Read the full stored bill text
MURIEL BOWSER
MAYOR
March 23, 2026
The Honorable Phil Mendelson
Chairman
Council of the District of Columbia
John A. Wilson Building
1350 Pennsylvania Avenue, NW, Suite 504
Washington, DC 20004
Dear Chairman Mendelson:
Pursuant to section 451 of the District of Columbia Home Rule Act (D.C. Official Code § 1-
204.51) and section 202 of the Procurement Practices Reform Act of 2010 (D.C. Official Code§
2-352.02), enclosed for consideration and approval by the Council of the District of Columbia is
Modification No. 5 to Contract No. DCAM-20-CS-RFQ-000lAC with MO Construction, Inc., to
fully exercise option year four in the not-to-exceed amount of $5,000,000. The period of
performance is from December 27, 2025, through December 26, 2026.
Under the proposed modification, MO Construction, Inc. will continue to provide on-call
construction, repair, and replacement services at schools, parks, recreation facilities, municipal
buildings, fire and police stations, short-term family housing units, and other public locations.
My administration is available to discuss any questions you may have regarding the proposed
contract modification. In order to facilitate a response to any questions you may have, please
contact Delano Hunter, Director, Department of General Services ("DGS"), or have your staff
contact Dr. Jacque McDonald, Chief Procurement Officer, DGS, at (202) 836-2092.
I look forward to the Council's favorable consideration of this contract modification.
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF GENERAL SERVICES
____________________________________________________________________________________
Pursuant to section 202(c-3) of the Procurement Practices Reform Act of 2010, as amended, D.C.
Official Code § 2-352.02(c-3), the following contract summary is provided:
COUNCIL CONTRACT SUMMARY
(Options Year Contracts)
Proposed Modification No. 5 to Contract No. DCAM-20-CS-RFQ-0001AC for On-Call
Construction, Repair and Replacement (“CRR”) Services
Full Exercise of Option Year Four
(A) Contract Number: DCAM-20-CS-RFQ-0001AC
(Modification No. 5 to fully exercise Option Year Four)
Proposed Contractor: MO Construction, Inc.
Proposed Contract Amount: Guaranteed Minimum: $50
Not-to-Exceed (“NTE”) Amount: $5,000,000
Term of Contract: December 27, 2025, through December 26, 2026
Type of Contract: Indefinite Delivery/Indefinite Quantity (“ID/IQ”)
(B) Identifying number of the underlying contract, including the identifiers assigned to the
underlying contract by the Council for the base period and any subsequent option periods:
Contract (Base Year): DCAM-20-CS-RFQ-0001AC
Council Approval: CA24-0341, December 24, 2021
Contract Amount: Guaranteed Minimum: $50; NTE Amount: $5,000,000
Exercise of Option Year One: Modification No. 1
Council Approval: CA24-0710, November 10, 2022
Contract Amount: Guaranteed Minimum: $50; NTE Amount: $5,000,000
Exercise of Option Year Two: Modification No. 2
Council Approval: CA25-0545, December 17, 2023
Contract Amount: Guaranteed Minimum: $50; Aggregate NTE: $5,000,000
Exercise of Option Year Three: Modification No. 3
Council Approval: CA25-1064, November 1, 2024
Contract Amount: Guaranteed Minimum: $50; NTE Amount: $5,000,000
Partial Exercise of Option Year Four: Modification No. 4 (extended term to March 26, 2026)
Contract Amount: Guaranteed Minimum: $0; NTE Amount: $0
Partial Exercise of Option Year Four: Modification No. 4a (extended term to April 30,2026)
Contract Amount: Guaranteed Minimum: $0; NTE Amount: $0
Full Exercise of Option Year Four: Proposed Modification No. 5
Contract Amount : Guaranteed Minimum: $50; NTE Amount: $5,000,000
(C) A description of any other contracts the proposed contractor is currently seeking or holds
with the District:
The Contractor is currently involved in following District projects:
S/NO Contract
Number
Contract Caption Value of the Contract
1 0016-2024J Make ready units $1million +
2 63-2025 Job order contract $3 million +
(D) A statement that the Citywide Clean Hands database indicates that the proposed contractor is
current with its District taxes. If the Citywide Clean Hands Database indicates that the
proposed contractor is not current with its District taxes, either: (1) a certification that the
contractor has worked out and is current with a payment schedule approved by the District;
or (2) a certification that the contractor will be current with its District taxes after the District
recovers any outstanding debt as provided under D.C. Official Code § 2-353.01(b):
The Citywide Clean Hands database indicates that the Contractor is current with its District taxes.
The relevant certification is attached.
(E) A statement that the proposed contract is within the appropriated budget authority for the
agency for the fiscal year and is consistent with the financial plan and budget adopted in
accordance with D.C. Official Code §§ 47-392.01 and 47-392.02:
The Office of the Chief Financial Officer has certified that the guaranteed minimum value of $50 of
proposed Modification No. 5 is within the appropriated budget authority for the agency and is
consistent with the financial plan and budget adopted in accordance with D.C. Official Code §§ 47 -
392.01 and 47-392.02. The applicable Fiscal Sufficiency certification accompanies this Council
Package.
(F) (1) A certification that the proposed contractor has been determined not to be in violation of
section 334a of the Board of Ethics and Government Accountability Establishment and
Comprehensive Ethics Reform Amendment Act of 2011, D.C. Official Code § 1-1163.34a; and
(2) A certification from the proposed contractor that it currently is not and will not be in
violation of section 334a of the Board of Ethics and Government Accountability
Establishment and Comprehensive Ethics Reform Amendment Act of 2011, D.C. Official
Code § 1-1163.34a:
Based upon a certification from the Contractor, the Contractor has been determined not to be in
violation of D.C. Official Code § 1-1163.34a; and will not be in violation of D.C. Official Code § 1-
1163.34a.
/0 /0 /1 /0 /i255 /3 /4 /5 /i255 /6 /4 /7 /8 /8 /4 /9 /i255 /6 /10
/10/11 /12 /5 /13 /14 /15 /4 /16 /14 /9 /i255 /17 /18 /i255 /19 /1 /1 /19 /3
/20 /21 /22 /23 /i255 /25 /26 /i255 /27 /25 /22 /28 /29 /23 /30 /31/21 /32 /29 /33 /i255 /34 /35 /36 /i255 /37 /35 /37 /38 /39 /35 /35 /34 /38 /37 /34 /40 /41 /42 /37/27 /25 /22 /28 /29 /23 /i255 /27 /43 /44/45 /23 /32 /30
/46 /47 /48 /49 /50 /i255 /51 /51 /52 /51 /51 /51 /1 /53 /54 /54
/18 /11 /12 /8 /i255 /48 /17 /50 /i255 /0 /55 /55 /55 /19 /1 /56 /3
/i255
/58 /16 /59 /8 /7 /14 /60/8 /14 /4 /i255 /16 /61 /i255 /4 /5 /8 /i255 /17 /13 /12 /4 /7 /13 /62 /4 /i255 /16 /61 /i255 /18 /16 /63 /64 /60/65 /13 /11
/66 /61 /61 /13 /62 /8 /i255 /16 /61 /i255 /4 /5 /8 /i255 /18 /5 /13 /8 /61 /i255 /46 /13 /14 /11 /14 /62 /13 /11 /63 /i255 /66 /61 /61 /13 /62 /8 /7
/66 /61 /61 /13 /62 /8 /i255 /16 /61 /i255 /67 /11 /68 /i255 /11 /14 /69 /i255 /70 /8 /59 /8 /14 /64 /8 /i255
/71/66 /i255 /18 /66 /49 /6 /67 /70 /72 /18 /67 /48 /66 /49 /i255 /48 /49 /18
/53 /1 /56 /73 /i255 /74 /75 /76 /48 /70 /i255 /70 /17 /i255 /49 /10/i255 /6 /67 /47 /i255 /19 /1 /19
/10/76 /6 /77 /48 /49 /58 /67 /66 /49 /i255 /17 /18 /i255 /i255 /19 /1 /1 /0 /19 /52 /0 /73 /78 /1
/i255
/79 /32 /21 /80 /29 /33 /i255 /81 /33 /28 /23 /26 /36 /i255 /81 /25 /82 /82 /23 /29 /22 /28 /25 /80 /i255 /21 /80 /83 /i255 /84 /80 /26 /25 /32 /29 /23 /44/23 /80 /22 /i255 /85 /83 /44/28 /80 /28 /86 /22 /32 /21 /22 /28 /25 /80
/85 /43 /22 /33 /25 /32 /28 /87 /23 /83 /i255 /79 /88 /i255 /31/23 /82 /28 /80 /83 /21 /i255 /89 /23 /80 /90 /28 /80 /86
/67 /16 /i255 /59 /11 /63 /13 /69 /11 /4 /8 /i255 /4 /5 /13 /12 /i255 /62 /8 /7 /4 /13 /61 /13 /62 /11 /4 /8 /9 /i255 /91 /63 /8 /11 /12 /8 /i255 /59 /13 /12 /13 /4 /i255 /71/92 /67 /11 /68 /93 /17 /18 /93 /15 /16 /59 /93 /i255 /66 /14 /i255 /4 /5 /8 /i255 /71/92 /67 /11 /68 /i255 /17 /18 /i255 /5 /16 /60/8 /91 /11 /15 /8 /9 /i255 /62 /63 /13 /62 /94 /i255 /4 /5 /8
/95 /96 /11 /63 /13 /69 /11 /4 /8 /i255 /11 /i255 /18 /8 /7 /4 /13 /61 /13 /62 /11 /4 /8 /i255 /16 /61 /i255 /18 /63 /8 /11 /14 /i255 /77 /11 /14 /69 /12 /97 /i255 /5 /92 /91 /8 /7 /63 /13 /14 /94 /i255 /64 /14 /69 /8 /7 /i255 /4 /5 /8 /i255 /18 /63 /8 /11 /14 /i255 /77 /11 /14 /69 /12 /i255 /12 /8 /62 /4 /13 /16 /14 /93
/98 /99 /100 /101 /102 /103 /102 /98 /104 /101 /99 /i255 /106/103 /i255 /98 /107 /99 /104 /108 /i255 /109/104 /108 /110 /111
/76 /12 /i255 /7 /8 /91 /16 /7 /4 /8 /69 /i255 /13 /14 /i255 /4 /5 /8 /i255 /18 /63 /8 /11 /14 /i255 /77 /11 /14 /69 /12 /i255 /12 /92 /12 /4 /8 /60/9 /i255 /4 /5 /8 /i255 /11 /65 /16 /59 /8 /i255 /7 /8 /61 /8 /7 /8 /14 /62 /8 /69 /i255 /13 /14 /69 /13 /59 /13 /69 /64 /11 /63 /112 /8 /14 /4 /13 /4 /92 /i255 /5 /11 /12 /i255 /14 /16 /i255 /16 /64 /4 /12 /4 /11 /14 /69 /13 /14 /15
/63 /13 /11 /65 /13 /63 /13 /4 /92 /i255 /113 /13 /4 /5 /i255 /4 /5 /8 /i255 /17 /13 /12 /4 /7 /13 /62 /4 /i255 /16 /61 /i255 /18 /16 /63 /64 /60/65 /13 /11 /i255 /66 /61 /61 /13 /62 /8 /i255 /16 /61 /i255 /67 /11 /68 /i255 /11 /14 /69 /i255 /70 /8 /59 /8 /14 /64 /8 /i255 /16 /7 /i255 /4 /5 /8 /i255 /17 /8 /91 /11 /7 /4 /60/8 /14 /4 /i255 /16 /61 /i255 /47 /60 /91 /63 /16 /92 /60/8 /14 /4
/6 /8 /7 /59 /13 /62 /8 /12 /93 /i255 /76 /12 /i255 /16 /61 /i255 /4 /5 /8 /i255 /69 /11 /4 /8 /i255 /11 /65 /16 /59 /8 /9 /i255 /4 /5 /8 /i255 /13 /14 /69 /13 /59 /13 /69 /64 /11 /63 /112 /8 /14 /4 /13 /4 /92 /i255 /5 /11 /12 /i255 /62 /16 /60/91 /63 /13 /8 /69 /i255 /113 /13 /4 /5 /i255 /17 /18 /i255 /18 /16 /69 /8 /i255 /114 /i255 /3 /53 /52 /19 /55 /78 /19 /9 /i255 /i255 /4 /5 /8 /7 /8 /61 /16 /7 /8
/4 /5 /13 /12 /i255 /18 /8 /7 /4 /13 /61 /13 /62 /11 /4 /8 /i255 /16 /61 /i255 /18 /63 /8 /11 /14 /i255 /77 /11 /14 /69 /12 /i255 /13 /12 /i255 /13 /12 /12 /64 /8 /69 /93
/67 /48 /67 /75 /47 /i255 /3 /53 /93 /i255 /67 /76 /115 /76 /67 /48 /66 /49 /9 /i255 /75 /48 /18 /47 /49 /6 /48 /49 /58 /9 /i255 /116 /47 /70 /71/48 /67 /6 /9 /i255 /76 /6 /6 /47 /6 /6 /71/47 /49 /67 /6 /9 /i255 /76 /49 /17 /i255 /46 /47 /47 /6
/18 /77 /76 /116 /67 /47 /70 /i255 /19 /55 /i255 /58 /47 /49 /47 /70 /76 /75 /i255 /75 /48 /18 /47 /49 /6 /47
/6 /72 /74 /18 /77 /76 /116 /67 /47 /70 /i255 /48 /48 /93 /i255 /18 /75 /47 /76 /49 /i255 /77 /76 /49 /17 /6 /i255 /74 /47 /46 /66 /70 /47 /i255 /70 /47 /18 /47 /48 /96 /48 /49 /58 /i255 /76 /i255 /75 /48 /18 /47 /49 /6 /47 /i255 /66 /70 /i255 /116 /47 /70 /71/48 /67
/17 /93 /18 /93 /i255 /18 /66 /17 /47 /i255 /114 /i255 /3 /53 /52 /19 /55 /78 /19 /i255 /117 /19 /1 /1 /78 /118
/114 /i255 /3 /53 /52 /19 /55 /78 /19 /i255 /116 /70 /66 /77 /48 /74 /48 /67 /48 /66 /49 /i255 /76 /58 /76 /48 /49 /6 /67 /i255 /48 /6 /6 /72 /76 /49 /18 /47 /i255 /66 /46 /i255 /75 /48 /18 /47 /49 /6 /47 /i255 /66 /70 /i255 /116 /47 /70 /71/48 /67
/119 /119 /120 /119 /i255 /121 /122 /123 /i255 /111 /122 /124 /125 /125 /122 /i255 /111 /126/127 /i255 /111 /128 /129 /122 /125 /i255 /126/130 /131 /120 /127 /i255 /126/132 /133 /123 /129 /134 /135 /122 /136 /134 /127 /i255 /110 /98 /i255 /130 /120 /120 /130 /121 /137 /138 /123 /136 /134 /125 /139 /i255 /140 /130 /120 /130 /141 /i255 /131 /130 /121 /142 /143 /120 /121 /143 /137 /144/145 /101 /132 /146 /147 /110 /98 /147 /135 /136 /148
/i255
GOVERNMENT OF THE DISTRICT OF COLUMBIADEPARTMENT OF GENERAL SERVICES
MemorandumTo:Delano HunterDirector, Department of General ServicesFrom:Antoinette Hudson Beckham Agency Fiscal OfficerDepartment of General ServicesReference:On-Call Construction, Repair & Replacement (CRR) Services Modification No. 5 to Contract No. DCAM-20-CS-RFQ-0001AC with MO Construction, Inc.Full Exercise of Option Year 004Date:January 12, 2026Subject:Fiscal Sufficiency ReviewIn my capacity as the Agency Fiscal Officer of the Department of General Services (the “Department”), I hereby state that Modification No. 5 to Contract No. DCAM-20-CS-RFQ-0001AC for On-Call Construction, Repair & Replacement Services between the Department and MO Construction, Inc. (the “Contractor”) with a Not-To-Exceed (“NTE”) value of $5,000,000.00,has a guaranteed minimum valueof $50.00, that is consistent with the Department’s current budget and that adequate funds are available in the budget for the expenditure. The $50.00minimum value is hereby approved.Funds supporting individual task order agreements, above the minimum amount approved of $50.00, to be issued against the base period (“Base Period”) and four (4) one-year option periods (“Option Years”) aggregate NTE value of $5,000,000.00, will be reviewed for certification and approval at the time of issuance of any such task order agreements. Each task order is subject to availability of appropriated funds. Task orders, ineligible for capital expenditure, will be funded under the Department of General Services (“DGS”) operating budget, if funding is available. The Department of General Services (DGS-Implementing AGY/Owner AGY) has $50.00in cumulative capital budget allotment balance.
Fiscal Sufficiency Review On-Call Construction, Repair & Replacement (“CRR”) ServicesContract Number: DCAM-20-CS-RFQ-0001AC Modification No. 5 – Exercise of Option Year 004 The PASS information is attached/ below: Project Name Project Number AY Fund Detail Imp. Agency Owner Agency RK/PO Amount Comments AM0.PL902C.CRITICAL SYSTEM REPLACEMENT100144N/A 3030300 AM0 AM0 RK321003 $50.00Total $50.00 _____________________________ Antoinette Hudson BeckhamAgency Fiscal OfficerDepartment of General Services
for AHB
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF GENERAL SERVICES
___________________________________________________________________________
3924 Minnesota Avenue NE, 6th Floor Washington DC 20019 | Telephone (202) 727-2800 | Fax (202) 727-7283
OFFICE OF THE GENERAL COUNSEL
MEMORANDUM
TO: Tomás Talamante
Director, Office of Policy and Legislative Affairs
FROM: Kristen Walp
Interim Deputy General Counsel
SUBJECT: Legal Sufficiency Certification
Proposed Modification No. 5 to Basic Ordering Agreement for On -Call Construction,
Repair & Replacement Services
Contract Number: DCAM-20-CS-RFQ-0001AC
Contractor: MO Construction, Inc.
DATE: March 12, 2026
_____________________________________________________________________________
This is to certify that this Office has reviewed the above-referenced proposed Modification No. 5
and has found it to be legally sufficient, subject to submission of : (i) any required materials and
Council approval; (ii) Council’s approval of the same; and (iii) a Fiscal Certification issued by the
Department of General Services’ Agency Fiscal Officer.
Please feel free to contact me at (202) 727-2800 with any questions.
____________________________
Kristen Walp
Interim Deputy General Counsel
X
2. MODIFICATION NUMBER
Modification No. 4
MODIFICATION OF CONTRACT
Department of General Services Department of General Services
Contracts and Procurement Division Capital Construction Services Division
3924 Minnesota Avenue, NE, 5th Floor 3924 Minnesota Avenue, NE, 5th Floor
6. ISSUED BY: 7. ADMINISTERED BY (If other than Item 6)
1. CONTRACT NO
DCAM-20-CS-RFQ-0001AC
Page of Pages
12
5. CAPTION4. PURCHASE REQUISITION NO.
N/A
3. EFFECTIVE DATE
See Block 16C On-Call Construction, Repair &
Replacement ("CRR") Services
9B. DATED (SEE ITEM 11)
X
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
DCAM-20-CS-RFQ-0001AC
Washington, DC 20012
Attn: Adetola Aderotoye
Contract POC: Arad Rahimi (arad.rahimi@dc.gov)
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
MO Construction, Inc.
7059 Blair Road NW, Suite 202
12. Accounting and Appropriation Data (If Required)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED
MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made
by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received
prior to the opening hour and date specified.
Email: info@moconstructiondc.com 10B. DATED (SEE ITEM 13)
December 27, 2021
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a)
By completing items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer
submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office,
appropriation data, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
CHECK
ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1
x Title 27 DCMR Section 4728 and Contract No. DCAM-20-CS-RFQ-0001AC
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
D. OTHER (Specify type of modification and authority)
Basic Order Agreement ("BOA") No. DCAM-20-CS-RFQ-0001AC for Maintenance & Repairs of Government Facilities (“MRGF”) Services is hereby modified as
follows:
Partial Exercise of Option Year Period. The Department hereby partially exercises Option Year Four (OY4) through March 26, 2026. This extension is at
no cost to the district.
2 Terms & Conditions. All other Terms and Conditions remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
3 Release. It is mutually agreed that in exchange for this Change Order and other considerations, the Contractor hereby releases, waives, settles, and holds
the Department harmless from any and all actual or potential claims or demands for delays, disruptions, additional work, additional time, additional cost,
contract extensions, compensations or liability under any theory, whether known or unknown, that the Contractor may have now or in the future against the
Department arising from or out of, as consequence or result of, relating to or in any manner connected with this Change Order, the above-referenced
Project, and the Contract work.
Tola Aderotoye, Vice President Suzi Tabot, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. DISTRICT OF COLUMBIA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Washington, DC 20019 Washington, DC 20019
12/22/2025
12/23/2025
(Continuation)
CONTRACT NUMBER Modificati on Number Page of Pages
DCAM-20-CS-RFQ-0001AC Modi fication No. 4 2 of 2
Basic Ordering Agreement Executed on December 27, 2021 5,000,000. 00$
Modification No. 1 Modification No.1 (Full Exercise of Option Ye ar 001) 5,000,000.00$
AGREEMENT RECAP:
Modification No. 2 Modification No.2 (Full Exercise of Option Ye ar 002) 5,000,000.00$
Modification No. 3 Modification No.3 (Full Exercise of Option Ye ar 003) 5,000,000.00$
Modification No. 4 Proposed Modifi cation No. 4 (Partial Exercise of Option Year 004) - $
X
Washington, DC 20019 Washington, DC 20019
Tola Aderotoye, Vice President Suzi Tabot, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. DISTRICT OF COLUMBIA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1
x Title 27 DCMR Section 4728 and Contract No. DCAM-20-CS-RFQ-0001AC
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
D. OTHER (Specify type of modification and authority)
Basic Order Agreement ("BOA") No. DCAM-20-CS-RFQ-0001AC for Maintenance & Repairs of Government Facilities (“MRGF”) Services is hereby modified as
follows:
Partial Exercise of Option Year Period. The Department hereby partially exercises Option Year Four (OY4) through April 30, 2026. This extension is at no
cost to the district.
2 Terms & Conditions. All other Terms and Conditions remain unchanged.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
3 Release. It is mutually agreed that in exchange for this Change Order and other considerations, the Contractor hereby releases, waives, settles, and holds
the Department harmless from any and all actual or potential claims or demands for delays, disruptions, additional work, additional time, additional cost,
contract extensions, compensations or liability under any theory, whether known or unknown, that the Contractor may have now or in the future against the
Department arising from or out of, as consequence or result of, relating to or in any manner connected with this Change Order, the above-referenced
Project, and the Contract work.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office,
appropriation data, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
CHECK
ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
12. Accounting and Appropriation Data (If Required)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED
MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made
by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received
prior to the opening hour and date specified.
Email: info@moconstructiondc.com 10B. DATED (SEE ITEM 13)
December 27, 2021
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a)
By completing items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer
submitted;
9B. DATED (SEE ITEM 11)
X
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
DCAM-20-CS-RFQ-0001AC
Washington, DC 20012
Attn: Adetola Aderotoye
Contract POC: Arad Rahimi (arad.rahimi@dc.gov)
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
MO Construction, Inc.
7059 Blair Road NW, Suite 202
2. MODIFICATION NUMBER
Modification No. 4a
MODIFICATION OF CONTRACT
Department of General Services Department of General Services
Contracts and Procurement Division Capital Construction Services Division
3924 Minnesota Avenue, NE, 5th Floor 3924 Minnesota Avenue, NE, 5th Floor
6. ISSUED BY: 7. ADMINISTERED BY (If other than Item 6)
1. CONTRACT NO
DCAM-20-CS-RFQ-0001AC
Page of Pages
12
5. CAPTION4. PURCHASE REQUISITION NO.
N/A
3. EFFECTIVE DATE
See Block 16C On-Call Construction, Repair &
Replacement ("CRR") Services
3/11/2026
3/11/2026
(Continuation)
Modification No. 3 Modification No.3 (Full Exercise of Option Ye ar 003) 5,000,000.00$
Modification No. 4 Modification No. 4 (Partial Exercise of Optio n Year 004) - $
Modification No. 4a Modi fication No. 4a (Partial Exercise of Option Year 004) - $
Modification No. 2 Modification No.2 (Full Exercise of Option Ye ar 002) 5,000,000.00$
CONTRACT NUMBER Modificati on Number Page of Pages
DCAM-20-CS-RFQ-0001AC Modi fication No. 4a 2 of 2
Basic Ordering Agreement Executed on December 27, 2021 5,000,000. 00$
Modification No. 1 Modification No.1 (Full Exercise of Option Ye ar 001) 5,000,000.00$
AGREEMENT RECAP:
X
3
Adetola Aderotoye, Vice President Suzi Tabot, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. DISTRICT OF COLUMBIA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Exercise of Option Year 004: In accordance with Section 1.6 of the Contract (Basic Ordering Agreement, or "BOA"), the Department hereby exercises Option Year 004
and extends the term of the BOA through December 26, 2026. The full term of Option Year 004 is from December 27, 2025, through December 26, 2026. The
continuation of services beyond September 30, 2026 is subject to the availability of appropriated FY27 budget funding.
Minimum Guaranteed & Not-to-Exceed ("NTE") Value of Agreement. In accordance with Section Nos. 1.8 & 1.9 of the BOA, the Contractor shall be entitled to
receive a minimum of $50.00. The Contract has an aggregate NTE amount of $5,000,000.00 for Option Year 004 for all services to be provided under this BOA. All work
will be awarded and released on a competitive basis through individual task order agreements.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
4 Release. It is mutually agreed that in exchange for this Change Order and other considerations, the Contractor hereby releases, waives, settles, and holds the Department
harmless from any and all actual or potential claims or demands for delays, disruptions, additional work, additional time, additional cost, contract extensions,
compensations or liability under any theory, whether known or unknown, that the Contractor may have now or in the future against the Department arising from or out of,
as consequence or result of, relating to or in any manner connected with this Change Order, the above-referenced Project, and the Contract Work.
2
Terms & Conditions. All other Terms and Conditions remain unchanged.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1
x Title 27 DCMR Section 4728 and Contract No. DCAM-20-CS-RFQ-0001AC
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
D. OTHER (Specify type of modification and authority)
Basic Ordering Agreement (BOA) No. DCAM-20-CS-RFQ-0001AC for On-Call Construction, Repair & Replacement ("CRR") Services is hereby modified as follows:
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office,
appropriation data, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
CHECK
ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
12. Accounting and Appropriation Data (If Required)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Email: info@moconstructiondc.com 10B. DATED (SEE ITEM 13)
December 27, 2021
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate
letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED
AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or
electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
9B. DATED (SEE ITEM 11)
X
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
DCAM-20-CS-RFQ-0001AC
Washington, DC 20012
Attn: Adetola Aderotoye
Washington, DC 20019 Washington, DC 20019
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER
Mo Construction, Inc.
7059 Blair Road NW, Suite 202
Contract POC: Arad Rahimi (arad.rahimi@dc.gov)
2. MODIFICATION NUMBER
Modification No. 5
MODIFICATION OF CONTRACT
Department of General Services Department of General Services
Contracts and Procurement Division Capital Construction Services Division
3924 Minnesota Avenue, NE 5th Floor 3924 Minnesota Avenue, NE 5th Floor
6. ISSUED BY: 7. ADMINISTERED BY (If other than Item 6)
1. CONTRACT NO
DCAM-20-CS-RFQ-0001AC
Page of Pages
12
5. CAPTION4. PURCHASE REQUISITION NO.
RK321003
3. EFFECTIVE DATE
See Block 16C On-Call Construction, Repair &
Replacement ("CRR") Services
2/3/2026
(Continuation)
Modification No. 3 Modi fication No. 3 (Full Exercise of Option Year 003) $5,000,000.00
Modification No. 4 Modification No . 4 (Partial Exercise of Option Year 004) $0.00
Modification No. 5 Proposed Modifi cation No. 5 (Full Exercise of Option Year 004) $5,000,000.00
Modifciation No. 2 Modification No . 2 (Full Exercise of Option Year 002) $5,000,000.00
CONTRACT NUMBER Modification Number Page of Pages
DCAM-20-CS-RFQ-0001AC Modification No. 5 2 of 2
Basic Ordering Agreement Execu ted on December 27, 2021 $5,000,00 0.00
Modification No. 1 Modi fication No. 1 (Full Exercise of Option Year 001) $5,000,000.00
5. Agreement RECAP: