Read the full stored bill text
26 RS BR 1369
Page 1 of 244
BR136900.100 - 1369 - 130264 - 4678v Jacketed
AN ACT relating to road projects and declaring an emergency. 1
Be it enacted by the General Assembly of the Commonwealth of Kentucky: 2
Section 1. The projects authorized by the General Assembly in this Act 3
constitute the official 2026-2028 Biennial Highway Construction Plan. 4
Section 2. Whereas the funding for these projects is provided by the 5
Transportation Cabinet Budget Bill, which takes effect upon its passage and approval by 6
the Governor or upon its otherwise becoming a law, an emergency is decl ared to exist 7
and this Act takes effect upon its passage and approval by the Governor or upon its 8
otherwise becoming a law. 9
Section 3. The 2026-2028 biennial highway construction plan is as follows:10
County FundPhaseDescriptionRouteItem No.
2026-2028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1702 IN ADAIR COUNTYKY -1702Adair PL4325
DN
RW
UT
CN 58,000 GR
Project Cost: 58,000 0 0
AD
DRESS CONDITION OF Louie B. Nunn Cumberland Parkway FROM
MILEPOINT 43.02 TO MILEPOINT 48.15
LN-9008Adair PL22207
DN 200,000 NHPM
RW
UT
CN 2,000,000 NHPM
Project Cost: 0 2,200,000 0
KY
55 NEW TURNING LANE AT BETTY'S OK COUNTRY COOKING.
(18CCN)(2020CCR) (2022CCR) (2024CCR)
KY-55Adair PL80003
DN 450,000 SPP
RW 1,420,000 SPP
UT
CN
Project Cost: 0 450,000 1,420,000
IM
PROVE SAFETY AND MOBILITY ALONG KY 55 NEAR DOC'S
MARKET. (2022CCN) (2024CCR)
KY-55Adair PL80200
DN 400,000 SPP
RW 1,260,000 SPP
UT
CN
Project Cost: 0 400,000 1,260,000
Pr
ovide access into Green River Commerce Park along KY 55 to
promote economic growth in Adair County. (MP 16.6-16.75)
(2024CCN)
KY-55Adair PL80351
DN 200,000 SPP
RW 790,000 SPP
UT 8,100,000 SPP
CN
Project Cost: 0 200,000 8,890,000
Page 2 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve mobility and congestion along KY 55 from US 127 in Russell
C
ounty to the Louis B. Nunn Cumberland KY 55/KY6177 in Adair
County. (Russell MP 0.0 - 8.159; Adair MP 0.0 - 9.68) (2024CCN)
KY-55Adair PL 400,000 SPP80352
DN 7,560,000 SPP
RW
UT
CN
Project Cost: 400,000 7,560,000 0
T
otal for Adair county PL
Total Amounts:
CN
UT
RW
DN
400,000
8,810,000
3,470,000
8,100,000
58,000 2,000,000
458,000 10,810,000 11,570,000
I
MPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION
IMPROVEMENTS FROM NEAR THE STONY POINT ROAD
INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW ROAD
INTERSECTION (12CCR)(18CCN) (2020CCR) (2024CCR)
KY-100Allen PL320
DN
RW
UT
CN 11,780,000 SPP
Project Cost:
0 11,780,000 0
W
IDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN
SECTION FROM OLIVER STREET TO US 31E TO INCREASE
CAPACITY/SAFETY. MP 11.800-12.700 (14CCN)(18CCN) (2020CCR)
(2024CCR)
KY-100Allen PL8802
DN
RW 610,000 SPP
UT 580,000 SPP
CN 720,000 SPP
Project Cost:
0 1,190,000 720,000
B
RIDGE PROJECT IN ALLEN COUNTY ON (002C00004N) JEFFERSON
SCHOOL R AT DIFFICULT CREEK
CR-1043Allen PL10026
DN 139,182 FBP2
RW
UT
CN 927,878 FBP2
Project Cost: 0 0 1,067,060
Page 3 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY-100 FROM KY-622 IN SIMPSON COUNTY TO EST
OF
SULPHUR FORK CREEK IN ALLEN COUNTY (2012CCR) (2022CCN)
(2024CCR)
KY-100Allen PL80206
DN
RW
UT
CN 19,140,000 SPP
Project Cost: 0 19,140,000 0
I
mprove safety on KY 101 from KY 234 to the Warren County Line.
(2022CCN) (2024CCR)
KY-101Allen PL80207
DN
RW 2,200,000 SPP
UT 2,510,000 SPP
CN
Project Cost: 0 2,200,000 2,510,000
I
MPROVE SAFETY AND REDUCE CONGESTION ALONG KY 100 (OLD
GALLATIN RD) FROM THE INTERSECTION WITH WOODLAND CIRCLE
DRIVE TO JOHN KELLY DRIVE IN SCOTTSVILLE. (2024CCN)
KY-100Allen PL80308
DN 526,000 SPP
RW 563,000 SPP
UT
CN
Project Cost:
0 526,000 563,000
I
mprove connectivity within Allen Springs Industrial Park. (2024CCN)PF-9999Allen PL80312
DN
RW 110,000 STP2
UT 260,000 STP2
CN 2,700,000 SPP
Project Cost: 370,000 2,700,000 0
R
ECONSTRUCTION/NEW CONSTRUCTION OF TWO-LANE ROADWAY
WITH SHOULDERS AND WIDER BRIDGES. (2024CCN)
KY-101Allen PL80315
DN 9,120,000 SPP
RW
UT
CN
Project Cost: 0 9,120,000 0
Page 4 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct roundabout intersection at KY 100 and KY 3500 (Old
G
allatin Road/Franklin Road) (MP 13.05-13.15) (2024CCN)
KY-100Allen PL80353
DN
RW 250,000 SPP
UT 500,000 SPP
CN 1,300,000 SPP
Project Cost: 0 750,000 1,300,000
T
otal for Allen county PL
Total Amounts:
CN
UT
RW
DN 9,646,000 139,182
110,000 3,060,000 563,000
260,000 1,080,000 2,510,000
33,620,000 2,947,878
370,000 47,406,000 6,160,060
I
MPROVE KY 151 FROM US 127 AT LAWRENCEBURG TO I-64 IN
FRANKLIN COUNTY. (2020CCN) (2024CCR)
KY-151Anderson PL806
DN
RW
UT 420,000 SPP
CN 1,800,000 SPP
Project Cost: 420,000 1,800,000 0
WIDENING WITH ACCESS IMPROVEMENTS TO ANDERSON CROSSING
O
N US62, FROM 0.2MI W OF CORPORATE DR TO US127B
(LAWRENCEBURG BYPASS). PRIORITY SECTION (2016BOP)
(2024CCN)
US-62A nderson PL8100.1000
DN
RW 5,040,000 SPP
UT
CN
Project Cost: 0 0 5,040,000
ADDRESS DEFICIENCIES OF BRIDGE ON KY 44 OVER TIMBER CREEK
(
003B00028N)
KY-44A nderson PL10065
DN 237,733 BRX
RW
UT
CN 1,584,890 BRX
Project Cost: 0 0 1,822,623
Page 5 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
F
ROM MILEPOINT 56.287 TO MILEPOINT 58.345
BG-9002Anderson PL22183
DN 200,000 NHPM
RW
UT
CN 2,003,520 NHPM
Project Cost: 0 2,203,520 0
IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END
OF
BRIDGE OVER KENTUCKY RIVER AT TYRONE(18CCN) (2020CCR)
(2022CCR) (2024CCR)
US-62A nderson PL80001
DN
RW
UT 5,850,000 STP2
CN
Project Cost: 0 5,850,000 0
T
otal for Anderson county PL
Total Amounts:
CN
UT
RW
DN 200,000 237,733
5,040,000
420,000 5,850,000
3,803,520 1,584,890
420,000 9,853,520 6,862,623
I
mprove US-60 from Humphrey Creek bridge to 0.4 mi west of Hester
Sullivan Lane. (02CCR) (2020CCR) (2022CCR) (2024CCR)
US-60Ballard PL118
DN
RW
UT 11,200,000 NH
CN 10,640,000 NH
Project Cost: 0 11,200,000 10,640,000
C
ONSTRUCT NEW STRUCTURE OVER THE OHIO RIVER AT CAIRO,
ILLINOIS (KENTUCKY'S SHARE)(004B00021N)
US-51Ballard PL1140
DN 4,000,000 4,500,000 3,005,000 BRO2
RW
UT
CN 26,365,000 BRO2
Project Cost: 4,000,000 30,865,000 3,005,000
Page 6 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT APPROACH ROADWAY TO NEW BRIDGE OVER THE
O
HIO RIVER AT CAIRO, ILLINOIS (KY APPROACH ROADWAY WORK
ONLY).
US-51Ballard PL1140.2000
DN
RW
UT
CN 14,620,000 NH
Project Cost: 0 14,620,000 0
A
DDRESS CONDITION, SAFETY, CONGESTION, AND FUTURE
CAPACITY ISSUES ON US-60 THROUGH THE CITY OF LACENTER.
(2024CCN)
US-60Ballard PL80300
DN 1,560,000 NH
RW 2,750,000 NH
UT 1,500,000 NH
CN
Project Cost:
1,560,000 0 4,250,000
A
DDRESS CONDITION, SAFETY, CONGESTION, AND FUTURE
CAPACITY FROM PROPOSED BARLOW EASTERN BYPASS TO
PROPOSED LACENTER SOUTHERN BYPASS. (2024CCN)
US-60Ballard PL80301
DN 2,080,000 NH
RW
UT
CN
Project Cost:
0 0 2,080,000
CORRECT ROADWAY GEOMETRICS, INADEQUATE PASSING ZONES,
I
MPROVE OPERATING SPEEDS AND IMPROVE CONNECTIVITY FROM
CARLISLE COUNTY LINE TO RAILROAD OVERPASS IN WICKLIFFE.
(2024CCN)
US-51B allard PL80308
DN 1,560,000 SPP
RW
UT
CN
Project Cost: 0 1,560,000 0
THE PURPOSE OF THIS PROJECT IS TO PROVIDE ROADWAY
I
NFRASTRUCTURE TO SUPPORT COMMUNITY
GROWTH/DEVELOPMENT AND SAFE ACCESS FOR FREIGHT TRAFFIC
TO DEVELOPING RIVERPORT SOUTH OF WICKLIFFE. (2024CCN)
US-51B allard PL80320
DN 300,000 SPP
RW 400,000 SPP
UT 400,000 SPP
CN
Project Cost: 0 300,000 800,000
Page 7 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE GEOMETRIC DEFICIENCIES, FREIGHT TRUCK MOBILITY, AND
I
MPROVE SAFETY ON KY 286 FROM HERSHEL JONES ROAD TO KY
473. (2024CCN)
KY-286B allard PL80322
DN 1,500,000 SPP
RW
UT
CN
Project Cost: 0 1,500,000 0
T
otal for Ballard county PL
Total Amounts:
CN
UT
RW
DN 5,560,000 7,860,000 5,085,000
3,150,000
11,200,000 1,900,000
40,985,000 10,640,000
5,560,000 60,045,000 20,775,000
I
MPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E
(ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM
KY-1297 TO US-68 IN GLASGOW. (14CCN) (16CCN) (2020CCR)
(2024CCR)
CR-1366,
KY-1297
Barren PL8821
DN
RW
UT
CN 13,440,000 SPP
Project Cost:
0 13,440,000 0
ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET.
(
005B00058N)
US-31B arren PL10001
DN
RW 1,000,000 BRX
UT 550,000 BRX
CN 2,900,000 BRX
Project Cost: 1,000,000 550,000 2,900,000
A
DDRESS CONDITION OF US-31E FROM MILEPOINT 8.052 TO
MILEPOINT 12.117
US-31Barren PL20038
DN 160,000 STP4
RW
UT
CN 1,840,000 STP4
Project Cost: 2,000,000 0 0
Page 8 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF US-68X FROM MILEPOINT 2.75 TO
M
ILEPOINT 4.27
US-68Barren PL22300
DN 640,000 STP3
RW
UT
CN 7,360,000 STP3
Project Cost: 8,000,000 0 0
NEW INTERCHANGE ON THE LOUIE NUNN CUMBERLAND PARKWAY
A
T KY (CONTINGENT ON ECONOMIC DEVELOPMENT PROJECTS)-249
IN GLASGOW(18CCN) (2022CCR) (2024CCR)
LN-9008B arren PL80002
DN 2,030,000 SPP
RW
UT
CN
Project Cost: 0 0 2,030,000
REDUCE CONGESTION AND INCREASE MOBILITY ON US 31E FROM
A
BERDEEN DRIVE TO TROJAN TRAIL, INCLUDING RECONSTRUCTION
OF THE INTERCHANGE WITH LN 9008. (2024CCN)
LN-9008B arren PL80300
DN
RW 330,000 SPP
UT 1,860,000 SPP
CN
Project Cost: 0 2,190,000 0
I
MPROVE SAFETY AND MOBILITY ON US-31E IN THE HAYWOOD
AREA. (2024CCN)
US-31Barren PL80319
DN 620,000 SPP
RW 650,000 SPP
UT
CN
Project Cost: 0 620,000 650,000
A
ddition of southbound left turn lane and northbound right turn lane at
new Southern States facility on KY 3600 (MP 1.95). (2024CCN)
KY-3600Barren PL80352
DN
RW
UT
CN 190,000 SPP
Project Cost: 0 190,000 0
T
otal for Barren county PL
Total Amounts:
CN
UT
RW
DN 800,000 620,000 2,030,000
1,000,000 330,000 650,000
2,410,000
9,200,000 13,630,000 2,900,000
11,000,000 16,990,000 5,580,000
Page 9 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY-111 IN THE VICINITY OF THE "S-CURVE" EAST OF
O
WINGSVILLE (14CCR) (2022CCN) (2024CCR)
KY-111B ath PL193
DN 380,000 SPP
RW
UT
CN
Project Cost: 0 0 380,000
I
NSTALL GUARDRAIL ON US-60 IN BATH COUNTYUS-60Bath PL4327
DN
RW
UT
CN 46,000 GR
Project Cost: 46,000 0 0
RECONSTRUCT CURVE AT .8 MILE SOUTH OF KY-36 (08CCN)(12CCR)
M
ILEPOINT 7.147 TO 7.247) (2022CCN)
KY-965B ath PL8404
DN 270,000 SPP
RW
UT
CN
Project Cost: 0 0 270,000
C
ORRECT HORIZONTAL AND WIDTH DEFICIENCIES ON KY 36 FROM
"OLD KY 11" MP 1.004 TO KY 1325 (MP 6.97) TO IMPROVE SAFETY
AND OPERATIONAL EFFICIENCY OF ROADWAY (14CCN) (2022CCN)
(2024CCR)
KY-36Bath PL 400,000 SPP8814
DN 3,640,000 SPP
RW
UT
CN
Project Cost:
0 400,000 3,640,000
B
RIDGE PROJECT IN BATH COUNTY ON (006B00012N) US-60 AT
DRAINAGE DITCH
US-60Bath PL10067
DN 357,929 BRX
RW
UT
CN 2,386,193 BRX
Project Cost: 0 0 2,744,122
Page 10 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN BATH COUNTY ON (006B00013N) US-60 AT
C
ROOKED RUN CREEK
US-60Bath PL10068
DN 366,778 BRX
RW
UT
CN 2,445,188 BRX
Project Cost: 0 0 2,811,966
A
DDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER COW CREEK
(006B00011N)
US-60Bath PL10095
DN 144,243 BRX
RW
UT
CN 961,619 BRX
Project Cost: 0 0 1,105,862
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 117.83 TO
MILEPOINT 123.6
I -64Bath PL22045
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 5,400,000 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 123.6 TO MILEPOINT
1
28.955
I -64B ath PL22046
DN 450,000 NHPM
RW
UT
CN 4,521,000 NHPM
Project Cost: 4,971,000 0 0
IMPROVE SAFETY ON KY 36 FROM THE INTERSECTION WITH I-64 TO
T
HE INTERSECTION OF KY 965 INCLUDING THE CURVES KNOWN AS
CLEAR CREEK FURNACE AND THOMAS HILL (2020CCN) MILEPOINT
13.394 TO MILEPOINT 17.104 (2022CCN) (2024CCR)
KY-36B ath PL80101
DN
RW 1,650,000 SPP
UT 2,430,000 SPP
CN
Project Cost: 0 4,080,000 0
Page 11 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ON KY 36 FROM
N
ORTH OF MARIELLA DR TO THE INTERSECTION OF OLD KY 36 (2020
CCN) (2022CCN) (2024CCR)
KY-36B ath PL80102
DN 720,000 SPP
RW 1,300,000 SPP
UT
CN
Project Cost: 0 720,000 1,300,000
R
EALIGN ROADWAY ON US 60 NEAR OWINGSVILLE BEGINNING IN
THE VICINITY OF ROSE BUSH LN AND ENDING AT WELLS ROAD
NEAR I 64 EXIT 123 (2022CCN) (2024CCR)
US-60Bath PL80250
DN
RW 1,820,000 SPP
UT 1,300,000 SPP
CN
Project Cost: 0 1,820,000 1,300,000
T
otal for Bath county PL
Total Amounts:
CN
UT
RW
DN
400,000
450,000 1,210,000 5,158,950
3,470,000 1,300,000
2,430,000 1,300,000
4,567,000 4,910,000 5,793,000
5,017,000 12,420,000 13,551,950
ENHANCING CUMBERLAND AVENUE FROM US 25E TO 18TH STREET
W
ITH STREET IMPROVEMENTS FOR VEHICLE AND PEDESTRIANS, AS
WELL AS STORM WATER MANAGEMENT TO IMPROVE SAFETY,
CONGESTION, AND ENVIRONMENTAL IMPACT. (2020CCR) (2024CCR)
KY-74B ell PL167
DN
RW 580,000 SPP
UT 3,860,000 SPP
CN 17,580,000 SPP
Project Cost: 0 4,440,000 17,580,000
I
NSTALL GUARDRAIL ON KY-2011 IN BELL COUNTYKY-2011Bell PL4395
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
Page 12 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-66 IN BELL COUNTYK Y-66Bell PL4397
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
P
ROVIDE PASSING OPPORTUNITIES ON US 119 IN THE VICINITY OF
MP 4.5 IN BELL COUNTY. (12CCN)(14CCR) (2020CCN) (2024CCR)
US-119Bell PL8702
DN
RW 1,240,000 SPP
UT 610,000 SPP
CN 5,600,000 SPP
Project Cost: 0 1,850,000 5,600,000
B
RIDGE PROJECT IN BELL COUNTY ON (007B00055N) KY-66 AT RED
BIRD CREEK
KY-66Bell PL10171
DN
RW 10,000 BRX
UT 10,000 BRX
CN 1,046,035 BRX
Project Cost: 0 0 1,066,035
B
RIDGE PROJECT IN BELL COUNTY ON (007C00072N) 17TH STREET
AT YELLOW CREEK
KY-217Bell PL10239
DN 202,446 FBP2
RW
UT
CN 1,349,640 FBP2
Project Cost: 0 0 1,552,086
A
DDRESS CONDITION OF US-119 FROM MILEPOINT 13.88 TO
MILEPOINT 15.88
US-119Bell PL22303
DN 318,364 STP5
RW
UT
CN 3,661,186 STP5
Project Cost: 0 3,979,550 0
Page 13 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Fill in existing depressed median to install a two-way left turn lane
f
rom the intersection of KY 441 to intersection of Tim Short
Automotive. (2022CCN)
US-25Bell PL80201
DN 240,000 SPP
RW
UT
CN 560,000 SPP
Project Cost: 0 240,000 560,000
T
otal for Bell county PL
Total Amounts:
CN
UT
RW
DN 558,364 202,446
1,820,000 10,000
4,470,000 10,000
190,000 3,661,186 26,135,675
190,000 10,509,550 26,358,121
R
EDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THE
INTERCHANGE OF I-75 AND KY-14 IN WALTON. (2020CCR)
(2022CCR) (2024CCR)
I -75Boone PL80
DN
RW 17,250,000 NH
UT 1,680,000 NH
CN
Project Cost: 0 0 18,930,000
P
rovide East-West Connectivity and Improve Mobility From KY 237 to
KY 842. (2024BOP)
US-42Boone PL446.1000
DN
RW 15,750,000 SPP
UT
CN
Project Cost: 0 0 15,750,000
P
rovide East-West Connectivity and Improve Mobility from KY 842 to
Mall Road. (2024BOP)
US-42Boone PL446.2000
DN
RW 36,750,000 SPP
UT
CN
Project Cost: 0 0 36,750,000
Page 14 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE MOBILITY AND REDUCE CONGESTION ON US-25 FROM
W
INNING COLORS DRIVE TO THE NORFOLK SOUTHERN RAILROAD
CROSSING SOUTH OF KY-1829 (INDUSTRIAL ROAD); EXCLUDES
GRADE SEPARATION AT KY-536. (2020CCR) (2022CCR) (2024CCR)
US-25Boone PL447
DN
RW 28,750,000 SPP
UT
CN
Project Cost:
0 28,750,000 0
R
econstruct US 25 from Winning Colors Drive to Melinda Lane.
(2024BOP)
US-25Boone PL447.1000
DN
RW 10,500,000 SPP
UT 4,160,000 SPP
CN
Project Cost: 0 10,500,000 4,160,000
R
econstruct US 25 from Melinda Lane to RR Spur Crossing.
(2024BOP)
US-25Boone PL447.2000
DN
RW 15,750,000 SPP
UT
CN
Project Cost: 0 0 15,750,000
D
EDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY
URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2026
THROUGH FY 2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2024CCR)
CO-0Boone PL966.0800
DN
RW
UT
CN 8,600,000 8,600,000 8,600,000 SNK
Project Cost:
8,600,000 8,600,000 8,600,000
A
DDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON
RICHARDSON ROAD (KY 842) 0.14 MI E OF US 25 NEAR
INDEPENDENCE (008B00092N) (2020CCN)
KY-842Boone PL1087
DN
RW 4,000,000 BRX
UT 3,775,000 BRX
CN 10,000,000 BRX
Project Cost:
0 17,775,000 0
Page 15 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
I-275/KY-212 INTERCHANGE AND KY-20 RECONSTRUCTION NEAR
G
REATER CINCINNATI AIRPORT. (2004BOPC)(KYTC SHARE @ 46.6%)
(2024CCN)
I -275B oone PL8000.2000
DN 6,990,000 SPP
RW
UT
CN
Project Cost: 0 0 6,990,000
A
DDRESS DEFICIENCIES OF BRIDGE ON I-275 OVER OHIO RIVER
(008B00052N)
I -275Boone PL10028
DN 520,000 FBP
RW
UT
CN 5,200,000 FBP
Project Cost: 0 0 5,720,000
ADDRESS DEFICIENCIES OF BRIDGE ON KY 14 OVER MCCOYS FORK
(
008B00003N)
KY-14B oone PL10049
DN 211,800 BRX
RW
UT
CN 1,411,999 BRX
Project Cost: 0 0 1,623,799
R
ECONSTRUCT GUNPOWDER RD. FROM US-42 TO KY-536. (18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-237Boone PL80000
DN
RW 19,800,000 SPP
UT
CN
Project Cost: 0 0 19,800,000
E
XPANSION OF ROUNDABOUTS ALONG KY-237 AT CARDINAL COVE
AND GRAVES RD(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-237Boone PL80001
DN
RW 2,880,000 SPP
UT 1,570,000 SPP
CN
Project Cost: 0 4,450,000 0
Page 16 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONVERT TURFWAY RD AND THOROUGHBRED BLVD FROM 2 WAY
TO
ONE WAY AND CONSTRUCT NEW I-75 ACCESS (2020CCN)
(2022CCR) (2024CCR)
KY-1017,
KY-717
Boone PL80100
DN 3,000,000 SPP
RW
UT
CN
Project Cost:
0 3,000,000 0
C
ONVERT KY 18 (BURLINGTON PIKE) TO A SUPER STREET
(2020CCN) (2022CCR) (2024CCR)
KY-18Boone PL80101
DN
RW
UT
CN 19,500,000 NH
Project Cost: 0 19,500,000 0
R
econstruct KY 3060 (Frogtown Road) from US 42 to US 25.
(2022CCR) (2024CCR)
KY-3060Boone PL80102
DN
RW 16,680,000 SPP
UT 4,710,000 SPP
CN
Project Cost: 0 16,680,000 4,710,000
R
econstruct Turfway Road (KY 717) from Aero Parkway (MP 0.0) to
Donaldson Road (MP 1.67). (2020CCN) (2022CCR) (2024CCR)
KY-717Boone PL80150
DN
RW
UT
CN 5,000,000 5,000,000 STPF
Project Cost: 0 5,000,000 5,000,000
C
onduct a planning study to evaluate potential improvement options to
promote economic growth through central Boone County as well as
improving safety and modernizing existing roadways (2022CCN)
(2024CCR)
KY-536,
US-42
Boone PL 810,000 SPP80202
DN
RW
UT
CN
Project Cost:
0 810,000 0
Page 17 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
PLANNING STUDY TO IMPROVE EXISTING ALIGNMENTS AND NEW
C
ONSTRUCTION BETWEEN KY 536 (HATHAWAY ROAD) AND KY 14
(VERONA MUDLICK ROAD) (2022CCN) (2024CCR)
KY-536,
US-42
Boone PL 840,000 SPP80204
DN
RW
UT
CN
Project Cost:
840,000 0 0
I
mprove safety and address geometric deficiencies along KY 18 from
Caroline Williams Way to KY 338; include multi-modes. (2022CCN)
(2024CCR)
KY-18Boone PL80206
DN 1,040,000 SPP
RW
UT
CN
Project Cost:
0 1,040,000 0
I
mprove safety & mobility, reduce congestion and address geometric
deficiencies along Camp Ernst Road (CR 1001) from KY 237 (Pleasant
Valley Rd) to KY 536 (Hathaway Rd). (2022CCN) (Includes Item No.
6-80208) (2024CCR)
CR-1001Boone PL80207
DN
RW 17,250,000 SPP
UT
CN
Project Cost:
0 0 17,250,000
I
mprove safety & mobility, reduce congestion and address geometric
deficiencies along Camp Ernst Road (CR 1001) from Long Branch Rd.
to KY 237 (Pleasant Valley Rd.) (2022CCN)(See Item No. 6-80207)
(2024CCN)
CR-1001Boone PL80208
DN 2,690,000 SPP
RW
UT
CN
Project Cost:
0 0 2,690,000
I
mprove access to KY 237 for Litton Lane. (2022CCN) (2024CCR)KY-237Boone PL80209
DN
RW 7,350,000 SPP
UT 520,000 SPP
CN
Project Cost: 0 7,350,000 520,000
Page 18 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Paired Grade-Separated Intersections along KY 18 at KY 842 and Mall
R
oad. (2022CCN) (2024CCR)
KY-18Boone PL80210
DN 4,992,000 SPP
RW
UT
CN
Project Cost: 0 4,992,000 0
I
mprove capacity at the KY 18 (Burlington Pike) intersection with KY
1017 (Aero Parkway) to support existing and future traffic volumes.
Consider grade separation design options. (2022CCN)
KY-18Boone PL80211
DN 1,860,000 SPP
RW
UT
CN
Project Cost:
0 1,860,000 0
E
XPAND NORTHBOUND AND SOUTHBOUND REST AREAS ON
I-71/I-75 IN BOONE COUNTY TO ADD MORE TRUCK PARKING.
(2022CCN) (2024CCR)
I -75Boone PL80257
DN
RW
UT 450,000 NH
CN 16,000,000 NH
Project Cost:
16,450,000 0 0
I
MPROVE SAFETY AND REDUCE CONGESTION ALONG HICKS PIKE
(CR 1151) FROM US 42 TO KY 338. (2024CCN)
CR-1151Boone PL80304
DN 5,160,000 SPP
RW
UT
CN
Project Cost: 0 5,160,000 0
I
MPROVE SAFETY & MOBILITY, AND ADDRESS GEOMETRIC
DEFICIENCIES ALONG US 25 (DIXIE HWY.) BETWEEN KY 16 (MARY
GRUBBS HIGHWAY) AND KY 338 (RICHWOOD RD.) (2024CCN)
US-25Boone PL80316
DN 4,320,000 SPP
RW
UT
CN
Project Cost:
0 4,320,000 0
Page 19 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION ON LIMABURG ROAD
F
ROM CONRAD LANE TO KY 18 (BURLINGTON PIKE). (2024CCN)
CR-1042Boone PL80317
DN 2,160,000 SPP
RW
UT
CN
Project Cost: 0 2,160,000 0
I
MPROVE SAFETY AND MOBILITY ALONG KY 20 (PETERSBURG
ROAD) FROM GRAVES ROAD TO KY 237 (NORTH BEND ROAD).
(2024CCN)
KY-20Boone PL80318
DN 4,380,000 SPP
RW
UT
CN
Project Cost:
0 4,380,000 0
T
ransportation improvements adjoining KY 237 Central Parkway in
Partnership with Boone County (TID). (2024CCN)
KY-237Boone PL80320
DN
RW
UT
CN 10,400,000 SPP
Project Cost: 0 10,400,000 0
I
mprove Steeplechase Elementary School access and safety by
extending Grand National Blvd to Chambers Road. (2024CCN)
KY-2951Boone PL80350
DN 2,000,000 SPP
RW 4,000,000 SPP
UT 200,000 SPP
CN
Project Cost: 0 2,000,000 4,200,000
A
dd additional exit lane on I-75 Southbound (MP 171 South) ramp and
align lights to provide 2 left turn lanes and I right turn lane on HWY
14/16 Nart Grubbs HWY. Ramp only work. (2024CCN)
I -75Boone PL80352
DN
RW
UT
CN 1,560,000 SPP
Project Cost:
0 1,560,000 0
Page 20 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Reconstruct Limaburg Road from KY 18 to Gateway Blvd (CR 1086)
(
2024CCN)
CR-1042Boone PL80356
DN 4,500,000 SPP
RW
UT
CN
Project Cost: 0 4,500,000 0
R
econstruct KY 20 from the new KY 495 (Graves Road) Interchange
to KY 18 (MP14.6-16.7) (2024CCN)
KY-20Boone PL80357
DN 4,500,000 SPP
RW
UT
CN
Project Cost: 0 4,500,000 0
R
econstruct KY 536 from Camp Ernst Road to Old Union Road (MP
8.0-10.8) (2024CCN)
KY-536Boone PL80358
DN 6,750,000 SPP
RW
UT
CN
Project Cost: 0 0 6,750,000
I
mprove safety & mobility and address geometric deficiencies along US
25 (Dixie Hwy) between KY 16 and KY 338 (Richwood Rd) (MP
2.2-4.7) (2024CCN)
US-25Boone PL80359
DN 4,000,000 SPP
RW
UT
CN
Project Cost:
0 4,000,000 0
C
ONSTRUCT A NEW CONNECTION BETWEEN KY 1292, BEAVER
ROAD, TO KY 2951, CHAMBERS ROAD, AND KY 16. (2024CCN)
PF-9999Boone PL80360
DN 6,000,000 SPP
RW
UT
CN
Project Cost: 0 6,000,000 0
T
otal for Boone county PL
Total Amounts:
CN
UT
RW
DN
840,000 810,000
47,912,000 17,161,800
70,160,000 126,550,000
450,000 5,345,000 11,270,000
24,600,000 55,060,000 20,211,999
25,890,000 179,287,000 175,193,799
Page 21 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Extend Stewart Street to Bellafato Street in the City of Paris to provide
i
mproved access to US 460.
CO-0Bourbon PL474
DN 355,000 SPP
RW 150,000 SPP
UT 310,000 SPP
CN
Project Cost: 0 355,000 460,000
I
MPROVE US 460 FROM RUSSELL CAVE RD TO I 75 (2ND PART OF
7-8705) (2020CCN)(SEE 7-8705.10) (2022CCR) (2024CCR)
US-460Bourbon PL80104
DN
RW
UT
CN 5,000,000 14,660,000 STP2
Project Cost: 5,000,000 14,660,000 0
I
MPROVE SAFETY OF CANE RIDGE ROAD (KY 537) FROM THE
INTERSECTION WITH 460 TO THE ENTRANCE PAST COLOR POINT
(2020CCN) (2022CCR)
KY-537Bourbon PL80155
DN 3,240,000 SPP
RW
UT
CN
Project Cost:
0 0 3,240,000
MODERNIZE ROADWAY, IMPROVE CONGESTION, SAFETY AND
P
EDESTRIAN ACCESS FROM US 27 ALONG Y 1939 FOR .212 MILES
INCLUDING IMPROVEMENTS TO THE INTERSECTION OF MATLACK ST
AND THE BOURBON COUNTY SCHOOL BUS BARN (2022CCN)
(INCLUDES ITEM NO. 7-916) (2024CCR)
KY-1939B ourbon PL80203
DN
RW 740,000 SPP
UT 1,150,000 SPP
CN 2,240,000 SPP
Project Cost: 0 740,000 3,390,000
I
mprove safety on KY 627 (Winchester Rd) from Clark/Bourbon CL to
US 68X (High St). Breakout section including the KY 57 (Austerlitz Rd)
intersection and continuing North for approx. 0.70 miles. (2024CCN)
KY-627Bourbon PL80321
DN 350,000 SPP
RW 100,000 SPP
UT 100,000 SPP
CN
Project Cost:
0 350,000 200,000
Page 22 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Replace bridge on KY 1893 (Shawhan Rd) over Stoner Creek.
(
009B00041N)
KY-1893Bourbon PL80361
DN 325,909 FBP2
RW
UT
CN 2,172,724 FBP2
Project Cost: 0 0 2,498,633
T
otal for Bourbon county PL
Total Amounts:
CN
UT
RW
DN 705,000 3,565,909
740,000 250,000
1,560,000
5,000,000 14,660,000 4,412,724
5,000,000 16,105,000 9,788,633
I
MPROVE SAFETY AND DECREASE CONGESTION ON KY 716 FROM
MP 0.0 (US 60) TO MP 0.56 (KY 3293) (2020CCR) (2024CCN)
KY-716Boyd PL180
DN 520,000 SPP
RW 280,000 SPP
UT
CN
Project Cost: 0 520,000 280,000
F
EDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO
FOR FY 2022-2028. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2022CCR) (2024CCR)
CO-0Boyd PL208.0600
DN
RW
UT
CN 1,800,000 1,800,000 1,800,000 SAH
Project Cost: 1,800,000 1,800,000 1,800,000
ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG
S
ANDY RIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L
AND 010B00046R)(SD)
I -64B oyd PL10016
DN 200,000 FBP
RW
UT
CN 2,000,000 FBP
Project Cost: 0 0 2,200,000
Page 23 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN BOYD COUNTY ON (010B00058N) US-23S AT
O
HIO RIVER,CSX,STREETS
US-23Boyd PL10074
DN 260,000 BRO
RW
UT
CN 2,600,000 BRO
Project Cost: 0 2,860,000 0
ADDRESS DEFICIENCIES OF BRIDGE ON US 23 OVER OHIO RIVER,CSX
,
STREETS (010B00040N)
US-23B oyd PL10096
DN 200,000 BRZ
RW
UT
CN 2,000,000 BRZ
Project Cost: 0 2,200,000 0
I
mprove operational efficiency of the US 60 (13th Street) and KY 168
(Blackburn Ave) intersection. (2024CCN)
KY-168,
US-60
Boyd PL80300
DN 1,300,000 NH
RW
UT
CN
Project Cost:
0 1,300,000 0
I
mprove the operational efficiency of Greenup Avenue (US-23) from
the southern split with Winchester Avenue (US-23X) (MP 17.065) to
the intersection of 20th Street (MP 18.055). (2024CCN)
US-23Boyd PL80301
DN 560,000 NH
RW
UT
CN
Project Cost:
0 0 560,000
I
mprove safety, mobility and accessibility at the intersection of KY 168
and CS 2341 (Robert's Drive); located within close proximity of an at
grade CSX Railroad Crossing (MP 6.7-6.8) (2024CCN)
KY-168Boyd PL80350
DN 760,000 SPP
RW 2,400,000 SPP
UT
CN
Project Cost:
0 760,000 2,400,000
Page 24 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve Commerce Drive (CR 1299), including widening, improving
g
eometrics and drainage (2024CCN)
CR-1299Boyd PL80351
DN 780,000 SPP
RW 1,150,000 SPP
UT
CN
Project Cost: 0 780,000 1,150,000
C
onstruct a new bridge from south side of Camp Landing across the
Little Sandy River. Near US 60/KY 180 (Memorandum of Agreement
with Boyd County, state funds provided for design only) (2024CCN)
PF-9999Boyd PL80353
DN 570,000 SPP
RW
UT
CN
Project Cost:
0 570,000 0
T
otal for Boyd county PL
Total Amounts:
CN
UT
RW
DN 4,390,000 760,000
3,830,000
1,800,000 6,400,000 3,800,000
1,800,000 10,790,000 8,390,000
U
S 150 Bypass between Fireside Dr and Gose Pike in Danville,
Kentucky; City of Danville’s SS4A USDOT Grant Funded Project.
US-127,
US-150
Boyle PL473
DN 2,190,000 KYD
RW
UT
CN 13,760,000 KYD
Project Cost:
15,950,000 0 0
R
ECONSTRUCT KY 52 FROM KY 1805 (Goggin Ln) TO KY 590
(2022CCN) (2024CCR)
KY-52Boyle PL80204
DN
RW 2,510,000 SPP
UT 3,480,000 SPP
CN
Project Cost: 0 0 5,990,000
Page 25 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE THE SAFETY AND MOBILITY OF KY 34 FROM ALUM
S
PRINGS CROSSPIKE (MP 10.391) TO APPROX. 1,000 FEET WEST OF
CORPORATE DRIVE (MP 10.800) (2022CCN)
KY-34B oyle PL80250
DN
RW 3,360,000 SPP
UT 1,120,000 SPP
CN
Project Cost: 0 3,360,000 1,120,000
W
iden the Goggin Ln from MP 0 to MP 2.712 to create a road shoulder
that would improve safety (2024CCN)
KY-1805Boyle PL80300
DN 2,430,000 SPP
RW
UT
CN
Project Cost: 0 2,430,000 0
I
mprove roadway geometry to promote safety on KY 34 from
Lexington Avenue to Old Bridge Road in Boyle County. (2024CCN)
KY-34Boyle PL80302
DN 1,500,000 SPP
RW
UT
CN
Project Cost: 0 1,500,000 0
PLANNING STUDY TO EVALUATE OPTIONS FOR IMPROVING SAFETY
O
N KY 52 BETWEEN DANVILLE AND LANCASTER. (2024CCN)
KY-52B oyle PL80313
DN 1,950,000 SPP
RW
UT
CN
Project Cost: 0 1,950,000 0
I
mprove the existing geometry and typical section of US 68 from
approx. MP 5.2 to MP 6.39 at the intersection of 2nd Street in Perryville
(2024CCN)
US-68Boyle PL80354
DN 780,000 SPP
RW
UT
CN
Project Cost: 0 780,000 0
T
otal for Boyle county PL
Total Amounts:
CN
UT
RW
DN 2,190,000 6,660,000
3,360,000 2,510,000
4,600,000
13,760,000
15,950,000 10,020,000 7,110,000
Page 26 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
OPERATION OF AUGUSTA FERRY FOR FY 2027 THROUGH FY 2032.
(
12CCR)(14CCR) (2020CCR) (2024CCR)
KY-8Bracken PL355.2200
DN
RW
UT
CN 537,000 338,000 SPP
Project Cost: 0 537,000 338,000
R
ECONSTRUCT KY 8 FROM WRANGLING RUN RD TO OLD KY 19.
(2020CCN) (2022CCR) (2024CCR)
KY-8Bracken PL80103
DN 4,550,000 SPP
RW
UT
CN
Project Cost: 0 4,550,000 0
I
MPROVE SAFETY AND MOBILITY AT THE INTERSECTION OF KY 9
(AA HIGHWAY) AND KY 1019 (LENNOXBURG FOSTER ROAD).
(2022CCN) (2024CCR)
KY-9Bracken PL80250
DN 140,000 SPP
RW 20,000 SPP
UT 120,000 SPP
CN
Project Cost:
0 140,000 140,000
T
otal for Bracken county PL
Total Amounts:
CN
UT
RW
DN 4,690,000
20,000
120,000
537,000 338,000
0 5,227,000 478,000
I
MPROVE KY-205 FROM NORTH OF KY-1812 TO SOUTH OF PEGGS
FORK RD. (2020CCR)
KY-205Breathitt PL375
DN
RW
UT 2,360,000 STPF
CN 5,000,000 STPF
Project Cost: 0 2,360,000 5,000,000
Page 27 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ROCKFALL MITIGATION ON KY 15 FROM 0.593 MILE NORTH OF
B
EAVERLY ROAD (MP 13.750) TO KY 1098/KY 1813 (MP 14.644).
(2018BOP) (2024CCR)
KY-15Breathitt PL5014
DN
RW
UT
CN 24,490,000 KYD
9,510,000 PROT
Project Cost: 34,000,000 0 0
R
EPLACE BRIDGE OVER PUNCHEON CREEK ON MAX ROARK RD
(2020CCN)
CR-1125Breathitt PL80107
DN 150,000 SPP
RW 10,000 SPP
UT 10,000 SPP
CN
Project Cost: 0 150,000 20,000
T
otal for Breathitt county PL
Total Amounts:
CN
UT
RW
DN 150,000
10,000
2,360,000 10,000
34,000,000 5,000,000
34,000,000 2,510,000 5,020,000
R
EALIGN KY 86 FROM JESSIE PRIEST ROAD TO EAST OF ROSETTA
CORNERS. (2020CCR) ($2 MILLION CONGRESSIONAL EARMARK
DEMO ID KY188) (2024CCR)
KY-86Breckinridge PL159
DN
RW
UT
CN 8,100,000 SPP
Project Cost:
0 0 8,100,000
A
DDRESS SAFETY AND GEOMETRIC DEFICIENCIES ON KY 79 FROM
KY 477 TO KY 144 (12CCN)(14CCR)(18CCN)(2020 CCR) (COMBINED
W/ 4-8703) (2022CCR) (2024CCR)
KY-79Breckinridge PL8702
DN
RW 4,200,000 SPP
UT 2,430,000 SPP
CN
Project Cost:
0 4,200,000 2,430,000
Page 28 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74.
(
18CCN)
KY-261Breckinridge PL8902
DN 100,000 BRX
RW 25,000 BRX
UT 25,000 BRX
CN 400,000 BRX
Project Cost: 0 0 550,000
M
INOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60.
(16CCN) (18CCN) (2024CCN)
KY-992Breckinridge PL8904
DN 560,000 SPP
RW 900,000 SPP
UT
CN
Project Cost: 0 560,000 900,000
T
otal for Breckinridge county PL
Total Amounts:
CN
UT
RW
DN 560,000 100,000
4,200,000 925,000
2,455,000
8,500,000
0 4,760,000 11,980,000
R
ECONSTRUCT KY 44 FROM KY 1319 KINGS CHURCH HIGHWAY TO
SPENCER COUNTY LINE (2020CCN) (2024CCR)
KY-44Bullitt PL43
DN 1,250,000 SPP
RW 1,050,000 SPP
UT 890,000 SPP
CN 5,570,000 SPP
Project Cost: 2,300,000 6,460,000 0
R
ECONSTRUCT KY 44 FROM I 65 TO CHIMNEY ROCK DRIVE
(MILEPOINT 13.1 TO MILEPOINT 15.1). (2022CCN)
KY-44Bullitt PL150.0200
DN 2,420,000 SPP
RW
UT
CN
Project Cost: 0 2,420,000 0
Page 29 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SECTION 5 FROM CS 3316/CS 3628 TO US 31E BYPASS (2008BOPC)
(
2022CCN) (2024CCR)
KY-44Bullitt PL150.5000
DN
RW 1,720,000 SPP
UT 610,000 SPP
CN
Project Cost: 0 1,720,000 610,000
M
T. WASHINGTON-TAYLORSVILLE RD; RECONSTRUCT KY 44 FROM
US31E BYPASS TO KY 1319 KINGS CHURCH HIGHWAY (2020CCN)
(2022CCR) (2024CCR)
KY-44Bullitt PL347.5000
DN
RW 4,500,000 SPP
UT 1,770,000 SPP
CN
Project Cost:
0 4,500,000 1,770,000
E
XPAND TRUCK PARKING AT I-65 SB WELCOME CENTER.I -65Bullitt PL578
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
I
NSTALL GUARDRAIL ON KY-1319 IN BULLITT COUNTYKY-1319Bullitt PL4309
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
W
IDEN KY-245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH
COUNTY LINE (MP12.261 NELSON/MP0.000 BULLITT) TO HAPPY
HOLLOW RD (MP 4.425). (2022CCN) (2024CCR)
KY-245Bullitt PL8307.2000
DN
RW 5,250,000 SPP
UT 12,880,000 SPP
CN
Project Cost:
0 5,250,000 12,880,000
Page 30 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY
C
OLLEGE. (08CCN)(10CCR)(14CCR)(16CCR) (2020CCR) (2024CCR)
KY-245Bullitt PL8509
DN
RW
UT
CN 14,680,000 HGC
Project Cost: 14,680,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 2674 OVER WHITTAKER
RUN (015B00083N)
KY-2674Bullitt PL10143
DN 440,483 BRZ
RW
UT
CN 2,936,554 BRZ
Project Cost: 0 0 3,377,037
ADDRESS CONDITION OF I-065 FROM MILEPOINT 110.7 TO MILEPOINT
1
18.58
I -65B ullitt PL22067
DN 7,200,000 NHPM
RW
UT
CN 72,000,000 NHPM
Project Cost: 79,200,000 0 0
A
CCESS, SAFETY AND ECONOMIC DEVELOPMENT IMPROVEMENT
STUDY ALONG KY 61 IN LEBANON JUNCTION FROM LEBANON
JUNCTION MIDDLE SCHOOL TO NELSON COUNTY LINE 9 (MP 0.0 TO
3.7) (2020CCN)
KY-61Bullitt PL 260,000 SPP80100
DN
RW
UT
CN
Project Cost:
0 260,000 0
I
MPROVE SAFETY AND REDUCE CONGESTION ON KY 1450 (BLUE
LICK RD.) BETWEEN THE INTERSECTIONS WITH KY 1526 (JOHN
HARPER HIGHWAY) AND CR 1512A (JEFFIE LANE) (2020CCN)
(2022CCR) (2024CCR)
KY-1450Bullitt PL80101
DN
RW 1,800,000 SPP
UT 5,750,000 SPP
CN
Project Cost:
0 1,800,000 5,750,000
Page 31 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY 44 FROM BOGARD LANE TO ARMSTRONG LANE
(
2020CCN) (2022CCR)
KY-44Bullitt PL80103
DN 2,670,000 SPP
RW 5,640,000 SPP
UT
CN
Project Cost: 0 2,670,000 5,640,000
REDUCE CONGESTION, IMPROVE SAFETY, AND ENHANCE MOBILITY
O
N JOHN HARPER HWY (KY 1526) FROM I-65 (MP 11.4) TO KY 61
(MP 12.9) (2024CCN)
KY-1526B ullitt PL 260,000 SPP80339
DN
RW
UT
CN
Project Cost: 0 260,000 0
I
mprove traffic operations and improve safety along US 31E
(Louisville-Bardstown Rd) from the Bullitt/Nelson County Line to KY 44.
Consider a 2+1 configuration and/or innovative intersections (MP 0.0 -
3.53 Bullitt; MP 0.0 - 1.882 Spencer). (2024CCN)
US-31Bullitt PL80354
DN 1,670,000 STPF
RW
UT
CN
Project Cost:
0 1,670,000 0
I
mprove safety and reduce congestion on KY 61 from KY 245 to Plaza
Park Blvd in Lebanon Junction. Project will evaluate widening from 2 to
4 travel lanes and consider other lower impact alternatives. (MP
1.97-9.42) (2024CCN)
KY-61Bullitt PL 260,000 SPP80357
DN 8,050,000 SPP
RW
UT
CN
Project Cost:
0 260,000 8,050,000
T
otal for Bullitt county PL
Total Amounts:
CN
UT
RW
DN
780,000
8,450,000 6,760,000 8,490,483
1,050,000 13,270,000 5,640,000
890,000 21,010,000
87,870,000 5,570,000 2,936,554
97,370,000 27,270,000 38,077,037
Page 32 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2027
T
HROUGH FY 2032.(12CCR) (2020CCR) (2024CCR)
KY-269Butler PL125.1500
DN
RW
UT
CN 166,000 173,000 SPP
Project Cost: 0 166,000 173,000
OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO
C
OUNTY FERRY AUTHORITY FOR FY 2027-2032.(12CCR) (2020CCR)
(2024CCR)
KY-369B utler PL8504.1000
DN
RW
UT
CN 166,000 173,000 SPP
Project Cost: 0 166,000 173,000
B
RIDGE PROJECT IN BUTLER COUNTY ON (016B00002N) US-231 AT
W FK INDIAN CAMP CREEK
US-231Butler PL10031
DN 850,925 FBP
RW
UT
CN 5,672,835 FBP
Project Cost: 0 0 6,523,760
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 340 OVER E PRONG
INDIAN CAMP CREE (016B00042N)
KY-340Butler PL10054
DN 133,805 FBP2
RW
UT
CN 892,032 FBP2
Project Cost: 0 1,025,837 0
A
DDRESS CONDITION OF US-231 FROM MILEPOINT 10.68 TO
MILEPOINT 10.94
US-231Butler PL22311
DN 88,000 STP4
RW
UT
CN 1,012,000 STP4
Project Cost: 1,100,000 0 0
Page 33 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Bridge replacement over Panther CreekC R-1401Butler PL80329
DN 142,168 FBP2
RW
UT
CN 947,784 FBP2
Project Cost: 0 0 1,089,952
T
otal for Butler county PL
Total Amounts:
CN
UT
RW
DN 88,000 133,805 993,093
1,012,000 1,224,032 6,966,619
1,100,000 1,357,837 7,959,712
S
TUDY THE I-24 CORRIDOR FROM THE I-69 INTERCHANGE IN LYON
COUNTY TO THE TENNESSEE STATE LINE.
I -24Caldwell PL 750,000 NH11
DN
RW
UT
CN
Project Cost: 750,000 0 0
R
ELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY
LINE TO FREDONIA, 4.5 MILES. (2020CCN) (2022CCR) (2024CCR)
US-641Caldwell PL187.6000
DN
RW
UT 4,000,000 STPF
CN 28,080,000 SPP
Project Cost: 0 0 32,080,000
B
RIDGE PROJECT IN CALDWELL COUNTY ON (017B00050N) KY-293
AT DONALDSON CREEK
KY-293Caldwell PL10063
DN 1,299,093 BRX
RW
UT
CN 8,660,621 BRX
Project Cost: 9,959,714 0 0
Page 34 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-069 FROM MILEPOINT 73.694 TO
M
ILEPOINT 77.994
I -69Caldwell PL22079
DN 1,290,000 NHPM
RW
UT
CN 12,850,000 NHPM
Project Cost: 0 0 14,140,000
R
ECONSTRUCT CS 1006 (JEFF WATSON RD) FROM KY 91 TO KY
2617. (2024CCN)
CS-1006Caldwell PL80304
DN 730,000 SPP
RW
UT
CN
Project Cost: 0 730,000 0
A
DDRESS TRAFFIC CONTROL AT THE INTERSECTION OF KY2617
AND US62 WEST TO IMPROVE TURN MOVEMENTS FROM KY 2617.
(2024CCN)
US-62Caldwell PL80307
DN 780,000 SPP
RW 500,000 SPP
UT
CN
Project Cost:
0 780,000 500,000
E
XTEND 3 LANE SECTION OF KY 91 (MARION ROAD) FROM MP 12.9
TO BECKNER LANE (MP 13.4) (2024CCN)
KY-91Caldwell PL80308
DN 520,000 SPP
RW 600,000 SPP
UT 300,000 SPP
CN
Project Cost: 0 520,000 900,000
T
otal for Caldwell county PL
Total Amounts:
CN
UT
RW
DN
750,000
1,299,093 2,030,000 1,290,000
1,100,000
4,300,000
8,660,621 40,930,000
10,709,714 2,030,000 47,620,000
Page 35 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL
R
OAD. (SEE 1-120 FOR D, R, U FUNDING) (08CCN)(10CCR)(LET BY
CITY) (2022CCN) (2024CCR)
KY-2594,
K
Y-94,
PF-9999,
US-641
Calloway PL8502
DN
RW
UT
CN 10,800,000 HGC
Project Cost:
0 10,800,000 0
I
MPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121
(2020CCN)
CS-1047,
KY-748
Calloway PL8952
DN
RW
UT 810,000 SPP
CN 5,750,000 SPP
Project Cost:
0 810,000 5,750,000
P
LANNING STUDY FOR SCENIC BYWAY ALONG KENTUCKY LAKE
(2020CCN) (2024CCR)
PF-9999Calloway PL 250,000 SPP80100
DN
RW
UT
CN
Project Cost: 250,000 0 0
A
ddress congestion, geometric deficiencies, and access issues from
KY121 to Utterback Road in Murray. (2022CCN) (2024CCR)
CS-1047Calloway PL80200
DN
RW 3,300,000 SPP
UT
CN
Project Cost: 0 3,300,000 0
C
ORRECT ROADWAY GEOMETRICS AND ADDRESS CONGESTION
AND SAFETY ISSUES AT KY 94 AND KY 1660 (JOHNNY ROBERTSON
ROAD) NEAR MURRAY. (2024CCN)
KY-94Calloway PL80316
DN 270,000 SPP
RW 320,000 SPP
UT 210,000 SPP
CN
Project Cost:
0 270,000 530,000
T
otal for Calloway county PL
Total Amounts:
CN
UT
RW
DN
250,000
270,000
3,300,000 320,000
810,000 210,000
10,800,000 5,750,000
250,000 15,180,000 6,280,000
Page 36 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADD LANE ON RAMP FROM EASTBOUND I-275 TO NORTHBOUND
I
-471. (2024CCR)
I -471Campbell PL23
DN 2,320,000 NH
RW
UT
CN 12,400,000 NH
Project Cost: 0 2,320,000 12,400,000
E
xtend Pond Creek Road from US 27 to Persimmon Grove, KY 1121.
(2024BOP)
PF-9999Campbell PL352.1000
DN
RW 13,200,000 SPP
UT 1,620,000 SPP
CN
Project Cost: 0 13,200,000 1,620,000
E
xtend Pond Creek Road from Persimmon Grove, KY 1121 to AA
Highway, KY 9 . (2024BOP)
PF-9999Campbell PL352.2000
DN
RW 22,000,000 SPP
UT 8,640,000 SPP
CN
Project Cost: 0 22,000,000 8,640,000
REPLACE 4TH STREET BRIDGE OVER THE LICKING RIVER BETWEEN
C
OVINGTON AND NEWPORT; BRIDGE NUMBER 059B00037N
KY-8C ampbell PL1086
DN
RW
UT
CN 27,042,195 35,520,000 BRO
29,770,000 FBP
Project Cost: 27,042,195 35,520,000 29,770,000
C
ONSTRUCT NEW I-471 SOUTHBOUND OFF-RAMP AT KY-8 (SEE
ALSO 6-183.00). (02CCN)(06CCN) (2020CCN)
I -471, KY-8Campbell PL8104
DN 4,340,000 SPP
RW 5,750,000 SPP
UT
CN
Project Cost: 0 4,340,000 5,750,000
Page 37 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275
I
NTERCHANGE WITH KY-9 (AA HWY.) (2024CCN)
KY-9Campbell PL80311
DN 5,000,000 SPP
RW
UT
CN
Project Cost: 0 5,000,000 0
C
onstruct a roundabout at the intersection of KY 1892 (Grand Ave)
and Highland Ave (2024CCN)
PF-9999Campbell PL80313
DN 810,000 SPP
RW
UT
CN
Project Cost: 0 810,000 0
I
MPROVE CONDITIONS BY CONSTRUCTING A SOUTHBOUND TRUCK
CLIMBING LANE NORTH OF KY 709, AND RECONSTRUCT THE
INTERSECTION OF KY 709 AND US 27 TO ALLOW FOR ADEQUATE
TURN LANES THAT ACCOMMODATE ALL MOVEMENTS. (2024CCN)
US-27Campbell PL80314
DN 780,000 SPP
RW 1,500,000 SPP
UT
CN
Project Cost:
0 780,000 1,500,000
T
otal for Campbell county PL
Total Amounts:
CN
UT
RW
DN 13,250,000
35,200,000 7,250,000
10,260,000
27,042,195 35,520,000 42,170,000
27,042,195 83,970,000 59,680,000
C
ORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF
US-51/US-62/FRONT ST/ELM ST IN BARDWELL TO ADDRESS FLOW,
SAFETY, AND ACCESS ISSUES.(12CCR)(18CCN)
US-51, US-62Carlisle PL333
DN
RW
UT
CN 390,000 SPP
Project Cost: 390,000 0 0
Page 38 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CORRECT SUBSTANDARD ROADWAY GEOMETRICS ON US-62 FROM
K
Y 1181 TO KY 408 TO ADDRESS ACCESS ISSUES, SAFETY
CONCERNS, FLOOD PRONE AREA, AND REGIONAL CONNECTIVITY.
(2024CCN)
US-62C arlisle PL80302
DN 1,560,000 SPP
RW 500,000 SPP
UT
CN
Project Cost: 0 1,560,000 500,000
I
MPROVE SAFETY, MOBILITY, CONNECTIVITY, AND ADDRESS
GEOMETRIC DEFICIENCIES ALONG US-62 BETWEEN HOBBS
ROAD/BOSWELL ROAD TO KY 307. (2024CCN)
US-62Carlisle PL80303
DN 1,040,000 SPP
RW 400,000 SPP
UT
CN
Project Cost: 0 1,040,000 400,000
CORRECT ROADWAY GEOMETRICS AND IMPROVE SAFETY, ACCESS
A
ND REGIONAL CONNECTIVITY FROM HICKMAN COUNTY LINE TO KY
1377 SOUTH OF BARDWELL. (2024CCN)
US-51C arlisle PL80309
DN 900,000 SPP
RW 400,000 SPP
UT
CN
Project Cost: 0 900,000 400,000
C
ORRECT SUBSTANDARD ROADWAY GEOMETRICS, TO IMPROVE
TRAFFIC FLOW, SAFETY AND ACCESS MANAGEMENT ISSUES FROM
KY 1377 TO TRUMAN CREEK BRIDGE IN BARDWELL. (2024CCN)
US-51Carlisle PL80323
DN 1,000,000 SPP
RW
UT
CN
Project Cost:
0 0 1,000,000
I
MPROVE INTERSECTION WITH US 62 AND KY 1628 / PALESTINE RD
(CR 1024). (2024CCN)
US-62Carlisle PL80331
DN 750,000 SPP
RW 500,000 SPP
UT
CN
Project Cost: 0 750,000 500,000
T
otal for Carlisle county PL
Total Amounts:
CN
UT
RW
DN 4,250,000 1,000,000
1,800,000
390,000
390,000 4,250,000 2,800,000
Page 39 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CARROLL COUNTY ON (021B00043N) US-42 AT
K
ENTUCKY RIVER & CITY ST
US-42Carroll PL1084
DN
RW
UT 2,500,000 BRX
CN 28,645,178 BRX
Project Cost: 31,145,178 0 0
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 46.1205 TO
MILEPOINT 53.433
I -71Carroll PL20020
DN 2,840,000 NHPM
RW
UT
CN 28,400,000 NHPM
Project Cost: 31,240,000 0 0
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 38.808 TO
MILEPOINT 46.1205
I -71Carroll PL22101
DN 3,170,000 NHPM
RW
UT
CN 31,670,000 NHPM
Project Cost: 34,840,000 0 0
I
mprove safety and mobility and address geometric deficiencies at the
intersection of KY 36 & KY 1492 (Locust Road). (2022CCN)
(2024CCR)
KY-36Carroll PL80219
DN 740,000 SPP
RW 450,000 SPP
UT
CN
Project Cost:
0 740,000 450,000
I
MPROVE SAFETY AND MOBILITY AND ADDRESS GEOMETRIC
DEFICIENCIES ALONG US 42 FROM THE WESTERN CITY LIMIT OF
GHENT TO THE GALLATIN COUNTY LINE. (2024CCN)
US-42Carroll PL80301
DN 2,160,000 SPP
RW
UT
CN
Project Cost:
0 2,160,000 0
Page 40 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY AND ADDRESS GEOMETRIC
D
EFICIENCIES ALONG KY 55 FROM KY 389 TO US 42. (2024CCN)
KY-55Carroll PL80302
DN 4,320,000 SPP
RW
UT
CN
Project Cost: 0 4,320,000 0
T
otal for Carroll county PL
Total Amounts:
CN
UT
RW
DN 6,010,000 7,220,000
450,000
2,500,000
88,715,178
97,225,178 7,220,000 450,000
C
arter County East Bound Rest Area Renovation located on I-64 at MP
174. (2024BOP)
I -64Carter PL3028
DN
RW
UT
CN 940,000 NH
Project Cost: 940,000 0 0
R
ECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD
TO EAST OF KY-3296. THE PROJECT SHALL INCLUDE 12' LANES,
WIDE PAVED SHOULDERS, UNOBSTRUCTED CLEAR ZONES,
FLATTER VERTICAL GRADES, AND GENTLY HORIZONTAL CURVES.
(08CCN)(12CCR)(14CCR)(18CCN) (2020CCR) (2024CCR)
US-60Carter PL8401
DN 1,040,000 SPP
RW 3,450,000 SPP
UT
CN
Project Cost:
0 1,040,000 3,450,000
CONSTRUCT TURN LANES AND SAFETY FEATURES AT PROPOSED
N
EW HIGH SCHOOL AND CAREER TECHNOLOGY CENTER. (2024CCR)
US-60C arter PL9021
DN
RW
UT
CN 1,040,000 SPP
Project Cost: 0 1,040,000 0
Page 41 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CARTER COUNTY ON (022C00044N) SMOKY
C
REEK RD OVER SMOKEY CREEK
CR-1464Carter PL10081
DN 107,323 FBP2
RW
UT
CN 715,484 FBP2
Project Cost: 0 822,807 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 148.665 TO
MILEPOINT 150.16
I -64Carter PL22051
DN 430,000 NHPM
RW
UT
CN 4,310,000 NHPM
Project Cost: 0 0 4,740,000
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 150.16 TO
MILEPOINT 154.26
I -64Carter PL22052
DN 430,000 NHPM
RW
UT
CN 4,310,000 NHPM
Project Cost: 0 4,740,000 0
IMPROVE US-60 GEOMETRY BEGINNING TERMINI AT NEW
C
ONSTRUCTION AT OLIVE HILL MP 12.4 EXTENDING 1.1 MILES TO I-64
EXIT 161.(18CCN) (2022CCR) (2024CCR)
US-60C arter PL80050
DN
RW 7,700,000 SPP
UT 7,020,000 SPP
CN
Project Cost: 0 7,700,000 7,020,000
G
eometric improvements on KY 1025 from US 60 (MP 0.0),East of
Olive Hill extending North 0.30 miles providing access to West Carter
Middle and High Schools and facilities. Project will include bike/ped
facilities. (2022CCN)
KY-1025Carter PL80200
DN
RW
UT
CN 2,470,000 SPP
Project Cost:
0 2,470,000 0
Page 42 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and operational efficiency of KY 3297 near East Carter
M
iddle School and the new sports complex. (2022CCN) (2024CCR)
KY-3297Carter PL80201
DN
RW 280,000 SPP
UT 220,000 SPP
CN 710,000 SPP
Project Cost: 500,000 710,000 0
I
mprove connectivity in Grayson between KY 1 (Carol Malone Blvd)
and KY 3297 (Midland Trail). (2024CCN)
PF-9999Carter PL80304
DN 810,000 SPP
RW 6,600,000 SPP
UT
CN
Project Cost: 0 810,000 6,600,000
C
urve correction on KY 174 to improve horizontal alignment which will
include a bridge replacement. (2024CCN)
KY-174Carter PL80305
DN 1,350,000 SPP
RW
UT
CN
Project Cost: 0 1,350,000 0
T
otal for Carter county PL
Total Amounts:
CN
UT
RW
DN 3,737,323 430,000
280,000 7,700,000 10,050,000
220,000 7,020,000
940,000 9,245,484 4,310,000
1,440,000 20,682,807 21,810,000
IMPROVE SAFETY AND GEOMETRIC DEFICIENCIES ALONG US 127 AT
D
UNNVILLE (2022CCN)
PF-9999,
U
S-127
Casey PL164
DN
RW 1,880,000 SPP
UT 1,030,000 SPP
CN
Project Cost: 0 0 2,910,000
Page 43 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
NEW ALIGNMENT ON KY-70 FROM MP 16.8 TO 19 (12CCN) (2022CCN)
(
2024CCR)
KY-70Casey PL8701
DN 1,200,000 SPP
RW
UT
CN
Project Cost: 0 1,200,000 0
C
ORRECT VERTICAL ALIGNMENT ON US 127 AND KY 1552 NEAR
INTERSECTION.(12CCN)
(2024CCN)
US-127Casey PL8702
DN 210,000 NH
RW
UT
CN
Project Cost:
0 210,000 0
R
ECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)
(16CCR)(18CCN) (2020CCR) (2024CCR)
KY-70Casey PL8703
DN
RW 3,420,000 SPP
UT 1,090,000 SPP
CN
Project Cost: 0 3,420,000 1,090,000
R
ECONSTRUCT BRUSH CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)
(16CCR)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-49Casey PL8704
DN
RW 1,000,000 SPP
UT 1,040,000 SPP
CN
Project Cost: 0 1,000,000 1,040,000
CONSTRUCT A NEW STORM DRAINING SYSTEM, CURB AND GUTTER
F
ROM BELDON AVENUE EASTWARD AND CONSTRUCT A NEW LEFT
TURN ONTO COLLEGE STREET.(12CCN)
(2024CCN)
KY-70C asey PL8706
DN 786,000 PROT
RW 1,660,000 PROT
UT
CN
Project Cost: 786,000 1,660,000 0
Page 44 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CASEY COUNTY ON (023B00084N) KY-910 AT
B
RANCH- DRY FORK
KY-910Casey PL10048
DN 151,553 BRX
RW
UT
CN 1,010,356 BRX
Project Cost: 0 0 1,161,909
T
otal for Casey county PL
Total Amounts:
CN
UT
RW
DN 786,000 1,410,000 151,553
6,080,000 1,880,000
3,160,000
1,010,356
786,000 7,490,000 6,201,909
I
mprove capacity and mobility of the I-24/KY 115 interchange (Exit 89)
in Christian County, KY (2022BOP). (2024CCR)
I -24Christian PL10
DN
RW 1,580,000 NH
UT 2,080,000 NH
CN 19,440,000 NH
Project Cost: 3,660,000 19,440,000 0
E
XTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO
US-68/KY-80 EAST OF HOPKINSVILLE (HOPKINSVILLE NORTHEAST
BYPASS). (2020CCN) (2022CCR) (2024CCR)
PF-9999Christian PL136
DN
RW 5,170,000 SPP
UT 2,710,000 SPP
CN
Project Cost: 0 5,170,000 2,710,000
R
ECONSTRUCT KY 1007 FROM US 68 TO KY 1682 IN HOPKINSVILLE.
(INCLUDES 2-227.10)(2020CCR) (2022CCR) (2024CCR)
KY-1007,
PF-9999
Christian PL227
DN
RW 7,250,000 SPP
UT 7,400,000 SPP
CN
Project Cost:
0 7,250,000 7,400,000
Page 45 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT NEW CONNECTOR FROM JUST SOUTH OF THE CSX
R
AILROAD WEST OF PEMBROKE TO US 41 NEAR THE INDUSTRIAL
PARK. (D,R,U UNDER 2-381) (2024CCR)
PF-9999Christian PL381.2000
DN
RW
UT
CN 14,040,000 STP2
Project Cost: 14,040,000 0 0
I
MPROVE KY-107 FROM THE BYPASS TO KY-380.(12CCN)(14CCR)
(2020CCR) (2024CCN)
KY-107Christian PL8703
DN
RW
UT 1,800,000 SPP
CN 2,530,000 SPP
Project Cost: 0 1,800,000 2,530,000
I
MPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO
JUST SOUTH OF PEMBROKE (MP 9.625)(16CCN)(18CCN) (2022CCR)
(2024CCR)
KY-115Christian PL8953
DN
RW
UT
CN 8,010,000 STP2
Project Cost:
0 8,010,000 0
I
MPROVE AND WIDEN KY 115 FROM I-24 (MP 2.901) TO ANDERSON
ROAD (MP 687). (16CCN) (2022CCR) (2024CCR)
KY-115Christian PL8954
DN
RW
UT
CN 13,100,000 SPP
Project Cost: 0 0 13,100,000
B
RIDGE PROJECT IN CHRISTIAN COUNTY ON (024B00041N) KY-107
AT DONALDSON CREEK
KY-107Christian PL10068
DN 245,217 BRX
RW
UT
CN 1,634,783 BRX
Project Cost: 0 0 1,880,000
Page 46 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CHRISTIAN COUNTY ON (024B00058N) KY-109
A
T MCKNIGHTS CREEK
KY-109Christian PL10069
DN 237,593 BRX
RW
UT
CN 1,583,953 BRX
Project Cost: 0 0 1,821,546
A
DDRESS CONDITION OF I-024 NON-CARDINAL DIRECTION FROM
MILEPOINT 75 TO MILEPOINT 85.563
I -24Christian PL22014
DN 310,000 NHPM
RW
UT
CN 3,138,790 NHPM
Project Cost: 0 0 3,448,790
U
S 41A NEW TURNING LANE NORTHBOUND AT EXISTING MEDIAN
CROSSOVER NEAR MILEPOST 11.4. CITY TO CONSTRUCT AND BE
REIMBURSED. (18CCN) (2020CCR)
US-41Christian PL80001
DN 60,000 SPP
RW
UT
CN 210,000 SPP
Project Cost:
0 270,000 0
A
DDRESS SAFETY ISSUES BY INSTALLING INTERCHANGE LIGHTING
(2020CCN)
I -24Christian PL80103
DN
RW
UT
CN 820,000 SPP
Project Cost: 0 820,000 0
I
MPROVE SAFETY AND MOBILITY BY WIDENING AND CORRECTING
GEOMETRIC DEFICIENCIES ON KY 107 FROM MILEPOINT 15.0 TO
MILEPOINT 15.6 (2022CCN) (2024CCR)
KY-107Christian PL80250
DN
RW
UT
CN 3,230,000 SPP
Project Cost:
3,230,000 0 0
Page 47 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Provide left and right turn lanes and improve sight distance on KY 107
a
t the intersection of KY 107 and Lovers Lane.
KY-107Christian PL80250.1000
DN
R
W
UT
CN 1,680,000 SPP
Project Cost: 1,680,000 0 0
T
otal for Christian county PL
Total Amounts:
CN
UT
RW
DN 60,000 792,810
1,580,000 12,420,000
2,080,000 1,800,000 10,110,000
18,950,000 28,480,000 21,987,526
22,610,000 42,760,000 32,890,336
REPAIR, RENOVATE, AND PRESERVE THE HISTORICAL I-64 EB REST
A
REA FACILITY IN CLARK COUNTY.
I -64C lark PL27
DN
RW
UT
CN 3,140,000 SPP
Project Cost: 3,140,000 0 0
C
lark County Rest Area Renovation Located on I-64 at MP 98.
(2024BOP)
I -64Clark PL3047
DN
RW
UT
CN 4,890,000 SPP
Project Cost: 0 4,890,000 0
R
ECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN
CLARK COUNTY (MP 14.210)) TO 500 FEET WEST OF SEWELL SHOP
ROAD (MP 17.032).(16CCN)(18CCN) (2022CCR) (2024CCR)
US-60Clark PL8952
DN 1,730,000 SPP
RW
UT
CN
Project Cost: 0 1,730,000 0
Page 48 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM 500 FEET
W
EST OF SEWELL SHOP ROAD (MP 17.032) IN CLARK COUNTY TO
500 FEET WEST OF BENTBROOK (MP 2.007) IN MONTGOMERY
COUNTY.(16CCN) (2024CCN)
US-60C lark PL8953
DN 2,650,000 SPP
RW
UT
CN
Project Cost: 0 2,650,000 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 0 TO MILEPOINT 5.341
KY-9000Clark PL22154
DN 460,000 NHPM
RW
UT
CN 4,626,186 NHPM
Project Cost: 0 5,086,186 0
M
ODERNIZE AND IMPROVE CAPACITY ON US 60 FROM KY 859
(HALEY RD) TO KY 1958 (BYPASS RD) IN CLARK COUNTY.
(2020CCN) (2022CCR) (2024CCR)
US-60Clark PL80151
DN 4,090,000 SPP
RW
UT
CN
Project Cost: 0 0 4,090,000
N
ew construction of KY 1923 (Waterworks Road) between MP 4.2
and 5.0. This includes a new crossing over the West Fork of Lower
Howard Creek (2024CCN)
KY-1923Clark PL80350
DN 940,000 SPP
RW
UT
CN
Project Cost:
0 940,000 0
B
ridge Rehab/Replacement on Four Mile Road (CR 1205) at MP
2.15-2.16 over an Unnamed Tributary approx. 2.16 miles east along
the KY River from the town of Ford (025C00028N)
CR-1205Clark PL80359
DN 158,545 FBP2
RW
UT
CN 1,056,965 FBP2
Project Cost:
0 0 1,215,510
T
otal for Clark county PL
Total Amounts:
CN
UT
RW
DN 5,780,000 4,248,545
3,140,000 9,516,186 1,056,965
3,140,000 15,296,186 5,305,510
Page 49 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE US 421 FROM GOOSE CREEK BRIDGE (MP 15.4) TO CHOP
B
OTTOM RD (MP 14.3) INCLUDING RECONSTRUCTION OF
HIGHWAY/RAIL GRADE CROSSING ON KY-1999 AT THE
INTERSECTION WITH US-421 AND KY-80 (2022CCN) (2024CCR)
US-421Clay PL8003.1000
DN
RW
UT
CN 14,000,000 SPP
Project Cost:
0 14,000,000 0
I
MPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO
MP 7.1) AND ITS INTERSECTION WITH KY 3476. (14CCN)(18CCN)
(2020CCR)
KY-638Clay PL8861
DN 80,000 SPP
RW 160,000 SPP
UT 340,000 SPP
CN
Project Cost:
0 80,000 500,000
IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND,
I
NCLUDING INTERSECTIONS AT HAL ROGERS PARKWAY AND KY
687. (14CCN)(18CCN) (2020CCR)
CR-1286C lay PL8864
DN
RW
UT
CN 12,950,000 SPP
Project Cost: 12,950,000 0 0
B
RIDGE PROJECT IN CLAY COUNTY ON (026B00012N) US-421 AT
RICE BRANCH
US-421Clay PL10176
DN
RW 10,000 BRX
UT 10,000 BRX
CN 717,551 BRX
Project Cost: 0 0 737,551
B
RIDGE PROJECT IN CLAY COUNTY ON (026B00050N) KY-66 AT
JACKS CREEK
KY-66Clay PL10178
DN
RW 10,000 BRX
UT 10,000 BRX
CN 1,074,388 BRX
Project Cost: 0 0 1,094,388
Page 50 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN CLAY COUNTY ON (026C00072N) CR-1155 AT
M
ILL CREEK
CR-1155Clay PL10185
DN
RW 10,000 FBP2
UT 10,000 FBP2
CN 529,644 FBP2
Project Cost: 0 549,644 0
A
DDRESS CONDITION OF Hal Rogers Daniel Boone Parkway FROM
MILEPOINT 27.785 TO MILEPOINT 35.929
HR-9006Clay PL20042
DN 180,000 STP5
RW
UT
CN 1,780,000 STP5
Project Cost: 0 1,960,000 0
CONSTRUCT NEW CONNECTOR ROAD BETWEEN US 421 AT MP 17.51
TO
RAILROAD AVE. AT MP 0.1. THIS WILL REQUIRE APPROXIMATELY
300' OF NEW ROADWAY ALONG THE CONNECTOR, A 450' 3-LANE
BRIDGE, NEW RIGHT TURN LANE ON US 421 AND NEW TRAFFIC
SIGNALS AT PROPOSED INTERSECTION. THIS IS CONTINGENT ON
US-421C lay PL80251
DN 400,000 SPP
RW 410,000 SPP
UT 390,000 SPP
CN
Project Cost: 0 400,000 800,000
IMPROVE GEOMETRIC ALIGNMENT FROM KY 3472 AT MP 1.7
C
ONTINUING PAST THE BERT. T. COMBS PARK TO THE INTERSECTION
OF BEECH CREEK ROAD AND WHITE OAK ROAD. (APPROXIMATELY
1.5 MILES OF ROADWAY TO IMPROVE) (2022CCN)
KY-3472C lay PL80253
DN
RW 2,000,000 SPP
UT 12,760,000 SPP
CN
Project Cost: 0 14,760,000 0
I
MPROVE GEOMETRIC ALIGNMENT FROM THE INTERSECTION OF
BEECH CREEK ROAD AND WHITE OAK ROAD TO KY-11 AT MP 14.24.
(APPROXIMATELY 4.0 MILES OF ROAD WAY TO IMPROVE)
(2022CCN)
CR-1004Clay PL80254
DN
RW 2,200,000 SPP
UT 1,250,000 SPP
CN 16,000,000 SPP
Project Cost:
0 3,450,000 16,000,000
Page 51 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Preliminary Engineering and Environmental for Hal Rogers Parkway
I
mprovement (HRPI) corridor from London to Hazard (BMP 3.887 to
EMP 55.201) (IF-Potential RAISE GRANT) (2024CCN)
HR-9006Clay PL80352
DN 24,960,000 IF
RW
UT
CN
Project Cost: 0 24,960,000 0
I
nstall Guardrail on KY 1524 in Clay County (MP 9.45-12.3) (2024CCN)KY-1524Clay PL80356
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
T
otal for Clay county PL
Total Amounts:
CN
UT
RW
DN 25,620,000
4,210,000 590,000
14,020,000 750,000
13,040,000 16,309,644 17,791,939
13,040,000 60,159,644 19,131,939
RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND
O
LD US-127 INTERSECTION, EXTENDING NORTHERLY TO NORTH OF
THE KY-3063 AND OLD US-127 INTERSECTION. (SEE 8-108 AND
8-115 FOR PE&ENV)(12CCR) (2020CCR) (2022CCR) (2024CCR)
US-127C linton PL8601.3000
DN
RW
UT
CN 7,000,000 8,420,000 NH
Project Cost: 0 7,000,000 8,420,000
I
mprove safety and mobility of KY 558 from KY 90 to Russell/Clinton
Co line (2024CCN)
KY-558Clinton PL 400,000 SPP80313
DN 1,040,000 SPP
RW
UT
CN
Project Cost: 400,000 1,040,000 0
Page 52 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Clinton county P L
Total Amounts:
CN
UT
RW
DN
400,000
1,040,000
7,000,000 8,420,000
400,000 8,040,000 8,420,000
O
PERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2027
THROUGH FY 2032 USING AUDITED COSTS AS THE BASIS.(12CCR)
(2020CCR) (2022CCR) (2024CCR)
KY-91Crittenden PL326.1700
DN
RW
UT
CN 1,662,000 1,662,000 SPP
Project Cost: 0 1,662,000 1,662,000
R
econstruct and elevate a 0.12 mile section of KY 295 above the
floodplain from M.P. 1.038 to M.P. 1.605 just south of Dycusburg
(2022CCN)
KY-295Crittenden PL80201
DN
RW 180,000 SPP
UT 120,000 SPP
CN 560,000 SPP
Project Cost:
0 300,000 560,000
UPGRADE STREET TO ACCOMMODATE TRUCK TRAFFIC, ADDRESS
S
AFETY CONCERNS, ADDRESS GEOMETRIC DEFICIENCIES, POSSIBLE
BIKE AND PED PATH. THIS PROJECT WILL EXTEND FROM US 60 TO
US 641. (2024CCN)
CS-1094,
C
S-1095
Crittenden PL80334
DN 780,000 SPP
RW 500,000 SPP
UT 750,000 SPP
CN
Project Cost: 0 780,000 1,250,000
O
n KY 120 reconstruct substandard curve between Herman Travis
Rd Intersection and Piney Creek (2024CCN)
KY-120Crittenden PL80335
DN 260,000 SPP
RW 300,000 SPP
UT 100,000 SPP
CN
Project Cost: 0 260,000 400,000
Page 53 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Crittenden county P L
Total Amounts:
CN
UT
RW
DN 1,040,000
180,000 800,000
120,000 850,000
1,662,000 2,222,000
0 3,002,000 3,872,000
BRIDGE PROJECT IN CUMBERLAND COUNTY ON (029B00020N) KY-90
A
T DUTCH CREEK
KY-90C umberland PL10053
DN 278,729 FBP
RW
UT
CN 1,858,195 FBP
Project Cost: 2,136,924 0 0
T
otal for Cumberland county PL
Total Amounts:
CN
UT
RW
DN 278,729
1,858,195
2,136,924 0 0
I
MPROVE KY-54 FROM BOLD FORBES WAY TO KY 1456
(THRUSTON-DERMONT RD). DESIGN UNDER PARENT 2-8300.00.
(2018BOP) (2022CCN) (2024CCR)
KY-54Daviess PL8300.2000
DN
RW 3,900,000 SPP
UT 5,710,000 SPP
CN
Project Cost: 0 9,610,000 0
IMPROVE KY-54 FROM KY 1456 (THRUSTON-DERMONT RD) TO
C
OUNTRYSIDE DRIVE; DESIGN UNDER PARENT 2-8300.00. (2018BOP)
(2022CCR) (2024CCR)
KY-54D aviess PL8300.3000
DN
RW
UT
CN 5,030,000 SPP
Project Cost: 0 0 5,030,000
Page 54 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-54 FROM COUNTRYSIDE DRIVE TO JACK HINTON RD.
D
ESIGN UNDER PARENT 2-8300.00. (2018BOP) (2022CCR) (2024CCR)
KY-54Daviess PL8300.4000
DN
RW 5,750,000 SPP
UT 6,920,000 SPP
CN
Project Cost: 0 5,750,000 6,920,000
A
DDRESS SUBSTANDARD ROADWAY GEOMETRICS AND SAFETY
CONCERNS ON KY 1456 FROM KY 54 TO HAYDEN ROAD. MP 2.778
TO 4.714 (SEE 2-8709.00)(14CCN)(16CCR) (2022CCN)
KY-1456Daviess PL8801
DN
RW 4,400,000 SPP
UT 4,370,000 SPP
CN
Project Cost:
0 4,400,000 4,370,000
I
MPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-3143Daviess PL8854
DN
RW
UT
CN 5,000,000 STP1
Project Cost: 0 0 5,000,000
A
DDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO
RIVER. JOINT PROJECT WITH INDIANA. (030B00118N)(BSBP)
KY-2262Daviess PL10020
DN 1,500,000 BRX
RW
UT
CN 10,000,000 BRX
Project Cost: 0 0 11,500,000
A
DDRESS SAFETY, CONGESTION, AND MOBILITY ISSUES ON KY 144
FROM MP 2.5 TO MP 3.75 INCLUDING 12 FOOT DRIVING LANES AND
TURNING LANES WHERE NEEDED. (2020CCN) (2022CCR) (2024CCR)
KY-144Daviess PL80150
DN 720,000 SPP
RW 1,680,000 SPP
UT
CN
Project Cost:
0 720,000 1,680,000
Page 55 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
OLD HARTFORD RD - WIDEN TO IMPROVE TRAFFIC FLOW AND
S
AFETY. PROJECT BEGINS AT HARRIET LN (CR 1120H) AND ENDS
AT BURLEW BLVD (KY 1432). (2024CCN)
KY-298Daviess PL80301
DN 1,290,000 SPP
RW 2,190,000 SPP
UT
CN
Project Cost: 0 1,290,000 2,190,000
R
ECONSTRUCT GOETZ DR FROM SOUTHTOWN BLVD (KY 2121) TO
FREDERICA ST (US 431). INSTALL TURN LANES AS NEEDED.
(2024CCN)
KY-2699Daviess PL80302
DN 490,000 SPP
RW 600,000 SPP
UT 580,000 SPP
CN
Project Cost:
0 490,000 1,180,000
W
IDEN KY 2127 FROM KELLER ROAD (CR 1301) TO KY 2121,
INCLUDING 10' MULTIUSE PATH. (2024CCN)
KY-2127Daviess PL80305
DN 1,130,000 SPP
RW 280,000 SPP
UT
CN
Project Cost: 0 1,130,000 280,000
T
otal for Daviess county PL
Total Amounts:
CN
UT
RW
DN 3,630,000 1,500,000
14,050,000 4,750,000
5,710,000 11,870,000
20,030,000
0 23,390,000 38,150,000
RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER
B
RIDGE AT BROWNSVILLE TO 0.42 MILE NORTH OF THE
KY-70/KY-259 INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CCR)
(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-259,
K
Y-70
Edmonson PL7030.1000
DN
RW
UT
CN 1,240,000 STP2
Project Cost: 0 1,240,000 0
Page 56 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY ON KY 259 FROM NORTH OF
K
YROCK ROAD TO THE GRAYSON COUNTY LINE. (2020CCN)
KY-259Edmonson PL80107
DN
RW 370,000 SPP
UT 340,000 SPP
CN 2,190,000 SPP
Project Cost: 0 710,000 2,190,000
R
ECONSTRUCTION AND REALIGNMENT OF KY 259 FROM MP 12.096
TO 15.633/ (2024CCN)
KY-259Edmonson PL80317
DN 1,300,000 SPP
RW 5,390,000 SPP
UT
CN
Project Cost: 0 1,300,000 5,390,000
R
ECONSTRUCT KY 2326 (OTTER GAP ROAD) FROM US 31W IN
WARREN CO. TO NOAH BLEDSOE ROAD IN EDMONSON CO.
(2024CCN)
KY-2326Edmonson PL80323
DN 1,300,000 SPP
RW 1,500,000 SPP
UT
CN
Project Cost:
0 1,300,000 1,500,000
R
econstruction/Widening from KY 2326 to KY 101 (MP 0.0 - 2.455).
(2024CCN)
CR-1137Edmonson PL80350
DN 1,670,000 SPP
RW
UT
CN
Project Cost: 0 1,670,000 0
R
econstruction/Widening from KY 743 to Noah Bledsoe Road (MP 0.0 -
1.254). (2024CCN)
CR-1139Edmonson PL80351
DN 890,000 SPP
RW
UT
CN
Project Cost: 0 890,000 0
T
otal for Edmonson county PL
Total Amounts:
CN
UT
RW
DN 5,160,000
370,000 6,890,000
340,000
1,240,000 2,190,000
0 7,110,000 9,080,000
Page 57 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO
K
Y-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)
(10CCR)(12CCR)(14CCR)(16CCR)(18CCR) (2020CCR)
KY-32E lliott PL192.0100
DN
RW
UT
CN 20,000,000 STP2
Project Cost: 0 0 20,000,000
R
ECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD
SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND.(PRIORITY SECTION
2). (10CCR)(16CCN)(18CCN) (2024CCN)
KY-32Elliott PL192.0300
DN 4,030,000 STP2
RW
UT
CN
Project Cost: 0 4,030,000 0
R
econstruct KY 7 from Sandy Hook to the Morgan County Line.
(2024CCR)
KY-7Elliott PL228.4000
DN
RW 8,800,000 SPP
UT 6,480,000 SPP
CN
Project Cost: 0 8,800,000 6,480,000
K
Y-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.
(14CCN)(16CCR)(18CCN)(2020CCR) (2022CCR)
KY-32Elliott PL8802
DN
RW
UT
CN 17,930,000 STP2
Project Cost: 17,930,000 0 0
T
otal for Elliott county PL
Total Amounts:
CN
UT
RW
DN 4,030,000
8,800,000
6,480,000
17,930,000 20,000,000
17,930,000 12,830,000 26,480,000
Page 58 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON
K
Y-82 FROM KY-89 IN ESTILL CO. TO NEW CONSTRUCTION
LOCATED NORTH OF HUDSON MILL ROAD IN ESTILL COUNTY.
(2022CCR) (2024CCN)
KY-82Estill PL205
DN
RW 6,300,000 SPP
UT 4,010,000 SPP
CN
Project Cost:
0 0 10,310,000
I
MPROVE SAFETY ON KY-2459 (CARHARTT AVE.) FROM KY-89 TO
THE RAILROAD BRIDGE. (2020CCR)
KY-2459Estill PL206
DN
RW 390,000 SPP
UT 620,000 SPP
CN
Project Cost: 0 1,010,000 0
I
NSTALL GUARDRAIL ON KY-499 IN ESTILL COUNTYKY-499Estill PL4315
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
C
onstruct a walkway across the Kentucky River along KY 52 in Irvine.
(2024CCN)
KY-52Estill PL80300
DN
RW
UT
CN 2,310,000 SPP
Project Cost: 2,310,000 0 0
T
otal for Estill county PL
Total Amounts:
CN
UT
RW
DN
390,000 6,300,000
620,000 4,010,000
2,330,000
2,330,000 1,010,000 10,310,000
Page 59 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Lexington-Georgetown; Reconstruct/Widen US 25 from Spurr Road to
K
earney Road. (Section 1) (2024CCR)
US-25Fayette PL122.2000
DN
RW
UT
CN 22,380,000 SPP
Project Cost: 0 0 22,380,000
L
exington-Georgetown; Reconstruct/Widen US 25 from Kearney Road
to Ironworks Road. (Section 2) (2022CCR) (2024CCR)
US-25Fayette PL122.3000
DN
RW
UT
CN 36,225,000 HGC
Project Cost: 0 36,225,000 0
DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON
U
RBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2026
THROUGH FY 2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP) (2020CCR) (2024CCR)
CO-0F ayette PL227.1400
DN
RW
UT
CN 7,800,000 7,800,000 7,800,000 SLX
Project Cost: 7,800,000 7,800,000 7,800,000
CONSTRUCT CITATION BOULEVARD FROM RUSSELL CAVE ROAD TO
N
EWTOWN PIKE. (2024CCR)
CO-0F ayette PL265
DN
RW
UT
CN 4,060,000 STPF
Project Cost: 4,060,000 0 0
O
PERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2027
THROUGH FY 2032. (12CCR)(18CCR) (2020CCR) (2024CCR)
KY-169,
PF-9999
Fayette PL357.1700
DN
RW
UT
CN 540,000 540,000 SPP
Project Cost:
0 540,000 540,000
Page 60 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REPLACE RJ CORMAN RAILROAD BRIDGE OVERPASS (MP 8.378)
I
MPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH
BROADWAY) (12CCR)(14CCR)(16CCR)(18CCN)(2020CCR)(2022CCR)
(2024CCR)
US-27Fayette PL412
DN
RW
UT
CN 13,492,000 NH
Project Cost:
13,492,000 0 0
REPLACE RJ CORMAN RAILROAD BRIDGE OVERPASS (MP 8.378),
I
MPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH
BROADWAY)(12CCR)(14CCR)(16CCR)(18CCN) (2020CCR)
(2022CCR)(FEDERAL RAISE GRANT FUNDING COMPONENT)(SEE ITEM
NO. 7-412.00 FOR NH COMPONENT)
US-27F ayette PL412.1000
DN
RW
UT
CN 8,120,000 KYD
Project Cost: 8,120,000 0 0
A
CCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN
NICHOLASVILLE AND MAN-O-WAR BLVD. (14CCR) (2024CCN)
US-27Fayette PL430
DN
RW 11,250,000 SPP
UT
CN
Project Cost: 0 0 11,250,000
N
ICHOLASVILLE - MAN-O-WAR BLVD; ACCESS MANAGEMENT ON
US-27 (NICHOLASVILLE RD) FROM JUST SOUTH OF KOHL'S DRIVE
TO MAN-O-WAR BLVD.
US-27Fayette PL430.2000
DN
RW 4,400,000 NH
UT 1,460,000 NH
CN 15,000,000 SPP
Project Cost:
0 4,400,000 16,460,000
N
EW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION
FROM US-68 (HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE
SEGMENTS 2A & 2B IN AUGUST, 1998 ADVANCE PLANNING STUDY.
(2024CCR)
KY-4Fayette PL439
DN 2,480,000 NH
RW
UT
CN
Project Cost:
0 0 2,480,000
Page 61 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SAFETY IMPROVEMENTS TO NEW CIRCLE ROAD BETWEEN
B
OARDWALK AND BRYAN STATION ROAD. - STATE FUNDED
COMPONENT OF FEDERAL GRANT RECEIVED IN LATE 2023.
(2024CCR)
KY-4Fayette PL462
DN
RW
UT 690,000 KYD
CN 3,980,000 HGC
Project Cost:
4,670,000 0 0
I
mprove the Red Mile Corridor between South Broadway and
Versailles Road.
CS-4702Fayette PL475
DN
RW
UT
CN 13,500,000 SPP
Project Cost: 0 13,500,000 0
S
OUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD
BETWEEN TATES CREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)
(18CCN) (2022CCR) (2024CCR)
KY-4Fayette PL8801
DN
RW
UT
CN 6,350,000 SPP
Project Cost:
0 0 6,350,000
I
MPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW
CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE
ROAD. (16CCN)(18CCR) (2020CCR) (2022CCR) (2024CCR)
KY-1927Fayette PL8902
DN
RW
UT
CN 5,000,000 6,000,000 STPF
Project Cost:
0 5,000,000 6,000,000
R
EDUCE CONGESTION ON I-64/I-75 FROM NORTHERN SPLIT TO
NEWTOWN PIKE (MP 115.200 – 117.665). SECTION 1 (2024CCR)
I -75Fayette PL8909.1000
DN
RW
UT 30,000 NH
CN
Project Cost: 30,000 0 0
Page 62 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REPLACE EXISTING I-75 SOUTHBOUND BRIDGE (034B00085N) AND
A
PPROACHES TO REDUCE CONGESTION ON I-64/I-75 FROM
NORTHERN SPLIT TO NEWTOWN PIKE (MP 118.0 TO MP 116.8).
SECTION 1 PRIORITY CONSTRUCTION SECTION.
I -75Fayette PL8909.1500
DN
RW
UT
CN 15,000,000 NH
Project Cost:
0 15,000,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON S 75 NC OVER N
BROADWAY & N LIMESTONE (034B00083L and 034B00083R)
I -75Fayette PL10076
DN 548,856 BRX
RW
UT
CN 3,659,040 BRX
Project Cost: 0 0 4,207,896
A
DDRESS CONDITION OF I-064 CARDINAL DIRECTION FROM
MILEPOINT 71 TO MILEPOINT 74.3
I -64Fayette PL20008
DN 150,000 NHPM
RW
UT
CN 1,501,000 NHPM
Project Cost: 1,651,000 0 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 71 (74.3 CARDINAL)
TO
MILEPOINT 74.729
I -64F ayette PL20050
DN 180,000 STP5
RW
UT
CN 1,801,000 STP5
Project Cost: 0 1,981,000 0
A
DDRESS CONGESTION AND IMPROVE SAFETY ON US 60 FROM
MILEPOINT 12.41 TO MILEPOINT 16.37 BY WIDENING AND
MODERNIZING US 60 FROM THE END OF THE FOUR-LANE SECTION
NEAR POLO CLUB BLVD TO KY 859 (HALEY RD). (2020CCN)
(2022CCR) (2024CCR)
US-60Fayette PL80150
DN
RW 1,610,000 STPF
UT 1,530,000 STPF
CN
Project Cost:
0 1,610,000 1,530,000
Page 63 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ACCESS MANAGEMENT IMPROVEMENT ON US 27 (NICHOLASVILLE
R
D) AT KY 4 (NEW CIRCLE) INTERCHANGE. (2022CCN) (2024CCR)
US-27Fayette PL80205
DN 1,120,000 NH
RW 2,630,000 NH
UT 2,500,000 NH
CN
Project Cost: 1,120,000 2,630,000 2,500,000
P
rovide a safe and efficient connection with access to I-64 from US
60 near the Hamburg area. (2022CCN)
KY-1425,
PF-9999,
US-60
Fayette PL 390,000 SPP80207
DN
RW
UT
CN
Project Cost:
0 390,000 0
RELIEVE TRAFFIC CONGESTION ON NEW CIRCLE RD BETWEEN Tates
C
reek AND Nicholasville Rd (MP 17.741-19.283) BY INCREASING
CAPACITY (2024CCN)
KY-4F ayette PL80303
DN 4,500,000 SPP
RW 1,500,000 SPP
UT
CN
Project Cost: 0 4,500,000 1,500,000
R
egional Corridor Feasibility Study to evaluate east-west connectivity
between US 127 and I-75. Study region includes the following
counties: Anderson, Fayette, Franklin, Jessamine, Mercer, Scott &
Woodford. (2024CCN)
PF-9999Fayette PL 540,000 SPP80304
DN
RW
UT
CN
Project Cost:
0 540,000 0
A
lumni Drive: Address congestion from Edgewater DR to MOW Blvd.
(2024CCN)
CS-3016Fayette PL80305
DN 1,250,000 SPP
RW 3,500,000 SPP
UT
CN
Project Cost: 0 1,250,000 3,500,000
Page 64 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Modernize roadway, improve multi-mobility, and include safety and
c
apacity improvements at intersections on US 60 (Versailles Road)
from Viley Road to west end of Norfolk Southern railroad bridge.
Breakout Section of US 60 from Viley Road to Oxford Circle
(2024CCN)
US-60Fayette PL80306
DN
RW 2,210,000 NH
UT
CN
Project Cost:
0 0 2,210,000
P
rovide additional capacity and improve multi-modal access on KY
1425 (Man o' War Blvd) from I-75 to US 60 (Winchester Road).
(2024CCN)
KY-1425Fayette PL80307
DN 780,000 SPP
RW 2,070,000 SPP
UT
CN
Project Cost:
0 780,000 2,070,000
I
mprove safety and access management measures on New Circle Rd.
(KY 4): from Boardwalk to North Limestone Street. (2024CCN)
KY-4Fayette PL80308
DN 1,560,000 SPP
RW 5,000,000 SPP
UT
CN
Project Cost: 0 1,560,000 5,000,000
O
perational & multimodal improvements on US 60 (Winchester Rd) from
Midland to New Circle Rd. (2024CCN)
US-60Fayette PL80309
DN 370,000 NH
RW 500,000 NH
UT 500,000 NH
CN
Project Cost: 0 370,000 1,000,000
M
odernize roadway, improve multi-mobility, and include safety and
capacity improvements at intersections on US 60 (Versailles Road)
from Viley Road to west end of Norfolk Southern railroad bridge.
Breakout section of US 60 from Porter Place to Oliver Lewis
(2024CCN)
US-60Fayette PL80323
DN 180,000 NH
RW
UT
CN
Project Cost:
0 0 180,000
Page 65 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety of the entrance ramp onto WB New Circle from Tates
C
reek Road, extension of the acceleration lane (MP 17.8 - 18.2)
(2024CCN)
KY-4Fayette PL80352
DN 250,000 SPP
RW
UT
CN 900,000 SPP
Project Cost: 0 250,000 900,000
R
educe congestion on New Circle Road between Richmond Road and
Alumni Drive (MP 14.851-16.123).(SAME AS 4-80360 IN SB 91
CHANGES) (2024CCN)
KY-4Fayette PL80363
DN 4,000,000 SPP
RW
UT
CN
Project Cost:
0 4,000,000 0
T
otal for Fayette county PL
Total Amounts:
CN
UT
RW
DN
930,000
1,270,000 12,890,000 3,208,856
8,640,000 26,030,000
720,000 5,990,000
38,953,000 79,866,000 62,629,040
40,943,000 102,326,000 97,857,896
U
PGRADE, WIDEN, AND PROVIDE SPOT IMPROVEMENTS ON KY-165
TO IMPROVE SAFETY FROM KY-32 TO US-68. (14CCN)
(2024CCN)
KY-165Fleming PL8815
DN 2,000,000 SPP
RW
UT
CN
Project Cost:
0 2,000,000 0
C
ONSTRUCT LEFT TURN LANES ON KY 11 AT ROSS DRIVE, TAYLOR
MILL AND THE INDUSTRIAL PARK ROAD. (16CCN) (2024CCN)
KY-11Fleming PL8901
DN 810,000 SPP
RW 1,440,000 SPP
UT
CN
Project Cost: 0 810,000 1,440,000
Page 66 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SAFETY IMPROVEMENTS AND PAVEMENT REHAB EAST OF
F
LEMINGSBURG BYPASS TO KY 156. (2020CCN) (2022CCR)
(2024CCR)
KY-32Fleming PL8903
DN
RW
UT
CN 16,200,000 SPP
Project Cost: 16,200,000 0 0
W
IDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN
FLEMING CO. (16CCN)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-801Fleming PL8915
DN
RW
UT
CN 6,000,000 6,000,000 STP2
Project Cost: 0 6,000,000 6,000,000
C
ONSTRUCT TURN LANES AT PROPOSED NEW SCHOOL, CENTRAL
OFFICE , AND BUS GARAGE. (2024CCR)
KY-11Fleming PL9020
DN
RW
UT
CN 1,820,000 SPP
Project Cost: 0 0 1,820,000
B
RIDGE PROJECT IN FLEMING COUNTY ON (035B00004N) KY-597 AT
INDIAN CREEK
KY-597Fleming PL10083
DN 140,251 BRZ
RW
UT
CN 935,008 BRZ
Project Cost: 0 1,075,259 0
I
MPROVE SAFETY AND SIGHT DISTANCE ON KY-32 BEGINNING AT
0.4 MILES WEST OF FLEMING/ROWAN CO LINE AND ENDING 0.3
MILES EAST OF THE LINE.(18CCN) (2020CCR) (2022CCR)
KY-32Fleming PL80051
DN
RW 1,650,000 SPP
UT 1,950,000 SPP
CN
Project Cost:
0 3,600,000 0
Page 67 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY 57 TO PROVIDE BETTER HORIZONTAL AND
V
ERTICAL ALIGNMENT, WIDER SHOULDERS, AND EXTEND CLEAR
ZONES (2020CCN) (2022CCR) (2024CCR)
KY-57Fleming PL80103
DN
RW 9,900,000 SPP
UT 8,400,000 SPP
CN
Project Cost: 0 9,900,000 8,400,000
T
otal for Fleming county PL
Total Amounts:
CN
UT
RW
DN 2,950,251
11,550,000 1,440,000
1,950,000 8,400,000
16,200,000 6,935,008 7,820,000
16,200,000 23,385,259 17,660,000
S
POT IMPROVEMENTS ON KY 979, BEGINNING 0.14 MI WEST OF
NEWMAN’S BRANCH ROAD TO THE JOHN M. STUMBO SCHOOL.
(SECTION 1)
KY-979Floyd PL195.1000
DN
RW
UT
CN 6,140,000 HGC
Project Cost:
6,140,000 0 0
SPOT IMPROVEMENTS ON KY 979 FROM BRANHAM’S CREEK TO 0.14
MIL WEST OF NEWSOME BRANCH ROAD. (SECTION 2)
KY-979Fl oyd PL195.2000
DN
RW
UT
CN 7,080,000 HGC
Project Cost: 0 7,080,000 0
I
NSTALL GUARDRAIL ON KY-1929 IN FLOYD COUNTYKY-1929Floyd PL4336
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
Page 68 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-404 IN FLOYD COUNTYK Y-404Floyd PL4355
DN
RW
UT
CN 130,000 GR
Project Cost: 130,000 0 0
I
NSTALL GUARDRAIL ON KY-404 IN FLOYD COUNTYKY-404Floyd PL4356
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-3385 IN FLOYD COUNTYKY-3385Floyd PL4387
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-680 IN FLOYD COUNTYKY-680Floyd PL4390
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-1100 IN FLOYD COUNTYKY-1100Floyd PL4423
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
Page 69 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1100 IN FLOYD COUNTYK Y-1100Floyd PL4424
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-1428 IN FLOYD COUNTYKY-1428Floyd PL4425
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-1428 IN FLOYD COUNTYKY-1428Floyd PL4426
DN
RW
UT
CN 9,000 GR
Project Cost: 9,000 0 0
I
NSTALL GUARDRAIL ON KY-3384 IN FLOYD COUNTYKY-3384Floyd PL4429
DN
RW
UT
CN 6,000 GR
Project Cost: 6,000 0 0
I
NSTALL GUARDRAIL ON KY-550 IN FLOYD COUNTYKY-550Floyd PL4430
DN
RW
UT
CN 88,000 GR
Project Cost: 88,000 0 0
Page 70 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-777 IN FLOYD COUNTYK Y-777Floyd PL4431
DN
RW
UT
CN 99,000 GR
Project Cost: 99,000 0 0
I
NSTALL GUARDRAIL ON KY-850 IN FLOYD COUNTYKY-850Floyd PL4432
DN
RW
UT
CN 49,000 GR
Project Cost: 49,000 0 0
I
NSTALL GUARDRAIL ON KY-1498 IN FLOYD COUNTYKY-1498Floyd PL4472
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
A
DDRESS ROCKFALL ISSUES ON KY 80 AT MP 8 TO MP 10 IN FLOYD
COUNTY. (2024CCN)
KY-80Floyd PL5019
DN
RW
UT
CN 14,200,000 SPP
Project Cost: 0 0 14,200,000
B
RIDGE PROJECT IN FLOYD COUNTY ON (036C00074N) MARTHA'S
VINEYARD AT BULL CREEK
CR-1655Floyd PL10098
DN
RW 35,000 BRZ
UT 300,000 BRZ
CN
Project Cost: 335,000 0 0
Page 71 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Planning Study to evaluate potential improvements for KY 680 from MP
1
3.90 to the intersection of US 23, as well as the intersection of KY
680 and US 23. (2024CCN)
KY-680Floyd PL 620,000 SPP80300
DN
RW
UT
CN
Project Cost: 0 620,000 0
C
onstruct a new bridge and approaches off of KY 1428 near MP 14.1.
Provide a new access route from KY 1428 across Levisa Fork of the
Big Sandy River near Ball Alley Curve in Prestonsburg (Previously
12-8806)
PF-9999Floyd PL80353
DN
RW
UT
CN 5,500,000 SPP
Project Cost:
0 0 5,500,000
T
otal for Floyd county PL
Total Amounts:
CN
UT
RW
DN
620,000
35,000
300,000
6,981,000 7,080,000 19,700,000
7,316,000 7,700,000 19,700,000
I
MPROVE SAFETY, TRUCK MOBILITY, AND REDUCE CONGESTION
ALONG I-64 FROM DIRECTLY EAST OF US-127 TO US-60 SOUTH OF
FRANKFORT. (2024CCR)
I -64Franklin PL551
DN 20,000,000 NH
RW 870,000 NH
UT 340,000 NH
CN
Project Cost:
20,000,000 0 1,210,000
W
IDEN I-64 TO 6 LANES FROM KY-395 TO KY-151.I -64Franklin PL2035.4000
DN
RW 280,000 NH
UT
CN
Project Cost: 0 0 280,000
Page 72 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN I-64 TO 6 LANES FROM KY-151 TO WEST OF THE KY-420
B
RIDGE. (2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)
(SEE ITEM NO. 5-2035.80 FOR BRIDGES) (2024CCN)
I -64Franklin PL2035.7000
DN
RW 150,000 NH
UT
CN
Project Cost: 0 0 150,000
B
RIDGE PROJECT IN FRANKLIN COUNTY ON (037B00074N) KY 676
(E-W CONN) AT KENTUCKY RIVER & KY 1263
KY-676Franklin PL10045
DN
RW 70,000 FBP
UT 90,000 FBP
CN 18,000,000 FBP
Project Cost: 0 160,000 18,000,000
A
DDRESS DEFICIENCIES OF "SINGING" BRIDGE ON US 60X OVER
KENTUCKY RIVER (037B00065N)
US-60Franklin PL10139
DN
RW 1,050,000 STP1
UT 3,120,000 STP1
CN 8,000,000 12,000,000 STP1
Project Cost: 4,170,000 8,000,000 12,000,000
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 57.811 TO
MILEPOINT 59.431
I -64Franklin PL22032
DN 970,000 NHPM
RW
UT
CN 9,700,000 NHPM
Project Cost: 0 10,670,000 0
A
DD A TURN LANE AT THE INTERSECTION OF KY 676 AND US 60
(2020CCN) (2024CCR)
US-60Franklin PL80105
DN 190,000 SPP
RW 180,000 SPP
UT
CN
Project Cost: 0 190,000 180,000
Page 73 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND TRAFFIC FLOW ON US 60 (VERSAILLES
R
OAD) FROM US 460 TO I-64 IN FRANKFORT. (2024CCN)
US-60Franklin PL80301
DN 730,000 NH
RW 3,720,000 NH
UT
CN
Project Cost: 0 730,000 3,720,000
T
otal for Franklin county PL
Total Amounts:
CN
UT
RW
DN 20,000,000 1,890,000
1,050,000 70,000 5,200,000
3,120,000 90,000 340,000
17,700,000 30,000,000
24,170,000 19,750,000 35,540,000
IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE
L
INE TO SOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDOR
IMPROVEMENT) (2022CCR)
JC-9003F ulton PL25
DN
RW
UT 1,120,000 NH
CN 13,440,000 NH
Project Cost: 1,120,000 13,440,000 0
OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2027
T
HROUGH FY 2032. (12CCR) (2020CCR) (2024CCR)
KY-1354F ulton PL320.1700
DN
RW
UT
CN 144,000 144,000 SPP
Project Cost: 0 144,000 144,000
ADDRESS ECONOMIC DEVELOPMENT, AND TRUCK ACCESS ISSUES
TO
THE FULTON INDUSTRIAL PARK FROM THE PURCHASE PARKWAY
TO HOLLAND LANE IN FULTON. (2024CCN)
KY-307F ulton PL80304
DN 780,000 SPP
RW 500,000 SPP
UT 400,000 SPP
CN
Project Cost: 0 780,000 900,000
Page 74 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND
F
REIGHT ACCESS ISSUES FROM KY 166 TO KY 1099 IN HICKMAN.
(2024CCN)
KY-125Fulton PL80310
DN 1,630,000 SPP
RW
UT
CN
Project Cost: 0 1,630,000 0
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES
A
ND FREIGHT ACCESS AT INTERSECTION WITH KY 94 SOUTHWEST.
(2024CCN)
KY-94F ulton PL80319
DN 300,000 SPP
RW 150,000 SPP
UT 250,000 SPP
CN
Project Cost: 0 300,000 400,000
C
ORRECT SUBSTANDARD INTERSECTION GEOMETRICS AND
ADDRESS ACCESS ISSUES AT KY 309 & KY 1099 IN HICKMAN TO
IMPROVE THE LESS THAN ADEQUATE TRUCK TURNING RADIUS.
(2024CCN)
KY-1099Fulton PL80324
DN 780,000 SPP
RW 400,000 SPP
UT 1,000,000 SPP
CN
Project Cost:
0 780,000 1,400,000
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES
A
ND FREIGHT ACCESS FROM TENNESSEE STATE LINE TO KY 166.
(2024CCN)
KY-125F ulton PL80326
DN 1,000,000 SPP
RW 750,000 SPP
UT 500,000 SPP
CN
Project Cost: 0 1,000,000 1,250,000
T
otal for Fulton county PL
Total Amounts:
CN
UT
RW
DN 4,490,000
1,800,000
1,120,000 2,150,000
13,584,000 144,000
1,120,000 18,074,000 4,094,000
Page 75 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN)
(
18CCR) (2024CCR)
I -71Gallatin PL8910
DN
RW
UT
CN 12,650,000 20,000,000 NH
Project Cost: 0 12,650,000 20,000,000
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 56.673 TO
MILEPOINT 59.94
I -71Gallatin PL22104
DN 480,000 STP4
RW
UT
CN 4,820,000 STP4
Project Cost: 5,300,000 0 0
R
ECONSTRUCT I-71 WITH ADDITIONAL LANES FROM LITTLE SUGAR
ROAD OVERPASS TO THE BOONE COUNTY LINE. (2024CCN)
I -71Gallatin PL80303
DN 3,780,000 SPP
RW
UT
CN
Project Cost: 0 3,780,000 0
R
elocate US 42 from MP 0.6 to MP 2.0 (Memorandum of Agreement
with Nucor Steel Gallatin to provide ROW). (2024CCN)
US-42Gallatin PL80355
DN 3,640,000 STP2
RW
UT
CN
Project Cost: 0 0 3,640,000
T
otal for Gallatin county PL
Total Amounts:
CN
UT
RW
DN 480,000 3,780,000 3,640,000
4,820,000 12,650,000 20,000,000
5,300,000 16,430,000 23,640,000
Page 76 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34.
(
2006BOPC) (16CCN)(18CCR) (2020CCR) (2024CCR)
US-27Garrard PL196.3000
DN
RW 9,350,000 NH
UT 5,520,000 NH
CN 10,000,000 NH
Project Cost: 9,350,000 5,520,000 10,000,000
W
est Lancaster Bypass from North of Lancaster to Bell Street at
Stanford, KY. (2024CCR)
CO-0Garrard PL196.5000
DN
RW 12,740,000 NH
UT
CN
Project Cost: 0 0 12,740,000
S
afety improvements to address right turn movements out of Chenault
Bridge onto Lexington Road (2024CCN)
KY-34Garrard PL80326
DN
RW
UT 50,000 SPP
CN 325,000 SPP
Project Cost: 50,000 325,000 0
T
otal for Garrard county PL
Total Amounts:
CN
UT
RW
DN
9,350,000 12,740,000
50,000 5,520,000
325,000 10,000,000
9,400,000 5,845,000 22,740,000
U
pdate US 25 from KY 2842 to south intersection of KY 491.
(2024BOP)
US-25Grant PL80216.1000
DN
R
W 1,470,000 SPP
UT 1,560,000 SPP
CN 11,760,000 SPP
Project Cost: 0 1,470,000 13,320,000
Page 77 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Update US 25 from KY 1994 to KY 2842. (2024BOP)U S-25Grant PL80216.2000
DN
R
W 4,200,000 SPP
UT 3,120,000 SPP
CN
Project Cost: 0 4,200,000 3,120,000
N
EW CONSTRUCTION ON THE EAST SIDE OF THE RR FROM
SHERMAN-NEWTOWN ROAD TO LEMON-NORTHCUTT ROAD.
(2024CCN)
US-25Grant PL80315
DN 6,380,000 SPP
RW
UT
CN
Project Cost: 0 0 6,380,000
T
otal for Grant county PL
Total Amounts:
CN
UT
RW
DN 6,380,000
5,670,000
4,680,000
11,760,000
0 5,670,000 22,820,000
R
ebuild Downtown Mayfield, KY from 2021 Tornado Devastation
(Allocated KYD USDOT RAISE Grant Funding project) (See Zvarious
99-8600 SPP Western KY December 2021 Tornado Relief Funding Pool
for uncovered FEMA or Insurance for reconstruction of existing
roads.)
CO-0Graves PL220
DN
RW
UT 4,300,000 KYD
CN 27,200,000 KYD
Project Cost:
4,300,000 27,200,000 0
ADDRESS DEFICIENCIES OF BRIDGE ON KY 2422 OVER BR OF OBION
C
REEK (042B00232N)
KY-2422G raves PL10260
DN 221,285 BRZ
RW
UT
CN 1,475,232 BRZ
Project Cost: 0 1,696,517 0
Page 78 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN KY 303 FROM MP 16.034 (EAST FARTHING ST) TO MP 16.807
(
CHARLES DR) (2020CCN) (2022CCR) (2024CCR)
KY-303Graves PL80103
DN
RW
UT 2,700,000 SPP
CN 5,600,000 SPP
Project Cost: 0 2,700,000 5,600,000
W
IDEN KY 131 FROM MP 0 (KY 58) TO MP 4.555 (KY 483) (2020CCN)
(2022CCR) (2024CCR)
KY-131Graves PL80104
DN
RW 2,100,000 SPP
UT 2,600,000 SPP
CN
Project Cost: 0 2,100,000 2,600,000
U
pgrade/Widen KY 121 bypass in Mayfield to four lanes. (2022CCN)
(2024CCR)
KY-121Graves PL80202
DN
RW 550,000 SPP
UT 540,000 SPP
CN 10,800,000 SPP
Project Cost: 0 1,090,000 10,800,000
C
ORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND
TRUCK ACCESS ISSUES FROM KY 348 IN SYMSONIA TO
MCCRACKEN COUNTY LINE. (2024CCN)
KY-131Graves PL80332
DN 1,000,000 SPP
RW 1,500,000 SPP
UT
CN
Project Cost:
0 1,000,000 1,500,000
A
DDRESS ACCESS, CONGESTION, AND GEOMETRIC ALIGNMENT
ISSUES FROM THE EASTERN CITY LIMITS OF MAYFIELD TO KY 131.
(2024CCN)
KY-58Graves PL80333
DN 1,000,000 SPP
RW 1,000,000 SPP
UT 1,500,000 SPP
CN
Project Cost:
0 1,000,000 2,500,000
T
otal for Graves county PL
Total Amounts:
CN
UT
RW
DN 2,221,285
2,650,000 2,500,000
4,300,000 3,240,000 4,100,000
28,675,232 16,400,000
4,300,000 36,786,517 23,000,000
Page 79 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY224.
C
ONSTRUCTION SEGMENT 2. (2024CCR)
US-62Grayson PL8502.2000
DN
RW
UT
CN 9,720,000 SPP
Project Cost: 0 9,720,000 0
B
RIDGE PROJECT IN GRAYSON COUNTY ON (043B00053N) KY-79 AT
ROUGH RIVER LAKE
KY-79Grayson PL10048
DN 310,073 FBP
RW
UT
CN 2,067,154 FBP
Project Cost: 2,377,227 0 0
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 95.03 TO MILEPOINT 106.08
WK-9001Grayson PL22166
DN 1,360,000 NHPM
RW
UT
CN 13,640,000 NHPM
Project Cost: 0 0 15,000,000
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 106.08 TO MILEPOINT 108
WK-9001Grayson PL22167
DN 360,000 NHPM
RW
UT
CN 3,640,000 NHPM
Project Cost: 0 0 4,000,000
ADDRESS SAFETY, GEOMETRIC DEFICIENCIES, AND MAINTENANCE
I
SSUES ALONG KY 259 FROM BEAR CREEK ROAD (MP 9.217) TO THE
NORTHERN INTERSECTION OF BLOOMINGTON ROAD (MP 11.761)
SOUTH OF LEITCHFIELD (2020CCN) (2022CCR) (2024CCR)
KY-259G rayson PL80101
DN 1,670,000 SPP
RW
UT
CN
Project Cost: 0 1,670,000 0
Page 80 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE INTERSECTIONS ALONG THE LEITCHFIELD BYPASS AT KY
1
214, US 62, AND KY 920. (2024CCN)
KY-3155Grayson PL80311
DN 500,000 SPP
RW
UT 260,000 SPP
CN 3,240,000 SPP
Project Cost: 0 760,000 3,240,000
T
otal for Grayson county PL
Total Amounts:
CN
UT
RW
DN 310,073 2,170,000 1,720,000
260,000
2,067,154 9,720,000 20,520,000
2,377,227 12,150,000 22,240,000
CONSTRUCT NEW CONNECTOR ON THE EAST SIDE OF GREENSBURG
B
EGINNING NEAR THE US-61 AND US-68 INTERSECTION SOUTH OF
TOWN AND EXTENDING TO KY 3535 ON THE NORTH SIDE OF
GREENSBURG. (2020CCR) (2022CCR) (2024CCR)
PF-9999G reen PL398
DN
RW 4,200,000 SPP
UT 3,240,000 SPP
CN
Project Cost: 0 4,200,000 3,240,000
I
NSTALL GUARDRAIL ON KY-61 IN GREEN COUNTYKY-61Green PL4316
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
MPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK
BRIDGE TO JUST NORTH OF KY323. (12CCN)(14CCR)(16CCR)
(2020CCR) (2022CCR) (2024CCR)
KY-61Green PL8712
DN
RW
UT
CN 8,640,000 STPF
Project Cost:
8,640,000 0 0
Page 81 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY ON KY 210 FROM MORNINGSTAR ROAD (LARUE
M
P14.23) TO JUST EAST OF CORINTH CHURCH (TAYLOR MP0.60)
(2024CCN)
KY-210Green PL80154.2000
DN
R
W 3,150,000 STPF
UT
CN
Project Cost: 0 0 3,150,000
I
mprove safety by reconstruction and widening bridge ID 044B00008N
on KY 61 over Clover Lick Creek at MP 6.03, approximately 2.2 miles
south of intersection with US 68.
KY-61Green PL80358
DN 148,265 FBP
RW
UT
CN 988,437 FBP
Project Cost:
0 0 1,136,702
T
otal for Green county PL
Total Amounts:
CN
UT
RW
DN 148,265
4,200,000 3,150,000
3,240,000
8,730,000 988,437
8,730,000 4,200,000 7,526,702
R
ECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)
(14CCR)(16CCR)(18CCN) (2024CCR)
KY-2Greenup PL132
DN 750,000 SPP
RW 9,350,000 SPP
UT
CN
Project Cost: 0 750,000 9,350,000
I
MPROVE KY-207 FROM THE INDUSTRIAL PARKWAY TO THE KY-693
INTERSECTION IN FLATWOODS.(08CCN)(16CCR) (2020CCR)
(2022CCR) (2024CCR)
KY-207Greenup PL8509
DN
RW 17,600,000 SPP
UT 12,480,000 SPP
CN
Project Cost:
0 17,600,000 12,480,000
Page 82 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 8S OVER OHIO RV,CSX
R
R,CO Rd, (045B00064N)
KY-8Greenup PL10109
DN 528,000 BRX
RW
UT
CN 5,280,000 BRX
Project Cost: 0 0 5,808,000
I
mprove congestion, access and mobility at the KY 693/KY 1488
intersection by constructing a traffic signal (MP 3.384 KY 693)
(2024CCN)
KY-693Greenup PL80352
DN
RW 110,000 SPP
UT 210,000 SPP
CN 420,000 SPP
Project Cost:
0 320,000 420,000
T
otal for Greenup county PL
Total Amounts:
CN
UT
RW
DN 750,000 528,000
17,710,000 9,350,000
210,000 12,480,000
5,700,000
0 18,670,000 28,058,000
I
MPROVE CONNECTION BETWEEN US-60 AND CANNELTON BRIDGE
APPROACH AT HAWESVILLE.
KY-69,
PF-9999
Hancock PL197
DN
RW
UT
CN 7,500,000 SPP
Project Cost:
0 7,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 69 OVER OHIO RIVER
(046B00043N)
KY-69Hancock PL10147
DN 125,000 FBP
RW
UT
CN 750,000 FBP
Project Cost: 0 875,000 0
Page 83 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN US-60 FROM MILE 2.2 IN LEWISPORT TO KY-1957. (2024CCN)U S-60Hancock PL80306
DN
RW 250,000 SPP
UT 1,000,000 SPP
CN 9,000,000 SPP
Project Cost: 0 1,250,000 9,000,000
T
otal for Hancock county PL
Total Amounts:
CN
UT
RW
DN 125,000
250,000
1,000,000
8,250,000 9,000,000
0 9,625,000 9,000,000
ADDRESS CONGESTION, SAFETY, AND MOBILITY ALONG US 31W
F
ROM VETERANS WAY IN ELIZABETHTOWN TO THE NORTH WILSON
ROAD OVERPASS IN RADCLIFF. (2018BOP) (2022CCR) (2024CCR)
US-31H ardin PL154.3000
DN 2,500,000 SPP
RW 8,400,000 SPP
UT 4,960,000 SPP
CN
Project Cost: 0 2,500,000 13,360,000
EXTEND RING ROAD FROM THE WESTERN KENTUCKY PARKWAY TO
I
-65. (REQUIRES RELOCATION OF I-65 SOUTHBOUND COMMERCIAL
VEHICLE MONITORING STATION, PROJECT 4-286.10) (12CCR)(14CCR)
(2020CCN) (2022CCR) (2024CCR)
PF-9999H ardin PL198
DN
RW 6,100,000 STP2
UT
CN
Project Cost: 0 0 6,100,000
R
emoval of two at-grade CSX Railroad Crossings on Quarry Road
(CS-1518) near US31W, and the construction of a single separated
grade crossing, in the City of Upton in Hardin County. (2024CCR)
US-31Hardin PL201
DN
RW 790,000 RRS
UT 710,000 RRS
CN 5,300,000 RRS
Project Cost: 790,000 710,000 5,300,000
Page 84 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A BYPASS OF GLENDALE. (2022BOP) (2024CCN)P F-9999Hardin PL202
DN
RW 6,400,000 SPP
UT 1,500,000 SPP
CN
Project Cost: 0 7,900,000 0
C
ollege Street Road and US 62 Safety Improvements Project with
USDOT SS4A Grant and $800,000 state matching funds.
CO-0Hardin PL204
DN
RW
UT
CN 7,000,000 KYD
800,000 SPP
Project Cost: 7,800,000 0 0
I
-65 SOUTHBOUND PORT OF ENTRY FOR A COMMERCIAL VEHICLE
MONITORING STATION. (2022CCR)
I -65Hardin PL286.1000
DN
RW
UT
CN 15,000,000 NH
Project Cost: 0 0 15,000,000
B
RIDGE PROJECT IN HARDIN COUNTY ON (047B00060N) KY-86 AT
VERTRESS CREEK
KY-86Hardin PL10054
DN 270,484 BRX
RW
UT
CN 1,803,229 BRX
Project Cost: 0 0 2,073,713
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 5.853 TO MILEPOINT 8.837
BG-9002Hardin PL20051
DN 120,000 STP5
RW
UT
CN 1,192,960 STP5
Project Cost: 0 1,312,960 0
Page 85 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address safety, mobility, and access management, along with
p
otentially reconfiguring the interchange to I 65. (2022CCN) (2024CCR)
US-62Hardin PL80200
DN
RW 6,310,000 SPP
UT 1,150,000 SPP
CN
Project Cost: 0 6,310,000 1,150,000
E
XTEND RING ROAD FROM US 31W TO KY 61 (LINCOLN PARKWAY)
(2022CCN) (2024CCR)
PF-9999Hardin PL80250
DN
RW 2,200,000 SPP
UT
CN
Project Cost: 0 0 2,200,000
A
DDRESS GEOMETRIC DEFICIENCIES ALONG KY 1600 FROM KY 361
TO THE ROUNDABOUT AT KY 220 IN RINEYVILLE. (2024CCN)
KY-1600Hardin PL80301
DN 730,000 SPP
RW 1,880,000 SPP
UT
CN
Project Cost: 0 730,000 1,880,000
EXTEND COMMERCE DRIVE FROM SPRINGFIELD ROAD TO US 31W AT
K
Y 1136 ON THE SOUTH SIDE OF ELIZABETHTOWN. (2024CCN)
PF-9999H ardin PL80303
DN
RW 2,890,000 SPP
UT 1,620,000 SPP
CN 5,040,000 SPP
Project Cost: 0 4,510,000 5,040,000
I
MPROVE THE INTERSECTION OF US 62 AND THE US 31W BYPASS
RAMP AT NICHOLAS STREET IN ELIZABETHTOWN. (2024CCN)
US-62Hardin PL80310
DN 570,000 SPP
RW 2,100,000 SPP
UT 2,080,000 SPP
CN
Project Cost: 570,000 0 4,180,000
Page 86 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADD SHOULDERS AND TURN LANES TO US 31W BETWEEN KY 1136
A
ND KY 222 EAST OF GLENDALE. SEE GLENDALE AREA
TRANSPORTATION STUDY. (2024CCN)
US-31Hardin PL80313
DN 1,570,000 SPP
RW
UT
CN
Project Cost: 0 1,570,000 0
R
eplace Meeting Creek Bridge (047C00063N) over P&L Railway ( MP
4.050 -4.070).
CR-1292Hardin PL80351
DN 182,201 FBP
RW
UT
CN 1,214,676 FBP
Project Cost: 0 1,396,877 0
T
otal for Hardin county PL
Total Amounts:
CN
UT
RW
DN 570,000 5,102,201 270,484
790,000 15,600,000 20,680,000
3,830,000 8,190,000
7,800,000 2,407,636 27,143,229
9,160,000 26,939,837 56,283,713
I
NSTALL GUARDRAIL ON KY-987 IN HARLAN COUNTY (2024CCR)KY-987Harlan PL4370
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-987 IN HARLAN COUNTY (2024CCR)KY-987Harlan PL4371
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
Page 87 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address Slide on US 421 in Harlan County.U S-421Harlan PL5012
DN
RW
UT
CN 5,040,000 SPP
Project Cost: 0 5,040,000 0
B
RIDGE PROJECT IN HARLAN COUNTY ON (048B00179N) KY-2007
AT WALLINS CREEK
KY-2007Harlan PL10015
DN 144,955 BRX
RW
UT
CN 966,368 BRX
Project Cost: 1,111,323 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KENTUCKY AV OVER
MARTINS FK CUMBERLAND RV (048C00067N)
CS-1041Harlan PL10018
DN 1,019,992 BRZ
RW
UT
CN 6,799,950 BRZ
Project Cost: 7,819,942 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 38 OVER Fanny Wynn
Branch (048B00197N)
KY-38Harlan PL10233
DN
RW
UT
CN 776,000 BRX
Project Cost: 0 776,000 0
A
DDRESS CONDITION OF US-119 FROM MILEPOINT 6 TO MILEPOINT
7.8
US-119Harlan PL20040
DN 272,000 STP4
RW
UT
CN 3,128,000 STP4
Project Cost: 0 3,400,000 0
Page 88 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXTEND KY 72 FROM ALVA/BLACK STAR NEAR HARLAN /BELL
C
OUNTY LINE TO LIGGETT WEST OF HARLAN CITY.
APPROXIMATELY 5 MILES OF RECONSTRUCTION (2022CCN)
(2024CCR)
KY-72Harlan PL80257
DN 1,750,000 SPP
RW 2,000,000 SPP
UT
CN
Project Cost:
0 1,750,000 2,000,000
S
POT IMPROVEMENTS TO IMPROVE GEOMETRICS AT PARTICULAR
LOCATIONS OF US 421 CROSSING OVER PINE MOUNTAIN BETWEEN
US 119 AND KY 221 IN HARLAN COUNTY TO ADDRESS SAFETY
CONCERNS. MILEPOINT 17.2 TO MILEPOINT 23.0 (2022CCN)
US-421Harlan PL80259
DN
RW 750,000 SPP
UT 800,000 SPP
CN 13,520,000 SPP
Project Cost:
0 1,550,000 13,520,000
TO IMPROVE ACCESS, CONNECTIVITY AND MOBILITY BY EXTENDING
K
Y 72 FROM ALVA/BLACK STAR NEAR HARLAN/ BELL COUNTY
LINE. RECONSTRUCT EXISTING COAL HAUL ROAD TO CONNECT KY
72 TO KY 72 (2022CCN) (2024CCR)
KY-72H arlan PL80260
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 0 1,000,000 0
S
pot improvements to widen at particular locations along KY 2010 to
improve mobility and safety (2024CCN)
KY-2010Harlan PL80358
DN 520,000 SPP
RW 110,000 SPP
UT
CN 2,000,000 SPP
Project Cost: 2,630,000 0 0
S
pot improvements to improve geometrics at particular locations of KY
221 to address safety concerns (MP 10 - 17.5) (2024CCN)
KY-221Harlan PL80359
DN 520,000 SPP
RW 200,000 SPP
UT 200,000 SPP
CN
Project Cost: 0 520,000 400,000
Page 89 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct various turn lanes along US 119 at the following highways -
C
amp O. Cumberlands, Billy G Hollow Road, KY 3467, Shewmaker
Hollow, KY 3452 ad Tremont Lane (2024CCN)
US-119Harlan PL80363
DN
RW
UT
CN 1,040,000 SPP
Project Cost: 1,040,000 0 0
I
mprove safety along KY 38, KY 221, KY 987, US 421, and KY 522 by
removing trees (2024CCN)
KY-221,
KY-38,
KY-522,
KY-987,
US-421
Harlan PL80365
DN
RW
UT
CN 2,000,000 SPP
Project Cost:
0 2,000,000 0
T
otal for Harlan county PL
Total Amounts:
CN
UT
RW
DN 1,684,947 3,542,000
110,000 750,000 2,200,000
800,000 200,000
10,926,318 10,944,000 13,520,000
12,721,265 16,036,000 15,920,000
I
NSTALL GUARDRAIL ON KY-32 IN HARRISON COUNTYKY-32Harrison PL4307
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
R
ECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4. (12CCN)(14CCR)
(18CCN) (2022CCR) (2024CCR)
US-27Harrison PL8708
DN
RW 1,050,000 SPP
UT 540,000 SPP
CN
Project Cost: 0 1,050,000 540,000
Page 90 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A CONNECTOR ROAD BETWEEN OLD LAIR ROAD AND
K
Y 982 (NEW LAIR ROAD) NEAR THE HARRISON COUNTY HIGH
SCHOOL. (2022CCN) (2024CCR)
CR-1124,
KY-982,
PF-9999,
US-27
Harrison PL80251
DN
RW 1,580,000 SPP
UT 200,000 SPP
CN
Project Cost:
0 1,780,000 0
C
ONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF WEBSTER
AVENUE (CS-1071) AND EDUCATION DRIVE. (2022CCN) (2024CCR)
CS-1159Harrison PL80252
DN
RW 530,000 SPP
UT 100,000 SPP
CN 650,000 SPP
Project Cost: 0 630,000 650,000
P
rovide a two way left turn lane on KY 982 (New Lair Road) (MP 4.4 -
5.1) (2024CCN)
KY-982Harrison PL80353
DN 780,000 SPP
RW 600,000 SPP
UT 1,500,000 SPP
CN
Project Cost: 0 780,000 2,100,000
T
otal for Harrison county PL
Total Amounts:
CN
UT
RW
DN 780,000
3,160,000 600,000
300,000 2,040,000
50,000 650,000
50,000 4,240,000 3,290,000
A
DDRESS CONDITION OF KY-218 FROM MILEPOINT 7.245 TO
MILEPOINT 11.528
KY-218Hart PL20049
DN 264,000 STP5
RW
UT
CN 3,036,000 STP5
Project Cost: 0 0 3,300,000
Page 91 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Hart county P L
Total Amounts:
CN
UT
RW
DN 264,000
3,036,000
0 0 3,300,000
I
mprove the intersection of Watson Lane (CS-1372) and US 41.
(2022CCR) (2024CCR)
CS-1372Henderson PL383.1000
DN
RW
UT
CN 4,480,000 STP1
Project Cost: 4,480,000 0 0
A
ddress safety and congestion along Watson Lane (CR-1372).
(2024CCR)
CS-1372Henderson PL383.2000
DN
RW
UT
CN 3,030,000 SPP
Project Cost: 0 3,030,000 0
D
ELIVERY OF I-69 ORX SECTION 2 FROM US 60 NORTH TO SECTION
3 SOUTH OF EVANSVILLE. (COSTS SHARED BY KY AND IN)
(2024CCR)
PF-9999Henderson PL1088.5000
DN
RW
UT 10,000,000 NH
CN 39,000,000 NH
Project Cost: 10,000,000 39,000,000 0
I
-69 Ohio River Crossing (ORX) at Henderson/Evansville (KY Share) -
SGF Fund Component "CONTINGENT UPON AWARD OF A FEDERAL
MULTIMODAL PROJECT DISCRETIONARY GRANT FOR THIS
PROJECT". (2024CCR)
PF-9999Henderson PL1088.5200
DN
RW
UT
CN 150,000,000 SGF
Project Cost:
150,000,000 0 0
Page 92 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
I-69 OHIO RIVER CROSSING (ORX) AT HENDERSON/EVANSVILLE
S
ECTION 2 TOLLING COMPONENT. (KY SHARE)
PF-9999Henderson PL1088.5300
DN
RW
UT
CN 175,000,000 IF
Project Cost: 0 175,000,000 0
A
DDRESS CONDITION OF KY-425 FROM MILEPOINT 0 TO MILEPOINT
4.747
KY-425Henderson PL22333
DN 480,000 STP3
RW
UT
CN 5,520,000 STP3
Project Cost: 0 6,000,000 0
C
ONSTRUCT A NEW ROUTE INTO THE PARK FROM WATSON LANE.
(2024CCN)
PF-9999Henderson PL80309
DN
RW 300,000 SPP
UT 250,000 SPP
CN 2,900,000 SPP
Project Cost: 300,000 250,000 2,900,000
I
MPROVE LEVEL OF SERVICE ON KY 425 FROM US60 TO US 41.
(2024CCN)
KY-425Henderson PL80310
DN 1,740,000 SPP
RW
UT
CN
Project Cost: 0 1,740,000 0
I
MPROVE EASTERN INTERSECTION OF US 60 AND KY 1078.
(2024CCN)
US-60Henderson PL80311
DN 270,000 SPP
RW
UT
CN
Project Cost: 0 270,000 0
Page 93 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve congestion and mobility on KY 812 in the vicinity of sports
c
omplex (MP 5.7-6.11). (2024CCN)
KY-812Henderson PL80350
DN 520,000 SPP
RW 300,000 SPP
UT 500,000 SPP
CN 2,500,000 SPP
Project Cost: 0 520,000 3,300,000
T
otal for Henderson county PL
Total Amounts:
CN
UT
RW
DN 3,010,000
300,000 300,000
10,000,000 250,000 500,000
154,480,000 222,550,000 5,400,000
164,780,000 225,810,000 6,200,000
I
MPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY 153
TO US 421. (2024CCN)
I -71Henry PL572
DN 4,320,000 SPP
RW
UT
CN
Project Cost: 0 4,320,000 0
R
EHABILITATION-OVERLAY AND WIDENING EXISTING KY-55 FROM
KY-22 TO CURVE AT MP 2.210 NORTH OF EMINENCE. INCLUDES
REPLACING EXISTING CURB AND GUTTER AND SIDEWALKS, AND
RELOCATION OF IMPACT UTILITIES. (MP 1.408 TO 2.210)(14CCN)
(2024CCN)
KY-55Henry PL8820
DN
RW 1,830,000 SPP
UT 1,450,000 SPP
CN
Project Cost:
0 3,280,000 0
G
EOTECH REPAIRS ON KY-389 IN HENRY COUNTY ABOVE THE
KENTUCKY RIVER SOUTH OF MARSHALLS BOTTOM ROAD. (14CCN)
(2024CCN)
KY-389Henry PL8822
DN 580,000 SPP
RW 600,000 SPP
UT 290,000 SPP
CN 2,320,000 SPP
Project Cost:
0 580,000 3,210,000
Page 94 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Henry county P L
Total Amounts:
CN
UT
RW
DN 4,900,000
1,830,000 600,000
1,450,000 290,000
2,320,000
0 8,180,000 3,210,000
C
orrect geometric deficiencies and improve safety, access, and
regional connectivity from Clayton Street to KY-703 in Clinton.
(2022CCN) (2024CCR)
US-51Hickman PL80203
DN
RW 1,580,000 SPP
UT 2,600,000 SPP
CN
Project Cost: 0 1,580,000 2,600,000
C
ORRECT GEOMETRIC DEFICIENCIES AND IMPROVE SAFETY,
ACCESS, AND REGIONAL CONNECTIVITY FROM KY-703 IN CLINTON
TO .160 MILES SOUTH OF OBION CREEK BRIDGE. (2024CCN)
US-51Hickman PL80325
DN 1,770,000 SPP
RW 2,500,000 SPP
UT
CN
Project Cost:
0 1,770,000 2,500,000
I
MPROVE SAFETY, ACCESS, AND REGIONAL CONNECTIVITY, AND
ADDRESS GEOMETRIC DEFICIENCIES FROM HICKMAN C/L TO CANE
CREEK BRIDGE. (2024CCN)
US-51Hickman PL80327
DN 1,040,000 SPP
RW 1,000,000 SPP
UT
CN
Project Cost:
0 1,040,000 1,000,000
C
ORRECT GEOMETRIC DEFICIENCIES, AND IMPROVE SAFETY,
ACCESS AND REGIONAL CONNECTIVITY FROM BAYOU DE CHEIN
BRIDGE TO MARTIN ROAD. (2024CCN)
US-51Hickman PL80328
DN 1,560,000 SPP
RW 1,050,000 SPP
UT
CN
Project Cost:
0 1,560,000 1,050,000
Page 95 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY, TRUCK MOBILITY, AND GEOMETRIC DEFICIENCIES
A
T THE ICR RAILROAD OVERPASS. (2024CCN)
KY-307H ickman PL80329
DN 800,000 SPP
RW
UT
CN
Project Cost: 0 0 800,000
I
MPROVE INTERSECTION GEOMETRICS AND ADDRESS SIGHT
DISTANCE ISSUES WITH ACCESS TO US 51 FROM KY 1301 AND THE
ENTRANCE OF HARPERS COUNTRY HAMS NEAR CLINTON.
(2024CCN)
US-51Hickman PL80330
DN 520,000 SPP
RW 150,000 SPP
UT 350,000 SPP
CN
Project Cost:
0 520,000 500,000
T
otal for Hickman county PL
Total Amounts:
CN
UT
RW
DN 4,890,000 800,000
1,580,000 4,700,000
2,950,000
0 6,470,000 8,450,000
R
emove the median on US 41 (South Main Street) from the railroad to
MP 15.521 (2024CCN)
US-41Hopkins PL129
DN 500,000 SPP
RW 385,000 SPP
UT 760,000 SPP
CN
Project Cost: 0 500,000 1,145,000
I
MPROVE KY-281 FROM ISLAND PARK DRIVE TO 0.25 MI NORTH OF
CARRIAGE LANE (KY-2281).
KY-281Hopkins PL384
DN
RW 2,100,000 SPP
UT 1,930,000 SPP
CN
Project Cost: 0 2,100,000 1,930,000
Page 96 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Extend Midtown Blvd from CSX Railroad to Whittington Drive, 500’
s
outh of Commerce Drive. (2022CCR) (2024CCR)
PF-9999Hopkins PL804.3000
DN
RW 580,000 SPP
UT 1,300,000 SPP
CN 5,200,000 SPP
Project Cost: 0 1,880,000 5,200,000
R
econstruct Whittington Drive beginning 500’ south of Commerce Drive
and ending at the intersection of Whittington Drive and Island Ford
Road (KY 281), including the reconstruction of the KY 281
intersection. (2022CCR) (2024CCR)
CS-1287Hopkins PL804.4000
DN
RW 2,400,000 SPP
UT 1,680,000 SPP
CN
Project Cost:
0 2,400,000 1,680,000
I
MPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281.
(06CCN)(12CCR)(18CCR) (2024CCR)
US-41Hopkins PL8305
DN
RW
UT
CN 9,470,000 HGC
Project Cost: 0 9,470,000 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 124.946 TO
MILEPOINT 126.839
I -69Hopkins PL20031
DN 1,100,000 NHPM
RW
UT
CN 11,000,000 NHPM
Project Cost: 0 0 12,100,000
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 89.848 TO
MILEPOINT 93.724
I -69Hopkins PL22083
DN 470,000 NHPM
RW
UT
CN 4,715,274 NHPM
Project Cost: 0 0 5,185,274
Page 97 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-069 FROM MILEPOINT 108.994 TO
M
ILEPOINT 114.246 (113.81 NON-CARDINAL)
I -69Hopkins PL22087
DN 1,050,000 NHPM
RW
UT
CN 10,517,430 NHPM
Project Cost: 11,567,430 0 0
ADDRESS CONDITION OF US-62 FROM MILEPOINT 15.4 TO MILEPOINT
1
5.8
US-62H opkins PL22337
DN 100,000 STP3
RW
UT
CN 1,150,000 STP3
Project Cost: 0 1,250,000 0
I
MPROVE US 41A BEGINNING AT INDUSTRIAL DR AT HOPKINS CO
ENDING AT PROVIDENCE (2022CCR) (2024CCR)
US-41Hopkins PL80105
DN 2,900,000 SPP
RW
UT
CN
Project Cost: 0 2,900,000 0
I
MPROVE US41A BEGINNING NEAR NEBO AT MP 8.7 AND ENDING AT
MP 11.2 IN HOPKINS COUNTY. (2022BOP) (2024CCN)
US-41Hopkins PL80105.1000
DN
R
W 2,630,000 SPP
UT
CN
Project Cost: 0 0 2,630,000
I
MPROVE US41A BEGINNING NEAR KY 630 AT MP 5.0 AND ENDING
AT MP 7.4 IN HOPKINS COUNTY. (2022BOP)
US-41Hopkins PL80105.2000
DN
R
W 1,800,000 SPP
UT 1,740,000 SPP
CN
Project Cost: 0 1,800,000 1,740,000
Page 98 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY OF KY 260 FROM THE
A
PPROACHES AT THE RAILROAD CROSSING IN HANSON TO THE
SOUTHBOUND ON AND OFF RAMPS OF I69. (2024CCN)
KY-260Hopkins PL80300
DN 730,000 SPP
RW 2,000,000 SPP
UT
CN
Project Cost: 0 730,000 2,000,000
T
otal for Hopkins county PL
Total Amounts:
CN
UT
RW
DN 1,050,000 4,230,000 1,570,000
6,880,000 5,015,000
1,300,000 6,110,000
10,517,430 10,620,000 20,915,274
11,567,430 23,030,000 33,610,274
I
NSTALL GUARDRAIL ON KY-89 IN JACKSON COUNTYKY-89Jackson PL4404
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
B
RIDGE PROJECT IN JACKSON COUNTY ON (055B00028N) KY-89 AT
HORSE LICK CREEK
KY-89Jackson PL10041
DN
RW 2,000 BRZ
UT 5,000 BRZ
CN 1,056,128 BRZ
Project Cost: 7,000 0 1,056,128
B
RIDGE PROJECT IN JACKSON COUNTY ON (055B00001N) US-421
AT INDIAN CREEK
US-421Jackson PL10198
DN
RW
UT
CN 1,540,000 FBP
Project Cost: 1,540,000 0 0
Page 99 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SUBSTANDARD HORIZONTAL AND VERTICAL ALIGNMENT
OF
US 421 IN THE CLOVER BOTTOM AREA NEAR THE STONE
QUARRY. (2020CCN)
US-421Jackson PL80104
DN
RW 1,395,500 SPP
UT 400,000 SPP
CN
Project Cost: 0 1,395,500 400,000
A
DDRESS SAFETY ISSUES WITH VERTICAL AND HORIZONTAL
ALIGNMENT ON US 421 FROM MP 11.6 EAST OF PILGRIMS REST RD
TO MP 12.6 (2020CCN) (2024CCR)
US-421Jackson PL80105
DN
RW
UT
CN 13,000,000 SPP
Project Cost:
0 13,000,000 0
M
OVE KY 578 OVER 10FT FOR IMPROVED SIGHT DISTANCE AND
CREATE A BETTER APPROACH FOR MOORE CREEK GREEN HILL
ROAD (2022CCN)
KY-578Jackson PL80261
DN
RW 60,000 SPP
UT 340,000 SPP
CN 1,400,000 SPP
Project Cost:
0 400,000 1,400,000
I
mprove the existing geometric alignments at two spot locations (MP
4.7-6.3 and 8.0-8.5) by realigning curves in high crash cluster areas
and widening. Improve design speed to 45 mph along these two
sections. (2024CCN)
KY-290Jackson PL80313
DN 1,040,000 SPP
RW
UT
CN
Project Cost:
0 1,040,000 0
T
otal for Jackson county PL
Total Amounts:
CN
UT
RW
DN 1,040,000
2,000 1,455,500
5,000 340,000 400,000
1,580,000 13,000,000 2,456,128
1,587,000 15,835,500 2,856,128
Page 100 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64
I
NTERCHANGE EAST OF LOUISVILLE. (DESIGNED WITH 5-41)
I -265Jefferson PL21.2000
DN 3,000,000 NH
RW
UT
CN
Project Cost: 0 0 3,000,000
W
IDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY
(US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148.
(98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR) (2020CCR)
(2022CCR) (2024CCR)
KY-1931Jefferson PL323.0100
DN
RW
UT
CN 32,940,000 HGC
Project Cost:
0 0 32,940,000
R
ECONSTRUCT AND WIDEN KY 1819 (WATTERSON TRAIL) -
PLANTSIDE DRIVE TO BLUEGRASS PARKWAY. (98CCR) (2024CCN)
KY-1819Jefferson PL373.2000
DN 470,000 SPP
RW
UT 2,110,000 SPP
CN 9,830,000 SPP
Project Cost: 0 470,000 11,940,000
I
MPROVE DIXIE HIGHWAY BETWEEN GREENWOOD ROAD (KY 1931)
AND STONESTREET ROAD (CR 1003). (14CCN) (2024CCN)
US-31Jefferson PL478.3000
DN 630,000 NH
RW 510,000 SPP
UT 1,390,000 SPP
CN
Project Cost: 630,000 1,900,000 0
IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO
U
S-31E. (2024CCR)
I -265J efferson PL554
DN 1,500,000 NH
RW
UT
CN
Project Cost: 0 0 1,500,000
Page 101 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY-1747
(
HURSTBOURNE PARKWAY) FROM STONY BROOK DRIVE TO I-64.
(2024CCN)
KY-1747Jefferson PL555
DN 7,660,000 SPP
RW
UT
CN
Project Cost: 0 7,660,000 0
I
MPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM
US-31E (BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD).
(2024CCR)
I -265Jefferson PL558
DN 7,500,000 NH
RW
UT
CN
Project Cost:
0 7,500,000 0
I
MPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264
(WATTERSON EXPRESSWAY) INTERCHANGE. (2024CCR)
I -65Jefferson PL559
DN 3,480,000 NH
RW
UT
CN
Project Cost: 3,480,000 0 0
R
econnecting West Louisville to the Ohio Riverfront throughout the
Riverside Expressway (I-64) Corridor USDOT Grant project (Louisville
Metro to provide $100,000 toward the cost of project).
PF-9999Jefferson PL587
DN 1,927,000 KYD
RW
UT 1,575,000 KYD
CN 24,839,000 KYD
1,387,000 STPF
Project Cost:
29,728,000 0 0
I
NSTALLATION OF SOLAR LIGHTING AT I-64/I-264 INTERCHANGE AT
SHERMAN MINTON BRIDGE; I-264/RIVER PARK-ALI; I-264/BELLS
LANE; I-264/VIRGINA/DUMESNIL; AND I-264/RALPH AVE-CANE RUNE
INTERSECTIONS IN JEFFERSON COUNTY KENTUCKY. (2024BOP)
I -264, I -64Jefferson PL607
DN
RW
UT
CN 2,080,000 CARB
Project Cost:
2,080,000 0 0
Page 102 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE
U
RBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY
2026-2032. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING
MPO TIP). (2020CCR) (2022CCR) (2024CCR)
CO-0J efferson PL965.1900
DN
RW
UT
CN 26,800,000 26,800,000 26,800,000 SLO
Project Cost: 26,800,000 26,800,000 26,800,000
ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G)
OVER SOUTH FORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER
AVE (CS 1138G) 056C00083N (2020CCR)
CS-1017J efferson PL1070
DN 356,881 FBP2
RW
UT
CN 2,379,206 FBP2
Project Cost: 0 2,736,087 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056C00130N) RIVER
RD AT GOOSE CREEK
CR-1001Jefferson PL1079
DN 1,210,368 BRZ
RW
UT
CN 8,069,119 BRZ
Project Cost: 0 0 9,279,487
I
MPROVE AND WIDEN MT WASHINGTON ROAD FROM PRESTON
HIGHWAY TO PENN RUN CREEK BRIDGE. (10CCN)(SAME AS
5-8611.00) (2024CCN)
KY-2053Jefferson PL8205.1000
DN
RW 5,080,000 SPP
UT 9,510,000 SPP
CN
Project Cost: 0 5,080,000 9,510,000
THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH
S
CHOOL ENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION
IMPROVEMENTS WITH PALATKA ROAD AND TURN LANES. (14CCN)
(2020CCR) (2024CCR)
KY-1931J efferson PL8810
DN
RW
UT
CN 6,070,000 HGC
Project Cost: 0 0 6,070,000
Page 103 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXTEND THE LEFT TURN LANE ON HURSTBOURNE LANE AT
I
NTERSECTION WITH SIX MILE LANE. (16CCN) (2024CCN)
KY-1747,
PF-9999
Jefferson PL8905
DN
RW
UT
CN 210,000 SPP
Project Cost:
0 210,000 0
W
IDEN TAYLORSVILLE ROAD FROM I-265 TO KY-148. (18CCN)
(2024CCR)
KY-155Jefferson PL8908
DN
RW
UT
CN 23,760,000 STPF
Project Cost: 23,760,000 0 0
I
mprove safety and traffic operations on KY 155 from MP 2.0 in
Spencer County to Floyds Fork In Jefferson County (total length 6.247
miles) (Portion of 5-8954.0). (2024CCN)
KY-155Jefferson PL8954.1000
DN 2,080,000 STPF
RW 3,540,000 STPF
UT
CN
Project Cost:
2,080,000 0 3,540,000
S
AFETY IMPROVEMENTS AT CR 1013F AT CRUMS LANE
ELEMENTARY. (2020BOP)(2021SCHSAF) (2024CCN)
CR-1013,
KY-1934
Jefferson PL9026
DN 420,000 SPP
RW
UT
CN
Project Cost:
0 420,000 0
A
DDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER
GOOSE CREEK. (056C00113N) (2020CCR)
CS-1079Jefferson PL10008
DN 165,331 BRX
RW
UT
CN 1,102,206 BRX
Project Cost: 0 0 1,267,537
Page 104 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00142N) I-64 AT
K
Y 3077 (RIVER RD). (BRIDGE PAINTING OF I-64 RIVERSIDE
EXPRESSWAY BRIDGES)
I -64Jefferson PL10016
DN
RW
UT
CN 8,000,000 BRX
Project Cost: 8,000,000 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00179N) I-65 AT
HILL, CSX RR & BURNETT (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10064
DN
RW
UT
CN 43,000,000 BRO
6,304,783 FBP
Project Cost: 49,304,783 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00180N) I-65 AT
US 60A (EASTERN PKWY)
I -65Jefferson PL10065
DN 5,340,000 BRO
RW
UT
CN
Project Cost: 0 0 5,340,000
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00183N) I-65 AT
E
KENTUCKY & S BROOK ST (POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson PL10066
DN
RW
UT
CN 47,000,000 BRO
7,000,000 BRX
17,971,591 FBP
Project Cost: 0 0 71,971,591
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00191N) I-65 AT
JACOB, BROADWAY, GRAY ST
I -65Jefferson PL10068
DN 10,612,000 FBP
RW
UT
CN 52,616,706 52,616,706 BRO
Project Cost: 0 63,228,706 52,616,706
Page 105 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00192N) I-65 AT
E
CHESTNUT ST
I -65Jefferson PL10069
DN 819,705 BRO
RW
UT
CN 5,464,700 BRO
Project Cost: 0 6,284,405 0
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00250N) I-264 AT
P
&L RAILWAY
I -264J efferson PL10075
DN
RW
UT
CN 35,367,503 FBP
Project Cost: 35,367,503 0 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00193N) I-65 AT
BROOK/MUHAMMAD ALI. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10099
DN 10,545,062 FBP
RW 50,000 50,000 FBP
UT 75,000 75,000 FBP
CN 70,300,410 6,500,000 FBP
Project Cost: 0 80,970,472 6,625,000
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00194N) I-65 AT
MUHAMMAD ALI SB ON-RAMP. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65Jefferson PL10100
DN 154,954 FBP
RW
UT
CN 1,033,024 FBP
Project Cost:
0 0 1,187,978
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00195R) I-65 NB
AT FLOYD STREET. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10101
DN 611,386 BRX
RW
UT
CN 4,075,906 BRX
Project Cost: 0 4,687,292 0
Page 106 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN JEFFERSON COUNTY ON (056B00197R) I-65 NB
A
T E. LIBERTY STREET. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10102
DN 1,408,057 BRX
RW
UT
CN 9,387,049 BRX
Project Cost: 0 10,795,106 0
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00182N) I-65 AT
BRANDIES AVE. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10104
DN 2,330,669 FBP
RW 50,000 FBP
UT 75,000 FBP
CN
Project Cost: 0 0 2,455,669
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00181N) I-65 AT
UNIVERSITY BLVD. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10105
DN 2,624,670 FBP
RW
UT
CN
Project Cost: 0 0 2,624,670
B
RIDGE PROJECT IN JEFFERSON COUNTY ON (056B00212N) I-65 AT
BRADLEY AVE. (POTENTIAL CMGC DELIVERY PROJECT)
I -65Jefferson PL10106
DN
RW
UT
CN 14,287,927 FBP2
Project Cost: 14,287,927 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON US 31 OVER OHIO RIVER
(056B00136N)
US-31Jefferson PL10115
DN 1,050,000 FBP
RW
UT
CN 7,000,000 FBP
Project Cost: 8,050,000 0 0
Page 107 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-264 FROM MILEPOINT 12.7 TO MILEPOINT
1
8.41
I -264J efferson PL20016
DN 2,730,000 NHPM
RW
UT
CN 27,270,000 NHPM
Project Cost: 30,000,000 0 0
A
DDRESS CONDITION OF KY-913 FROM MILEPOINT 2.38 TO
MILEPOINT 3.07
KY-913Jefferson PL20024
DN 60,000 STP5
RW
UT
CN 690,000 STP5
Project Cost: 0 0 750,000
A
DDRESS CONDITION OF KY-1020 FROM MILEPOINT 2.67 TO
MILEPOINT 3.66
KY-1020Jefferson PL20025
DN 80,000 STP5
RW
UT
CN 920,000 STP5
Project Cost: 0 0 1,000,000
A
DDRESS CONDITION OF KY-1932 FROM MILEPOINT 3.21 TO
MILEPOINT 3.8
KY-1932Jefferson PL20027
DN 80,000 STP5
RW
UT
CN 920,000 STP5
Project Cost: 0 0 1,000,000
ADDRESS CONDITION OF KY-1934 FROM MILEPOINT 0 TO MILEPOINT
4
.44
KY-1934J efferson PL20028
DN 340,000 NHPM
RW
UT
CN 3,910,000 NHPM
Project Cost: 0 0 4,250,000
Page 108 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF KY-1934 FROM MILEPOINT 4.44 TO
M
ILEPOINT 9.74
KY-1934Jefferson PL20029
DN 480,000 STP3
RW
UT
CN 5,520,000 STP3
Project Cost: 0 0 6,000,000
A
DDRESS PAVEMENT CONDITION ON KY-2052 FROM MP 0.0 TO MP
4.205.
KY-2052Jefferson PL20060
DN 360,000 SPP
RW
UT
CN 3,600,000 SPP
Project Cost: 0 360,000 3,600,000
ADDRESS CONDITION OF I-265 FROM MILEPOINT 18.8 TO MILEPOINT
2
3.364
I -265J efferson PL20069
DN 770,000 NHPM
RW
UT
CN 7,680,738 NHPM
Project Cost: 8,450,738 0 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 13.124 (13.206
NON-CARDINAL) TO MILEPOINT 19.44
I -64Jefferson PL22024
DN 1,820,000 NHPM
RW
UT
CN 18,180,000 NHPM
Project Cost: 0 0 20,000,000
A
DDRESS CONDITION OF I-065 FROM MILEPOINT 123.18 TO
MILEPOINT 127.57
I -65Jefferson PL22069
DN 3,600,000 NHPM
RW
UT
CN
Project Cost: 0 0 3,600,000
Page 109 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-065 FROM MILEPOINT 131.24 TO
M
ILEPOINT 136.338
I -65Jefferson PL22070
DN 1,400,000 NHPM
RW
UT
CN 14,000,000 NHPM
Project Cost: 15,400,000 0 0
I
MPROVE OPERATIONS ALONG US-60 FROM OLD SHELBYVILLE
ROAD TO NORTH ENGLISH STATION ROAD. (18CCN) (2020CCR)
(2024CCR)
US-60Jefferson PL80001
DN
RW 650,000 NH
UT 700,000 NH
CN 4,680,000 NH
Project Cost:
1,350,000 4,680,000 0
E
XTEND PLANTSIDE DRIVE FROM REHL ROAD TO TAYLORSVILLE
ROAD. (18CCN)(2020CCR) (2022CCR) (2024CCR)
PF-9999Jefferson PL80003
DN
RW 230,000 SPP
UT 900,000 SPP
CN 10,800,000 SPP
Project Cost: 0 230,000 11,700,000
C
ONSTRUCT NEW INTERCHANGE ON KY-841 AT THE RENAISSANCE
SOUTH BUSINESS PARK(18CCN) (FUNDED WITH LOCAL FUNDS)
(2024CCN)
I -65,
KY-1065,
KY-841,
PF-9999
Jefferson PL80006
DN
RW
UT
CN 16,330,000 SPP
Project Cost:
0 0 16,330,000
W
IDEN AND IMPROVE RANGELAND RD FROM POLAR LEVEL RD TO
SHEPHERDSVILLE RD (2020CCN) (2022CCR) (2024CCR)
CR-1015Jefferson PL80108
DN
RW 1,380,000 SPP
UT 1,150,000 SPP
CN
Project Cost: 0 2,530,000 0
Page 110 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A SIDEWALK ALONG MT HOLLY RD FROM CHARLENE
D
R TO FOX AVE FOR CORAL RIDGE ELEMENTARY (2020CCN)
KY-2055Jefferson PL80110
DN
RW 40,000 SPP
UT 40,000 SPP
CN 330,000 SPP
Project Cost: 0 80,000 330,000
R
educe congestion, improve safety, and enhance mobility on KY 2050
(Herr Lane) from Prince Valiant Drive/Westmar Terrace to Bedford
Lane. (2022CCN) (2024CCR)
KY-2050Jefferson PL80200
DN
RW 580,000 SPP
UT 2,030,000 SPP
CN
Project Cost:
0 580,000 2,030,000
I
mprove safety and reduce congestion on KY 1065 (Outer Loop) from
I-65 to KY 2052 (Shepherdsville Road). Project will evaluate the
addition of one travel lane in each direction and consider
accommodations for bicyclists and pedestrians (2022CCN) (2024CCR)
KY-1065Jefferson PL80203
DN 2,450,000 SPP
RW
UT
CN
Project Cost:
0 0 2,450,000
I
mprove safety and reduce congestion on KY 1931 (Manslick Road)
from KY 1931 (St. Andrews Church Road) to I-264 (Henry Watterson
Expressway). Project will evaluate 3-lane widening and consider
accommodations for bicyclists and pedestrians. (2022CCN)
(2024CCR)
KY-1931Jefferson PL80204
DN
RW 6,650,000 SPP
UT 12,030,000 SPP
CN
Project Cost:
0 0 18,680,000
DESIGN AND CONSTRUCTION OF A REALIGNED OLD BARDSTOWN
R
OAD TO ALIGN WITH THE ENTRANCE TO WALGREENS AT HILLOCK.
(MILEPOINT 0.0 TO MILEPOINT 0.01) WITH A MEMORANDUM OF
AGREEMENT WITH THE LOUISVILLE METRO GOVERNMENT.
(2022CCN)
CR-1006J efferson PL80250
DN
RW
UT
CN 440,000 SPP
Project Cost: 0 0 440,000
Page 111 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REDUCE CONGESTION, IMPROVE SAFETY, AND ENHANCE MOBILITY
O
N KY 1819 (WATTERSON TRAIL) FROM BLUEGRASS PARKWAY TO
BLANKENBAKER PARKWAY (KY 913) (2022CCN) (2024CCR)
KY-1819J efferson PL80258
DN
RW 530,000 SPP
UT 1,600,000 SPP
CN 12,480,000 SPP
Project Cost: 2,130,000 12,480,000 0
RIGHT SIZING AND PEDESTRIAN ACCESS IMPROVEMENTS ON US 31E
F
ROM MILEPOINT 14.625 TO MILEPOINT 13.125 (2022CCN)
US-31J efferson PL80259
DN
RW
UT
CN 2,240,000 SPP
Project Cost: 2,240,000 0 0
R
educe congestion, improve safety and enhance mobility along the US
31E (Bardstown Road) corridor from the Bullitt/Jefferson County line to
KY 1065 (Beulah Church/Seatonville Road). (MP 0.0 – MP 5.6)
(2022CCN) (2024CCR)
US-31Jefferson PL80261
DN 5,830,000 SPP
RW
UT
CN
Project Cost:
0 5,830,000 0
T
RANSPORTATION SYSTEM MANAGEMENT & TRANSPORTATION
DEMAND MANAGEMENT ACTIVITIES ON US 31E (BARDSTOWN
ROAD) BETWEEN DOUGLASS BOULEVARD & HIKES LANE.
TRANSPORTATION SYSTEM MANAGEMENT (TSMO) PROJECTS ARE
INTENDED TO IMPROVE THE OPERATION CAPACITY OF EXISTING.
US-31Jefferson PL80300
DN 500,000 SPP
RW 500,000 SPP
UT 500,000 SPP
CN 5,000,000 SPP
Project Cost:
0 1,500,000 5,000,000
TRANSPORTATION SYSTEM MANAGEMENT IMPROVEMENTS ON US
3
1W FROM KY 841 TO KY 44 IN SOUTHERN JEFFERSON COUNTY; TO
INCLUDE THE CONSIDERATION OF ACCESS MANAGEMENT AND
SAFETY IMPROVEMENTS. (2024CCN)
US-31J efferson PL80302
DN 3,710,000 SPP
RW
UT
CN
Project Cost: 0 3,710,000 0
Page 112 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY 1065 AND
K
Y 61 INTERSECTION. PROJECT WILL CONSIDER ADDING A RIGHT
TURN LANE ON WESTBOUND KY 1065 (OUTER LOOP) AT KY 61
(PRESTON HIGHWAY). (2024CCN)
KY-1065Jefferson PL80303
DN 200,000 SPP
RW 240,000 SPP
UT 240,000 SPP
CN
Project Cost:
0 200,000 480,000
RELOCATE & RECONSTRUCT KY 1531 (JOHNSON ROAD) WITH
I
MPROVED GEOMETRY FROM US 60 (SHELBYVILLE ROAD) TO AIKEN
ROAD. PROJECT WILL CONSIDER A 2 LANE ROAD (NO ADDITIONAL
LANES) AND A 4 TO 6 FOOT SHOULDER. (2024CCN)
KY-1531J efferson PL80304
DN 970,000 SPP
RW 470,000 SPP
UT 240,000 SPP
CN 10,190,000 SPP
Project Cost: 0 970,000 10,900,000
I
MPROVE SAFETY AND REDUCE CONGESTION ON GRADE LANE
FROM KY 1065 (OUTER LOOP) TO KY 1631 (FERN VALLEY ROAD).
PROJECT DESIGN WILL EVALUATE 3-LANE WIDENING WITH
TWO-WAY CENTER TURN LANE AND CONSIDER BICYCLE AND
PEDESTRIAN FACILITIES. (2024CCN)
CR-1001Jefferson PL 185,000 SPP80306
DN 1,200,000 SPP
RW 700,000 SPP
UT
CN
Project Cost:
185,000 1,200,000 700,000
I
MPROVE TRAFFIC OPERATIONS ON KY 22 FROM JUST EAST OF
MURPHY LANE TO HAUNZ LANE. PROJECT DESIGN WILL EVALUATE
3-LANE WIDENING WITH TWOWAY CENTER TURN LANE AND
CONSIDER BICYCLE AND PEDESTRIAN FACILITIES. (2024CCN)
KY-22Jefferson PL80310
DN 650,000 SPP
RW 420,000 SPP
UT 630,000 SPP
CN
Project Cost:
0 650,000 1,050,000
WEST KENTUCKY STREET (CS 1005) MASTER PLAN PROJECT FROM
1
8TH STREET TO 4TH STREET. PROJECT WILL CONSIDER SIDEWALK
IMPROVEMENTS, BICYCLE FACILITIES, IMPROVEMENTS TO THE RAIL
CROSSING AT 15TH STREET, AND THE ADDITION OF STREET TREES.
(2024CCN)
CS-1005J efferson PL80311
DN 520,000 SPP
RW 300,000 SPP
UT 300,000 SPP
CN
Project Cost: 0 520,000 600,000
Page 113 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONGESTION AND SAFETY ISSUES IN THE VICINITY OF
T
HE BRECKENRIDGE LANE (KY 1932) AND DUTCHMANS LANE
INTERSECTION. (2024CCN)
KY-1932Jefferson PL80321
DN 500,000 STPF
RW 300,000 STPF
UT 400,000 STPF
CN
Project Cost: 0 500,000 700,000
T
HIS PROJECT IS A MAJOR COMPLETE STREET RE-DESIGN OF 9TH
STREET JUST WEST OF THE CENTRAL BUSINESS DISTRICT OF
LOUISVILLE FROM THE OHIO RIVER SOUTH TO ITS INTERSECTION
WITH BROADWAY. NINTH STREET WAS ORIGINALLY DESIGNED TO
SERVE AS A FREIGHT ROUTE WITH (2024CCN)
CS-1046,
CS-1176
Jefferson PL80324
DN 2,990,000 SPP
RW 220,000 SPP
UT 390,000 SPP
CN
Project Cost:
0 2,990,000 610,000
SAFETY ANALYSIS OF THE KY 3222 (ROSE ISLAND ROAD)
B
EGINNING IN JEFFERSON COUNTY MILE POINT 0.0-1.0 AND OLDHAM
COUNTY FROM 0.0 TO 3.1 (INTERSECTION OF KY 1793). (2024CCN)
KY-3222J efferson PL 220,000 SPP80330
DN
RW
UT
CN
Project Cost: 0 220,000 0
I
MPROVE SAFETY AND OPERATIONS ON ARNOLDTOWN ROAD
FROM KY 1931 TO KY 907. PROJECT DESIGN WILL EVALUATE 2
LANE ROAD (NO ADDED LANES).KIPDA ID# 249 (2024CCN)
CR-1003Jefferson PL 250,000 SPP80331
DN 2,170,000 SPP
RW
UT
CN
Project Cost:
0 250,000 2,170,000
I
MPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDY
INTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) ADDRESSING
SAFETY AND CONGESTION ISSUES. THE IMPROVEMENTS MAY
INCLUDE BUT ARE NOT LIMITED TO: CONSIDERATION OF
ALTERNATIVE TRANSPORTATION MODES, DEPLOYMENT (2024CCN)
I -64Jefferson PL80334
DN 2,550,000 NH
RW
UT
CN
Project Cost:
0 2,550,000 0
Page 114 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ENHANCE MOBILITY AND PROVIDE SAFE ACCESS TO COMMUNITY
F
ACILITIES ALONG KY 1819 (WATTERSON TRAIL) FROM SKYVIEW
PARK (MP 10.43) TO PLANTSIDE DRIVE (MP 10.79). (2024CCN)
KY-1819Jefferson PL80340
DN 470,000 SPP
RW 40,000 SPP
UT 50,000 SPP
CN
Project Cost: 0 470,000 90,000
R
OADWAY RECONFIGURATION, ONE-WAY TO TWO-WAY
CONVERSION. (2024CCN) (POSSIBLE SLO FUNDING)
US-42Jefferson PL80342
DN 500,000 SPP
RW
UT 2,200,000 SPP
CN
Project Cost: 0 500,000 2,200,000
S
afety improvements on KY 1865 (New Cut Road)/Taylor Boulevard
from MP 0.5 (just south of Old New Cut Road) to MP 5.766 (just north
of the I-264 ramp). (2024CCN)
KY-1865Jefferson PL80352
DN 4,000,000 NH
RW 4,000,000 NH
UT 4,000,000 NH
CN
Project Cost:
0 4,000,000 8,000,000
I
mprovements from Eastern Parkway Transportation Study between
Bardstown Road to Cherokee Park entrance (MP 6.82 -0.322) with a
Memorandum of Agreement with the Louisville Metro Government.
(2024CCN)
US-60Jefferson PL80355
DN 1,130,000 SPP
RW
UT 450,000 SPP
CN
Project Cost:
0 1,130,000 450,000
I
mprovements from Eastern Parkway Transportation Study between
Hahn Street to Concord Drive (MP 3.84-4.15) with a Memorandum of
Agreement with the Louisville Metro Government. (2024CCN)
US-60Jefferson PL80356
DN 990,000 SPP
RW 130,000 SPP
UT
CN
Project Cost:
0 990,000 130,000
T
otal for Jefferson county PL
Total Amounts:
CN
UT
RW
DN
185,000 470,000
14,067,000 67,473,091 27,405,992
1,180,000 8,370,000 17,110,000
3,875,000 3,155,000 35,630,000
244,016,951 188,393,977 293,762,646
263,323,951 267,862,068 373,908,638
Page 115 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
COMPLETE EAST NICHOLASVILLE BYPASS WITH AT GRADE
I
NTERSECTION AT US 27.
KY-169,
PF-9999,
US-27
Jessamine PL87.3500
DN
RW
UT
CN 30,000,000 NH
Project Cost:
0 0 30,000,000
I
MPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND
ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68
(HARRODSBURG RD) TO US 27 (NICHOLASVILLE RD)(12CCR)
(18CCN) (2022CCR) (2024CCR)
KY-1980Jessamine PL414
DN
RW
UT
CN 29,000,000 HGC
Project Cost:
29,000,000 0 0
N
ICHOLASVILLE - MAN-O-WAR BLVD; ACCESS MANAGEMENT ON
US-27 (NICHOLASVILLE RD) FROM NICHOLASVILLE BYPASS TO
JUST SOUTH OF KOHL'S DRIVE.
US-27Jessamine PL430.1000
DN
RW 4,400,000 SPP
UT
CN
Project Cost:
0 0 4,400,000
I
MPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE
COUNTY TO NORTH OF KY-1967 IN WOODFORD COUNTY.
(2024CCN)
KY-169Jessamine PL440
DN 910,000 SPP
RW
UT
CN
Project Cost:
0 0 910,000
R
ECONSTRUCT KY 169 FROM US 68 TO 0.54 MILES NORTH OF
CLEAR CREEK RD (MP 14.448 TO MP 19.00). (16CCN) (2024CCN)
KY-169Jessamine PL8906
DN 3,720,000 SPP
RW
UT
CN
Project Cost: 0 3,720,000 0
Page 116 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE
C
OUNTY TO NORTH OF KY-1967 IN WOODFORD COUNTY.
(2020CCN) (2024CCR)
KY-169Jessamine PL80108
DN
RW 5,640,000 SPP
UT 5,550,000 SPP
CN
Project Cost: 0 0 11,190,000
I
MPROVE SAFETY AND MOBILITY ON NORTH 3RD STREET/KEENE
ROAD FROM OAK ST TO US 27 (NICHOLASVILLE BYPASS) IN
NICHOLASVILLE (2024CCN)
KY-169Jessamine PL80324
DN 1,250,000 SPP
RW
UT
CN
Project Cost:
0 1,250,000 0
R
econstruct KY 169 (Richmond Ave) from proposed East Nicholasville
Byp to US 27X (North Main St). (2024CCN)
KY-169Jessamine PL80325
DN 1,250,000 SPP
RW
UT
CN
Project Cost: 0 1,250,000 0
T
otal for Jessamine county PL
Total Amounts:
CN
UT
RW
DN 6,220,000 910,000
10,040,000
5,550,000
29,000,000 30,000,000
29,000,000 6,220,000 46,500,000
I
MPROVE ROADWAY GEOMETRICS AND CAPACITY FROM GARBAGE
HOLLOW TO EAST OF MILL STREET. (2020CCR) (2022CCR)
(2024CCR)
KY-40Johnson PL149
DN
RW 1,500,000 SPP
UT 1,400,000 SPP
CN
Project Cost:
0 1,500,000 1,400,000
Page 117 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1092 IN JOHNSON COUNTYK Y-1092Johnson PL4391
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-201 IN JOHNSON COUNTYKY-201Johnson PL4392
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-40 IN JOHNSON COUNTYKY-40Johnson PL4393
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
I
NSTALL GUARDRAIL ON KY-580 IN JOHNSON COUNTYKY-580Johnson PL4394
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-3387 IN JOHNSON COUNTYKY-3387Johnson PL4433
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
Page 118 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE ROADWAY GEOMETRICS AND CAPACITY ON KY 40 FROM
K
Y 321 TO GARBAGE HOLLOW (2020CCN) (2022CCR) (2024CCR)
KY-40Johnson PL80100
DN 910,000 SPP
RW 670,000 SPP
UT 7,870,000 SPP
CN
Project Cost: 0 910,000 8,540,000
I
MPROVE US 460 FROM THE INTERSECTION WITH KY 114 TO THE
INTERCHANGE WITH US 23 (2020CCR) (2022CCR) (2024CCR)
US-460Johnson PL80101
DN
RW 1,240,000 SPP
UT 540,000 SPP
CN 43,500,000 SPP
Project Cost: 0 1,780,000 43,500,000
A
DDRESS CONGESTION AND SAFETY ISSUES ON KY 321 FROM THE
6TH STREET TO THE JUNCTION OF KY 321 AND KY 40 (2020CCN)
(SAME AS 12-8102 IN 2020 HIGHWAY PLAN) (2022CCR)
KY-321Johnson PL80116
DN 220,000 SPP
RW
UT 230,000 SPP
CN
Project Cost:
0 220,000 230,000
CONSTRUCT ACCESS ROAD TO PROPOSED JOHNSON COUNTY HIGH
S
CHOOL AND MIDDLE SCHOOL CAMPUS. TO INTERSECT WITH KY 40
AT MILEPOINT 8.85 (2022CCN) (2024CCR)
KY-40,
P
F-9999
Johnson PL80250
DN
RW
UT
CN 8,700,000 SPP
Project Cost: 8,700,000 0 0
T
otal for Johnson county PL
Total Amounts:
CN
UT
RW
DN 1,130,000
2,740,000 670,000
540,000 9,500,000
9,214,000 43,500,000
9,214,000 4,410,000 53,670,000
Page 119 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A COMPANION BRIDGE TO THE EXISTING I-71/75 BRENT
S
PENCE BRIDGE OVER THE OHIO RIVER BETWEEN COVINGTON, KY
AND CINCINNATI, OH. (DEDICATED ADDITIONAL STATE GENERAL
FUNDS) (2024CCR)
CO-0K enton PL17.3100
DN
RW
UT
CN 125,000,000 SGF
Project Cost: 0 125,000,000 0
CONSTRUCTION OF ROADWAY SAFETY IMPROVEMENTS ON KY 371
A
T CHAMBERS OFFICE PARK AND BUTTERMILK SQUARE IN KENTON
COUNTY, KENTUCKY. (2024BOP)
KY-371K enton PL392
DN
RW 530,000 SPP
UT 210,000 SPP
CN 1,200,000 SPP
Project Cost: 0 740,000 1,200,000
I
MPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE
I-275 INTERCHANGE. (18CCR) (2020CCR) (2024CCR)
KY-17Kenton PL449
DN
RW 530,000 STPF
UT 2,080,000 STPF
CN
Project Cost: 0 2,610,000 0
R
educe Congestion along KY 1303 from Dudley Road to I-275.
(2024BOP)
KY-1303Kenton PL450.1000
DN
RW 4,400,000 STPF
UT 2,160,000 STPF
CN
Project Cost: 0 6,560,000 0
R
educe Congestion along KY 1303 from I-275 to US 25. (2024BOP)KY-1303Kenton PL450.2000
DN
RW 1,100,000 SPP
UT 540,000 SPP
CN
Project Cost: 0 1,100,000 540,000
Page 120 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE,
O
RPHANAGE ROAD, AND US 25. FT. MITCHELL WILL PAY $50,000
TOWARD DESIGN. (16CCN)(18CCN) (2020CCR) (2022CCR)
(2024CCR)
US-25Kenton PL8951
DN
RW 18,900,000 SPP
UT 2,500,000 SPP
CN
Project Cost:
0 18,900,000 2,500,000
B
RIDGE PROJECT IN KENTON COUNTY ON (059B00048N) KY 17 AT
OHIO RIVER
KY-17Kenton PL10044
DN 1,920,000 FBP
RW
UT
CN 12,000,000 FBP
Project Cost: 13,920,000 0 0
A
DDRESS CONDITION OF KY-236 FROM MILEPOINT 2.13 TO
MILEPOINT 2.62
KY-236Kenton PL20044
DN 48,000 STP5
RW
UT
CN 552,000 STP5
Project Cost: 0 600,000 0
A
DDRESS CONDITION OF I-075 NON-CARDINAL DIRECTION FROM
MILEPOINT 184.708 TO MILEPOINT 186.95
I -75Kenton PL22130
DN 1,600,000 NHPM
RW
UT
CN 8,400,000 NHPM
Project Cost: 0 0 10,000,000
R
ECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET
TO JACQUELINE DRIVE.(18CCN) (2020CCR) Kenton Co. government
will allocate $250,000 to sanitary sewer and waterline relocation. The
City of Erlanger up to $350,000. The City of Erlanger is es eligible to
apply to SD1 for up to 50% of the total cost of storm water
KY-236Kenton PL80002
DN
RW 8,500,000 HGC
UT 5,500,000 HGC
CN 20,000,000 HGC
Project Cost:
0 14,000,000 20,000,000
Page 121 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN KENTON LANDS ROAD FROM US 25 TO RIGGS ROAD
(
2020CCN) (2022CCR) (2024CCR)
KY-2373Kenton PL80105
DN 3,360,000 SPP
RW
UT
CN
Project Cost: 0 3,360,000 0
R
econstruct KY 536 from KY 16 to Staffordsburg Road. (2024BOP)KY-536Kenton PL80203.1000
DN
R
W 9,200,000 SPP
UT
CN
Project Cost: 0 0 9,200,000
R
econstruct KY 536 from Staffordsburg Road to KY 177. (2024BOP)KY-536Kenton PL80203.2000
DN
R
W 15,530,000 SPP
UT
CN
Project Cost: 0 0 15,530,000
P
rovide connectivity, improve mobility, and reduce congestion along
KY 536 from KY 17 to KY 16; include multi-modes. (2022CCN)
(2024CCR)
KY-536Kenton PL80217
DN
RW 6,830,000 SPP
UT 1,560,000 SPP
CN
Project Cost:
0 6,830,000 1,560,000
R
EHABILITATE/RECONSTRUCT US 25 FROM BUTTERMILK PIKE
(KY371) TO I-75 (MP 8.58 TO MP 9.86) (2022CCN) (2024CCR)
US-25Kenton PL80254
DN
RW 880,000 SPP
UT 2,800,000 SPP
CN
Project Cost: 0 880,000 2,800,000
Page 122 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 16
(
TAYLOR MILL RD) FROM KY 2047 (SENOUR RD) TO KY 536 (HARRIS
PIKE); INCLUDE MULTIMODAL NEEDS. (2024CCN)
KY-16Kenton PL80300
DN 5,400,000 SPP
RW
UT
CN
Project Cost: 0 5,400,000 0
A
ddress safety and mobility along KY 2373 from west intersection of
Amsterdam Road to east intersection of Amsterdam Road. (2024BOP)
KY-2373Kenton PL80305.1000
DN 1,300,000 SPP
RW
UT
CN
Project Cost: 0 1,300,000 0
A
ddress safety and mobility along KY 273 from east intersection of
Amsterdam Road to Hightower Road. (2024BOP)
KY-2373Kenton PL80305.2000
DN 2,600,000 SPP
RW
UT
CN
Project Cost: 0 2,600,000 0
A
DDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 1501
(HANDS PIKE) FROM EDWIN DRIVE TO KY 16. (2024CCN)
KY-1501Kenton PL80307
DN 970,000 SPP
RW
UT
CN
Project Cost: 0 970,000 0
A
DDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 1501
(HANDS PIKE) FROM OTTER TO EDWIN DRIVES. (2024CCN)
KY-1501Kenton PL80308
DN 1,380,000 SPP
RW
UT
CN
Project Cost: 0 1,380,000 0
Page 123 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT I-75 INTERCHANGE AT KY 236 (DONALDSON
H
IGHWAY). (2024CCN)
I -75Kenton PL80309
DN 3,240,000 NH
RW
UT
CN
Project Cost: 0 0 3,240,000
T
otal for Kenton county PL
Total Amounts:
CN
UT
RW
DN 1,920,000 15,058,000 4,840,000
41,670,000 24,730,000
9,950,000 7,400,000
12,000,000 125,552,000 29,600,000
13,920,000 192,230,000 66,570,000
E
liminate rockfall hazards from kY 2029 to Rock Fork Road.KY-80Knott PL158
DN
RW 250,000 PROT
UT 710,000 PROT
CN 6,090,000 PROT
Project Cost: 960,000 6,090,000 0
I
NSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYKY-1088Knott PL4323
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYKY-1088Knott PL4324
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
Page 124 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-160 IN KNOTT COUNTYK Y-160Knott PL4357
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-1088 IN KNOTT COUNTYKY-1088Knott PL4375
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-3391 IN KNOTT COUNTYKY-3391Knott PL4376
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-550 IN KNOTT COUNTYKY-550Knott PL4377
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
NSTALL GUARDRAIL ON KY-582 IN KNOTT COUNTYKY-582Knott PL4378
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
Page 125 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-2102 IN KNOTT COUNTYK Y-2102Knott PL4395
DN
RW
UT
CN 200,000 GR
Project Cost: 200,000 0 0
I
NSTALL GUARDRAIL ON KY-2102 IN KNOTT COUNTYKY-2102Knott PL4396
DN
RW
UT
CN 140,000 GR
Project Cost: 140,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN KNOTT COUNTYKY-7Knott PL4397
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN KNOTT COUNTYKY-7Knott PL4398
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-3391 IN KNOTT COUNTYKY-3391Knott PL4434
DN
RW
UT
CN 52,000 GR
Project Cost: 52,000 0 0
Page 126 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-582 IN KNOTT COUNTYK Y-582Knott PL4435
DN
RW
UT
CN 22,000 GR
Project Cost: 22,000 0 0
NEW CONSTRUCTION OF ONE MILE STRETCH OF KY-1231 BEGINNING
A
T BRIDGE AFTER LEAVING KY-550. (04CCN)(06CCR)(08CCR)
(10CCR)(12CCR) (2020CCN)
KY-1231K nott PL8200
DN
RW
UT
CN 5,320,000 SPP
Project Cost: 0 5,320,000 0
ADDRESS CONDITION OF HAL ROGERS PARKWAY FROM MILEPOINT
7
2.184 TO MILEPOINT 75.113.
HR-9006K nott PL20011
DN 60,000 STP4
RW
UT
CN 1,100,000 STP4
Project Cost: 0 1,160,000 0
ADDRESS CONDITION OF HAL ROGERS PARKWAY FROM MILEPOINT
8
0.340 TO MILEPOINT 83.166.
HR-9006K nott PL20012
DN 60,000 STP4
RW
UT
CN 1,150,000 STP4
Project Cost: 0 1,210,000 0
E
liminate rockfall hazards 0.2 mile west of Intersection of KY 1087 &
KY 80. (2024CCN)
KY-80Knott PL80301
DN 540,000 SPP
RW 180,000 SPP
UT 730,000 SPP
CN
Project Cost: 0 540,000 910,000
Page 127 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve roadway geometrics along KY 899 from end of prior
c
onstruction near Pippa Passes to the bottom of the hill at Short
Branch. (2024CCN)
KY-899Knott PL80302
DN 590,000 SPP
RW 350,000 SPP
UT 380,000 SPP
CN
Project Cost: 0 590,000 730,000
I
mprovements to the visibility at the intersection of KY 15 and KY 1231
(Big Branch Rd.) around Carr Fork Lake. (2024CCN)
KY-15Knott PL80303
DN 40,000 SPP
RW
UT 100,000 SPP
CN 100,000 SPP
Project Cost: 0 40,000 200,000
A
ddress safety, congestion, and geometrics from KY 899 to KY 3391.
(2024CCN)
KY-160Knott PL80304
DN 1,190,000 SPP
RW
UT
CN
Project Cost: 0 1,190,000 0
C
urve revision 3.654 miles east of intersection of KY 3209 & KY 1087.
(2024CCN)
KY-1087Knott PL80305
DN 240,000 SPP
RW 240,000 SPP
UT 120,000 SPP
CN
Project Cost: 0 240,000 360,000
I
mprove horizontal and vertical roadway geometry to eliminate the
substandard curve and increase sight distance on KY 1098 (MP
10.5-11.0) (2024CCN)
KY-1098Knott PL80350
DN 420,000 SPP
RW 100,000 SPP
UT
CN
Project Cost:
0 420,000 100,000
Page 128 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Eliminate rockfall hazards along Hal Rogers Parkway (old KY-80) from
M
P 78.27 to 79.59. (2024CCN)
HR-9006Knott PL80354
DN 500,000 SPP
RW 150,000 SPP
UT
CN
Project Cost: 0 500,000 150,000
T
otal for Knott county PL
Total Amounts:
CN
UT
RW
DN 3,640,000
250,000 1,020,000
710,000 1,330,000
1,084,000 13,660,000 100,000
2,044,000 17,300,000 2,450,000
D
rainage Improvements along KY 312 (Master Street) from MP 0 to MP
0.90 in Know County at Corbin, Kentucky. (2022BOP) (2024CCN)
KY-312Knox PL182
DN
RW 750,000 SPP
UT 1,000,000 SPP
CN 4,160,000 SPP
Project Cost: 0 1,750,000 4,160,000
I
NSTALL GUARDRAIL ON KY-11 IN KNOX COUNTYKY-11Knox PL4373
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-3438 IN KNOX COUNTYKY-3438Knox PL4379
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
Page 129 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-11 IN KNOX COUNTYK Y-11Knox PL4405
DN
RW
UT
CN 29,000 GR
Project Cost: 29,000 0 0
I
MPROVE SAFETY OF INTERSECTION AT US 25E AND KY 3439 AND
PROVIDE SIDEWALKS TO AN AREA FREQUENTED BY PEDESTRIANS
(MP 0.0 - MP 0.9) (2022CCR) (2024CCR)
KY-3439Knox PL8857
DN
RW
UT
CN 2,920,000 SPP
Project Cost: 0 2,920,000 0
B
RIDGE PROJECT IN KNOX COUNTY ON (061C00073N) CR-1532 AT
STINKING CREEK
CR-1532Knox PL10205
DN
RW 10,000 FBP2
UT 10,000 FBP2
CN 894,355 FBP2
Project Cost: 0 0 914,355
I
MPROVE SAFETY, ADDRESS GEOMETRIC DEFICIENCIES AND
PROVIDE FLOOD MITIGATION ON KY 1487 (MANCHESTER STREET)
FROM JUDGE STREET TO US 25E (2020CCN) (2022CCR) (2024CCR)
KY-1487Knox PL80155
DN
RW
UT
CN 7,800,000 SPP
Project Cost:
0 7,800,000 0
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG
N
KY 830 FROM US 25E TO KY 1629 INCLUDING WIDENING AND NEW
TURNING LANES (2020CCN) (2024CCR)
KY-830K nox PL80156
DN
RW 350,000 SPP
UT 1,250,000 SPP
CN 2,080,000 SPP
Project Cost: 0 1,600,000 2,080,000
Page 130 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and access along KY 11 by raising roadway above
Fl
ood X elevation. (2022CCN) (2024CCR)
KY-11Knox PL80203
DN
RW 210,000 PROT
UT 1,400,000 PROT
CN 4,890,000 PROT
Project Cost: 1,610,000 4,890,000 0
W
iden Richland Creek Road from US 25E a distance of 0.70 miles
(2024CCN)
CR-1311Knox PL80311
DN 780,000 SPP
RW 250,000 SPP
UT 1,500,000 SPP
CN
Project Cost: 0 780,000 1,750,000
C
onstruct a new route north off of CS 2054 (Opportunity Drive) along
the former RR track bed approximately 0.7 miles to KY 830 (2024CCN)
PF-9999Knox PL80361
DN
RW
UT
CN 1,400,000 SPP
Project Cost: 0 1,400,000 0
T
otal for Knox county PL
Total Amounts:
CN
UT
RW
DN 780,000
210,000 1,100,000 260,000
1,400,000 2,250,000 1,510,000
79,000 17,010,000 7,134,355
1,689,000 21,140,000 8,904,355
A
DDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84
FROM KY 357 TO KY 61 (LINCOLN PARKWAY) NEAR HODGENVILLE
(2020CCR) (2022CCR) (2024CCR)
KY-84Larue PL8909
DN 840,000 SPP
RW 790,000 SPP
UT
CN
Project Cost:
0 840,000 790,000
Page 131 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Larue county P L
Total Amounts:
CN
UT
RW
DN 840,000
790,000
0 840,000 790,000
R
EDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069;
IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229;
IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH TO KY-192;
AND IMPROVE ACCESS TO THE SCHOOL FROM KY-192 BYPASS.
(06CCR)(10CCR)(12CCR)(14CCR) (2020CCR) (2022CCR) (2024CCR)
US-25Laurel PL147
DN
RW
UT
CN 66,215,000 HGC
Project Cost:
66,215,000 0 0
I
mprove Rudy Bear Road and KY 3007 from KY 80 South to KY 3432
West of I-75. (2022CCR) (2024CCR)
CO-0Laurel PL169
DN 250,000 SPP
RW 2,500,000 SPP
UT 1,500,000 SPP
CN 7,600,000 SPP
Project Cost: 250,000 4,000,000 7,600,000
E
XPAND TRUCK PARKING AT I-75 NB TRUCK REST HAVEN.I -75Laurel PL179
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
E
XPAND TRUCK PARKING AT I-75 SB TRUCK REST HAVEN.I -75Laurel PL180
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
Page 132 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-2041 IN LAUREL COUNTYK Y-2041Laurel PL4380
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4381
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4382
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-312 IN LAUREL COUNTYKY-312Laurel PL4383
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-363 IN LAUREL COUNTYKY-363Laurel PL4407
DN
RW
UT
CN 142,000 GR
Project Cost: 142,000 0 0
Page 133 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM
K
Y-1006 TO US-25E. (08CCN) (2024CCR)
US-25Laurel PL8515
DN
RW 2,000,000 STP1
UT
CN
Project Cost: 0 0 2,000,000
R
EPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045)
(AREA ADJACENT TO FARISTON INDUSTRIAL PARK WITH NEW
ROADWAY ALIGNMENT). (14CCN)(18CCN)
CR-1221Laurel PL8811
DN
RW
UT
CN 1,830,000 SPP
Project Cost:
0 1,830,000 0
I
MPROVE THE HAL ROGERS PARKWAY TO INTERSTATE
STANDARDS FROM 4.0 MI EAST OF KY 192 TO LAUREL/CLAY CO.
LINE. (I-75 TO HAZARD) (16CCN)(18CCR) (2024CCR)
HR-9006Laurel PL8909
DN 1,170,000 NH
RW
UT
CN
Project Cost:
0 0 1,170,000
B
RIDGE PROJECT IN LAUREL COUNTY ON (063B00004N) KY-490 AT
ROCKCASTLE RIVER
KY-490Laurel PL10042
DN 482,051 BRZ
RW
UT
CN 3,213,675 BRZ
Project Cost: 0 3,695,726 0
A
DDRESS CONDITION OF KY-192 FROM MILEPOINT 20.2 TO
MILEPOINT 22.041
KY-192Laurel PL20038
DN 440,000 STP4
RW
UT
CN 5,060,000 STP4
Project Cost: 5,500,000 0 0
Page 134 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS ACCESS AND SAFETY ISSUES AT THE INTERSECTION OF
K
Y 80 AND PAYNE TRAIL AND BUSH ELEMENTARY SCHOOL BY
CONSTRUCTING A CONNECTOR ROAD FROM HAL ROGERS
PARKWAY (HR 9006) TO KY 6264 (PAYNE TRAIL). (2020CCN)
(2022CCN)
HR-9006Laurel PL80154
DN 120,000 SPP
RW 890,000 SPP
UT 40,000 SPP
CN
Project Cost:
0 120,000 930,000
C
onstruct 3 new left turn lanes between milepoints 7.615 and 7.994.
(2022CCN)
US-25Laurel PL80205
DN
RW
UT
CN 370,000 SPP
Project Cost: 370,000 0 0
I
mprove the geometrics of a curve, widen a drainage structure, and
provide turn lanes to Johnson Elementary School on KY 638
(2024CCN)
KY-638Laurel PL80312
DN 210,000 SPP
RW 1,060,000 SPP
UT 710,000 SPP
CN
Project Cost:
0 210,000 1,770,000
W
iden KY 192 from Mallard Drive to Esquire Lane, address horizontal
and vertical alignment as needed (MP 16.61 - 18.08) (2024CCN)
KY-192Laurel PL80357
DN 1,300,000 SPP
RW
UT
CN
Project Cost: 0 1,300,000 0
T
otal for Laurel county PL
Total Amounts:
CN
UT
RW
DN 690,000 2,112,051 1,170,000
2,500,000 3,950,000
1,500,000 750,000
74,187,000 5,043,675 7,600,000
74,877,000 11,155,726 13,470,000
Page 135 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve KY-32 from Elliott C/L to Yatesville Lake reconstruction
s
ection for better access to Yatesville Lake and to improve safety.
See Elliott County listing for continuation of project to KY-7 @ Sandy
Hook. (2024CCN)
KY-32Lawrence PL156
DN 1,760,000 SPP
RW
UT
CN
Project Cost:
0 1,760,000 0
I
NSTALL GUARDRAIL ON KY-644 IN LAWRENCE COUNTYKY-644Lawrence PL4399
DN
RW
UT
CN 80,000 GR
Project Cost: 80,000 0 0
I
NSTALL GUARDRAIL ON KY-644 IN LAWRENCE COUNTYKY-644Lawrence PL4400
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-1690 IN LAWRENCE COUNTYKY-1690Lawrence PL4436
DN
RW
UT
CN 74,000 GR
Project Cost: 74,000 0 0
B
RIDGE PROJECT IN LAWRENCE COUNTY ON (064B00038N) KY-644
AT LEVISA FORK
KY-644Lawrence PL10016
DN 683,372 BRX
RW
UT
CN 4,555,811 BRX
Project Cost: 0 0 5,239,183
Page 136 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF KY-201 FROM MILEPOINT 5 TO MILEPOINT
1
0.9
KY-201Lawrence PL22352
DN 80,000 NHPM
RW
UT
CN 640,000 NHPM
Project Cost: 0 0 720,000
R
EPAVE KY 201 FROM MP 5.0 TO 10.9 (2020CCN)KY-201Lawrence PL80103
DN
RW
UT
CN 675,000 STP4
Project Cost: 675,000 0 0
R
EPAVE KY 32 FROM MP 21.0 TO 23.0 (2020CCN)KY-32Lawrence PL80104
DN
RW
UT
CN 340,000 STP4
Project Cost: 340,000 0 0
R
EPAVE ROUTE 3 SOUTH FROM MP 12.58 TO MP 0 AND PLACE
GUARD RAILS ON FALLS HILL (2020CCN) (2022CCR)
KY-3Lawrence PL80105
DN
RW
UT
CN 1,700,000 SPP
Project Cost: 0 1,700,000 0
R
EPAVE KY 1690 FROM MP 4.3 TO MP 6.3 AND PLACE GUARD RAILS
ON RICHARDSON HILL (2020CCN)
KY-1690Lawrence PL80107
DN
RW
UT
CN 200,000 SPP
Project Cost: 0 200,000 0
Page 137 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
PLACE LIGHTING AT INTERSECTION OF KY 644 AND KY 2565
(
2020CCN) (2024CCN)
KY-644Lawrence PL80108
DN 30,000 SPP
RW
UT 20,000 SPP
CN 200,000 SPP
Project Cost: 0 30,000 220,000
I
mprove KY-1 from the Johnson C/L to KY-3 to eliminate dangerous
curves and address safety. (2024CCN)
KY-1Lawrence PL80306
DN 1,000,000 SPP
RW
UT
CN
Project Cost: 0 0 1,000,000
C
orrect substandard roadway geometrics and address safety issues
on KY-201/KY-32 from Johnson C/L to KY-1 for safety. (2024CCN)
KY-201Lawrence PL80307
DN 7,280,000 SPP
RW
UT
CN
Project Cost: 0 0 7,280,000
I
MPROVE/WIDEN KY-3398 FROM KY-3 @ FALLSBURG TO US-23 @
FULLERS TO IMPROVE SAFETY AND TO ACCOMMODATE
RESIDENTIAL GROWTH AND RECREATIONAL VEHICLES IN THIS
AREA. (2024CCN)
KY-3398Lawrence PL80310
DN 840,000 SPP
RW
UT
CN
Project Cost:
0 840,000 0
T
otal for Lawrence county PL
Total Amounts:
CN
UT
RW
DN 2,630,000 9,043,372
20,000
1,269,000 1,900,000 5,395,811
1,269,000 4,530,000 14,459,183
Page 138 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Rockfall Mitigation on KY 52 near Beattyville from MP 12.8 to MP 13.4 in
L
ee County. (To seek future federal Protect funds)
KY-52Lee PL5017
DN
RW 870,000 PROT
UT 120,000 PROT
CN
Project Cost: 0 990,000 0
B
RIDGE PROJECT IN LEE COUNTY ON (065C00024N) SILVER CREEK
RD AT SILVER CREEK
CS-1005Lee PL10051
DN 70,910 BRX
RW
UT
CN 472,731 BRX
Project Cost: 0 0 543,641
R
ECONSTRUCT ALONG KY 399 BETWEEN MP 5.75 AND 6.2
(2020CCN) (2022CCR)
KY-399Lee PL80104
DN
RW 220,000 SPP
UT 110,000 SPP
CN
Project Cost: 0 330,000 0
R
econstruct KY 11 from 0.5 miles south of KY 587 to 0.65 miles north
of KY 52 in Beattyville (MP 1.082 - 4.798) (2024CCN)
KY-11Lee PL80351
DN 2,700,000 STPF
RW
UT
CN
Project Cost: 0 0 2,700,000
T
otal for Lee county PL
Total Amounts:
CN
UT
RW
DN 2,770,910
1,090,000
230,000
472,731
0 1,320,000 3,243,641
Page 139 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON US-421 IN LESLIE COUNTYU S-421Leslie PL4320
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON US-421 IN LESLIE COUNTYUS-421Leslie PL4408
DN
RW
UT
CN 99,000 GR
Project Cost: 99,000 0 0
C
ONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL
ROGERS PARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)(18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-1482Leslie PL8516
DN 320,000 SPP
RW 1,230,000 SPP
UT 520,000 SPP
CN
Project Cost: 0 320,000 1,750,000
C
ONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH
KY 80. (16CCN)(18CCN) (2022CCR)
US-421Leslie PL8951
DN
RW 140,000 SPP
UT 310,000 SPP
CN 1,360,000 SPP
Project Cost: 0 450,000 1,360,000
A
DDRESS DEFICIENCIES OF BRIDGE ON KY-1780 OVER MID-FK KY
RVR (066B00026N)
KY-1780Leslie PL10254
DN 205,820 BRZ
RW
UT
CN 1,372,134 BRZ
Project Cost: 0 0 1,577,954
Page 140 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SAFETY IMPROVEMENTS ON KY 3424 FROM MP 1.1 TO MP 1.5.
(
18CCN)
KY-3424Leslie PL80002
DN
RW
UT
CN 1,360,000 SPP
Project Cost: 0 1,360,000 0
I
NSTALL NEW GUARDRAIL ON KY 2009 FROM MP 13.418 TO MP
14.767.(18CCN)
KY-2009Leslie PL80003
DN
RW
UT
CN 560,000 SPP
Project Cost: 0 560,000 0
I
NSTALL NEW GUARDRAIL ON KY 1482 FROM MP 0 TO MP 1.9.
(18CCN)
KY-1482Leslie PL80004
DN
RW
UT
CN 120,000 SPP
Project Cost: 0 120,000 0
I
NSTALL NEW GUARDRAIL ON KY 257 FROM MP 5.723 TO MP 5.853.
(18CCN)
KY-257Leslie PL80005
DN
RW
UT
CN 40,000 SPP
Project Cost: 0 40,000 0
I
NSTALL NEW GUARDRAIL ON KY 1807 FROM MP 0.914 TO MP 1.256.
(18CCN)
KY-1807Leslie PL80006
DN
RW
UT
CN 60,000 SPP
Project Cost: 0 60,000 0
Page 141 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
GUARD RAIL INSTALLATION ON BULL SKIN RD MP 1.582 TO MP 2
(
2020CCN) (2024CCR)
KY-1482Leslie PL80108
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
G
UARD RAIL INSTALLATION ON WOOTEN RD FROM MP 0.089 TO MP
3.567 AS NEEDED (2020CCN) (2024CCR)
KY-1807Leslie PL80109
DN
RW
UT
CN 180,000 GR
Project Cost: 180,000 0 0
T
otal for Leslie county PL
Total Amounts:
CN
UT
RW
DN 320,000 205,820
140,000 1,230,000
310,000 520,000
389,000 2,140,000 2,732,134
389,000 2,910,000 4,687,954
I
MPROVE US-119 FROM KY-2034/COUGAR DRIVE TO BRASS DRIVE
(MP 16.731 TO 17.740). THROUGH MAYKING (MP 19.925 TO 20.6)
AND AUXILIARY LANE (MP 22.0 TO 22.75) (16CCN)(SEE 12-199.10
FOR D, R, U) (18CCR) (2022CCR) (2024CCR)
US-119Letcher PL199.1500
DN
RW
UT
CN 17,400,000 NH
Project Cost:
17,400,000 0 0
R
ECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO
KY-932. 2012BOP (2024CCN)
PF-9999,
US-119
Letcher PL311.8000
DN
RW 3,420,000 APD
UT 400,000 APD
CN 46,000,000 APD
Project Cost:
0 3,820,000 46,000,000
Page 142 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety along US 119 from bottom (North side) of Pine Mountain
t
o intersection with KY 15 at Whitesburg (MP 14.1-15.8) (2024CCN)
US-119Letcher PL311.9000
DN 1,560,000 APD
RW 1,500,000 APD
UT 2,000,000 APD
CN 15,000,000 APD
Project Cost: 1,560,000 3,500,000 15,000,000
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4327
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-588 IN LETCHER COUNTYKY-588Letcher PL4344
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4345
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYKY-1103Letcher PL4358
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
Page 143 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYK Y-1103Letcher PL4359
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4360
DN
RW
UT
CN 170,000 GR
Project Cost: 170,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4361
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4362
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-588 IN LETCHER COUNTYKY-588Letcher PL4380
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
Page 144 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1103 IN LETCHER COUNTYK Y-1103Letcher PL4402
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4403
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-932 IN LETCHER COUNTYKY-932Letcher PL4404
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYKY-317Letcher PL4437
DN
RW
UT
CN 107,000 GR
Project Cost: 107,000 0 0
I
NSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYKY-317Letcher PL4438
DN
RW
UT
CN 88,000 GR
Project Cost: 88,000 0 0
Page 145 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-317 IN LETCHER COUNTYK Y-317Letcher PL4439
DN
RW
UT
CN 57,000 GR
Project Cost: 57,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4440
DN
RW
UT
CN 94,000 GR
Project Cost: 94,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4441
DN
RW
UT
CN 67,000 GR
Project Cost: 67,000 0 0
I
NSTALL GUARDRAIL ON KY-7 IN LETCHER COUNTYKY-7Letcher PL4442
DN
RW
UT
CN 53,000 GR
Project Cost: 53,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4443
DN
RW
UT
CN 59,000 GR
Project Cost: 59,000 0 0
Page 146 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYK Y-931Letcher PL4444
DN
RW
UT
CN 66,000 GR
Project Cost: 66,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4445
DN
RW
UT
CN 41,000 GR
Project Cost: 41,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4446
DN
RW
UT
CN 75,000 GR
Project Cost: 75,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4447
DN
RW
UT
CN 54,000 GR
Project Cost: 54,000 0 0
I
NSTALL GUARDRAIL ON KY-931 IN LETCHER COUNTYKY-931Letcher PL4448
DN
RW
UT
CN 25,000 GR
Project Cost: 25,000 0 0
Page 147 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS
A
ND IMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN
MP 9.176 AND MP 9.247.
KY-805L etcher PL8702
DN
RW
UT
CN 1,250,000 STP2
Project Cost: 0 1,250,000 0
IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS
A
ND IMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN
MP 8.554 AND MP 9.176. (2024CCN)
KY-805L etcher PL8702.1000
DN 250,000 SPP
RW 2,090,000 SPP
UT 530,000 SPP
CN
Project Cost: 0 250,000 2,620,000
B
RIDGE PROJECT IN LETCHER COUNTY ON (067B00053N) KY-931 AT
N FORK KENTUCKY RIVER
KY-931Letcher PL10119
DN
RW 75,000 FBP2
UT 250,000 FBP2
CN 1,777,613 FBP2
Project Cost: 0 2,102,613 0
B
RIDGE PROJECT IN LETCHER COUNTY ON (067B00094N) KY-2036
AT ROCKHOUSE CREEK
KY-2036Letcher PL10122
DN
RW 54,000 BRX
UT 164,000 BRX
CN 1,574,580 BRX
Project Cost: 0 0 1,792,580
I
NSTALL A LEFT TURN AT INTERSECTION OF KY 15 AND KY 3401
(2020CCN) (2022CCR)
KY-3401Letcher PL80114
DN
RW
UT
CN 1,250,000 SPP
Project Cost: 0 1,250,000 0
Page 148 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL A GUARD RAIL ON KY 463 NEAR GORDON PARK
(
2020CCN)
KY-463Letcher PL80115
DN
RW
UT
CN 11,000 GR
Project Cost: 11,000 0 0
S
pot improvements along KY 113 from KY 2545 to Landfill Rd where
the Letcher County Transfer Station is located. (2022CCN)
KY-113Letcher PL80200
DN
RW 390,000 STP2
UT 370,000 STP2
CN 1,410,000 STP2
Project Cost: 390,000 370,000 1,410,000
T
otal for Letcher county PL
Total Amounts:
CN
UT
RW
DN 1,560,000 250,000
390,000 4,995,000 2,144,000
3,020,000 694,000
19,247,000 4,277,613 63,984,580
21,197,000 12,542,613 66,822,580
N
EW ROUTE FROM VANCEBURG TO KY-59 FROM POLLITT LANE IN
VANCEBURG (ALT. 5B1-2 PER PLANNING STUDY). (2020CCR)
(2022CCR) (2024CCR)
KY-59Lewis PL231
DN
RW 3,450,000 SPP
UT
CN
Project Cost:
0 0 3,450,000
R
ECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICK
ROAD.(16CCN)(18CCN)
KY-8Lewis PL8806.1000
DN 2,800,000 SPP
RW
UT
CN
Project Cost: 0 0 2,800,000
Page 149 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE
(
14CCN) (16CCR) (18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-57Lewis PL8807
DN
RW 7,480,000 SPP
UT 4,480,000 SPP
CN
Project Cost: 0 7,480,000 4,480,000
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 1068 OVER LAUREL
FORK (068B00058N)
KY-1068Lewis PL10099
DN 135,373 BRZ
RW
UT
CN 902,486 BRZ
Project Cost: 0 1,037,859 0
C
ONSTRUCT RIGHT AND LEFT TURN LANES AT THE INTERSECTION
OF KY 989 (MP18.553) TO IMPROVE SAFETY AND DECREASE
COLLISIONS. (2022CCN)
KY-9Lewis PL80251
DN 270,000 SPP
RW 280,000 SPP
UT 380,000 SPP
CN
Project Cost:
0 270,000 660,000
C
onstruct left and right turning lanes from KY 10 (AA Highway) onto
KY 1306 (MP 11.9 - 12.3) (2024CCN)
KY-10Lewis PL80354
DN 330,000 SPP
RW 240,000 SPP
UT
CN 2,100,000 SPP
Project Cost: 0 330,000 2,340,000
T
otal for Lewis county PL
Total Amounts:
CN
UT
RW
DN 735,373 2,800,000
7,480,000 3,970,000
4,860,000
902,486 2,100,000
0 9,117,859 13,730,000
Page 150 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN LINCOLN COUNTY ON (069B00068N) KY-3246
A
T FALL LICK CREEK
KY-3246Lincoln PL10055
DN 113,937 BRX
RW
UT
CN 759,580 BRX
Project Cost: 0 0 873,517
A
DDRESS CONDITION OF US-27 FROM MILEPOINT 17.526 TO
MILEPOINT 18.155
US-27Lincoln PL20016
DN 120,000 STP5
RW
UT
CN 1,380,000 STP5
Project Cost: 0 1,500,000 0
N
EW TURNING LANE AT ARCADIA VIEW DRIVE(18CCN) (2020CCR)US-127Lincoln PL80000
DN 350,000 SPP
RW 210,000 SPP
UT 300,000 SPP
CN
Project Cost: 0 350,000 510,000
I
NSTALL GUARD RAIL ON GOSHEN RD AT DIX RIVER BRIDGE
(2020CCN) (2024CCR)
CR-1043Lincoln PL80110
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
C
ontinue ongoing improvements to US 27 Corridor from Somerset to
Lexington. Improve Level of Service and safety on US 27 from KY 328
to KY 501 in Lincoln County. (2022CCN) (2024CCR)
US-27Lincoln PL 400,000 NH80201
DN 2,680,000 NH
RW
UT
CN
Project Cost:
400,000 0 2,680,000
Page 151 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCTION TO MITIGATE ROCKSLIDE DAMAGE ON KY 300
(
2022CCN) (2024CCR)
KY-300Lincoln PL80202
DN 700,000 SPP
RW 530,000 SPP
UT 320,000 SPP
CN
Project Cost: 0 700,000 850,000
I
mprove Safety and Access Control along US 150 from Danville to
Stanford. (2024CCN)
US-150Lincoln PL80300
DN 1,500,000 NH
RW
UT
CN
Project Cost: 0 1,500,000 0
T
otal for Lincoln county PL
Total Amounts:
CN
UT
RW
DN
400,000
2,670,000 2,793,937
740,000
620,000
30,000 1,380,000 759,580
430,000 4,050,000 4,913,517
PADUCAH-HENDERSON; RELOCATE US-60 FROM EAST OF THE
T
ENNESSEE RIVER BRIDGE TO EAST OF RUDD-SPEES ROAD (00CCR)
(12CCR)(14CCR) (2020CCR) (2024CCR)
US-60L ivingston PL330
DN
RW
UT 3,240,000 SPP
CN 12,960,000 SPP
Project Cost: 0 3,240,000 12,960,000
T
otal for Livingston county PL
Total Amounts:
CN
UT
RW
DN
3,240,000
12,960,000
0 3,240,000 12,960,000
Page 152 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING
R
AILROAD BETWEEN STOCKYARDS AND INDUSTRIAL PARK.
(16CCN)(18CCN) (2020CCR)
KY-2349Logan PL8908
DN 100,000 SPP
RW 120,000 SPP
UT 170,000 SPP
CN
Project Cost: 0 100,000 290,000
W
IDEN US-79 FROM TODD COUNTY LINE TO INTERSECTION WITH
RUSSELLVILLE BYPASS.(18CCN) (2020CCR) (2022CCR) (2024CCN)
US-79Logan PL80050
DN 11,370,000 NH
RW
UT
CN
Project Cost: 0 11,370,000 0
I
MPROVE SAFETY AT THE INTERSECTION OF US 431 AND KY 663.
(2024CCN)
US-431Logan PL80314
DN 400,000 SPP
RW 200,000 SPP
UT 250,000 SPP
CN
Project Cost: 0 400,000 450,000
T
otal for Logan county PL
Total Amounts:
CN
UT
RW
DN 11,870,000
320,000
420,000
0 11,870,000 740,000
A
DD RESTROOM FACILITY TO I-24 EASTBOUND & WESTBOUND
WEIGH STATIONS IN LYON COUNTY (DESIGN FUNDS AUTHORIZED
UNDER ITEM NO. 99-44.00)
I -24Lyon PL7
DN
RW
UT
CN 2,060,000 NH
Project Cost: 2,060,000 0 0
Page 153 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF
T
HE LYON/CALDWELL COUNTY LINE (2020CCR) (2022CCR)
(2024CCR)
US-62,
US-641
Lyon PL187.5000
DN
RW
UT 2,080,000 STPF
CN 5,000,000 STPF
Project Cost:
2,080,000 0 5,000,000
B
RIDGE PROJECT IN LYON COUNTY ON (072B00047N) KY-903 AT I
24 @ MP. 51.718
KY-903Lyon PL10158
DN 74,852 FBP2
RW
UT
CN 499,016 FBP2
Project Cost: 0 0 573,868
A
DDRESS DEFICIENCIES ON BRIDGE ON KY-819 OVER PANTHER
CREEK (072B00031N)
KY-819Lyon PL10197
DN 137,213 FBP
RW
UT
CN 914,756 FBP
Project Cost: 0 1,051,969 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 68.084 (68.116
NON-CARDINAL) TO MILEPOINT 71.818 (71.786 CARDINAL)
I -69Lyon PL22077
DN 310,000 NHPM
RW
UT
CN 3,151,869 NHPM
Project Cost: 0 3,461,869 0
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 71.786 (71.818
NON-CARDINAL) TO MILEPOINT 73.694
I -69Lyon PL22078
DN 410,000 NHPM
RW
UT
CN 4,090,000 NHPM
Project Cost: 4,500,000 0 0
Page 154 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ON US 62 WHERE THE P&L RAIL OVERPASS MEETS THE TWO (2) KY
8
10 INTERSECTIONS, RECONSTRUCT US 62/KY 810 (NORTH AND
SOUTH) INTERSECTIONS WITH TURN LANES OR OTHER MEASURE TO
IMPROVE LINE OF SIGHT AND SAFETY ISSUES. (2024CCN)
US-62L yon PL80312
DN 780,000 SPP
RW 450,000 SPP
UT
CN
Project Cost: 0 780,000 450,000
T
otal for Lyon county PL
Total Amounts:
CN
UT
RW
DN 410,000 1,227,213 74,852
450,000
2,080,000
6,150,000 4,066,625 5,499,016
8,640,000 5,293,838 6,023,868
I
ntersection Improvements at Barnes Mill Road (KY 876) and Goggins
Lane (CR 1303).
KY-876Madison PL4702
DN
RW 240,000 SPP
UT 480,000 SPP
CN 1,352,000 SPP
Project Cost: 240,000 480,000 1,352,000
P
ROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO
THE MADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881
MP.783-MP 2.780), JOHN BALLARD RD (KY 2877 MP0-MP.806 & CR
1236 MP0-MP.429) FROM MENELAUS TO AIRPORT RD, & A NEW
BRIDGE OVER SILVER CR.(14CCN)(16CCR) (2020CCR) (2022CCR)
CR-1236,
KY-2877,
KY-2881
Madison PL8853
DN
RW
UT
CN 17,830,000 HGC
Project Cost:
0 17,830,000 0
E
XTEND BOGGS LN TO CONNECT TO PAVILION WAY (2020CCN)
(2022CCR) (2024CCR)
CR-1200,
CS-1526
Madison PL80110
DN 330,000 SPP
RW
UT
CN
Project Cost:
0 0 330,000
Page 155 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
New road that extends from Menelaus Road (KY 1983) at existing MP
2
.851 to Mayde Road in Berea. (2022CCN) (2024CCR)
KY-1983,
PF-9999
Madison PL80201
DN
RW
UT
CN 4,330,000 SPP
Project Cost:
4,330,000 0 0
R
econstruct KY 21 from KY 1617 to US 421. (2024CCN)KY-21Madison PL80314
DN 1,560,000 SPP
RW
UT
CN
Project Cost: 0 1,560,000 0
I
mprove capacity on Barnes Mill Road between Goggins Lane and the
I-75 interchange. Improvements to also include the intersection with
Goggins Lane (2024CCN)
KY-876Madison PL80315
DN 1,820,000 SPP
RW 1,000,000 SPP
UT 1,600,000 SPP
CN
Project Cost:
0 1,820,000 2,600,000
N
ew construction/modification of the I-75 exit 87 interchange as
referenced in the West Richmond Small Urban Area Study (2024CCN)
I -75Madison PL80316
DN
RW 193,000 NH
UT
CN
Project Cost: 0 0 193,000
SCOPING STUDY TO EVALUATE THE FEASIBILITY OF EXTENDING THE
B
EREA BYPASS FROM KY 21 IN EASTERN BEREA TO US 25 SOUTH
OF BEREA IN MADISON COUNTY. (2024CCN)
PF-9999M adison PL 320,000 SPP80356
DN
RW
UT
CN
Project Cost: 0 320,000 0
Page 156 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Relieve congestion and safety improvements on CR 1303 (Goggins
L
ane) between KY 169 and US 25 at Victory Drive (MP 0.979 to
0.363). (2024CCN)
CR-1303Madison PL80362
DN 480,000 SPP
RW 350,000 SPP
UT 1,260,000 SPP
CN
Project Cost: 0 480,000 1,610,000
T
otal for Madison county PL
Total Amounts:
CN
UT
RW
DN
320,000
3,860,000 330,000
240,000 1,543,000
480,000 2,860,000
4,330,000 17,830,000 1,352,000
4,570,000 22,490,000 6,085,000
ROADWAY IMPROVEMENTS AND SIDEWALK CONSTRUCTION ALONG
K
Y 40 (MP 0.145-0.660) TO BETTER FACILITATE ALTERNATIVE
TRANSPORTATION METHODS (2018BOP). (2020CCR) (2024CCR)
KY-40M agoffin PL213
DN
RW
UT 1,560,000 STPF
CN 3,780,000 STPF
Project Cost: 1,560,000 3,780,000 0
R
ECONSTRUCT KY 7 FROM WILL BAILEY BRANCH ROAD TO KY
1090. (2024CCN)
KY-7Magoffin PL80302
DN 1,260,000 SPP
RW 2,750,000 SPP
UT
CN
Project Cost: 0 1,260,000 2,750,000
R
econstruct CR 1265 from the intersection with KY 3337 (MP 0.0) to
KY 3050 (MP 0.547) (2024CCN)
CR-1265Magoffin PL80303
DN 730,000 SPP
RW
UT
CN
Project Cost: 0 730,000 0
Page 157 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Magoffin county P L
Total Amounts:
CN
UT
RW
DN 1,990,000
2,750,000
1,560,000
3,780,000
1,560,000 5,770,000 2,750,000
C
onstruct Phase 2 of the Loretto Sidewalk Project consisting on 3,900
LF of 5-foot wide sidewalk along St. Francis Highway (KY 52) from
near Schoolhouse Drive to the intersection of KY 49 and HWY 52,
northern terminus of the Phase 1 project, in the City of Loretto.
(2024CCN)
KY-52Marion PL3025
DN
RW
UT
CN 177,000 SPP
Project Cost:
0 177,000 0
B
RIDGE PROJECT IN MARION COUNTY ON (078B00037N) KY-152 AT
COLEMANS RUN CREEK
KY-152Marion PL10059
DN 234,738 BRX
RW
UT
CN 1,564,920 BRX
Project Cost: 0 0 1,799,658
I
MPROVE CONNECTIVITY AND CONGESTION BETWEEN US 68 AND
KY 55 ON THE EAST SIDE OF LEBANON (APPROXIMATELY 2 MILES)
(2022CCN) (2024CCR)
KY-2154,
KY-55,
PF-9999,
US-68
Marion PL80259
DN
RW 5,000,000 STPF
UT 1,560,000 STPF
CN
Project Cost:
0 5,000,000 1,560,000
RECONSTRUCT BILL SAMUEL'S JR RD (CR1129) AND MAKER'S MARK
R
D (CR1309) FROM NEAR BURK SPRING RD (CR1307) INTERSECTION
TO HICKORY CAMP RD (CR1224) INTERSECTION TO IMPROVE
ACCESS, SAFETY, AND CONNECTIVITY AND MOBILITY (DESIGN,
RIGHT OF WAY, AND UTILITY PHASES TO BE PAID FOR OR DONATED
CR-1129M arion PL80312
DN
RW
UT
CN 9,720,000 SPP
Project Cost: 0 0 9,720,000
Page 158 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Marion county P L
Total Amounts:
CN
UT
RW
DN 234,738
5,000,000
1,560,000
177,000 11,284,920
0 5,177,000 13,079,658
I
MPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM
KY-95 TO THE EXISTING FOUR-LANE HIGHWAY AT LONE VALLEY
RD NEAR I-24 INTERCHANGE AND FUTURE I-69 CONNECTION.
(2020CCR) (2024CCR)
US-62Marshall PL398
DN
RW
UT 1,080,000 SPP
CN 8,400,000 SPP
Project Cost:
0 1,080,000 8,400,000
B
RIDGE PROJECT IN MARSHALL COUNTY ON (079B00014N) KY-795
AT CHESTNUT CREEK
KY-795Marshall PL10171
DN 199,072 BRZ
RW
UT
CN 1,327,146 BRZ
Project Cost: 1,526,218 0 0
ADDRESS CONDITION OF I-024 FROM MILEPOINT 17.32 TO MILEPOINT
2
6.558
I -24M arshall PL20013
DN 1,200,000 NHPM
RW
UT
CN 12,000,000 NHPM
Project Cost: 0 0 13,200,000
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 40.088 TO
MILEPOINT 50.547
I -69Marshall PL22074
DN 800,000 NHPM
RW
UT
CN 7,953,756 NHPM
Project Cost: 0 8,753,756 0
Page 159 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY,
S
ERVICE, AND CONGESTION ISSUES FROM BENTON BAPTIST TEMPLE
ROAD / HAPPY HOLLOW RD TO US 68 IN DRAFFENVILLE. (2024CCN)
US-641M arshall PL80311
DN 1,560,000 SPP
RW 1,750,000 SPP
UT
CN
Project Cost: 0 1,560,000 1,750,000
IMPROVE GEOMETRIC ALIGNMENTS AND ADDRESS ACCESS ISSUES
A
ND SAFETY CONCERNS FROM KY 2206 TO THE ENTRANCE OF
MARSHALL COUNTY HOSPITAL IN BENTON. (2024CCN)
KY-348M arshall PL80314
DN 1,040,000 SPP
RW 1,000,000 SPP
UT
CN
Project Cost: 0 1,040,000 1,000,000
T
otal for Marshall county PL
Total Amounts:
CN
UT
RW
DN 199,072 3,400,000 1,200,000
2,750,000
1,080,000
1,327,146 7,953,756 20,400,000
1,526,218 12,433,756 24,350,000
I
NEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO
BOOTH FORK. [STA. 190+00 TO STA. 298+00 (ENGLISH)] (2002BOP)
(12CCR)(AR/W)(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin PL154.1100
DN
RW
UT 2,320,000 SPP
CN
Project Cost:
0 0 2,320,000
I
MPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED
JUST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES
BEFORE GORDON HOLLOW ROAD, AND IMPROVE THE
CULVERT/SAFETY DESIGN TO INCREASE MOTORIST AND
PEDESTRIAN SAFETY. (12CCR) (2020CCR) (2022CCR) (2024CCR)
KY-40Martin PL192
DN
RW
UT
CN 1,974,646 SPP
Project Cost:
0 1,974,646 0
Page 160 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-3 IN MARTIN COUNTYK Y-3Martin PL4333
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-3 IN MARTIN COUNTYKY-3Martin PL4335
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4347
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4348
DN
RW
UT
CN 30,000 GR
Project Cost: 30,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4349
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
Page 161 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-2031 IN MARTIN COUNTYK Y-2031Martin PL4405
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
I
NSTALL GUARDRAIL ON KY-1439 IN MARTIN COUNTYKY-1439Martin PL4449
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
I
NSTALL GUARDRAIL ON KY-292 IN MARTIN COUNTYKY-292Martin PL4454
DN
RW
UT
CN 31,000 GR
Project Cost: 31,000 0 0
I
NSTALL GUARDRAIL ON KY-908 IN MARTIN COUNTYKY-908Martin PL4480
DN
RW
UT
CN 110,000 GR
Project Cost: 110,000 0 0
B
RIDGE PROJECT IN MARTIN COUNTY ON (080B00005N) KY-40 AT
ROCKCASTLE CREEK
KY-40Martin PL10127
DN
RW 50,000 FBP2
UT 200,000 FBP2
CN 4,472,753 FBP2
Project Cost: 0 0 4,722,753
Page 162 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 3407 OVER Wolf Creek
(
080B00028N)
KY-3407Martin PL10151
DN
RW 50,000 BRX
UT 135,000 BRX
CN 1,921,219 BRX
Project Cost: 0 0 2,106,219
T
otal for Martin county PL
Total Amounts:
CN
UT
RW
DN
100,000
2,655,000
535,000 1,974,646 6,393,972
535,000 1,974,646 9,148,972
I
NSTALL GUARDRAIL ON KY-10 IN MASON COUNTYKY-10Mason PL4325
DN
RW
UT
CN 74,000 GR
Project Cost: 74,000 0 0
ADDRESS CONDITION OF KY-9 FROM MILEPOINT 7.147 TO MILEPOINT
1
0.256
KY-9M ason PL20030
DN 400,000 NHPM
RW
UT
CN 4,600,000 NHPM
Project Cost: 0 0 5,000,000
T
otal for Mason county PL
Total Amounts:
CN
UT
RW
DN 400,000
74,000 4,600,000
74,000 0 5,000,000
Page 163 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address issues with service, congestion and safety from US 45 to
I
-24 in Paducah. See March, 2002 Paducah-McCracken County
Transportation Study. (2024CCN)
US-62McCracken PL142
DN
RW 5,500,000 STP1
UT 2,800,000 STP1
CN
Project Cost: 0 5,500,000 2,800,000
E
xtend KY 1286 from KY 998 (MP 6.916) to US 60. (Priority Section 2)
(2022CCR) (2024CCR)
KY-1286McCracken PL153.2000
DN
RW
UT
CN 7,800,000 STP1
Project Cost: 7,800,000 0 0
I
mprove KY 1286 from US 62(MP 5.000) to Perkins Creek Bridge (MP
5.896, B00167N). (Priority Section 3) (2022CCN) (2024CCR)
KY-1286McCracken PL153.3000
DN
RW 2,750,000 STP1
UT 2,160,000 STP1
CN
Project Cost: 0 4,910,000 0
I
mprove KY 1286 from Perkins Creek Bridge (MP 5.896, B00167N) to
KY 998 (MP 6.916). (Priority Section 4) (2022CCN) (2024CCR)
KY-1286McCracken PL153.4000
DN
RW
UT 2,160,000 STP1
CN
Project Cost: 0 2,160,000 0
I
MPROVE THE US-60 INTERSECTION AT COLEMAN ROAD EAST OF
THE I-24 DOUBLE CROSSOVER DIAMOND (DCD).
US-60McCracken PL222
DN
RW
UT
CN 4,900,000 NH
Project Cost: 0 0 4,900,000
Page 164 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN US-60 FROM NEW HOLT ROAD TO NEAR OLIVET CHURCH
R
OAD.
US-60McCracken PL223
DN
RW
UT
CN 4,300,000 NH
Project Cost: 0 0 4,300,000
RELOCATION AND MINOR WIDENING OF US-60 FROM CLARKS RIVER
TO
US-62 JCT.(10CCR)(14CCR)(LET W/ 1-1115.20)(16CCR)
US-60M cCracken PL1115.1000
DN 560,000 NH
RW 4,030,000 NH
UT
CN
Project Cost: 560,000 0 4,030,000
U
pgrade navigational lighting for the US 45 (Irvin S Cobb) Bridge.
073B00001N
US-45McCracken PL4903
DN 70,000 SPP
RW
UT
CN 900,000 SPP
Project Cost: 970,000 0 0
B
RIDGE PROJECT IN MCCRACKEN COUNTY ON (073B00030N)
KY-3520 AT P&L RAILWAY
KY-3520McCracken PL10162
DN 456,086 BRZ
RW
UT
CN 3,040,571 BRZ
Project Cost: 0 3,496,657 0
BRIDGE PROJECT IN MCCRACKEN COUNTY ON (073B00100N) I-24 AT
O
HIO RIVER
I -24M cCracken PL10166
DN
RW
UT
CN 23,100,000 BRX
Project Cost: 0 23,100,000 0
Page 165 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Planning and Phase I Engineering for the future expansion or
r
eplacement of the I-24 Ohio River Bridge. (Shared Cost w/ Illinois)
(073B00100N)
I -24McCracken PL10261
DN
RW
UT
CN 1,375,000 1,375,000 BRO
Project Cost: 0 1,375,000 1,375,000
A
DDRESS CONDITION OF I-024 FROM MILEPOINT 16.172 TO
MILEPOINT 17.32
I -24McCracken PL20017
DN 80,000 STP3
RW
UT
CN 800,000 STP3
Project Cost: 0 880,000 0
A
DDRESS SAFETY, CONGESTION, AND FUTURE CAPACITY ISSUES
FROM US 60 TO US 68 IN PADUCAH. SEE MARCH, 2002
PADUCAH-MCCRACKEN COUNTY TRANSPORTATION STUDY.
(2024CCN)
I -24McCracken PL80305
DN 2,080,000 NH
RW 550,000 NH
UT
CN
Project Cost:
0 2,080,000 550,000
I
MPROVE MOBILITY, SAFETY AND ADDRESS GEOMETRIC
DEFICIENCIES ON KY 998 (OLIVET CHURCH ROAD) FROM KY 1286
(FRIENDSHIP ROAD) TO US 62. (2024CCN)
KY-998McCracken PL80315
DN 1,560,000 SPP
RW 2,750,000 SPP
UT
CN
Project Cost:
0 1,560,000 2,750,000
B
ASED ON THE 2019 PADUCAH SUA, ID "Q". RECONFIGURE THE
INTERSECTION OF KY 731 AND LABELLE AVE. A ROUNDABOUT
SHOULD BE CONSIDERED. THIS IS BASED ON 33 CRASHES IN 3
YEARS AND COMPLAINTS FROM LOCALS ABOUT POOR DRAINAGE
RUN OFF GOING INTO THE STREET. (2024CCN)
KY-731McCracken PL80317
DN
RW 2,000,000 SPP
UT 3,500,000 SPP
CN
Project Cost:
0 2,000,000 3,500,000
T
otal for McCracken county PL
Total Amounts:
CN
UT
RW
DN 630,000 4,176,086
10,250,000 7,330,000
4,320,000 6,300,000
8,700,000 28,315,571 10,575,000
9,330,000 47,061,657 24,205,000
Page 166 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN MCCREARY COUNTY ON (074B00020N) KY-1470
A
T MARSH CREEK
KY-1470McCreary PL10059
DN 156,474 BRX
RW
UT
CN 1,043,159 BRX
Project Cost: 0 0 1,199,633
P
RELIMINARY ENGINEERING AND ENVIRONMENTAL CORRIDOR
STUDY FOR IMPROVING SAFETY AND MAKING KY-92 A SCENIC
ROUTE FROM MONTICELLO TO STEARNS (FLEXIBLE SOLUTIONS)
(18CCN) (2020CCR) (2024CCR)
KY-92McCreary PL 500,000 SPP80004
DN
RW
UT
CN
Project Cost:
0 500,000 0
PROVIDE CONNECTIVITY, IMPROVE MOBILITY AND RESPONSE FROM
U
S 27 TO MCCREARY COUNTY HIGH SCHOOL (2020CCN) (2022CCR)
(2024CCR)
US-27M cCreary PL80102
DN
RW 10,000 SPP
UT 160,000 SPP
CN 3,120,000 SPP
Project Cost: 10,000 160,000 3,120,000
I
mprove mobility and safety RR crossing elimination by constructing
bridge and realigning KY 1470, approx 0.177 miles west of CR1199A
(Dick Wilson Rd) and extending easterly to US 27. (2020CCN)
(2022CCR) (2024CCR)
CR-1199McCreary PL80103
DN
RW 750,000 SPP
UT 720,000 SPP
CN 8,420,000 SPP
Project Cost:
0 1,470,000 8,420,000
T
otal for McCreary county PL
Total Amounts:
CN
UT
RW
DN
500,000
156,474
10,000 750,000
880,000
12,583,159
10,000 2,130,000 12,739,633
Page 167 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND
K
Y-250. (08CCN)(12CCR)(18CCN) (2020CCR) (2022CCR)
US-431McLean PL8400
DN
RW
UT
CN 1,770,000 SPP
Project Cost: 1,770,000 0 0
R
EPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND
ADDRESS SAFETY ISSUES WITH BRIDGES ON KY-136 IN MCLEAN
COUNTY FROM KY-56 TO OHIO COUNTY LINE. (075B00034N,
075B00011N, 075B00009N, 075B00010N) (2022CCN) (2024CCN)
KY-136McLean PL8812
DN
RW
UT
CN 7,560,000 SPP
Project Cost:
0 0 7,560,000
B
RIDGE PROJECT IN MCCLEAN COUNTY ON (075B00028N) KY-81 AT
UNNAMED STREAM
KY-81McLean PL10111
DN 133,805 BRX
RW
UT
CN 892,032 BRX
Project Cost: 0 0 1,025,837
B
RIDGE PROJECT IN MCCLEAN COUNTY ON (075B00040N) KY-140
AT BR OF LONG FALLS CREEK
KY-140McLean PL10116
DN 224,659 BRX
RW
UT
CN 1,497,726 BRX
Project Cost: 0 0 1,722,385
T
otal for McLean county PL
Total Amounts:
CN
UT
RW
DN 358,464
1,770,000 9,949,758
1,770,000 0 10,308,222
Page 168 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)
(
18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-79Meade PL8705
DN
RW
UT
CN 17,280,000 SPP
Project Cost: 0 17,280,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 313 OVER OHIO RIVER
AND CO ROAD (082B00021N)
KY-313Meade PL10078
DN 475,000 BRX
RW
UT
CN 3,525,000 BRX
Project Cost: 0 0 4,000,000
A
DDRESS SAFETY AND MOBILITY ALONG KY 313 (BRANDENBURG
BYPASS) FROM KY 448 TO KY 228 IN BRANDENBURG. (2024CCN)
KY-313Meade PL80309
DN 2,000,000 SPP
RW
UT
CN
Project Cost: 0 2,000,000 0
T
otal for Meade county PL
Total Amounts:
CN
UT
RW
DN 2,000,000 475,000
17,280,000 3,525,000
0 19,280,000 4,000,000
R
econstruction of US 460 from Lucky Stop to KY 713 @ Means.
(2024CCN)
US-460Menifee PL250
DN 600,000 SPP
RW 3,750,000 SPP
UT 12,730,000 SPP
CN
Project Cost: 0 600,000 16,480,000
Page 169 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN EXISTING ROADWAY AND IMPROVE VERTICAL AND
H
ORIZONTAL CURVES. NEW CONSTRUCTION. COMPLETES US 460
UPGRADES IN MENIFEE COUNTY FROM MP 14.35 TO 19.39 AND IN
MORGAN COUNTY FROM MP 0 TO MP 0.8. (14CCN)(16CCR)
(2024CCN)
US-460Menifee PL8805
DN 3,930,000 SPP
RW
UT
CN
Project Cost:
0 3,930,000 0
I
MPROVE SAFETY, CORRECT GEOMETRICS, AND ENHANCE
REGIONAL CONNECTIVITY ON US 460 FROM THE INTERSECTION OF
KY 1240 TO 0.7 MILES EAST OF THE MORGAN COUNTY LINE
(2022CCN) (2024CCR)
US-460Menifee PL80200
DN
RW 7,500,000 SPP
UT 3,600,000 SPP
CN
Project Cost:
0 11,100,000 0
I
mprove safety, correct geometrics, and enhance regional connectivity
on US 460 from the bridge over Dog Trot Fork (MP 3.3) to Rothwell (MP
4.8). (2022CCN) (2024CCR)
US-460Menifee PL80201
DN
RW
UT 1,985,000 SPP
CN 13,220,000 SPP
Project Cost:
0 1,985,000 13,220,000
T
otal for Menifee county PL
Total Amounts:
CN
UT
RW
DN 4,530,000
7,500,000 3,750,000
5,585,000 12,730,000
13,220,000
0 17,615,000 29,700,000
I
MPROVE SYSTEM MOBILITY ALONG MOBERLY ROAD FROM KY 390
TO KY 1989 IN NORTHWEST HARRODSBURG. (12CCR) (2020CCN)
(2024CCR)
CS-1237Mercer PL417
DN
RW 420,000 SPP
UT 390,000 SPP
CN 2,760,000 SPP
Project Cost: 0 810,000 2,760,000
Page 170 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve level of safety and access at and around the intersection of
U
S 127 and KY 598 (Sparrow Lane). (MP 2.676 - 2.776) (2024CCN)
US-127Mercer PL80355
DN
RW 40,000 SPP
UT 170,000 SPP
CN 750,000 SPP
Project Cost: 0 210,000 750,000
T
otal for Mercer county PL
Total Amounts:
CN
UT
RW
DN
460,000
560,000
3,510,000
0 1,020,000 3,510,000
S
UMMER SHADE BYPASS. (06CCR)(2006BOPC)(08CCR)(12CCR)
(14CCR) (2024CCN)
KY-90Metcalfe PL112.1000
DN 2,240,000 SPP
RW
UT
CN
Project Cost: 0 2,240,000 0
RECONSTRUCT KY 163 AS A NEW ROUTE ON WEST SIDE OF
E
DMONTON FROM KY 163 AT GARY BELL RD (MP 10.0) S OF
EDMONTON CROSSING US 68 (STOCKTON ST) 2000 FT WEST OF THE
COURTHOUSE SQ, TO US 68 (GREENSBURG ST) AT I-CHNG WITH
NUNN PKWY (MP 9.8).(14CCN)(16CCR)(18CCN) (2020CCR)
KY-163M etcalfe PL8859
DN
RW 3,660,000 SPP
UT 2,570,000 SPP
CN
Project Cost: 0 6,230,000 0
INTERSECTION IMPROVEMENTS AT US-68 AND KY-80. OPTIONS
I
NCLUDE REALIGNMENT OF NORTH APPROACH, WIDENING FOR TURN
LANES, AND A ROUNDABOUT. (2024CCN)
US-68M etcalfe PL80306
DN 330,000 SPP
RW 310,000 SPP
UT 310,000 SPP
CN
Project Cost: 0 330,000 620,000
Page 171 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ON THE
L
B NUNN CUMBERLAND EXPRESSWAY AT EXIT 27 INTERCHANGE.
(2024CCN)
LN-9008M etcalfe PL80309
DN 1,940,000 SPP
RW 330,000 SPP
UT 380,000 SPP
CN
Project Cost: 0 1,940,000 710,000
P
E & ENVIRONMENTAL FOR KY-163 FROM KY-90 TO PROPOSED
WEST EDMONTON BYPASS. (2024CCN)
KY-163Metcalfe PL80325
DN 3,000,000 SPP
RW
UT
CN
Project Cost: 0 0 3,000,000
T
otal for Metcalfe county PL
Total Amounts:
CN
UT
RW
DN 4,510,000 3,000,000
3,660,000 640,000
2,570,000 690,000
0 10,740,000 4,330,000
O
PERATION OF TURKEY NECK BEND FERRY FOR FY 2027-2032.
(12CCR) (2020CCR) (2024CCR)
KY-214Monroe PL128.1100
DN
RW
UT
CN 1,250,000 1,250,000 SPP
Project Cost: 0 1,250,000 1,250,000
B
RIDGE PROJECT IN MONROE COUNTY ON (086B00040N) KY-678 AT
SKAGGS CREEK
KY-678Monroe PL10044
DN 301,224 BRX
RW
UT
CN 2,008,159 BRX
Project Cost: 0 0 2,309,383
Page 172 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Monroe county P L
Total Amounts:
CN
UT
RW
DN 301,224
1,250,000 3,258,159
0 1,250,000 3,559,383
W
IDEN KY-1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL
INDUSTRIAL PARK, MONTGOMERY COUNTY. (SEE 7-8501.00 FOR
"SPB" FUNDS) (2005HPP-KY129) (2022CCR) (2024CCR)
KY-1991Montgomery PL240
DN
RW
UT
CN 3,050,000 STP1
Project Cost: 3,050,000 0 0
U
PGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND
TRAIL TO THE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES
EXTENSION OF INDUSTRIAL ACCESS ROAD TO HINKSTON PIKE).
(12CCR)(18CCN) (2022CCR) (2024CCR)
KY-1991Montgomery PL411
DN
RW 620,000 SPP
UT 980,000 SPP
CN 9,050,000 SPP
Project Cost:
0 1,600,000 9,050,000
W
IDEN EXISTING PAVEMENT & IMPROVE VERTICAL & HORIZONTAL
CURVES FROM EXISTING MT STERLING BYPASS (KY 686) TO 500' W
OF BENTBROOK SUBDIVISION. ADD FULL WIDTH SHOULDERS & A
CENTER TURNING LANE IN CONGESTION AREAS FROM MP 2.2 TO
4.311.(14CCN)(16CCR)(18CCN) (2020CCR) (2024CCR)
US-60Montgomery PL8810
DN
RW
UT 5,730,000 SPP
CN
Project Cost:
0 5,730,000 0
T
otal for Montgomery county PL
Total Amounts:
CN
UT
RW
DN
620,000
6,710,000
3,050,000 9,050,000
3,050,000 7,330,000 9,050,000
Page 173 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WEST LIBERTY BYPASS - CONSTRUCT NEW ROUTE FROM US 460 @
K
Y 2498 TO US 460 @ KY 172. (00CCN)
PF-9999M organ PL8004
DN 1,800,000 SPP
RW
UT
CN
Project Cost: 0 1,800,000 0
I
MPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)
(16CCN) (2022CCR) (2024CCR)
KY-2498Morgan PL8804
DN
RW
UT
CN 8,790,000 SPP
Project Cost: 8,790,000 0 0
ADDRESS CONDITION OF KY-1260 FROM MILEPOINT 0 TO MILEPOINT
2
.8
KY-1260M organ PL20033
DN 160,000 STP4
RW
UT
CN 1,840,000 STP4
Project Cost: 0 0 2,000,000
I
mprove safety and substandard geometrics on US 460 from the
Menifee County Line to approximately milepoint 0.8. (2022CCN)
(2024CCR)
US-460Morgan PL80202
DN 580,000 SPP
RW 500,000 SPP
UT 180,000 SPP
CN
Project Cost: 0 580,000 680,000
I
mprove safety and reliability of US 460 from the intersection of KY
1081 to the Magoffin County line (2024CCN)
US-460Morgan PL80307
DN 1,200,000 SPP
RW
UT
CN
Project Cost: 0 1,200,000 0
T
otal for Morgan county PL
Total Amounts:
CN
UT
RW
DN 3,580,000 160,000
500,000
180,000
8,790,000 1,840,000
8,790,000 3,580,000 2,680,000
Page 174 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION
6
01 TO WENDELL FORD CENTER. (14CCN)(18CCN) (2022CCR)
(2024CCR)
KY-181Muhlenberg PL8802
DN
RW
UT
CN 6,320,000 STPF
Project Cost: 0 6,320,000 0
S
TRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY
181 NORTH NEAR THE INTERSECTION WITH THE WKY PARKWAY,
WENDELL FORD NATIONAL GUARD CENTER, AND JOB CORP.
(14CCN)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-2533Muhlenberg PL8803
DN
RW 1,730,000 SPP
UT 1,120,000 SPP
CN
Project Cost:
0 2,850,000 0
B
RIDGE PROJECT IN MUHLENBERG COUNTY ON (089B00031N)
KY-181 AT BAT EAST CREEK
KY-181Muhlenberg PL10122
DN 215,380 BRX
RW
UT
CN 1,435,867 BRX
Project Cost: 1,651,247 0 0
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 45.95 TO MILEPOINT 52.535
WK-9001Muhlenberg PL22162
DN 870,000 NHPM
RW
UT
CN 8,730,000 NHPM
Project Cost: 0 0 9,600,000
A
DDRESS CONDITION OF Wendell H. Ford Western KY Parkway
FROM MILEPOINT 59.92 TO MILEPOINT 65.375
WK-9001Muhlenberg PL22165
DN 410,000 NHPM
RW
UT
CN 4,150,380 NHPM
Project Cost: 0 4,560,380 0
Page 175 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WESTERN KENTUCKY PKY - RECONSTRUCT INTERCHANGE AT US
4
31 AT CENTRAL CITY (2022CCN) (2024CCR)
WK-9001Muhlenberg PL80201
DN
RW 1,380,000 SPP
UT 2,090,000 SPP
CN 15,600,000 SPP
Project Cost: 0 3,470,000 15,600,000
T
otal for Muhlenberg county PL
Total Amounts:
CN
UT
RW
DN 215,380 410,000 870,000
3,110,000
3,210,000
1,435,867 10,470,380 24,330,000
1,651,247 17,200,380 25,200,000
I
MPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM
THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON
COUNTY LINE. (2016BOP)(18CCR)(D-Auth under 4-396) (2022CCR)
(2024CCR)
US-150Nelson PL396.1000
DN
RW
UT
CN 4,000,000 5,000,000 STPF
Project Cost:
0 4,000,000 5,000,000
I
NSTALL GUARDRAIL ON KY-458 IN NELSON COUNTY (2024CCR)KY-458Nelson PL4319
DN
RW
UT
CN 311,000 GR
Project Cost: 311,000 0 0
W
IDEN US-150 FROM KY-49 TO NEAR KY-245/WAL-MART WIDENING.
(06CCN) (2022CCN) (2024CCR)
US-150Nelson PL8308.1000
DN
RW 3,500,000 STP1
UT 2,080,000 STP1
CN
Project Cost: 0 3,500,000 2,080,000
Page 176 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
F
ROM MILEPOINT 8.837 TO MILEPOINT 10.172
BG-9002Nelson PL20052
DN 50,000 STP5
RW
UT
CN 537,400 STP5
Project Cost: 0 587,400 0
A
DDRESS CONDITION OF Martha Layne Collins Bluegrass Parkway
FROM MILEPOINT 35.15 TO MILEPOINT 39.267
BG-9002Nelson PL22176
DN 730,000 NHPM
RW
UT
CN 7,270,000 NHPM
Project Cost: 0 0 8,000,000
A
ddress geometric deficiencies along KY 55 near pleasant view road
in Bloomfield. (2024CCN)
KY-55Nelson PL80356
DN 340,000 SPP
RW 1,000,000 SPP
UT
CN
Project Cost: 0 340,000 1,000,000
A
ddress condition of KY 247 (Monks Road) between KY 52 and US
31E (Approx. 7.64 miles in length). (2024CCN)
KY-247Nelson PL80366
DN
RW
UT
CN 1,080,000 STP5
Project Cost: 1,080,000 0 0
T
otal for Nelson county PL
Total Amounts:
CN
UT
RW
DN 390,000 730,000
3,500,000 1,000,000
2,080,000
1,391,000 4,537,400 12,270,000
1,391,000 8,427,400 16,080,000
Page 177 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS
C
OUNTY SCHOOL PROPERTY (12CCR)(16CCR)(2020CCR) (2022CCR)
(2024CCR)
KY-36Nicholas PL205
DN
RW 2,100,000 SPP
UT 1,620,000 SPP
CN 6,720,000 SPP
Project Cost: 0 2,100,000 8,340,000
R
ECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)(16CCR)
(18CCN) (2024CCR)
KY-36Nicholas PL8811
DN
RW 440,000 SPP
UT
CN 1,680,000 SPP
Project Cost: 0 440,000 1,680,000
B
RIDGE PROJECT IN NICHOLAS COUNTY ON (091B00012N) KY-32 AT
FLEMING CREEK
KY-32Nicholas PL10094
DN 327,888 FBP2
RW
UT
CN 2,185,920 FBP2
Project Cost: 0 2,513,808 0
A
DDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER
TRIB-HOOKTOWN BRANCH (091B00031N)
KY-32Nicholas PL10103
DN 58,818 BRX
RW
UT
CN 392,122 BRX
Project Cost: 0 450,940 0
A
DDRESS CONDITION OF US-68 FROM MILEPOINT 10.73 TO
MILEPOINT 12.13
US-68Nicholas PL22360
DN 121,600 STP4
RW
UT
CN 1,398,400 STP4
Project Cost: 0 1,520,000 0
Page 178 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety, geometric deficiencies, and promote connectivity
a
long KY-36 between US-68 (mile-point 0.864) and KY-13 (mile-point
3.910). (2024CCN)
KY-36Nicholas PL80306
DN 2,430,000 SPP
RW
UT
CN
Project Cost: 0 2,430,000 0
T
otal for Nicholas county PL
Total Amounts:
CN
UT
RW
DN 2,938,306
2,540,000
1,620,000
3,976,442 8,400,000
0 9,454,748 10,020,000
A
ddress Drainage Issues on US 62 in Ohio CountyUS-62Ohio PL127
DN
RW
UT
CN 2,400,000 SPP
Project Cost: 0 2,400,000 0
I
NSTALL GUARDRAIL ON KY-69 IN OHIO COUNTYKY-69Ohio PL4302
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
NSTALL GUARDRAIL ON KY-69 IN OHIO COUNTYKY-69Ohio PL4303
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
Page 179 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO
T
HREE LANES INCLUDING CURB AND GUTTER AND ADDRESSING
TWO SHARP TURNS. (16CCN)(18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-54Ohio PL8951
DN
RW 2,020,000 SPP
UT 2,640,000 SPP
CN
Project Cost:
0 2,020,000 2,640,000
A
DDRESS LEFT TURN LANE ISSUES ON US-231 AT BOTH PERDUE
ENTRANCES. (2024CCN)
US-231Ohio PL80303
DN 850,000 SPP
RW 910,000 SPP
UT
CN
Project Cost: 0 850,000 910,000
T
otal for Ohio county PL
Total Amounts:
CN
UT
RW
DN 850,000
2,020,000 910,000
2,640,000
90,000 2,400,000
90,000 5,270,000 3,550,000
K
Y-393 RECONSTRUCT FROM 140FEET SOUTH OF RAILROAD
CROSSING (CSX) EXTENDING NORTHWEST TOWARDS KY 146
ENDING AT STATION 12+00 (DESIGN UNDER 5-230.00).
(CONSTRUCTION SEQ.#2) (2020CCN) (2022CCR) (2024CCR)
KY-146,
KY-393
Oldham PL234
DN
RW
UT
CN 5,000,000 18,490,000 10,000,000 STPF
Project Cost:
5,000,000 18,490,000 10,000,000
R
ECONSTRUCT KY-22 FROM KY-329 TO ABBOTT LANE.
(2004BOPC)(08CCR)(10CCR)(12CCR) (2024CCN)
KY-22Oldham PL304.1000
DN 1,040,000 SPP
RW 4,200,000 SPP
UT 2,500,000 SPP
CN
Project Cost: 0 1,040,000 6,700,000
Page 180 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO
K
Y-393 (MP 18.0). (2022CCR) (2024CCR)
I -71Oldham PL483.1000
DN
RW
UT 2,090,000 NH
CN 21,000,000 NH
Project Cost: 2,090,000 0 21,000,000
W
IDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO
KY-53 (MP 22.4). (16CCN) (2024CCR)
I -71Oldham PL483.2000
DN 6,160,000 NH
RW 2,420,000 NH
UT 1,040,000 NH
CN
Project Cost: 6,160,000 0 3,460,000
A
ddition of soundwall on I-71 SB along Darby Pointe Neighborhood
(MP 16.7-17.4) (To be let with 5-483.1 I-71 Widening). (2024CCN)
I -71Oldham PL483.4000
DN 220,000 SPP
RW
UT
CN 6,225,000 SPP
Project Cost: 0 220,000 6,225,000
D
ESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22
(TOTAL 3.2 MILES). (14CCN)(18CCN) (2022CCR) (2024CCR)
KY-53Oldham PL8852
DN
RW 1,790,000 SPP
UT 730,000 SPP
CN
Project Cost: 0 1,790,000 730,000
A
DDRESS CONDITION OF I-071 CARDINAL DIRECTION FROM
MILEPOINT 14.38 TO MILEPOINT 18.07
I -71Oldham PL22098
DN 750,000 NHPM
RW
UT
CN 7,550,000 NHPM
Project Cost: 0 8,300,000 0
Page 181 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE THE INTERCHANGE OF I 71 AND KY 329. (18CCN)
(
2020CCR) (DESIGNED UNDER 5-483.10) (2022CCR) (2024CCR)
I -71Oldham PL80005
DN 430,000 NH
RW 1,160,000 NH
UT 1,050,000 NH
CN 9,840,000 NH
Project Cost: 430,000 2,210,000 9,840,000
L
andslide repair on Westport Road (KY-524) from JCT. US-42 West,
north 1.0 mile. (2002BOPC)(NOT REQUIRED) (2022CCN)
KY-524Oldham PL80211
DN 650,000 SPP
RW 530,000 SPP
UT 500,000 SPP
CN 4,000,000 SPP
Project Cost: 0 650,000 5,030,000
I
MPROVE TRAFFIC FLOW, MINIMIZE CONGESTION, AND ADDRESS
SAFETY ISSUES ON US 42 BETWEEN RIDGMOOR DRIVE AND KY
1694 (GUM STREET). INCLUDES CONSIDERATION OF A THREE LANE
WIDENING AND BIKE/PED ACCOMMODATIONS. (2024CCN)
US-42Oldham PL80307
DN 3,500,000 SPP
RW
UT
CN
Project Cost:
0 3,500,000 0
I
MPROVE SAFETY, ACCESS, AND ADDRESS GEOMETRIC
DEFICIENCIES ALONG KY 362 FROM THE OLDHAM/SHELBY COUNTY
LINE TO KY 146 (IN AND SOUTH OF PEWEE VALLEY). INCLUDES
CONSIDERATION OF A 3 LANE WIDENING WITH A TWO WAY LEFT
TURN LANE AND BIKE/PED ACCOMMODATIONS. (2024CCN)
KY-362Oldham PL 210,000 SPP80314
DN 1,960,000 SPP
RW
UT
CN
Project Cost:
0 210,000 1,960,000
R
EDUCE CONGESTION, IMPROVE SAFETY AND ENHANCE MOBILITY
ON KY 146 IN BUCKNER FROM KY 1817 (NEW CUT ROAD) (MP 6.81)
TO KY 393 (MP 7.42). (2024CCN)
KY-146Oldham PL80325
DN 510,000 SPP
RW 1,140,000 SPP
UT 1,130,000 SPP
CN
Project Cost:
0 510,000 2,270,000
Page 182 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDITION OF SOUNDWALL ON I 71 NB ALONG SPRING HILL
S
UBDIVISION. (As a part of the I-MOVE Expansion Project on I 71).
(NOTE: Does not meet required noise wall environmental noise
analysis abatement eligibility requirements for federal funding.)
(2024CCN)
I -71Oldham PL80344
DN 210,000 SPP
RW
UT
CN 3,400,000 SPP
Project Cost:
0 210,000 3,400,000
I
MPROVE SAFETY AND REDUCE CONGESTION, ALONG US 22 FROM
HAUNZ LANE TO KY 329. (2024CCN)
KY-22Oldham PL80345
DN 330,000 SPP
RW 840,000 SPP
UT
CN
Project Cost: 0 330,000 840,000
T
otal for Oldham county PL
Total Amounts:
CN
UT
RW
DN
210,000
6,590,000 7,210,000 1,960,000
2,950,000 9,130,000
2,090,000 1,050,000 5,900,000
5,000,000 26,040,000 54,465,000
13,680,000 37,460,000 71,455,000
W
IDEN KY 22 FROM INTERSECTION WITH KY 845 TO THE
OWEN/GRANT COUNTY LINE.(12CCN)(14CCR)(16CCR)
(2024CCN)
KY-22Owen PL8702
DN
RW 3,300,000 SPP
UT
CN
Project Cost: 0 0 3,300,000
R
ECONSTRUCTION KY 355 FROM KY 22 IN GRATZ TO KY 1982 NEAR
PERRY PARK. (2024CCN)
KY-355Owen PL80319
DN 4,860,000 SPP
RW
UT
CN
Project Cost: 0 4,860,000 0
Page 183 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Owen county P L
Total Amounts:
CN
UT
RW
DN 4,860,000
3,300,000
0 4,860,000 3,300,000
RECONSTRUCT THE INTERSECTION OF KY 11 AND KY 846 (2020CCN)
(
2024CCR)
KY-11O wsley PL80105
DN
RW
UT
CN 3,490,000 SPP
Project Cost: 3,490,000 0 0
I
mprovements to the intersection of KY 3504 and Old KY 11 (CR
1346K) (2024CCN)
KY-3504Owsley PL80304
DN
RW
UT
CN 240,000 SPP
Project Cost: 240,000 0 0
T
otal for Owsley county PL
Total Amounts:
CN
UT
RW
DN
3,730,000
3,730,000 0 0
R
ELOCATE KY 22 FROM THE INTERSECTION OF FRYER ROAD AND
KY 330 TO US 27 (ALIGNMENT H FROM 1988 STUDY) (2022CCN)
(2024CCR)
KY-22,
PF-9999
Pendleton PL8508.1000
DN 3,440,000 SPP
RW
UT
CN
Project Cost:
0 3,440,000 0
Page 184 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY ON US 27 AT THE KY
I
NTERSECTION (MILEPOINT 11.6 TO MILEPOINT 12) (2022CCN)
(2024CCR)
US-27Pendleton PL80253
DN 420,000 STPF
RW 550,000 STPF
UT 190,000 STPF
CN
Project Cost: 0 420,000 740,000
R
ECONSTRUCTION FROM KY 3185 IN BUTLER TO KY 467 (2022CCN)KY-177Pendleton PL80258
DN 2,240,000 SPP
RW
UT
CN
Project Cost: 0 2,240,000 0
I
MPROVE SAFETY AND MOBILITY ON US 27 AT THE KY 22
INTERSECTION. (2024CCN)
US-27Pendleton PL80306
DN 870,000 STPF
RW
UT
CN
Project Cost: 0 0 870,000
RECONSTRUCT KY 177 FROM LICKING RIVER BRIDGE IN BUTLER TO
K
Y 3185. (2024CCN)
KY-177P endleton PL80310
DN 2,170,000 SPP
RW
UT
CN
Project Cost: 0 2,170,000 0
T
otal for Pendleton county PL
Total Amounts:
CN
UT
RW
DN 8,270,000 870,000
550,000
190,000
0 8,270,000 1,610,000
Page 185 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address roadway slide on KY 7 from MP 9.8 to MP 10.0. (2024CCR)K Y-7Perry PL178
DN
RW
UT
CN 4,270,000 PROT
Project Cost: 4,270,000 0 0
I
MPROVE KY 476 FROM BRIDGE OVER NORTH FORK KY RIVER (MP.
0.45) TO NORTH OF WALKER CORNETT ROAD IN WABACO.
(SECTION 1)
KY-476Perry PL209.1000
DN 160,000 SPP
RW
UT 580,000 SPP
CN 3,780,000 SPP
Project Cost: 0 740,000 3,780,000
I
MPROVE KY 476 FROM KY-15X IN WALKERTOWN TO BRIDGE OVER
NORTH FORK KY RIVER.
KY-476Perry PL209.2000
DN 330,000 SPP
RW
UT
CN
Project Cost: 0 330,000 0
R
ECONSTRUCTION OF KY 15 FROM BONNYMAN TO NEAR KY 28.
(14CCN) (2020CCN) (2022CCR) (2024CCR)
KY-15Perry PL269.2000
DN
RW 13,750,000 SPP
UT
CN
Project Cost: 0 0 13,750,000
I
NSTALL GUARDRAIL ON KY-7 IN PERRY COUNTYKY-7Perry PL4317
DN
RW
UT
CN 64,000 GR
Project Cost: 64,000 0 0
Page 186 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL ROGERS
P
ARKWAY. (16CCN)(18CCN) (2024CCR)
HR-9006Perry PL8903
DN
RW
UT
CN 12,000,000 NH
Project Cost: 0 0 12,000,000
A
DDRESS CONDITION OF Hal Rogers Daniel Boone Parkway FROM
MILEPOINT 57.185 TO MILEPOINT 59.088
HR-9006Perry PL22204
DN 600,000 NHPM
RW
UT
CN 6,000,000 NHPM
Project Cost: 0 6,600,000 0
N
EW IMPROVED ACCESS TO WENDALL FORD AIRPORT (2020CCN)
(2022CCR) (2024CCR)
CR-1365Perry PL80100
DN
RW
UT
CN 18,200,000 HGC
Project Cost: 18,200,000 0 0
R
econstruct roadway to eliminate flooding beginning at the intersection
with KY 550. (2024CCN)
KY-1440Perry PL80305
DN 710,000 SPP
RW 830,000 SPP
UT
CN
Project Cost: 0 710,000 830,000
I
mprove drainage issues and construct sidewalk on KY 550 from MP
1.2 to MP 1.7 near the Galen College of Nursing. (2024CCN)
KY-550Perry PL80306
DN 680,000 SPP
RW
UT
CN
Project Cost: 0 680,000 0
Page 187 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct a new access road to East Perry Sports Complex
d
evelopment and a connector to Nautilus Drive (2024CCN)
PF-9999Perry PL80308
DN 360,000 SPP
RW 60,000 SPP
UT 110,000 SPP
CN 1,080,000 SPP
Project Cost: 360,000 170,000 1,080,000
T
otal for Perry county PL
Total Amounts:
CN
UT
RW
DN 360,000 2,480,000
60,000 14,580,000
690,000
22,534,000 6,000,000 16,860,000
22,894,000 9,230,000 31,440,000
MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE
R
OADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO
HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT
THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY,
FROM BILL KING RD. TO US 119. (2020CCR) ($7 MILLION
KY-1426P ike PL147
DN
RW 2,600,000 PROT
UT 1,500,000 PROT
CN 7,000,000 PROT
Project Cost: 4,100,000 0 7,000,000
P
ikeville Corridor Access and Safety Improvement Project with USDOT
SS4A Grant and $1,900,000 state matching funds.
CO-0Pike PL182
DN
RW
UT
CN 7,400,000 KYD
1,900,000 SPP
Project Cost: 9,300,000 0 0
I
MPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM
(CR 1458) TO NEAR DESKINS BRANCH CULVERT. (18CCR)
(2020CCR)
KY-194Pike PL198
DN
RW
UT
CN 9,000,000 5,538,000 STPF
Project Cost:
9,000,000 5,538,000 0
Page 188 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND
K
Y-1460 INTERSECTION. (2020CCR) (2022CCR) (2024CCR)
US-460Pike PL346
DN
RW 872,000 NH
UT 860,000 NH
CN 6,060,000 NH
Project Cost: 872,000 860,000 6,060,000
I
NSTALL GUARDRAIL ON KY-1056 IN PIKE COUNTYKY-1056Pike PL4410
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4411
DN
RW
UT
CN 50,000 GR
Project Cost: 50,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4412
DN
RW
UT
CN 70,000 GR
Project Cost: 70,000 0 0
I
NSTALL GUARDRAIL ON KY-1499 IN PIKE COUNTYKY-1499Pike PL4413
DN
RW
UT
CN 150,000 GR
Project Cost: 150,000 0 0
Page 189 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYK Y-194Pike PL4414
DN
RW
UT
CN 120,000 GR
Project Cost: 120,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4415
DN
RW
UT
CN 100,000 GR
Project Cost: 100,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4416
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4417
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4418
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
Page 190 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYK Y-197Pike PL4419
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-197 IN PIKE COUNTYKY-197Pike PL4421
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
NSTALL GUARDRAIL ON KY-122 IN PIKE COUNTYKY-122Pike PL4455
DN
RW
UT
CN 32,000 GR
Project Cost: 32,000 0 0
I
NSTALL GUARDRAIL ON KY-122 IN PIKE COUNTYKY-122Pike PL4456
DN
RW
UT
CN 93,000 GR
Project Cost: 93,000 0 0
I
NSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYKY-1469Pike PL4457
DN
RW
UT
CN 36,000 GR
Project Cost: 36,000 0 0
Page 191 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-1469 IN PIKE COUNTYK Y-1469Pike PL4458
DN
RW
UT
CN 22,000 GR
Project Cost: 22,000 0 0
I
NSTALL GUARDRAIL ON KY-1499 IN PIKE COUNTYKY-1499Pike PL4459
DN
RW
UT
CN 45,000 GR
Project Cost: 45,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4460
DN
RW
UT
CN 39,000 GR
Project Cost: 39,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4461
DN
RW
UT
CN 11,000 GR
Project Cost: 11,000 0 0
I
NSTALL GUARDRAIL ON KY-194 IN PIKE COUNTYKY-194Pike PL4462
DN
RW
UT
CN 17,000 GR
Project Cost: 17,000 0 0
Page 192 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-610 IN PIKE COUNTYK Y-610Pike PL4463
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
B
RIDGE PROJECT IN PIKE COUNTY ON (098B00009N) KY-308 AT
ROAD FK.ROAD CREEK
KY-308Pike PL10131
DN
RW 50,000 BRX
UT 76,000 BRX
CN 757,000 BRX
Project Cost: 0 0 883,000
B
RIDGE PROJECT IN PIKE COUNTY ON (098B00013N) KY-1426 AT
BENT BRANCH
KY-1426Pike PL10132
DN
RW
UT
CN 1,375,883 BRX
Project Cost: 0 0 1,375,883
B
RIDGE PROJECT IN PIKE COUNTY ON (098B00235N) KY-1441 AT
RACCOON CREEK
KY-1441Pike PL10139
DN 225,423 BRX
RW
UT
CN 1,502,820 BRX
Project Cost: 1,728,243 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER Tug Fork
(098B00001N)
US-119Pike PL10152
DN 30,000 BRX
RW
UT
CN 1,500,000 BRX
Project Cost: 0 1,530,000 0
Page 193 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS DEFICIENCIES OF BRIDGE ON KY 610 OVER Shelby Creek
(
098B00071N)
KY-610Pike PL10154
DN
RW 75,000 BRX
UT 130,000 BRX
CN 2,237,153 BRX
Project Cost: 2,442,153 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON Petty Fork OVER Left Fork
Long Fork (098C00121N)
CR-1766Pike PL10156
DN 106,626 BRZ
RW
UT
CN 710,838 BRZ
Project Cost: 817,464 0 0
A
DDRESS CONDITION OF US-119 FROM MILEPOINT 12.23 TO
MILEPOINT 16.85
US-119Pike PL20003
DN 184,800 STP4
RW
UT
CN 2,125,200 STP4
Project Cost: 2,310,000 0 0
I
mprove substandard geometrics in the curve near Marshall Branch.
(2024CCN)
KY-1469Pike PL80308
DN
RW 130,000 SPP
UT 250,000 SPP
CN 1,890,000 SPP
Project Cost: 0 380,000 1,890,000
M
ake template changes to improve sight distance, drainage, and
ingress/egress through this commercial section of US 23 (2024CCN)
US-23Pike PL80309
DN 680,000 NH
RW 230,000 NH
UT 1,320,000 NH
CN
Project Cost: 0 680,000 1,550,000
T
otal for Pike county PL
Total Amounts:
CN
UT
RW
DN 516,849 710,000
3,547,000 130,000 280,000
1,630,000 1,110,000 1,396,000
26,061,011 7,038,000 17,082,883
31,754,860 8,988,000 18,758,883
Page 194 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS
C
APACITY ISSUES FOR KY 213 FROM KY 615 TO BOTTOM OF
MOUNTAIN. (PRIORITY SECTION 2)(2018BOP) (2022CCN) (2024CCR)
KY-213Powell PL163.2000
DN
RW 3,600,000 SPP
UT 1,740,000 SPP
CN
Project Cost: 0 5,340,000 0
I
mprove safety and traffic operations along KY 11/KY 15 in Stanton
from east of Halls Lane to west of Stonegate Drive by widening and
providing a two-way left-turn lane. (2024CCN)
KY-11Powell PL170
DN
RW
UT
CN 3,920,000 SPP
Project Cost:
0 3,920,000 0
M
inor widening to improve redundancy of Regional Travel.KY-15Powell PL176
DN
RW 290,000 PROT
UT 280,000 PROT
CN
Project Cost: 0 570,000 0
M
OUNTAIN PARKWAY AT EXIT 16: INSTALL ROADWAY LIGHTING AS
A SAFETY MEASURE DUE TO FLOODING CONCERNS.
KY-9000Powell PL194
DN 110,000 NH
RW
UT
CN 1,000,000 NH
Project Cost: 0 110,000 1,000,000
I
MPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL
COUNTY FROM SONS ROAD TO REED COURT. (2024CCN)
KY-213Powell PL210
DN
RW
UT
CN 3,280,000 SPP
Project Cost: 0 0 3,280,000
Page 195 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-82 IN POWELL COUNTYK Y-82Powell PL4318
DN
RW
UT
CN 32,000 GR
Project Cost: 32,000 0 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 19.228 TO MILEPOINT 22.307
KY-9000Powell PL20005
DN 270,000 STP4
RW
UT
CN 2,645,726 STP4
Project Cost: 0 0 2,915,726
A
DDRESS CONDITION OF KY-213 FROM MILEPOINT 1.691 TO
MILEPOINT 2.244
KY-213Powell PL20035
DN 28,000 STP4
RW
UT
CN 322,000 STP4
Project Cost: 0 350,000 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 22.307 TO MILEPOINT 27.376
KY-9000Powell PL20042
DN 200,000 STP5
RW
UT
CN 2,000,000 STP5
Project Cost: 0 2,200,000 0
A
DDRESS CONDITION OF Bert T. Combs Mountain Parkway FROM
MILEPOINT 27.376 TO MILEPOINT 32.787
KY-9000Powell PL22158
DN 410,000 NHPM
RW
UT
CN 4,102,360 NHPM
Project Cost: 0 0 4,512,360
Page 196 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT A BRIDGE ON KY 11 (CAMPTON RD MP 3.4 TO 3.85)
A
CROSS THE BERT T. COMBS MOUNTAIN PARKWAY
KY-11Powell PL80250
DN
RW 5,000,000 SPP
UT
CN
Project Cost: 0 0 5,000,000
T
otal for Powell county PL
Total Amounts:
CN
UT
RW
DN 338,000 680,000
3,890,000 5,000,000
2,020,000
32,000 6,242,000 11,028,086
32,000 12,490,000 16,708,086
S
OMERSET NORTHERN BYPASS SECTION 3; FROM WEST OF THE
BRIDGE OVER US-27 AND THE SOUTHERN RR, E TO KY-39 N OF
BROYLES RD. (INCLUDES I-CHNG AT KY-39). (CONST SEQ. 3)
(2002BOP)(04KYD)(05KYD) (2024CCN)
KY-80,
PF-9999
Pulaski PL59.5000
DN
RW
UT
CN 42,000,000 42,000,000 IF
11,000,000 NH
Project Cost:
0 53,000,000 42,000,000
S
omerset Northern Bypass Section 4; From East of the KY 39
Interchange, to KY 461 / KY 80 Interchange (8-59.25 - BUILD Grant
Project)(Congressional KYD Earmark - $45M)
(2024CCN)
KY-80,
PF-9999
Pulaski PL59.6000
DN
RW
UT
CN 42,000,000 IF
Project Cost:
0 0 42,000,000
S
OMERSET NORTHERN BYPASS (I-66) FROM WEST OF THE BRIDGE
OVER US-27 TO KY 461/KY 80 INTERCHANGE. (REMAINING
ALLOCATED FY 24 CONGRESSIONAL EARMARK KYD FUNDING,
INCLUDING REQUIRED 20% STATE MATCHING FUNDS)
CO-0, KY-80Pulaski PL59.7000
DN
RW
UT 1,310,000 KYD
CN 54,950,000 KYD
Project Cost:
56,260,000 0 0
Page 197 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
HORIZONTAL AND VERTICAL REALIGNMENT OF KY-196 AT WHITE
O
AK CREEK FROM 1.0 MILE E OF WARNER ROAD TO 0.3 MILE W OF
SIEVERS ROAD.(10CCR)(14CCR) (2024CCN)
KY-196Pulaski PL121
DN 600,000 SPP
RW 530,000 SPP
UT 520,000 SPP
CN
Project Cost: 0 600,000 1,050,000
I
MPROVE SAFETY AND MOBILITY ALONG KY 39 BETWEEN KY 80
AND OAK LEAF LANE. (2020CCR) (2024CCR)
KY-39Pulaski PL169
DN 710,000 STP1
RW
UT
CN
Project Cost: 0 710,000 0
R
educe congestion and improve safety and mobility along US 27
between General Burnside Island and Cumberland River Bridge.
(2024CCN)
US-27Pulaski PL272
DN
RW 6,330,500 NH
UT
CN
Project Cost:
0 0 6,330,500
B
RIDGE PROJECT IN PULASKI COUNTY ON (100B00102N) KY-196 AT
LITTLE WHITE OAK CREEK
KY-196Pulaski PL10069
DN 140,588 BRX
RW
UT
CN 937,250 BRX
Project Cost: 0 0 1,077,838
ADDRESS CONDITION OF KY-39 FROM MILEPOINT 6.47 TO MILEPOINT
1
0.673
KY-39P ulaski PL22366
DN 140,000 STP5
RW
UT
CN 1,610,000 STP5
Project Cost: 1,750,000 0 0
Page 198 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY AND
M
OBILITY ALONG KY 90 BETWEEN WAYNE COUNTY LINE AND NEW
CUMBERLAND RIVER BRIDGE (2020CCN) (2022CCR) (2024CCR)
KY-90Pulaski PL80104
DN 2,500,000 SPP
RW 6,300,000 SPP
UT 2,270,000 SPP
CN
Project Cost: 2,500,000 0 8,570,000
A
ddress safety, capacity and access issues along KY-461 from
south of Buck Creek extending northerly to Pulaski/Rockcastle Line (as
a continuation of 8-59.25). (2024CCN)
KY-461Pulaski PL80302
DN 2,976,000 SPP
RW
UT
CN
Project Cost:
0 2,976,000 0
M
inor widening along KY-914 by adding turning lanes and relocating
an existing entrance into adjacent property. (2024CCN)
KY-914Pulaski PL80310
DN 100,000 SPP
RW
UT 180,000 SPP
CN 1,100,000 SPP
Project Cost: 100,000 180,000 1,100,000
I
mprove geometrics and safety along KY 3262 from Baker Road to
approximately 0.5mi northeast of Baker Road (2024CCN)
KY-3262Pulaski PL80312
DN 514,800 SPP
RW 640,000 SPP
UT
CN
Project Cost: 0 514,800 640,000
I
mprove safety and congestion along KY 1642 at KY 1577 (MP 13.4
-13.7) (2024CCN)
KY-1642Pulaski PL80350
DN
RW 1,200,000 SPP
UT 1,500,000 SPP
CN 3,640,000 SPP
Project Cost: 0 2,700,000 3,640,000
Page 199 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve sight distance at the left turn lanes along US 27 at KY 635
t
raffic light (MP 22.5 -22.8) (2024CCN)
US-27Pulaski PL80353
DN 100,000 SPP
RW
UT 150,000 SPP
CN
Project Cost: 0 100,000 150,000
T
otal for Pulaski county PL
Total Amounts:
CN
UT
RW
DN 2,740,000 4,900,800 140,588
1,200,000 13,800,500
1,310,000 1,680,000 2,940,000
56,560,000 53,000,000 89,677,250
60,610,000 60,780,800 106,558,338
I
MPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE
NEW ROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)
(14CCR)(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-616Robertson PL8711
DN
RW 530,000 SPP
UT 320,000 SPP
CN 4,480,000 SPP
Project Cost:
0 850,000 4,480,000
I
MPROVE THE INTERSECTION OF US 62 AND KY 165 IN MOUNT
OLIVET. (2024CCN)
US-62Robertson PL80312
DN 390,000 SPP
RW
UT
CN
Project Cost: 0 390,000 0
T
otal for Robertson county PL
Total Amounts:
CN
UT
RW
DN 390,000
530,000
320,000
4,480,000
0 1,240,000 4,480,000
Page 200 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN ROCKCASTLE COUNTY ON (102C00067N)
M
ARET CEMETERY RD AT ROUND STONE CREEK
CR-1086Rockcastle PL10071
DN 136,244 FBP2
RW
UT
CN 908,293 FBP2
Project Cost: 0 1,044,537 0
A
DDRESS CONDITION OF I-075 FROM MILEPOINT 64.5 (65.22
NON-CARDINAL) TO MILEPOINT 68.78
I -75Rockcastle PL22111
DN 530,000 NHPM
RW
UT
CN 5,293,808 NHPM
Project Cost: 0 0 5,823,808
A
ddress capacity and access issues along KY-461 from
Pulaski/Rockcastle County Line to KY 1250. (2024CCN)
KY-461Rockcastle PL80303
DN 2,527,800 SPP
RW
UT
CN
Project Cost: 0 0 2,527,800
A
ddress safety, capacity and access issues along KY-461 from KY
1250 to US 150. (2024CCN)
KY-461Rockcastle PL80304
DN 1,672,000 SPP
RW
UT
CN
Project Cost: 0 1,672,000 0
P
lanning study on US 25 to address Connectivity for future
development in Mt. Vernon on the western side of I-75 between exit
59 and exit 62. (2024CCN)
US-25Rockcastle PL 250,000 SPP80305
DN
RW
UT
CN
Project Cost:
0 250,000 0
T
otal for Rockcastle county PL
Total Amounts:
CN
UT
RW
DN
250,000
1,808,244 3,057,800
908,293 5,293,808
0 2,966,537 8,351,608
Page 201 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH.
(
12CCR)(18CCR) (2020CCR) (2022CCR) (2024CCR)
KY-32Rowan PL204
DN
RW
UT
CN 27,460,000 HGC
Project Cost: 27,460,000 0 0
E
xtend KY 801 from its intersection with KY 158 at Sharkey to KY 32
near the Fleming/Rowan county line. (2024CCR)
KY-801Rowan PL 320,000 SPP234
DN 3,920,000 SPP
RW
UT
CN
Project Cost: 0 320,000 3,920,000
R
owan County East & West Bound Renovation located on I-64.
(2024BOP)
I -64Rowan PL3029
DN
RW
UT
CN 5,100,000 NH
Project Cost: 5,100,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4312
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4315
DN
RW
UT
CN 90,000 GR
Project Cost: 90,000 0 0
Page 202 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-3319 IN ROWAN COUNTYK Y-3319Rowan PL4319
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4320
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON US-60 IN ROWAN COUNTYUS-60Rowan PL4321
DN
RW
UT
CN 40,000 GR
Project Cost: 40,000 0 0
I
MPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION
ON KY-377 FROM KY-32 TO JUST SOUTH OF CLEAR FORK ROAD.
(2022BOP) (2024CCN)
KY-377Rowan PL8406.1000
DN
RW
UT
CN 50,760,000 SPP
Project Cost: 0 0 50,760,000
I
MPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION
ON KY-377 FROM JUST SOUTH OF CLEARK FORK ROAD TO JUST
NORTH OF KY 799 (BIG PERRY ROAD). (2024CCN)
KY-377Rowan PL8406.2000
DN
RW 6,600,000 STP2
UT 11,760,000 STP2
CN
Project Cost:
0 6,600,000 11,760,000
Page 203 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-064 FROM MILEPOINT 134.75 TO
M
ILEPOINT 138.3
I -64Rowan PL22048
DN 800,000 NHPM
RW
UT
CN 8,000,000 NHPM
Project Cost: 0 8,800,000 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 147.9 TO MILEPOINT
1
48.665
I -64R owan PL22050
DN 230,000 NHPM
RW
UT
CN 2,259,115 NHPM
Project Cost: 0 0 2,489,115
WIDEN AND SOFTEN CURVE ON CR 1391 (BRATTON BRANCH RD) AT
W
ALMART (2020CCN)
CR-1391R owan PL80108
DN 25,000 SPP
RW 60,000 SPP
UT 80,000 SPP
CN
Project Cost: 0 25,000 140,000
I
mprove safety and reduce congestion on KY 32 (Flemingsburg Road)
between the intersections of CS 1203 (Trademore Drive) and CS1001
(Fraley Drive) and in the vicinity of the I-64 interchange. (2024CCN)
KY-32Rowan PL80307
DN
RW 3,000,000 NH
UT 7,540,000 NH
CN 15,000,000 NH
Project Cost:
0 10,540,000 15,000,000
R
educe congestion and improve mobility on KY 32 (Flemingsburg
Road) between the intersections with KY 3531 (Viking Drive) and
CS1020 (Mabry Drive). (2024CCN)
KY-32Rowan PL80308
DN 1,820,000 SPP
RW
UT
CN
Project Cost:
0 1,820,000 0
Page 204 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Improve safety and reduce congestion at the intersection of US 60
(
West Wilkinson Blvd.) and KY 32 (Flemingsburg Road). (2024CCN)
KY-32, US-60Rowan PL80309
DN
RW 440,000 STP1
UT 600,000 STP1
CN 4,350,000 STP1
Project Cost: 0 1,040,000 4,350,000
T
otal for Rowan county PL
Total Amounts:
CN
UT
RW
DN
320,000
2,645,000 4,150,000
10,040,000 60,000
8,140,000 11,840,000
32,770,000 8,000,000 72,369,115
32,770,000 29,145,000 88,419,115
R
educe congestion and improve capacity, safety and mobility on US
127 between the west bypass of Jamestown to the Cumberland
Parkway. See segment 12 in June 1998 Advance (2024CCR)
US-127Russell PL156
DN
RW 5,490,000 NH
UT 3,880,000 NH
CN
Project Cost:
0 5,490,000 3,880,000
B
RIDGE PROJECT IN RUSSELL COUNTY ON (104B00003N) KY-379 AT
CROCUS CREEK
KY-379Russell PL10072
DN 77,042 BRZ
RW
UT
CN 513,615 BRZ
Project Cost: 590,657 0 0
I
MPROVE CONGESTION AND SAFETY ALONG US 127 AT KY 1381
(VOILS ROAD) AND SK LANE IN RUSSELL SPRINGS (MILEPOINT 17.2
TO MILEPOINT 17.45) (2022CCN)
US-127Russell PL80250
DN 260,000 SPP
RW 1,050,000 SPP
UT
CN
Project Cost:
0 260,000 1,050,000
Page 205 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE GEOMETRICS ALONG KY 3278. (2024CCN)K Y-3278Russell PL80316
DN 225,000 SPP
RW 200,000 SPP
UT 400,000 SPP
CN
Project Cost: 0 225,000 600,000
T
otal for Russell county PL
Total Amounts:
CN
UT
RW
DN 77,042 485,000
5,490,000 1,250,000
4,280,000
513,615
590,657 5,975,000 5,530,000
B
RIDGE PROJECT IN SCOTT COUNTY ON (105R00605N) HINTON RD
AT NS (CNO&TP) SYSTEM
CR-1020Scott PL10013
DN 263,149 BRZ
RW
UT
CN 1,754,325 BRZ
Project Cost: 0 2,017,474 0
B
RIDGE PROJECTS IN SCOTT AND WOODFORD COUNTIES ON
(105B00082N) CANE RUN RD, (120B00024L&R) OVER ELKHORN
CREEK, AND (120B00022L&R) OVER US 421 ALONG I-64
CR-1206Scott PL10059
DN
RW
UT
CN 3,000,000 FBP
Project Cost: 0 0 3,000,000
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 67.106 TO
MILEPOINT 71
I -64Scott PL20049
DN 780,000 NHPM
RW
UT
CN 7,786,800 NHPM
Project Cost: 8,566,800 0 0
Page 206 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-075 FROM MILEPOINT 136.758 TO
M
ILEPOINT 138.424
I -75Scott PL22119
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 0 5,400,000
I
MPROVE CAPACITY AND ACCESS ON KY 2906 FROM US 460 TO US
62 (2020CCN) (2022CCR) (2024CCR)
KY-2906Scott PL80102
DN
RW 5,700,000 SPP
UT 1,750,000 SPP
CN
Project Cost: 0 5,700,000 1,750,000
I
mprove safety and driver expectancy at the intersection of US 62
(Paynes Depot Road), US 421 (Leestown Road), and Weisenberger
Mill Road. (2024CCN)
US-62Scott PL80317
DN 520,000 SPP
RW 500,000 SPP
UT 700,000 SPP
CN 3,000,000 SPP
Project Cost:
520,000 1,200,000 3,000,000
P
rovide a safe and efficient connection between KY 32 (Long Lick
Pike) and KY 1143 (Georgetown Bypass). (2024CCN)
PF-9999Scott PL80318
DN 690,000 SPP
RW 650,000 SPP
UT 380,000 SPP
CN
Project Cost: 0 690,000 1,030,000
A
ddress safety issues on KY 1962 (Lemon's Mill Road) From Military
Street in Georgetown to Lisle Road at I-75. (2024CCN)
CS-1010,
CS-1115,
KY-1962
Scott PL80319
DN 1,000,000 SPP
RW
UT
CN
Project Cost:
0 1,000,000 0
T
otal for Scott county PL
Total Amounts:
CN
UT
RW
DN 1,300,000 1,953,149 490,000
6,200,000 650,000
700,000 2,130,000
7,786,800 1,754,325 10,910,000
9,086,800 10,607,474 14,180,000
Page 207 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
EXPAND TRUCK PARKING AT I-64 EB WELCOME CENTER.I -64Shelby PL579
DN
RW
UT
CN 1,160,000 NH
Project Cost: 1,160,000 0 0
CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO
R
OCKET LANE. (12CCN)(14CCR)(2020CCR) (2022CCR) (2024CCR)
US-60S helby PL8713
DN
RW
UT
CN 3,220,000 SPP
Project Cost: 0 3,220,000 0
W
IDEN KY 55X FROM TWO TO FIVE LANES FROM US 60 (MP 0.0)
NORTH TO KY 43 (MP 1.354).(16CCN) (2024CCN)
KY-55Shelby PL8958
DN 1,650,000 SPP
RW
UT
CN
Project Cost: 0 1,650,000 0
B
RIDGE PROJECT IN SHELBY COUNTY ON (106B00007R) US 60 EB
AT CLEAR CREEK
US-60Shelby PL10086
DN 598,605 FBP
RW
UT
CN 3,990,701 FBP
Project Cost: 4,589,306 0 0
ADDRESS CONDITION OF I-064 FROM MILEPOINT 43.77 TO MILEPOINT
4
6.303
I -64S helby PL22029
DN 490,000 NHPM
RW
UT
CN 4,910,000 NHPM
Project Cost: 0 0 5,400,000
Page 208 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS ACCESS MANAGEMENT AND SAFETY ISSUES ALONG KY
5
5X FROM KY 43 TO THE ENTRANCE OF THE SHELBYVILLE BYPASS
(KY 55). (2024CCN)
KY-55Shelby PL 250,000 SPP80308
DN 2,090,000 SPP
RW
UT
CN
Project Cost: 250,000 2,090,000 0
IMPROVE CONNECTIVITY FROM KY 53 AT THE OLD SEVEN MILE PIKE
I
NTERSECTION TO US 60/ROCKET LANE INTERSECTION. (2024CCN)
PF-9999S helby PL80312
DN 1,800,000 SPP
RW
UT
CN
Project Cost: 0 1,800,000 0
A
DDRESS SAFETY AND IMPROVE TRAFFIC FLOW WITH
OPERATIONAL IMPROVEMENTS ON KY 55 AT OLD BRUNERSTOWN
ROAD. THIS PROJECT WILL CONSIDER A RIGHT-TURN LANE ON SB
KY 55. (2024CCN)
KY-55Shelby PL80318
DN 270,000 SPP
RW 60,000 SPP
UT 110,000 SPP
CN
Project Cost:
0 270,000 170,000
A
DDRESS SAFETY AND IMPROVE TRAFFIC FLOW AT THE KY 55/US
60 INTERSECTION IN SHELBYVILLE. PROJECT WILL CONSIDER THE
ADDITION OF A RIGHT-TURN LANE SOUTHBOUND ON KY 55.
(2024CCN)
KY-55Shelby PL80319
DN 270,000 SPP
RW 110,000 SPP
UT 170,000 SPP
CN 670,000 SPP
Project Cost:
0 270,000 950,000
CONSTRUCT PEDESTRIAN FACILITIES ON THE NORTH SIDE OF US 60
F
ROM THE MASONIC HOME TO ROCKET LANE. (2024CCN)
US-60S helby PL80326
DN 470,000 STP1
RW 50,000 STP1
UT 20,000 STP1
CN
Project Cost: 0 470,000 70,000
T
otal for Shelby county PL
Total Amounts:
CN
UT
RW
DN
250,000
598,605 6,550,000 490,000
220,000
300,000
5,150,701 3,220,000 5,580,000
5,999,306 9,770,000 6,590,000
Page 209 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET.
(
14CCN) (2022CCR) (2024CCR)
KY-1008Simpson PL8855
DN
RW
UT
CN 4,600,000 HGC
Project Cost: 0 4,600,000 0
I
MPROVE US-31W FROM KY-1008 TO KY-621. (14CCN)(16CCR)
(2020CCR) (2024CCR)
US-31Simpson PL8856
DN
RW 4,200,000 SPP
UT 8,880,000 SPP
CN
Project Cost: 0 4,200,000 8,880,000
S
UPPLEMENTAL MOA FOR INDUSTRIAL ACCESS ROADS FOR
STONE-GIVENS PARK (2022CCN)
KY-100Simpson PL80202
DN
RW
UT
CN 300,000 SPP
Project Cost: 300,000 0 0
IMPROVE MOBILITY ALONG KY 1171 (NORTH STREET) FROM THE
I
NTERSECTION WITH US 31W TO THE INTERSECTION WITH KY 1008 IN
FRANKLIN. (2024CCN)
KY-1171S impson PL80310
DN 1,290,000 SPP
RW
UT
CN
Project Cost: 0 1,290,000 0
IMPROVE MOBILITY BY COMPLETING THE KY 1008 BYPASS AROUND
F
RANKLIN. (2024CCN)
KY-1008S impson PL80316
DN 3,410,000 SPP
RW
UT
CN
Project Cost: 0 3,410,000 0
Page 210 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY ON KY 585 AT LICK CREEK FROM MP 3.45 TO 3.75.
(
2024CCN)
KY-585S impson PL80321
DN 970,000 SPP
RW 650,000 SPP
UT 620,000 SPP
CN
Project Cost: 0 970,000 1,270,000
T
otal for Simpson county PL
Total Amounts:
CN
UT
RW
DN 5,670,000
4,200,000 650,000
9,500,000
300,000 4,600,000
300,000 14,470,000 10,150,000
I
mprove safety and traffic operations on KY 55 from KY 1169 to KY
155 and on KY 155 from KY 55 to MP 2.0 (total length 2.71 miles)
(Portion of 5-8954.0). (2024CCN)
KY-155,
KY-55
Spencer PL8954.2000
DN 780,000 SPP
RW 1,080,000 SPP
UT 5,070,000 SPP
CN
Project Cost:
0 780,000 6,150,000
I
mprove traffic operations on KY 55 from KY 1169 to KY 155 (MP 10.5
- 11.3) (Portion of 5-8954.0). (2024CCN)
KY-55Spencer PL8954.3000
DN 440,000 SPP
RW 210,000 SPP
UT 150,000 SPP
CN
Project Cost: 0 440,000 360,000
IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG
K
Y-44 NEAR DUTCHMAN CREEK ROAD. (16CCN) (2020CCR)
(2024CCR)
KY-44S pencer PL8955
DN
RW 220,000 SPP
UT 300,000 SPP
CN 3,260,000 SPP
Project Cost: 0 520,000 3,260,000
Page 211 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN SPENCER COUNTY ON (108B00008N) KY 44 AT
P
LUM CREEK
KY-44Spencer PL10094
DN 330,450 BRX
RW
UT
CN 2,202,998 BRX
Project Cost: 0 2,533,448 0
REDUCE CONGESTION, IMPROVE SAFETY, AND ENHANCE MOBILITY
O
N KY 55 FROM KY 44 TO INDUSTRIAL DR. (MP 6.610 TO MP 6.838)
(2022CCN)
KY-55S pencer PL80213
DN 250,000 SPP
RW
UT 40,000 SPP
CN
Project Cost: 0 250,000 40,000
IMPROVE CAPACITY, RELIEVE CONGESTION, AND IMPROVE SAFETY
A
LONG KY 44 FROM GOOSE CREEK ROAD (CR 1121) TO OAK TREE
WAY (CS 1053) (MILEPOINT 1.202 TO MILEPOINT 7.542) (2022CCN)
(2024CCR)
KY-44S pencer PL80254
DN 8,630,000 SPP
RW
UT
CN
Project Cost: 0 8,630,000 0
IMPROVE CAPACITY, RELIEVE CONGESTION, AND IMPROVE SAFETY
A
LONG KY 44 FROM COXS LANE (CR 1087) NEAR THE
BULLITT/SPENCER CO LINE TO GOOSE CREEK ROAD (CR 1121)
(MILEPOINT 0 TO MILEPOINT 1.202). (2022CCN) (2024CCR)
KY-44S pencer PL80255
DN 1,770,000 SPP
RW
UT
CN
Project Cost: 0 1,770,000 0
I
MPROVE SAFETY AND TRAFFIC OPERATIONS ON KY 55 FROM KY
44 IN TAYLORSVILLE TO KY 1169 (NORMANDY ROAD) BY
PROVIDING ADDITIONAL TURNING AND PASSING OPPORTUNITIES
(2+1 ROAD BY ADDING A TURN LANE THAT CAN SERVE AS AN
ALTERNATING PASSING LANE). (2022CCN) (2024CCR)
KY-55Spencer PL80256
DN 1,720,000 SPP
RW
UT
CN
Project Cost:
0 1,720,000 0
Page 212 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND TRAFFIC OPERATIONS ON KY 55 FROM KY
1
55 NEAR ELK CREEK TO KY 148 AT FINCHVILLE. PROJECT LIMITS
ARE ON KY 55 IN SPENCER COUNTY FROM KY 155 (TAYLORSVILLE
ROAD) AT MP 11.270 TO THE SPENCER/SHELBY COUNTY LINE AT MP
13.566 AND IN SPENCER COUNTY FROM MP 0.00 TO JUST NORTH OF
KY-55S pencer PL80257
DN 3,270,000 SPP
RW
UT
CN
Project Cost: 0 3,270,000 0
ADDRESS SAFETY AND GEOMETRIC ISSUES ON KY 44 AT JUNCTION
K
Y 1251 TO CURVE AFTER HUNTER'S TRACE ROAD. (2024CCN)
KY-44S pencer PL80315
DN 1,020,000 SPP
RW 920,000 SPP
UT
CN
Project Cost: 0 1,020,000 920,000
I
mprove safety at the intersection of KY 155 and KY
3192/Hochstrasser Road (MP 2.4-2.6) (2024CCN)
KY-155Spencer PL80316
DN 540,000 SPP
RW 210,000 SPP
UT 110,000 SPP
CN
Project Cost: 0 540,000 320,000
I
MPROVE SAFETY AT THE US 31E/KY 523 INTERSECTION. (2024CCN)US-31Spencer PL80327
DN 400,000 STPF
RW
UT
CN
Project Cost: 0 0 400,000
I
mprove intersection of KY 155 and Goebel Road/Hochstrasser Road
(MP 0.65 - 0.85). (2024CCN)
KY-155Spencer PL80351
DN 330,000 SPP
RW 160,000 SPP
UT
CN
Project Cost: 0 330,000 160,000
T
otal for Spencer county PL
Total Amounts:
CN
UT
RW
DN 19,080,450 400,000
220,000 2,580,000
300,000 5,370,000
2,202,998 3,260,000
0 21,803,448 11,610,000
Page 213 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026 THROUGH FY
2
032. (2024CCR)
CO-0Statewide PL65.1900
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 BRO
Project Cost: 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide PL65.2000
DN
RW
UT
CN 2,000,000 2,000,000 1,000,000 BRX
Project Cost: 2,000,000 2,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS OFF SYSTEM BRIDGES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL65.2100
DN
RW
UT
CN 1,000,000 1,000,000 1,000,000 BRZ
Project Cost: 1,000,000 1,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026-2032. (FBP
PROGRAM) (2024CCR)
CO-0Statewide PL65.2200
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 FBP
Project Cost: 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2026-2032. (FBP2
PROGRAM)
CO-0Statewide PL65.2300
DN
RW
UT
CN 2,000,000 2,000,000 2,000,000 FBP2
Project Cost: 2,000,000 2,000,000 2,000,000
Page 214 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
'ITS' AND 'TSMO' ACTIVITIES ON VARIOUS NHS ROUTES IN
K
ENTUCKY FOR FY 2027 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL66.1900
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
T
ransportation Systems Management and Operations (TSMO) activities
on various routes for FY-2022 through FY 2028. (2024CCR)
CO-0Statewide PL66.2100
DN
RW
UT
CN 2,000,000 2,000,000 SPP
Project Cost: 0 2,000,000 2,000,000
S
TATEWIDE TRANSPORTATION ALTERNATIVES PROGRAM FOR FY
2026 THROUGH FY 2032 (2024CCR)
CO-0Statewide PL195.1600
DN
RW
UT
CN 12,300,000 12,300,000 12,300,000 TAP
Project Cost: 12,300,000 12,300,000 12,300,000
N
ON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS
FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL219.1800
DN
RW
UT
CN 8,100,000 8,100,000 8,100,000 CM
Project Cost: 8,100,000 8,100,000 8,100,000
P
AVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN
KENTUCKY FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL224.1400
DN
RW
UT
CN 5,000,000 5,000,000 STP5
Project Cost: 0 5,000,000 5,000,000
Page 215 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALLATION OF HIGH MAST LIGHTING AT THE I-24 REST AREA IN
C
HRISTIAN COUNTY, KENTUCKY. (2024BOP)
CO-0Statewide PL233
DN
RW
UT
CN 1,040,000 SPP
Project Cost: 0 1,040,000 0
P
ROMOTING RESILIENT OPERATIONS FOR TRANSFORMATIVE,
EFFICIENT, AND COST SAVING TRANSPORTATION (PROTECT)
PROGRAM FORMULA FUNDS.
CO-0Statewide PL239
DN
RW
UT
CN 20,000,000 5,000,000 PROT
Project Cost:
0 20,000,000 5,000,000
S
TATEWIDE CARBON REDUCTION PROGRAM.CO-0Statewide PL244
DN
RW
UT
CN 12,520,000 14,600,000 14,600,000 CARB
Project Cost: 12,520,000 14,600,000 14,600,000
S
TATEWIDE BRIDGE INSPECTION FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL327.1600
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 BRX
Project Cost: 5,000,000 5,000,000 5,000,000
S
TATEWIDE I-STATE ROUTES FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL337.1500
DN
RW
UT
CN 5,000,000 5,000,000 NHPM
Project Cost: 0 5,000,000 5,000,000
Page 216 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2026
T
HROUGH FY 2032. (2024CCR)
CO-0Statewide PL346.1600
DN
RW
UT
CN 3,000,000 3,000,000 3,000,000 BRZ
Project Cost: 3,000,000 3,000,000 3,000,000
R
AILWAY-HIGHWAY CROSSINGS PROGRAM ON VARIOUS ROUTES
FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL352.1600
DN
RW
UT
CN 3,430,000 3,510,000 RRP
Project Cost: 3,430,000 3,510,000 0
P
AVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN
KENTUCKY FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL369.1000
DN
RW
UT
CN 5,000,000 5,000,000 NHPM
Project Cost: 0 5,000,000 5,000,000
O
HIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2026 THROUGH
FY 2032. (2024CCR)
CO-0Statewide PL388.1000
DN
RW
UT
CN 4,000,000 4,000,000 4,000,000 BRX
Project Cost: 4,000,000 4,000,000 4,000,000
S
TATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL391.0600
DN 1,000,000 1,000,000 1,000,000 STPF
RW
UT
CN
Project Cost: 1,000,000 1,000,000 1,000,000
Page 217 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
STATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES FOR FY 2022
T
HROUGH FY 2028. (2024CCR)
CO-0Statewide PL391.0700
DN 5,000,000 5,000,000 5,000,000 SPP
RW
UT
CN
Project Cost: 5,000,000 5,000,000 5,000,000
U
PGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR
STREAMS AND WATERWAYS FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL400.0700
DN
RW
UT
CN 500,000 500,000 500,000 BRX
Project Cost:
500,000 500,000 500,000
H
ONORING BORDER STATES COMMITMENTS FOR EXISTING
BRIDGES(CANNOT BE MOVED) FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide PL510.0500
DN
RW
UT
CN 2,000,000 2,000,000 2,000,000 BRX
Project Cost:
2,000,000 2,000,000 2,000,000
S
TATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT
STABILIZATION FOR FY 2022 THROUGH FY 2028. (2024CCR)
CO-0Statewide PL511.0400
DN
RW
UT
CN 1,000,000 1,000,000 1,000,000 SPP
Project Cost: 1,000,000 1,000,000 1,000,000
P
REVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL514.0100
DN
RW
UT
CN 2,500,000 2,500,000 2,500,000 BRX
Project Cost: 2,500,000 2,500,000 2,500,000
Page 218 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT
S
TABILIZATION ON NH ROUTES FOR FY 2026 THROUGH FY 2032.
(2020CCR) (2024CCR)
CO-0Statewide PL518.0100
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
S
TATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT
STABILIZATION ON NON NH ROUTES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide PL518.0300
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 STPF
Project Cost:
5,000,000 5,000,000 5,000,000
S
tatewide NHS Rest Area Repairs. (2024CCR)CO-0Statewide PL600
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
STATEWIDE NHS REST AREA / WELCOME CENTERS / WEIGH STATION
R
EPAIRS. (2024CCR)
CO-0S tatewide PL600.1000
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 SPP
Project Cost: 5,000,000 5,000,000 5,000,000
A
dditional Parking at NHS Rest Area and Weigh Stations. (2024CCR)CO-0Statewide PL601
DN
RW
UT
CN 5,000,000 5,000,000 NH
Project Cost: 0 5,000,000 5,000,000
Page 219 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY IMPROVEMENT NEEDS FOR STATE-OWNED DAMS
C
ONSTRUCTED TO FACILIATE KENTUCKY'S HIGHWAY SYSTEM.
CO-0S tatewide PL610
DN
RW
UT
CN 5,000,000 5,000,000 SPP
Project Cost: 0 5,000,000 5,000,000
P
LANNING FUNDS TO SCOPE PROJECTS FOR CONSIDERATION IN
FUTURE HIGHWAY PLANS.
CO-0Statewide PL 2,500,000 2,500,000 SPP611
DN
RW
UT
CN
Project Cost: 0 2,500,000 2,500,000
S
TATEWIDE SAFETY PROGRAM FOR FY 2026 THROUGH FY 2032.
(HSIP) (2024CCR)
CO-0Statewide PL911.0900
DN
RW
UT
CN 71,300,000 71,300,000 71,300,000 SAF
Project Cost: 71,300,000 71,300,000 71,300,000
S
TATEWIDE SAFETY FUNDING TO BE USED ALONGSIDE FEDERAL
HSIP FUNDING TO ENHANCE ROADWAY SAFETY IN KENTUCKY.
(2022CCR)
CO-0Statewide PL911.5000
DN
RW
UT
CN 2,500,000 2,500,000 2,500,000 SPP
Project Cost: 2,500,000 2,500,000 2,500,000
S
TATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL1063.1600
DN
RW
UT
CN 1,000,000 1,000,000 1,000,000 BRX
Project Cost: 1,000,000 1,000,000 1,000,000
Page 220 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
STATEWIDE PROGRAM TO FUND BRIDGE SCOUR
C
OUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL1071.0800
DN
RW
UT
CN 3,000,000 3,000,000 3,000,000 BRX
Project Cost: 3,000,000 3,000,000 3,000,000
S
TATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide PL1074.0800
DN
RW
UT
CN 2,000,000 2,000,000 1,000,000 BRX
Project Cost: 2,000,000 2,000,000 1,000,000
P
AVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2026
THROUGH FY 2032 STP5 FUNDING. (2024CCR)
CO-0Statewide PL2700.1400
DN
RW
UT
CN 2,000,000 2,000,000 STP5
Project Cost: 0 2,000,000 2,000,000
A
MERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN
IMPLEMENTATION PROJECTS FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL3011.0100
DN
RW
UT
CN 5,000,000 5,000,000 5,000,000 STPF
Project Cost: 5,000,000 5,000,000 5,000,000
W
hitehaven Rest Area Renovation located between Exit 6 and Exit 7
on Interstate 24 in Paducah, KY. (2024BOP)
CO-0Statewide PL3022
DN
RW
UT
CN 980,000 NH
Project Cost: 980,000 0 0
Page 221 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
SCHOOL TURN LANE PROJECTS FOR NEW SCHOOLS FOR FY 2022
T
HROUGH FY 2028. (2022CCR) (2024CCR)
CO-0Statewide PL8500.1600
DN
RW
UT
CN 2,500,000 2,500,000 2,500,000 SPP
Project Cost: 2,500,000 2,500,000 2,500,000
W
estern KY DECEMBER 2021 Tornado Relief Funding POOL FOR THE
LAST DOLLAR (UNCOVERED BY FEMA OR INSURANCE)
RECONCTRUCTION OF EXISTING ROADS. (2022CCR) (2024CCR)(SEE
GRAVES COUNTY 1-220.00 FOR MAYFIELD, KY KYD USDOT RAISE
GRANT PROJECT)
CO-0Statewide PL8600
DN
RW
UT
CN 3,000,000 7,000,000 SPP
Project Cost:
3,000,000 7,000,000 0
A
DVANCE CONSTRUCTION COMMITMENTS FOR MOUNTAIN
PARKWAY EXPANSION; I-65 CENTRAL CORRIDOR; AND OTHER
ACTIVE DESIGN/BUILD PROJECTS.
CO-0Statewide PL8601
DN
RW
UT
CN 182,000,000 100,000,000 93,000,000 NH
Project Cost:
182,000,000 100,000,000 93,000,000
A
DVANCE CONSTRUCTION CONTRACTS FOR KY 536 IN NORTHERN
KENTUCKY, KY 32 IN MOREHEAD, AND OTHER ACTIVE STPF
PROJECTS PREVIOUSLY AUTHORIZED.
CO-0Statewide PL8602
DN
RW
UT
CN 6,000,000 21,000,000 STPF
Project Cost:
0 6,000,000 21,000,000
U
S 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND
DEBT SERVICE FOR FY 2027. (2024CCR)
CO-0Statewide PL9068.6100
DN
RW
UT
CN 6,000,000 GAR
Project Cost: 0 6,000,000 0
Page 222 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND
D
EBT SERVICE (STP) FOR FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide PL9068.6600
DN
RW
UT
CN 6,000,000 GAR
Project Cost: 0 6,000,000 0
GARVEE BOND DEBT SERVICE PAYMENTS FOR THE BRENT SPENCE
B
RIDGE PROJECT AND THE I-69 ORX BRIDGE PROJECT.
CO-0S tatewide PL9660
DN
RW
UT
CN 29,000,000 38,600,000 GAR
Project Cost: 0 29,000,000 38,600,000
A
DDRESS CIF (CONSTRAINT INDUCED FATIGUE) DETAILS ON
VARIOUS BRIDGES STATEWIDE
CO-0Statewide PL10003
DN
RW
UT
CN 4,000,000 FBP
Project Cost: 0 0 4,000,000
T
otal for Statewide county PL
Total Amounts:
CN
UT
RW
DN
2,500,000 2,500,000
6,000,000 6,000,000 6,000,000
352,630,000 387,850,000 368,900,000
358,630,000 396,350,000 377,400,000
IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY-70
I
N CAMPBELLSVILLE FROM US-68 TO COUNTRY VIEW COURT
(CS-1305)
KY-70T aylor PL443
DN 1,680,000 SPP
RW
UT
CN
Project Cost: 0 1,680,000 0
Page 223 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY ON KY 210 FROM JUST EAST OF CORINTH
C
HURCH (MP0.60) TO KY 883 (MP14.20) IN TAYLOR COUNTY.
(2024CCN)
KY-210Taylor PL80154.3000
DN 3,120,000 SPP
RW
UT
CN
Project Cost: 0 3,120,000 0
E
XTEND KY 3350 (CAMPBELLSVILLE BYPASS) FROM ky 289 TO US
68 ON THE EAST SIDE OF CAMPBELLSVILLE. (2022CCN) (2024CCR)
KY-3350,
PF-9999
Taylor PL80257
DN 1,560,000 SPP
RW
UT
CN
Project Cost:
0 1,560,000 0
T
otal for Taylor county PL
Total Amounts:
CN
UT
RW
DN 6,360,000
0 6,360,000 0
B
RIDGE PROJECT IN TODD COUNTY ON (110B00031N) KY-848 AT
SPRING CREEK
KY-848Todd PL10048
DN 130,320 BRX
RW
UT
CN 868,802 BRX
Project Cost: 0 0 999,122
T
otal for Todd county PL
Total Amounts:
CN
UT
RW
DN 130,320
868,802
0 0 999,122
Page 224 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Correct geometric deficiencies and address safety, mobility and
a
ccess issues along KY 139 from the intersection of KY 124 north of
Cadiz to the I-24 Interchange in Caldwell Co (EMP 0.348) (2024CCN)
KY-139Trigg PL147
DN 1,620,000 SPP
RW
UT
CN
Project Cost: 0 1,620,000 0
B
RIDGE PROJECT IN TRIGG COUNTY ON (111B00009N) KY-272 AT
BURGE CREEK
KY-272Trigg PL10182
DN 269,786 BRZ
RW
UT
CN 1,798,571 BRZ
Project Cost: 2,068,357 0 0
A
DDRESS SAFETY CONCERNS ON GLENWOOD RD (CR-1005) FROM
KY 272 TO US 68/80 FROM MP 0.0 TO MP 2.1 (2024CCN)
CR-1005Trigg PL80306
DN 780,000 SPP
RW 750,000 SPP
UT 500,000 SPP
CN
Project Cost: 0 780,000 1,250,000
A
DDRESS SAFETY CONCERNS ON KINGS CHAPEL RD (CR-1004)
FROM KY 272 TO US 68/80 FROM MP 0.0 TO MP 3.7 (2024CCN)
CR-1014Trigg PL80307
DN 1,560,000 SPP
RW
UT
CN
Project Cost: 0 1,560,000 0
IMPROVE KY 276 FROM KY139 (MP 0.00) TO US68 (MP 14.121). THIS
N
ARROW 2 LANE ROAD SERVES AS A BY-PASS WHEN I-24 IS
SHUTDOWN NEAR CADIZ, KY. CORRIDOR IMPROVEMENTS, CORRECT
GEOMETRIC DEFICIENCIES, ADDRESS SAFETY. (2024CCN)
KY-276T rigg PL80318
DN 3,800,000 SPP
RW
UT
CN
Project Cost: 0 3,800,000 0
T
otal for Trigg county PL
Total Amounts:
CN
UT
RW
DN 269,786 7,760,000
750,000
500,000
1,798,571
2,068,357 7,760,000 1,250,000
Page 225 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF
U
S-421/KY-1226 AT MP 11.5. (12CCR) (2020CCR) (2024CCR)
US-421Trimble PL905
DN 350,000 SPP
RW 830,000 SPP
UT 640,000 SPP
CN
Project Cost: 0 350,000 1,470,000
A
DDRESS CONDITION OF I-071 FROM MILEPOINT 38.086 TO
MILEPOINT 38.808
I -71Trimble PL22100
DN 380,000 NHPM
RW
UT
CN 3,780,000 NHPM
Project Cost: 4,160,000 0 0
I
MPROVE SAFETY, TRUCK MOBILITY, AND ADDRESS GEOMETRIC
DEFICIENCIES ALONG KY 36 FROM US 421 TO 250 FEET EAST OF
SCHOOL HOLLOW ROAD IN MILTON. (2024CCN)
KY-36Trimble PL80309
DN 500,000 SPP
RW
UT
CN
Project Cost:
0 500,000 0
C
ONSTRUCT PEDESTRIAN FACILITIES ALONG US 421 FROM
CUTSHAW LANE TO TRIMBLE COUNTY HIGH SCHOOL/KY 625 AND
ALONG KY 625 TO BEDFORD ELEMENTARY SCHOOL (TOTAL 0.983
MI.) (2024CCN)
US-421Trimble PL80337
DN 430,000 SPP
RW 110,000 SPP
UT 70,000 SPP
CN
Project Cost:
0 430,000 180,000
T
otal for Trimble county PL
Total Amounts:
CN
UT
RW
DN 380,000 1,280,000
940,000
710,000
3,780,000
4,160,000 1,280,000 1,650,000
Page 226 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Address safety and service concerns of US-60 from the KY-950 to
K
Y-492. (2022CCN)
US-60Union PL80202
DN
RW 3,680,000 SPP
UT 8,320,000 SPP
CN
Project Cost: 0 3,680,000 8,320,000
A
ddress the service, safety and condition of KY 56 from Morganfield
to KY 141. (2022CCN) (2024CCR)
KY-56Union PL80203
DN
RW 3,680,000 SPP
UT 3,800,000 SPP
CN
Project Cost: 0 3,680,000 3,800,000
R
econstruct US 60 from Waverly to Corydon (2024CCN)US-60Union PL80314
DN 840,000 SPP
RW 2,000,000 SPP
UT
CN
Project Cost: 0 840,000 2,000,000
R
econstruct US 60 from the Morganfield Bypass to Waverly.
(2024CCN)
US-60Union PL80315
DN 1,150,000 SPP
RW
UT
CN
Project Cost: 0 1,150,000 0
T
otal for Union county PL
Total Amounts:
CN
UT
RW
DN 1,990,000
7,360,000 2,000,000
12,120,000
0 9,350,000 14,120,000
Page 227 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
COMPLETE I65/US68 (GLASGOW ROAD)DIAMOND INTERCHANGE BY
A
DDING NORTHBOUND ON-RAMP AND SOUTHBOUND OFF-RAMP.
(2024CCR)
I -65Warren PL20
DN
RW 530,000 NH
UT 1,655,000 NH
CN
Project Cost: 0 0 2,185,000
N
EW I-65 INTERCHANGE IN SOUTHERN WARREN COUNTY NEAR
WOODBURN. (2024CCR)
I -65Warren PL21
DN 2,000,000 SPP
RW
UT
CN
Project Cost: 0 0 2,000,000
I
MPROVE KY 185 FROM 0.32 MILES SOUTH OF THE AUSTIN RAYMER
ROAD TO 0.08 MILES SOUTH OF THE BRIDGE OVER IVY CREEK.
(2018BOP) (2022CCR)
KY-185Warren PL110.4000
DN
RW 800,000 SPP
UT 680,000 SPP
CN 10,150,000 SPP
Project Cost:
0 1,480,000 10,150,000
R
ECONSTRUCT KY 622 (PLANO RD) TO ELIMINATE TWO
RIGHT-ANGLE CURVES. (2022CCR) (2024CCR)
KY-622Warren PL182
DN
RW 2,880,000 SPP
UT 2,720,000 SPP
CN
Project Cost: 0 5,600,000 0
C
ONSTRUCT A DOUBLE CROSSOVER DIAMOND (DCD) ON US-31W
AT THE I-165 INTERCHANGE IN BOWLING GREEN.
US-31Warren PL212
DN 1,500,000 STP1
RW
UT
CN
Project Cost: 0 1,500,000 0
Page 228 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE
N
ATCHER PARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)
(18CCN) (2020CCR) (2022CCR) (2024CCR)
KY-884Warren PL8818
DN
RW
UT
CN 11,780,000 HGC
Project Cost: 11,780,000 0 0
W
IDEN US-31W FROM WARREN/SIMPSON COUNTY LINE TO
BUCHANON PARK. (14CCN) (2020CCN) (2022CCR) (2024CCR)
US-31Warren PL8853
DN
RW
UT
CN 18,720,000 HGC
Project Cost: 0 18,720,000 0
MAJOR WIDENING/RECONSTRUCTION OF CEMETERY ROAD (KY-234)
F
ROM FOUNTAIN TRACE TO ROGER PORTER ROAD (MP 7.878 TO MP
9.625).(14CCN) (2020CCN) (2022CCR) (2024CCR)
KY-234W arren PL8854
DN
RW 5,400,000 SPP
UT 4,800,000 SPP
CN
Project Cost: 0 10,200,000 0
I
MPROVE US-31W FROM CAMPBELL LANE (US-231) TO UNIVERSITY
BOULEVARD (US-231X). (14CCN)(16CCR)(18CCR) (2020CCR)
(2022CCR) (2024CCR)
US-31Warren PL8857
DN
RW
UT
CN 4,820,000 SPP
Project Cost:
0 4,820,000 0
W
IDEN US 31W FROM PARK AVENUE TO FAIRVIEW AVENUE MP
13.7-14.25. (18CCN) (2020CCR) (2024CCR)
US-31Warren PL8904.1000
DN
RW
UT
CN 5,880,000 HGC
Project Cost: 5,880,000 0 0
Page 229 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE PROJECT IN WARREN COUNTY ON (114C00016N)
G
REENCASTLE RD AT TAYLOR BRANCH
CR-1388Warren PL10053
DN 157,458 BRZ
RW
UT
CN 1,049,720 BRZ
Project Cost: 1,207,178 0 0
SAFETY IMPROVEMENTS AND REHABILITATION ON KY-3225. KEEP
E
XISTING FOOTPRINT BY REPLACING CURBLINE IN SAME LOCATION
FROM MP 0 TO MP 1(18CCN) (2022CCR)
KY-3225W arren PL80051
DN
RW 1,420,000 SPP
UT 130,000 SPP
CN
Project Cost: 0 1,420,000 130,000
WIDEN KY-234 FROM MP 11.9 TO 12.4. IMPROVEMENTS MAY
I
NCLUDE A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTON
DR. (18CCN) (2022CCR) (2024CCR)
KY-234W arren PL80052
DN
RW
UT
CN 1,260,000 SPP
Project Cost: 0 1,260,000 0
R
educe congestion and increase safety on Cave Mill Road/Dishman
Lane from the end of the three-lane section near Raintree Drive (MP
0.570) just east of Grider Pond Road. (2022CCN) (2024CCR)
CR-1704,
CS-1432,
CS-2281
Warren PL80201
DN
RW 6,830,000 SPP
UT 6,450,000 SPP
CN
Project Cost:
0 6,830,000 6,450,000
T
ranspark: Improve mobility and reduce congestion on US-31W from
Mizpah Road to Freeport Road (2022CCN) (2024CCR)
US-31Warren PL80203
DN
RW
UT
CN 4,630,000 SPP
Project Cost: 0 4,630,000 0
Page 230 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Construct a two-lane roundabout at the intersection of KY 101 and the
I
-65 southbound entrance and exit ramps in Smiths Grove. Widen the
existing I-65 southbound exit ramp to two lanes and extend the
beginning point if the ramp approximately five-hundred to
one-thousand feet north. Widen approximately five hundred feet of
KY-101Warren PL80214
DN
RW 2,370,000 SPP
UT 2,710,000 SPP
CN 5,176,000 SPP
Project Cost:
0 5,080,000 5,176,000
M
INOR WIDENING OF CS-1344/CR1235 (SMALLHOUSE RD) FROM
ELROD RD TO US 231 (CAMPBELL LANE). SCOPE INCLUDES
PEDESTRIAN AND BICYCLE ACCOMMODATIONS, INTERSECTION
IMPROVEMENTS, CONTINUOUS CENTER TURN LANE. (2024CCN)
CS-1334Warren PL80301
DN 1,940,000 SPP
RW 6,500,000 SPP
UT
CN
Project Cost:
0 1,940,000 6,500,000
I
MPROVE SAFETY AND MOBILITY ON US 31W FROM FREEPORT
ROAD TO KY 101. (2024CCN)
US-31Warren PL80302
DN 1,940,000 SPP
RW
UT
CN
Project Cost: 0 1,940,000 0
I
MPROVE SAFETY AND MOBILITY ON KY 101 BETWEEN THE ALLEN
COUNTY LINE AND I 65. (2024CCN)
KY-101Warren PL80304
DN 970,000 SPP
RW 1,630,000 SPP
UT
CN
Project Cost: 0 970,000 1,630,000
I
MPROVE SAFETY AND MOBILITY ON KY 622 FROM I 165 TO US 231.
(2024CCN)
KY-622Warren PL80305
DN 1,290,000 SPP
RW
UT
CN
Project Cost: 0 1,290,000 0
Page 231 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
IMPROVE SAFETY AND MOBILITY ON US 31W FROM KY 3225 TO KY
9
57, INCLUDING THE RECONSTRUCTION OF THE INTERCHANGE WITH
KY 446. (2024CCN)
US-31W arren PL80307
DN 1,940,000 NH
RW
UT
CN
Project Cost: 0 0 1,940,000
C
ONSTRUCT DUAL-LANE ROUNDABOUT AT BROADWAY AVE AND
US 31W BYPASS. (2024CCN)
US-31Warren PL80311
DN 3,120,000 STP1
RW
UT
CN
Project Cost: 3,120,000 0 0
IMPROVE SAFETY AND MOBILITY ON KY 234 AT I 65, INCLUDING THE
R
ECONSTRUCTION OF THE INTERCHANGE. (2024CCN)
I -65W arren PL80322
DN 1,940,000 NH
RW
UT
CN
Project Cost: 0 0 1,940,000
S
COPING STUDY FOR OUTER BELTLINE EXTENDING KY 3145 TO
NORTHERN WARREN COUNTY. (2024CCN)
PF-9999Warren PL80326
DN 15,000,000 SPP
RW
UT
CN
Project Cost: 0 15,000,000 0
M
AJOR WIDENING OF 68X (RUSSELLVILLE RD) INCLUDING
CONSTRUCTION OF ROUNDABOUTS AT INTERSECTIONS WITH
MORGANTOWN RD AND UNIVERSITY BLVD. SCOPE INCLUDES
RECONSTRUCTION OF CSX OVERPASS AND PEDESTRIAN AND
BICYCLE ACCOMMODATIONS NEAR WKU CAMPUS. (2024CCN)
US-68Warren PL80327
DN 2,600,000 SPP
RW 3,900,000 SPP
UT
CN
Project Cost:
0 2,600,000 3,900,000
Page 232 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
CONSTRUCT NEW INTERCHANGE ON I-165 (NATCHER EXPRESSWAY)
A
T ELROD ROAD. INCLUDES NEW CONSTRUCTION FOR SEGMENTS
OF ELROD ROAD AND MINOR WIDENING OF SMALLHOUSE ROAD.
APPROXIMATELY 5 MILES OF ROADWAY IMPROVEMENTS TO
PROVIDE CONNECTIONS FROM NEW INTERCHANGE TO US 31W, KY
CR-1240W arren PL80328
DN 1,300,000 SPP
RW
UT
CN
Project Cost: 0 1,300,000 0
T
otal for Warren county PL
Total Amounts:
CN
UT
RW
DN 3,277,458 26,540,000 5,880,000
19,700,000 12,560,000
10,910,000 8,235,000
18,709,720 29,430,000 15,326,000
21,987,178 86,580,000 42,001,000
I
MPROVE MOBILITY ON THE KY 555 HEARTLAND PARKWAY
CORRIDOR FROM KY 53 TO BLUEGRASS PARKWAY (2022CCN)
(2024CCR)
KY-555Washington PL164.2000
DN
RW
UT 4,500,000 NH
CN 19,440,000 NH
Project Cost: 4,500,000 19,440,000 0
A
DDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US
150 IN WASHINGTON COUNTY FROM 0.7 MILES EAST OF GRUNDY
HOME ROAD (MILEPOINT 2.50) TO US 150X (MP 6.557) AT THE OLD
ST. CATHERINE'S COLLEGE. (2016BOP) (2022CCN) (2024CCR)
US-150Washington PL396.3000
DN 500,000 STPF
RW
UT 1,500,000 STPF
CN
Project Cost:
2,000,000 0 0
ADDRESS CONDITION OF KY-528 FROM MILEPOINT 1.4 TO MILEPOINT
1
.8
KY-528W ashington PL20042
DN 16,250 STP4
RW
UT
CN 308,750 STP4
Project Cost: 325,000 0 0
Page 233 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Replacement of an existing metal truss bridge that has been down
r
ated by KYDOT to 5-tons at MP 1.983 on Sulphur Lick Road (CR
1031).
CR-1031Washington PL80350
DN 154,927 FBP2
RW
UT
CN 1,032,850 FBP2
Project Cost: 0 0 1,187,777
T
otal for Washington county PL
Total Amounts:
CN
UT
RW
DN 516,250 154,927
6,000,000
308,750 19,440,000 1,032,850
6,825,000 19,440,000 1,187,777
I
MPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD
AND RESURFACE FROM KY 1275 FROM BELL LANE TO KY
833/ROGERS GROVE ROAD(18CCN) (2020CCR) (2024CCR)
KY-1275Wayne PL80005
DN 100,000 SPP
RW 1,000,000 SPP
UT 60,000 SPP
CN 2,000,000 SPP
Project Cost:
100,000 1,060,000 2,000,000
R
educe congestion and improve safety, capacity, and mobility along
KY 1275, including sidewalks, from KY 90 to Bell Lane. (18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-1275Wayne PL80006
DN
RW 500,000 STP2
UT
CN 3,000,000 STP2
Project Cost:
3,500,000 0 0
R
EDUCE CONGESTION AND IMPROVES SAFETY, CAPACITY AND
MOBILITY OF KY 90 BETWEEN KY 90X/KY 1275 AND KY 3106
(2020CCN) (2022CCR) (2024CCR)
KY-90Wayne PL80105
DN
RW 5,000,000 SPP
UT 2,400,000 SPP
CN
Project Cost:
0 5,000,000 2,400,000
Page 234 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS SAFETY, MOBILITY, AND CONNECTIVITY BY RELOCATING
A
LONG KY 92 IN MONTICELLO BETWEEN LOCUST ST AND ELK
SPRINGS CREEK RD (2020CCN) (2022CCR) (2024CCR)
KY-90, KY-92Wayne PL80108
DN
RW 1,166,000 SPP
UT 874,500 SPP
CN 4,860,000 SPP
Project Cost: 0 2,040,500 4,860,000
R
educe congestion and improve safety along KY 90 from 0.284 mile
West of KY 92 to 0.084 mile West of KY 92. (2024CCN)
KY-90Wayne PL80307
DN 150,000 SPP
RW 200,000 SPP
UT 240,000 SPP
CN 690,000 SPP
Project Cost: 0 590,000 690,000
I
mprove safety and mobility along KY 1765 between KY 1275 and end
of state maintenance near Conley Bottom boat dock. (2024CCN)
KY-1765Wayne PL 200,000 SPP80308
DN 630,000 SPP
RW 3,520,000 SPP
UT
CN
Project Cost: 200,000 630,000 3,520,000
MINOR WIDENING BY ADDING OFFSET LEFT TURNING LANES INTO KY
1
568 AND FRAZER CHAPEL ROAD. (2024CCN)
KY-90W ayne PL80309
DN 200,000 SPP
RW 180,000 SPP
UT 240,000 SPP
CN 1,040,000 SPP
Project Cost: 200,000 420,000 1,040,000
I
MPROVE VERTICAL GEOMETRICS ALONG KY 92 NEAR KY 789 TO
IMPROVE SIGHT DISTANCE. ADD TURNING LANES AND MINOR
WIDENING FROM ALONG KY 92 FROM 789 TO KY 90. (2024CCN)
KY-92Wayne PL80314
DN 1,360,000 SPP
RW 2,150,000 SPP
UT
CN
Project Cost:
0 1,360,000 2,150,000
Page 235 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
BRIDGE REPLACEMENT OVER LITTLE SOUTH FORK ALONG BALDY
R
OAD (CR 1127),
CR-1127Wayne PL80315
DN 164,487 FBP2
RW
UT
CN 1,096,582 FBP2
Project Cost: 0 0 1,261,069
T
otal for Wayne county PL
Total Amounts:
CN
UT
RW
DN
200,000
300,000 2,140,000 164,487
500,000 7,546,000 5,670,000
1,414,500 2,400,000
3,000,000 9,686,582
4,000,000 11,100,500 17,921,069
RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS
TO
ALLEVIATE FLOODING. (12CCR)(18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-138W ebster PL228
DN 240,000 SPP
RW 250,000 SPP
UT 380,000 SPP
CN
Project Cost: 0 240,000 630,000
A
DDRESS CONDITION OF I-069 FROM MILEPOINT 133.686 TO
MILEPOINT 134.982
I -69Webster PL22091
DN 160,000 NHPM
RW
UT
CN 1,558,266 NHPM
Project Cost: 0 1,718,266 0
A
ddress service concerns of KY 630 from KY 132 in Dixon to the
Hopkins County Line (2024CCN)
KY-630Webster PL80316
DN 760,000 SPP
RW
UT
CN
Project Cost: 0 760,000 0
Page 236 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Total for Webster county P L
Total Amounts:
CN
UT
RW
DN 1,160,000
250,000
380,000
1,558,266
0 2,718,266 630,000
I
NSTALL GUARDRAIL ON KY-312 IN WHITLEY COUNTYKY-312Whitley PL4328
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-727 IN WHITLEY COUNTYKY-727Whitley PL4337
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-836 IN WHITLEY COUNTYKY-836Whitley PL4363
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
I
NSTALL GUARDRAIL ON KY-204 IN WHITLEY COUNTYKY-204Whitley PL4389
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
Page 237 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
INSTALL GUARDRAIL ON KY-26 IN WHITLEY COUNTYK Y-26Whitley PL4390
DN
RW
UT
CN 10,000 GR
Project Cost: 10,000 0 0
I
NSTALL GUARDRAIL ON KY-478 IN WHITLEY COUNTYKY-478Whitley PL4391
DN
RW
UT
CN 60,000 GR
Project Cost: 60,000 0 0
I
NSTALL GUARDRAIL ON KY-856 IN WHITLEY COUNTYKY-856Whitley PL4392
DN
RW
UT
CN 20,000 GR
Project Cost: 20,000 0 0
C
ONSTRUCT A NEW ENTRANCE TO THE UNIVERSITY OF THE
CUMBERLANDS FROM SOUTH 2ND ST UP THE HILL TO TIE INTO
HUTTON WAY. (16CCN) (2024CCN)
PF-9999Whitley PL8954
DN 410,000 SPP
RW
UT 70,000 SPP
CN 2,180,000 SPP
Project Cost: 0 410,000 2,250,000
RECONFIGURE EXISTING INTERSECTION OF KY 92 AND PENNY LANE
TO
IMPROVE SAFETY ALONG AT INTERSECTION. CONSTRUCT NEW
CONNECTOR ROAD BETWEEN KY 92 AND PENNY LANE.
RECONFIGURE TRAFFIC OPERATION ALONG PENNY LANE BETWEEN
KY 92 AND NEW CONNECTOR ROAD (2022CCN) (2024CCR)
KY-92W hitley PL80264
DN
RW
UT
CN 2,000,000 SPP
Project Cost: 0 0 2,000,000
Page 238 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Resurfacing of High Top Road (2024CCN)C R-1412Whitley PL80307
DN
RW
UT
CN 380,000 SPP
Project Cost: 0 380,000 0
W
iden existing South 2nd street to improve geometric deficiencies
along route (2024CCN)
CS-1132Whitley PL80308
DN 1,040,000 SPP
RW 3,500,000 SPP
UT
CN
Project Cost: 0 1,040,000 3,500,000
I
mprove safety by lowering vertical crest on US25W and realigning
High Top Road intersection with US25W (2024CCN)
US-25Whitley PL80310
DN
RW 210,000 SPP
UT 250,000 SPP
CN 400,000 SPP
Project Cost: 0 460,000 400,000
D
evelop and evaluate potential intersection alternatives (including a
roundabout) to improve traffic flow at the intersection of Arena Drive
(CS 2000) and Corbin Center Drive. (2024CCN)
CS-2000Whitley PL80351
DN
RW 110,000 SPP
UT 260,000 SPP
CN 1,500,000 SPP
Project Cost: 0 370,000 1,500,000
W
iden I-75 from MP 19.2 in Whitley County to MP 23.5 South of Corbin
(2024CCN)
I -75Whitley PL80353
DN 2,600,000 NH
RW
UT
CN
Project Cost: 0 0 2,600,000
T
otal for Whitley county PL
Total Amounts:
CN
UT
RW
DN 1,450,000 2,600,000
320,000 3,500,000
510,000 70,000
150,000 380,000 6,080,000
150,000 2,660,000 12,250,000
Page 239 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Minor widening to improve redundancy of Regional travel. (2024CCR)K Y-15Wolfe PL177
DN
RW 290,000 PROT
UT 560,000 PROT
CN
Project Cost: 0 850,000 0
R
econstruct KY 715 from intersection with KY 11 (0.0) to the
intersection with KY 15 (MP 5.765). (2024CCN)
KY-715Wolfe PL80352
DN 2,600,000 SPP
RW
UT
CN
Project Cost: 0 0 2,600,000
T
otal for Wolfe county PL
Total Amounts:
CN
UT
RW
DN 2,600,000
290,000
560,000
0 850,000 2,600,000
I
MPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS
PARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE.
US-60Woodford PL117
DN
RW 1,070,000 NH
UT 2,340,000 NH
CN 6,910,000 NH
Project Cost: 1,070,000 2,340,000 6,910,000
ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON
R
OAD AT WOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP
9.70).(16CCN)(18CCN) (2022CCR) (2024CCR)
US-60W oodford PL8905
DN
RW
UT 800,000 SPP
CN 910,000 SPP
Project Cost: 800,000 0 910,000
Page 240 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
ADDRESS CONDITION OF I-064 FROM MILEPOINT 64.856 TO
M
ILEPOINT 67.106
I -64Woodford PL20048
DN 250,000 NHPM
RW
UT
CN 2,472,500 NHPM
Project Cost: 2,722,500 0 0
A
DDRESS CONDITION OF I-064 FROM MILEPOINT 59.431 TO
MILEPOINT 64.856
I -64Woodford PL22033
DN 3,190,000 NHPM
RW
UT
CN 31,930,000 NHPM
Project Cost: 0 0 35,120,000
R
econstruct McCracken Pike (KY-1659) on a new horizontal alignment
to minimize pedestrian and vehicle conflicts near Woodford Reserve
Distillery (ROW to be provided by County) (2022CCN) (2024CCR)
KY-1659Woodford PL80200
DN
RW
UT 330,000 SPP
CN 1,660,000 SPP
Project Cost:
330,000 1,660,000 0
RECONSTRUCT INTERSECTION AT US 62 (ROSE HILL AVE & TYRONE
P
K) AND KY 1964 (CLIFTON RD) IN VERSAILLES (2022CCN)
US-62W oodford PL80252
DN 370,000 SPP
RW 500,000 SPP
UT 1,000,000 SPP
CN
Project Cost: 0 370,000 1,500,000
I
mprove safety and mobility on KY 341 beginning at I-64 to
approximately 0.8 miles north. (2024CCN)
KY-341Woodford PL80320
DN 650,000 SPP
RW 630,000 SPP
UT 780,000 SPP
CN
Project Cost: 650,000 0 1,410,000
Page 241 of 244
County FundPhaseDescriptionRouteItem No.
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FY2026 FY2027 FY2028
Additional turn lanes and road improvement to US 60 at MP 6.1 for
e
ntrance to Livestock Innovation Center at UK (2024CCN)
US-60Woodford PL80353
DN 220,000 SPP
RW
UT
CN 1,150,000 SPP
Project Cost: 0 220,000 1,150,000
S
afety improvements on US 60X from Main Street to Maple Street in
Versailles (MP 0.940-1.234). (2024CCN)
US-60Woodford PL80357
DN 275,000 SPP
RW
UT 6,600,000 SPP
CN
Project Cost: 0 275,000 6,600,000
T
otal for Woodford county PL
Total Amounts:
CN
UT
RW
DN 900,000 865,000 3,190,000
1,070,000 1,130,000
1,130,000 2,340,000 8,380,000
2,472,500 1,660,000 40,900,000
5,572,500 4,865,000 53,600,000
Page 242 of 244
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Biennium Fund Summary
Fund D escription FY 2027 FY 2028 Total
APD APD 7,320,000 61,000,000 68,320,000
BRO BRO 103,656,111 111,331,706 214,987,817
BRO2 BRO2 30,865,000 3,005,000 33,870,000
BRX BRX 84,197,786 100,124,826 184,322,612
BRZ BRZ 19,219,492 19,290,606 38,510,098
CARB CARB 14,600,000 14,600,000 29,200,000
CM CM 8,100,000 8,100,000 16,200,000
FBP FBP 100,066,318 106,215,370 206,281,688
FBP2 FBP2 12,795,333 18,083,063 30,878,396
GAR GAR 41,000,000 38,600,000 79,600,000
GR GR 0 0 0
HGC HGC 118,725,000 59,010,000 177,735,000
IF IF 241,960,000 84,000,000 325,960,000
KYD KYD 27,200,000 0 27,200,000
NH NH 375,680,000 402,468,500 778,148,500
NHPM NHPM 82,493,977 201,729,347 284,223,324
PROT PROT 35,050,000 12,000,000 47,050,000
RRP RRP 3,510,000 0 3,510,000
RRS RRS 710,000 5,300,000 6,010,000
SAF SAF 71,300,000 71,300,000 142,600,000
SAH SAH 1,800,000 1,800,000 3,600,000
SGF SGF 125,000,000 0 125,000,000
SLO SLO 26,800,000 26,800,000 53,600,000
SLX SLX 7,800,000 7,800,000 15,600,000
SNK SNK 8,600,000 8,600,000 17,200,000
SPP SPP 1,149,243,446 1,396,448,800 2,545,692,246
STP1 STP1 27,790,000 28,300,000 56,090,000
STP2 STP2 48,010,000 48,910,000 96,920,000
STP3 STP3 8,130,000 6,000,000 14,130,000
STP4 STP4 7,640,000 4,915,726 12,555,726
STP5 STP5 21,120,910 13,050,000 34,170,910
STPF STPF 85,858,000 87,190,000 173,048,000
TAP TAP 12,300,000 12,300,000 24,600,000
Total Amount 2,908,541,373 2,958,272,944 5,866,814,317
Page 243 of 244
2026-2 028 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Fund Summary
Fund D escription FY 2026 FY 2027 FY 2028 Total
APD APD 1,560,000 7,320,000 61,000,000 69,880,000
BRO BRO 75,042,195 103,656,111 111,331,706 290,030,012
BRO2 BRO2 4,000,000 30,865,000 3,005,000 37,870,000
BRX BRX 79,037,858 84,197,786 100,124,826 263,360,470
BRZ BRZ 18,371,816 19,219,492 19,290,606 56,881,914
CARB CARB 14,600,000 14,600,000 14,600,000 43,800,000
CM CM 8,100,000 8,100,000 8,100,000 24,300,000
FBP FBP 79,285,743 100,066,318 106,215,370 285,567,431
FBP2 FBP2 16,287,927 12,795,333 18,083,063 47,166,323
GAR GAR 0 41,000,000 38,600,000 79,600,000
GR GR 8,645,000 0 0 8,645,000
HGC HGC 183,335,000 118,725,000 59,010,000 361,070,000
IF IF 0 241,960,000 84,000,000 325,960,000
KYD KYD 152,551,000 27,200,000 0 179,751,000
NH NH 312,194,000 375,680,000 402,468,500 1,090,342,500
NHPM NHPM 237,269,468 82,493,977 201,729,347 521,492,792
PROT PROT 21,236,000 35,050,000 12,000,000 68,286,000
RRP RRP 3,430,000 3,510,000 0 6,940,000
RRS RRS 790,000 710,000 5,300,000 6,800,000
SAF SAF 71,300,000 71,300,000 71,300,000 213,900,000
SAH SAH 1,800,000 1,800,000 1,800,000 5,400,000
SGF SGF 150,000,000 125,000,000 0 275,000,000
SLO SLO 26,800,000 26,800,000 26,800,000 80,400,000
SLX SLX 7,800,000 7,800,000 7,800,000 23,400,000
SNK SNK 8,600,000 8,600,000 8,600,000 25,800,000
SPP SPP 111,325,000 1,149,243,446 1,396,448,800 2,657,017,246
STP1 STP1 22,620,000 27,790,000 28,300,000 78,710,000
STP2 STP2 41,230,000 48,010,000 48,910,000 138,150,000
STP3 STP3 8,000,000 8,130,000 6,000,000 22,130,000
STP4 STP4 17,550,000 7,640,000 4,915,726 30,105,726
STP5 STP5 2,830,000 21,120,910 13,050,000 37,000,910
STPF STPF 70,567,000 85,858,000 87,190,000 243,615,000
TAP TAP 12,300,000 12,300,000 12,300,000 36,900,000
Total Amount 1,768,458,007 2,908,541,373 2,958,272,944 7,635,272,324
Page 244 of 244