URIEL BOWSER
MAYOR
February 20, 2026
The Honorable Phil Mendelson
Chairman
Council of the District of Columbia
John A. Wilson Building
1350 Pennsylvania Avenue, NW, Suite 504
Washington, DC 20004-3001
SUBJECT: FY 2026 Reprogramming Request: $5,912,217.00 within the The Department of Behavioral
Health
Dear Chairman Mendelson:
Pursuant to D.C. Official Code § 47-363(a), I am transmitting the enclosed request to reprogram $5,912,217.00 of FY
2026 Capital Fu nds – 3030300 Long Term/G.O./I.T. Bonds and 3 030304 Short -Term Bonds within the
Department of Behavioral Health . The attached reprogramming memorandum provides a detailed justification for
why funds are needed.
Thank you for your consideration of this request. I look forward to the Council’s favorable action.
Sincerely,
Muriel Bowser
Mayor of the District of Columbia
Enclosure
cc: K
evin Donahue, City Administrator
Glen Lee, Chief Financial Officer
Jennifer Budoff, Budget Director, Council of the District of Columbia
Jennifer Reed, Director, Office of Budget and Performance Management, Office of the City Administrator
Angell Jacobs, Deputy Chief Financial Officer and Chief of Staff, Office of the Chief Financial Officer
Eric M. Cannady, Deputy Chief Financial Officer, Office of Budget and Planning
Sherrie Greenfield, Associate Deputy Chief Financial Officer, Office of Budget and Planning
Stacy-Ann White, Director, Operating Budget Office of Budget and Planning
Kenneth Evans, Director, Capital Improvements Program, Office of Budget
and Planning
Delicia Moore, Associate Chief Financial Officer, Human Support Services Cluster
MURIEL BOWSER
MAYOR
February 20, 2026
G
len Lee
Chief Financial Officer
Office of the Chief Financial Officer
1350 Pennsylvania Avenue, NW, Suite 203
Washington, D.C. 20004
D
ear Mr. Lee:
P
ursuant to the Reprogramming Policy Act of 1980, (D.C. Official Code § 47- 363 et seq.), I am
submitting a request to reprogram FY 2026 Capital Funds – 3030300 and 3030304 in the amount
of $5,912,217.00 within the Department of Behavioral Health. This reprogramming will be from
five capital projects to a single generic capital project. This is requested by the Department of
General Services (DGS) to facilitate vendor billing related to the DBH/DGS MOU to implement
several capital projects at Saint Elizabeths Hospital (SEH). The funds will be reprogrammed as
outlined on the attached attribute s sheet and additional details are contained in the agency’s
submission.
T
hank you for your consideration of this request. I look forward to the Chief Financial Officer’s
favorable review.
S
incerely,
M
uriel Bowser
E
nclosure
cc: E
ric M. Cannady, Deputy Chief Financial Officer, Office of Budget and Planning
Sherrie Greenfield, Associate Deputy Chief Financial Officer, Office of Budget and
Planning
Stacy-Ann White, Director, Operating Budget, Office of Budget and Planning
Kenneth Evans, Director, Capital Improvements Program, Office of Budget and Planning
GOVERNMENT OF THE DISTRICT OF COLUMBIA
OFFICE OF THE CHIEF FINANCIAL OFFICER
John A. Wilson Building * 1350 Pennsylvania Avenue, N.W. * Suite 203 * Washington, D.C. 20004
Phone: (202) 727-2476 * Fax: (202) 727-1643 * www.cfo.dc.gov
Glen M. Lee
Chief Financial Officer
The Honorable Phil Mendelson
Chairman
Council of the District of Columbia
John A. Wilson Building
1350 Pennsylvania Avenue, NW, Suite 504
Washington, DC 20004-3001
Dear Chairman Mendelson:
Pursuant to
the Reprogramming Policy Act of 1980, D.C. Official Code § 47-363(a) and the
Consolidated Appropriations Act, 2026, approved February 3, 2026, Pub. Law. No. 119-75, the
Office of the Chief Financial Officer (OCFO) has re viewed the Mayor’s request to reprogram
Capital funds budget authority and allotment in the amount of $5,912,217 within the Department
of Behavioral Health (DBH).
This request reprograms capital funds from several system upgrades and improvements projects
related to Saint Elizabeths Hospital to a newly established capital project. The funds will
subsequently be transferred to an inter-agency capital project to facilitate vendor billing related to
the Memorandum of Understanding (MOU) with the Department of Geneal Services (DGS).
Capital budget in the amount of $5,912,217 will be reprogrammed from the following projects:
Agency Project Title Amount
RM0/RM0 100973 RM0.HX990C.FACILITY UPGRADES $ 132,217.00
RM0/RM0 101268 Air Handler Unit Overhaul SEH $ 3,000,000.00
RM0/RM0 101269 Building Automation System Replacement $ 1,000,000.00
RM0/RM0 101270 Emergency Water Bypass Line $ 280,000.00
RM0/RM0 101274 RM0.FY25.Fire Safety System Overhaul $ 1,500,000.00
Total $ 5,912,217.00
Capital budget in the amount of $5,912,217 will be reprogrammed to the following new project:
February 19, 2026
Honorable Phil Mendelson
FY 2026 Reprogramming Request for $5,912,217 of Capital Funds Budget Authority and Allotment within the
Department of Behavioral Health
Agency Project Title Amount
RM0/RM0 101449 MEP AND LIFE SAFETY UPGRADES $ 5,912,217.00
Total $ 5,912,217.00
Capital funds in the amount of $5,912,217 are available in various DBH capital projects because
the funding is being redirected to a new project that aligns with an MOU between DGS and DBH.
This new project will allow DGS to bill more efficiently and timely.
The Office of Budget and Planning’s analysis indicates that the reprogramming will not have an
adverse impact on DBH’s budget or the District’s financial plan. The OCFO has no objection to
this reprogramming request.
Sincerely,
Glen M. Lee
Chief Financial Officer
Enclosure
cc: Muriel Bowser, Mayor of the District of Columbia
Kevin Donahue, City Administrator
Jennifer Reed, D eputy City Administrator and D irector, Office of Budget and Performance
Management
Ben Hampton, Deputy Director, Office of Budget and Performance Management, Office of
the City Administrator
Jennifer Budoff, Budget Director, Council of the District of Columbia
Angell Jacobs, Deputy Chief Financial Officer and Chief of Staff, Office of the Chief
Financial Officer
Barbara J. Bazron Ph.D., Director, Department of Behavioral Health
Delicia Moore, Associate Chief Financial Officer, Human Support Services Cluster
Stephanie Robinson, Interim Budget Director, Human Support Services Cluster
Adran Reid, Agency Fiscal Officer, Department of Behavioral Health
Eric M. Cannady, Deputy Chief Financial Officer, Office of Budget and Planning
Sherrie Greenfield, Associate Deputy Chief Financial Officer, Office of Budget and Planning
Kenneth Evans, Director, Capital Budget/CIP, Office of Budget and Planning
Kory Miller, Manager, Capital Budget/CIP, Office of Budget and Planning
Zia-Ur-Rahman Haleemi , Senior Capital Budget Analyst , Capital Budget/CIP , Office of
Budget and Planning
Tomas Talamante, Director, Office of Policy and Legislative Affairs
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF BEHAVIORAL HEALTH
Office of the Chief Financial Officer
REPROGRAMMING AUTHORIZATION
MEMORANDUM
TO: Office of Policy and Legisla
tive Affairs
Executive Office of the Mayor
THRU: Delicia Moore,
Associate Chief Financial Officer
Human Support Services Cluster
FROM: Adran Reid,
Agency Fiscal Officer
Department of Behavioral Health
Barbara J. Bazron, Ph.D.
Agency Director
Department of Behavioral Health
DATE: January 13, 2026
SUBJECT: FY2026 Reprogramming Request for $5,912,217.00 of Capital Funds
Budget Authority within the Department of Behavioral Health (RM0)
This memo is to request the reprogramming of FY2026 Capital Funds Budget in the
amount of $5,912,217.00 within the Department of Behavioral Health (DBH) from five
capital projects to a single generic capital project. This is requested by the Department of
General Services (DGS) to facilitate vendor billing related to the DBH/DGS MOU to
implement various capital projects at Saint Elizab
eths Hospital (SEH).
Why are the funds needed?
DBH and DGS have signed an MOU where DGS is responsible for the implementation of
several capital projects at SEH. DGS has stated that the current funding allocation to five
project numbers will cause vendor billing problems due to the broad nature of the work
performed.
for
for
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF BEHAVIORAL HEALTH
Office of the Chief Financial Officer
Does this reprogramming restore a budget cut authorized by the Mayor and/or
Council?
This reprogramming does not restore a budget cut authorized by the Mayor and/or
Council.
How will the funds be reprogrammed?
Capital budget in the amount of $5,912,217.00 will be reprogrammed from Projects
101268, 101269, 101270, 101274, and 100973 to Project 101449.
Agency Project Title Amount
RM0 101270 Emer gency Water Bypass Line ($280,000.00)
RM0 101268 Air Handler Unit Overhaul SEH ($3,000,000.00)
RM0 100973 RM0.HX990C.FACILITY UPGRADES ($132,217.00)
RM0 101269 Buildin g Automation System Replacement ($1,000,000.00)
RM0 101274 RM0.FY25.Fire Safet y System Overhaul ($1,500,000.00)
RM0 101449 MEP and Life Safet y Upgrades $5,912,217.00
In accordance with the Capital Project Clarification Emergency Act of 2009 requirements
for a new project, the following information is provided:
1. Description of the scope of the project: To facilitate vendor billing through
providing a single generic project number that comprises all work proposed in the
five original capital projects listed in the DBH/DGS MOU for SEH
2. Description of the purpose of the project: To implement various capital
projects at SEH related to: System upgrades and necessary improvements: Fire
Suppression System Upgrade, Fire Safety System Upgrade, Air Conditioning
System Annual Overhaul/Upgrade, and Building Automation System (BAS)
Replacement/Upgrade
3. Estimated fully funded cost: $5,912,217.00
4. Estimated impact on the operating budget: System upgrades and necessary
improvements
5. Geographic Location: Saint Elizabeths Hospital
6. Facility Name or identifier: N/A
GOVERNMENT OF THE DISTRICT OF COLUMBIA
DEPARTMENT OF BEHAVIORAL HEALTH
Office of the Chief Financial Officer
Why are the funds available?
The Capital budget is available in the amount $5,912,217.00 to reprogram in the above
referenced projects because it has not been disbursed for its intended use. The
reprogramming will ensure that the budget is disbursed for its intended use from the
appropriate agency fund.
What hardship will the District face if the action is postponed until the subsequent
fiscal year?
If this action is postponed, there are expected to be billing issues with the vendor that will
implement the system upgrades and necessary improvements at SEH.
Does this reprogramming establish new programs or change allocations specifically
denied, limited, or increased by the Council in the budget act, the accompanying
budget report, or mark-up sheets?
This reprogramming will not establish a new program or change allocations specifically
denied, limited, or increased by the Council in the budget act, the accompanying budget
report, or mark-up sheets.
What programs, services or other purchases will be delayed as a result of the action,
and the impact on the program or agency?
No other Programs, services or other purchases will be delayed because of this action.
Should you have any questions, please contact Anthony Jefferson at (202) 671-3393.
Attachments
cc: Eric M. Cannady, Deputy Chief Financial Officer, Office of Budget and Planning
Government of the District of Columbia Originating Agency Name and Code: DATE
01/13/26
DOCUMENT INFORMATION
Fiscal Year: 2026
Implementing
Agency CFO: Adran Reid $5,912,217.00
Period: 4
Implementing Agency Associate CFO: Delicia Moore
Effective Date: 1/13/2026
3030300 RM0 700319 70440 7132001 101270 3000226 09 09.01 CONTRACTUAL SERVICES - OTHER 280,000.00 280,000.00 (280,000.00) $0.00 $0.00
3030304 RM0 700319 70440 7171004 101268 3000228 03 03.01 PURCHASES - AUTOMOTIVE EQUIPMENT 3,000,000.00 3,000,000.00 (3,000,000.00) $0.00 $0.00
3030300 RM0 700310 70413 7132001 100973 3000226 06 06.01 CONTRACTUAL SERVICES - OTHER 6,493,408.92 132,217.00 (132,217.00) $6,361,191.92 $0.00
3030300 RM0 700319 70440 7132001 101269 3000226 03 03.01 CONTRACTUAL SERVICES - OTHER 1,000,000.00 1,000,000.00 (1,000,000.00) $0.00 $0.00
3030304 RM0 700319 70440 7132001 101274 3000228 03 03.01 CONTRACTUAL SERVICES - OTHER 1,500,000.00 1,500,000.00 (1,500,000.00) $0.00 $0.00
$0.00 $0.00
3030300 RM0 700319 70440 7132001 101449 3000226 09 09.01 CONTRACTUAL SERVICES - OTHER 280,000.00 $280,000.00 $280,000.00
3030304 RM0 700319 70440 7171004 101449 3000228 03 03.01 PURCHASES - AUTOMOTIVE EQUIPMENT 3,000,000.00 $3,000,000.00 $3,000,000.00
3030300 RM0 700310 70413 7132001 101449 3000226 06 06.01 CONTRACTUAL SERVICES - OTHER 132,217.00 $132,217.00 $132,217.00
3030300 RM0 700319 70440 7132001 101449 3000226 03 03.01 CONTRACTUAL SERVICES - OTHER 1,000,000.00 $1,000,000.00 $1,000,000.00
3030304 RM0 700319 70440 7132001 101449 3000228 03 03.01 CONTRACTUAL SERVICES - OTHER 1,500,000.00 $1,500,000.00 $1,500,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $12,273,408.92 $5,912,217.00 $5,912,217.00 $5,912,217.00 $12,273,408.92 $5,912,217.00
DESCRIPTION:
Funds are being reprogrammed from 5 capital projects to a single capital project. This is being performed at the request of DGS to facilitate vendor billing.
REVISED
AUTHORITYSUB-TASK
DIFS Reprogramming Sheet (CAPITAL BUDGET ONLY)
SUFFIX ACCOUNT PROJECT AWARD EXPENDITURE TYPE REVISED
ALLOTMENTFUND PROGRAM
Budget Document Amount:
COST CENTERAGENCY TASK
Department of Behavioral Health (RM0)
AMT OF DECREASE AMT OF INCREASECURRENT
ALLOTMENT
CURRENT
AUTHORITY
1/13/2026 JE - SEH $5.9M PAGE No: 1
for
R025 YTD Budgetary Control Analysis Report - DC Authority Reporting
Run date/Tim01-09-2026 08:01:33
Control BudgDC Authority Reporting
Fiscal Year 2026
Period ALL
Agency RM0
Fund ALL
Account ALL
Program ALL
Cost Center ALL
Project ALL
Award ALL
Fund Fund Descri pAccount Account Des cProgram Program Des Cost Center Cost Center DProject Project Desc rAward Award Descr Initial Budge tAdjustment Budget Total Budget Commitment Obligation Expenditure Available Budget
3030300 LONG TERM / 7132001 CONTRACTU 700319 ENIGINEERI N 70440 OFFICE OF TH 101270 EMERGENCY 3000226 RM0.0300.CAP $0.00 $280,000.00 $280,000.00 $0.00 $0.00 $0.00 $280,000.00
3030304 SHORT - TER M 7171004 PURCHASES - 700319 ENIGINEERIN 70440 OFFICE OF TH 101268 AIR HANDLER 3000228 RM0.0304.SHO $0.00 $3,000,000.00 $3,000,000.00 $0.00 $0.00 $0.00 $3,000,000.00
3030300 LONG TERM / 7132001 CONTRACTU 700310 COMPREHE N 70413 OFFICE OF CO 100973 RM0.HX990C. 3000226 RM0.0300.CA P $0.00 $6,493,408.92 $6,493,408.92 $6,217,127.70 $90,588.28 $0.00 $185,692.94
3030300 LONG TERM / 7132001 CONTRACTU 700319 ENIGINEERI N 70440 OFFICE OF TH 101269 BUILDING AU 3000226 RM0.0300.CAP $0.00 $1,000,000.00 $1,000,000.00 $0.00 $0.00 $0.00 $1,000,000.00
3030304 SHORT - TER M 7132001 CONTRACTU 700319 ENIGINEERI N 70440 OFFICE OF TH 101274 RM0.FY25.FIR 3000228 RM0.0304.SHO $0.00 $1,500,000.00 $1,500,000.00 $0.00 $0.00 $0.00 $1,500,000.00
$0.00 $12,273,408.92 $12,273,408.92 $6,217,127.70 $90,588.28 $0.00 $5,965,692.94
Project Task / Sub-Task Project Subtask Description Appropriated Fund (A)
Authority
(B)
Allotment Allotment Expenditure Encumbrance Pre-
Encumbrance
(C)
Expenditures
(D)
Total Exp, Enc
and Pre-Enc LTD
100973 06.01 8920F.8920F.FACILITY UPGRADES - HOWARD RD.FACILITY UPGRADES - H 3030-CAPITAL FUND - OTHER 13,439,386.91 13,439,386.91 13 2,217.00 - 90,588.28 6,217,127.70 6,780,388.37 13,088,104.35
101268 03.01 Air Handler Unit Overhaul SEH 3030-CAPITAL FUND - OTHER 3,000,000.00 3,000,000.00 3,000,000.00 - - - - -101269 03.01 Building Automation System Replacement SEH 3030-CAPITAL FUND - OTHER 1,000,000.00 1,000,000.00 1,000,000.00 - - - - -101270 09.01 Emergency Water Bypass SEH 3030-CAPITAL FUND - OTHER 280,000.00 280,000.00 280,000.00 - - - - -101274 03.01 Fire Safety System Overhaul 3030-CAPITAL FUND - OTHER 1,500,000.00 1,500,000.00 1,500,000.00 - - - - -
$19,219,386.91 $19,219,386.91 $5,912,217.0
0 $0.00 $90,588.2 8 $6,217,127.70 $6,780,388.37 $13,088,104.35
FY26 LTDLTD
MEMORANDUM OF UNDERSTANDING
BETWEEN
THE DEPARTMENT OF BEHAVIORAL HEALTH
SAINT ELIZABETHS HOSPITAL
AND
‘THE DEPARTMENT OF GENERAL SERVICES
FISCAL YEAR 2025
INTRODUCTION
ThisMemorandumofUnderstanding(MOU)isenteredintobetweentheDepartmentofBehavioralHealth(DBH),whooperatesSt.ElizabethsHospital(“SEH”or“Hospital”),aninpatientpsychiatricfacilitythatprovidesmedicalandmentalhealthservices(DBHor"Buyer",andtheDepartmentofGeneralServices(DGS),theselleragency(DGSor"Seller"),collectivelyreferredtohereinasthe"Parties."
PROGRAM GOALS AND OBJECTIVES
‘ThePurposeofthisMOU istooutlinetherelationshipandprocessfortheimplementationofseveralapprovedcapitalprojectsatDBH’sSaintElizabethsHospital(SEH)aslistedbelowunderScopeofServices(IIL).
SCOPE OF SERVICES
Pursuanttotheapplicableauthoritiesand infurtheranceofthe sharedgoalsofthe PartiestocarryoutthepurposeofthisMOU expeditiouslyandeconomically,thePartiesherebyagree:
ObligationsandResponsibilities
Pursuanttothetermsand conditionsof thisMOU, DGS herebyagreestooverseeandmanagetheimplementationofseveralapprovedcapitalprojectsatSaintElizabeth’sHospital(hereinafterreferredtoas“SEHProjects”).Thisincludesi.FireSuppressionSystemUpgrade; SafetySystemUpgrade;iii,Nineteen
(19)AirHandlingUnitsOverhaul/Upgrade;andiv.BuildingAutomationSystem(BAS)Replacemen/Upgrade.
b. Obligations/ResponsibilitiesofDGS
i.DGSshallprovideoverallProjectManagementandOversightofallaspectsoftheSEH ProjectsatSaintElizabethsHospital(SEH) locatedat1100AlabamaAvenue, SE Washington,DC 20032-4540.
1,DGSshallprovidealladministrativeandprofessionalservicesrequiredfortheplanning,acquisition,andimplementationthroughcompletionoftheSEHProjects.
2.DGSshallconductandmanagetheSEHProjectsinaccordancewithall
1
applicablelaws,regulations,codesandDGSprocedures.
3.DGSshallprovidequalityassuranceservicesduringdesignandconstructionsothattheconsultantsandcontractorsmeetallrequiredinspections,tests,submittals,andothercontractrequirements.
4.DGSshallassumeresponsibilityformaintainingthebudget(s)andschedulecontrolfortheSEHProjects,
5.DGSshallreviewandapproveallinvoicesandsubmitforpaymentaswellasensuresubmissionofallcorrespondingCBEdataandotherrequiredreports.
6.DGS shallensurethataprojectmanagerisavailableasreasonablyNecessarytomeetwithDBH/SEHpersonneltoensureaccurateandtimelymanagementoftheSEHProjects.
©. Obligations/ResponsibilitiesofDBH/SEH
i,FundingofProgramPersonneltosupportimplementationofSEHProjects.DBH/SEHshallonlyfundpositionsprovidingservicestoDBH/SEHonthecampusofSaintElizabeths,whichisasfollows:
1.Proj2.Supervisory
IV. FUNDINGPROVISIONS
a, Cost ofServices
i.ThetotalProjectcostsshallbefundedbyDBH.DBHshalltransferFiveMillion,NineHundredandTwelveThousand,TwoHundredandSeventeenDollars($5,912,217.00)toDGS forthecostof designing,permitting,constructionservices,monitoring,andProjectManagementServicesincludingthedesign,purchase,installation,andinspectionofthematerials.
ii,TheestimatedcostofservicesunderthisMOU isbaseduponanestimate
developedbyDGS basedonthe mostcurrentmarketcostoftherequiredmaterialsand services.
iii,IntheeventofterminationoftheMOU,repaymentofanyamountstoDBH/SEH shallbeheldin abeyanceuntilallrequiredfiscalreconciliationhasbeencompleted,butnotlaterthanSeptember30,2026,
b.Payment
4.PaymentforallofthegoodsandservicesshallbemadethroughanIntraDistrictadvancebyDBHtoDGSbasedonthetotalamountofthisMOU.
ii, Advances toDGS fortheservicestobe performed and goods tobe providedshallnotexceed theamountof this MOU.
iii,DGSshallbillagainsttheProjectbudgetonlyforthosegoodsorservicesactuallyprovidedpursuanttothetermsofthisMOU.DGSshallretumanyexcessfundsoftheProjectbudgettoDBHbySeptember30thofthenextfiscalyear.
iv, The Parties'DirectorsortheirdesigneesshallresolvealladjustmentsanddisputesarisingfromservicesperformedunderthisMOU. IntheeventthatthePartiesareunabletoresolvea financialissue,themattershallbereferredtotheDistrictOfficeofFinancialOperationsand Systems.
¥.DGSshallensurethattherevenuesforthisprojectarereflectedinthebudgetentrybudgetline-itemdetailscreenandtheappropriateaccumulators.
vi. DGS shallestablishan agency internalservicefund withacorrespondingindexthattiestothefundandagencyorganizationstructureforthetransferoffundsfrom theBuyertotheSeller.
vil.DGSshallestablishmethodsintheSOAR/DIFSsothatfundsmaybeindependentlytracked.
viii.Iftheactualproportionatefundsrequiredarelessthananticipated,DGSshallgrantarefundtoDBH.
€.ReversePay-GoCapitaltoOperatingFunding
DuringtheDGS reviewand/orprocurementprocess,ifanypart(s)oftheSEHProjectaredeemedcapital-ineligible,DBH/SEHandDGSwillexecuteanotherMOU foruseofOperatingFunds.DBH/SEHwillworkwithOCFO(OfficeofChiefFinancialOfficer)tosubmitareverseCapitalPay-GoreprogrammingofthefandsfromCapitalfandstoOperatingfunds.Oncereprogrammed,DBH/SEHshallinitiateinter-agencytransferofthosefundstoDGS.
ANTI-DEFICIENCY CONSIDERATIONS
ThePartiesacknowledgeandagreethattheirrespectiveobligationstofulfillfinancialobligationsofanykindpursuanttoanyandallprovisionsofthisMOU,oranysubsequentagreemententeredintobythepartiespursuanttothisMOU,areandshallremainsubjecttotheprovisionsof(i)thefederalAnti-DeficiencyAct,31 U.S.C. §§1341, 1342, 1349,1351, (ii)the Districtof Columbia Anti DeficiencyAct, D.C. OfficialCode §§ 47 355.01-355.08, (iii)D.C. OfficialCode§ 47-105,and(iv)D.C.OfficialCode§ 1204.46,astheforegoingstatutesmaybeamended
3
Vili.
xX.
fromtimetotime,regardlessofwhetheraparticularobligationhasbeenexpresslysoconditioned.
EFFECTIVE DATE
‘ThisMOU shallbe effectiveon thedate on whichthe MOU isfullyexecutedby theDBHDirectororhis/herdesignee,SEHChiefExecutiveOfficerothis/herdesigneeand,theDGSDirectororhis/herdesignee.
DURATION OF MOU
a,The MOU shallremaininforce,unlessterminatedearlier:pursuanttoSectionXIIherein,untilSeptember30,2026.
b.ThePartiesmayextendthetermofthisMOU byexercisingamaximumofthree(3)six-monthoptionperiods.
Theexerciseofanoptionperiodissubjecttotheavailabilityoffundsatthetimeoftheexerciseoftheoption.
TRANSFER OF RIGHTS AND RESPONSIBILITIES
DGS may enterintoany contracts,delegations,assignmentsorsuchotheragreementsasauthorizedbyapplicablelawsandregulationsthatDGSdeterminesnecessarytocarryoutthepurposesoftheMOU.DGSmayassignalloranypartofthisMOU tooneormoreofitssubsidiariesorpartneragencies.
COMPLIANCE AND MONITORING
‘ThePartiesagreetocomplywithallapplicablelaws,rules,andregulationswhethernowinforceorhereafterenactedorpromulgated,andtoobserveandperformanycontracts,delegations,assignments,orotheragreementsenteredintobyDGSinfurtheranceofthisMOU.DGSadministrationoftheexpendituresanduseofthefundswillbesubjecttoscheduledandunscheduledmonitoringreviewstoensurecompliancewithallapplicablerequirements.
RECORDS AND REPORTS.
DGSshallmaintainrecordsandreceiptsfortheexpendituresofallfundsprovidedforaPeriodofnolessthanthree(3)yearsfromthedateofexpirationorterminationofthisMOUand,upontheDistrictofColumbia’srequest,makethesedocumentsavailableforinspectionbydulyauthorizedrepresentativesofDBH/SEHandotherofficialsasmaybespecifiedby theDistrictofColumbia at itssolediscretion.
CONFIDENTIAL INFORMATION
XIV.
Xv.
ThePartiestothisMOU shalluse,restrict,safeguardanddisposeofallinformationrelatedtoservicesprovidedbythisMOU inaccordancewithallrelevantfederalandlocalstatutes,regulationsandpolicies.InformationreceivedbyeitherPartyintheperformanceofresponsibilitiesassociatedwiththeperformanceof thisMOU shallremainthepropertyoftheParties.
MODIFICATIONS
ThetermsandconditionsofthisMOU maybemodifiedonlyuponapriorwrittenagreementexecutedbytheparties.
PROVISIONSFORTERMINATION
EitherDGS or DBH/SEH may terminatethisMOU inwhole orinpart by givingthirtyG0)dayswrittennoticetotheotherParty,whenitisinthebestinterestofeitherPartytodoso,basedonthefollowinggrounds:
() Lackoffunding;
(2) Changesinapplicablelaws;
(3) Changesinthe structureornatureoftheProgram orProject;or
(4) Eliminationoftheprogram,service,or‘projectsupportedby thisMOU.
Such terminationshallnotbe deemed abreachof the MOU. Intheeventthatterminationof thisMOU occurspriortocompletionof the Project,DGS willrenderthesitesafeandfreeofhazardousconditions,andthecoststhereofand anysumsdueunderanycontractssnteredintobyDGSwithrespecttotheProjectshallbeanexpenseoftheProjectpayableunderthisMOU.
AUTHORITYFOR MOU
D.C.OfficialCode§1-301.01(k).
PROCUREMENT PRACTICES
IfaDistrictofColumbiaagencyorinstrumentalityplanstoutilizethegoodsand/orservicesofanagent,contractor,consultantorotherthirdpartytoprovideanyofthegoodsand/orservicesunderthisMOU,thentheagencyorinstrumentalityshallabidebytheprovisionsoftheDistrictofColumbiaProcurementPracticesReformActof2010(D.C.OfficialCode§2-351.01 etseq.)toprocurethegoods or services.
XVI NOTICE
ThefollowingindividualsarethePointofContact(POC)foreachPartyunderthisMOU:
ForDBH/SEH: ForDGS:MarkChastang MohamedJallohChiefExecutiveOfficer ExecutiveProgramMangerSaintElizabethsHospital Departmentof GeneralServicesDepartmentofBehavioralHealth 3924MinnesotaAvenue,NE1100AlabamaAvenue,SE : (202)594-7344Washington,DC 20032 mohamedjalloh1@dc.govO:(202)299-5500mark.chastang@dc.gov
XVII. MISCELLANEOUS
ThePartiesshallcomplywithallapplicablelaws,rulesandregulationswhethernowinforceothereafterenactedorpromulgated.
IN WITNESS WHEREOF, thePartiesheretohave executedthisMOU as follows:
DEPARTMENT OF BEHAVIORALHEALTH
; Z
AN Me (Se -rbaraJ.Bazroi Wn irkChastang,MPA,MBA,FACHEDirector ),SEH
va SLBAS nentJoes
DEPARTMENT OF GENERAL SERVICES
PPeltieordtunterDate:5/21/2025