Pursuant to D.C. Official Code § 2-352.02, I have enclosed, for consideration by the Council of the District of
Columbia, the (a) Council Contract Summary for the contract between the District of Columbia Housing
Au
thority (“DCHA”) and Micon Constructions Inc. and (b) DCHA Contract Number DJ93-54-20 24N wi th Micon
Constructions Inc.
DCHA proposes to enter into a contract for capital repairs-HVAC modernization (domestic water and heating
lateral replacement) at the B enning Terrace DCHA property with Micon Constructions Inc. for one (1) year with
four (4) one-year options. Under the proposed contract, Micon Constructions Inc. w ill receive up to
$1,268,517.46.
As always, I am available to discuss any questions you may have regarding the proposed contract. I n order to
f
acilitate a response to any questions concerning this contract, please have your staff contact Hammere
Gebreyes, Director of External Affairs & Senior Advisor, at (202) 207-4694.
I look forward to your favorable consideration of this proposed contract.
Sincerely,
Nicole Wic kliffe
Interim Executive Director, District of Columbia Housing Authority
E
nclosures
KP/hg
cc: Nyasha Smith, Secretary to the Council
May 15, 2026
COUNCIL CONTRACT SUMMARY
Pursuant to D.C. Official Code § 2-352.02(c), as amended, the following is provided:
(1) The name of the proposed contractor, the contract/loan amount, and the term of th e p roposed contract:
Contractor: Micon Constructions Inc.
Contract Amount: $25,000.00 - $10,000,000.00
Contract Term(s): One (1) base year with four (4) additional one-year options
Source Selection Method: RFP 54-2024
(2) Description of the Goods and S ervices to be provided:
Pursuant to D.C. Official Code § 2-352.02(b)(2), as amended, I have enclosed for consideration the Indefinite-quantity
Job Order Contract for general construction, repair, and demolition services.
(3) A d es cription of t h e selection p roc ess, i ncluding t he number of of ferors, t he evaluation cri teria, t he
evaluation results, and the basis for selecting the proposed contractor:
The District of Columbia Housing Authority (DCHA), responsible for providing affordable housing solutions within the
D
istrict, initiated a competitive bidding process to procure general construction, repair, and demolition services. This
process was set in motion with the release of a Request for Proposal (RFP) on August 19, 2024.
To ensure maximum visibility and encourage a wide range of participation, the RFP was advertised extensively in both
pr
int and online media. Prominent publications such as The Washington Post, Washington Informer, Washington Times,
and El Tiempo Latino carried the advertisement , r eaching a diverse audience across the District. Additionally, the RFP
Notification was prominently displayed on the DCHA website and the RFP posted to the Housing Agency Marketplace,
providing easy online access to potential bidders.
The DCHA received t
hirty five (35) proposals from vendors in response to the RFP. To ensure a fair and impartial
eva
luation, a dedicated review panel was convened. This panel comprised experienced staff members from DCHA's
Capital Construction and Design department, bringing their expertise in construction projects. The evaluation process
w
as rigorous, focusing not only on the technical requirements outlined in the RFP but also on the vendors' Section 3 plan.
This plan is a key component of the evaluation, aimed to promote job training and employment opportunities for low -
inc
ome residents, aligning with DCHA's commitment to social and economic upliftment within the District.
Based on this comprehensive evaluation, the vendor was identified as having successfully met the technical requirements
and demonstrating the capability to deliver the general construction, repair, and demolition services. This vendor was
M
icon Construction, Inc.
To ensure compliance with government regulations and maintain the highest standards of int egrity, DCHA staff
conducted a further review of the qualified vendors using the System for Award Management. This crucial step ensured
that none of the vendors were debarred or suspended from doing business with either the federal or District government,
safeguarding the procurement process from potential legal or ethical complications.
Ultimately, after careful consideration and thorough evaluation, Micon Constructions Inc. emerged as the proposed
contractor. Their proposal was evaluated based on the firm's technical capability, capacity, performance history, and
pr
oposed pricing coefficients/factors, which are applied to the Construction Task Catalog. The selection was based on
of
fering the best value while meeting all technical, social responsibility, and JOC requirements outlined in the RFP.
The contract is an Indefinite-quantity Job Order Contract (JOC) for general construction, repair, and demolition services.
T
he contract term is one (1) base year (May 1, 2025, through April 30, 2026) with four (4) one- year options. The
minimum total amount that may be ordered under this Contract is $25,000.00, and the maximum total amount that may
be ordered during the base year shall not exceed $10,000,000.00. Work is initiated only upon issuance of a Job
Order and a
corresponding Notice to Proceed. A specific Job Order (DJ93-D C02.01) has been issued for Capital
Repairs - HVAC Modernization (Domestic Water & Heating Lateral Replacement ) at Benning Terrace with a value
of $1,268,517.46 and an estimated duration of 270 days.
(4) Background and qualifications of the proposed contractor:
Micon Construction Inc. is an award-winning, full-service construction company, specializing in construction
management and general contracting. The company is based in the District of Columbia. Micon Construction understands
the intricacies of design, architecture, and construction, allowing them to bring uncompromising quality to each endeavor.
Micon
Construction Inc. has built a reputation for excellence, which is supported by multiple Home Builders
Association Pyramid Awards for best residential renovations and best custom homes. This success is based on
their model of accepting a limited number of projects at a time to ensure personal attention, reliability, and the attention
to detail required by each client. They leverage long-s tanding collaborative relationships with leading architects,
artisans, and other
industry professionals to provide a dedicated team committed to fulfilling the client’s vision.
(5) Performance standards and expected outcomes of the proposed contract:
The ex
pected outcomes of this Job Order Contract (JOC) are the efficient and timely completion of repair, demolition,
and general construction projects for DCHA and its affiliated facilities. The work performed under individual Job Orders
is expected to be executed in strict accordance with the Contract, which includes the Construction Task Catalog® (CTC),
Technical Specifications, and all applicable Federal and District laws, regulations, and codes. Key performance standards
include
adhering to project schedules, maintaining site safety and preparation, providing quality assurance, and
performing all work with experienced labor and high-quality materials.
Performance
will be rigorously controlled and monitored by the Authority's designated Project Manager. The Contractor
must furnish all necessary management, documentation, labor, materials, equipment, and design support to complete
each Job Order. Quality is maintained through the requirement for technical submittals such as safety plans, detailed
construction schedules, and shop drawings within five days of receiving the Job Order/Notice to Proceed. Furthermore,
all work must align with the Modernization Principles and Redevelopment Principles adopted by the DCHA Board
of Commissioners.
A
critical outcome of this contract is the fulfillment of DCHA's commitment to social responsibility. The Contractor
is required
to comply with Section 3 requirements, which mandate providing training, employment, and
contracting
opportunities to low and very low income residents of the District of Columbia, to the greatest extent feasible.
Additionally, the Contractor must adhere to the prevailing wage rates set forth in the Davis Bacon wage determinations
for the Metropolitan Washington D.C. area, as applicable to the type of construction and working hours specified in each
Job Order.
Further ensuring project integrity and completion, the Contractor is required to provide a 100% Performance Bond and
a 100% Payment Bond for any individual Job Order exceeding $150,000. Failure to submit these acceptable bonds at the
time the Notice to Proceed is issued can result in the cancellation of the Job Order and possible termination of the Contract
for default. This bonding requirement guarantees faithful performance and payment for all labor and materials used in
the performance of the Work.
(6) D
escription of the funding source for the proposed agreement and a certification that the proposed
agreement is consistent with the District's financial plan and budget:
D
istrict Funds
(7) A
certification of legal sufficiency:
T
he Legal Sufficiency Memorandum is attached.
(8) A
certification that the proposed contractor's/proposed owner is in compliance with District tax laws:
T
he District tax law compliance certification is attached.
(9) T
he status of the proposed contractor as a certified local, small or disadvantaged business enterprise.
T
he contractor is certified as a Minority Business Enterprise (MBE). This designation reflects the
contractor’s commitment to diversity and inclusion in business opportunities. The company meets the District’s criteria
for participation as a certified MBE in government contracting.
(1
0) A statement indicating whether the proposed contractor is currently debarred from providing services or
good to the District or federal government:
D
CHA’s Office of Administrative Service has conducted a federal and local search of Micon Construction, Inc. and has
found no evidence of federal or District debarment.
(1
1) Where the contract, if executed, will be made available via FOIA request:
T
he contract will be made available on the DCHA website.
(
12) Where the original solicitation, and any amendment or modifications, will be made available online.
O
riginal solicitation #54-2024 was published on the DCHA Website. See link:
http://dchousing.org/wordpress/solicitations.
Initial File #: 201972
Entity Type: Domestic Business Corporation
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF LICENSING AND CONSUMER PROTECTION
CORPORATIONS DIVISION
C E R T I F I C A T E
THIS IS TO CERTIFY that all applicable provisions of the District of Columbia Business
Organizations Code (Title 29) have been complied with and accordingly, this CERTIFICATE OF
GOOD STANDING is hereby issued to
MICON CONSTRUCTIONS Inc.
WE FURTHER CERTIFY that the domestic filing entity is formed under the law of the District on
05/26/2000; that all fees, and penalties owed to the District for entity filings collected through the
Mayor have been paid and Payment is reflected in the records of the Mayor; The entity's most recent
biennial report required by § 29-102.11 has been delivered for filing to the Mayor; and the entity has
not been dissolved. This office does not have any information about the entity’s business practices
and financial standing and this certificate shall not be construed as the entity’s endorsement.
IN TESTIMONY WHEREOF I have hereunto set my hand and caused the seal of this office to be
affixed as of 04/15/2026 12:09 AM
Muriel Bowser
Mayor
Tracking #: C2026CT0074942
Business and Professional Licensing Administration
1717 N Street NW, Suite 300, Washington, DC 20036 |
202.636.3930 phone | 202-636-3931 fax | info@miconconstructions.com
April 16th, 2026
District of Columbia Housing Authority
300 7th Street, SW – 10th Floor
Washington, DC 20032
Reference: Certification Regarding Federal Taxes
The undersigned hereby certifies that it is current with its federal tax obligations, or has worked
out and is current with a payment schedule approved by the federal government. ,
___________________________________
Olufemi O. Akinwande
CEO
Micon Constructions, Inc.
1717 N Street NW, Suite 300
Washington, DC 20036
Date: ___________
Notary
I hereby certify that on this day ____ of ___________________ Olufemi O. Akinwande
personally appeared and signed this document and acknowledged he was a member of the
Corporation.
State/County: Notary Public:
04/16/2026
April16th 2026
Jordan Paul Beabout
Florida Palm Beach
Notarized remotely online using communication technology via Proof.
1717 N Street NW, Suite 300, Washington, DC 20036 |
202.636.3930 phone | 202-636-3931 fax | info@miconconstructions.com
April 16th, 2026
District of Columbia Housing Authority
300 7th Street, SW – 10th Floor
Washington, DC 20032
Reference: Certification Regarding No Pending Litigation
The undersigned hereby certifies that the contractor has no pending claims against the District.
___________________________________
Olufemi O. Akinwande
CEO
Micon Constructions, Inc.
1717 N Street NW, Suite 300
Washington, DC 20036
Date: ___________
Notary
I hereby certify that on this day ____ of ___________________ Olufemi O. Akinwande
Personally appeared and signed this document and acknowledged he was a member of the
Corporation.
State/County: Notary Public:
04/16/2026
16th April 2026
Jordan Paul Beabout
Florida Palm Beach
Notarized remotely online using communication technology via Proof.
1717 N Street NW, Suite 300, Washington, DC 20036 |
202.636.3930 phone | 202-636-3931 fax | info@miconconstructions.com
The undersigned hereby certifies that Micon Constructions, Inc. is currently not, and will not be,
in violation of District of Columbia Code §1-1163.34a, which provides a covered contractor shall not
contribute to a prohibited recipient during the prohibited period.
___________________________________
By:
Title:
NOTARY:
I hereby certify that on this ________ day of May 2026, _________________ personally appeared and
signed this document and acknowledged that he/she was the ________________ of Micon
Construction, Inc.
State/County/District of Columbia Notary Public: ________________________________
[SEAL]
Olufemi O Akinwande
CEO
7th Olufemi O Akinwande
CEO
xxxxxxxxxxxxxxxxxx
Florida BROWARD
Notarized remotely online using communication technology via Proof.
1717 N Street NW, Suite 300, Washington, DC 20036 |
202.636.3930 phone | 202-636-3931 fax | info@miconconstructions.com
AFFIDAVIT
I, Olufemi O. Akinwande, hereby attest that all members of the team who are listed below are
not listed in the List of Parties Excluded from Federal Procurement or Non-Procurement
Programs.
CONSTRUCTION TEAM
Project Name: Child Healthy Homes at Highland Additions
Project Number: DJ93-DC03.01
Contractor: Micon Constructions, Inc.
I further attest that no principal, major stockholder, officer, or director of the team is debarred
from participating in a federal procurement or non-procurement program.
___________________________________
Olufemi O. Akinwande
CEO
Micon Constructions, Inc.
1717 N Street NW, Suite 300
Washington, DC 20036
Date: ___________
Notary
I hereby certify that on this day ____ of ___________________ Olufemi O. Akinwande
personally appeared and signed this document and acknowledged he was a member of the
Corporation.
State/County: Notary Public:
04/16/2026
16th 2026April
Florida Palm Beach
Notarized remotely online using communication technology via Proof.
Jordan Paul Beabout
1101 4th Street, SW
Washington, DC 20024
Date of Notice: April 14, 2026 L0016418125Notice Number:
FEIN: **-***4818
Case ID: 18935794
Government of the District of Columbia
Office of the Chief Financial Officer
Office of Tax and Revenue
MICON CONSTRUCTIONS INC
1717 N ST NW STE 300
WASHINGTON DC 20036-2827
Branch Chief, Collection and Enforcement Administration
Authorized By Melinda Jenkins
To validate this certificate, please visit MyTax.DC.gov. On the MyTax DC homepage, click the
“Validate a Certificate of Clean Hands” hyperlink under the Clean Hands section.
CERTIFICATE OF CLEAN HANDS
As reported in the Clean Hands system, the above referenced individual/entity has no outstanding
liability with the District of Columbia Office of Tax and Revenue or the Department of Employment
Services. As of the date above, the individual/entity has complied with DC Code § 47-2862, therefore
this Certificate of Clean Hands is issued.
TITLE 47. TAXATION, LICENSING, PERMITS, ASSESSMENTS, AND FEES
CHAPTER 28 GENERAL LICENSE
SUBCHAPTER II. CLEAN HANDS BEFORE RECEIVING A LICENSE OR PERMIT
D.C. CODE § 47-2862 (2006)
§ 47-2862 PROHIBITION AGAINST ISSUANCE OF LICENSE OR PERMIT
1101 4th Street SW, Suite W270, Washington, DC 20024/Phone: (202) 724-5045/MyTax.DC.gov
COPY
CERTIFICATIONS
I hereby certify that the proposed contract between the District of Columbia Housing Authority
(“DCHA”) and Micon Constructions Inc. to provide capital repairs-HV AC modernization (domestic
water and heating replacement) for the Benning Terrace property in the amount of up to One Million
Two Hundred Sixty Eight Thousand Five Hundred Seventeen and 46/00 Dollars ($1,268,517.46) from
funds received by DCHA from the District of Columbia for DCHA’s 2026 Fiscal Year operating budget
is in compliance with the applicable Federal law and regulations.
Nicole Wickliffe
Interim Executive Director, DCHA
I have reviewed this proposed action. DCHA will make available to Micon Constructions Inc. up to
One Million Two Hundred Sixty Eight Thousand Five Hundred Seventeen and 46/00 Dollars
($1,268,517.46) to provide capital repairs-HVAC modernization (domestic water and heating
replacement) for the Benning Terrace DCHA property. This action is within the 2026 Fiscal Year
DCHA operating budget and such funds are available for administration by DCHA in Fiscal Year 2026.
I
sra A
. Elkhazeen
Interim Chief Financial Officer
Dated: May __15, 2026
Dated: May 15, 2026
/0 /1 /2 /3 /4 /5 /6/1 /7/5 /i255 /9/10 /i255 /11 /6/3 /12 /12 /i255 /3 /7/0 /i255 /12 /9/13 /3 /12 /i255 /14 /15 /11 /16 /7/1 /11 /11 /i255 /0 /1 /17 /1 /12 /9/2 /6/1 /7/5
/13 /14 /1 /i255 /7/18 /19/20 /21 /22 /23 /i255 /i255 /12 /11 /0 /25 /26 /27 /27 /28 /29 /30 /31 /32 /30 /32 /33
/13 /21 /22 /34 /35 /36 /37 /38 /34 /35 /39 /40 /i255 /2 /21 /22 /35 /39 /41 /23 /i255 /30 /31 /42 /26 /26 /42 /32 /30 /32 /28 /i255 /43
/30 /31 /42 /26 /26 /42 /32 /30 /32 /33
/14 /15 /11 /16 /7/1 /11 /11 /i255 /13 /1 /4 /5 /16 /10 /16 /13 /3 /5 /16 /9/7 /i255 /0 /16 /17 /16 /11 /16 /9/7
/29 /29 /26 /i255 /29 /5 /44 /i255 /11 /34 /22 /21 /21 /34 /45 /i255 /7/46 /47/46 /45 /i255 /11 /18 /35 /34 /21 /i255 /27 /48 /30 /7
/47/38 /49 /50 /35 /40 /51 /34 /39 /40 /45 /i255 /0 /46 /13 /46 /i255 /32 /30 /30 /30 /26
/0 /38 /34 /21 /i255 /16 /49 /49 /18 /21 /41 /23 /i255 /30 /31 /42 /26 /26 /42 /32 /30 /32 /28
/13 /21 /22 /34 /35 /36 /37 /38 /34 /35 /39 /40 /i255 /13 /38 /34 /21 /51 /39 /22 /35 /21 /49 /23 /i255 /i255 /12 /14 /1 /45 /i255 /11 /14 /1 /45
/0 /14 /1 /45 /i255 /12 /4 /14
/13 /1 /4 /5 /16 /10 /16 /13 /3 /5 /1 /i255 /9/10 /i255 /14 /15 /11 /16 /7/1 /11 /11 /i255 /13 /1 /4 /5 /16 /10 /16 /13 /3 /5 /16 /9/7
/5 /50 /35 /49 /i255 /38 /37 /52 /40 /39 /53/54 /21 /41 /51 /21 /49 /i255 /34 /50 /38 /34
/55/56 /57 /58 /59/i255 /57 /58/59 /61 /62 /63 /64 /57 /62 /56 /58/59 /61 /65 /i255 /56 /59/57 /66
/44 /38 /49 /i255 /67 /18 /54 /36 /54 /54 /21 /41 /i255 /34 /50 /21 /i255 /22 /21 /68 /18 /35 /22 /21 /19/21 /40 /34 /49 /i255 /34 /39 /i255 /20 /21 /i255 /37 /39 /40 /49 /35 /41 /21 /22 /21 /41 /i255 /38 /i255 /13 /21 /22 /34 /35 /36 /21 /41 /i255 /14 /18 /49 /35 /40 /21 /49 /49 /i255 /1 /40 /34 /21 /22 /69 /22 /35 /49 /21 /i255 /70 /13 /14 /1 /71 /46 /i255 /3 /i255 /13 /14 /1 /i255 /35 /49 /i255 /38 /i255 /20 /18 /49 /35 /40 /21 /49 /49 /i255 /34 /50 /38 /34 /i255 /35 /49
/50 /21 /38 /41 /68 /18 /38 /22 /34 /21 /22 /21 /41 /i255 /35 /40 /i255 /34 /50 /21 /i255 /0 /35 /49 /34 /22 /35 /37 /34 /i255 /39 /67 /i255 /13 /39 /54 /18 /19/20 /35 /38 /i255 /38 /40 /41 /i255 /19/21 /21 /34 /49 /i255 /38 /54 /54 /i255 /12 /39 /37 /38 /54 /i255 /14 /18 /49 /35 /40 /21 /49 /49 /i255 /1 /40 /34 /21 /22 /69 /22 /35 /49 /21 /i255 /70 /12 /14 /1 /71 /i255 /22 /21 /68 /18 /35 /22 /21 /19/21 /40 /34 /49 /46 /i255 /14 /18 /49 /35 /40 /21 /49 /49 /21 /49 /i255 /53/35 /34 /50
/13 /14 /1 /i255 /37 /21 /22 /34 /35 /36 /37 /38 /34 /35 /39 /40 /i255 /22 /21 /37 /21 /35 /72 /21 /i255 /69 /22 /21 /67 /21 /22 /21 /40 /37 /21 /i255 /35 /40 /i255 /69 /22 /39 /37 /18 /22 /21 /19/21 /40 /34 /i255 /38 /40 /41 /i255 /37 /39 /40 /34 /22 /38 /37 /34 /35 /40 /51 /i255 /39 /69 /69 /39 /22 /34 /18 /40 /35 /34 /35 /21 /49 /46 /i255 /2 /18 /22 /49 /18 /38 /40 /34 /i255 /34 /39 /i255 /32 /73 /32 /26 /27 /46 /28 /31 /i255 /34 /50 /35 /49 /i255 /37 /21 /22 /34 /35 /36 /37 /38 /34 /35 /39 /40
/37 /38 /40 /i255 /20 /21 /i255 /22 /21 /72 /39 /52 /21 /41 /i255 /35 /67 /i255 /38 /i255 /20 /18 /49 /35 /40 /21 /49 /49 /i255 /35 /49 /i255 /67 /39 /18 /40 /41 /i255 /34 /39 /i255 /50 /38 /72 /21 /i255 /72 /35 /39 /54 /38 /34 /21 /41 /i255 /34 /50 /21 /i255 /54 /38 /53/49 /i255 /34 /50 /38 /34 /i255 /51 /39 /72 /21 /22 /40 /i255 /34 /50 /21 /i255 /13 /14 /1 /i255 /69 /22 /39 /51 /22 /38 /19/46
/74 /56 /63 /75 /57 /62 /58/63
/63 /76 /77 /78 /79/80 /81 /82 /i255 /61 /83 /84 /84 /77 /85 /75 /86 /80 /87 /77
/88 /89 /90 /90 /89 /91 /92 /93 /i255 /91 /95 /91 /90 /i255 /96 /97/98 /99 /100 /101 /98 /100 /102 /103 /98 /101 /98 /104 /101 /105 /106 /107 /89 /108 /109 /99 /110 /89 /111 /112 /113 /114 /111 /115 /116 /99 /117 /118 /119 /120 /119 /104 /108 /118 /99 /121 /119 /99 /122 /123 /119 /98 /124 /108 /125 /126 /99 /127 /125 /125 /125 /125 /90 /128 /98 /98 /129 /130 /131 /131 /114
/132 /118 /118 /109 /100 /95 /89 /89 /98 /99 /100 /101 /98 /100 /102 /103 /98 /101 /98 /104 /101 /105 /106 /107 /89 /108 /109 /99 /110 /89 /111 /112 /113 /114 /111 /115 /116 /99 /117 /118 /119 /120 /119 /104 /108 /118 /99 /121 /119 /99 /122 /123 /119 /98 /124 /108 /125 /126 /99 /127 /125 /125 /125 /125 /90 /128 /98 /98 /129 /130 /131 /131 /114 /91 /89 /91
MEM
ORANDUM
TO:
FROM
:
DATE:
Keith Pettigrew, Interim
Executive Director
Andrea Powell
Deputy General Counsel
May 15, 2026
District of Columbia Housing Authority
300 7th Street, SW, 10th Floor, Washington, DC 20024
202-535-1000
Nicole Wickliffe, Interim Executive Director
SUBJECT: Proposed Contract for Capital Repairs-HVAC Modernization (domestic water and
heating lateral replacement) at the District of Columbia Housing Authority's ("DCHA")
Benning Terrace project
between DCHA and Micon Constructions, Inc. (“Contractor”)
to be submitted to the Council for the District of Columbia for approval pursuant to
D.C. Official Code §2-352.02(a)(1), as amended.
1. Procurement Process
I have enclosed for consideration by the Council of the District of Columbia, the Council
Contract Summary for a proposed contract, in an amount up to $1,268,517.46 between DCHA and
Micon Constructions, Inc. This proposed contract is for capital repairs-HVAC modernization
(domestic water and heating lateral replacement) at DCHA’s Benning Terrace project. DCHA issued a
Request
for Proposal (RFP) Solicitation No.: 54-2024 on August 19, 2024. To ensure maximum
visibility and encourage a wide range of participation, the RFP was advertised extensively in both
print and online media. Prominent publications such as The Washington Post, Washington Informer,
Washington Times,
and El Tiempo Latino carried the advertisement, reaching a diverse audience
across the District. Additionally, the RFP Notification was prominently displayed on the
DCHA website and the RFP posted to the Housing Agency Marketplace, providing easy online to
potential bidders.
The DCHA received proposals from vendors in response to the RFP. To ensure a fair and impartial
evaluation,
a dedicated review panel was convened. Based on this comprehensive evaluation, the
vendor was identified as having successfully met the technical requirements and demonstrating
the capability to deliver the required storm water management service. The vendor was
Micon Constructions, Inc.
2. Description of Proposed Contract
This proposed contract between DCHA and Micon Constructions, Inc. is for capital repairs-HVAC
modernization (domestic water and heating lateral replacement) at Benning Terrace. A contract will be
entered into with Micon Constructions, Inc.
www.dchousing.org
www.dchousing.org
The length of the Contract will be a one base year contract with four (4) one year options. The
scope of work in the Contract contains sufficient details and plans. DCHA will fund the Contract
with funds from the District of Columbia for Fiscal Year 2026 in compliance with the applicable
Federal
and District of Columbia regulations and DCHA’s policies and procedures.
3. Legal Review
The DCHA Office of the General Counsel (OGC) has reviewed the proposed Contract with Micon
Constructions, Inc. for legal sufficiency. OGC’s review of the Contract indicated that it is legally
sufficient. In additi on, we are not aw are of any pending legal claims of Micon Constructions, Inc.
against the District of Columbia or DCHA.
APPROVED AS TO LEGAL SUF FICIENCY:
Andrea Powell
Deputy General Counsel
District of Columbia Housing Authority
RESOLUTION 25-08
TO AUTHORIZE THE EXECUTION OF MULTIPLE JOB ORDER CONTRACTING
(JOC) CONTRACTS
WHEREAS, District of Columbia Housing Authority (“DCHA”), its instrumentalities
and affiliates require a large capacity of contracts to accomplish various projects for
repair, alteration, modernization, maintenance, rehabilitation, demolition, construction
and environmental services at various properties; and
WHEREAS, on August 18, 2024 , DCHA advertised a Request for Proposals
(“RFP”) in was placed in The Washington Post Sunday Edition , Washington Informer,
Afro American, The Washington Times, El Tiempo Latino and East of the River. Copies
were emailed to LSDBE Vendors Email Blast, Section 3 Vendors Email Blast, all District
Government Certified Business Entity members and all District of Columbia Department
of Housing and Community Development (“DHCD”) Section 3 vendors; and
WHEREAS, on August 19, 2024, Solicitation No. 54 -2024 Job Order Contracting
(JOC) was posted on the DCHA website, and the Agency’s e-procurement system; and
WHEREAS, Solicitation No.’s 54 -2024, 54 -2024A through 54 -2024I for JOC
General Construction, Electrical, Mechanical and Plumbing, and Electrical and Fire Alarm
for the repair, alteration, modernization, maintenanc e, rehabilitation, demolition and
construction of infrastructure, buildings and structures by means of Job Orders issued
under JOC Indefinite Delivery Indefinite Quantity (IDIQ) contracts (“JOC Contract”) was
posted to the Agency’s e-procurement system Bonfire, issued to the Department of Small
and Local Business Development, bidders interested in doing business with DCHA,
posted to the DCHA Website; and
WHEREAS, by November 20, 2024, DCHA received thirty -five (35) proposals for
evaluation; and
WHEREAS, the solicitation stated that DCHA would make an award to the firms
that were deemed technically qualified in accordance with the solicitation requirements
for the repair, alteration, modernization, maintenance, rehabilitation, demolition and
construction of infrastructure, buildings and structures, and in the best interest of DCHA;
and
RESOLUTION 25-08
TO AUTHORIZE THE EXECUTION
OF MULTIPLE JOB ORDER CONTRACTING
(JOC) CONTRACTS
WHEREAS, based on the proposals and the results of the evaluation process,
DCHA determined that A.L. Merton, ARS Design Build, Autumn General Contracting,
LLC, Bennett Group, C & A Electric, Inc, Centennial Contractors Enterprises, Inc.,
Consys Inc., Delkan Group, First Choice Construction, HEP Construction, Irreno
Construction Company, JAP Construction LLC, Landivar and Associates, Metropolitan
Engineering Inc., Micon Construction, Inc, Mo Construction Inc., One-Kare Enterprise
LLC, S-Works Construction Corporation, TMG Construction Corporation, Vigil
Contracting Inc., Walker Construction have met the technical requirements of the RFP
as a qualified firms capable of providing the repair, alteration, modernization,
maintenance, rehabilitation, demolition and construction of infrastructure, buildings and
structures by means of Job Orders issued under JOC Contracts; and
WHEREAS, DCHA performed a review of the Federal Systems Award
Management and the District’s Excluded Parties List on March 10, 2025, and has
determined that A.L. Merton, ARS Design Build, Autumn General Contracting, LLC,
Bennett Group, C & A Electric, Inc, Centennial Contractors Enterprises, Inc., Consys Inc.,
Delkan Group, First Choice Construction, HEP Construction, Irreno Construction
Company, JAP Construction LLC, Landivar and Associates, Metropolitan Engineering
Inc., Micon Construction, Inc, Mo Construction In c., One-Kare Enterprise LLC, S -Works
Construction Corporation, TMG Construction Corporation, Vigil Contracting Inc., Walker
Construction does not appear on that list.
RESOLUTION 25-08
TO AUTHORIZE THE EXECUTION
OF MULTIPLE JOB ORDER CONTRACTING
(JOC) CONTRACTS
NOW, THEREFORE, BE IT RESOLVED , that the Board of Commissioners of
District of Columbia Housing Authority hereby authorizes the Executive Director to
execute twenty -one (21) contracts to provide repair, alteration, modernization,
maintenance, rehabilitation, demolition and construction of infrastructure, buildings and
structures by means of Job Orders issued under JOC Indefinite Delivery Indefinite
Quantity (IDIQ) contracts (“JOC Contract”) at various pro perties owned by or done on
behalf of, the Authority or any of its instrumentalities or affiliates, for a period of five (5)
years consisting of one (1) base year with four (4) one -year options, in the minimum
aggregate amount of Five Hundred Twenty -Five Thousand Dollars ($525,000.00) not to
exceed the maximum aggregate amount of Five Hundred Thirty -Five Million Dollars
($535,000,000.00), subject to the availability of funding.
ADOPTED, by the Board of Commissioners and signed in authentication of its
passage the 9th day of April 2025.
ATTEST: APPROVED:
Keith L. Pettigrew Raymond Skinner
Executive Director/Secretary Chairperson
APPROVED FOR FORM AND LEGAL SUFFICIENCY:
Amy M. Glassman
Senior Vice President & General Counsel
CERTIFICATION OF FUNDS TO RESOLUTION 25-08
TO AUTHORIZE THE EXECUTION
OF MULTIPLE JOB ORDER CONTRACTING
(JOC) CONTRACTS
District of Columbia Housing Authority
Certification of Funds Available
Funding Request
Contract A.L. Merton, ARS Design Build, Autumn General Contracting, LLC, Bennett
Group, C & A Electric, Inc, Centennial Contractors Enterprises, Inc., Consys Inc.,
Delkan Group, First Choice Construction, HEP Construction, Irreno Construction
Company, JAP Construction LLC, Landivar and Associates, Metropolitan Engineering
Inc., Micon Construction, Inc, Mo Construction Inc., One-Kare Enterprise LLC, S-Works
Construction Corporation, TMG Construction Corporation, Vigil Contracting Inc., Walker
Construction for a period of five (5) years consisting of one (1) base year with four (4)
one-year options, in the minimum aggregate amount of Five Hundred Twenty-Five
Thousand Dollars ($525,000.00) not to exceed the maximum aggregate amount of Five
Hundred Thirty-Five Million Dollars ($535,000,000.00), subject to the availability of
funding.
Funding Source Amount
Operating
Capital- Mixed Funding HUD & City $525K-$535M subject to
availability of funding
IF APPLICABLE- AMOUNT OF PREVIOUS CONTRACT
$270,802,018.00
AMOUNT EXPENDED THROUGH (date
March 31, 2025
CERTIFICATION DATE
Heather Mueller________ 03/31/2025
Heather Mueller
Chief Financial Officer
GOVERNMENT OF THE DISTRICT OF COLUMBIA
PROFILE SUMMARY
(CONTRAC
Ts TO PURCHASE, SELL, ACQUIRE, TRANSFER, LEASE OF REAL
PROPERTY/ EXCLUSIVE RIGHT AGREEMENTs/LOANs & GRANTs OVER
$1M/INTRA-DISTRICTs)
Contract Agency: District of Columbia Housing Authority
________________________________
Agency Code
______03_________
Using Agenc
y: District of Columbia Housing
Authority Agency Code
_______________________________ ________03_______
Loan/Grant/Lease Sub-recipient Name: Micon Constructions Inc.
Should the D.C. Council have any questions regarding this loan/grant/lease, please contact:
Michael Rees
e (202) 439-0007
Program Manager Telephone #
TYPE OF DO
CUMENT SUBMITTED
1. ❒ Loan/Grant/Lease Modification 4. ❒ Unwritten or Informal Contract
2. ❒ Exercise of Grant Option Year (E.O.) 5. ❒ Lease of Real Property
LOAN/GRANT TYPE
1. ❒ Subsidy 4. ❒ Cost Reimbursement
2. ❒ Loan Price 5. ❒ Time and Material
3. ❒ Task Order 6. ❒ Advance Payment
3. ❒ Loan/Grant/Lease Modification: 6. ❒ Other:
Contract for Special Projects -
Child Healthy Homes (High-level
Unit Turns) - Highland Additions
{0030246 -}
GRANT/LOAN/LEASE INFORMATION
Grant/Loan/Lease No.: DHA21C-FY25-005A Subsidy: $1,268,517.46
Subsidy Amt. Required This FY: $1,268,517.46 Amt. Required Next FY: N/A
Ca
ption: DJ93-DC02.01 HVAC Modernization Term: Under 365days
Do
es this Housing Subsidy Amount exceed $1 million: Yes No
If y
es, please attach a copy of the DC Council approval and provide the following information:
Date received: Date approved:
LEAS
E INFORMATION - N/A
Lease No.: Total Cost Location:
Annual Cost Sq. Ft. Leased: Cost Per Sq. Ft.
To
tal Bldg. Sq. Ft.: % Sq. Ft. Leased by D.C.
BRIEF
DESCRIPTION OF GRANT/LOAN/LEASE
SOURCE OF FUNDING
1. ☐Appropriated 4. ☐Intra-District
2. ☐Capital 5. ☐Inter-Jurisdictional
3. ☐Grant ( ) 6. ☒Other: (Indicate: ) District Funds
If p
rocurement action is funded by grant or other non-capital or non-appropriated funds, will the
District need to expend some portion of its funds prior to receiving funds from the grantor or
other funding source?
Yes No No t applicable
If Y
es, indicate the amount the District will need to expend and the percentage this amount
represents of the total funds required to support the effort. District Funds $
% .
X
X
CONTRACT
JOB ORDER CONTRACE (100)
2024N
‘KHISCONTRACTmadeandcuieredintothis_ist___dayof_May__,2025byandbetween:MiconConstructionIng,hereinaftercalledthe“Contractor”andtheDistrictofColumbiaHousingAuthorityhereinaftercalledthe“DCHA”.
WITNESSETH, thattheContractorandtheDCHA fortheconsiderationstatedhereirrmutuailyagreeas
follows:
ARTICLE1:StatementofWorkTheContractorshallfurnishalllabor,matetials,tools,equipment,andsorvices,andperformandcompleteallworkrequiredforContractNo.54-2024NinstrictaccordancewithContractNo,$4-2024N,anyAddendathereto,Drawings,ConstructionTaskCatalog®Distribution,UsingTheConstructionTaskCatalog®)-Distribution,TechnicalSpecifications-Distribution;JOCRFPVolumeIandVolume{V,andReportsreferencedtherein,whichsaidTechnicalSpecifications,Reports,AddendaandDrawingsareincorporatedhereinbyreferenceandmadeaparthereof.
ARTICLE2;TheContractSumThisContractisanindcfinite-quantityJobOrderContract(FOC)fortherepair,demolition,and/orconstructionoftheilemsspecified.TheminimumtotalamountthalmaybeofdercdunderthisContractis$25,000.00.Themaximumtotalamountthatmaybeorderedunderthis,ContractduringthebaseyearperiodofMay1,2025throughApril30,2026stallnotexcced$10,000,000.00.Thismaximummaybeadjustedinaccordancewithanyapprovedcontractamendments.Thecontracttermigone(1)baseyearwithfour(4)one-yearoptionperiods.AnyunusedcontractcapacitymayberolledoveratthediscretionofDCHA.NoworkshallcommenceunderthisContractuntilaJobOrderhasbeenissuedandacorresponding,NotivetoProceedhasbeenprovidedbyDCHA.
D cilApprovalMandate
InaccordancewithDC Couneilmandateanycontraci(s)awardedbyDCHA andmoetthe
requirementsfistedbelowrequireDCCouncilApproval.TheCouneithasiwoapprovalworkLlows,
(1)Passive-contractisapprovedwithin10daysofsubmittal;and(2)Active-contractmaymake
upto45daysallersubmittal,TheproposedcontractunderthisresolutionissubjecttoDCCouncil
approvalbasedontheaggregatetotalandmulti-yearawardrequestedabove.Forthepurposeof
JOCcontractsDCHAisonlyrequiredtosubmitJobOrdersandTaskOrderssubjecttothe
requirementsbelow.
1.Aggregatetotalisequaltoorgreaterthan$1,000,000.00;2.Multi-yearcontracts(atypicalJobOrderorTaskOrderislessthan12monthshowever,shouldatimeextensionberequired#2willheapplicable};3.Orboth|and2.
ARTICLE3:TheContractTermOne(1)baseyearwithFour(4)one-yearoptions,BaseyearMay1,2025—April30,2026;4oneyearoptionrenewalatthediscretionofCHA basedoncapacityandperformance.Inaddition,ContractorunusedcontractcapacitymayberolledoverperDCHA’sdiscretion.
ARTICLE4:ContractDocumentsThisContractshallconsistofthecomponentparts,allofwhichareincorporatedhereinandmadeparthereof:
Bic
ReNS
uments
ThisContract
GeneralConditionsoftheContractforConstructionHUDForm5370
DCHASupplementalConditions
AILRFPDocuments
JOCSpecialConditions
ConstructionTaskCatalog®®-Distribution
Drawings
UsingTheConstructionTaskCatalog®-Distribution
‘TechnicalSpecifications—Distribution
JOCRFPVolumeI
JOCRFPVolumeIV
Reports
TechnicalSpecifications
Addenda
MWBE Requirements
Section3Requirements
ApprenticeshipProgram
AffirmativeAction/ContractComplianceRequirements
WageDecision
ProtestProcedures
Schedule
DCHAModemizationPrinciples
DCHA’RedevelopmentPrinciples
ContractForm(Sample)
PaymentBond(Sample)
PerformanceBond(Sample)
Sree
meee
oe
BidSubmissionRequirements
7.18.
19,
20.
21
2.
23,
24.25.
BidBondForm(Sample)BidFormStatementofBiddersQualificationsRepresentations,CertificationsandOtherStatementsofBidders,HUDFormNon-CollusiveAffidavitPrimeContractor'sCertificationofContinuedEligibilityTaxCertificationAffidavitPaymenttoSubcontractorsandSuppliersCertificateContractorsOptiontoPerformWorkatOtherthanAuthorityOwnedorControlled
26. MinorityFinancialInstitutionDataForm/Info27. NoticetoProceed
THISCONTRACT,togetherwiththeotherdocumentsenumeratedinArticle3withsaidotherdocumentsareasfullyapartoftheJobOrderContractNo.54-2024Nasifattachedheretoorrepeatedhercin,fromtheContract.IntheeventthatanypartofthisContractshallbedeclaredunenforceableorinvalid,theprovisionsinArticle3shallgovern,exceptasotherwisespecificallystated.‘Thevariousprovisionsinthe‘AddendashallbeconstruedinorderofpreferenceofthecomponentpartoftheContractwhicheachmodifies,
ThisContractmaybeexecutedbythepartiesinoneormorecounterparts,eachofwhichshallbedeemedtobeanoriginalhereofandallofwhichcounterpartoriginalsshallbedeemedtoconstituteoneandthesamedocument.‘NoworkundertheContractshallcommenceuntilaJobOrderhasbeenexecutedandthecontractorisinreceiptofaNoticetoProceedissuedbyDCHA.
INWITNESSWHEREOF,thepartiestheretohavecausedthisContracttobeexecutedasofthedayandyearfirstabovewritten,
SES RE(Contractor)
Bysent. .D. AK INNANDE
(Person’sName)
TitlePres IDENT
Business Address:
ITIT N SREET NW
Get)
WAHIVGTON, b&(City)
Witness: DistrictofColumbiaHousingAuthority
‘CherylMoore
_ _ Title___ContractingOfficer
BusinessAddress:
3007*StreetSW_10*Floor.
(Street)
jon.D.C.20024
(City)
CERTIFICATION:
Samu] AKinnaan thatIamthePees 1b02F6 corporationnamedas Contractorherein;that SAM ‘inwlancl’whosignedthisContractonbehalfoftheContractor,wasthen *Te£), of saidCorporation,thatsaidContractwasdulysignedforandin behalfof saidcorporationby authorityofitsgoverningbody,andiswithinthescopeof
ADDENDUM
ADDENDUM NO. 1 to Contract No 54-2024N
ISSUED: June 27, 2025
CONTRACT NO.: JOC 54-2024N
Job Order Contracting
Micon Construction Inc, shall acknowledge receipt of this addendum, by returning it. Failure to
acknowledge receipt of this addendum may be cause for rejection of your contract.
Contractor’s are informed that the above-named contract is modified as follows:
The District of Columbia Housing Authority hereby issues Addendum No. 1 is hereby
amended to include the following:
A. Contract Documents, Article 4 Item 17, page 2, Bid Bond Form (Sample) Delete
“Form” and (“Sample”)
B. Payment and Performance Bond Requirements
WHEREAS, in accordance with 2 C.F.R. § 200.326 and the DCHA Procurement and
Contracting Policy § 7203.5(a), DCHA requires Payment and Performance Bonds for
construction contracts exceeding $150,000; and
WHEREAS, DCHA is clarifying its requirements to ensure uniform application and
enforceability across all Job Order Contracts;
NOW, THEREFORE, the following shall apply and be binding on the Contractor as part of its
Contract with DCHA:
1. Performance Bond Requirement
The Contractor shall provide a Performance Bond in the amount of 100% of the Job
Order price prior to commencement of any work authorized by an individual Job Order
issued under this Contract. The Performance Bond shall guarantee the faithful
performance of the work in accordance with the terms and conditions of the Contract.
2. Payment Bond Requirement
The Contractor shall provide a Payment Bond in the amount of 100% of the Job 3.
ATTACHMENT A
Addendum No.
JOC Contract 54-2024N
Job Order Contracting
DCHA Contract 54-2024N Job Order Contracting Page 2 of 2
Order price prior to commencement of any work authorized by an individual Job Order.
The Payment Bond shall guarantee the payment of all labor, materials, supplies, and
services used in the performance of work under the Contract.
3. Bonding Form and Surety Approval
Bonds shall be executed on the standard DCHA bond forms as included in the Contract
Documents (refer to JOC RFP 2024 Volume I) and must be issued by a surety company
authorized to do business in the District of Columbia and acceptable to DCHA.
4. Execution and Delivery
The required Payment and Performance Bonds must be submitted for each Job Order
exceeding $150,000 at the time the Notice to Proceed is issued. Failure to submit
acceptable bonds shall result in the cancellation of the Job Order and may be grounds for
termination of the Contract for default.
5. Modifications and Enforceability
No part of this Addendum shall be deemed to waive or limit any right of DCHA under
the original Contract documents. The Addendum is incorporated into the Contract and
shall have the same force and effect as if originally included therein.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
ADDENDUM
ADDENDUM NO. 2 to Contract No 54-2024N
ISSUED: July 2, 2025
CONTRACT NO.: JOC 54-2024N
Job Order Contracting
Micon Construction Inc shall acknowledge receipt of this addendum, by returning it. Failure to
acknowledge receipt of this addendum may be cause for rejection of your contract.
Contractor’s are informed that the above-named contract is modified as follows:
The District of Columbia Housing Authority hereby issues Addendum No. 2 is hereby
amended to include the following:
A. Payment and Performance Bond Requirements
WHEREAS, in accordance with 2 C.F.R. § 200.326 and the DCHA Procurement and
Contracting Policy § 7203.5(a), DCHA requires Payment and Performance Bonds for
construction contracts exceeding $150,000; and
WHEREAS, DCHA is clarifying its requirements to ensure uniform application and
enforceability across all Job Order Contracts;
NOW, THEREFORE, the following shall apply and be binding on the Contractor as part of its
Contract with DCHA:
1. Performance Bond Requirement
The Contractor shall provide a Performance Bond in the amount of 100% of the total
Contract price prior to commencement of any work authorized by an individual Job Order
issued under this Contract. The Performance Bond shall guarantee the faithful performance
of the work in accordance with the terms and conditions of the Contract.
2. Payment Bond Requirement
The Contractor shall provide a Payment Bond in the amount of 100% of the total
Contract price prior to commencement of any work authorized by an individual Job
Order. The Payment Bond shall guarantee the payment of all labor, materials, supplies, and
services used in the performance of work under the Contract.
ATTACHMENT A
Addendum No. 2
JOC Contract 54-2024N
Job Order Contracting
DCHA Contract 54-2024N Job Order Contracting Page 2 of 2
3. Bonding Form and Surety Approval
Bonds shall be executed on the standard DCHA bond forms as included in the Contract
Documents (refer to JOC RFP 2024 Volume I) and must be issued by a surety company
authorized to do business in the District of Columbia and acceptable to DCHA.
4. Execution and Delivery
The required Payment and Performance Bonds must be submitted for any contract
exceeding $150,000 at the time the Notice to Proceed is issued. Failure to submit
acceptable bonds shall result in the cancellation of the Job Order and may be grounds for
termination of the Contract for default.
5. Modifications and Enforceability
No part of this Addendum shall be deemed to waive or limit any right of DCHA under the
original Contract documents. The Addendum is incorporated into the Contract and shall
have the same force and effect as if originally included therein.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
Checklistof Documents Included:
Summary Cost Sheet
Noticeto Proceed
Wage Determination
ProjectScope of Work
UtilizationCompliance Report
Pre-ConstructionEvaluation
Summary ofCost Project
ID# DJ93-DC02.01
HVAC Modemization
-DomesticWater &
Heating Lateral
Replacement at
Benning
toma DescriptionofTask Value ‘Comments
1 HVAC Modemization-DomesticWater & $1,244,254.50)
HeatingLateralReplacementatBenning
2 JOC ProgramLicensingFee 1.95% $24,262.51
3.| FundingSource DeFY25
4 | PropertyGode oca22
TOTAL $1,268,517<6
DistrictofColumbiaHousingAuthority
Job Order Contracting (JOC) Program
HVAC Modernization -Domestic Water & Heating Lateral Replacement
at Benning
ProjectNumber: DJ93-DC02.01
Project Manager: Stephen Ivy
JOCJobOrderPackage-DJ93-DC02.01
Districtof Columbia Housing Authority.
WageDetermination
DatePrepared: 4/2025
ProjectNumber: Dues-pc02.01
ProjectName: HVACModemization-DomasticWater& HeatingLeteralReplacementatBenningProjectLocation:BenningTerrace
ProjectManager: Stephenby
‘ThewagedeterminationforthisJoborderis:
Residential
Expranin,a8necessary:
‘WageDetermination JOC JobOrderPackageDJ93-DC02.01
DistrictofColumbiaHousingAuthority3007thStreet,SW |10thFloor
‘Washington,OC20024
{202}5351000|dchousing.arg
KeithL,Pettigrew,ExecutivaDiceztor
ContractsAdministration¢ ComplianceDivision
WAGE DECISION REQUEST
‘TO: ContractComptianceDivision
FROM: DEPT: PMO DATE: 20257 30
INSTRUCTIONS:Pieasecompletethisformbyfirstplacingacheck(V)besideAiftherequestisfora constructioncontractor Bif the requestisfora servicecontract.Then place a check W)besidetheappropriateactivityundertherespectivecategory;andfillinallothercomespondinginformation,Itsveryimportantthatyoucompletethelastsentenceattheendofthecategory,inorderthatthewagedecisionissuedmaybekeptcurrent.
CONTRACT/SOLICITATION/PURCHASE ORDER NO. —_DJ93-DC02.04
A A.ConstructionContract$2,000plus{}1,Demolitionofstructureslocatedat1}(@)commercialorhigh-tiseresidential{}(6)low-riseresident{}2.Construction,alteration,repairorremodelingof:0)@ low-riseresidentialunitslocatedat4}(b)commercial?facilityorhigh-tiseresidentialunitslocatedat_{}(6)siteimprovementsfocatedat{}G@)severrwaterlinelocatedatG © others(specily)[7 B.ServieeContract$2,500plus
{}1.Janitorial,elevatororheating/airconditioningorboiler(3)maintenanceandservicing,moving/storage,transetiber,courierorphotographicserviceslocatedat
oe{)2.OthersGpecify)
GA Thesedeterminations:0620250003___with modification2 arecorrcetforthiscontractNo, pyes.000201 :
LA ThesedeterminationsNo:9¢20250008 Mod2 tobeusedforthiscontract,butmay bechangeduponrequestforCCD,
TiffanyJoknsow forAnaValdez 2025730
LaborComplianceSpecialist Date
Wage DecisionRequestexpirationdaie iA
"GeneralDecisionNumberDC2025000302/14/2025
SupersededGeneralDecisionNumberDC20240003
StateDistrlet ofColumbia
ConstructionTypeResidential
CountyDistrictof ColumbiaStatewides
RESIDENTIALCONSTRUCTIONPROJECTS(consistingofsinglefamily
homesandapartmentsup© and including4stories)$
Note Contracis subject to the Davis-Bacon Act are generally
requitedtopayatleasttheapplicableminimum wage rate
roquiradunderExecutiveOrder14026orExecutiveOrder1365.88
PleasenotethattheseExecutiveOrdersapplytocovered
contra ctsen tered into by the federa! govern ment that are
subject tothe Da vis-BaconAct iteelf, but do not apply to
contractssubjectonlytotheDavis-BaconRelatedActs,
includingthosesetforthat29CFR681(a)(1)8
ERE EEKKEELEEEE EELELEEEL EEE EEEEEEEEEEEEE
Ufthecontractisentered
intoonoraflerJanuary30,
2022,orthecontractiz
peor (rah
eles Qosereipehay
Nera !
$ ExecutiveOrder14026
generallyappliestothe
contracMecca
bevendvinien tl
ri [Litton
i plitpoeaageitlWud
Pepsipheneisad
nananretthat botnetlearyConeinuiuret ao) or ratien neti a)
tenderteadle: Eevee hid eatin asleer
yoy POCdtpr bea farthetppheatinaiesb td
nib regeEiderinnaitishigher)foralthoursspentperformingon
: thatcontractin20258
ERLE EEEEEEEEEEERE EE,CECE ERE,
TheapplicableExecutiveOrderminimumwageratawillbe
adjustedannually$ifthiscontractiscoveredbyoneofhe
ExecutiveOrdersandaclassificationconsiderednecessaryfor
performanceofworkonthecontractdoesnotappearonthis
wagedetermination,thecontractormuststillsubmit2
conformancereques
Glia cashes tinaeceriacbsrectieren ad etrier
poursca trebahe foesclieWider isgareaales
LupUiven§Doliqoetebeiguseartieeis$
Veatlicalienbeater Patlicatie
1 CG WO
1 GLU
lee
! Gigs
SEEQVEM Me DEP
tin ringee
AEEIIS HOHED 1AIAEESLEWATERIALeHDLEE pa Hohe
He por ae veetg Srp ava sengpauring taggingsedCisgssecyeel Doellinfalefigde aielber sulin egbee is oe tae
roptgvicalsyslens
PPL OAGUIONSdeeers ty deri Lat erdagdagVing dsp dao deteedah ata begdeed ag,WarbearigaGaypeeceselbshersigiingad CorieieaeDappreviccetv alereeearksWeteeotsvaedaybetsFyealn de vvittclicey
ELEUMIIC Stn gits
file fing:
PMC REDLOE SANE SS DSeeet
eOPAIOATEIATSGanTeereten,DancesbaSayLanneTapVat aesbeyavesginis¢HependWe Freey atheHieteyieing
Saperdereehvehag
1 VACATIONSEmployercontributes8%ofbasichourlyrateforS years or more of service; 6% of basic hourly rate for8monthsto yearsofserviceasvacationpaycredit.
PLLMO005-00908/01/2024
Rates Fringes
PLUMBER. eee $2845 14,36H
a PAID {OLIDAYS Labor Day, Veterans Day, Thanksgiving Dayand the day after Thanksgiving, Chris tmas Day, New Year: sDay, Martin Luther Kin g:s.Birth day, Memorial Day and theFourthof July.
PLLMO602-00908/01/2024
Rates Feinges.
PIPEFITTER(4VACPipeInstallation}...........$52.97 23,+a
a PAID1OLIDAYSNewYear:sDay,MartinLutherKing:sBirthday,MemorialDay,IndependenceDay,LaborDay,Veterans:Day,Thanksgiving DayandthedayafterThanksgivingandChristmasDay.
SLDC2009-00405/27/2008
Rates Fringes
BRICKLAYER 2071 0 00
CWPENTER,IncludingGrewalHanging 1748 48 287
CEMENTKASCH/CONCRETEFTRISHER 1872 000
DAVEALLFINISHER/TAPER 15004% 0 ov
FLEGTRECIa - 198 Bal
LABORER.CottuonorGeneral 126498 a 00
LARORER.WasonTenderforpuntingcauliingslavingfeistiagmsarrybrick,Stmeandcewntstructeresfiestatiowe2);acludaspointing,caulkingandcleaningofneworreplacementmasonry,brick,
stoneandcement 1249#8
PAIMER.BrushandRoller + 163248 516
POINTER,CAULER,CLEANER,Torludepoiotiagsuullinetlacingswistingmemry,brick,stoveandcement,structures(restorationwork)2 excludespointingcaulkingcleaningofnavorrep laconentnasonty,brick,stoneorcemen| . 1883
ROOFER 26.33 000
SHEETMETALKORKER 1833
NELMERS-Roceiverateprosevibedforcraftyerformingoperationtowhichweldingis incidental
SBABDEDEGRBRESEEERBBbBOBUGBBSSSBBSEBBBBBRBBBOOZRBBBSBBRBSUSBGERE
#4Workers inthisclassificationuy beentitledtoahighorminimm wageunderExccutiveOrder14028(.1775}or14858(1950) PleaseseetheNoteatthetopofthemagedeterminationforworeinfurmtionPleayealsanatethattheinimumvegereydirementsofExecutiveOrder14026aranotcurrentlyboingmfrcedsstoanyeotact otsuacatie) wMichtheswtsofkus,loisiana,aWssissivpi,faelydicgtheiragencies,area parey
Now,ZaecuciwOder(BOG, EsmalisaingPaid SickLewfo PeleraliinteectrsappiiestallemirectssubjerlttheDavis-BaconActforthichthecontractisawrdedCandanysolicitationvasissued)oorafterJanuarrl,2071% thiscontractiscoveredbythe EO,thecontractormst providoewlLoeeswithihourotpaidsickioavsforevery30 havrsthey work,upto56hoursofpaidsickleavesachyearEm]eyesmsibeperaittedusapaidsick leaveforthelrmi lines,iolurvasbakmith releudaeds,incledingProvenlivocare;to assista[amilywenber(orpersonwhois
LikefamiLytocheemlovee}vhoisill,injured,orkas ober
pela-telatdaeis,iecioéiaguramtiwesre;mfr raevas
recultingttayortoassistafanilyseberiorpasa a
Likefamilytotheeployec)whoisa victimof,domestic
violence,sana assaclivesaldicgddition!inl:wii
oremtrectorreqyivenntocudarkerpratecsiasuaderthe£6isawilableat
butps$//awdolgov/agencies/xhd/governnant-contracts
Unlistedclassificationsneededforworkuotincludedwithin
thescopeoftheclassificulionslisted«mybeaddedafter
awardonlyasprovidedinthelaborstandardscontactclauses
(29CFR5 8 (a)(1)(iii))
‘Thehodyofeachvayedeterminationliststheclasandago ratesthathavebeenfoundtobewrevailingforthetype(s)wfconstructionandesouraphicareacovermlbythevage
determinulionTheclassificationsaralistodinalphabetical
orderunderratoidentifiersindicatingshethertheparticular
rateisaunionrute(currentunionnegotiaterate), a survey
Fale,awoighteduninaveragerate,a stateadoptedrate,ora
supplenental classificationraie
ificalions
UnionRateIdentifiors
Afar-leveridentifierbedauingsitheharactersotherbenese YTwae, 298.orPSPdonatesthatsunionratemasprevailingforthatclassificationin thesurveyRxamle$PLUWL98—00507/01/2024PLUMis an idontifioroftheunionwhosecollectivelybargainedrateprovailedin thesurveyforthisclassification,whichinthisexamplewouldbePlushors0198indivwtesthelocalunionaugerordistrictcouncilnumberwhereapplicable,i¢, PlumbersLocal0198Thenoxtnumber,005intheexample,isaninterne]uuaherusedin
procesSingthertpedeterainatioathedate(/01/2M4in theaxale, istheoffertivedaveofchemst currentnegotiatedrate
Unionprevailingsageratesareupdatedtoreflecta] changesovertiuethatarereportedtoWO iu theratesintheeollactivebargainingagreement(GBA)governingtheclassification
WuionAverageRateTdentifiers
Tet ideotifieindicatesthatnosingleratepremiielforthoseciaesificatione,butthat190olWedatarear ted fortheclassificationsrefleotedunionratesEXAMPLESUAVG-OHO619OL/OL/2924INGindicatesthattherateis avoightadunimateragerateWindicatestheStaleofthioThenextnumber,0010intheexample,isan internalnumberusediavredcciegthessedeterainationthedate,M/U/204fotkeswmle, indicatesedace theegedaternication05updatedtoreflec| themostcurrentunionaveragerate
AUQWGratewillbeupdatedonceayear,usuallyinJanuary,toroflectaweighledaverageofthecurrentratesin thecallectiveburgainingagreomentsonwhichtherateisbased
SurveyBatoIdentifiers
the identifierindicatestha:eithera singlenonunion
rateprevailed(asdefinediu29CFR1.2) forthiselassificacimintbesuyvyurthattheratersderivliycomputingaweightedaverageratebasedonalltheravesreportedimthesurvrforthatcvassification,asaveightedauregetateincludesallrataseaportediathesurryit myaclucebokucimandv@-cnimrats.fom) SL 222-06/27/2024.SUindicatestherateisa singlenon-onianprevailingrateoraweightedaverageofsurveydatalorthatclassification.FLindicatestheStateofFlorida,2022istheyearoftheeurveyotwhichthescclassificationsandralesarebased. The oextnumber, 007 in the example, is wn interna]
huaberusedinproducingthewagedetermination.Thodare,6/27/2024intheexamale,indicatesthesurveycomplationdatefortheclassificatiansandratesunderchatidentifier
280?wageratestypicallyrewainineffectuctila newsurveyisconducted. lowever,theRageand Hour Division (HD) has the
discretiontoupdatesuckratesunder29(FR1,8(c}(1).
StuteAdoptedRateIdentiliars
The"SK"?identifiorindieaiesthattheclassifteationsundprovailingwageralessetbya stato(orLaval)governnontwereadoptedunder29 C.F.R 1.3¢g)-(h).Example’Sai2023-00701/08/2024.SAreflectsthattheratesarestateadopted.YEreferstotheStateofYaine.2023istheyoarduringwichthestetecamletedthesirmyothiehthelistelclassificatiasandratesarehesed.eactocnber,Wintheeemle,is aninternalnusberusedinproducingthomagedeterainationThedate,01/03/2024intheexanplc,reflectsthedateonthichtheclassificationsandratesunderthe7847identifiertookeffectunderstateluwinthestatefrouwhichtherateswereadopted
WCEDETERMINATN APPSLS PROCESS
b Mastherebeenaninitialdecisioninthematter?Thiscanbes
i asurveyunderlyinga wagedarerninution4 anctistingpublishedwagedeletwinavion(au initialPHDlettersettingforthapositianona wagedeterminationuatterdan inixialconformance(additionalclassificationandrate)deterwigation
Mourwprelscdutters.inittalemact,iacludingrqvet:frsummariesofsotves,ehouldbeditentedtotheRD BranchofTageSurveys.Roquasctecan besubmittedviaemil to
davisbavoninfo@dol.govorbymailto
BranchofYageSurveysYageaudHourDivisionU.S.Denartuen|ofLabor260ConstitutionAvenue,H.%,Washington,DC20210
Regardinganyotberwigedoterminationuuttorsuchasvcnformncedecisions,requestsfarinitialdecisionssholdbedirectedtotheMDGranehafCastructon PageDeterufnationsReqvestscenbosubuittedvisemil toBUD Officedal. gororbywailtos
BranchofConstruciianWageDeterminatiensWageandHourDivision0.$,Departuen¢ ofLabor200CouseitutionAvenue,K.#.Washington,BC20210
3}[faninitialdecisionhasbeenissuod,thenanyinterestedparty (those affectedhy the action) that disagrees with thedecisioncayrequestreviewandreconsiderutionfromthefaseacdHourAdministrator(Soe29CPRPart1.8aud29CFRPart7)Requestsforreviewandroconsiderationcanbysubmitiedviaesi1todba.veeonsideratinntdol.govorbymail tol
WageandYourAduiuistraterU.8.Department ofLahor200Constitutiondveane,i,Washington,KC20210
Theroynestskaldbsaccomanicdhyafullstaleneotof thLuterestedpertispositionaudanyinformtion(73daw,preimtdwcciptio,aragcactcemteialtherequestorconsidersrelevuuttotheissuc
4 TftbedeisimetheMsinistratoeisnolkwreble,aninterestedpartrmyappaldiretlrt the MninistretiwReviewBoard(foruerlytheFugeAppealsBoard). rite tot
AdzinistrativeReviewBoardC8. Deportmen¢ofLabor200.Consti tuLicnAvenue,.Washington,DC 20210.
ERSSROGEERBAANNBBESEEHGRADGOSSEOHORNAGGSGKEARGEhGeESRERaGEEGEES
ENDOFGENERaLDECISTax”
Detailed Scope of Work
Gate: August01,2025Contractor Miconconstructions,incProjectNo. Duea.Dc02.01
ProjactName: HVACModernizationDomesticWater& HeatingLateralReplacementatBenning
Location: BenningTerrace
[J Fretiminary[reviseDetailedScopeofWork
Refertotheattacheddocurnenttitled:CapitalConstruction& DesignScopeofWorkDJ93-DC02.01-
HVAC Modernization-DomesticWater& HeatingLateralReplacementatBering.Dated:7/23/25.Pages
16.
Final
PleasereferencethaRequestforProposalforadditionalinformationregardingthisJoborder.
OCHARepresentative:
‘Manager * Date
Contractor'sAcceptance:‘TheundersignedhasreviewedthisscapeafworkandagreesthatthisdacumentinconjunctionwiththeRFP.constitutestheScopeofWorkinitsentirety,
cEO 8/4/2025
Tite Date
JOCJobOrderPackageDJ93-DC02.01 L7]Page1014aysi2026
DetaledScopaofok
DistrictofColumbiaHousingAuthority
9007thStreet,SW |10thFloor
Washington,0020024(202)535-1000|ichousingory
Rg
rr
KeithL.Pettigrew,ExecutiveDirector
CapitalConstruction & Design
ScopeofWork
DJ93-DC02.01-HVACModernization-DomesticWater& HeatingLateralReplacementatBenning
7/23/25
GeneralRequirements:1.AllworkshallbedoneperDistrictofColumbiacodesandailotherapplicablecodesfollowedandenforcedbytheDistrict
ofColumbiaineffectatthetimeoftheinstallation.
2. AllWork must be executed per the generalterms andiconditionsofthe specifiedJOC/IOIQ contract.
a. Contractormust provideconstructionschedule forapproval priorto preconstructionmeeting forDCHA-PM
approval
b, The contractormust provideconstructionschedule ofvaluesatconstructionstart,
3, Allsystemsshalibe operable and functionatthe completionofthis contract.
4, The contractormust secure the unit/workingarea at alltimes during contract/activeworking period untilowner
acceptance,anydamageorstolenequipmentormaterialsshallbetheresponsibilityofthecontractortorepairor
replace.DCHA willnot be held responsiblefor any lossor damaged materials,or equipment lefton the site.
Providesubmittalsforallnew equipment forDCHA approvalpriorta equipment procurement.
Alllequipment shallbe installedper manufacturers installationdocuments or applicablecodes ifthey take precedence.
ContractortoprovidetrainingofbothDCHAstaffandoutsidevendorsassociatedContractormust providethe followingnotificattonsto DCHA-PM forcoordination:
a. MaterialDeliveries:48hr noticepriorto deliveryforelevator/site accesscoordination.
b. UtilityShutdown: 48hr noticepriorto shutdown of utilitiesthataffectoccupied units.
9. Allwork shallbe completed with the leastpossibledisturbanceand utilityinterruptionto the development residents.
The Contractorshallnotifythe DCHA Property Manager and the DCHA PMO contactof any interruptionsInutility
servicestotheresidentsatleastseventy-two(72)hoursbeforetheinterruption.Interruptionsshallonlyoccurafter
writtenconsent fram the PropertyManager and shallbe coordinatedto avold repeated interruptions.Allinterruptions
shalloccurduringoff-peak hours and shallbe limitedto a maximum of two (2)hours per interruptionor atthe
discretionof the Property Manager.
410,TheContractorshallprotecttheexistingstructurefromanydamageduringthiscontract'sexecution.Anydamage
incurredshallbe the responsibilityof the contractorand must be reportedto the DCHA PMO contactand the Regional
Maintenance Supervisorimmediately.The damage(s) must be promptly repairedto insurethe continued effective
operationof the system at no costto DCHA. Alldamage thatoccursto the property due to the Contractor'snegligence
shallbe repairedat nocost to DCHA and allrepairsmust be acceptableto the DCHA PMO contactor Regional
Maintenance Supervisor.
LL.TheContractoratinalwalkthroughshalldemonstratetheoperationandthepropereffectivefunctionoftheinstalled
items and materialspriorto acceptance by the DCHA PMO contact.The Contractorshallalsoprovidewarrantiesas
requiredforsuchequipment.
12, The contractorshallprovide$20,315.19 allowance to be used unforeseen conditionsas directedby DCHA.
eum
Page1afa
BasicProjectScope
1,Thecontractormustsecurelimitsofdisturbanceatalltimes,anydamageorstolenequipmentor
materialsshallbetheresponsibilityofthecontractortorepairorreplace
2,EnsurethatallCraw/Spacesin-scopearesafefreeofdebrisandsecureatalltimes.
3.Basedonwalkthrough—providea$20,315.19reimbursablecontingencyforunforeseen
conditions
4,Unita's:
+ Walk-ups
+ N/A
+TownHomes* 4390G Street
»43926Street
*43946Street
+ 43966Street
+ 4700AlabamaAve
* 4702 Alabama Ave
+ 4704AlabamaAve
+ 4706AlabamaAve
+ 4708AlabamaAve
«4710AlabamaAve
* 4712AlabamaAve
+4714AlabamaAve
*4716AlabamaAve* 4718 Alabama Ave
* 4720AlabamaAve
*4721AlabamaAve
* 4722 Alabama Ave
+4723AlabamaAve
+ 4724AlabamaAve
+4725AlabamaAve
* 4726AlabamaAve
+4727AlabamaAve
*4728AlabamaAve
+ 4729AlabamaAve
«4730AlabamaAve* 4731 Alabama Ave
* 4732 Alabama Ave
+ 4734AlabamaAve
« 4735 Alabama Ave
« 4736 Alabama Ave
* 4737 Alabama Ave
+ 4738AlabamaAve
* 4735 Alabama Ave
+ 4740 Alabama Ave
* 4741 Alabama Ave
*4742AlabamaAve
+ 4387FStreet Page20f4
* 4389FStreet
* 4391FStreet
+ 4393FStreet
+ 4395FStreet
+ 4397FStreet
+ 4401FStreet
= 4403FStreet
© 4405FStreet
© 4407FStreet
© 4409FStreet
* 4411FStreet
© 4413FStreet
+ 4415FStreet
© 4417FStreet
* 4419FStreet
© 4421FStreet
+ 4423FStreet
* 4425FStreet
* 4427FStreet
+ 4429FStreet
«4431 FStreet
ProjectScopefor:HVACModernization-DomesticWater& HeatingLateralReplacementatBenningDomestic&SanitarySystem(TownHomes& Apartments):
1. De-waterallcraw!spaces
RemoveallDebrisandforeigncontaminantsfromcrawlspacesDemolishalldamagedvaporbarriers
‘TestallpipeinsulationSuspectedofcontainedanasbestos
Abateanyashestos/Leadcontainingmaterial
DemolishailexistingGas&domesticwaterlinesDemolishanyexistingcastIronsanitarylinesto+/-18”belowgradeProvidepowerineachcrawlspacebay.a.Powerassemblyshouldbepulledfromacommonarepowerpanelb,BreakersWiringconduitjunctionboxesetc.shouldbesizedaccordingtothenewheatingsystemsmanufacturer'srequirements.
9, Furnishandinstallnewvaporbarriersystemsasneeded10.FurnishandinstallnewDomestic/Gas/Sanitarypipingandassembliestoa.Allsanitarylinesshouldhavepropercleanouts
i.CleanoutlocationstobecoordinatedwithPMO
i.Cameraalisanitaryfines
1.Provideareportoutlininganddescribingallfindingsfromcameraexplorationii,Jetandclean-outallSanitaryInestothestreetconnectionpoint(orcitybranchmain)11.FurnishandinstallquarterturnshutoffvalvesforalldomesticandHVACsupply/returnlines{perunit}a.Furnishedandinstalleddraindownports(perunit}12.FurnishandinstallallnewcrawlspaceratedinsulationOnallpipingdomestic,HVAC.13.Furnishandinstallheatingsystemforcrawlspaces
a. Priceandcompare:
i,Muttiplecrawlspaceratedspaceheatersll,Heattracetape
14.Coordinateanengineeringmeeting
eID Aa oe
anengineerofyourchoicePMOandMr.PaulGoelofCCD.
Page30f4
a.Calculatetheairflowneededforeachcrawlspaceaddorsubtractairflowportholesasneeded
15.Providea safetyplanandairqualitysystemincludingmonitoringforallconfinedspacewerk.
ProjectScopeAttachments
AreaMap—General
AreaMap-withMark-ups& UnitNumbers
Page4of4
ee ee ee et
ry
Districtof Columbia Housing Authority
Contractor'sPriceProposalSummary-Category
JobOrderNumber: 0U830C02.01
Tite: HVACMaderrization-DomesticWater&HeatingLateralReplacernentatBenning,
Contractor; Miconconstructions,inc
ContractNumber: J93-64-2024N
ProposalValue: 84,244,264.50
ProposalName: HVAGModemization-DomesticWater§,HeatingLateralReplacementatBenning
Locatlon: BenningTerrace
BrisfScope: HVACModernization-DomesticWater& HeatingLateralReplacementatRenning,
To:Stephentvy From:FemiAkinwandaProjectManager ProjectEngineerD.C,HousingAuthority Miconconstructions,inc
Contingancy: $20,215.19
Townhomes: $1,223,990.31
WorkOrderProposalTotal $1,244,284.50
“Thisworkonderproposalfalrenesantshecoreottztlfortheproposal.Anydiscrepancybebveenlineotal,sub-biasandteproposaltotisduaroundingofheineolsandabot,
ThePercentofNPPonthisPropasal 0.00%
FomiAkinvande,ProjactEngineer
JOCJobOrderPackageDJ93-0002.01 40(ContactorsPriceProposalSunmary-Cater Papetotawares
Districtof Columbia Housing Authority
Contractor'sPriceProposalDetail-Category
JobOrderNuns Bys@000201Tit: HVACModemizatonDomesticWer&HeatingLateralReplacementatBenningContractor:iconconstructions,neContractNumber:DYB3-54.2004NProposalvaie:«81244,254.50HVAC Modemization-DornesticWater & HeatingLateralReplacementatBenning
BenningTerace
sinter bonsai et
[Gentogeneynen Se cyaeee eee waneiilcostadractedbyCamer.Insertappropiatequanily2edstthabaseooettatheactualRaburableFeethorearemulteReimbursableFees,Inteschaneseparatelyanaad»commentIne *noteDockiodenttytheReimbursaleFew(estéewalkclosure,roadoutvariousparis.axlendodwarranty,expadiedshippingcots,a},AcopyofaachFecelptinci,orprtofpaymentshelbssubmitedwihtePace
- ‘uantiy «UnitPice Fedorrotation mais x 5100 4.0000 S20.31619
SubtotalforContingoncy: $20,346.19
[Townhomes
2 OarpoOeOS Te aborerortaatarorinauseahteConatuctonTaskCaUIogWand 1283105‘rectadtyoumerenty _usntiy OritPie Far TeiInataauss 25600x #010 x nace sists
Userote:stortcemavealldebsandforeigncontaminantsinc/avispaces.2guysadayx18aeo83a sscoones ‘SF10MiPovetytensVaporBaxiar S071auaniiy OniBisa FraIataaion 8000 x ssisee +0208* so9e7e8
LUserNots:VeporBairforGratAspacetetx58Units
4 Oran13.0006 BF2ThickR10,BardPoisons,FoamBoardluatn,Mesa 108,907.25Fastnod‘Cuan UnitPike TarInstaliaionwoco x ss x 1.9208= soao0r.28seeNote:reudspaceInsulationS008"prurtx68B Borweabates LF 2 DiemstarPipe,2ThickForgannalatonAhAlSenseJacet 186,50745esi) —(uan897arcs rae raatInstaaon aizag0x sia x 4208= sirea7a43Demalon sizoc0 sam 0208» s2499ee2
sorNote:Pipeinsulation152%peruit8
JOGJooOrderPackageDJ83-D002.01 10
‘SonractorsPriceProtoclBtal-Caegery PoaeToteens
Contractor'sPriceProposalDetall-CategoryContinued.
JobOrderNumbe:—DU8-DG0201Titi: HVACModernization-DomestcWater&HeatingLateralReplaoementatBenringCelNumber Mes, _UOWBescon tineTota
ffownhomes
anortoe Sean LTForenReviseVeTungope,Aa S7.080.50—_ ‘Quanity ‘UnitPris "actcr Total
Inaon eim00 en x soz” sr98.90sorts7a aera TF 9 DianePipTk, ParanutonA Sooait siosatoanee Tay Taree ae aadIntaon somo x wussx toate* seooui3tDereon Seco weet toa= stazesstaorNeo:Fpelin 06peu 587 arse eta UFForosRantWornSpma? Tae‘Garey UnitPree “Facer Toa
Ion gone x sant tam* 340098
UserNate:yBariaceara TF 1BanaterPipeTickPoogionselationWhASoninckST 350,12068,‘Guantity ‘UnitPrice Facr Tea
Inalaton Bins x stanx ‘coe wanesCanolfan zie tae 1 wertsero:PhonsdaonSfpant8we marpena 028 LFForonReveWriSoe,Ae waeerty Troe rae TaInston 00x an 120= sig0astUserteTar eaoaTse LF 0 BeetPip,2Tc loach AlSenoocak Precws oy TakFR Far Tatration 217500x wea x ‘aoe aeaznoatereitan aise me oan teersUserata:Fpnationa moream ws” orWornRevdWinSee,a Pe7 ‘Quantity UnitPrice Factor Total
toatalaion atsoo x $222 x 1.92087 shazpea
Useri metean TEPDanetePpa2TickForgannvtiionWinAT $9e147tant irae ~~ taa
istalon arsonx sieeyx tons= ssngssaeDenton avem oo ne seconsoroe:Fiptalton368perux81 morwena om8__LFForWan RoutedVcingSpace,AB Savanecai TTT Faaor raatInston 217500x 8233 x 4.0208= $5.178.18
serae anmwea TeeTs braneCoppaTape soe‘Quantity ~ UnitPrice Tats!
ineaton atmo x wn x sianDeaton Show fat paringIntlcopperdentwateingwe aitwoecare LE_For>t6neda maTony Tras rar <a‘nstastton 12000 x e028 x +0208= $2403.78
te:
TOCdbOderPackage0.103602.07 a
‘eneciorsPreePopolDemirGai FeeeTot8ron2s
Contractor'sPricaProposalDetail-CategoryContinued.
Duse-De02.01
HVACModernization-DomesticWater& HeatingLateralReplacementatBenning
51Number tot ___UOMDescription UneTetst
[roventiomas J
rT) Tes -F ForWorkinResiWiringSpace,ASS Seas8T——— uanity UnitPigs FanIntec aizacox aim x 0206" ssaeaar
Userat:
1 ar waneiTa LF_ SiHerdDravnTypeLCopperTita $06,145.30uel Tait Fear TaalInaalaton eom00 gas x ‘0208= s5n2a7.e4eneton emo x ma ec) 514887.85
UserNote:InstaconordometewateingTe mere0eTe oF ‘gzeeies)Tottration * seat
Userncta:i eitieopome 223___UFFarskinReaitedWorking8 rant‘Quan Unica Faetor Ta ~etalon soma x sim x 10200= sernsatsortot:Bate FF HardBrawnTypeGopserTubes $28,008.68Guan UnitPri Fazer Totintotason zarsoyx 1073 x 4ia208= seaoae9Demon BITE x S26 x sin208 $8072.45
UserNote:InstallcopperdomeswateringBT TwoRORTS mF Fer950,Desue isi,800:76)uenity Tare ~fratatiaton27500 x e0ss x 6.50076,
B wireaons ForWarnRestleWiringSpace,Al — $2886.49ueniy UnitPrion iat2a7500x Hak sone
EEE ZL) LF 1-44HadDraemTyee|CopperTubepe 3282843‘uenhy Untie ¥ TaalInstaaion 2arsox vez x sera?Demetion Birsoox eo x 0.068
LooeNote:instalespcercanesvatepina
% BNTwOROTE mee UF_Fer>160,Deduct, ($2,058.82)att) OF Fear Taal .Instat 2i7sa0x $093 x ‘0208 saonazeernots
3 NTwODasTS ‘0023__UF_FarWekimRestedWiringSpee,Ad S885Susy itPies Facer TatIntatatn 217599x siz x 1.0208 seassrNot:
7 nuBnaT TF HardBrawnTwveCopperTubepeasney ‘rite Factor "TaalIretaanon 21800x sae s.c208 60.4812Damatien 2irso 351 4308= size
UserNote:etlcopperdomesvstorping
JOGJobOrderPackage0J93-D002.01 70
‘SonatasFicePropelDetailCaegery PoeSefaaa
Contractor'sPriceProposalDetail.CatagoryContinued.
JobOrderNumber:
Tite:
es1Number
Dygs-0¢02.01
HVACModernization-DomesticWater&HeatingLateralReplacementatBenning
oc,__UOM_Desedetion UneToat
[Townhomes ]
Bn won Tan UF eros,eat ~4196.25)— ‘nti Tair “ieInsttatonzarecox eu88 $4,40825
NotBea woz IF ForlornReadWaningpase,Aaa $5080Gusntiy Trtrcs TaInession ziremox sea $5508.20orNateDi emoRe a _ $1288838,unites Facer aaIntaton 281 +0208 srost3Damion om ‘ane= ss.g0088Userote:30pruntekwen wR (CaiEA ForWokinRearomdWongSp,Bal EoQuanty"Une Fase TaiInston ziom x $915 1.0208" se2iiseLernote:
mii eoeM 8A SFSODeqeCopperBow $16,598.21Guay Tie TealInaaton nos x see 1099288Camalon am x 258 8.20885eertite:30perSunabck _ _BHO 102 EA ForibckinResvichdWorkingSpace,Aad $2765.56‘an TaitPes TaalInttoten 24000 saat sareesnerNow: _ _we zanreonoMn EA 00DayeCopperSow 7068.02Guana nico Favor aslInsatoson aco sae ‘ace wssaseDemoton sooo sanz3 anzee s2a070oorote:10paraunitlock _ _3 aTitoDo 0023 EA_ForWhenRasbcedWongSpeco,Aad ‘Sraneat“auaaiy Unitica Faaior Teitnsataon socax sea re) siaeeatUsers _se «aaiiveopoe EA_1-1460DograeCopparElbow 3820076Suey ice Fr TaTretaion s200x 8847 10208= sassDemeton mo x e273 spe= sto0searNote4pareunblack__warivwonnee‘____EA_ForWorknResistWorkingSpace,Ald saoQunty Unt ce Fear Tadsnctaiton zo x 1470 1.0200 wensVeertine _Sari Teonuee BA 80DegreeCopperEon _ 30,510.10aan TeaPisa Facer Taalsaan 800 x S077 1.0708= sea0s01Denalion oa Oe nee= sesz1a0UserNote:6perBuntsk
JOGsJobOrderPackageDJ83-0002.01 10SontecorePcaPropose!DealCasgery peer)izes
Contractor'sPriceProposalDotall-CategoryContinued.
JobOrderNumber: 093-DC02.01
Title: HVACModemization-DomesticWater&HeatingLateralReplacementatBenningesiNorer Hod __UOM_Deserpton LireTotat
[Townhomes
38 eT eooes ‘nes EA ForWominReniitesWorkingSpc,Ase Sre2erty TaiPi TearInstat ein x $1803 1.0208= saneserNote:a a DOOD EA__WEReducingCopperTeo $2108.98‘Gusnety ‘ritPis Foor TaalInstalion 2000 x $50.74 ‘0200 stasnnasDomain 24000 wan78 208 = 3872608,sorNote:20porunitHockWein o0bNe 623 EA_ForsrkinReebidedWortngSpace,Ala 159008750usniy UnitPrice Faster Tadbetaliaion moo x st208 soa* sn0srsesortat: _2 ze11w80008—0 FA_3 ReducingCopperTee $19,023.01Guan Take Faaar jaaInstataon 48000 $1238 s.cz0e i085,Deealon veoco 78 ‘9208 ‘520058sorNote:20per6unttck@ mireoanD UZ EA ForWoekinRacedWaringSpace,Aaa $282785usa ‘rite Facer aaInstatatenveom x 51800 4.0208" seeor.esUsernote:weiro0c801 EA 1ReducingCapperTer weg82.83‘usniy ritPi Faaar Saarinstalatione400x e249 s.0z08 sousenetion ens x waa zee szaz03ssorNote:BporBontooka5 aa eamRHI 02s EA_ ForWorkinReaiiedWorkingSpaceRal 3126879‘Suen UnitPie Feder TaalInston e400 92 1.0208 128873,Usertot:wn remee EAT ReducingSopperToe 31640466uty Unite Fadar elIntaiaion soo x sti2se siazca= waasrDamalion B00 ‘ear 1in208« wosnarsesNote8pr6unkblockeV teonnste ‘323A ForWok ResttedWorkingSpace,Ad s137718‘uanty UnitPrice Foor jaasation 00x s2n.e soz0e* srarrsa
Yer ote:Bi wOetED EA_2ReducingOopreTew $1,966.98“ven Tere Fazer TeaInaeason e400 ‘i720 +0208= snesDeeeiton ean 7.2 oan = $9.78075UserNota8por8uittock«Biweonase 023A ForWorkinResistWoringSpace,Add $4.68480Guantiy UnitPee Fear TolInstenaren ean0x 2879 028© sranece
Usertae
JOCJobOrderPackageDJ93-DC02.01
‘ensctar2PrePropeaslDataCatagcry 40
Pagesora
42008
Contractor'sPricaProposalDetall-CategoryContinued.
JobOrderNumber: 2J93-DC02.01
We: HVACModemizationDomesticWater&HeatingLateralReplacementatBenning‘catNomber Nod VOMDeserpton LineTotal
[Townhomes
BTU BASFCopperGouri 516,195.17usr Tria Factor imIntatationzune x sensex 4.0008 992358Damaton panes was x snare 020885ostste:30perauniteckW_wriwenane O23___EAForWat RevtciedWertngSpace,Aad $2705.58‘uarty Unitce Facior TeaInsaaton maco x anats ‘0208= sareesaUsertot@ Siena EA__1"CopperCoun 38,508.10uanity Face aaIntataon eco x x sane 4.12040,Demalon foc = x ‘ee 924807UserNeto:10perunittlockwe_ witwobaeTe tes___EA_ForWokinReavisWingSpaceA 10081Gus Unica Far TeaInstiton sooox B15 x 1.0208* suaiLeerote:Bm aaTiteon EA 1 CopperCeugig 41888‘ous Ti Far teaInctataion coe x seatsx ‘ecee= sarisDemaion ec mn x tee« see72e6UserNote:10pa unlockmine cnc ERForWerkReneeWangSpace,Fa $1,20046‘usa hiPia For aaInestagon 00 x sum x +0208= attsVeerNote% mevwona EA CopperCouninn 070078‘anti Trtres Faster 5Inston sao x soe x 4.0008 sasteaeDemoiton am 075 “tbeas saziet4UserNoto:10perunteneckwie Uz EA_ForekInRethedWrtingSpace,Aad Bazaoa Uniti’ "ar TaIntataton x $803 x ‘0209* sisr2aeeortots:3 arseues LF 2UndergroundBalAvaSpgeCastronSalPipeAssorabinddes $2,088,08‘tingsandgesteta,Grutoronterkeuesvaten,bahillnacompaction._ Nottoruenerdelais _‘ienity Fei TearInestton oon x * +0008 soooDematien sont x ‘e208= e808eerHet:Removecatronsay inae Bwnowe 201¢ UFForWoknRestoWortngSpace,a ‘aT076‘ay Trice Faas Ta -tntatson 49000 wot x 0208= weveUsertate
JOGJobOrderPackageDJ93-DC02.07 70
‘entaetorsPrionProposalDetCatenoy Pageeraarenas
Contractor'sPricaProposalDetall-CategoryContinued.
Dyes-De02.01
HVACModemization-DomesticWater&HeatingLateralReplacementatBenning1nurber Med,__ VOMDeseren LineTot
[Townhomes ]
a0 aaytoons UF undergradBelAndSpeGantFonScoPpsAssemsncnaesal atesTingsandgenet.cludeseartwercexcavation,baliandcompactionNottusewheredetaiavalbie‘usny nie Fact “aIstaovon om x ene x ‘208= sosoDeroten woo sens ‘a8 seta
UserHot:Ramovecastzonarityingar gatoywonoee GUM LF_‘For\ibainRaetiseaWorkingSpace,Ad 3270554‘Guenty niPice Fackr TalInsaton soocox wax ‘0008 wantesrNotaera ones UF #UndergroundBelAndSpgsGastronSodPipeAesarbpinudesa waroia tingeand gaskets,Exideartworkexcavation,beckandcompaction,olorurewheredealisavaliable
CnIntataon ooo x asx ate sooDaman aoa) 00 0208 serait
eerNee:Removecastkonsantaiiog 7 _aaa Ts150500 2018 LFForWerkinRostctedWiringSpecs.A Set512i‘esnty UnitPaice Fasor TtInman 35000x B88 x sa208* sea
5Noe _eae saaetec EAI]HPAwcmateSubnersbieSumpPump,118Vat750Vet.1Pave 38,708.144-112ThreadedDieeherga,EpoxyCoatedGantStelHousingAndInletcay UnitPrice ctr TaIneion tex 352023x san veroerBusiback_wanetacite EA 1.5067760Or200060WatSuacaHounedElecWelleter 824568usnity nities Facer aaInataiason 1800x soos x 0206" seeerNoto:2hectorparbung«BasiaBHO UF Set240VolSa¥ReguntnaLowTempartureHostCallTioned 110.0888oppobrad160degreesF‘unity Uniti Facer TelInsaton woaiond sO 1.0208 ssoneessleatTroeporofconnorng7 mosiaTe0511 MLF_#ZAWG,TypeTHARETHVA,600Vok,Copper,SinaeStlCable,tad $26,008.55InCond _ - .vary it Fear TaInstalatonaun 5003.12x s.0m08 sonness
UserNoto:PowerfsjunctionboxfrheateneandNase«262618150008 EA Pele130340ot,18YosoAmpere,BranchGaitBreaker0000, ‘aaa98Angesrept Capacty . -ui ‘nite Fao “italInstataon ‘e00x 58x +008 seas.eerHote:Forneaternts
39 -aBOTsoTF-0mS EA initalSotUpFor‘PushCamara"videoCarersInepeston,1To12" $616.57DisrstorPleoOruser"pushcamers"issagtviewcamersatthaand‘fsldpushoafor1b12"ameterpipesforcstanonaupto30fet,‘Guero, UntPace acter etInetaiton ix sem09 x ‘.on0a* 61857UserNote:Camaranapetionofsalanes
JOGJobOrderPackageDJ93-D002.01 70
‘ConiracorsPreeProposalDetl-Catogony Page7068
Contractor'sPriceProposalDetall-CategoryContinued.
JobOrderNumber— DJ9DC02.01
Titl: HVAGModerization-DomesticWater&HeatingLateralReplacementatBenning
25tNumber Hod__ YOM_Deseripton LineTotal
[Townhomes
te a301S0 EA Re-SelUpiioveForPushGamera”VideoGameralnapeclion,"Taz Meee?DismearipeOrCuber _!‘uantiy TaitFaee ToitInaaaon 1500x sos x sateat
eerote:GamersInspectionofsanitarynesEES) A__hilSetUeAndFinalEawprientRemevalForUpTo6JetGeena _ S00751usr TiPie Fear Toi‘naaaton 100 x sean x 10208= sar_ sorNote:dellesningsatanhes72 Saoisoanbobe EA MovaAndResetipAtDixonAccssitanrionForUpTo”JotClesirg 35,402.53arty ThiPi Faiar TaalInataavon 00x seaaz0x 49208" 5540238,
UserNote:Jetclesninaofsaintines
SubtotalforTownhornas: $1,223,930.91
WorkOrderProposalTotal $1,244,254.50
“Thisworkdarproposalalrprevertshecarsttnalfortheproposal.Anyeerepancybetwosninelal,subolalsandteproposaltellsewrounngofthenettlaesul,
‘ThePercentofNPPonthisProposal: 0.00%
JOGJobOrderPackazeD83.0002.01 10
‘SoniraclorsFreePropotelDetCotegery PageBatawarz025
DistrictofColumblaHousingAuthority
UtilizationComplianceReport
Date; ar2025
From: FemiAkinwandeMiconconstructions,ine
1200PenySt
HVAGModemization-DomesticWater&HeatingLateralReplacementatBenning
byee-Dc02.01
ProposalAmount 31,248/254.50
NameofContractor Wert| Trede Corttications)Planned% Actual%
‘Miconconsiructons,me 5 Insulation,Ping, BE.MEE 31.244.25440)100.008 3000)enElecticl,Materials
TotalS12,2645010000% $00000%
ContractorReporting Planned ory
CBEContracting 100.0% 8.00%
MBEContracting 100.00% 2.00%
TotalManHours FromProposal Planned| Actual
TotalProjectManHours 13,008 3.40000 0.00
SuctionSReporting [Section326%Goal Planned Actual
‘Section3ManHours 429960 40.00 0.90
NewSection3Manhires NA 20 00
sontue hia= Feiatiwande
Tio PretEner DateofSoning__Obrugue2005
FemorGomporetename__ Menonsinctins,ne
‘Adirers1200PonySt218,WASHOC,0620018
“elaphoneNumber—_ (202)696-2501
JOCJobOrderPackage-0J93-DC02.01 12
1
JOC Job Order Package - DJ93-DC02.01
Job Order/Notice To Proceed (NTP)
Date:
Contract Number:
Project Number:
August 04, 2025
DJ93-54-2024N
DJ93-DC02.01
Job Order Number:
PO Number:
DJ93-DC02.01
Project Name:
Project Location:
HVAC Modernization -Domestic Water & Heating Lateral Replacement at Benning
DC022 - Benning Terrace
Schedule: Proposed NTP Date: Oct 06, 2025
Estimated Completion Date:
Contract Duration:
Jul 02, 2026
270 Days
Brief Description of Work (See Detailed Scope of Work & RFP for contractual requirements:
HVAC Modernization -Domestic Water & Heating Lateral Replacement at Benning
Job Order Value: $1,244,254.50
Contractor's Local Office:
Micon constructions, inc
Femi Akinwande
1200 Perry St
218
WASH DC, DC 20018
DCHA Approval Signatures:
Stephen Ivy 08/04/2025
Contractor's Home Office:
Micon constructions, inc
Femi Akinwande
1200 Perry St
218
WASH DC, DC 20018
08/06/2025
Project Manager Date
08/05/2025
Administrator Date
JOC Coordinator Date Contracting Officer Date
Contractor's Acceptance:
President 8/4/2025
Title Date
Permits: Contractor to provide Owner copies of all necessary permits prior to field activities.
This Job Order is being issued in accordance with all terms and conditions of DCHA Contract
DJ93-54-2024N. Refer to sections 2-17 of DCHA Job Order Package for related documents.
Copies: Contractor, DMA, CPA and OFM
Job Order Notice To Proceed 8/4/2025
District of Columbia Housing Authority
Liquidated Damages: Yes
No
Name