Back to Kentucky

HB502 • 2026

AN ACT relating to road projects and declaring an emergency.

AN ACT relating to road projects and declaring an emergency.

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
J. Petrie
Last action
2026-04-13
Official status
04/13/26: signed by Governor (Acts Ch. 145)
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

AN ACT relating to road projects and declaring an emergency.

AN ACT relating to road projects and declaring an emergency.

What This Bill Does

  • AN ACT relating to road projects and declaring an emergency.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

SCS1

Senate Committee Substitute 1

Retain, delete, and add to original provisions; set out the 2026-2028 Biennial Highway Construction Plan; EMERGENCY.

Plain English: 26 RS HB 502/SCS 1 Page 1 of 192 HB050240.100 - 1376 - 135576 - 9969v Senate Committee Substitute AN ACT relating to road projects and declaring an emergency.

  • 26 RS HB 502/SCS 1 Page 1 of 192 HB050240.100 - 1376 - 135576 - 9969v Senate Committee Substitute AN ACT relating to road projects and declaring an emergency.
  • 1 Be it enacted by the General Assembly of the Commonwealth of Kentucky: 2 Section 1.
  • Notwithstanding KRS 48.110, 48.300, and 176.430, the projects 3 authorized by the General Assembly in this Act constitute the official 2026-2028 Biennial 4 Highway Construction Plan.
  • 5 Section 2.

Bill History

  1. 2026-04-13 Kentucky Legislative Research Commission

    signed by Governor (Acts Ch. 145)

  2. 2026-04-01 Kentucky Legislative Research Commission

    reported favorably, to Rules with Committee Substitute (1) posted for passage in the Regular Orders of the Day for Wednesday, April 01 2026 3rd reading, passed 37-0 with Committee Substitute (1) received in House to Rules (H) posted for passage for concurrence in Senate Committee Substitute (1) House concurred in Committee Substitute (1) passed 89-3 enrolled, signed by Speaker of the House enrolled, signed by President of the Senate delivered to Governor

  3. 2026-03-24 Kentucky Legislative Research Commission

    taken from Transportation (S) 2nd reading returned to Transportation (S)

  4. 2026-03-20 Kentucky Legislative Research Commission

    taken from Transportation (S) 1st reading returned to Transportation (S)

  5. 2026-03-13 Kentucky Legislative Research Commission

    to Transportation (S)

  6. 2026-03-11 Kentucky Legislative Research Commission

    received in Senate to Committee on Committees (S)

  7. 2026-03-10 Kentucky Legislative Research Commission

    reported favorably, to Rules taken from Rules placed in the Orders of the Day 3rd reading, passed 94-5

  8. 2026-03-05 Kentucky Legislative Research Commission

    taken from Appropriations & Revenue (H) 2nd reading returned to Appropriations & Revenue (H)

  9. 2026-03-04 Kentucky Legislative Research Commission

    taken from Committee on Committees (H) 1st reading returned to Committee on Committees (H) to Appropriations & Revenue (H)

  10. 2026-03-03 Kentucky Legislative Research Commission

    introduced in House to Committee on Committees (H)

Official Summary Text

AN ACT relating to road projects and declaring an emergency.

Current Bill Text

Read the full stored bill text
26 RS HB 502/EN
Page 1 of 1
HB050220.100 - 1376 - 135652 - 10045v Engrossed
AN ACT relating to road projects and declaring an emergency. 1
Be it enacted by the General Assembly of the Commonwealth of Kentucky: 2
Section 1. Notwithstanding KRS 48.110, 48.300, and 176.430, the projects 3
authorized by the General Assembly in this Act constitute the official 2026-2028 Biennial 4
Highway Construction Plan. 5
Section 2. The General Assembly acknowledges that the project authorizations 6
contained within this Act are based on the Transportation Cabinet's estimates. The 7
Transportation Cabi net shall have the authority to expend funds necessary to complete 8
the projects as authorized in this Act, amended only by variations dictated by bid or 9
unforeseen circumstances. 10
Section 3. The Secretary of the Transpor tation Cabinet shall produce a single 11
document that shall detail the enacted fiscal biennium 2026 -2028 Biennial Highway 12
Construction Program, the 2028 -2032 Highway Preconstruction Program, and the Local 13
Assistance Road Program. 14
Section 4. Notwithstanding KRS 48.300, this Act in conjunction with 2026 15
Regular Session HJR 75 and HJR 76 shall constitute the Six-Year Road Plan. 16
Section 5. Whereas the funding for these projects is provided by the 17
Transportation Cabinet Budget Bill, which takes effect upon its passage and approval by 18
the Governor or upon its otherwise becoming a law, an emergency is declared to exist, 19
and this Act takes effect upon its passage and approval by the Governor or up on its 20
otherwise becoming a law. 21
Section 6. The 2026-2028 Biennial Highway Construction Plan is as follows: 22
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1702 IN ADAIR COUNTYK Y-1702Adair PL4325
DN
RW
UT
CN 58,000 GR
Project Cost: 58,000 0 0
A
DDRESS CONDITION OF Louie B. Nunn Cumberland Parkway FROM
MILEPOINT 43.02 TO MILEPOINT 48.15
LN-9008Adair PL22207
DN 200,000 NHPM
RW
UT
CN 2,000,000 NHPM
Project Cost: 0 2,200,000 0
I
mprove mobility and congestion along KY 55 from US 127 in Russell
County to the Louis B. Nunn Cumberland KY 55/KY6177 in Adair
County. (Russell MP 0.0 - 8.159; Adair MP 0.0 - 9.68) (2024CCN)
KY-55Adair PL 400,000 SPP80352
DN
RW
UT
CN
Project Cost: 400,000 0 0
I
mprove horizontal and vertical geometrics along KY 55 from 0.113 mile
South of Tom Andrews Rd to 0.107 mile North of Tom Andrews Rd.
(MP 8.631 to 8.85)
KY-55Adair PL80411
DN 110,000 SPP
RW 220,000 SPP
UT 220,000 SPP
CN
Project Cost:
110,000 440,000 0
R
econstruction KY 61 from Columbia Bypass (KY 55) to Green County
Line. See Alternate 4 Priority Section in December 2002 scoping study.
(MP 12.213 to 19.745)
KY-61Adair PL80412
DN 3,766,000 SPP
RW
UT
CN
Project Cost:
0 3,766,000 0
Page 2 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
The proposed roadway would help alleviate traffic on existing KY 206,
K
Y3491, as well as traffic thru town on KY 55X and KY80. Eastern
Columbia Bypass
PF-9999Adair PL 250,000 SPP80413
DN
RW
UT
CN
Project Cost: 0 0 250,000
A
ddress flooding issues on Rice Drive (CS 1110) and Watson Street
(CS 1139) , Memorandum of Agreement with City of Columbia to
construct
CS-1110Adair PL80418
DN 102,000 SPP
RW
UT
CN 511,300 SPP
Project Cost:
0 613,300 0
T
otal for Adair county PL
Total Amounts:
CN
UT
RW
DN
400,000 250,000
110,000 4,068,000
220,000
220,000
58,000 2,511,300
568,000 7,019,300 250,000
I
MPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION
IMPROVEMENTS FROM NEAR THE STONY POINT ROAD
INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW ROAD
INTERSECTION (12CCR)(18CCN) (2020CCR) (2024CCR)
KY-100Allen PL320
DN
RW
UT
CN 11,780,000 SPP
Project Cost:
11,780,000 0 0
B
RIDGE PROJECT IN ALLEN COUNTY ON (002C00004N) JEFFERSON
SCHOOL R AT DIFFICULT CREEK
CR-1043Allen PL10026
DN 139,182 FBP2
RW
UT
CN 927,878 FBP2
Project Cost: 0 0 1,067,060
Page 3 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY-100 FROM KY-622 IN SIMPSON COUNTY TO EST
OF
SULPHUR FORK CREEK IN ALLEN COUNTY (2012CCR) (2022CCN)
(2024CCR)
KY-100Allen PL80206
DN
RW
UT
CN 19,140,000 SPP
Project Cost: 19,140,000 0 0
I
mprove connectivity within Allen Springs Industrial Park. (2024CCN)PF-9999Allen PL80312
DN
RW 110,000 STP2
UT 260,000 STP2
CN 2,700,000 STP2
Project Cost: 110,000 260,000 2,700,000
T
otal for Allen county PL
Total Amounts:
CN
UT
RW
DN 139,182
110,000
260,000
30,920,000 3,627,878
31,030,000 260,000 3,767,060
WIDENING WITH ACCESS IMPROVEMENTS TO ANDERSON CROSSING
O
N US62, FROM 0.2MI W OF CORPORATE DR TO US127B
(LAWRENCEBURG BYPASS). PRIORITY SECTION (2016BOP)
(2024CCN)
US-62A nderson PL8100.1000
DN
RW 5,040,000 STP1
UT
CN
Project Cost: 0 5,040,000 0
ADDRESS DEFICIENCIES OF BRIDGE ON KY 44 OVER TIMBER CREEK
(
003B00028N)
KY-44A nderson PL10065
DN 237,733 BRX
RW
UT
CN 1,584,890 BRX
Project Cost: 0 0 1,822,623
Page 4 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
F
ROM MILEPOINT 56.287 TO MILEPOINT 58.345
BG-9002Anderson PL22183
DN 200,000 NHPM
RW
UT
CN 2,003,520 NHPM
Project Cost: 0 2,203,520 0
IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END
OF
BRIDGE OVER KENTUCKY RIVER AT TYRONE(18CCN) (2020CCR)
(2022CCR) (2024CCR)
US-62A nderson PL80001
DN
RW
UT 5,850,000 STP2
CN
Project Cost: 5,850,000 0 0
T
otal for Anderson county PL
Total Amounts:
CN
UT
RW
DN 200,000 237,733
5,040,000
5,850,000
2,003,520 1,584,890
5,850,000 7,243,520 1,822,623
I
mprove US-60 from Humphrey Creek bridge to 0.4 mi west of Hester
Sullivan Lane. (02CCR) (2020CCR) (2022CCR) (2024CCR)
US-60Ballard PL118
DN
RW
UT 10,000,000 NH
CN
Project Cost: 0 10,000,000 0
C
ONSTRUCT NEW STRUCTURE OVER THE OHIO RIVER AT CAIRO,
ILLINOIS (KENTUCKY'S SHARE)(004B00021N)
US-51Ballard PL1140
DN 4,000,000 4,500,000 3,005,000 BRO2
RW
UT
CN 26,365,000 BRO2
Project Cost: 4,000,000 30,865,000 3,005,000
Page 5 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT APPROACH ROADWAY TO NEW BRIDGE OVER THE
O
HIO RIVER AT CAIRO, ILLINOIS (KY APPROACH ROADWAY WORK
ONLY).
US-51Ballard PL1140.2000
DN
RW
UT
CN 14,620,000 NH
Project Cost: 0 14,620,000 0
A
DDRESS CONDITION, SAFETY, CONGESTION, AND FUTURE
CAPACITY ISSUES ON US-60 THROUGH THE CITY OF LACENTER.
(2024CCN)
US-60Ballard PL80300
DN
RW 2,750,000 NH
UT
CN
Project Cost:
0 2,750,000 0
CORRECT ROADWAY GEOMETRICS, INADEQUATE PASSING ZONES,
I
MPROVE OPERATING SPEEDS AND IMPROVE CONNECTIVITY FROM
CARLISLE COUNTY LINE TO RAILROAD OVERPASS IN WICKLIFFE.
(2024CCN)
US-51B allard PL80308
DN 1,560,000 NH
RW
UT
CN
Project Cost: 0 1,560,000 0
THE PURPOSE OF THIS PROJECT IS TO PROVIDE ROADWAY
I
NFRASTRUCTURE TO SUPPORT COMMUNITY
GROWTH/DEVELOPMENT AND SAFE ACCESS FOR FREIGHT TRAFFIC
TO DEVELOPING RIVERPORT SOUTH OF WICKLIFFE. (2024CCN)
US-51B allard PL80320
DN 300,000 STP2
RW
UT
CN
Project Cost: 0 300,000 0
IMPROVE GEOMETRIC DEFICIENCIES, FREIGHT TRUCK MOBILITY, AND
I
MPROVE SAFETY ON KY 286 FROM HERSHEL JONES ROAD TO KY
473. (2024CCN)
KY-286B allard PL80322
DN 1,500,000 SPP
RW
UT
CN
Project Cost: 0 1,500,000 0
T
otal for Ballard county PL
Total Amounts:
CN
UT
RW
DN 4,000,000 7,860,000 3,005,000
2,750,000
10,000,000
40,985,000
4,000,000 61,595,000 3,005,000
Page 6 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Widen KY 249 from Hilltopper Way to Trojan TrailK Y-249Barren PL186
DN
RW
UT
CN 4,150,000 SPP
Project Cost: 0 4,150,000 0
I
MPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E
(ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM
KY-1297 TO US-68 IN GLASGOW. (14CCN) (16CCN) (2020CCR)
(2024CCR)
CR-1366,
KY-1297
Barren PL8821
DN
RW
UT
CN 13,440,000 CRP
Project Cost:
0 0 13,440,000
ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET.
(
005B00058N)
US-31B arren PL10001
DN
RW 1,000,000 BRX
UT 550,000 BRX
CN 2,900,000 BRX
Project Cost: 1,000,000 550,000 2,900,000
A
DDRESS CONDITION OF US-31E FROM MILEPOINT 8.052 TO
MILEPOINT 12.117
US-31Barren PL20038
DN 160,000 STP4
RW
UT
CN 1,840,000 STP4
Project Cost: 2,000,000 0 0
A
DDRESS CONDITION OF US-68X FROM MILEPOINT 2.75 TO
MILEPOINT 4.27
US-68Barren PL22300
DN 640,000 STP3
RW
UT
CN 7,360,000 STP3
Project Cost: 8,000,000 0 0
Page 7 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Barren county P L
Total Amounts:
CN
UT
RW
DN 800,000
1,000,000
550,000
9,200,000 4,150,000 16,340,000
11,000,000 4,700,000 16,340,000
I
NSTALL GUARDRAIL ON US-60 IN BATH COUNTYUS-60Bath PL4327
DN
RW
UT
CN 46,000 GR
Project Cost: 46,000 0 0
B
RIDGE PROJECT IN BATH COUNTY ON (006B00012N) US-60 AT
DRAINAGE DITCH
US-60Bath PL10067
DN 357,929 BRX
RW
UT
CN 2,386,193 BRX
Project Cost: 0 0 2,744,122
B
RIDGE PROJECT IN BATH COUNTY ON (006B00013N) US-60 AT
CROOKED RUN CREEK
US-60Bath PL10068
DN 366,778 BRX
RW
UT
CN 2,445,188 BRX
Project Cost: 0 0 2,811,966
A
DDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER COW CREEK
(006B00011N)
US-60Bath PL10095
DN 144,243 BRX
RW
UT
CN 961,619 BRX
Project Cost: 0 0 1,105,862
Page 8 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-064 FROM MILEPOINT 117.83 TO
M
ILEPOINT 123.6
I -64Bath PL22045
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 5,400,000 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 123.6 TO MILEPOINT
1
28.955
I -64B ath PL22046
DN 450,000 NHPM
RW
UT
CN 4,521,000 NHPM
Project Cost: 4,971,000 0 0
IMPROVE SAFETY ON KY 36 FROM THE INTERSECTION WITH I-64 TO
T
HE INTERSECTION OF KY 965 INCLUDING THE CURVES KNOWN AS
CLEAR CREEK FURNACE AND THOMAS HILL (2020CCN) MILEPOINT
13.394 TO MILEPOINT 17.104 (2022CCN) (2024CCR)
KY-36B ath PL80101
DN
RW 1,650,000 SPP
UT
CN
Project Cost: 1,650,000 0 0
T
otal for Bath county PL
Total Amounts:
CN
UT
RW
DN 450,000 490,000 868,950
1,650,000
4,567,000 4,910,000 5,793,000
6,667,000 5,400,000 6,661,950
ENHANCING CUMBERLAND AVENUE FROM US 25E TO 18TH STREET
W
ITH STREET IMPROVEMENTS FOR VEHICLE AND PEDESTRIANS, AS
WELL AS STORM WATER MANAGEMENT TO IMPROVE SAFETY,
CONGESTION, AND ENVIRONMENTAL IMPACT. (2020CCR) (2024CCR)
KY-74B ell PL167
DN
RW 580,000 SPP
UT
CN
Project Cost: 580,000 0 0
Page 9 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-2011 IN BELL COUNTYK Y-2011Bell PL4395
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
I
NSTALL GUARDRAIL ON KY-66 IN BELL COUNTYKY-66Bell PL4397
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
B
RIDGE PROJECT IN BELL COUNTY ON (007B00055N) KY-66 AT RED
BIRD CREEK
KY-66Bell PL10171
DN
RW 10,000 BRX
UT 10,000 BRX
CN 1,046,035 BRX
Project Cost: 0 0 1,066,035
B
RIDGE PROJECT IN BELL COUNTY ON (007C00072N) 17TH STREET
AT YELLOW CREEK
KY-217Bell PL10239
DN 202,446 FBP2
RW
UT
CN 1,349,640 FBP2
Project Cost: 0 0 1,552,086
A
DDRESS CONDITION OF US-119 FROM MILEPOINT 13.88 TO
MILEPOINT 15.88
US-119Bell PL22303
DN 318,364 STP5
RW
UT
CN 3,661,186 STP5
Project Cost: 0 3,979,550 0
Page 10 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve mobility by constructing a 2+1 road on US 119 in Bell County
by adding a continuous third lane that serves as an alternate passing
lane (MP 3.5 - 9.3). (2024CCN)
US-119Bell PL80300
DN 2,330,000 NH
RW
UT
CN
Project Cost: 0 2,330,000 0
I
mprove safety at existing Bell County School Bus Garage, construct
turn lane and acceleration lane on US 25E (MP 10.18 to 10.28
US-25Bell PL80421
DN
RW
UT
CN 150,000 CRP
Project Cost: 0 0 150,000
T
otal for Bell county PL
Total Amounts:
CN
UT
RW
DN 2,648,364 202,446
580,000 10,000
10,000
190,000 3,661,186 2,545,675
770,000 6,309,550 2,768,121
R
EDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THE
INTERCHANGE OF I-75 AND KY-14 IN WALTON. (2020CCR)
(2022CCR) (2024CCR)
I -75Boone PL80
DN
RW 7,250,000 NH
UT
CN
Project Cost: 7,250,000 0 0
D
EDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY
URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2026
THROUGH FY 2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2024CCR)
CO-0Boone PL966.0800
DN
RW
UT
CN 8,600,000 8,600,000 8,600,000 SNK
Project Cost:
8,600,000 8,600,000 8,600,000
Page 11 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON
R
ICHARDSON ROAD (KY 842) 0.14 MI E OF US 25 NEAR
INDEPENDENCE (008B00092N) (2020CCN)
KY-842Boone PL1087
DN
RW 4,000,000 BRX
UT 3,775,000 BRX
CN 10,000,000 BRX
Project Cost: 0 17,775,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON I-275 OVER OHIO RIVER
(008B00052N)
I -275Boone PL10028
DN 520,000 FBP
RW
UT
CN 5,200,000 FBP
Project Cost: 0 0 5,720,000
ADDRESS DEFICIENCIES OF BRIDGE ON KY 14 OVER MCCOYS FORK
(
008B00003N)
KY-14B oone PL10049
DN 211,800 BRX
RW
UT
CN 1,411,999 BRX
Project Cost: 0 0 1,623,799
C
ONVERT KY 18 (BURLINGTON PIKE) TO A SUPER STREET
(2020CCN) (2022CCR) (2024CCR)
KY-18Boone PL80101
DN
RW
UT
CN 9,500,000 NH
Project Cost: 9,500,000 0 0
R
econstruct Turfway Road (KY 717) from Aero Parkway (MP 0.0) to
Donaldson Road (MP 1.67). (2020CCN) (2022CCR) (2024CCR)
KY-717Boone PL80150
DN
RW
UT
CN 5,000,000 5,000,000 STPF
Project Cost: 0 5,000,000 5,000,000
Page 12 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety & mobility, reduce congestion and address geometric
d
eficiencies along Camp Ernst Road (CR 1001) from KY 237 (Pleasant
Valley Rd) to KY 536 (Hathaway Rd). (2022CCN) (Includes Item No.
6-80208) (2024CCR)
CR-1001Boone PL80207
DN
RW 7,250,000 STPF
UT
CN
Project Cost:
7,250,000 0 0
T
otal for Boone county PL
Total Amounts:
CN
UT
RW
DN 731,800
14,500,000 4,000,000
3,775,000
18,100,000 23,600,000 20,211,999
32,600,000 31,375,000 20,943,799
I
MPROVE US 460 FROM RUSSELL CAVE RD TO I 75 (2ND PART OF
7-8705) (2020CCN)(SEE 7-8705.10) (2022CCR) (2024CCR)
US-460Bourbon PL80104
DN
RW
UT
CN 8,200,000 STP2
Project Cost: 8,200,000 0 0
MODERNIZE ROADWAY, IMPROVE CONGESTION, SAFETY AND
P
EDESTRIAN ACCESS FROM US 27 ALONG Y 1939 FOR .212 MILES
INCLUDING IMPROVEMENTS TO THE INTERSECTION OF MATLACK ST
AND THE BOURBON COUNTY SCHOOL BUS BARN (2022CCN)
(INCLUDES ITEM NO. 7-916) (2024CCR)
KY-1939B ourbon PL80203
DN
RW 740,000 STPF
UT 1,150,000 STPF
CN 2,240,000 STPF
Project Cost: 740,000 3,390,000 0
R
eplace bridge on KY 1893 (Shawhan Rd) over Stoner Creek.
(009B00041N)
KY-1893Bourbon PL80361
DN 325,909 FBP2
RW
UT
CN 2,172,724 FBP2
Project Cost: 0 0 2,498,633
Page 13 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Bourbon county P L
Total Amounts:
CN
UT
RW
DN 325,909
740,000
1,150,000
8,200,000 2,240,000 2,172,724
8,940,000 3,390,000 2,498,633
F
EDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO
FOR FY 2022-2028. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2022CCR) (2024CCR)
CO-0Boyd PL208.0600
DN
RW
UT
CN 1,800,000 1,800,000 1,800,000 SAH
Project Cost: 1,800,000 1,800,000 1,800,000
ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG
S
ANDY RIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L
AND 010B00046R)(SD)
I -64B oyd PL10016
DN 200,000 FBP
RW
UT
CN 2,000,000 FBP
Project Cost: 0 0 2,200,000
B
RIDGE PROJECT IN BOYD COUNTY ON (010B00058N) US-23S AT
OHIO RIVER,CSX,STREETS
US-23Boyd PL10074
DN 260,000 BRO
RW
UT
CN 2,600,000 BRO
Project Cost: 0 2,860,000 0
ADDRESS DEFICIENCIES OF BRIDGE ON US 23 OVER OHIO RIVER,CSX
,
STREETS (010B00040N)
US-23B oyd PL10096
DN 200,000 BRZ
RW
UT
CN 2,000,000 BRZ
Project Cost: 0 2,200,000 0
Page 14 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct a new bridge over the Little Sandy River and construct a
r
oadway from the south side of Camp Landing. Project to be complete
through a Memorandum of Agreement with Boyd County, state funds
contingent on the completion of transfer of ownership of all right of
way necessary for the project to the Boyd County Fiscal Court. The
PF-9999Boyd PL80353
DN 1,000,000 SPP
RW
UT
CN
Project Cost:
1,000,000 0 0
T
otal for Boyd county PL
Total Amounts:
CN
UT
RW
DN 1,000,000 460,000 200,000
1,800,000 6,400,000 3,800,000
2,800,000 6,860,000 4,000,000
U
S 150 Bypass between Fireside Dr and Gose Pike in Danville,
Kentucky; City of Danville’s SS4A USDOT Grant Funded Project.
US-127,
US-150
Boyle PL473
DN 2,190,000 KYD
RW
UT
CN 13,760,000 KYD
Project Cost: 15,950,000 0 0
R
ECONSTRUCT KY 52 FROM KY 1805 (Goggin Ln) TO KY 590
(2022CCN) (2024CCR)
KY-52Boyle PL80204
DN
RW 2,510,000 STP2
UT
CN
Project Cost: 2,510,000 0 0
PLANNING STUDY TO EVALUATE OPTIONS FOR IMPROVING SAFETY
O
N KY 52 BETWEEN DANVILLE AND LANCASTER. (2024CCN)
KY-52B oyle PL80313
DN 1,950,000 SPP
RW
UT
CN
Project Cost: 1,950,000 0 0
Page 15 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve the existing geometry and typical section of US 68 from
a
pprox. MP 5.2 to MP 6.39 at the intersection of 2nd Street in Perryville
(2024CCN)
US-68Boyle PL80354
DN 780,000 SPP
RW
UT
CN
Project Cost: 0 780,000 0
I
ntersection Improvements at KY 2168/US 127 and KY 2168/KY34 (MP
O to 3.088)
KY-2168Boyle PL80425
DN 500,000 SPP
RW 250,000 SPP
UT 150,000 SPP
CN
Project Cost: 0 900,000 0
T
otal for Boyle county PL
Total Amounts:
CN
UT
RW
DN 4,140,000 1,280,000
2,510,000 250,000
150,000
13,760,000
20,410,000 1,680,000 0
O
PERATION OF AUGUSTA FERRY FOR FY 2027 THROUGH FY 2032.
(12CCR)(14CCR) (2020CCR) (2024CCR)
KY-8Bracken PL355.2200
DN
RW
UT
CN 537,000 338,000 SPP
Project Cost: 0 537,000 338,000
A
dd turn lanes on KY 9 (AA Hwy) at the KY 875 (Mt Zion Road)
intersection to improve safety and mobility. (SYP 6-8902) (MP 7.6 to
7.9)
KY-9Bracken PL8902
DN 20,000 SPP
RW 20,000 SPP
UT 120,000 SPP
CN 170,000 SPP
Project Cost: 20,000 310,000 0
Page 16 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Bracken county P L
Total Amounts:
CN
UT
RW
DN 20,000
20,000
120,000
707,000 338,000
20,000 847,000 338,000
R
OCKFALL MITIGATION ON KY 15 FROM 0.593 MILE NORTH OF
BEAVERLY ROAD (MP 13.750) TO KY 1098/KY 1813 (MP 14.644).
(2018BOP) (2024CCR)
KY-15Breathitt PL5014
DN
RW
UT
CN 24,490,000 KYD
9,510,000 PROT
Project Cost: 34,000,000 0 0
I
mprove reliability of KY 1110 between MP 14 and MP 15.KY-1110Breathitt PL80411
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 0 1,000,000 0
T
otal for Breathitt county PL
Total Amounts:
CN
UT
RW
DN 1,000,000
34,000,000
34,000,000 1,000,000 0
R
EALIGN KY 86 FROM JESSIE PRIEST ROAD TO EAST OF ROSETTA
CORNERS. (2020CCR) ($2 MILLION CONGRESSIONAL EARMARK
DEMO ID KY188) (2024CCR)
KY-86Breckinridge PL159
DN
RW
UT
CN 8,100,000 CRP
Project Cost:
0 8,100,000 0
Page 17 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74.
(
18CCN)
KY-261Breckinridge PL8902
DN 100,000 BRX
RW 25,000 BRX
UT 25,000 BRX
CN 400,000 BRX
Project Cost: 0 0 550,000
T
otal for Breckinridge county PL
Total Amounts:
CN
UT
RW
DN 100,000
25,000
25,000
8,100,000 400,000
0 8,100,000 550,000
R
ECONSTRUCT KY 44 FROM I 65 TO CHIMNEY ROCK DRIVE
(MILEPOINT 13.1 TO MILEPOINT 15.1). (2022CCN)
KY-44Bullitt PL150.0200
DN 2,420,000 SPP
RW
UT
CN
Project Cost: 0 2,420,000 0
S
ECTION 5 FROM CS 3316/CS 3628 TO US 31E BYPASS (2008BOPC)
(2022CCN) (2024CCR)
KY-44Bullitt PL150.5000
DN
RW 1,720,000 SPP
UT 610,000 SPP
CN
Project Cost: 0 1,720,000 610,000
M
T. WASHINGTON-TAYLORSVILLE RD; RECONSTRUCT KY 44 FROM
US31E BYPASS TO KY 1319 KINGS CHURCH HIGHWAY (2020CCN)
(2022CCR) (2024CCR)
KY-44Bullitt PL347.5000
DN
RW 4,500,000 SPP
UT
CN
Project Cost: 0 4,500,000 0
Page 18 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXPAND TRUCK PARKING AT I-65 SB WELCOME CENTER.I -65Bullitt PL578
DN
RW
UT
CN 1,160,000 NH
Project Cost: 0 1,160,000 0
I
NSTALL GUARDRAIL ON KY-1319 IN BULLITT COUNTYKY-1319Bullitt PL4309
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
W
IDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH
COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY
HOLLOW RD (MP 4.425). (2022CCN) (2024CCR)
KY-245Bullitt PL8307.2000
DN
RW 5,250,000 SPP
UT
CN
Project Cost: 0 5,250,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 2674 OVER WHITTAKER
RUN (015B00083N)
KY-2674Bullitt PL10143
DN 440,483 BRZ
RW
UT
CN 2,936,554 BRZ
Project Cost: 0 0 3,377,037
ADDRESS CONDITION OF I-065 FROM MILEPOINT 110.7 TO MILEPOINT
1
18.58
I -65B ullitt PL22067
DN 7,200,000 NHPM
RW
UT
CN 30,000,000 NHPM
Project Cost: 37,200,000 0 0
Page 19 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION ON KY 1450 (BLUE
L
ICK RD.) BETWEEN THE INTERSECTIONS WITH KY 1526 (JOHN
HARPER HIGHWAY) AND CR 1512A (JEFFIE LANE) (2020CCN)
(2022CCR) (2024CCR)
KY-1450Bullitt PL80101
DN
RW 1,800,000 SPP
UT
CN
Project Cost:
0 1,800,000 0
R
ECONSTRUCT KY 44 FROM BOGARD LANE TO ARMSTRONG LANE
(2020CCN) (2022CCR)
KY-44Bullitt PL80103
DN 2,670,000 SPP
RW
UT
CN
Project Cost: 0 2,670,000 0
I
mprove traffic operations and improve safety along US 31E
(Louisville-Bardstown Rd) from the Bullitt/Nelson County Line to KY 44.
Consider a 2+1 configuration and/or innovative intersections (MP 0.0 -
3.53 Bullitt; MP 0.0 - 1.882 Spencer). (2024CCN)
US-31Bullitt PL80354
DN 1,670,000 STPF
RW
UT
CN
Project Cost:
0 1,670,000 0
I
mprove safety and reduce congestion on KY 44 between the I-65
interchange and the KY 61 intersection. Consider access
management.
KY-44Bullitt PL80412
DN 130,000 SPP
RW 125,000 SPP
UT
CN
Project Cost:
130,000 125,000 0
I
mprove safety and reduce congestion on KY 61 from KY 44 in
Shepherdville to KY 245. Project will evaluate widening from 2 to 4
travel lanes and consider other lower impact alternatives. (MP
9.42-14.5)
KY-61Bullitt PL 250,000 SPP80429
DN
RW
UT
CN
Project Cost:
250,000 0 0
Page 20 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety, improve traffic operations, and enhance mobility on
K
Y 61 from the Bullitt/Nelson County Line to KY 245. (MP 0 - 9.42)
KY-61Bullitt PL 400,000 SPP80430
DN
RW
UT
CN
Project Cost: 400,000 0 0
T
otal for Bullitt county PL
Total Amounts:
CN
UT
RW
DN
650,000
7,330,000 6,760,000 440,483
13,395,000
610,000
30,030,000 1,160,000 2,936,554
38,010,000 21,315,000 3,987,037
O
PERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2027
THROUGH FY 2032.(12CCR) (2020CCR) (2024CCR)
KY-269Butler PL125.1500
DN
RW
UT
CN 166,000 173,000 SPP
Project Cost: 0 166,000 173,000
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO
C
OUNTY FERRY AUTHORITY FOR FY 2027-2032.(12CCR) (2020CCR)
(2024CCR)
KY-369B utler PL8504.1000
DN
RW
UT
CN 166,000 173,000 SPP
Project Cost: 0 166,000 173,000
B
RIDGE PROJECT IN BUTLER COUNTY ON (016B00002N) US-231 AT
W FK INDIAN CAMP CREEK
US-231Butler PL10031
DN 850,925 FBP
RW
UT
CN 5,672,835 FBP
Project Cost: 0 0 6,523,760
Page 21 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 340 OVER E PRONG
I
NDIAN CAMP CREE (016B00042N)
KY-340Butler PL10054
DN 133,805 FBP2
RW
UT
CN 892,032 FBP2
Project Cost: 0 1,025,837 0
B
ridge replacement over Panther CreekCR-1401Butler PL80329
DN 142,168 FBP2
RW
UT
CN 947,784 FBP2
Project Cost: 0 0 1,089,952
L
ane departure safety improvements on KY-79 between the KY-70
crossroads and the Grayson County line
KY-79Butler PL80406
DN 500,000 SPP
RW
UT
CN
Project Cost: 0 0 500,000
W
iden KY-70 to provide turning lanes at KY 1468 (Gardiner Lane) and
new industrial access road. Extend Industrial Drive to KY 70 for new
access to industrial park.
KY-70Butler PL80412
DN 250,000 SPP
RW
UT
CN
Project Cost:
0 250,000 0
T
otal for Butler county PL
Total Amounts:
CN
UT
RW
DN 383,805 1,493,093
1,224,032 6,966,619
0 1,607,837 8,459,712
Page 22 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY
L
INE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) (2024CCR)
US-641Caldwell PL187.6000
DN
RW
UT 2,080,000 STPF
CN 5,000,000 STPF
Project Cost: 0 2,080,000 5,000,000
B
RIDGE PROJECT IN CALDWELL COUNTY ON (017B00050N) KY-293
AT DONALDSON CREEK
KY-293Caldwell PL10063
DN 1,299,093 BRX
RW
UT
CN 8,660,621 BRX
Project Cost: 9,959,714 0 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 73.694 TO
MILEPOINT 77.994
I -69Caldwell PL22079
DN 1,290,000 NHPM
RW
UT
CN 12,850,000 NHPM
Project Cost: 0 0 14,140,000
E
XTEND 3 LANE SECTION OF KY 91 (MARION ROAD) FROM MP 12.9
TO BECKNER LANE (MP 13.4) (2024CCN)
KY-91Caldwell PL80308
DN 520,000 SPP
RW
UT
CN
Project Cost: 520,000 0 0
T
otal for Caldwell county PL
Total Amounts:
CN
UT
RW
DN 1,819,093 1,290,000
2,080,000
8,660,621 17,850,000
10,479,714 2,080,000 19,140,000
Page 23 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL
R
OAD. (SEE 1-120 FOR D, R, U FUNDING) (08CCN)(10CCR)(LET BY
CITY) (2022CCN) (2024CCR)
KY-2594,
K
Y-94,
PF-9999,
US-641
Calloway PL8502
DN
RW
UT
CN 10,800,000 HGC
Project Cost:
10,800,000 0 0
I
MPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121
(2020CCN)
CS-1047,
KY-748
Calloway PL8952
DN
RW
UT
CN 5,750,000 CRP
Project Cost:
0 0 5,750,000
W
idening of KY 121 from Lowes Drive to Country Club Lane, adding a
right-drop-lane and two-way-left-turn-lane to accommodate new
entrance to Calloway County High School
KY-121Calloway PL80411
DN 750,000 STP1
RW 400,000 STP1
UT 150,000 STP1
CN 1,200,000 STP1
Project Cost:
750,000 550,000 1,200,000
I
mprove existing alignment to accommodate addition of right drop lane
and two-way left turn lane for new entrances to proposed Murray
Elementary School.
KY-1550Calloway PL80412
DN 100,000 SPP
RW
UT
CN
Project Cost:
100,000 0 0
T
otal for Calloway county PL
Total Amounts:
CN
UT
RW
DN 850,000
400,000
150,000
10,800,000 6,950,000
11,650,000 550,000 6,950,000
Page 24 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Extend Pond Creek Road from US 27 to Persimmon Grove, KY 1121.
(
2024BOP)
PF-9999Campbell PL352.1000
DN
RW 13,200,000 CRP
UT 1,620,000 CRP
CN
Project Cost: 0 13,200,000 1,620,000
REPLACE 4TH STREET BRIDGE OVER THE LICKING RIVER BETWEEN
C
OVINGTON AND NEWPORT; BRIDGE NUMBER 059B00037N
KY-8C ampbell PL1086
DN
RW
UT
CN 27,042,195 35,520,000 BRO
29,770,000 FBP
Project Cost: 27,042,195 35,520,000 29,770,000
C
ONSTRUCT NEW I-471 SOUTHBOUND OFF-RAMP AT KY-8 (SEE
ALSO 6-183.00). (02CCN)(06CCN) (2020CCN)
I -471, KY-8Campbell PL8104
DN 4,340,000 NH
RW
UT
CN
Project Cost: 0 4,340,000 0
T
otal for Campbell county PL
Total Amounts:
CN
UT
RW
DN 4,340,000
13,200,000
1,620,000
27,042,195 35,520,000 29,770,000
27,042,195 53,060,000 31,390,000
CORRECT SUBSTANDARD ROADWAY GEOMETRICS ON US-62 FROM
K
Y 1181 TO KY 408 TO ADDRESS ACCESS ISSUES, SAFETY
CONCERNS, FLOOD PRONE AREA, AND REGIONAL CONNECTIVITY.
(2024CCN)
US-62C arlisle PL80302
DN 1,500,000 NH
RW
UT
CN
Project Cost: 1,500,000 0 0
Page 25 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY, MOBILITY, CONNECTIVITY, AND ADDRESS
G
EOMETRIC DEFICIENCIES ALONG US-62 BETWEEN HOBBS
ROAD/BOSWELL ROAD TO KY 307. (2024CCN)
US-62Carlisle PL80303
DN 1,000,000 NH
RW
UT
CN
Project Cost: 0 1,000,000 0
C
ORRECT SUBSTANDARD ROADWAY GEOMETRICS, TO IMPROVE
TRAFFIC FLOW, SAFETY AND ACCESS MANAGEMENT ISSUES FROM
KY 1377 TO TRUMAN CREEK BRIDGE IN BARDWELL. (2024CCN)
US-51Carlisle PL80323
DN 1,000,000 NH
RW
UT
CN
Project Cost:
1,000,000 0 0
T
otal for Carlisle county PL
Total Amounts:
CN
UT
RW
DN 2,500,000 1,000,000
2,500,000 1,000,000 0
B
RIDGE PROJECT IN CARROLL COUNTY ON (021B00043N) US-42 AT
KENTUCKY RIVER & CITY ST
US-42Carroll PL1084
DN
RW
UT 2,500,000 BRX
CN 28,645,178 BRX
Project Cost: 31,145,178 0 0
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 46.1205 TO
MILEPOINT 53.433
I -71Carroll PL20020
DN 2,840,000 NHPM
RW
UT
CN 28,400,000 NHPM
Project Cost: 31,240,000 0 0
Page 26 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-071 FROM MILEPOINT 38.808 TO
M
ILEPOINT 46.1205
I -71Carroll PL22101
DN 3,170,000 NHPM
RW
UT
CN 31,670,000 NHPM
Project Cost: 34,840,000 0 0
T
otal for Carroll county PL
Total Amounts:
CN
UT
RW
DN 6,010,000
2,500,000
88,715,178
97,225,178 0 0
C
arter County East Bound Rest Area Renovation located on I-64 at MP
174. (2024BOP)
I -64Carter PL3028
DN
RW
UT
CN 940,000 NH
Project Cost: 940,000 0 0
B
RIDGE PROJECT IN CARTER COUNTY ON (022C00044N) SMOKY
CREEK RD OVER SMOKEY CREEK
CR-1464Carter PL10081
DN 107,323 FBP2
RW
UT
CN 715,484 FBP2
Project Cost: 0 822,807 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 148.665 TO
MILEPOINT 150.16
I -64Carter PL22051
DN 430,000 NHPM
RW
UT
CN 4,310,000 NHPM
Project Cost: 0 0 4,740,000
Page 27 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-064 FROM MILEPOINT 150.16 TO
M
ILEPOINT 154.26
I -64Carter PL22052
DN 430,000 NHPM
RW
UT
CN 4,310,000 NHPM
Project Cost: 0 4,740,000 0
G
eometric improvements on KY 1025 from US 60 (MP 0.0),East of
Olive Hill extending North 0.30 miles providing access to West Carter
Middle and High Schools and facilities. Project will include bike/ped
facilities. (2022CCN)
KY-1025Carter PL80200
DN
RW
UT
CN 2,470,000 CRP
Project Cost:
0 0 2,470,000
I
mprove connectivity in Grayson between KY 1 (Carol Malone Blvd)
and KY 3297 (Midland Trail). (2024CCN)
PF-9999Carter PL80304
DN 810,000 SPP
RW
UT
CN
Project Cost: 0 810,000 0
T
otal for Carter county PL
Total Amounts:
CN
UT
RW
DN 1,347,323 430,000
940,000 5,025,484 6,780,000
940,000 6,372,807 7,210,000
IMPROVE SAFETY AND GEOMETRIC DEFICIENCIES ALONG US 127 AT
D
UNNVILLE (2022CCN)
PF-9999,
U
S-127
Casey PL164
DN
RW 1,880,000 NH
UT
CN
Project Cost: 0 1,880,000 0
Page 28 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)
(
16CCR)(18CCN) (2020CCR) (2024CCR)
KY-70Casey PL8703
DN
RW 3,420,000 SPP
UT
CN
Project Cost: 0 3,420,000 0
R
ECONSTRUCT BRUSH CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)
(16CCR)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-49Casey PL8704
DN
RW 1,000,000 SPP
UT
CN
Project Cost: 0 1,000,000 0
CONSTRUCT A NEW STORM DRAINING SYSTEM, CURB AND GUTTER
F
ROM BELDON AVENUE EASTWARD AND CONSTRUCT A NEW LEFT
TURN ONTO COLLEGE STREET.(12CCN)
(2024CCN)
KY-70C asey PL8706
DN 786,000 PROT
RW 1,660,000 PROT
UT
CN
Project Cost: 786,000 1,660,000 0
B
RIDGE PROJECT IN CASEY COUNTY ON (023B00084N) KY-910 AT
BRANCH- DRY FORK
KY-910Casey PL10048
DN 151,553 BRX
RW
UT
CN 1,010,356 BRX
Project Cost: 0 0 1,161,909
S
urface Sloan Fork Road (CR 1169) from Turkey Creek Road to Merritt
Ridge Road, approximately 1.937 miles. (Memorandum of Agreement
with Casey County to construct) (MP 1.939 to 3.876)
cr-1169Casey PL80414
DN
RW
UT
CN 350,000 SPP
Project Cost:
350,000 0 0
T
otal for Casey county PL
Total Amounts:
CN
UT
RW
DN 786,000 151,553
7,960,000
350,000 1,010,356
1,136,000 7,960,000 1,161,909
Page 29 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve capacity and mobility of the I-24/KY 115 interchange (Exit 89)
i
n Christian County, KY (2022BOP). (2024CCR)
I -24Christian PL10
DN
RW 1,500,000 NH
UT
CN
Project Cost: 1,500,000 0 0
BRIDGE IMPROVEMENTS ON KY 115 BETWEEN MP 2.8 AND MP 3.0 AT
E
XIT 89 OVER I-24 NEAR NEW BUC-EES DEVELOPMENT
KY-115C hristian PL10.1000
DN
RW
UT
CN 6,250,000 FBP
Project Cost: 6,250,000 0 0
C
ONSTRUCT NEW CONNECTOR FROM JUST SOUTH OF THE CSX
RAILROAD WEST OF PEMBROKE TO US 41 NEAR THE INDUSTRIAL
PARK. (D,R,U UNDER 2-381) (2024CCR)
PF-9999Christian PL381.2000
DN
RW
UT
CN 13,500,000 STP2
Project Cost:
13,500,000 0 0
I
MPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO
JUST SOUTH OF PEMBROKE (MP 9.625)(16CCN)(18CCN) (2022CCR)
(2024CCR)
KY-115Christian PL8953
DN
RW
UT
CN 7,700,000 STP2
Project Cost:
0 7,700,000 0
I
MPROVE AND WIDEN KY 115 FROM I-24 (MP 2.901) TO ANDERSON
ROAD (MP 687). (16CCN) (2022CCR) (2024CCR)
KY-115Christian PL8954
DN
RW
UT
CN 13,100,000 CRP
Project Cost: 0 0 13,100,000
Page 30 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CHRISTIAN COUNTY ON (024B00041N) KY-107
A
T DONALDSON CREEK
KY-107Christian PL10068
DN 245,217 BRX
RW
UT
CN 1,634,783 BRX
Project Cost: 0 0 1,880,000
B
RIDGE PROJECT IN CHRISTIAN COUNTY ON (024B00058N) KY-109
AT MCKNIGHTS CREEK
KY-109Christian PL10069
DN 237,593 BRX
RW
UT
CN 1,583,953 BRX
Project Cost: 0 0 1,821,546
A
DDRESS CONDITION OF I-024 NON-CARDINAL DIRECTION FROM
MILEPOINT 75 TO MILEPOINT 85.563
I -24Christian PL22014
DN 310,000 NHPM
RW
UT
CN
Project Cost: 0 0 310,000
T
otal for Christian county PL
Total Amounts:
CN
UT
RW
DN 792,810
1,500,000
19,750,000 7,700,000 16,318,736
21,250,000 7,700,000 17,111,546
N
EW CONSTRUCTION TO EXTEND VETERANS MEMORIAL PARKWAY
FROM IRVINE RD (KY89) TO BOONEWBORO RD (KY 627)
KY-1958Clark PL8401
DN
RW 9,000,000 NH
UT
CN
Project Cost: 0 9,000,000 0
Page 31 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
M
ILEPOINT 0 TO MILEPOINT 5.341
KY-9000Clark PL22154
DN 460,000 NHPM
RW
UT
CN 4,626,186 NHPM
Project Cost: 0 5,086,186 0
B
ridge Rehab/Replacement on Four Mile Road (CR 1205) at MP
2.15-2.16 over an Unnamed Tributary approx. 2.16 miles east along
the KY River from the town of Ford (025C00028N)
CR-1205Clark PL80359
DN 158,545 FBP2
RW
UT
CN 1,056,965 FBP2
Project Cost:
0 0 1,215,510
T
otal for Clark county PL
Total Amounts:
CN
UT
RW
DN 460,000 158,545
9,000,000
4,626,186 1,056,965
0 14,086,186 1,215,510
I
MPROVE US 421 FROM GOOSE CREEK BRIDGE (MP 15.4) TO CHOP
BOTTOM RD (MP 14.3) INCLUDING RECONSTRUCTION OF
HIGHWAY/RAIL GRADE CROSSING ON KY-1999 AT THE
INTERSECTION WITH US-421 AND KY-80 (2022CCN) (2024CCR)
US-421Clay PL8003.1000
DN
RW
UT
CN 14,000,000 CRP
Project Cost:
0 14,000,000 0
IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND,
I
NCLUDING INTERSECTIONS AT HAL ROGERS PARKWAY AND KY
687. (14CCN)(18CCN) (2020CCR)
CR-1286C lay PL8864
DN
RW
UT
CN 12,950,000 SPP
Project Cost: 12,950,000 0 0
Page 32 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CLAY COUNTY ON (026B00012N) US-421 AT
R
ICE BRANCH
US-421Clay PL10176
DN
RW 10,000 BRX
UT 10,000 BRX
CN 717,551 BRX
Project Cost: 0 0 737,551
B
RIDGE PROJECT IN CLAY COUNTY ON (026B00050N) KY-66 AT
JACKS CREEK
KY-66Clay PL10178
DN
RW 10,000 BRX
UT 10,000 BRX
CN 1,074,388 BRX
Project Cost: 0 0 1,094,388
B
RIDGE PROJECT IN CLAY COUNTY ON (026C00072N) CR-1155 AT
MILL CREEK
CR-1155Clay PL10185
DN
RW 5,000 FBP2
UT 10,000 FBP2
CN 410,400 FBP2
Project Cost: 0 425,400 0
B
RIDGE PROJECT IN CLAY COUNTY ON (026C00125N) CR-1150 AT
RED BIRD
CR-1150Clay PL10186
DN
RW
UT
CN 630,000 FBP2
Project Cost: 0 630,000 0
CONSTRUCT NEW CONNECTOR ROAD BETWEEN US 421 AT MP 17.51
TO
RAILROAD AVE. AT MP 0.1. THIS WILL REQUIRE APPROXIMATELY
300' OF NEW ROADWAY ALONG THE CONNECTOR, A 450' 3-LANE
BRIDGE, NEW RIGHT TURN LANE ON US 421 AND NEW TRAFFIC
SIGNALS AT PROPOSED INTERSECTION. THIS IS CONTINGENT ON
US-421C lay PL80251
DN 400,000 SPP
RW 410,000 SPP
UT 390,000 SPP
CN
Project Cost: 0 400,000 800,000
Page 33 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Preliminary Engineering and Environmental for Hal Rogers Parkway
I
mprovement (HRPI) corridor from London to Hazard (BMP 3.887 to
EMP 55.201) (IF-Potential RAISE GRANT) (2024CCN)
HR-9006Clay PL80352
DN 24,960,000 IF
RW
UT
CN
Project Cost: 0 24,960,000 0
I
nstall Guardrail on KY 1524 in Clay County (MP 9.45-12.3) (2024CCN)KY-1524Clay PL80356
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
M
artin Cemetery Rd Bridge over Red Bird River Replacement
026C00158N
CR-1082Clay PL80423
DN 100,000 FBP2
RW
UT 100,000 FBP2
CN 630,000 FBP2
Project Cost: 0 830,000 0
P
owder Horn Rd Bridge Replacement 026C00029NCR-1156Clay PL80425
DN 75,000 FBP2
RW 10,000 FBP2
UT
CN 400,000 FBP2
Project Cost: 0 485,000 0
T
otal for Clay county PL
Total Amounts:
CN
UT
RW
DN 25,535,000
15,000 430,000
110,000 410,000
13,040,000 16,070,400 1,791,939
13,040,000 41,730,400 2,631,939
Page 34 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RELOCATION OF US 127 FROM KY 90 INTERSECTION TO AARON
R
IDGE ROAD (MP 11.7 TO MP 16.315) (2022CCN) (2024CCR)
US-127Clinton PL8600
DN
RW 5,800,000 NH
UT 3,510,000 NH
CN
Project Cost: 5,800,000 0 3,510,000
RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND
O
LD US-127 INTERSECTION, EXTENDING NORTHERLY TO NORTH OF
THE KY-3063 AND OLD US-127 INTERSECTION. (SEE 8-108 AND
8-115 FOR PE&ENV)(12CCR) (2020CCR) (2022CCR) (2024CCR)
US-127C linton PL8601.3000
DN
RW
UT
CN 19,150,000 NH
Project Cost: 0 0 19,150,000
T
otal for Clinton county PL
Total Amounts:
CN
UT
RW
DN
5,800,000
3,510,000
19,150,000
5,800,000 0 22,660,000
O
PERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2027
THROUGH FY 2032 USING AUDITED COSTS AS THE BASIS.(12CCR)
(2020CCR) (2022CCR) (2024CCR). This is Kentucky's share of the
annual costs, total cost shared with Illinois.
KY-91Crittenden PL326.1700
DN
RW
UT
CN 831,000 831,000 SPP
Project Cost:
0 831,000 831,000
R
econstruct and elevate a 0.12 mile section of KY 295 above the
floodplain from M.P. 1.038 to M.P. 1.605 just south of Dycusburg
(2022CCN)
KY-295Crittenden PL80201
DN
RW 180,000 SPP
UT 120,000 SPP
CN
Project Cost:
0 300,000 0
Page 35 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety, truck mobility, and access at the Intersection of US-60
a
nd US-641/E Gum St.
US-60Crittenden PL80400
DN 300,000 STP2
RW 300,000 STP2
UT 150,000 STP2
CN
Project Cost: 300,000 450,000 0
I
mprove safety and substandard geometrics in curves along US-60
near Rosebud Church Road
US-60Crittenden PL80401
DN 250,000 STP2
RW
UT
CN
Project Cost: 250,000 0 0
T
otal for Crittenden county PL
Total Amounts:
CN
UT
RW
DN 550,000
480,000
270,000
831,000 831,000
550,000 1,581,000 831,000
ADDRESS CONDITION OF KY-61 FROM MILEPOINT 12.9 TO MILEPOINT
1
3.6
KY-61C umberland PL20021
DN 272,000 STP5
RW
UT
CN 3,128,000 STP5
Project Cost: 0 3,400,000 0
T
otal for Cumberland county PL
Total Amounts:
CN
UT
RW
DN 272,000
3,128,000
0 3,400,000 0
Page 36 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND
K
Y 298. (12CCR) (16CCR)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-298Daviess PL229
DN
RW
UT
CN 3,050,000 STP1
Project Cost: 3,050,000 0 0
IMPROVE KY-54 FROM KY 1456 (THRUSTON-DERMONT RD) TO
C
OUNTRYSIDE DRIVE; DESIGN UNDER PARENT 2-8300.00. (2018BOP)
(2022CCR) (2024CCR)
KY-54D aviess PL8300.3000
DN
RW
UT
CN 5,030,000 NH
Project Cost: 0 5,030,000 0
I
MPROVE KY-54 FROM COUNTRYSIDE DRIVE TO JACK HINTON RD.
DESIGN UNDER PARENT 2-8300.00. (2018BOP) (2022CCR) (2024CCR)
KY-54Daviess PL8300.4000
DN
RW 5,750,000 STP1
UT
CN
Project Cost: 0 5,750,000 0
A
DDRESS SUBSTANDARD ROADWAY GEOMETRICS AND SAFETY
CONCERNS ON KY 1456 FROM KY 54 TO HAYDEN ROAD. MP 2.778
TO 4.714 (SEE 2-8709.00)(14CCN)(16CCR) (2022CCN)
KY-1456Daviess PL8801
DN
RW 4,400,000 STP1
UT
CN
Project Cost:
0 4,400,000 0
I
MPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-3143Daviess PL8854
DN
RW
UT
CN 11,300,000 STP1
Project Cost: 0 11,300,000 0
Page 37 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO
R
IVER. JOINT PROJECT WITH INDIANA. (030B00118N)(BSBP)
KY-2262Daviess PL10020
DN 1,500,000 BRX
RW
UT
CN 10,000,000 BRX
Project Cost: 0 0 11,500,000
O
LD HARTFORD RD - WIDEN TO IMPROVE TRAFFIC FLOW AND
SAFETY. PROJECT BEGINS AT HARRIET LN (CR 1120H) AND ENDS
AT BURLEW BLVD (KY 1432). (2024CCN)
KY-298Daviess PL80301
DN 1,290,000 STP1
RW
UT
CN
Project Cost:
0 1,290,000 0
R
ECONSTRUCT GOETZ DR FROM SOUTHTOWN BLVD (KY 2121) TO
FREDERICA ST (US 431). INSTALL TURN LANES AS NEEDED.
(2024CCN)
KY-2699Daviess PL80302
DN 490,000 SPP
RW 600,000 SPP
UT
CN
Project Cost:
490,000 600,000 0
A
dd dual left turn lanes from KY 331 westbound onto US 60
eastbound (BMP 0.108 to EMP 0.0) as well as dual receiving lanes on
US 60 eastbound. (BMP 10.287 to EMP 10.179)
US-60Daviess PL80410
DN 400,000 NH
RW
UT 300,000 NH
CN 1,700,000 NH
Project Cost:
0 400,000 2,000,000
C
onstruct an additional southbound lane on Carter Road (CS 1100)
from McFarland Avenue to Parrish Avenue.
CS-1100Daviess PL80411
DN 600,000 SPP
RW 800,000 SPP
UT 500,000 SPP
CN 850,000 SPP
Project Cost: 0 600,000 2,150,000
Page 38 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct new exchange on I-165 between MP 59.5 and 68.5.I -165Daviess PL80414
DN 2,000,000 STPF
RW
UT
CN
Project Cost: 0 2,000,000 0
U
pgrade Audubon Parkway to interstate standards for conversion to
I-169.
AU-9005Daviess PL80415
DN 1,000,000 NH
RW
UT
CN
Project Cost: 1,000,000 0 0
T
otal for Daviess county PL
Total Amounts:
CN
UT
RW
DN 1,490,000 4,290,000 1,500,000
10,750,000 800,000
800,000
3,050,000 16,330,000 12,550,000
4,540,000 31,370,000 15,650,000
RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER
B
RIDGE AT BROWNSVILLE TO 0.42 MILE NORTH OF THE
KY-70/KY-259 INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CCR)
(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-259,
K
Y-70
Edmonson PL7030.1000
DN
RW
UT
CN 1,240,000 STP2
Project Cost: 0 1,240,000 0
R
ECONSTRUCTION AND REALIGNMENT OF KY 259 FROM MP 12.096
TO 15.633/ (2024CCN)
KY-259Edmonson PL80317
DN 1,300,000 SPP
RW
UT
CN
Project Cost: 0 1,300,000 0
Page 39 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Minor widening of Blackgold Road to provide secondary access to
n
ew Kyrock school
CR-1308Edmonson PL80409
DN 300,000 SPP
RW 250,000 SPP
UT 600,000 SPP
CN 500,000 SPP
Project Cost: 0 550,000 1,100,000
T
otal for Edmonson county PL
Total Amounts:
CN
UT
RW
DN 1,600,000
250,000
600,000
1,240,000 500,000
0 3,090,000 1,100,000
IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO
K
Y-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)
(10CCR)(12CCR)(14CCR)(16CCR)(18CCR) (2020CCR)
KY-32E lliott PL192.0100
DN
RW
UT
CN 20,000,000 STP2
Project Cost: 0 0 20,000,000
K
Y-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.
(14CCN)(16CCR)(18CCN)(2020CCR) (2022CCR)
KY-32Elliott PL8802
DN
RW
UT
CN 7,930,000 STP2
Project Cost: 7,930,000 0 0
T
otal for Elliott county PL
Total Amounts:
CN
UT
RW
DN
7,930,000 20,000,000
7,930,000 0 20,000,000
Page 40 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-499 IN ESTILL COUNTYK Y-499Estill PL4315
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
C
onstruct a walkway across the Kentucky River along KY 52 in Irvine.
(2024CCN)
KY-52Estill PL80300
DN
RW
UT
CN 2,310,000 SPP
Project Cost: 2,310,000 0 0
T
otal for Estill county PL
Total Amounts:
CN
UT
RW
DN
2,330,000
2,330,000 0 0
L
exington-Georgetown; Reconstruct/Widen US 25 from Spurr Road to
Kearney Road. (Section 1) (2024CCR)
US-25Fayette PL122.2000
DN
RW
UT
CN 5,000,000 STPF
Project Cost: 0 0 5,000,000
L
exington-Georgetown; Reconstruct/Widen US 25 from Kearney Road
to Ironworks Road. (Section 2) (2022CCR) (2024CCR)
US-25Fayette PL122.3000
DN
RW
UT
CN 36,225,000 HGC
Project Cost: 0 36,225,000 0
Page 41 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON
U
RBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2026
THROUGH FY 2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2024CCR)
CO-0F ayette PL227.1400
DN
RW
UT
CN 7,800,000 7,800,000 7,800,000 SLX
Project Cost: 7,800,000 7,800,000 7,800,000
CONSTRUCT CITATION BOULEVARD FROM RUSSELL CAVE ROAD TO
N
EWTOWN PIKE. (2024CCR)
CO-0F ayette PL265
DN
RW
UT
CN 4,060,000 STPF
Project Cost: 0 4,060,000 0
O
PERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2027
THROUGH FY 2032. (12CCR)(18CCR) (2020CCR) (2024CCR)
KY-169,
PF-9999
Fayette PL357.1700
DN
RW
UT
CN 540,000 540,000 SPP
Project Cost: 0 540,000 540,000
R
EPLACE RJ CORMAN RAILROAD BRIDGE OVERPASS (MP 8.378)
IMPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH
BROADWAY) (12CCR)(14CCR)(16CCR)(18CCN)(2020CCR)(2022CCR)
(2024CCR)
US-27Fayette PL412
DN
RW
UT
CN 6,000,000 NH
Project Cost:
0 0 6,000,000
REPLACE RJ CORMAN RAILROAD BRIDGE OVERPASS (MP 8.378),
I
MPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH
BROADWAY)(12CCR)(14CCR)(16CCR)(18CCN) (2020CCR)
(2022CCR)(FEDERAL RAISE GRANT FUNDING COMPONENT)(SEE ITEM
NO. 7-412.00 FOR NH COMPONENT)
US-27F ayette PL412.1000
DN
RW
UT
CN 8,120,000 KYD
Project Cost: 8,120,000 0 0
Page 42 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reduce congestion on KY 4 from Trade Center to Railroad Bridge
N
orth of Palumbo Drive
KY-4Fayette PL438.1000
DN
RW 6,820,000 NH
UT
CN
Project Cost: 0 6,820,000 0
N
EW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION
FROM US-68 (HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE
SEGMENTS 2A & 2B IN AUGUST, 1998 ADVANCE PLANNING STUDY.
(2024CCR)
KY-4Fayette PL439
DN 2,480,000 NH
RW
UT
CN
Project Cost:
0 0 2,480,000
S
AFETY IMPROVEMENTS TO NEW CIRCLE ROAD BETWEEN
BOARDWALK AND BRYAN STATION ROAD. - STATE FUNDED
COMPONENT OF FEDERAL GRANT RECEIVED IN LATE 2023.
(2024CCR)
KY-4Fayette PL462
DN
RW
UT 690,000 KYD
CN 3,980,000 HGC
Project Cost:
0 690,000 3,980,000
I
mprove the Red Mile Corridor between South Broadway and
Versailles Road.
CS-4702Fayette PL475
DN
RW
UT
CN 13,500,000 CRP
Project Cost: 0 0 13,500,000
I
MPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW
CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE
ROAD. (16CCN)(18CCR) (2020CCR) (2022CCR) (2024CCR)
KY-1927Fayette PL8902
DN
RW
UT
CN 6,600,000 STPF
Project Cost:
0 0 6,600,000
Page 43 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REDUCE CONGESTION ON I-64/I-75 FROM NORTHERN SPLIT TO
N
EWTOWN PIKE (MP 115.200 – 117.665). SECTION 1 (2024CCR)
I -75Fayette PL8909.1000
DN
RW
UT 30,000 NH
CN 7,500,000 NH
Project Cost: 30,000 0 7,500,000
R
EPLACE EXISTING I-75 SOUTHBOUND BRIDGE (034B00085N) AND
APPROACHES TO REDUCE CONGESTION ON I-64/I-75 FROM
NORTHERN SPLIT TO NEWTOWN PIKE (MP 118.0 TO MP 116.8).
SECTION 1 PRIORITY CONSTRUCTION SECTION.
I -75Fayette PL8909.1500
DN
RW
UT
CN 15,000,000 NH
Project Cost:
0 15,000,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON S 75 NC OVER N
BROADWAY & N LIMESTONE (034B00083L and 034B00083R)
I -75Fayette PL10076
DN 548,856 BRX
RW
UT
CN 3,659,040 BRX
Project Cost: 0 0 4,207,896
ADDRESS CONDITION OF I-064 FROM MILEPOINT 71 (74.3 CARDINAL)
TO
MILEPOINT 74.729
I -64F ayette PL20050
DN 180,000 STP5
RW
UT
CN 1,801,000 STP5
Project Cost: 0 1,981,000 0
A
DDRESS CONGESTION AND IMPROVE SAFETY ON US 60 FROM
MILEPOINT 12.41 TO MILEPOINT 16.37 BY WIDENING AND
MODERNIZING US 60 FROM THE END OF THE FOUR-LANE SECTION
NEAR POLO CLUB BLVD TO KY 859 (HALEY RD). (2020CCN)
(2022CCR) (2024CCR)
US-60Fayette PL80150
DN
RW 1,610,000 STPF
UT 1,530,000 STPF
CN
Project Cost:
1,610,000 1,530,000 0
Page 44 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address congestion and improve safety on US 60 (Winchester Rd)
a
nd Man O' War Blvd (KY 1425 & CS 4524) creating an alternative
route between Sir Barton Way (CS 2636) and Polo Club Blvd (CS
2548) (2022CCN). (State to provide design funding only, city to provide
right of way, utilities, and construction through a Transportation
CO-0Fayette PL80206
DN 2,515,000 SPP
RW
UT
CN
Project Cost:
0 2,515,000 0
M
odernize roadway, improve multi-mobility, and include safety and
capacity improvements at intersections on US 60 (Versailles Road)
from Viley Road to west end of Norfolk Southern railroad bridge.
Breakout Section of US 60 from Viley Road to Oxford Circle
(2024CCN)
US-60Fayette PL80306
DN
RW 2,210,000 NH
UT 820,000 NH
CN
Project Cost:
0 2,210,000 820,000
T
otal for Fayette county PL
Total Amounts:
CN
UT
RW
DN 2,695,000 3,028,856
1,610,000 9,030,000
30,000 2,220,000 820,000
15,920,000 65,426,000 54,579,040
17,560,000 79,371,000 58,427,896
W
IDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN
FLEMING CO. (16CCN)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-801Fleming PL8915
DN
RW
UT
CN 6,000,000 STP2
Project Cost: 0 6,000,000 0
B
RIDGE PROJECT IN FLEMING COUNTY ON (035B00004N) KY-597 AT
INDIAN CREEK
KY-597Fleming PL10083
DN 140,251 BRZ
RW
UT
CN 935,008 BRZ
Project Cost: 0 1,075,259 0
Page 45 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Fleming county P L
Total Amounts:
CN
UT
RW
DN 140,251
6,935,008
0 7,075,259 0
S
POT IMPROVEMENTS ON KY 979, BEGINNING 0.14 MI WEST OF
NEWMAN’S BRANCH ROAD TO THE JOHN M. STUMBO SCHOOL.
(SECTION 1)
KY-979Floyd PL195.1000
DN
RW
UT
CN 6,140,000 HGC
Project Cost: 6,140,000 0 0
SPOT IMPROVEMENTS ON KY 979 FROM BRANHAM’S CREEK TO 0.14
MIL WEST OF NEWSOME BRANCH ROAD. (SECTION 2)
KY-979Fl oyd PL195.2000
DN
RW
UT
CN 7,080,000 HGC
Project Cost: 7,080,000 0 0
I
NSTALL GUARDRAIL ON KY-1929 IN FLOYD COUNTYKY-1929Floyd PL4336
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-404 IN FLOYD COUNTYKY-404Floyd PL4355
DN
RW
UT
CN 130,000 GR
Project Cost: 130,000 0 0
Page 46 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-404 IN FLOYD COUNTYK Y-404Floyd PL4356
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-3385 IN FLOYD COUNTYKY-3385Floyd PL4387
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-680 IN FLOYD COUNTYKY-680Floyd PL4390
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-1100 IN FLOYD COUNTYKY-1100Floyd PL4423
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
I
NSTALL GUARDRAIL ON KY-1100 IN FLOYD COUNTYKY-1100Floyd PL4424
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
Page 47 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1428 IN FLOYD COUNTYK Y-1428Floyd PL4425
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-1428 IN FLOYD COUNTYKY-1428Floyd PL4426
DN
RW
UT
CN 9,000 GR
Project Cost: 9,000 0 0
I
NSTALL GUARDRAIL ON KY-3384 IN FLOYD COUNTYKY-3384Floyd PL4429
DN
RW
UT
CN 6,000 GR
Project Cost: 6,000 0 0
I
NSTALL GUARDRAIL ON KY-550 IN FLOYD COUNTYKY-550Floyd PL4430
DN
RW
UT
CN 88,000 GR
Project Cost: 88,000 0 0
I
NSTALL GUARDRAIL ON KY-777 IN FLOYD COUNTYKY-777Floyd PL4431
DN
RW
UT
CN 99,000 GR
Project Cost: 99,000 0 0
Page 48 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-850 IN FLOYD COUNTYK Y-850Floyd PL4432
DN
RW
UT
CN 49,000 GR
Project Cost: 49,000 0 0
I
NSTALL GUARDRAIL ON KY-1498 IN FLOYD COUNTYKY-1498Floyd PL4472
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
B
RIDGE PROJECT IN FLOYD COUNTY ON (036C00074N) MARTHA'S
VINEYARD AT BULL CREEK
CR-1655Floyd PL10098
DN
RW 35,000 BRZ
UT 300,000 BRZ
CN
Project Cost: 335,000 0 0
T
otal for Floyd county PL
Total Amounts:
CN
UT
RW
DN
35,000
300,000
14,061,000
14,396,000 0 0
B
RIDGE PROJECT IN FRANKLIN COUNTY ON (037B00074N) KY 676
(E-W CONN) AT KENTUCKY RIVER & KY 1263
KY-676Franklin PL10045
DN
RW 70,000 FBP
UT 90,000 FBP
CN 18,000,000 FBP
Project Cost: 0 160,000 18,000,000
Page 49 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF "SINGING" BRIDGE ON US 60X OVER
K
ENTUCKY RIVER (037B00065N)
US-60Franklin PL10139
DN
RW 1,050,000 STP1
UT 3,120,000 STP1
CN 8,000,000 STP1
Project Cost: 1,050,000 3,120,000 8,000,000
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 57.811 TO
MILEPOINT 59.431
I -64Franklin PL22032
DN 970,000 NHPM
RW
UT
CN 9,700,000 NHPM
Project Cost: 0 10,670,000 0
I
MPROVE SAFETY AND TRAFFIC FLOW ON US 60 (VERSAILLES
ROAD) FROM US 460 TO I-64 IN FRANKFORT. (2024CCN)
US-60Franklin PL80301
DN 730,000 NH
RW
UT
CN
Project Cost: 0 730,000 0
T
otal for Franklin county PL
Total Amounts:
CN
UT
RW
DN 1,700,000
1,050,000 70,000
3,210,000
9,700,000 26,000,000
1,050,000 14,680,000 26,000,000
IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE
L
INE TO SOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDOR
IMPROVEMENT) (2022CCR)
JC-9003F ulton PL25
DN
RW
UT 1,120,000 NH
CN 6,000,000 NH
Project Cost: 1,120,000 6,000,000 0
Page 50 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2027
T
HROUGH FY 2032. (12CCR) (2020CCR) (2024CCR)
KY-1354F ulton PL320.1700
DN
RW
UT
CN 144,000 144,000 SPP
Project Cost: 0 144,000 144,000
C
ORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND
FREIGHT ACCESS ISSUES FROM KY 166 TO KY 1099 IN HICKMAN.
(2024CCN)
KY-125Fulton PL80310
DN 1,560,000 SPP
RW
UT
CN
Project Cost: 1,560,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES
A
ND FREIGHT ACCESS AT INTERSECTION WITH KY 94 SOUTHWEST.
(2024CCN)
KY-94F ulton PL80319
DN 300,000 SPP
RW
UT
CN
Project Cost: 0 300,000 0
C
ORRECT SUBSTANDARD INTERSECTION GEOMETRICS AND
ADDRESS ACCESS ISSUES AT KY 309 & KY 1099 IN HICKMAN TO
IMPROVE THE LESS THAN ADEQUATE TRUCK TURNING RADIUS.
(2024CCN)
KY-1099Fulton PL80324
DN 750,000 SPP
RW
UT
CN
Project Cost:
750,000 0 0
W
idening and resurfacing of Mengel Exn. road from intersection with
KY 1354 and extending west 0.300 miles (Memorandum of Agreement
with Fulton County to Construct)
CR-1312Fulton PL80417
DN 20,000 SPP
RW
UT
CN 150,000 SPP
Project Cost:
0 170,000 0
T
otal for Fulton county PL
Total Amounts:
CN
UT
RW
DN 2,310,000 320,000
1,120,000
6,294,000 144,000
3,430,000 6,614,000 144,000
Page 51 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN)
(
18CCR) (2024CCR)
I -71Gallatin PL8910
DN
RW
UT
CN 10,000,000 NH
Project Cost: 0 10,000,000 0
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 56.673 TO
MILEPOINT 59.94
I -71Gallatin PL22104
DN 480,000 STP4
RW
UT
CN 4,820,000 STP4
Project Cost: 5,300,000 0 0
R
econstruct I-71 from the end of the 6-lane typical section to Little
Sugar Road Overpass
I-71Gallatin PL80402
DN 4,000,000 NH
RW
UT
CN
Project Cost: 4,000,000 0 0
T
otal for Gallatin county PL
Total Amounts:
CN
UT
RW
DN 4,480,000
4,820,000 10,000,000
9,300,000 10,000,000 0
I
MPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34.
(2006BOPC) (16CCN)(18CCR) (2020CCR) (2024CCR)
US-27Garrard PL196.3000
DN
RW 9,350,000 NH
UT 5,520,000 NH
CN
Project Cost: 9,350,000 5,520,000 0
Page 52 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
West Lancaster Bypass from North of Lancaster to Bell Street at
S
tanford, KY. (2024CCR)
CO-0Garrard PL196.5000
DN
RW 12,740,000 NH
UT 1,300,000 NH
CN
Project Cost: 12,740,000 1,300,000 0
S
afety improvements to address right turn movements out of Chenault
Bridge onto Lexington Road (2024CCN)
KY-34Garrard PL80326
DN
RW
UT 50,000 CRP
CN 325,000 CRP
Project Cost: 0 0 375,000
I
mprove safety on KY 52 from Boone Creek Road to KY 1150 in
Garrard County
KY-52Garrard PL80409
DN 1,500,000 SPP
RW
UT
CN
Project Cost: 1,500,000 0 0
I
mprove safety on KY 52 from KY 590 in Boyle County to Martin Lane
in Garrard County.
KY-52Garrard PL80410
DN 2,000,000 SPP
RW
UT
CN
Project Cost: 2,000,000 0 0
T
otal for Garrard county PL
Total Amounts:
CN
UT
RW
DN 3,500,000
22,090,000
6,820,000 50,000
325,000
25,590,000 6,820,000 375,000
Page 53 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Update US 25 from KY 2842 to south intersection of KY 491.
(
2024BOP)
US-25Grant PL80216.1000
DN
R
W 1,470,000 SPP
UT
CN
Project Cost: 0 1,470,000 0
T
otal for Grant county PL
Total Amounts:
CN
UT
RW
DN
1,470,000
0 1,470,000 0
R
ebuild Downtown Mayfield, KY from 2021 Tornado Devastation
(Allocated KYD USDOT RAISE Grant Funding project) (See Zvarious
99-8600 SPP Western KY December 2021 Tornado Relief Funding Pool
for uncovered FEMA or Insurance for reconstruction of existing
roads.)
CO-0Graves PL220
DN
RW
UT 4,300,000 KYD
CN 27,200,000 KYD
Project Cost:
4,300,000 27,200,000 0
ADDRESS DEFICIENCIES OF BRIDGE ON KY 2422 OVER BR OF OBION
C
REEK (042B00232N)
KY-2422G raves PL10260
DN 221,285 BRZ
RW
UT
CN 1,475,232 BRZ
Project Cost: 0 1,696,517 0
W
IDEN KY 303 FROM MP 16.034 (EAST FARTHING ST) TO MP 16.807
(CHARLES DR) (2020CCN) (2022CCR) (2024CCR)
KY-303Graves PL80103
DN
RW
UT 2,700,000 SPP
CN
Project Cost: 0 2,700,000 0
Page 54 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Upgrade/Widen KY 121 bypass in Mayfield to four lanes. (2022CCN)
(
2024CCR)
KY-121Graves PL80202
DN 600,000 SPP
RW
UT
CN
Project Cost: 600,000 0 0
T
otal for Graves county PL
Total Amounts:
CN
UT
RW
DN 600,000 221,285
4,300,000 2,700,000
28,675,232
4,900,000 31,596,517 0
I
MPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY224.
CONSTRUCTION SEGMENT 2. (2024CCR)
US-62Grayson PL8502.2000
DN
RW
UT
CN 9,720,000 CRP
Project Cost: 0 0 9,720,000
B
RIDGE PROJECT IN GRAYSON COUNTY ON (043B00053N) KY-79 AT
ROUGH RIVER LAKE
KY-79Grayson PL10048
DN 310,073 FBP
RW
UT
CN 2,067,154 FBP
Project Cost: 2,377,227 0 0
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 106.08 TO MILEPOINT 108
WK-9001Grayson PL22167
DN 360,000 NHPM
RW
UT
CN 3,640,000 NHPM
Project Cost: 0 0 4,000,000
Page 55 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE INTERSECTIONS ALONG THE LEITCHFIELD BYPASS AT KY
1
214, US 62, AND KY 920. (2024CCN)
KY-3155Grayson PL80311
DN 500,000 SPP
RW
UT
CN
Project Cost: 0 500,000 0
R
eplace bridge 043B00036N on US 62 over Caney Creek to achieve
widening
US-62Grayson PL80406
DN 250,000 FBP2
RW 20,000 FBP2
UT 120,000 FBP2
CN 2,400,000 FBP2
Project Cost: 250,000 140,000 2,400,000
T
otal for Grayson county PL
Total Amounts:
CN
UT
RW
DN 560,073 500,000 360,000
20,000
120,000
2,067,154 15,760,000
2,627,227 640,000 16,120,000
C
onstruction of new connector on the east side of Greensburg
beginning at KY 3535 and extending to Taylor Cox Road (Design under
4-398)
KY-3535Green PL398.1000
DN
RW 4,000,000 STPF
UT 3,000,000 STPF
CN
Project Cost:
0 4,000,000 3,000,000
I
NSTALL GUARDRAIL ON KY-61 IN GREEN COUNTYKY-61Green PL4316
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
Page 56 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK
B
RIDGE TO JUST NORTH OF KY323. (12CCN)(14CCR)(16CCR)
(2020CCR) (2022CCR) (2024CCR)
KY-61Green PL8712
DN
RW
UT
CN 8,640,000 STPF
Project Cost: 8,640,000 0 0
A
DDRESS SAFETY ON KY 210 FROM MORNINGSTAR ROAD (LARUE
MP14.23) TO JUST EAST OF CORINTH CHURCH (TAYLOR MP0.60)
(2024CCN)
KY-210Green PL
80154.2000
DN
R
W 3,150,000 STPF
UT 3,240,000 STPF
CN
Project Cost: 0 3,150,000 3,240,000
I
mprove safety by reconstruction and widening bridge ID 044B00008N
on KY 61 over Clover Lick Creek at MP 6.03, approximately 2.2 miles
south of intersection with US 68.
KY-61Green PL80358
DN 148,265 FBP
RW
UT
CN 988,437 FBP
Project Cost:
0 0 1,136,702
T
otal for Green county PL
Total Amounts:
CN
UT
RW
DN 148,265
7,150,000
6,240,000
8,730,000 988,437
8,730,000 7,150,000 7,376,702
I
mprove KY 207 from the intersection with KY 67 (MP 11) to MP 15
(Design under 9-8509)
KY-207Greenup PL8509.1000
DN
RW 8,000,000 STPF
UT
CN
Project Cost: 0 8,000,000 0
Page 57 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 8S OVER OHIO RV,CSX
R
R,CO Rd, (045B00064N)
KY-8Greenup PL10109
DN 528,000 BRX
RW
UT
CN 5,280,000 BRX
Project Cost: 0 0 5,808,000
T
otal for Greenup county PL
Total Amounts:
CN
UT
RW
DN 528,000
8,000,000
5,280,000
0 8,000,000 5,808,000
I
MPROVE CONNECTION BETWEEN US-60 AND CANNELTON BRIDGE
APPROACH AT HAWESVILLE.
KY-69,
PF-9999
Hancock PL197
DN
RW
UT
CN 7,500,000 CRP
Project Cost:
0 0 7,500,000
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 69 OVER OHIO RIVER
(046B00043N)
KY-69Hancock PL10147
DN 125,000 FBP
RW
UT
CN 750,000 FBP
Project Cost: 0 875,000 0
W
IDEN US-60 FROM MILE 2.2 IN LEWISPORT TO KY-1957. (2024CCN)US-60Hancock PL80306
DN
RW 250,000 NH
UT 1,000,000 NH
CN
Project Cost: 0 250,000 1,000,000
Page 58 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address safety and condition concerns of KY-69 near Tick Ridge Rd.K Y-69Hancock PL80407
DN 300,000 SPP
RW
UT
CN
Project Cost: 0 0 300,000
T
otal for Hancock county PL
Total Amounts:
CN
UT
RW
DN 125,000 300,000
250,000
1,000,000
750,000 7,500,000
0 1,125,000 8,800,000
ADDRESS CONGESTION, SAFETY, AND MOBILITY ALONG US 31W
F
ROM VETERANS WAY IN ELIZABETHTOWN TO THE NORTH WILSON
ROAD OVERPASS IN RADCLIFF. (2018BOP) (2022CCR) (2024CCR)
US-31H ardin PL154.3000
DN 2,500,000 NH
RW
UT
CN
Project Cost: 2,500,000 0 0
EXTEND RING ROAD FROM THE WESTERN KENTUCKY PARKWAY TO
I
-65. (REQUIRES RELOCATION OF I-65 SOUTHBOUND COMMERCIAL
VEHICLE MONITORING STATION, PROJECT 4-286.10) (12CCR)(14CCR)
(2020CCN) (2022CCR) (2024CCR)
PF-9999H ardin PL198
DN
RW 6,100,000 STP2
UT
CN
Project Cost: 0 0 6,100,000
R
emoval of two at-grade CSX Railroad Crossings on Quarry Road
(CS-1518) near US31W, and the construction of a single separated
grade crossing, in the City of Upton in Hardin County. (2024CCR)
US-31Hardin PL201
DN
RW 790,000 RRS
UT 710,000 RRS
CN 5,300,000 RRS
Project Cost: 790,000 710,000 5,300,000
Page 59 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A BYPASS OF GLENDALE. (2022BOP) (2024CCN)P F-9999Hardin PL202
DN
RW 6,400,000 STP2
UT
CN
Project Cost: 0 6,400,000 0
C
ollege Street Road and US 62 Safety Improvements Project with
USDOT SS4A Grant and $800,000 state matching funds.
CO-0Hardin PL204
DN
RW
UT
CN 7,000,000 KYD
800,000 SPP
Project Cost: 7,800,000 0 0
I
-65 SOUTHBOUND PORT OF ENTRY FOR A COMMERCIAL VEHICLE
MONITORING STATION. (2022CCR)
I -65Hardin PL286.1000
DN
RW
UT
CN 7,500,000 NH
Project Cost: 0 0 7,500,000
B
RIDGE PROJECT IN HARDIN COUNTY ON (047B00060N) KY-86 AT
VERTRESS CREEK
KY-86Hardin PL10054
DN 270,484 BRX
RW
UT
CN 1,803,229 BRX
Project Cost: 0 0 2,073,713
EXTEND COMMERCE DRIVE FROM SPRINGFIELD ROAD TO US 31W AT
K
Y 1136 ON THE SOUTH SIDE OF ELIZABETHTOWN. (2024CCN)
PF-9999H ardin PL80303
DN
RW 2,890,000 SPP
UT
CN
Project Cost: 0 2,890,000 0
Page 60 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Replace Meeting Creek Bridge (047C00063N) over P&L Railway ( MP
4
.050 -4.070).
CR-1292Hardin PL80351
DN 182,201 FBP
RW
UT
CN 1,214,676 FBP
Project Cost: 0 1,396,877 0
T
otal for Hardin county PL
Total Amounts:
CN
UT
RW
DN 2,500,000 182,201 270,484
790,000 9,290,000 6,100,000
710,000
7,800,000 1,214,676 14,603,229
11,090,000 11,396,877 20,973,713
I
NSTALL GUARDRAIL ON KY-987 IN HARLAN COUNTY (2024CCR)KY-987Harlan PL4370
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-987 IN HARLAN COUNTY (2024CCR)KY-987Harlan PL4371
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
B
RIDGE PROJECT IN HARLAN COUNTY ON (048B00179N) KY-2007
AT WALLINS CREEK
KY-2007Harlan PL10015
DN 144,955 BRX
RW
UT
CN 966,368 BRX
Project Cost: 1,111,323 0 0
Page 61 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KENTUCKY AV OVER
M
ARTINS FK CUMBERLAND RV (048C00067N)
CS-1041Harlan PL10018
DN 1,019,992 BRZ
RW
UT
CN 6,799,950 BRZ
Project Cost: 7,819,942 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 38 OVER Fanny Wynn
Branch (048B00197N)
KY-38Harlan PL10233
DN
RW
UT
CN 776,000 BRX
Project Cost: 0 776,000 0
S
POT IMPROVEMENTS TO IMPROVE GEOMETRICS AT PARTICULAR
LOCATIONS OF US 421 CROSSING OVER PINE MOUNTAIN BETWEEN
US 119 AND KY 221 IN HARLAN COUNTY TO ADDRESS SAFETY
CONCERNS. MILEPOINT 17.2 TO MILEPOINT 23.0 (2022CCN)
US-421Harlan PL80259
DN
RW 750,000 SPP
UT
CN
Project Cost:
750,000 0 0
C
onstruct various turn lanes along US 119 at the following highways -
Camp O. Cumberlands, Billy G Hollow Road, KY 3467, Shewmaker
Hollow, KY 3452 ad Tremont Lane (2024CCN)
US-119Harlan PL80363
DN
RW
UT
CN 1,040,000 SAF
Project Cost:
1,040,000 0 0
R
econstruct remaining unimproved section of US421 from the end of
the progressive design-build project to Barn Branch
US-421Harlan PL80401
DN 2,000,000 STP2
RW
UT
CN
Project Cost: 2,000,000 0 0
T
otal for Harlan county PL
Total Amounts:
CN
UT
RW
DN 3,164,947
750,000
8,926,318 776,000
12,841,265 776,000 0
Page 62 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-32 IN HARRISON COUNTYK Y-32Harrison PL4307
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
C
ONSTRUCT A CONNECTOR ROAD BETWEEN OLD LAIR ROAD AND
KY 982 (NEW LAIR ROAD) NEAR THE HARRISON COUNTY HIGH
SCHOOL. (2022CCN) (2024CCR)
CR-1124,
KY-982,
PF-9999,
US-27
Harrison PL80251
DN
RW 1,580,000 SPP
UT 200,000 SPP
CN
Project Cost:
0 1,780,000 0
C
ONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF WEBSTER
AVENUE (CS-1071) AND EDUCATION DRIVE. (2022CCN) (2024CCR)
CS-1159Harrison PL80252
DN
RW 530,000 SPP
UT 100,000 SPP
CN
Project Cost: 0 630,000 0
P
rovide a two way left turn lane on KY 982 (New Lair Road) (MP 4.4 -
5.1) (2024CCN)
KY-982Harrison PL80353
DN 780,000 SPP
RW 600,000 SPP
UT
CN
Project Cost: 780,000 600,000 0
T
otal for Harrison county PL
Total Amounts:
CN
UT
RW
DN 780,000
2,710,000
300,000
50,000
830,000 3,010,000 0
Page 63 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve the intersections and access management along US 31W at
K
Y 88 and KY 571 near the Hart County High School
US-31Hart PL80407
DN 650,000 STP2
RW
UT
CN
Project Cost: 650,000 0 0
T
otal for Hart county PL
Total Amounts:
CN
UT
RW
DN 650,000
650,000 0 0
I
mprove the intersection of Watson Lane (CS-1372) and US 41.
(2022CCR) (2024CCR)
CS-1372Henderson PL383.1000
DN
RW
UT
CN 4,300,000 STP1
Project Cost: 4,300,000 0 0
A
ddress safety and congestion along Watson Lane (CR-1372).
(2024CCR)
CS-1372Henderson PL383.2000
DN
RW
UT
CN 3,030,000 STP1
Project Cost: 0 3,030,000 0
D
ELIVERY OF I-69 ORX SECTION 2 FROM US 60 NORTH TO SECTION
3 SOUTH OF EVANSVILLE. (COSTS SHARED BY KY AND IN)
(2024CCR)
PF-9999Henderson PL1088.5000
DN
RW
UT 10,000,000 NH
CN 39,000,000 NH
Project Cost:
10,000,000 39,000,000 0
Page 64 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
I-69 Ohio River Crossing (ORX) at Henderson/Evansville (KY Share) -
S
GF Fund Component "CONTINGENT UPON AWARD OF A FEDERAL
GRANT OR APPROVED FEDERAL LOAN FOR THE PROJECT"".
(2024CCR)
PF-9999Henderson PL1088.5200
DN
RW
UT
CN 150,000,000 SGF
Project Cost:
150,000,000 0 0
I
-69 OHIO RIVER CROSSING (ORX) AT HENDERSON/EVANSVILLE
SECTION 2 TOLLING COMPONENT. (KY SHARE)
PF-9999Henderson PL1088.5300
DN
RW
UT
CN 175,000,000 IF
Project Cost: 0 175,000,000 0
A
DDRESS CONDITION OF KY-425 FROM MILEPOINT 0 TO MILEPOINT
4.747
KY-425Henderson PL22333
DN 480,000 STP3
RW
UT
CN 5,520,000 STP3
Project Cost: 0 6,000,000 0
C
onstruct a new connector between US-41 and US-60 in Henderson
between MM 11.9 and 12.1 on US-41 N and MM 12.3 and 12.4 on US
60 E.
PF-9999Henderson PL80413
DN 2,150,000 STPF
RW
UT
CN
Project Cost:
0 2,150,000 0
T
otal for Henderson county PL
Total Amounts:
CN
UT
RW
DN 2,630,000
10,000,000
154,300,000 222,550,000
164,300,000 225,180,000 0
Page 65 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY-53
TO
KY-153.
I -71Henry PL552
DN 6,500,000 NH
RW
UT
CN
Project Cost: 0 6,500,000 0
R
EHABILITATION-OVERLAY AND WIDENING EXISTING KY-55 FROM
KY-22 TO CURVE AT MP 2.210 NORTH OF EMINENCE. INCLUDES
REPLACING EXISTING CURB AND GUTTER AND SIDEWALKS, AND
RELOCATION OF IMPACT UTILITIES. (MP 1.408 TO 2.210)(14CCN)
(2024CCN)
KY-55Henry PL8820
DN
RW 1,830,000 SPP
UT
CN
Project Cost:
0 1,830,000 0
T
otal for Henry county PL
Total Amounts:
CN
UT
RW
DN 6,500,000
1,830,000
0 8,330,000 0
C
orrect geometric deficiencies and improve safety, access, and
regional connectivity from Clayton Street to KY-703 in Clinton.
(2022CCN) (2024CCR)
US-51Hickman PL80203
DN
RW 1,500,000 STP2
UT
CN
Project Cost: 0 1,500,000 0
T
otal for Hickman county PL
Total Amounts:
CN
UT
RW
DN
1,500,000
0 1,500,000 0
Page 66 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Extend Midtown Blvd from CSX Railroad to Whittington Drive, 500’
s
outh of Commerce Drive. (2022CCR) (2024CCR)
PF-9999Hopkins PL804.3000
DN
RW
UT
CN 6,500,000 CRP
Project Cost: 0 0 6,500,000
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 124.946 TO
MILEPOINT 126.839
I -69Hopkins PL20031
DN 1,100,000 NHPM
RW
UT
CN 11,000,000 NHPM
Project Cost: 0 0 12,100,000
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 89.848 TO
MILEPOINT 93.724
I -69Hopkins PL22083
DN 470,000 NHPM
RW
UT
CN 4,715,274 NHPM
Project Cost: 0 0 5,185,274
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 108.994 TO
MILEPOINT 114.246 (113.81 NON-CARDINAL)
I -69Hopkins PL22087
DN 1,050,000 NHPM
RW
UT
CN 10,517,430 NHPM
Project Cost: 11,567,430 0 0
ADDRESS CONDITION OF US-62 FROM MILEPOINT 15.4 TO MILEPOINT
1
5.8
US-62H opkins PL22337
DN 100,000 STP3
RW
UT
CN 1,150,000 STP3
Project Cost: 0 1,250,000 0
Page 67 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY OF KY 260 FROM THE
A
PPROACHES AT THE RAILROAD CROSSING IN HANSON TO THE
SOUTHBOUND ON AND OFF RAMPS OF I69. (2024CCN)
KY-260Hopkins PL80300
DN 730,000 SPP
RW
UT
CN
Project Cost: 0 730,000 0
T
otal for Hopkins county PL
Total Amounts:
CN
UT
RW
DN 1,050,000 830,000 1,570,000
10,517,430 1,150,000 22,215,274
11,567,430 1,980,000 23,785,274
I
NSTALL GUARDRAIL ON KY-89 IN JACKSON COUNTYKY-89Jackson PL4404
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
B
RIDGE PROJECT IN JACKSON COUNTY ON (055B00028N) KY-89 AT
HORSE LICK CREEK
KY-89Jackson PL10041
DN
RW 2,000 BRZ
UT 5,000 BRZ
CN 1,056,128 BRZ
Project Cost: 7,000 0 1,056,128
B
RIDGE PROJECT IN JACKSON COUNTY ON (055B00001N) US-421
AT INDIAN CREEK
US-421Jackson PL10198
DN
RW
UT
CN 1,540,000 FBP
Project Cost: 1,540,000 0 0
Page 68 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SUBSTANDARD HORIZONTAL AND VERTICAL ALIGNMENT
OF
US 421 IN THE CLOVER BOTTOM AREA NEAR THE STONE
QUARRY. (2020CCN)
US-421Jackson PL80104
DN
RW 1,395,500 SPP
UT 400,000 SPP
CN
Project Cost: 0 1,395,500 400,000
A
DDRESS SAFETY ISSUES WITH VERTICAL AND HORIZONTAL
ALIGNMENT ON US 421 FROM MP 11.6 EAST OF PILGRIMS REST RD
TO MP 12.6 (2020CCN) (2024CCR)
US-421Jackson PL80105
DN
RW
UT
CN 13,000,000 STP2
Project Cost:
13,000,000 0 0
M
OVE KY 578 OVER 10FT FOR IMPROVED SIGHT DISTANCE AND
CREATE A BETTER APPROACH FOR MOORE CREEK GREEN HILL
ROAD (2022CCN)
KY-578Jackson PL80261
DN
RW 60,000 SPP
UT 340,000 SPP
CN 1,400,000 SPP
Project Cost:
0 60,000 1,740,000
T
otal for Jackson county PL
Total Amounts:
CN
UT
RW
DN
2,000 1,455,500
5,000 740,000
14,580,000 2,456,128
14,587,000 1,455,500 3,196,128
WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM LINN
S
TATION RD (CS-1004H) TO EDEN AVE (CS-1660H). (06CCR)
(03KYD)(2006BOPP)(SEE 5-344.02 FOR KYD C PHASE)(14CCR)
KY-1747J efferson PL344.0100
DN 230,000 SPP
RW 100,000 SPP
UT
CN
Project Cost: 230,000 100,000 0
Page 69 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO
U
S-31E. (2024CCR)
I -265J efferson PL554
DN 3,000,000 NH
RW
UT
CN
Project Cost: 0 3,000,000 0
IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM I-264 TO
I
-265. (2024CCR)
I -71J efferson PL557
DN
RW 390,000 NH
UT
CN
Project Cost: 0 0 390,000
R
econnecting West Louisville to the Ohio Riverfront throughout the
Riverside Expressway (I-64) Corridor USDOT Grant project (Louisville
Metro to provide $100,000 toward the cost of project).
PF-9999Jefferson PL587
DN 1,927,000 KYD
RW
UT 1,575,000 KYD
CN 24,839,000 KYD
1,387,000 STPF
Project Cost: 29,728,000 0 0
I
NSTALLATION OF SOLAR LIGHTING AT I-64/I-264 INTERCHANGE AT
SHERMAN MINTON BRIDGE; I-264/RIVER PARK-ALI; I-264/BELLS
LANE; I-264/VIRGINA/DUMESNIL; AND I-264/RALPH AVE-CANE RUNE
INTERSECTIONS IN JEFFERSON COUNTY KENTUCKY. (2024BOP)
I -264, I -64Jefferson PL607
DN
RW
UT
CN 2,080,000 CARB
Project Cost:
2,080,000 0 0
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE
U
RBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY
2026-2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING
MPO TIP). (2020CCR) (2022CCR) (2024CCR)
CO-0J efferson PL965.1900
DN
RW
UT
CN 26,800,000 26,800,000 26,800,000 SLO
Project Cost: 26,800,000 26,800,000 26,800,000
Page 70 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G)
OVER SOUTH FORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER
AVE (CS 1138G) 056C00083N (2020CCR)
CS-1017J efferson PL1070
DN 356,881 FBP2
RW
UT
CN 2,379,206 FBP2
Project Cost: 0 2,736,087 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056C00130N) RIVER
RD AT GOOSE CREEK
CR-1001Jefferson PL1079
DN 1,210,368 BRZ
RW
UT
CN 8,069,119 BRZ
Project Cost: 0 0 9,279,487
THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH
S
CHOOL ENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION
IMPROVEMENTS WITH PALATKA ROAD AND TURN LANES. (14CCN)
(2020CCR) (2024CCR)
KY-1931J efferson PL8810
DN
RW
UT
CN 6,070,000 HGC
Project Cost: 6,070,000 0 0
W
IDEN TAYLORSVILLE ROAD FROM I-265 TO KY-148. (18CCN)
(2024CCR)
KY-155Jefferson PL8908
DN
RW
UT
CN 23,760,000 STPF
Project Cost: 0 23,760,000 0
I
MPROVE THE HURSTBOURNE PARKWAY (KY 1747) AT
SHELBYVILLE ROAD (US 60) INTERSECTION TO INCREASE
CAPACITY, REDUCE DELAYS, AND IMPROVE SAFETY. (16CCN)
KY-1747Jefferson PL8953
DN 350,000 SPP
RW
UT
CN
Project Cost: 350,000 0 0
Page 71 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and traffic operations on KY 155 from MP 2.0 in
S
pencer County to Floyds Fork In Jefferson County (total length 6.247
miles) (Portion of 5-8954.0). (2024CCN)
KY-155Jefferson PL8954.1000
DN 2,080,000 STPF
RW
UT
CN
Project Cost: 0 2,080,000 0
A
DDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER
GOOSE CREEK. (056C00113N) (2020CCR)
CS-1079Jefferson PL10008
DN 165,331 BRX
RW
UT
CN 1,102,206 BRX
Project Cost: 0 0 1,267,537
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00142N) I-64 AT
KY 3077 (RIVER RD). (BRIDGE PAINTING OF I-64 RIVERSIDE
EXPRESSWAY BRIDGES)
I -64Jefferson PL10016
DN
RW
UT
CN 8,000,000 BRX
Project Cost:
8,000,000 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00179N) I-65 AT
HILL, CSX RR & BURNETT (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10064
DN
RW
UT
CN 43,000,000 BRO
6,304,783 FBP
Project Cost: 49,304,783 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00180N) I-65 AT
US 60A (EASTERN PKWY)
I -65Jefferson PL10065
DN 5,340,000 BRO
RW
UT
CN
Project Cost: 0 0 5,340,000
Page 72 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00183N) I-65 AT
E
KENTUCKY & S BROOK ST (POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson PL10066
DN
RW
UT
CN 47,000,000 BRO
7,000,000 BRX
17,971,591 FBP
Project Cost: 0 0 71,971,591
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00191N) I-65 AT
JACOB, BROADWAY, GRAY ST
I -65Jefferson PL10068
DN 10,612,000 FBP
RW
UT
CN 52,616,706 52,616,706 BRO
Project Cost: 0 63,228,706 52,616,706
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00192N) I-65 AT
E CHESTNUT ST
I -65Jefferson PL10069
DN 819,705 BRO
RW
UT
CN 5,464,700 BRO
Project Cost: 0 6,284,405 0
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00250N) I-264 AT
P
&L RAILWAY
I -264J efferson PL10075
DN
RW
UT
CN 35,367,503 FBP
Project Cost: 35,367,503 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00193N) I-65 AT
BROOK/MUHAMMAD ALI. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10099
DN 10,545,062 FBP
RW 50,000 50,000 FBP
UT 75,000 75,000 FBP
CN 70,300,410 6,500,000 FBP
Project Cost: 0 80,970,472 6,625,000
Page 73 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00194N) I-65 AT
M
UHAMMAD ALI SB ON-RAMP. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65Jefferson PL10100
DN 154,954 FBP
RW
UT
CN 1,033,024 FBP
Project Cost: 0 0 1,187,978
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00195R) I-65 NB
AT FLOYD STREET. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10101
DN 611,386 BRX
RW
UT
CN 4,075,906 BRX
Project Cost: 0 4,687,292 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00197R) I-65 NB
AT E. LIBERTY STREET. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10102
DN 1,408,057 BRX
RW
UT
CN 9,387,049 BRX
Project Cost: 0 10,795,106 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00182N) I-65 AT
BRANDIES AVE. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10104
DN 2,330,669 FBP
RW 50,000 FBP
UT 75,000 FBP
CN
Project Cost: 0 0 2,455,669
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00181N) I-65 AT
UNIVERSITY BLVD. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10105
DN 2,624,670 FBP
RW
UT
CN
Project Cost: 0 0 2,624,670
Page 74 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00212N) I-65 AT
B
RADLEY AVE. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10106
DN
RW
UT
CN 14,287,927 FBP2
Project Cost: 14,287,927 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON US 31 OVER OHIO RIVER
(056B00136N)
US-31Jefferson PL10115
DN 1,050,000 FBP
RW
UT
CN 7,000,000 FBP
Project Cost: 8,050,000 0 0
ADDRESS CONDITION OF I-264 FROM MILEPOINT 12.7 TO MILEPOINT
1
8.41
I -264J efferson PL20016
DN 2,730,000 NHPM
RW
UT
CN 27,270,000 NHPM
Project Cost: 30,000,000 0 0
A
DDRESS CONDITION OF KY-913 FROM MILEPOINT 2.38 TO
MILEPOINT 3.07
KY-913Jefferson PL20024
DN 60,000 STP5
RW
UT
CN 690,000 STP5
Project Cost: 0 0 750,000
A
DDRESS CONDITION OF KY-1020 FROM MILEPOINT 2.67 TO
MILEPOINT 3.66
KY-1020Jefferson PL20025
DN 80,000 STP5
RW
UT
CN 920,000 STP5
Project Cost: 0 0 1,000,000
Page 75 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF KY-1932 FROM MILEPOINT 3.21 TO
M
ILEPOINT 3.8
KY-1932Jefferson PL20027
DN 80,000 STP5
RW
UT
CN 920,000 STP5
Project Cost: 0 0 1,000,000
A
DDRESS CONDITION OF KY-1934 FROM MILEPOINT 4.44 TO
MILEPOINT 9.74
KY-1934Jefferson PL20029
DN 480,000 STP3
RW
UT
CN 5,520,000 STP3
Project Cost: 0 0 6,000,000
ADDRESS CONDITION OF I-265 FROM MILEPOINT 18.8 TO MILEPOINT
2
3.364
I -265J efferson PL20069
DN 770,000 NHPM
RW
UT
CN 7,680,738 NHPM
Project Cost: 8,450,738 0 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 13.124 (13.206
NON-CARDINAL) TO MILEPOINT 19.44
I -64Jefferson PL22024
DN 1,820,000 NHPM
RW
UT
CN 18,180,000 NHPM
Project Cost: 0 0 20,000,000
A
DDRESS CONDITION OF I-065 FROM MILEPOINT 123.18 TO
MILEPOINT 127.57
I -65Jefferson PL22069
DN 3,600,000 NHPM
RW
UT
CN
Project Cost: 0 0 3,600,000
Page 76 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-065 FROM MILEPOINT 131.24 TO
M
ILEPOINT 136.338
I -65Jefferson PL22070
DN 1,400,000 NHPM
RW
UT
CN 14,000,000 NHPM
Project Cost: 15,400,000 0 0
E
ASTWOOD FISHERSVILLE CONNECTOR TO I-64KY-1531Jefferson PL80000
DN 5,000,000 NH
RW
UT
CN
Project Cost: 0 5,000,000 0
I
MPROVE OPERATIONS ALONG US-60 FROM OLD SHELBYVILLE
ROAD TO NORTH ENGLISH STATION ROAD. (18CCN) (2020CCR)
(2024CCR)
US-60Jefferson PL80001
DN
RW 650,000 NH
UT 700,000 NH
CN
Project Cost:
650,000 700,000 0
E
XTEND PLANTSIDE DRIVE FROM REHL ROAD TO TAYLORSVILLE
ROAD. (18CCN)(2020CCR) (2022CCR) (2024CCR). To be completed
through an MOA with the city of Louisville.
PF-9999Jefferson PL80003
DN
RW
UT
CN 13,000,000 CRP
Project Cost:
0 0 13,000,000
R
educe congestion, improve safety, and enhance mobility on KY 2050
(Herr Lane) from Prince Valiant Drive/Westmar Terrace to Bedford
Lane. (2022CCN) (2024CCR)
KY-2050Jefferson PL80200
DN
RW 580,000 SPP
UT
CN
Project Cost:
0 580,000 0
Page 77 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
DESIGN AND CONSTRUCTION OF A REALIGNED OLD BARDSTOWN
R
OAD TO ALIGN WITH THE ENTRANCE TO WALGREENS AT HILLOCK.
(MILEPOINT 0.0 TO MILEPOINT 0.01) WITH A MEMORANDUM OF
AGREEMENT WITH THE LOUISVILLE METRO GOVERNMENT.
(2022CCN)
CR-1006J efferson PL80250
DN
RW
UT
CN 440,000 SPP
Project Cost: 440,000 0 0
REDUCE CONGESTION, IMPROVE SAFETY, AND ENHANCE MOBILITY
O
N KY 1819 (WATTERSON TRAIL) FROM BLUEGRASS PARKWAY TO
BLANKENBAKER PARKWAY (KY 913) (2022CCN) (2024CCR)
KY-1819J efferson PL80258
DN
RW 530,000 SPP
UT 1,600,000 SPP
CN
Project Cost: 0 530,000 1,600,000
RIGHT SIZING AND PEDESTRIAN ACCESS IMPROVEMENTS ON US 31E
F
ROM MILEPOINT 14.625 TO MILEPOINT 13.125 (2022CCN)
US-31J efferson PL80259
DN
RW
UT
CN 2,240,000 NH
Project Cost: 2,240,000 0 0
A
dd dedicated eastbound left and right turn lanes from Thixton Lane
(KY 2053) onto Bardstown Rd (US 31E) (MP 1.946)
US-31Jefferson PL80261.1000
DN 150,000 STPF
RW 50,000 STPF
UT 50,000 STPF
CN 2,000,000 STPF
Project Cost: 150,000 2,100,000 0
P
rovide offset left turns on Bardstown Rd (US 31E) at Hillock Drive/
Colonel Hancock Drive Intersection (MP 4.089)
US-31Jefferson PL80261.2000
DN 150,000 STPF
RW 50,000 STPF
UT 50,000 STPF
CN 2,000,000 STPF
Project Cost: 150,000 2,100,000 0
Page 78 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Add dedicated turn lanes from Cedar Creek Rd to Bardstown Rd (US
3
1E). (2nd EB left turn and EB right turn lanes) (MP 4.369)
US-31Jefferson PL80261.3000
DN 150,000 STPF
RW 50,000 STPF
UT 50,000 STPF
CN
Project Cost: 150,000 100,000 0
TRANSPORTATION SYSTEM MANAGEMENT IMPROVEMENTS ON US
3
1W FROM KY 841 TO KY 44 IN SOUTHERN JEFFERSON COUNTY; TO
INCLUDE THE CONSIDERATION OF ACCESS MANAGEMENT AND
SAFETY IMPROVEMENTS. (2024CCN)
US-31J efferson PL80302
DN 3,710,000 NH
RW
UT
CN
Project Cost: 0 3,710,000 0
SAFETY ANALYSIS OF THE KY 3222 (ROSE ISLAND ROAD)
B
EGINNING IN JEFFERSON COUNTY MILE POINT 0.0-1.0 AND OLDHAM
COUNTY FROM 0.0 TO 3.1 (INTERSECTION OF KY 1793). (2024CCN)
KY-3222J efferson PL 220,000 SPP80330
DN
RW
UT
CN
Project Cost: 0 220,000 0
R
OADWAY RECONFIGURATION, ONE-WAY TO TWO-WAY
CONVERSION. (2024CCN) (POSSIBLE SLO FUNDING)
US-42Jefferson PL80342
DN 500,000 SPP
RW
UT
CN
Project Cost: 0 500,000 0
I
mprove Traffic Operations and Safety on KY 155 from the Floyds Fork
Bridge (MP 4.000) to KY 148 (MP 4.400).
KY-155Jefferson PL80404
DN 500,000 SPP
RW
UT
CN
Project Cost: 0 0 500,000
Page 79 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Operational improvements along US 42 from Falls Creek Road (MP 7.5)
t
o Woodstone Way (MP 7.9)
US-42Jefferson PL80406
DN 470,000 NH
RW
UT
CN
Project Cost: 470,000 0 0
R
econfigure I-65 SB ramps to Arthur Street to improve safety and to
improve ingress/egress to/from the University of Louisville campus
and adjoining neighborhoods. (MP 133.3 - 133.8)
I-65Jefferson PL80432
DN 120,000 NH
RW 15,000 NH
UT 55,000 NH
CN
Project Cost:
135,000 55,000 0
P
lanning study to extend Blankenbaker Parkway to the Gene SnyderKY-913Jefferson PL 1,200,000 SPP80433
DN
RW
UT
CN
Project Cost: 1,200,000 0 0
T
otal for Jefferson county PL
Total Amounts:
CN
UT
RW
DN
1,200,000 220,000
9,497,000 38,643,091 18,445,992
665,000 1,410,000 490,000
1,575,000 980,000 1,750,000
226,766,951 198,783,977 207,322,646
239,703,951 240,037,068 228,008,638
C
OMPLETE EAST NICHOLASVILLE BYPASS WITH AT GRADE
INTERSECTION AT US 27.
KY-169,
PF-9999,
US-27
Jessamine PL87.3500
DN
RW
UT
CN 10,000,000 NH
Project Cost:
0 0 10,000,000
Page 80 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND
R
OADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68
(HARRODSBURG RD) TO US 27 (NICHOLASVILLE RD)(12CCR)
(18CCN) (2022CCR) (2024CCR)
KY-1980Jessamine PL414
DN
RW
UT
CN 28,600,000 HGC
Project Cost:
0 28,600,000 0
I
MPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE
COUNTY TO NORTH OF KY-1967 IN WOODFORD COUNTY.
(2020CCN) (2024CCR)
KY-169Jessamine PL80108
DN
RW 5,640,000 SPP
UT
CN
Project Cost:
0 5,640,000 0
I
MPROVE THE SAFETY ON US 68 IN MERCER AND JESSAMINE
COUNTIES NEAR THE KY RIVER. (MP 14.45 IN MERCER COUNTY TO
MP 1.38 IN JESSAMINE COUNTY
US-68Jessamine PL80418
DN 8,000,000 STP2
RW
UT
CN
Project Cost:
8,000,000 0 0
S
coping study to explore feasible and cost effective highway projects
connecting Nicholasville and I-75 in Madison Co.
PF-9999Jessamine PL 250,000 SPP80428
DN
RW
UT
CN
Project Cost: 0 250,000 0
T
otal for Jessamine county PL
Total Amounts:
CN
UT
RW
DN
250,000
8,000,000
5,640,000
28,600,000 10,000,000
8,000,000 34,490,000 10,000,000
Page 81 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1092 IN JOHNSON COUNTYK Y-1092Johnson PL4391
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-201 IN JOHNSON COUNTYKY-201Johnson PL4392
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-40 IN JOHNSON COUNTYKY-40Johnson PL4393
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
I
NSTALL GUARDRAIL ON KY-580 IN JOHNSON COUNTYKY-580Johnson PL4394
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-3387 IN JOHNSON COUNTYKY-3387Johnson PL4433
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
Page 82 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE US 460 FROM THE INTERSECTION WITH KY 114 TO THE
I
NTERCHANGE WITH US 23 (2020CCR) (2022CCR) (2024CCR)
US-460Johnson PL80101
DN
RW 1,240,000 NH
UT
CN
Project Cost: 1,240,000 0 0
CONSTRUCT ACCESS ROAD TO PROPOSED JOHNSON COUNTY HIGH
S
CHOOL AND MIDDLE SCHOOL CAMPUS. TO INTERSECT WITH KY 40
AT MILEPOINT 8.85 (2022CCN) (2024CCR)
KY-40,
P
F-9999
Johnson PL80250
DN
RW
UT
CN 8,700,000 SPP
Project Cost: 8,700,000 0 0
T
otal for Johnson county PL
Total Amounts:
CN
UT
RW
DN
1,240,000
9,214,000
10,454,000 0 0
CONSTRUCT A COMPANION BRIDGE TO THE EXISTING I-71/75 BRENT
S
PENCE BRIDGE OVER THE OHIO RIVER BETWEEN COVINGTON, KY
AND CINCINNATI, OH. (DEDICATED ADDITIONAL STATE GENERAL
FUNDS) (2024CCR)
CO-0K enton PL17.3100
DN
RW
UT
CN 125,000,000 SGF
Project Cost: 0 125,000,000 0
I
MPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE
I-275 INTERCHANGE. (18CCR) (2020CCR) (2024CCR)
KY-17Kenton PL449
DN
RW 530,000 STPF
UT 2,080,000 STPF
CN
Project Cost: 530,000 2,080,000 0
Page 83 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reduce Congestion along KY 1303 from Dudley Road to I-275.
(
2024BOP)
KY-1303Kenton PL450.1000
DN
RW 4,400,000 STPF
UT 2,160,000 STPF
CN
Project Cost: 4,400,000 2,160,000 0
I
MPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE,
ORPHANAGE ROAD, AND US 25. FT. MITCHELL WILL PAY $50,000
TOWARD DESIGN. (16CCN)(18CCN) (2020CCR) (2022CCR)
(2024CCR)
US-25Kenton PL8951
DN
RW 5,000,000 STPF
UT
CN
Project Cost:
0 5,000,000 0
B
RIDGE PROJECT IN KENTON COUNTY ON (059B00048N) KY 17 AT
OHIO RIVER
KY-17Kenton PL10044
DN 1,920,000 FBP
RW
UT
CN 12,000,000 FBP
Project Cost: 13,920,000 0 0
A
DDRESS CONDITION OF I-075 NON-CARDINAL DIRECTION FROM
MILEPOINT 184.708 TO MILEPOINT 186.95
I -75Kenton PL22130
DN 1,600,000 NHPM
RW
UT
CN 8,400,000 NHPM
Project Cost: 0 0 10,000,000
R
ECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET
TO JACQUELINE DRIVE.(18CCN) (2020CCR) Kenton Co. government
will allocate $250,000 to sanitary sewer and waterline relocation. The
City of Erlanger up to $350,000. The City of Erlanger is es eligible to
apply to SD1 for up to 50% of the total cost of storm water
KY-236Kenton PL80002
DN
RW 8,500,000 SPP
UT
CN
Project Cost:
0 8,500,000 0
Page 84 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruct KY 536 from KY 16 to Staffordsburg Road. (2024BOP)K Y-536Kenton PL80203.1000
DN
R
W 9,200,000 STP2
UT
CN
Project Cost: 9,200,000 0 0
R
EHABILITATE/RECONSTRUCT US 25 FROM BUTTERMILK PIKE
(KY371) TO I-75 (MP 8.58 TO MP 9.86) (2022CCN) (2024CCR)
US-25Kenton PL80254
DN
RW 880,000 SPP
UT 2,800,000 SPP
CN
Project Cost: 0 880,000 2,800,000
C
onstruct new DCD interchange on I-75 in Kenton County at Buttermilk
Pike (KY 371)
I-75Kenton PL80400
DN 5,000,000 NH
RW
UT
CN
Project Cost: 0 5,000,000 0
T
otal for Kenton county PL
Total Amounts:
CN
UT
RW
DN 1,920,000 5,000,000 1,600,000
14,130,000 14,380,000
4,240,000 2,800,000
12,000,000 125,000,000 8,400,000
28,050,000 148,620,000 12,800,000
E
liminate rockfall hazards from KY 2029 to Rock Fork Road.KY-80Knott PL158
DN
RW 250,000 PROT
UT 710,000 PROT
CN
Project Cost: 960,000 0 0
Page 85 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYK Y-1088Knott PL4323
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYKY-1088Knott PL4324
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-160 IN KNOTT COUNTYKY-160Knott PL4357
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYKY-1088Knott PL4375
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-3391 IN KNOTT COUNTYKY-3391Knott PL4376
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
Page 86 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-550 IN KNOTT COUNTYK Y-550Knott PL4377
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
NSTALL GUARDRAIL ON KY-582 IN KNOTT COUNTYKY-582Knott PL4378
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-2102 IN KNOTT COUNTYKY-2102Knott PL4395
DN
RW
UT
CN 200,000 GR
Project Cost: 200,000 0 0
I
NSTALL GUARDRAIL ON KY-2102 IN KNOTT COUNTYKY-2102Knott PL4396
DN
RW
UT
CN 140,000 GR
Project Cost: 140,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN KNOTT COUNTYKY-7Knott PL4397
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
Page 87 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-7 IN KNOTT COUNTYK Y-7Knott PL4398
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-3391 IN KNOTT COUNTYKY-3391Knott PL4434
DN
RW
UT
CN 52,000 GR
Project Cost: 52,000 0 0
I
NSTALL GUARDRAIL ON KY-582 IN KNOTT COUNTYKY-582Knott PL4435
DN
RW
UT
CN 22,000 GR
Project Cost: 22,000 0 0
NEW CONSTRUCTION OF ONE MILE STRETCH OF KY-1231 BEGINNING
A
T BRIDGE AFTER LEAVING KY-550. (04CCN)(06CCR)(08CCR)
(10CCR)(12CCR) (2020CCN)
KY-1231K nott PL8200
DN
RW
UT
CN 5,320,000 CRP
Project Cost: 0 0 5,320,000
I
mprove roadway geometrics along KY 899 from end of prior
construction near Pippa Passes to the bottom of the hill at Short
Branch. (2024CCN)
KY-899Knott PL80302
DN 590,000 SPP
RW
UT
CN
Project Cost: 0 590,000 0
T
otal for Knott county PL
Total Amounts:
CN
UT
RW
DN 590,000
250,000
710,000
1,084,000 5,320,000
2,044,000 590,000 5,320,000
Page 88 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-11 IN KNOX COUNTYK Y-11Knox PL4373
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-3438 IN KNOX COUNTYKY-3438Knox PL4379
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-11 IN KNOX COUNTYKY-11Knox PL4405
DN
RW
UT
CN 29,000 GR
Project Cost: 29,000 0 0
I
MPROVE SAFETY OF INTERSECTION AT US 25E AND KY 3439 AND
PROVIDE SIDEWALKS TO AN AREA FREQUENTED BY PEDESTRIANS
(MP 0.0 - MP 0.9) (2022CCR) (2024CCR)
KY-3439Knox PL8857
DN
RW
UT
CN 2,920,000 SPP
Project Cost: 0 2,920,000 0
B
RIDGE PROJECT IN KNOX COUNTY ON (061C00073N) CR-1532 AT
STINKING CREEK
CR-1532Knox PL10205
DN
RW 10,000 FBP2
UT 10,000 FBP2
CN 894,355 FBP2
Project Cost: 0 0 914,355
Page 89 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY, ADDRESS GEOMETRIC DEFICIENCIES AND
P
ROVIDE FLOOD MITIGATION ON KY 1487 (MANCHESTER STREET)
FROM JUDGE STREET TO US 25E (2020CCN) (2022CCR) (2024CCR)
KY-1487Knox PL80155
DN
RW
UT
CN 7,800,000 CRP
Project Cost: 0 0 7,800,000
I
mprove safety and access along KY 11 by raising roadway above
Flood X elevation. (2022CCN) (2024CCR)
KY-11Knox PL80203
DN
RW 210,000 PROT
UT
CN
Project Cost: 210,000 0 0
I
mprove safety by constructing new access road to aquatic center
owned by Barbourville Independent Schools that will be transferred to
Barbourville City local government to provide safe ingress and egress
to facility
Knox PL80413
DN 150,000 SPP
RW
UT 75,000 SPP
CN 750,000 SPP
Project Cost:
150,000 75,000 750,000
T
otal for Knox county PL
Total Amounts:
CN
UT
RW
DN 150,000
210,000 10,000
75,000 10,000
79,000 2,920,000 9,444,355
439,000 2,995,000 9,464,355
A
DDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84
FROM KY 357 TO KY 61 (LINCOLN PARKWAY) NEAR HODGENVILLE
(2020CCR) (2022CCR) (2024CCR)
KY-84Larue PL8909
DN 840,000 SPP
RW
UT
CN
Project Cost: 0 840,000 0
Page 90 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY ON KY 210 FROM KY 1618 (6.994) TO
M
ORNINGSTAR ROAD (MP14.230) IN LARUE COUNTY. (2024CCN)
KY-210Larue PL80154.1000
DN 1,680,000 SPP
RW
UT
CN
Project Cost: 0 1,680,000 0
T
otal for Larue county PL
Total Amounts:
CN
UT
RW
DN 2,520,000
0 2,520,000 0
R
EDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069;
IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229;
IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH TO KY-192;
AND IMPROVE ACCESS TO THE SCHOOL FROM KY-192 BYPASS.
(06CCR)(10CCR)(12CCR)(14CCR) (2020CCR) (2022CCR) (2024CCR)
US-25Laurel PL147
DN
RW
UT
CN 30,400,000 CRP
35,815,000 HGC
Project Cost:
0 66,215,000 0
I
mprove Rudy Bear Road and KY 3007 from KY 80 South to KY 3432
West of I-75. (2022CCR) (2024CCR)
CO-0Laurel PL169
DN 250,000 SPP
RW 2,500,000 SPP
UT 1,500,000 SPP
CN
Project Cost: 250,000 2,500,000 1,500,000
E
XPAND TRUCK PARKING AT I-75 NB TRUCK REST HAVEN.I -75Laurel PL179
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
Page 91 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXPAND TRUCK PARKING AT I-75 SB TRUCK REST HAVEN.I -75Laurel PL180
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
I
NSTALL GUARDRAIL ON KY-2041 IN LAUREL COUNTYKY-2041Laurel PL4380
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4381
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4382
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4383
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
Page 92 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-363 IN LAUREL COUNTYK Y-363Laurel PL4407
DN
RW
UT
CN 142,000 GR
Project Cost: 142,000 0 0
I
MPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM
KY-1006 TO US-25E. (08CCN) (2024CCR)
US-25Laurel PL8515
DN 2,000,000 STP1
RW 2,000,000 STP1
UT
CN
Project Cost: 0 2,000,000 2,000,000
I
MPROVE THE HAL ROGERS PARKWAY TO INTERSTATE
STANDARDS FROM 4.0 MI EAST OF KY 192 TO LAUREL/CLAY CO.
LINE. (I-75 TO HAZARD) (16CCN)(18CCR) (2024CCR)
HR-9006Laurel PL8909
DN 1,170,000 NH
RW
UT
CN
Project Cost: 0 0 1,170,000
B
RIDGE PROJECT IN LAUREL COUNTY ON (063B00004N) KY-490 AT
ROCKCASTLE RIVER
KY-490Laurel PL10042
DN 482,051 BRZ
RW
UT
CN 3,213,675 BRZ
Project Cost: 0 3,695,726 0
A
DDRESS ACCESS AND SAFETY ISSUES AT THE INTERSECTION OF
KY 80 AND PAYNE TRAIL AND BUSH ELEMENTARY SCHOOL BY
CONSTRUCTING A CONNECTOR ROAD FROM HAL ROGERS
PARKWAY (HR 9006) TO KY 6264 (PAYNE TRAIL). (2020CCN)
(2022CCN)
HR-9006Laurel PL80154
DN 120,000 SPP
RW
UT
CN
Project Cost:
0 120,000 0
Page 93 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve the geometrics of a curve, widen a drainage structure, and
p
rovide turn lanes to Johnson Elementary School on KY 638
(2024CCN)
KY-638Laurel PL80312
DN 210,000 SPP
RW
UT
CN
Project Cost: 210,000 0 0
W
iden KY 192 from Mallard Drive to Esquire Lane, address horizontal
and vertical alignment as needed (MP 16.61 - 18.08) (2024CCN)
KY-192Laurel PL80357
DN 1,300,000 SPP
RW
UT
CN
Project Cost: 0 1,300,000 0
R
econstruct curve and address geometric deficiencies and safety on
KY-1535
KY-1535Laurel PL80402
DN 350,000 SPP
RW 1,000,000 SPP
UT 400,000 SPP
CN
Project Cost: 1,350,000 400,000 0
W
iden US25 to a three-lane typical section with a center two-way
left-turn lane. Access management with sidewalk. Concept A from the
11-181 planning study
US-25Laurel PL 250,000 STP180409
DN
RW
UT
CN
Project Cost:
250,000 0 0
R
econstruct and address geometric deficiencies and safety on KY
363 (Whitley Street) from KY 2391 to Meyers Baker Road.
KY-363Laurel PL80426
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 1,000,000 0 0
T
otal for Laurel county PL
Total Amounts:
CN
UT
RW
DN
250,000
1,810,000 3,902,051 1,170,000
1,000,000 2,500,000 2,000,000
400,000 1,500,000
2,542,000 69,428,675
5,602,000 76,230,726 4,670,000
Page 94 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve KY-32 from Elliott C/L to Yatesville Lake reconstruction
s
ection for better access to Yatesville Lake and to improve safety.
See Elliott County listing for continuation of project to KY-7 @ Sandy
Hook. (2024CCN)
KY-32Lawrence PL156
DN 1,760,000 SPP
RW
UT
CN
Project Cost:
1,760,000 0 0
I
NSTALL GUARDRAIL ON KY-644 IN LAWRENCE COUNTYKY-644Lawrence PL4399
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
I
NSTALL GUARDRAIL ON KY-644 IN LAWRENCE COUNTYKY-644Lawrence PL4400
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-1690 IN LAWRENCE COUNTYKY-1690Lawrence PL4436
DN
RW
UT
CN 74,000 GR
Project Cost: 74,000 0 0
B
RIDGE PROJECT IN LAWRENCE COUNTY ON (064B00038N) KY-644
AT LEVISA FORK
KY-644Lawrence PL10016
DN 683,372 BRX
RW
UT
CN 4,555,811 BRX
Project Cost: 0 0 5,239,183
Page 95 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF KY-201 FROM MILEPOINT 5 TO MILEPOINT
1
0.9
KY-201Lawrence PL22352
DN 80,000 NHPM
RW
UT
CN 640,000 NHPM
Project Cost: 0 0 720,000
I
mprove intersection traffic movements along KY 2565 and KY 32
between US 23 and Louisa
KY-2565Lawrence PL80400
DN 425,000 SPP
RW
UT
CN
Project Cost: 0 425,000 0
T
otal for Lawrence county PL
Total Amounts:
CN
UT
RW
DN 1,760,000 425,000 763,372
254,000 5,195,811
2,014,000 425,000 5,959,183
R
ockfall Mitigation on KY 52 near Beattyville from MP 12.8 to MP 13.4 in
Lee County. (To seek future federal Protect funds)
KY-52Lee PL5017
DN
RW 870,000 PROT
UT 120,000 PROT
CN
Project Cost: 990,000 0 0
B
RIDGE PROJECT IN LEE COUNTY ON (065C00024N) SILVER CREEK
RD AT SILVER CREEK
CS-1005Lee PL10051
DN 70,910 BRX
RW
UT
CN 472,731 BRX
Project Cost: 0 0 543,641
Page 96 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruct KY 11 from 0.5 miles south of KY 587 to 0.65 miles north
o
f KY 52 in Beattyville (MP 1.082 - 4.798) (2024CCN)
KY-11Lee PL80351
DN 2,700,000 STPF
RW
UT
CN
Project Cost: 0 0 2,700,000
T
otal for Lee county PL
Total Amounts:
CN
UT
RW
DN 2,770,910
870,000
120,000
472,731
990,000 0 3,243,641
I
NSTALL GUARDRAIL ON US-421 IN LESLIE COUNTYUS-421Leslie PL4320
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON US-421 IN LESLIE COUNTYUS-421Leslie PL4408
DN
RW
UT
CN 99,000 GR
Project Cost: 99,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY-1780 OVER MID-FK KY
RVR (066B00026N)
KY-1780Leslie PL10254
DN 205,820 BRZ
RW
UT
CN 1,372,134 BRZ
Project Cost: 0 0 1,577,954
Page 97 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SAFETY IMPROVEMENTS ON KY 3424 FROM MP 1.1 TO MP 1.5.
(
18CCN)
KY-3424Leslie PL80002
DN
RW
UT
CN 1,360,000 CRP
Project Cost: 0 0 1,360,000
I
NSTALL NEW GUARDRAIL ON KY 2009 FROM MP 13.418 TO MP
14.767.(18CCN)
KY-2009Leslie PL80003
DN
RW
UT
CN 560,000 GR
Project Cost: 0 560,000 0
I
NSTALL NEW GUARDRAIL ON KY 1482 FROM MP 0 TO MP 1.9.
(18CCN)
KY-1482Leslie PL80004
DN
RW
UT
CN 120,000 GR
Project Cost: 0 120,000 0
I
NSTALL NEW GUARDRAIL ON KY 257 FROM MP 5.723 TO MP 5.853.
(18CCN)
KY-257Leslie PL80005
DN
RW
UT
CN 40,000 GR
Project Cost: 0 40,000 0
I
NSTALL NEW GUARDRAIL ON KY 1807 FROM MP 0.914 TO MP 1.256.
(18CCN)
KY-1807Leslie PL80006
DN
RW
UT
CN 60,000 GR
Project Cost: 0 60,000 0
Page 98 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
GUARD RAIL INSTALLATION ON BULL SKIN RD MP 1.582 TO MP 2
(
2020CCN) (2024CCR)
KY-1482Leslie PL80108
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
G
UARD RAIL INSTALLATION ON WOOTEN RD FROM MP 0.089 TO MP
3.567 AS NEEDED (2020CCN) (2024CCR)
KY-1807Leslie PL80109
DN
RW
UT
CN 180,000 GR
Project Cost: 180,000 0 0
P
ROVIDE ADDITIONAL ACCESS TO RESIDENTS ALONG KY257
DURING FLOODING EVENTS (2024CCN) (Study Underway) MP 6.7 -
11
KY-257Leslie PL80305
DN 1,000,000 STPF
RW
UT
CN
Project Cost:
0 1,000,000 0
W
iden, resurface, and extend asphalt on CR-1449 (Leeco Road) in
preparation for development of an RV park, pavilion, baseball/softball
fields, housing development, and trails along the route
CR-1449Leslie PL80412
DN 250,000 SPP
RW
UT
CN
Project Cost:
250,000 0 0
T
otal for Leslie county PL
Total Amounts:
CN
UT
RW
DN 250,000 1,000,000 205,820
389,000 780,000 2,732,134
639,000 1,780,000 2,937,954
Page 99 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE US-119 FROM KY-2034/COUGAR DRIVE TO BRASS DRIVE
(
MP 16.731 TO 17.740). THROUGH MAYKING (MP 19.925 TO 20.6)
AND AUXILIARY LANE (MP 22.0 TO 22.75) (16CCN)(SEE 12-199.10
FOR D, R, U) (18CCR) (2022CCR) (2024CCR)
US-119Letcher PL199.1500
DN
RW
UT
CN 10,000,000 NH
Project Cost:
10,000,000 0 0
R
ECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO
KY-932. 2012BOP (2024CCN)
PF-9999,
US-119
Letcher PL311.8000
DN
RW 3,420,000 APD
UT 400,000 APD
CN
Project Cost:
0 3,820,000 0
I
mprove safety along US 119 from bottom (North side) of Pine Mountain
to intersection with KY 15 at Whitesburg (MP 14.1-15.8) (2024CCN)
US-119Letcher PL311.9000
DN 1,560,000 APD
RW 1,500,000 APD
UT 2,000,000 APD
CN 15,000,000 APD
Project Cost: 1,560,000 3,500,000 15,000,000
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4327
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-588 IN LETCHER COUNTYKY-588Letcher PL4344
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
Page 100 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYK Y-7Letcher PL4345
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYKY-1103Letcher PL4358
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYKY-1103Letcher PL4359
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4360
DN
RW
UT
CN 170,000 GR
Project Cost: 170,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4361
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
Page 101 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYK Y-931Letcher PL4362
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-588 IN LETCHER COUNTYKY-588Letcher PL4380
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYKY-1103Letcher PL4402
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4403
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-932 IN LETCHER COUNTYKY-932Letcher PL4404
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
Page 102 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYK Y-317Letcher PL4437
DN
RW
UT
CN 107,000 GR
Project Cost: 107,000 0 0
I
NSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYKY-317Letcher PL4438
DN
RW
UT
CN 88,000 GR
Project Cost: 88,000 0 0
I
NSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYKY-317Letcher PL4439
DN
RW
UT
CN 57,000 GR
Project Cost: 57,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4440
DN
RW
UT
CN 94,000 GR
Project Cost: 94,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4441
DN
RW
UT
CN 67,000 GR
Project Cost: 67,000 0 0
Page 103 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYK Y-7Letcher PL4442
DN
RW
UT
CN 53,000 GR
Project Cost: 53,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4443
DN
RW
UT
CN 59,000 GR
Project Cost: 59,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4444
DN
RW
UT
CN 66,000 GR
Project Cost: 66,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4445
DN
RW
UT
CN 41,000 GR
Project Cost: 41,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4446
DN
RW
UT
CN 75,000 GR
Project Cost: 75,000 0 0
Page 104 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYK Y-931Letcher PL4447
DN
RW
UT
CN 54,000 GR
Project Cost: 54,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4448
DN
RW
UT
CN 25,000 GR
Project Cost: 25,000 0 0
IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS
A
ND IMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN
MP 9.176 AND MP 9.247.
KY-805L etcher PL8702
DN
RW
UT
CN 1,250,000 STP2
Project Cost: 0 1,250,000 0
B
RIDGE PROJECT IN LETCHER COUNTY ON (067B00053N) KY-931 AT
N FORK KENTUCKY RIVER
KY-931Letcher PL10119
DN
RW 75,000 FBP2
UT 250,000 FBP2
CN 1,777,613 FBP2
Project Cost: 0 2,102,613 0
B
RIDGE PROJECT IN LETCHER COUNTY ON (067B00094N) KY-2036
AT ROCKHOUSE CREEK
KY-2036Letcher PL10122
DN
RW 54,000 BRX
UT 164,000 BRX
CN 1,574,580 BRX
Project Cost: 0 0 1,792,580
Page 105 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL A GUARD RAIL ON KY 463 NEAR GORDON PARK
(
2020CCN)
KY-463Letcher PL80115
DN
RW
UT
CN 11,000 GR
Project Cost: 11,000 0 0
T
otal for Letcher county PL
Total Amounts:
CN
UT
RW
DN 1,560,000
4,995,000 54,000
2,650,000 164,000
11,847,000 3,027,613 16,574,580
13,407,000 10,672,613 16,792,580
R
ECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE
(14CCN) (16CCR) (18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-57Lewis PL8807
DN
RW 7,480,000 SPP
UT
CN
Project Cost: 0 7,480,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 1068 OVER LAUREL
FORK (068B00058N)
KY-1068Lewis PL10099
DN 135,373 BRZ
RW
UT
CN 902,486 BRZ
Project Cost: 0 1,037,859 0
T
otal for Lewis county PL
Total Amounts:
CN
UT
RW
DN 135,373
7,480,000
902,486
0 8,517,859 0
Page 106 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE
S
AFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO
EDUCATION WAY. (2022CCR)
US-27Lincoln PL167
DN
RW 12,390,000 NH
UT 14,000,000 NH
CN
Project Cost: 12,390,000 14,000,000 0
B
RIDGE PROJECT IN LINCOLN COUNTY ON (069B00068N) KY-3246
AT FALL LICK CREEK
KY-3246Lincoln PL10055
DN 113,937 BRX
RW
UT
CN 759,580 BRX
Project Cost: 0 0 873,517
A
DDRESS CONDITION OF US-27 FROM MILEPOINT 17.526 TO
MILEPOINT 18.155
US-27Lincoln PL20016
DN 120,000 STP5
RW
UT
CN 1,380,000 STP5
Project Cost: 0 1,500,000 0
N
EW TURNING LANE AT ARCADIA VIEW DRIVE(18CCN) (2020CCR)US-127Lincoln PL80000
DN 350,000 SPP
RW 210,000 SPP
UT 300,000 SPP
CN
Project Cost: 0 350,000 510,000
I
NSTALL GUARD RAIL ON GOSHEN RD AT DIX RIVER BRIDGE
(2020CCN) (2024CCR)
CR-1043Lincoln PL80110
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
Page 107 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Continue ongoing improvements to US 27 Corridor from Somerset to
L
exington. Improve Level of Service and safety on US 27 from KY 328
to KY 501 in Lincoln County. (2022CCN) (2024CCR)
US-27Lincoln PL 400,000 NH80201
DN 2,680,000 NH
RW
UT
CN
Project Cost: 400,000 2,680,000 0
R
ECONSTRUCTION TO MITIGATE ROCKSLIDE DAMAGE ON KY 300
(2022CCN) (2024CCR)
KY-300Lincoln PL80202
DN 700,000 SPP
RW 530,000 SPP
UT 320,000 SPP
CN
Project Cost: 0 700,000 850,000
I
mprove Safety and Access Control along US 150 from Danville to
Stanford. (2024CCN)
US-150Lincoln PL80300
DN 1,500,000 NH
RW 1,050,000 NH
UT
CN
Project Cost: 1,500,000 1,050,000 0
C
ontinue ongoing improvements to US 27 corridor from Somerset to
Lexington. Improve Level of Service and safety on US 27 from KY 70
at Eubank in Pulaski to KY 328 in Lincoln County.
US-27Lincoln PL80400
DN 1,876,200 NH
RW 5,315,900 NH
UT
CN
Project Cost:
1,876,200 0 5,315,900
T
otal for Lincoln county PL
Total Amounts:
CN
UT
RW
DN
400,000
3,376,200 3,850,000 113,937
12,390,000 1,050,000 6,055,900
14,000,000 620,000
30,000 1,380,000 759,580
16,196,200 20,280,000 7,549,417
Page 108 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and substandard geometrics in curve along KY 453
(
Dover Rd.) from I-24 Exit 31 to Easter Day Rd. (MP 4.401 - 5.314)
KY-453Livingston PL80418
DN 300,000 SPP
RW 350,000 SPP
UT 250,000 SPP
CN
Project Cost: 300,000 600,000 0
T
otal for Livingston county PL
Total Amounts:
CN
UT
RW
DN 300,000
350,000
250,000
300,000 600,000 0
W
IDEN US-79 FROM TODD COUNTY LINE TO INTERSECTION WITH
RUSSELLVILLE BYPASS.(18CCN) (2020CCR) (2022CCR) (2024CCN)
US-79Logan PL80050
DN 11,370,000 NH
RW
UT
CN
Project Cost: 11,370,000 0 0
W
iden US 79 from Todd County line to Russellville Bypass. (Estimates
based on preliminary engineering. Design funds allocated under Logan
Co. Item No. 03-80050)
US-79Logan PL80414
DN
RW 7,800,000 NH
UT
CN
Project Cost: 0 7,800,000 0
I
mprove safety at the US 68/US 431, US 68/Newtown Road, and US
68/KY 79 intersections. (MP 12.265 - 12.465)
US-68Logan PL80415
DN 500,000 SPP
RW
UT
CN
Project Cost: 0 500,000 0
Page 109 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Logan county P L
Total Amounts:
CN
UT
RW
DN 11,370,000 500,000
7,800,000
11,370,000 8,300,000 0
R
ELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF
THE LYON/CALDWELL COUNTY LINE (2020CCR) (2022CCR)
(2024CCR)
US-62,
US-641
Lyon PL187.5000
DN
RW
UT 2,080,000 STPF
CN
Project Cost:
2,080,000 0 0
B
RIDGE PROJECT IN LYON COUNTY ON (072B00047N) KY-903 AT I
24 @ MP. 51.718
KY-903Lyon PL10158
DN 74,852 FBP2
RW
UT
CN 499,016 FBP2
Project Cost: 0 0 573,868
A
DDRESS DEFICIENCIES ON BRIDGE ON KY-819 OVER PANTHER
CREEK (072B00031N)
KY-819Lyon PL10197
DN 137,213 FBP
RW
UT
CN 914,756 FBP
Project Cost: 0 1,051,969 0
ON US 62 WHERE THE P&L RAIL OVERPASS MEETS THE TWO (2) KY
8
10 INTERSECTIONS, RECONSTRUCT US 62/KY 810 (NORTH AND
SOUTH) INTERSECTIONS WITH TURN LANES OR OTHER MEASURE TO
IMPROVE LINE OF SIGHT AND SAFETY ISSUES. (2024CCN)
US-62L yon PL80312
DN 750,000 NH
RW
UT
CN
Project Cost: 0 750,000 0
Page 110 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Lyon county P L
Total Amounts:
CN
UT
RW
DN 887,213 74,852
2,080,000
914,756 499,016
2,080,000 1,801,969 573,868
I
ntersection Improvements at Barnes Mill Road (KY 876) and Goggins
Lane (CR 1303).
KY-876Madison PL4702
DN
RW 240,000 SPP
UT 480,000 SPP
CN 1,352,000 SPP
Project Cost: 0 240,000 1,832,000
P
ROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO
THE MADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881
MP.783-MP 2.780), JOHN BALLARD RD (KY 2877 MP0-MP.806 & CR
1236 MP0-MP.429) FROM MENELAUS TO AIRPORT RD, & A NEW
BRIDGE OVER SILVER CR.(14CCN)(16CCR) (2020CCR) (2022CCR)
CR-1236,
KY-2877,
KY-2881
Madison PL8853
DN
RW
UT
CN 17,830,000 HGC
Project Cost:
0 17,830,000 0
N
ew road that extends from Menelaus Road (KY 1983) at existing MP
2.851 to Mayde Road in Berea. (2022CCN) (2024CCR)
KY-1983,
PF-9999
Madison PL80201
DN
RW
UT
CN 4,330,000 CRP
Project Cost:
0 0 4,330,000
N
ew construction/modification of the I-75 exit 87 interchange as
referenced in the West Richmond Small Urban Area Study (2024CCN)
I -75Madison PL80316
DN
RW 193,000 NH
UT 420,000 NH
CN
Project Cost: 0 193,000 420,000
Page 111 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Relieve congestion and safety improvements on CR 1303 (Goggins
L
ane) between KY 169 and US 25 at Victory Drive (MP 0.979 to
0.363). (Memorandum of Agreement with Madison County to Design
and Construct, Madison County to provide $2 million for right of way
acquisition and utilities relocation.)(2024CCN)
CR-1303Madison PL80362
DN 750,000 SPP
RW
UT
CN 9,120,000 SPP
Project Cost:
0 750,000 9,120,000
E
xtend Farristown Industrial Drive at Menelaus Rd (KY 1983) to the
east to connect to US 25.
FF-9999Madison PL80421
DN 800,000 SPP
RW
UT
CN
Project Cost: 800,000 0 0
P
rovide an additional connection for Union City Road (KY 1986) to the
Robert Martin Bypass located east of the railroad. (MP 0-0.4)
KY-1986Madison PL80429
DN 450,000 SPP
RW
UT
CN
Project Cost: 0 0 450,000
I
mprove capacity on KY 52 (Lancaster Ave) beginning south of
Elizabeth St/Carnes Rd to north of Kit Carson Dr. (MP 9.997 - 10.346)
KY-52Madison PL80430
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 1,000,000 0 0
T
otal for Madison county PL
Total Amounts:
CN
UT
RW
DN 1,800,000 750,000 450,000
433,000
900,000
17,830,000 14,802,000
1,800,000 19,013,000 16,152,000
Page 112 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ROADWAY IMPROVEMENTS AND SIDEWALK CONSTRUCTION ALONG
K
Y 40 (MP 0.145-0.660) TO BETTER FACILITATE ALTERNATIVE
TRANSPORTATION METHODS (2018BOP). (2020CCR) (2024CCR)
KY-40M agoffin PL213
DN
RW
UT 1,560,000 STPF
CN
Project Cost: 1,560,000 0 0
R
ECONSTRUCT KY 7 FROM WILL BAILEY BRANCH ROAD TO KY
1090. (2024CCN)
KY-7Magoffin PL80302
DN 1,260,000 SPP
RW
UT
CN
Project Cost: 0 1,260,000 0
T
otal for Magoffin county PL
Total Amounts:
CN
UT
RW
DN 1,260,000
1,560,000
1,560,000 1,260,000 0
C
onstruct Phase 2 of the Loretto Sidewalk Project consisting on 3,900
LF of 5-foot wide sidewalk along St. Francis Highway (KY 52) from
near Schoolhouse Drive to the intersection of KY 49 and HWY 52,
northern terminus of the Phase 1 project, in the City of Loretto.
(2024CCN)
KY-52Marion PL3025
DN
RW
UT
CN 177,000 SPP
Project Cost:
0 177,000 0
B
RIDGE PROJECT IN MARION COUNTY ON (078B00037N) KY-152 AT
COLEMANS RUN CREEK
KY-152Marion PL10059
DN 234,738 BRX
RW
UT
CN 1,564,920 BRX
Project Cost: 0 0 1,799,658
Page 113 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE CONNECTIVITY AND CONGESTION BETWEEN US 68 AND
K
Y 55 ON THE EAST SIDE OF LEBANON (APPROXIMATELY 2 MILES)
(2022CCN) (2024CCR)
KY-2154,
KY-55,
PF-9999,
US-68
Marion PL80259
DN
RW 5,000,000 STPF
UT 1,560,000 STPF
CN 1,000,000 STPF
Project Cost:
0 5,000,000 2,560,000
RECONSTRUCT BILL SAMUEL'S JR RD (CR1129) AND MAKER'S MARK
R
D (CR1309) FROM NEAR BURK SPRING RD (CR1307) INTERSECTION
TO HICKORY CAMP RD (CR1224) INTERSECTION TO IMPROVE
ACCESS, SAFETY, AND CONNECTIVITY AND MOBILITY (DESIGN,
RIGHT OF WAY, AND UTILITY PHASES TO BE PAID FOR OR DONATED
CR-1129M arion PL80312
DN
RW
UT
CN 8,000,000 CRP
Project Cost: 0 0 8,000,000
I
mprove sight distance at vertical curve by lowering the top of the hill
while raising the road in the sag.
KY-49Marion PL80411
DN 150,000 SPP
RW 250,000 SPP
UT 450,000 SPP
CN 1,000,000 SPP
Project Cost: 0 400,000 1,450,000
A
DDRESS ROADWAY FLOODING ALONG KY 49 FROM MILEPOINT
6.000 SOUTH OF NARROWS ROAD TO MILEPOINT 8.700 NORTH OF
BIG SOUTH FORK. (TO REPLACE MARION COUNTY SYP 4-8715.00)
KY-49Marion PL80412
DN 750,000 PROT
RW 500,000 PROT
UT 600,000 PROT
CN 2,500,000 PROT
Project Cost:
0 4,350,000 0
A
dd guardrail on KY 429 (MP 1.065 - 1.126)KY-429Marion PL80414
DN 25,000 GR
RW 10,000 GR
UT 300,000 GR
CN 165,000 GR
Project Cost: 0 500,000 0
T
otal for Marion county PL
Total Amounts:
CN
UT
RW
DN 925,000 234,738
5,760,000
900,000 2,010,000
2,842,000 11,564,920
0 10,427,000 13,809,658
Page 114 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM
K
Y-95 TO THE EXISTING FOUR-LANE HIGHWAY AT LONE VALLEY
RD NEAR I-24 INTERCHANGE AND FUTURE I-69 CONNECTION.
(2020CCR) (2024CCR)
US-62Marshall PL398
DN
RW
UT
CN 7,500,000 CRP
Project Cost:
0 0 7,500,000
B
RIDGE PROJECT IN MARSHALL COUNTY ON (079B00014N) KY-795
AT CHESTNUT CREEK
KY-795Marshall PL10171
DN 199,072 BRZ
RW
UT
CN 1,327,146 BRZ
Project Cost: 1,526,218 0 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 40.088 TO
MILEPOINT 50.547
I -69Marshall PL22074
DN 800,000 NHPM
RW
UT
CN 7,953,756 NHPM
Project Cost: 0 8,753,756 0
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY,
S
ERVICE, AND CONGESTION ISSUES FROM BENTON BAPTIST TEMPLE
ROAD / HAPPY HOLLOW RD TO US 68 IN DRAFFENVILLE. (2024CCN)
US-641M arshall PL80311
DN 1,500,000 NH
RW
UT
CN
Project Cost: 0 1,500,000 0
T
otal for Marshall county PL
Total Amounts:
CN
UT
RW
DN 199,072 2,300,000
1,327,146 7,953,756 7,500,000
1,526,218 10,253,756 7,500,000
Page 115 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED
J
UST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES
BEFORE GORDON HOLLOW ROAD, AND IMPROVE THE
CULVERT/SAFETY DESIGN TO INCREASE MOTORIST AND
PEDESTRIAN SAFETY. (12CCR) (2020CCR) (2022CCR) (2024CCR)
KY-40Martin PL192
DN
RW
UT
CN 1,974,700 CRP
Project Cost:
0 0 1,974,700
I
NSTALL GUARDRAIL ON KY-3 IN MARTIN COUNTYKY-3Martin PL4333
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-3 IN MARTIN COUNTYKY-3Martin PL4335
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4347
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4348
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
Page 116 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYK Y-292Martin PL4349
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-2031 IN MARTIN COUNTYKY-2031Martin PL4405
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-1439 IN MARTIN COUNTYKY-1439Martin PL4449
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4454
DN
RW
UT
CN 31,000 GR
Project Cost: 31,000 0 0
I
NSTALL GUARDRAIL ON KY-908 IN MARTIN COUNTYKY-908Martin PL4480
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
Page 117 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN MARTIN COUNTY ON (080B00005N) KY-40 AT
R
OCKCASTLE CREEK
KY-40Martin PL10127
DN
RW 50,000 FBP2
UT 200,000 FBP2
CN 4,472,753 FBP2
Project Cost: 0 0 4,722,753
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 3407 OVER Wolf Creek
(080B00028N)
KY-3407Martin PL10151
DN
RW 50,000 BRX
UT 135,000 BRX
CN 1,921,219 BRX
Project Cost: 0 0 2,106,219
A
ddress safety concerns, substandard roadway geometrics, and
pavement conditions on KY-908 from Reservoir Road to Helen Mills
Road. 1.5 miles (MP 6.705-8.182)
KY-908Martin PL80412
DN 250,000 SPP
RW 75,000 SPP
UT 100,000 SPP
CN
Project Cost:
250,000 175,000 0
T
otal for Martin county PL
Total Amounts:
CN
UT
RW
DN 250,000
75,000 100,000
100,000 335,000
535,000 8,368,672
785,000 175,000 8,803,672
I
NSTALL GUARDRAIL ON KY-10 IN MASON COUNTYKY-10Mason PL4325
DN
RW
UT
CN 74,000 GR
Project Cost: 74,000 0 0
Page 118 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF KY-9 FROM MILEPOINT 7.147 TO MILEPOINT
1
0.256
KY-9M ason PL20030
DN 400,000 NHPM
RW
UT
CN 4,600,000 NHPM
Project Cost: 0 0 5,000,000
I
mprove the operational efficiency for northbound traffic on KY-9 (AA
Highway) at the intersection with Kenton Station Drive (hospital
entrance) (MP10.6-10.9)
KY-9Mason PL80413
DN 180,000 SPP
RW 250,000 SPP
UT 500,000 SPP
CN
Project Cost: 180,000 750,000 0
I
mprove safety and operational efficiency of intersection of KY 9 (AA
Highway) and KY 11. (MP 7.46-7.66)
KY-9Mason PL80414
DN 250,000 SPP
RW
UT 500,000 SPP
CN 1,000,000 SPP
Project Cost: 250,000 1,500,000 0
T
otal for Mason county PL
Total Amounts:
CN
UT
RW
DN 430,000 400,000
250,000
1,000,000
74,000 1,000,000 4,600,000
504,000 2,250,000 5,000,000
A
ddress issues with service, congestion and safety from US 45 to
I-24 in Paducah. See March, 2002 Paducah-McCracken County
Transportation Study. (2024CCN)
US-62McCracken PL142
DN
RW 5,500,000 STP1
UT
CN
Project Cost:
0 5,500,000 0
Page 119 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Extend KY 1286 from KY 998 (MP 6.916) to US 60. (Priority Section 2)
(
2022CCR) (2024CCR)
KY-1286McCracken PL153.2000
DN
RW
UT
CN 7,500,000 STP1
Project Cost: 7,500,000 0 0
I
mprove KY 1286 from US 62(MP 5.000) to Perkins Creek Bridge (MP
5.896, B00167N). (Priority Section 3) (2022CCN) (2024CCR)
KY-1286McCracken PL153.3000
DN
RW 2,750,000 STP1
UT 2,160,000 STP1
CN
Project Cost: 0 2,750,000 2,160,000
I
mprove KY 1286 from Perkins Creek Bridge (MP 5.896, B00167N) to
KY 998 (MP 6.916). (Priority Section 4) (2022CCN) (2024CCR)
KY-1286McCracken PL153.4000
DN
RW
UT 2,160,000 STP1
CN
Project Cost: 0 2,160,000 0
B
RIDGE PROJECT IN MCCRACKEN COUNTY ON (073B00030N)
KY-3520 AT P&L RAILWAY
KY-3520McCracken PL10162
DN 456,086 BRZ
RW
UT
CN 3,040,571 BRZ
Project Cost: 0 3,496,657 0
BRIDGE PROJECT IN MCCRACKEN COUNTY ON (073B00100N) I-24 AT
O
HIO RIVER
I -24M cCracken PL10166
DN
RW
UT
CN 23,100,000 BRX
Project Cost: 0 23,100,000 0
Page 120 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Planning and Phase I Engineering for the future expansion or
r
eplacement of the I-24 Ohio River Bridge. (Shared Cost w/ Illinois)
(073B00100N)
I -24McCracken PL10261
DN
RW
UT
CN 1,375,000 1,375,000 BRO
Project Cost: 0 1,375,000 1,375,000
A
DDRESS CONDITION OF I-024 FROM MILEPOINT 16.172 TO
MILEPOINT 17.32
I -24McCracken PL20017
DN 80,000 STP3
RW
UT
CN 800,000 STP3
Project Cost: 0 880,000 0
I
mprove safety, congestion, mobility, and access at the Intersection of
US 60 with Coleman Rd. and James Sanders Blvd.
US-60McCracken PL80406
DN 900,000 NH
RW
UT
CN
Project Cost: 0 900,000 0
I
mprove traffic flow, minimize congestion, and address safety
concerns on US 60 from New Holt Road to Tractor Supply
US-60McCracken PL80408
DN 800,000 NH
RW 750,000 NH
UT 500,000 NH
CN 2,250,000 NH
Project Cost: 800,000 1,250,000 2,250,000
T
otal for McCracken county PL
Total Amounts:
CN
UT
RW
DN 800,000 1,436,086
9,000,000
2,660,000 2,160,000
7,500,000 28,315,571 3,625,000
8,300,000 41,411,657 5,785,000
Page 121 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN MCCREARY COUNTY ON (074B00020N) KY-1470
A
T MARSH CREEK
KY-1470McCreary PL10059
DN 156,474 BRX
RW
UT
CN 1,043,159 BRX
Project Cost: 0 0 1,199,633
PROVIDE CONNECTIVITY, IMPROVE MOBILITY AND RESPONSE FROM
U
S 27 TO MCCREARY COUNTY HIGH SCHOOL (2020CCN) (2022CCR)
(2024CCR)
US-27M cCreary PL80102
DN
RW
UT
CN 700,000 CRP
Project Cost: 0 700,000 0
I
mprove mobility and safety RR crossing elimination by constructing
bridge and realigning KY 1470, approx 0.177 miles west of CR1199A
(Dick Wilson Rd) and extending easterly to US 27. (2020CCN)
(2022CCR) (2024CCR)
CR-1199McCreary PL80103
DN
RW 750,000 SPP
UT
CN
Project Cost:
0 750,000 0
I
mprove safety and mobility along US27 at KY2792/ KY1651 and
widen approach routes 1500 feet on each side of US 27 in Pine Knot
US-27McCreary PL80406
DN 320,000 NH
RW 480,000 NH
UT
CN
Project Cost: 320,000 0 480,000
T
otal for McCreary county PL
Total Amounts:
CN
UT
RW
DN 320,000 156,474
750,000 480,000
700,000 1,043,159
320,000 1,450,000 1,679,633
Page 122 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND
K
Y-250. (08CCN)(12CCR)(18CCN) (2020CCR) (2022CCR)
US-431McLean PL8400
DN
RW
UT
CN 1,700,000 SPP
Project Cost: 1,700,000 0 0
B
RIDGE PROJECT IN MCCLEAN COUNTY ON (075B00028N) KY-81 AT
UNNAMED STREAM
KY-81McLean PL10111
DN 133,805 BRX
RW
UT
CN 892,032 BRX
Project Cost: 0 0 1,025,837
B
RIDGE PROJECT IN MCCLEAN COUNTY ON (075B00040N) KY-140
AT BR OF LONG FALLS CREEK
KY-140McLean PL10116
DN 224,659 BRX
RW
UT
CN 1,497,726 BRX
Project Cost: 0 0 1,722,385
I
mprove safety of the intersection of KY-81 and KY-138 by adding a
conflict warning system.
KY-138McLean PL80401
DN 15,000 SPP
RW 250,000 SPP
UT 50,000 SPP
CN 150,000 SPP
Project Cost: 265,000 50,000 150,000
T
otal for McLean county PL
Total Amounts:
CN
UT
RW
DN 15,000 358,464
250,000
50,000
1,700,000 2,539,758
1,965,000 50,000 2,898,222
Page 123 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)
(
18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-79Meade PL8705
DN
RW
UT
CN 17,280,000 SPP
Project Cost: 17,280,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 313 OVER OHIO RIVER
AND CO ROAD (082B00021N)
KY-313Meade PL10078
DN 475,000 BRX
RW
UT
CN 3,525,000 BRX
Project Cost: 0 0 4,000,000
A
DDRESS SAFETY AND MOBILITY ALONG KY 313 (BRANDENBURG
BYPASS) FROM KY 448 TO KY 228 IN BRANDENBURG. (2024CCN)
KY-313Meade PL80309
DN 2,000,000 SPP
RW
UT
CN
Project Cost: 0 2,000,000 0
P
erform embankment slope repairs along KY 933 (Olin Rd) near the
Doe Valley Lake Dam (MP 0.0 to 7.3) . Spots along the entire length, as
noted in the study.
KY-933Meade PL80415
DN
RW
UT
CN 750,000 SPP
Project Cost:
0 0 750,000
T
otal for Meade county PL
Total Amounts:
CN
UT
RW
DN 2,000,000 475,000
17,280,000 4,275,000
17,280,000 2,000,000 4,750,000
Page 124 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruction of US 460 from Lucky Stop to KY 713 @ Means.
(
2024CCN)
US-460Menifee PL250
DN 600,000 STP2
RW
UT
CN
Project Cost: 600,000 0 0
W
IDEN EXISTING ROADWAY AND IMPROVE VERTICAL AND
HORIZONTAL CURVES. NEW CONSTRUCTION. COMPLETES US 460
UPGRADES IN MENIFEE COUNTY FROM MP 14.35 TO 19.39 AND IN
MORGAN COUNTY FROM MP 0 TO MP 0.8. (14CCN)(16CCR)
(2024CCN)
US-460Menifee PL8805
DN 3,930,000 SPP
RW
UT
CN
Project Cost:
0 3,930,000 0
I
mprove safety, correct geometrics, and enhance regional connectivity
on US 460 from the bridge over Dog Trot Fork (MP 3.3) to Rothwell (MP
4.8). (2022CCN) (2024CCR)
US-460Menifee PL80201
DN
RW
UT 1,985,000 STPF
CN
Project Cost:
0 1,985,000 0
T
otal for Menifee county PL
Total Amounts:
CN
UT
RW
DN 600,000 3,930,000
1,985,000
600,000 5,915,000 0
I
MPROVE SYSTEM MOBILITY ALONG MOBERLY ROAD FROM KY 390
TO KY 1989 IN NORTHWEST HARRODSBURG. (12CCR) (2020CCN)
(2024CCR)
CS-1237Mercer PL417
DN
RW 420,000 SPP
UT 390,000 SPP
CN
Project Cost:
0 420,000 390,000
Page 125 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve level of safety and access at and around the intersection of
U
S 127 and KY 598 (Sparrow Lane). (MP 2.676 - 2.776) (2024CCN)
US-127Mercer PL80355
DN
RW 40,000 CRP
UT 170,000 CRP
CN 750,000 CRP
Project Cost: 0 960,000 0
I
mprove access onto US 127 from the Industrial Park North of the
Harrodsburg Bypass. Consider design/build.
US-127Mercer PL80424
DN 350,000 SPP
RW 100,000 SPP
UT 150,000 SPP
CN
Project Cost: 350,000 250,000 0
T
otal for Mercer county PL
Total Amounts:
CN
UT
RW
DN 350,000
560,000
320,000 390,000
750,000
350,000 1,630,000 390,000
S
UMMER SHADE BYPASS. (06CCR)(2006BOPC)(08CCR)(12CCR)
(14CCR) (2024CCN)
KY-90Metcalfe PL112.1000
DN 2,240,000 SPP
RW
UT
CN
Project Cost: 2,240,000 0 0
I
mprove safety and mobility on KY 90 between the Barren County Line
and KY 640 in Summer Shade. (MP 0-3.283)
KY-90Metcalfe PL80416
DN 750,000 SPP
RW
UT
CN
Project Cost: 0 0 750,000
Page 126 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Metcalfe county P L
Total Amounts:
CN
UT
RW
DN 2,240,000 750,000
2,240,000 0 750,000
O
PERATION OF TURKEY NECK BEND FERRY FOR FY 2027-2032.
(12CCR) (2020CCR) (2024CCR)
KY-214Monroe PL128.1100
DN
RW
UT
CN 1,250,000 1,250,000 SPP
Project Cost: 0 1,250,000 1,250,000
B
RIDGE PROJECT IN MONROE COUNTY ON (086B00040N) KY-678 AT
SKAGGS CREEK
KY-678Monroe PL10044
DN 301,224 BRX
RW
UT
CN 2,008,159 BRX
Project Cost: 0 0 2,309,383
R
econstruct or realign KY 163 (Celina Road) from Tennessee State
Line to Tompkinsville Bypass
KY-163Monroe PL80401
DN 2,500,000 SPP
RW
UT
CN
Project Cost: 0 2,500,000 0
I
mprove safety and mobility on KY 100 at the narrow bridge over
Spring Creek. (MP1.72-1.77)
KY-100Monroe PL80419
DN 250,000 SPP
RW 75,000 SPP
UT 100,000 SPP
CN
Project Cost: 0 425,000 0
Page 127 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and mobility on KY 100 at the narrow bridge over
I
ndian Creek. (MP 4-4.1)
KY-100Monroe PL80420
DN 250,000 SPP
RW 75,000 SPP
UT 100,000 SPP
CN
Project Cost: 0 0 425,000
T
otal for Monroe county PL
Total Amounts:
CN
UT
RW
DN 2,750,000 551,224
75,000 75,000
100,000 100,000
1,250,000 3,258,159
0 4,175,000 3,984,383
W
IDEN KY-1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL
INDUSTRIAL PARK, MONTGOMERY COUNTY. (SEE 7-8501.00 FOR
"SPB" FUNDS) (2005HPP-KY129) (2022CCR) (2024CCR)
KY-1991Montgomery PL240
DN
RW
UT
CN 3,050,000 STP1
Project Cost:
3,050,000 0 0
U
PGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND
TRAIL TO THE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES
EXTENSION OF INDUSTRIAL ACCESS ROAD TO HINKSTON PIKE).
(12CCR)(18CCN) (2022CCR) (2024CCR)
KY-1991Montgomery PL411
DN
RW 620,000 SPP
UT
CN
Project Cost:
0 620,000 0
W
IDEN EXISTING PAVEMENT & IMPROVE VERTICAL & HORIZONTAL
CURVES FROM EXISTING MT STERLING BYPASS (KY 686) TO 500' W
OF BENTBROOK SUBDIVISION. ADD FULL WIDTH SHOULDERS & A
CENTER TURNING LANE IN CONGESTION AREAS FROM MP 2.2 TO
4.311.(14CCN)(16CCR)(18CCN) (2020CCR) (2024CCR)
US-60Montgomery PL8810
DN
RW
UT 5,730,000 SPP
CN
Project Cost:
0 5,730,000 0
Page 128 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruct US-460 from Cardinal Ln to US-60 in Mount Sterling. This
s
hould include a consistent urban typical and other geometric
improvements.
US-460Montgomery PL80423
DN 2,250,000 STP1
RW
UT
CN
Project Cost: 2,250,000 0 0
T
otal for Montgomery county PL
Total Amounts:
CN
UT
RW
DN 2,250,000
620,000
5,730,000
3,050,000
5,300,000 6,350,000 0
R
ECONSTRUCT KY-7 FROM MILE POST 2.7 TO MILE POST 5.6
(JUNCTION 519 TO SOUTH SIDE OF WRIGLEY HILL)
KY-7Morgan PL8402
DN
RW 2,750,000 STP2
UT
CN
Project Cost: 0 2,750,000 0
I
MPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)
(16CCN) (2022CCR) (2024CCR)
KY-2498Morgan PL8804
DN
RW
UT
CN 8,790,000 SPP
Project Cost: 8,790,000 0 0
I
mprove sight distance at intersection of US 460 and KY 2499
(Dogwood Lane) in West Liberty
US-460Morgan PL80401
DN 50,000 SPP
RW 50,000 SPP
UT 125,000 SPP
CN 200,000 SPP
Project Cost: 50,000 175,000 200,000
Page 129 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Morgan county P L
Total Amounts:
CN
UT
RW
DN 50,000
2,800,000
125,000
8,790,000 200,000
8,840,000 2,925,000 200,000
W
IDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION
601 TO WENDELL FORD CENTER. (14CCN)(18CCN) (2022CCR)
(2024CCR)
KY-181Muhlenberg PL8802
DN
RW
UT
CN 6,320,000 STPF
Project Cost: 6,320,000 0 0
B
RIDGE PROJECT IN MUHLENBERG COUNTY ON (089B00031N)
KY-181 AT BAT EAST CREEK
KY-181Muhlenberg PL10122
DN 215,380 BRX
RW
UT
CN 1,435,867 BRX
Project Cost: 1,651,247 0 0
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 45.95 TO MILEPOINT 52.535
WK-9001Muhlenberg PL22162
DN 870,000 NHPM
RW
UT
CN 8,730,000 NHPM
Project Cost: 0 0 9,600,000
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 59.92 TO MILEPOINT 65.375
WK-9001Muhlenberg PL22165
DN 410,000 NHPM
RW
UT
CN 4,150,380 NHPM
Project Cost: 0 4,560,380 0
Page 130 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WESTERN KENTUCKY PKY - RECONSTRUCT INTERCHANGE AT US
4
31 AT CENTRAL CITY (2022CCN) (2024CCR)
WK-9001Muhlenberg PL80201
DN 700,000 SPP
RW 1,380,000 SPP
UT
CN
Project Cost: 2,080,000 0 0
T
otal for Muhlenberg county PL
Total Amounts:
CN
UT
RW
DN 915,380 410,000 870,000
1,380,000
7,755,867 4,150,380 8,730,000
10,051,247 4,560,380 9,600,000
I
MPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM
THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON
COUNTY LINE. (2016BOP)(18CCR)(D-Auth under 4-396) (2022CCR)
(2024CCR)
US-150Nelson PL396.1000
DN
RW
UT
CN 4,000,000 5,000,000 STPF
Project Cost:
0 4,000,000 5,000,000
I
NSTALL GUARDRAIL ON KY-458 IN NELSON COUNTY (2024CCR)KY-458Nelson PL4319
DN
RW
UT
CN 311,000 GR
Project Cost: 311,000 0 0
A
ddress safety and mobility along KY 245 from the existing 5 lane
section at Flaget Hospital (MP 7.720) to just north of Hall Loop (MP
9.020). Improve intersection of KY 245 and KY 509.
KY-245Nelson PL8307.2500
DN
RW 400,000 STPF
UT 1,000,000 STPF
CN 7,000,000 STPF
Project Cost:
0 1,400,000 7,000,000
Page 131 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN US-150 FROM KY-49 TO NEAR KY-245/WAL-MART WIDENING.
(
06CCN) (2022CCN) (2024CCR)
US-150Nelson PL8308.1000
DN
RW 3,500,000 STP1
UT 2,080,000 STP1
CN
Project Cost: 0 3,500,000 2,080,000
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 8.837 TO MILEPOINT 10.172
BG-9002Nelson PL20052
DN 50,000 STP5
RW
UT
CN 537,400 STP5
Project Cost: 0 587,400 0
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 10.172 TO MILEPOINT 17.542 (17.134 CARDINAL)
BG-9002Nelson PL22173
DN 550,000 NHPM
RW
UT
CN 5,500,000 NHPM
Project Cost: 6,050,000 0 0
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 17.134 (17.542 NON-CARDINAL) TO MILEPOINT
24.095
BG-9002Nelson PL22174
DN 1,600,000 NHPM
RW
UT
CN 16,000,000 NHPM
Project Cost:
0 17,600,000 0
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 35.15 TO MILEPOINT 39.267
BG-9002Nelson PL22176
DN 730,000 NHPM
RW
UT
CN 7,270,000 NHPM
Project Cost: 0 0 8,000,000
Page 132 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve traffic operations, mobility and passing opportunities along US
3
1 E (Louisville - Bardstown Rd) from KY 509 to Bullitt County Line.
Consider a 2+1 configuration and/or innovative intersections. (MP
20.536 - 27.428) (2024CCN)
US-31Nelson PL80363
DN 2,320,000 STPF
RW 320,000 STPF
UT 620,000 STPF
CN
Project Cost:
0 2,320,000 940,000
A
DDRESS CONGESTION ALONG US 62 IN BARDSTOWN FROM KY
245 TO KY 605. (MP 15.894-17.209)
US-62Nelson PL80416
DN 800,000 SPP
RW
UT
CN
Project Cost: 800,000 0 0
P
reliminary Design to improve safety and congestion from Kelly Drive
to US 31E (MP 3.346-3.661)
KY-245Nelson PL80417
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 0 1,000,000 0
T
otal for Nelson county PL
Total Amounts:
CN
UT
RW
DN 1,350,000 4,970,000 730,000
3,900,000 320,000
1,000,000 2,700,000
5,811,000 20,537,400 19,270,000
7,161,000 30,407,400 23,020,000
I
MPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS
COUNTY SCHOOL PROPERTY (12CCR)(16CCR)(2020CCR) (2022CCR)
(2024CCR)
KY-36Nicholas PL205
DN
RW 2,100,000 STP2
UT
CN
Project Cost: 2,100,000 0 0
Page 133 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER
T
RIB-HOOKTOWN BRANCH (091B00031N)
KY-32Nicholas PL10103
DN 58,818 BRX
RW
UT
CN 392,122 BRX
Project Cost: 0 450,940 0
I
mprove access along KY 386 (Carpenter Pike) from US 68 to new
industrial site.
KY-386Nicholas PL80407
DN 750,000 SPP
RW
UT
CN
Project Cost: 0 750,000 0
T
otal for Nicholas county PL
Total Amounts:
CN
UT
RW
DN 808,818
2,100,000
392,122
2,100,000 1,200,940 0
A
ddress Drainage Issues on US 62 in Ohio CountyUS-62Ohio PL127
DN
RW
UT
CN 2,400,000 CRP
Project Cost: 0 0 2,400,000
I
NSTALL GUARDRAIL ON KY-69 IN OHIO COUNTYKY-69Ohio PL4302
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
Page 134 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-69 IN OHIO COUNTYK Y-69Ohio PL4303
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
A
ddress the safety concerns of KY-69 from Sunnydale Road to
KY-54 at Fordsville.
KY-69Ohio PL80408
DN 2,550,000 SPP
RW
UT
CN
Project Cost: 0 2,550,000 0
T
otal for Ohio county PL
Total Amounts:
CN
UT
RW
DN 2,550,000
90,000 2,400,000
90,000 2,550,000 2,400,000
K
Y-393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD
CROSSING (CSX) EXTENDING NORTHWEST TOWARDS KY 146
ENDING AT STATION 12+00 (DESIGN UNDER 5-230.00).
(CONSTRUCTION SEQ.#2) (2020CCN) (2022CCR) (2024CCR)
KY-146,
KY-393
Oldham PL234
DN
RW
UT
CN 10,000,000 STPF
Project Cost:
0 0 10,000,000
R
econstruct KY 22 from KY 329 to Abbott Lane, Including Rail
Crossing Improvement in the vicinity of KY 329 (Railroad Ave) and
CSX Railroad to improve safety and freight mobility through Crestwood
(KY 329 – MP 8.840-8.935 and KY 1408 – MP 2.900-3.132)
KY-22Oldham PL304.1000
DN 2,260,000 SPP
RW
UT
CN
Project Cost:
0 2,260,000 0
Page 135 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO
K
Y-393 (MP 18.0). (2022CCR) (2024CCR)
I -71Oldham PL483.1000
DN
RW 1,900,000 NH
UT 2,500,000 NH
CN 12,500,000 NH
Project Cost: 1,900,000 2,500,000 12,500,000
W
IDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO
KY-53 (MP 22.4). (16CCN) (2024CCR)
I -71Oldham PL483.2000
DN 6,160,000 NH
RW
UT
CN
Project Cost: 0 6,160,000 0
A
ddition of soundwall on I-71 SB along Darby Pointe Neighborhood
(MP 16.7-17.4) (To be let with 5-483.1 I-71 Widening). (2024CCN)
I -71Oldham PL483.4000
DN 220,000 SPP
RW
UT
CN 6,225,000 SPP
Project Cost: 220,000 6,225,000 0
D
ESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22
(TOTAL 3.2 MILES). (14CCN)(18CCN) (2022CCR) (2024CCR)
KY-53Oldham PL8852
DN
RW 1,790,000 SPP
UT 730,000 SPP
CN 36,400,000 SPP
Project Cost: 1,790,000 730,000 36,400,000
A
DDRESS CONDITION OF I-071 CARDINAL DIRECTION FROM
MILEPOINT 14.38 TO MILEPOINT 18.07
I -71Oldham PL22098
DN 750,000 NHPM
RW
UT
CN 7,550,000 NHPM
Project Cost: 0 8,300,000 0
Page 136 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE THE INTERCHANGE OF I 71 AND KY 329. (18CCN)
(
2020CCR) (DESIGNED UNDER 5-483.10) (2022CCR) (2024CCR)
I -71Oldham PL80005
DN 430,000 NH
RW 1,160,000 NH
UT 1,050,000 NH
CN
Project Cost: 430,000 1,160,000 1,050,000
C
onstruct a turn lane on KY-329 bypass at Dovefield DriveKY-329Oldham PL80050
DN 200,000 SPP
RW
UT
CN 600,000 SPP
Project Cost: 200,000 0 600,000
I
mprove safety and reduce congestion on KY 53 from I-71 to Zhale
Smith Road. Includes consideration of a five lane widening and bike/
ped accommodations. (2022CCN) (2024CCR)
KY-53Oldham PL80209
DN 1,600,000 STPF
RW
UT
CN
Project Cost:
1,600,000 0 0
I
mprove safety and reduce congestion on KY 146 (LaGrange Road)
from KY 329B (KY 329 Bypass) to KY 393. Includes consideration of
a four lane widening and bike/ped accommodations. (2022CCN)
KY-146Oldham PL80210
DN 3,300,000 SPP
RW
UT
CN
Project Cost:
0 3,300,000 0
L
andslide repair on Westport Road (KY-524) from JCT. US-42 West,
north 1.0 mile. (2002BOPC)(NOT REQUIRED) (2022CCN)
KY-524Oldham PL80211
DN 650,000 SPP
RW 530,000 SPP
UT 500,000 SPP
CN
Project Cost: 650,000 1,030,000 0
Page 137 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE TRAFFIC FLOW, MINIMIZE CONGESTION, AND ADDRESS
S
AFETY ISSUES ON US 42 BETWEEN RIDGMOOR DRIVE AND KY
1694 (GUM STREET). INCLUDES CONSIDERATION OF A THREE LANE
WIDENING AND BIKE/PED ACCOMMODATIONS. (2024CCN)
US-42Oldham PL80307
DN 3,500,000 NH
RW
UT
CN
Project Cost:
0 3,500,000 0
I
MPROVE SAFETY AND REDUCE CONGESTION AT THE I-71/KY 53
(NORTH/SOUTH FIRST AVENUE) INTERCHANGE. INCLUDES
CONSIDERATION OF AN ADDITIONAL LEFT-TURN LANE ON NB KY 53
TO THE SB I-71 ON-RAMP. REQUIRES MINOR WIDENING OF KY 53
BRIDGE (093B0002N) AND RAMP. (2024CCN)
I-71Oldham PL80313
DN 800,000 NH
RW 200,000 NH
UT 200,000 NH
CN
Project Cost:
800,000 400,000 0
I
MPROVE SAFETY, ACCESS, AND ADDRESS GEOMETRIC
DEFICIENCIES ALONG KY 362 FROM THE OLDHAM/SHELBY COUNTY
LINE TO KY 146 (IN AND SOUTH OF PEWEE VALLEY). INCLUDES
CONSIDERATION OF A 3 LANE WIDENING WITH A TWO WAY LEFT
TURN LANE AND BIKE/PED ACCOMMODATIONS. (2024CCN)
KY-362Oldham PL 210,000 SPP80314
DN 1,960,000 SPP
RW
UT
CN
Project Cost:
0 210,000 1,960,000
R
EDUCE CONGESTION, IMPROVE SAFETY AND ENHANCE MOBILITY
ON KY 146 IN BUCKNER FROM KY 1817 (NEW CUT ROAD) (MP 6.81)
TO KY 393 (MP 7.42). (2024CCN)
KY-146Oldham PL80325
DN 510,000 SPP
RW
UT
CN
Project Cost:
0 510,000 0
A
DDITION OF SOUNDWALL ON I 71 NB ALONG SPRING HILL
SUBDIVISION. (As a part of the I-MOVE Expansion Project on I 71).
(NOTE: Does not meet required noise wall environmental noise
analysis abatement eligibility requirements for federal funding.)
(2024CCN)
I -71Oldham PL80344
DN 210,000 SPP
RW
UT
CN 3,400,000 SPP
Project Cost:
210,000 3,400,000 0
Page 138 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION, ALONG US 22 FROM
H
AUNZ LANE TO KY 329. (2024CCN)
KY-22Oldham PL80345
DN 330,000 SPP
RW 840,000 SPP
UT
CN
Project Cost: 330,000 840,000 0
E
xamine congestion, safety and mobility on KY 146 from KY 393 (mp
7.64) to Fifth Avenue (CS 1044) (mp 10.67)
KY-146Oldham PL 250,000 SPP80427
DN
RW
UT
CN
Project Cost: 250,000 0 0
F
easibility study for an additional connection on I-71 in northeast
Oldham County
I-71Oldham PL 500,000 NH80428
DN
RW
UT
CN
Project Cost: 0 500,000 0
T
otal for Oldham county PL
Total Amounts:
CN
UT
RW
DN
250,000 710,000
4,440,000 16,480,000 1,960,000
3,690,000 2,730,000
3,930,000 1,050,000
17,175,000 59,500,000
8,380,000 41,025,000 62,510,000
R
esurfacing KY 1982 (MP 0.0 - 7.153)KY-1982Owen PL80419
DN
RW
UT
CN 858,400 STP5
Project Cost: 0 858,400 0
Page 139 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Resurfacing KY 3548 (MP 0.0 - 3.53)K Y-3548Owen PL80420
DN
RW
UT
CN 345,400 STP5
Project Cost: 0 345,400 0
R
esurfacing KY 325 (MP 0.0 - 5.642)KY-325Owen PL80421
DN
RW
UT
CN 752,300 STP5
Project Cost: 0 0 752,300
T
otal for Owen county PL
Total Amounts:
CN
UT
RW
DN
1,203,800 752,300
0 1,203,800 752,300
RECONSTRUCT THE INTERSECTION OF KY 11 AND KY 846 (2020CCN)
(
2024CCR)
KY-11O wsley PL80105
DN
RW
UT
CN 3,490,000 CRP
Project Cost: 0 0 3,490,000
C
onstruct a right turn lane on KY 28 at the Amburgey Rd. intersection
(MP 0.274) near the Owsley Co. Elementary School
KY-28Owsley PL80402
DN 75,000 SPP
RW 50,000 SPP
UT 75,000 SPP
CN 200,000 SPP
Project Cost: 75,000 325,000 0
Page 140 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve pedestrian access/connectivity and safety by constructing
s
idewalk on CR 1346K (Old KY 11) from approximately MP 0.013 to MP
0.071. City and County will be responsible for right of way and utilities.
CR-1346Owsley PL80413
DN 30,000 SPP
RW
UT
CN 260,000 SPP
Project Cost: 0 290,000 0
I
mprove pedestrian access/connectivity and safety by constructing
sidewalk on KY 30 from approximately MP 8.694 to MP 8.818. City and
County will be responsible for right of way and utilities.
KY-30Owsley PL80414
DN 65,000 SPP
RW
UT
CN 650,000 SPP
Project Cost:
0 715,000 0
R
epair roadway settlements on KY-30 between the KY-30/11
intersection and Botner Road.(MP3.9-8.26)
KY-30Owsley PL80415
DN 150,000 SPP
RW
UT
CN 1,500,000 SPP
Project Cost: 150,000 1,500,000 0
T
otal for Owsley county PL
Total Amounts:
CN
UT
RW
DN 225,000 95,000
50,000
75,000
2,610,000 3,490,000
225,000 2,830,000 3,490,000
I
MPROVE SAFETY AND MOBILITY ON US 27 AT THE KY 22
INTERSECTION. (2024CCN)
US-27Pendleton PL80306
DN 870,000 STPF
RW
UT
CN
Project Cost: 870,000 0 0
Page 141 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Pendleton county P L
Total Amounts:
CN
UT
RW
DN 870,000
870,000 0 0
A
ddress roadway slide on KY 7 from MP 9.8 to MP 10.0. (2024CCR)KY-7Perry PL178
DN
RW
UT
CN 4,270,000 PROT
Project Cost: 4,270,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN PERRY COUNTYKY-7Perry PL4317
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
N
EW INTERCHANGE OFF OF A NEW EXIT 55 HAL ROGERS
PARKWAY. (16CCN)(18CCN) (2024CCR)
HR-9006Perry PL8903
DN
RW
UT
CN 7,440,000 NH
Project Cost: 0 0 7,440,000
A
DDRESS CONDITION OF Hal Rogers Daniel Boone Parkway FROM
MILEPOINT 57.185 TO MILEPOINT 59.088
HR-9006Perry PL22204
DN 600,000 NHPM
RW
UT
CN 6,000,000 NHPM
Project Cost: 0 6,600,000 0
Page 142 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct a new access road to East Perry Sports Complex
d
evelopment and a connector to Nautilus Drive (2024CCN)
PF-9999Perry PL80308
DN 360,000 SPP
RW 60,000 SPP
UT 110,000 SPP
CN
Project Cost: 360,000 60,000 110,000
T
otal for Perry county PL
Total Amounts:
CN
UT
RW
DN 360,000 600,000
60,000
110,000
4,334,000 6,000,000 7,440,000
4,694,000 6,660,000 7,550,000
MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE
R
OADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO
HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT
THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY,
FROM BILL KING RD. TO US 119. (2020CCR) ($7 MILLION
KY-1426P ike PL147
DN
RW 2,600,000 PROT
UT 1,500,000 PROT
CN 7,000,000 PROT
Project Cost: 4,100,000 0 7,000,000
P
ikeville Corridor Access and Safety Improvement Project with USDOT
SS4A Grant and $1,900,000 state matching funds.
CO-0Pike PL182
DN
RW
UT
CN 7,400,000 KYD
1,900,000 SPP
Project Cost: 9,300,000 0 0
I
MPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM
(CR 1458) TO NEAR DESKINS BRANCH CULVERT. (18CCR)
(2020CCR)
KY-194Pike PL198
DN
RW
UT
CN 2,538,000 2,500,000 STPF
Project Cost:
0 2,538,000 2,500,000
Page 143 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CURVE REVISION AND PASSING LANES ON KY-194 NEAR DESKINS
B
RANCH (08CCR)(12CCR)
KY-194Pike PL281
DN
RW
UT
CN 5,000,000 STP2
Project Cost: 0 0 5,000,000
I
MPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND
KY-1460 INTERSECTION. (2020CCR) (2022CCR) (2024CCR)
US-460Pike PL346
DN
RW 872,000 NH
UT 860,000 NH
CN
Project Cost: 0 872,000 860,000
I
NSTALL GUARDRAIL ON KY-1056 IN PIKE COUNTYKY-1056Pike PL4410
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4411
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4412
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
Page 144 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1499 IN PIKE COUNTYK Y-1499Pike PL4413
DN
RW
UT
CN 150,000 GR
Project Cost: 150,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4414
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4415
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4416
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4417
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
Page 145 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYK Y-197Pike PL4418
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4419
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4421
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
NSTALL GUARDRAIL ON KY-122 IN PIKE COUNTYKY-122Pike PL4455
DN
RW
UT
CN 32,000 GR
Project Cost: 32,000 0 0
I
NSTALL GUARDRAIL ON KY-122 IN PIKE COUNTYKY-122Pike PL4456
DN
RW
UT
CN 93,000 GR
Project Cost: 93,000 0 0
Page 146 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYK Y-1469Pike PL4457
DN
RW
UT
CN 36,000 GR
Project Cost: 36,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4458
DN
RW
UT
CN 22,000 GR
Project Cost: 22,000 0 0
I
NSTALL GUARDRAIL ON KY-1499 IN PIKE COUNTYKY-1499Pike PL4459
DN
RW
UT
CN 45,000 GR
Project Cost: 45,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4460
DN
RW
UT
CN 39,000 GR
Project Cost: 39,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4461
DN
RW
UT
CN 11,000 GR
Project Cost: 11,000 0 0
Page 147 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYK Y-194Pike PL4462
DN
RW
UT
CN 17,000 GR
Project Cost: 17,000 0 0
I
NSTALL GUARDRAIL ON KY-610 IN PIKE COUNTYKY-610Pike PL4463
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
B
RIDGE PROJECT IN PIKE COUNTY ON (098B00009N) KY-308 AT
ROAD FK.ROAD CREEK
KY-308Pike PL10131
DN
RW 50,000 BRX
UT 76,000 BRX
CN 757,000 BRX
Project Cost: 0 0 883,000
B
RIDGE PROJECT IN PIKE COUNTY ON (098B00013N) KY-1426 AT
BENT BRANCH
KY-1426Pike PL10132
DN
RW
UT
CN 1,375,883 BRX
Project Cost: 0 0 1,375,883
A
DDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER Tug Fork
(098B00001N)
US-119Pike PL10152
DN 30,000 BRX
RW
UT
CN 1,500,000 BRX
Project Cost: 0 1,530,000 0
Page 148 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 610 OVER Shelby Creek
(
098B00071N)
KY-610Pike PL10154
DN
RW 75,000 BRX
UT 130,000 BRX
CN 2,237,153 BRX
Project Cost: 2,442,153 0 0
M
ake template changes to improve sight distance, drainage, and
ingress/egress through this commercial section of US 23 (2024CCN)
US-23Pike PL80309
DN 680,000 NH
RW
UT
CN
Project Cost: 0 680,000 0
I
mprove geometric and drainage issues between MP 8.93 and 9.10.KY-199Pike PL80403
DN 250,000 SPP
RW
UT
CN
Project Cost: 250,000 0 0
I
nstall guardrail where roadway drops down to creekKY-308Pike PL80408
DN
RW
UT
CN 175,000 GR
Project Cost: 175,000 0 0
T
otal for Pike county PL
Total Amounts:
CN
UT
RW
DN 250,000 710,000
2,675,000 872,000 50,000
1,630,000 936,000
12,897,153 4,038,000 16,632,883
17,452,153 5,620,000 17,618,883
Page 149 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Minor widening to improve redundancy of Regional Travel.K Y-15Powell PL176
DN
RW 290,000 PROT
UT 280,000 PROT
CN
Project Cost: 0 570,000 0
I
MPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL
COUNTY FROM SONS ROAD TO REED COURT. (2024CCN)
KY-213Powell PL210
DN
RW
UT
CN 3,280,000 CRP
Project Cost: 0 0 3,280,000
I
NSTALL GUARDRAIL ON KY-82 IN POWELL COUNTYKY-82Powell PL4318
DN
RW
UT
CN 32,000 GR
Project Cost: 32,000 0 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 19.228 TO MILEPOINT 22.307
KY-9000Powell PL20005
DN 270,000 STP4
RW
UT
CN 2,645,726 STP4
Project Cost: 0 0 2,915,726
A
DDRESS CONDITION OF KY-213 FROM MILEPOINT 1.691 TO
MILEPOINT 2.244
KY-213Powell PL20035
DN 28,000 STP4
RW
UT
CN 322,000 STP4
Project Cost: 0 350,000 0
Page 150 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
M
ILEPOINT 22.307 TO MILEPOINT 27.376
KY-9000Powell PL20042
DN 200,000 STP5
RW
UT
CN 2,000,000 STP5
Project Cost: 0 2,200,000 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 27.376 TO MILEPOINT 32.787
KY-9000Powell PL22158
DN 410,000 NHPM
RW
UT
CN 4,102,360 NHPM
Project Cost: 0 0 4,512,360
T
otal for Powell county PL
Total Amounts:
CN
UT
RW
DN 228,000 680,000
290,000
280,000
32,000 2,322,000 10,028,086
32,000 3,120,000 10,708,086
S
OMERSET NORTHERN BYPASS SECTION 3; FROM WEST OF THE
BRIDGE OVER US-27 AND THE SOUTHERN RR, E TO KY-39 N OF
BROYLES RD. (INCLUDES I-CHNG AT KY-39). (CONST SEQ. 3)
(2002BOP)(04KYD)(05KYD) (2024CCN)
KY-80,
PF-9999
Pulaski PL59.5000
DN
RW
UT
CN 42,000,000 42,000,000 IF
11,000,000 NH
Project Cost:
0 53,000,000 42,000,000
S
omerset Northern Bypass Section 4; From East of the KY 39
Interchange, to KY 461 / KY 80 Interchange (8-59.25 - BUILD Grant
Project)(Congressional KYD Earmark - $45M)
(2024CCN)
KY-80,
PF-9999
Pulaski PL59.6000
DN
RW
UT
CN 42,000,000 IF
Project Cost:
0 0 42,000,000
Page 151 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SOMERSET NORTHERN BYPASS (I-66) FROM WEST OF THE BRIDGE
O
VER US-27 TO KY 461/KY 80 INTERCHANGE. (REMAINING
ALLOCATED FY 24 CONGRESSIONAL EARMARK KYD FUNDING,
INCLUDING REQUIRED 20% STATE MATCHING FUNDS)
CO-0, KY-80Pulaski PL59.7000
DN
RW
UT 1,310,000 KYD
CN 54,950,000 KYD
Project Cost:
56,260,000 0 0
H
ORIZONTAL AND VERTICAL REALIGNMENT OF KY-196 AT WHITE
OAK CREEK FROM 1.0 MILE E OF WARNER ROAD TO 0.3 MILE W OF
SIEVERS ROAD.(10CCR)(14CCR) (2024CCN)
KY-196Pulaski PL121
DN 600,000 SPP
RW
UT
CN
Project Cost:
0 600,000 0
R
educe congestion and improve safety and mobility along US 27
between General Burnside Island and Cumberland River Bridge.
(2024CCN)
US-27Pulaski PL272
DN
RW 6,330,500 NH
UT
CN
Project Cost:
0 6,330,500 0
B
RIDGE PROJECT IN PULASKI COUNTY ON (100B00102N) KY-196 AT
LITTLE WHITE OAK CREEK
KY-196Pulaski PL10069
DN 140,588 BRX
RW
UT
CN 937,250 BRX
Project Cost: 0 0 1,077,838
ADDRESS CONDITION OF KY-39 FROM MILEPOINT 6.47 TO MILEPOINT
1
0.673
KY-39P ulaski PL22366
DN 140,000 STP5
RW
UT
CN 1,610,000 STP5
Project Cost: 1,750,000 0 0
Page 152 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY AND
M
OBILITY ALONG KY 90 BETWEEN WAYNE COUNTY LINE AND NEW
CUMBERLAND RIVER BRIDGE (2020CCN) (2022CCR) (2024CCR)
KY-90Pulaski PL80104
DN 2,500,000 SPP
RW
UT
CN
Project Cost: 2,500,000 0 0
A
ddress safety, capacity and access issues along KY-461 from
south of Buck Creek extending northerly to Pulaski/Rockcastle Line (as
a continuation of 8-59.25). (2024CCN)
KY-461Pulaski PL80302
DN 2,976,000 SPP
RW
UT
CN
Project Cost:
0 2,976,000 0
M
inor widening along KY-914 by adding turning lanes and relocating
an existing entrance into adjacent property. (2024CCN)
KY-914Pulaski PL80310
DN 100,000 SPP
RW
UT 180,000 SPP
CN
Project Cost: 100,000 180,000 0
I
mprove safety and congestion along KY 1642 at KY 1577 (MP 13.4
-13.7) (2024CCN)
KY-1642Pulaski PL80350
DN
RW 1,200,000 SPP
UT
CN
Project Cost: 1,200,000 0 0
I
nstall turning lane from KY 914 into Pulaski County Compost site (MP
9.4-9.6)
KY-914Pulaski PL80416
DN
RW
UT
CN 80,000 CRP
Project Cost: 0 80,000 0
T
otal for Pulaski county PL
Total Amounts:
CN
UT
RW
DN 2,740,000 3,576,000 140,588
1,200,000 6,330,500
1,310,000 180,000
56,560,000 53,080,000 84,937,250
61,810,000 63,166,500 85,077,838
Page 153 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE
N
EW ROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)
(14CCR)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-616Robertson PL8711
DN
RW 530,000 SPP
UT 320,000 SPP
CN
Project Cost: 0 850,000 0
I
MPROVE THE INTERSECTION OF US 62 AND KY 165 IN MOUNT
OLIVET. (2024CCN)
US-62Robertson PL80312
DN 390,000 SPP
RW
UT
CN
Project Cost: 0 390,000 0
T
otal for Robertson county PL
Total Amounts:
CN
UT
RW
DN 390,000
530,000
320,000
0 1,240,000 0
B
RIDGE PROJECT IN ROCKCASTLE COUNTY ON (102C00067N)
MARET CEMETERY RD AT ROUND STONE CREEK
CR-1086Rockcastle PL10071
DN 136,244 FBP2
RW
UT
CN 908,293 FBP2
Project Cost: 0 1,044,537 0
A
DDRESS CONDITION OF I-075 FROM MILEPOINT 64.5 (65.22
NON-CARDINAL) TO MILEPOINT 68.78
I -75Rockcastle PL22111
DN 530,000 NHPM
RW
UT
CN 5,293,808 NHPM
Project Cost: 0 0 5,823,808
Page 154 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address capacity and access issues along KY-461 from
P
ulaski/Rockcastle County Line to KY 1250. (2024CCN)
KY-461Rockcastle PL80303
DN 2,527,800 SPP
RW
UT
CN
Project Cost: 0 2,527,800 0
P
lanning study on US 25 to address Connectivity for future
development in Mt. Vernon on the western side of I-75 between exit
59 and exit 62. (2024CCN)
US-25Rockcastle PL 250,000 SPP80305
DN
RW
UT
CN
Project Cost:
0 250,000 0
A
ddress capacity issues from KY-461 to US-25 in Mt. Vernon to
continue corridor improvements to US 150 as identified in the 1998
planning study. (2024CCN)
US-150Rockcastle PL80306
DN 1,081,200 STP1
RW
UT
CN
Project Cost:
0 0 1,081,200
T
otal for Rockcastle county PL
Total Amounts:
CN
UT
RW
DN
250,000
2,664,044 1,611,200
908,293 5,293,808
0 3,822,337 6,905,008
I
MPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH.
(12CCR)(18CCR) (2020CCR) (2022CCR) (2024CCR)
KY-32Rowan PL204
DN
RW
UT
CN 27,460,000 HGC
Project Cost: 27,460,000 0 0
Page 155 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Rowan County East & West Bound Renovation located on I-64.
(
2024BOP)
I -64Rowan PL3029
DN
RW
UT
CN 5,100,000 NH
Project Cost: 5,100,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4312
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4315
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-3319 IN ROWAN COUNTYKY-3319Rowan PL4319
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4320
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
Page 156 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYU S-60Rowan PL4321
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
MPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION
ON KY-377 FROM KY-32 TO JUST SOUTH OF CLEAR FORK ROAD.
(2022BOP) (2024CCN)
KY-377Rowan PL8406.1000
DN
RW
UT
CN 5,000,000 5,000,000 STP2
Project Cost: 0 5,000,000 5,000,000
I
MPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION
ON KY-377 FROM JUST SOUTH OF CLEARK FORK ROAD TO JUST
NORTH OF KY 799 (BIG PERRY ROAD). (2024CCN)
KY-377Rowan PL8406.2000
DN
RW 6,600,000 STP2
UT
CN
Project Cost:
0 6,600,000 0
T
otal for Rowan county PL
Total Amounts:
CN
UT
RW
DN
6,600,000
32,770,000 5,000,000 5,000,000
32,770,000 11,600,000 5,000,000
R
educe congestion and improve capacity, safety and mobility on US
127 between the west bypass of Jamestown to the Cumberland
Parkway. See segment 12 in June 1998 Advance (2024CCR)
US-127Russell PL156
DN 1,750,000 NH
RW 3,000,000 NH
UT 3,000,000 NH
CN 5,000,000 NH
Project Cost:
1,750,000 6,000,000 5,000,000
Page 157 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reduce congestion and improve safety, capacity and mobility along US
1
27 from the Cumberland Parkway to Lakeway drive KY 379 in
Russell Springs.
US-127Russell PL166
DN 2,000,000 NH
RW
UT
CN
Project Cost: 2,000,000 0 0
B
RIDGE PROJECT IN RUSSELL COUNTY ON (104B00003N) KY-379 AT
CROCUS CREEK
KY-379Russell PL10072
DN 77,042 BRZ
RW
UT
CN 513,615 BRZ
Project Cost: 590,657 0 0
I
MPROVE GEOMETRICS ALONG KY 3278. (2024CCN)KY-3278Russell PL80316
DN 225,000 SPP
RW
UT
CN
Project Cost: 0 0 225,000
I
nitial Asphalt treatment of Tony Sloan Way (MP 0 - 0.8) (Memorandum
of Agreement with Russell County to construct)
CR-9999Russell PL80417
DN
RW
UT
CN 350,000 CRP
Project Cost: 0 350,000 0
T
otal for Russell county PL
Total Amounts:
CN
UT
RW
DN 3,827,042 225,000
3,000,000
3,000,000
513,615 350,000 5,000,000
4,340,657 6,350,000 5,225,000
Page 158 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN SCOTT COUNTY ON (105R00605N) HINTON RD
A
T NS (CNO&TP) SYSTEM
CR-1020Scott PL10013
DN 263,149 BRZ
RW
UT
CN 1,754,325 BRZ
Project Cost: 0 2,017,474 0
A
DDRESS CONDITION OF I-075 FROM MILEPOINT 136.758 TO
MILEPOINT 138.424
I -75Scott PL22119
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 0 5,400,000
I
mprove safety and driver expectancy at the intersection of US 62
(Paynes Depot Road), US 421 (Leestown Road), and Weisenberger
Mill Road. (2024CCN)
US-62Scott PL80317
DN 520,000 STPF
RW 500,000 STPF
UT 700,000 STPF
CN 3,000,000 STPF
Project Cost:
520,000 500,000 3,700,000
E
XTEND LEXUS WAY (KY 3552) FROM CHERRY BLOSSOM WAY (US
62) TO OLD OXFORD ROAD (CS 1414) (NOTE: $2,043,200
($1,635,200 FEDERAL CONGRESSIONAL COMMUNITY PROJECT
FUNDS (CPF); AND $408,000 LOCAL MATCHING FUNDS PROVIDED
BY CITY OF GEORGETOWN, KY) IS AVAILABLE FOR THE PROJECT
PF-9999Scott PL80415
DN 1,250,000 SPP
RW
UT
CN
Project Cost:
0 0 1,250,000
R
OADSIDE SAFETY IMPROVEMENTS ON A PORTION OF US-62
(MCCLELLAND CIR) ALONG BLEVINS LANE.
US-62Scott PL80422
DN
RW
UT
CN 45,000 GR
Project Cost: 45,000 0 0
T
otal for Scott county PL
Total Amounts:
CN
UT
RW
DN 520,000 263,149 1,740,000
500,000
700,000
45,000 1,754,325 7,910,000
565,000 2,517,474 10,350,000
Page 159 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXPAND TRUCK PARKING AT I-64 EB WELCOME CENTER.I -64Shelby PL579
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO
R
OCKET LANE. (12CCN)(14CCR)(2020CCR) (2022CCR) (2024CCR)
US-60S helby PL8713
DN
RW
UT
CN 3,220,000 STP1
Project Cost: 3,220,000 0 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 43.77 TO MILEPOINT
4
6.303
I -64S helby PL22029
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 0 5,400,000
IMPROVE CONNECTIVITY FROM KY 53 AT THE OLD SEVEN MILE PIKE
I
NTERSECTION TO US 60/ROCKET LANE INTERSECTION. (2024CCN)
PF-9999S helby PL80312
DN 1,800,000 SPP
RW
UT
CN
Project Cost: 0 0 1,800,000
A
DDRESS SAFETY AND IMPROVE TRAFFIC FLOW WITH
OPERATIONAL IMPROVEMENTS ON KY 55 AT OLD BRUNERSTOWN
ROAD. THIS PROJECT WILL CONSIDER A RIGHT-TURN LANE ON SB
KY 55. (2024CCN)
KY-55Shelby PL80318
DN 270,000 SPP
RW 60,000 SPP
UT
CN
Project Cost:
0 270,000 60,000
Page 160 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT PEDESTRIAN FACILITIES ON THE NORTH SIDE OF US 60
F
ROM THE MASONIC HOME TO ROCKET LANE. (2024CCN)
US-60S helby PL80326
DN 470,000 STP1
RW 50,000 STP1
UT 20,000 STP1
CN
Project Cost: 470,000 70,000 0
A
ddress safety, improve roadway geometrics, improve traffic
operations, and consider access management on KY 55 from south of
Logan Station Road (MP 5.24) to the I-64 interchange (MP 6.03).
KY-55Shelby PL80409
DN 610,000 SPP
RW
UT
CN
Project Cost: 0 0 610,000
I
mprove the intersection of KY 1531 (Aiken Road) and KY 362 (Ash
Avenue/Aiken Road)
KY-362Shelby PL80425
DN 400,000 SPP
RW 110,000 SPP
UT 120,000 SPP
CN
Project Cost: 400,000 230,000 0
A
ddress safety and traffic operations on KY 362 (Aiken Road) at
Persimmon Ridge Drive (CR 1339)
KY-362Shelby PL80426
DN 210,000 SPP
RW 40,000 SPP
UT 50,000 SPP
CN
Project Cost: 210,000 90,000 0
T
otal for Shelby county PL
Total Amounts:
CN
UT
RW
DN 1,080,000 270,000 2,900,000
200,000 60,000
190,000
4,380,000 4,910,000
5,460,000 660,000 7,870,000
Page 161 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET.
(
14CCN) (2022CCR) (2024CCR)
KY-1008Simpson PL8855
DN
RW
UT
CN 4,600,000 HGC
Project Cost: 4,600,000 0 0
S
UPPLEMENTAL MOA FOR INDUSTRIAL ACCESS ROADS FOR
STONE-GIVENS PARK (2022CCN)
KY-100Simpson PL80202
DN
RW
UT
CN 300,000 SPP
Project Cost: 300,000 0 0
P
rovide access from US 31W to proposed industrial park in the city of
Franklin by constructing a new four lane road with curb, gutter as well
as reconstruct and widen Steele Rd. (Memorandum of Agreement with
the City of Franklin to construct, right of way to be donated)
PF-9999Simpson PL80413
DN
RW 20,000 CRP
UT 300,000 CRP
CN 8,343,800 CRP
Project Cost:
0 0 8,663,800
C
onstruct 3,300 linear feet of new road from KY 100 west of Exit 6 to
KY 585. Minor widening of KY 585 and US 31W to provide turning
lanes. (Memorandum of Agreement with the City of Franklin to
construct, right of way to be donated)
PF-9999Simpson PL80421
DN 500,000 SPP
RW 150,000 SPP
UT 500,000 SPP
CN 2,000,000 SPP
Project Cost:
0 500,000 2,650,000
T
otal for Simpson county PL
Total Amounts:
CN
UT
RW
DN 500,000
170,000
800,000
4,900,000 10,343,800
4,900,000 500,000 11,313,800
Page 162 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG
K
Y-44 NEAR DUTCHMAN CREEK ROAD. (16CCN) (2020CCR)
(2024CCR)
KY-44S pencer PL8955
DN
RW 220,000 CRP
UT 300,000 CRP
CN 3,260,000 CRP
Project Cost: 0 0 3,780,000
B
RIDGE PROJECT IN SPENCER COUNTY ON (108B00008N) KY 44 AT
PLUM CREEK
KY-44Spencer PL10094
DN 330,450 BRX
RW
UT
CN 2,202,998 BRX
Project Cost: 0 2,533,448 0
I
mprove safety at the intersection of KY 155 and KY
3192/Hochstrasser Road (MP 2.4-2.6) (2024CCN). Consider
design/build.
KY-155Spencer PL80316
DN 540,000 SPP
RW 210,000 SPP
UT 110,000 SPP
CN 5,000,000 SPP
Project Cost: 540,000 5,320,000 0
I
mprove intersection of KY 155 and Goebel Road/Hochstrasser Road
(MP 0.65 - 0.85). (2024CCN). Consider design/build.
KY-155Spencer PL80351
DN 330,000 SPP
RW 160,000 SPP
UT 110,000 SPP
CN 1,250,000 SPP
Project Cost: 330,000 1,520,000 0
T
otal for Spencer county PL
Total Amounts:
CN
UT
RW
DN 870,000 330,450
370,000 220,000
220,000 300,000
8,452,998 3,260,000
870,000 9,373,448 3,780,000
Page 163 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026 THROUGH FY
2
032. (2024CCR)
CO-0Statewide PL65.1900
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 BRO
Project Cost: 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide PL65.2000
DN
RW
UT
CN 2,000,000 2,000,000 1,000,000 BRX
Project Cost: 2,000,000 2,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS OFF SYSTEM BRIDGES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL65.2100
DN
RW
UT
CN 1,000,000 1,000,000 1,000,000 BRZ
Project Cost: 1,000,000 1,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026-2032. (FBP
PROGRAM) (2024CCR)
CO-0Statewide PL65.2200
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 FBP
Project Cost: 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026-2032. (FBP2
PROGRAM)
CO-0Statewide PL65.2300
DN
RW
UT
CN 2,000,000 2,000,000 2,000,000 FBP2
Project Cost: 2,000,000 2,000,000 2,000,000
Page 164 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
'ITS' AND 'TSMO' ACTIVITIES ON VARIOUS NHS ROUTES IN
K
ENTUCKY FOR FY 2027 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL66.1900
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
T
ransportation Systems Management and Operations (TSMO) activities
on various routes for FY-2022 through FY 2028. (2024CCR)
CO-0Statewide PL66.2100
DN
RW
UT
CN 750,000 750,000 SPP
Project Cost: 0 750,000 750,000
S
TATEWIDE TRANSPORTATION ALTERNATIVES PROGRAM FOR FY
2026 THROUGH FY 2032 (2024CCR)
CO-0Statewide PL195.1600
DN
RW
UT
CN 12,300,000 12,300,000 12,300,000 TAP
Project Cost: 12,300,000 12,300,000 12,300,000
N
ON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS
FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL219.1800
DN
RW
UT
CN 8,100,000 8,100,000 8,100,000 CM
Project Cost: 8,100,000 8,100,000 8,100,000
P
AVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN
KENTUCKY FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL224.1400
DN
RW
UT
CN 5,000,000 5,000,000 STP5
Project Cost: 0 5,000,000 5,000,000
Page 165 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
PROMOTING RESILIENT OPERATIONS FOR TRANSFORMATIVE,
E
FFICIENT, AND COST SAVING TRANSPORTATION (PROTECT)
PROGRAM FORMULA FUNDS.
CO-0Statewide PL239
DN
RW
UT
CN 20,000,000 5,000,000 PROT
Project Cost: 0 20,000,000 5,000,000
S
TATEWIDE CARBON REDUCTION PROGRAM.CO-0Statewide PL244
DN
RW
UT
CN 12,520,000 14,600,000 14,600,000 CARB
Project Cost: 12,520,000 14,600,000 14,600,000
S
TATEWIDE BRIDGE INSPECTION FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL327.1600
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 BRX
Project Cost: 5,000,000 5,000,000 5,000,000
S
TATEWIDE I-STATE ROUTES FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL337.1500
DN
RW
UT
CN 5,000,000 5,000,000 NHPM
Project Cost: 0 5,000,000 5,000,000
S
TATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL346.1600
DN
RW
UT
CN 3,000,000 3,000,000 3,000,000 BRZ
Project Cost: 3,000,000 3,000,000 3,000,000
Page 166 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RAILWAY-HIGHWAY CROSSINGS PROGRAM ON VARIOUS ROUTES
FO
R FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL352.1600
DN
RW
UT
CN 3,430,000 3,510,000 RRP
Project Cost: 3,430,000 3,510,000 0
P
AVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN
KENTUCKY FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL369.1000
DN
RW
UT
CN 5,000,000 5,000,000 NHPM
Project Cost: 0 5,000,000 5,000,000
O
HIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2026 THROUGH
FY 2032. (2024CCR)
CO-0Statewide PL388.1000
DN
RW
UT
CN 4,000,000 4,000,000 4,000,000 BRX
Project Cost: 4,000,000 4,000,000 4,000,000
S
TATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL391.0600
DN 500,000 500,000 500,000 STPF
RW
UT
CN
Project Cost: 500,000 500,000 500,000
U
PGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR
STREAMS AND WATERWAYS FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL400.0700
DN
RW
UT
CN 500,000 500,000 500,000 BRX
Project Cost:
500,000 500,000 500,000
Page 167 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
HONORING BORDER STATES COMMITMENTS FOR EXISTING
B
RIDGES(CANNOT BE MOVED) FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL510.0500
DN
RW
UT
CN 2,000,000 2,000,000 2,000,000 BRX
Project Cost: 2,000,000 2,000,000 2,000,000
S
TATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT
STABILIZATION FOR FY 2022 THROUGH FY 2028. (2024CCR)
CO-0Statewide PL511.0400
DN
RW
UT
CN 500,000 500,000 500,000 SPP
Project Cost: 500,000 500,000 500,000
P
REVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL514.0100
DN
RW
UT
CN 2,500,000 2,500,000 2,500,000 BRX
Project Cost: 2,500,000 2,500,000 2,500,000
S
TATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT
STABILIZATION ON NH ROUTES FOR FY 2026 THROUGH FY 2032.
(2020CCR) (2024CCR)
CO-0Statewide PL518.0100
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost:
0 5,000,000 5,000,000
S
TATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT
STABILIZATION ON NON NH ROUTES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide PL518.0300
DN
RW
UT
CN 4,000,000 4,000,000 4,000,000 STPF
Project Cost:
4,000,000 4,000,000 4,000,000
Page 168 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Statewide NHS Rest Area Repairs. (2024CCR)C O-0Statewide PL600
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
A
dditional Parking at NHS Rest Area and Weigh Stations. (2024CCR)CO-0Statewide PL601
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
ADDRESS SAFETY IMPROVEMENT NEEDS FOR STATE-OWNED DAMS
C
ONSTRUCTED TO FACILIATE KENTUCKY'S HIGHWAY SYSTEM.
CO-0S tatewide PL610
DN
RW
UT
CN 4,000,000 4,000,000 SPP
Project Cost: 0 4,000,000 4,000,000
S
TATEWIDE SAFETY PROGRAM FOR FY 2026 THROUGH FY 2032.
(HSIP) (2024CCR)
CO-0Statewide PL911.0900
DN
RW
UT
CN 71,300,000 71,300,000 71,300,000 SAF
Project Cost: 71,300,000 71,300,000 71,300,000
S
TATEWIDE SAFETY FUNDING TO BE USED ALONGSIDE FEDERAL
HSIP FUNDING TO ENHANCE ROADWAY SAFETY IN KENTUCKY.
(2022CCR)
CO-0Statewide PL911.5000
DN
RW
UT
CN 2,500,000 2,500,000 2,500,000 SPP
Project Cost: 2,500,000 2,500,000 2,500,000
Page 169 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2026
T
HROUGH FY 2032. (2024CCR)
CO-0Statewide PL1063.1600
DN
RW
UT
CN 1,000,000 1,000,000 1,000,000 BRX
Project Cost: 1,000,000 1,000,000 1,000,000
S
TATEWIDE PROGRAM TO FUND BRIDGE SCOUR
COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL1071.0800
DN
RW
UT
CN 3,000,000 3,000,000 3,000,000 BRX
Project Cost:
3,000,000 3,000,000 3,000,000
S
TATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL1074.0800
DN
RW
UT
CN 2,000,000 2,000,000 1,000,000 BRX
Project Cost: 2,000,000 2,000,000 1,000,000
P
AVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2026
THROUGH FY 2032 STP5 FUNDING. (2024CCR)
CO-0Statewide PL2700.1400
DN
RW
UT
CN 2,000,000 2,000,000 STP5
Project Cost: 0 2,000,000 2,000,000
A
MERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN
IMPLEMENTATION PROJECTS FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL3011.0100
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 STPF
Project Cost: 5,000,000 5,000,000 5,000,000
Page 170 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Whitehaven Rest Area Renovation located between Exit 6 and Exit 7
o
n Interstate 24 in Paducah, KY. (2024BOP)
CO-0Statewide PL3022
DN
RW
UT
CN 980,000 NH
Project Cost: 980,000 0 0
S
CHOOL TURN LANE PROJECTS FOR NEW SCHOOLS FOR FY 2022
THROUGH FY 2028. (2022CCR) (2024CCR)
CO-0Statewide PL8500.1600
DN
RW
UT
CN 1,000,000 1,000,000 SPP
Project Cost: 0 1,000,000 1,000,000
W
estern KY DECEMBER 2021 Tornado Relief Funding POOL FOR THE
LAST DOLLAR (UNCOVERED BY FEMA OR INSURANCE)
RECONCTRUCTION OF EXISTING ROADS. (2022CCR) (2024CCR)(SEE
GRAVES COUNTY 1-220.00 FOR MAYFIELD, KY KYD USDOT RAISE
GRANT PROJECT)
CO-0Statewide PL8600
DN
RW
UT
CN 1,000,000 SPP
Project Cost:
0 1,000,000 0
A
DVANCE CONSTRUCTION COMMITMENTS FOR MOUNTAIN
PARKWAY EXPANSION; I-65 CENTRAL CORRIDOR; AND OTHER
ACTIVE DESIGN/BUILD PROJECTS.
CO-0Statewide PL8601
DN
RW
UT
CN 182,000,000 100,000,000 93,000,000 NH
Project Cost:
182,000,000 100,000,000 93,000,000
A
DVANCE CONSTRUCTION CONTRACTS FOR KY 536 IN NORTHERN
KENTUCKY, KY 32 IN MOREHEAD, AND OTHER ACTIVE STPF
PROJECTS PREVIOUSLY AUTHORIZED.
CO-0Statewide PL8602
DN
RW
UT
CN 6,000,000 21,000,000 STPF
Project Cost:
0 6,000,000 21,000,000
Page 171 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND
D
EBT SERVICE FOR FY 2027. (2024CCR)
CO-0Statewide PL9068.6100
DN
RW
UT
CN 6,000,000 GAR
Project Cost: 0 6,000,000 0
U
S 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND
DEBT SERVICE (STP) FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL9068.6600
DN
RW
UT
CN 6,000,000 GAR
Project Cost: 0 6,000,000 0
GARVEE BOND DEBT SERVICE PAYMENTS FOR THE BRENT SPENCE
B
RIDGE PROJECT AND THE I-69 ORX BRIDGE PROJECT.
CO-0S tatewide PL9660
DN
RW
UT
CN 29,000,000 38,600,000 GAR
Project Cost: 0 29,000,000 38,600,000
A
DDRESS CIF (CONSTRAINT INDUCED FATIGUE) DETAILS ON
VARIOUS BRIDGES STATEWIDE
CO-0Statewide PL10003
DN
RW
UT
CN 4,000,000 FBP
Project Cost: 0 0 4,000,000
T
otal for Statewide county PL
Total Amounts:
CN
UT
RW
DN 500,000 500,000 500,000
340,630,000 370,560,000 358,650,000
341,130,000 371,060,000 359,150,000
Page 172 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY ON KY 210 FROM JUST EAST OF CORINTH
C
HURCH (MP0.60) TO KY 883 (MP14.20) IN TAYLOR COUNTY.
(2024CCN)
KY-210Taylor PL80154.3000
DN 3,120,000 SPP
RW
UT
CN
Project Cost: 3,120,000 0 0
E
XTEND KY 3350 (CAMPBELLSVILLE BYPASS) FROM ky 289 TO US
68 ON THE EAST SIDE OF CAMPBELLSVILLE. (2022CCN) (2024CCR)
KY-3350,
PF-9999
Taylor PL80257
DN 1,560,000 SPP
RW
UT
CN
Project Cost:
0 0 1,560,000
ADDRESS CONGESTION AND SAFETY ALONG KY 658 AND KY 3518
I
N CAMPBELLSVILLE BETWEEN US 68 AND KY 70 AND IMPROVE THE
INTERSECTION AT US 68. (MP 0-0.665)
KY-658T aylor PL80420
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 0 1,000,000 0
A
ddress congestion and improve intersections along KY 210 in
Campbellsville from Arbor Lane to US 68. (MP 15.669-16.626)
KY-210Taylor PL80421
DN 2,000,000 SPP
RW
UT
CN
Project Cost: 0 0 2,000,000
T
otal for Taylor county PL
Total Amounts:
CN
UT
RW
DN 3,120,000 1,000,000 3,560,000
3,120,000 1,000,000 3,560,000
Page 173 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN TODD COUNTY ON (110B00031N) KY-848 AT
S
PRING CREEK
KY-848Todd PL10048
DN 130,320 BRX
RW
UT
CN 868,802 BRX
Project Cost: 0 0 999,122
W
iden US 79 from MP 3.0 to Logan County line. (Estimates based on
preliminary engineering. Design funds allocated under Logan Co. Item
No. 03-80050)
US-79Todd PL80402
DN
RW 5,700,000 NH
UT 9,100,000 NH
CN
Project Cost:
14,800,000 0 0
I
mprove safety and access on KY 181 from US 421 to Elkton city limits
(MP 0.21-10.955)
KY-181Todd PL80422
DN 4,600,000 SPP
RW
UT
CN
Project Cost: 0 4,600,000 0
T
otal for Todd county PL
Total Amounts:
CN
UT
RW
DN 4,600,000 130,320
5,700,000
9,100,000
868,802
14,800,000 4,600,000 999,122
C
orrect geometric deficiencies and address safety, mobility and
access issues along KY 139 from the intersection of KY 124 north of
Cadiz to the I-24 Interchange in Caldwell Co (EMP 0.348) (2024CCN)
KY-139Trigg PL147
DN 1,500,000 SPP
RW
UT
CN
Project Cost: 0 1,500,000 0
Page 174 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN TRIGG COUNTY ON (111B00009N) KY-272 AT
B
URGE CREEK
KY-272Trigg PL10182
DN 269,786 BRZ
RW
UT
CN 1,798,571 BRZ
Project Cost: 2,068,357 0 0
A
DDRESS SAFETY CONCERNS ON GLENWOOD RD (CR-1005) FROM
KY 272 TO US 68/80 FROM MP 0.0 TO MP 2.1 (2024CCN)
CR-1005Trigg PL80306
DN 750,000 SPP
RW
UT
CN
Project Cost: 0 750,000 0
T
otal for Trigg county PL
Total Amounts:
CN
UT
RW
DN 269,786 2,250,000
1,798,571
2,068,357 2,250,000 0
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 38.086 TO
MILEPOINT 38.808
I -71Trimble PL22100
DN 380,000 NHPM
RW
UT
CN 3,780,000 NHPM
Project Cost: 4,160,000 0 0
C
ONSTRUCT PEDESTRIAN FACILITIES ALONG US 421 FROM
CUTSHAW LANE TO TRIMBLE COUNTY HIGH SCHOOL/KY 625 AND
ALONG KY 625 TO BEDFORD ELEMENTARY SCHOOL (TOTAL 0.983
MI.) (2024CCN)
US-421Trimble PL80337
DN 430,000 SPP
RW
UT
CN
Project Cost:
0 430,000 0
Page 175 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and reduce congestion on I-71 from the Henry/Trimble
C
ounty line to the Trimble/Carroll County line.
I-71Trimble PL80414
DN 700,000 NH
RW
UT
CN
Project Cost: 700,000 0 0
C
onstruct a realignment of US 421 through Milton between the
Milton-Madison Bridge (MP 18.78) and extending south to reconnect to
the existing US 421 near MP 15.45.
US-421Trimble PL 500,000 SPP80415
DN
RW
UT
CN
Project Cost:
0 500,000 0
R
eplace bridge (112B00017N) on KY 1838 at MP 2.18KY-1838Trimble PL80434
DN 500,000 BRX
RW
UT
CN 3,500,000 BRX
Project Cost: 0 500,000 3,500,000
R
eplace bridge (112B00009N) at MP 1.554KY-316Trimble PL80435
DN 300,000 BRX
RW
UT
CN 2,000,000 BRX
Project Cost: 0 300,000 2,000,000
T
otal for Trimble county PL
Total Amounts:
CN
UT
RW
DN
500,000
1,080,000 1,230,000
3,780,000 5,500,000
4,860,000 1,730,000 5,500,000
Page 176 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruct US 60 from Waverly to Corydon (2024CCN)U S-60Union PL80314
DN 800,000 STP2
RW
UT
CN
Project Cost: 800,000 0 0
R
econstruct US 60 from the Morganfield Bypass to Waverly.
(2024CCN)
US-60Union PL80315
DN 1,100,000 STP2
RW
UT
CN
Project Cost: 0 1,100,000 0
T
otal for Union county PL
Total Amounts:
CN
UT
RW
DN 800,000 1,100,000
800,000 1,100,000 0
N
EW I-65 INTERCHANGE IN SOUTHERN WARREN COUNTY NEAR
WOODBURN. (2024CCR)
I -65Warren PL21
DN 2,000,000 NH
RW
UT
CN
Project Cost: 0 0 2,000,000
T
HREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE
NATCHER PARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)
(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-884Warren PL8818
DN
RW
UT
CN 11,780,000 HGC
Project Cost: 0 0 11,780,000
Page 177 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN US-31W FROM WARREN/SIMPSON COUNTY LINE TO
B
UCHANON PARK. (14CCN) (2020CCN) (2022CCR) (2024CCR)
US-31Warren PL8853
DN
RW
UT
CN 18,720,000 HGC
Project Cost: 18,720,000 0 0
B
RIDGE PROJECT IN WARREN COUNTY ON (114C00016N)
GREENCASTLE RD AT TAYLOR BRANCH
CR-1388Warren PL10053
DN 157,458 BRZ
RW
UT
CN 1,049,720 BRZ
Project Cost: 1,207,178 0 0
WIDEN KY-234 FROM MP 11.9 TO 12.4. IMPROVEMENTS MAY
I
NCLUDE A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTON
DR. (18CCN) (2022CCR) (2024CCR)
KY-234W arren PL80052
DN
RW
UT
CN 1,260,000 SPP
Project Cost: 1,260,000 0 0
R
educe congestion and increase safety on Cave Mill Road/Dishman
Lane from the end of the three-lane section near Raintree Drive (MP
0.570) just east of Grider Pond Road. (2022CCN) (2024CCR)
(Memorandum of Agreement with Warren County to construct and
move right of way and utilities to 2027 and construction to 2028)
CR-1704,
CS-1432,
CS-2281
Warren PL80201
DN
RW 6,830,000 SPP
UT
CN
Project Cost:
0 6,830,000 0
T
ranspark: Improve mobility and reduce congestion on US-31W from
Mizpah Road to Freeport Road (2022CCN) (2024CCR)
US-31Warren PL80203
DN
RW
UT
CN 4,630,000 SPP
Project Cost: 4,630,000 0 0
Page 178 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct a two-lane roundabout at the intersection of KY 101 and the
I
-65 southbound entrance and exit ramps in Smiths Grove. Widen the
existing I-65 southbound exit ramp to two lanes and extend the
beginning point if the ramp approximately five-hundred to
one-thousand feet north. Widen approximately five hundred feet of
KY-101Warren PL80214
DN
RW 2,370,000 SPP
UT
CN
Project Cost:
2,370,000 0 0
MINOR WIDENING OF CS-1344/CR1235 (SMALLHOUSE RD) FROM
E
LROD RD TO US 231 (CAMPBELL LANE). SCOPE INCLUDES
INTERSECTION IMPROVEMENTS, CONTINUOUS CENTER TURN LANE.
(2024CCN)
CS-1334W arren PL80301
DN 1,940,000 SPP
RW
UT
CN
Project Cost: 0 1,940,000 0
S
COPING STUDY FOR OUTER BELTLINE EXTENDING KY 3145 TO
NORTHERN WARREN COUNTY. (2024CCN)
PF-9999Warren PL80326
DN 7,500,000 STPF
RW
UT
CN
Project Cost: 0 7,500,000 0
T
otal for Warren county PL
Total Amounts:
CN
UT
RW
DN 157,458 9,440,000 2,000,000
2,370,000 6,830,000
25,659,720 11,780,000
28,187,178 16,270,000 13,780,000
I
MPROVE MOBILITY ON THE KY 555 HEARTLAND PARKWAY
CORRIDOR FROM KY 53 TO BLUEGRASS PARKWAY (2022CCN)
(2024CCR)
KY-555Washington PL164.2000
DN
RW
UT 4,500,000 NH
CN 5,000,000 NH
Project Cost:
4,500,000 5,000,000 0
Page 179 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US
1
50 IN WASHINGTON COUNTY FROM 0.7 MILES EAST OF GRUNDY
HOME ROAD (MILEPOINT 2.50) TO US 150X (MP 6.557) AT THE OLD
ST. CATHERINE'S COLLEGE. (2016BOP) (2022CCN) (2024CCR)
US-150Washington PL396.3000
DN 500,000 STPF
RW
UT 1,500,000 STPF
CN 5,000,000 STPF
Project Cost:
500,000 1,500,000 5,000,000
ADDRESS CONDITION OF KY-528 FROM MILEPOINT 1.4 TO MILEPOINT
1
.8
KY-528W ashington PL20042
DN 16,250 STP4
RW
UT
CN 308,750 STP4
Project Cost: 325,000 0 0
R
eplacement of an existing metal truss bridge that has been down
rated by KYDOT to 5-tons at MP 1.983 on Sulphur Lick Road (CR
1031).
CR-1031Washington PL80350
DN 154,927 FBP2
RW
UT
CN 1,032,850 FBP2
Project Cost:
0 0 1,187,777
I
MPROVEMENTS TO THE INTERSECTIONS OF US 150 AT KY 55 AND
AT KY 528 NEAR SPRINGFIELD
US-150Washington PL80410
DN 500,000 SPP
RW 100,000 SPP
UT 250,000 SPP
CN 3,500,000 SPP
Project Cost: 0 4,350,000 0
I
nstall southbound right turn lane on KY 55 at Booker Road (MP
3.485-3.523)
KY-55Washington PL80422
DN 50,000 SPP
RW
UT 50,000 SPP
CN 100,000 SPP
Project Cost: 0 200,000 0
T
otal for Washington county PL
Total Amounts:
CN
UT
RW
DN 516,250 550,000 154,927
100,000
4,500,000 1,800,000
308,750 8,600,000 6,032,850
5,325,000 11,050,000 6,187,777
Page 180 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD
A
ND RESURFACE FROM KY 1275 FROM BELL LANE TO KY
833/ROGERS GROVE ROAD(18CCN) (2020CCR) (2024CCR)
KY-1275Wayne PL80005
DN 100,000 CRP
RW 1,000,000 CRP
UT 60,000 CRP
CN 2,000,000 CRP
Project Cost: 0 0 3,160,000
R
educe congestion and improve safety, capacity, and mobility along
KY 1275, including sidewalks, from KY 90 to Bell Lane. (18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-1275Wayne PL80006
DN
RW 500,000 CRP
UT
CN 3,000,000 CRP
Project Cost:
0 0 3,500,000
R
EDUCE CONGESTION AND IMPROVES SAFETY, CAPACITY AND
MOBILITY OF KY 90 BETWEEN KY 90X/KY 1275 AND KY 3106
(2020CCN) (2022CCR) (2024CCR)
KY-90Wayne PL80105
DN
RW 5,000,000 SPP
UT
CN
Project Cost:
0 5,000,000 0
A
DDRESS SAFETY, MOBILITY, AND CONNECTIVITY BY RELOCATING
ALONG KY 92 IN MONTICELLO BETWEEN LOCUST ST AND ELK
SPRINGS CREEK RD (2020CCN) (2022CCR) (2024CCR)
KY-90, KY-92Wayne PL80108
DN
RW 1,166,000 CRP
UT 874,500 CRP
CN 4,860,000 CRP
Project Cost:
0 6,900,500 0
R
educe congestion and improve safety along KY 90 from 0.284 mile
West of KY 92 to 0.084 mile West of KY 92. (2024CCN)
KY-90Wayne PL80307
DN 150,000 SPP
RW 200,000 SPP
UT 240,000 SPP
CN 690,000 SPP
Project Cost: 150,000 440,000 690,000
Page 181 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
MINOR WIDENING BY ADDING OFFSET LEFT TURNING LANES INTO KY
1
568 AND FRAZER CHAPEL ROAD. (2024CCN)
KY-90W ayne PL80309
DN 200,000 SPP
RW
UT
CN
Project Cost: 200,000 0 0
I
MPROVE VERTICAL GEOMETRICS ALONG KY 92 NEAR KY 789 TO
IMPROVE SIGHT DISTANCE. ADD TURNING LANES AND MINOR
WIDENING FROM ALONG KY 92 FROM 789 TO KY 90. (2024CCI)
KY-92Wayne PL80314
DN 1,360,000 SPP
RW
UT
CN
Project Cost: 0 1,360,000 0
B
RIDGE REPLACEMENT OVER LITTLE SOUTH FORK ALONG BALDY
ROAD (CR 1127),
CR-1127Wayne PL80315
DN 164,487 FBP2
RW
UT
CN 1,096,582 FBP2
Project Cost: 0 0 1,261,069
I
mprove mobility and safety along KY 90 at KY 3284 / KY 90X and
widen approach routes approximately 1500 feet on each side of KY
90 in Monticello.
KY-90Wayne PL80408
DN 180,000 SPP
RW
UT
CN
Project Cost:
180,000 0 0
T
otal for Wayne county PL
Total Amounts:
CN
UT
RW
DN 530,000 1,360,000 264,487
6,366,000 1,500,000
1,114,500 60,000
4,860,000 6,786,582
530,000 13,700,500 8,611,069
Page 182 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS
TO
ALLEVIATE FLOODING. (12CCR)(18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-138W ebster PL228
DN 200,000 SPP
RW
UT
CN
Project Cost: 200,000 0 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 133.686 TO
MILEPOINT 134.982
I -69Webster PL22091
DN 160,000 NHPM
RW
UT
CN 1,558,266 NHPM
Project Cost: 0 1,718,266 0
T
otal for Webster county PL
Total Amounts:
CN
UT
RW
DN 200,000 160,000
1,558,266
200,000 1,718,266 0
I
NSTALL GUARDRAIL ON KY-312 IN WHITLEY COUNTYKY-312Whitley PL4328
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-727 IN WHITLEY COUNTYKY-727Whitley PL4337
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
Page 183 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-836 IN WHITLEY COUNTYK Y-836Whitley PL4363
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-204 IN WHITLEY COUNTYKY-204Whitley PL4389
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-26 IN WHITLEY COUNTYKY-26Whitley PL4390
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-478 IN WHITLEY COUNTYKY-478Whitley PL4391
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-856 IN WHITLEY COUNTYKY-856Whitley PL4392
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
Page 184 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY ON US 25W (MILEPOINT 13.3 TO
M
ILEPOINT 14.6) INCLUDED IN THIS RECONSTRUCTION WILL BE
APPROXIMATELY 1.3 MILES OF ROADWAY TO BE
WIDENED/IMPROVED, AN APPROXIMATELY 250' BRIDGE
REPLACEMENT OVER WATTS CREEK,INTERSECTIONS OF KY 26 AND
US-25W hitley PL80107
DN 1,500,000 STP1
RW
UT
CN
Project Cost: 1,500,000 0 0
RECONFIGURE EXISTING INTERSECTION OF KY 92 AND PENNY LANE
TO
IMPROVE SAFETY ALONG AT INTERSECTION. CONSTRUCT NEW
CONNECTOR ROAD BETWEEN KY 92 AND PENNY LANE.
RECONFIGURE TRAFFIC OPERATION ALONG PENNY LANE BETWEEN
KY 92 AND NEW CONNECTOR ROAD (2022CCN) (2024CCR)
KY-92W hitley PL80264
DN
RW
UT
CN 2,000,000 SPP
Project Cost: 0 0 2,000,000
D
evelop and evaluate potential intersection alternatives (including a
roundabout) to improve traffic flow at the intersection of Arena Drive
(CS 2000) and Corbin Center Drive. (2024CCN)
CS-2000Whitley PL80351
DN
RW 110,000 CRP
UT 260,000 CRP
CN 1,500,000 CRP
Project Cost: 0 0 1,870,000
W
iden I-75 from MP 19.2 in Whitley County to MP 23.5 South of Corbin
(2024CCN)
I -75Whitley PL80353
DN 2,600,000 NH
RW
UT
CN
Project Cost: 0 0 2,600,000
C
onstruct new access to Corbin Arena to help with ingress and
egress. Memorandum of Agreement with City of Corbin to construct.
CS-2000Whitley PL80414
DN 750,000 SPP
RW 650,000 SPP
UT 415,000 SPP
CN 6,000,000 SPP
Project Cost: 0 1,400,000 6,415,000
Page 185 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety by reconstructing intersection of US-25W and Angel
R
oad
US-25Whitley PL80415
DN 350,000 NH
RW
UT
CN
Project Cost: 350,000 0 0
S
afety improvements & congestion relief on KY92 by providing
circulation through the corridor
CR-1305Whitley PL80417
DN 637,000 SPP
RW
UT
CN
Project Cost: 637,000 0 0
I
ntersection Improvements on 18th Street (US 25W)US-25Whitley PL80427
DN 150,000 SPP
RW 1,000,000 SPP
UT
CN
Project Cost: 0 1,150,000 0
N
orth Hamlin Ave/Roy Kidd Ave intersection realignment to include
curb & gutter and sidewalks on each side
KY-830Whitley PL80429
DN 100,000 SPP
RW 75,000 SPP
UT 190,000 SPP
CN
Project Cost: 0 175,000 190,000
S
ight distance improvement on Depot Street (CS 2212)CS-2212Whitley PL80430
DN 100,000 SPP
RW 75,000 SPP
UT 500,000 SPP
CN 500,000 SPP
Project Cost: 100,000 1,075,000 0
Page 186 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Re-establish Frank Selvy Way (CS 2180) as 14 feet one way
v
ehicular lane, relocate pole near Barbourville St. Bridge and
intersection improvements at Roy Kidd Ave and South Laurel Ave.
CS-2028Whitley PL80431
DN 100,000 SPP
RW 80,000 SPP
UT 150,000 SPP
CN 300,000 SPP
Project Cost: 100,000 230,000 300,000
T
otal for Whitley county PL
Total Amounts:
CN
UT
RW
DN 2,687,000 1,000,000 2,600,000
1,880,000 110,000
650,000 865,000
150,000 500,000 9,800,000
2,837,000 4,030,000 13,375,000
M
inor widening to improve redundancy of Regional travel. (2024CCR)KY-15Wolfe PL177
DN
RW 290,000 PROT
UT 560,000 PROT
CN
Project Cost: 850,000 0 0
R
econstruct KY 191 from the Mountain Parkway Exit/Underpass to KY
3356 (MP 3.096 - 6.808)
KY-191Wolfe PL 190,000 SPP80417
DN
RW
UT
CN
Project Cost: 190,000 0 0
H
ill and curve correction on KY 191 between Hazel Green and KY 205
(02CCN)(08CCR)(10CCR). THIS PROJECT REPLACES SYP 10-8102.
KY-191Wolfe PL80418
DN 400,000 SPP
RW
UT
CN
Project Cost: 0 400,000 0
Page 187 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Wolfe county P L
Total Amounts:
CN
UT
RW
DN
190,000
400,000
290,000
560,000
1,040,000 400,000 0
I
MPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS
PARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE.
US-60Woodford PL117
DN
RW 1,070,000 NH
UT 2,340,000 NH
CN
Project Cost: 0 1,070,000 2,340,000
E
XTEND FALLING SPRINGS BLVD FROM TYRONE PIKE (US-62) TO
CLIFTON ROAD (KY-1964)
Woodford PL8908
DN 1,020,000 SPP
RW
UT
CN
Project Cost: 0 1,020,000 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 59.431 TO
MILEPOINT 64.856
I -64Woodford PL22033
DN 3,190,000 NHPM
RW
UT
CN 31,930,000 NHPM
Project Cost: 0 0 35,120,000
R
econstruct McCracken Pike (KY-1659) on a new horizontal alignment
to minimize pedestrian and vehicle conflicts near Woodford Reserve
Distillery (ROW to be provided by County) (2022CCN) (2024CCR)
KY-1659Woodford PL80200
DN
RW
UT 330,000 SPP
CN
Project Cost: 330,000 0 0
Page 188 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Additional turn lanes and road improvement to US 60 at MP 6.1 for
e
ntrance to Livestock Innovation Center at UK (2024CCN)
US-60Woodford PL80353
DN 220,000 CRP
RW
UT
CN 1,150,000 CRP
Project Cost: 0 0 1,370,000
I
ntersection improvements at KY 2113/US 62 and KY2113/KY 33.
Consider design/build.
KY-2113Woodford PL80400
DN 500,000 SPP
RW 500,000 SPP
UT 150,000 SPP
CN
Project Cost: 500,000 650,000 0
T
otal for Woodford county PL
Total Amounts:
CN
UT
RW
DN 500,000 1,020,000 3,410,000
1,570,000
330,000 150,000 2,340,000
33,080,000
830,000 2,740,000 38,830,000
Page 189 of 192
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Biennium Fund Summary
Fund D escription FY 2027 FY 2028 Total
APD APD 7,320,000 15,000,000 22,320,000
BRO BRO 103,656,111 111,331,706 214,987,817
BRO2 BRO2 30,865,000 3,005,000 33,870,000
BRX BRX 84,997,786 105,624,826 190,622,612
BRZ BRZ 19,219,492 19,290,606 38,510,098
CARB CARB 14,600,000 14,600,000 29,200,000
CM CM 8,100,000 8,100,000 16,200,000
CRP CRP 74,690,500 154,923,500 229,614,000
FBP FBP 100,066,318 103,215,370 203,281,688
FBP2 FBP2 12,242,281 20,483,063 32,725,344
GAR GAR 41,000,000 38,600,000 79,600,000
GR GR 1,280,000 0 1,280,000
HGC HGC 118,470,000 15,760,000 134,230,000
IF IF 241,960,000 84,000,000 325,960,000
KYD KYD 27,890,000 0 27,890,000
NH NH 360,160,500 216,775,900 576,936,400
NHPM NHPM 87,832,108 163,651,442 251,483,550
PROT PROT 26,580,000 12,000,000 38,580,000
RRP RRP 3,510,000 0 3,510,000
RRS RRS 710,000 5,300,000 6,010,000
SAF SAF 71,300,000 71,300,000 142,600,000
SAH SAH 1,800,000 1,800,000 3,600,000
SGF SGF 125,000,000 0 125,000,000
SLO SLO 26,800,000 26,800,000 53,600,000
SLX SLX 7,800,000 7,800,000 15,600,000
SNK SNK 8,600,000 8,600,000 17,200,000
SPP SPP 208,309,600 102,896,000 311,205,600
STP1 STP1 50,460,000 16,521,200 66,981,200
STP2 STP2 40,550,000 38,800,000 79,350,000
STP3 STP3 8,130,000 6,000,000 14,130,000
STP4 STP4 350,000 2,915,726 3,265,726
STP5 STP5 21,851,750 10,502,300 32,354,050
STPF STPF 119,653,000 97,740,000 217,393,000
TAP TAP 12,300,000 12,300,000 24,600,000
Page 190 of 192
Total Amount 2,068,054,446 1,495,636,639 3,563,691,085
Page 191 of 192
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Fund Summary
Fund D escription FY 2026 FY 2027 FY 2028 Total
APD APD 1,560,000 7,320,000 15,000,000 23,880,000
BRO BRO 75,042,195 103,656,111 111,331,706 290,030,012
BRO2 BRO2 4,000,000 30,865,000 3,005,000 37,870,000
BRX BRX 77,309,615 84,997,786 105,624,826 267,932,227
BRZ BRZ 17,554,352 19,219,492 19,290,606 56,064,450
CARB CARB 14,600,000 14,600,000 14,600,000 43,800,000
CM CM 8,100,000 8,100,000 8,100,000 24,300,000
CRP CRP 0 74,690,500 154,923,500 229,614,000
FBP FBP 78,809,513 100,066,318 103,215,370 282,091,201
FBP2 FBP2 16,537,927 12,242,281 20,483,063 49,263,271
GAR GAR 0 41,000,000 38,600,000 79,600,000
GR GR 8,865,000 1,280,000 0 10,145,000
HGC HGC 80,870,000 118,470,000 15,760,000 215,100,000
IF IF 0 241,960,000 84,000,000 325,960,000
KYD KYD 151,861,000 27,890,000 0 179,751,000
NH NH 330,411,200 360,160,500 216,775,900 907,347,600
NHPM NHPM 183,879,168 87,832,108 163,651,442 435,362,718
PROT PROT 21,676,000 26,580,000 12,000,000 60,256,000
RRP RRP 3,430,000 3,510,000 0 6,940,000
RRS RRS 790,000 710,000 5,300,000 6,800,000
SAF SAF 72,340,000 71,300,000 71,300,000 214,940,000
SAH SAH 1,800,000 1,800,000 1,800,000 5,400,000
SGF SGF 150,000,000 125,000,000 0 275,000,000
SLO SLO 26,800,000 26,800,000 26,800,000 80,400,000
SLX SLX 7,800,000 7,800,000 7,800,000 23,400,000
SNK SNK 8,600,000 8,600,000 8,600,000 25,800,000
SPP SPP 144,027,000 208,309,600 102,896,000 455,232,600
STP1 STP1 27,390,000 50,460,000 16,521,200 94,371,200
STP2 STP2 75,000,000 40,550,000 38,800,000 154,350,000
STP3 STP3 8,000,000 8,130,000 6,000,000 22,130,000
STP4 STP4 7,625,000 350,000 2,915,726 10,890,726
STP5 STP5 1,750,000 21,851,750 10,502,300 34,104,050
STPF STPF 47,957,000 119,653,000 97,740,000 265,350,000
TAP TAP 12,300,000 12,300,000 12,300,000 36,900,000
Total Amount 1,666,684,970 2,068,054,446 1,495,636,639 5,230,376,055
Page 192 of 192