Date: Job Order Number:
Contract Number:
Project Number:
Project Name:
PO Number:
January 17, 2025 DJ69-DC28.01
DJ69-DC28.01
Additional Vacant Units at Langston T
errace
DJ69-0008-2019
DC025 - Langston Terrace
Project Location:
Schedule:
Estimated Completion Date:
Contract Duration:
Liquidated Damages: Yes No
Proposed NTP Date:
141 Days
Feb 03, 2025
Jun 23, 2025
Additional Vacant Units at Langston Terrace
Brief Description of W
ork (See Detailed Scope of Work & RFP for contractual requirements:
Job Order Value: $1,496,052.98
Irreno Construction Company Inc
Cito Irreno
Contractor's Home Office:
Cito Irreno
Irreno Construction Company Inc
Contractor's Local Office:
Contractor's Acceptance:
Name Title Date
This Job Order is being issued in accordance with all terms and conditions of DCHA Contract
DJ69-0008-2019. Refer to sections 2-17 of DCHA Job Order Package for related documents.
Permits: Contractor to provide Owner copies of all necessary permits prior to field activities.
DCHA
Approval Signatures:
DateProject Manager Administrator Date
JOC Coordinator Date Contracting Officer Date
Copies: Contractor, DMA, CPA and OFM
JOC Job Order Package - DJ69-DC28.01 1
1/17/2025Job Order Notice To Proceed
VP of Construction
1/17/2025
1/17/25
01/31/2025
01/31/2025

Districtof Columbia Housing Authority

Job Order Contracting (JOC) Program
Additional Vacant Units at Langston Terrace
Project Number: DJ69-DC28.01
Project Manager: LaTrice Browning

JOC Job Order Package - DJ69-DC28.01

DistrictofColumbiaHousingAuthority

Wage Determination
sl
DatePrepared: 71812024
ProjectNumber: DJ69-D628.01
ProjectName: ‘AdditionalVacantUnitsatLangstonTerrace
ProjectLocation:LangstonTerrace
ProjectManager. ——_LaTriceBrowning
‘Thewagedeterminationforthisjoborderis:
Residential
Explanation,asnecessary:

JOC Job Order Package DJ69-DC28.01
WageDetermination
DistrictofColumbiaHousingAuthority
3007thStreet,SW |10thFloor
Washington,DC 20024
(202)535-1000|dchousing.org

KeithL.Pettigrew,ExecutiveDirector
ContractsAdministration¢ComplianceDivision
WAGE DECISIONREQUEST
TO:— ContractCompliance Division
FROM:LaTriceBrowning DATE:6/25/2024
INSTRUCTIONS:Pleasecompletethisformbyfirstplacingacheck(v)besideAiftherequestisforaconstructioncontractorBiftherequestisforaservicecontract.Thenplaceacheck(\)besidetheappropriateactivityundertherespectivecategory;andfillinallothercorrespondinginformation.Itisveryimportantthatyoucompletethelastsentenceattheendofthecategory,inorderthatthewagedecisionissuedmaybekeptcurrent.CONTRACT/SOLICITATION/PURCHASEORDERNO.DJ69-DC28.01AdditionalVacantUnitsatLangstonTerrace{X}A.Construction Contract$2,000plus{}1.demolitionofstructureslocatedat{}@)commercialorhigh-riseresidential{}(b)low-riseresidential{X}2.construction,alteration,repairorremodelingof:(3@) low-riseresidentialunitslocatedatLangstonTerrace{3(b)commercialfacilityorhigh-riseresidentialunitslocatedat

{}© siteimprovementslocatedat{} @) sewer/water linelocatedat
{} (©)others(specify),
{ }B.Serviee Contraet$2,500plus,{}1.locatedat,{}2.others(specify)
{JThesedeterminations:_DC20230003 withmodification_1 are
correctforthiscontractNo. DJ69-DC28.0"
{}ThisdeterminationsNo: tobeusedforthiscontract,
butmaybechangeduponrequestforCCD.
‘WageDecisionRequestexpirationdate
Chughtome“oe 6/27/2024,‘ContractingOfficer Date
TiffanyJohnsonsigned2024626
DCH committedtoprovidingequalaccesstotiseventforallparticipants6residentswithdisabilities.IfyouneedareasonableaccommodationpleasecontactourADA/SO4DepartmentatADASC4@dchousing.orgwithyourcompleterequest.Ifyouneedasignlanguageorforeignlanguageinterpreter,pleasegotodchousing.org/languageorcll
a Fieasealiowatieast3businessdaystomakethenecessaryarrangements,

3725/24,1:00AM SAM.gov
"GeneralDecisionNumber:02623000301/13/2023,
SupersededGeneralDecisionNumber:0C20220003
State:DistrictofColumbia
ConstructionType:Residential
County:DistrictofColumbiaStatewide.
RESIDENTIALCONSTRUCTIONPROJECTS(consistingofsinglefamilyhomesandapartmentsuptoandincluding4 stories).
Note:ContractssubjecttotheDavis-BaconActaregenerallyrequiredtopayatleasttheapplicableminimumwageraterequiredunderExecutiveOrder14026orExecutiveOrder13658.PleasenotethattheseExecutiveOrdersapplytocoveredcontractsenteredintobythefederalgovernmentthataresubjecttotheDavis-BaconActitself,butdonotapplytocontractssubjectonlytotheDavis-BaconRelatedActs,includingthosesetforthat29CFR5.1(a)(2)-(6@).
]Ifthe contract isentered |.
[intoon or afterJanuary30, ||2022,or the contractis |
[renewedor extended(e.g.,an |.The contractormust pay
Joptionisexercised)onor | allcoveredworkersatlafterJanuary30, 2022: | least$16.20per hour (or
I
|
|
|
|
generallyappliestothecontract.
theapplicablewageratelistedonthiswagedetermination,ifitishigher)forallhoursspentperformingonthecontractin2623.

|TFthecontractwasawardedon|.ExecutiveOrder13658lorbetweenJanuary1,2015and|generallyappliestothe|3anuary29, 2022,and the | contract.
Icontractisnotrenewedor |.Thecontractormustpayalllextendedon or afterJanuary | coveredworkersat least[3@,2022: | $12.15perhour(orthe| applicablewageratelisted| onthiswagedetermination,
I
I
|

ifitishigher)forallhoursspentperformingon‘thatcontractin2623.
TheapplicableExecutiveOrderminimumwageratewillbeadjustedannually.IfthiscontractiscoveredbyoneoftheExecutiveOrdersanda classificationconsiderednecessaryforperformanceofworkonthecontractdoesnotappearonthiswagedetermination,thecontractormuststillsubmitaconformancerequest.
AdditionalinformationoncontractorrequirementsandworkerprotectionsundertheExecutiveOrdersisavailableathttp://www.dol.gov/whd/govcontracts.
ModificationNumber PublicationDate@ 01/06/20231 01/13/2023,
hitps:/tsamgoviwage-determination/de20230003/1 16
3/25/24,11:00AM SAMgov
‘ASBEOO24-00804/01/2021
Rates Fringes
ASBESTOSWORKER:HAZARDOUSMATERIALHANDLER. «$24.46 8.6948
Includespreparation,wetting,stripping,removal,scrapping,vacuuming,bagginganddisposingofallinsulationmaterials,whethertheycontainasbestosornot,frommechanicalsystems
a.PAIDHOLIDAYS:NewYear'sDay,MartinLutherKingDay,MemorialDay,IndependenceDay,LaborDay,Veterans’Day,ThanksgivingDay,thedayafterThanksgivingandChristmasDayprovidedtheemployeeworkstheregularworkdaybeforeandafterthepaidholiday.

* ELEVe@10-0101/01/2023
Rates Fringes
ELEVATORMECHANIC. -$52.49 37.335+a+b
‘a.PAIDHOLIDAYS:NewYear'sDay,MemorialDay,IndependenceDay,LaborDay,Veterans’Day,ThanksgivingDay,ChristmasDayandtheFridayafterThanksgiving.
b.VACATIONS:Employercontributes8%ofbasichourlyratefor5 yearsormoreofservice;6%ofbasichourlyratefor6 monthsto5 yearsofserviceasvacationpaycredit.

PLUM@@05-2908/01/2015
Rates Fringes
PLUMBER... ceeeeeeeS 26.41 9.86+a

‘a.PAIDHOLIDAYS:LaborDay,Veterans’Day,ThanksgivingDayandthedayafterThanksgiving,ChristmasDay,NewYear'sDay,MartinLutherKing'sBirthday,MemorialDayandtheFourthofJuly.

PLUM@602-@0908/01/2022
Rates Fringes
PIPEFITTER(HVACPipeInstallation).....ceeeeeeeeeeeeee$47.98 23.20+a
a.PAIDHOLIDAYS:NewYear'sDay,MartinLutherKing'sBirthday,MemorialDay,IndependenceDay,LaborDay,Veterans’Day,ThanksgivingDayandthedayafterThanksgivingandChristmasDay.

* suDC2009-0045/27/2009
Rates Fringes
BRICKLAYER. «$20.71 0.00
hitps:/tsamgoviwage-determination/de20230003/1
3/25/24,11:00AM SAMgov
CARPENTER,IncludingDrywallHanging.seseeeeeeeeeeeeeeereeeees$17643 2.37
CEMENTMASON/CONCRETEFINISHER...$18.72 2.08
DRYWALLFINISHER/TAPER. -$15.00** 0.00
ELECTRICIAN -$19.93 3.41
LABORER:CommonorGeneral......$12.54** 0.08
LABORER:MasonTenderforpointing,caulking,cleaningofexistingmasonry,brick,stoneandcementstructures(restorationwork);excludespointing,caulkingandCleaningofneworreplacementmasonry,brick,stoneandcement......sseeeeeeeee$12,59**
PAINTER:BrushandRoller.......$15.32** 5.15
POINTER,CAULKER,CLEANER,Includespointing,caulking,cleaningofexistingmasonry,brick,stoneandcementstructures(restorationwork);excludespointing,caulking,cleaningofneworreplacementmasonry,brick,stoneorCOMME.eeeeeeeeeeeeeeeeeeecees$18.33
ROOFER. -$26.33 0.00
SHEETMETALWORKER......020-00++-$18.33 0.08

WELDERS- Receiverateprescribedforcraftperformingoperationtowhichweldingisincidental.

**Workersinthisclassificationmaybeentitledtoa higherminimumwageunderExecutiveOrder14026($16.20)or13658($12.15).PleaseseetheNoteatthetopofthewagedeterminationformoreinformation.
Note:ExecutiveOrder(£0)13706,EstablishingPaidSickLeaveforFederalContractorsappliestoallcontractssubjecttotheDavis-BaconActforwhichthecontractisawarded(andanysolicitationwasissued)onorafterJanuary1,2017.IfthiscontractiscoveredbytheEO,thecontractormustprovideemployeeswith1 hourofpaidsickleaveforevery30hours‘theywork,upto56hoursofpaidsickleaveeachyear.Employeesmustbepermittedtousepaidsickleavefortheirownillness,injuryorotherhealth-relatedneeds,includingpreventivecare;toassista familymember(orpersonwhoislikefamilytotheemployee)whoisill,injured,orhasotherhealth-relatedneeds,includingpreventivecare;orforreasonsresultingfrom,ortoassista familymember(orpersonwhoisLikefamilytotheemployee)whoisa victimof,domesticviolence,sexualassault,orstalking.Additionalinformation
hitps:/tsamgoviwage-determination/de20230003/1
3725/24,1:00AM SAM.gov
oncontractorrequirementsandworkerprotectionsunderthe£0isavailableathttps://www.dol.gov/agencies/whd/government-contracts.
Unlistedclassificationsneededforworknotincludedwithin‘thescopeoftheclassificationslistedmaybeaddedafterawardonlyasprovidedinthelaborstandardscontractclauses(29CFR5.5 (a)(1)(44))-

Thebodyofeachwagedeterminationliststheclassificationandwageratesthathavebeenfoundtobeprevailingforthecitedtype(s)ofconstructionintheareacoveredbythewagedetermination.Theclassificationsarelistedinalphabetical
orderof “"identifiers""thatindicatewhethertheparticularrateisa unionrate(currentunionnegotiatedrateforlocal),a surveyrate(weightedaveragerate)ora unionaveragerate(weightedunionaveragerate).

UnionRateIdentifiers
A fourletterclassificationabbreviationidentifierenclosedindottedlinesbeginningwithcharactersotherthan""SU""or'UAVG""denotesthattheunionclassificationandratewereprevailingforthatclassificationinthesurvey.Example:PLUM@198-@05@7/@1/2014.PLUMisanabbreviationidentifierof‘theunionwhichprevailedinthesurveyforthisclassification,whichinthisexamplewouldbePlumbers.0198indicatesthelocalunionnumberordistrictcouncilnumberwhereapplicable,i.e.,PlumbersLocal@198.Thenextnumber,@@5intheexample,isaninternalnumberusedinprocessing‘thewagedetermination.07/01/2014istheeffectivedateofthemostcurrentnegotiatedrate,whichinthisexampleisJuly1,2614.

Unionprevailingwageratesareupdatedtoreflectallratechangesinthecollectivebargainingagreement(CBA)governingthisclassificationandrate.
SurveyRateIdentifiers
Classificationslistedunderthe""SU""identifierindicatethatnoonerateprevailedforthisclassificationinthesurveyandthepublishedrateisderivedbycomputinga weightedaverageratebasedonalltheratesreportedinthesurveyforthatclassification.Asthisweightedaveragerateincludesallratesreportedinthesurvey,itmayincludebothunionandnon-unionrates.Example:SULA2@12-0075/13/2014.SUindicatestheratesaresurveyratesbasedona weightedaveragecalculationofratesandarenotmajorityrates.LAindicates‘theStateofLouisiana.2012istheyearofsurveyonwhich‘theseclassificationsandratesarebased.Thenextnumber,007intheexample,isaninternalnumberusedinproducingthewagedetermination.5/13/2014indicatesthesurveycompletiondatefortheclassificationsandratesunderthatidentifier.
Surveywageratesarenotupdatedandremainineffectuntilanewsurveyisconducted.
UnionAverageRateIdentifiers
Classification(s)listedundertheUAVGidentifierindicate
hitps:/tsamgoviwage-determination/de20230003/1
3725/24,1:00AM SAM.gov
thatnosinglemajorityrateprevailedforthoseclassifications;however,100%ofthedatareportedfortheclassificationswasuniondata.EXAMPLE:UAVG-OH-@0108/29/2014.UAVGindicatesthattherateisa weightedunionaveragerate.OH indicatesthestate.Thenextnumber,0010in‘theexample,isaninternalnumberusedinproducingthewagedetermination.08/29/2014indicatesthesurveycompletiondatefortheclassificationsandratesunderthatidentifier.
A UAVGratewillbeupdatedoncea year,usuallyinJanuaryofeachyear,toreflecta weightedaverageofthecurrentnegotiated/CBArateoftheunionlocalsfromwhichtherateisbased.

WAGEDETERMINATIONAPPEALSPROCESS
1.)Hastherebeenan initialdecisioninthematter?Thiscanbe:
* anexistingpublishedwagedetermination* a surveyunderlying2 wagedetermination* a WageandHourDivisionlettersettingfortha positionona wagedeterminationmatter* a conformance(additionalclassificationandrate)ruling
Onsurveyrelatedmatters,initialcontact,includingrequestsforsummariesofsurveys,shouldbewiththeWageandHourNationalOfficebecauseNationalOfficehasresponsibilityfor‘theDavis-Baconsurveyprogram.Iftheresponsefromthisinitialcontactisnotsatisfactory,thentheprocessdescribedin2.)and3.)shouldbefollowed.
Withregardtoanyothermatternotyetripefortheformalprocessdescribedhere,initialcontactshouldbewiththeBranchofConstructionWageDeterminations.Writeto:
BranchofConstructionWageDeterminationsWageandHourDivisionU.S.DepartmentofLabor208ConstitutionAvenue,N.W.Washington,DC2021
2.)Iftheanswertothequestionin1.)isyes,thenaninterestedparty(thoseaffectedbytheaction)canrequestreviewandreconsiderationfromtheWageandHourAdministrator(See29CFRPart1.8and29CFRPart7).Writeto:
WageandHourAdministratorU.S.DepartmentofLabor288ConstitutionAvenue,N.W.Washington,DC20216
Therequestshouldbeaccompaniedbya fullstatementoftheinterestedparty'spositionandbyanyinformation(wagepaymentdata,projectdescription,areapracticematerial,etc.)thattherequestorconsidersrelevanttotheissue.
3.)Ifthedecisionof theAdministratorisnotfavorable,aninterestedpartymayappealdirectlytotheAdministrativeReviewBoard(formerlytheWageAppealsBoard).Writeto:
hitps:/tsamgoviwage-determination/de20230003/1
3/25/24,11:00AM SAM.gov
AdministrativeReviewBoardU.S.DepartmentofLabor208ConstitutionAvenue,N.W.Washington,DC20216
4.)AlldecisionsbytheAdministrativeReviewBoardarefinal.

ENDOF GENERALDECISIO"
hitps:/tsamgoviwage-determination/de20230003/1

wae
Districtof Columbia Housing Authority

Detailed Scope of Work
Sea

Date: July03,2024Contractor: ImenoConstructionCompanyInc
ProjectNo. Dy69-0628.01
ProjectName: AdditionalVacantUnitsatLangstonTerrace
Location: LangstonTerrace
Preliminary Revised X| Final

DetailedScopeofWork
Refertotheattacheddocumentstitled:SCOPEOFWORK pages:1-11.titled:SCOPEOFWORK (Irreno).Dated:6/13/2024,Pages:1-10.
PleasereferencetheRequestforProposalforadditionalinformationregardingthisjoborder.DCHARepresentative:

71914
ProjectManager Date
Contractor'sAcceptance:‘TheundersignedhasreviewedthisscopeofworkandagreesthatthisdocumentinconjunctionwiththeRFPconstitutestheScopeofWorkinitsentirety
Aw pure VP ofConstruction 71812024
Gfeme Title Date

JOC Job Order Package DJ69-DC28.01 7
DetailedScopeofWork Pagetof1‘7rer2024

DistrictofColumbiaHousingAuthority
3007thStreet,SW|10thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

SCOPE OF WORK
|. SUMMARY OF WORK
IrrenoConstructionCo.,Inc.shallprovidelabor,material,equipment,andpreoccupancyclearancereportsin23VacantwalkupsandtownhomeslocatedinLangstonTerraceproperty.Renovatevacantunitsintomakereadiesunittobeoccupiedbyfuturetenants.ThefollowingproposaltakesintoconsiderationpreviousproposalssubmittedtoDCHAtoensureallmakereadiesareabated,renovated,andcleared.Duetoexistingconditions,thereare3tierthatmayapplytoaunit:Heavy,Medium,andLightthatarereferencedbelow(Exhibit1)
Includesthefollowingaddresses:
2103 G ST NE #4
707 24TH ST NE #106
70924THSTNE#11711 24TH ST NE #123
2301 H ST NE #140
2210HSTNE#147
740 Langston Ter NE
728 Langston Ter NE
726 Langston Ter NE
10. 724 Langston Ter NE
11,722LangstonTerNE12. 718 Langston Ter NE
13. 714 Langston Ter NE
14,712LangstonTerNE
15. 711 21ST ST NE #198
16.71121STSTNE#19917. 711 21ST ST NE #200
18. 711 21STST NE #202
19. 718 21ST ST NE #227
20.71621STSTNE#23221. 716 21ST ST NE #235
22. 715 Langston Terr NE
23,713LangstonTerNE
PRN OV aN
ll. WORK DESCRIPTION
DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

01 General Requirements: (APPLICABLE TO ALL UNITS)
1.AllsystemsmustmeetallapplicableDistrictofColumbiaCodesandRegulations.
2.AllWorkmustbeexecutedperthegeneraltermsandconditionsofthespecifiedJOCcontract.3.Contractorshallremove/encapsulatehazardouscontai
DCHA requirements.
4.Contractorshallprovideclearancereportsdocumentingabatementofhazardousmaterials.5. Provide new 18-CY dump trucksforsixmonths to dispose of construction waste and debris
throughoutconstruction.
6.Provideone(1)finalpost-constructioncleanup.7.Newvinylcompositetile(VCT)flooringshallbewaxedwithoneclearcoat.
8. ICCIwillprovideafinalleadwipetesttoprovidepre-occupancyclearancereport.
9,ICCItoprovideequipment’sbasedonDCHAstandardsbookand/orapprovedsubmittals.10.Includestheremovalofprevioustenant'spersonalbelongingspriortoconstruction.
11. Includesand Owner Controlled allowance of $79,985.29 for unforeseen conditions.

1gmaterialsproperlyperDDOEand
02 LightScopeofWork:5Units
02ExistingConditions:
1.Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.
2.Removeexistingplumbing,includingbathtubsandfixtures.
3. Remove toiletaccessories.4. Removeexistinginteriordoorsandassociatedhardware.
5.Removeexistingwoodwallbaseonallflooring.
6.Removalofexistingceramicflooringandbaseinbathroom.7.Removeexistingwindowtreatments.

06Wood,Plastics,andComposites:
1. ProvidenewprimedwoodClosetshelvingandclothesrodsasneeded.
2. FurnishandInstall36”x36”stainlesssteelgreaseshieldsabovenewranges.
3. FurnishandInstall4”primed-wood,square,straight-edgewallbasealongwithprimed-wood
quarter-roundmolding.
08Openings:
1.Furnishandinstallnewpre-hung,primedwood,solidcoreinteriordoorsalongwithnew
residentiallocksets.
DistrictofColumbiaHousingAuthority
3007thStreet,SW|10thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

2.Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframeto
accommodatenewdoor.
09Finishes1. ICCIshallprovidepointupandlevel4finishestoareasnecessary.
2.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewceilings,walls,doors,door
framesandcasing,andwoodbasetrim.
10Specialties:
1.Providelimitedbathroomaccessories,including:one(1)showercurtainrodone(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoapdish.
2.Metalwrapsallwindowscasingandsills.
15Equipment:
1. Provideone(1)new:electricalrange,non-ductedhoodinwhite.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22Plumbing:
1. Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.
15Mechanical
1. Allexistingradiatorstohavetheircoversremovedandcleanedasneeded.ICIisnot
responsibleforprovidingmissingradiatorcovers.
26Electrical:
1. Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates
3. Alldevicesandcoverplatesshouldbewhiteonwhite.
4. Providenewlightfixturesreusingexistingtoremaincircuitsandwiring.Newlightfixturesshall
consistof:
a) Kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom:one(1)new14”roundLEDfixture.
©) Hallway:one(1)new14”roundLEDfixture.
d) Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.
e) LivingRoom:nolightfixtures.

5. Replaceexistingsmokedetectorswithcombinationsmoke/CO2detectors.
DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

6. Providenecessarywiringtoensurerangesareonaseparatecircuit.
7.Surfacemountedoutletforrefrigeratorifapplicable.
8, NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.
03-MediumScopeofWork:5Units
02ExistingConditions:
1.Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.
2.Removeexistingflooring.3.Removeexistingkitchenandbathroomcabinetryandcountertops.
4, Removeexistingplumbing,includingbathtubsandfixtures.
5. Remove toiletaccessories.6. Removeexistinginteriordoorsandassociatedhardware.
7. Removeexistingentrydoorsandassociatedhardware.
8 Removeexistingbathroomwalltileandgypsumboardwallsurrounds.9. Removeexistingwoodwallbaseonallflooring.
10.Removalofexistingceramicflooringandbaseinbathroom.
11,Removeexistingwindowtreatments.

06Wood,Plastics,andComposites:
1.ProvidenewprimedwoodClosetshelvingandclothesrodsasneeded.2.Furnishandinstallnewbathroomvanitysinglecabinetswithmarbletop
3.Furnishandinstallapproximately12-LFofnewAdvanta,orequal,kitchenbaseandwallcabinetry,withnopullhardware.
4, FurnishandInstall36”x36”stainlesssteelgreaseshieldsabovenewranges.
5.Furnishandinstall4”primed-wood,square,straight-edgewallbasealongwithprimed-woodquarter-roundmolding.

08Openings:
1. Furnishandinstallnewpre-hung,pi
residentiallocksets.
2. Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframeto
accommodatenewdoor.
3. Additionofallowanceoftwo(2)newwindowassembliesperunittocoverrepairsand
replacements.

1edwood,solidcoreinteriordoorsalongwithnew
09finishes:1. ICC!shallprovide heavy point up and level4finishes to areas necessary.
2.Allnewfinishestolevel-4andwallsprimed.
DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

3.Providenew1/2”moisture-resistantgypsumboardinthebathroomandshallbefinishedtoa
Level4finishedatexposedareas.
4,Applyonecoatof1/8”cementitious,self-levelingcompoundoverexistingtoinstallnewVCT.5. flooring.
6. Provide new 12”x12” VCT flooringin bedroom and common areas.
7. Provide new 2"x2” Daltilefloorceramic tileand 4” cove base tilein bathrooms. New 1/8” tile
jointsshallbegroutedwithun-sandedgrout.
8.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewceilings,walls,doors,doorframesandcasing,andwoodbasetrim.
9.Applynew“popcorn”texturedpaintonallceilings.10. Apply 1/4” siliconeon new plumbing fixturesand

‘hencountertops.
10Specialties:
1. Providenewtoiletandbathaccessories,including:one(1)showercurtainrod;one(1)medicine
cabinetwithmirror;one(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoapdish.
2.Furnishandinstallnewsolidsurfacecountertops(1/2”)withplywoodbackingandintegral
backsplash.3.Metalwrapallwindowsca

iandsills
14Equipment:
1. Provide one (1)new: electricalrange, non-ducted hood inwhite.
2.Provideone(1)plug-insinkgarbagedisposal.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22—Plumbing:
Provideone(1)newkitchenstainlesssteelsinkandone(1)chromefaucet.
Provideone(1)newbathroomlavatorysinkandlavatoryfaucet.Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.
Installnewshutoffvalveswithaccesspoints.Installationof new angle stop valves at the vai
vaene iesandkitchenfaucets.

12Mechanical
DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

1. Allexistingradiatorsto have theircovers removed and cleaned as needed. ICCIisnot
responsibleforprovidingmissingradiatorcovers.

26 Electrical
1.Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates3.Alldevicesandcoverplatesshouldbewhiteonwi
4, Providenewlightfixturesreusingexistingtoremaincircuitsandwiring.Newlightfixturesshall
consistof:a) Kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom: one (1)new 14” round LED fixture.
©) Hallway:one(1)new14”roundLEDfixture.d) Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.
€) LivingRoom:nolightfixtures.

5. Replaceexistingsmokedetectorswithcombinationsmoke/CO2detectors.
6. Providenecessarywiringtoensurerangesareonaseparatecircuit.7.Surfacemountedoutletforrefrigeratorifapplicable
8 NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.
04 -HeavyScopeofWork:13Units
1.Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.
2.Removeexistingflooring.
3.Removeexistingkitchenandbathroomcabinetryandcountertops.4, Removeexistingplumbing,includingbathtubsandfixtures.
5. Remove toiletaccessories.
6. Removeexistinginteriordoorsandassociatedhardware.7.Removeexistingentrydoorsandassociatedhardware.
8 Removeexistingbathroomwalltileandgypsumboardwallsurrounds.
9. Removeexistingwoodwallbaseonallflooring.10.Removalofexistingceramicflooringandbaseinbathroom.
11,RemoveBiohazardwhereexisting.
12,Removeexistingwindowtreatments.

06Wood,Plastics,andComposites:
1. Providenew primedwoodClosetshelvingandclothesrodsasneeded.

DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

2.Furnishandinstallnewbathroomvanitysinglecabinetswithmarbletop.
3.Furnishandinstallapproximately12-LFofnewAdvanta,orequal,kitchenbaseandwall
cabinetry,withnopullhardware.4, FurnishandInstall36”x36”stainlesssteelgreaseshieldsabovenewranges.
5.Furnishandinstall4”primed-wood,square,straight-edgewallbasealongwithprimed-wood.
‘a.quarter-roundmolding.
08Openings:
1.Furnishandinstallnewpre-hung,primedwood,solidcoreinteriordoorsalongwithnewresidentiallocksets.
2.Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframeto
accommodatenewdoor.3.Additionofallowanceoftwo(2)newwindowassembliesperunittocoverrepairsand
replacements.
09Finishes:1.ICCIshallfurnishandinstallthefollowingnewpartitionsinwetwallslocatedinbathroomsand
kitchen:
a. Perimeterhat-channelsupportsnewgypsumboardwalls.
b.New2%"studwallpartitionstomatchexistinglayout.c. New%”drywallwallsasneededthroughouttheentirespace.
d Allnewfinishestolevel-4andwallsprimed.
e. Providenew1/2”moisture-resistantgypsumboardinthebathroomandshallbe
finishedtoaLevel4finishedatexposedareas.
2.Applyonecoatof1/8”cementitious,self-levelingcompoundoverexistingtoinstallnewVCTflooring.
3. Provide new 12”x12” VCT flooringin bedroom and common areas
4, Providenew2”x2”Daltilefloorceramictileand4”covebasetileinbathrooms.New1/8”tilejointsshallbegroutedwithun-sandedgrout.
5.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewceilings,walls,doors,door
framesandcasing,andwoodbasetrim.Apply new “popcorn” textured painton allceilings.
7.Apply1/8"siliconeonnewplumbingfixturesandkitchencountertops.
10Specialties:
DistrictofColumbiaHousingAuthority
3007thStreet,SW|1thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

1.Providenewtoiletandbathaccessories,including:one(1)showercurtainrod;one(1)medicine
cabinetwithmirror;one(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoap
dish,2.Furnishandinstallnewsolidsurfacecountertops(1/2”)withplywoodbackingandintegral
backsplash.
3.Metalwrapallwindowscasingandsills
11Equipment:
1.Provideone(1)new:electricalrange,non-ductedhoodinwhite2.Provideone(1)plug-insinkgarbagedisposal.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22Plumbing:
1.Provideone(1)newkitchenstainlesssteelsinkandone(1)chromefaucet.Provideone(1)newbathroomlavatorysinkandlavatoryfaucet.
Providenew60-in.bakedenamelbathtubs.Providenewdrainandtrapassembly.
Providenewfiberglassbathtubsurroundwalls.Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.
Installnewshutoffvalveswithaccesspoints
Installationofnewanglestopvalvesatthevanitiesandkitchenfaucets.
Noyaen
12Mechanical
1. Allexistingradiatorstohavetheircoversremovedandcleanedasneeded.ICCIisnot
responsibleforprovidingmissingradiatorcovers.
26Electrical:
1. Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates
3. Alldevicesandcoverplatesshouldbewhiteonwhite.
4, Providenewlightfixturesreusingexistingtoremaincircuitsandwiring.Newlightfixturesshall
consistof:
a) kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom:one(1)new14”roundLEDfixture.
©) Hallway:one(1)new14”roundLEDfixture,

DistrictofColumbiaHousingAuthority
3007thStreet,SW|10thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

4) Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.
e) LivingRoom:nolightfixtures.
5.Replaceexistingsmokedetectorswithcombinationsmoke/CO2detectors.6. Providenecessarywiringtoensurerangesareonaseparatecircuit.
7.Surfacemountedoutletforrefrigeratorifapplicable.
8. NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.

05—StormDoors& Railings
1. Replaceandorrepairexistingscreendoorsintownhomesto makethemoperable.
2. Provideriskassessmentofexistinginteriorandexteriorhandrails.
3. Preprailingsfornewpaint.
4. Primeandpaintallinteriorandexteriorrailings.
06-Biohazard
1. Provideproperprotection,negativeair,anddeodorizersforhumanbiohazardwasteremoval.
2. Properlyremoveanddisposeofexistinghumanwaste.
DistrictofColumbiaHousingAuthority
3007thStreet,SW|10thFloor
Washington,0¢20024(202)85-1000|dchousingog
KeithL.Pettigrew,ExecutiveDirector

RenovationSeverityDescription:
HeavyRenovation:
Heavyrenovationsincludedemolitionoftheentirebathroomandkitchen,flooring,andopenings.Unitswillreceivenewpartitionwetwallsbetweenthebathroomandkitchen,newflooring,newopenings,anallowanceoftwonewwindowsperunit,heavypointup,level4finishes,windowmetalwraps,newtexturedceiling,newpaint,all-inclusivebathroom,andkitchens,Newelectricalrangeandnon-ductedhoodonly.(Seespecificdetailsabove)IndustrialHygienisttoincludeclearancereport.
MediumRenovation:
Mediumrenovationsincludedemolitionofkitchencabinets,interiorandexteriordoors,replaceshowerdivertersonly,minorpointup,twocoatsofpaint,newtexturedceilings,windowmetalwraps,new
kitchencabinets.Bathroomtoremain.Newelectricalrangeonly.IndustrialHygienisttoincludeclearancereport.
LightRenovation:
Lightrenovationincludesdemolitionofopenings.Bathroomandkitchentoremain.Replaceallinteriordoors,twocoatsofpaint,newtexturedceiling,newmetalwraps,newshowerdiverteronly.Newelectricalrangeonly.IndustrialHygienisttoincludeclearancereport.
ICCI

June13",2024
SCOPE OFWORK
1. PROJECTOVERVIEW
A. ProjectInformationLangstonTerraceVacantMakeReadies
B.ProjectLocationLangstonTerrace71121*NEWashingtonDC20002
C. PartiesContractor’isIrrenoConstructionCo.,Inc.(ICC!)“Owner’istheDistrictofColumbiaHousingAuthority(OCHA)
ll, SUMMARY OF WORK
IrrenoConstructionCo.,Inc.shallprovidelabor,material,equipment,andpreoccupancyclearancereportsin23VacantwalkupsandtownhomeslocatedinLangstonTerraceproperty.Renovatevacantunitsintomakereadiesunittobeoccupiedbyfuturetenants.ThefollowingproposaltakesintoconsiderationpreviousproposalssubmittedtoDCHAtoensureallmakereadiesareabated,renovated,andcleared.Duetoexistingconditions,thereare3tierthatmayapplytoaunit:Heavy,Medium,andLightthatarereferencedbelow(Exhibit1)
Il, WORK DESCRIPTION

01 GeneralConditions
01 GeneralRequirements:(APPLICABLETOALLUNITS)
1. Providenew18-CYdumptrucksforsixmonthstodisposeofconstructionwasteanddebris
‘throughoutconstruction.
Provideone(1)finalpost-constructioncleanup.
Newvinylcompositetile(VCT)flooringshallbewaxedwithoneclearcoat.
ICIwillprovidea finalleadwipetesttoprovidepre-occupancyclearancereport.
ICItoprovideequipment’sbasedonDCHAstandardsbookand/orapprovedsubmittals.
Removeprevioustenantpersonalbelongingspriortoconstruction.
ICIwillhaveanallowanceof$79,985.29forunforeseenconditions.
Noyawn
02 LightScopeofWork:5Units
02ExistingConditions:
Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.Removeexistingplumbing,includingbathtubsandfixtures.
Remove toiletaccessories.
Removeexistinginteriordoorsandassociatedhardware.Removeexistingwoodwallbaseonallflooring.
Removalofexistingceramicflooringandbaseinbathroom.Remove existingwindow treatments.
NOUR eM
cal
06Wood,Plastics,andComposites:1.ProvidenewprimedwoodClosetshelvingandclothesrodsasneeded.
2.FurnishandInstall36”x36”stainlesssteelgreaseshieldsabovenewranges.
3.FurnishandInstall4”primed-wood,square,straight-edgewallbasealongwithprimed-woodquarter-round molding.
08Openings:1.Furnishandinstallnewpre-hung,primedwood,solidcoreinteriordoorsalongwithnew
residentiallocksets.
2.Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframetoaccommodatenewdoor.
09 Finishes
1.ICC!shallprovidepointupandlevel4finishestoareasnecessary.2.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewc
framesandcasing,andwoodbasetrim.
is,walls,doors,door
10Specialties:
1.Providelimitedbathroomaccessories,including:one(1)showercurtainrodone(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoapdish.
2.Metalwrapsallwindowscasingandsills.
15Equipment:
1.Provideone(1)new:electricalrange,non-ductedhoodinwhite.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22Plumbing:
1. Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.
15Mechanical
1. Allexistingradiatorstohavetheircoversremovedandcleanedasneeded.ICIisnot
responsibleforprovidingmissingradiatorcovers.
26Electrical:
1, Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates
3. Alldevicesandcoverplatesshouldbewhiteonwhite.
4. Providenewlightfixturesreusingexistingtoremaincircuitsandwi
consistof:
a) kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom:one (1)new14”roundLEDfixture.
) Hallway:one(1)new14”roundLEDfixture.
d) Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.
e) LivingRoom:nolightfixtures.

cal
eno
Replaceexistingsmokedetectorswithcombinationsmoke/CO?detectors.
Providenecessarywiringtoensurerangesareonaseparatecircuit.Surfacemountedoutletforrefrigeratorifapplicable.
NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.

03— MediumScopeofWork:5Units
02ExistingConditions:
PON aVawene
10.Removalofexistingceramicflooringandbas
Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.
Remove existing flooring.
ingkitchenandbathroomcabinetryandcountertops.
ingplumbing,includingbathtubsandfixtures.
Remove toiletaccessories.
Removeexistinginteriordoorsandassociatedhardware.Removeexistingentrydoorsandassociatedhardware.
Removeexistingbathroomwalltileandgypsumboardwallsurrounds.Remove existingwood wall base on allflooring.
inbathroom.

11.Removeexistingwindowtreatments.
06Wood,Plastics,andComposites:
1.ProvidenewprimedwoodClosetshelvingandclothesrodsasneeded.2.Furnishandinstallnewbathroomvanitysinglecabinetswithmarbletop
3.Furnishandinstallapproximately12-LFofnewAdvanta,orequal,kitchenbaseandwall.
cabinetry,withnopullhardware.4. FurnishandInstall36’x36”stainlesssteelgreaseshieldsabovenewranges.
5.FurnishandInstall4”primed-wood,square,straight-edgewallbasealongwithprimed-wood
quarter-roundmolding.
08Openings:
1.Furnishandinstallnewpre-hung,primedwood,solidcoreinteriordoorsalongwithnewresidentiallocksets.
2.Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframeto
accommodatenewdoor.3.Additionofallowanceoftwo(2)newwindowassembliesperunittocoverrepairsand
replacements.
09finishes:
1.ICIshallprovideheavypointupandlevel4finishestoareasnecessary.2.Allnewfinishestolevel-4andwallsprimed.
3.Providenew1/2"moisture-resistantgypsumboardinthebathroomandshallbefinishedtoa
Level4finishedatexposedareas.4. Applyonecoatof1/8”cementitious,self-levelingcompoundoverexistingtoinstallnewVCT.
5. flooring.
6.Providenew12"x12"VCTflooringinbedroomandcommonareas.
cal

7. Provide new 2”x2” Daltilefloorceramic tileand 4” cove base tilein bathrooms. New 1/8” tile
jointsshallbegroutedwithun-sandedgrout.
8.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewceilings,walls,doors,doorframes and casing,and wood base trim.
9. Applynew“popcorn”texturedpaintonallceilings.
10.Apply1/4”siliconeonnewplumbingfixturesandkitchencountertops.
10Specialties:
1.Providenewtoiletandbathaccessories,including:one(1)showercurtainrod;one(1)medicinecabinetwithmirror;one(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoap
dish.
2.Furnishandinstallnewsolidsurfacecountertops(1/2”)withplywoodbackingandintegralbacksplash.
3.Metalwrapallwindowscasingandsills
14Equipment:
1. Provideone(1)new:electricalrange,non-ductedhoodinwhite.
2. Provideone(1)plug-insinkgarbagedisposal.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22-Plumbing:
Provideone(1)newkitchenstainlesssteelsinkandone(1)chromefaucet.Provideone(1)newbathroomlavatorysinkandlavatoryfaucet.
Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.Installnewshutoffvalveswithaccesspoints.
Installationofnewanglestopvalvesatthevanitiesandkitchenfaucets.

yeep
12Mechanical
1. Allexistingradiatorstohavetheircoversremovedandcleanedasneeded.ICIisnot
responsibleforprovidingmissingradiatorcovers.
26Electrical:
1, Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates
3. Alldevicesandcoverplatesshouldbewhiteonwhite.
4. Providenewlightfixturesreusingexistingtoremaincircuitsandwi
consistof:
a) kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom:one (1)new14”roundLEDfixture.
) Hallway:one(1)new14”roundLEDfixture.
4d)Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.
e) LivingRoom:nolightfixtures.

ig.Newlightfixturesshall

cal
Replaceexistingsmokedetectorswithcombinationsmoke/CO?detectors.
Providenecessarywiringtoensurerangesareonaseparatecircuit.Surfacemountedoutletforrefrigeratorifapplicable
NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.

eno
04-HeavyScopeofWork:13Units
Cutcapandmakesafeallelectricalandplumbingintheunitpriortoremediationefforts.Removeexistingflooring.
Removeexistingkitchenandbathroomcabinetryandcountertops.
Removeexistingplumbing,includingbathtubsandfixtures.
Removetoiletaccessories.Removeexistinginteriordoorsandassociatedhardware.
Removeexistingentrydoorsandassociatedhardware.Removeexistingbathroomwalltileandgypsumboardwallsurrounds.
Removeexistingwoodwallbaseonallflooring.
10.Removalofexistingceramicflooringandbaseinbathroom.11.RemoveBiohazardwhereexisting.
12.Removeexistingwindowtreatments.

Pengvaewne
06Wood,Plastics,andComposites:
1.ProvidenewprimedwoodClosetshelvingandclothesrodsasneeded.
2.Furnishandinstallnewbathroomvanitysinglecabinetswithmarbletop.3.Furnishandinstallapproximately12-LFofnewAdvanta,orequal,kitchenbaseandwall
cabinetry,withnopullhardware.4, FurnishandInstall36"x36”stainlesssteelgreaseshieldsabovenewranges.
5.FurnishandInstall4”primed-wood,square,straight-edgewallbasealongwithprimed-wood.
a.quarter-roundmolding.

08Openings:
1.Furnishandinstallnewpre-hung,primedwood,solidcoreinteriordoorsalongwithnewresidentiallocksets.
2.Furnishandinstallnewentrydoorandhardwareandmodifytheexistingburiedframeto
accommodatenewdoor.3.Additionofallowanceoftwo(2)newwindowassembliesperunittocoverrepairsand
replacements.
09 Finishes:
1.ICC!shallfurnishandinstallthefollowingnewpartitionsinwetwallslocatedinbathroomsand
kitchen:a.Perimeterhat-channelsupportsnewgypsumboardwalls.
. New2%”studwallpartitionstomatchexistinglayout.
c.New%”drywallwallsasneededthroughouttheentirespace.d.Allnewfinishestolevel-4andwallsprimed.
cal
€. Providenew1/2”moisture-resistantgypsumboardinthebathroomandshallbefinishedtoaLevel4finishedatexposedareas.
2. Applyonecoatof1/8”cementitious,self-levelingcompoundoverexistingtoinstallnewVCT
flooring.Provide new 12x12” VCT flooringin bedroom and common areas
4, Providenew2”x2"Daltilefloorceramictileand4”covebasetileinbathrooms.New1/8”tile
jointsshallbegroutedwithun-sandedgrout.5.Applyonecoatprimerandtwocoatsofpaintonallexistingandnewceilings,walls,doors,door
framesandcasing,andwoodbasetrim.
6.Applynew“popcorn”texturedpaintonallceilings.7.Apply1/8”siliconeonnewplumbingfixturesandkitchencountertops.

10Specialties:1.Providenewtoiletandbathaccessories,including:one(1)showercurtainrod;one(1)medi
cabinetwithmirror;one(1)wall-mountedtoiletpaperholder;one(1)surfacemountedsoapdish.
2.Furnishandinstallnewsolidsurfacecountertops(1/2”)withplywoodbackingandintegral
backsplash.3. Metal wrapall windows casing and sills

11Equipment:1.Provideone(1)new:electricalrange,non-ductedhoodinwhite
2.Provideone(1)plug-insinkgarbagedisposal.
12Furnishings:
1. Providenewvinyl,horizontal1-in.slatwindowblinds.
22Plumbing:
Provideone(1)newkitchenstainlesssteelsinkandone(1)chromefaucet.
Provideone(1)newbathroomlavatorysinkandlavatoryfaucet.Providenew60-in.bakedenamelbathtubs.Providenewdrainandtrapassembly.
Providenewfiberglassbathtubsurroundwalls.
Providenewshowerdivertersalongwithshowerheadsandassociatedtrims.Installnewshutoffvalveswithaccesspoints
Installationofnewanglestopvalvesatthevanitiesandkitchenfaucets.
Noyaene
12Mechanical
1. Allexistingradiatorstohavetheircoversremovedandcleanedasneeded.ICIisnot
responsibleforprovidingmissingradiatorcovers.
26Electrica
1. Existingreceptacleandlightswitchdevicesshallbereplaced.
2. ReplaceCoverPlates
3. Alldevicesandcoverplatesshouldbewhiteonwhite.
cal
4,
5.
6.
7.
8.
Providenewlightfixturesreusingexistingtoremaincircuitsandwiring.Newlightfixturesshallconsistof:
a) Kitchen:one(1)new2x4surfacemountedLEDfixture.
b) Bathroom: one (1)new 14” round LED fixture.
c) Hallway: one (1)new 14” round LED fixture.
d) Bedroom:one(1)newLEDsconcelightfixtureineachbedroom.e) LivingRoor 10lightfixtures.
Replaceexistingsmokedetectorswithcombinationsmoke/CO2detectors.
Providenecessarywiringtoensurerangesareonaseparatecircuit.
Surfacemountedoutletforrefrigeratorifapplicable.NewElectricalpanelwillbeinstalledalongwithnewterminationsatthepanelboard.

05~StormDoors& Railings
1.Replaceandorrepairexistingscreendoorsintownhomestomakethemoperable.
2.Provideriskassessmentofexistinginteriorandexteriorhandrails.3.Preprailingsfornewpaint.
4, Primeandpaintallinteriorandexteriorrailings.
06-Biohazard
1.Provideproperprotection,negativeair,anddeodorizersforhumanbiohazardwasteremoval.2.Properlyremoveanddisposeofexistinghumanwaste.
cal

RenovationSeverityDescription:
HeavyRenovation:
Heavyrenovationsincludedemolitionoftheentirebathroomandkitchen,flooring,andopenings.Unitswillreceivenewpartitionwetwallsbetweenthebathroomandkitchen,newflooring,newopenings,anallowanceoftwonewwindowsperunit,heavypointup,level4finishes,windowmetalwraps,newtexturedceiling,newpaint,all-inclusivebathroom,andkitchens.Newelectricalrangeandnon-ductedhoodonly.(Seespecificdetailsabove)IndustrialHygienisttoincludeclearancereport.
MediumRenovation:
Mediumrenovationsincludedemolitionofkitchencabinets,interiorandexteriordoors,replaceshowerdivertersonly,minorpointup,twocoatsofpaint,newtexturedceilings,windowmetalwraps,newkitchencabinets.Bathroomtoremain.Newelectricalrangeonly.IndustrialHygienisttoincludeclearancereport.
LightRenovation:
Lightrenovationincludesdemolitionofopenings.Bathroomandkitchentoremain.Replaceallinteriordoors,twocoatsofpaint,newtexturedceiling,newmetalwraps,newshowerdiverteronly.Newelectricalrangeonly.IndustrialHygienisttoincludeclearancereport.

rrvre[Arve[Fuave[nouses|ForaLfanoow| 10 —[8][snoo]77] vetlanoow| ee se| oe
[s:neow s|sjrorau[1508]ea] 38| are
oougrKey= 2 Room
= 3 ROOM 2
4 room / ©=— 5ROOM/ “
js ©) Ga
PASC ocilSomerpace .@venoresuayROOMS:A iHSire eae / a
Lone 3| 2

:
8

WASHINGTON, D.C. PROJECT H- 1706

DistrictofColumbia HousingAuthority

Contractor'sPriceProposalSummary-CSI
JobOrderNumber: DJ69-DC28.01

Title: ‘AdditionalVacantUnitsatLangstonTerrace
Contractor: IrrenoConstructionCompanyInc
ContractNumber DJ69-0008-2019
ProposalValue: $1,496,052.98,
ProposalName: ‘AdditionalVacantUnitsatLangstonTerrace-6.6.24
Locati LangstonTerrace
BriefScope: AdditionalVacantUnitsatLangstonTerrace
To:_LaTriceBrowning,ProjectManager From:
01-GeneralRequirements: $943,234.36
02-ExistingConditions: $22,023.62
03-Concrete: $10,918.86
05-Metals: $5,394.05
06-Wood,Plastic,andComposites: $98,794.78
07-ThermalAndMoistureProtection: $2,602.98
08-Openings: $48,159.99
09-Finishes: $114,841.82
‘14-Equipment: $4,578.67
12 Furnishings: $70,526.30
23-Heating,Ventilating,AndAir-Conditioning(HVAC): $3,647.63,
26-Electrical: $174,329.91
WorkOrderProposalTotal '$1,496,052.98
Thisworkocderproposalotalrepresentsthecorectotalforthepropesal.Anydiscrepancybetweenlinetoa,‘sub‘otalsandtheproposalotalduetorouncingofthelinetollsandsubtotals.

ThePercentofNPPonthisProposal: 0.00%
An pore 7/8/2024
CitoIrréno,Proxéet’manager Date
JOCJobOrderPackageDJ69-DC28.01
Contractor'sPriceProposalSummary-CS!

DistrictofColumbia HousingAuthority

Contractor's Price Proposal Detail-CSI

JobOrderNumber: DU69-DC28.01
Tit ‘AdditionalVacantUnitsatLangstonTerrace
Contractor: IrrenoConstructionCompanyInc
ContractNumber: DJ69-0008-2019
ProposalValue: $1,496,052.98,
ProposalNam ‘AdditionalVacantUnitsatLangstonTerrace-6.6.24
Location: LangstonTerrace
StNumber Mod. _UOMDescription LineTotal
[ot-GeneralRequirements
1 ‘01221600-0002 EA ReimbursableFeesRembusableFeeswilbepaiothecorrectorfor '$100,000.00eligiblecosts,Inserttheappropriatequantitytoadjustthebasecosttothe‘actualReimbursableFee.IftherearemultipleRemmbursableFees,listeachconeseparatelyandaddacommentinthe“notebocktoidentitytReimbursableFoe(e.9.sidewalkdosure,roadcut.variouspermit,extendedwarranty,expeditedshipingcoststc).AcopyofeachreceiptshallbesubmitedwitthePriceProposal.‘Quentty UnitPrice Face oarInston 100,00000x S100 x 4.0000 $100,000.00
UserNote:OwnerAllowanceforUniorseenConditions.
Categoryt:01-General Category:Requirements2 01222300-1078, MO__18GYRearDumpTruckWithFulTineTruckDever $59,308.18
‘Guanitiy UniPrice Facor ToadInstataion 300 x $17,081.73x 1.1590 $50,388.18
Catogoryt:01-General Category:Requirements307 222300-1078 (0028MO ForEquipmentWitoutOperator,Deduct S617 54
‘Guantiy UniPre Fao oarInston soo x= $4002878x 4.9590 $-11817.54
UserNote:
Categoryt:01-General Category:Requirementsa (047419000-0031 (CY TredlonalBulkingConstructionMaterialsLandflDumpFee $6,508.44
‘Quanity UniPrice Facor TalInstataion33500x $1675x 1.1590 $6,503.44
UserNote:S0CYofdebrisremovalforExtreme,20CYforHeavy,10forMedium,and5frLight.
Categoryt:01-General Category:Requirements= 07742300-0008 FA CleanResidentialHVAGUnit $3,159.58
‘Guantiy UniPrice Fador TotalInstatafon 6500 x sai90x 4.4601 $9,158.53
UserNote:Removalofradiatorcovertocleanheater.
Category1:04-HeavyUnits(13) Category2:01-General Catogorys:Conditions
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page1of34
er024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
6017423 00-0004 EA CleanResidentVAGUnit $1,214.05
‘Guaniiy UniPrice Facor ToaInstatation2500 x sag x 1.1590 1.21405
UserNote:Removalofredatocovertocianheaters.
Catogory1:03-MediumUnits(5) Category2:01-General Catogorys:Conditions7 01742300-0008 FA CleanResidenialVAGUnt $1,214.05
‘Guaniy UniPre Fader TaalInstaation 2500 x saig0x 4.1590 81.2140
UserNote:Removalofradiatorcovertoeanheaters
Categoryt:02-LightUnits(5) Category2:_01-General Category:Conditions07880100-0008, FA Pre-CleanUntOneBedroomUnit $2,041.75
‘Guanitiy UniPrice Facor ToadInstataion 00 x 835283x 4.1890 $2041.75
UserNote:Buk-outofexistingunt.Removalofexistingtenantsbelongings.
Categoryt:02-LightUnits(5) Gategory2:01-General Category:Conditions® 67850100-0008 FA Pre-GleanUnitOneBedroomUnit $2041.75
‘Guantiy UriPrCe Far oarInston 500 x 335233x 4.1590 82,081.75,
UserNote:Buk-ouofexistingunit,Removalofexistingtenantsbelongings.
Gategoryt:03-MediumUnits(5) Category2:01-Gener Category:Conditions70019507 00-0003 EA Pre-ClesnUnt-OneBedroomUnit $5,308.56
‘Guanitiy UniPrice Fader TealInstaation 1300x $35253x 4.1890 $5,308.56,
UserNote:Buk-outofexistingunt.Removaloexistingtenantsbelongings
Catogoryt:04HeavyUnits(13) Category:Conditions07880100-0012 EA FinalleanUnit-OneBedroomUnit $6,472.68
‘Guaniiy UniPrice Fador ToaInstatation1300 x sa2059x 1.1590 se47269
Categoryt:04-HeavyUnits(13) Category2:01-Gener Category:Conditions12 019607000072 EA FinalCleanUnit-OneBedroomUnit $2489.47
‘Guaniiy UniPrice Fader TealInstaation 500 x 42059 x 4.1890 s2.489.47
Category1:03-MediumUnits(5) Gategory2:01-General Category:Conditions7078501 00-0012 EA FinalCleanUnit-OneBedroomUnit $2,489.47
‘Guantiy UniPrice Fao icInston 500 x $429.59x 4.9590 s2.489.47
Category1:02-LightUnits(5) Category2:_01-General Category:Conditions
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page20134rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
3407 50800-0008 LF ReplaceBaseCabinet->8"AndUpTo15°IncludesAllHerdware)And $12,364.21Blocking‘Quentiy UriPrCe Far oarInston 5000 x $2138 x 4.1590= $12;384.21
UserNote:Lessthan15"ofbasecabinet
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites15 01950600-0003 0131 LF ForRaisedPanelDoors,Add 3768.42
‘Guaniiy UniPrice Fador TealInstaation 5000x $1328x 4.1590= 768-42
UserNote:
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites78 01880800-0008 LF ReplaceBaseCabinet->8"AndUpTo15°(includesAllHerdware)And $32,177.48Blocking‘Quentiy UriPrCe Facer oirInston 13000x 821396x st601= $92,177.48
UserNote:Lossthan15"ofbasecabinet
Category1:04-HeavyUnits(13) Category2:06-Wood,Plastics, Category:andCompositesW701 950600-0003 0131 LF ForRatedPanelDoors,Add $1,000.76
‘Guanitiy UniPrice Fador TealInstaation 13000x $1328x 4601= 81,909.78,
UserNote:
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites78 01880800-0004 LF ReplaceBaseCabinet>15*AndUpTo2°(ncudesAlHardware)And $26,975.82Blocking‘Quentiy UniPrCe Fao oirInston 13000x si7ae7x s.a601= $25,975.92
UserNote:providenewkitchenbasecabinetry
Category1:04-HeavyUnits(13) Category2:06-Wood,Plastics, Category:andComposites19 01950500-0004 01st LF ForRatedPanelDoors,Add $1517.18
‘Guaniiy UniPrice Fador TealInstaation 13000x si00sx. teo1= $1817.18
UserNote:
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites2 07880800-0004 LF ReplaceBaseCabinet->15"AndUpTo24(IncludesAlHardware)And $10,365.52Blocking‘Quentiy UniPrCe Fao oarInston 5000 x si7ae7x 4.1590= $10,385.52
UserNote:providenewkichenbasecabinetry
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page30134‘rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
21618508 00-0004 0181 LF ForRaisedPanelDoors,Add $582.98
‘Guaniiy UniPrice Facor ToaInstatation5000 x $10.08 4.1590= $502.98
UserNote:
Catogory1:03-MediumUnis(5) Category2:_06-Wood,Plastics, Catogorys:andComposites2 01950800-0007 FA BaseEndPanel $1,140.75
‘Guaniy UniPace Fader TaalInstaation 5200 x 1891 ssot* $1140.75
UserNote:Endpanelsatbothendsofbasecabinets.
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites2% 01960500-0007 FA BasendPanel $438.38,
‘Guanitiy UniPrice Facor TalInstataion 2000 x st8st 4.1590= $498.33
UserNote:Endpanelsatbothendsofbasecabinets.
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites24078508 00-0008, FA BaseFiler $2,336.20
‘Guentiy UniPre Facer oarInston 5200 x 30.78 s.a601= 82,398.20
UserNote:basefilers2sneeded.
Category1:04-HeavyUnits(13) Category2:06-Wood,Plastics, Category:andComposites2501 950800-0008, FA BaseFiler $898.46
‘Guaniiy UniPrice Fader TalInstaation 2000 x $38.78 4.1590= 3896-48
UserNote:basefilersesneeded.
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites2 07850800-0012 LF ReplaceWellCabinet->3°AndUpTo18"(includesAlHardware)And $9251.72Blocking‘Quentiy UniPrice Far icalInston 5000 x 815085 4.1590= 89,281.72
UserNote:lessthat16"basecabinetsforlayout
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites2701 950800-0012 O1s1 LF ForRaisedPanelDoors,Add $576.60
‘Guaniiy UniPrice Fader TalInstaation 5000x $9.95 4.1590= $576.60
UserNote:
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page40f34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
201 850800-0012, LF ReplaceWallCabinet->3"AndUpTo18"(IncludesAlHardware)And '$24,07:30Blocking‘Quentiy UniPrice Facer icInston 13000x si5965x st601= $24,077.30
UserNote:lessthat16"basecabinetsforlayout
Category1:04-HeavyUnits(13) Category2:06-Wood,Plastics, Category:andComposites201 950800-0012 0131 LF ForRaisedPanelDoors,Add $7,500.59
‘Guanitiy UniPrice Fador TalInstaation 13000x $995 x steo1= $1,500.58
UserNote:
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites3007 850800-0018, LF ReplaceWellCabinet.>15"AndUpTo26(nelodesAlHardware)Ard 37,687.65Blocking‘Quentiy UniPre Far icInston 5000 x 13288 x 4.1590= 87,887.85,
UserNote:providenewkichenwallcabinetry
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites3107 950800-0015,O1s1 LF ForRaisedPanelDoors,Add $448.53,
‘Guaniiy UniPrice Fader TaalInstaation 5000x sr x 4.1590= $448.53
UserNote:
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites3207 850800-0018, LF ReplaceWallCabinet>15°AndUpTo26(nelodesAlHardware)Ard $20,006.85Blocking‘Quentiy riPre Fao icInston 13000x 13288 x s.a601= $20,006.85
UserNote:providenewkichenwallcabinetry
Category1:04-HeavyUnits(13) Category2:06-Wood,Plastics, Category:andComposites3307 950800-0015,01st LF ForRatedPanelDoors,Add $1,167.29
‘Guaniiy UniPrice Fador TalInstaation 13000x s7% x teo1= 31,167.28
UserNote:
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites3407 850800-0016 EA WallEndPanel 3865.67
‘Guantiy UniPrice Fador ToadInstatafon 5200 x S435 x 1601= $865.7
UserNote:Firsatendpanelsasnoeded.
Categoryt:04-HeavyUnits(13) Category2:06-Wood,Plastics, Catogorys:andComposites
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page50f34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
ralRequirements
35078508 00-0016, EA WallEndPanel $332.63,
‘Guaniiy UniPrice Facor TealInstatation20.00x sss x 4.1590= 800263
UserNote:Firsatendpanelsasnoeded.
Catogory1:03-MediumUnis(5) Category2:_06-Wood,Plastics, Catogorys:andComposites3807 950800-0017 FA WalFiler $2,070.96
‘Guaniy UniPas Fader TaalInstaation 5200 x sass x ssot* $2070.98
UserNote:Fillerstomeetwalls2sneeded
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites3701860800-0017 FA WalFiller $795.77
‘Guanitiy UniPrice Facor TalInstataion 2000 x $3433x 4.1590= $795.77
UserNote:Fillerstomeetwallsesneeded
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Category:andComposites3807 850800-0082 LF WoodShelvingForClosets(1Wide) $2,972.84
‘Guentiy niPrice Far icInston 10000x 20st x 4.1590= 8273.47
emotion 100.00x sae x 11500= 9549.37UserNote:Bedroon/CoatCloses:providenewwoodshelving
Category1:03-MediumUnits(5) Gategory2:06-Wood,Plastics, Category:andComposites3807 850800-0082 LF WoodShelvingForClosets(18°Wide) $7,73671
‘Guantiy UniPrice Fao oarInston 250.00x s2081x 1601= $6,307.00emotion 780.00x sae x ie01= $1,428.71
UserNote:Bedroon/CoatCloses:providenewwoodshelving
Categoryt:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites407 850800-0005 FA ClosetRolerBallGaichArdPiste $1,683.30
‘Guentiy niPre Fao oarInston 7300 x 37a x 1601= 81,397.41
emotion 7300 x ssa x 41601= 5295.90
Categoryt:04-HeavyUnits(13) Category2:08-Openings Catogorys:
a1 07950800-0005 EA ClosetRolerBallGatchArdPiste $627.60
‘Guanitiy UniPrice Fader TealInstaation 3000x sure x 4.1590= $513.80emotion 3000 x S327 x 1.1500= 113.70
Gategoryt:02-LightUnits(5) Category2:_08-Openings Category:
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page6of34‘rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

CSINumber Mod. UOM Description neTotat
ralRequirements
42_01.8508.00-0005 EA ClosetRollerBallCatchAndPiste $627.60
‘Guaniy UnPre Factor ToiakInstaiation 3000 x sire x 4.1500= 513.90Demoition 3000 x sar x 4.1590= $113.70
Catogory1:03-MediumUnits(5) Category2:08-Openings Catogory4:
a ores0800-0008 EA 74°To65"UlSingleHungVingTtWindowWithWeldedFramesArd $14,860.58InsulatedGlazinglncludesfrextscreens,caukandsealants,hardware(topandbotiomcatchhardware,balances)andweatherstipping(lacioryfinish),KeystoneorEqua.

‘Quanity UniPrice Fador ToaInstaation 1800 x $825.18x 1601= $14,950.02Demotton 1500x $2934x 1601= 851058UserNote:Alowanceoftwenty(20)singlehungwindowreplacementserunt
Catogory1:04-HeavyUnits(13)Category2:08-Openings Category:
4407 850800-0046 EA InteriorWoodDoor,1-318"Thick,Flos,SoldCorelncudeshinges, $27,718.64bumpers,passagelockse,primerandtwocoatspainting‘Quentity UnitPrice Fao icInston 5000 x 90380 x 4.1590= $22,820.71
emotion 5000 x $8482x 411500= $4,897.98UserNote:providenewswinginginteriordoorsandassociatedhardware(hinges,bumpersandockset)throughoutthe{eslandsecondfoor
Categoryt:02-LightUnits(5) Category2:08-Openings Category:
4507 850800-0046 (0048EA For6PanelDoor,Add $305.22
‘Guaniiy UniPrice Fador ToaInstatation5000 x $682 x 4.1590= $905.22
UserNote:
Gategoryt:02-LightUnits(5) Gategory2:08-Openings Categony4:
a8 07950800-0046, EA InteriorWoodDoor,1-18"Thick,Flush,SailCoreineudesFnges, 372,136.87bumpers,passagelocks,primerandtwocoatspainting‘Quanity UnitPrice Facor TalInstataion 13000x $393.80x 1601= $50,390.18Demotton 13000x $8452x 11601= 812,748.71UserNote:providenewswinginginteriordoorsandassocitedhardware(hinges,bumpersandlockset)throughoutthefistandsecondfoor
Categoryt:04-HeavyUnits(13)Category2:08-Openings Category:
a7 07950800-0046 0049 EA For6PanelDoor,Ada $1,028.54
‘Guaniy UniPaCS Fader TaalInstatation13000x sea2 x sso * $1,028.56
UserNote:
Catogory1:04-HeavyUnits(13)Category2:08-Openings Category:
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page7of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
ralRequirements
4807 850800-0046, EA InteriorWoodDoor,1-38"Thick,Flush,SoldCorlncudeshinges. $27,718.64bumpers,passagelockse,primerandtwocoatspainting,‘Quentity UnitPrice Far icInston 5000 x 90380 x 4.1590= $22,820.71
emotion 5000 x $8482x 41500= $4,897.98UserNote:providenewswinginginteriordoorsandassociatedhardware(hinges,bumpersandockset)throughoutthe{eslandsecondfoor
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
4807 850800-0046, (0048EA ForPanelDoor,Adc $305.22
‘Guaniiy UniPrice Fador ToaInstatation5000 x $682 x 4.1590= $995.22
UserNote:
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
007 950800-0048, EA ReplaceintevorWoedDoorFramelncludesadjacentwellworkandpaint $16,587.92
‘Guaniiy UniPrice Fador TealInstaation 13000x sio999x fteo1= $16,587.82
UserNote:providenewinteriordooramesthroughoutunit
Catogory1:04-HeavyUnits(13)Category2:08-Openings Category:
S107 850800-0048 (0058EA ForExcusionOFPaint,Deduct $-88281
‘Guantiy UniPrice Fador TotalInstataion 13000x $582 x 1601= s-eezet
UserNote:
Categoryt:04-HeavyUnits(13) Category2:08-Openings Catogorys:
207 950800-0008 EA ReplaceInteriorWoedDoorFramelncludesadjacentwallworkandpaint $6,373.82
‘Guaniiy UniPrice Fador TealInstaation 5000x sio999x 4.1590= 88.73.82
UserNote:providenewinteriordoorframesthroughoutunit
Categoryt:02LightUnits(5) Category2:08-Openings Category:
307 850800-0048, (0054EA ForExcisionOFPaint,Deduct $343.08
‘Guentiy UniPrice Fao oarInston 5000 x $592 x 4.1590= $-343.08,
UserNote:
Categoryt:02-LightUnits(6) __Category2:08-Openings Category:
407 950800-0048 EA ReplaceInteriorWoedDoorFramelncludesadjacentwallworkandpaint $6,573.92
‘Guanitiy UniPrice Facor TealInstataion 5000 x stonesx 4.1890= $6,373.82
UserNote:providenewinteriordoorframesthroughoutunit
Category1:03-MediumUnits(5) Category2:08-Openings Category:
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page8of34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
85078508 00-0048, (0054EA ForExcusionOfPant,Deduct $-343.08
‘Guaniiy UniPrice Facor ToaInstatation5000 x $692 x 4.1590= $043.08,
UserNote:
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
807 950800-0060 ‘OPN Weatherstiening $067.93
‘Guaniy UniPrice Fador ToadInstaation 13.00 $45.80 1601= 9890.72emotion 1300x sis x 41.601= si721
Catogoryt:04-HeavyUnits(13)Category2:08-Openings Category:
37 07850800-0060, ‘OPN Weatherstioping $333.50
‘Guanitiy UniPrice Fador ToaInstatation 8.00 $45.80x 1.1590 8265.41Demotton 500 x sis x 4.1890 358.08
Category1:03-MediumUnits(5) Category2:08-Openings
S807 850800-0061 EA Thresholds(Aluminum) $1,024.32
‘Guentiy UniPre Fao iInston 1300 x 35617x aso = sea7-i2
emotion 1300 x si.7sx ie01= si7721
Categoryt:04-HeavyUnits(13) Category2:08-Openings Catogorys:
3207 850800-0061 EA Thresholds(Aluminum) $393.60
‘Guaniiy UniPrice Fader TealInstaation 5.00 $86.17 4.1590= 892551emotion 500 x sis x 1.1500= 368,08
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
07850800-0076 EA HeavyDutySteelSocuyScreenDoor,0.026StaiiessStoelMesh, $9946.72PowerCoatedColorAndHardware(SummitOrRuscoOrEqua)‘Queniity UnitPrice Factor icInston 1200 x $630.59x 4.1590= $8,895.42emotion 1200 x $7558x 11500= $1,051.31UserNote:Removalofexistingandinstalationofnewscreendoors.
Categoryt:05~StormDoors Category:
31079508 00-0100 EA ExteriorMetalDoor,1-8/4"Thick,16Gauge,Flush,Frond $15,869.75Completelncideshinges,Bumpers,brassfrishpeephole,brassknocker,brassfishmalslo,deadboltlocket,weatherstapping,treshold,sweep,primerandtwocoatspainting‘Quanity UniPrice Fador ToaInstatation1300 x snoisttx 1801= $15,900.18Demotton 1300x sory x 1601= 3560.57
Category1:04-HeavyUnits(13)Category2:08-Openings Category:
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDeta-CSI Page90134rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mo. __UOMDescription LineTotal
ralRequirements
6201950800-0100 0050 EA ForGaugeDoor,Add $2,791.85
‘Guaniiy UriPrce Faaior ToaInsatotion1300x $185.12x 1.1601= 2701.85
UserNote:
Gatogoryt:04-HeavyUnits(13)Category2:08-Openings Catogorys:
01950800-0100 O19 EA FerDoorWithSpringHingesAdd $406.14
Guan TaitPrice Paar Tattrstaation 1300x $2593x 1.1001= 408.14
UserNote:
Catogory1:04-HeavyUnits(13) Category2:08-Openings Catogorys:
@ 01950800-0700 0122 EA For’HourTo1-172HourRatedDoorAndFMLabel,Add $838.54
‘Guantiy UriPrice Fadior oaInston 1300x $5527x 1601= 803.54
UserNote:
Category:04-HeavyUnis(13)Category2:08Openings Category4:
@ 07950800-0100 EA EtaforetalDoor,1-8/4Thick,16Gauge,Flos,(ron) $6,007.96CCompletelncudeshinges,bumpers,brassfrishpeephole,brassknocker,brassfrishmalslot,deadbot,locksel,weatherstpping,treshold,sweep,

primerandtwocoatsparting.‘Quanity ‘ritPrce Fador oaInston 500 x Sits x 4.1590= 3528256Demottion 500 x Soratx 4.1590= 821540
Catogory1:03-MediumUnits(5) Category2:08-Openings Catogorys:
@ 01950800-0100 050 EA For¢GaugeDoorAda $1072.77
Caan TaitPrice Fagor Toadtrstaation so x $168.12x 4.1590= sioraTt
UserNote:
Catogory1:03-MediumUnits(5) Category2:08-Openings Catogorys:
37 01950800-0700 OT@ EA ForDoorWithSpingHingesAdd $186.06
Guantiy UriPrce Fador icInston 500 x $2693x 4.1500= 158.08
UserNote:
Category’:03-MediumUnits(5) Category2:08-Openings Catogorys:
07950800-0100 O12 EA ForHourTo1-172HourRatedDaocAndFMLab,Add $320.28
Caan TaitPrice Fagor Toadtrstaation so x s827 x 4.1590= 332029
UserNote:
Category1:03-MediumUnits(5)Category2:08-Openings Catogory4:
JOCJobOrderPackageDJ69-DC28.01 40
‘ContractsPriceProposalDeta-St Page100f34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat

ralRequirements
6801 850800-0100 EA ExteriorMetalDoor,1/4"Tick,18Gauge,Flush,(Front) $6,097.98CCompletelncudeshinges,bumpers,brassfrishpeephoe,brassknocker,brassnishmailslot,desdbot,lockset,westhersirpping,treshold,sweep,

pimerandtwocoatspainting‘Quantity ‘UniPace Fader TaalInstaation 500 x stoi x 4.1590* $5,882.56,emotion 500 x so7t7x 11500= 821540
Categoryt:02-LightUnits(6) Category2:08-Openings Category:
7001850800-0100 (0050EA For14GaugeDoor,Add $1072.77
‘Guanitiy UniPrice Facor TealInstatation 00 x $185.12x 4.1590= ssor27
UserNote:
Gatogoryt:02-LightUnits(5) Category2:08-Openings Category:
7107 950800-0100 O18 EA ForDoorWithSpringHinges,Ada $156.06
‘Guaniy UniPre Fader TaalInstatation 500 x s293 x 4.1590* $156.08
UserNote:
Categoryt:02-LightUnits(5) Category2:08-Openings Category:
7201 850800-0100 (0122EA FortHourTo1-172HourReledDoorAndFMLabel.Ada $320.28
‘Guanitiy UniPrice Fador ToaInstatation 00 x 88527x 4.1590= 920.28
UserNote:
Gategoryt:02-LightUnits(5) Gategory2:08-Openings Category:
7301 950800-0102 EA ReplaceExteriorMetalDoorFrame,18Gaugelncudesadjacentwallwork $5,541.99andpaint‘Quanity UniPrice Facor ToadInstatation1300 x ss6747x 44601= $5,541.88
Gategoryt:04-HeavyUnits(13)Category2:08-Openings Categony4:
7407 950800-0102 0125 —~EAFor1-172HourRating,Add $528.05,
‘Guanitiy UniPrice Fador TealInstaation 1300x $3508x 4601= 8520005
UserNote:
Catogory1:04-HeavyUnits(13)Category2:08-Openings Category:
7 07850800-0102 EA ReplaceExteriorMetalDoorFrame,18Gaugelncudesadjacentwallwork $2,120.48andpaint,‘Quentiy UniPre Facer oarInston 500 x $967.47x 4.1590= 82,129.49
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
707 850800-0102 0128 EA Fort-1f2HourRating,Add $4068
‘Guantiy UniPrice Fador TotalInstatafon 100 x $35.08x 4.1590= s4o.68
UserNote:
Categoryt:03-MediumUnits(5) Category2:08-Openings Categony4:
JOCJobOrderPackageDJ69-DC28.01 10
Contractor’PriceProposalDetal-CSI Page11of34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: 069-DC28.01
‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
ralRequirements
77618509 00-0008 ‘SF GWBWall61°Thick,IncludesOrwall,Fish,ComerBeads, $16,875.04
‘Guanitiy UniPrice Fador ToaInstatation520000x $202 x 4.1590= siat74.t4Demotton 520000x 8073 x 4.3590= $4,700.90
Catogoryt:04-HeavyUnits(13)Catogory2:09-Finishes Category:
7s 07950900-0008(0075SF ForWaterResistantGypsumBoard(Greenboard),Add $5424
‘Guaniy UniPaCS Fader TaalInstatation520000x sooo x 4.1590* ssazat
UserNote:
Catogoryt:04-HeavyUnits(13)Category2:08-Finishes Category:
7e 07850900-0010 ‘SF SkimCoatPaster,1Goat $6,460.88
Guanitiy UniPrice Fador ToaInstatation364000x $183 x 4601= $6,480.89
UserNote:Skimmingofeddtonalwallsinmediumandheavyunits
Catogoryt:04-HeavyUnits(13)Catogory2:09-Finishes Category:
o_o 950900-0010 ‘SF SkimCoatPlaster,1Goat $2,482.58
‘Guaniy UniPre Fader TaalInstatation140000x S153 x 4.1590* $2482.58
UserNote:Skimmingofedtionelwalinmediumandheavyunis
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
Bi 07850800-0018, ‘GSF PaintEnireUnitCompleteIncludingDoorsincudesdoors,wall,makings, $34,415.58kitchen,ceilingset.Includespreparation,PerSFofforareaCombinationsem:-sossandeggshell.Twocoatspantoronecoatprimerandonecoatpaint‘Quanity UniPrice Fador TaalInstaation9.10000x $328 x tot = $94,415.53
UserNote:Onecostprimerandonecostpantonallocationsmentionedinnote.TotalSFaveragesto600SF
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
e207 850900-0018,(0078GSF ForEachAdditionalGoat,Ada $12,457.15
‘Guantiy UniPrice Fador icInstatafon8.10000x S18 x 4.4601= s124s7.18
UserNote:
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Catogorys:
07950900-0015, ‘GSF PaintEntreUnitCompleteInudingDoorslncudesdoors,wal,moldings, $11,335.02kitchen,celingset.Includespreparation.PerSFofforareaCombinationsemi-glossandeggshell.Twocoatspaintoronecoatprimerandonecoatpaint‘Quantity UniPrice Fador ToadInstatafon300000x $328 x 4.1580= 11,99802
UserNote:Onecoatprimerandonecoatpantonallocationsmentionedinnote.TotalSFaveragesto600SF
Categoryt:03-MediumUnits(5) Category2:09Finishes Catogorys:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page120134rer2024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat
ralRequirements
e407 8509000013, (0079GSF__-ForEachAdditonalCoat,Add $4,102.86
‘Guaniy UnPre Factor oisInstaiation300000x sue x 41590= $4,102.86,
UserNote:
Category1:03-MediumUnits(5) Category2:09Finishes Category:
es crasopo00019 ‘GSF PaintEntreUnitCompleteIncludingDoorsincidesdoors,wall,moldings, $11,335.02ktchen,celingsetc.Includespreparation.PerSFoffloorarea.Combinationsemi-glossandeggshell.Twocoalspaintoronecoatprimer‘andonecoatpaint‘Quantity UnitPre Factor oiadInstaiation300000x $328 x 1590= $1,305.02
UserNote:Onecoatprimerandonecoatpantonallocationsmentionedinnote.TotalSF averagesto600SF
Categoryt:02-LightUnits(5) Category2:08Finishes Category:
ores09000019 0o7a SF ForEachAdditonalGoat,Add 382057
‘Guan atPrice Facor ToaInstatation 00.00x sue x 1.1880= $820.87
UserNote:
Categoryt:02-LightUnits(5) Category2:08-Finishes Category4:
‘87 07650900-0027 ‘SF Replace12"x12"VCT,18"Incudeslevelingcompound. $42,498.78
‘Guanty UnitPre Factor oiadInstaiation780000x seo x 601 = $42,498.78
UserNote:Replacamentofvinylflooring(roughly600SFperunitaverage).
Categoryt:04-HeavyUnits(13) Category2:09Finishes Category:
‘07 960900-0028 SF Replace12"x12"VGT,1/8Includeslevelingcompound: $1,690.71
‘Guantiy TatPrCe Factor ToilInstatiation30000x S469 x 4.1890= $1,690.71
UserNote:10%ofreplacementforlooseormissingte,
Categoryt:03-MediumUnits(5) Category2:09-Finishes Category4:
oTes09000039 SF CeramicTieWainscotWithMorar $1,041.94
‘Guantiy atPre Facor ToiadInstaation 5000 x s7 x 1800= $010.38
Demastion 5000 x s227 x 4.1590= 8191.55UserNote:Minorlereplacementinexistingbathroomsforreplacementofmingvalves&minorrepairs
Catogoryt:03-MediumUnits(5) Category2:09Finishes Catogory4:
oo ores100-002 EA WedicineCabinetWithMiror 32,600.38
‘Guantiy ARPS Facer TearInstaiation 1300 x $175.38x sasot= $2,644.98
Demoition 1300 x si887 x 1801= 3254.42UserNote:providenewbathroommedicinecabinetswithmirors
Categoryt:04-HeavyUnits(13) Catagory2:10Specialties Category:
JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page13of34
rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
ralRequirements
er 01951000-0017 EA ResdentalBathAccessoryPackage,IncludesTwo(2)24”TowelBars $1,197.54SoapBish,Tumbler,PaperHolderAnd5SisinlessStee!(1Diameter)ShowerRod‘Quant TaitPaice Faaor oartreason 500 x 15523,x 1.1500* $900.58emotion 500 x $5142x 41590= 8297.98
Category’:03-MediumUnits(5) Category2: 10-Specialios Catogorys:
019510000017 EA ResidentialBathAccossoryPackage,IncludesTwo(2)24TowelBars 33,11655SoopDish,Tumbler,PopeHolderAnd6SainlessStoo(1Diameter)ShowerRod‘Quanity UriPrice Fadior oarInston 1300x 815523x 4.1604 s2asio7Demottion 1300x $6142x 4.3801 s775.48
Catogoryt:04-HeavyUnits(13)Category2:10Specialties Catogorys:
oreswoo0sez EA CleateForRod $002.81
Goan TaitPaice Fader oartreatin 10400x $583x 1001* $703.38Demotion 10400x sistx 1601= 108.42UserNote:BedroomiCoatClosets:providenewceasfordothesrods
Category':04-HeavyUnits(13)Category2:08-Wood,Plastics, Catogorys:andComposites01651000-00R2 FA CleatsForRod $348.06
Goan TaitPaice Fader oartration 4000x $583x 1.1500* $270.28emotion 4000x sistx 41590= sreeUserNote:BedroomiCoatClosets:providenewceasfordothesrods
Category':03-MediumUnits(5)Category2:08-Wood,Plastics, Catogorys:andCompositesores100000 TF ChthesRod $1380.89
Goan TaitPace Fader paltreatin 15600x seatx 601 = 1,160.05Demoition 188.00x sir x 1601= 5220.84UserNote:BodroomiCoatClosets:providenewdatesrods
Category:04-HeavyUnits(13)Category2:08-Wood,Pastcs, Catogorys:andComposites_ oFes1000-002 TF ChthesRod 359407
Goan TaitPace Faaor paltreatin 000 x seatx 1.1500* 48.75Demoition 6000x sir x 41590= $88.92UserNote:BodroomiCoatClosets:providenewdatesrods
Category':03-MediumUnits(6)Category2:08-Wood,Pastcs, Catogorys:andCompositesw__ ores100002 TF CurtainRed $780.11
Goan TaitPace Faaor paltrstasotionsooox $518x 11800* sieott
UserNote:providenew5bathroomcuarods
Catogory1:03-MediumUnits(5)_Category2:10Specialties Catogorys:
JOCJobOrderPackageDJ69-DC28.01 40
‘ContractsPriceProposalDeta-St Page14of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
ralRequirements
980185 1000-0024 LF CutanRod $300.61
‘Guanitiy UniPrice Fador ToaInstatation6500 x $518 x 1601= se006t
UserNote:providenew5bathroomcurtainrods
Gategoryt:04-HeavyUnits(13)Category2:10Specialties Category:
990795 1000-0033, EA Tub/ShowerEnclosure,5Heighncludingbackerboard(WenderBoar), $14,668.52ceramictleandgrout‘Quantity UniPrice Facor ToadInstataion 1300 x 873552x 4.1601 $11,089.58Demoston 1300x Sarat x 4.1801 $3,578.94UserNote:Tubsurrounds
Catogoryt:04-HeavyUnits(13)Category2:22-Plumbing Category:
10001 96100-0085 FA ‘GesStandardCleanFreestandingRange $14,448.34
‘Guanitiy UniPrice Fador ToaInstatation1300 x $860.07x 1601= s12s70.97Demotton 1300x $97.98x 11601= $1,477.38
Category1:04-HeavyUnits(13)Category2:11-Equipment Category:
ior 07981700-0035 FA ‘GesStandardCleanFreestandingRange $555176
‘Guantiy riPrCe Fao oarInston 500 x $960.07x 4.1590= 498411
emotion 500 x $9788x 4.1500= 8867.88
Category1:03-MediumUnits(5) Category:11-Equipment Catogorys:
T0201 961100-0085 FA ‘GasStandardCleanFreestandingRange $5,551.78
‘Guaniiy UniPrice Fader TealInstaation 500 x 886007x 4.1890 $4984.11emotion 500 x $07.98x 4.1590 8567.58
Categoryt:02LightUnits(5) Category2:11-Equipment Category:
Tos 07851100-0087 EAS HPHeavyDulyFoodWisteDsposer $32,44662
‘Guanitiy UniPrice Facor ToaInstatation 00 x $350.10x 4.1590= $2288Demotton 500 x S775 x 4.1590= 8415.78
Gategoryt:02-LightUnits(5) __Category2:_11-Equipment Category:
Toa 07951100-0037 EAS HPHeavyDulyFoodWsteDsposer $6,962.05
‘Guaniy UniPaCS Fader TaalInstataion 1300x 50.10 x sot * $5278.98emotion 1300 x ss x ie0t= $1,082.08
Categoryt:04-HeavyUnits(13) Category2:11-Equipment Catogorys:
10501961 000087 EA 3/4HPHeavyDutyFoodWasteDisposer $2,446.62
‘Guanitiy UniPrice Facor ToadInstatation 00 x $350.10x 4.1880= $2,028.83Demoston 500 x S775 x 1.1590= 8415.79
Catogory1:03-MediumUnits(5) Category2:11-Equipment Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page150f34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
lor ralRequirements
ios 01952200-0008 EA SiainlssSte!SingleBowKitchenSirkWithSingleLeverFaucetincudes.|$10,942.08‘rap,basketstrainer,escutcheons,supplyfineandwaterstops.‘Quenity ‘UnitPrice Factor oarInston 1300 x 50252 x 1601= $8,995.57emotion 1300 x 819302x sot = $2,006.11
Categoryt:04-HeavyUnits(13)Category2:22-Plumbing Catogorys:
107 01952200-0008 EA SiainissStelSingleBoviKitchenSirkWithSingleLeverFaucetncudes $4,204.50,trap,basketsvainer,escutcheons,supply‘Quantiy UnitPrice ToadInstataion 00 x $592.52 - $3493.65Demotton 50 x 513302 = S705
Catogory1:03-MediumUnis(5) Catogory2:22Plumbing Category:
108 018822000072 EA BathTub,EnamelOnSteelncludesvalve,fauce,showerhead,overiow $14,455.43ondtap.oro UniPre Fader TaalInstataion 1300x s79034x sso * 81191936emotion 1300 x 8168.18x ie0t= $2,586.07
Categoryt:04-HeavyUnits(13)Category2:22-Plumbing Catogorys:
10801 9622000073 EA Tub!ShowerFaucetAndShowerHeadinctdesriserpipe,singlelover $3,708.39antscadvalve,cverir,ap,dinandspout‘Quantity UnitPrice Fador ToaInstatation 500 x $516.18x 4.1590= $2,901.18Demotton 500 x si77 x 4.1590= 871725
Category1:03-MediumUnits(5) Category2:22-Plumbing Category:
WO 079822000073 EA Tub!ShowerFaucetAndShowerHesdindudesrisepipe,Snglelever $9,650.98ntiscaldvalve,civertr,rap,dinendspout‘Quantity UnitPrice Fader TaalInstatation1300x $518.16x aso * 87,784.38emotion 1300x sim x 44601= $1,888.61,
Categoryt:04-HeavyUnits(13)Category:22-Plumbing Category:
Tit 019622000018 EA RougivnPerPlumbingFixture(SinkWaterCosel,Lavatory.Tub/Shower, $16,271.84WasherBoxEcnctudesallsupplyines,wasteinesandvents(lortoceiing)plusallhangers,misce¥eneous.hardware,tings,gaskets,etc)Excludesactualfixture,‘Quantity UniPaCS Fader TaalInstatation1500x soa587x 4.1590* si6271.864
UserNote:Roughnofnewplumbingforbathroomsandkitchens,Totalof3perunitkchensink,watershutofines,lavatory,endtublshower,)
Categoryt:03-MediumUnits(5) Category2:22Plumbing Category:
42 oves22000018 EA RoughvinPerPlumbingFoture(Sink,WaterCloset,Lavalory,Tub/Shower, $42,346.93\WsherBoxEcIncudesalsupplynes,wastelinesandvents(oortocling)plusallhangers,miscelaneous.hardware,fitings,gaskels,et.)

Excludesactualfixture.‘Quantiy UnitPre Facior olaInstaation 3900 x $095.97x 601 = 42,248.53
UserNote:Roughnofnewplumbingforbathroomsandkitchens.Totalof3peruni(kitchensink,watershutofInes,lavatory,andtublshower.)
Catogory1:04-HeavyUnits(13) Category2:_22-Plumbing Category4:

JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page16of34
rerz024

Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

StNumber Mod. __UOMDescription LineTotal
lor ralRequirements
11301852200-0028) EA CountertopLavatory.IncludesEscutcheons,SupplyValveAndLine,Tap $9,403.04‘AndFaucotK-15240-8,‘Quentty UniPrice Facer oarInston 1300 x $455.55x 1601= $6,840.12
Demotton 1300 x sise4 x sot = $2,582.92UserNote:lavatory@bathroom.
Category:04-HeavyUnits(13)Catogory2:22Plumbing Catogorys:
We 01952200-0028 EA CountertopLavatory,IncludesEscutcheons,SupplyValveAndLine,Tap $3613.12‘AndFaueotK-15240-8,‘Quantity UniPrice Fader TealInstaation 500 x $455.55x 4.1590= s2.628.32emotion 500 x 5169.94x 41.1500= 3904.80UserNote:lavatory@bathroom.
Categoryt:03-MediumUnits(5) Category2:22-Plumbing Catogorys:
11501 962200-0038 EA ReplaceGasConnectorFlexConneciorAndVale $393.89
‘Guanitiy UniPrice Facor ToadInstatation 00 x sere?x 4.1590= $995.88
Catogoryt:02-LightUnits(5) Catogory2:_22-Plumbing Category:
T1607 9522000068 EA Tub/ShowerMaingValve,AmericanStandardR120 $1,056.49
‘Guaniy UniPrCe Fader TaalInstatation 500 x sianosx 4.1590* 881738emotion 50 x S428 x 4.1500= 5298.10
Catogoryt:03-MediumUnits(5) Category2:22-Plumbing Category:
i701 962200-0088 EA Tub/ShowerMaingValve,AmericanStandardR120 $2,746.86
‘Guanitiy UniPrice Facor TealInstatation1300 x si4t0sx 4.1880= $2,125.20Demoston 1300x sa28 x 1.1590= 8621.68
Categoryt:04-HeavyUnits(13)Category2:22-Plumbing Category:
T1801 852200-0088 EA Baih/ShowerTim,AmericanSiandardT675502,PolshedChromelncades $1,627.16{ubdverierspout,valveleverhendle,showerarmandshowerheed.‘Quanity UnitPrice Facor TaalInstatation1300x $0495x 4.1590* siaetraemotion 1300x sasstx 1.1500= $405.45
Categoryt:04-HeavyUnits(13)Category2:22-Plumbing Catogorys:
T1801 952200-0046 EA Bath/ShowerTim,AmericanSiandardT675502,PolshedChromelncludes $702.76{ubdivertorspoutvaleleverhandle,showerarmandshowerhead‘Quantity UnitPrice Factor ToaInstatation 00 x $9498x 4.1590= 8546.82Demotton 500 x s2581x 4.1590= 5155.94
Catogory1:03-MediumUnis(5) Catogory2:22-Plumbing Catogorys:
72007 952600-0088 EA CarbonMonoxideDetecior,120VAC $6,480.28
‘Quanity UniPrice Fader icInston 2500 x $168.25x 4.1590= $4875.33
emotion 25.00x $5539x 11500= $1,804.98UserNote:Replacementofexistingsmokewithcombinationsmoke/CO2
Catogory1:03-MediumUnits(5) Category2:26-Electrical Categony4:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page17of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
‘AdditionalVacantUnitsatLangstonTerrace

CSINumber Mod. UOM Description neTotat
ralRequirements
4210185.2600-0044' EA CarbonMonoxideDetector,120VAC $16,864.66
‘Guaniiy UnitPre Factor ToaInstaiation 65.00x $188.28x 601 = 12,687.90Demoition 65.00x $65.39x 4.3601= $4,176.77
UserNote:Replacementofexistingsmokewithcombinationsmoke/CO2

Catogory':04-HeavyUnits(13)Catogory2:26-Electrical Catagorys:
"201952600-0088 EA GarbonMooseDeteco,120VAC $6,480.28
‘Guantiy UriPrbe Fadior "oaInsatotion2500x 16825x 1.1500= 4975.23Demottion 2500x $5539x 4.1590= 31.5045,UserNote:ReplacementofestingsmokewihcombinationsmokelCO2
Catagory’:02-LightUnits(6) __Categorya:_26-Electrical Catogory4:
7079826 00.0047 UF 12AWG,2Conductor,Sold,RomexCopperWing 320007
‘Guantiy ritPrice Fao oarInston tooo x 5282x 4.1590= s20207
UserNote:20ofromexwiringforgarbagedisposals&misc.wing
Catogoryt:03-MediumUnits(5)Category2:26-Electrical Categorys:
2a 07952600-0087 LF 12AWG,2Conductor,Soi,RomexCopperWing $760.10
‘Goan ritPrce Fadior ToiInston 25000x $252x 1.1601= s7e0.10
UserNote:20ofromexwingforgarbagedisposals&mise.wing
Catogoryt:04-HeavyUnits(13)Catogory2:26-Electrical Catogorys:
‘Subtotalfor01-GeneralRequirements: $943,234.36
[ozExistingConditions J
125024119416-0080 ‘SF __DomolshPasarArdLathFrom2SidesOFAIlerorPartonall $5,363.85
Goan UriPrice Fagor TorInston 520000x $088x 4.1590= $5,989.85
UserNote:Fulldemolitionofbetroomperimeterwalinheavyunis.
Catogoryt:04-HeavyUnits(13)Catogory2:09-Finishes Catogorys:
We 02897019-0008 EA__TotclyOharactesicLeachingProcedure(TOLP)LeadTet(24Hour $1687.08,Turaround)ArdLabFee‘Quantiy TaitPrice Paar TearInston 000 x seat x 4.1590= $1,887.08
UserNote:4testeachhenslocaton.
Catogoryt:05-StormDoors Catogorys:
iar e2831873-0018 EA teedWipeSamples(HourTuraround)AndLabFee $1,652.85
‘Guantiy UriPrce Fador icInston 12500x s270 x 1.1500= $1,952.95
Category’:02-LightUnits(5) Category2:_01-General Catogorys:Conditions
JOCJobOrderPackageDJ69-DC28.01 40
‘ContractsPriceProposalDeta-St Page18.0f34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Ti ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[o2-ExistingConditions __]12802831919-0013 EA LeadWipeSamples(8HourTurnaround)AndLabFee $1852.95,
‘Goan ritPrce Faaior TearInston 12500x si278x 1.1800= $1,952.95
Category’:03~MediumUnits(6) Category2:01-General Catogorys:Conditionsme 0289191-0070 EA LeodWipeSamples(HourTumareund)AndLabFee $4622.25
Guan TaitPrice Faaor TeakInston 32500x e279 x 1601= 482225
Catogoryt:04-HeavyUnits(13)Catogory2:01-General Catogorys:Conditions30027 1613-0008 SF 1010500SFBirdWasteRemovalUpToThickness $4681.20
‘Guaniiy ritPrice Far icInston 70000x ser”x 4.1590= sassi.20
UserNote:Removalofhumanwasteinuns
Category1:08-Biohazard Catogorys:
wai eZee0000-0018 EA PoriableWasteDecontaminationUninalodesconnectiontonagalvea $345.83systom.‘Quant UriPrce Faaior TorInston 100 x 529899x 1.1800= $345.88
UserNote:Decontaminationunitforhumanwasteremoval

Categoryt:05Biohazard Categony4:
132 028900000073(040 EA ForDismantingAndRelocationToADiferentArea,Add 121751
‘Guanitiy UniPrice Fader TealInstaation 600 x $175.08x 4.1590= si2t7si
UserNote:
Categoryt:08Biohazard Category:
‘Subtotalfor02-ExistingConditions: $22,023.62
[o3Concrete ]
iss 03013071-0004 ‘SF 18°To14",CementitiousMortarPatch,DecksAndFloors $10,918.88
‘Guaniy UniPaCS Fader TaalInstatation260000x sae2 x sot* $19,918.68
UserNote:Fleshpatchupto200’offoring
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
‘Subtotalfor03-Concrete: $10,918.86
[os-Metals J
ia405750000-0018 ‘SF 0.0875"Thick(20Gauge)304BrushedStainlessStee!Sheet,InstaledOn $1,237.81Wats‘Guaniy UniPrice Fader TealInstaation 7500x si27%8x. 4.1590= $1,108.18,emotion 7500 x sia3 x 4.1590= 812865UserNote:Rangebackslash
Category1:03-MediumUnits(5) Category2:10Specialties Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page19of36rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Tit ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[os-Metals. J
13805750000-0016,o140 SF For>1670200,Deduct, 3-65.19
‘Guanitiy UniPrice Facor ToadInstatation7500 x $075 x 4.1590= $65.19
UserNote:
Gategory1:03-MediumUnits(5) Category2:_10-Specialties Category:
19805750000-0016 ‘SF 010375"Thick(20Gauge)304BrushedStainlessStee!Shea,nsalodOn $3218.31Wats‘Quanity UniPrice Facor ToadInstataion 19500x $1278x 1.1590 82.83.02Demotton 19500x S143 x 4.1590 $334.49UserNote:Rangebacksplash
Gatogoryt:04-HeavyUnits(13)Category2:10Speciaies Category:
137 057500000016 0140 SF For>160200,Deduct $-169.50
Guanitiy UniPrice Fador ToadInstatation195.00x $075 x 4.1590= $-169.50
UserNote:
Catogoryt:04-HeavyUnits(13)Catogory2:10Specialties Category:
13805750000-0076 ‘SF 00375"Thick(20Gauge)304BrushedStainlessStes!Shea,nsalodOn $1257.81Wats‘Quanity UniPrice Facor TealInstataion 7500 x $1278x 4.1590= 91,108.18emotion 7500 x S143 x 4.1590= 812865UserNote:Rangebacksplash
Categoryt:02-LightUnits(6) Category2:10Specialties Catogorys:
138057600000016 0140 SF For>16T0200,Deduct 5-65.19
‘Guanitiy UniPrice Facor TalInstatation7500 x $07 x 4.1590= $65.19
UserNote:
Gategoryt:02-LightUnits(5) Category:10-Specialties Category:
‘Subtotalfor05-Metals: $5,394.05
[06-Wood,Plastic,andComposites J
14006 163300-0028 ‘SF 34"ThickPlywoodUnderlaymentBCGradeSubiioor $396.96
‘Guanitiy UniPrice Facor TalInstatation25000x S137 x 4.1590= $996.98
UserNote:Underlaymentfrcorancountertops
Gatogoryt:03-MediumUnits(5) Catogory2:10-Specialties Category:
Tai 06163300-0028 ‘SF 84°ThickPhywoodUnderaymentBGGradeSubfoor $1,083.07
‘Guentiy UniPre Fao oarInston 650.00x sis? x s.a601= $1,083.07
UserNote:Underlaymentfrcorancountertops,
Categoryt:04-HeavyUnits(13)Category2:10Specialties Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page20of36rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: DJ69-D028.01
Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat

los-Wood,Plastic,andComposites J

142 06411800-0212 FA VanitySinkBase,2Drawer $3,411.68
‘Guanitiy UniPrice Fador ToaInstatation1300 x $208.42x 1801= so,t1908Demotton 1300x si980x sasot= 529861UserNote:providenewbathroomvantysinkcatinets
Categoryt:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites143064713000212 (0068EA ForSevileSens,RaisedPanels,Ada $880.45
‘Guanitiy UniPrice Fador ToaInstatation1300 x $5838x 1601= $800.45
UserNote:
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andCompositesYas 06461900-0005 LF 4117HighWatePineBaseMolding,AlDimensionsAveNominel $28,720.88
‘Guaniy UniPaCS Fader TaalInstatation650000x saai x sot * $26,729.68
UserNote:Insiaationofnewwallbase(500LFperunit)
Catogoryt:04-HeavyUnits(13)Category2:08-Finishes Category:
74506461000-0008 LF 4172FighWhitePineBaseMolding,AlDimensionsAveNominal $11,030.48
‘Guanitiy UniPrice Facor ToaInstatation250000x $381 x 4.1590= $11,00848
UserNote:Intalationofnewwalbase(500LFperunt)
Catogory1:03-MediumUnits(5) Category2:08-Finishes Category:
14806481900-0005 LF 4172HighWhitePineBaseMolding,AlDimensionsAveNominal $73,165.63
‘Guaniiy UniPre Fader TaalInstatation250000x saat x 4.1590* si.039.48emotion 250000x sore x 4.1580= $2,144.15{UserNote:Instlationofnewwallbase(600LFperunit)
Categoryt:02-LightUnits(5) Category2:09-Finishes Catogorys:
14706463600-0698 LF 8443-112CustomShapedPoplar $3,031.34
‘Guaniiy UniPrice Fador TalInstaation65000x. 402 x teo1= $3,031.34
UserNote:Timtocoverratatorgeps.
Category1:04-HeavyUnits(13)Category2:06-Wood,Plastics, Category:andComposites74806483600-0608 LF 14°x3-172CustomShapedPoplar $1,164.80
‘Guanitiy UniPrice Fador TotalInstatafon25000x s4cz x 4.1590= 1,104.20
UserNote:Trimtocoverratatorgaps.
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Catogorys:andComposites
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page21of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Ti ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[os-Wood,Plastic,andComposites ]
44805650000-0041 LF V2x12QuarterRoundThm,PasteMolding $18,625.41
Goan UnitPrce Faaior TearInston 850000x S247x 1.1601= s1a.a5.41
UserNote:Quarterroundornewbase.AverageofSCOLFpernit
Category:04-HeavyUnits(13)Category2:08-Wood,Pastcs, Catogorys:andComposites16006650000-0047 LF 2x12QuarerRoundThm,PasteMaking 310.14125
Goan Trice Fader Tattration 250000x s2aTx 1.1500= 57,188.88Demotion 250000x s108x 4.9590= $2,904.43UserNote:Quarterroundfornewbase.AverageofSODLFporuni
Category’:02-LightUnits(6) Category?08-Wood,Pastcs, Catogorys:andComposites7s oees0000-007 UF 2x12QuarierRoundThm,PasteMaking $7,156.85,
Goan TaitPace Faaor Teartrstasotion250000x s2a7x 4.1590= 37,188.88
UserNote:Quarterroundfornewbase.AverageofSOOLFperunt
Category’:03~MedlumUnis(6)Category2:06-Wood,Pastcs, Catogorys:andComposites
‘Subtotalfor06-Wood,Plastic,andComposite $98,794.79
[07-ThermalAndMoistureProtection ]
820792 1300-0002 ‘CLF4°x14"JointSiiconeSealantAnCaulking $1,184.61
‘Guantiy TaitPrice Far oarInston 500 x sieoa2x 4.1590= $920.63Demottion 500 x $44.00x 4.1590= 5254.98UserNote:Removalofexistingcaulkpintsandnewcaulkingaalbaoomtleartubits.
Catogoryt:03-MediumUnits(5)Catogory2:22-Plumbing Catogory4:
7 ov200.0002 08s CLF ForGalorng,Ada $5028
‘Guantiy rire Far oarInston 500 x s023 x 4.1590= 359.28
UserNote:
Catogory1:03-MediumUnis(6)Category2:22-Plumbing Catogorys:
14 o721300-00020087 GLF For1PaMidewResisantAdd $57.60
‘Goan ritPrce Faaior TearInston 500 x $998x 1.1800= 5760
UserNote:
Catogory1:03MediumUnits(5)Catogory2:_22-Plumbing Catogorys:
JOCJobOrderPackageDJ69-DC28.01 40
‘ContractsPriceProposalDeta-St Page220f34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: DJ69-D028.01
Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat

[07-ThermalAndMoistureProtection J

4850792 71300-0002 ‘CLF 1/4"x14"Joint,SilconeSealantAngCaulking $1,184.61
‘Guaniiy UniPre Factor ToaInstaiation 500 x $180.42x 11580) 020.63Demoition 500 x 44.00 x 4.1590 8254.98
UserNote:Removalofexistingcaulkjointsendnewcaulkingtalbathroomtieandtubjoints
Categoryt:02-LightUnits(5) Category2:_22Plumbing Category4:
75807 821900-0002 (0088—-CLFForColoring,Ada $50.28
‘Guanty UnitPe Factor olaInstatation 500 x si023x 11880 $59.28
UserNote:
Categoryt:02-LightUnits(5) Category2:22Plumbing Category:
17 o7@21900-0002 0087 CLF FortPartMidewResistant,Ada $57.60
‘Guantiy TatPrCe Factor ToaInstatiation 500 x $096 x 1.1890 ss7.60
UserNote:
Categoryt:02-LightUnits(5) Category2:22Plumbing Category4:
‘Subtotalfor07-ThermalAndMoistureProtection: $2,602.98

[08-Openings J

18808311300-0038 EA 12°12"RecessedStelAccessDoorWhCamLatch $2,091.32
Guan TaitPrice Faaor ToadInston 1300x sisse7x 1.1001 $2001.32
UserNote:Newaccesspanelsornewshutoffvalvesforwatershut
Categoryt:04-HeavyUnits(13) Category2:08-Openings Catogory4:
se 08311900-0088 EA 12x12"RecessedSelAccessDoorWhGamLatch $808.58
‘Guantiy ritPree Facer oatInston 500 x sis8s7x 4.1590 $903.58
UserNote:Newaccesspanelsfornewshutvalvesforwatershut
Category1:03-MediumUnits(5)Category2:08-Openings Catogorys:
16008311900-0038 EA 12x12"RecessedSoolAccesDoorWithGamLatch $803.58
Caan TaitPrice Fagor ToitInston 500 x s1s867x 1.1590 3903.58
UserNote:Newaccsspanelsornewshutvalvesforwatershut
Catagory’:02-LightUnits6) __Category2:08-Openings Catogory4:
16108511300-0220 EA 157920SFWrdow,AumiramWrdowPenning $20,328.86
‘Guantiy ritPree Facer TostInston 500 x 325978x 4.1590 s20.32008
UserNote:Insalatonofeluninumwindowwrapsfrpreventionofladdisturbance
Category’:04-HeavyUnits(13)Category2:08-Openings Categorys:
JOCJobOrderPackageDJ69-DC28.01 40
‘ControctorsPaiceProposalDetal-CS! Page25of34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: DJ69-D028.01
Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat

[08-Openings ]

16208511900-0228, EA >151020SFWindow,AluminumWindowPanning $7,816.88
‘Guaniiy UniPrice Facor ToaInstatation2500 x $260.78x 4.1590= srareee
UserNote:Instaationofeluminumwindowwrapsforpreventionofeadisturbance
Catogory1:03-MediumUnits(5) Category2:08-Openings Category:
16308511300-0229 EA >1570205FWindow,AluminumWindowPaaring 37,816.88
‘Guaniiy UniPrice Fador TealInstaation 2500 x $26078x 4.1890= $7816.88
UserNote:Insisationofeluminumwindowwrapsforpreventionofeacisturbence
Catagoryt:02LightUnits(5) Category2:08-Openings Category:
Tes 08536800-0008, EA >6108SF;InsectScreenForVinylWindows $200.68
‘Guantiy UniPrice Fador icInstaaion 500 x 3071 x 4.1500= 8177.98emotion 5.00 s3s2 x 4.1500= $22.72UserNote:WindowScreens(1perunit)
Category1:03-MediumUnits(5) Category2:08-Openings Category:
785 08586600-0008 EA >6708SF,InsectScreenForVinWindows $521.7
‘Guantiy UniPre Face oarInstateion 1300 x ss071x 4.4500= 46271
emotion 1300 x saez x 4.1500= $58.08UserNote:WindowScreens(1perunit)
Gatogoryt:04-HeavyUnits(13)Category2:08-Openings Category:
76508536600-0003 EA >6T09SF,InsectScreenForVinylWindows $200.68
‘Guaniy UniPace Fader TaalInstaaion 500 x sort x 4.1590* 817798emotion 500 x sas2 x 4.1500= samUserNote:WindowScreens(1perunit)
Categoryt:02-LightUnits(6) Category:08-Openings Categony4:
167 08596500-0008 EA >1570.20SF,InsectScreenForVinylWindows $844.96
‘Guaniiy UniPrice Fader TalInstaation 1300x $8218x 4.1890= $785.88emotion 1300x s3s2 x 1.1500= $50.08UserNote:WindowScreens(1perunit)
Categoryt:04-HeavyUnits(13) Category2:08-Openings Catogorys:
es 08596600-0008 EA >181020SF,InsectScreenForVinylWindows $324.98
‘Guanitiy UniPrice Facor ToadInstataion 00 x $5216x 4.1590= 330227Demotton 50 x sas2 x 1.1590= 32272UserNote:WindowScreens(tperunit)
Catogory1:03-MediumUnis(5) Category2:08-Openings Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page24of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01
Ti

CSINumber Mod.
‘AdditionalVacantUnitsatLangstonTerrace
VOM Description neTotat

[08-Openings J

468 0853.65.00-0008 FA >1570.20SF,InsectScreenForVinylWindows $324.98
‘Guaniiy UniPre Factor ToaInstaiation 500 x $5218x 4.1500= se0227Demoition 500 x sas2 x 1.1590= 12
UserNote:WindowScreens(1perunit)
Categoryt:02-LightUnits(5) Gategory2:08-Openings Category4:
77008536800-0008 FA >307095SF,InsectScreenForVinylWindows $1,323.00
‘Guanty UnitPre Factor ToiadInstaiation 1500 x S718 x 4.1590= 81,254.85,
Demeition 1600 x sas2 x 4.1590= $68.15UserNote:WindowScreens(8porunit)
Categoryt:02-LightUnits(5) Category2:08-Openings Category4:
Wi 08536600-0008 FA >30T035SF,nseatScreenForVinylWindows $3,499.60
‘Guantiy WatPCS Facor ToiadInstaation 3800 x S718 x 1.1890 $3.26261
Demestion 38.00x sae2 x 1.1590= Si77.49UserNote:WindowScreens(8peruit)
Catogoryt:04-HeavyUnits(13) Category2:08-Openings Catogory4:
72085968 00-0000 EA >307005SF,IneectScreenForVinylWindows $1,323.00
‘Guantiy ARPS Facer ToilInstaiation 1500 x S718 x 1890* 81,254.85
Demestion 1500 x sae2 x 1.1590= 968.15
UserNote:WindowScreens(3perunit)
Category1:03-MediumUnits(5) Category2:08-Openings Category:
‘Subtotalfor08-Openings: $48,159.99
[09-Finishes J

1730801 6081-0008 (CSFWaxAndPolishTleAndVCTFlooring $823.01
‘Guaniiy UnitPre Factor ToadInstaiation 3000 x sase7x 4.500= se23.01
Categoryt:02-LightUnits(5) Category2:09Finishes Category4:
740901 6097-0008 (0368 CSF ForAddlionalCoat,Ada $696.10
‘Guantiy atPrCe Factor ToaInstatiation3000 x $2002x 4.1890= 696.10
UserNote:
Categoryt:02 LightUnits(5) Category2:09-Finishes Category4:
175 __08016087-0008 (CSFWaxAndPoishTieAndVGTFlooring $2,199.82
‘Guantiy WatPre Facor oiad
Instaiation 7800 x 32387 x 4.4800= 32,198.82
Categoryt:04-HeavyUnits(13) Category2:09-Finishes Category4:
JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page25of34
rer2024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Tit ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[03-Finishes ]
47608016081-0008 (0366CSF_—_ForAddtionalCoat,Add $1,809.85
‘Guanitiy UniPrice Facor ToaInstatation7300 x s2o02x 4.1590= $1,900.85
UserNote:
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
17709016091-0008 ‘CSFWaxAndPolshTieAndVCTFlooring $823.01
‘Guaniy UniPrice Fador TealInstaation 3000x sase7x 4.1890= $823.01
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
760907 6097-0008 0368 CSF —_ForAddiionelCoat,Ada $686.10
‘Guentiy UniPre Far oarInston 3000 x 2002 x 4.1590= $696.10
UserNote:
ategoryt:03-MediumUnits(5) Category2:09-Finishes Category:
17309018000-0002 ‘SF RemovalOfAcousticalAndPopcamCelingsTreatment $3,806.24
‘Guanitiy UniPrice Facor ToaInstatation300000x siz x 4.1590= $9,904.24
Categoryt:03-MediumUnits(5) Category2:09-Finishes Catogorys:
780 09018000-0002 ‘SF RemovalOfAcousticalAndPopcamCelingsTreatment $778.85
‘Guaniiy UniPrice Fader TalInstaation0000 x. sii x 4.1590= $7885
Gategoryt:02-LightUnits(5) ___Category2:_09-Finishes Category:
Wei 09078000-0002 ‘SF RemovalOfAcousticalAndPopcomCelingsTreatment $10,134.63
‘Guaniy UniPas Fader TaalInstatation780000x sz x sot * $10,13463
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
Te2 08221613-0008 ‘SF___{-518With, 16°OnCarer,20Gauge,NonLosdBearing,NonStructural $9,883.95MalStudFramingWithTracksAndRunners‘Quanity UnitPrice Fader TaalInstatation520000x ste6 x 4.1590* $9,883.95
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
18308221613-0008 0013S ___For>1,000,Deduct $964.28
‘Guantiy UniPrice Fador ToadInstatafon520000x S016 x 4.1580= $90429
UserNot:
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Catogorys:
Tes 09301800-0008 ‘SF LessThan&x6"MountedFloorTieincudesglazedporcelain,unglazed $8,030.78
Porcelainandglazedcoramicties.Tesmountedfromback,sideorfrontin42°12",12"x26",orsimiarsizedsheets,

‘Quantity UnitPrice Factor oiadInstaiation850.00x 018 x 4601= 86,922.02Demeition 650.00x sia? x 1601= $1,108.48
Catogoryt:04-HeavyUnits(13) Category2:09Finishes Catogory4:
JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page28of3¢
rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Tit ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[03-Finishes ]
ies 08301300-0014 F Highx12"Long,UnpolishedCeramicCoveBase(DaltiePotato) $3,559.19
‘Guanitiy UniPrice Fador ToaInstatation280.00x sios1x 1801= $9,170.09Demotton 280.00x 8123 x sasot= 3368.10
Catogoryt:04-HeavyUnits(13)Catogory2:09-Finishes Category:
Yes 09301300-0018 EA ©High,UnpolshedCeramicCoveBaseOuterGomer $624.97
‘Guaniy UniPaCS Fader TaalInstatation5200 x si008x sso * $808.08emotion 5200 x $028 x 4601= si688
Categoryt:04-HeavyUnits(13) Category2:09-Finishes Catogorys:
187 09311300-0002 SF ThinSet-LatexPorlandGementMorar $1,123.56
‘Guanitiy UniPrice Facor ToadInstataion650.00x $1.00x 1601= 875407Demotton e000 x soao x 11601= 5360.49
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
7e8 08812300-0075 ‘SF PaintnierorPiaster/ywalWas,AcousicTexte,2CoalsFish, $8,487.52Sprayed‘Quantiy UniPrCe Faor oarInston 9.10000x 080 x 4.1590= 88,487.52
UserNote:Newtexturedpopeomcelingfish
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Category:
7e8 09912500-0075 0261 SF For>6,000"To10,000,Deduct $-843.75
‘Guanitiy UniPrice Facor ToaInstatation8,100.00x $008 x 4.1590= $848.75
UserNote:
Catogoryt:04-HeavyUnits(13)Catogory2:09-Finishes Category:
780099423000075 SF PaintinierorPlastevOrywallWels,AcousticTexture,2GoatsFish, $2,761.60Sprayed‘Quanity UniPrice Fador TealInstaation300000x 080 x 4.1890= 82,781.60
UserNote:Newtexturedpopcorncalingnish
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
Tei 0801230000750260 SF For32.500705,000,Deduct $139.08
‘uantiy UniPrice Fador ToadInstatafon300000x S004 x 4.1580= $139.08
UserNot:
Categoryt:03-MediumUnits(5) Category2:09-Finishes Catogorys:
12 099125000075 SF PabntinterorPlaste/DrywallWs,AcoustTexture,2GoalsFinish $2,781.60Sprayed‘Quanity UniPrice Facor ToaInstatation300000x $080 x 4.1590= $2,781.60
UserNote:Newtexturedpopcornclingnish
Catogoryt:02-LightUnits(5) __Catogory2:_08--Finishes Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page27of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Tit ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[03-Finishes ]
ies 088123.00-00750260 «SF _-For>2.800T05,000,Deduct $-139.08
uaniiy UniPrice Fador ToaInstatation300000x S008 x 4.1590= $130.08
UserNote:
Catogoryt:02-LightUnits(5) Catogory2:_08-Finishes Category:
194 099125000152 SF PaintnterarDaywaliPasterCelina,1CoatPam,BrushiRllorWoxk $200.02
‘Guaniy UniPrice Fador ToadInstaation60000x. $043 x 4.1890= $299.02
UserNote:applysecondcoatofpaintonwallsurfaces
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
18508012300-0836 LF PaintinterorWoodTrimTo6"Wide,2GoatsPant $260.78
‘Guanitiy UniPrice Fador ToadInstataion25000x. $080 x 4.1590= 8280-78
{UserNote:Trimpaintorradiatorsurrounds
Category1:03-MediumUnits(5) Category2:06-Wood,Plastics, Catogorys:andComposites198099743000074 ‘SF Serape,RepairArdSandSeverelyDamagedDrywallSurfaces $10,230.77
‘Guaniiy UniPre Fader ToaInstaation1550000x sos7 x 4.1590* $10298.77
UserNote:Prepseverelydamagedenstingwallsfrpaint
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
187088143000014 ‘SF Scrape,RepairAndSandSevereDamagedDrywallSuraces $28,36783
‘Guanitiy UniPrice Fador ToadInstatafon4290000x sos? x 1601= $2867.99
{UserNote:Propseverelydamagedexistingwallsfrpain.
Categoryt:04-HeavyUnits(13)Category2:09-Finishes Catogorys:
19809914300-0014 ‘SF Serape,RepairArdSandSeverelyDamagedDrywallSurfaces $1,651.58
‘Guaniiy UniPrice Fador TealInstaation250000x sos7 x 4.1890= $1,851.58,
UserNote:Propdamageérywalipastetbottomofwallswhereexistingbaseisremoved.
Category1:02-LightUnits(5) Category2:09-Finishes Category:
188 08086600-0008 F 37,38647
Fador TotalInstatafon300000x sett x 4.1580= 87,396.47
Category1:03-MediumUnits(5) Category2:09-Finishes Category:
200 08.96.6800-0006, SF 37,33647
Fador TealInstatation300000x sat x 1.1590= $7998.47
Categoryt:02-LightUnits(6) Category2:09-Finishes Catogorys:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page28of34rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat
[09-Finishes J
2010887 1823-0008 ‘SF Type1StructuralSteel$P2/3HandOrPowerToolCleaningSurface $754.74Preparation‘Quanty WatPre Facor oieInstaation 880.00x sure x 4800= $784.74
UserNote:Propofinteriorandexteriormetalsurfacesforpaint.
Category’:05-StormDoors Category:
22 0971925-0038 ‘SF SprayType1StructuralSil1.8MiPameAndTwo1.5MiAlkydFinish $1,662.47Coats‘Guaniiy UnitPre Factor ToilInstaiation 880.00x S168 x 4.1590= 81,662.47
UserNote:Paintingofinteriorandexteriormetalralings.
Categoryt:05-StormDoors Category:
‘Subtotalfor09-Finish $114,841.82
1 -Equipment J

20811304913-0023 EA 80°NonDuctedRangeHood(Broan41000) $904.83,
‘Guaniiy UniPre Factor ToaInstaiation 500 x $142.28x 4.1500= e241Demoition 500 x $2939 x 1.1590= s70.32
Category1:03-MediumUnits(5) Category2:11-Equipment Category4:
20a 17301818-0028 EA 80°NonDuctedRangeHood(Brosn41000) $904.83,
‘Guantiy WatPre Facor ToiadInstaation 500 x 14228 x 4890= $024.51
Demestion 500 x $29.38x 4.1590= si70.32
Categoryt:02-LightUnits(5) Category2:_11-Equipment Category:
20549 9018190028 EA 80°NonDuctedRangeHood(Broan41000) $2,589.01
‘Guaniiy atPrice Facor ToaInstatation 1300 x 14228 x 1.801= 82.45.77
Demestion 1300 x $2039 x 44601= $443.24
Categoryt:04-HeavyUnits(13) Category2:11-Equipment Category4:
‘Subtotalfor11-Equipment: $4,578.67
12Furnishings J
206-12211313-0004 SF 1"x0,008"Sats,AluminumHorzontalLouverBlinds $17,612.55
‘Guantiy TARPS Facer ToaInstaiation187200x S769 x saso1= $16,700.43
Demoition 187200x soz x sasot= 012.12UserNote:provi(12)new24°x72"windowblindsthroughoutuni.
Categoryt:04-HeavyUnits(13) Category2:08-Openings Category:
JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page28of34
rer024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat
12-Furnishings J
zor 42211313-0004) SF 1"x0,008"Slats,AluminumHorizontalLowerBinds $7,331.60
‘Guaniiy UnitPre Factor ToaInstaiation 780,00x S769 x 4.1500= seest.stDemoition 75000x so42 x 1.1590= $379.69
UserNote:provide(12)new24°x72"windowbindsthroughoutunt

Catogoryt:03-MediumUnis(5)Category2:08-Openings Catogorys:
20812366116-0005 SF 2ThickGoerGroupB,SoldSurfaceCouniropWith4”Backsplash $28,702.62
‘Guantiy UriPrbe Fadior oaInston 5000 x $3938x 1.1601= 2,702.82
Catogoryt:04-HeavyUnits(13) Category2:10Specialties Categorys:
20812366116-0005 SF 2 ThickGaorGroupB",SoléSutacoCountoropWith4”Backsplash $1141325
Goan UnitPrce Faaior TearInston 25000x $3938x 1.1500= s1141a25
Category1:03-MediumUnits(5)Category2:10Speciates Catogorys:
2012366116-0006 LF U2"Thick,GoerGroup"BY,SoldSuaceEndSplashForSoldSurface $2,120.43,Counterops‘Quanity UnitPrce Fadior ToitInston 130.00x $1408x 1.1601= 2,120.48
Category’:04-HeavyUnis(13)Category2:10Specialios Catogorys:
2123661 16-0006 LF U2"Thick,GoerGroup"BY,SoldSuaceEndSplashForSoldSurface 361476Counterops‘Quanity ritPrce Faaior TearInsatoton 50.00x $1408x 1.1800= so1a78
Catogory1:03-MediumUnits(5)Category2:10Specialties Catogorys:
2212366116-0007 EA CitoForSekAnd/OrFaucotloSoldSurfaceCountorop $7,106.08
Caan TaitPaice Fagor TeakInston 1300x sr3s6x 1601= $1,108.08
Catogoryt:04-HeavyUnits(13)Catogory2:10-Specialties Catogorys:
23123661160007 EA CutoutForSekAnd/OrFauoataSoldSurfaceCourterop 342501
‘uanily Tritico Faaor iattnstasotion500 x sas x 4.1590= 42st
Categoryt:03-MediumUnits(5)Category2:10Speciaes Catogory4:
Subtotalfor12-Furnishings: $70,526.30
[23-Heating,Ventilating,AndAir-Conditioning(HVAC) J
2a 23052800-0002 EA 112TrreadedOrSwoated,Wey,125LB,RegularPor,CarbonStel $69.20‘Tim,BrassBody,BalVave‘Quanity UriPrice Fagor TearInston 1000x ssoetx 4.1590= 3899.20
UserNote:Newballvavesforunitdomeswateshut
Category1:03-MediumUnis(5)Category2:22Plumbing Categorys:
JOCJobOrderPackageDJ69-DC28.01 40
‘ContractsPriceProposalDeta-St Page30of34rer2024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Tit ‘AdditionalVacantUnitsatLangstonTerraceStNumber Mod. __UOMDescription LineTotal
[23-Heating,Ventilating,AndAir-Conditioning(HVAC) }
218 23052800-0102(0120EA ForWerkInResirciodWorkingSpace,Ada $120.77
‘Guanitiy UniPrice Facor ToaInstatation10.00x sioa2x 4.1590= 8120.77
UserNote:
Catogoryt:03-MediumUnits(5) Category2:22-Plumbing Catogorys:
218 _25052800-0102, EA 12TrveadedOrSwoaied.Wy, 125LB,RegularPor,CarbonStl $693.20“Tim,BrassBody,BalVive‘Quantity UniPrice Facor TalInstatation1000 x sso8tx 4.1590= 3693.20
UserNote:Newballvalvesforunitdomesticwatershutof,
Categoryt:02LightUnits(5) Category2:22-Plumbing Category:
2725052800-0102 0120 EA ForWorkInReaitedWorkingSpace,Ads $24.18
‘Guentiy UniPrice Far oarInston 200 x stow x 4.1590= 824.18
UserNote:
Categoryt:02-LightUnits(6) Category2:22-Plumbing Category:
218 _25082800-0102 EA 172TrveadedOrSwoaied.&-Way,125LB,RegularPor,GarbonStoel $1,80231‘Tim,BrassBody,BallValve‘Quanity UniPrice Fador oralInstataion 2600 x ssostx 4.1590= $1,902.31
{UserNote:Newballvalvesforunitdomeswatershutof
Categoryt:04-HeavyUnits(13)Category2:22-Plumbing Catogorys:
219 __25052800-0102(0120EA ForWbrkInResticiedWorkingSpace,Ada $314.00
‘Guaniiy UniPrice Fader ToadInstaation 2500 x sina x. 4.1590= 931400
UserNote:
Category1:04-HeavyUnits(13)Category2:22-Plumbing Category:
‘Subtotalfor23-Heating,Ventilating,AndAir-Conditioning(HVAC): $3,647.63,
[26-Electrical ]
220-26241800-0027, EA 100AmpRating,16-20AmpBroskers,120/240Vol,3Wire,1Phase $19,823.34AssembledPanelboar,>50To100AmpMainBreaker,20CircultCapacity‘Quanity UnitPrice Factor TealInstatation 00 x $1,96075x 4.1880 $11,362.55Demoston 500 x s424eax 4.1590 $2,480.73
Catagoryt:02LightUnits(5) Category2:26-Electrical Category:
2ai___-26241600-0027 EA 100AmpRating,16-20/AmpBreakers,1207240Vol,8Wire,1Phase $19,825.34‘AssembledPanelboar,>50To100AmpMainBreaker,20CircuitCopeciy‘Quentity UnitPrice Factor icInston 500 x $1,98075x 4.1590= $11,36286
emotion 500 x S424 x 4.1500= $2,460.78
Category1:03-MediumUnits(5) Category2:26-Electrical Catogorys:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page31of34rer2024
Contractor'sPriceProposalDetail-CSIContinued..
DJ69-DC28.01
‘AdditionalVacantUnitsatLangstonTerrace
Mod. UOM Description
[26- Electrical J
JobOrderNumber:
Ti

CSINumber neTotat

22 28241600-0027, EA 100AmpRating,1620AmpBreakers,120/240Vol,$Wire,1Phase $35,940.67“AssembledPanelboar,»50To100AmpMainBreaker,20CircuitCapacity‘Quentity UnitPrice Factor iInston 1300 x $1,98075x 4.1590= $29,542.62
emotion 1300 x S42 x 41500= $6,388.05
Categoryt:04-HeavyUnits(13)Category2:26-Electrical Category:
232627 2800-0005, EA 1Gang,20/Amp,NEMA5:20,DuplexReceptacleAssembly $24,761.38
‘Guanitiy UniPrice Fador TealInstaation22100x. seas2x 1601 $17,887:30Demotion z100 x $2008x asot= $7,194.08UserNote:Replacementofdamagedreceptaces.
Categoryt:04-HeavyUnits(13) Category2:26-Electrical Catogorys:
2a 26272600-0005, EA 1Gang,20Amp,NEMA5:20,DuplexReceptacleAssembly $9,514.58
‘Guanitiy UniPrice Facor TalInstataion 8500 x $6852x 4.1590= $6,750.25Demotton 8500 x $20.08x 11590= $2,784.33UserNote:Replacementofdamagedrecepiaces
Categoryt:03-MediumUnits(5) Category2:26-Electrical Category:
725 26272600-0008, FA 1Gang,20Amp,GF,DuplexReceptacleAssembly $33,288.68
‘Guaniiy UniPrice Facor ToaInstatation2500 x $3544x 4.1590= 247562Demotton 2500 x $28.08x 4.1590= 881304UserNote:ReplacementofGCFrecopacies.
Catogory1:03-MediumUnits(5) Catogory2:26-Electrical Category:
226 26272600-0008 FA 1Gang,20Amp,GF,DuplexReceptacleAssembly $8,558.64
‘Guantiy UniPrice Fador oralInstatafion6500 x e544 x 4.1604 $6402.73emotion 6500 x $28.08x 4.1601 82,118.91UserNote:ReplacementofGOF|recepiacies.
Categoryt:04-HeavyUnits(13)Category2:26-Electrical Category:
2a 28272600-0128, EA 1Gang,20Amp,120277Vok.SPST,SwichAssembly $5,861.08
‘Guentiy UniPre Fao oarInston 5000 x 37308x 4.1590= $4,204.99
Demotton 5000 x $28.08x 4.1590= $1,626.08
Catogory1:03-MediumUnits(5) Category2:26-Electrical Categony4:
782627 2600-0128 EA 1Gang,20Amp,1207277Vok,SPST,SwitchAssembly $15,258.23
‘Guaniiy UniPrice Fador TealInstaation 13000x 87308x 1601= singetatemotion 13000x $20.08x sasot= $4231.81
Catogoryt:04-HeavyUnits(13)Category2:26-Electrical Category:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page320f34rer024
Contractor'sPriceProposalDetail-CSIContinued..

JobOrderNumber: DJ69-D028.01
Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat

[26- Electrical J

228-28511900-0528, EA 4Length,4000Lumens,SurfaceMount,VlumatrcLEDFodure(Lihonia $6,188.16stl)‘Guantiy riPre Facer oarInston 1300 x Soest x 1601= $5,815.50
emotion 1300 x s2artx 43601= 837288UserNote:KichenFodure
Catogory1:04-HeavyUnits(13)Category2:26-Electrical Category:
23026511900-0528 EA #Length,4000Lumens,SuraceMount,VelumetieLEDFixture(Uthonia $2,577.80sma)‘Quanity UniPrice Fader ToadInstaation 500 x s38561x 4.1590= 82.29461emotion 500 x sent x 1.1500= $13.19
Catogory1:03-MediumUnits(5) Category2:26-Electrical Category:
2at__26611900-0528, EA Length,4000Lumens,SufacsMount,VolumeticLEDFodure(Lithonia $2,577.80sma)‘Guantiy UniPrice Fador ToaInstaaion 500 x soe58tx 4.1590= s22me1Demotton 500 x sant x 41.1500= ss.8
Catogoryt:02-LightUnits(5) __Catogory2:_26-Electrical Category:
22-26511900-0807 EA 6Highx1.76"Wasx35"Doop15Wa,900Lumens,WhiteAayie $8,618.04Difuser.BaushedNike,LEDWalSconce(Kehler10790NILED)‘Quantiy UnitPrice Factor TearInstataion 39.00x 816598x 1601= 8748153Demotton 3900 x $2954x 11601= $1,396.50UserNote:BedroomFodures,
Categoryt:04-HeavyUnits(13) Category2:26-Electrical Category:
238-26611900-0497 EA 6°Highx11.76"Waox85"Doop,15Vat,600Lumens,WhiteAayie $1,129.45Difser,BrushedNice,LEDWalSconce(Kichler10790NILED)‘Quantity UnitPrice Factor oaInstatafion 500 x $16596x 4.1590 $958.28Demotton 500 x $2064x 1.1890 si7tas
Catogoryt:02-LightUnits(5) __Catogory2:26-Electrical Category:
Zaa___26511900-0407 EA 6°Highx1.75"Widex35"Deop,15Wis,900Lumens,WhiteAerie $1,120.45Diffuser,BrushedNickel,LEDWalSconce(Kichler10790NILED)‘Quantity UnitPrice Factor TeakInstaation 500 x 816536x 4.1890= $958.26emotion 500 x $2054x 1.1500= si71.18
Catogory1:03-MediumUnits(5) Catogory2:26-Electrical Category:
235-26511900-0881 EA 17Wats,14Dametor,2240Lumens,4000KCCT,LEDDrumFite 3291668(Erertron1OLED&X614-40)‘Quentity niPrCe Fao oarInston 1500 x $138.08x 4.1590= $2,400.17
emotion 1500 x samt x 41500= 351651
Categoryt:03-MediumUnits(5) Category2:26-Electrical Catogorys:
JOCJobOrderPackageDJ69-DC28.01 10
‘Contractor’PriceProposalDelaCSI Page35of34rer2024
Contractor'sPriceProposalDetail-CSIContinued..
JobOrderNumber: DJ69-D028.01

Ti ‘AdditionalVacantUnitsatLangstonTerrace
CSINumber Mod. UOM Description neTotat
[26-Electrical J
236-26511300-0881 EA 17Wats,14°Diameter,2240Lumens,4000CCT,LEDDrumFixture $2,916.68(Eneron10LED4x614-40)‘Quantiy WatPre Facor ToiadInstaation 1500 x $138.08x 1800= $2,400.17
Demostion 1500 x 20.71 x 4.1590= $516.51
Categoryt:02-LightUnits(5) Category2:26-Electrical Catogory4:
2ar___26611900-058 EA 17Waits,1Dametor,2240Lumens,4000KCCT,LEDDrumFaure $12,650.95(Enerion1OLED&X614-40)‘Quantity TatPrCe Factor ToaInstatiation65.00x $138.08x 601 = $10,410.82Demostion 6500 x sort x 3601= $2,240.83
UserNote:Halway,Bathroom,andEntranceFores

Categoryt:04-HeavyUnits(13) Category2:26-Electrical Category:
‘Subtotalfor26-Electrical: $171,329.91
WorkOrderProposalTotal $1,496,052.98
‘Thisworkorderproposaltotalrepresentsthecorrecttotalfortheproposal.Anydiscrepancybetweeninetotals,

‘sub-oalsandtheproposalotalduetoroundingofthelinetotalsandaub-otls.
‘ThePercentofNPPonthisProposal: 0.00%
JOGJobOrderPackageDJ69-DC26.01 10
‘Contractor'sPriceProposalDetal-CSI Page34of34
rer024

pees
Districtof Columbia Housing Authority

UtilizationCompl lanceReport
Date: ‘71812024
From: CitoIrreno
IrrenoConstructionCompanyInc

Project:AdditionalVacantUnitsatLangstonTerrace
Project#: 069-DC28.01
ProposalAmount: $1,496,052.98
NamoofContractor Ward | Trade Cortitication(s)Planned]—% ‘Actual%
[Abode,ne Maryland BE,Sections| $177,000.00]11.43% 0.00]0.00%
[ADUAppliances ha 325,000.00)5.68% 000]0.00%
DCHousing-renoConstruction bee,mee, 3540836.97|36.14%6|0.00]0.00%|Company,nc. weeHBBuilders IA $507,707.05|40.62%| sooo]0.00%
{J&PHomeSolutionsLLC ha 301,706.96]_ 6.13%| 000]0.00%
Total$1496,052.9810.00% $0.000.00%
ContractorReporting Planned ‘Retual
N/AContracting 52.43% 0.00%
(CBEContracting 36.16% 0.00%
Section3Contracting 11.43% 0.00%
MBEContracting 47.57% 0.00%
WBEContracting 38.16% 0.00%
TotalManHours FromProposal Planned| Actual
TotalProjectManHours 18,948 418,000.000.00
Section3Reporting [Section310%Goal Planned]Actual
Section3ManHours 1,804.60 440.00 0.00
NewSection3ManHires NA 0.00 0.00)
JOCJobOrderPackage-DJ69-DC28.01 412

Signature Cito lrreno
Date of Signing 08-July-2024
Firm or Corporate Name lrreno Construction Company Inc
Address , , 1207 34th Street, NW, Washington, DC 20007
Telephone Number 240-423-4 734
JOC Job Order Package - DJ69-DC28.01
{0030246 -}
GRANT/LOAN/LEASE INFORMATION
Gr
ant/Loan/Lease No. : DCHA Subsidy: $1,496,052.98
Subsidy Amt. Required This FY: $1,496,052.98 Amt. Required Next FY: N/A
Ca
ption: Irreno Construction Company Inc Term: 240 days
Doe
s this Housing Subsidy Amount exceed $1 million: Yes No
If
yes, please attach a copy of the DC Council approval and provide the following information:
Date received:__________________ Date approved:
LEAS
E INFORMATION - N/A
Lease No.:______________________ Total Cost
Location:_______________________ Annual Cost
Sq. Ft. Leased: __________________ Cost Per Sq. Ft.
Total Bldg. Sq. Ft.:_______________ % Sq. Ft. Leased By D.C.
BRIEF DESCRIPTION OF GRANT/LOAN/LEASE
SOURCE OF FUNDING
1. Appropriated 4. Intra -District
2. Capital 5. Inter -Jurisdictional
3. Grant ( ) 6. Other: (Indicate: ) Public Housing
District Funds
If procurement action is funded by grant or other non-capital or non-appropriated funds, will the
District need to expend some portion of its funds prior to receiving funds from the grantor or
other funding source?
Yes No X Not applicable
If Yes, indicate the amount the District will need to expend and the percentage this amount
represents of the total funds required to support the effort. District Funds $
%______________________.
X
GOVERNMENT OF THE DISTRICT OF COLUMBIA
PROFILE SUMMARY
(CONTRACTs TO PURCHASE, SELL, ACQUIRE, TRANSFER, LEASE OF REAL
PROPERTY/ EXCLUSIVE RIGHT AGREEMENTs/LOANs & GRANTs OVER $1M/INTRA-
DISTRICTs)
Contracting Agency: District of Columbia Housing
Authority
Agency Code
Using Agency: District of Columbia Housing
Authority
Agency Code
Loan/Grant/Lease Sub-recipient Name: Irreno Construction Co, Inc.
Should t
he D.C. Council have any questions regarding this loan/grant/lease, please contact:
Daniel Simmons (202) 627-9163
Program Manager Telephone #
TYPE OF DOCUMENT SUBMITTED
1. Loan/Grant/Lease Modification 4. Unwritten or Informal Contract
2. Exercise of Grant Option Year (E.O.) 5. Lease of Real Property
3.  Loan/Grant/Lease Modification: 6.  Other:
Job Order
Contracting for the
additional vacant units renovations at
Langston Terrace
LOAN/GRANT TYPE
1.  Subsidy 4.  Cost Reimbursement
2.  Loan Price 5.  Time and Material
3.  Task Order 6.  Advance Payment