relating to capital improvement projects for the benefit
of THE Nineteenth REPRESENTATIVE DISTRICT.
BE IT
ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
����
SECTION
1.
�
The director of finance is authorized
to issue general obligation bonds in the sum of $64,915,000 or so much thereof
as may be necessary and the same sum or so much thereof as may be necessary is
appropriated for fiscal year 2025-2026 for the purpose of capital improvement
projects for the nineteenth representative district, as follows:
1.
��
Aina Haina Elementary
School
����
Construction for a fence surrounding the
campus for safety.
����
Construction
������������������
$150,000
���������
Total funding
����������������������
$150,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
2.
��
Aina Haina Elementary School
����
Equipment and appurtenances for air
conditioning for campus classrooms and staff meeting areas.
����
Equipment
���������������������
$300,000
���������
Total funding
����������������������
$300,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
3.
��
Aina Haina Elementary School
����
Construction for paving the mauka lot
outside of the back cattle gate for parking.
����
Construction
������������������
$800,000
���������
Total funding
����������������������
$800,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
4.
��
Aina Haina Elementary School
����
Equipment and appurtenances for the
electrical upgrade of the campus.
����
Equipment
���������������������
$900,000
���������
Total funding
����������������������
$900,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
5.
��
Aina Haina Elementary School
����
Construction for a multipurpose office and
health room adjacent to the administration building on the makai side.
����
Construction
����������������
$1,500,000
���������
Total funding
��������������������
$1,500,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
6.
��
Kaimuki Middle School
����
Construction for repair and maintenance of
four restrooms located inside the school building.
����
Construction
����������������
$1,250,000
���������
Total funding
��������������������
$1,250,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
7.
��
Kaimuki Middle School
����
Construction for the refurbishing, repair,
and maintenance of existing locker room and restrooms located within to include
flooring, painting, fixturing, and a wall addition to reduce the size of a
locker room to add two additional classrooms.
����
Construction
����������������
$2,500,000
���������
Total funding
��������������������
$2,500,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
8.
��
Aina Haina Library
����
Construction for landscaping of three
outside grassy areas behind the library, to include repair and maintenance of
existing non-working irrigation and lighting which may include the front grassy
area.
����
Construction
����������������
$1,000,000
���������
Total funding
��������������������
$1,000,000
����
The sum
appropriated for this capital improvement project shall be expended by the
Hawaii state public library system.
9.
��
Aina Haina Library
����
Construction for repair and maintenance of
original ADA restroom.
����
Construction
����������������
$1,000,000
���������
Total funding
��������������������
$1,000,000
����
The sum
appropriated for this capital improvement project shall be expended by the
Hawaii state public library system.
10.
�
Kaiser High School
����
Design and construction for the performing
arts complex, including a one thousand two hundred seat auditorium with a stage
to seat three hundred musicians; film production and broadcast studio; scene
shop; science, technology, engineering, and mathematics innovation space; dance
studio; art gallery; and graphics arts classroom.
����
Design
����������������������
$5,250,000
����
Construction
���������������
$44,250,000
���������
Total funding
�������������������
$49,500,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
11.
�
Kaiser High School
����
Design and construction for modernizing the
swimming pool stadium, including installing chemical and filtration equipment,
spalling, converting existing light towers and underwater lighting to LED, and
installing hand railings to bleachers.
����
Design
������������������������
$345,000
����
Construction
����������������
$2,300,000
���������
Total funding
��������������������
$2,645,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
12.
�
Kaiser High School
����
Design and construction for erosion control
at Kaiser stadium's west light towers and the fencing, softball, and baseball
venues.
����
Design
������������������������
$120,000
����
Construction
������������������
$800,000
���������
Total funding
����������������������
$920,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
13.
�
Kaiser High School
����
Design and construction for installing hand
railings onto Kaiser stadium bleachers.
����
Design
������������������������
$150,000
����
Construction
������������������
$800,000
���������
Total funding
����������������������
$950,000
����
The sum appropriated
for this capital improvement project shall be expended by the department of
education.
14.
�
Kaiser High School
����
Design, construction,
�
equipment, and appurtenances for weightroom
modernization, including expansion of the existing weightroom and replacing
weight training equipment.
����
Design
������������������������
$250,000
����
Construction
����������������
$1,000,000
����
Equipment
���������������������
$250,000
���������
Total funding
��������������������
$1,500,000
����
The sum
appropriated for this capital improvement project shall be expended by the
department of education.
����
SECTION 2.
�
The appropriation made for the capital
improvement projects authorized by this Act shall not lapse at the end of the
fiscal year for which the appropriation is made; provided that all moneys from
the appropriation unencumbered as of June 30, 2028, shall lapse as of that
date.
����
SECTION 3.
�
This Act shall take effect on July 1, 2025.
INTRODUCED BY:
_____________________________
Report Title:
CIP; Nineteenth Representative District; Appropriation
Description:
Appropriates funds for capital improvement projects in the
nineteenth representative district.
The summary description
of legislation appearing on this page is for informational purposes only and is
not legislation or evidence of legislative intent.