Proposed Contract between the University of the District of Columbia and KADCON Corporation to contract No. GF-2024-C-0033

Proposed Contract between the University of the District of Columbia and KADCON Corporation to contract No. GF-2024-C-0033

Small Business
Active

The official status still shows this bill as active or still awaiting another formal step.

Sponsor
at the request of the University of the District of Columbia
Last action
2025-03-27
Official status
Deemed Approved
Effective date
Not listed

Plain English Breakdown

The exact start date and completion date are not specified in the provided official material.

Proposed Contract between UDC and KADCON Corporation

This bill proposes a firm fixed price contract between the University of the District of Columbia and KADCON Corporation for garage repairs on the Van Ness Campus.

What This Bill Does

  • Creates a firm fixed price contract between the University of the District of Columbia and KADCON Corporation to repair structural elements in the Van Ness Campus Parking Garage.
  • Sets the total cost of the contract at $3,850,200.00 for labor, materials, equipment, and supervision.
  • Specifies that the work will be completed within 450 days from when the project starts.

Who It Names or Affects

  • The University of the District of Columbia
  • KADCON Corporation

Terms To Know

Firm Fixed Price Contract
A type of contract where the price is set at the start and does not change, regardless of any cost increases or decreases.
Subcontracting Plan
A plan that outlines how a contractor will subcontract parts of their work to other businesses, often with requirements for small business participation.

Limits and Unknowns

  • The exact start date and completion date are not specified.
  • Details about the specific performance standards and expected outcomes are not fully detailed in the summary.

Bill History

  1. 2025-03-27 Council of the District of Columbia LIMS

    Retained by the Council with comments from the Committee of the Whole

  2. 2025-03-26 Council of the District of Columbia LIMS

    CA26-0101 Introduced by Chairman Mendelson at Office of the Secretary

Official Summary Text

Proposed Contract between the University of the District of Columbia and KADCON Corporation to contract No. GF-2024-C-0033

Current Bill Text

Read the full stored bill text
Maurice D. Edington, Ph.D. President

4200 Connecticut Avenue NW — Washington, DC 20008 Phone: 202.274.6016 ▪ www.udc.edu
March 26, 2025 The Honorable Phil Mendelson, Chairman Council of the District of Columbia John A. Wilson Building 1350 Pennsylvania Avenue, NW-Suite 504 Washington, DC 20004 Dear Chairman Mendelson: Pursuant to section 451(c) of the District of Columbia Home Rule Act, approved December 24, 1973 (87 Stat. 803; Pub. L. 93-198; D.C. Official Code 1-204.51) and section 202 of the Procurement Practices Reform Act of 2010, effective April 8, 2011 (D.C. Law 18-371; D.C. Official Code 2-352.02), for the Council of the District of Columbia’s consideration and approval is proposed Contract No. GF-2024-C-0033 between the University of the District of Columbia and KADCON Corporation for garage repair on the Van Ness Campus. This firm fixed price contract of $3,850,200.00 covers labor, materials, equipment, and supervision to repair structural elements in the University’s Van Ness Campus Parking Garage at 4200 Connecticut Avenue, NW Washington, DC 20008. The scope includes repairing concrete cracks, concrete surfaces, concrete columns, beams, walls, and stairs, as well as replacing expansion joints, deck drains, deteriorated steel, and waterproofing. The contract's period of performance is from the date of the Notice to Proceed not to exceed 450 consecutive calendar days. As always, I am available to discuss any questions you may have regarding the proposed contract modification. In order to facilitate a response to any questions you may have, please have your staff contact Ms. Mary Ann Harris, Chief Contracting Officer, at (202) 274-5426. I look forward to a favorable consideration of this contract modification. Sincerely, Maurice Edington, Ph.D. President
1

GOVERNMENT OF THE DISTRICT OF COLUMBIA
Office of Contracting and Procurement

Pursuant to section 202(c) of the Procurement Practices Reform Act of 2010, as amended, D.C.
Official Code § 2-352.02(c), the following contract summary is provided:

COUNCIL CONTRACT SUMMARY
(Standard and Multiyear)

Van Ness Parking Garage Emergency Structural Repairs

(A) Contract Number: GF-2024-C-0033

Contractor: KADCON Corporation

Phase I Contract Award Amount: $3,850,200.00

Unit and Method of Compensation: US Dollars

Term of Contract: From start date in the Notice to proceed not to exceed
450 days thereafter

Type of Contract: Firm Fixed Price

Source Selection Method: Competitive Sealed Bidding

(B) For a contract containing option periods, the contract amount for the base period and for each
option period. If the contract amount for one or more of the option periods differs from the
amount for the base period, provide an explanation of the reason for the difference:

N/A

(C) The goods or services to be provided, the methods of delivering goods or services, and any
significant program changes reflected in the proposed contract:

The University of the District of Columbia Capital Planning and Construction Division is seeking an
experienced Contractor to provide all labor, materials, equipment, and supervision to repair structural
elements in the University’s Van Ness Campus Parking Garage at 4200 Connecticut Avenue, N.W.
Washington, D.C. 20008. This scope includes repairing concrete cracks, concrete surfaces, concrete
columns, beams, walls, and stairs, as well as replacing expansion joints, deck drains, deteriorated steel,
and waterproofing.

2

The University proposes to enter into a firm fixed price contract with KADCON Corporation, in the
amount of three million eight hundred fifty thousand two hundred dollars and zero cents
($3,850,200.00).

The Contract Administrator for this contract is hereby requesting an issuance to KADCON
Corporation to perform the Construction Services.

The Contractor's proposal was reviewed and found to be consistent with the Contractor's initially
submitted bid and is in line with the independent government’s estimate. Therefore, the proposal is
considered fair and reasonable and recommended for acceptance.

(D) The selection process, including the number of offerors, the evaluation criteria, and the
evaluation results, including price, technical or quality, and past performance components:

This IFB is designated only for certified small business enterprises (SBE) with a requirement that 35%
be subcontracted to a small business that is certified by the D.C. Department of Small Local Business
Development (DSLBD) unless the prime contractor is certified and will perform 100% of the work.
Applicable preference points for certified small business enterprise (SBE) pursuant to the provisions of
the “Small and Certified Business Enterprise Development and Assistance Act of 2014”, D.C. Official
Code § 2- 218.01 et seq., as amended, shall be applied to price evaluation. Bidders must provide
documentation with their bid submission that the certified small business identified in their proposed
Subcontracting Plan has agreed to be a part of the contract as stated in the Plan. Bids responding to
this IFB may be rejected if the bidder fails to submit a subcontracting plan required by law. Bidders
and their subcontractors may apply for DSLBD certification online by going to https://dslbd.dc.gov
and selecting “Get Certified.” Questions about certification email should be directed to
cbe.info@dc.gov.

The solicitation was issued on September 20, 2024, and there were five (5) amendments issued . The
following bids were received on November 14, 2024.

NO. CONTRACTOR BID PRICE
CERTIFICATION
No.
Preference
Points Price Reduction CBE Price
1 KADCON Corporation $ 3,850,200.00 LSDX95309072027 12% $ 462,024.00 $ 3,388,176.00
2 Concrete Strategies $ 4,717,050.00 0%
3 Protec Construction $ 4,407,924.73 LSDX95309072027 12% $ 528,950.97 $ 3,878,973.76
4 Plenary Enterprise, LLC $ 5,410,075.00 LSDZRE24944032025 12% $ 649,209.00 $ 4,760,866.00

(E) A description of any bid protest related to the award of the contract, including whether the
protest was resolved through litigation, withdrawal of the protest by the protestor, or voluntary
corrective action by the District. Include the identity of the protestor, the grounds alleged in the
protest, and any deficiencies identified by the District as a result of the protest:

The Contract award was not protested.

(F) The background and qualifications of the proposed contractor, including its organization,
financial stability, personnel, and performance on past or current government or private sector
contracts with requirements similar to those of the proposed contract:
3

The contractor has adequate financial resources to perform the contract or the ability to obtain those
resources.

The contractor submitted, along with their bid, a bid guarantee of 5% of the total contract price.
KADCON Corporation shall provide, at the time of the contract award, a 100% performance bond and
50% payment bond in the total amount payable under the terms of the contract.

Surety for this project is Nationwide Mutual Insurance Company, located in Columbus, OH. Surety is
licensed to conduct business in the District of Columbia as well as in Maryland and Virginia.

The contractor EEO Employer Information Report and agreement to comply with the requirements of
Mayor's Order 85-85 was approved on December 2, 2024.

The contractor's First Source Agreement was approved on January 16, 2025.

The contractor has a satisfactory record of compliance with the law, i.e., clean hands certification First
Source Agreement and Affirmation action plan approved by the Office of Human Rights, has a license
to do business in the District, and is not suspended or debarred by the district government.

The contractor has the ability to obtain the necessary organization, experience, accounting, operational
control, and technical skills.

The University has no knowledge that the contractor has an unsatisfactory record of integrity or
business ethics.

(G) A summary of the subcontracting plan required under section 2346 of the Small, Local, and
Disadvantaged Business Enterprise Development and Assistance Act of 2005, as amended, D.C.
Official Code § 2-218.01 et seq. (“Act”), including a certification that the subcontracting plan
meets the minimum requirements of the Act and the dollar volume of the portion of the contract
to be subcontracted, expressed both in total dollars and as a percentage of the total contract
amount:

The Contracting Officer determined that the company has a subcontracting plan that meets the 35%
requirement.

(H) Performance standards and the expected outcome of the proposed contract:

The contractor shall provide the services required according to the contract specifications , delivery
schedule and dollar amount.

(I) The amount and date of any expenditure of funds by the District pursuant to the contract prior
to its submission to the Council for approval:

N/A

(J) A certification that the proposed contract is within the appropriated budget authority for the
agency for the fiscal year and is consistent with the financial plan and budget adopted in
accordance with D.C. Official Code §§ 47-392.01 and 47-392.02:
4

The University of the District of Columbia’s Chief Finance Officer has certified that funds are
available in the proposed contract amount for the services required on March 20, 2025.

(K) A certification that the contract is legally sufficient, including whether the proposed contractor
has any pending legal claims against the District:

The University of the District of Columbia’s General Counsel has certified that the contract is legally
sufficient, and that the contractor has no pending legal claims against the District on March 4, 2025.

(L) A certification that Citywide Clean Hands database indicates that the proposed contractor is
current with its District taxes. If the Citywide Clean Hands Database indicates that the
proposed contractor is not current with its District taxes, either: (1) a certification that the
contractor has worked out and is current with a payment schedule approved by the District; or
(2) a certification that the contractor will be current with its District taxes after the District
recovers any outstanding debt as provided under D.C. Official Code § 2-353.01(b):

The Citywide Clean Hands database certified on December 30, 2024, that the contractor is current
with its District taxes.

(M) A certification from the proposed contractor that it is current with its federal taxes, or has
worked out and is current with a payment schedule approved by the federal government:

The contractor has certified that it is current with its federal taxes.

(N) The status of the proposed contractor as a certified local, small, or disadvantaged business
enterprise as defined in the Small, Local, and Disadvantaged Business Enterprise Development
and Assistance Act of 2005, as amended; D.C. Official Code § 2-218.01 et seq.:

The contractor is certified by the DC Department of Small and Local Business Development. Its
certification number is LSDX95309072027. Its certification expires July 9, 2027.

(O) Other aspects of the proposed contract that the Chief Procurement Officer considers significant:

N/A

(P) A statement indicating whether the proposed contractor is currently debarred from providing
services or goods to the District or federal government, the dates of the debarment, and the
reasons for debarment:

The contractor is not debarred from providing services or goods to the District or federal government
according to the DC Office of Contracts & Procurement’s Excluded Parties List and the Federal
Government’s System for Award Management.

(Q) Any determination and findings issues relating to the contract’s formation, including any
determination and findings made under D.C. Official Code § 2-352.05 (privatization contracts):

None
5

(R) Where the contract, and any amendments or modifications, if executed, will be made available
online:

The Contract and any amendments or modifications will be available on the University of the District
of Columbia, Office of Contracting Procurement website.

https://www.udc.edu/about/administration/procurement/solicitations

(S) Where the original solicitation, and any amendments or modifications, will be made available
online:

The Contract and any amendments or modifications will be available on the University of the District
of Columbia, Office of Contracting Procurement website.

https://www.udc.edu/about/administration/procurement/solicitations

Certificate of Insurance
1101 4th Street, SW
Washington, DC 20024
Date of Notice: December 30, 2024 L0012964829Notice Number:
FEIN: **-***7040
Case ID: 18416032

Government of the District of Columbia
Office of the Chief Financial Officer
Office of Tax and Revenue
KADCON CORPORATION
1053 31ST ST NW STE A
WASHINGTON DC 20007-4428

Branch Chief, Collection and Enforcement Administration
Authorized By Melinda Jenkins
To validate this certificate, please visit MyTax.DC.gov. On the MyTax DC homepage, click the
“Validate a Certificate of Clean Hands” hyperlink under the Clean Hands section.
CERTIFICATE OF CLEAN HANDS
As reported in the Clean Hands system, the above referenced individual/entity has no outstanding
liability with the District of Columbia Office of Tax and Revenue or the Department of Employment
Services. As of the date above, the individual/entity has complied with DC Code § 47-2862, therefore
this Certificate of Clean Hands is issued.
TITLE 47. TAXATION, LICENSING, PERMITS, ASSESSMENTS, AND FEES
CHAPTER 28 GENERAL LICENSE
SUBCHAPTER II. CLEAN HANDS BEFORE RECEIVING A LICENSE OR PERMIT
D.C. CODE § 47-2862 (2006)
§ 47-2862 PROHIBITION AGAINST ISSUANCE OF LICENSE OR PERMIT
1101 4th Street SW, Suite W270, Washington, DC 20024/Phone: (202) 724-5045/MyTax.DC.gov

Funding Certification

Office of the Chief Financial Officer

4200 Connecticut Avenue N.W. | Building 39, 2nd Floor | Washington, DC 20008 | 202.274.5488 | udc.edu

TO: Mary Ann Harris
Director of Contracting & Procurement
University of the District of Columbia

FROM: Brian Connell
Budget Officer
University of the District of Columbia

DATE: March 20, 2025

RE: Funding Certification for KADCON Corporation

This memorandum is to certify that funds are available in the amount of $3,850,200.00 in the
FY25 Capital Budget to satisfy the proposed contractual obligation with KADCON
Corporation for the Van Ness Parking Garage Emergency Structural Repairs Project scheduled
for Fiscal Year 2025. These funds are under Index CP76D, Account 71300.

Should you require additional information, please contact me at 202-274-6057.

Fiscal Impact Statement

4200 Connecticut Avenue NW | Washington, DC 20008

TO: The Board of Trustees
FROM: Managing Director of Finance
DATE: February 11, 2025
SUBJECT: GF-2024-B-0033, “Van Ness Parking Garage Emergency Structural Repairs”

Conclusion

It has been concluded that the University has sufficient funding in the FY202 5 Capital
Construction Budget to fund the $3,850,200.00 costs to complete the general contractor
construction services on the “ Van Ness Parking Garage Emergency Structural Repairs ”
project at the Van Ness Campus.

Background

The University’s mission of providing educational programs that encourage, promote, and
increase student enrollment and student retention will be enhanced by this completed project.
The “Van Ness Parking Garage Emergency Structural Repairs” project will complete required
emergency repairs critical to a safe parking infrastructure at the University’s Van Ness
Campus.

This project was issued in a solicitation to certified businesses only . The low bid contract
amount of $3,850,200.00 is for all costs to complete construction activities as detailed in the
construction documents, including a phased construction sequence that will minimally disrupt
parking while completing the required structural repairs.

Financial & Risk Assessment

Based on the information provided there are no known risks to the University at this time.

Legal Sufficiency

Office of the General Counsel

4200 Connecticut Avenue NW, Bldg. 39, Room 301-R | Washington, DC 20008 | 202.274.5400 fax: 202-274-5320 | www.udc.edu

CERTIFICATE

To: The Honorable Phil Mendelson
Chairman
Council of the District of Columbia
1350 Pennsylvania Avenue, NW, Suite 504
Washington, DC 20004

From: Avis Marie Russell
General Counsel

Re: Legal Sufficiency Certification – Proposed Contract GF-2024-B-0033 Van Ness Parking
Garage Emergency Structural Repairs Project by and between Kadcon Corporation and
the Board Of Trustees of the University of the District Of Columbia

Date: March 4, 2025

This is to certify that the Office of the General Counsel has reviewed the above -referenced Proposed
Contract GF -2024-B-0033 Van Ness Parking Garage Emergency Structural Repairs Project by and
between Kadcon Corporation and the Board Of Trustees of the University of the District Of Columbia
and found such Contract to be le gally sufficient subject to submission of any required materials and
Council approval.

If you have any questions, please do not hesitate to contact me on (202) 274-5604.

By: ___________________________
Avis Marie Russell
General Counsel
University of the District of Columbia

Resolution
KADCON Corporation - Van Ness Parking Garage Emergency Structural Repairs Project
BOARD OF TRUSTEES
UNIVERSITY OF THE DISTRICT OF COLUMBIA
UDC RESOLUTION NO. 2025 - 06
SUBJECT: APP ROVAL OF PROPOSE D CONTRACT GF-2024-B-0033 VAN NESS
PARKING GARAGE EMERGENCY STRUCTURAL REPAIRS PROJECT
BY AND BETWEEN KADCON CORPORATION AND THE BOARD OF
TRUSTEES OF THE UNIVERSITY OF THE DISTRICT OF COLUMBIA
(“CONTRACT”)
WHEREAS, in accordance with the D.C. Official Code §38-1202.01(a)(8), the Board of Trustees
(“Board”) is charged with the responsibility of governing the University and possesses all of the
powers necessary or convenient to make contracts and procure and contract for goods and services;
and
WHEREAS, pursuant to 8B DCMR §3000.4, specific approval of the President is required for
contracts totaling two hundred fifty thousand dollars ($250,000) or more; and
WHEREAS, pursuant to 8B DCMR §205.4(e), specific authorization of the Board is required for
any commitment greater than one million dollars ($1,000,000) in a single fiscal year; and
WHEREAS, in accordance with the D.C. Official Code §1-204.51(b)(1), approval of the Council
of the District of Columbia (“Council”) is required for all contracts involving expenditures in excess
of one million dollars ($1,000,000) during a 12-month period; and
WHEREAS, KADCON Corporation and the University desire to enter into the proposed Contract
for the Van Ness Parking Garage Emergency Structural Repairs Project in the total amount of three
million eight hundred fifty thousand two hundred dollars ($3,850,200); and
WHEREAS, KADCON Corporation and the University desire to enter into the proposed Contract;
and
WHEREAS, the President has approved the Contract; and
WHEREAS, the Board is satisfied that the Contract represents the proper culmination of the
University’s procurement process and represents the best value to the University; and
NOW THEREFORE BE IT RESOLVED, that, subject to the required approval of the Council,
the Board of Trustees approves the Contract and each the President and the University’s Chief
Contracting Officer are authorized to execute the Contract in substantially the form attached hereto
as Attachment A.
KADCON Corporation - Van Ness Parking Garage Emergency Structural Repairs Project
BOARD OF TRUSTEES
UNIVERSITY OF THE DISTRICT OF COLUMBIA
UDC RESOLUTION NO. 2025 - 06
BE IT FURTHER RESOLVED, that as soon as practicable, the President is hereby directed to
transmit the Contract to the Council for its approval.
Submitted by the Operations Committee: February 11, 2025
Approved by the Board of Trustees: February 25, 2025
Christopher D. Bell
Chairperson of the Board

Contract
1
GOVERNMENT OF THE DISTRICT OF COLUMBIA
University of the District of Columbia
CONSTRUCTION CONTRACT
CONTRACT NO.
GF-2024-C-0033
DATE OF CONTRACT
NAME AND ADDRESS OF CONTRACTOR
KADCON Corporation
1053 31st Street NW
Washington, DC 20007
TYPE OF ORGANIZATION (“x”)
 INDIVIDUAL  PARTNERSHIP
JOINT VENTURE X CORPORATION
STATE OF INCORPORATION
Washington, DC
CONTRACT FOR (work to be performed)
KADCON Corporation, hereinafter referred to as “the Contractor,” and The Board of Trustees for the
University of the District of Columbia, hereinafter referred to as the “University,” mutually agree as
follows:
The University, in consideration of the bid price in the amount of three million eight hundred fifty
thousand two hundred and zero dollars and zero cents ($3,850,200.00), enters this firm fixed price
contract with KADCON Corporation, for the Van Ness Parking Emergency Structural Repairs.
The University, represented by the Office of Contracting and Procurement, in executing this contract, and
the Contractor, mutually agree to perform this contract in strict accordance with this contract document,
including the Solicitation (IFB No. GF-2024-B-0033), and the Contractor's bid. These documents are
incorporated herein by reference and made a part hereof.
The following addition to the contract is hereby stipulated and agreed to by the parties hereto:
A. General Provisions
1. Time for Completion
Work shall commence on the date specified in a written Notice to Proceed to be issued by the Office
of Strategic Sourcing and Procurement and shall continue WITHOUT INTERRUPTION until
completion and acceptance. The contract shall be completed within four hundred and fifty (450)
calendar days after such notice.
2. Liquidated Damages
Partial acceptance shall not preclude LIQUIDATED DAMAGES for failure to complete the contract
within the required time limits established under TIME FOR COMPLETION in Section F.1. For
each day after the phased completion date outlined in the period of performance, LIQUIDATED
DAMAGES in the amount of $1,090.00 will be levied against the General Contractor. This amount
represents the cost associated with Project Management, Construction Management and QA/QC
Inspection.
3. L iving Wage Act
Effective January 1, 2024, until June 30, 2024, the living wage rate is $17.05 per hour. Effective July
1, 2024, the District’s Minimum Wage and Living Wage will increase to $17.50.
2
4. Labor Wage Determinations
All reference to Wage Determination No. DC20240002 August 23, 2024, shall be replaced with General
Decision Number: DC20230002.
B. Order Of Precedence And Documents Incorporated By Reference
The following documents are hereby incorporated into and made a part of this Contract. Any
inconsistency in this contract shall be resolved by giving precedence in the following order:
1. Sections A and B of this contract;
2. IFB No. GF-2023-B-0033 all attachments and amendments;
3. Standard Contract Provisions (SCP) For Use With Specifications for the District of Columbia
Government Construction Projects, March 2011;
4. Contract attachments other than the Standard Contract Provisions;
5. Contractor’s Bid
Form No. DC 26-40-6 86-4005-1, wd-206
In witness whereof, the parties hereto have executed this Contract as of the date entered on the first page hereof.
3
AWARD (The Contractor is not required to sign this document). Your bid on this solicitation is
hereby accepted.

By
Mary Ann Harris
Chief Contracting Officer
Office of Contracting and Procurement
Rev. July 1986 86-p4005-2 wd-206

1
1
/
1
4
/
2
0
2
4

Eddie Whitaker
University of the District of Columbia
4200 Connecticut Avenue, NW
Washington, DC 20008

Attn: Contracting Officer

Reference: Invitation for Bid No. GF-2024-B-0033, Van Ness Emergency Garage Structural Repairs

Dear Mr. Whitaker:

On

behalf

of

K
A
D
C
O
N

C
o
r
p
o
r
a
t
i
o
n
,

I

am

pleased

to

submit

this

proposal

in

response

to

the

University

of

the

District

of

Columbia
’
s

Invitation

for

Bid

(
IFB
)

No
.

GF
-
2024
-
B
-
0033
,

Van

Ness

Emergency

Garage

Structural

Repairs

for

the

University

of

the

District

of

Columbia
.

The

Offeror

has

reviewed

the

IFB

and

the

attachments

to

it
,

as

well

as

any

addenda

to

it
,

and

has

conducted

due

diligence

and

analysis

as

the

Offeror
,

in

its

sole

judgment
,

has

deemed

necessary

to

submit

its

Bid

in

response

to

the

IFB
.

The

Bidder
’
s

proposal

is

as

follows
:

PRICE

SCHEDULE
]

The

contractor

must

bid

a

lump

sum

fixed

price

for

the

following

contract

line

items

(
CLINs
)

described

below
.

Contract Line
Item No. (CLIN)
ITEM DESCRIPTION

Total Price
B.3
Van Ness Emergency Garage Structural Repairs
LUMP SUM BID PRICE
The Bidder’s Price Bid shall include a detailed breakdown in Sections B.6 of the total cost proposed

C
h
a
i
r
m
a
n

1 0 5 3 31 S T S T R E E T NW | W A S H I N G T O N DC 2 0 0 0 7 | T EL : 2 0 2 . 9 4 4 . 9 4 0 0 | WWW . K A D C O N . C O M
R
i
a
d

K
a
d
i
s
s
i
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
3,850,200
GF-2024-B-0033 Van
Ness Parking Garage Emergency Structural Repairs

P
age 1 of 41

1. So
licitation No.

G
F-2024-B-0033
2. T
ype

[ X] Sealed Bid
[ ] Sealed Proposal
3. Da
te
Issued

09/20/2024
Page

1 of 41
Not counting
attachments
4. Co
ntract Number 5. Requisition/Purchase Request No.

190564408

6.
[ ] O
pen M
arket with set aside for SBE
subcontracting (see Section M
.1.6

[x] CBE Set-As
ide (See B.2 & Sec. M)
Mandatory 35% S
BE s
ubcontracting with
Section M.2.5 and M.1.6
7. Issu
ed By:
Eddie Whitaker, Contracting Officer
c/o Michiko Gadson, Contract Specialist
University of the District of Columbia
Office of Contracting and Procurement
4200 Connecticut Avenue NW Bldg. 39 Suite 200C
Washington, DC 20008
8. Address Bid To:
Mary Ann Harris, Chief Contracting Officer
c/o Michiko Gadson, Senior Contract Specialist
University of the District of Columbia
Office of Contracting and Procurement
4200 Connecticut Avenue NW Bldg. 39 Suite 200C
Washington, DC 20008
9
. FOR
INFORMATION
CONTACT
A. Name

Michiko Gadson
B Telephone

202-274-5191
C. E-Mail Address

mgadson@udc.edu
IM
PORTANT – The “Bidder” Section of this form must be completed by the Bidder
SO
LICITATION
N
OTE: In sealed bid solicitations “bid” and Bidder” mean “bid” and bidder”
1
0. Sealed bids shall be sent to the email address shown in item 9.C, not less than 2:00 p.m. local time on October 17, 2024.
1
1.The University requires performance of work described in strict accordance with the following:
D
ESCRIPTION SECTION PAGE
S
olicitation Bid/Award Form A 1-2
S
chedule for Construction, Alterations, Repair, Price B 3-5
S
cope/Specifications/Drawings C 6-7
P
ackaging and Markings D 8
I
nspection and Acceptance E 9
D
eliveries and Performance F 10
Co
ntract Administration Data G 11-15
S
pecial Contract Requirements H 16-20
Co
ntract Clauses I 21-31
L
ist of Attachments J 32
Re
presentations, Certifications and Other Statements of Bidders K 33
I
nstructions to Bidders L 34-39
E
valuation Preference Points M 40-41

12
. The contractor shall begin performance on the date specified in the written [] Award [ X] NTP and complete all work
not later than 450 days from the start date specified in NTP. This period of performance is [ x] Mandatory [] Negotiable.
1
3. The contractor SHALL furnish a bid bond with bid submission, and performance and payment bonds
(Attachment J.11) within 5 calendar days after receiving the UDC Notice of Intent to Award.
14.
Additional Solicitation Considerations
A. All bids are subject to the work requirements, provisions and clauses incorporated in this solicitation in full text or by reference.
B. A BID GUARANTEE [ X] is required [] is not required
P
ERFORMANCE AND PAYMENT BONDS are also required pursuant to Article 12 Sections A, B, and C of the Government of the
District of Columbia Standard Contract Provisions for use with Specifications for District of Columbia Government Construction
P
rojects (R
evised March 2011).
U
NIVERSITY OF THE DISTRICT OF COLUMBIA OFFICE OF CONTRACTING AND PROCUREMENT

GF-2024 -B-0033
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178

2

BI
D (MUST BE FULLY COMPLETED BY

BIDDER

PRIOR TO SUBMISSION TO UDC)

15.

Nam
e, Company Name and Address of
Bid
or
/Bidder (with zip code)

16.

T
elephone No.

( )

18.

R
emittance

Address (if
different than item 15)

17.

E-
m
ail address

19.

Th
e
bid or
/bidder agrees to perform the work required at the prices specified herein and according to the BID SCHEDULE (Section B) and in strict
accordance with the terms of this solicitation, if this
bid
/bid is accepted by the University within ____ calendar days after the date
bid
s/bids are due.

20.
The bid or/bidder agrees to furnish any required performance and payment bonds.

2
1. ACKNOWLEDGEMENT OF AMENDMENTS

Th
e
bid
or/bidder acknowledges receipt of amendments to the solicitation (number and date each) See

Section L.11

Am
endment
Number

Date

22
.
Name and Title of Person authorized to sign
bid/bid
(Type of Print)

2
2A. Signature

22B.
Bid
/Bid Date

AWARD
(To be completed by the University)

2
3. Amount

24. Accounting and Appropriations data

2
5. PAYMENT WILL BE MADE BY:

University of the District of Columbia

Office of the Controller/Agency CFO

4200 Connecticut Avenue
, NW
Washington, DC 20008

26. Submit invoices as instructed in Section G of this solicitation
(Contract Administration Data)

C
ONTRACTING OFFICER WILL COMPLETE ITEM 27 OR 28 AS APPLICABLE

2
7. []

NEGOTIATED
AGREEMENT

(The Contractor is required to sign this
document and return ___ copies to the issuing office. The Contractor agrees to
furnish and deliver all items or perform all work requirements for the consideration
stated in this contract. The rights and obligations of the parties of this contract shall
be governed by (a) this contract award, (b) the solicitation, and (c) clauses,
representations, certifications, and specifications incorporated by reference in or
attached to this contract.

28. []
AWARD
(
The contractor is not required to sign this document).
Your
bid
on this solicitation is hereby accepted. This award
consummates the contract which consists of (a) the solicitation and
your
bid
, and (b) this contract award. No further contractual
document is necessary.

2
9. Name and Title of Contractor of Person Authorized to sign (Type or Print)

3
0. Name of CO (Type of Print)

2
9A. Signature

29B. Date

30A. Signature

30B. Date

U
NIVERSITY OF THE DISTRICT OF COLUMBIA OFFICE OF
CONTRACTING

AND PROCUREMENT

S
ECTION B: SCHEDULE FOR CONSTRUCTION, ALTERATIONS, REPAIRS PRICE

KADCON Corporation
1053 31st Street NW,
Washington DC 20007 rkadissi@kadcon.com
202 944-9400
1 2 3 4 5
9/26/24 10/7/24 10/28/24 11/6/24 11/7/24
Riad Kadissi
Chairman
11/14/24
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
3,850,200

3

B.1

The University of the District of Columbia Capital Planning and Construction Division is seeking
an
experienced Contractor to provide all labor, materials, equipment, and supervision to repair
structural elements in the University’s Van Ness Campus Parking Garage at 4200 Connecticut
Avenue, N.W. Washington, D.C. 20008. This scope includes repairing concr
ete cracks, concrete
surfaces, concrete columns, beams, walls and stairs, as well
as
replacing expansion joints, deck
drains, deteriorated steel, and waterproofing.

B.2

The University contemplates
the award of a
fixed
-
price
contract as
authorized by the District of
Columbia Procurement Practices Reform Act of 2010 (PPRA) Section 503 and the District of
Columbia Municipal Regulations (DCMR) Title 8B Section 3021.

B.3

[PRICE SCHEDULE]

The contractor must bid a lump sum fixed price for the following contract line items (CLINs) as
described below.

Contract Line
Item No. (CLIN)

ITEM DESCRIPTION

Total Price

B3.001

Van Ness Parking Garage Emergency Structural Repairs

$

LUMP SUM BID PRICE

Enter Lump Sum Price in
W
ord
s
:

The Bidder’s Price Bid shall include a detailed breakdown in Sections B.6 of the total cost proposed

B.4

ESTIMATED PRICE RANGE

$2,600,000.00 - $3,400,000.00

B.
5
DESIGNATION OF SOLICITATION FOR THE
SBE SET
-
ASIDE
WITH 35%
SUBCONTRACTING TO DSLBD CERTIFIED SMALL BUSINESS REQUIREMENT

This IFB is designated only for certified small business enterprise
s (S
BE) with a requirement that
35% be subcontracted to
a
small business that is certified by the D.C. Department of Small Local
Business Development (DSLBD) unless the prime contractor is certified and will perform 100%
of the work. Applicable preference points for certified small business enterprise (SBE) purs
uant
to the provisions of the “Small and Certified Business Enterprise Development and Assistance
Act of 2014”, D.C. Official Code § 2
-218.01
et seq
., as amended
,
shall be applied to price
evaluation. Bidders must provide documentation with their bid submission that the certified small
business identified in their proposed Subcontracting Plan has agreed to be a part of the contract
as stated in the Plan.

Bids responding to this IFB may be rejected if the bidder fails to submit a
subcontracting plan required by law.
Bidders and their subcontractors may apply for DSLBD
certification online by going to
https://dslbd.dc.gov

and select
ing

“Get Certified.”
Questions
about certification email should be directed to
cbe.info@dc.gov
.

B.6
.1 PRICE

BREAKDOWN

B.6.1 The bidder shall complete this breakdown of prices from CLIN B3.001 and submit it with

its bid. In case of any discrepancy in the bid price entered here and the lump sum price in B3.001,
Van Ness Parking Garage
Emergency Structural Repairs, Section B.6.l below shall govern.

Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
3,850,200
Three million, eight hundred fifty thousand, two hundred Dollars

4

* Division means a discrete component of the work for which a separate price is requested. The
“Total Price Breakdown" is the sum of all components and must equal the Lump Sum Bid Price.

DIVISION NO.

*

DESCRIPTION

TOTAL

PRICE

BREAKDOWN

Div.

01

General

Requirements

$

Div.

02

Existing

Conditions

$

Div.

03

Concrete

$

Div.

04

Masonry

$

Div.

05

Metals

$

Div.

06

Wood,

Plastic

$

Div.

07

Thermal

and

Moisture

Protection

$

Div.

08

Openings

$

Div.

09

Finishes

$

Div.

10

Specialties

$

Div.

11

Equipment

$

Div.

12

Furnishings

$

Div.

13

Special Construction

$

Div.

14

Conveying Systems

$

Div.

21

Fire

Suppression

$

Div.

22

Plumbing

$

Div.

23

Heating,

Ventilating

&

Air

Conditioning

$

Div. 25

Integrated
Automation

$

Div.

26

Electrical

$

Div.

27

Communications

$

Div. 28

Electronic Safety & Security

$

Div. 31

Earthworks

$

Div.

32

Exterior Improvements

$

Div.

33

Utilities

$

Div. 34

Transportation

$

Lump Sum

Bid

Price

Lump Sum Bid Price

$

Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
465,400
282,300
2,340,000
263,000
278,000
221,500
3,850,200
DSLBD Certification
DSLBD HOME (http:/ /dslbd.dc.gov)
Business Certification Information
Kadcon Corporation
Certification Information
Previous Page
Trade Name (Doing Business As):
Description: General Contracting.
Specialities: Historical Renovations, Interior Buildout.
Principal Owner: Riad Kadissi
Contact Name: Riad Kadissi
Address: 1053 31ST STREET NW,WASHINGTON,DC 20007
Phone: 2029449400
Fax: 2029449401
Email: rkadissi@kadcon.com
Website: www.kadcon.com
Date Established: January 12, 1994
Organization Type: Corporation
Ward: 2
Categories
Local Business Enterprise (LBE)
Disadvantaged Business Enterprise (DBE)
Longtime Resident Business (LRB)
Small Business Enterprise (SBE)
NIGP Codes
Primary Business Services
Certification Number: LSDX95309072027
Expiration Date: July 9, 2027
Preference Points: 12
% of Price Reduction: 12%
Show 10 entries Search:
Showing 1 to 10 of 16 entries Previous 1 2 Next
CODE DESCRIPTION
9107500 Wall and Ceiling Repair and Replacement (Including Drywalling)
9124000 Demolition Services
9140000 CONSTRUCTION SERVICES, TRADE (NEW CONSTRUCTION)
9142700 Carpentry
9145500 Masonry
9146100 Painting and Wallpapering
9181900 Buildings, Structures and Components Consulting
9183100 Construction Consulting
9186300 Housing Consulting
9187500 Management Consulting
Construction Contracting: 100%
Wage Determination
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Docusign Envelope ID: DE37A80E-302E-4615-988D-B122AA5A3178
Living Wage Act
GOVERNMENT OF THE DISTRICT OF COLUMBIA
Department of Employment Services

MURIEL BOWSER DR. UNIQUE MORRIS-HUGHES
MAYOR DIRECTOR

4058 Minnesota Ave, N.E. • Suite 3600 • Washington, D.C. 20019 • Office: 202.671.1900
LIVING WAGE ACT FACT SHEET

The Living Wage Act of 2006, D.C. Code §§ 2- 220.01 – 2-220.11, provides that District of Columbia government
contractors and recipients of government assistance (grants, loans, tax increment financing) , in the amount of
$100,000 or more, shall pay affiliated employees wages at no less than the current living wage rate.
Effective January 1, 2025 until June 30, 2025, the Living Wage rate is $17.50
per hour.
Effective July 1, 2025, the District’s Minimum Wage and Living Wage rates
will increase to $17.95 per hour.

Subcontractors of D.C. government contractors , who receive $15,000 or more from the contract , and subcontractors
of the recipients of government assistance, who receive $50,000 or more from the assistance, are also required to pay
their affiliated employees no less than the current living wage rate.
“Affiliated employee” means any individual employed by a recipient who receives compensation directly from
government assistance or a contract with the District of Columbia government, including any employee of a
contractor or subcontractor of a recipient who performs services pursuant to government assistance or a contract.
The term “affiliated employee” does not include those individuals who perform only intermittent or incidental
services with respect to the government assistance or contract, or who are otherwise employed by the contractor,
recipient or subcontractor.
Exemptions – The following contracts and agreements are exempt from the Living Wage Act:
1. Contracts or other agreements that are subject to higher wage level determinations required by federal
law (i.e., if a contract is subject to the Service Contract Act and certain wage rates are lower than the
District’s current living wage, the contractor must pay the higher of the two rates);

2. Existing and future collective bargaining agreements, provided that the future collective bargaining
agreement results in the employee being paid no less than the current living wage;

3. Contracts for electricity, telephone, water, sewer or other services provided by a regulated utility;

4. Contracts for services needed immediately to prevent or respond to a disaster or imminent threat to
public health or safety declared by the Mayor;

5. Contracts or other agreements that provide trainees with additional services including, but not limited
to, case management and job readiness services, provided that the trainees do not replace employees
subject to the Living Wage Act;

6. An employee, under 22 years of age, employed during a school vacation period, or enrolled as full-time
student, as defined by the respective institution, who is in high school or at an accredited institution of
higher education and who works less than 25 hours per week; provided that students not replace
employees subject to the Living Wage Act;

7. Tenants or retail establishments that occupy property constructed or improved by receipt of
government assistance from the District of Columbia; provided, that the tenant or retail establishment
did not receive direct government assistance from the District of Columbia;

8. Employees of nonprofit organizations that employ not more than 50 individuals and qualify for taxation
exemption pursuant to Section 501 (c) (3) of the Internal Revenue Code of 1954, approved August 16,
1954 (68 A Stat. 163; 26. U.S.C. §501(c)(3));

9. Medicaid provider agreements for direct care services to Medicaid recipients, provided, that the direct
care service is not provided through a home care agency, a community residence facility, or a group
home for persons with intellectual disabilities as those terms are defined in section 2 of the Health-Care
and Community Residence Facility, Hospice, and Home Care Li censure Act of 1983; D.C. Official
Code § 44-501; and

10. Contracts or other agreements between managed care organizations and the Health Care Safety Net
Administration or the Medicaid Assistance Administration to provide health services.

Enforcement
The Department of Employment Services (DOES) Office of Wage -Hour and the D.C. Office of Contracting and
Procurement share monitoring responsibilities.
Home Care Final Rule: The Department of Labor extended overtime protections to home care workers
and workers who provide companionship services. Employers within this industry are now subject to
recordkeeping provisions.
If you learn that a contractor subject to this law is not paying at least the current living wage, you should report it to
the contracting officer. If you believe that your employer is subject to this law and is not paying at least the current
living wage, you may file a complaint with the DOES Office of Wage - Hour, located at 4058 Minnesota Avenue,
N.E. Suite 3600, Washington, D.C. 20019, call (202) 671-1880, or file your claim on-line: www.does.dc.gov. Go to
“File a Claim” tab.
For questions and additional information, contact the Office of Contracting and Procurement at (202) 727-0252 or the
Department of Employment Services on (202) 671-1880.
Please note: This fact sheet is for informational purposes only as required by Section 106 of the Living Wage Act. It should not
be relied on as a definitive statement of the Living Wage Act or any regulations adopted pursuant to the law.
THE LIVING WAGE ACT OF 2006
D.C. Code §§ 2-220.01 – 2-220.11
Recipients of new contracts or government assistance shall pay affiliated employees and subcontractors who
perform services under the contracts no less than the current living wage.
Effective January 1, 2025 until June 30, 2025, the Living Wage rate is $17.50 per hour.
Effective July 1, 2025, the District’s Minimum Wage and Living Wage rates will increase to
$17.95 per hour.
The requirement to pay a living wage applies to:
 All recipients of contracts in the amount of $100,000 or more, and all subcontractors that receive
$15,000 or more from the funds received by the recipient from the District of Columbia, and
 All recipients of government assistance in the amount of $100,000 or more, and all subcontractors of
these recipients that receive $50,000 or more from the government assistance received by the
recipient from the District of Columbia.
“Contract” means a written agreement between a recipient and the District government.
“Government assistance” means a grant, loan, or tax increment financing that result in a financial benefit
from an agency, commission, instrumentality, or other entity of the District government.
“Affiliated employee” means any individual employed by a recipient who received compensation directly
from government assistance or a contract with the District of Columbia government, including employees of
the District of Columbia, any employee of a contractor or subcontractor of a recipient who performs
services pursuant to government assistance or contract. The term “affiliated employee” does not include
those individuals who perform only intermittent or incidental services with respect to the contract or
government assistance or who are otherwise employed by the contractor, recipient, or subcontractor.

Certain exemptions apply: 1) Contracts or agreements subject to wage determinations required by federal law
which are higher than the wage required by this Act; 2) Existing and future collecting bargaining agreements,
provided that the future agreement results in employees being paid no less than the current living wage; 3)
contracts for electricity, telephone, water , sewer performed by regulated utilities; 4) contracts for services needed
immediately to prevent or respond to a disaster or imminent threat declared by the Mayor; 5) contracts awarded to
recipients that provide trainees with services, including but not limited to case management and job readiness
services, provided the trainee does not replace employees; 6) employees under 22 years of age employed during a
school vacation period, or enrolled as a full-time student who works less than 25 hours per week; 7) tenants or
retail establishments that occupy property constructed or improved by government assistance, provided there is no
receipt of direct District government assistance; 8) employees of nonprofit organizations that employ not more
than 50 individuals and qualify for 501(c)(3) status; 9) Medicaid provider agreements for direct care services to
Medicaid recipients, provided, that the direct care service is not provided through a home care agency, a
community residence facility, or a group home for persons with intellectual disabilities as those terms are defined
in section 2 of the Health-Care and Community Residence Facility, Hospice, and Home Care Licensure Act of
1983; D.C. Code § 44-501; and 10) contracts or agreements between managed care organizations and the Health
Care Safety Net Administration or the Medicaid Assistance Administration to provide health services.

Home Care Final Rule: The Department of Labor extended overtime protections to home care workers and
workers who provide companionship services. Employers within this industry are now subject to recordkeeping
provisions.

Each recipient and subcontractor of a recipient shall provide this notice to each affiliated employee covered by this notice, and
shall also post this notice in a conspicuous site in its place of business. All recipients and subcontractors shall retain payroll
records created and maintained in the regular course of business under District of Columbia law for a period of at least 3 years.

To file a claim, visit: Department of Employment Services, Office of Wage-Hour, 4058 Minnesota Avenue, NE, Suite 3600,
Washington, D.C. 20019; call: (202) 671-1880; or file your claim on-line: does.dc.gov. Go to “File a Claim” tab.
Standard Contract Provisions
Page 1
Government of the District of ColumbiaSTANDARD CONTRACTPROVISIONSFor Use WithSpecifications forDistrict of Columbia GovernmentConstruction Projects(Revised March 2011)
PLEASE RETAIN FOR YOUR REFERENCE
Page 2
INDEX INSTRUCTIONS TO BIDDERS PAGEQualification of Bidders ..........5Bid Documents ....5 Examination of Bid .... .................. Error in Bids ... 5 Labor and Material Not Furnished by District .. 5 Addenda and Interpretations .. 6Alternate Bids .... 6Bids for All or Part .... 6Price Schedule Interpretation .... 6 Corrections ... 6 Bond ............ A. Bid Guaranty .. ................ 6B. Performance Bond .. ................. ..7C. Payment Bond .. ................ .7D. Bond Source ................ ..7Signature to Bids ..........7Marking and Mailing Bids ......8Receiving Bids, Modifications or Withdrawals . ...........8Withdrawal of Bids .. ............8Opening of Bids .. ...8 ....Cancellatio ....Contract and Bond .....GENERAL PROVISIONS Definitions Specifications and Drawings Changes A. Designated Change Orders B. Other Change Orders C. General Requirements D. Change Order Breakdown EQUITABLE ADJUSTMENT OF CONTRACT TERMS Differing Site Conditions
Page 3
INDEX (Continued)PAGESignificant Changes in Character of Work ... 13Termination-Dela... ... ....14 ... 15 .... 19 ... 21Transfer or Assignment... .... 21Material and Workmanship. .... 21 .... 22District Material .... 22 .... 22 .... 22 .... 23 .... 3Inspection and Acceptance ... 23Superintendence by Contractor ... 24Permits and Responsibilities ... 24Indemnification ... 24Protection Against Trespass . ... 24Conditions Affecting the Work ...... 24A. General .... 24B. Work and Storage Space .... 24C. Work on Sundays, Legal Holidays and at Night .... 24 D. Existing Features .... 24E. Utilities and Vaults .... 25F. Site Maintenance .... 25 G. Private Work ....25H. District of Columbia Noise Control Act of 1977. 25Other Contracts .. 25Patent Indemnity. ... 26Additional Bond Security . ... 26Covenant Against Contingency Fees. ... 26Appointment of Attorney.. ... 26District Employees Not to Benefit... ... 26Waiver... .... 27Buy American.. ... 27A. Agreement .... 27B. Domestic Construction Material ... 27C. Domestic Component ... 27
Page 4
.......... 7Taxes A. Federal Excise Taxes ... 27B. Sales and Use Taxes .. 27Suspension of Work ..... 28Safety Program . 28 A. General ...... 28 B. Con ... 29Retention of Records .... 29Recovery of LABOR PROVISIONS Davis-Bacon Act 30Minimum Wages .. ............30B. Withholding ..30 ............... 30Convict Labor ..................................................................... 31Apprentices and Trainees . 31 .... 31 ... 31 ... 31Contract Work Hours and Safety Standards Act . 32A. Overtime Basis .... 32B. Liability for Unpaid Wages .... 33C. Disputes .... 33D. Violation Penalty ... 34E. Health and Safety Standards ....... 34Copeland Act . 34A. Definition .... 34B. Weekly Compliance Statement .... 34C. Payrolls and Records ... .34D. Payroll Deductions Not Subject to Secretary of Labor Approval ....35E. Payroll Deductions Subject to Secretary of Labor Approval .... 36F. Applications for Secretary of Labor Approval .... 36G. Action by Secretary of Labor Upon Applications .... 36H. Prohibited Payroll Deductions .... 36I. Methods of Payment of Wages ..... 37Non-segregated Facilities Termination and Debarment .. 37 Form - .... 38Form .... 39
Page 5
INSTRUCTIONS TO BIDDERS(Construction)ARTICLE 1. QUALIFICATIONS OF BIDDERSBidders shall have the capability to perform classes of work contemplated, have the necessary plant and sufficient capital to execute the work properly within specified time. Any Bidder who has not performed comparable work for the District within the last 5 years shall manpower, financial resources, and construction experience that he considers will qualify him for proposed contract. This information shall be certified by a Certified Public Accountant for Inc.., at 008, or on an approved equivalent form. This requirement is not needed if the bidder has submitted such a statement to the District within a year prior to bid opening date, but will be required if bidder has previously submitted such a statement under-one company name or organization or joint venture and is now bidding under another company name or organization or joint venture. A certified statement of prequalification approval by another jurisdiction may be considered as an alternative to foregoing procedure. A bidder shall submit a supplemental statement if requested by the District. ARTICLE 2. BID DOCUMENTSThe Specifications (including all documents referenced therein and all documents attached thereto), drawings and addenda which form the basis of any bid shall be considered as part thereof and will form part of the bid. Copies of these documents will be furnished to or made available for the inspection of prospective bidders by that office indicated in the advertisement or invitation. ARTICLE 3. EXAMINATION OF BID DOCUMENTS AND SITE OF WORKEach Bidder shall carefully examine the site of the proposed work and the bid documents and fully acquaint himself with conditions relating to construction and labor so that he may fully understand the facilities, difficulties and restrictions attending the execution of the work under the bid documents, and he shall judge for and satisfy himself as to conditions to be encountered affecting the character, quality and quantity of the work to be performed and materials to be furnished arid to the relieve him from any obligation under his bid or contract. ARTICLE 4. PREPARATION FOR BIDSThe bid form furnished in the bid proposal and specifications shall be used in strict compliance with the requirements of the Invitation and Supplemental Instructions to Bidders in the specifications. Special care shall be exercised in the preparation of bids. Bidders must make their own estimates of the facilities and difficulties to be anticipated upon execution of the contract, including local conditions, uncertainty of weather and all other contingencies. All designations and prices shall be fully and clearly set forth in the bid submission. ALL PRICES SHALL BE INSERTED IN FIGURES TYPED OR PRINTED LEGIBLY ON THE BID FORM. All corrections on the bid documents must be initialed by the person signing the bid form. ARTICLE 5. ERROR IN BIDSBidders or their authorized agents are expected to examine all bid documents and any addenda thereto, and all other instructions pertaining to the work which ot constitute reason for relief on plea of error in the bid. IN CASE OF ERROR IN THE EXTENSION OF PRICES IN THE BID, UNIT PRICES WILL GOVERN. The bidder must submit his plea of error in writing to the Contracting Officer and must be prepared to document and prove his error. ARTICLE 6. LABOR AND MATERIAL NOT FURNISHED BY DISTRICTThe District will not furnish any labor, material or supplies unless a provision to do so is included in the contract documents.
Page 6
ARTICLE 7. ADDENDA AND INTERPRETATIONSNo oral interpretations of the meaning of the drawings, specifications or other bid documents will be made to any bidder. Verbal clarification will not be binding on the District. All requests must be in writing and addressed to the Contracting Officer responsible for administering the contract. Requests for interpretations of bid documents must be received by the Contracting Officer not later than 10 days prior to bid opening date. All changes to the bid documents will be made by addenda mailed to all prospective bidders, who have obtained copies of the bid documents, not later than 7 days before bid opening date. In case of discrepancy among addenda, a later dated addendum has priority over earlier dated addenda. It shall bnsibility to make inquiry as to any or all addenda issued, and failure of any prospective bidder to receive any such addenda issued by the Contracting Officer shall not relieve the bidder from any obligation under his bid as submitted. Bidders must acknowledge receipt of all addenda on the Bid Form; failure to do so may result in rejection of bid.. All addenda issued shall become part of the bid and contract documents. - ARTICLE 8. ALTERNATE BIDSAlternate bids will not be considered unless called for in the Bid Form. ARTICLE 9. BIDS FOR ALL OR PARTWhere bids are not qualified by specific limitations, the District reserves the right to award all or any of the items according to its best interests. ARTICLE 10. PRICE SCHEDULE INTERPRETATIONQuantities appearing in the Price Schedule are approximate only and are prepared for the comparison of bids. Payment will be made only for actual material requirements accepted and for work performed and accepted.Schedule quantities may be increased., decreased or omitted and there shall be no adjustment in contract unit prices except as provided, and except for such materials actually purchased or work actually performed prior to notification of the change in items affected. The price for any item, unless otherwise specified, shall include full compensation for all needed to complete specified items. Prices without exception shall be net, not subject to discount, and shall include all royalties and costs arising from patents, proprietary items, trademarks and copyrights. ARTICLE 11. CORRECTIONSErasures and other changes in bids must be explained or noted over the signature of the bidder. ARTICLE 12. BOND REQUIREMENTS A. BID GUARANTYOn all bids of $100,000.00 or more, security is required to insure the execution of the contract. No bid will be considered unless it is so guaranteed. Each bidder must furnish with his bid either a Bid Bond (Form No. DC 2640-5), with good and sufficient sureties, a certified check payable to the order of the Treasurer of the District of Columbia (uncertified check will not be accepted), negotiable United States bonds (at par value), or an irrevocable letter of credit in an amount not less than five percent (5%) of the amount of his bid, as a guaranty that he Will not withdraw said bid within the period specified therein after the opening of the same; or, if no period be specified, within ninety (90) days after said opening, and will, within the period specified therefore, or, if no period be specified, within ten (10) days, after the prescribed forms are forwarded to him for execution (or within any extension of time which may be granted by the officer to whom the bid was addressed) execute and deliver a written contract on the standard District form in accordance with bid as accepted and give bond with good and sufficient sureties, as specified below for the faithful performance and proper fulfillment of such contract and payment of laborers and material men as required by law or, in the event of the withdrawal of said bid within the period above stated, or the failure to enter into such contract and give such bond within the time above stated, that he will pay to the District the difference between the amount specified in said bid and the amount for which the District may procure the required work, if the latter amount be in excess of the former. In case security is in the form of a certified check or United States bonds, the District may make such disposition of the same as will accomplish the purpose for which
Page 7
checks and United States bonds will be returned to the unsuccessful bidders after award of contract and to successful bidders after the signing of prescribed forms of contract and bonds. Guaranty bonds will be returned only upon written application. B. PERFORMANCE BONDFor any construction contract exceeding $100,000.00, a Performance Bond (Form No. DC 2640-7) shall be required in a penal amount equal to one hundred percent (100%) of the contract price at time of award. Additional performance bond protection shall be required in connection with any modification effecting an increase in price under any contract for which a bond is required pursuant to the above if: 1. The modification is for new or additional work which is beyond the scope of the existing contract; or, 2. The modification is pursuant to an existing provision of the contract and is expected to increase the contract price by $50,000 or twenty-five percent (25%) of the original total contract price, whichever is less. The penal amount of the bond protection shall be increased so that the total performance bond protection is one hundred percent (100%) of the contract price as revised by both the modification requiring such additional protection and the aggregate of any previous modification. The increased penal amount may be secured either by increasing the bond protection provided by existing surety or sureties or by obtaining an additional performance bond from a new surety. C. PAYMENT BOND In accordance with the provisions of Section 504(b) of the District of Columbia Procurement Practices Act of 1985, payment bonds shall be required in an amount not less than fifty percent (50%) of the total amount payable by the terms of the contract. Additional payment protection shall be required in connection with any notification effecting an increase in price under any contract for which a bond is required pursuant to the above if 1. The modification is for new or additional work which is beyond the scope of the existing contract; or 2. The modification is pursuant to an existing provision of the contract and is expected to increase the contract price by $50,000 or twenty-five percent (25%) of the original total contract price, whichever is less. The penal amount of the additional bond protection shall generally be such that the total payment bond protection is fifty percent (50%) of the contract price as revised by both the modification requiring such additional protection, and the aggregate of any previous modifications. The additional protection may be secured either by increasing the bond protection provided by the existing surety or sureties or by obtaining an additional payment bond from a new surety. D. BOND SOURCEThe bonds may be obtained from any surety company authorized by the U.S. Treasury Department as acceptable sureties on Federal Bonds and authorized to transact business in the District of Columbia by the Director, Department of Insurance, Securities and Banking. ARTICLE 13. SIGNATURE TO BIDSEach bid must show the full business address of the bidder and be signed by him with his usual signature. Bids by partnerships must be signed with the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and designation of the person signing. Bids by corporations must be signed with the name of the corporation, followed by the signature and
Page 8
designation of the President or Vice President and attested by the Secretary of the corporation or other persons authorized to bind the corporation and the corporate seal affixed thereto. If bid is signed by other than the President or Vice President, evidence of authority to so sign must be furnished in the form of an extract of minutes. of a meeting of the Board of Directors or extract of bylaws certified by the Corporate Secretary and corporate seal affixed thereto. The names of all persons signing shall be typed or printed below the signatures. A bid by a person who affixes to without disclosing his principal, may be held personally to the bid. Bids submitted by a joint venture must be signed by all authorized parties to the joint venture. ARTICLE 14. MARKING AND MAILING BIDSBids, addenda acknowledgment, and bid guaranty must be securely sealed in suitable envelopes, addressed and marked on the outside with the name of the bidder, invitation number and date of opening. ARTICLE 15. RECEIVING BIDS, MODIFICATIONS OR WITHDRAWALSBids received prior to the time set for opening will be securely kept unopened. The officer whose duty it is to open them will decide when the specified time has arrived and no bid received thereafter will be considered unless: (1) they are sent by registered mail or by certified mail for which an official dated post office stamp (postmark) on the original Receipt for Certified Mail has been obtained and it is determined by the District that the late receipt was due solely to delay in the mails for which the bidder was not responsible; or (2) if submitted by mail (or by telegram if authorized by the Contracting Officer), it is determined by the District that the late receipt was due solely to mishandling by the District after receipt at the District agency: Provided, that timely receipt. at such agency is established upon examination of an appropriate date or time stamp or other documentary evidence of receipt within the control of such agency. Bidders using certified mail are cautioned to obtain a receipt for certified mail showing legible, dated postmark and to retain such receipt against the chance that it will be required as evidence that a late bid was timely mailed. The only evidence acceptable in this matter is as follows: (1) where the Receipt of Certified Mail identifies the post office station of mailing, evidence furnished by the bidder which establishes, that the business day of the station ended at an earlier time, in which case the time of mailing shall be deemed to be last minute of the business day; or (2) anentry in ink on the Receipt for Certified Mail showing the time of mailing and the initials of postal employee receiving the item and making the entry, with appropriate written verification of such entry from the post office station of mailing, in which case the time of mailing, shall be the time shown in the entry. If the postmark on the original Receipt for Certified Mail does not show a date, the bid shall not be considered. The time of mailing of late bids submitted by registered or certified mail shall be deemed to be the last minute of the date shown in the postmark on the registered mail receipt or registered mail wrapper or on the Receipt for Certified Mail unless the bidder furnishes evidence from the post office station of mailing which establishes an earlier time. No responsibility will attach to the District or any of its officers or employees for the premature opening of a bid not properly addressed and identified. Unless specifically authorized, telegraphic bids will not be considered, but modifications, by telegram, of bids already submitted will be considered if received prior to the hour set for opening, but should not reveal the amount of the original or revised bid. ARTICLE 16. WITHDRAWAL OF BIDSBids may be withdrawn on written or telegraphic request received from bidders prior to the time fixed for opening, provided the name of the bidder appears on the outside of the envelope containing the bid. Negligence on the part of the bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened. ARTICLE 17. OPENING OF BIDSAt the time fixed for the opening of bids, their contents will be made public by the Office of Contracting and Procurement for the information of bidders and other properly interested persons. ARTICLE 18. AWARD OR REJECTIONThe Contract will be awarded to the lowest responsible Bidder complying with conditions of the bid documents, provided his bid is reasonable and it is in the best interest of the District to accept it. The Bidder, to whom award is made, will be notified by
Page 9
the Contracting Officer at the earliest possible date. The District, however, reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in the best interest of the District. If more than one bid be offered by any one party, by or in the name of his or their clerk, partner, or other person, all such bids may be rejected. This shall not prevent a Bidder from proceeding under Article 8 hereof, nor from quoting different prices on different qualities of material or different conditions of delivery. A supplier or material man who has quoted prices on materials to a Bidder is not thereby disqualified from quoting to other bidders or from submitting a bid directly for the materials or work. Each Bidder shall submit a bid on all items in the Price Schedule; failure to bid on all items may result in bid rejection. In addition to requirements for qualification of bidders as set forth in Article 1 hereof, and as determined by the District, proposals will be considered irregular and may be rejected by the Contracting Officer for any of, but not limited to, the following reasons: A. Incompetency, inadequate plant or insufficient capital statement on AGC or equivalent form. B. Evidence of collusion. C. Uncompleted work which might hinder or prevent proper and prompt execution and completion of work contemplated. D. Evidence that Bidder has not adequately considered all aspects of contemplated work. E. Failure to settle bills satisfactorily, claims and judgments due for labor and material on cts in force on bid opening date. F. Default under previous contracts. G. Unacceptable rating as listed on published government lists. H. Proposal submission on form other than that form furnished by District, or altered or partially detached form. I. Unauthorized additions, deletions, omissions, conditional bids, or irregularities which may make proposal incomplete or ambiguous in meaning. J. Failure to acknowledge all addenda issued. K. Failure to submit bid in the properly labeled receptacle at that location designated as the Office of Contracting and Procurement, Bid Room, Suite 700, 441 4th St., N.W.,Washington, D.C. 20001 and prior to the time set for opening as governed by the Official Clock designated as such in that Bid Room. ARTICLE 19. CANCELLATION OF AWARDSThe right is reserved to the District, without any liability upon the District, to cancel the award of any contract at any time prior to approval of a formal written contract signed by the Contractor and the Contracting Officer. ARTICLE 20. CONTRACT AND BONDThe Bidder to whom award is made must, when required, enter into a written contract on the standard District form, with satisfactory security in the amount required (see Article 12) within the period specified, or no period be specified, within 10 days alter the prescribed forms are presented to him for signature.
Page 10
GENERAL PROVISIONS(Construction Contract) ARTICLE 1. DEFINITIONS A. mbia, a municipal corporation. B. as used herein means the elected head of the District as set forth in Public Law 93-198 dated December 24, 1973, Title 4, Part B, Section 422(1). C. ed herein means the District official authorized to execute and administrate the Contract on behalf of the District. D. Instructions to Bidders, General Provisions, Labor Provisions, Performance and Payment Bonds, Specifications, Special Provisions, Contract Drawings, approved written Change Orders and Agreements required to acceptably complete the Contract, including authorized extensions thereof. ARTICLE 2. SPECIFICATIONS AND DRAWINGSThe Contractor shall keep on the work site a copy of Contract drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the Contract drawings, or shown on the Contract drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. All Contract requirements are equally binding. Each Contract requirement, whether or not omitted elsewhere in the Contract, is binding as though occurring in any or all parts of the Contract. In case of discrepancy: 1. The Contracting Officer shall be promptly notified in writing of any error, discrepancy or omission, apparent or otherwise. 2. Applicable Federal and D. C. Code requirements have priority over: the Contract form, General Provisions, Change Orders, Addenda, Contract drawings, Special Provisions and Specifications. 3. The Contract form, General Provisions and Labor Provisions have priority over: Change Orders, Addenda, Contract drawings, Special Provisions and Specifications. 4. Change Orders have priority over: Addenda, Contract drawings and Specifications. 5. Addenda have priority over: Contract drawings, Special Provisions and Specifications. A later dated Addendum has priority over earlier dated Addenda. 6. Special Provisions have priority over: Contract drawings and other specifications. 7. Shown and indicated dimensions have priority over scaled dimensions. 8. Original scale drawings and details have priority over any other different scale drawings and details. 9. Large scale drawings and details have priority over small scale drawings and details. 10. Any adjustment by the Contractor without a prior determination by the Contracting Officer shall be at his own risk and expense. The Contracting Officer will furnish from time to time such detail drawings and other information as he may consider necessary, unless otherwise provided.
Page 11
ARTICLE 3. CHANGESA. DESIGNATED CHANGE ORDERSThe Contracting Officer may, at any time, without notice to the sureties, by written order designated or indicated to be a change order, make any change in the work within the general scope of the Contract, including but not limited to changes 1. In the Contract drawings and specifications; 2. In the method or manner of performance of the work; 3. In the District furnished facilities, equipment, materials or services; or 4. Directing acceleration in the performance of the work. Nothing provided in this Article shall excuse the Contractor from proceeding with the prosecution of the work so changed. B. OTHER CHANGE ORDERSAny other written order or an oral order (which term as used in this Section (B) shall include direction, instruction, interpretation, or determination) from the Contracting Officer which causes any such change, shall be treated as a Change Order under this Article, provided that the Contractor gives the Contracting Officer written notice stating the date, circumstances and sources of the order and that the Contractor regards the order as a Change Order. C. GENERAL REQUIREMENTSExcept as herein provided, no order, statement or conduct of the Contracting Officer shall be treated as a change under this Article or entitle the Contractor to an equitable adjustment hereunder. If any change under this Article causes an increase or decrease in the , or the time required for, the performance of any part of the work under this Contract whether or not changed by any order, an equitable adjustment shall be made and the Contract modified in writing accordingly; provided, however, that except for claims based on defective specifications, no claim for any change under (B) above shall be allowed for any cost incurred more than 20 days before the Contractor gives written notice as therein required unless this 20 days is extended by the Contracting Officer and provided further, that in case of defective drawings and specifications, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with such defective drawings and specifications. If the Contractor intends to assert a claim for an equitable adjustment under this Article, he must, within 30 days after receipt of a written Change Order under (A) above or the furnishing of a written notice under (B) above, submit to the Contracting Officer a written statement setting forth the general nature and monetary extent of such claim, unless this period is extended by the Contracting Officer. The statement of claim hereunder may be included in the notice under (B) above. No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under the Contract. D. CHANGE ORDER BREAKDOWNContract prices shall be used for Change Order work where work is of similar nature; no other costs, overhead or profit will be allowed. Where Contract prices are not appropriate and the nature of the change is known in advance of construction, the parties shall attempt to agree on a fully justifiable price adjustment and/or adjustment of completion time. When Contract prices are not appropriate, or the parties fail to agree on equitable adjustment, or in processing claims, equitable adjustment for Change Order work shall be per this Article and Article 4 and shall be based upon the breakdown shown in following
Page 12
subsections 1. through 7. The Contractor shall assemble a complete cost breakdown that lists and substantiates each item of work and each item of cost.1. LaborPayment will be made for direct labor cost plus indirect labor cost such as insurance, taxes, fringe benefits and welfare provided such costs are considered reasonable. Indirect costs shall be itemized and verified by receipted invoices. If verification is not possible, up to 18 percent of direct labor costs may be allowed. In addition, up to 20 percent of direct plus indirect labor costs may be allowed for overhead and profit. 2. BondPayment for additional bond cost will be made per bond rate schedule submitted to the Office of Contracting and Procurement with the executed Contract. 3. MaterialsPayment for cost of required materials will be F.O.B. destination (the job site) with an allowance for overhead and profit. 4. Rented EquipmentPayment for required equipment rented from an outside company that is neither an affiliate of, nor a subsidiary of, the Contractor will be based on receipted invoices which shall not exceed rates given in the current edition of the Rental Rate Blue Book for Construction Equipment published by Data Quest. If actual rental rates exceed manual rates, written justification shall be furnished to the Contracting Officer for consideration. No additional allowance will be made for overhead and profit. The Contractor shall submit written certification to the Contracting Officer that any required rented equipment is neither owned by nor rented from the Contractor or an affiliate of or subsidiary of the Contractor. 5. Payment for required equipment owned by the Contractor or an affiliate of the Contractor will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the District will be based on one-half the derived hourly rate under this subsection. 6. MiscellaneousNo additional allowance will be made for general superintendence, use of small tools and other costs for which no specific allowance is herein provided. 7. Subcontract WorkPayment for additional necessary subcontract work will be based on applicable procedures in 1. through 6., to which total additional subcontract work up to an additional 10 percent may be allowed for the ARTICLE 4. EQUITABLE ADJUSTMENT OF CONTRACT TERMS The Contractor is entitled to an equitable adjustment of the contract terms whenever the following situations develop: Differing Site Conditions: (1) During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the Contractor, upon discovering such conditions, shall promptly notify the Contracting Officer in writing of the specific differing conditions before they are disturbed and before the affected work is performed.
Page 13
(2) Upon written notification, the Contracting Officer will investigate the conditions, and if he/she determines that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding loss of anticipated profits, will be made and the contract modified in writing accordingly. The Contracting Officer will notify the Contractor of his/her determination whether or not an adjustment of the contract is warranted. (3) No contract adjustment which results in a benefit to the Contract will be allowed unless the Contractor has provided the required written notice. (4) No contract adjustment will be allowed under this clause for any effects caused on unchanged work. Suspension of Work Ordered by the Contracting Officer: (1) If the performance of all or any portion of the work is suspended or delayed by the Contracting Officer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the Contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the Contractor shall submit to the Contracting Officer in writing a request for equitable adjustment within seven (7) calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. (2) Contracting Officer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control or and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the Contracting Officer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The Contracting Officer will notify the Contract of his/her determination whether or not an adjustment of the contract is warranted. (3) No contract adjustment will be allowed unless the Contractor has submitted the request for adjustment within the time prescribed. (4) No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided for or excluded under any other term of condition of this contract. Significant Changes in the Character of Work: (1) The Contracting Officer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the Contractor agrees to perform the work as altered. (2) If the alterations or changes in quantities significantly change the character of the work under the contract, whether or not changed by any such different quantities or alterations, an adjustment, excluding loss of anticipated profits, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the Contractor in such amount as the Contracting Officer may determine to be fair and reasonable.
Page 14
(3) If the alterations or changes in quantities significantly change the character of the work to be performed under the contract, the altered work will be paid for asprovided elsewhere in the contract. (4) circumstances: (a) When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or (b) When an item of work is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in the case of a decrease below 75 percent, to the actual amount of work performed. ARTICLE 5. TERMINATION-DELAYSIf the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will insure its completion within the time specified in the Contract, or any extension thereof, or fails to complete said work within specified time, the District may, by written notice to the Contractor, terminate his right to proceed with thework or such part of the work involving the delay. In such event the District may take over the work and prosecute the same to completion, by contract or otherwise, and may take possession of and utilize in completing the work such materials, appliances, and plant as may have been paid for by the District or may be on the site of the work and necessary therefore. Whether or not the any liability to the District resulting from his refusal or failure to complete the work within the specified time. If fixed and agreed liquidated damages are provided in the Contract and if the District does not so will consist of such liquidated damages until the work is completed or accepted. resulting damage if: 1. The delay in the completion the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, acts of the public enemy, acts of the District in either its sovereign or contractual capacity, acts of another contractor in the performance of a contract with the District, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, climatic conditions beyond the normal which could be anticipated, or delays of subcontractors or suppliers arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and such subcontractors or suppliers (the term subcontractors or suppliers shall mean subcontractors or suppliers at any tier); and 2. The Contractor, within 10 days from the beginning of any such delay, (unless the Contracting Officer grants a further period of time before the date of final payment under the Contract) notifies the Contracting Officer in writing of the causes of delay. The Contracting Officer shall ascertain the facts and the extent of the delay and extend the time far completing the work when, in his judgment, the findings of fact justify such an extension, and his findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in Article 7 herein. If, after notice of termination of the ContracArticle, it is determined for any reason that the Contractor was not in default under the provisions of this Article, or that the delay was excusable under the provisions of this Article, the rights and
Page 15
obligations of the parties shall be in accordance with Article 6 herein. Failure to agree to any such adjustment shall be a dispute concerning a question of fact within the meaning of Article 7 herein.The rights and remedies of the District provided in this Article are in addition to any other rights and remedies provided by law or under the Contract. The District may, by written notice, terminate the Contract or a portion thereof as a result of an Executive Order of the President of the United States with respect to the prosecution of war or in the interest of national defense. When the Contract is so terminated, no claim for loss of anticipated profits will be permitted. ARTICLE 6. TERMINATION FOR CONVENIENCE OF THE DISTRICT A. The performance of work under the Contract may be terminated by the District in accordance with this Article in whole, or in part, whenever the Contracting Officer shall determine that such termination is in the best interest of the District. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under the Contract is terminated, and the date upon which such termination becomes effective. B. After receipt of a Notice of Termination, and except as otherwise directed by the Contracting Officer, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the Notice of Termination. 2. Place no further orders or subcontracts for materials, services, or facilities except as may be necessary for completion of such portion of the work under the Contract as is not terminated. 3. Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the Notice of Termination. 4. Assign to the District, in the manner, at the times, and to the extent directed by the Contracting Officer, all of the right, title and interest of the Contractor under the orders and subcontracts so terminated, in which case the District shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. 5. Settle all outstanding liabilities and all claims arising out of such termination of orders or subcontracts, with the approval or ratification of the Contracting Officer to the extent he may require, which approval or ratification shall be final for all purposes of this Article. 6. Transfer title to the District and deliver in the manner, at the times, and to the extent, if any, directed by the Contracting Officer : a. The fabricated or unfabricated parts, work in progress, completed work, supplies, and other material procured as a part of, or acquired in connection with, the performance of the work terminated by the Notice of Termination, and b. The completed, or partially completed plans, drawings information and other property which, if the Contract bad been completed, would have been required to be furnished to the District. 7. Use his best efforts to sell, in the manner, at the terms, to the extent, and at the price or prices directed or authorized by the Contracting Officer, any property of the types referred to in 6 above provided, however, that the Contractor: a. Shall not be required to extend credit to any purchaser, and
Page 16
b.May acquire any property under the conditions prescribed and at a price or prices approved by the Contracting Officer, and c. Provided further, that the proceeds of any such transfer or disposition shall be applied in reduction of any payments to be made by the District to the Contractor under the Contract or shall otherwise be credited to the price or cost of the work covered by the Contract or paid in such other manner as the Contracting Officer may direct. 8. Complete performance of such part of the work as shall not have been terminated by the Notice of Termination. 9. Take such action as may be necessary, or as the Contracting Officer may direct, for the protection and preservation of the property related to the Contract which is in the possession of the Contractor and in which the District has or may acquire an interest. 10. The Contractor shall proceed immediately with the performance of the above obligations notwithstanding any delay in determining or adjusting the cost, or any item of reimbursable cost, under this Article. 11. raw materials, purchased parts and work in progress) at any one plant or location, a period beginning with the effective date of the termination for convenience and ending 90 days after receipt by the Contracting Officer of acceptable inventory schedules covering all items of that particular property classification in the termination inventory at that plant or location, or ending on such later date as may be agreed to by the Contracting Officer and the Contractor. Final phase of a plant clearance period means that part of a plant clearance period which occurs alter the receipt of acceptable inventory schedules covering all items of the particular property classification at the plant or location. At any time after expiration of the plant clearance period, as defined above, the Contractor may submit to the Contracting Officer a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by the Contracting Officer, and may request the District to remove such items or enter into a storage agreement covering them. Not later than 15 days thereafter, the District will accept title to such items and remove them or enter into a storage agreement covering the same; provided, that the list submitted shall be subject to verification by the Contracting Officer upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. C. After receipt of a Notice of Termination, the Contractor shall submit to the Contracting Officer his termination claim, in the form with the certification prescribed by the Contracting Officer. Such claim shall be submitted promptly but in no event later than one year from the effective date of termination, unless one or more extensions in writing are granted by the Contracting Officer upon request of the Contractor made in writing within such one year period or authorized extension thereof. However, if the Contracting Officer determines that the facts justify such action, he may receive and act upon any such termination claim at any time after such one year period or extension thereof. Upon failure of the Contractor to submit his termination claim within the time procedures in effect as of the date of execution of the Contract, determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined.
Page 17
D. Subject to the provisions of C above, and subject to any review required by theprocedures in effect as of the date of execution of the Contract, the Contractor and Contracting Officer may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant to this Article, which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts, exclusive of settlement costs, shall not exceed the total Contract price as reduced by the amount of payments otherwise made and as further reduced by the Contract price of work not terminated. The Contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. Nothing in E below prescribing the amount to be paid to the Contractor in the event of failure of the Contractor and the Contracting Officer to agree upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this Article, shall be deemed to limit, restrict or otherwise determine or effect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. In the event of the failure of the Contractor and the Contracting Officer to agree as provided in D above upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this Article, the Contracting Officer shall, subject to the Contract, determine, on the basis of information available to him, the amount, if any, due the Contractor by reason of the termination and shall pay to the Contractor the amounts determined by the Contracting Officer, as follows, but without duplication of any amounts agreed upon in accordance with D above: 1. With respect to all Contract work performed prior to the effective date of the Notice of Termination, the total (without duplication of any items) of: a. The cost of such work; b. The cost of settling and paying claims arising out of the termination of work under subcontracts or orders as provided in B 5. above, exclusive of the amounts paid or payable on account of supplies or materials delivered or services furnished by the subcontractor prior to the effective date of the Notice of Termination of work under the Contract, which amounts shall be included in the cost on account of which payment is made under E1.a. above; and c. A sum, as profit on E.1.a. above, determined by the Contracting Officer to be fair and reasonable; provided however, that if it appears that the Contractor would have sustained a loss on the entire Contract had it been completed, no profit shall be included or allowed under this subparagraph and an appropriate adjustment shall be made reducing the amount of the settlement to reflect the indicated rate of loss; and provided further that profit shall be allowed only on preparations made and work done by the Contractor for the terminated portion of settlement expenses. Anticipatory profits and consequential damages will not be allowed. Any reasonable method may be used to arrive at a fair profit, separately or as part of the whole settlement. 2. The reasonable cost of the preservation and protection of property incurred pursuant to B.9; and any other reasonable cost incidental to termination of work under the Contract including expense incidental to the determination of the amount due to the Contractor as the result of the termination of work under the Contract.
Page 18
F. The total sum to be paid to me Contractor under E.1. above shall not exceed the total Contract price as reduced by the amount of payments otherwise made and as further reduced by the Contract price of work not terminated. Except for normal spoilage, and except to the extent that the District shall have otherwise expressly assumed the risk of loss, there shall be excluded from the amounts payable to the Contractor under E.1. above, the fair value, as determined by the Contracting Officer, of property which is destroyed, lost, stolen or damaged so as to become undeliverable to the District, or to a buyer pursuant to B.7 above. G. The Contractor shall have the right of appeal, under Article 7 herein, from any determination made by the Contracting Officer under C. or E. above, except that, if the Contractor has failed to submit his claim within the time provided in C above and has failed to request extension of such time, he shall have no such right of appeal. In any case where the Contracting Officer has made a determination of the amount due under C. or E. above, the District shall pay to the Contractor the following: 1. If there is no right of appeal hereunder or if no timely appeal has been taken, the amount so determined by the Contracting Officer, or 2. If an appeal had been taken, the amount finally determined on such appeal. H. In arriving at the amount due the Contractor under this Article there shall be deducted: 1. all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of the Contract; 2. any claim which the District may have against the Contractor in connection with the Contract; and 3. the agreed price for, or the proceeds of sale of, any materials, supplies or other things kept by the Contractor or sold, pursuant to the provisions of this Article and not otherwise recovered by or credited to the District. I. If the termination hereunder be partial, prior to the settlement of the terminated portion of the Contract, the Contractor may file with the Contracting Officer a request in writing for an equitable adjustment of the price or prices specified in the Contract relating to the continued portion of the Contract (the portion not terminated by the Notice of Termination), and such equitable adjustment as may be agreed upon shall be made at such price or prices; however, nothing contained herein shall limit the right of the District and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the Contract when said Contract does not contain an established Contract price for such continued portion. J. The District may from time to time, under such terms and conditions as it may prescribe, make partial payments against costs incurred by the Contractor in connection with the terminated portion of the Contract whenever in the opinion of the Contracting Officer the aggregate of such payments shall be within the amount to which the Contractor will be entitled hereunder. If the total of such payments is in excess of the amount finally agreed or determined to be due under this Article, such excess Shall be payable by the Contractor to the District upon demand, together with interest computed at the rate of 6 percent per annum for the period from the date such excess is received by the Contractor to the date on which such excess is repaid to the District; provided however, that no interest shall be charged with respect to any such excess payment attributable to a reduction in the of retention or other disposition of termination inventory until ten days after the date of such retention or disposition, or such later date as determined by the Contracting Officer by reason of the circumstances.
Page 19
K. Unless otherwise provided in the Contract or by applicable statute, the Contractor, from the effective date of termination and for a period of three years after final settlement under the Contract, shall preserve and make available to the District at all reasonable times at the office of the Contractor, but without direct charge to the District, all his books, records, documents and other evidence bearing on the costs and expenses of the Contractor under the Contract and relating to the work terminated hereunder, or, to the extent approved by the Contracting Officer, photographs and other authentic reproductions thereof. ARTICLE 7. DISPUTES A. All disputes arising under or relating to this contract shall be resolved as providedherein. B. Claims by a Contractor against the District. , as used in Section B of this clause, means a written assertion by the Contractor seeking, as a matter of right, the payment of money in a sum certain, theadjustment or interpretation of contract terms, or other relief arising under or relatingto this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for therelief sought by the claimant. (a) All claims by a Contractor against the District arising under or relating to a contract shall be in writing and shall be submitted to the Contracting Officer for a (1) A description of the claim and the amount in dispute; (2) Any data or other information in support of the claim; resolve the dispute prior to filing the claim; and Officer. (b) The Contracting Officer may meet with the Contractor in a further attempt to resolve the claim by agreement. November (2004) SCP. 9 (c) For any claim of $50,000 or less, the Contracting Officer shall issue a decision within sixty (60) days from receipt of a written request from a Contractor that a decision be rendered within that period. (d) For any claim over $50,000, the Contracting Officer shall issue a decision within ninety (90) days of receipt of the claim. Whenever possible, the Contracting Officer shall take into account factors such as the size and complexity of the claim and the adequacy of the information in support of the claim provided by the Contractor. (1) Provide a description of the claim or dispute; (2) Refer to the pertinent contract terms; (3) State the factual areas of agreement and disagreement; (4) State the reasons for the decision, including any specific findings of fact, although specific findings of fact are not required and, if made, shall not be binding in any subsequent proceeding; (5) If all or any part of the claim is determined to be valid, determine the amount of monetary settlement, the contract adjustment to be made, or other relief to be granted; decision; and (7) Inform the Contractor of the right to seek further redress by appealing the decision to the Contract Appeals Board. (f) Any failure by the Contracting Officer to issue a decision on a contract claim within the required time period will be deemed to be a denial of the claim, and
Page 20
will authorize the commencement of an appeal to the Contract Appeals Board as authorized by D.C. Official Code § 2-309.04.(g) (1) If a Contractor is unable to support any part of his or her claim and it isdetermined that the inability is attributable to a material misrepresentation of fact or fraud on the part of the Contractor, the Contractor shall be liable to the District for an amount equal to the unsupported part of the claim in addition to all costs to the District attributable to the cost of reviewing that (2) Liability under paragraph (g)(1) shall be determined within six (6) years of the commission of the misrepresentation of fact or fraud. (h) The decision of the Contracting Officer shall be final and not subject to review unless an administrative appeal or action for judicial review is timely commenced by the Contractor as authorized by D. C. Official Code § 2-309.04. (i) Pending final decision of an appeal, action, or fina l settlement, a Contractor shall proceed diligently with performance of the contract in accordance with the decision of the Contracting Officer. November (2004) SCP. 10 C. Claims by the District against a Contractor (a) Claim as used in Section C of this clause, means a written demand or written assertion by the District seeking, as a matter of right, the payment of money in a sum certain, the adjustment of contract terms, or other relief arising under or relating to this contract. A claim arising under a contract, unlike a claim relating to that contract, is a claim that can be resolved under a contract clause that provides for the relief sought by the claimant. (b) (1) All claims by the District against a Contractor arising under or relating to a contract shall be decided by the Contracting Officer. (2) The Contracting Officer shall send written notice of the claim to the following: (a) Provide a description of the claim or dispute; (b) Refer to the pertinent contract terms; (c) State the factual areas of agreement and disagreement; (d) State the reasons for the decision, including any specific findings of fact, although specific findings of fact are not required and, if made, shall not be binding in any subsequent proceeding; (e) If all or any part of the claim is determined to be valid, determine the amount of monetary settlement, the contract adjustment to be made, or other relief to be granted; decision; and (g) Inform the Contractor of the right to seek further redress by appealing the decision to the Contract Appeals Board. (3) The decision shall be supported by reasons and shall inform the Contractor of its rights as provided herein. (4) The authority contained in this clause shall not apply to a claim or dispute for penalties or forfeitures prescribed by statute or regulation which another District agency is specifically authorized to administer, settle, or determine. (5) This clause shall not authorize the Contracting Officer to settle, compromise, pay, or otherwise adjust any claim involving fraud. (c) The decision of the Contracting Officer shall be final and not subject to review unless an administrative appeal or action for judicial review is timely commenced by the Contractor as authorized by D.C. Official Code §2- 309.04. (d) Pending final decision of an appeal, action, or final settlement, the Contractor shall proceed diligently with performance of the contract in accordance with the decision of the Contracting Officer.
Page 21
ARTICLE 8. PAYMENTS TO CONTRACTORThe District will pay the contract price or prices as hereinafter provided in accordance with District and Federal regulations.The District will make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates approved by the Contracting Officer. The Contractor shall furnish a breakdown of the total Contract price showing the amount included therein for each principal category of the work, in such detail as requested, to provide a basis for determining progress payments. In the preparation of estimates the Contracting Officer, at his discretion, may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site may also be taken into consideration: 1. If such consideration is specifically authorized by the Contract; 2. If the Contractor furnishes satisfactory evidence that he has acquired title to such material, that it meets Contract requirements and that it will be utilized on the work covered by the Contract; and 3. If the Contractor furnishes to the Contracting Officer an itemized list. The Contracting Officer at his/her discretion shall cause to be with held retention in an amount sufficient to protect the interest of the District of Columbia. The amount shall not exceed ten percent (10%) of the partial payment. However, if the Contracting Officer, at any time after 50 percent of the work has been completed, finds that satisfactory progress is being made, he may authorize any of the remaining progress payments to be made in full or may retain from such remaining partial payments less than 10 percent thereof. Also, whenever work is substantially complete, the Contracting Officer, if he considers the amount retained to be in excess of theamount adequate for the protection of the District, at his discretion, may release to the Contractor all or a portion of such excess amount. Furthermore, on completion and acceptance of each separate building, public work, or other division of the Contract, on which the price is stated separately in the Contract, payment may be made therefore without retention of a percentage, less authorized deductions. All material and work covered by progress payments made shall thereupon become the sole property of the District, but this provision shall not be construed as relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work, or as waiving the right of the District to require the fulfillment of all of the terms of the Contract. Upon completion and acceptance of all work, the amount due the Contractor under the Contract shall be paid upon presentation at a properly executed voucher and after the Contractor shall have furnished the District with a release, if required, of all claims against the District arising by virtue of the Contract, other than claims in stated amounts as may be specifically excepted by the Contractor from the operation of the release. ARTICLE 9. TRANSFER OR ASSIGNMENTUnless otherwise provided by law, neither the Contract nor any interest therein may be transferred or assigned by the Contractor to any other party without the written consent of the Contracting Officer nor without the written acceptance by the surety on the performance and payment bond securing the Contract of the assignee as the Contractor and the principal on such bond; and any attempted transfer or assignment not authorized by this Article shall constitute a breach of the Contract and the District may for such cause terminate the right of the Contractor to proceed in the same manner as provided in Article 5 herein, and the Contractor and his sureties shall be liable to the District for any excess cost occasioned the District thereby. ARTICLE 10. MATERIAL AND WORKMANSHIP A. GENERALUnless otherwise specifically provided in the Contract, all equipment, material and articles incorporated in the work covered by the Contract shall be new and of the most suitable grade for the purpose intended. Unless otherwise specifically provided in the Contract, reference to any equipment, material, article or patented
Page 22
process, by trade name, make or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition., and the Contractor may use any equipment, material, article or process which, in the judgment of the Contracting Officer, is equivalent to that named unless otherwise specified. The Contractor shall furnish to the Contracting Officer for his approval the name of the manufacturer, the model number, and other identifying data and information respecting the performance, capacity, nature and rating of the mechanical and other equipment which the Contractor contemplates incorporating in the work. Machinery and equipment shall be in proper condition. When required by the Contract or when called for by the Contracting Officer, the Contractor shall furnish to the Contracting Officer for approval full information concerning the material or articles which he contemplates incorporating in the expense, with all shipping charges prepaid. Machinery, equipment, material, and articles installed or used without required approval shall be at the risk of subsequent rejection B. SURPLUS MATERIALS USEWhenever specified in the Contract or authorized by the Contracting Officer that materials become the property of the Contractor, which by reference or otherwise shall include disposal of materials, it is understood that the Contractor accepts such materialse or liability to the District. If such material specified in the Contract will have a potential or real interest of value, the Contractor shall make allowance in the Contract to show such value. C. DISTRICT MATERIALNo materials furnished by the District shall be applied to any other use, public or private, than that for which they are issued to the Contractor. The full amount of the cost to the District of all materials furnished by the District to the Contractor and for which no charge is made, which are not accounted for by the Contractor to the satisfaction of the Contracting Officer, will be charged against the Contractor and his sureties and may be deducted from any monies due the Contractor, and this charge shall be in addition to and not in lieu of any other liabilities of the Contractor whether civil or criminal. Materials furnished by the District for which a charge is made at a rate mentioned in the specifications will be delivered to the Contractor upon proper requisitions therefore and will be charged to his account. D. Plant The Contractor shall at all times employ sufficient tools and equipment for prosecuting the various classes of work to full completion in the manner and time required. The Contractor shall at all times perform work in sufficient light and shall provide proper illumination, including lighting required for night work as directed, as a Contract requirement. All equipment, tools, formwork and staging used on the project shall be of sufficient size and in proper mechanical and safe condition to meet work requirements, to produce satisfactory work quality and to prevent injury to persons, the project or adjacent property. When methods and equipment are not prescribed in the Contract, the Contractor is free to use tools, methods and equipment that he satisfactorily demonstrates will accomplish the work in conformity with Contract requirements. If the Contractor desires to use a method or type of tool or equipment other than specified in the Contract, he shall request approval to do so; the request shall be in writing and shall include a full description of proposed methods, tools and equipment and reason for the change or substitution. Approval of substitutions and changed methods will be on condition that the Contractor will be fully responsible for producing work meeting Contractrequirements. If after trial use of the substituted methods, tools and equipment, the Contracting Officer determines that work produced does not meet Contract requirements, the Contractor shall complete remaining work with specified methods, tools and equipment. E. CAPABILITY OF WORKERS- All work under the Contract shall be performed in a skillfuland workmanlike manner. The Contracting Officer may require the Contractor to remove from the work any such employees as the Contracting Officer deems incompetent, careless, insubordinate, or otherwise objectionable, or whose continued employment on the work is deemed by the Contracting Officer to be contrary to the public interest. Such request will be in writing:
Page 23
F. CONFORMITY OF WORK AND MATERIALSAll work performed and materials andproducts furnished shall be in conformity, within indicated tolerances, with lines, grades, cross sections, details, dimensions, material and construction requirements shown or intended by the drawings arid specifications. When materials, products or work cannot be corrected, written notice of rejection will be issued. Rejected materials, products and work shall be eliminated form the project and accepany portion of the project shall not constitute implied acceptance nor in any way release the Contractor from Contract requirements. G. UNAUTHORIZED WORK AND MATERIALSWork performed or materials ordered or furnished for the project deviating from requirements without written authority, will be istrict is not obligated to pay for unauthorized work. Unauthorized work and materials may be ordered removed and ARTICLE 11. INSPECTION AND ACCEPTANCEExcept as otherwise provided in the Contract, inspection and test by the District of material and workmanship required by the Contract shall be made at reasonable times and at the site of the work, unless the Contracting Officer determines that such inspection or test of material which is to be incorporated in the work shall be made at the place of production, manufacture or shipment of such material. To the extent specified by the Contracting Officer at the time of determining to make off-site inspection or test, such inspection or test shall be conclusive as to whether the material involved conforms to Contract requirements. Such off-site inspection or test shall not relieve the Contractor of responsibility for damage to or loss of the material prior to acceptance, nor in any way affect the continuing rights of the District after acceptance of the completed work under the terms of the last paragraph of this Article, except as herein above provided. The Contractor shall, without charge, replace any material and correct any workmanship found by the District not to conform to Contract requirements, unless in the public interest the District consents to accept such material or workmanship with an appropriate adjustment in Contract price. The Contractor shall promptly segregate and remove rejected material from the premises at Con If the Contractor does not promptly replace rejected material or correct rejected workmanship, theDistrict: 1. May, by contract or otherwise, replace such material and correct such workmanship and charge the cost thereof to the Contractor, or 2. proceed in accordance with Article 5 herein. The Contractor shall furnish promptly, without additional cost to the District, all facilities, labor and material reasonably needed for performing such safe and convenient inspection and test as may be required by the Contracting Officer. All inspections and tests by the District shall be performed in such manner as not unnecessarily to delay the work. Special, full size, and performance tests shall be performed as described in the Contract. The Contractor shall be charged with any additional cost of inspection when material and workmanship are not ready for inspection at the time specified by the Contractor. Should it be considered necessary or advisable by the Contracting Officer at any time before acceptance of the work, either in part or in its entirety, to make an examination of work completed, by removing or tearing out same, the Contractor shall, on request, promptly furnish all necessary facilities, labor and material to do same. If such work is found to be defective or nonconforming in any material respect, due to the fault of the Contractor or his subcontractors, he shall defray all the expenses of such examination and of satisfactory reconstruction. If, however, such work is found to meet the requirements of the Contract, an equitable adjustment shall be made in the Contract price
Page 24
to compensate the Contractor for the additional services involved in such examination and reconstruction and, if completion of the work has been delayed thereby, he shall, in addition, be granted an equitable extension of time. Unless otherwise provided in the Contract, acceptance by the District will be made as promptly as practicable after completion and inspection of all work required by the Contract. Acceptance shall be final and conclusive except as regards to latent defects, under any warranty or guaranty. ARTICLE 12. SUPERINTENDENCE BY CONTRACTORThe Contractor shall give his personal superintendence to the performance of the work or have a competent foreman or superintendent, satisfactory to the Contracting Officer, on the work site at all times during progress, with authority to act for him. ARTICLE 13. PERMITS AND RESPONSIBILITIESThe Contractor shall, without expense to the District, be responsible for obtaining any necessary licenses, certificates and permits, and for complying with any applicable Federal, State, and Municipal laws, codes and regulations, in connection with the prosecution of the work. He shall be similarly responsible for all damages to persons or property that occurs as a result of his fault or negligence. He shall take proper safety, health and environmental precautions to protect the work, the workers, the public, and the property of others. He shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire construction work, except for any completed unit of construction thereof which theretofore may have been accepted. ARTICLE 14. INDEMNIFICATIONThe Contractor shall indemnify and save harmless the District and all of its officers, agents and servants against any and all claims or liability arising from or based on, or as a consequence or result of, any act, omission or default of the Contractor, his employees, or his subcontractors, in the performance of, or in connection with, any work required, contemplated or performed under the Contract. ARTICLE l5. PROTECTION AGAINST TRESPASSExcept as otherwise expressly provided in the Contract, the Contractor is authorized to refuse admission either to the premises or to the working space covered by the Contract to any person whose admission is not specifically authorized in writing by the Contracting Officer. ARTICLE 16. CONDITIONS AFFECTING THE WORK A. GENERALThe Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work and the cost thereof. Any failure by the Contractor to do so will not relieve him from responsibility for successfully performing the work as specified without additional expense to the District. The District assumes no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of the Contract, unless such understanding or representation by the District is expressly stated in the Contract. B. WORK AND STORAGE SPACEAvailable work and storage space designated by the District shall be developed as required by the Contract or restored at completion of the project by the Contractor to a condition equivalent to that existing prior to construction. No payment will be made for furnishing or restoration of any work and storage space. If no area is designerations, he shall obtain necessary space elsewhere at no expense or liability to the District. C. WORK ON SUNDAYS, LEGAL HOLIDAYS AND AT NIGHTNo work shall be done at any time on Sundays or legal holidays or on any other day before 7 a.m. or after 7 p.m.,except with the written permission of the Contracting Officer and pursuant to the requirements of the Police Requirements of the District. D. EXISTING FEATURESSubsurface and topographic information including borings data,utilities data and other physical data contained in the Contract or otherwise available, are
Page 25
not intended as representations or warranties but are furnished as available information. The District assumes no expense or liability for the accuracy of, or interpretations made from, existing features. The Contractor shall be responsible for reasonable consideration of existing features above and below ground which may affect the project. E. UTILITIES AND VAULTSThe Contractor shall take necessary measures to prevent interruption of service or damage to existing utilities within or adjacent to the project. It shall be the ty to determine exact locations of all utilities in the field. For any underground utility or vault encountered, the Contractor shall immediately notify the Contracting Officer and take necessary measures to protect the utility or vault and maintain the service until relocation by owner is accomplished. No additional payment will be made for the encountering of these obstructions. In case of damage to utilities by the Contractor, either above or below ground, the Contractor shall restore such utilities to a condition equivalent to that which existed prior to the damage by repairing, rebuilding or otherwise restoring as may be directed, at the directed by the Contracting Officer, the utility owner will make needed repairs at the No compensation, other than authorized time extensions, will be allowed the Contractor for protective measures, work interruptions, changes in construction sequence, changes in methods of handling excavation and drainage or changes in types of equipment used, made necessary by existing utilities, imprecise utility or vault information or by others performing work within or adjacent to the project. F. SITE MAINTENANCEThe Contractor shall maintain the project site in a neat and presentable manner throughout the course of all operations, and shall be responsible for such maintenance until final acceptance by the District Trash containers shall be furnished, maintained and emptied by the Contractor to the satisfaction of the Contracting Officer. Excavated earthwork, stripped forms and all other materials and debris not scheduled for reuse in the project shall be promptly removed from the site. The Contracting Officer may order the Contractor to clean up the project site at any stage of work at no added expense to the District If the Contractor fails to comply with this order, the Contracting Officer may require the work to be done by others and the costs will be charged to the Contractor. Upon completion of all work and prior to final inspection, the Contractor shall clean up and remove from the project area and adjacent areas all excess materials, equipment, temporary structures, and refuse, and restore said areas to an acceptable condition. G. PRIVATE WORKExcept as specifically authorized by the Contracting Officer, theContractor shall not perform any private work abutting District projects with any labor, materials, tools, equipment, supplies or supervision scheduled for the Contract until all work under the Contract has been completed. Contract materials used for any unauthorized purpose shall be subtracted from Contract amount. H. DISTRICT OF COLUMBIA NOISE CONTROL ACT OF 1977The contractor shall be in strict compliance with D.C. Law 2-53, District of Columbia Noise Control Act of 1977 and all provisions thereof. Effective March 16, 1978. 24 D.C.Register 5293. ARTICLE 17. OTHER CONTRACTSThe District may undertake or award other contracts for additional work and the Contractor shall fully cooperate with such other contractors and District employees and carefully coordinate his own work with such additional work as may be directed by the Contracting Officer. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by District employees. The District assumes no liability, other than authorized time extensions, for Contract delays and damages resulting from delays and lack of progress by others.
Page 26
ARTICLE 18. PATENT INDEMNITYExcept as otherwise provided, the Contractor agrees to indemnify the District and its officers, agents, and employees against liability, including costs and expenses, for infringement upon any Letters Patent of the United States (except Letters Patent issued upon an application which is now or may hereafter be, for reasons of national security, ordered by the Federal Government to be kept classified or otherwise withheld from issue) arising out of the performance of the Contract or out of the use or disposal, by or for the account of theDistrict, of supplies furnished or construction work performed hereunder. ARTICLE 19. ADDITIONAL BOND SECURITYIf any surety upon any bond furnished in connection with the Contract becomes unacceptable to the District, or if any such surety fails to furnish reports as to his financial condition from time to time as requested by the District, the Contractor shall promptly furnish such additional security as may be required from time to time to protect the interests of the District and of persons supplying labor or materials in the prosecution of the work contemplated by the Contract. Provided that upon the failure of the Contractor to furnish such additional security within ten (10) days after written notice so to do, all payments under the Contract will be withheld until such additional security is furnished. ARTICLE 20. COVENANT AGAINST CONTINGENT FEESThe Contractor warrants that no person or selling agency has been employed or retained to solicit or secure the Contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee,excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Contractor for the purpose of securing business. For breach or violation of this warranty, the District shall have the right to terminate the Contract without liability or in its discretion to deduct from the Contract price or consideration, or otherwise recover, the full amount of such commission, percentage, brokerage or contingent fee. ARTICLE 21. APPOINTMENT OF ATTORNEYThe Contractor does hereby irrevocably designate and appoint the Clerk of the Superior Court of the District of Columbia and his successors in office as the true and lawful attorney of the Contractor for the purpose of receiving service of all notices and processes issued by any court in the District, as well as service of all pleadings and other papers, in relation to any action or legal proceeding arising out of or pertaining to the Contract or the work required or performed hereunder. The Contractor expressly agrees that the validity of any service upon the said Clerk as herein authorized shall not be affected either by the fact that the Contractor was personally within the District and otherwise subject to personal service at the time of such service upon the said Clerk or by the fact that the Contractor failed to receive a copy of such process, notice, pleading or other paper so served upon the said Clerk, provided that said Clerk shall have deposited in theUnited States mail, certified and postage prepaid, a copy of such process, notice, pleading or other papers addressed to the Contractor at the address stated in the Contract. ARTICLE 22. DISTRICT EMPLOYEES NOT TO BENEFIT Unless a determination is made as provided herein, no officer or employee of the District will be admitted to any share or part of this contract or to any benefit that may arise therefrom, and any contract made by the Contracting Officer or any District employee authorized to execute contracts in which they or an employee of the District will be personally interested shall be void, and no payment shall be made thereon by the District or any officer thereof, but this provision shall not be construed to extend to this contract if made with a corporation for its general benefit. A District employee shall not be a party to a contract with the District and will not knowingly cause or allow a business concern or other organization owned or substantially owned or controlled by the employee to be a party to such a contract, unless a written determination has been made by the head of the procuring agency that cannot reasonably otherwise be met. (DC Procurement Practices Act of l985, D.C. Law 6-85, D.C. Official Code, section 2-310.01, and Chapter 18 of the DC Personnel Regulations) The Contractor represents and covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of its services hereunder. The Contractor further covenants not to employ any person having such known interests in the performance of the contract.
Page 27
ARTICLE 23. WAIVERNo waiver of any breach of any provision of the Contract shall operate as a waiver of such provision or of the Contract or as a waiver of subsequent or other breaches of the same or any other provision of the Contract; nor shall any action or non-action by the Contracting Officer or by the Mayor be construed as a waiver of any provision of the Contract or of any breach thereof unless the same has been expressly declared or recognized as a waiver by the Contracting Officer or the Mayor in writing. ARTICLE 24. BUY AMERICAN A. AGREEMENTIn accordance with the Buy American Act (41 USC l0a-l0d), and Executive Order 10582. December 17, 1954 (3 CFR, 1954-58 Comp., p. 230), as amended by Executive Order 11051, September 27,1962 (3 CFR, l05963 Comp., p. 635), the Contractor agrees that only domestic construction material will be used by the Contractor, subcontractors, material men and suppliers in the performance of the Contract, except for non-domestic material listed in the Contract. B. DOMESTIC CONSTRUCTION MATERIALmaterial or supply brought to the construction site for incorporation in the building or work. An unmanufactured has been mined or produced in the United States. A manufactured construction material if the cost of its components which have been mined, produced, or manufactured in the United States exceeds 50 percent of the any article, material, or supply directly incorporated in a construction material. - C. DOMESTIC COMPONENTregardless of its source, in fact, if the article, material or supply in which it is incorporated was manufactured in the United States and the component is of a class or kind determined by the District to be not mined, produced or manufactured in the United States in sufficient and reasonably available commercial quantities and of a satisfactory quality. D. FOREIGN MATERIAL When steel materials are used in a project a minimal use of foreign steel is permitted. The cost of such materials can not exceed on-tenth of one percent of the total project cost, or $2,500,000, whichever is greater. ARTICLE 25. TAXES A. FEDERAL EXCISEMaterials, supplies and equipment are not subject to the Federal M h the Contract provided that title to such materials, supplies and equipment passes to the District under the Contract. The Contractor shall in such cases furnish his subcontractors and suppliers by the U.S. Internal Revenue Service. B. SALES AND USE TAXESMaterials which are physically incorporated as a permanent part of real property are not subject to District of Columbia Sales and Use Tax. The Contractor shall, when purchasing such materials, furnish his suppliers with a Tax Regulations of the District of Columbia. Where the Contractor, subcontractor or material man has already paid the Sales and Use Tax on material, as prescribed above, the Sales and Use Tax Regulations of the District of Columbia permit the Contractor, subcontractor or material man to deduct the sales or use tax on the purchase price of the same on his next monthly return as an adjustment. However, the Contractor, subcontractor or material man must satisfy the Chief Financial Officer for the District of Columbia that no sum in reimbursement of such tax was included in the Contract or else that the District has received a credit under the Contract in an amount equal to such tax. District of Columbia Sales and Use Tax shall be paid on any material and supplies, including equipment rentals, which do not become a physical part of the finished project. (See District of Columbia Sales and Use Tax Administration Ruling No. 6).
Page 28
The Contractor, subcontractor,or material supplier shall provide proof of compliance with the provisions of D.C. Law 9-260, as amended, codified in D.C. Code46-103, Employer Contributions, prior to award. Material and supplies required under contracts relating to Glenn Dale Hospital, Glenn Maryland, are subject to the MarylandState Sales and Use Tax, effective July 1, 1968. BIDDERS SHALL INCLUDE SUCH TAX IN THEIR BIDS. Contracts relating to Department of Corrections, Lorton, Virginia, are subject to the Virginia Retail Sales and Use Tax, effective September 1, 1966, when TAX IN THEIR BIDS. The Contractor, subcontractor, or material supplier shall provide proof of compliance with the applicable tax filing and licensing requirements set forth in D.C. Code, Title 47, Taxation and Fiscal Affairs, prior to contract award. ARTICLE 26. SUSPENSION OF WORKThe Contracting Officer may order the Contractor in writing to suspend, delay or interrupt all or any part of the work for such period of time as he may determine to be appropriate for the convenience of the District. If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed or interrupted by an act of the Contracting Officer in the administration of the Contract, or by his failure to act within the time specified in the Contract (or if no time is specified, within a reasonable time), an adjustment will be made for an increase in the cost of performance of the Contract (excluding profit) necessarily caused by such unreasonable suspension, delay or interruption and the Contract modified in writing accordingly. However, no adjustment will be made under this Article for any suspension, delay or interruption to the extent: 1. That performance would have been so suspended, delayed or interrupted by any other cause, including the fault or negligence of the contractor, or 2. For which an equitable adjustment is provided or excluded under any other provision of the Contract. No claim under this Article shall be allowed: 1. For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall no apply as to a claim resulting from a suspension order), and 2. Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of such suspension, delay, or interruption, but not later than the date of final payment under the Contract. ARTICLE 27. SAFETY PROGRAM A. GENERALIn order to provide safety controls for the protection of the life and health of District and Contract employees and the general public; prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of the Contract, the Contractor shall comply with all applicable Federal and local laws governing safety, health and sanitation including the Safety Standards, Rules and Regulations issued by the American National Standards, U. S. Department of Labor, U. S. Department of Health and Human Services, D. C. Minimum Wage and Industrial Safety Board and the latest ed issued by the Federal Highway Administration. The Contractor shall also take or cause to be taken such additional safety measures as the Contracting Officer may determine to be reasonably necessary.
Page 29
The Contractor shall designate one person to be responsible for carrying out the The Contractor shall maintain an accurate record of all accidents resulting in death,injury, occupational disease, and/or damage to property, materials, supplies, and equipment incident to work performed under the Contract. Copies of these reports shall be furnished to the Contracting Officer within two working days after occurrence. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor. This Article is applicable to all subcontractors used under the Contract and compliance with these provisions by the subcontractors will be the responsibility of the Contractor. (In Contracts involving work of short duration or of non-hazardous character, the following Section B. will be deleted by Special Provision) B. Prior to commencement of the work, the Contractor shall: 1. Submit in writing to the Contracting Officer for his approval his program for complying with this Article for accident prevention. 2. above program to develop a mutual understanding relative to the administration of the overall safety program. ARTICLE 28. RETENTION OF RECORDSUnless otherwise provided in the Contract, or by applicable statute, the Contractor, from the effective date of Contract completion and for a period of three years after final settlement under the Contract, shall preserve and make available to the District at all reasonable times at the office of the Contractor but without direct charge to the District, all his books, records, documents, and other evidence bearing on the costs and expenses of the Contractor under the Contract. ARTICLE 29. RECOVERY OF DEBTS OWED THE DISTRICT---The Contractor hereby agrees that the District may use all or any portion of any consideration or refund due the Contractor under the Contract to satisfy, in whole or part, any debt due the District.
Page 30
LABOR PROVISIONS (Construction Contract) ARTICLE 1. DAVIS-BACON ACT (40 USC 276a-276a 7) Each Contractor and subcontractor at any tier contracting for any part of Contract work in excess of $2,000 for construction alteration, and/or repair, including painting and decorating of public buildings and public works and which requires or involves the employment of mechanics and/or laborers shall be subject to the Davis-Bacon Act provisions as follows: A. MINIMUM WAGES 1. All mechanics and laborers employed or working upon the site of the work or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the United States Department of Labor, hereinafter referred to as theSecretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at wage rates not less than those contained in the wage determination decision of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such Laborers and mechanics; and the wage determination decision shall be posted by the contractor at the site of the work in a prominent place where it can be easily seen by the workers. For the purpose of this clause, contributions made or costs reasonably anticipated under section l(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of 29 CFR 5.5(a)(l)(iv). Also for the purpose of this clause; regular contributions made or costs incurred for more than a weekly period under plans, funds, or programs, but covering the particular weekly period, are deemed to be constructively made or incurred during such weekly period. 2. The contracting officer shall require that any class of laborers or mechanics, including apprentices and trainees, which is not listed in the wage determination and which is to be employed under the contract, shall be classified or reclassified conformably to the wage determination and a report of the action taken shall be sent by the Contracting Officer to the Secretary of Labor. In the event the interested parties cannot agree on the proper classification or reclassification of a particular class of laborers and mechanics, including apprentices and trainees, to be used, the question accompanied by the recommendation of the Contracting Officer shall be referred to the Secretary for final determination. 3. The Contracting Officer shall require, whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringebenefit which is not expressed as an hourly wage rate and the contractor is obligated to pay a cash equivalent of such a fringe benefit, an hourly cash equivalent thereof to be established. In the event the interested parties cannot agree upon a cash equivalent of the fringe benefit, the question, accompanied by the recommendation of the Contracting Officer, shall be referred to the Secretary of Labor for determination. 4. If the Contractor does not make payments to a trustee or other third person, he may consider as part of the wages of any laborer or mechanic the amount o any costs reasonably anticipated in providing benefits under a plan or program of a type expressly listed in the wage determination decision of the Secretary of Labor which is a part of this contract: Provided, however, The Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the
Page 31
contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.B. WITHHOLDING.The Contracting Officer may withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices and trainees, employed by the contractor or any subcontractor on the work the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice or trainee, employed or working on the site of the work or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project, all or part of the wages required by the contract, the District may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. C. PAYROLLS AND BASIC RECORDS. 1. Payrolls and basic records relating thereto will be maintained during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work, or under the United States Housing Act of 1937, or under the Housing Act of 1949, in the construction or development of the project. Such records will contain the name and address of each such employee, his correct classification, rates of pay. (including rates of contributions or costs anticipated of the types described in section l(b)(2) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(l) (iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in sectionl(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits in enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing, to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. 2. The contractor will submit weekly a copy of all payrolls to the Contracting Officer if the agency is a party to the contract, but if the agency is not such a party the contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may be, for transmission to the Contracting Officer. The copy shall be accompanied by a statement signed by the employer or his agent indicating that the payrolls are correct and complete, that the wage rates contained therein are not less than those determined by the Secretary of Labor and that the classifications set forth for each laborer or mechanic regulations of the Secretary of Labor (29 CFR, Part 3) and the filing with the initial payroll or any subsequent payroll of a copy of any findings by the Secretary of Labor under 29 CFR 5.5(a)(1)(iv) shall satisfy this requirement. The prime contractor shall be responsible for the submission of copies of payrolls of all subcontractors. The contractor will make the records required under the labor standards clauses of the contract available for inspection by authorized representatives of the District and the Department of Labor, and will permit such representatives to interview employees during working hours on the job. Contractors employing apprentices or trainees under approved programs shall include a notation on the first weekly certified payrolls submitted to the Contracting Officer that their employment is pursuant to an ARTICLE 2. CONVICT LABOR (18 USC 438)Convict labor shall not be used on Contract work unless otherwise provided by law.
Page 32
ARTICLE 3. APPRENTICES AND TRAINEESA. APPRENTICESApprentices shall be permitted to work as such only when they are registered, individually, under a bona fide apprenticeship program registered with the Apprenticeship Council, D.C. Department of Labor. The allowance ratio of apprentices to journeymen in any craft classification shall not be greater than the ratio permitted to the Contractor a to his entire work force under the registered program. Any employee listed on a payroll at an apprentice wage rate, who is not a trainee as defined in Section B. ofthis Article or is not registered as above, shall be paid the wage rate determined by the Secretary of Labor or the classifications of work he actually performed. The Contractorand Subcontractor shall furnish to the Contracting Officer written evidence of the registration of his appropriate ratios and wage rates for the areas of construction, prior tousing any apprentice on the Contract. B. TRAINEESTrainees will be permitted to work as such when they are bona fide trainees employed pursuant to a program approved by the Contracting Officer and Apprenticeship Council, D.C. Department of Labor. C. REQUIREMENTSThe Contractor agrees to hire for the performance of the Contract a number of apprentices or trainees or both, in each occupation, which bears to the average number of the journeymen in that occupation to be employed in the performance of the Contract the applicable ratios as determined by the Apprenticeship Council, 0. C. Department of Labor. 1. The Contractor shall assure that 25 percent of such apprentices or trainees in each occupation are in their first year of training, when feasible. Feasibility here involves a consideration of: a. The availability of training opportunities for first year apprentices; b. The hazardous nature of the work for beginning workers; c. Excessive unemployment of apprentices in their second and subsequent years of training. 2. The Contractor shall maintain records of employment, by trade, of the number of apprentices and trainees, apprentices and trainees by first year of training, and of journeymen, and the wages paid and hours of work of such apprentices, trainees and journeymen. The Contractor shall make these records available for inspection upon request of the Contracting Officer and the Apprenticeship Council, 0. C. Department of Labor. 3. The Contractor who claims compliance based on the criterion stated in 29 CFR5.a. agrees to maintain records of employment as described in 29 CFR5.a..3(a)(2) on non-governmental and non-governmentally assisted construction work done during the performance of the Contract in the same labor market area. The Contractor shall make these records available for inspection upon request of the Contracting Officer and the Apprenticeship Council, D. C. Department of Labor. 4. The Contractor agrees to supply one copy of the written notices as required in accordance with 29 CFR. 5.a.4(c) at the request of the Contracting Officer. The Contractor shall supply at 3 month intervals during performance of the Contract and after completion of the Contract performance a statement containing a breakdown by craft of hours worked and wages paid for first year apprentices and trainees, other apprentices and trainees, and journeymen. Two copies of the statement shall be submitted to the Contracting Officer, who will submit a copy to the Apprenticeship Council, D. C. Department of Labor.
Page 33
5. Section 5, D. C. Law 2156, AC] 2325, dated December 29, 1978, is hereby incorporated as part of this Amendment as follows:ime contractors and subcontractors who contract with the District of Columbia Government to perform construction or renovation work with a single contract or cumulative contracts of at least $500,000, let within a twelve (12) month period, shall be required to register an apprentice.ship program with the District of Columbia D.C. Register 6991. ARTICLE 4. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (40 USC 327- 330) A. OVERTIME BASISEach Contractor and subcontractor at any tier contracting for any part of Contract work which may require or involve the employment of laborers, mechanics, watchmen or guards, apprentices or trainees shall not require or permit any laborer, mechanic, watchman or guard, apprentice or trainee in any workweek in which he is employed on such work, to work in excess of eight (8) hours in any calendar day or in excess of forty (40) hours in such workweek unless such laborer, mechanic, watchman or guard, apprentice or trainee receives compensation at a rate not less than one and onehalf times his basic rate of pay for all hours worked in excess of eight (8) hours in any calendar day or in excess of forty (40) hours in such workweek, as the case may be. B. LIABILITY FOR UNPAID WAGESIn the event of violation of the provisions of SectionA, the Contractor and any subcontractor responsible therefore shall be liable to any affected employee for his unpaid wages. In addition, such Contractor and subcontractor shall be liable to the District for Liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer, mechanic, watchman or guard, apprentice or trainee employed in violation of any provision of Section A, in the awn of $10 for each calendar day on which such employee was required or permitted to work in excess of eight (8) hours or in excess of the standard workweek of forty (40) hours without payment of the overtime wages required by Section A. The Contracting Officer may withhold or cause to be withheld from the Contractor such sums as administratively determined to satisfy any liability of the Contractor and subcontractors for unpaid wages and liquidated damages as herein provided. In the event of failure to pay any laborer, mechanic, watchman, or guard, apprentice or trainee employed or working on the work site, all or part of the wages required by the Contract, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment, advance or guarantee of funds until such violations have ceased. C. DISPUTESAny Contractor or subcontractor aggrieved by the withholding of a sum as liquidated damages as provided shall have the right, within sixty (60) days thereafter, to appeal to the Contracting Officer in the case of liquidated damages withheld for the use and benefit of the District. The Contracting Officer shall have authority to review the administrative determination of liquidated damages and to issue a final order affirming such determination; or if it is found that the sum determined is incorrect or that the Contractor or subcontractor violated these Labor Provisions inadvertently notwithstanding the exercise of due care on his part and that of his agents, recommendations may be made to the Secretary of Labor that an appropriate adjustment in liquidated damages be made, or that the Contractor or subcontractor be relieved of liability for such liquidated damages. The Secretary will review all pertinent facts in the matter and may conduct such investigation as he deems necessary so as to affirm or reject the recommendation. The decision of the Secretary shall be final. In all such cases in which a Contractor or subcontractor may be aggrieved by a final order for the withholding of liquidated damages as herein before provided, the Contractor or subcontractor may, within sixty (60) days after such final order, file a claim per Article 7 of the General Provisions, provided, however, that final orders of the Contracting Officer or the Secretary of Labor as the case may be, shall be conclusive with respect to findings of fact if such findings are supported by substantial evidence.
Page 34
D. VIOLATION PENALTYIf the Contractor or subcontractor who employs, directs & controls any laborer or mechanic employed in the performance of any work contemplated by the Contract, shall intentionally violate any provision herein, he shall be deemed guilty of a misdemeanor, and for each and every such offense shall, upon conviction, be punished by a fine of not to exceed $1,000 or by imprisonment for not more than six (6) months, or by both such fine and imprisonment, in the discretion of the court having jurisdiction thereof (Section 106 Title 1, P.L. 87851, 40 USC Sec. 332, 76 Stat. 359). E. HEALTH AND SAFETY STANDARDSIt is a condition. of the Contract, and shall be made a condition of each subcontract under the Contract, that the Contractor and any subcontractor shall not require any laborer or mechanic employed in performance of the Contract to work in surroundings or wider working condition which are unsanitary, hazardous, or dangerous to his health or safety, as determined under construction safety and health standards per 29 CFR Part 1518. The Secretary of Labor is authorized to make such inspections, hold such hearings, issue such orders, and make such decisions based on findings of fact, as are deemed necessary to gain compliance with this Section and any health and safety standard promulgated by the Secretary. In the event that the Secretary of Labor determines non-compliance under the provisions of this Section after an opportunity for an adjudicatory hearing by the Secretary of any condition of the Contract, the District shall have the right to cancel the Contract, and to enter into other contracts for the completion of the Contract work, charging any additional cost to the Contractor. ARTICLE 5. COPELAND ACT (18 USC 874, and 40 USC 276c) - Each Contractor and subcontractor at any tier contracting for any part of Contract work in excess of $2,000.0O shall be subject to the Copeland Act provisions as follow: A. DEFINITIONAs used in this Arti not apply to persons in classifications higher than that of laborer or mechanic and those who are the immediate supervisors of such employees. B. WEEKLY COMPLIANCE STATEMENTThe Contractor and each subcontractor engaged in the construction, prosecution, completion or repair of any public building or public work shall furnish each week a statement with respect to the wages paid each of his employees engaged on work covered by these Labor Provisions during the precedingweekly payroll period. The statement shall be executed by the Contractor or subcontractor, or by an authorized officer or employee of the Contractor or subcontractor, who supervises the payment of wages, and shall be on the form attached at the end of 2640-11). Each weekly statement required shall be delivered by the Contractor or subcontractor, within seven (7) days after regular payment date of the payroll period, to a representative of the Contracting Officer in charge at the site of the building or work. After each examination and check as may be made, such statement, or copy thereof, shall be kept available, or shall be transmitted together with a report of any violation, in accordance with applicable procedures prescribed by the US. Department of Labor. Upon a written finding by the Contracting Officer, the Secretary of Labor may provide reasonable limitations, variations, tolerances and exemptions from the requirements of this Section subject to such conditions as the Secretary of Labor may specify. C. PAYROLLS AND RECORDSThe Contractor and each subcontractor shall preserve his weekly payroll records for a period of three (3) years from date of completion of the Contract. The payroll records shall set out accurately and completely the name, address-and Social Security Number of each laborer and mechanic, his correct classification, rate of pay, daily and weekly number of hours worked, deductions made, and actual wages paid. Such payroll records shall be made available at all times for inspection by the Contracting Officer, and by authorized representatives of the U.S. Department of Labor.
Page 35
D. PAYROLL DEDUCTIONS NOT SUBJECT TO SECRETARY OF LABOR APPROVALDeductions made under the circumstances or in the situations described in paragraphs of this Section may be made without application to and approval at the Secretary of Labor: 1. Any deduction made in compliance with the requirements of Federal, State, or local law, such as Federal or State withholding income taxes and Federal social security taxes. 2. Any deduction of sums previously paid to the employee as a bona fide prepayment of wages when such prepayment is made without discount or fidonly when cash or its equivalent has been advanced to the person employed insuch manner as to give him complete freedom of disposition of the advanced funds. 3. Any deduction of amounts required by court process to be paid to another, unless the deduction is in favor of the Contractor, subcontractor, or any affiliated person, or when collusion or collaboration exists. 4. Any deduction constituting a contribution on behalf of the person employed to funds established by the employer, or representatives of employees, or both, for the purpose of providing either from principal or income, or both, medical or hospital care, pensions or annuities or retirement, death benefits, compensation for injuries, illness, accidents, sickness, or disability, or for insurance to provide any of the foregoing, or unemployment benefits, vacation pay, savings accounts, or similar payments for the benefit of employees, their families and dependents: Provided, however, that the following standards are met: a. The deduction is not otherwise prohibited by law; b. it is either voluntarily consented to by the employee in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of or for the continuation of employment, or provided for in a bona fide collective bargaining agreement between the Contractor or subcontractor and representatives of his employees; c. No profit or other benefit is otherwise obtained, directly or indirectly, by the Contractor or subcontractor or any affiliated person in the form of commission, dividend, or otherwise; and d. The deductions - shall serve the convenience and interest of the employee. 5. Any deduction contributing toward the purchase of United States Defense Stamps and Bonds when voluntarily authorized by the employee. 6. Any deduction requested by the employee to enable him to repay loans to or to purchase shares in credit unions organized and operated in accordance with Federal, State and District credit union statutes. 7. Any deduction voluntarily authorized by the employee for the making of contributions to governmental or quasi-governmental agencies, such as the American Red Cross. 8. Any deduction voluntarily authorized by the employee for the making of contributions to Community Chests, United Givers Funds, and similar charitable organizations.
Page 36
9. Any deduction to pay regular union initiation fees and membership dues, not including fines or special assessments; provided, however, that a collective bargaining agreement between the Contractor or subcontractor and representatives of his employees provides for such deductions and the deductions are not otherwise prohibited by law. 10. Any deduction not more facilities meeting the requirements of Section 3(m) of the Fair Labor Standards Act of 1938, as amended, and Part 531 of said title. When such a deduction is made the additional records required under 516.25(a) of this title shall be kept. E. PAYROLL. DEDUCTIONS SUBJECT TO SECRETARY OF LABOR APPROVALThe Contractor and any subcontractor may apply to the Secretary of Labor for permission to make any deduction not permitted under Section D. The Secretary may grant permission whenever be finds that: 1. The Contractor, subcontractor or any ai1iated person does not make a profit or benefit directly from the deduction, either in the form of a commission, dividend or otherwise; 2. The deduction, is not otherwise prohibited by law; 3. The deduction is either: a. voluntarily consented to by the employee in writing and in advance of the period in which the work is to be done and such consent is not a condition either for the obtaining of employment or its continuance, or b. provided for in a bona fide collective bargaining agreement between the Contractor or subcontractor and representatives of its employees; and 4. The deduction services the convenience and interest of the employee. F. APPLICATIONS FOR SECRETARY OF LABOR APPROVALAny application for the making of payroll deductions under Section E. shall comply with the requirements prescribed in Paragraphs 1 through 5: 1. The application shall be in writing and shall be addressed to the Secretary of Labor. 2. The application shall identify the Contract under which the work in question is to be performed. Permission will be given for deductions only on specific, identified contracts, except upon a showing of exceptional circumstances. 3. The application shall state affirmatively that there is compliance with the standards set forth in Section B. The affirmation shall be accompanied by a full statement of the facts indicating such compliance. 4. The application shall include a description of the proposed deduction, the purpose to be served thereby, and the classes of laborers or mechanics front whose wages proposed deduction would be made. 5. The application shall state the name and business of any third person to whom any funds obtained from the proposed deductions are to be transmitted and the affiliation of such person, if any, with the applicant. G. ACTION BY SECRETARY OF LABOR UPON APPLICATIONSThe Secretary will decide whether or not the requested deduction is permissible under provisions of Section B, and shall notify the applicant in writing of his decision. H. PROHIBITED PAYROLL DEDUCTIONSDeductions not elsewhere stipulated and which are not found to be permissible under Section B are prohibited.
Page 37
I. METHODS OF PAYMENT OF WAGESThe payment of wages shall be by cash, negotiable instruments payable on demand, or the additional forms of compensation for which deductions are permissible. No other methods of payment shall be recognized on work subject to the Copeland Act. ARTICLE 6. RESERVED ARTICLE 7. NONSEGREGATED FACILITIESThe Contractor certifies that he does not and will not maintain or provide for his employees any segregated facility at any of his establishments; that he does not and will not permit his employees to perform their services at any location under his control where segregated facilities are maintained; and that he will obtain and retain identical certifications from proposed subcontractors prior to award or subcontracts. and other eating area, time clock, locker room and other storage or dressing area, parking lot, drinking fountain, recreation or entertainment area, transportation and housing facility, provided for employees which is segregated by explicit directive or is segregated on the basis of race, color, age, sex, religion or national origin, because of habit, local custom or otherwise. Penalty for violation or making false statements is prescribed in 18 USC 1001.
Page 38

Page 39
Office of Human Rights

M E M O R A N D U M

TO: Michiko Gadson/UDC

FROM: Kenneth Saunders, Acting Director

DATE: December 2, 2024

SUBJECT: Affirmative Action Program, KADCON Corporation

CONTRACT: GF-2024-B-0033

We have reviewed the above-referenced contractor’s EEO Employer Information Report and
agreement to comply with the requirements of Mayor's Order 85-85, submitted by UDC on
November 21, 2024. We find the forms are in conformity with the Mayor’s Order.

If your Agency has any questions, contact OHR at 202-727-4559. ALL QUESTIONS FROM
THE CONTRACTOR SHOULD BE DIRECTED TO THE APPROPRIATE AGENCY
REPRESENTATIVE, WHO MAY THEN CONTACT OHR.

OCP/TC/GF-2024-B-0033

First Source Agreement Approval
GOVERNMENT OF THE DISTRICT OF COLUMBIA
Department of Employment Services
x kk
a
—
MuRIELBOWSER Dr.UNIQUEMoRRIS-HUGHES
Mayor DIRECTOR
January16,2025
MichikoGadsonContractSpecialistUDCOfficeofContractingandProcurement4200ConnecticutAve,NWWashington,DC20008
Re:FirstSourceEmploymentAgreement
DearMs.Gadson,
EnclosedisyourcopyofthesignedFirstSourceEmploymentAgreementbetweentheD.C.Department
ofEmploymentServices(DOES)andKADCON CorporationDeveloperCl,GeneralContractor62or
‘SubcontractorCJ.UnderthetermsoftheAgreement,youarerequiredtouseDOESasthefirstsourcetofillallnewjobscreatedasaresultofProject:UDC VanNessParkingGarageStructuralRepair
YoumustregisterandpostyourjobvacanciestotheDepartmentofEmploymentServices’VirtualOne-Stop(VOS)atwww.denetworks.org.
Inaddition,youarerequiredtohavethefollowingpercentageofhoursworkedbyDistrictresidents:20%ofjourneyworkerhours;60%ofapprenticehours;51%ofskilledlaborerhours;and70%ofcommonlaborerhours.Further,DistrictresidentsregisteredinprogramsapprovedbytheDistrictofColumbiaApprenticeshipCouncilshallwork35%ofallapprenticeshiphoursworkedinconnectionwiththeProjector60%whereapplicable.
Reminder:AllGeneralContractorsmustinvitetheirsubcontractorsthataresubjecttotheFirstSourceEmploymentAgreementrequirements,tojointheprojectusingtheFirstSourceOnlineRegistration&ReportingSystem(FORRS),websitehttp:/firstsource.dc.gov.Additionally,contractorsarerequiredtoreporthoursworkedpercentagesthroughoutthedurationofyourcontract.ContactthemonitorlistedbelowregardingLCPTrackersubmission.
Ifyouhaveanyquestionsorneedadditionalinformation,pleasecontactAlexUnderwood,(202)698-3529,alex.underwood2@de.gov
Sincerely,‘atid

DafielKing
AssociateDirectorOfficeofFirstSourceCompliance
Enclosure
4058MinnesotaAve,N.E.*Suite5000+Washington,D.C.20019+Office:202.671.1900

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

1

I. REVISED FIRST SOURCE EMPLOYMENT PLAN
GOVERNMENT‐ASSISTED PROJECT/CONTRACT INFORMATION
DISTRICT
CONTRACTING AGENCY:

CONTRACTING
OFFICER:

TELEPHONE
NUMBER:,

TOTAL
CONTRACT AMOUNT:

EMPLOYER
CONTRACT AMOUNT:

PROJECT
NAME:

PROJECT
ADDRESS:

CITY:

STATE
:

ZIP CODE:

PROJECT
DESCRIPTION OF WORK:

PROJECT
START DATE: PROJECT END DATE:

EMPLOYER
START DATE: EMPLOYER END DATE:

EMPLOYER INFORMATION
EMPLOYER NAME:

COMPANY
NAME:

EMPLOYER
ADDRESS:

CITY:

STATE:

ZIP CODE:

TELEPHONE

NUMBER:

FEDERAL IDENTIFICATION NO.:

CONTACT
PERSON:

TITLE:

E
‐
MAIL:

TELEPHONE NUMBER:

EMPLOYER
DESCRIPTION OF WORK:

ARE YOU A SUBCONTRACTOR YES NO
IF YES, NAME OF PRIME CONTRACTOR:

PRIME CONTRACTOR WILL MEET HOURS WORKED PERCENTAGES REQUIREMENTS
FOR ENTIRE PROJECT OR PER EACH SUBCONTRACTOR

II. EMPLOYMENT HOURS TO BE WORKED PROJECTIONS
First Source law requires EMPLOYERS (winning bidders) to submit a revised Employment Plan.

A.
For construction projects receiving $5 million or more in government
assistance,

E m p l o y e r s t o provide projection of the total number of hours
to be worked on the project by trade.
JOURNEY WORKER
Provide a
projection of the total number of journey worker hours, by trade, to be worked on the
project or
contract and the total number of journey worker hours, by trade, to be worked by
District residents.

This page to be completed by Employer ______________
Employer Initials
[
T
y
p
e

a

q
u
o
t
e

f
r
o
m

t
[
T
y
p
e

a

q
u
o
t
e

f
r
o
m

t
University of the District of Columbia
Eddie Whitaker
5,385,500
5,385,500
UDC Van Ness Parking Garage Structural Repair
4200 Connecticut Avenue
Washington DC 20008
KADCON Corporation
KADCON Corporation
1053 31st Street NW
Washington DC 20008
202-944-9400
Riad Kadissi
Chairman
Rkadissi@kadcon.com 202-944-9400
General Contractor
x
x
54-1697040

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

2

Projection of Total Number of
Journey Worker Hours
Trade Projection of Total Number of Journey
Worker Hours by DC Residents
(First Source Law requires 20%)

APPRENTICE
Provide a
projection of the total number of apprentice hours, by trade, to be worked on the
project or contract
and the total number of apprentice hours, by trade, to be worked by District
residents.

Projection of Total Number of
Apprentice Hours
Trade Projection of Total Number of
Apprentice Hours by DC Residents
(First Source Law requires 60%)

SKILLED WORKER
Provide a
projection of the total number of skilled laborer hours, by trade, to be worked on the
project or
contract and the total number of skilled laborer hours, by trade, to be worked by
District residents.

Projection of Total Number of
Skilled Labor Hours
Trade Projection of Total Number of
Skilled Labor Hours by DC
Residents
(First Source Law requires 51%)

(First Source Law requires 51%)

COMMON LABORER
Provide a
projection of the total number of common laborer hours to be worked on the project
or contract and
the total number of common laborer hours to be worked by District residents.

Projection of Total Number of
Common Laborer Hours
Trade Projection of Total Number of Common
Laborer Hours by DC Residents
(First Source Law requires 70%)

This page to be completed by Employer ______________
Employer Initials
500
300
600
Electrical
Sprinkler
Concrete
250
150
400
N/A N/A
3,000
1,000
Concrete
Steel
2,000
800
1600
300
Cleaning
Scaffolding
1,200
800

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

3

B.
EMPLOYMENT HIRING PROJECTIONS

ALL EMPLOYERS:

Please indicate ALL new position(s) you will create as a result of the project. If you WILL NOT

be creating any new employment opportunities, please complete the attached justification
sheet with an explanation. Attach additional sheets as needed.

JOB TITLE # OF JOBS
F/T P/T
SALARY

RANGE
UNION MEMBERSHIP
REQUIRED NAME LOCAL#
PROJECTE
D HIRE
DATE
A
B
C
D
E
F
G
H
I
J
K

This page to be completed by Employer ______________
Employer Initials

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

4

C.
JUSTIFICATION SHEET: Please provide a detailed explanation of why the Employer will not
have
any new hires on the project.

This page to be completed by Employer ______________
Employer Initials
KADCON does not anticipate hiring anyone for this project. KADCON's current employees are anticipated to run
this project. this type of project required KADCON to assign employee who they know have experience and
knowledge to perform the work. Moreover , those assigned staff member will remain on the project from
commencement to closeout . should the status of KADCON staff changes , KADCON will comply with the
requirements of the First Source Agreement and ensure that 51% of all hires are DC resident

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

5

D.
EMPLOYMENT PROJECTIONS

I.
Provide a timetable outlining the total hours worked by trade over the life of the project or
contract and an associated hiring schedule.

II.
Provide descriptions of the skill requirements by job title or position, including industry‐
recognized certifications required for the different positions.

III.
Provide a strategy to fill the hours required to be worked by District residents, including a

component on communicating these requirements to contractors and subcontractors and
a
component on potential community outreach partnerships with the University of the
District
of Columbia, the University of the District of Columbia Community College, the
Department
of Employment Services, Jointly Funded Apprenticeship Programs, the District of Columbia
Workforce Intermediary, or other government‐approved,
community‐based job training
providers.

This page to be completed by Employer ______________
Employer Initials
At this time, KADCON does not anticipate hiring any employee to work on this project
At this time, KADCON does not anticipate hiring any employee to work on this project
The possible opening that may be created from this project are as follows: Project Engineer:
Assist with project buyout, submittals, reports, and documentation.
project Laborer: provide a daily site cleanup

Participate in DC job fairs-post opening on DC periodicals-post with Does-For subcontractor
compliance include First Source requirements as part of the subcontractor Agreement

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

6

D.
EMPLOYMENT PROJECTIONS (Continued)

IV.
A remediation str ategy to ameliorate any problems
associated with meeting these worked
hours percentage requirements, including any problems encountered with contractors and
subcontractors.

V.
The designation of a senior official from the general contractor who will be responsible for
implementing the hours worked percentages and reporting requirements.

VI.
Provide descriptions of the health and retirement benefits that will be provided to District

residents working on the project or contract.

VII.
Provide a strategy to ensure that District residents who work on the project or contract
receive ongoing employment and training opportunities after they complete work on the
job
for which they were initially hired and a review of past practices in continuing to
employ
District residents from one project or contract to the next.

This page to be completed by Employer ______________
Employer Initials
Riad Kadissi , Chairman
Simple IRA
KADCON Corporation must remain in compliant with this agreement, therefore a senior level executive will be
managed thorough monthly report and submission with DOES
KADCON Corporation does not hire for only one project. if a hire is made, the person will be
provided continual training and be placed on future project at the completion of the identified project

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

7

D.
EMPLOYMENT PROJECTIONS (continued)

VIII.
Provide a strategy to hire graduates of District of Columbia Public Schools, District of
Columbia Public Charter Schools, community‐based job training providers, and hard‐to‐
employ residents.

IX.
Please disclose past compliance with the First Source Employment Agreement Act of 1984
or
the Workforce Intermediary Establishment and Reform of First Source Amendment Act of
2011 and the Davis‐Bacon Act, where applicable, and the bidder or offeror's general
District‐
resident hiring practices on projects or contracts completed within the last two (2)
years.

X.
Please note that EMPLOYERS on construction projects must submit weekly certified payrolls
from all subcontractors at any tier working on the project or contract, as well as
make such
payroll and personnel records available upon request at job sites to the contracting District of
Columbia agency.

This page to be completed by Employer ______________
Employer Initials
Should the need arise for hiring, KADCON Corporation will solicit all district of Columbia training
provider and hiring assistance programs
Ballou SHS Field & Site Improvement-Full Compliance
Drew Elementary School - Full Compliance
UDC Van Ness Tennis Courts- Full Compliance
Lansburgh Park -Full Compliance
Johnson and Garrison Elementary School Field Lighting
Acknowledged

GOVERNMENT OF THE DISTRICT OF COLUMBIA
REVISED EMPLOYMENT PLAN

8

Once approved, this revised employment plan shall not be amended except with the approval of Department
of Employment Services.

By:
______________________________________
EMPLOYER Senior Official (Print) Date

______________________________________
EMPLOYER Senior Official (Signature)

______________________________________
Name of Company

______________________________________

______________________________________
Address

______________________________________
Telephone

______________________________________
Email

______________________________________ ___________________
Signature Department of Employment Services Date

KADCON Corporation
Riad Kadissi
KADCON Corporation
1053 31st Street NW Washington DC 2008
rkadissi@kadcon.com
1/14/2025
Certificate of Insurance
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOSAUTOS ONLY
NON-OWNED
SCHEDULEDOWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR
CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED
$PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
1/17/2025
Sahouri Ins & Financial
8200 Greensboro Drive
Suite 1550
McLean VA 22102
703-883-0500
855-242-6660
coi@sahouri.com
Erie Insurance Exchange
26271
KADCCOR-01
Beazley
37540
Kadcon Corporation
1053 31st Street NW
Washington DC 20007
Flagship City Insurance Co
35585
Swiss Re Corporate Solutions America Insurance
Travelers Casualty & Surety
19038
751677166
A
X
1,000,000
X
1,000,000
5,000
1,000,000
2,000,000
X
Q47-1250815
11/12/2024
11/12/2025
2,000,000
A
1,000,000
X
X
Q11-1230826
11/12/2024
11/12/2025
A
X
X
10,000,000
Q35-1270273
11/12/2024
11/12/2025
10,000,000
C
X
Q95-6200189
11/12/2024
11/12/2025
500,000
500,000
500,000
B
D
E
Pollution Liability
Cyber Liability
Employee Theft/3rd Party Crime
ENP0007986-03
C-4MQ8-230511-CYBER-2024
0107699572S
11/12/2024
11/12/2024
9/15/2024
11/12/2025
11/12/2025
9/15/2025
Each Occurrence Limit
Per Claim/Aggregate
Limit
2,000,000
4,000,000
10,000
The following coverages are included on the Business Owners Policy (#Q47-1250815) via Erie Insurance, effective 11/12/2024-2025:
- $50,000 Business Personal Property (1053 31st Street NW), $1,000 Deductible
- $50,000 CONTRACTOR'S EQUIPMENT (Blanket, Leased)
- $2,500,000 INLAND MARINE/INSTALLATION (Comprehensive Perils, Including Breakage) per jobsite, in transit, or in temporary storage - per form
IMIFCP0218
- $250,000 EMPLOYEE DISHONESTY ($0 deductible)
Cyber Liability $4MM Aggregate C-4MQ8-230511-CYBER-2024 - 11/12/2024-11/12/2025 - Swiss Re Corporate Solutions America Insurance Company
Employment Practices and Third Party Liability $4MM - Policy#: 652508490 - 11/12/2024 to 11/12/2025 - Continental Casualty Company
See Attached...
University of the District of Columbia
4200 Connecticut Avenue NW
Washington DC 20008

ACORD 101 (2008/01)
The ACORD name and logo are registered marks of ACORD
© 2008 ACORD CORPORATION. All rights reserved.
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: FORM TITLE:
ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE Page of
AGENCY CUSTOMER ID:
LOC #:
AGENCY
CARRIER NAIC CODE
POLICY NUMBER
NAMED INSURED
EFFECTIVE DATE:
KADCCOR-01
1
1
Sahouri Ins & Financial
Kadcon Corporation
1053 31st Street NW
Washington DC 20007
25
CERTIFICATE OF LIABILITY INSURANCE
Sexual/Physical Abuse & Molestation - $2MM Aggregate & $1MM Per Occurrence - 11/12/2024-11/12/2025 - Beazley Insurance - Policy #: SML17867A24
Contractors Professional Liability - $1,000,000 Per Claim, $2,000,000 Aggregate - 11/12/2024-11/12/2025 - Underwriters at Lloyd's of London, Policy Number:
PSN0040168061
Contract Number: GF-2024-B-0033
Project Name: UDC Van Ness Parking Garage Structural Repair
Project Address: 4200 Connecticut Avenue NW, Washington, DC 20008