Back to Kentucky

HJR52 • 2026

A JOINT RESOLUTION relating to road projects.

A JOINT RESOLUTION relating to road projects.

Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
P. Stevenson
Last action
2026-02-10
Official status
02/10/26: to Appropriations & Revenue (H)
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

A JOINT RESOLUTION relating to road projects.

A JOINT RESOLUTION relating to road projects.

What This Bill Does

  • A JOINT RESOLUTION relating to road projects.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2026-02-10 Kentucky Legislative Research Commission

    to Appropriations & Revenue (H)

  2. 2026-02-03 Kentucky Legislative Research Commission

    introduced in House to Committee on Committees (H)

Official Summary Text

A JOINT RESOLUTION relating to road projects.

Current Bill Text

Read the full stored bill text
26 RS BR 1372
Page 1 of 191
BR137200.100 - 1372 - 130265 - 4679v Jacketed
A JOINT RESOLUTION relating to road projects. 1
Be it resolved by the General Assembly of the Commonwealth of Kentucky: 2
Section 1. This Joint Resolution in conjunction with 2026 Regular Session HB3
533 shall constitute the Six -Year Road Plan. The last four years of the Six-Year Road 4
Plan are as follows: 5
2028-2032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN ADAIR COUNTY ON
(0
01B00013N) KY-80 AT RUSSELL
CREEK
KY-80Adair 10047 PL
DN BRX 354,203
RW
UT
CN BRX 2,361,352
Project Cost: 0 0 2,715,555 0
AD
DRESS CONDITION OF Louie B. Nunn
Cumberland Parkway FROM MILEPOINT
48.15 TO MILEPOINT 57.791
LN-9008Adair 22208 PL
DN NHPM 730,000
RW
UT
CN NHPM 7,329,876
Project Cost:
0 0 8,059,876 0
KY
55 NEW TURNING LANE AT BETTY'S
OK COUNTRY COOKING. (18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-55Adair 80003 PL
DN
RW
UT SPP 1,880,000
CN SPP 4,330,000
Project Cost:
1,880,000 4,330,000 0 0
IM
PROVE SAFETY AND MOBILITY ALONG
KY 55 NEAR DOC'S MARKET. (2022CCN)
(2024CCR)
KY-55Adair 80200 PL
DN
RW
UT SPP 1,730,000
CN SPP 4,040,000
Project Cost:
1,730,000 4,040,000 0 0
Pr
ovide access into Green River
Commerce Park along KY 55 to promote
economic growth in Adair County. (MP
16.6-16.75) (2024CCN)
KY-55Adair 80351 PL
DN
RW
UT
CN SPP 1,570,000
Project Cost:
1,570,000 0 0 0
Page 2 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve mobility and congestion along KY
5
5 from US 127 in Russell County to the
Louis B. Nunn Cumberland KY 55/KY6177
in Adair County. (Russell MP 0.0 - 8.159;
Adair MP 0.0 - 9.68) (2024CCN)
KY-55Adair 80352 PL
DN
RW SPP 16,700,000
UT SPP 11,230,000
CN SPP 104,930,000
Project Cost:
27,930,000 0 104,930,000 0
T
otal for Adair county PL
Total Amounts:
CN
UT
RW
DN 1,084,203
16,700,000
14,840,000
1,570,000 8,370,000 114,621,228
33,110,000 8,370,000 115,705,431 0
B
RIDGE PROJECT IN ALLEN COUNTY ON
(002C00033N) PETROLEUM RD AT LITTLE
TRAMMEL CREEK
CR-1220Allen 10028 PL
DN FBP2 152,273
RW
UT
CN FBP2 1,015,151
Project Cost: 0 0 0 1,167,424
A
DDRESS CONDITION OF US-231 FROM
MILEPOINT 0 TO MILEPOINT 8.569
US-231,
US-31
Allen 20039 PL
DN STP5 880,000
RW
UT
CN STP5 10,120,000
Project Cost:
0 11,000,000 0 0
I
mprove safety on KY 101 from KY 234 to
the Warren County Line. (2022CCN)
(2024CCR)
KY-101Allen 80207 PL
DN
RW
UT
CN SPP 17,290,000
Project Cost:
17,290,000 0 0 0
Page 3 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ALONG KY 100 (OLD
GALLATIN RD) FROM THE INTERSECTION
WITH WOODLAND CIRCLE DRIVE TO
JOHN KELLY DRIVE IN SCOTTSVILLE.
KY-100Allen 80308 PL
DN
RW
UT SPP 1,184,000
CN SPP 1,974,000
Project Cost:
1,184,000 1,974,000 0 0
R
ECONSTRUCTION/NEW CONSTRUCTION
OF TWO-LANE ROADWAY WITH
SHOULDERS AND WIDER BRIDGES.
(2024CCN)
KY-101Allen 80315 PL
DN
RW SPP 10,546,000
UT SPP 7,184,000
CN SPP 90,785,000
Project Cost:
10,546,000 7,184,000 0 90,785,000
T
otal for Allen county PL
Total Amounts:
CN
UT
RW
DN 880,000 152,273
10,546,000
1,184,000 7,184,000
17,290,000 12,094,000 91,800,151
29,020,000 20,158,000 0 91,952,424
WIDENING WITH ACCESS IMPROVEMENTS
TO
ANDERSON CROSSING ON US62,
FROM 0.2MI W OF CORPORATE DR TO
US127B (LAWRENCEBURG BYPASS).
PRIORITY SECTION (2016BOP) (2024CCN)
US-62A nderson 8100.1000 PL
DN
RW
UT SPP 4,160,000
CN SPP 6,760,000
Project Cost: 4,160,000 6,760,000 0 0
ADDRESS DEFICIENCIES OF BRIDGE ON E
B
URGIN ROAD OVER LITTLE WILLOW
CREEK (003C00040N)
CR-1235A nderson 10069 PL
DN BRZ 129,798
RW
UT
CN BRZ 865,318
Project Cost: 995,116 0 0 0
Page 4 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE US-62 (VERSAILLES RD.) FROM
H
ILLTOP DR. TO WEST END OF BRIDGE
OVER KENTUCKY RIVER AT
TYRONE(18CCN) (2020CCR) (2022CCR)
(2024CCR)
US-62Anderson 80001 PL
DN
RW
UT
CN STP2 15,610,000
Project Cost:
15,610,000 0 0 0
T
otal for Anderson county PL
Total Amounts:
CN
UT
RW
DN 129,798
4,160,000
16,475,318 6,760,000
20,765,116 6,760,000 0 0
CONSTRUCT NEW STRUCTURE OVER THE
O
HIO RIVER AT CAIRO, ILLINOIS
(KENTUCKY'S SHARE)(004B00021N)
US-51B allard 1140 PL
DN BRO2 2,500,000
RW
UT BRO2 256,000
CN BRO2 80,949,000 80,949,000 80,949,000 80,949,000
Project Cost: 83,705,000 80,949,000 80,949,000 80,949,000
A
DDRESS CONDITION, SAFETY,
CONGESTION, AND FUTURE CAPACITY
ISSUES ON US-60 THROUGH THE CITY OF
LACENTER. (2024CCN)
US-60Ballard 80300 PL
DN
RW
UT
CN SPP 27,840,000
Project Cost:
0 0 27,840,000 0
A
DDRESS CONDITION, SAFETY,
CONGESTION, AND FUTURE CAPACITY
FROM PROPOSED BARLOW EASTERN
BYPASS TO PROPOSED LACENTER
SOUTHERN BYPASS. (2024CCN)
US-60Ballard 80301 PL
DN
RW NH 2,500,000
UT NH 3,250,000
CN SPP 12,000,000
Project Cost:
0 5,750,000 0 12,000,000
Page 5 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
THE PURPOSE OF THIS PROJECT IS TO
P
ROVIDE ROADWAY INFRASTRUCTURE
TO SUPPORT COMMUNITY
GROWTH/DEVELOPMENT AND SAFE
ACCESS FOR FREIGHT TRAFFIC TO
US-51Ballard 80320 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
A
DDRESS CONDITION, SAFETY AND
CONGESTION ISSUES ON US 60
THROUGH THE CITY OF BARLOW.
(2024CCN)
US-60Ballard 80321 PL
DN NH 1,500,000
RW NH 2,500,000
UT NH 1,050,000
CN SPP 8,400,000
Project Cost:
1,500,000 0 3,550,000 8,400,000
I
MPROVE GEOMETRIC DEFICIENCIES,
FREIGHT TRUCK MOBILITY, AND IMPROVE
SAFETY ON KY 286 FROM HERSHEL
JONES ROAD TO KY 473. (2024CCN)
KY-286Ballard 80322 PL
DN
RW SPP 3,700,000
UT SPP 500,000
CN SPP 2,000,000
Project Cost:
4,200,000 2,000,000 0 0
T
otal for Ballard county PL
Total Amounts:
CN
UT
RW
DN 4,000,000
3,700,000 2,500,000 2,500,000
756,000 3,250,000 1,050,000
82,949,000 82,949,000 108,789,000 101,349,000
91,405,000 88,699,000 112,339,000 101,349,000
W
iden KY 249 from Hilltopper Way to
Trojan Trail
KY-249Barren 186 PL
DN
RW
UT
CN SPP 4,150,000
Project Cost: 4,150,000 0 0 0
Page 6 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN BARREN COUNTY
O
N (005B00046N) KY-740 AT BLUE
SPRINGS CREEK
KY-740Barren 10030 PL
DN BRX 223,534
RW
UT
CN BRX 1,490,228
Project Cost: 0 0 0 1,713,762
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3179 OVER PETER CREEK
(005B00090N)
KY-3179Barren 10059 PL
DN BRZ 241,608
RW
UT
CN BRZ 1,610,719
Project Cost:
0 0 0 1,852,327
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 48 TO MILEPOINT 53.3 (53.2
CARDINAL)
I -65Barren 22061 PL
DN NHPM 760,000
RW
UT
CN NHPM 7,643,500
Project Cost:
0 0 8,403,500 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 53.2 (53.3 NON-CARDINAL) TO
MILEPOINT 53.956
I -65Barren 22063 PL
DN NHPM 130,000
RW
UT
CN NHPM 1,300,000
Project Cost:
1,430,000 0 0 0
N
EW INTERCHANGE ON THE LOUIE NUNN
CUMBERLAND PARKWAY AT KY
(CONTINGENT ON ECONOMIC
DEVELOPMENT PROJECTS)-249 IN
GLASGOW(18CCN) (2022CCR)
LN-9008Barren 80002 PL
DN
RW SPP 3,020,000
UT SPP 1,060,000
CN SPP 23,390,000
Project Cost:
0 4,080,000 23,390,000 0
Page 7 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION AND INCREASE
M
OBILITY ON US 31E FROM ABERDEEN
DRIVE TO TROJAN TRAIL, INCLUDING
RECONSTRUCTION OF THE INTERCHANGE
WITH LN 9008. (2024CCN)
LN-9008B arren 80300 PL
DN
RW
UT
CN SPP 24,800,000
Project Cost: 24,800,000 0 0 0
I
MPROVE SAFETY AND MOBILITY ON
US-31E IN THE HAYWOOD AREA.
(2024CCN)
US-31Barren 80319 PL
DN
RW
UT SPP 620,000
CN SPP 4,960,000
Project Cost: 620,000 4,960,000 0 0
T
otal for Barren county PL
Total Amounts:
CN
UT
RW
DN 130,000 760,000 465,142
3,020,000
620,000 1,060,000
30,250,000 4,960,000 31,033,500 3,100,947
31,000,000 9,040,000 31,793,500 3,566,089
R
ECONSTRUCT KY-111 IN THE VICINITY
OF THE "S-CURVE" EAST OF
OWINGSVILLE (14CCR) (2022CCN)
(2024CCR)
KY-111Bath 193 PL
DN
RW SPP 2,300,000
UT SPP 1,960,000
CN SPP 7,840,000
Project Cost:
2,300,000 1,960,000 7,840,000 0
R
ECONSTRUCT CURVE AT .8 MILE SOUTH
OF KY-36 (08CCN)(12CCR) MILEPOINT
7.147 TO 7.247) (2022CCN)
KY-965Bath 8404 PL
DN
RW SPP 580,000
UT SPP 350,000
CN SPP 3,100,000
Project Cost:
580,000 350,000 3,100,000 0
Page 8 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT HORIZONTAL AND WIDTH
D
EFICIENCIES ON KY 36 FROM "OLD KY
11" MP 1.004 TO KY 1325 (MP 6.97) TO
IMPROVE SAFETY AND OPERATIONAL
EFFICIENCY OF ROADWAY (14CCN)
KY-36Bath 8814 PL
DN
RW SPP 5,750,000
UT SPP 3,920,000
CN SPP 81,200,000
Project Cost:
0 9,670,000 0 81,200,000
B
RIDGE PROJECT IN BATH COUNTY ON
(006B00015N) US-60 AT LICKING RIVER
US-60Bath 10069 PL
DN BRX 1,346,018
RW
UT
CN
Project Cost: 0 0 0 1,346,018
IMPROVE SAFETY ON KY 36 FROM THE
I
NTERSECTION WITH I-64 TO THE
INTERSECTION OF KY 965 INCLUDING THE
CURVES KNOWN AS CLEAR CREEK
FURNACE AND THOMAS HILL (2020CCN)
KY-36B ath 80101 PL
DN
RW
UT
CN SPP 13,440,000
Project Cost: 13,440,000 0 0 0
I
MPROVE SAFETY AND OPERATIONAL
EFFICIENCY ON KY 36 FROM NORTH OF
MARIELLA DR TO THE INTERSECTION OF
OLD KY 36 (2020 CCN) (2022CCN)
(2024CCR)
KY-36Bath 80102 PL
DN
RW
UT SPP 1,860,000
CN SPP 6,600,000
Project Cost:
1,860,000 6,600,000 0 0
R
EALIGN ROADWAY ON US 60 NEAR
OWINGSVILLE BEGINNING IN THE
VICINITY OF ROSE BUSH LN AND ENDING
AT WELLS ROAD NEAR I 64 EXIT 123
(2022CCN) (2024CCR)
US-60Bath 80250 PL
DN
RW
UT
CN SPP 11,600,000
Project Cost:
11,600,000 0 0 0
Page 9 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Bath county P L
Total Amounts:
CN
UT
RW
DN 1,346,018
2,880,000 5,750,000
1,860,000 6,230,000
25,040,000 6,600,000 10,940,000 81,200,000
29,780,000 18,580,000 10,940,000 82,546,018
B
RIDGE PROJECT IN BELL COUNTY ON
(007C00072N) 17TH STREET AT YELLOW
CREEK
CS-2222Bell 10101 PL
DN BRZ 90,720
RW
UT
CN BRZ 604,802
Project Cost: 695,522 0 0 0
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00007N) KY-66 AT SIMS FORK
KY-66Bell 10167 PL
DN FBP2 250,108
RW
UT
CN FBP2 1,667,385
Project Cost: 0 0 0 1,917,493
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00024L) US-25E-10 AT YELLOW
CREEK
US-25Bell 10169 PL
DN BRO 805,362
RW
UT
CN
Project Cost:
0 0 0 805,362
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00051N) KY-1534 AT WILLIAMS
BRANCH
KY-1534Bell 10170 PL
DN BRX 97,566
RW
UT
CN BRX 650,440
Project Cost:
0 0 748,006 0
Page 10 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve mobility by constructing a 2+1
road on US 119 in Bell County by adding a
continuous third lane that serves as an
alternate passing lane (MP 3.5 - 9.3).
(2024CCN)
US-119Bell 80300 PL
DN NH 2,330,000
RW NH 2,400,000
UT NH 2,320,000
CN SPP 30,000,000
Project Cost:
2,330,000 4,720,000 0 30,000,000
T
otal for Bell county PL
Total Amounts:
CN
UT
RW
DN 2,420,720 97,566 1,055,470
2,400,000
2,320,000
604,802 650,440 31,667,385
3,025,522 4,720,000 748,006 32,722,855
I
MPROVE SAFETY, MOBILITY,
OPERATIONS, AND GEOMETRICS AT THE
JUNCTION OF I-75 AND I-275 AND THE
SYSTEM-TO-SYSTEM RAMPS. (2024CCR)
I -75Boone 79 PL
DN
RW NH 15,000,000 9,000,000
UT
CN
Project Cost:
0 15,000,000 9,000,000 0
R
EDUCE CONGESTION AND IMPROVE
TRAFFIC MOBILITY AT THE INTERCHANGE
OF I-75 AND KY-14 IN WALTON.
(2020CCR) (2022CCR) (2024CCR)
I -75Boone 80 PL
DN
RW
UT
CN NH 10,000,000 10,000,000
Project Cost:
0 0 10,000,000 10,000,000
P
rovide East-West Connectivity and
Improve Mobility From KY 237 to KY 842.
(2024BOP)
US-42Boone 446.1000 PL
DN
RW
UT SPP 1,800,000
CN
Project Cost:
0 1,800,000 0 0
Page 11 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Provide East-West Connectivity and
I
mprove Mobility from KY 842 to Mall Road.
(2024BOP)
US-42Boone 446.2000 PL
DN
RW
UT SPP 3,600,000
CN
Project Cost: 0 3,600,000 0 0
I
MPROVE MOBILITY AND REDUCE
CONGESTION ON US-25 FROM WINNING
COLORS DRIVE TO THE NORFOLK
SOUTHERN RAILROAD CROSSING SOUTH
OF KY-1829 (INDUSTRIAL ROAD);
US-25Boone 447 PL
DN
RW
UT SPP 9,880,000
CN SPP 48,000,000
Project Cost:
9,880,000 48,000,000 0 0
R
econstruct US 25 from Winning Colors
Drive to Melinda Lane. (2024BOP)
US-25Boone 447.1000 PL
DN
RW
UT
CN SPP 20,880,000
Project Cost: 0 20,880,000 0 0
R
econstruct US 25 from Melinda Lane to
RR Spur Crossing. (2024BOP)
US-25Boone 447.2000 PL
DN
RW
UT SPP 6,240,000
CN SPP 25,520,000
Project Cost: 6,240,000 0 25,520,000 0
D
EDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR NKY URBANIZED
AREA AND SUBJECT TO MPO CONTROL
FOR FY 2026 THROUGH FY 2032.
(FUNDING SUBJECT TO FISCAL
CO-0Boone 966.0800 PL
DN
RW
UT
CN SNK 8,600,000 8,600,000 8,600,000 8,600,000
Project Cost:
8,600,000 8,600,000 8,600,000 8,600,000
Page 12 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
I-275/KY-212 INTERCHANGE AND KY-20
R
ECONSTRUCTION NEAR GREATER
CINCINNATI AIRPORT. (2004BOPC)(KYTC
SHARE @ 46.6%) (2024CCN)
I -275Boone 8000.2000 PL
DN
RW SPP 16,780,000
UT SPP 5,250,000
CN SPP 54,920,000
Project Cost:
0 16,780,000 5,250,000 54,920,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 OVER OHIO RIVER (008B00052N)
I -275Boone 10028 PL
DN FBP 2,500,000
RW
UT
CN FBP 25,000,000
Project Cost: 0 27,500,000 0 0
A
DDRESS CONDITION OF I-275 FROM
MILEPOINT 7.25 TO MILEPOINT 13.076
I -275Boone 20007 PL
DN NHPM 1,230,000
RW
UT
CN NHPM 12,279,090
Project Cost: 0 0 13,509,090 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 178.024 TO MILEPOINT
183.094 (182.816 NON-CARDINAL)
I -75Boone 20063 PL
DN NHPM 960,000
RW
UT
CN NHPM 9,606,432
Project Cost:
0 0 0 10,566,432
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 182.816 (183.094 CARDINAL)
TO MILEPOINT 183.312
I -75Boone 22128 PL
DN NHPM 750,000
RW
UT
CN NHPM 7,450,000
Project Cost:
0 8,200,000 0 0
Page 13 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT GUNPOWDER RD. FROM
U
S-42 TO KY-536. (18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-237Boone 80000 PL
DN
RW
UT SPP 4,320,000
CN SPP 32,250,000
Project Cost: 4,320,000 32,250,000 0 0
E
XPANSION OF ROUNDABOUTS ALONG
KY-237 AT CARDINAL COVE AND
GRAVES RD(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-237Boone 80001 PL
DN
RW
UT
CN SPP 5,040,000
Project Cost:
5,040,000 0 0 0
C
ONVERT TURFWAY RD AND
THOROUGHBRED BLVD FROM 2 WAY TO
ONE WAY AND CONSTRUCT NEW I-75
ACCESS (2020CCN) (2022CCR)
(2024CCR)
KY-1017,
KY-717
Boone 80100 PL
DN
RW SPP 13,750,000
UT SPP 1,800,000
CN SPP 30,000,000
Project Cost:
13,750,000 1,800,000 30,000,000 0
R
econstruct KY 3060 (Frogtown Road)
from US 42 to US 25. (2022CCR)
(2024CCR)
KY-3060Boone 80102 PL
DN
RW
UT
CN SPP 26,680,000
Project Cost:
0 26,680,000 0 0
R
econstruct Turfway Road (KY 717)
from Aero Parkway (MP 0.0) to Donaldson
Road (MP 1.67). (2020CCN) (2022CCR)
(2024CCR)
KY-717Boone 80150 PL
DN
RW
UT
CN STPF 7,000,000
Project Cost:
7,000,000 0 0 0
Page 14 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and address geometric
d
eficiencies along KY 18 from Caroline
Williams Way to KY 338; include
multi-modes. (2022CCN) (2024CCR)
KY-18Boone 80206 PL
DN
RW SPP 2,932,500
UT SPP 985,600
CN SPP 9,600,000
Project Cost:
3,918,100 0 9,600,000 0
I
mprove safety & mobility, reduce
congestion and address geometric
deficiencies along Camp Ernst Road (CR
1001) from KY 237 (Pleasant Valley Rd) to
KY 536 (Hathaway Rd). (2022CCN)
CR-1001Boone 80207 PL
DN
RW
UT SPP 2,800,000
CN SPP 34,720,000
Project Cost:
2,800,000 0 0 34,720,000
I
mprove safety & mobility, reduce
congestion and address geometric
deficiencies along Camp Ernst Road (CR
1001) from Long Branch Rd. to KY 237
(Pleasant Valley Rd.) (2022CCN)(See Item
CR-1001Boone 80208 PL
DN
RW SPP 13,800,000
UT SPP 3,360,000
CN SPP 29,760,000
Project Cost:
0 17,160,000 0 29,760,000
I
mprove access to KY 237 for Litton Lane.
(2022CCN) (2024CCR)
KY-237Boone 80209 PL
DN
RW
UT
CN SPP 6,050,000
Project Cost: 6,050,000 0 0 0
P
aired Grade-Separated Intersections
along KY 18 at KY 842 and Mall Road.
(2022CCN) (2024CCR)
KY-18Boone 80210 PL
DN
RW SPP 14,662,500
UT SPP 3,942,400
CN SPP 33,040,000
Project Cost:
18,604,900 0 33,040,000 0
Page 15 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve capacity at the KY 18 (Burlington
P
ike) intersection with KY 1017 (Aero
Parkway) to support existing and future
traffic volumes. Consider grade
separation design options. (2022CCN)
KY-18Boone 80211 PL
DN
RW SPP 19,500,000
UT SPP 1,000,000
CN SPP 24,800,000
Project Cost:
20,500,000 0 24,800,000 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ALONG HICKS PIKE (CR
1151) FROM US 42 TO KY 338.
(2024CCN)
CR-1151Boone 80304 PL
DN
RW SPP 15,600,000
UT SPP 3,410,000
CN SPP 37,200,000
Project Cost:
19,010,000 0 37,200,000 0
I
MPROVE SAFETY & MOBILITY, AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG US 25 (DIXIE HWY.) BETWEEN KY
16 (MARY GRUBBS HIGHWAY) AND KY
338 (RICHWOOD RD.) (2024CCN)
US-25Boone 80316 PL
DN
RW SPP 6,000,000
UT SPP 3,480,000
CN SPP 46,800,000
Project Cost:
9,480,000 0 46,800,000 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON LIMABURG ROAD FROM
CONRAD LANE TO KY 18 (BURLINGTON
PIKE). (2024CCN)
CR-1042Boone 80317 PL
DN
RW SPP 12,000,000
UT SPP 4,180,000
CN SPP 29,760,000
Project Cost:
16,180,000 0 29,760,000 0
I
MPROVE SAFETY AND MOBILITY ALONG
KY 20 (PETERSBURG ROAD) FROM
GRAVES ROAD TO KY 237 (NORTH BEND
ROAD). (2024CCN)
KY-20Boone 80318 PL
DN
RW SPP 15,840,000
UT SPP 3,370,000
CN SPP 38,440,000
Project Cost:
19,210,000 0 38,440,000 0
Page 16 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve Steeplechase Elementary School
a
ccess and safety by extending Grand
National Blvd to Chambers Road.
(2024CCN)
KY-2951Boone 80350 PL
DN
RW
UT
CN SPP 15,000,000
Project Cost:
0 15,000,000 0 0
R
econstruct Limaburg Road from KY 18 to
Gateway Blvd (CR 1086) (2024CCN)
CR-1042Boone 80356 PL
DN
RW SPP 12,500,000
UT SPP 4,000,000
CN SPP 35,000,000
Project Cost: 12,500,000 4,000,000 35,000,000 0
R
econstruct KY 20 from the new KY 495
(Graves Road) Interchange to KY 18
(MP14.6-16.7) (2024CCN)
KY-20Boone 80357 PL
DN
RW SPP 25,500,000
UT SPP 6,000,000
CN SPP 46,000,000
Project Cost:
25,500,000 6,000,000 46,000,000 0
R
econstruct KY 536 from Camp Ernst
Road to Old Union Road (MP 8.0-10.8)
(2024CCN)
KY-536Boone 80358 PL
DN
RW SPP 20,000,000
UT SPP 3,000,000
CN SPP 60,000,000
Project Cost:
0 20,000,000 3,000,000 60,000,000
I
mprove safety & mobility and address
geometric deficiencies along US 25 (Dixie
Hwy) between KY 16 and KY 338
(Richwood Rd) (MP 2.2-4.7) (2024CCN)
US-25Boone 80359 PL
DN
RW SPP 10,000,000
UT SPP 3,000,000
CN SPP 39,000,000
Project Cost:
10,000,000 3,000,000 39,000,000 0
Page 17 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT A NEW CONNECTION
B
ETWEEN KY 1292, BEAVER ROAD, TO
KY 2951, CHAMBERS ROAD, AND KY 16.
(2024CCN)
PF-9999Boone 80360 PL
DN
RW SPP 30,000,000
UT SPP 5,000,000
CN SPP 85,000,000
Project Cost:
30,000,000 5,000,000 0 85,000,000
T
otal for Boone county PL
Total Amounts:
CN
UT
RW
DN 3,250,000 1,230,000 960,000
178,285,000 65,580,000 9,000,000
43,608,000 28,560,000 8,250,000
26,690,000 183,860,000 426,039,090 292,606,432
248,583,000 281,250,000 444,519,090 293,566,432
E
xtend Stewart Street to Bellafato Street
in the City of Paris to provide improved
access to US 460.
CO-0Bourbon 474 PL
DN
RW
UT
CN SPP 3,390,000
Project Cost: 3,390,000 0 0 0
B
RIDGE PROJECT IN BOURBON COUNTY
ON (009B00055N) KY-1879 AT LAYSONS
BRANCH
KY-1879Bourbon 10036 PL
DN BRX 149,023
RW
UT
CN BRX 993,485
Project Cost:
0 0 0 1,142,508
I
mprove safety on KY 627 (Winchester
Rd) from Clark/Bourbon CL to US 68X
(High St). Breakout section including the
KY 57 (Austerlitz Rd) intersection and
continuing North for approx. 0.70 miles.
KY-627Bourbon 80321 PL
DN
RW
UT
CN SPP 1,250,000
Project Cost:
1,250,000 0 0 0
Page 18 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Bourbon county P L
Total Amounts:
CN
UT
RW
DN 149,023
4,640,000 993,485
4,640,000 0 0 1,142,508
I
MPROVE SAFETY AND DECREASE
CONGESTION ON KY 716 FROM MP 0.0
(US 60) TO MP 0.56 (KY 3293) (2020CCR)
(2024CCN)
KY-716Boyd 180 PL
DN
RW
UT SPP 1,080,000
CN SPP 2,800,000
Project Cost:
1,080,000 2,800,000 0 0
F
EDERAL 'STP' FUNDS DEDICATED TO
HUNTINGTON-ASHLAND MPO FOR FY
2022-2028. (FUNDING SUBJECT TO
FISCAL CONSTRAINT PENDING MPO TIP)
(2020CCR) (2022CCR) (2024CCR)
CO-0Boyd 208.0600 PL
DN
RW
UT
CN SAH 1,800,000 1,800,000 1,800,000 1,800,000
Project Cost:
1,800,000 1,800,000 1,800,000 1,800,000
B
RIDGE PROJECT IN BOYD COUNTY ON
(010B00058N) US-23S AT OHIO
RIVER,CSX,STREETS
US-23Boyd 10074 PL
DN BRO 1,800,000
RW
UT
CN BRO 18,000,000
Project Cost:
0 0 19,800,000 0
B
RIDGE PROJECT IN BOYD COUNTY ON
(010C00018N) STRAIGHT CRK AT
STRAIGHT CREEK
CR-1243Boyd 10075 PL
DN FBP2 213,974
RW
UT
CN FBP2 1,426,494
Project Cost:
0 0 1,640,468 0
Page 19 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-60 FROM
M
ILEPOINT 4.135 TO MILEPOINT 9.638
US-60Boyd 20036 PL
DN STP5 480,000
RW
UT
CN STP5 5,520,000
Project Cost: 0 0 0 6,000,000
I
mprove operational efficiency of the US
60 (13th Street) and KY 168 (Blackburn
Ave) intersection. (2024CCN)
KY-168,
US-60
Boyd 80300 PL
DN
RW NH 4,600,000
UT NH 3,360,000
CN NH 4,060,000
Project Cost:
7,960,000 0 4,060,000 0
I
mprove the operational efficiency of
Greenup Avenue (US-23) from the
southern split with Winchester Avenue
(US-23X) (MP 17.065) to the intersection
of 20th Street (MP 18.055). (2024CCN)
US-23Boyd 80301 PL
DN
RW NH 60,000
UT NH 60,000
CN NH 1,550,000
Project Cost:
120,000 1,550,000 0 0
I
mprove safety, mobility and accessibility
at the intersection of KY 168 and CS 2341
(Robert's Drive); located within close
proximity of an at grade CSX Railroad
Crossing (MP 6.7-6.8) (2024CCN)
KY-168Boyd 80350 PL
DN
RW
UT SPP 1,630,000
CN SPP 6,000,000
Project Cost:
1,630,000 6,000,000 0 0
I
mprove Commerce Drive (CR 1299),
including widening, improving geometrics
and drainage (2024CCN)
CR-1299Boyd 80351 PL
DN
RW
UT SPP 840,000
CN SPP 9,600,000
Project Cost:
840,000 9,600,000 0 0
Page 20 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Boyd county P L
Total Amounts:
CN
UT
RW
DN 2,013,974 480,000
4,660,000
6,970,000
1,800,000 21,750,000 25,286,494 7,320,000
13,430,000 21,750,000 27,300,468 7,800,000
R
ECONSTRUCT KY 52 FROM KY 1805
(Goggin Ln) TO KY 590 (2022CCN)
(2024CCR)
KY-52Boyle 80204 PL
DN
RW
UT
CN SPP 8,120,000
Project Cost: 0 8,120,000 0 0
I
MPROVE THE SAFETY AND MOBILITY OF
KY 34 FROM ALUM SPRINGS CROSSPIKE
(MP 10.391) TO APPROX. 1,000 FEET
WEST OF CORPORATE DRIVE (MP
10.800) (2022CCN)
KY-34Boyle 80250 PL
DN
RW
UT
CN SPP 8,140,000
Project Cost:
8,140,000 0 0 0
W
iden the Goggin Ln from MP 0 to MP
2.712 to create a road shoulder that
would improve safety (2024CCN)
KY-1805Boyle 80300 PL
DN
RW SPP 5,100,000
UT SPP 3,450,000
CN SPP 15,850,000
Project Cost:
8,550,000 0 15,850,000 0
I
mprove roadway geometry to promote
safety on KY 34 from Lexington Avenue
to Old Bridge Road in Boyle County.
(2024CCN)
KY-34Boyle 80302 PL
DN
RW SPP 6,600,000
UT SPP 3,000,000
CN SPP 13,700,000
Project Cost:
9,600,000 0 13,700,000 0
Page 21 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PLANNING STUDY TO EVALUATE
O
PTIONS FOR IMPROVING SAFETY ON
KY 52 BETWEEN DANVILLE AND
LANCASTER. (2024CCN)
KY-52Boyle 80313 PL
DN
RW SPP 2,000,000
UT SPP 4,100,000
CN SPP 15,800,000
Project Cost:
6,100,000 0 15,800,000 0
I
mprove the existing geometry and typical
section of US 68 from approx. MP 5.2 to
MP 6.39 at the intersection of 2nd Street in
Perryville (2024CCN)
US-68Boyle 80354 PL
DN
RW SPP 1,250,000
UT SPP 2,000,000
CN SPP 6,500,000
Project Cost:
3,250,000 6,500,000 0 0
T
otal for Boyle county PL
Total Amounts:
CN
UT
RW
DN
14,950,000
12,550,000
8,140,000 14,620,000 45,350,000
35,640,000 14,620,000 45,350,000 0
O
PERATION OF AUGUSTA FERRY FOR
FY 2027 THROUGH FY 2032.(12CCR)
(14CCR) (2020CCR) (2024CCR)
KY-8Bracken 355.2200 PL
DN
RW
UT
CN SPP 338,000 338,000 338,000 338,000
Project Cost: 338,000 338,000 338,000 338,000
R
ECONSTRUCT KY 8 FROM WRANGLING
RUN RD TO OLD KY 19. (2020CCN)
(2022CCR) (2024CCR)
KY-8Bracken 80103 PL
DN
RW SPP 5,350,000
UT SPP 3,050,000
CN SPP 31,633,000
Project Cost:
8,400,000 0 31,633,000 0
Page 22 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Bracken county P L
Total Amounts:
CN
UT
RW
DN
5,350,000
3,050,000
338,000 338,000 31,971,000 338,000
8,738,000 338,000 31,971,000 338,000
I
MPROVE KY-205 FROM NORTH OF
KY-1812 TO SOUTH OF PEGGS FORK RD.
(2020CCR)
KY-205Breathitt 375 PL
DN
RW
UT
CN STPF 6,800,000
Project Cost: 6,800,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-1812 OVER BOONE FORK OF
FROZEN CRE (013B00006N)
KY-1812Breathitt 10070 PL
DN BRZ 165,340
RW
UT
CN BRZ 1,102,264
Project Cost:
0 0 1,267,604 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-542 OVER SPRING FK-QUICKSAND
CRK (013B00043N)
KY-542Breathitt 10072 PL
DN BRZ 159,286
RW
UT
CN BRZ 1,061,904
Project Cost:
0 0 1,221,190 0
R
EPLACE BRIDGE OVER PUNCHEON
CREEK ON MAX ROARK RD (2020CCN)
CR-1125Breathitt 80107 PL
DN
RW
UT
CN SPP 150,000
Project Cost: 150,000 0 0 0
Page 23 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Replace bridge and approaches on Round
B
ottom Rd to reduce flooding issues
(013C00054N)
CR-1007Breathitt 80353 PL
DN FBP2 158,545
RW
UT
CN FBP2 1,056,965
Project Cost: 0 1,215,510 0 0
T
otal for Breathitt county PL
Total Amounts:
CN
UT
RW
DN 158,545 324,626
6,950,000 1,056,965 2,164,168
6,950,000 1,215,510 2,488,794 0
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ON KY 79 FROM KY 477 TO
KY 144 (12CCN)(14CCR)(18CCN)(2020
CCR) (COMBINED W/ 4-8703) (2022CCR)
(2024CCR)
KY-79Breckinridge 8702 PL
DN
RW
UT
CN SPP 8,700,000
Project Cost:
8,700,000 0 0 0
M
INOR WIDENING OF KY 992 BETWEEN
ROCK QUARRY AND US 60. (16CCN)
(18CCN) (2024CCN)
KY-992Breckinridge 8904 PL
DN
RW
UT SPP 900,000
CN SPP 3,720,000
Project Cost:
900,000 3,720,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CARL NEWBY RD OVER ROCK LICK
CREEK (014C00034N)
CR-1349Breckinridge 10080 PL
DN BRZ 103,141
RW
UT
CN BRZ 687,608
Project Cost:
0 0 0 790,749
Page 24 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES AND MAINTENANCE ISSUES
ALONG KY 79 FROM MCCOY-ROFF
ROAD TO 600' N OF SAND ROCK PASS
ROAD. (2024CCN)
KY-79B reckinridge 80300 PL
DN SPP 1,400,000
RW SPP 2,190,000
UT
CN
Project Cost: 1,400,000 0 2,190,000 0
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG KY 261 AT THE S-CURVES JUST
NORTH OF FIRST STREET. SEE 4-8903.00.
(2024CCN)
KY-261Breckinridge 80306 PL
DN SPP 340,000
RW SPP 180,000
UT SPP 190,000
CN
Project Cost:
340,000 180,000 0 190,000
T
otal for Breckinridge county PL
Total Amounts:
CN
UT
RW
DN 1,740,000 103,141
180,000 2,190,000
900,000 190,000
8,700,000 3,720,000 687,608
11,340,000 3,900,000 2,190,000 980,749
R
ECONSTRUCT KY 44 FROM I 65 TO
CHIMNEY ROCK DRIVE (MILEPOINT 13.1
TO MILEPOINT 15.1). (2022CCN)
KY-44Bullitt 150.0200 PL
DN
RW SPP 9,170,000
UT SPP 11,360,000
CN SPP 22,540,000
Project Cost:
20,530,000 0 22,540,000 0
S
ECTION 5 FROM CS 3316/CS 3628 TO
US 31E BYPASS (2008BOPC) (2022CCN)
(2024CCR)
KY-44Bullitt 150.5000 PL
DN
RW
UT
CN SPP 3,140,000
Project Cost:
3,140,000 0 0 0
Page 25 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
MT. WASHINGTON-TAYLORSVILLE RD;
R
ECONSTRUCT KY 44 FROM US31E
BYPASS TO KY 1319 KINGS CHURCH
HIGHWAY (2020CCN) (2022CCR)
(2024CCR)
KY-44Bullitt 347.5000 PL
DN
RW
UT
CN SPP 13,730,000
Project Cost:
13,730,000 0 0 0
W
IDEN KY-245 FROM FLAGET HOSPITAL
(MP 7.722) THROUGH COUNTY LINE
(MP12.261 NELSON/MP0.000 BULLITT) TO
HAPPY HOLLOW RD (MP 4.425).
(2022CCN) (2024CCR)
KY-245Bullitt 8307.2000 PL
DN
RW
UT
CN SPP 72,000,000
Project Cost:
0 72,000,000 0 0
A
DDRESS CONDITION OF KY-480 FROM
MILEPOINT 0 TO MILEPOINT 5.14
(2024CCR)
KY-480Bullitt 20036 PL
DN
RW
UT
CN NHPM 1,060,000
Project Cost:
1,060,000 0 0 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 118.58 TO MILEPOINT 123.18
I -65Bullitt 22068 PL
DN NHPM 5,000,000
RW
UT
CN NHPM 50,000,000
Project Cost: 0 55,000,000 0 0
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON KY 1450 (BLUE LICK
RD.) BETWEEN THE INTERSECTIONS WITH
KY 1526 (JOHN HARPER HIGHWAY) AND
CR 1512A (JEFFIE LANE) (2020CCN)
KY-1450B ullitt 80101 PL
DN
RW
UT
CN SPP 6,550,000
Project Cost: 0 6,550,000 0 0
Page 26 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY 44 FROM BOGARD
L
ANE TO ARMSTRONG LANE (2020CCN)
(2022CCR)
KY-44Bullitt 80103 PL
DN
RW
UT SPP 7,660,000
CN SPP 16,940,000
Project Cost: 0 7,660,000 16,940,000 0
R
AISE THE ROADWAY BY 4 FEET, WIDEN
IT FROM 2 TO 3 LANES (ADDING A
TWO-WAY LEFT TURN), AND REPLACING
BRIDGE ID #015B00020N
KY-44Bullitt 80338 PL
DN FBP 410,093
RW
UT
CN FBP 2,733,952
Project Cost:
0 0 3,144,045 0
I
mprove traffic operations and improve
safety along US 31E
(Louisville-Bardstown Rd) from the
Bullitt/Nelson County Line to KY 44.
Consider a 2+1 configuration and/or
US-31Bullitt 80354 PL
DN
RW STPF 880,000
UT STPF 860,000
CN SPP 15,150,000
Project Cost:
1,740,000 15,150,000 0 0
I
mprove safety and reduce congestion on
KY 61 from KY 245 to Plaza Park Blvd in
Lebanon Junction. Project will evaluate
widening from 2 to 4 travel lanes and
consider other lower impact alternatives.
KY-61Bullitt 80357 PL
DN
RW SPP 3,810,000
UT SPP 4,900,000
CN SPP 23,265,000
Project Cost:
0 3,810,000 4,900,000 23,265,000
T
otal for Bullitt county PL
Total Amounts:
CN
UT
RW
DN 5,000,000 410,093
10,050,000 3,810,000
12,220,000 7,660,000 4,900,000
17,930,000 143,700,000 42,213,952 23,265,000
40,200,000 160,170,000 47,524,045 23,265,000
Page 27 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OPERATION OF REED'S FERRY AT
L
OGANSPORT FOR FY 2027 THROUGH
FY 2032.(12CCR) (2020CCR) (2024CCR)
KY-269Butler 125.1500 PL
DN
RW
UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost: 173,000 173,000 173,000 173,000
O
PERATION OF THE ROCHESTER FERRY
BY THE BUTLER AND OHIO COUNTY
FERRY AUTHORITY FOR FY 2027-2032.
(12CCR) (2020CCR) (2024CCR)
KY-369Butler 8504.1000 PL
DN
RW
UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost:
173,000 173,000 173,000 173,000
B
RIDGE PROJECT IN BUTLER COUNTY ON
(016B00012N) US-231 AT RENFROW
CREEK
US-231Butler 10032 PL
DN BRX 104,535
RW
UT
CN BRX 696,900
Project Cost:
0 0 0 801,435
B
RIDGE PROJECT IN BUTLER COUNTY ON
(016B00016N) KY-70 AT MUDDY CREEK
KY-70Butler 10033 PL
DN BRZ 845,336
RW
UT
CN BRZ 5,635,575
Project Cost: 0 6,480,911 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-165 OVER GREEN RIVER (016B00061N)
I -165Butler 10060 PL
DN BRO 220,000
RW
UT
CN BRO 2,200,000
Project Cost: 0 0 0 2,420,000
Page 28 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Butler county P L
Total Amounts:
CN
UT
RW
DN 845,336 324,535
346,000 5,981,575 346,000 3,242,900
346,000 6,826,911 346,000 3,567,435
R
ELOCATE US-641 FROM SOUTH OF THE
LYON/CALDWELL COUNTY LINE TO
FREDONIA, 4.5 MILES. (2020CCN)
(2022CCR) (2024CCR)
US-641Caldwell 187.6000 PL
DN
RW
UT STPF 5,000,000 5,000,000
CN
Project Cost:
5,000,000 5,000,000 0 0
B
RIDGE PROJECT IN CALDWELL COUNTY
ON (017B00033L and 017B00033R) I-69
AT TRADEWATER RIVER
I -69Caldwell 10062 PL
DN BRO 1,687,179
RW
UT
CN BRO 11,247,863
Project Cost:
0 0 12,935,042 0
B
RIDGE PROJECT IN CALDWELL COUNTY
ON (017B00060N) LEWISTOWN CHURCH
R AT I-69
CR-1011Caldwell 10064 PL
DN BRX 365,223
RW
UT
CN
Project Cost:
0 0 0 365,223
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 77.994 TO MILEPOINT 79.35
I -69Caldwell 22080 PL
DN NHPM 120,000
RW
UT
CN NHPM 1,200,000
Project Cost: 1,320,000 0 0 0
Page 29 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-069 FROM
M
ILEPOINT 79.35 TO MILEPOINT 82.934
I -69Caldwell 22081 PL
DN STP3 320,000
RW
UT
CN STP3 3,201,221
Project Cost: 3,521,221 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 86.344 TO MILEPOINT 89.848
I -69Caldwell 22082 PL
DN STP4 300,000
RW
UT
CN STP4 3,018,190
Project Cost: 3,318,190 0 0 0
R
ECONSTRUCT CS 1006 (JEFF WATSON
RD) FROM KY 91 TO KY 2617. (2024CCN)
CS-1006Caldwell 80304 PL
DN
RW SPP 860,000
UT SPP 1,680,000
CN SPP 3,330,000
Project Cost: 2,540,000 3,330,000 0 0
A
DDRESS TRAFFIC CONTROL AT THE
INTERSECTION OF KY2617 AND US62
WEST TO IMPROVE TURN MOVEMENTS
FROM KY 2617. (2024CCN)
US-62Caldwell 80307 PL
DN
RW
UT SPP 400,000
CN SPP 2,000,000
Project Cost:
400,000 2,000,000 0 0
E
XTEND 3 LANE SECTION OF KY 91
(MARION ROAD) FROM MP 12.9 TO
BECKNER LANE (MP 13.4) (2024CCN)
KY-91Caldwell 80308 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
Page 30 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Caldwell county P L
Total Amounts:
CN
UT
RW
DN 740,000 1,687,179 365,223
860,000
7,080,000 5,000,000
9,419,411 5,330,000 11,247,863
18,099,411 10,330,000 12,935,042 365,223
B
RIDGE PROJECT IN CALLOWAY
COUNTY ON (018B00079N) KY-893 AT
BRANCH OF MCCULLOUGH CRE
KY-893Calloway 10103 PL
DN BRZ 189,934
RW
UT
CN BRZ 1,266,225
Project Cost: 0 0 0 1,456,159
A
ddress congestion, geometric
deficiencies, and access issues from
KY121 to Utterback Road in Murray.
(2022CCN) (2024CCR)
CS-1047Calloway 80200 PL
DN
RW
UT SPP 3,240,000
CN SPP 8,640,000
Project Cost:
3,240,000 0 8,640,000 0
C
ORRECT ROADWAY GEOMETRICS AND
ADDRESS CONGESTION AND SAFETY
ISSUES AT KY 94 AND KY 1660 (JOHNNY
ROBERTSON ROAD) NEAR MURRAY.
(2024CCN)
KY-94Calloway 80316 PL
DN
RW
UT
CN SPP 750,000
Project Cost:
750,000 0 0 0
T
otal for Calloway county PL
Total Amounts:
CN
UT
RW
DN 189,934
3,240,000
750,000 8,640,000 1,266,225
3,990,000 0 8,640,000 1,456,159
Page 31 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION ALONG THE I-471
C
ORRIDOR FROM US-27 TO OHIO STATE
LINE. (2024CCR)
I -471Campbell 81 PL NH 1,080,000
DN
RW
UT
CN
Project Cost: 1,080,000 0 0 0
E
xtend Pond Creek Road from US 27 to
Persimmon Grove, KY 1121. (2024BOP)
PF-9999Campbell 352.1000 PL
DN
RW
UT
CN SPP 25,520,000
Project Cost: 25,520,000 0 0 0
E
xtend Pond Creek Road from Persimmon
Grove, KY 1121 to AA Highway, KY 9 .
(2024BOP)
PF-9999Campbell 352.2000 PL
DN
RW
UT
CN SPP 46,400,000
Project Cost:
0 46,400,000 0 0
R
EPLACE 4TH STREET BRIDGE OVER THE
LICKING RIVER BETWEEN COVINGTON
AND NEWPORT; BRIDGE NUMBER
059B00037N
KY-8Campbell 1086 PL
DN
RW
UT
CN BRO 2,450,000
Project Cost:
2,450,000 0 0 0
C
ONSTRUCT NEW I-471 SOUTHBOUND
OFF-RAMP AT KY-8 (SEE ALSO
6-183.00). (02CCN)(06CCN) (2020CCN)
I -471, KY-8Campbell 8104 PL
DN
RW
UT SPP 1,080,000
CN SPP 31,200,000
Project Cost:
0 1,080,000 31,200,000 0
Page 32 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN CAMPBELL COUNTY
O
N (019B00039L) I-471 NC AT OHIO
RIVER
I -471Campbell 10035 PL
DN BRO 1,500,000
RW
UT
CN BRO 15,000,000
Project Cost: 0 16,500,000 0 0
B
RIDGE PROJECT IN CAMPBELL COUNTY
ON (019B00039R) I-471 AT OHIO RIVER
I -471Campbell 10036 PL
DN BRO 1,500,000
RW
UT
CN BRO 15,000,000
Project Cost: 0 16,500,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 WB OVER OHIO RIVER @ BRENT
(019B00040L)
I -275Campbell 10051 PL
DN
RW
UT
CN BRO 40,000,000
Project Cost:
0 0 0 40,000,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 EB OVER OHIO RIVER @ BRENT
(019B00040R)
I -275Campbell 10053 PL
DN
RW
UT
CN FBP 40,000,000
Project Cost:
0 0 0 40,000,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-27 OVER OHIO RIVER (019B00076N)
US-27Campbell 10064 PL
DN BRX 1,800,000
RW
UT
CN BRX 18,000,000
Project Cost: 0 19,800,000 0 0
Page 33 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-275 FROM
M
ILEPOINT 73.061 TO MILEPOINT 77.579
I -275Campbell 20010 PL
DN NHPM 1,070,000
RW
UT
CN NHPM 10,680,000
Project Cost: 0 0 0 11,750,000
A
DDRESS CONDITION OF US-27 FROM
MILEPOINT 8.83 TO MILEPOINT 10.52
US-27Campbell 20017 PL
DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE I-275
INTERCHANGE WITH KY-9 (AA HWY.)
(2024CCN)
KY-9Campbell 80311 PL
DN
RW SPP 500,000
UT SPP 2,000,000
CN SPP 50,000,000
Project Cost:
2,500,000 0 50,000,000 0
C
onstruct a roundabout at the intersection
of KY 1892 (Grand Ave) and Highland
Ave (2024CCN)
PF-9999Campbell 80313 PL
DN
RW SPP 3,300,000
UT SPP 1,160,000
CN SPP 3,100,000
Project Cost:
4,460,000 0 3,100,000 0
I
MPROVE CONDITIONS BY
CONSTRUCTING A SOUTHBOUND TRUCK
CLIMBING LANE NORTH OF KY 709, AND
RECONSTRUCT THE INTERSECTION OF
KY 709 AND US 27 TO ALLOW FOR
US-27Campbell 80314 PL
DN
RW
UT SPP 750,000
CN SPP 7,750,000
Project Cost:
750,000 7,750,000 0 0
Page 34 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Campbell county P L
Total Amounts:
CN
UT
RW
DN
1,080,000
4,920,000 1,070,000
3,800,000
3,910,000 1,080,000
27,970,000 103,530,000 84,300,000 90,680,000
36,760,000 109,530,000 84,300,000 91,750,000
B
RIDGE PROJECT IN CARLISLE COUNTY
ON (020B00068N) KY-80 AT LONGGEAR
CREEK
KY-80Carlisle 10107 PL
DN BRX 117,079
RW
UT
CN BRX 780,528
Project Cost: 0 897,607 0 0
C
ORRECT SUBSTANDARD ROADWAY
GEOMETRICS ON US-62 FROM KY 1181
TO KY 408 TO ADDRESS ACCESS
ISSUES, SAFETY CONCERNS, FLOOD
PRONE AREA, AND REGIONAL
US-62Carlisle 80302 PL
DN
RW
UT SPP 1,000,000
CN SPP 6,000,000
Project Cost:
1,000,000 6,000,000 0 0
I
MPROVE SAFETY, MOBILITY,
CONNECTIVITY, AND ADDRESS
GEOMETRIC DEFICIENCIES ALONG US-62
BETWEEN HOBBS ROAD/BOSWELL
ROAD TO KY 307. (2024CCN)
US-62Carlisle 80303 PL
DN
RW
UT SPP 300,000
CN SPP 2,500,000
Project Cost:
300,000 2,500,000 0 0
C
ORRECT ROADWAY GEOMETRICS AND
IMPROVE SAFETY, ACCESS AND
REGIONAL CONNECTIVITY FROM
HICKMAN COUNTY LINE TO KY 1377
SOUTH OF BARDWELL. (2024CCN)
US-51Carlisle 80309 PL
DN
RW
UT SPP 2,500,000
CN SPP 5,800,000
Project Cost:
2,500,000 5,800,000 0 0
Page 35 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT SUBSTANDARD ROADWAY
G
EOMETRICS, TO IMPROVE TRAFFIC
FLOW, SAFETY AND ACCESS
MANAGEMENT ISSUES FROM KY 1377 TO
TRUMAN CREEK BRIDGE IN BARDWELL.
US-51Carlisle 80323 PL
DN
RW SPP 1,000,000
UT SPP 3,000,000
CN SPP 7,000,000
Project Cost:
1,000,000 3,000,000 7,000,000 0
IMPROVE INTERSECTION WITH US 62 AND
K
Y 1628 / PALESTINE RD (CR 1024).
(2024CCN)
US-62C arlisle 80331 PL
DN
RW
UT SPP 135,000
CN SPP 900,000
Project Cost: 135,000 900,000 0 0
T
otal for Carlisle county PL
Total Amounts:
CN
UT
RW
DN 117,079
1,000,000
3,935,000 3,000,000
15,980,528 7,000,000
4,935,000 19,097,607 7,000,000 0
A
DDRESS CONDITION OF KY-467 FROM
MILEPOINT 0 TO MILEPOINT 4.52
KY-467Carroll 20050 PL
DN STP5 64,000
RW
UT
CN STP5 736,000
Project Cost: 0 0 800,000 0
I
mprove safety and mobility and address
geometric deficiencies at the intersection
of KY 36 & KY 1492 (Locust Road).
(2022CCN) (2024CCR)
KY-36Carroll 80219 PL
DN
RW
UT SPP 280,000
CN SPP 3,948,000
Project Cost:
280,000 3,948,000 0 0
Page 36 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY AND
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG US 42 FROM THE WESTERN CITY
LIMIT OF GHENT TO THE GALLATIN
COUNTY LINE. (2024CCN)
US-42Carroll 80301 PL
DN
RW SPP 5,400,000
UT SPP 930,000
CN SPP 25,200,000
Project Cost:
6,330,000 0 25,200,000 0
I
MPROVE SAFETY AND MOBILITY AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 55 FROM KY 389 TO US 42.
(2024CCN)
KY-55Carroll 80302 PL
DN
RW SPP 3,130,000
UT SPP 1,800,000
CN SPP 51,200,000
Project Cost:
4,930,000 0 51,200,000 0
T
otal for Carroll county PL
Total Amounts:
CN
UT
RW
DN 64,000
8,530,000
3,010,000
3,948,000 77,136,000
11,540,000 3,948,000 77,200,000 0
R
ECONSTRUCT US-60 FROM WEST OF
GLENWOOD HOLLOW ROAD TO EAST OF
KY-3296. THE PROJECT SHALL INCLUDE
12' LANES, WIDE PAVED SHOULDERS,
UNOBSTRUCTED CLEAR ZONES,
US-60Carter 8401 PL
DN
RW
UT SPP 4,480,000
CN SPP 24,000,000
Project Cost:
4,480,000 24,000,000 0 0
BRIDGE PROJECT IN CARTER COUNTY ON
(
022B00033N) KY-174 AT TYGARTS
CREEK
KY-174C arter 10079 PL
DN BRX 329,052
RW
UT
CN BRX 2,193,682
Project Cost: 0 2,522,734 0 0
Page 37 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-064 FROM
M
ILEPOINT 171.2 TO MILEPOINT 180.812
I -64Carter 22055 PL
DN NHPM 780,000
RW
UT
CN NHPM 7,829,870
Project Cost: 0 8,609,870 0 0
I
MPROVE US-60 GEOMETRY BEGINNING
TERMINI AT NEW CONSTRUCTION AT
OLIVE HILL MP 12.4 EXTENDING 1.1 MILES
TO I-64 EXIT 161.(18CCN) (2022CCR)
(2024CCR)
US-60Carter 80050 PL
DN
RW
UT
CN SPP 11,600,000
Project Cost:
11,600,000 0 0 0
I
mprove connectivity in Grayson between
KY 1 (Carol Malone Blvd) and KY 3297
(Midland Trail). (2024CCN)
PF-9999Carter 80304 PL
DN
RW
UT SPP 4,640,000
CN SPP 8,100,000
Project Cost:
4,640,000 8,100,000 0 0
C
urve correction on KY 174 to improve
horizontal alignment which will include a
bridge replacement. (2024CCN)
KY-174Carter 80305 PL
DN
RW SPP 720,000
UT SPP 700,000
CN SPP 10,540,000
Project Cost:
1,420,000 10,540,000 0 0
T
otal for Carter county PL
Total Amounts:
CN
UT
RW
DN 1,109,052
720,000
9,820,000
11,600,000 52,663,552
22,140,000 53,772,604 0 0
Page 38 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND GEOMETRIC
D
EFICIENCIES ALONG US 127 AT
DUNNVILLE (2022CCN)
PF-9999,
US-127
Casey 164 PL
DN
RW
UT
CN SPP 13,500,000
Project Cost:
13,500,000 0 0 0
N
EW ALIGNMENT ON KY-70 FROM MP
16.8 TO 19 (12CCN) (2022CCN)
(2024CCR)
KY-70Casey 8701 PL
DN
RW SPP 2,420,000
UT SPP 2,240,000
CN SPP 20,420,000
Project Cost:
4,660,000 0 20,420,000 0
C
ORRECT VERTICAL ALIGNMENT ON US
127 AND KY 1552 NEAR INTERSECTION.
(12CCN)
(2024CCN)
US-127Casey 8702 PL
DN
RW NH 260,000
UT NH 290,000
CN NH 1,950,000
Project Cost:
550,000 1,950,000 0 0
R
ECONSTRUCT BELL HILL FROM MP 10.4
TO MP 11.9.(12CCN)(16CCR)(18CCN)
(2020CCR) (2024CCR)
KY-70Casey 8703 PL
DN
RW
UT
CN SPP 14,040,000
Project Cost:
14,040,000 0 0 0
RECONSTRUCT BRUSH CREEK HILL FROM
M
P 1.8 TO MP 2.8.(12CCN)(16CCR)
(18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-49C asey 8704 PL
DN
RW
UT
CN SPP 12,960,000
Project Cost: 12,960,000 0 0 0
Page 39 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT A NEW STORM DRAINING
S
YSTEM, CURB AND GUTTER FROM
BELDON AVENUE EASTWARD AND
CONSTRUCT A NEW LEFT TURN ONTO
COLLEGE STREET.(12CCN)
KY-70Casey 8706 PL
DN
RW
UT PROT 6,370,000
CN PROT 13,680,000
Project Cost:
6,370,000 0 13,680,000 0
A
DDRESS CONDITION OF KY-910 FROM
MILEPOINT 1.464 TO MILEPOINT 8.801
KY-910Casey 20019 PL
DN STP5 160,000
RW
UT
CN STP5 1,840,000
Project Cost: 0 0 0 2,000,000
A
DD LANES (TWO PLUS ONE) TO US 127
FROM LIBERTY TO THE LINCOLN CO LINE
(2020CCN) (2024CCR)
US-127Casey 80150 PL
DN
RW NH 3,620,000
UT NH 4,440,000
CN SPP 26,880,000
Project Cost:
3,620,000 0 4,440,000 26,880,000
T
otal for Casey county PL
Total Amounts:
CN
UT
RW
DN 160,000
6,300,000
8,900,000 4,440,000
40,500,000 1,950,000 34,100,000 28,720,000
55,700,000 1,950,000 38,540,000 28,880,000
E
XTEND KY-1682 FROM THE E.T.
BREATHITT PARKWAY TO US-68/KY-80
EAST OF HOPKINSVILLE (HOPKINSVILLE
NORTHEAST BYPASS). (2020CCN)
(2022CCR) (2024CCR)
PF-9999Christian 136 PL
DN
RW
UT
CN SPP 41,010,000
Project Cost:
0 41,010,000 0 0
Page 40 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY 1007 FROM US 68 TO
K
Y 1682 IN HOPKINSVILLE. (INCLUDES
2-227.10)(2020CCR) (2022CCR)
(2024CCR)
KY-1007,
PF-9999
Christian 227 PL
DN
RW
UT
CN SPP 12,320,000
Project Cost:
0 12,320,000 0 0
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00021N) US-41 AT CSX
RAILROAD
US-41Christian 10066 PL
DN BRX 624,338
RW
UT
CN
Project Cost:
0 0 0 624,338
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00034N) KY-117 AT SINKING
FORK CREEK
KY-117Christian 10067 PL
DN BRX 802,254
RW
UT
CN
Project Cost:
0 0 0 802,254
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00062N) KY-1453 AT
MONTGOMERY CREEK
KY-1453Christian 10070 PL
DN BRX 279,575
RW
UT
CN BRX 1,863,831
Project Cost:
0 0 0 2,143,406
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00099N) KY-800 AT PENNYRILE
PARKWAY
KY-800Christian 10074 PL
DN BRX 1,257,758
RW
UT
CN
Project Cost:
0 0 0 1,257,758
Page 41 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-41A FROM
M
ILEPOINT 4 TO MILEPOINT 12.56
US-41Christian 20061 PL
DN STP3 760,000
RW
UT
CN STP3 8,740,000
Project Cost: 0 0 9,500,000 0
A
DDRESS CONDITION OF I-024 FROM
MILEPOINT 69.83 TO MILEPOINT 76.142
(75 NON-CARDINAL)
I -24Christian 22012 PL
DN NHPM 3,210,000
RW
UT
CN NHPM 32,095,800
Project Cost:
0 0 0 35,305,800
A
DDRESS CONDITION OF US-41 FROM
MILEPOINT 9.2 TO MILEPOINT 11.39
US-41Christian 22320 PL
DN NHPM 1,200,000
RW
UT
CN NHPM 13,800,000
Project Cost: 0 0 0 15,000,000
T
otal for Christian county PL
Total Amounts:
CN
UT
RW
DN 760,000 7,373,925
53,330,000 8,740,000 47,759,631
0 53,330,000 9,500,000 55,133,556
R
ECONSTRUCT US 60 FOR SAFETY
IMPROVEMENTS FROM I-64 IN CLARK
COUNTY (MP 14.210)) TO 500 FEET WEST
OF SEWELL SHOP ROAD (MP 17.032).
(16CCN)(18CCN) (2022CCR) (2024CCR)
US-60Clark 8952 PL
DN
RW SPP 4,840,000
UT SPP 4,370,000
CN SPP 11,150,000
Project Cost:
9,210,000 0 11,150,000 0
Page 42 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT US 60 FOR SAFETY
I
MPROVEMENTS FROM 500 FEET WEST
OF SEWELL SHOP ROAD (MP 17.032) IN
CLARK COUNTY TO 500 FEET WEST OF
BENTBROOK (MP 2.007) IN
US-60Clark 8953 PL
DN
RW SPP 4,440,000
UT SPP 4,160,000
CN SPP 14,670,000
Project Cost:
8,600,000 0 14,670,000 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway CARDINAL DIRECTION
FROM MILEPOINT 5.341 TO MILEPOINT
10.227
KY-9000Clark 22155 PL
DN NHPM 500,000
RW
UT
CN NHPM 5,000,000
Project Cost:
0 5,500,000 0 0
M
ODERNIZE AND IMPROVE CAPACITY ON
US 60 FROM KY 859 (HALEY RD) TO KY
1958 (BYPASS RD) IN CLARK COUNTY.
(2020CCN) (2022CCR) (2024CCR)
US-60Clark 80151 PL
DN
RW SPP 11,740,000
UT SPP 8,730,000
CN SPP 34,450,000
Project Cost:
0 11,740,000 8,730,000 34,450,000
N
ew construction of KY 1923
(Waterworks Road) between MP 4.2 and
5.0. This includes a new crossing over
the West Fork of Lower Howard Creek
(2024CCN)
KY-1923Clark 80350 PL
DN
RW SPP 550,000
UT SPP 450,000
CN SPP 6,100,000
Project Cost:
1,000,000 6,100,000 0 0
B
ridge Rehab/Replacement on Red River
Road (CR 1137) at MP 0.19-0.2 over the
CSX Railroad approx. 0.20 miles west of
KY 89 (025R00614N)
CR-1137Clark 80358 PL
DN BRX 210,038
RW
UT
CN BRX 1,400,252
Project Cost:
0 1,610,290 0 0
Page 43 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Clark county P L
Total Amounts:
CN
UT
RW
DN 710,038
9,830,000 11,740,000
8,980,000 8,730,000
12,500,252 25,820,000 34,450,000
18,810,000 24,950,290 34,550,000 34,450,000
I
MPROVE SAFETY AND SIGHT DISTANCE
ALONG KY 638 (MP 6.7 TO MP 7.1) AND
ITS INTERSECTION WITH KY 3476.
(14CCN)(18CCN) (2020CCR)
KY-638Clay 8861 PL
DN
RW
UT
CN SPP 1,560,000
Project Cost:
1,560,000 0 0 0
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM CLAY/LAUREL LINE TO
MANCHESTER (JUST PAST EXIT 20 AT
BRIDGE OVER KY 80/US 421), MP 10.593
HR-9006Clay 8910 PL
DN NH 1,000,000
RW SPP 18,750,000
UT SPP 13,200,000
CN SPP 117,600,000
Project Cost:
1,000,000 31,950,000 0 117,600,000
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM MANCHESTER TO
CLAY/LESLIE LINE; MP 21.498 TO MP
35.929 (SEGMENT 8) (16CCN)(18CCN)
HR-9006Clay 8911 PL
DN NH 1,000,000
RW SPP 18,000,000
UT SPP 5,000,000
CN
Project Cost:
1,000,000 0 18,000,000 5,000,000
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00057N) KY-2438 AT GOOSE
CREEK & WALK PATH
KY-2438Clay 10179 PL
DN BRX 1,213,977
RW
UT
CN
Project Cost:
0 0 1,213,977 0
Page 44 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN CLAY COUNTY ON
(
026B00060N) KY-1482 AT LITTLE
BULLSKIN CREEK
KY-1482Clay 10180 PL
DN BRX 121,086
RW
UT
CN BRX 807,242
Project Cost: 0 0 0 928,328
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00073N) HR-9006 AT CSX RR-HAM
BR RD-GOOSE C
HR-9006Clay 10181 PL
DN BRO 1,534,312
RW
UT
CN
Project Cost:
0 0 0 1,534,312
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00102N) KY-3478 AT ROBINSON
CREEK
KY-3478Clay 10183 PL
DN FBP2 179,671
RW
UT
CN FBP2 1,197,806
Project Cost:
0 0 0 1,377,477
B
RIDGE PROJECT IN CLAY COUNTY ON
(026C00016N) FRANK BOWLING ROAD
AT REDBIRD RIVER
CR-1114Clay 10184 PL
DN
RW FBP2 10,000
UT FBP2 10,000
CN FBP2 1,045,350
Project Cost:
0 0 1,065,350 0
B
RIDGE PROJECT IN CLAY COUNTY ON
(026C00125N) CR-1150 AT RED BIRD
CR-1150Clay 10186 PL
DN
RW FBP2 10,000
UT FBP2 10,000
CN FBP2 1,372,134
Project Cost: 0 0 0 1,392,134
Page 45 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT NEW CONNECTOR ROAD
B
ETWEEN US 421 AT MP 17.51 TO
RAILROAD AVE. AT MP 0.1. THIS WILL
REQUIRE APPROXIMATELY 300' OF NEW
ROADWAY ALONG THE CONNECTOR, A
US-421Clay 80251 PL
DN
RW
UT
CN SPP 3,830,000
Project Cost:
3,830,000 0 0 0
I
MPROVE GEOMETRIC ALIGNMENT FROM
KY 3472 AT MP 1.7 CONTINUING PAST
THE BERT. T. COMBS PARK TO THE
INTERSECTION OF BEECH CREEK ROAD
AND WHITE OAK ROAD.
KY-3472Clay 80253 PL
DN
RW
UT
CN SPP 14,560,000
Project Cost:
14,560,000 0 0 0
T
otal for Clay county PL
Total Amounts:
CN
UT
RW
DN 2,000,000 1,213,977 1,835,069
18,750,000 18,010,000 10,000
13,200,000 10,000 5,010,000
19,950,000 1,045,350 120,977,182
21,950,000 31,950,000 20,279,327 127,832,251
R
ELOCATION OF US 127 FROM KY 90
INTERSECTION TO AARON RIDGE ROAD
(MP 11.7 TO MP 16.315) (2022CCN)
(2024CCR)
US-127Clinton 8600 PL
DN
RW NH 5,800,000
UT NH 3,510,000
CN SPP 46,680,000
Project Cost:
5,800,000 0 3,510,000 46,680,000
R
ELOCATION OF US-127 FROM EAST OF
THE AARON RIDGE RD AND OLD US-127
INTERSECTION, EXTENDING NORTHERLY
TO NORTH OF THE KY-3063 AND OLD
US-127 INTERSECTION. (SEE 8-108 AND
US-127Clinton 8601.3000 PL
DN
RW
UT
CN NH 15,000,000 15,000,000
Project Cost:
15,000,000 15,000,000 0 0
Page 46 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility of KY 558
f
rom KY 90 to Russell/Clinton Co line
(2024CCN)
KY-558Clinton 80313 PL
DN
RW SPP 5,410,000
UT SPP 4,260,000
CN SPP 9,860,000
Project Cost: 9,670,000 0 9,860,000 0
T
otal for Clinton county PL
Total Amounts:
CN
UT
RW
DN
11,210,000
4,260,000 3,510,000
15,000,000 15,000,000 9,860,000 46,680,000
30,470,000 15,000,000 13,370,000 46,680,000
O
PERATION OF CAVE-IN-ROCK FERRY
AT OHIO RIVER FOR FY 2027 THROUGH
FY 2032 USING AUDITED COSTS AS THE
BASIS.(12CCR) (2020CCR) (2022CCR)
(2024CCR)
KY-91Crittenden 326.1700 PL
DN
RW
UT
CN SPP 1,662,000 1,662,000 1,662,000 1,662,000
Project Cost:
1,662,000 1,662,000 1,662,000 1,662,000
UPGRADE STREET TO ACCOMMODATE
T
RUCK TRAFFIC, ADDRESS SAFETY
CONCERNS, ADDRESS GEOMETRIC
DEFICIENCIES, POSSIBLE BIKE AND PED
PATH. THIS PROJECT WILL EXTEND FROM
CS-1094,
C
S-1095
Crittenden 80334 PL
DN
RW
UT
CN SPP 7,500,000
Project Cost: 7,500,000 0 0 0
O
n KY 120 reconstruct substandard
curve between Herman Travis Rd
Intersection and Piney Creek (2024CCN)
KY-120Crittenden 80335 PL
DN
RW
UT
CN SPP 1,500,000
Project Cost:
1,500,000 0 0 0
Page 47 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Crittenden county P L
Total Amounts:
CN
UT
RW
DN
10,662,000 1,662,000 1,662,000 1,662,000
10,662,000 1,662,000 1,662,000 1,662,000
A
DDRESS CONDITION OF KY-61 FROM
MILEPOINT 12.9 TO MILEPOINT 13.6
KY-61Cumberland 20021 PL
DN STP5 272,000
RW
UT
CN STP5 3,128,000
Project Cost: 0 0 0 3,400,000
T
otal for Cumberland county PL
Total Amounts:
CN
UT
RW
DN 272,000
3,128,000
0 0 0 3,400,000
I
MPROVE KY-54 FROM BOLD FORBES
WAY TO KY 1456 (THRUSTON-DERMONT
RD). DESIGN UNDER PARENT 2-8300.00.
(2018BOP) (2022CCN) (2024CCR)
KY-54Daviess 8300.2000 PL
DN
RW
UT
CN SPP 5,460,000
Project Cost:
5,460,000 0 0 0
I
MPROVE KY-54 FROM COUNTRYSIDE
DRIVE TO JACK HINTON RD. DESIGN
UNDER PARENT 2-8300.00. (2018BOP)
(2022CCR) (2024CCR)
KY-54Daviess 8300.4000 PL
DN
RW
UT
CN SPP 14,070,000
Project Cost:
14,070,000 0 0 0
Page 48 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SUBSTANDARD ROADWAY
G
EOMETRICS AND SAFETY CONCERNS
ON KY 1456 FROM KY 54 TO HAYDEN
ROAD. MP 2.778 TO 4.714 (SEE
2-8709.00)(14CCN)(16CCR) (2022CCN)
KY-1456Daviess 8801 PL
DN
RW
UT
CN SPP 11,340,000
Project Cost:
11,340,000 0 0 0
I
MPROVE KY-3143 FROM KY-3335 TO KY
54. (14CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-3143Daviess 8854 PL
DN
RW
UT
CN STP1 7,660,000
Project Cost:
7,660,000 0 0 0
B
RIDGE PROJECT IN DAVIESS COUNTY
ON (030B00138N) KY-662 AT
BLACKFORD CREEK
KY-662Daviess 10082 PL
DN BRZ 649,139
RW
UT
CN BRZ 4,327,594
Project Cost:
0 4,976,733 0 0
A
DDRESS CONDITION OF KY-81 FROM
MILEPOINT 11.89 TO MILEPOINT 13.32
KY-81Daviess 20017 PL
DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
A
DDRESS CONDITION OF KY-2155 FROM
MILEPOINT 0 TO MILEPOINT 1.99
KY-2155Daviess 20019 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,300,000
Project Cost: 0 0 0 2,500,000
Page 49 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-165 FROM
M
ILEPOINT 59.474 TO MILEPOINT 64.001
I -165Daviess 20065 PL
DN NHPM 380,000
RW
UT
CN NHPM 3,863,248
Project Cost: 0 4,243,248 0 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 64.001 TO MILEPOINT 70.185
I -165Daviess 20066 PL
DN STP3 520,000
RW
UT
CN STP3 5,207,854
Project Cost: 0 5,727,854 0 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 64.001 TO MILEPOINT 70.185
(2024CCR)
I -165Daviess 22138 PL
DN NHPM 560,000
RW
UT
CN NHPM 5,600,000
Project Cost:
0 6,160,000 0 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 15.883 TO
MILEPOINT 23.441
AU-9005Daviess 22195 PL
DN STP5 1,160,000
RW
UT
CN STP5 11,600,000
Project Cost:
12,760,000 0 0 0
A
DDRESS SAFETY, CONGESTION, AND
MOBILITY ISSUES ON KY 144 FROM MP
2.5 TO MP 3.75 INCLUDING 12 FOOT
DRIVING LANES AND TURNING LANES
WHERE NEEDED. (2020CCN) (2022CCR)
KY-144Daviess 80150 PL
DN
RW
UT SPP 2,240,000
CN SPP 4,320,000
Project Cost:
2,240,000 4,320,000 0 0
Page 50 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OLD HARTFORD RD - WIDEN TO IMPROVE
T
RAFFIC FLOW AND SAFETY. PROJECT
BEGINS AT HARRIET LN (CR 1120H) AND
ENDS AT BURLEW BLVD (KY 1432).
(2024CCN)
KY-298Daviess 80301 PL
DN
RW
UT SPP 2,750,000
CN SPP 11,760,000
Project Cost:
2,750,000 11,760,000 0 0
R
ECONSTRUCT GOETZ DR FROM
SOUTHTOWN BLVD (KY 2121) TO
FREDERICA ST (US 431). INSTALL TURN
LANES AS NEEDED. (2024CCN)
KY-2699Daviess 80302 PL
DN
RW
UT
CN SPP 3,250,000
Project Cost:
3,250,000 0 0 0
W
IDEN KY 2127 FROM KELLER ROAD (CR
1301) TO KY 2121, INCLUDING 10'
MULTIUSE PATH. (2024CCN)
KY-2127Daviess 80305 PL
DN
RW
UT SPP 870,000
CN SPP 7,020,000
Project Cost:
870,000 7,020,000 0 0
T
otal for Daviess county PL
Total Amounts:
CN
UT
RW
DN 1,160,000 2,229,139 200,000
5,860,000
53,380,000 43,478,696 2,300,000
60,400,000 45,707,835 0 2,500,000
R
ECONSTRUCTION AND REALIGNMENT
OF KY 259 FROM MP 12.096 TO 15.633/
(2024CCN)
KY-259Edmonson 80317 PL
DN
RW
UT SPP 2,410,000
CN SPP 26,772,000
Project Cost:
2,410,000 26,772,000 0 0
Page 51 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY 2326 (OTTER GAP
R
OAD) FROM US 31W IN WARREN CO.
TO NOAH BLEDSOE ROAD IN EDMONSON
CO. (2024CCN)
KY-2326Edmonson 80323 PL
DN
RW
UT SPP 2,000,000
CN SPP 6,000,000
Project Cost:
2,000,000 6,000,000 0 0
R
econstruction/Widening from KY 2326 to
KY 101 (MP 0.0 - 2.455). (2024CCN)
CR-1137Edmonson 80350 PL
DN
RW SPP 1,250,000
UT SPP 3,000,000
CN SPP 6,000,000
Project Cost: 4,250,000 0 6,000,000 0
R
econstruction/Widening from KY 743 to
Noah Bledsoe Road (MP 0.0 - 1.254).
(2024CCN)
CR-1139Edmonson 80351 PL
DN
RW SPP 650,000
UT SPP 1,500,000
CN SPP 350,000
Project Cost:
2,150,000 350,000 0 0
T
otal for Edmonson county PL
Total Amounts:
CN
UT
RW
DN
1,900,000
8,910,000
33,122,000 6,000,000
10,810,000 33,122,000 6,000,000 0
I
MPROVE KY-32 FROM WEST OF
STEGALL COLD SPRING ROAD TO KY-7
NEAR NEWFOUNDLAND. (PRIORITY
SECTION I)(06CCR) (08CCR) (10CCR)
(12CCR)(14CCR)(16CCR)(18CCR)
KY-32Elliott 192.0100 PL
DN
RW
UT
CN STP2 20,000,000 20,000,000 20,000,000 13,600,000
Project Cost:
20,000,000 20,000,000 20,000,000 13,600,000
Page 52 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY-32 FROM 0.408 MILES
W
EST OF STEGALL COLD SPRING ROAD
TO KY-7 NEAR NEWFOUNDLAND.
(PRIORITY SECTION 2). (10CCR)(16CCN)
(18CCN) (2024CCN)
KY-32Elliott 192.0300 PL
DN
RW
UT STP2 7,010,000
CN STP2 15,000,000 23,440,000
Project Cost:
0 7,010,000 15,000,000 23,440,000
R
econstruct KY 7 from Sandy Hook to the
Morgan County Line. (2024CCR)
KY-7Elliott 228.4000 PL
DN
RW
UT
CN SPP 80,640,000
Project Cost: 0 80,640,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 755 OVER SOUTH RUIN CREEK
(032B00030N)
KY-755Elliott 10098 PL
DN BRZ 112,375
RW
UT
CN BRZ 749,168
Project Cost:
0 861,543 0 0
T
otal for Elliott county PL
Total Amounts:
CN
UT
RW
DN 112,375
7,010,000
20,000,000 101,389,168 35,000,000 37,040,000
20,000,000 108,511,543 35,000,000 37,040,000
I
MPROVE LEVEL OF SERVICE, SAFETY,
AND CONNECTIVITY ON KY-82 FROM
KY-89 IN ESTILL CO. TO NEW
CONSTRUCTION LOCATED NORTH OF
HUDSON MILL ROAD IN ESTILL COUNTY.
KY-82Estill 205 PL
DN
RW
UT
CN SPP 37,200,000
Project Cost:
0 37,200,000 0 0
Page 53 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Estill county P L
Total Amounts:
CN
UT
RW
DN
37,200,000
0 37,200,000 0 0
D
EDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR LEXINGTON
URBANIZED AREA AND SUBJECT TO MPO
CONTROL FOR FY 2026 THROUGH FY
2032. (FUNDING SUBJECT TO FISCAL
CO-0Fayette 227.1400 PL
DN
RW
UT
CN SLX 7,800,000 7,800,000 7,800,000 7,800,000
Project Cost:
7,800,000 7,800,000 7,800,000 7,800,000
O
PERATION OF VALLEY VIEW FERRY AT
KY RIVER FOR FY 2027 THROUGH FY
2032. (12CCR)(18CCR) (2020CCR)
(2024CCR)
KY-169,
PF-9999
Fayette 357.1700 PL
DN
RW
UT
CN SPP 540,000 540,000 540,000 540,000
Project Cost:
540,000 540,000 540,000 540,000
A
CCESS MANAGEMENT ON
NICHOLASVILLE ROAD BETWEEN
NICHOLASVILLE AND MAN-O-WAR
BLVD. (14CCR) (2024CCN)
US-27Fayette 430 PL
DN
RW
UT SPP 7,180,000
CN SPP 30,380,000
Project Cost:
7,180,000 0 30,380,000 0
N
ICHOLASVILLE - MAN-O-WAR BLVD;
ACCESS MANAGEMENT ON US-27
(NICHOLASVILLE RD) FROM JUST SOUTH
OF KOHL'S DRIVE TO MAN-O-WAR BLVD.
US-27Fayette 430.2000 PL
DN
RW
UT
CN SPP 43,000,000
Project Cost:
43,000,000 0 0 0
Page 54 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION ON KY-4 (NEW
C
IRCLE RD) FROM LIBERTY ROAD TO THE
RAILROAD BRIDGE NORTH OF PALUMBO
DRIVE.
KY-4Fayette 438 PL
DN
RW NH 6,800,000
UT NH 6,000,000
CN SPP 58,550,000
Project Cost:
6,800,000 6,000,000 0 58,550,000
N
EW CIRCLE RD: IMPROVE SAFETY AND
REDUCE CONGESTION FROM US-68
(HARRODSBURG RD) TO US-60
(VERSAILLES RD). SEE SEGMENTS 2A &
2B IN AUGUST, 1998 ADVANCE
KY-4Fayette 439 PL
DN
RW NH 1,170,000
UT NH 1,760,000
CN
Project Cost:
0 2,930,000 0 0
IMPROVE LIBERTY ROAD FROM
G
RAFTONS MILL LANE TO NEW CIRCLE
ROAD AND IMPROVE INTERSECTION WITH
NEW CIRCLE ROAD. (16CCN)(18CCR)
(2020CCR) (2022CCR) (2024CCR)
KY-1927F ayette 8902 PL
DN
RW
UT
CN STPF 6,930,000
Project Cost: 6,930,000 0 0 0
REDUCE CONGESTION ON I-64/I-75 FROM
N
ORTHERN SPLIT TO NEWTOWN PIKE (MP
115.200 – 117.665). SECTION 1
(2024CCR)
I -75F ayette 8909.1000 PL
DN
RW
UT
CN NH 23,000,000 23,000,000 18,760,000
Project Cost: 23,000,000 23,000,000 18,760,000 0
B
RIDGE PROJECT IN FAYETTE COUNTY
ON (034B00022L) W NEW CIRCLE RD NC
AT US 60 -VERSAILLES RD
US-60Fayette 10042 PL
DN BRO 499,840
RW
UT
CN
Project Cost:
0 0 0 499,840
Page 55 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN FAYETTE COUNTY
O
N (034B00022R) NEW CIRCLE ROAD AT
US 60 -VERSAILLES RD
KY-4Fayette 10043 PL
DN BRO 668,794
RW
UT
CN
Project Cost: 0 0 0 668,794
B
RIDGE PROJECT IN FAYETTE COUNTY
ON (034B00139N) KY-3367 AT BR OF
NO. ELKHORN CREEK
KY-3367Fayette 10044 PL
DN BRZ 375,394
RW
UT
CN BRZ 2,502,630
Project Cost:
0 2,878,024 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-25 OVER I-64 (034B00002N)
US-25Fayette 10075 PL
DN FBP 1,173,574
RW
UT
CN FBP 7,823,824
Project Cost: 8,997,398 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-25 OVER RAMP A OF I-75 & I-64
(034B00003N)
US-25Fayette 10084 PL
DN FBP 593,016
RW
UT
CN FBP 3,953,441
Project Cost:
4,546,457 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
BRYAN AVENUE OVER I-75 & I-64
(034B00048N)
KY-57Fayette 10085 PL
DN BRX 1,099,519
RW
UT
CN BRX 7,330,129
Project Cost:
0 8,429,648 0 0
Page 56 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
N
B & SB 75 NON-CARDINAL OVER
RELOCATED KEARNEY ROAD
(034B00078L and 034B00078R)
I -75Fayette 10086 PL
DN FBP 1,444,640
RW
UT
CN BRX 4,815,500
FBP 4,815,500
Project Cost:
6,260,140 4,815,500 0 0
A
DDRESS CONGESTION AND IMPROVE
SAFETY ON US 60 FROM MILEPOINT
12.41 TO MILEPOINT 16.37 BY WIDENING
AND MODERNIZING US 60 FROM THE END
OF THE FOUR-LANE SECTION NEAR
US-60Fayette 80150 PL
DN
RW
UT
CN STPF 10,000,000
Project Cost:
0 0 0 10,000,000
A
CCESS MANAGEMENT IMPROVEMENT
ON US 27 (NICHOLASVILLE RD) AT KY 4
(NEW CIRCLE) INTERCHANGE. (2022CCN)
(2024CCR)
US-27Fayette 80205 PL
DN
RW
UT
CN NH 7,500,000 7,500,000
Project Cost:
0 7,500,000 7,500,000 0
A
ddress congestion and improve safety
on US 60 (Winchester Rd) and Man O'
War Blvd (KY 1425 & CS 4524) creating
an alternative route between Sir Barton
Way (CS 2636) and Polo Club Blvd (CS
CO-0Fayette 80206 PL
DN SPP 1,960,000
RW SPP 9,800,000
UT SPP 600,000
CN SPP 12,700,000
Project Cost:
1,960,000 9,800,000 600,000 12,700,000
R
ELIEVE TRAFFIC CONGESTION ON NEW
CIRCLE RD BETWEEN Tates Creek AND
Nicholasville Rd (MP 17.741-19.283) BY
INCREASING CAPACITY (2024CCN)
KY-4Fayette 80303 PL
DN
RW
UT SPP 1,000,000
CN SPP 48,000,000
Project Cost:
1,000,000 48,000,000 0 0
Page 57 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Alumni Drive: Address congestion from
E
dgewater DR to MOW Blvd. (2024CCN)
CS-3016Fayette 80305 PL
DN
RW
UT SPP 2,750,000
CN SPP 6,000,000
Project Cost: 2,750,000 6,000,000 0 0
M
odernize roadway, improve
multi-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80306 PL
DN
RW
UT NH 820,000
CN NH 4,940,000
Project Cost:
820,000 4,940,000 0 0
P
rovide additional capacity and improve
multi-modal access on KY 1425 (Man o'
War Blvd) from I-75 to US 60 (Winchester
Road). (2024CCN)
KY-1425Fayette 80307 PL
DN
RW
UT SPP 1,600,000
CN SPP 5,000,000
Project Cost:
1,600,000 5,000,000 0 0
I
mprove safety and access management
measures on New Circle Rd. (KY 4): from
Boardwalk to North Limestone Street.
(2024CCN)
KY-4Fayette 80308 PL
DN
RW
UT SPP 1,200,000
CN SPP 15,000,000
Project Cost:
1,200,000 15,000,000 0 0
O
perational & multimodal improvements on
US 60 (Winchester Rd) from Midland to
New Circle Rd. (2024CCN)
US-60Fayette 80309 PL
DN
RW
UT
CN NH 1,400,000
Project Cost:
1,400,000 0 0 0
Page 58 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Modernize roadway, improve
m
ulti-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80311 PL
DN
RW NH 710,000
UT NH 260,000
CN NH 1,560,000
Project Cost:
970,000 1,560,000 0 0
M
odernize roadway, improve
multi-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80312 PL
DN
RW NH 2,840,000
UT NH 1,060,000
CN NH 6,800,000
Project Cost:
3,900,000 0 6,800,000 0
M
odernize roadway, improve
multi-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80323 PL
DN
RW NH 770,000
UT NH 320,000
CN NH 1,690,000
Project Cost:
1,090,000 1,690,000 0 0
R
educe congestion on New Circle Road
between Richmond Road and Alumni Drive
(MP 14.851-16.123).(SAME AS 4-80360 IN
SB 91 CHANGES) (2024CCN)
KY-4Fayette 80363 PL
DN
RW SPP 1,500,000
UT SPP 5,000,000
CN SPP 35,000,000
Project Cost:
6,500,000 0 35,000,000 0
T
otal for Fayette county PL
Total Amounts:
CN
UT
RW
DN 5,171,230 1,474,913 1,168,634
12,620,000 10,970,000
21,190,000 7,760,000 600,000
99,262,765 135,678,259 106,780,000 89,590,000
138,243,995 155,883,172 107,380,000 90,758,634
Page 59 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE, WIDEN, AND PROVIDE SPOT
I
MPROVEMENTS ON KY-165 TO IMPROVE
SAFETY FROM KY-32 TO US-68. (14CCN)
(2024CCN)
KY-165Fleming 8815 PL
DN
RW SPP 3,850,000
UT SPP 4,320,000
CN SPP 40,600,000
Project Cost:
8,170,000 40,600,000 0 0
C
ONSTRUCT LEFT TURN LANES ON KY
11 AT ROSS DRIVE, TAYLOR MILL AND
THE INDUSTRIAL PARK ROAD. (16CCN)
(2024CCN)
KY-11Fleming 8901 PL
DN
RW
UT SPP 1,510,000
CN SPP 2,400,000
Project Cost:
1,510,000 2,400,000 0 0
W
IDEN KY 801 FROM NEAR MMRC
REGIONAL PARK TO KY 158 IN FLEMING
CO. (16CCN)(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-801Fleming 8915 PL
DN
RW
UT
CN STP2 7,000,000
Project Cost:
7,000,000 0 0 0
A
DDRESS CONDITION OF KY-32 FROM
MILEPOINT 13 TO MILEPOINT 17.45
KY-32Fleming 22327 PL
DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 4,000,000 0 0 0
I
MPROVE SAFETY AND SIGHT DISTANCE
ON KY-32 BEGINNING AT 0.4 MILES WEST
OF FLEMING/ROWAN CO LINE AND
ENDING 0.3 MILES EAST OF THE LINE.
(18CCN) (2020CCR) (2022CCR)
KY-32Fleming 80051 PL
DN
RW
UT
CN SPP 7,560,000
Project Cost:
7,560,000 0 0 0
Page 60 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY 57 TO PROVIDE
B
ETTER HORIZONTAL AND VERTICAL
ALIGNMENT, WIDER SHOULDERS, AND
EXTEND CLEAR ZONES (2020CCN)
(2022CCR) (2024CCR)
KY-57Fleming 80103 PL
DN
RW
UT
CN SPP 48,000,000
Project Cost:
0 48,000,000 0 0
T
otal for Fleming county PL
Total Amounts:
CN
UT
RW
DN 320,000
3,850,000
5,830,000
18,240,000 91,000,000
28,240,000 91,000,000 0 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00049N) KY-1210 AT LEFT FK
MIDDLE CREEK
KY-1210Floyd 10092 PL
DN FBP2 276,656
RW
UT
CN FBP2 1,844,370
Project Cost: 0 0 2,121,026 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00060N) KY-1091 AT LEFT FK
BEAVER CREEK
KY-1091Floyd 10093 PL
DN BRX 313,566
RW
UT
CN BRX 2,090,441
Project Cost:
0 2,404,007 0 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00087N) KY-194 AT COW CREEK
KY-194Floyd 10094 PL
DN BRX 100,354
RW
UT
CN BRX 669,024
Project Cost: 0 0 0 769,378
Page 61 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN FLOYD COUNTY ON
(
036B00135N) KY-3 AT CSX RR &
LEVISA FORK
KY-3Floyd 10096 PL
DN FBP 1,331,866
RW
UT
CN FBP 8,879,104
Project Cost: 0 0 10,210,970 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036C00074N) MARTHA'S VINEYARD AT
BULL CREEK
CR-1655Floyd 10098 PL
DN
RW
UT
CN FBP2 1,150,000
Project Cost:
0 0 1,150,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3385 OVER Buffalo Creek
(036B00122N)
KY-3385Floyd 10161 PL
DN BRZ 103,141
RW
UT
CN BRZ 687,608
Project Cost:
0 0 0 790,749
T
otal for Floyd county PL
Total Amounts:
CN
UT
RW
DN 313,566 1,608,522 203,495
2,090,441 11,873,474 1,356,632
0 2,404,007 13,481,996 1,560,127
I
MPROVE SAFETY, TRUCK MOBILITY,
AND REDUCE CONGESTION ALONG I-64
FROM DIRECTLY EAST OF US-127 TO
US-60 SOUTH OF FRANKFORT.
(2024CCR)
I -64Franklin 551 PL
DN
RW
UT
CN NH 4,000,000 24,000,000 48,500,000
Project Cost:
0 4,000,000 24,000,000 48,500,000
Page 62 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN I-64 TO 6 LANES FROM KY-395 TO
K
Y-151.
I -64Franklin 2035.4000 PL
DN
RW
UT NH 270,000
CN
Project Cost: 270,000 0 0 0
W
IDEN I-64 TO 6 LANES FROM KY-151 TO
WEST OF THE KY-420 BRIDGE.
(2004BOPC)(DESIGN FUNDED UNDER
5-2035.40)(16CCN)(SEE ITEM NO.
5-2035.80 FOR BRIDGES) (2024CCN)
I -64Franklin 2035.7000 PL
DN
RW
UT NH 150,000
CN
Project Cost:
0 150,000 0 0
B
RIDGE PROJECT IN FRANKLIN COUNTY
ON (037B00008N) US 60 AT RJ CORMAN
RAILROAD
US-60Franklin 10040 PL
DN BRO 2,465,331
RW
UT
CN
Project Cost:
0 0 0 2,465,331
B
RIDGE PROJECT IN FRANKLIN COUNTY
ON (037B00074N) KY 676 (E-W CONN)
AT KENTUCKY RIVER & KY 1263
KY-676Franklin 10045 PL
DN
RW
UT
CN BRO 18,000,000
FBP 18,000,000 21,660,000
Project Cost:
18,000,000 18,000,000 21,660,000 0
A
DDRESS DEFICIENCIES OF "SINGING"
BRIDGE ON US 60X OVER KENTUCKY
RIVER (037B00065N)
US-60Franklin 10139 PL
DN
RW
UT
CN BRZ 17,000,000
Project Cost:
17,000,000 0 0 0
Page 63 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-064 FROM
M
ILEPOINT 46.303 TO MILEPOINT 53.118
I -64Franklin 22030 PL
DN NHPM 1,330,000
RW
UT
CN NHPM 13,270,000
Project Cost: 0 14,600,000 0 0
A
DD A TURN LANE AT THE
INTERSECTION OF KY 676 AND US 60
(2020CCN) (2024CCR)
US-60Franklin 80105 PL
DN
RW
UT SPP 120,000
CN SPP 1,860,000
Project Cost:
120,000 1,860,000 0 0
I
mprove safety and reduce congestion on
US 127 in Frankfort from I-64 to US 60
(2022CCN) (2024CCR)
US-127Franklin 80201 PL
DN NH 2,080,000
RW SPP 5,780,000
UT SPP 3,400,000
CN SPP 13,100,000
Project Cost:
11,260,000 0 13,100,000 0
I
MPROVE SAFETY AND TRAFFIC FLOW
ON US 60 (VERSAILLES ROAD) FROM US
460 TO I-64 IN FRANKFORT. (2024CCN)
US-60Franklin 80301 PL
DN
RW
UT NH 660,000
CN SPP 11,580,000
Project Cost:
660,000 0 11,580,000 0
T
otal for Franklin county PL
Total Amounts:
CN
UT
RW
DN 2,080,000 1,330,000 2,465,331
5,780,000
4,450,000 150,000
35,000,000 37,130,000 70,340,000 48,500,000
47,310,000 38,610,000 70,340,000 50,965,331
Page 64 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OPERATION OF HICKMAN FERRY AT
M
ISSISSIPPI RIVER FOR FY 2027
THROUGH FY 2032. (12CCR) (2020CCR)
(2024CCR)
KY-1354Fulton 320.1700 PL
DN
RW
UT
CN SPP 144,000 144,000 144,000 144,000
Project Cost:
144,000 144,000 144,000 144,000
A
DDRESS ECONOMIC DEVELOPMENT,
AND TRUCK ACCESS ISSUES TO THE
FULTON INDUSTRIAL PARK FROM THE
PURCHASE PARKWAY TO HOLLAND
LANE IN FULTON. (2024CCN)
KY-307Fulton 80304 PL
DN
RW
UT
CN SPP 1,500,000
Project Cost:
1,500,000 0 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY AND FREIGHT
ACCESS ISSUES FROM KY 166 TO KY
1099 IN HICKMAN. (2024CCN)
KY-125F ulton 80310 PL
DN
RW SPP 1,650,000
UT SPP 2,160,000
CN SPP 11,600,000
Project Cost: 3,810,000 11,600,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY ISSUES AND FREIGHT
ACCESS AT INTERSECTION WITH KY 94
SOUTHWEST. (2024CCN)
KY-94F ulton 80319 PL
DN
RW
UT
CN SPP 500,000
Project Cost: 500,000 0 0 0
C
ORRECT SUBSTANDARD INTERSECTION
GEOMETRICS AND ADDRESS ACCESS
ISSUES AT KY 309 & KY 1099 IN
HICKMAN TO IMPROVE THE LESS THAN
ADEQUATE TRUCK TURNING RADIUS.
KY-1099Fulton 80324 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
Page 65 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY ISSUES AND FREIGHT
ACCESS FROM TENNESSEE STATE LINE
TO KY 166. (2024CCN)
KY-125F ulton 80326 PL
DN
RW
UT
CN SPP 4,000,000
Project Cost: 4,000,000 0 0 0
T
otal for Fulton county PL
Total Amounts:
CN
UT
RW
DN
1,650,000
2,160,000
8,144,000 11,744,000 144,000 144,000
11,954,000 11,744,000 144,000 144,000
I
MPROVE GEOMETRICS ON I-71 FROM
US-127 TO MP 64. (16CCN)(18CCR)
(2024CCR)
I -71Gallatin 8910 PL
DN
RW
UT
CN NH 20,000,000
Project Cost: 20,000,000 0 0 0
R
ECONSTRUCT I-71 WITH ADDITIONAL
LANES FROM LITTLE SUGAR ROAD
OVERPASS TO THE BOONE COUNTY
LINE. (2024CCN)
I -71Gallatin 80303 PL
DN
RW SPP 300,000
UT SPP 290,000
CN SPP 78,000,000
Project Cost:
590,000 0 78,000,000 0
R
elocate US 42 from MP 0.6 to MP 2.0
(Memorandum of Agreement with Nucor
Steel Gallatin to provide ROW). (2024CCN)
US-42Gallatin 80355 PL
DN
RW SPP 8,000,000
UT SPP 4,000,000
CN SPP 15,000,000
Project Cost:
0 12,000,000 0 15,000,000
Page 66 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Gallatin county P L
Total Amounts:
CN
UT
RW
DN
300,000 8,000,000
290,000 4,000,000
20,000,000 78,000,000 15,000,000
20,590,000 12,000,000 78,000,000 15,000,000
I
MPROVE US-27 FROM WEST
LANCASTER BYPASS TO KY-34.
(2006BOPC) (16CCN)(18CCR) (2020CCR)
(2024CCR)
US-27Garrard 196.3000 PL
DN
RW
UT
CN NH 12,000,000 19,040,000
Project Cost:
12,000,000 19,040,000 0 0
W
est Lancaster Bypass from North of
Lancaster to Bell Street at Stanford, KY.
(2024CCR)
CO-0Garrard 196.5000 PL
DN
RW
UT NH 1,300,000
CN NH 20,000,000
Project Cost:
0 1,300,000 0 20,000,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-563 OVER SCOTT FORK
(040B00019N)
KY-563Garrard 10077 PL
DN BRZ 142,134
RW
UT
CN BRZ 947,560
Project Cost:
0 0 1,089,694 0
T
otal for Garrard county PL
Total Amounts:
CN
UT
RW
DN 142,134
1,300,000
12,000,000 19,040,000 947,560 20,000,000
12,000,000 20,340,000 1,089,694 20,000,000
Page 67 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 162.6 TO MILEPOINT 164.4
I -75Grant 20062 PL
DN NHPM 530,000
RW
UT
CN NHPM 5,270,000
Project Cost: 0 5,800,000 0 0
U
pdate US 25 from KY 1994 to KY 2842.
(2024BOP)
US-25Grant 80216.2000 PL
D
N
RW
UT
CN SPP 22,400,000
Project Cost: 22,400,000 0 0 0
N
EW CONSTRUCTION ON THE EAST SIDE
OF THE RR FROM SHERMAN-NEWTOWN
ROAD TO LEMON-NORTHCUTT ROAD.
(2024CCN)
US-25Grant 80315 PL
DN
RW SPP 4,550,000
UT SPP 1,860,000
CN SPP 57,120,000
Project Cost:
0 6,410,000 0 57,120,000
T
otal for Grant county PL
Total Amounts:
CN
UT
RW
DN 530,000
4,550,000
1,860,000
22,400,000 5,270,000 57,120,000
22,400,000 12,210,000 0 57,120,000
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00062N) KY-464 AT MAYFIELD
CREEK
KY-464Graves 10126 PL
DN FBP 706,193
RW
UT
CN FBP 4,707,956
Project Cost: 0 0 0 5,414,149
Page 68 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN GRAVES COUNTY
O
N (042B00127N) KY-408 AT GOOSE
CREEK
KY-408Graves 10129 PL
DN BRX 312,751
RW
UT
CN BRX 2,085,008
Project Cost: 0 0 2,397,759 0
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00131N) KY-339 AT WEST
MAYFIELD CREEK
KY-339Graves 10132 PL
DN BRX 1,291,059
RW
UT
CN BRX 8,607,060
Project Cost:
0 0 0 9,898,119
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00271N) KY-1820 AT BRANCH
OF MAYFEILD CREEK
KY-1820Graves 10142 PL
DN BRZ 222,409
RW
UT
CN BRZ 1,482,730
Project Cost:
0 0 0 1,705,139
A
DDRESS CONDITION OF US-45 FROM
MILEPOINT 19.4 TO MILEPOINT 20.6
US-45Graves 20042 PL
DN STP4 708,000
RW
UT
CN STP4 8,142,000
Project Cost: 0 0 8,850,000 0
W
IDEN KY 131 FROM MP 0 (KY 58) TO MP
4.555 (KY 483) (2020CCN) (2022CCR)
(2024CCR)
KY-131Graves 80104 PL
DN
RW
UT
CN SPP 18,720,000
Project Cost:
18,720,000 0 0 0
Page 69 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY AND TRUCK ACCESS
ISSUES FROM KY 348 IN SYMSONIA TO
MCCRACKEN COUNTY LINE. (2024CCN)
KY-131G raves 80332 PL
DN
RW
UT SPP 1,000,000
CN SPP 5,000,000
Project Cost: 1,000,000 5,000,000 0 0
A
DDRESS ACCESS, CONGESTION, AND
GEOMETRIC ALIGNMENT ISSUES FROM
THE EASTERN CITY LIMITS OF MAYFIELD
TO KY 131. (2024CCN)
KY-58Graves 80333 PL
DN
RW
UT
CN SPP 8,500,000
Project Cost:
8,500,000 0 0 0
T
otal for Graves county PL
Total Amounts:
CN
UT
RW
DN 1,020,751 2,219,661
1,000,000
27,220,000 5,000,000 10,227,008 14,797,746
28,220,000 5,000,000 11,247,759 17,017,407
A
DDRESS CONNECTIVITY, MOBILITY,
AND SAFETY CONCERNS ON THE WEST
SIDE OF LEITCHFIELD FROM KY 54 TO
THE NORTHERN INTERSECTION OF KY
259 AND KY 3155 (2020CCN) (2022CCR)
PF-9999Grayson 80100 PL
DN SPP 2,800,000
RW SPP 7,500,000
UT
CN
Project Cost:
2,800,000 0 7,500,000 0
A
DDRESS SAFETY, GEOMETRIC
DEFICIENCIES, AND MAINTENANCE
ISSUES ALONG KY 259 FROM BEAR
CREEK ROAD (MP 9.217) TO THE
NORTHERN INTERSECTION OF
KY-259Grayson 80101 PL
DN
RW SPP 2,300,000
UT SPP 3,480,000
CN SPP 17,360,000
Project Cost:
5,780,000 0 17,360,000 0
Page 70 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND TURN
M
OVEMENTS ALONG WALLACE AVENUE
(CS 1136) IN LEITCHFIELD FROM THE
INTERSECTION WITH EAST CARROLL
GIBSON BLVD TO THE WILLIAM
CS-1136Grayson 80150 PL
DN SPP 560,000
RW SPP 780,000
UT SPP 600,000
CN
Project Cost:
560,000 780,000 600,000 0
I
MPROVE SAFETY, GEOMETRIC
DEFICIENCIES AND DRAINAGE ALONG US
62 FROM SCHOOLHOUSE ROAD TO THE
PROPOSED LEITCHFIELD WESTERN
BYPASS. (2024CCN)
US-62Grayson 80307 PL
DN SPP 1,680,000
RW SPP 3,750,000
UT SPP 2,880,000
CN SPP 9,220,000
Project Cost:
1,680,000 0 6,630,000 9,220,000
T
otal for Grayson county PL
Total Amounts:
CN
UT
RW
DN 5,040,000
2,300,000 780,000 11,250,000
3,480,000 3,480,000
17,360,000 9,220,000
10,820,000 780,000 32,090,000 9,220,000
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES AND MAINTENANCE ISSUES
ALONG US 68 FROM THE METCALFE
COUNTY LINE (MP 0.000) TO 1600 FEET
WEST OF SOUTH THURLOW ROAD (MP
US-68G reen 397.1100 PL
DN SPP 1,120,000
RW SPP 3,130,000
UT
CN
Project Cost: 1,120,000 0 3,130,000 0
C
ONSTRUCT NEW CONNECTOR ON THE
EAST SIDE OF GREENSBURG BEGINNING
NEAR THE US-61 AND US-68
INTERSECTION SOUTH OF TOWN AND
EXTENDING TO KY 3535 ON THE NORTH
PF-9999Green 398 PL
DN
RW
UT
CN SPP 42,920,000
Project Cost:
0 42,920,000 0 0
Page 71 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SPOT IMPROVEMENTS & IMPROVE
E
XISTING ALIGNMENT ON KY 88 FROM
0.20 MILES WEST OF AKIN NARROWS OF
PITMAN RD (MP 8.996) TO KY 61 (MP
11.232). (14CCN)(16CCR)(18CCN)
KY-88Green 8853 PL
DN SPP 1,120,000
RW SPP 2,500,000
UT
CN
Project Cost:
1,120,000 0 2,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
LILETOWN RD OVER GREASY CK
(044C00012N)
CR-1227Green 10082 PL
DN BRZ 224,724
RW
UT
CN BRZ 1,498,162
Project Cost:
1,722,886 0 0 0
A
DDRESS SAFETY ON KY 210 FROM
MORNINGSTAR ROAD (LARUE MP14.23)
TO JUST EAST OF CORINTH CHURCH
(TAYLOR MP0.60) (2024CCN)
KY-210Green
80154.2000 PL
D
N
RW
UT STPF 3,240,000
CN STPF 7,400,000 10,000,000
Project Cost: 3,240,000 7,400,000 10,000,000 0
T
otal for Green county PL
Total Amounts:
CN
UT
RW
DN 2,464,724
5,630,000
3,240,000
1,498,162 50,320,000 10,000,000
7,202,886 50,320,000 15,630,000 0
R
ECONSTRUCT KY-2 FROM MP 13.2 TO
US-23 (MP 17.2)(08CCN)(14CCR)(16CCR)
(18CCN) (2024CCR)
KY-2Greenup 132 PL
DN
RW
UT SPP 8,100,000
CN SPP 98,600,000
Project Cost: 8,100,000 0 98,600,000 0
Page 72 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE KY-207 FROM THE INDUSTRIAL
P
ARKWAY TO THE KY-693
INTERSECTION IN FLATWOODS.(08CCN)
(16CCR) (2020CCR) (2022CCR)
(2024CCR)
KY-207Greenup 8509 PL
DN
RW
UT
CN SPP 40,600,000
Project Cost:
40,600,000 0 0 0
A
DDRESS CONDITION OF US-23 FROM
MILEPOINT 0 TO MILEPOINT 4.5
US-23Greenup 20037 PL
DN STP5 440,000
RW
UT
CN STP5 5,060,000
Project Cost: 0 0 5,500,000 0
T
otal for Greenup county PL
Total Amounts:
CN
UT
RW
DN 440,000
8,100,000
40,600,000 103,660,000
48,700,000 0 104,100,000 0
N
EW INTERCHANGE AT I-65/KY 1136
(GILEAD CHURCH ROAD) AT MP 84 IN
HARDIN COUNTY. (2022BOP) (2024CCN)
I -65Hardin 29 PL
DN NH 2,800,000
RW SPP 9,380,000
UT SPP 4,340,000
CN
Project Cost:
2,800,000 0 9,380,000 4,340,000
A
DDRESS CONGESTION, SAFETY, AND
MOBILITY ALONG US 31W FROM
VETERANS WAY IN ELIZABETHTOWN TO
THE NORTH WILSON ROAD OVERPASS IN
RADCLIFF. (2018BOP) (2022CCR)
US-31Hardin 154.3000 PL
DN
RW
UT
CN SPP 52,800,000
Project Cost:
0 52,800,000 0 0
Page 73 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND RING ROAD FROM THE WESTERN
K
ENTUCKY PARKWAY TO I-65.
(REQUIRES RELOCATION OF I-65
SOUTHBOUND COMMERCIAL VEHICLE
MONITORING STATION, PROJECT
PF-9999H ardin 198 PL
DN
RW STP2 3,000,000
UT STP2 2,080,000
CN STP2 19,000,000 10,000,000 11,440,000
Project Cost: 5,080,000 19,000,000 10,000,000 11,440,000
C
ONSTRUCT A BYPASS OF GLENDALE.
(2022BOP) (2024CCN)
PF-9999Hardin 202 PL
DN
RW
UT
CN SPP 8,320,000
Project Cost: 8,320,000 0 0 0
I
-65 SOUTHBOUND PORT OF ENTRY FOR
A COMMERCIAL VEHICLE MONITORING
STATION. (2022CCR)
I -65Hardin 286.1000 PL
DN
RW
UT
CN NH 13,920,000
Project Cost: 13,920,000 0 0 0
I
MPROVE SAFETY, MOBILITY AND
GEOMETRICS ON US-62 FROM I-65 TO
UPPER COLESBURG ROAD (CR-1038)
(2024CCR)
US-62Hardin 442 PL
DN SPP 2,020,000
RW SPP 4,380,000
UT
CN
Project Cost:
2,020,000 0 4,380,000 0
B
RIDGE PROJECT IN HARDIN COUNTY ON
(047B00059N) KY-86 AT ROUGH RIVER
KY-86Hardin 10053 PL
DN BRX 431,168
RW
UT
CN BRX 2,874,454
Project Cost: 0 0 3,305,622 0
Page 74 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-065 FROM
M
ILEPOINT 90.53 TO MILEPOINT 97.54
I -65Hardin 20047 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 82.2 TO MILEPOINT 90.53
I -65Hardin 22064 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 97.54 TO MILEPOINT 102.1
I -65Hardin 22065 PL
DN NHPM 1,000,000
RW
UT
CN NHPM 10,000,000
Project Cost: 0 11,000,000 0 0
A
ddress safety, mobility, and access
management, along with potentially
reconfiguring the interchange to I 65.
(2022CCN) (2024CCR)
US-62Hardin 80200 PL
DN
RW
UT
CN SPP 27,440,000
Project Cost:
27,440,000 0 0 0
E
XTEND RING ROAD FROM US 31W TO
KY 61 (LINCOLN PARKWAY) (2022CCN)
(2024CCR)
PF-9999Hardin 80250 PL
DN
RW
UT SPP 2,240,000
CN SPP 14,270,000
Project Cost:
0 2,240,000 14,270,000 0
Page 75 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE THE INTERSECTION OF US 62
A
ND THE US 31W BYPASS RAMP AT
NICHOLAS STREET IN ELIZABETHTOWN.
(2024CCN)
US-62Hardin 80310 PL
DN
RW
UT
CN SPP 1,890,000
Project Cost:
0 1,890,000 0 0
A
DD SHOULDERS AND TURN LANES TO
US 31W BETWEEN KY 1136 AND KY 222
EAST OF GLENDALE. SEE GLENDALE
AREA TRANSPORTATION STUDY.
(2024CCN)
US-31Hardin 80313 PL
DN
RW SPP 3,750,000
UT
CN
Project Cost:
3,750,000 0 0 0
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG US 31W FROM KY 222 TO KY 61
(LINCOLN PARKWAY)/WESTERN
KENTUCKY PARKWAY INTERSECTION.
(2024CCN)
US-31Hardin 80314 PL
DN SPP 3,780,000
RW SPP 4,400,000
UT SPP 4,200,000
CN SPP 32,670,000
Project Cost:
3,780,000 0 8,600,000 32,670,000
A
ddress safety along US 31W from the
end of the center barrier wall on
Muldraugh hill in Hardin County (MP 34.65)
to KY 44 in Jefferson County (1.917).
(2024CCN)
US-31Hardin 80364 PL
DN SPP 1,400,000
RW SPP 1,880,000
UT SPP 2,480,000
CN
Project Cost:
1,400,000 0 4,360,000 0
T
otal for Hardin county PL
Total Amounts:
CN
UT
RW
DN 10,000,000 1,000,000 431,168 400,000
6,750,000 20,040,000
2,080,000 2,240,000 6,680,000 4,340,000
49,680,000 83,690,000 27,144,454 48,110,000
68,510,000 86,930,000 54,295,622 52,850,000
Page 76 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN HARLAN COUNTY
O
N (048B00107N) US-119 AT POOR FK
CUMBERLAND RVR
US-119Harlan 10194 PL
DN FBP 550,000
RW
UT
CN FBP 5,500,000
Project Cost: 0 0 6,050,000 0
A
DDRESS CONDITION OF US-119 FROM
MILEPOINT 26 TO MILEPOINT 28.066
US-119Harlan 20041 PL
DN STP4 344,000
RW
UT
CN STP4 3,956,000
Project Cost: 0 0 0 4,300,000
E
XTEND KY 72 FROM ALVA/BLACK
STAR NEAR HARLAN /BELL COUNTY
LINE TO LIGGETT WEST OF HARLAN
CITY. APPROXIMATELY 5 MILES OF
RECONSTRUCTION (2022CCN) (2024CCR)
KY-72Harlan 80257 PL
DN
RW
UT SPP 500,000
CN SPP 30,000,000
Project Cost:
500,000 30,000,000 0 0
TO
IMPROVE ACCESS, CONNECTIVITY
AND MOBILITY BY EXTENDING KY 72
FROM ALVA/BLACK STAR NEAR
HARLAN/ BELL COUNTY LINE.
RECONSTRUCT EXISTING COAL HAUL
KY-72Harlan 80260 PL
DN
RW SPP 500,000
UT SPP 200,000
CN SPP 8,000,000
Project Cost:
700,000 8,000,000 0 0
S
pot improvements to improve geometrics
at particular locations of KY 221 to
address safety concerns (MP 10 - 17.5)
(2024CCN)
KY-221Harlan 80359 PL
DN
RW
UT
CN SPP 1,300,000
Project Cost:
0 1,300,000 0 0
Page 77 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Harlan county P L
Total Amounts:
CN
UT
RW
DN 550,000 344,000
500,000
700,000
39,300,000 5,500,000 3,956,000
1,200,000 39,300,000 6,050,000 4,300,000
R
ECONSTRUCT US 27 FROM MP 11.9 TO
MP 12.4. (12CCN)(14CCR)(18CCN)
(2022CCR) (2024CCR)
US-27Harrison 8708 PL
DN
RW
UT
CN SPP 9,180,000
Project Cost: 9,180,000 0 0 0
B
RIDGE PROJECT IN HARRISON COUNTY
ON (049B00053N) PLEASANT STREET AT
SO.FK. LICKING RIVER
KY-36Harrison 10040 PL
DN BRX 1,067,965
RW
UT
CN
Project Cost:
0 0 0 1,067,965
B
RIDGE PROJECT IN HARRISON COUNTY
ON (049R00603N) NEBO RD AT CSX
RAILWAY
CR-1316Harrison 10042 PL
DN BRX 271,998
RW
UT
CN BRX 1,813,320
Project Cost:
0 0 2,085,318 0
C
ONSTRUCT A CONNECTOR ROAD
BETWEEN OLD LAIR ROAD AND KY 982
(NEW LAIR ROAD) NEAR THE HARRISON
COUNTY HIGH SCHOOL. (2022CCN)
(2024CCR)
CR-1124,
KY-982,
PF-9999,
US-27
Harrison 80251 PL
DN
RW
UT
CN SPP 10,000,000
Project Cost:
10,000,000 0 0 0
Page 78 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Provide a two way left turn lane on KY
9
82 (New Lair Road) (MP 4.4 - 5.1)
(2024CCN)
KY-982Harrison 80353 PL
DN
RW
UT
CN SPP 8,000,000
Project Cost: 8,000,000 0 0 0
T
otal for Harrison county PL
Total Amounts:
CN
UT
RW
DN 271,998 1,067,965
27,180,000 1,813,320
27,180,000 0 2,085,318 1,067,965
I
MPROVE CONNECTION BETWEEN KY 88
AND US 31W NEAR I-65 IN
MUNFORDVILLE. (2024CCN)
PF-9999Hart 80304 PL
DN STP2 1,400,000
RW STP2 1,888,000
UT STP2 580,000
CN SPP 7,440,000
Project Cost:
0 1,400,000 2,468,000 7,440,000
T
otal for Hart county PL
Total Amounts:
CN
UT
RW
DN 1,400,000
1,888,000
580,000
7,440,000
0 1,400,000 2,468,000 7,440,000
B
RIDGE PROJECT IN HENDERSON
COUNTY ON ( 051B00002R/051B00007L)
US-41 AT OHIO RIVER
US-41Henderson 2091.1000 PL
DN BRO 405,000
FBP 3,000,000
RW
UT
CN BRO 2,700,000
FBP 20,000,000
Project Cost:
0 26,105,000 0 0
Page 79 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y 2084 OVER BR CANOE CRK
(051B00052N)
KY-2084Henderson 10148 PL
DN FBP 305,183
RW
UT
CN FBP 2,034,551
Project Cost: 0 0 0 2,339,734
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-41 OVER OHIO RIVER (051B00002R)
US-41Henderson 10163 PL
DN BRO 2,613,900
RW
UT
CN BRO 26,139,000
Project Cost: 0 28,752,900 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 137.141 TO MILEPOINT
142.334
I -69Henderson 22093 PL
DN NHPM 1,800,000
RW
UT
CN NHPM 18,000,000
Project Cost:
0 19,800,000 0 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 0 TO
MILEPOINT 8.88
AU-9005Henderson 22193 PL
DN NHPM 1,400,000
RW
UT
CN NHPM 14,000,000
Project Cost:
0 0 15,400,000 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 8.88 TO
MILEPOINT 15.883
AU-9005Henderson 22194 PL
DN NHPM 1,150,000
RW
UT
CN NHPM 11,550,000
Project Cost:
0 0 12,700,000 0
Page 80 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE LEVEL OF SERVICE ON KY 425
F
ROM US60 TO US 41. (2024CCN)
KY-425Henderson 80310 PL
DN
RW SPP 660,000
UT SPP 470,000
CN SPP 30,160,000
Project Cost: 1,130,000 0 30,160,000 0
IMPROVE EASTERN INTERSECTION OF US
6
0 AND KY 1078. (2024CCN)
US-60H enderson 80311 PL
DN
RW SPP 390,000
UT SPP 440,000
CN SPP 1,620,000
Project Cost: 830,000 0 1,620,000 0
T
otal for Henderson county PL
Total Amounts:
CN
UT
RW
DN 7,818,900 2,550,000 305,183
1,050,000
910,000
66,839,000 57,330,000 2,034,551
1,960,000 74,657,900 59,880,000 2,339,734
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM KY-53 TO
KY-153.
I -71Henry 552 PL
DN NH 6,500,000
RW NH 1,800,000
UT
CN
Project Cost:
6,500,000 0 1,800,000 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM KY 153 TO
US 421. (2024CCN)
I -71Henry 572 PL
DN
RW SPP 1,500,000
UT
CN
Project Cost:
0 1,500,000 0 0
Page 81 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REHABILITATION-OVERLAY AND
W
IDENING EXISTING KY-55 FROM KY-22
TO CURVE AT MP 2.210 NORTH OF
EMINENCE. INCLUDES REPLACING
EXISTING CURB AND GUTTER AND
KY-55Henry 8820 PL
DN
RW
UT
CN SPP 3,460,000
Project Cost:
3,460,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 202 OVER FLAG RUN (052B00011N)
KY-202Henry 10109 PL
DN FBP2 155,757
RW
UT
CN FBP2 1,038,381
Project Cost: 0 0 1,194,138 0
A
DDRESS CONDITION OF I-071 FROM
MILEPOINT 24.727 TO MILEPOINT 29.112
(28.17 CARDINAL)
I -71Henry 20068 PL
DN NHPM 450,000
RW
UT
CN NHPM 4,541,533
Project Cost:
0 4,991,533 0 0
T
otal for Henry county PL
Total Amounts:
CN
UT
RW
DN 6,500,000 450,000 155,757
1,500,000 1,800,000
3,460,000 4,541,533 1,038,381
9,960,000 6,491,533 2,994,138 0
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00017N) KY-307 AT NORTH
FORK BAYOU DE CHIE
KY-307Hickman 10145 PL
DN BRX 299,943
RW
UT
CN BRX 1,999,620
Project Cost:
0 2,299,563 0 0
Page 82 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN HICKMAN COUNTY
O
N (053B00042N) KY-58 AT OBION
CREEK
KY-58Hickman 10147 PL
DN FBP 830,898
RW
UT
CN FBP 5,539,320
Project Cost: 6,370,218 0 0 0
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00078N) KY-1475 AT
HURRICANE BRANCH
KY-1475Hickman 10149 PL
DN BRX 112,898
RW
UT
CN BRX 752,652
Project Cost:
0 0 0 865,550
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00093N) KY-3061 AT BR OF
BRUSH CREEK (EAST)
KY-3061Hickman 10150 PL
DN BRX 136,244
RW
UT
CN BRX 908,293
Project Cost:
0 0 0 1,044,537
C
orrect geometric deficiencies and
improve safety, access, and regional
connectivity from Clayton Street to
KY-703 in Clinton. (2022CCN) (2024CCR)
US-51Hickman 80203 PL
DN
RW
UT
CN SPP 8,640,000
Project Cost:
0 8,640,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
I
MPROVE SAFETY, ACCESS, AND
REGIONAL CONNECTIVITY FROM KY-703
IN CLINTON TO .160 MILES SOUTH OF
OBION CREEK BRIDGE. (2024CCN)
US-51H ickman 80325 PL
DN
RW
UT SPP 4,000,000
CN SPP 18,000,000
Project Cost: 4,000,000 18,000,000 0 0
Page 83 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY, ACCESS, AND
R
EGIONAL CONNECTIVITY, AND
ADDRESS GEOMETRIC DEFICIENCIES
FROM HICKMAN C/L TO CANE CREEK
BRIDGE. (2024CCN)
US-51Hickman 80327 PL
DN
RW
UT SPP 2,000,000
CN SPP 8,000,000
Project Cost:
2,000,000 8,000,000 0 0
CORRECT GEOMETRIC DEFICIENCIES, AND
I
MPROVE SAFETY, ACCESS AND
REGIONAL CONNECTIVITY FROM BAYOU
DE CHEIN BRIDGE TO MARTIN ROAD.
(2024CCN)
US-51H ickman 80328 PL
DN
RW
UT SPP 1,000,000
CN SPP 6,500,000
Project Cost: 1,000,000 6,500,000 0 0
I
MPROVE SAFETY, TRUCK MOBILITY,
AND GEOMETRIC DEFICIENCIES AT THE
ICR RAILROAD OVERPASS. (2024CCN)
KY-307Hickman 80329 PL
DN
RW SPP 750,000
UT SPP 1,000,000
CN SPP 4,000,000
Project Cost:
1,750,000 4,000,000 0 0
I
MPROVE INTERSECTION GEOMETRICS
AND ADDRESS SIGHT DISTANCE ISSUES
WITH ACCESS TO US 51 FROM KY 1301
AND THE ENTRANCE OF HARPERS
COUNTRY HAMS NEAR CLINTON.
US-51Hickman 80330 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
T
otal for Hickman county PL
Total Amounts:
CN
UT
RW
DN 830,898 299,943 249,142
750,000
8,000,000
7,539,320 47,139,620 1,660,945
17,120,218 47,439,563 0 1,910,087
Page 84 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Remove the median on US 41 (South Main
S
treet) from the railroad to MP 15.521
(2024CCN)
US-41Hopkins 129 PL
DN
RW
UT
CN SPP 7,395,000
Project Cost: 7,395,000 0 0 0
I
MPROVE KY-281 FROM ISLAND PARK
DRIVE TO 0.25 MI NORTH OF CARRIAGE
LANE (KY-2281).
KY-281Hopkins 384 PL
DN
RW
UT
CN SPP 5,270,000
Project Cost:
5,270,000 0 0 0
R
econstruct Whittington Drive beginning
500’ south of Commerce Drive and ending
at the intersection of Whittington Drive and
Island Ford Road (KY 281), including the
reconstruction of the KY 281 intersection.
CS-1287Hopkins 804.4000 PL
DN
RW
UT
CN SPP 3,230,000
Project Cost:
3,230,000 0 0 0
B
RIDGE PROJECT IN HOPKINS COUNTY
ON (054B00016N) EDWARD T BREATHITT
AT PENNYRILE PARKWAY
I -69Hopkins 10093 PL
DN BRO 1,235,868
RW
UT
CN
Project Cost:
0 0 0 1,235,868
B
RIDGE PROJECT IN HOPKINS COUNTY
ON (054B00076N) KY-109 AT CLEAR
CREEK
KY-109Hopkins 10098 PL
DN BRX 1,149,704
RW
UT
CN BRX 7,664,692
Project Cost:
0 0 0 8,814,396
Page 85 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-41 FROM
M
ILEPOINT 12.376 TO MILEPOINT 14.53
US-41Hopkins 20067 PL
DN STP3 224,000
RW
UT
CN STP3 2,576,000
Project Cost: 0 2,800,000 0 0
A
DDRESS CONDITION OF Edward T.
Breathitt Pennyrile Parkway FROM
MILEPOINT 29.9 TO MILEPOINT 32.861
EB-9004Hopkins 22192 PL
DN NHPM 910,000
RW
UT
CN NHPM 9,091,115
Project Cost:
10,001,115 0 0 0
I
MPROVE US 41A BEGINNING AT
INDUSTRIAL DR AT HOPKINS CO ENDING
AT PROVIDENCE (2022CCR) (2024CCR)
US-41Hopkins 80105 PL
DN
RW SPP 2,400,000
UT SPP 5,800,000
CN SPP 34,800,000
Project Cost:
8,200,000 0 34,800,000 0
I
MPROVE US41A BEGINNING NEAR NEBO
AT MP 8.7 AND ENDING AT MP 11.2 IN
HOPKINS COUNTY. (2022BOP)
(2024CCN)
US-41Hopkins
80105.1000 PL
D
N
RW
UT SPP 2,500,000
CN SPP 5,500,000
Project Cost: 2,500,000 5,500,000 0 0
I
MPROVE US41A BEGINNING NEAR KY
630 AT MP 5.0 AND ENDING AT MP 7.4 IN
HOPKINS COUNTY. (2022BOP)
US-41Hopkins
80105.2000 PL
D
N
RW
UT
CN SPP 4,640,000
Project Cost: 4,640,000 0 0 0
Page 86 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY OF KY
2
60 FROM THE APPROACHES AT THE
RAILROAD CROSSING IN HANSON TO
THE SOUTHBOUND ON AND OFF RAMPS
OF I69. (2024CCN)
KY-260Hopkins 80300 PL
DN
RW
UT SPP 1,670,000
CN SPP 6,760,000
Project Cost:
1,670,000 6,760,000 0 0
T
otal for Hopkins county PL
Total Amounts:
CN
UT
RW
DN 910,000 224,000 2,385,572
2,400,000
9,970,000
29,626,115 14,836,000 34,800,000 7,664,692
42,906,115 15,060,000 34,800,000 10,050,264
A
DDRESS SUBSTANDARD HORIZONTAL
AND VERTICAL ALIGNMENT OF US 421 IN
THE CLOVER BOTTOM AREA NEAR THE
STONE QUARRY. (2020CCN)
US-421Jackson 80104 PL
DN
RW
UT
CN SPP 14,360,000
Project Cost:
14,360,000 0 0 0
I
mprove the existing geometric alignments
at two spot locations (MP 4.7-6.3 and
8.0-8.5) by realigning curves in high crash
cluster areas and widening. Improve
design speed to 45 mph along these two
KY-290Jackson 80313 PL
DN
RW SPP 1,650,000
UT SPP 1,620,000
CN SPP 5,040,000
Project Cost:
3,270,000 5,040,000 0 0
T
otal for Jackson county PL
Total Amounts:
CN
UT
RW
DN
1,650,000
1,620,000
14,360,000 5,040,000
17,630,000 5,040,000 0 0
Page 87 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SNYDER FREEWAY; RECONSTRUCT 2
R
AMPS AT I-265/I-64 INTERCHANGE EAST
OF LOUISVILLE. (DESIGNED WITH 5-41)
I -265Jefferson 21.2000 PL
DN
RW NH 5,540,000
UT NH 4,830,000
CN NH 10,000,000
SPP 63,660,000
Project Cost: 0 10,370,000 0 73,660,000
I
MPROVE DIXIE HIGHWAY BETWEEN
GREENWOOD ROAD (KY 1931) AND
STONESTREET ROAD (CR 1003). (14CCN)
(2024CCN)
US-31Jefferson 478.3000 PL
DN
RW
UT
CN SPP 7,540,000
Project Cost:
7,540,000 0 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-265 FROM I-65 TO
US-31E. (2024CCR)
I -265Jefferson 554 PL
DN NH 1,500,000
RW NH 3,560,000
UT NH 3,010,000
CN
Project Cost:
1,500,000 0 3,560,000 3,010,000
R
EDUCE CONGESTION AND IMPROVE
SAFETY ALONG KY-1747
(HURSTBOURNE PARKWAY) FROM
STONY BROOK DRIVE TO I-64.
(2024CCN)
KY-1747Jefferson 555 PL
DN
RW SPP 9,000,000
UT SPP 10,440,000
CN SPP 77,720,000
Project Cost:
9,000,000 10,440,000 0 77,720,000
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM I-264 TO
I-265. (2024CCR)
I -71Jefferson 557 PL
DN
RW NH 390,000
UT NH 940,000
CN
Project Cost:
0 1,330,000 0 0
Page 88 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON I-265 FROM US-31E
(BARDSTOWN RD) TO KY-155
(TAYLORSVILLE RD). (2024CCR)
I -265Jefferson 558 PL
DN
RW NH 2,500,000
UT NH 1,500,000
CN
Project Cost:
2,500,000 1,500,000 0 0
D
EDICATED FEDERAL AID STP FUNDS
EARMARKED FOR LOUISVILLE
URBANIZED AREA AND SUBJECT TO MPO
CONTROL FOR FY 2026-2032. (FUNDING
SUBJECT TO FISCAL CONSTRAINT
CO-0Jefferson 965.1900 PL
DN
RW
UT
CN SLO 26,800,000 26,800,000 26,800,000 26,800,000
Project Cost:
26,800,000 26,800,000 26,800,000 26,800,000
I
MPROVE AND WIDEN MT WASHINGTON
ROAD FROM PRESTON HIGHWAY TO
PENN RUN CREEK BRIDGE. (10CCN)
(SAME AS 5-8611.00) (2024CCN)
KY-2053Jefferson 8205.1000 PL
DN
RW
UT
CN SPP 13,190,000
Project Cost:
13,190,000 0 0 0
I
mprove safety and traffic operations on
KY 155 from MP 2.0 in Spencer County to
Floyds Fork In Jefferson County (total
length 6.247 miles) (Portion of 5-8954.0).
(2024CCN)
KY-155Jefferson 8954.1000 PL
DN
RW
UT STPF 3,130,000 9,000,000
CN STPF 34,120,000
Project Cost:
0 3,130,000 9,000,000 34,120,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00039L and 056B00039R) I-64
WB AT TUCKER STATION RD
I -64J efferson 10057 PL
DN FBP 830,898
RW
UT
CN FBP 10,700,000
Project Cost: 830,898 0 10,700,000 0
Page 89 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00087R) I-265 NB AT KY 22
(BROWNSBORO RD)
I -265J efferson 10063 PL
DN BRO 1,706,159
RW
UT
CN BRO 11,374,391
Project Cost: 0 0 13,080,550 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00180N) I-65 AT US 60A
(EASTERN PKWY)
I -65J efferson 10065 PL
DN
RW
UT
CN BRO 25,515,595
FBP 10,062,708
Project Cost: 35,578,303 0 0 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00184N) I-65 AT ST CATHERINE
ST
I -65J efferson 10067 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00205N) I-65 AT NS RAILROAD
(POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson 10070 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00209N) I-65 AT PHILLIPS LN
I -65J efferson 10071 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Page 90 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00210N) I-65 AT MANNING RD
I -65J efferson 10072 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00211N) I-65 AT KFEC GATE 6
DR
I -65J efferson 10073 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00269N) I-264 EB AT I-264 WB
OFF RAMP
I -264J efferson 10076 PL
DN BRO 96,734
RW
UT
CN BRO 644,896
Project Cost: 0 0 741,630 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00273N) I-264 EB ON RAMP AT
P&L RAILWAY
I -264J efferson 10077 PL
DN FBP 1,430,900
RW
UT
CN FBP 9,539,336
Project Cost: 0 0 10,970,236 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00278N) I-64 WB RAMP AT I-64
EB
I -64J efferson 10078 PL
DN BRO 463,096
RW
UT
CN BRO 3,087,310
Project Cost: 0 0 0 3,550,406
Page 91 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00389N) I-65 AT GRADE LN
I -65J efferson 10082 PL
DN BRO 872,972
RW
UT
CN FBP 5,819,814
Project Cost: 0 0 6,692,786 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00390N) I-65 AT STANDIFORD
LN
I -65J efferson 10083 PL
DN FBP 1,039,935
RW
UT
CN FBP 6,932,898
Project Cost: 0 0 7,972,833 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00186N) I-65 AT OAK STREET.
(POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson 10103 PL
DN FBP 750,000
RW
UT
CN BRO 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00182N) I-65 AT BRANDIES
AVE. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65J efferson 10104 PL
DN
RW
UT
CN FBP 15,537,793
Project Cost: 15,537,793 0 0 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00181N) I-65 AT UNIVERSITY
BLVD. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65J efferson 10105 PL
DN
RW
UT
CN BRO 17,497,802
Project Cost: 17,497,802 0 0 0
Page 92 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
C
R 1002 OVER NS RAILROAD & HIKES LN
(056B00122L)
KY-1703Jefferson 10112 PL
DN BRX 1,129,560
RW
UT
CN BRX 7,530,401
Project Cost: 0 0 8,659,961 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CR 1002 OVER NS RAILROAD & HIKES LN
(056B00122R)
KY-1703Jefferson 10113 PL
DN BRX 1,129,560
RW
UT
CN BRX 7,530,401
Project Cost:
0 0 8,659,961 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 31 OVER OHIO RIVER (056B00136N)
US-31Jefferson 10115 PL
DN
RW
UT
CN FBP 33,546,500
Project Cost: 33,546,500 0 0 0
A
DDRESS CONDITION OF KY-841 FROM
MILEPOINT 0 TO MILEPOINT 10.25
KY-841Jefferson 20022 PL
DN NHPM 1,312,000
RW
UT
CN NHPM 15,088,000
Project Cost: 0 0 0 16,400,000
A
DDRESS CONDITION OF KY-2048 FROM
MILEPOINT 0 TO MILEPOINT 1.13
KY-2048Jefferson 20030 PL
DN STP5 88,000
RW
UT
CN STP5 1,012,000
Project Cost: 1,100,000 0 0 0
Page 93 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-2052 FROM
M
ILEPOINT 0 TO MILEPOINT 4.205
KY-2052Jefferson 20031 PL
DN STP3 336,000
RW
UT
CN STP3 3,864,000
Project Cost: 4,200,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 0.795 (0.828 CARDINAL) TO
MILEPOINT 5.217 (4.935 NON-CARDINAL)
I -64Jefferson 20065 PL
DN NHPM 550,000
RW
UT
CN NHPM 5,455,000
Project Cost:
0 0 6,005,000 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 127.57 TO MILEPOINT 131.24
I -65Jefferson 20067 PL
DN NHPM 790,000
RW
UT
CN NHPM 7,910,000
Project Cost: 8,700,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 11.574 TO MILEPOINT 13.206
(13.124 CARDINAL)
I -64Jefferson 22023 PL
DN NHPM 2,500,000
RW
UT
CN STP5 11,000,000
Project Cost:
0 0 0 13,500,000
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 123.18 TO MILEPOINT 127.57
I -65Jefferson 22069 PL
DN
RW
UT
CN NHPM 76,000,000
Project Cost: 76,000,000 0 0 0
Page 94 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-071 FROM
M
ILEPOINT 0 TO MILEPOINT 3.66
I -71Jefferson 22096 PL
DN STP5 200,000
RW
UT
CN STP5 2,000,000
Project Cost: 0 2,200,000 0 0
A
DDRESS CONDITION OF I-264 FROM
MILEPOINT 18.41 TO MILEPOINT 20.7
I -264Jefferson 22140 PL
DN NHPM 540,000
RW
UT
CN NHPM 5,449,257
Project Cost: 0 5,989,257 0 0
W
IDEN AND IMPROVE RANGELAND RD
FROM POLAR LEVEL RD TO
SHEPHERDSVILLE RD (2020CCN)
(2022CCR) (2024CCR)
CR-1015Jefferson 80108 PL
DN
RW
UT
CN SPP 3,500,000
Project Cost:
3,500,000 0 0 0
R
educe congestion, improve safety, and
enhance mobility on KY 2050 (Herr Lane)
from Prince Valiant Drive/Westmar
Terrace to Bedford Lane. (2022CCN)
(2024CCR)
KY-2050Jefferson 80200 PL
DN
RW
UT
CN SPP 2,860,000
Project Cost:
0 2,860,000 0 0
I
mprove safety and reduce congestion on
KY 1065 (Outer Loop) from I-65 to KY
2052 (Shepherdsville Road). Project will
evaluate the addition of one travel lane in
each direction and consider
KY-1065Jefferson 80203 PL
DN
RW SPP 3,440,000
UT SPP 2,730,000
CN SPP 27,250,000
Project Cost:
0 6,170,000 0 27,250,000
Page 95 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and reduce congestion on
K
Y 1931 (Manslick Road) from KY 1931
(St. Andrews Church Road) to I-264
(Henry Watterson Expressway). Project
will evaluate 3-lane widening and
KY-1931Jefferson 80204 PL
DN
RW
UT
CN SPP 10,270,000
Project Cost:
0 10,270,000 0 0
I
mprove safety, reduce congestion, and
improve multi-modal transportation options
along KY 61 from Commerce Crossings Dr
(BMP 1.395) to Briden Avenue (EMP
8.400) including the I-264 (Watterson
KY-61Jefferson 80205 PL
DN SPP 6,570,000
RW SPP 10,510,000
UT SPP 10,570,000
CN SPP 58,850,000
Project Cost:
6,570,000 0 21,080,000 58,850,000
R
educe congestion, improve safety and
enhance mobility along the US 31E
(Bardstown Road) corridor from the
Bullitt/Jefferson County line to KY 1065
(Beulah Church/Seatonville Road). (MP 0.0
US-31Jefferson 80261 PL
DN
RW SPP 3,530,000
UT SPP 2,920,000
CN SPP 144,360,000
Project Cost:
6,450,000 0 0 144,360,000
T
RANSPORTATION SYSTEM
MANAGEMENT IMPROVEMENTS ON US
31W FROM KY 841 TO KY 44 IN
SOUTHERN JEFFERSON COUNTY; TO
INCLUDE THE CONSIDERATION OF
US-31Jefferson 80302 PL
DN
RW SPP 8,350,000
UT SPP 8,690,000
CN SPP 3,330,000
Project Cost:
17,040,000 3,330,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE KY 1065 AND KY
61 INTERSECTION. PROJECT WILL
CONSIDER ADDING A RIGHT TURN LANE
ON WESTBOUND KY 1065 (OUTER LOOP)
KY-1065Jefferson 80303 PL
DN
RW
UT
CN SPP 2,400,000
Project Cost:
2,400,000 0 0 0
Page 96 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON GRADE LANE FROM KY
1065 (OUTER LOOP) TO KY 1631 (FERN
VALLEY ROAD). PROJECT DESIGN WILL
EVALUATE 3-LANE WIDENING WITH
CR-1001Jefferson 80306 PL
DN
RW
UT SPP 300,000
CN SPP 13,500,000
Project Cost:
300,000 13,500,000 0 0
I
MPROVE TRAFFIC OPERATIONS ON KY
22 FROM JUST EAST OF MURPHY LANE
TO HAUNZ LANE. PROJECT DESIGN WILL
EVALUATE 3-LANE WIDENING WITH
TWOWAY CENTER TURN LANE AND
KY-22Jefferson 80310 PL
DN
RW
UT
CN SPP 4,000,000
Project Cost:
4,000,000 0 0 0
W
EST KENTUCKY STREET (CS 1005)
MASTER PLAN PROJECT FROM 18TH
STREET TO 4TH STREET. PROJECT WILL
CONSIDER SIDEWALK IMPROVEMENTS,
BICYCLE FACILITIES, IMPROVEMENTS TO
CS-1005Jefferson 80311 PL
DN
RW
UT
CN SPP 6,600,000
Project Cost:
6,600,000 0 0 0
A
DDRESS CONGESTION AND SAFETY
ISSUES IN THE VICINITY OF THE
BRECKENRIDGE LANE (KY 1932) AND
DUTCHMANS LANE INTERSECTION.
(2024CCN)
KY-1932Jefferson 80321 PL
DN
RW
UT
CN STPF 2,500,000
Project Cost:
0 2,500,000 0 0
THIS PROJECT IS A MAJOR COMPLETE
S
TREET RE-DESIGN OF 9TH STREET JUST
WEST OF THE CENTRAL BUSINESS
DISTRICT OF LOUISVILLE FROM THE OHIO
RIVER SOUTH TO ITS INTERSECTION WITH
CS-1046,
C
S-1176
Jefferson 80324 PL
DN
RW
UT
CN SPP 17,460,000
Project Cost: 0 17,460,000 0 0
Page 97 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND OPERATIONS ON
A
RNOLDTOWN ROAD FROM KY 1931 TO
KY 907. PROJECT DESIGN WILL
EVALUATE 2 LANE ROAD (NO ADDED
LANES).KIPDA ID# 249 (2024CCN)
CR-1003Jefferson 80331 PL
DN
RW SPP 520,000
UT SPP 190,000
CN SPP 13,640,000
Project Cost:
0 710,000 13,640,000 0
I
MPROVEMENTS WITHIN THE I-64
CORRIDOR FROM THE KENNEDY
INTERCHANGE TO I-264 (WATTERSON
EXPRESSWAY) ADDRESSING SAFETY
AND CONGESTION ISSUES. THE
I -64Jefferson 80334 PL
DN
RW NH 1,490,000
UT NH 530,000
CN
Project Cost:
0 1,490,000 530,000 0
E
NHANCE MOBILITY AND PROVIDE SAFE
ACCESS TO COMMUNITY FACILITIES
ALONG KY 1819 (WATTERSON TRAIL)
FROM SKYVIEW PARK (MP 10.43) TO
PLANTSIDE DRIVE (MP 10.79). (2024CCN)
KY-1819Jefferson 80340 PL
DN
RW
UT
CN SPP 840,000
Project Cost:
840,000 0 0 0
R
OADWAY RECONFIGURATION,
ONE-WAY TO TWO-WAY CONVERSION.
(2024CCN) (POSSIBLE SLO FUNDING)
US-42Jefferson 80342 PL
DN
RW
UT
CN SPP 2,950,000
Project Cost:
2,950,000 0 0 0
S
afety improvements on KY 1865 (New
Cut Road)/Taylor Boulevard from MP 0.5
(just south of Old New Cut Road) to MP
5.766 (just north of the I-264 ramp).
(2024CCN)
KY-1865Jefferson 80352 PL
DN
RW NH 5,000,000
UT NH 4,000,000
CN SPP 60,000,000
Project Cost:
9,000,000 0 0 60,000,000
Page 98 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improvements from Eastern Parkway
T
ransportation Study between Bardstown
Road to Cherokee Park entrance (MP 6.82
-0.322) with a Memorandum of Agreement
with the Louisville Metro Government.
US-60Jefferson 80355 PL
DN
RW
UT
CN SPP 6,780,000
Project Cost:
6,780,000 0 0 0
I
mprovements from Eastern Parkway
Transportation Study between Hahn
Street to Concord Drive (MP 3.84-4.15)
with a Memorandum of Agreement with
the Louisville Metro Government.
US-60Jefferson 80356 PL
DN
RW
UT SPP 410,000
CN SPP 6,100,000
Project Cost:
410,000 6,100,000 0 0
T
otal for Jefferson county PL
Total Amounts:
CN
UT
RW
DN 10,114,898 740,000 7,955,820 8,775,096
28,380,000 11,380,000 14,070,000
16,320,000 23,760,000 20,100,000 3,010,000
265,546,398 90,269,257 105,967,137 561,935,310
320,361,296 126,149,257 148,092,957 573,720,406
C
ONSTRUCT NEW INTERCHANGE AT US
27 AND NICHOLASVILLE BYPASS.
US-27Jessamine 87.4000 PL
DN
RW
UT
CN SPP 72,430,000
Project Cost: 0 0 0 72,430,000
N
ICHOLASVILLE - MAN-O-WAR BLVD;
ACCESS MANAGEMENT ON US-27
(NICHOLASVILLE RD) FROM
NICHOLASVILLE BYPASS TO JUST
SOUTH OF KOHL'S DRIVE.
US-27Jessamine 430.1000 PL
DN
RW
UT SPP 1,460,000
CN SPP 29,270,000
Project Cost:
1,460,000 0 29,270,000 0
Page 99 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE KY-169 FROM NORTH OF
C
LEAR CREEK RD IN JESSAMINE COUNTY
TO NORTH OF KY-1967 IN WOODFORD
COUNTY. (2024CCN)
KY-169Jessamine 440 PL
DN
RW SPP 2,330,000
UT SPP 2,850,000
CN SPP 13,790,000
Project Cost:
2,330,000 2,850,000 13,790,000 0
R
ECONSTRUCT KY 169 FROM US 68 TO
0.54 MILES NORTH OF CLEAR CREEK RD
(MP 14.448 TO MP 19.00). (16CCN)
(2024CCN)
KY-169Jessamine 8906 PL
DN
RW SPP 6,390,000
UT SPP 5,850,000
CN SPP 29,220,000
Project Cost:
12,240,000 0 29,220,000 0
BRIDGE PROJECT IN MERCER COUNTY ON
(
084B00003N) US-68 AT KENTUCKY
RIVER
US-68J essamine 10054 PL
DN FBP2 1,575,000
RW
UT
CN FBP 10,500,000
FBP2 10,500,000
Project Cost: 12,075,000 0 10,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3433 OVER BR.JESSAMINE CREEK
(057B00030N)
KY-3433Jessamine 10078 PL
DN BRZ 129,623
RW
UT
CN BRZ 864,156
Project Cost:
0 0 0 993,779
I
MPROVE KY-169 FROM NORTH OF
CLEAR CREEK RD IN JESSAMINE COUNTY
TO NORTH OF KY-1967 IN WOODFORD
COUNTY. (2020CCN) (2024CCR)
KY-169Jessamine 80108 PL
DN
RW
UT
CN SPP 16,800,000
Project Cost:
0 16,800,000 0 0
Page 100 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY ON
N
ORTH 3RD STREET/KEENE ROAD FROM
OAK ST TO US 27 (NICHOLASVILLE
BYPASS) IN NICHOLASVILLE (2024CCN)
KY-169Jessamine 80324 PL
DN
RW SPP 3,750,000
UT SPP 2,750,000
CN SPP 6,500,000
Project Cost:
6,500,000 0 6,500,000 0
R
econstruct KY 169 (Richmond Ave) from
proposed East Nicholasville Byp to US 27X
(North Main St). (2024CCN)
KY-169Jessamine 80325 PL
DN
RW SPP 1,200,000
UT SPP 1,500,000
CN SPP 8,000,000
Project Cost:
2,700,000 0 8,000,000 0
T
otal for Jessamine county PL
Total Amounts:
CN
UT
RW
DN 1,575,000 129,623
13,670,000
11,560,000 2,850,000
10,500,000 16,800,000 97,280,000 73,294,156
37,305,000 19,650,000 97,280,000 73,423,779
I
MPROVE ROADWAY GEOMETRICS AND
CAPACITY FROM GARBAGE HOLLOW TO
EAST OF MILL STREET. (2020CCR)
(2022CCR) (2024CCR)
KY-40Johnson 149 PL
DN
RW
UT
CN SPP 7,350,000
Project Cost:
7,350,000 0 0 0
B
RIDGE PROJECT IN JOHNSON COUNTY
ON (058B00052) KY-825 AT JENNY
CREEK
KY-825Johnson 10102 PL
DN FBP2 218,473
RW
UT
CN FBP2 1,456,486
Project Cost:
0 1,674,959 0 0
Page 101 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JOHNSON COUNTY
O
N (058B00054N) KY-469 AT GILLUM
BRANCH
KY-469Johnson 10103 PL
DN FBP2 85,022
RW
UT
CN FBP2 566,812
Project Cost: 0 651,834 0 0
I
MPROVE ROADWAY GEOMETRICS AND
CAPACITY ON KY 40 FROM KY 321 TO
GARBAGE HOLLOW (2020CCN)
(2022CCR) (2024CCR)
KY-40Johnson 80100 PL
DN
RW
UT
CN SPP 10,370,000
Project Cost:
0 10,370,000 0 0
A
DDRESS CONGESTION AND SAFETY
ISSUES ON KY 321 FROM THE 6TH
STREET TO THE JUNCTION OF KY 321
AND KY 40 (2020CCN) (SAME AS
12-8102 IN 2020 HIGHWAY PLAN)
KY-321Johnson 80116 PL
DN
RW
UT
CN SPP 420,000
Project Cost:
420,000 0 0 0
T
otal for Johnson county PL
Total Amounts:
CN
UT
RW
DN 303,495
7,770,000 12,393,298
7,770,000 12,696,793 0 0
U
PGRADE THE EXISTING I-71/75 BRENT
SPENCE BRIDGE CORRIDOR AT THE OHIO
RIVER BETWEEN COVINGTON, KY AND
CINCINNATI, OHIO. (NHPP FUNDING)
(02KYD) (2024CCR)
I -75Kenton 17 PL
DN
RW
UT
CN NH 44,000,000 78,000,000 100,000,000 133,000,000
Project Cost:
44,000,000 78,000,000 100,000,000 133,000,000
Page 102 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON KY-17 AT THE I-275
INTERCHANGE. (18CCR) (2020CCR)
(2024CCR)
KY-17Kenton 449 PL
DN
RW
UT
CN STPF 11,340,000
Project Cost:
11,340,000 0 0 0
R
educe Congestion along KY 1303 from
Dudley Road to I-275. (2024BOP)
KY-1303Kenton 450.1000 PL
DN
RW
UT
CN STPF 5,000,000 8,920,000
Project Cost: 0 5,000,000 8,920,000 0
R
educe Congestion along KY 1303 from
I-275 to US 25. (2024BOP)
KY-1303Kenton 450.2000 PL
DN
RW
UT
CN SPP 2,320,000
Project Cost: 2,320,000 0 0 0
W
EST 15TH STREET; ADDRESS
DEFICIENCIES OF BRIDGE AND
APPROACHES OVER CSX RR IN
COVINGTON (FUNDS TO BE PROVIDED
BY THE CITY AS PER MEMORANDUM OF
CS-2097Kenton 1070 PL
DN BRX 667,653
RW BRX 200,000
UT BRX 400,000
CN BRX 4,451,018
Project Cost:
0 0 5,718,671 0
I
MPROVE EXISTING ALIGNMENT WITH
BUTTERMILK PIKE, ORPHANAGE ROAD,
AND US 25. FT. MITCHELL WILL PAY
$50,000 TOWARD DESIGN. (16CCN)
(18CCN) (2020CCR) (2022CCR)
US-25Kenton 8951 PL
DN
RW
UT
CN SPP 6,000,000
Project Cost:
0 6,000,000 0 0
Page 103 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN KENTON COUNTY ON
(
059B00090N) I-75 RAMP AT 9TH
ST-COVINGTON
I -75K enton 10045 PL
DN BRO 587,194
RW
UT
CN BRO 3,914,629
Project Cost: 0 0 0 4,501,823
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-75 OVER OHIO RIVER (059B00046N)
I -75Kenton 10067 PL
DN BRO 150,000
RW
UT
CN BRO 1,000,000
Project Cost: 0 0 0 1,150,000
A
DDRESS CONDITION OF KY-1072 FROM
MILEPOINT 2.49 TO MILEPOINT 2.83
KY-1072Kenton 20045 PL
DN STP3 40,000
RW
UT
CN STP3 460,000
Project Cost: 0 500,000 0 0
A
DDRESS CONDITION OF I-075
NON-CARDINAL DIRECTION FROM
MILEPOINT 190.7 TO MILEPOINT 191.22
I -75Kenton 20064 PL
DN NHPM 70,000
RW
UT
CN NHPM 700,000
Project Cost: 0 770,000 0 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 183.312 TO MILEPOINT
184.708
I -75Kenton 22129 PL
DN STP5 420,000
RW
UT
CN STP5 4,255,000
Project Cost:
0 0 4,675,000 0
Page 104 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 186.95 TO MILEPOINT 190.7
I -75Kenton 22131 PL
DN NHPM 3,750,000
RW
UT
CN NHPM 37,500,000
Project Cost: 0 0 41,250,000 0
W
IDEN KENTON LANDS ROAD FROM US
25 TO RIGGS ROAD (2020CCN)
(2022CCR) (2024CCR)
KY-2373Kenton 80105 PL
DN
RW SPP 18,600,000
UT SPP 5,600,000
CN SPP 30,000,000
Project Cost:
24,200,000 0 30,000,000 0
R
econstruct KY 536 from KY 16 to
Staffordsburg Road. (2024BOP)
KY-536Kenton 80203.1000 PL
D
N
RW
UT SPP 5,600,000
CN SPP 18,000,000
Project Cost: 5,600,000 18,000,000 0 0
R
econstruct KY 536 from Staffordsburg
Road to KY 177. (2024BOP)
KY-536Kenton 80203.2000 PL
D
N
RW
UT SPP 6,160,000
CN SPP 60,000,000
Project Cost: 6,160,000 0 60,000,000 0
P
rovide connectivity, improve mobility, and
reduce congestion along KY 536 from KY
17 to KY 16; include multi-modes.
(2022CCN) (2024CCR)
KY-536Kenton 80217 PL
DN
RW
UT
CN SPP 34,800,000
Project Cost:
34,800,000 0 0 0
Page 105 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REHABILITATE/RECONSTRUCT US 25
F
ROM BUTTERMILK PIKE (KY371) TO I-75
(MP 8.58 TO MP 9.86) (2022CCN)
(2024CCR)
US-25Kenton 80254 PL
DN
RW
UT
CN SPP 11,600,000
Project Cost:
11,600,000 0 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ALONG KY 16 (TAYLOR
MILL RD) FROM KY 2047 (SENOUR RD)
TO KY 536 (HARRIS PIKE); INCLUDE
MULTIMODAL NEEDS. (2024CCN)
KY-16Kenton 80300 PL
DN
RW SPP 24,000,000
UT SPP 3,480,000
CN SPP 60,000,000
Project Cost:
24,000,000 3,480,000 0 60,000,000
A
ddress safety and mobility along KY
2373 from west intersection of
Amsterdam Road to east intersection of
Amsterdam Road. (2024BOP)
KY-2373Kenton
80305.1000 PL
D
N
RW SPP 2,200,000
UT SPP 1,620,000
CN SPP 6,960,000
Project Cost: 3,820,000 0 6,960,000 0
A
ddress safety and mobility along KY 273
from east intersection of Amsterdam Road
to Hightower Road. (2024BOP)
KY-2373Kenton
80305.2000 PL
D
N
RW SPP 5,500,000
UT SPP 2,160,000
CN SPP 13,920,000
Project Cost: 7,660,000 0 13,920,000 0
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 1501 (HANDS
PIKE) FROM EDWIN DRIVE TO KY 16.
(2024CCN)
KY-1501Kenton 80307 PL
DN
RW SPP 2,600,000
UT SPP 930,000
CN SPP 10,540,000
Project Cost:
3,530,000 0 10,540,000 0
Page 106 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND GEOMETRIC
D
EFICIENCIES ALONG KY 1501 (HANDS
PIKE) FROM OTTER TO EDWIN DRIVES.
(2024CCN)
KY-1501Kenton 80308 PL
DN
RW SPP 4,200,000
UT SPP 1,320,000
CN SPP 9,900,000
Project Cost:
5,520,000 0 9,900,000 0
R
ECONSTRUCT I-75 INTERCHANGE AT KY
236 (DONALDSON HIGHWAY).
(2024CCN)
I -75Kenton 80309 PL
DN
RW SPP 10,800,000
UT SPP 3,480,000
CN SPP 23,560,000
Project Cost:
0 14,280,000 0 23,560,000
T
otal for Kenton county PL
Total Amounts:
CN
UT
RW
DN 110,000 4,837,653 737,194
57,100,000 10,800,000 200,000
23,390,000 6,960,000 400,000
104,060,000 108,160,000 286,446,018 221,474,629
184,550,000 126,030,000 291,883,671 222,211,823
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060B00025N) KY-1088 AT YELLOW
CREEK
KY-1088Knott 10104 PL
DN BRX 160,984
RW
UT
CN BRX 1,073,226
Project Cost: 0 1,234,210 0 0
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060B00046N) KY-1091 AT RT FRK
BEAVER CREEK
KY-1091Knott 10106 PL
DN FBP2 302,039
RW FBP2 75,000
UT FBP2 130,000
CN FBP2 2,013,592
Project Cost:
0 0 2,520,631 0
Page 107 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN KNOTT COUNTY ON
(
060B00059N) KY-1102 AT
MONTGOMERY CREEK
KY-1102Knott 10107 PL
DN FBP 133,805
RW
UT
CN FBP 892,032
Project Cost: 0 0 1,025,837 0
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060C00032N) BIG DOUBLES BR AT
LITTLE CARR FORK
CR-1141Knott 10108 PL
DN FBP 73,697
RW
UT
CN FBP 491,314
Project Cost:
0 0 565,011 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 15 OVER Carr Fork Lake
(060B00056N)
KY-15Knott 10148 PL
DN BRO 110,550
RW
UT
CN BRO 1,105,500
Project Cost:
0 0 0 1,216,050
E
liminate rockfall hazards 0.2 mile west of
Intersection of KY 1087 & KY 80.
(2024CCN)
KY-80Knott 80301 PL
DN
RW
UT
CN SPP 14,970,000
Project Cost:
14,970,000 0 0 0
I
mprove roadway geometrics along KY
899 from end of prior construction near
Pippa Passes to the bottom of the hill at
Short Branch. (2024CCN)
KY-899Knott 80302 PL
DN
RW
UT
CN SPP 5,159,000
Project Cost:
5,159,000 0 0 0
Page 108 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Curve revision 3.654 miles east of
i
ntersection of KY 3209 & KY 1087.
(2024CCN)
KY-1087Knott 80305 PL
DN
RW
UT
CN SPP 1,125,000
Project Cost: 1,125,000 0 0 0
I
mprove horizontal and vertical roadway
geometry to eliminate the substandard
curve and increase sight distance on KY
1098 (MP 10.5-11.0) (2024CCN)
KY-1098Knott 80350 PL
DN
RW
UT SPP 100,000
CN SPP 2,000,000
Project Cost:
100,000 2,000,000 0 0
E
liminate rockfall hazards along Hal
Rogers Parkway (old KY-80) from MP
78.27 to 79.59. (2024CCN)
HR-9006Knott 80354 PL
DN
RW
UT SPP 650,000
CN SPP 12,900,000
Project Cost:
650,000 12,900,000 0 0
T
otal for Knott county PL
Total Amounts:
CN
UT
RW
DN 160,984 509,541 110,550
75,000
750,000 130,000
21,254,000 15,973,226 3,396,938 1,105,500
22,004,000 16,134,210 4,111,479 1,216,050
B
RIDGE PROJECT IN KNOX COUNTY ON
(061B00056N) KY-223 AT ROAD FK
STINKING CREEK
KY-223Knox 10201 PL
DN BRX 168,705
RW
UT
CN BRX 1,124,700
Project Cost:
0 0 0 1,293,405
Page 109 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN KNOX COUNTY ON
(
061B00093N) KY-3436 AT E.FK.LYNN
CAMP CK
KY-3436Knox 10204 PL
DN BRX 152,956
RW
UT
CN BRX 1,019,710
Project Cost: 0 0 1,172,666 0
C
onstruct a left turn lane with 350'
storage and 100' taper at MP 18.62
(2024CCN)
US-25Knox 80301 PL
DN
RW
UT
CN NH 70,000
Project Cost:
70,000 0 0 0
C
onstruct one left turn lane with 350'
storage and 100' taper at MP 19.85
(2024CCN)
US-25Knox 80302 PL
DN
RW
UT
CN NH 70,000
Project Cost:
70,000 0 0 0
C
onstruct one left turn lane with 350'
storage and 100' taper at MP 18.41 and
350' storage and 100' taper at US 25 E
(2024CCN)
US-25Knox 80304 PL
DN
RW
UT
CN NH 80,000
Project Cost:
80,000 0 0 0
W
iden Richland Creek Road from US 25E a
distance of 0.70 miles (2024CCN)
CR-1311Knox 80311 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost: 2,000,000 0 0 0
Page 110 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Knox county P L
Total Amounts:
CN
UT
RW
DN 152,956 168,705
2,220,000 1,019,710 1,124,700
2,220,000 0 1,172,666 1,293,405
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 84 FROM KY
357 TO KY 61 (LINCOLN PARKWAY)
NEAR HODGENVILLE (2020CCR)
(2022CCR) (2024CCR)
KY-84Larue 8909 PL
DN
RW
UT SPP 1,350,000
CN SPP 7,840,000
Project Cost:
1,350,000 7,840,000 0 0
A
DDRESS SAFETY ON KY 210 FROM KY
1618 (6.994) TO MORNINGSTAR ROAD
(MP14.230) IN LARUE COUNTY.
(2024CCN)
KY-210Larue
80154.1000 PL
D
N SPP 1,680,000
RW SPP 1,250,000
UT SPP 2,000,000
CN SPP 20,000,000
Project Cost: 1,680,000 0 3,250,000 20,000,000
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 61 FROM NEAR
SOUTH L AND N TPKE (KY 470)(MP
5.152) TO THE INTERSECTION OF
LINCOLN FARM RD (US 31E)(MP 8.031)
KY-61Larue 80258 PL
DN SPP 1,120,000
RW SPP 1,880,000
UT
CN
Project Cost:
1,120,000 0 1,880,000 0
T
otal for Larue county PL
Total Amounts:
CN
UT
RW
DN 2,800,000
3,130,000
1,350,000 2,000,000
7,840,000 20,000,000
4,150,000 7,840,000 5,130,000 20,000,000
Page 111 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE CONNECTIVITY BETWEEN
C
ORBIN AND LONDON FROM KY-1006 TO
US-25E. (08CCN) (2024CCR)
US-25Laurel 8515 PL
DN
RW STP1 14,800,000
UT STP1 5,560,000 9,000,000
CN STP1 6,000,000
Project Cost: 14,800,000 5,560,000 9,000,000 6,000,000
I
MPROVE THE HAL ROGERS PARKWAY
TO INTERSTATE STANDARDS FROM 4.0
MI EAST OF KY 192 TO LAUREL/CLAY
CO. LINE. (I-75 TO HAZARD) (16CCN)
(18CCR) (2024CCR)
HR-9006Laurel 8909 PL
DN
RW NH 2,680,000
UT NH 1,170,000
CN SPP 32,850,000
Project Cost:
0 3,850,000 0 32,850,000
B
RIDGE PROJECT IN LAUREL COUNTY ON
(063B00062N) KY-472 AT
S.FK.ROCKCASTLE RVR
KY-472Laurel 10209 PL
DN BRX 219,810
RW
UT
CN BRX 1,465,399
Project Cost:
0 0 0 1,685,209
B
RIDGE PROJECT IN LAUREL COUNTY ON
(063B00101N) KY-552 AT LITTLE LAUREL
RIVER
KY-552Laurel 10211 PL
DN BRZ 121,611
RW
UT
CN BRZ 810,738
Project Cost:
0 0 932,349 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
4.169 TO MILEPOINT 8.8
HR-9006Laurel 22196 PL
DN STP4 290,000
RW
UT
CN STP4 2,921,514
Project Cost:
0 0 0 3,211,514
Page 112 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS ACCESS AND SAFETY ISSUES
A
T THE INTERSECTION OF KY 80 AND
PAYNE TRAIL AND BUSH ELEMENTARY
SCHOOL BY CONSTRUCTING A
CONNECTOR ROAD FROM HAL ROGERS
HR-9006Laurel 80154 PL
DN
RW
UT
CN SPP 630,000
Project Cost:
630,000 0 0 0
I
mprove the geometrics of a curve, widen
a drainage structure, and provide turn
lanes to Johnson Elementary School on
KY 638 (2024CCN)
KY-638Laurel 80312 PL
DN
RW
UT
CN SPP 2,270,000
Project Cost:
2,270,000 0 0 0
W
iden KY 192 from Mallard Drive to
Esquire Lane, address horizontal and
vertical alignment as needed (MP 16.61 -
18.08) (2024CCN)
KY-192Laurel 80357 PL
DN
RW SPP 7,000,000
UT SPP 1,750,000
CN SPP 9,000,000
Project Cost:
8,750,000 9,000,000 0 0
T
otal for Laurel county PL
Total Amounts:
CN
UT
RW
DN 121,611 509,810
21,800,000 2,680,000
1,750,000 6,730,000 9,000,000
2,900,000 9,000,000 810,738 43,236,913
26,450,000 18,410,000 9,932,349 43,746,723
I
mprove KY-32 from Elliott C/L to Yatesville
Lake reconstruction section for better
access to Yatesville Lake and to improve
safety. See Elliott County listing for
continuation of project to KY-7 @ Sandy
KY-32Lawrence 156 PL
DN
RW SPP 3,190,000
UT SPP 1,830,000
CN SPP 5,920,000
Project Cost:
5,020,000 5,920,000 0 0
Page 113 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LAWRENCE COUNTY
O
N (064B00018N) KY-32 AT HOOD
CREEK
KY-32Lawrence 10111 PL
DN BRX 408,579
RW
UT
CN BRX 2,723,861
Project Cost: 0 0 3,132,440 0
B
RIDGE PROJECT IN LAWRENCE COUNTY
ON (064B00019N) KY-32 AT BLAINE
CREEK
KY-32Lawrence 10112 PL
DN FBP2 654,029
RW
UT
CN FBP2 4,360,196
Project Cost:
5,014,225 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
Mill Creek Hollow OVER Rockcastle Creek
(064C00078N)
CR-1149Lawrence 10157 PL
DN BRZ 138,338
RW
UT
CN BRZ 922,254
Project Cost:
0 0 0 1,060,592
I
mprove KY-1 from the Johnson C/L to
KY-3 to eliminate dangerous curves and
address safety. (2024CCN)
KY-1Lawrence 80306 PL
DN
RW SPP 13,650,000
UT SPP 3,240,000
CN SPP 85,120,000
Project Cost:
0 16,890,000 0 85,120,000
C
orrect substandard roadway geometrics
and address safety issues on
KY-201/KY-32 from Johnson C/L to KY-1
for safety. (2024CCN)
KY-201Lawrence 80307 PL
DN
RW SPP 12,600,000
UT SPP 6,480,000
CN SPP 84,000,000
Project Cost:
0 12,600,000 6,480,000 84,000,000
Page 114 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE/WIDEN KY-3398 FROM KY-3 @
F
ALLSBURG TO US-23 @ FULLERS TO
IMPROVE SAFETY AND TO
ACCOMMODATE RESIDENTIAL GROWTH
AND RECREATIONAL VEHICLES IN THIS
KY-3398Lawrence 80310 PL
DN
RW SPP 1,430,000
UT
CN
Project Cost:
1,430,000 0 0 0
T
otal for Lawrence county PL
Total Amounts:
CN
UT
RW
DN 654,029 408,579 138,338
4,620,000 26,250,000
1,830,000 3,240,000 6,480,000
4,360,196 5,920,000 2,723,861 170,042,254
11,464,225 35,410,000 9,612,440 170,180,592
R
ockfall Mitigation on KY 52 near
Beattyville from MP 12.8 to MP 13.4 in Lee
County. (To seek future federal Protect
funds)
KY-52Lee 5017 PL
DN
RW
UT
CN PROT 10,000,000 11,750,000
Project Cost:
0 10,000,000 11,750,000 0
R
econstruct KY 11 from 0.5 miles south of
KY 587 to 0.65 miles north of KY 52 in
Beattyville (MP 1.082 - 4.798) (2024CCN)
KY-11Lee 80351 PL
DN
RW STPF 5,750,000
UT STPF 2,320,000
CN STPF 24,000,000
Project Cost:
0 5,750,000 2,320,000 24,000,000
T
otal for Lee county PL
Total Amounts:
CN
UT
RW
DN
5,750,000
2,320,000
10,000,000 11,750,000 24,000,000
0 15,750,000 14,070,000 24,000,000
Page 115 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE
O
VER MUNCY CREEK ON US 421 0.5 MILE
SOUTH OF TAYLOR MORGAN ROAD (CR
1090).(066B00006N)
US-421Leslie 1095 PL
DN
RW
UT
CN BRX 1,350,000
Project Cost:
0 0 0 1,350,000
C
ONSTRUCT A NEW APPROACH FROM
KY-1482 ONTO THE HAL ROGERS
PARKWAY AT MP 39. (08CCN)(10CCR)
(2011BOPP)(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-1482Leslie 8516 PL
DN
RW
UT
CN SPP 7,410,000
Project Cost:
0 7,410,000 0 0
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM CLAY/LESLIE LINE TO
HYDEN SPUR, MP 35.929 TO MP 44.188
(SEGMENT 9). (16CCN)(18CCN)
HR-9006Leslie 8912 PL
DN NH 1,120,000
RW SPP 12,600,000
UT SPP 9,360,000
CN SPP 113,280,000
Project Cost:
1,120,000 0 21,960,000 113,280,000
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM HYDEN SPUR TO
LESLIE/PERRY LINE (SEGMENT 10).
(16CCN)(18CCN) (2024CCR)
HR-9006Leslie 8913 PL
DN NH 1,120,000
RW SPP 10,500,000
UT SPP 7,280,000
CN SPP 73,920,000
Project Cost:
0 1,120,000 0 91,700,000
B
RIDGE PROJECT IN LESLIE COUNTY ON
(066B00028N) KY-2058 AT BEECH FORK
CREEK
KY-2058Leslie 10212 PL
DN BRX 145,478
RW
UT
CN BRX 969,851
Project Cost:
0 0 0 1,115,329
Page 116 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LESLIE COUNTY ON
(
066B00033N) KY-699 AT CUTSHIN
CREEK
KY-699Leslie 10213 PL
DN FBP 25,208
RW
UT
CN FBP 168,056
Project Cost: 0 0 0 193,264
B
RIDGE PROJECT IN LESLIE COUNTY ON
(066B00058N) KY-1482 AT HALS FORK
KY-1482Leslie 10215 PL
DN BRX 206,793
RW
UT
CN BRX 1,378,620
Project Cost: 0 0 1,585,413 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CR-1353 OVER Middle Fork Kentucky Rv
(066C00117N)
CR-1353Leslie 10256 PL
DN BRZ 146,773
RW
UT
CN BRZ 978,489
Project Cost:
1,125,262 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
35.929 TO MILEPOINT 44.04
HR-9006Leslie 22201 PL
DN NHPM 600,000
RW
UT
CN NHPM 6,024,768
Project Cost:
6,624,768 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
44.04 TO MILEPOINT 51.026
HR-9006Leslie 22202 PL
DN NHPM 500,000
RW
UT
CN NHPM 4,957,826
Project Cost:
0 0 5,457,826 0
Page 117 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Leslie county P L
Total Amounts:
CN
UT
RW
DN 1,866,773 1,120,000 706,793 170,686
12,600,000 10,500,000
9,360,000 7,280,000
7,003,257 7,410,000 6,336,446 189,687,907
8,870,030 8,530,000 29,003,239 207,638,593
R
ECONSTRUCT US-119 BY WIDENING TO
4-LANES ALONG A NEW ALIGNMENT
THROUGH THE GATEWAY INDUSTRIAL
PARK TO US-23.(16CCN) (2024CCR)
US-119Letcher 199.5000 PL
DN
RW NH 3,000,000
UT NH 3,000,000
CN SPP 41,040,000
Project Cost:
6,000,000 0 41,040,000 0
R
ECONSTRUCTION OF US-119 FROM 0.15
MILE WEST OF KY-806 TO KY-932.
2012BOP (2024CCN)
PF-9999,
US-119
Letcher 311.8000 PL
DN
RW
UT
CN APD 47,190,000
Project Cost:
47,190,000 0 0 0
I
MPROVE THE EXISTING ROADWAY TO
MEET CURRENT STANDARDS AND
IMPROVE CONGESTION INTO AND OUT
OF JENKINS BETWEEN MP 8.554 AND MP
9.176. (2024CCN)
KY-805Letcher 8702.1000 PL
DN
RW
UT
CN SPP 7,430,000
Project Cost:
7,430,000 0 0 0
B
RIDGE PROJECT IN LETCHER COUNTY
ON (067B00091N) KY-803 AT MILLSTONE
CREEK
KY-803Letcher 10121 PL
DN FBP2 115,685
RW
UT
CN FBP2 771,236
Project Cost:
0 0 0 886,921
Page 118 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Letcher county P L
Total Amounts:
CN
UT
RW
DN 115,685
3,000,000
3,000,000
54,620,000 41,040,000 771,236
60,620,000 0 41,040,000 886,921
N
EW ROUTE FROM VANCEBURG TO
KY-59 FROM POLLITT LANE IN
VANCEBURG (ALT. 5B1-2 PER PLANNING
STUDY). (2020CCR) (2022CCR)
(2024CCR)
KY-59Lewis 231 PL
DN
RW
UT SPP 2,320,000
CN SPP 90,000,000
Project Cost:
2,320,000 90,000,000 0 0
R
ECONSTRUCT KY-57 FROM KY-9 TO
FLEMING/LEWIS COUNTY LINE (14CCN)
(16CCR) (18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-57Lewis 8807 PL
DN
RW
UT
CN SPP 48,000,000
Project Cost:
48,000,000 0 0 0
A
DDRESS CONDITION OF KY-9 FROM
MILEPOINT 0 TO MILEPOINT 8.048
KY-9Lewis 20029 PL
DN STP4 328,000
RW
UT
CN STP4 3,772,000
Project Cost: 0 4,100,000 0 0
C
ONSTRUCT RIGHT AND LEFT TURN
LANES AT THE INTERSECTION OF KY 989
(MP18.553) TO IMPROVE SAFETY AND
DECREASE COLLISIONS. (2022CCN)
KY-9Lewis 80251 PL
DN
RW
UT
CN SPP 1,120,000
Project Cost:
1,120,000 0 0 0
Page 119 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Lewis county P L
Total Amounts:
CN
UT
RW
DN 328,000
2,320,000
49,120,000 93,772,000
51,440,000 94,100,000 0 0
U
S-27 CORRIDOR FROM SOMERSET TO
LEXINGTON. IMPROVE SAFETY AND
REDUCE CONGESTION ON US-27 FROM
KY-1247 TO EDUCATION WAY.
(2022CCR)
US-27Lincoln 167 PL
DN
RW NH 12,390,000
UT NH 14,000,000
CN
Project Cost:
12,390,000 0 14,000,000 0
B
RIDGE PROJECT IN LINCOLN COUNTY
ON (069B00023N) KY-78 AT HANGING
FORK
KY-78Lincoln 10054 PL
DN FBP 610,365
RW
UT
CN FBP 4,069,102
Project Cost:
0 0 4,679,467 0
N
EW TURNING LANE AT ARCADIA VIEW
DRIVE(18CCN) (2020CCR)
US-127Lincoln 80000 PL
DN
RW
UT
CN SPP 1,520,000
Project Cost: 1,520,000 0 0 0
C
ontinue ongoing improvements to US 27
Corridor from Somerset to Lexington.
Improve Level of Service and safety on
US 27 from KY 328 to KY 501 in Lincoln
County. (2022CCN) (2024CCR)
US-27Lincoln 80201 PL
DN
RW NH 8,380,000
UT SPP 4,970,000
CN SPP 54,560,000
Project Cost:
0 8,380,000 4,970,000 54,560,000
Page 120 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCTION TO MITIGATE
R
OCKSLIDE DAMAGE ON KY 300
(2022CCN) (2024CCR)
KY-300Lincoln 80202 PL
DN
RW
UT
CN SPP 2,160,000
Project Cost: 2,160,000 0 0 0
I
mprove Safety and Access Control along
US 150 from Danville to Stanford.
(2024CCN)
US-150Lincoln 80300 PL
DN
RW NH 1,050,000
UT NH 3,780,000
CN NH 11,760,000
Project Cost:
4,830,000 0 11,760,000 0
T
otal for Lincoln county PL
Total Amounts:
CN
UT
RW
DN 610,365
13,440,000 8,380,000
3,780,000 18,970,000
3,680,000 15,829,102 54,560,000
20,900,000 8,380,000 35,409,467 54,560,000
B
RIDGE PROJECT IN LIVINGSTON
COUNTY ON (070B00009N) KY-135 AT
BUCK CREEK
KY-135Livingston 10152 PL
DN BRX 55,280
RW
UT
CN BRX 368,536
Project Cost:
0 0 0 423,816
T
otal for Livingston county PL
Total Amounts:
CN
UT
RW
DN 55,280
368,536
0 0 0 423,816
Page 121 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY BY IMPROVING SIGHT
L
INES CROSSING RAILROAD BETWEEN
STOCKYARDS AND INDUSTRIAL PARK.
(16CCN)(18CCN) (2020CCR)
KY-2349Logan 8908 PL
DN
RW
UT
CN SPP 1,000,000
Project Cost:
1,000,000 0 0 0
B
RIDGE PROJECT IN LOGAN COUNTY ON
(071B00047N) US-68X AT RJC RAILROAD
US-68Logan 10042 PL
DN FBP 1,262,998
RW
UT
CN FBP 8,419,984
Project Cost: 0 9,682,982 0 0
B
RIDGE PROJECT IN LOGAN COUNTY ON
(071B00099N) COOPERSTOWN-QUALIT
AT MUD RIVER
KY-3201Logan 10043 PL
DN BRX 208,307
RW
UT
CN BRX 1,388,711
Project Cost:
0 0 0 1,597,018
W
IDEN US-79 FROM TODD COUNTY LINE
TO INTERSECTION WITH RUSSELLVILLE
BYPASS.(18CCN) (2020CCR) (2022CCR)
(2024CCN)
US-79Logan 80050 PL
DN
RW NH 15,080,000
UT SPP 13,150,000
CN SPP 74,320,000
Project Cost:
15,080,000 0 13,150,000 74,320,000
I
MPROVE SAFETY AT THE INTERSECTION
OF US 431 AND KY 663. (2024CCN)
US-431Logan 80314 PL
DN
RW
UT
CN SPP 930,000
Project Cost: 930,000 0 0 0
Page 122 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Logan county P L
Total Amounts:
CN
UT
RW
DN 1,262,998 208,307
15,080,000
13,150,000
1,930,000 8,419,984 75,708,711
17,010,000 9,682,982 13,150,000 75,917,018
R
ELOCATE US-641 FROM US-62 NEAR
EDDYVILLE TO SOUTH OF THE
LYON/CALDWELL COUNTY LINE
(2020CCR) (2022CCR) (2024CCR)
US-62,
US-641
Lyon 187.5000 PL
DN
RW
UT
CN STPF 12,000,000 12,000,000 6,360,000
Project Cost:
12,000,000 12,000,000 6,360,000 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00038N) KY-295 AT I 24 @ MP
40.720
KY-295Lyon 10155 PL
DN BRX 483,907
RW
UT
CN BRX 3,226,046
Project Cost:
3,709,953 0 0 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00040N) GREGORY ROAD AT I-24
@ MP. 042.048
CS-1047Lyon 10156 PL
DN FBP2 64,109
RW
UT
CN FBP2 427,392
Project Cost:
491,501 0 0 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00046N) KY-6020 AT I-24 @ MP.
050.701
KY-6020Lyon 10157 PL
DN FBP2 40,018
RW
UT
CN FBP2 266,784
Project Cost:
306,802 0 0 0
Page 123 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LYON COUNTY ON
(
072B00058N) KY-6020 AT I-24 @ MP.
050.701
KY-6020Lyon 10161 PL
DN FBP 326,658
RW
UT
CN FBP 2,177,722
Project Cost: 2,504,380 0 0 0
O
N US 62 WHERE THE P&L RAIL
OVERPASS MEETS THE TWO (2) KY 810
INTERSECTIONS, RECONSTRUCT US
62/KY 810 (NORTH AND SOUTH)
INTERSECTIONS WITH TURN LANES OR
US-62Lyon 80312 PL
DN
RW
UT SPP 500,000
CN SPP 2,000,000
Project Cost:
500,000 2,000,000 0 0
T
otal for Lyon county PL
Total Amounts:
CN
UT
RW
DN 914,692
500,000
18,097,944 14,000,000 6,360,000
19,512,636 14,000,000 6,360,000 0
C
ONSTRUCT NEW I-75 INTERCHANGE
BETWEEN BEREA & RICHMOND TO
ACCOMMODATE NEW INDUSTRIAL SITE
BACK ENTRANCE AND POTENTIALLY
MADISON COUNTY AIRPORT. (2024CCR)
I -75Madison 3 PL
DN SPP 2,080,000
RW SPP 3,000,000
UT SPP 2,500,000
CN SPP 30,000,000
Project Cost:
2,080,000 0 5,500,000 30,000,000
B
RIDGE PROJECT IN MADISON COUNTY
ON (076B00070N) KY-1985 AT TATES
CREEK
KY-1985Madison 10050 PL
DN BRZ 237,649
RW
UT
CN BRZ 1,584,326
Project Cost:
0 0 1,821,975 0
Page 124 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND BOGGS LN TO CONNECT TO
P
AVILION WAY (2020CCN) (2022CCR)
(2024CCR)
CR-1200,
CS-1526
Madison 80110 PL
DN
RW SPP 1,010,000
UT SPP 330,000
CN SPP 1,270,000
Project Cost:
0 1,340,000 1,270,000 0
R
econstruct KY 21 from KY 1617 to US
421. (2024CCN)
KY-21Madison 80314 PL
DN
RW SPP 4,000,000
UT SPP 5,000,000
CN SPP 12,000,000
Project Cost: 9,000,000 0 12,000,000 0
I
mprove capacity on Barnes Mill Road
between Goggins Lane and the I-75
interchange. Improvements to also include
the intersection with Goggins Lane
(2024CCN)
KY-876Madison 80315 PL
DN
RW
UT
CN SPP 10,310,000
Project Cost:
0 0 10,310,000 0
N
ew construction/modification of the I-75
exit 87 interchange as referenced in the
West Richmond Small Urban Area Study
(2024CCN)
I -75Madison 80316 PL
DN
RW
UT NH 420,000
CN NH 21,500,000
Project Cost:
420,000 0 0 21,500,000
R
elieve congestion and safety
improvements on CR 1303 (Goggins Lane)
between KY 169 and US 25 at Victory
Drive (MP 0.979 to 0.363). (2024CCN)
CR-1303Madison 80362 PL
DN
RW
UT
CN SPP 2,300,000
Project Cost:
2,300,000 0 0 0
Page 125 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Madison county P L
Total Amounts:
CN
UT
RW
DN 2,080,000 237,649
4,000,000 1,010,000 3,000,000
5,420,000 330,000 2,500,000
2,300,000 25,164,326 51,500,000
13,800,000 1,340,000 30,901,975 51,500,000
B
RIDGE PROJECT IN MAGOFFIN COUNTY
ON (077B00071N) KY-3333 AT LICK CR.
KY-3333Magoffin 10053 PL
DN FBP2 325,094
RW
UT
CN FBP2 2,167,290
Project Cost: 0 2,492,384 0 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway FROM MILEPOINT 69.58
TO MILEPOINT 71
KY-9009Magoffin 22210 PL
DN STP4 220,000
RW
UT
CN STP4 2,190,000
Project Cost: 0 0 2,410,000 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway FROM MILEPOINT 71
TO MILEPOINT 73.19
KY-9009Magoffin 22211 PL
DN STP4 220,000
RW
UT
CN STP4 2,227,000
Project Cost:
0 0 2,447,000 0
R
ECONSTRUCT KY 7 FROM WILL BAILEY
BRANCH ROAD TO KY 1090. (2024CCN)
KY-7Magoffin 80302 PL
DN
RW
UT SPP 2,010,000
CN SPP 8,610,000
Project Cost: 2,010,000 8,610,000 0 0
Page 126 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct CR 1265 from the intersection
w
ith KY 3337 (MP 0.0) to KY 3050 (MP
0.547) (2024CCN)
CR-1265Magoffin 80303 PL
DN
RW SPP 700,000
UT SPP 480,000
CN SPP 5,920,000
Project Cost: 1,180,000 5,920,000 0 0
T
otal for Magoffin county PL
Total Amounts:
CN
UT
RW
DN 325,094 440,000
700,000
2,490,000
16,697,290 4,417,000
3,190,000 17,022,384 4,857,000 0
E
XTEND MARTIN LUTHER KING AVENUE
FROM DOWNTOWN LEBANON BYPASS
(VETERANS MEMORIAL HIGHWAY).
ESTIMATED DISTANCE IS 1.5 MILES
(14CCN) (2022CCN) (2024CCR)
PF-9999Marion 8805 PL
DN SPP 1,120,000
RW SPP 3,750,000
UT
CN
Project Cost:
1,120,000 0 3,750,000 0
B
RIDGE PROJECT IN MARION COUNTY ON
(078B00070N) KY-1157 AT ARBUCKLE
CREEK
KY-1157Marion 10061 PL
DN FBP2 122,066
RW
UT
CN FBP2 813,773
Project Cost:
0 0 935,839 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-208 OVER ROLLING FORK OF SALT
RIV (078B00020N)
KY-208Marion 10088 PL
DN BRZ 599,535
RW
UT
CN BRZ 3,996,897
Project Cost:
4,596,432 0 0 0
Page 127 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y-527 OVER ROLLING FORK RIVER
(078B00056N)
KY-527Marion 10089 PL
DN BRZ 448,074
RW
UT
CN BRZ 2,987,160
Project Cost: 0 0 3,435,234 0
E
xtend KY 2154 Bypass from KY208 to
KY49. (2022CCR) (2024CCR)
CO-0Marion 80153 PL
DN
RW SPP 5,750,000
UT SPP 2,800,000
CN
Project Cost: 5,750,000 0 2,800,000 0
R
EPLACE LOW WATER STRUCTURE ON
SILOAM ROAD (CR 1119) OVER NORTH
ROLLING FORK NEAR KY 337
INTERSECTION MP 0.089 TO MP 0.122
(078C00154N)
CR-1119Marion 80252 PL
DN FBP2 220,067
RW
UT
CN FBP2 1,467,113
Project Cost:
0 1,687,180 0 0
I
MPROVE CONNECTIVITY AND
CONGESTION BETWEEN US 68 AND KY
55 ON THE EAST SIDE OF LEBANON
(APPROXIMATELY 2 MILES) (2022CCN)
(2024CCR)
KY-2154,
KY-55,
PF-9999,
US-68
Marion 80259 PL
DN
RW
UT
CN STPF 5,000,000 5,800,000
Project Cost:
0 5,000,000 5,800,000 0
W
iden bridge (078B00027N) on KY 84
over Prather Creek just west of Raywick
(MP 4.31-4.36).
KY-84Marion 80359 PL
DN FBP 646,875
RW
UT
CN FBP 4,312,500
Project Cost:
0 4,959,375 0 0
Page 128 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Marion county P L
Total Amounts:
CN
UT
RW
DN 1,719,535 866,942 570,140
5,750,000 3,750,000
2,800,000
3,996,897 10,779,613 9,600,933
11,466,432 11,646,555 16,721,073 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY, SERVICE, AND
CONGESTION ISSUES FROM BENTON
BAPTIST TEMPLE ROAD / HAPPY
HOLLOW RD TO US 68 IN DRAFFENVILLE.
US-641M arshall 80311 PL
DN
RW
UT SPP 2,000,000
CN SPP 10,000,000
Project Cost: 2,000,000 10,000,000 0 0
I
MPROVE GEOMETRIC ALIGNMENTS AND
ADDRESS ACCESS ISSUES AND SAFETY
CONCERNS FROM KY 2206 TO THE
ENTRANCE OF MARSHALL COUNTY
HOSPITAL IN BENTON. (2024CCN)
KY-348Marshall 80314 PL
DN
RW
UT SPP 1,500,000
CN SPP 6,000,000
Project Cost:
1,500,000 6,000,000 0 0
T
otal for Marshall county PL
Total Amounts:
CN
UT
RW
DN
3,500,000
16,000,000
3,500,000 16,000,000 0 0
I
NEZ TO WARFIELD (SECTION 2-1): FROM
LITTLE BLACKLOG TO BOOTH FORK.
[STA. 190+00 TO STA. 298+00
(ENGLISH)] (2002BOP) (12CCR)(AR/W)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.1100 PL
DN
RW
UT
CN SPP 54,230,000
Project Cost:
0 54,230,000 0 0
Page 129 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
INEZ TO WARFIELD (SECTION 2-2): FROM
B
OOTH FORK TO KY-2031 [STA. 298+00
TO STA. 382+00 (ENGLISH)] (2002BOP)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.1600 PL
DN
RW
UT
CN SPP 45,660,000
Project Cost:
0 0 45,660,000 0
I
NEZ TO WARFIELD (SECTION 2-3): FROM
KY-2031 TO KY-292 [STA. 382+00 TO
STA. 427+00 (ENGLISH)] (2002BOP)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.2100 PL
DN
RW
UT
CN SPP 29,830,000
Project Cost:
0 0 29,830,000 0
I
NEZ TO WARFIELD; BRIDGE OVER TUG
FORK (SECTION III) (R & U IDENTIFIED IN
SECTION II-ITEM NO. 154.10)(16CCR)
(2022CCN) (2024CCR)
PF-9999Martin 154.3000 PL
DN
RW
UT
CN SPP 19,820,000
Project Cost:
0 0 0 19,820,000
B
RIDGE PROJECT IN MARTIN COUNTY ON
(080B00006N) KY-1224 AT ROCKHOUSE
FORK
KY-1224Martin 10128 PL
DN FBP2 138,760
RW
UT
CN FBP2 925,066
Project Cost:
0 0 0 1,063,826
A
DDRESS DEFICIENCIES OF BRIDGE ON
Mollett Branch OVER Rockhouse Fork
(080C00016N)
CR-1380Martin 10158 PL
DN BRZ 117,253
RW
UT
CN BRZ 781,690
Project Cost:
0 0 898,943 0
Page 130 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Martin county P L
Total Amounts:
CN
UT
RW
DN 117,253 138,760
54,230,000 76,271,690 20,745,066
0 54,230,000 76,388,943 20,883,826
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-68 OVER OHIO RIVER (081B00069N)
US-68Mason 10013.1000 PL
D
N BRO 300,000
RW
UT
CN BRO 2,000,000
Project Cost: 0 2,300,000 0 0
B
RIDGE PROJECT IN MASON COUNTY ON
(081B00041N) US-62X AT OHIO
RIVER-MYVLLE- CSX R
US-62Mason 10091 PL
DN BRX 4,000,000
RW
UT
CN BRX 40,000,000
Project Cost: 44,000,000 0 0 0
B
RIDGE PROJECT IN MASON COUNTY ON
(081B00047N) KY-1234 AT INDIAN RUN
CREEK
KY-1234Mason 10092 PL
DN BRX 76,747
RW
UT
CN BRX 511,649
Project Cost:
588,396 0 0 0
T
otal for Mason county PL
Total Amounts:
CN
UT
RW
DN 4,076,747 300,000
40,511,649 2,000,000
44,588,396 2,300,000 0 0
Page 131 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve KY 1286 from US 62(MP 5.000) to
P
erkins Creek Bridge (MP 5.896,
B00167N). (Priority Section 3) (2022CCN)
(2024CCR)
KY-1286McCracken 153.3000 PL
DN
RW
UT
CN STP1 4,760,000
Project Cost:
4,760,000 0 0 0
I
mprove KY 1286 from Perkins Creek
Bridge (MP 5.896, B00167N) to KY 998
(MP 6.916). (Priority Section 4) (2022CCN)
(2024CCR)
KY-1286McCracken 153.4000 PL
DN
RW
UT
CN STP1 5,220,000
Project Cost:
0 5,220,000 0 0
R
ELOCATION AND MINOR WIDENING OF
US-60 FROM CLARKS RIVER TO US-62
JCT.(10CCR)(14CCR)(LET W/ 1-1115.20)
(16CCR)
US-60McCracken 1115.1000 PL
DN
RW
UT NH 3,360,000
CN NH 14,560,000
Project Cost:
3,360,000 14,560,000 0 0
B
RIDGE PROJECT IN MCCRACKEN
COUNTY ON (073B00062N) US-62 AT
P&L RAILWAY
US-60McCracken 10163 PL
DN BRO 732,741
RW
UT
CN BRO 4,884,941
Project Cost:
0 0 0 5,617,682
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-45 OVER OHIO RIVER (073B00001N)
US-45McCracken 10198 PL
DN BRX 150,000
RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
Page 132 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Planning and Phase I Engineering for the
f
uture expansion or replacement of the
I-24 Ohio River Bridge. (Shared Cost w/
Illinois) (073B00100N)
I -24McCracken 10261 PL
DN
RW
UT
CN BRO 1,375,000 1,375,000
Project Cost:
1,375,000 1,375,000 0 0
A
DDRESS CONDITION OF US-60X FROM
MILEPOINT 0 TO MILEPOINT 0.7
US-60McCracken 20040 PL
DN STP5 36,000
RW
UT
CN STP5 414,000
Project Cost: 0 0 450,000 0
A
DDRESS SAFETY, CONGESTION, AND
FUTURE CAPACITY ISSUES FROM US 60
TO US 68 IN PADUCAH. SEE MARCH,
2002 PADUCAH-MCCRACKEN COUNTY
TRANSPORTATION STUDY. (2024CCN)
I -24McCracken 80305 PL
DN
RW
UT NH 2,240,000
CN NH 10,000,000 15,000,000
Project Cost:
2,240,000 0 10,000,000 15,000,000
I
MPROVE MOBILITY, SAFETY AND
ADDRESS GEOMETRIC DEFICIENCIES ON
KY 998 (OLIVET CHURCH ROAD) FROM
KY 1286 (FRIENDSHIP ROAD) TO US 62.
(2024CCN)
KY-998McCracken 80315 PL
DN
RW
UT SPP 3,000,000
CN SPP 10,000,000
Project Cost:
3,000,000 10,000,000 0 0
B
ASED ON THE 2019 PADUCAH SUA, ID
"Q". RECONFIGURE THE INTERSECTION
OF KY 731 AND LABELLE AVE. A
ROUNDABOUT SHOULD BE CONSIDERED.
THIS IS BASED ON 33 CRASHES IN 3
KY-731McCracken 80317 PL
DN
RW
UT
CN SPP 5,500,000
Project Cost:
0 5,500,000 0 0
Page 133 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for McCracken county P L
Total Amounts:
CN
UT
RW
DN 150,000 36,000 732,741
8,600,000
7,135,000 36,655,000 10,414,000 19,884,941
15,885,000 36,655,000 10,450,000 20,617,682
B
RIDGE PROJECT IN MCCREARY COUNTY
ON (074B00007N) KY-92 AT S. FORK OF
CUMBERLAND RI
KY-92McCreary 10057 PL
DN FBP 2,208,703
RW
UT
CN
Project Cost: 0 0 0 2,208,703
B
RIDGE PROJECT IN MCCREARY COUNTY
ON (074C00010N) WIBORG LOOP RD AT
NS (CNO&TP) SYSTEM
CR-1314McCreary 10061 PL
DN FBP2 317,874
RW
UT
CN FBP2 2,119,163
Project Cost:
0 0 2,437,037 0
T
otal for McCreary county PL
Total Amounts:
CN
UT
RW
DN 317,874 2,208,703
2,119,163
0 0 2,437,037 2,208,703
B
RIDGE PROJECT IN WEBSTER COUNTY
ON (117B00012N) KY-56 AT GREEN
RIVER
KY-56McLean 10135 PL
DN FBP 1,927,758
RW
UT
CN FBP 12,851,723
Project Cost:
0 0 0 14,779,481
Page 134 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y 140 OVER PORTERS DITCH
(075B00041N)
KY-140McLean 10152 PL
DN BRX 112,724
RW
UT
CN BRX 751,490
Project Cost: 0 0 864,214 0
T
otal for McLean county PL
Total Amounts:
CN
UT
RW
DN 112,724 1,927,758
751,490 12,851,723
0 0 864,214 14,779,481
A
DDRESS TRAVEL TIME RELIABILITY
AND IMPROVE INTERSECTIONS ALONG
KY 313 FROM HARDIN COUNTY TO KY
1638 IN BRANDENBURG. (2024CCN)
KY-313Meade 80305 PL
DN SPP 2,240,000
RW SPP 940,000
UT
CN
Project Cost:
2,240,000 0 940,000 0
A
DDRESS SAFETY AND MOBILITY
ALONG KY 313 (BRANDENBURG
BYPASS) FROM KY 448 TO KY 228 IN
BRANDENBURG. (2024CCN)
KY-313Meade 80309 PL
DN
RW SPP 830,000
UT SPP 1,460,000
CN SPP 24,000,000
Project Cost:
2,290,000 24,000,000 0 0
T
otal for Meade county PL
Total Amounts:
CN
UT
RW
DN 2,240,000
830,000 940,000
1,460,000
24,000,000
4,530,000 24,000,000 940,000 0
Page 135 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruction of US 460 from Lucky
S
top to KY 713 @ Means. (2024CCN)
US-460Menifee 250 PL
DN
RW
UT
CN SPP 15,840,000
Project Cost: 0 15,840,000 0 0
W
IDEN EXISTING ROADWAY AND
IMPROVE VERTICAL AND HORIZONTAL
CURVES. NEW CONSTRUCTION.
COMPLETES US 460 UPGRADES IN
MENIFEE COUNTY FROM MP 14.35 TO
US-460Menifee 8805 PL
DN
RW SPP 9,200,000
UT SPP 4,240,000
CN SPP 42,650,000
Project Cost:
13,440,000 0 42,650,000 0
BRIDGE PROJECT IN MENIFEE COUNTY ON
(
083B00024N) KY-713 AT BEAVER CR
@MENIFEE HISCH
KY-713M enifee 10054 PL
DN FBP2 193,448
RW
UT
CN FBP2 1,289,656
Project Cost: 0 0 0 1,483,104
I
MPROVE SAFETY, CORRECT
GEOMETRICS, AND ENHANCE REGIONAL
CONNECTIVITY ON US 460 FROM THE
INTERSECTION OF KY 1240 TO 0.7 MILES
EAST OF THE MORGAN COUNTY LINE
US-460Menifee 80200 PL
DN
RW
UT
CN SPP 37,120,000
Project Cost:
37,120,000 0 0 0
T
otal for Menifee county PL
Total Amounts:
CN
UT
RW
DN 193,448
9,200,000
4,240,000
37,120,000 15,840,000 42,650,000 1,289,656
50,560,000 15,840,000 42,650,000 1,483,104
Page 136 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SUMMER SHADE BYPASS. (06CCR)
(
2006BOPC)(08CCR)(12CCR)(14CCR)
(2024CCN)
KY-90Metcalfe 112.1000 PL
DN
RW SPP 5,180,000
UT SPP 4,900,000
CN SPP 20,720,000
Project Cost: 10,080,000 0 20,720,000 0
R
ECONSTRUCT KY 163 AS A NEW
ROUTE ON WEST SIDE OF EDMONTON
FROM KY 163 AT GARY BELL RD (MP
10.0) S OF EDMONTON CROSSING US 68
(STOCKTON ST) 2000 FT WEST OF THE
KY-163Metcalfe 8859 PL
DN
RW
UT
CN SPP 13,980,000
Project Cost:
13,980,000 0 0 0
I
NTERSECTION IMPROVEMENTS AT US-68
AND KY-80. OPTIONS INCLUDE
REALIGNMENT OF NORTH APPROACH,
WIDENING FOR TURN LANES, AND A
ROUNDABOUT. (2024CCN)
US-68Metcalfe 80306 PL
DN
RW
UT
CN SPP 1,240,000
Project Cost:
1,240,000 0 0 0
I
MPROVE SAFETY AND ADDRESS
GEOMETRIC DEFICIENCIES ON THE LB
NUNN CUMBERLAND EXPRESSWAY AT
EXIT 27 INTERCHANGE. (2024CCN)
LN-9008Metcalfe 80309 PL
DN
RW
UT
CN SPP 11,160,000
Project Cost:
11,160,000 0 0 0
T
otal for Metcalfe county PL
Total Amounts:
CN
UT
RW
DN
5,180,000
4,900,000
26,380,000 20,720,000
36,460,000 0 20,720,000 0
Page 137 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OPERATION OF TURKEY NECK BEND
F
ERRY FOR FY 2027-2032.(12CCR)
(2020CCR) (2024CCR)
KY-214Monroe 128.1100 PL
DN
RW
UT
CN SPP 1,250,000 1,250,000 1,250,000 1,250,000
Project Cost: 1,250,000 1,250,000 1,250,000 1,250,000
R
EPLACE BRIDGE ON KY-100 BETWEEN
MP 14.7 AND 14.9. (18CCN)
KY-100Monroe 80003 PL
DN BRX 204,133
RW
UT
CN BRX 1,360,887
Project Cost: 0 1,565,020 0 0
T
otal for Monroe county PL
Total Amounts:
CN
UT
RW
DN 204,133
1,250,000 2,610,887 1,250,000 1,250,000
1,250,000 2,815,020 1,250,000 1,250,000
W
IDEN EXISTING PAVEMENT & IMPROVE
VERTICAL & HORIZONTAL CURVES
FROM EXISTING MT STERLING BYPASS
(KY 686) TO 500' W OF BENTBROOK
SUBDIVISION. ADD FULL WIDTH
US-60Montgomery 8810 PL
DN
RW
UT
CN SPP 12,320,000
Project Cost:
12,320,000 0 0 0
B
RIDGE PROJECT IN MONTGOMERY
COUNTY ON (087B00053N) KY-3362 AT
GRASSY LICK CREEK
KY-3362Montgomery 10057 PL
DN FBP2 153,841
RW
UT
CN FBP2 1,025,604
Project Cost:
0 0 0 1,179,445
Page 138 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Montgomery county P L
Total Amounts:
CN
UT
RW
DN 153,841
12,320,000 1,025,604
12,320,000 0 0 1,179,445
W
EST LIBERTY BYPASS - CONSTRUCT
NEW ROUTE FROM US 460 @ KY 2498
TO US 460 @ KY 172. (00CCN)
PF-9999Morgan 8004 PL
DN
RW SPP 4,030,000
UT SPP 1,240,000
CN SPP 21,170,000
Project Cost: 5,270,000 0 21,170,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-437 OVER BIRCH FK OF WILLIAMS
CRK (088B00064N)
KY-437Morgan 10079 PL
DN FBP 138,338
RW
UT
CN FBP 922,254
Project Cost:
1,060,592 0 0 0
A
DDRESS CONDITION OF KY-882 FROM
MILEPOINT 0 TO MILEPOINT 2.468
KY-882Morgan 20031 PL
DN STP4 152,000
RW
UT
CN STP4 1,748,000
Project Cost: 0 1,900,000 0 0
A
DDRESS CONDITION OF KY-985 FROM
MILEPOINT 0 TO MILEPOINT 2.015
KY-985Morgan 20032 PL
DN STP4 140,000
RW
UT
CN STP4 1,610,000
Project Cost: 0 1,750,000 0 0
Page 139 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and substandard
g
eometrics on US 460 from the Menifee
County Line to approximately milepoint 0.8.
(2022CCN) (2024CCR)
US-460Morgan 80202 PL
DN
RW
UT
CN SPP 5,858,000
Project Cost:
5,858,000 0 0 0
I
mprove safety and reliability of US 460
from the intersection of KY 1081 to the
Magoffin County line (2024CCN)
US-460Morgan 80307 PL
DN
RW SPP 500,000
UT SPP 750,000
CN SPP 10,000,000
Project Cost:
1,250,000 10,000,000 0 0
T
otal for Morgan county PL
Total Amounts:
CN
UT
RW
DN 138,338 292,000
4,530,000
1,990,000
6,780,254 13,358,000 21,170,000
13,438,592 13,650,000 21,170,000 0
S
TRAIGHTEN DEAN ROAD INTERSECTION
OF 189 BYPASS TO KY 181 NORTH
NEAR THE INTERSECTION WITH THE WKY
PARKWAY, WENDELL FORD NATIONAL
GUARD CENTER, AND JOB CORP.
KY-2533Muhlenberg 8803 PL
DN
RW
UT
CN SPP 7,590,000
Project Cost:
7,590,000 0 0 0
A
DDRESS CONDITION OF Wendell H. Ford
Western KY Parkway FROM MILEPOINT
54.317 TO MILEPOINT 59.92
WK-9001Muhlenberg 22164 PL
DN NHPM 670,000
RW
UT
CN NHPM 6,651,254
Project Cost:
7,321,254 0 0 0
Page 140 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Muhlenberg county P L
Total Amounts:
CN
UT
RW
DN 670,000
14,241,254
14,911,254 0 0 0
I
MPROVE SAFETY, MOBILITY, AND
GEOMETRICS ON US-150 FROM THE
BLUEGRASS PARKWAY TO THE
NELSON/WASHINGTON COUNTY LINE.
(2016BOP)(18CCR)(D-Auth under 4-396)
US-150Nelson 396.1000 PL
DN
RW
UT
CN STPF 15,000,000 15,000,000 15,000,000
Project Cost:
15,000,000 15,000,000 15,000,000 0
W
IDEN US-150 FROM KY-49 TO NEAR
KY-245/WAL-MART WIDENING. (06CCN)
(2022CCN) (2024CCR)
US-150Nelson 8308.1000 PL
DN
RW
UT
CN STP1 5,000,000 10,000,000 6,000,000
Project Cost:
0 5,000,000 10,000,000 6,000,000
BRIDGE PROJECT IN NELSON COUNTY ON
(
090B00109N) KY-2738 AT EAST FORK
SIMPSON CREEK
KY-2738N elson 10065 PL
DN BRX 78,525
RW
UT
CN BRX 523,503
Project Cost: 0 0 0 602,028
A
DDRESS CONDITION OF Martha Layne
Collins Bluegrass Parkway FROM
MILEPOINT 10.172 TO MILEPOINT 17.542
(17.134 CARDINAL)
BG-9002Nelson 22173 PL
DN NHPM 550,000
RW
UT
CN NHPM 5,500,000
Project Cost:
6,050,000 0 0 0
Page 141 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF Martha Layne
C
ollins Bluegrass Parkway FROM
MILEPOINT 17.134 (17.542
NON-CARDINAL) TO MILEPOINT 24.095
BG-9002Nelson 22174 PL
DN NHPM 1,600,000
RW
UT
CN NHPM 16,000,000
Project Cost:
0 0 17,600,000 0
I
MPROVE CONNECTIVITY WEST OF
BARDSTOWN BY CONSTRUCTION NEW
ROUTE FROM THE BLUEGRASS
PARKWAY BEGINNING WEST OF EXIT 21
TO KY245 (2022CCN). (2024CCR)
PF-9999,
US-31
Nelson 80254 PL
DN SPP 7,840,000
RW SPP 12,500,000
UT
CN
Project Cost:
7,840,000 0 12,500,000 0
I
MPROVE MOBILITY AND CONNECTIVITY
WEST OF BARDSTOWN FROM KY 245 TO
US 31E NEAR COX'S CREEK. (2022CCN)
(2024CCR)
PF-9999,
US-31
Nelson 80255 PL
DN
RW STPF 5,750,000
UT STPF 3,600,000
CN
Project Cost:
5,750,000 0 3,600,000 0
A
ddress geometric deficiencies along KY
55 near pleasant view road in Bloomfield.
(2024CCN)
KY-55Nelson 80356 PL
DN
RW
UT SPP 200,000
CN SPP 1,500,000
Project Cost:
200,000 1,500,000 0 0
C
onstruct new interchange on BG
Parkway at KY 1858. Partial eligibility for
Interchange only as NH funds. (2024CCN)
PF-9999Nelson 80361 PL
DN NH 3,360,000
RW NH 12,000,000
UT NH 3,000,000
CN SPP 70,000,000
Project Cost:
3,360,000 0 15,000,000 70,000,000
Page 142 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve traffic operations, mobility and
p
assing opportunities along US 31 E
(Louisville - Bardstown Rd) from KY 509
to Bullitt County Line. Consider a 2+1
configuration and/or innovative
US-31Nelson 80363 PL
DN SPP 2,320,000
RW SPP 320,000
UT SPP 620,000
CN SPP 20,500,000
Project Cost:
2,320,000 0 940,000 20,500,000
T
otal for Nelson county PL
Total Amounts:
CN
UT
RW
DN 14,070,000 1,600,000 78,525
5,750,000 24,820,000
200,000 7,220,000
20,500,000 21,500,000 41,000,000 97,023,503
40,520,000 21,500,000 74,640,000 97,102,028
I
mprove safety, geometric deficiencies,
and promote connectivity along KY-36
between US-68 (mile-point 0.864) and
KY-13 (mile-point 3.910). (2024CCN)
KY-36Nicholas 80306 PL
DN
RW SPP 3,600,000
UT SPP 4,640,000
CN SPP 29,760,000
Project Cost:
8,240,000 0 29,760,000 0
T
otal for Nicholas county PL
Total Amounts:
CN
UT
RW
DN
3,600,000
4,640,000
29,760,000
8,240,000 0 29,760,000 0
I
MPROVE SAFETY ON KY 54 BY
UPGRADING MP 7.0 TO MP 8.0 TO THREE
LANES INCLUDING CURB AND GUTTER
AND ADDRESSING TWO SHARP TURNS.
(16CCN)(18CCN) (2020CCR) (2022CCR)
KY-54Ohio 8951 PL
DN
RW
UT
CN SPP 7,300,000
Project Cost:
7,300,000 0 0 0
Page 143 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN OHIO COUNTY ON
(
092B00015N) KY-69 AT SMITH CREEK
KY-69Ohio 10123 PL
DN FBP 350,943
RW
UT
CN FBP 2,339,618
Project Cost: 0 0 0 2,690,561
B
RIDGE PROJECT IN OHIO COUNTY ON
(092B00159N) KY-505 AT BR-INDIAN
CAMP CREEK
KY-505Ohio 10131 PL
DN BRX 148,460
RW
UT
CN BRX 989,736
Project Cost:
0 0 1,138,196 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 35.064 TO MILEPOINT 47.221
I -165Ohio 22134 PL
DN NHPM 3,200,000
RW
UT
CN NHPM 32,000,000
Project Cost: 0 0 0 35,200,000
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 47.221 TO MILEPOINT 59.474
I -165Ohio 22136 PL
DN NHPM 1,100,000
RW
UT
CN NHPM 11,000,000
Project Cost: 0 0 12,100,000 0
A
DDRESS LEFT TURN LANE ISSUES ON
US-231 AT BOTH PERDUE ENTRANCES.
(2024CCN)
US-231Ohio 80303 PL
DN
RW
UT SPP 980,000
CN SPP 3,890,000
Project Cost:
980,000 3,890,000 0 0
Page 144 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Ohio county P L
Total Amounts:
CN
UT
RW
DN 1,248,460 3,550,943
980,000
7,300,000 3,890,000 11,989,736 34,339,618
8,280,000 3,890,000 13,238,196 37,890,561
R
ECONSTRUCT KY-22 FROM KY-329 TO
ABBOTT LANE. (2004BOPC)(08CCR)
(10CCR)(12CCR) (2024CCN)
KY-22Oldham 304.1000 PL
DN
RW
UT
CN SPP 8,800,000
Project Cost: 8,800,000 0 0 0
W
IDEN I-71 FROM FOUR TO SIX LANES
FROM KY-329 (MP 14.1) TO KY-393 (MP
18.0). (2022CCR) (2024CCR)
I -71Oldham 483.1000 PL
DN
RW
UT
CN NH 26,000,000 20,000,000 18,240,000
Project Cost:
26,000,000 20,000,000 18,240,000 0
W
IDEN I-71 FROM FOUR TO SIX LANES
FROM KY-393 (MP 18.0) TO KY-53 (MP
22.4). (16CCN) (2024CCR)
I -71Oldham 483.2000 PL
DN
RW
UT
CN NH 12,000,000 20,000,000 8,000,000
Project Cost:
0 12,000,000 20,000,000 8,000,000
D
ESIGN FOR IMPROVING KY-53 FROM
ZHALE SMITH ROAD TO KY-22 (TOTAL
3.2 MILES). (14CCN)(18CCN) (2022CCR)
(2024CCR)
KY-53Oldham 8852 PL
DN
RW
UT
CN SPP 36,400,000
Project Cost:
36,400,000 0 0 0
Page 145 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y 1694 OVER HARRODS CREEK
(093B00025N)
KY-1694Oldham 10126 PL
DN FBP2 745,433
RW
UT
CN FBP2 4,969,553
Project Cost: 0 5,714,986 0 0
I
MPROVE TRAFFIC FLOW, MINIMIZE
CONGESTION, AND ADDRESS SAFETY
ISSUES ON US 42 BETWEEN RIDGMOOR
DRIVE AND KY 1694 (GUM STREET).
INCLUDES CONSIDERATION OF A THREE
US-42Oldham 80307 PL
DN
RW SPP 7,500,000
UT SPP 5,000,000
CN SPP 30,000,000
Project Cost:
12,500,000 0 30,000,000 0
I
MPROVE SAFETY, ACCESS, AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 362 FROM THE
OLDHAM/SHELBY COUNTY LINE TO KY
146 (IN AND SOUTH OF PEWEE VALLEY).
KY-362Oldham 80314 PL
DN
RW SPP 1,820,000
UT SPP 1,500,000
CN SPP 22,420,000
Project Cost:
0 3,320,000 0 22,420,000
R
EDUCE CONGESTION, IMPROVE SAFETY
AND ENHANCE MOBILITY ON KY 146 IN
BUCKNER FROM KY 1817 (NEW CUT
ROAD) (MP 6.81) TO KY 393 (MP 7.42).
(2024CCN)
KY-146Oldham 80325 PL
DN
RW
UT
CN SPP 5,580,000
Project Cost:
0 5,580,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION, ALONG US 22 FROM
HAUNZ LANE TO KY 329. (2024CCN)
KY-22Oldham 80345 PL
DN
RW
UT SPP 1,040,000
CN SPP 4,600,000
Project Cost:
1,040,000 4,600,000 0 0
Page 146 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Oldham county P L
Total Amounts:
CN
UT
RW
DN 745,433
7,500,000 1,820,000
6,040,000 1,500,000
71,200,000 47,149,553 68,240,000 30,420,000
84,740,000 51,214,986 68,240,000 30,420,000
W
IDEN KY 22 FROM INTERSECTION WITH
KY 845 TO THE OWEN/GRANT COUNTY
LINE.(12CCN)(14CCR)(16CCR)
(2024CCN)
KY-22Owen 8702 PL
DN
RW
UT SPP 1,350,000
CN SPP 21,600,000
Project Cost:
1,350,000 21,600,000 0 0
R
ECONSTRUCTION KY 355 FROM KY 22
IN GRATZ TO KY 1982 NEAR PERRY
PARK. (2024CCN)
KY-355Owen 80319 PL
DN
RW SPP 6,250,000
UT SPP 2,400,000
CN SPP 85,800,000
Project Cost:
8,650,000 0 85,800,000 0
T
otal for Owen county PL
Total Amounts:
CN
UT
RW
DN
6,250,000
3,750,000
21,600,000 85,800,000
10,000,000 21,600,000 85,800,000 0
R
EPLACE BRIDGE OVER MOORES FORK
AND REALIGN ROADWAY.
KY-708Owsley 173 PL
DN BRX 145,000
RW
UT
CN BRX 1,450,000
Project Cost: 0 1,595,000 0 0
Page 147 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-30 FROM
M
ILEPOINT 3.45 TO MILEPOINT 8.606
KY-30Owsley 20041 PL
DN STP4 264,000
RW
UT
CN STP4 3,036,000
Project Cost: 0 3,300,000 0 0
T
otal for Owsley county PL
Total Amounts:
CN
UT
RW
DN 409,000
4,486,000
0 4,895,000 0 0
R
ELOCATE KY 22 FROM THE
INTERSECTION OF FRYER ROAD AND KY
330 TO US 27 (ALIGNMENT H FROM 1988
STUDY) (2022CCN) (2024CCR)
KY-22,
PF-9999
Pendleton 8508.1000 PL
DN
RW SPP 11,590,000
UT SPP 2,030,000
CN SPP 64,250,000
Project Cost:
11,590,000 2,030,000 0 64,250,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 27 OVER SO.FK. LICKING RIVER
(096B00021N)
US-27Pendleton 10059 PL
DN FBP 2,349,709
RW
UT
CN
Project Cost:
0 0 0 2,349,709
I
MPROVE SAFETY AND MOBILITY ON US
27 AT THE KY INTERSECTION (MILEPOINT
11.6 TO MILEPOINT 12) (2022CCN)
(2024CCR)
US-27Pendleton 80253 PL
DN
RW
UT
CN STPF 4,060,000
Project Cost:
0 4,060,000 0 0
Page 148 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY ON US
2
7 AT THE KY 22 INTERSECTION.
(2024CCN)
US-27Pendleton 80306 PL
DN
RW STPF 390,000
UT STPF 650,000
CN STPF 3,050,000 6,000,000
Project Cost: 0 1,040,000 3,050,000 6,000,000
R
ECONSTRUCT KY 177 FROM LICKING
RIVER BRIDGE IN BUTLER TO KY 3185.
(2024CCN)
KY-177Pendleton 80310 PL
DN
RW SPP 580,000
UT SPP 1,120,000
CN SPP 26,400,000
Project Cost:
1,700,000 0 26,400,000 0
T
otal for Pendleton county PL
Total Amounts:
CN
UT
RW
DN 2,349,709
12,170,000 390,000
1,120,000 2,680,000
4,060,000 29,450,000 70,250,000
13,290,000 7,130,000 29,450,000 72,599,709
I
MPROVE KY 476 FROM KY-15X IN
WALKERTOWN TO BRIDGE OVER NORTH
FORK KY RIVER.
KY-476Perry 209.2000 PL
DN
RW SPP 720,000
UT SPP 700,000
CN SPP 4,200,000
Project Cost:
1,420,000 4,200,000 0 0
R
ECONSTRUCTION OF KY 15 FROM
BONNYMAN TO NEAR KY 28. (14CCN)
(2020CCN) (2022CCR) (2024CCR)
KY-15Perry 269.2000 PL
DN
RW
UT SPP 6,050,000
CN SPP 73,080,000
Project Cost:
6,050,000 0 73,080,000 0
Page 149 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NEW INTERCHANGE OFF OF A NEW EXIT
5
5 HAL ROGERS PARKWAY. (16CCN)
(18CCN) (2024CCR)
HR-9006Perry 8903 PL
DN
RW
UT
CN NH 7,440,000
Project Cost: 7,440,000 0 0 0
B
RIDGE PROJECT IN PERRY COUNTY ON
(097B00005N) KY-476 AT JAKES CREEK
KY-476Perry 10056 PL
DN BRX 168,143
RW
UT
CN BRX 1,120,951
Project Cost: 1,289,094 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
BRIDGE RD OVER LEATHERWOOD CREEK
(097C00060N)
CR-1540Perry 10084 PL
DN BRZ 127,184
RW
UT
CN BRZ 847,895
Project Cost:
975,079 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
51.026 TO MILEPOINT 56.1
HR-9006Perry 22203 PL
DN STP4 410,000
RW
UT
CN STP4 4,094,627
Project Cost:
0 4,504,627 0 0
R
econstruct roadway to eliminate flooding
beginning at the intersection with KY 550.
(2024CCN)
KY-1440Perry 80305 PL
DN
RW
UT SPP 1,180,000
CN SPP 5,760,000
Project Cost:
1,180,000 5,760,000 0 0
Page 150 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve drainage issues and construct
s
idewalk on KY 550 from MP 1.2 to MP 1.7
near the Galen College of Nursing.
(2024CCN)
KY-550Perry 80306 PL
DN
RW SPP 1,660,000
UT SPP 1,300,000
CN SPP 2,020,000
Project Cost:
1,660,000 1,300,000 2,020,000 0
C
onstruct a new access road to East
Perry Sports Complex development and a
connector to Nautilus Drive (2024CCN)
PF-9999Perry 80308 PL
DN
RW
UT
CN SPP 1,890,000
Project Cost:
1,890,000 0 0 0
T
otal for Perry county PL
Total Amounts:
CN
UT
RW
DN 295,327 410,000
2,380,000
7,930,000 1,300,000
11,298,846 14,054,627 75,100,000
21,904,173 15,764,627 75,100,000 0
M
ITIGATE OR ELIMINATE ROCKFALL
HAZARDS AND IMPROVE ROADWAY
FOR BETTER FLOW AND EFFICIENCY IN
ORDER TO HANDLE THE EXPECTED
CONGESTION ARISING FROM EVENTS AT
KY-1426Pike 147 PL
DN
RW
UT
CN PROT 15,000,000 10,000,000 7,400,000
Project Cost:
15,000,000 10,000,000 7,400,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 1056 OVER Tug Fork River
(098B00171N) (Border bridge with
WVDOT)
KY-1056Pike 10169 PL
DN BRX 175,000
RW
UT
CN BRX 1,750,000
Project Cost:
0 1,925,000 0 0
Page 151 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
U
S 52 OVER Tug Fork, CR 15, NSRR
(098B00263N) (Border bridge with
WVDOT)
US-52Pike 10171 PL
DN FBP 150,000
RW
UT
CN FBP 1,000,000
Project Cost:
1,150,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 52 OVER Tug Fork, CR 15, NSRR
(098B00263S) (Border bridge with
WVDOT)
US-52Pike 10172 PL
DN FBP 150,000
RW
UT
CN FBP 1,000,000
Project Cost:
1,150,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 52 OVER Tug Fork, KY 292
(098B00265N) (Border bridge with
WVDOT)
US-52Pike 10173 PL
DN BRX 305,000
RW
UT
CN BRX 3,050,000
Project Cost:
3,355,000 0 0 0
M
ake template changes to improve sight
distance, drainage, and ingress/egress
through this commercial section of US 23
(2024CCN)
US-23Pike 80309 PL
DN
RW
UT
CN NH 4,000,000
Project Cost:
4,000,000 0 0 0
R
eplace bridge (098B00064N) on KY 122
(MP 13.45-13.65)
KY-122Pike 80351 PL
DN FBP 430,237
RW
UT
CN FBP 2,868,244
Project Cost: 0 0 3,298,481 0
Page 152 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Pike county P L
Total Amounts:
CN
UT
RW
DN 605,000 175,000 430,237
24,050,000 11,750,000 10,268,244
24,655,000 11,925,000 10,698,481 0
I
MPROVE SAFETY, UPGRADE
GEOMETRICS, AND ADDRESS CAPACITY
ISSUES FOR KY 213 FROM KY 615 TO
BOTTOM OF MOUNTAIN. (PRIORITY
SECTION 2)(2018BOP) (2022CCN)
KY-213Powell 163.2000 PL
DN
RW
UT
CN SPP 9,300,000
Project Cost:
9,300,000 0 0 0
M
inor widening to improve redundancy of
Regional Travel.
KY-15Powell 176 PL
DN
RW
UT
CN PROT 7,200,000
Project Cost: 7,200,000 0 0 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway FROM MILEPOINT
11.913 TO MILEPOINT 19.228
KY-9000Powell 20004 PL
DN STP4 630,000
RW
UT
CN STP4 6,297,100
Project Cost:
6,927,100 0 0 0
C
ONSTRUCT A BRIDGE ON KY 11
(CAMPTON RD MP 3.4 TO 3.85) ACROSS
THE BERT T. COMBS MOUNTAIN
PARKWAY
KY-11Powell 80250 PL
DN
RW
UT SPP 5,000,000
CN SPP 12,890,000
Project Cost:
5,000,000 12,890,000 0 0
Page 153 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Powell county P L
Total Amounts:
CN
UT
RW
DN 630,000
5,000,000
22,797,100 12,890,000
28,427,100 12,890,000 0 0
S
omerset Northern Bypass Section 4;
From East of the KY 39 Interchange, to KY
461 / KY 80 Interchange (8-59.25 - BUILD
Grant Project)(Congressional KYD
Earmark - $45M)
KY-80,
PF-9999
Pulaski 59.6000 PL
DN
RW
UT
CN NH 16,000,000 17,000,000
Project Cost:
16,000,000 17,000,000 0 0
H
ORIZONTAL AND VERTICAL
REALIGNMENT OF KY-196 AT WHITE OAK
CREEK FROM 1.0 MILE E OF WARNER
ROAD TO 0.3 MILE W OF SIEVERS ROAD.
(10CCR)(14CCR) (2024CCN)
KY-196Pulaski 121 PL
DN
RW
UT
CN SPP 3,730,000
Project Cost:
3,730,000 0 0 0
I
MPROVE SAFETY AND MOBILITY ALONG
KY 39 BETWEEN KY 80 AND OAK LEAF
LANE. (2020CCR) (2024CCR)
KY-39Pulaski 169 PL
DN
RW STP1 2,530,000
UT STP1 1,150,000
CN STP1 7,980,000
Project Cost:
0 2,530,000 1,150,000 7,980,000
R
educe congestion and improve safety
and mobility along US 27 between General
Burnside Island and Cumberland River
Bridge.
(2024CCN)
US-27Pulaski 272 PL
DN
RW
UT NH 3,000,000
CN SPP 15,220,000
Project Cost:
0 3,000,000 15,220,000 0
Page 154 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN PULASKI COUNTY
O
N (100B00015N) KY-1956 AT LINE
CREEK
KY-1956Pulaski 10063 PL
DN BRX 312,402
RW
UT
CN BRX 2,082,679
Project Cost: 0 0 0 2,395,081
B
RIDGE PROJECT IN PULASKI COUNTY
ON (100B00048N) KY-934 AT BRUSHY
CREEK
KY-934Pulaski 10065 PL
DN BRX 31,693
RW
UT
CN BRX 211,288
Project Cost:
0 0 0 242,981
B
RIDGE PROJECT IN PULASKI COUNTY
ON (100B00066N) KENO RD (KY-751) AT
NS (CNO&TP) SYSTEM
CR-1254,
KY-751
Pulaski 10066 PL
DN BRX 641,804
RW
UT
CN BRX 4,278,690
Project Cost:
0 4,920,494 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
ED DICK RD OVER ROCK LICK CREEK
(100C00069N)
CR-1622Pulaski 10086 PL
DN BRZ 158,893
RW
UT
CN BRZ 1,059,288
Project Cost:
1,218,181 0 0 0
R
EDUCE CONGESTION AND IMPROVE
SAFETY, CAPACITY AND MOBILITY
ALONG KY 90 BETWEEN WAYNE
COUNTY LINE AND NEW CUMBERLAND
RIVER BRIDGE (2020CCN) (2022CCR)
KY-90Pulaski 80104 PL
DN
RW
UT
CN SPP 21,280,000
Project Cost:
0 21,280,000 0 0
Page 155 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety, capacity and access
i
ssues along KY-461 from south of Buck
Creek extending northerly to
Pulaski/Rockcastle Line (as a continuation
of 8-59.25). (2024CCN)
KY-461Pulaski 80302 PL
DN
RW SPP 7,640,000
UT SPP 6,670,000
CN SPP 51,240,000
Project Cost:
14,310,000 0 51,240,000 0
I
mprove geometrics and safety along KY
3262 from Baker Road to approximately
0.5mi northeast of Baker Road (2024CCN)
KY-3262Pulaski 80312 PL
DN
RW
UT SPP 510,000
CN SPP 4,720,000
Project Cost:
510,000 4,720,000 0 0
I
mprove sight distance at the left turn
lanes along US 27 at KY 635 traffic light
(MP 22.5 -22.8) (2024CCN)
US-27Pulaski 80353 PL
DN
RW
UT
CN SPP 780,000
Project Cost:
780,000 0 0 0
T
otal for Pulaski county PL
Total Amounts:
CN
UT
RW
DN 158,893 641,804 344,095
7,640,000 2,530,000
7,180,000 3,000,000 1,150,000
21,569,288 47,278,690 66,460,000 10,273,967
36,548,181 53,450,494 67,610,000 10,618,062
I
MPROVE THE INTERSECTION OF US 62
AND KY 165 IN MOUNT OLIVET.
(2024CCN)
US-62Robertson 80312 PL
DN
RW SPP 2,100,000
UT SPP 1,040,000
CN SPP 2,800,000
Project Cost: 3,140,000 0 2,800,000 0
Page 156 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Robertson county P L
Total Amounts:
CN
UT
RW
DN
2,100,000
1,040,000
2,800,000
3,140,000 0 2,800,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-1249 OVER W.FK. SKEGG CREEK
(102B00051N)
KY-1249Rockcastle 10088 PL
DN BRZ 222,691
RW
UT
CN BRZ 1,484,604
Project Cost: 0 0 1,707,295 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 60.1 TO MILEPOINT 65.22 (64.5
CARDINAL)
I -75Rockcastle 20018 PL
DN NHPM 630,000
RW
UT
CN NHPM 6,339,713
Project Cost:
0 0 6,969,713 0
A
ddress capacity and access issues
along KY-461 from Pulaski/Rockcastle
County Line to KY 1250. (2024CCN)
KY-461Rockcastle 80303 PL
DN
RW SPP 6,960,000
UT SPP 6,610,000
CN SPP 46,310,000
Project Cost:
0 6,960,000 6,610,000 46,310,000
A
ddress safety, capacity and access
issues along KY-461 from KY 1250 to US
150. (2024CCN)
KY-461Rockcastle 80304 PL
DN
RW SPP 4,600,000
UT SPP 4,380,000
CN SPP 29,680,000
Project Cost:
8,980,000 0 29,680,000 0
Page 157 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address capacity issues from KY-461 to
U
S-25 in Mt. Vernon to continue corridor
improvements to US 150 as identified in
the 1998 planning study. (2024CCN)
US-150Rockcastle 80306 PL
DN STP1 1,081,200
RW STP1 2,840,000
UT STP1 3,120,000
CN SPP 18,170,000
Project Cost:
1,081,200 0 5,960,000 18,170,000
T
otal for Rockcastle county PL
Total Amounts:
CN
UT
RW
DN 1,081,200 852,691
4,600,000 6,960,000 2,840,000
4,380,000 9,730,000
37,504,317 64,480,000
10,061,200 6,960,000 50,927,008 64,480,000
E
xtend KY 801 from its intersection with
KY 158 at Sharkey to KY 32 near the
Fleming/Rowan county line. (2024CCR)
KY-801Rowan 234 PL
DN
RW SPP 9,600,000
UT SPP 5,600,000
CN SPP 50,400,000
Project Cost: 0 9,600,000 5,600,000 50,400,000
I
MPROVE SAFETY AND CONNECTIVITY
AND REDUCE CONGESTION ON KY-377
FROM JUST SOUTH OF CLEARK FORK
ROAD TO JUST NORTH OF KY 799 (BIG
PERRY ROAD). (2024CCN)
KY-377Rowan 8406.2000 PL
DN
RW
UT
CN SPP 39,600,000
Project Cost:
39,600,000 0 0 0
W
IDEN AND SOFTEN CURVE ON CR 1391
(BRATTON BRANCH RD) AT WALMART
(2020CCN)
CR-1391Rowan 80108 PL
DN
RW
UT
CN SPP 270,000
Project Cost:
270,000 0 0 0
Page 158 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and reduce congestion on
K
Y 32 (Flemingsburg Road) between the
intersections of CS 1203 (Trademore
Drive) and CS1001 (Fraley Drive) and in
the vicinity of the I-64 interchange.
KY-32Rowan 80307 PL
DN
RW
UT
CN NH 16,000,000
Project Cost:
16,000,000 0 0 0
R
educe congestion and improve mobility
on KY 32 (Flemingsburg Road) between
the intersections with KY 3531 (Viking
Drive) and CS1020 (Mabry Drive).
(2024CCN)
KY-32Rowan 80308 PL
DN
RW SPP 2,300,000
UT SPP 3,920,000
CN SPP 18,000,000
Project Cost:
6,220,000 0 18,000,000 0
T
otal for Rowan county PL
Total Amounts:
CN
UT
RW
DN
2,300,000 9,600,000
3,920,000 5,600,000
55,870,000 18,000,000 50,400,000
62,090,000 9,600,000 23,600,000 50,400,000
R
educe congestion and improve capacity,
safety and mobility on US 127 between
the west bypass of Jamestown to the
Cumberland Parkway. See segment 12 in
June 1998 Advance (2024CCR)
US-127Russell 156 PL
DN
RW
UT
CN NH 4,180,000 20,000,000
Project Cost:
0 4,180,000 20,000,000 0
R
educe congestion and improve safety,
capacity and mobility along US 127 from
the Cumberland Parkway to Lakeway
drive KY 379 in Russell Springs.
US-127Russell 166 PL
DN NH 750,000
RW
UT
CN
Project Cost:
750,000 0 0 0
Page 159 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-80 FROM
M
ILEPOINT 4.1 TO MILEPOINT 6.6
KY-80Russell 20020 PL
DN STP5 224,000
RW
UT
CN STP5 2,576,000
Project Cost: 0 0 2,800,000 0
A
DDRESS CONDITION OF Louie B. Nunn
Cumberland Parkway FROM MILEPOINT
57.791 TO MILEPOINT 62.176
LN-9008Russell 22209 PL
DN NHPM 370,000
RW
UT
CN NHPM 3,667,044
Project Cost:
0 0 4,037,044 0
I
MPROVE CONGESTION AND SAFETY
ALONG US 127 AT KY 1381 (VOILS
ROAD) AND SK LANE IN RUSSELL
SPRINGS (MILEPOINT 17.2 TO MILEPOINT
17.45) (2022CCN)
US-127Russell 80250 PL
DN
RW
UT SPP 1,040,000
CN SPP 2,080,000
Project Cost:
1,040,000 2,080,000 0 0
I
MPROVE GEOMETRICS ALONG KY 3278.
(2024CCN)
KY-3278Russell 80316 PL
DN
RW
UT
CN SPP 890,000
Project Cost: 890,000 0 0 0
T
otal for Russell county PL
Total Amounts:
CN
UT
RW
DN 750,000 594,000
1,040,000
890,000 6,260,000 26,243,044
2,680,000 6,260,000 26,837,044 0
Page 160 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 134.386 TO MILEPOINT
136.758
I -75Scott 20051 PL
DN NHPM 690,000
RW
UT
CN NHPM 6,910,000
Project Cost: 7,600,000 0 0 0
I
MPROVE CAPACITY AND ACCESS ON
KY 2906 FROM US 460 TO US 62
(2020CCN) (2022CCR) (2024CCR)
KY-2906Scott 80102 PL
DN
RW
UT
CN SPP 9,520,000
Project Cost:
9,520,000 0 0 0
P
rovide a safe and efficient connection
between KY 32 (Long Lick Pike) and KY
1143 (Georgetown Bypass). (2024CCN)
PF-9999Scott 80318 PL
DN
RW
UT
CN SPP 2,790,000
Project Cost:
2,790,000 0 0 0
A
ddress safety issues on KY 1962
(Lemon's Mill Road) From Military Street in
Georgetown to Lisle Road at I-75.
(2024CCN)
CS-1010,
CS-1115,
KY-1962
Scott 80319 PL
DN
RW SPP 1,430,000
UT SPP 750,000
CN SPP 4,800,000
Project Cost:
2,180,000 4,800,000 0 0
T
otal for Scott county PL
Total Amounts:
CN
UT
RW
DN 690,000
1,430,000
750,000
19,220,000 4,800,000
22,090,000 4,800,000 0 0
Page 161 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN KY 55X FROM TWO TO FIVE
L
ANES FROM US 60 (MP 0.0) NORTH TO
KY 43 (MP 1.354).(16CCN) (2024CCN)
KY-55Shelby 8958 PL
DN
RW SPP 220,000
UT SPP 920,000
CN SPP 12,440,000
Project Cost: 1,140,000 12,440,000 0 0
B
RIDGE PROJECT IN SHELBY COUNTY ON
(106C00007N) CLORE JACKSON RD AT
FOX RUN
CR-1009Shelby 10025 PL
DN BRZ 155,771
RW
UT
CN BRZ 1,038,473
Project Cost:
1,194,244 0 0 0
B
RIDGE PROJECT IN SHELBY COUNTY ON
(106B00017N) KY 148 AT GUIST CREEK
KY-148Shelby 10089 PL
DN BRX 564,722
RW
UT
CN BRX 3,764,812
Project Cost: 0 0 0 4,329,534
A
DDRESS ACCESS MANAGEMENT AND
SAFETY ISSUES ALONG KY 55X FROM
KY 43 TO THE ENTRANCE OF THE
SHELBYVILLE BYPASS (KY 55).
(2024CCN)
KY-55Shelby 80308 PL
DN
RW SPP 200,000
UT SPP 816,000
CN SPP 16,020,000
Project Cost:
1,016,000 16,020,000 0 0
IMPROVE CONNECTIVITY FROM KY 53 AT
T
HE OLD SEVEN MILE PIKE INTERSECTION
TO US 60/ROCKET LANE INTERSECTION.
(2024CCN)
PF-9999S helby 80312 PL
DN
RW SPP 2,000,000
UT SPP 1,400,000
CN SPP 13,690,000
Project Cost: 3,400,000 0 13,690,000 0
Page 162 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND IMPROVE
T
RAFFIC FLOW WITH OPERATIONAL
IMPROVEMENTS ON KY 55 AT OLD
BRUNERSTOWN ROAD. THIS PROJECT
WILL CONSIDER A RIGHT-TURN LANE ON
KY-55Shelby 80318 PL
DN
RW
UT
CN SPP 830,000
Project Cost:
830,000 0 0 0
C
ONSTRUCT PEDESTRIAN FACILITIES ON
THE NORTH SIDE OF US 60 FROM THE
MASONIC HOME TO ROCKET LANE.
(2024CCN)
US-60Shelby 80326 PL
DN
RW
UT
CN STP1 1,140,000
Project Cost:
1,140,000 0 0 0
T
otal for Shelby county PL
Total Amounts:
CN
UT
RW
DN 155,771 564,722
2,420,000
3,136,000
3,008,473 28,460,000 13,690,000 3,764,812
8,720,244 28,460,000 13,690,000 4,329,534
I
MPROVE US-31W FROM KY-1008 TO
KY-621. (14CCN)(16CCR) (2020CCR)
(2024CCR)
US-31Simpson 8856 PL
DN
RW
UT
CN SPP 13,760,000
Project Cost: 0 13,760,000 0 0
B
RIDGE PROJECT IN SIMPSON COUNTY
ON (107B00033N) KY-664 AT NEELEY
BRANCH
KY-664Simpson 10046 PL
DN BRX 167,953
RW
UT
CN BRX 1,119,686
Project Cost:
0 0 1,287,639 0
Page 163 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE MOBILITY ALONG KY 1171
(
NORTH STREET) FROM THE
INTERSECTION WITH US 31W TO THE
INTERSECTION WITH KY 1008 IN
FRANKLIN. (2024CCN)
KY-1171Simpson 80310 PL
DN
RW SPP 1,690,000
UT SPP 1,620,000
CN SPP 5,270,000
Project Cost:
3,310,000 5,270,000 0 0
I
MPROVE MOBILITY BY COMPLETING THE
KY 1008 BYPASS AROUND FRANKLIN.
(2024CCN)
KY-1008Simpson 80316 PL
DN
RW SPP 13,000,000
UT SPP 3,720,000
CN SPP 21,080,000
Project Cost:
16,720,000 0 21,080,000 0
I
MPROVE SAFETY ON KY 585 AT LICK
CREEK FROM MP 3.45 TO 3.75.
(2024CCN)
KY-585Simpson 80321 PL
DN
RW
UT
CN SPP 2,480,000
Project Cost:
2,480,000 0 0 0
T
otal for Simpson county PL
Total Amounts:
CN
UT
RW
DN 167,953
14,690,000
5,340,000
2,480,000 19,030,000 22,199,686
22,510,000 19,030,000 22,367,639 0
I
mprove safety and traffic operations on
KY 55 from KY 1169 to KY 155 and on KY
155 from KY 55 to MP 2.0 (total length
2.71 miles)(Portion of 5-8954.0).
(2024CCN)
KY-155,
KY-55
Spencer 8954.2000 PL
DN
RW
UT
CN SPP 20,720,000
Project Cost:
0 20,720,000 0 0
Page 164 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve traffic operations on KY 55 from
K
Y 1169 to KY 155 (MP 10.5 - 11.3)
(Portion of 5-8954.0). (2024CCN)
KY-55Spencer 8954.3000 PL
DN
RW
UT
CN SPP 2,800,000
Project Cost: 2,800,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 1795 OVER BEECH CREEK
(108B00024N)
KY-1795Spencer 10162 PL
DN BRZ 668,118
RW
UT
CN BRZ 4,454,122
Project Cost:
0 0 0 5,122,240
R
EDUCE CONGESTION, IMPROVE
SAFETY, AND ENHANCE MOBILITY ON
KY 55 FROM KY 44 TO INDUSTRIAL DR.
(MP 6.610 TO MP 6.838) (2022CCN)
KY-55Spencer 80213 PL
DN
RW
UT
CN SPP 620,000
Project Cost:
620,000 0 0 0
I
MPROVE CAPACITY, RELIEVE
CONGESTION, AND IMPROVE SAFETY
ALONG KY 44 FROM GOOSE CREEK
ROAD (CR 1121) TO OAK TREE WAY (CS
1053) (MILEPOINT 1.202 TO MILEPOINT
KY-44Spencer 80254 PL
DN
RW SPP 6,750,000
UT SPP 5,720,000
CN SPP 36,810,000
Project Cost:
6,750,000 5,720,000 36,810,000 0
I
MPROVE CAPACITY, RELIEVE
CONGESTION, AND IMPROVE SAFETY
ALONG KY 44 FROM COXS LANE (CR
1087) NEAR THE BULLITT/SPENCER CO
LINE TO GOOSE CREEK ROAD (CR 1121)
KY-44Spencer 80255 PL
DN
RW SPP 1,350,000
UT SPP 1,140,000
CN SPP 6,980,000
Project Cost:
2,490,000 0 6,980,000 0
Page 165 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND TRAFFIC
O
PERATIONS ON KY 55 FROM KY 44 IN
TAYLORSVILLE TO KY 1169
(NORMANDY ROAD) BY PROVIDING
ADDITIONAL TURNING AND PASSING
KY-55Spencer 80256 PL
DN
RW SPP 40,000
UT SPP 440,000
CN SPP 6,020,000
Project Cost:
480,000 6,020,000 0 0
I
MPROVE SAFETY AND TRAFFIC
OPERATIONS ON KY 55 FROM KY 155
NEAR ELK CREEK TO KY 148 AT
FINCHVILLE. PROJECT LIMITS ARE ON KY
55 IN SPENCER COUNTY FROM KY 155
KY-55Spencer 80257 PL
DN
RW SPP 2,280,000
UT SPP 1,590,000
CN SPP 24,830,000
Project Cost:
2,280,000 1,590,000 24,830,000 0
A
DDRESS SAFETY AND GEOMETRIC
ISSUES ON KY 44 AT JUNCTION KY 1251
TO CURVE AFTER HUNTER'S TRACE
ROAD. (2024CCN)
KY-44Spencer 80315 PL
DN
RW
UT SPP 820,000
CN SPP 5,760,000
Project Cost:
820,000 5,760,000 0 0
I
mprove safety at the intersection of KY
155 and KY 3192/Hochstrasser Road (MP
2.4-2.6) (2024CCN)
KY-155Spencer 80316 PL
DN
RW
UT
CN SPP 5,000,000
Project Cost:
5,000,000 0 0 0
I
MPROVE SAFETY AT THE US 31E/KY 523
INTERSECTION. (2024CCN)
US-31Spencer 80327 PL
DN
RW STPF 400,000
UT STPF 450,000
CN STPF 1,020,000
Project Cost: 850,000 1,020,000 0 0
Page 166 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve intersection of KY 155 and
G
oebel Road/Hochstrasser Road (MP 0.65
- 0.85). (2024CCN)
KY-155Spencer 80351 PL
DN
RW
UT SPP 110,000
CN SPP 1,250,000
Project Cost: 110,000 1,250,000 0 0
T
otal for Spencer county PL
Total Amounts:
CN
UT
RW
DN 668,118
10,820,000
2,960,000 7,310,000
8,420,000 34,770,000 68,620,000 4,454,122
22,200,000 42,080,000 68,620,000 5,122,240
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 65.1900 PL
DN
RW
UT
CN BRO 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 65.2000 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS OFF
SYSTEM BRIDGES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 65.2100 PL
DN
RW
UT
CN BRZ 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
Page 167 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE REPAIRS ON VARIOUS BRIDGES
FO
R FY 2026-2032. (FBP PROGRAM)
(2024CCR)
CO-0Statewide 65.2200 PL
DN
RW
UT
CN FBP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026-2032. (FBP2 PROGRAM)
CO-0Statewide 65.2300 PL
DN
RW
UT
CN FBP2 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
'
ITS' AND 'TSMO' ACTIVITIES ON VARIOUS
NHS ROUTES IN KENTUCKY FOR FY 2027
THROUGH FY 2032. (2024CCR)
CO-0Statewide 66.1900 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
T
ransportation Systems Management and
Operations (TSMO) activities on various
routes for FY-2022 through FY 2028.
(2024CCR)
CO-0Statewide 66.2100 PL
DN
RW
UT
CN SPP 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
S
TATEWIDE TRANSPORTATION
ALTERNATIVES PROGRAM FOR FY 2026
THROUGH FY 2032 (2024CCR)
CO-0Statewide 195.1600 PL
DN
RW
UT
CN TAP 12,300,000 12,300,000 12,300,000 12,300,000
Project Cost:
12,300,000 12,300,000 12,300,000 12,300,000
Page 168 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NON-ATTAINMENT AREAS STATEWIDE
C
MAQ FUNDED PROJECTS FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 219.1800 PL
DN
RW
UT
CN CM 8,100,000 8,100,000 8,100,000 8,100,000
Project Cost: 8,100,000 8,100,000 8,100,000 8,100,000
P
AVEMENT REHAB ON STATE (NON RS)
SYSTEM ROUTES IN KENTUCKY FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 224.1400 PL
DN
RW
UT
CN STP5 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
PROMOTING RESILIENT OPERATIONS FOR
T
RANSFORMATIVE, EFFICIENT, AND
COST SAVING TRANSPORTATION
(PROTECT) PROGRAM FORMULA FUNDS.
CO-0S tatewide 239 PL
DN
RW
UT
CN PROT 5,000,000 5,000,000
Project Cost: 0 5,000,000 0 5,000,000
S
TATEWIDE CARBON REDUCTION
PROGRAM.
CO-0Statewide 244 PL
DN
RW
UT
CN CARB 14,600,000 14,600,000 14,600,000 14,600,000
Project Cost: 14,600,000 14,600,000 14,600,000 14,600,000
S
TATEWIDE BRIDGE INSPECTION FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 327.1600 PL
DN
RW
UT
CN BRX 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Page 169 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE I-STATE ROUTES FOR FY
2
026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 337.1500 PL
DN
RW
UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE OFF-SYSTEM BRIDGE
INSPECTION FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 346.1600 PL
DN
RW
UT
CN BRZ 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost:
3,000,000 3,000,000 3,000,000 3,000,000
R
AILWAY-HIGHWAY CROSSINGS
PROGRAM ON VARIOUS ROUTES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 352.1600 PL
DN
RW
UT
CN RRP 3,140,000 4,220,000 4,220,000 4,220,000
Project Cost:
3,140,000 4,220,000 4,220,000 4,220,000
P
AVEMENT REHABILITATION FOR
VARIOUS NHS ROUTES IN KENTUCKY
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 369.1000 PL
DN
RW
UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
O
HIO RIVER BRIDGES FRACTURE
CRITICAL FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 388.1000 PL
DN
RW
UT
CN BRX 4,000,000 4,000,000 4,000,000 4,000,000
Project Cost:
4,000,000 4,000,000 4,000,000 4,000,000
Page 170 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE HIGHWAY PROJECT DESIGN
A
CTIVITIES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 391.0600 PL
DN STPF 1,000,000 1,000,000 1,000,000 1,000,000
RW
UT
CN
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
S
TATEWIDE HIGHWAY PROJECT DESIGN
ACTIVITIES FOR FY 2022 THROUGH FY
2028. (2024CCR)
CO-0Statewide 391.0700 PL
DN SPP 5,000,000 5,000,000 5,000,000 5,000,000
RW
UT
CN
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
U
PGRADE NAVIGATIONAL LIGHTING FOR
BRIDGES OVER MAJOR STREAMS AND
WATERWAYS FOR FY 2026 THROUGH
FY 2032. (2024CCR)
CO-0Statewide 400.0700 PL
DN
RW
UT
CN BRX 500,000 500,000 500,000 500,000
Project Cost:
500,000 500,000 500,000 500,000
H
ONORING BORDER STATES
COMMITMENTS FOR EXISTING
BRIDGES(CANNOT BE MOVED) FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 510.0500 PL
DN
RW
UT
CN BRX 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
S
TATEWIDE CORRECTIONS OF ROCK
FALL OR EMBANKMENT STABILIZATION
FOR FY 2022 THROUGH FY 2028.
(2024CCR)
CO-0Statewide 511.0400 PL
DN
RW
UT
CN SPP 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
Page 171 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PREVENTATIVE MAINTENANCE FOR
B
RIDGE STRUCTURES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 514.0100 PL
DN
RW
UT
CN BRX 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
S
TATEWIDE CORRECTIONS OF
ROCKFALL OR EMBANKMENT
STABILIZATION ON NH ROUTES FOR FY
2026 THROUGH FY 2032. (2020CCR)
(2024CCR)
CO-0Statewide 518.0100 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE CORRECTIONS OF
ROCKFALL OR EMBANKMENT
STABILIZATION ON NON NH ROUTES FOR
FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 518.0300 PL
DN
RW
UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
S
tatewide NHS Rest Area Repairs.
(2024CCR)
CO-0Statewide 600 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE NHS REST AREA / WELCOME
CENTERS / WEIGH STATION REPAIRS.
(2024CCR)
CO-0Statewide 600.1000 PL
DN
RW
UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
Page 172 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Additional Parking at NHS Rest Area and
W
eigh Stations. (2024CCR)
CO-0Statewide 601 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
A
DDRESS SAFETY IMPROVEMENT NEEDS
FOR STATE-OWNED DAMS
CONSTRUCTED TO FACILIATE
KENTUCKY'S HIGHWAY SYSTEM.
CO-0Statewide 610 PL
DN
RW
UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
P
LANNING FUNDS TO SCOPE PROJECTS
FOR CONSIDERATION IN FUTURE
HIGHWAY PLANS.
CO-0Statewide 611 PL SPP 2,500,000 2,500,000 2,500,000 2,500,000
DN
RW
UT
CN
Project Cost:
2,500,000 2,500,000 2,500,000 2,500,000
S
TATEWIDE SAFETY PROGRAM FOR FY
2026 THROUGH FY 2032. (HSIP)
(2024CCR)
CO-0Statewide 911.0900 PL
DN
RW
UT
CN SAF 71,300,000 71,300,000 71,300,000 71,300,000
Project Cost:
71,300,000 71,300,000 71,300,000 71,300,000
S
TATEWIDE SAFETY FUNDING TO BE
USED ALONGSIDE FEDERAL HSIP
FUNDING TO ENHANCE ROADWAY
SAFETY IN KENTUCKY. (2022CCR)
CO-0Statewide 911.5000 PL
DN
RW
UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost:
2,500,000 2,500,000 2,500,000 2,500,000
Page 173 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE UNDERWATER BRIDGE
I
NSPECTION FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 1063.1600 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
S
TATEWIDE PROGRAM TO FUND BRIDGE
SCOUR COUNTER-MEASURES FOR
STATE-MAINTAINED BRIDGES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 1071.0800 PL
DN
RW
UT
CN BRX 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost:
3,000,000 3,000,000 3,000,000 3,000,000
S
TATEWIDE BRIDGE REPLACEMENT
PROGRAM FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 1074.0800 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
P
AVEMENT PREVENTATIVE
MAINTENANCE PROGRAM FOR FY 2026
THROUGH FY 2032 STP5 FUNDING.
(2024CCR)
CO-0Statewide 2700.1400 PL
DN
RW
UT
CN STP5 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
A
MERICANS WITH DISABILITIES ACT
(ADA) TRANSITION PLAN
IMPLEMENTATION PROJECTS FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 3011.0100 PL
DN
RW
UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
Page 174 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SCHOOL TURN LANE PROJECTS FOR
N
EW SCHOOLS FOR FY 2022 THROUGH
FY 2028. (2022CCR) (2024CCR)
CO-0Statewide 8500.1600 PL
DN
RW
UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
A
DVANCE CONSTRUCTION
COMMITMENTS FOR MOUNTAIN
PARKWAY EXPANSION; I-65 CENTRAL
CORRIDOR; AND OTHER ACTIVE
DESIGN/BUILD PROJECTS.
CO-0Statewide 8601 PL
DN
RW
UT
CN NH 31,000,000 31,000,000 31,000,000 31,000,000
Project Cost:
31,000,000 31,000,000 31,000,000 31,000,000
G
ARVEE BOND DEBT SERVICE
PAYMENTS FOR THE BRENT SPENCE
BRIDGE PROJECT AND THE I-69 ORX
BRIDGE PROJECT.
CO-0Statewide 9660 PL
DN
RW
UT
CN GAR 38,600,000 38,600,000 38,600,000 38,600,000
Project Cost:
38,600,000 38,600,000 38,600,000 38,600,000
T
otal for Statewide county PL
Total Amounts:
CN
UT
RW
DN
2,500,000 2,500,000 2,500,000 2,500,000
6,000,000 6,000,000 6,000,000 6,000,000
280,040,000 286,120,000 281,120,000 286,120,000
288,540,000 294,620,000 289,620,000 294,620,000
I
MPROVE SAFETY, ACCESS,
GEOMETRICS AND DRAINAGE ON KY-70
IN CAMPBELLSVILLE FROM US-68 TO
COUNTRY VIEW COURT (CS-1305)
KY-70Taylor 443 PL
DN
RW SPP 3,130,000
UT
CN
Project Cost:
3,130,000 0 0 0
Page 175 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY ON KY 210 FROM
J
UST EAST OF CORINTH CHURCH
(MP0.60) TO KY 883 (MP14.20) IN
TAYLOR COUNTY. (2024CCN)
KY-210Taylor
80154.3000 PL
D
N
RW SPP 2,880,000
UT SPP 5,520,000
CN
Project Cost: 2,880,000 5,520,000 0 0
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 70 FROM 0.
MILES EAST OF ROBERTS RD (NEAR
ELKHORN BAPTIST CHURCH) TO NEAR
KY 76 (MILEPOINT 3.1 TO MILEPOINT 4.1)
KY-70Taylor 80256 PL
DN SPP 840,000
RW SPP 1,880,000
UT
CN
Project Cost:
840,000 0 1,880,000 0
E
XTEND KY 3350 (CAMPBELLSVILLE
BYPASS) FROM ky 289 TO US 68 ON THE
EAST SIDE OF CAMPBELLSVILLE.
(2022CCN) (2024CCR)
KY-3350,
PF-9999
Taylor 80257 PL
DN
RW SPP 3,450,000
UT SPP 1,800,000
CN
Project Cost:
5,250,000 0 0 0
T
otal for Taylor county PL
Total Amounts:
CN
UT
RW
DN 840,000
9,460,000 1,880,000
1,800,000 5,520,000
12,100,000 5,520,000 1,880,000 0
U
pgrade connection for new industrial site
on KY 848 (Haddensville Road).
(2024CCR)
KY-848Todd 170 PL
DN
RW
UT
CN SPP 5,220,000
Project Cost:
0 0 0 5,220,000
Page 176 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Todd county P L
Total Amounts:
CN
UT
RW
DN
5,220,000
0 0 0 5,220,000
A
DDRESS CONDITION OF I-024 FROM
MILEPOINT 64.472 TO MILEPOINT 69.83
I -24Trigg 22010 PL
DN NHPM 1,200,000
RW
UT
CN NHPM 12,000,000
Project Cost: 0 0 0 13,200,000
A
DDRESS SAFETY CONCERNS ON
GLENWOOD RD (CR-1005) FROM KY 272
TO US 68/80 FROM MP 0.0 TO MP 2.1
(2024CCN)
CR-1005Trigg 80306 PL
DN
RW
UT
CN SPP 7,000,000
Project Cost:
7,000,000 0 0 0
A
DDRESS SAFETY CONCERNS ON KINGS
CHAPEL RD (CR-1004) FROM KY 272 TO
US 68/80 FROM MP 0.0 TO MP 3.7
(2024CCN)
CR-1014Trigg 80307 PL
DN
RW SPP 2,000,000
UT SPP 1,500,000
CN SPP 10,000,000
Project Cost:
3,500,000 10,000,000 0 0
T
otal for Trigg county PL
Total Amounts:
CN
UT
RW
DN 1,200,000
2,000,000
1,500,000
7,000,000 10,000,000 12,000,000
10,500,000 10,000,000 0 13,200,000
Page 177 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY ISSUES AND ACCESS
A
T THE INTERSECTION OF
US-421/KY-1226 AT MP 11.5. (12CCR)
(2020CCR) (2024CCR)
US-421Trimble 905 PL
DN
RW
UT
CN SPP 1,250,000
Project Cost:
1,250,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
JOYCE MILLS RD OVER TRIB TO CORN
CREEK (112C00034N)
CR-1301Trimble 10164 PL
DN BRZ 107,000
RW
UT
CN BRZ 711,000
Project Cost:
0 0 0 818,000
IMPROVE SAFETY, TRUCK MOBILITY,
A
ND ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 36 FROM US 421 TO 250 FEET
EAST OF SCHOOL HOLLOW ROAD IN
MILTON. (2024CCN)
KY-36T rimble 80309 PL
DN
RW SPP 1,000,000
UT SPP 250,000
CN SPP 1,875,000
Project Cost: 1,250,000 1,875,000 0 0
C
ONSTRUCT PEDESTRIAN FACILITIES
ALONG US 421 FROM CUTSHAW LANE
TO TRIMBLE COUNTY HIGH SCHOOL/KY
625 AND ALONG KY 625 TO BEDFORD
ELEMENTARY SCHOOL (TOTAL 0.983 MI.)
US-421Trimble 80337 PL
DN
RW
UT
CN SPP 1,440,000
Project Cost:
1,440,000 0 0 0
T
otal for Trimble county PL
Total Amounts:
CN
UT
RW
DN 107,000
1,000,000
250,000
2,690,000 1,875,000 711,000
3,940,000 1,875,000 0 818,000
Page 178 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y-56 OVER OHIO RIVER AT
SHAWNEETOW (113B00045N)
KY-56Union 10177 PL
DN BRX 150,000
RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
A
ddress safety and service concerns of
US-60 from the KY-950 to KY-492.
(2022CCN)
US-60Union 80202 PL
DN
RW
UT
CN SPP 10,000,000
Project Cost:
0 10,000,000 0 0
A
ddress the service, safety and condition
of KY 56 from Morganfield to KY 141.
(2022CCN) (2024CCR)
KY-56Union 80203 PL
DN
RW
UT
CN SPP 20,237,000
Project Cost:
0 20,237,000 0 0
R
econstruct US 60 from Waverly to
Corydon (2024CCN)
US-60Union 80314 PL
DN
RW
UT SPP 2,000,000
CN SPP 7,000,000
Project Cost: 2,000,000 7,000,000 0 0
R
econstruct US 60 from the Morganfield
Bypass to Waverly. (2024CCN)
US-60Union 80315 PL
DN
RW SPP 3,500,000
UT SPP 3,000,000
CN SPP 12,500,000
Project Cost: 6,500,000 0 12,500,000 0
Page 179 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Union county P L
Total Amounts:
CN
UT
RW
DN 150,000
3,500,000
5,000,000
1,000,000 37,237,000 12,500,000
9,650,000 37,237,000 12,500,000 0
C
OMPLETE I65/US68 (GLASGOW
ROAD)DIAMOND INTERCHANGE BY
ADDING NORTHBOUND ON-RAMP AND
SOUTHBOUND OFF-RAMP. (2024CCR)
I -65Warren 20 PL
DN
RW
UT
CN SPP 9,100,000
Project Cost:
9,100,000 0 0 0
R
ECONSTRUCT KY 622 (PLANO RD) TO
ELIMINATE TWO RIGHT-ANGLE CURVES.
(2022CCR) (2024CCR)
KY-622Warren 182 PL
DN
RW
UT
CN SPP 5,200,000
Project Cost:
5,200,000 0 0 0
M
AJOR WIDENING/RECONSTRUCTION OF
CEMETERY ROAD (KY-234) FROM
FOUNTAIN TRACE TO ROGER PORTER
ROAD (MP 7.878 TO MP 9.625).(14CCN)
(2020CCN) (2022CCR) (2024CCR)
KY-234Warren 8854 PL
DN
RW
UT
CN SPP 6,380,000
Project Cost:
6,380,000 0 0 0
B
RIDGE PROJECT IN WARREN COUNTY
ON (114B00003N) KY-185 AT BARREN
RIVER
KY-185Warren 10049 PL
DN BRX 1,448,144
RW
UT
CN BRX 9,654,291
Project Cost:
0 0 11,102,435 0
Page 180 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN WARREN COUNTY
O
N (114B00076N) KY-880 AT JENNINGS
CREEK
US-68Warren 10051 PL
DN BRX 92,466
RW
UT
CN BRX 924,665
Project Cost: 1,017,131 0 0 0
B
RIDGE PROJECT IN WARREN COUNTY
ON (114B00095N) I-65 AT BARREN RIVER
I -65Warren 10052 PL
DN BRO 2,785,992
RW
UT
CN BRO 18,573,282
Project Cost: 0 0 21,359,274 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 0.521 TO MILEPOINT 7.121
I -165Warren 22132 PL
DN STP5 500,000
RW
UT
CN STP5 5,017,600
Project Cost: 5,517,600 0 0 0
S
AFETY IMPROVEMENTS AND
REHABILITATION ON KY-3225. KEEP
EXISTING FOOTPRINT BY REPLACING
CURBLINE IN SAME LOCATION FROM MP
0 TO MP 1(18CCN) (2022CCR)
KY-3225Warren 80051 PL
DN
RW
UT
CN SPP 1,460,000
Project Cost:
1,460,000 0 0 0
R
educe congestion and increase safety
on Cave Mill Road/Dishman Lane from the
end of the three-lane section near
Raintree Drive (MP 0.570) just east of
Grider Pond Road. (2022CCN) (2024CCR)
CR-1704,
CS-1432,
CS-2281
Warren 80201 PL
DN
RW
UT
CN SPP 12,400,000
Project Cost:
0 12,400,000 0 0
Page 181 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
MINOR WIDENING OF CS-1344/CR1235
(
SMALLHOUSE RD) FROM ELROD RD TO
US 231 (CAMPBELL LANE). SCOPE
INCLUDES PEDESTRIAN AND BICYCLE
ACCOMMODATIONS, INTERSECTION
CS-1334Warren 80301 PL
DN
RW
UT SPP 6,200,000
CN SPP 9,920,000
Project Cost:
6,200,000 9,920,000 0 0
I
MPROVE SAFETY AND MOBILITY ON US
31W FROM FREEPORT ROAD TO KY 101.
(2024CCN)
US-31Warren 80302 PL
DN
RW SPP 7,150,000
UT SPP 7,440,000
CN SPP 23,560,000
Project Cost:
14,590,000 0 23,560,000 0
I
MPROVE SAFETY AND MOBILITY ON KY
101 BETWEEN THE ALLEN COUNTY LINE
AND I 65. (2024CCN)
KY-101Warren 80304 PL
DN
RW
UT SPP 2,480,000
CN SPP 9,920,000
Project Cost:
2,480,000 9,920,000 0 0
I
MPROVE SAFETY AND MOBILITY ON KY
622 FROM I 165 TO US 231. (2024CCN)
KY-622Warren 80305 PL
DN
RW SPP 2,600,000
UT SPP 3,720,000
CN SPP 6,820,000
Project Cost: 6,320,000 0 6,820,000 0
I
MPROVE SAFETY AND MOBILITY ON US
31W FROM KY 3225 TO KY 957,
INCLUDING THE RECONSTRUCTION OF
THE INTERCHANGE WITH KY 446.
(2024CCN)
US-31Warren 80307 PL
DN
RW NH 6,500,000
UT NH 7,440,000
CN NH 14,880,000
Project Cost:
0 13,940,000 0 14,880,000
Page 182 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT DUAL-LANE ROUNDABOUT
A
T BROADWAY AVE AND US 31W
BYPASS. (2024CCN)
US-31Warren 80311 PL
DN
RW STP1 10,000,000
UT STP1 5,000,000
CN STP1 5,000,000
Project Cost: 0 10,000,000 5,000,000 5,000,000
M
ODERNIZE US 68 BETWEEN VICTORIA
STREET AND CLAY STREET. (2024CCN)
US-68Warren 80320 PL
DN
RW SPP 330,000
UT SPP 1,240,000
CN SPP 1,860,000
Project Cost: 1,570,000 1,860,000 0 0
I
MPROVE SAFETY AND MOBILITY ON KY
234 AT I 65, INCLUDING THE
RECONSTRUCTION OF THE
INTERCHANGE. (2024CCN)
I -65Warren 80322 PL
DN
RW NH 330,000
UT NH 310,000
CN NH 3,720,000
Project Cost:
640,000 3,720,000 0 0
M
AJOR WIDENING OF 68X
(RUSSELLVILLE RD) INCLUDING
CONSTRUCTION OF ROUNDABOUTS AT
INTERSECTIONS WITH MORGANTOWN RD
AND UNIVERSITY BLVD. SCOPE
US-68Warren 80327 PL
DN
RW
UT SPP 5,800,000
CN SPP 11,160,000
Project Cost:
5,800,000 11,160,000 0 0
C
ONSTRUCT NEW INTERCHANGE ON
I-165 (NATCHER EXPRESSWAY) AT
ELROD ROAD. INCLUDES NEW
CONSTRUCTION FOR SEGMENTS OF
ELROD ROAD AND MINOR WIDENING OF
CR-1240Warren 80328 PL
DN
RW SPP 11,900,000
UT SPP 10,620,000
CN SPP 31,580,000
Project Cost:
22,520,000 0 31,580,000 0
Page 183 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Warren county P L
Total Amounts:
CN
UT
RW
DN 592,466 4,234,136
22,310,000 16,500,000
37,810,000 7,440,000 5,000,000
28,082,265 48,980,000 90,187,573 19,880,000
88,794,731 72,920,000 99,421,709 19,880,000
A
DDRESS SAFETY, MOBILITY, AND
GEOMETRIC ISSUES ALONG US 150 IN
WASHINGTON COUNTY FROM 0.7 MILES
EAST OF GRUNDY HOME ROAD
(MILEPOINT 2.50) TO US 150X (MP 6.557)
US-150Washington 396.3000 PL
DN
RW
UT
CN STPF 6,520,000 10,000,000
Project Cost:
0 6,520,000 10,000,000 0
A
DDRESS CONDITION OF US-150 FROM
MILEPOINT 7.6 TO MILEPOINT 7.9
US-150Washington 20043 PL
DN STP4 60,000
RW
UT
CN STP4 690,000
Project Cost: 0 750,000 0 0
A
ddress geometric deficiencies along KY
152 from US 150 (MP 8.815) to MP. 9.9 .
(2024CCN)
KY-152Washington 80352 PL
DN SPP 1,400,000
RW SPP 940,000
UT SPP 2,170,000
CN
Project Cost:
1,400,000 0 3,110,000 0
T
otal for Washington county PL
Total Amounts:
CN
UT
RW
DN 1,400,000 60,000
940,000
2,170,000
7,210,000 10,000,000
1,400,000 7,270,000 13,110,000 0
Page 184 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN WAYNE COUNTY ON
(
116C00042N) EAST RALEIGH CREEK AT
RALEIGH CREEK
CR-1006Wayne 10073 PL
DN BRZ 113,769
RW
UT
CN BRZ 758,460
Project Cost: 0 0 872,229 0
A
DDRESS CONDITION OF KY-90 FROM
MILEPOINT 12.29 TO MILEPOINT 12.872
KY-90Wayne 20022 PL
DN STP5 240,000
RW
UT
CN STP5 2,760,000
Project Cost: 0 0 0 3,000,000
A
DDRESS CONDITION OF KY-90 FROM
MILEPOINT 12.9 TO MILEPOINT 17.7
KY-90Wayne 22374 PL
DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 0 0 4,000,000 0
R
EDUCE CONGESTION AND IMPROVES
SAFETY, CAPACITY AND MOBILITY OF
KY 90 BETWEEN KY 90X/KY 1275 AND
KY 3106 (2020CCN) (2022CCR)
(2024CCR)
KY-90Wayne 80105 PL
DN
RW
UT
CN SPP 17,500,000
Project Cost:
17,500,000 0 0 0
I
mprove safety and mobility along KY 1765
between KY 1275 and end of state
maintenance near Conley Bottom boat
dock. (2024CCN)
KY-1765Wayne 80308 PL
DN
RW
UT SPP 2,020,000
CN SPP 10,210,000
Project Cost:
2,020,000 10,210,000 0 0
Page 185 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE VERTICAL GEOMETRICS
A
LONG KY 92 NEAR KY 789 TO IMPROVE
SIGHT DISTANCE. ADD TURNING LANES
AND MINOR WIDENING FROM ALONG KY
92 FROM 789 TO KY 90. (2024CCN)
KY-92Wayne 80314 PL
DN
RW
UT SPP 2,020,000
CN SPP 19,720,000
Project Cost:
2,020,000 19,720,000 0 0
T
otal for Wayne county PL
Total Amounts:
CN
UT
RW
DN 433,769 240,000
4,040,000
17,500,000 29,930,000 4,438,460 2,760,000
21,540,000 29,930,000 4,872,229 3,000,000
R
ECONSTRUCT BETWEEN KY 120 AND
RR BRIDGE AT SLAUGHTERS TO
ALLEVIATE FLOODING. (12CCR)(18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-138Webster 228 PL
DN
RW
UT
CN SPP 1,580,000
Project Cost:
1,580,000 0 0 0
B
RIDGE PROJECT IN WEBSTER COUNTY
ON (117B00038N) KY-132 AT UNNAMED
STREAM
KY-132Webster 10138 PL
DN
RW BRX 10,000
UT BRX 10,000
CN BRX 1,190,000
Project Cost:
0 0 0 1,210,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-2836 OVER SLOVER CREEK
(117B00122N)
KY-2836Webster 10159 PL
DN BRZ 180,514
RW
UT
CN BRZ 1,203,429
Project Cost:
0 0 1,383,943 0
Page 186 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y-2839 OVER BR TO JACKSON DITCH
(117B00121N)
KY-2839Webster 10182 PL
DN FBP 212,990
RW
UT
CN FBP 1,419,934
Project Cost: 1,632,924 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 134.982 TO MILEPOINT 136.5
I -69Webster 20064 PL
DN NHPM 130,000
RW
UT
CN NHPM 1,307,504
Project Cost: 0 1,437,504 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 136.5 TO MILEPOINT 137.141
I -69Webster 22092 PL
DN NHPM 50,000
RW
UT
CN NHPM 554,500
Project Cost: 604,500 0 0 0
A
ddress service concerns of KY 630
from KY 132 in Dixon to the Hopkins
County Line (2024CCN)
KY-630Webster 80316 PL
DN
RW SPP 2,750,000
UT SPP 1,620,000
CN SPP 8,540,000
Project Cost:
4,370,000 0 8,540,000 0
T
otal for Webster county PL
Total Amounts:
CN
UT
RW
DN 262,990 130,000 180,514
2,750,000 10,000
1,620,000 10,000
3,554,434 1,307,504 9,743,429 1,190,000
8,187,424 1,437,504 9,923,943 1,210,000
Page 187 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 11.27 TO MILEPOINT 20.045
I -75Whitley 22107 PL
DN NHPM 2,400,000
RW
UT
CN NHPM 24,000,000
Project Cost: 26,400,000 0 0 0
I
MPROVE SAFETY AND MOBILITY ON US
25W (MILEPOINT 13.3 TO MILEPOINT 14.6)
INCLUDED IN THIS RECONSTRUCTION
WILL BE APPROXIMATELY 1.3 MILES OF
ROADWAY TO BE WIDENED/IMPROVED,
US-25Whitley 80107 PL
DN FBP 1,500,000
RW FBP 1,000,000
UT FBP 500,000
CN FBP 10,000,000
Project Cost:
0 13,000,000 0 0
W
iden existing South 2nd street to
improve geometric deficiencies along
route (2024CCN)
CS-1132Whitley 80308 PL
DN
RW
UT SPP 1,500,000
CN SPP 3,000,000
Project Cost:
1,500,000 3,000,000 0 0
W
iden I-75 from MP 19.2 in Whitley County
to MP 23.5 South of Corbin (2024CCN)
I -75Whitley 80353 PL
DN
RW NH 530,000
UT NH 500,000
CN NH 50,000,000
Project Cost: 0 1,030,000 0 50,000,000
W
iden I-75 from MP 14.4 in Whitley County
to MP 19.2 (2024CCN)
I -75Whitley 80354 PL
DN NH 2,500,000
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 2,500,000 1,000,000 0
Page 188 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Widen I-75 from MP 10.1 in Whitley county
t
o MP 14.4 (2024CCN)
I -75Whitley 80355 PL
DN
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 0 0 1,000,000
T
otal for Whitley county PL
Total Amounts:
CN
UT
RW
DN 2,400,000 4,000,000
1,530,000 500,000 500,000
1,500,000 1,000,000 500,000 500,000
24,000,000 13,000,000 50,000,000
27,900,000 19,530,000 1,000,000 51,000,000
M
inor widening to improve redundancy of
Regional travel. (2024CCR)
KY-15Wolfe 177 PL
DN
RW
UT
CN PROT 7,430,000
Project Cost: 7,430,000 0 0 0
T
otal for Wolfe county PL
Total Amounts:
CN
UT
RW
DN
7,430,000
7,430,000 0 0 0
R
ECONSTRUCT INTERSECTION AT US 62
(ROSE HILL AVE & TYRONE PK) AND KY
1964 (CLIFTON RD) IN VERSAILLES
(2022CCN)
US-62Woodford 80252 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
Page 189 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility on KY 341
b
eginning at I-64 to approximately 0.8
miles north. (2024CCN)
KY-341Woodford 80320 PL
DN
RW
UT
CN SPP 3,500,000
Project Cost: 3,500,000 0 0 0
S
afety improvements on US 60X from
Main Street to Maple Street in Versailles
(MP 0.940-1.234). (2024CCN)
US-60Woodford 80357 PL
DN
RW
UT
CN SPP 3,000,000
Project Cost:
0 3,000,000 0 0
T
otal for Woodford county PL
Total Amounts:
CN
UT
RW
DN
5,500,000 3,000,000
5,500,000 3,000,000 0 0
Page 190 of 191
2028-2 032 HIGHWAY PRECONSTRUCTION PROGRAM
Fund Summary
DescriptionFund F Y 2029 FY 2030 FY 2031 FY 2032 Total
APD APD 47,190,000 0 0 0 47,190,000
BRO BRO 69,838,397 73,532,900 73,789,468 75,665,468 292,826,233
BRO2 BRO2 83,705,000 80,949,000 80,949,000 80,949,000 326,552,000
BRX BRX 76,259,574 74,019,073 75,787,833 69,829,376 295,895,856
BRZ BRZ 33,522,722 19,197,211 18,630,456 18,589,734 89,940,123
CARB CARB 14,600,000 14,600,000 14,600,000 14,600,000 58,400,000
CM CM 8,100,000 8,100,000 8,100,000 8,100,000 32,400,000
FBP FBP 98,650,008 101,142,357 101,596,694 104,475,601 405,864,660
FBP2 FBP2 19,887,528 15,436,853 15,064,489 12,467,824 62,856,694
GAR GAR 38,600,000 38,600,000 38,600,000 38,600,000 154,400,000
NH NH 364,020,000 365,050,000 358,510,000 385,890,000 1,473,470,000
NHPM NHPM 163,111,637 162,101,412 161,492,049 156,822,232 643,527,330
PROT PROT 36,000,000 25,000,000 32,830,000 5,000,000 98,830,000
RRP RRP 3,140,000 4,220,000 4,220,000 4,220,000 15,800,000
SAF SAF 71,300,000 71,300,000 71,300,000 71,300,000 285,200,000
SAH SAH 1,800,000 1,800,000 1,800,000 1,800,000 7,200,000
SLO SLO 26,800,000 26,800,000 26,800,000 26,800,000 107,200,000
SLX SLX 7,800,000 7,800,000 7,800,000 7,800,000 31,200,000
SNK SNK 8,600,000 8,600,000 8,600,000 8,600,000 34,400,000
SPP SPP 2,035,141,000 2,066,900,000 2,524,743,000 2,458,420,000 9,085,204,000
STP1 STP1 29,441,200 28,310,000 31,110,000 24,980,000 113,841,200
STP2 STP2 47,690,000 47,410,000 47,468,000 48,480,000 191,048,000
STP3 STP3 7,721,221 12,027,854 9,500,000 0 29,249,075
STP4 STP4 10,245,290 16,304,627 13,707,000 7,511,514 47,768,431
STP5 STP5 30,377,600 20,200,000 25,225,000 32,400,000 108,202,600
STPF STPF 86,650,000 84,420,000 85,050,000 85,120,000 341,240,000
TAP TAP 12,300,000 12,300,000 12,300,000 12,300,000 49,200,000
Total Amount 3,432,491,177 3,386,121,287 3,849,572,989 3,760,720,749 14,428,906,202