Back to Kentucky

HJR75 • 2026

A JOINT RESOLUTION relating to road projects.

A JOINT RESOLUTION relating to road projects.

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
J. Petrie
Last action
2026-04-13
Official status
04/13/26: signed by Governor (Acts Ch. 144)
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

A JOINT RESOLUTION relating to road projects.

A JOINT RESOLUTION relating to road projects.

What This Bill Does

  • A JOINT RESOLUTION relating to road projects.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

SCS1

Senate Committee Substitute 1

Retain, delete, and add to original provisions; set out the last four years of the Six-Year Road Plan.

Plain English: 26 RS HJR 75/SCS 1 Page 1 of 270 HJR007540.100 - 1379 - 135577 - 9970v Senate Committee Substitute A JOINT RESOLUTION relating to road projects.

  • 26 RS HJR 75/SCS 1 Page 1 of 270 HJR007540.100 - 1379 - 135577 - 9970v Senate Committee Substitute A JOINT RESOLUTION relating to road projects.
  • 1 Be it resolved by the General Assembly of the Commonwealth of Kentucky: 2 Section 1.
  • Notwithstanding KRS 48.110, 48.300, and 176.430, this Joint 3 Resolution in conjunction with 2026 Regular Session HB 502 and 2026 Regular Session HJR 4 76 shall constitute the Six-Year Road Plan.
  • The last four years of the Six -Year Road Plan are 5 as follows: 6 2028-2 032 HIGHWAY PRECONSTRUCTION PLAN County FundPhaseDescriptionRouteItem No.

Bill History

  1. 2026-04-13 Kentucky Legislative Research Commission

    signed by Governor (Acts Ch. 144)

  2. 2026-04-01 Kentucky Legislative Research Commission

    reported favorably, to Rules with Committee Substitute (1) posted for passage in the Regular Orders of the Day for Wednesday, April 01 2026 3rd reading, adopted 38-0 with Committee Substitute (1) received in House to Rules (H) posted for passage for concurrence in Senate Committee Substitute (1) House concurred in Committee Substitute (1) adopted 91-0 enrolled, signed by Speaker of the House enrolled, signed by President of the Senate delivered to Governor

  3. 2026-03-24 Kentucky Legislative Research Commission

    taken from Transportation (S) 2nd reading returned to Transportation (S)

  4. 2026-03-20 Kentucky Legislative Research Commission

    taken from Transportation (S) 1st reading returned to Transportation (S)

  5. 2026-03-13 Kentucky Legislative Research Commission

    to Transportation (S)

  6. 2026-03-11 Kentucky Legislative Research Commission

    received in Senate to Committee on Committees (S)

  7. 2026-03-10 Kentucky Legislative Research Commission

    reported favorably, to Rules taken from Rules placed in the Orders of the Day 3rd reading, adopted 95-4

  8. 2026-03-05 Kentucky Legislative Research Commission

    taken from Appropriations & Revenue (H) 2nd reading returned to Appropriations & Revenue (H)

  9. 2026-03-04 Kentucky Legislative Research Commission

    taken from Committee on Committees (H) 1st reading returned to Committee on Committees (H) to Appropriations & Revenue (H)

  10. 2026-03-03 Kentucky Legislative Research Commission

    introduced in House to Committee on Committees (H)

Official Summary Text

A JOINT RESOLUTION relating to road projects.

Current Bill Text

Read the full stored bill text
26 RS HJR 75/EN
Page 1 of 1
HJR007520.100 - 1379 - 135654 - 10047 Engrossed
A JOINT RESOLUTION relating to road projects. 1
Be it resolved by the General Assembly of the Commonwealth of Kentucky: 2
Section 1. Notwithstanding KRS 48.110, 48.300, and 176.430, this Joint 3
Resolution in conjunction with 2026 Regular Session HB 502 and 2026 Regular Session HJR 4
76 shall constitute the Six-Year Road Plan. The last four years of the Six -Year Road Plan are 5
as follows: 6
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN ADAIR COUNTY ON
(
001B00013N) KY-80 AT RUSSELL
CREEK
KY-80Adair 10047 PL
DN BRX 354,203
RW
UT
CN BRX 2,361,352
Project Cost: 0 0 2,715,555 0
A
DDRESS CONDITION OF Louie B. Nunn
Cumberland Parkway FROM MILEPOINT
48.15 TO MILEPOINT 57.791
LN-9008Adair 22208 PL
DN NHPM 730,000
RW
UT
CN NHPM 7,329,876
Project Cost:
0 0 8,059,876 0
K
Y 55 NEW TURNING LANE AT BETTY'S
OK COUNTRY COOKING. (18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-55Adair 80003 PL
DN SPP 450,000
RW SPP 1,420,000
UT SPP 1,880,000
CN SPP 4,330,000
Project Cost:
450,000 1,420,000 1,880,000 4,330,000
I
MPROVE SAFETY AND MOBILITY ALONG
KY 55 NEAR DOC'S MARKET. (2022CCN)
(2024CCR)
KY-55Adair 80200 PL
DN SPP 400,000
RW SPP 1,260,000
UT SPP 1,730,000
CN SPP 4,040,000
Project Cost:
400,000 1,260,000 1,730,000 4,040,000
P
rovide access into Green River
Commerce Park along KY 55 to promote
economic growth in Adair County. (MP
16.6-16.75) (2024CCN)
KY-55Adair 80351 PL
DN SPP 200,000
RW SPP 790,000
UT SPP 8,100,000
CN SPP 1,570,000
Project Cost:
200,000 790,000 8,100,000 1,570,000
Page 2 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve mobility and congestion along KY
5
5 from US 127 in Russell County to the
Louis B. Nunn Cumberland KY 55/KY6177
in Adair County. (Russell MP 0.0 - 8.159;
Adair MP 0.0 - 9.68) (2024CCN)
KY-55Adair 80352 PL
DN SPP 7,560,000
RW SPP 16,700,000
UT SPP 11,230,000
CN SPP 104,930,000
Project Cost:
7,560,000 27,930,000 0 104,930,000
I
mprove horizontal and vertical geometrics
along KY 55 from 0.113 mile South of Tom
Andrews Rd to 0.107 mile North of Tom
Andrews Rd. (MP 8.631 to 8.85)
KY-55Adair 80411 PL
DN
RW
UT
CN SPP 1,320,000
Project Cost:
1,320,000 0 0 0
R
econstruction KY 61 from Columbia
Bypass (KY 55) to Green County Line.
See Alternate 4 Priority Section in
December 2002 scoping study. (MP
12.213 to 19.745)
KY-61Adair 80412 PL
DN
RW SPP 7,532,000
UT SPP 3,000,000
CN SPP 30,000,000
Project Cost:
0 7,532,000 3,000,000 30,000,000
T
he proposed roadway would help
alleviate traffic on existing KY 206,
KY3491, as well as traffic thru town on
KY 55X and KY80. Eastern Columbia
Bypass
PF-9999Adair 80413 PL
DN SPP 2,700,000
RW SPP 3,300,000
UT SPP 3,000,000
CN SPP 30,000,000
Project Cost:
2,700,000 3,300,000 3,000,000 30,000,000
T
otal for Adair county PL
Total Amounts:
CN
UT
RW
DN 11,310,000 1,084,203
31,002,000
11,230,000 17,710,000
1,320,000 9,691,228 174,870,000
12,630,000 42,232,000 28,485,431 174,870,000
Page 3 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDENING OF KY 100 (FRANKLIN ROAD)
TO
3 LANES WITH URBAN SECTION FROM
OLIVER STREET TO US 31E TO INCREASE
CAPACITY/SAFETY. MP 11.800-12.700
(14CCN)(18CCN) (2020CCR) (2024CCR)
KY-100Allen 8802 PL
DN
RW SPP 610,000
UT SPP 580,000
CN SPP 720,000
Project Cost:
1,190,000 720,000 0 0
B
RIDGE PROJECT IN ALLEN COUNTY ON
(002C00033N) PETROLEUM RD AT LITTLE
TRAMMEL CREEK
CR-1220Allen 10028 PL
DN FBP2 152,273
RW
UT
CN FBP2 1,015,151
Project Cost:
0 0 0 1,167,424
A
DDRESS CONDITION OF US-231 FROM
MILEPOINT 0 TO MILEPOINT 8.569
US-231,
US-31
Allen 20039 PL
DN STP5 880,000
RW
UT
CN STP5 10,120,000
Project Cost:
0 11,000,000 0 0
I
mprove safety on KY 101 from KY 234 to
the Warren County Line. (2022CCN)
(2024CCR)
KY-101Allen 80207 PL
DN
RW STP2 2,200,000
UT STP2 2,510,000
CN STP2 17,290,000
Project Cost:
4,710,000 17,290,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ALONG KY 100 (OLD
GALLATIN RD) FROM THE INTERSECTION
WITH WOODLAND CIRCLE DRIVE TO
JOHN KELLY DRIVE IN SCOTTSVILLE.
KY-100Allen 80308 PL
DN SPP 526,000
RW SPP 563,000
UT SPP 1,184,000
CN SPP 1,974,000
Project Cost:
526,000 563,000 1,184,000 1,974,000
Page 4 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCTION/NEW CONSTRUCTION
OF
TWO-LANE ROADWAY WITH
SHOULDERS AND WIDER BRIDGES.
(2024CCN)
KY-101Allen 80315 PL
DN SPP 9,120,000
RW SPP 10,546,000
UT SPP 7,184,000
CN SPP 90,785,000
Project Cost:
9,120,000 17,730,000 0 90,785,000
C
onstruct roundabout intersection at KY
100 and KY 3500 (Old Gallatin
Road/Franklin Road) (MP 13.05-13.15)
(2024CCN)
KY-100Allen 80353 PL
DN
RW SPP 250,000
UT SPP 500,000
CN SPP 1,300,000
Project Cost:
250,000 500,000 1,300,000 0
T
otal for Allen county PL
Total Amounts:
CN
UT
RW
DN 9,646,000 880,000 152,273
3,060,000 11,109,000
3,090,000 7,684,000 1,184,000
28,130,000 1,300,000 93,774,151
15,796,000 47,803,000 2,484,000 93,926,424
I
MPROVE KY 151 FROM US 127 AT
LAWRENCEBURG TO I-64 IN FRANKLIN
COUNTY. (2020CCN) (2024CCR)
KY-151Anderson 806 PL
DN
RW
UT SPP 420,000
CN SPP 1,800,000
Project Cost: 420,000 1,800,000 0 0
WIDENING WITH ACCESS IMPROVEMENTS
TO
ANDERSON CROSSING ON US62,
FROM 0.2MI W OF CORPORATE DR TO
US127B (LAWRENCEBURG BYPASS).
PRIORITY SECTION (2016BOP) (2024CCN)
US-62A nderson 8100.1000 PL
DN
RW
UT STP1 4,160,000
CN STP1 6,760,000
Project Cost: 0 4,160,000 6,760,000 0
Page 5 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON E
B
URGIN ROAD OVER LITTLE WILLOW
CREEK (003C00040N)
CR-1235A nderson 10069 PL
DN BRZ 129,798
RW
UT
CN BRZ 865,318
Project Cost: 995,116 0 0 0
I
MPROVE US-62 (VERSAILLES RD.) FROM
HILLTOP DR. TO WEST END OF BRIDGE
OVER KENTUCKY RIVER AT
TYRONE(18CCN) (2020CCR) (2022CCR)
(2024CCR)
US-62Anderson 80001 PL
DN
RW
UT
CN STP2 15,610,000
Project Cost:
15,610,000 0 0 0
I
mprove the intersection of US 127 at
Hawthorne Lane in Anderson County.
US-127Anderson 80406 PL
DN SPP 150,000
RW
UT
CN SPP 350,000
Project Cost: 500,000 0 0 0
I
mprove intersection on KY 44 to Scenic
Gardens Drive & Nautical Way in
Lawrenceburg.
KY-44Anderson 80407 PL
DN SPP 150,000
RW SPP 100,000
UT SPP 250,000
CN SPP 500,000
Project Cost:
150,000 100,000 250,000 500,000
T
otal for Anderson county PL
Total Amounts:
CN
UT
RW
DN 429,798
100,000
420,000 4,160,000 250,000
16,825,318 1,800,000 6,760,000 500,000
17,675,116 6,060,000 7,010,000 500,000
Page 6 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve US-60 from Humphrey Creek
b
ridge to 0.4 mi west of Hester Sullivan
Lane. (02CCR) (2020CCR) (2022CCR)
(2024CCR)
US-60Ballard 118 PL
DN
RW
UT
CN NH 9,500,000
Project Cost:
9,500,000 0 0 0
CONSTRUCT NEW STRUCTURE OVER THE
O
HIO RIVER AT CAIRO, ILLINOIS
(KENTUCKY'S SHARE)(004B00021N)
US-51B allard 1140 PL
DN BRO2 2,500,000
RW
UT BRO2 256,000
CN BRO2 80,949,000 80,949,000 80,949,000 80,949,000
Project Cost: 83,705,000 80,949,000 80,949,000 80,949,000
A
DDRESS CONDITION, SAFETY,
CONGESTION, AND FUTURE CAPACITY
ISSUES ON US-60 THROUGH THE CITY OF
LACENTER. (2024CCN)
US-60Ballard 80300 PL
DN
RW
UT NH 1,500,000
CN NH 27,840,000
Project Cost:
29,340,000 0 0 0
A
DDRESS CONDITION, SAFETY,
CONGESTION, AND FUTURE CAPACITY
FROM PROPOSED BARLOW EASTERN
BYPASS TO PROPOSED LACENTER
SOUTHERN BYPASS. (2024CCN)
US-60Ballard 80301 PL
DN NH 2,000,000
RW NH 2,500,000
UT NH 3,250,000
CN NH 12,000,000
Project Cost:
2,000,000 0 5,750,000 12,000,000
T
HE PURPOSE OF THIS PROJECT IS TO
PROVIDE ROADWAY INFRASTRUCTURE
TO SUPPORT COMMUNITY
GROWTH/DEVELOPMENT AND SAFE
ACCESS FOR FREIGHT TRAFFIC TO
US-51Ballard 80320 PL
DN
RW SPP 400,000
UT SPP 400,000
CN SPP 2,000,000
Project Cost:
800,000 0 2,000,000 0
Page 7 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION, SAFETY AND
C
ONGESTION ISSUES ON US 60
THROUGH THE CITY OF BARLOW.
(2024CCN)
US-60Ballard 80321 PL
DN NH 1,500,000
RW NH 2,500,000
UT NH 1,050,000
CN NH 8,400,000
Project Cost:
1,500,000 0 3,550,000 8,400,000
I
MPROVE GEOMETRIC DEFICIENCIES,
FREIGHT TRUCK MOBILITY, AND IMPROVE
SAFETY ON KY 286 FROM HERSHEL
JONES ROAD TO KY 473. (2024CCN)
KY-286Ballard 80322 PL
DN
RW SPP 3,700,000
UT SPP 500,000
CN SPP 2,000,000
Project Cost:
4,200,000 2,000,000 0 0
I
mprove safety, truck, and future traffic
operations on US 60 from Shawnee Creek
to Ballard Elementary School. (MP 5.87 to
9.751)
US-60Ballard 80413 PL
DN SPP 1,000,000
RW SPP 1,500,000
UT SPP 500,000
CN SPP 4,800,000
Project Cost:
1,000,000 1,500,000 500,000 4,800,000
M
inor widening of KY 286 from KY 473 to
Bethel Church Road to improve safety,
truck mobility, and geometrics (MP 11.108
to 11.956)
KY-286Ballard 80414 PL
DN SPP 400,000
RW SPP 300,000
UT SPP 225,000
CN SPP 1,500,000
Project Cost:
400,000 300,000 225,000 1,500,000
T
otal for Ballard county PL
Total Amounts:
CN
UT
RW
DN 7,400,000
4,100,000 1,800,000 5,000,000
2,656,000 5,025,000
118,289,000 82,949,000 82,949,000 107,649,000
132,445,000 84,749,000 92,974,000 107,649,000
Page 8 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN BARREN COUNTY
O
N (005B00046N) KY-740 AT BLUE
SPRINGS CREEK
KY-740Barren 10030 PL
DN BRX 223,534
RW
UT
CN BRX 1,490,228
Project Cost: 0 0 0 1,713,762
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3179 OVER PETER CREEK
(005B00090N)
KY-3179Barren 10059 PL
DN BRZ 241,608
RW
UT
CN BRZ 1,610,719
Project Cost:
0 0 0 1,852,327
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 48 TO MILEPOINT 53.3 (53.2
CARDINAL)
I -65Barren 22061 PL
DN NHPM 760,000
RW
UT
CN NHPM 7,643,500
Project Cost:
0 0 8,403,500 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 53.2 (53.3 NON-CARDINAL) TO
MILEPOINT 53.956
I -65Barren 22063 PL
DN NHPM 130,000
RW
UT
CN NHPM 1,300,000
Project Cost:
1,430,000 0 0 0
N
EW INTERCHANGE ON THE LOUIE NUNN
CUMBERLAND PARKWAY AT KY
(CONTINGENT ON ECONOMIC
DEVELOPMENT PROJECTS)-249 IN
GLASGOW(18CCN) (2022CCR)
LN-9008Barren 80002 PL
DN SPP 2,030,000
RW SPP 3,020,000
UT SPP 1,060,000
CN SPP 23,390,000
Project Cost:
2,030,000 4,080,000 23,390,000 0
Page 9 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION AND INCREASE
M
OBILITY ON US 31E FROM ABERDEEN
DRIVE TO TROJAN TRAIL, INCLUDING
RECONSTRUCTION OF THE INTERCHANGE
WITH LN 9008. (2024CCN)
LN-9008B arren 80300 PL
DN
RW SPP 330,000
UT SPP 1,860,000
CN SPP 14,800,000 10,000,000
Project Cost: 330,000 1,860,000 14,800,000 10,000,000
I
MPROVE SAFETY AND MOBILITY ON
US-31E IN THE HAYWOOD AREA.
(2024CCN)
US-31Barren 80319 PL
DN NH 620,000
RW NH 650,000
UT NH 620,000
CN NH 4,960,000
Project Cost: 620,000 650,000 620,000 4,960,000
A
ddition of southbound left turn lane and
northbound right turn lane at new
Southern States facility on KY 3600 (MP
1.95). (2024CCN)
KY-3600Barren 80352 PL
DN
RW
UT
CN SPP 190,000
Project Cost:
190,000 0 0 0
T
otal for Barren county PL
Total Amounts:
CN
UT
RW
DN 2,780,000 760,000 465,142
330,000 3,670,000
2,920,000 620,000
1,490,000 45,833,500 18,060,947
4,600,000 6,590,000 47,213,500 18,526,089
R
ECONSTRUCT KY-111 IN THE VICINITY
OF THE "S-CURVE" EAST OF
OWINGSVILLE (14CCR) (2022CCN)
(2024CCR)
KY-111Bath 193 PL
DN SPP 380,000
RW SPP 2,300,000
UT SPP 1,960,000
CN SPP 7,840,000
Project Cost:
380,000 2,300,000 1,960,000 7,840,000
Page 10 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT CURVE AT .8 MILE SOUTH
OF
KY-36 (08CCN)(12CCR) MILEPOINT
7.147 TO 7.247) (2022CCN)
KY-965Bath 8404 PL
DN SPP 270,000
RW SPP 580,000
UT SPP 350,000
CN SPP 3,100,000
Project Cost: 270,000 930,000 3,100,000 0
C
ORRECT HORIZONTAL AND WIDTH
DEFICIENCIES ON KY 36 FROM "OLD KY
11" MP 1.004 TO KY 1325 (MP 6.97) TO
IMPROVE SAFETY AND OPERATIONAL
EFFICIENCY OF ROADWAY (14CCN)
KY-36Bath 8814 PL SPP 400,000
DN SPP 3,640,000
RW SPP 5,750,000
UT SPP 3,920,000
CN SPP 81,200,000
Project Cost:
4,040,000 0 9,670,000 81,200,000
B
RIDGE PROJECT IN BATH COUNTY ON
(006B00015N) US-60 AT LICKING RIVER
US-60Bath 10069 PL
DN BRX 1,346,018
RW
UT
CN
Project Cost: 0 0 0 1,346,018
IMPROVE SAFETY ON KY 36 FROM THE
I
NTERSECTION WITH I-64 TO THE
INTERSECTION OF KY 965 INCLUDING THE
CURVES KNOWN AS CLEAR CREEK
FURNACE AND THOMAS HILL (2020CCN)
KY-36B ath 80101 PL
DN
RW
UT SPP 2,430,000
CN SPP 6,000,000 6,000,000
Project Cost: 8,430,000 6,000,000 0 0
I
MPROVE SAFETY AND OPERATIONAL
EFFICIENCY ON KY 36 FROM NORTH OF
MARIELLA DR TO THE INTERSECTION OF
OLD KY 36 (2020 CCN) (2022CCN)
(2024CCR)
KY-36Bath 80102 PL
DN SPP 720,000
RW SPP 1,300,000
UT SPP 1,860,000
CN SPP 6,600,000
Project Cost:
720,000 1,300,000 1,860,000 6,600,000
Page 11 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REALIGN ROADWAY ON US 60 NEAR
O
WINGSVILLE BEGINNING IN THE
VICINITY OF ROSE BUSH LN AND ENDING
AT WELLS ROAD NEAR I 64 EXIT 123
(2022CCN) (2024CCR)
US-60Bath 80250 PL
DN
RW SPP 1,820,000
UT SPP 1,300,000
CN SPP 11,600,000
Project Cost:
3,120,000 11,600,000 0 0
I
mprove safety and mobility on KY 36 from
0.1 miles south of Suiter Branch Rd. to the
intersection with US 460 (MP 6.136).
KY-36Bath 80406 PL
DN SPP 2,000,000
RW SPP 3,250,000
UT SPP 6,500,000
CN SPP 16,500,000
Project Cost:
2,000,000 3,250,000 6,500,000 16,500,000
T
otal for Bath county PL
Total Amounts:
CN
UT
RW
DN
400,000
7,010,000 1,346,018
1,820,000 7,430,000 5,750,000
3,730,000 350,000 14,240,000
6,000,000 17,600,000 3,100,000 112,140,000
18,960,000 25,380,000 23,090,000 113,486,018
E
NHANCING CUMBERLAND AVENUE
FROM US 25E TO 18TH STREET WITH
STREET IMPROVEMENTS FOR VEHICLE
AND PEDESTRIANS, AS WELL AS STORM
WATER MANAGEMENT TO IMPROVE
KY-74Bell 167 PL
DN
RW
UT SPP 3,860,000
CN SPP 17,580,000
Project Cost:
21,440,000 0 0 0
P
ROVIDE PASSING OPPORTUNITIES ON
US 119 IN THE VICINITY OF MP 4.5 IN
BELL COUNTY. (12CCN)(14CCR)
(2020CCN) (2024CCR)
US-119Bell 8702 PL
DN
RW SPP 1,240,000
UT SPP 610,000
CN SPP 5,600,000
Project Cost:
1,850,000 5,600,000 0 0
Page 12 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN BELL COUNTY ON
(
007C00072N) 17TH STREET AT YELLOW
CREEK
CS-2222Bell 10101 PL
DN BRZ 90,720
RW
UT
CN BRZ 604,802
Project Cost: 695,522 0 0 0
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00007N) KY-66 AT SIMS FORK
KY-66Bell 10167 PL
DN FBP2 250,108
RW
UT
CN FBP2 1,667,385
Project Cost: 0 0 0 1,917,493
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00024L) US-25E-10 AT YELLOW
CREEK
US-25Bell 10169 PL
DN BRO 805,362
RW
UT
CN
Project Cost:
0 0 0 805,362
B
RIDGE PROJECT IN BELL COUNTY ON
(007B00051N) KY-1534 AT WILLIAMS
BRANCH
KY-1534Bell 10170 PL
DN BRX 97,566
RW
UT
CN BRX 650,440
Project Cost:
0 0 748,006 0
I
mprove mobility by constructing a 2+1
road on US 119 in Bell County by adding a
continuous third lane that serves as an
alternate passing lane (MP 3.5 - 9.3).
(2024CCN)
US-119Bell 80300 PL
DN
RW NH 2,400,000
UT NH 2,320,000
CN NH 30,000,000
Project Cost:
0 2,400,000 2,320,000 30,000,000
Page 13 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Corridor study of US25E through Bell &
K
nox to determine locations for the
installation of RCUTs (approximately 43
miles of roadway).
US-25Bell 80400 PL SPP 350,000
DN
RW
UT
CN
Project Cost:
350,000 0 0 0
I
mprove safety and reduce congestion on
US 25E from KY 74 to KY 441 (MP 1.70 to
2.80)
US-25Bell 80419 PL
DN SPP 750,000
RW SPP 1,000,000
UT SPP 1,000,000
CN SPP 12,000,000
Project Cost:
2,750,000 12,000,000 0 0
I
mprovement of existing KY 441/KY 2402
intersection (MP 4.25)
KY-441Bell 80420 PL
DN SPP 500,000
RW SPP 500,000
UT SPP 300,000
CN SPP 4,000,000
Project Cost: 1,000,000 300,000 4,000,000 0
T
otal for Bell county PL
Total Amounts:
CN
UT
RW
DN
350,000
1,340,720 97,566 1,055,470
2,740,000 2,400,000
5,470,000 300,000 2,320,000
18,184,802 17,600,000 4,650,440 31,667,385
28,085,522 20,300,000 7,068,006 32,722,855
I
MPROVE SAFETY, MOBILITY,
OPERATIONS, AND GEOMETRICS AT THE
JUNCTION OF I-75 AND I-275 AND THE
SYSTEM-TO-SYSTEM RAMPS. (2024CCR)
I -75Boone 79 PL
DN
RW NH 20,000,000
UT NH 10,000,000
CN NH 260,000,000
Project Cost:
30,000,000 0 0 260,000,000
Page 14 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION AND IMPROVE
T
RAFFIC MOBILITY AT THE INTERCHANGE
OF I-75 AND KY-14 IN WALTON.
(2020CCR) (2022CCR) (2024CCR)
I -75Boone 80 PL
DN
RW NH 10,000,000
UT NH 1,680,000
CN NH 36,000,000
Project Cost:
11,680,000 36,000,000 0 0
C
ONDUCT PLANNING STUDY TO
EVALUATE OPTIONS FOR
RECONSTRUCTING KY 338 (RICHWOOD
ROAD) FROM TRIPLE CROWN BLVD TO
US 42.
KY-338Boone 113 PL SPP 500,000
DN
RW
UT
CN
Project Cost:
500,000 0 0 0
P
rovide East-West Connectivity and
Improve Mobility From KY 237 to KY 842.
(2024BOP)
US-42Boone 446.1000 PL
DN
RW SPP 15,750,000
UT SPP 1,800,000
CN
Project Cost:
15,750,000 1,800,000 0 0
P
rovide East-West Connectivity and
Improve Mobility from KY 842 to Mall Road.
(2024BOP)
US-42Boone 446.2000 PL
DN
RW SPP 36,750,000
UT SPP 3,600,000
CN
Project Cost:
36,750,000 3,600,000 0 0
R
econstruct US 25 from Winning Colors
Drive to Melinda Lane. (2024BOP)
US-25Boone 447.1000 PL
DN
RW SPP 10,500,000
UT SPP 4,160,000
CN SPP 20,880,000
Project Cost: 14,660,000 20,880,000 0 0
Page 15 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct US 25 from Melinda Lane to
R
R Spur Crossing. (2024BOP)
US-25Boone 447.2000 PL
DN
RW SPP 15,750,000
UT SPP 6,240,000
CN SPP 25,520,000
Project Cost: 15,750,000 6,240,000 25,520,000 0
D
EDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR NKY URBANIZED
AREA AND SUBJECT TO MPO CONTROL
FOR FY 2026 THROUGH FY 2032.
(FUNDING SUBJECT TO FISCAL
CO-0Boone 966.0800 PL
DN
RW
UT
CN SNK 8,600,000 8,600,000 8,600,000 8,600,000
Project Cost:
8,600,000 8,600,000 8,600,000 8,600,000
I
-275/KY-212 INTERCHANGE AND KY-20
RECONSTRUCTION NEAR GREATER
CINCINNATI AIRPORT. (2004BOPC)(KYTC
SHARE @ 46.6%) (2024CCN)
I -275Boone 8000.2000 PL
DN SPP 6,990,000
RW SPP 16,780,000
UT SPP 5,250,000
CN SPP 54,920,000
Project Cost:
6,990,000 16,780,000 5,250,000 54,920,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 OVER OHIO RIVER (008B00052N)
I -275Boone 10028 PL
DN FBP 2,500,000
RW
UT
CN FBP 25,000,000
Project Cost: 0 27,500,000 0 0
A
DDRESS CONDITION OF I-275 FROM
MILEPOINT 7.25 TO MILEPOINT 13.076
I -275Boone 20007 PL
DN NHPM 1,230,000
RW
UT
CN NHPM 12,279,090
Project Cost: 0 0 13,509,090 0
Page 16 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 178.024 TO MILEPOINT
183.094 (182.816 NON-CARDINAL)
I -75Boone 20063 PL
DN NHPM 960,000
RW
UT
CN NHPM 9,606,432
Project Cost: 0 0 0 10,566,432
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 182.816 (183.094 CARDINAL)
TO MILEPOINT 183.312
I -75Boone 22128 PL
DN NHPM 750,000
RW
UT
CN NHPM 7,450,000
Project Cost:
0 8,200,000 0 0
R
ECONSTRUCT GUNPOWDER RD. FROM
US-42 TO KY-536. (18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-237Boone 80000 PL
DN
RW SPP 19,800,000
UT SPP 4,320,000
CN SPP 32,250,000
Project Cost:
19,800,000 4,320,000 32,250,000 0
E
XPANSION OF ROUNDABOUTS ALONG
KY-237 AT CARDINAL COVE AND
GRAVES RD(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-237Boone 80001 PL
DN
RW SPP 2,880,000
UT SPP 1,570,000
CN SPP 5,040,000
Project Cost:
2,880,000 1,570,000 5,040,000 0
C
ONVERT TURFWAY RD AND
THOROUGHBRED BLVD FROM 2 WAY TO
ONE WAY AND CONSTRUCT NEW I-75
ACCESS (2020CCN) (2022CCR)
(2024CCR)
KY-1017,
KY-717
Boone 80100 PL
DN STPF 3,000,000
RW STPF 13,750,000
UT STPF 1,800,000
CN STPF 30,000,000
Project Cost:
3,000,000 13,750,000 1,800,000 30,000,000
Page 17 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONVERT KY 18 (BURLINGTON PIKE) TO
A
SUPER STREET (2020CCN) (2022CCR)
(2024CCR)
KY-18Boone 80101 PL
DN
RW
UT
CN NH 10,000,000
Project Cost: 10,000,000 0 0 0
R
econstruct KY 3060 (Frogtown Road)
from US 42 to US 25. (2022CCR)
(2024CCR)
KY-3060Boone 80102 PL
DN
RW SPP 16,680,000
UT SPP 4,710,000
CN SPP 26,680,000
Project Cost:
16,680,000 4,710,000 26,680,000 0
R
econstruct Turfway Road (KY 717)
from Aero Parkway (MP 0.0) to Donaldson
Road (MP 1.67). (2020CCN) (2022CCR)
(2024CCR)
KY-717Boone 80150 PL
DN
RW
UT
CN STPF 7,000,000
Project Cost:
7,000,000 0 0 0
C
onduct a planning study to evaluate
potential improvement options to promote
economic growth through central Boone
County as well as improving safety and
modernizing existing roadways
KY-536,
US-42
Boone 80202 PL SPP 810,000
DN
RW
UT
CN
Project Cost:
810,000 0 0 0
P
LANNING STUDY TO IMPROVE EXISTING
ALIGNMENTS AND NEW CONSTRUCTION
BETWEEN KY 536 (HATHAWAY ROAD)
AND KY 14 (VERONA MUDLICK ROAD)
(2022CCN) (2024CCR)
KY-536,
US-42
Boone 80204 PL SPP 840,000
DN
RW
UT
CN
Project Cost:
840,000 0 0 0
Page 18 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and address geometric
d
eficiencies along KY 18 from Caroline
Williams Way to KY 338; include
multi-modes. (2022CCN) (2024CCR)
KY-18Boone 80206 PL
DN SPP 1,040,000
RW SPP 2,932,500
UT SPP 985,600
CN SPP 9,600,000
Project Cost:
1,040,000 2,932,500 985,600 9,600,000
I
mprove safety & mobility, reduce
congestion and address geometric
deficiencies along Camp Ernst Road (CR
1001) from KY 237 (Pleasant Valley Rd) to
KY 536 (Hathaway Rd). (2022CCN)
CR-1001Boone 80207 PL
DN
RW STPF 10,000,000
UT STPF 2,800,000
CN STPF 34,720,000
Project Cost:
12,800,000 34,720,000 0 0
I
mprove safety & mobility, reduce
congestion and address geometric
deficiencies along Camp Ernst Road (CR
1001) from Long Branch Rd. to KY 237
(Pleasant Valley Rd.) (2022CCN)(See Item
CR-1001Boone 80208 PL
DN SPP 2,690,000
RW SPP 13,800,000
UT SPP 3,360,000
CN SPP 29,760,000
Project Cost:
2,690,000 17,160,000 0 29,760,000
I
mprove access to KY 237 for Litton Lane.
(2022CCN) (2024CCR)
KY-237Boone 80209 PL
DN
RW SPP 7,350,000
UT SPP 520,000
CN SPP 6,050,000
Project Cost: 7,350,000 520,000 6,050,000 0
P
aired Grade-Separated Intersections
along KY 18 at KY 842 and Mall Road.
(2022CCN) (2024CCR)
KY-18Boone 80210 PL
DN SPP 4,992,000
RW SPP 14,662,500
UT SPP 3,942,400
CN SPP 33,040,000
Project Cost:
4,992,000 14,662,500 3,942,400 33,040,000
Page 19 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve capacity at the KY 18 (Burlington
P
ike) intersection with KY 1017 (Aero
Parkway) to support existing and future
traffic volumes. Consider grade
separation design options. (2022CCN)
KY-18Boone 80211 PL
DN SPP 1,860,000
RW SPP 19,500,000
UT SPP 1,000,000
CN SPP 24,800,000
Project Cost:
1,860,000 19,500,000 1,000,000 24,800,000
E
XPAND NORTHBOUND AND
SOUTHBOUND REST AREAS ON I-71/I-75
IN BOONE COUNTY TO ADD MORE TRUCK
PARKING. (2022CCN) (2024CCR)
I -75Boone 80257 PL
DN
RW
UT NH 450,000
CN NH 16,000,000
Project Cost:
450,000 16,000,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ALONG HICKS PIKE (CR
1151) FROM US 42 TO KY 338.
(2024CCN)
CR-1151Boone 80304 PL
DN STPF 5,160,000
RW STPF 15,600,000
UT STPF 3,410,000
CN STPF 37,200,000
Project Cost:
5,160,000 15,600,000 3,410,000 37,200,000
I
MPROVE SAFETY & MOBILITY, AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG US 25 (DIXIE HWY.) BETWEEN KY
16 (MARY GRUBBS HIGHWAY) AND KY
338 (RICHWOOD RD.) (2024CCN)
US-25Boone 80316 PL
DN STPF 4,320,000
RW STPF 6,000,000
UT STPF 3,480,000
CN STPF 46,800,000
Project Cost:
4,320,000 6,000,000 3,480,000 46,800,000
I
MPROVE SAFETY AND REDUCE
CONGESTION ON LIMABURG ROAD FROM
CONRAD LANE TO KY 18 (BURLINGTON
PIKE). (2024CCN)
CR-1042Boone 80317 PL
DN STPF 2,160,000
RW STPF 12,000,000
UT STPF 4,180,000
CN STPF 29,760,000
Project Cost:
2,160,000 12,000,000 4,180,000 29,760,000
Page 20 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY ALONG
K
Y 20 (PETERSBURG ROAD) FROM
GRAVES ROAD TO KY 237 (NORTH BEND
ROAD). (2024CCN)
KY-20Boone 80318 PL
DN SPP 4,380,000
RW SPP 15,840,000
UT SPP 3,370,000
CN SPP 38,440,000
Project Cost:
4,380,000 15,840,000 3,370,000 38,440,000
T
ransportation improvements adjoining KY
237 Central Parkway in Partnership with
Boone County (TID). (2024CCN)
KY-237Boone 80320 PL
DN
RW
UT
CN SPP 10,400,000
Project Cost:
10,400,000 0 0 0
I
mprove Steeplechase Elementary School
access and safety by extending Grand
National Blvd to Chambers Road.
(2024CCN)
KY-2951Boone 80350 PL
DN SPP 2,000,000
RW SPP 4,000,000
UT SPP 200,000
CN SPP 15,000,000
Project Cost:
2,000,000 4,200,000 15,000,000 0
A
dd additional exit lane on I-75
Southbound (MP 171 South) ramp and
align lights to provide 2 left turn lanes and I
right turn lane on HWY 14/16 Nart Grubbs
HWY. Ramp only work. (2024CCN)
I -75Boone 80352 PL
DN
RW
UT
CN NH 1,560,000
Project Cost:
1,560,000 0 0 0
R
econstruct Limaburg Road from KY 18 to
Gateway Blvd (CR 1086) (2024CCN)
CR-1042Boone 80356 PL
DN SPP 4,500,000
RW SPP 12,500,000
UT SPP 4,000,000
CN SPP 35,000,000
Project Cost: 4,500,000 16,500,000 35,000,000 0
Page 21 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 20 from the new KY 495
(
Graves Road) Interchange to KY 18
(MP14.6-16.7) (2024CCN)
KY-20Boone 80357 PL
DN SPP 4,500,000
RW SPP 25,500,000
UT SPP 6,000,000
CN SPP 46,000,000
Project Cost: 4,500,000 25,500,000 6,000,000 46,000,000
R
econstruct KY 536 from Camp Ernst
Road to Old Union Road (MP 8.0-10.8)
(2024CCN)
KY-536Boone 80358 PL
DN SPP 6,750,000
RW SPP 20,000,000
UT SPP 3,000,000
CN SPP 60,000,000
Project Cost:
6,750,000 20,000,000 3,000,000 60,000,000
I
mprove safety & mobility and address
geometric deficiencies along US 25 (Dixie
Hwy) between KY 16 and KY 338
(Richwood Rd) (MP 2.2-4.7) (2024CCN)
US-25Boone 80359 PL
DN SPP 4,000,000
RW SPP 10,000,000
UT SPP 3,000,000
CN SPP 39,000,000
Project Cost:
4,000,000 10,000,000 3,000,000 39,000,000
C
ONSTRUCT A NEW CONNECTION
BETWEEN KY 1292, BEAVER ROAD, TO
KY 2951, CHAMBERS ROAD, AND KY 16.
(2024CCN)
PF-9999Boone 80360 PL
DN SPP 6,000,000
RW SPP 30,000,000
UT SPP 5,000,000
CN SPP 85,000,000
Project Cost:
6,000,000 30,000,000 5,000,000 85,000,000
W
iden I-71 to six lanes in Boone County
between KY 14 and the I-75 interchange.
I-71Boone 80405 PL
DN NH 4,000,000
RW NH 5,000,000
UT NH 2,500,000
CN NH 165,000,000
Project Cost: 4,000,000 5,000,000 2,500,000 165,000,000
Page 22 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 14 (Verona Mudlick Rd)
f
rom I 71 to US 42.
KY-14Boone 80406 PL SPP 250,000
DN SPP 3,500,000
RW SPP 8,000,000
UT SPP 1,250,000
CN SPP 45,000,000
Project Cost: 3,750,000 8,000,000 1,250,000 45,000,000
"
Planning study to determine feasibility of
charging fees for using added capacity on
projects (ie a convenience lane) in
Kentucky and specifically reviewing the
addition of a convenience lane on
I-71Boone 80416 PL SPP 250,000
DN
RW
UT
CN
Project Cost:
250,000 0 0 0
T
otal for Boone county PL
Total Amounts:
CN
UT
RW
DN
2,650,000
71,842,000 3,250,000 1,230,000 960,000
165,460,000 245,865,000
19,090,000 30,320,000 48,168,000
37,560,000 148,650,000 166,419,090 1,052,526,432
296,602,000 428,085,000 215,817,090 1,053,486,432
Extend Stewart Street to Bellafato Street
i
n the City of Paris to provide improved
access to US 460.
CO-0Bourbon 474 PL
DN SPP 355,000
RW SPP 150,000
UT SPP 310,000
CN SPP 3,390,000
Project Cost: 355,000 150,000 310,000 3,390,000
B
RIDGE PROJECT IN BOURBON COUNTY
ON (009B00055N) KY-1879 AT LAYSONS
BRANCH
KY-1879Bourbon 10036 PL
DN BRX 149,023
RW
UT
CN BRX 993,485
Project Cost:
0 0 0 1,142,508
Page 23 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE US 460 FROM RUSSELL CAVE
R
D TO I 75 (2ND PART OF 7-8705)
(2020CCN)(SEE 7-8705.10) (2022CCR)
(2024CCR)
US-460Bourbon 80104 PL
DN
RW
UT
CN STP2 10,000,000
Project Cost:
10,000,000 0 0 0
I
MPROVE SAFETY OF CANE RIDGE ROAD
(KY 537) FROM THE INTERSECTION WITH
460 TO THE ENTRANCE PAST COLOR
POINT (2020CCN) (2022CCR)
KY-537Bourbon 80155 PL
DN SPP 3,240,000
RW
UT
CN
Project Cost:
3,240,000 0 0 0
I
mprove safety on KY 627 (Winchester
Rd) from Clark/Bourbon CL to US 68X
(High St). Breakout section including the
KY 57 (Austerlitz Rd) intersection and
continuing North for approx. 0.70 miles.
KY-627Bourbon 80321 PL
DN SPP 350,000
RW SPP 100,000
UT SPP 100,000
CN SPP 1,250,000
Project Cost:
350,000 100,000 100,000 1,250,000
M
odernize roadway, improving
congestion, safety on KY 1939
(Bethlehem Road) from Westridge Lane to
approx. 2,000 ft south of Cross Creek
Drive.
KY-1939Bourbon 80412 PL
DN SPP 1,100,000
RW SPP 3,600,000
UT SPP 2,300,000
CN SPP 6,200,000
Project Cost:
1,100,000 3,600,000 2,300,000 6,200,000
T
otal for Bourbon county PL
Total Amounts:
CN
UT
RW
DN 5,045,000 149,023
3,850,000
2,710,000
10,000,000 11,833,485
15,045,000 3,850,000 2,710,000 11,982,508
Page 24 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND DECREASE
C
ONGESTION ON KY 716 FROM MP 0.0
(US 60) TO MP 0.56 (KY 3293) (2020CCR)
(2024CCN)
KY-716Boyd 180 PL
DN SPP 520,000
RW SPP 280,000
UT SPP 1,080,000
CN SPP 2,800,000
Project Cost:
520,000 280,000 1,080,000 2,800,000
F
EDERAL 'STP' FUNDS DEDICATED TO
HUNTINGTON-ASHLAND MPO FOR FY
2022-2028. (FUNDING SUBJECT TO
FISCAL CONSTRAINT PENDING MPO TIP)
(2020CCR) (2022CCR) (2024CCR)
CO-0Boyd 208.0600 PL
DN
RW
UT
CN SAH 1,800,000 1,800,000 1,800,000 1,800,000
Project Cost:
1,800,000 1,800,000 1,800,000 1,800,000
B
RIDGE PROJECT IN BOYD COUNTY ON
(010B00058N) US-23S AT OHIO
RIVER,CSX,STREETS
US-23Boyd 10074 PL
DN BRO 1,800,000
RW
UT
CN BRO 18,000,000
Project Cost:
0 0 19,800,000 0
B
RIDGE PROJECT IN BOYD COUNTY ON
(010C00018N) STRAIGHT CRK AT
STRAIGHT CREEK
CR-1243Boyd 10075 PL
DN FBP2 213,974
RW
UT
CN FBP2 1,426,494
Project Cost:
0 0 1,640,468 0
A
DDRESS CONDITION OF US-60 FROM
MILEPOINT 4.135 TO MILEPOINT 9.638
US-60Boyd 20036 PL
DN STP5 480,000
RW
UT
CN STP5 5,520,000
Project Cost: 0 0 0 6,000,000
Page 25 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve the operational efficiency of
G
reenup Avenue (US-23) from the
southern split with Winchester Avenue
(US-23X) (MP 17.065) to the intersection
of 20th Street (MP 18.055). (2024CCN)
US-23Boyd 80301 PL
DN NH 560,000
RW NH 60,000
UT NH 60,000
CN NH 1,550,000
Project Cost:
560,000 60,000 60,000 1,550,000
I
mprove safety, mobility and accessibility
at the intersection of KY 168 and CS 2341
(Robert's Drive); located within close
proximity of an at grade CSX Railroad
Crossing (MP 6.7-6.8) (2024CCN)
KY-168Boyd 80350 PL
DN SPP 760,000
RW SPP 2,400,000
UT SPP 1,630,000
CN SPP 6,000,000
Project Cost:
760,000 2,400,000 1,630,000 6,000,000
I
mprove Commerce Drive (CR 1299),
including widening, improving geometrics
and drainage (2024CCN)
CR-1299Boyd 80351 PL
DN SPP 780,000
RW SPP 1,150,000
UT SPP 840,000
CN SPP 9,600,000
Project Cost:
780,000 1,150,000 840,000 9,600,000
C
onstruct a new bridge over the Little
Sandy River and construct a roadway
from the south side of Camp Landing.
Project to be complete through a
Memorandum of Agreement with Boyd
PF-9999Boyd 80353 PL
DN
RW SPP 600,000
UT SPP 1,000,000
CN SPP 10,000,000
Project Cost:
1,600,000 10,000,000 0 0
I
mprove pedestrian mobility and safety
along US-23 by constructing a pedestrian
sidewalk or shared-use-path with curb
and gutter from KY-5 in Boyd County to
Russell Plaza Drive in Greenup County.
US-23Boyd 80400 PL
DN SPP 250,000
RW SPP 250,000
UT SPP 400,000
CN SPP 2,500,000
Project Cost:
250,000 650,000 2,500,000 0
Page 26 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve operational efficiency of the US
6
0 (13th Street) and KY 168 (Blackburn
Ave) intersection
US-60Boyd 80402 PL
DN NH 800,000
RW NH 4,000,000
UT NH 2,500,000
CN NH 3,000,000
Project Cost: 800,000 4,000,000 2,500,000 3,000,000
I
mprove operational efficiency and reduce
congestion by constructing a right turn
lane on KY 5 approaching US 23 and a
TWLTL for turns to adjacent businesses.
KY-5Boyd 80403 PL
DN SPP 250,000
RW SPP 350,000
UT SPP 500,000
CN SPP 1,200,000
Project Cost:
250,000 350,000 500,000 1,200,000
I
mprove operation efficiency of the
intersection of US 23 (Greenup Avenue)
and US 23X (Winchester Avenue).
US-23Boyd 80404 PL
DN NH 850,000
RW NH 5,000,000
UT NH 1,500,000
CN NH 3,000,000
Project Cost:
850,000 6,500,000 3,000,000 0
I
mprove safety on KY 180 in the proximity
of the Shell/McDonalds.
KY-180Boyd 80408 PL
DN SPP 150,000
RW SPP 50,000
UT SPP 50,000
CN SPP 1,000,000
Project Cost: 150,000 50,000 50,000 1,000,000
T
otal for Boyd county PL
Total Amounts:
CN
UT
RW
DN 4,920,000 2,013,974 480,000
600,000 13,540,000
1,000,000 1,900,000 6,660,000
1,800,000 11,800,000 26,726,494 32,470,000
8,320,000 27,240,000 35,400,468 32,950,000
Page 27 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT A NEW CONNECTOR ROAD
O
N THE EAST SIDE OF DANVILLE
CONNECTING KY-34 AND US-150
BYPASS(18CCN) (2020CCR)
PF-9999Boyle 80000 PL
DN
RW SPP 6,600,000
UT SPP 3,000,000
CN SPP 43,750,000
Project Cost:
6,600,000 3,000,000 43,750,000 0
R
ECONSTRUCT KY 52 FROM KY 1805
(Goggin Ln) TO KY 590 (2022CCN)
(2024CCR)
KY-52Boyle 80204 PL
DN
RW
UT STP2 3,480,000
CN STP2 3,805,000 4,000,000
Project Cost:
7,285,000 4,000,000 0 0
"
IMPROVE THE SAFETY AND MOBILITY
OF KY 34 FROM ALUM SPRINGS
CROSSPIKE (MP 10.391) TO APPROX.
1,000 FEET WEST OF CORPORATE DRIVE
(MP 10.800) (2022CCN)"
KY-34Boyle 80250 PL
DN
RW SPP 3,360,000
UT SPP 1,120,000
CN SPP 8,140,000
Project Cost:
3,360,000 1,120,000 8,140,000 0
W
iden the Goggin Ln from MP 0 to MP
2.712 to create a road shoulder that
would improve safety (2024CCN)
KY-1805Boyle 80300 PL
DN NH 1,300,000
SPP 2,430,000
RW NH 4,600,000
SPP 5,100,000
UT NH 3,360,000
SPP 3,450,000
CN NH 4,060,000
SPP 15,850,000
Project Cost:
3,730,000 13,150,000 19,210,000 4,060,000
I
mprove roadway geometry to promote
safety on KY 34 from Lexington Avenue
to Old Bridge Road in Boyle County.
(2024CCN)
KY-34Boyle 80302 PL
DN SPP 1,500,000
RW SPP 6,600,000
UT SPP 3,000,000
CN SPP 13,700,000
Project Cost:
1,500,000 9,600,000 13,700,000 0
Page 28 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PLANNING STUDY TO EVALUATE
O
PTIONS FOR IMPROVING SAFETY ON
KY 52 BETWEEN DANVILLE AND
LANCASTER. (2024CCN)
KY-52Boyle 80313 PL
DN
RW SPP 2,000,000
UT SPP 4,100,000
CN SPP 15,800,000
Project Cost:
2,000,000 4,100,000 15,800,000 0
I
mprove the existing geometry and typical
section of US 68 from approx. MP 5.2 to
MP 6.39 at the intersection of 2nd Street in
Perryville (2024CCN)
US-68Boyle 80354 PL
DN
RW SPP 1,250,000
UT SPP 2,000,000
CN SPP 6,500,000
Project Cost:
0 1,250,000 2,000,000 6,500,000
R
esconstruction of the intersection of
US-150 (Perryville Rd) at KY-3366
(Bluegrass Pike)
US-150Boyle 80419 PL
DN SPP 350,000
RW SPP 750,000
UT SPP 1,200,000
CN SPP 2,150,000
Project Cost:
350,000 1,950,000 2,150,000 0
I
ntersection Improvements at KY 2168/US
127 and KY 2168/KY34 (MP O to 3.088)
KY-2168Boyle 80425 PL
DN
RW
UT
CN SPP 3,500,000
Project Cost: 3,500,000 0 0 0
T
otal for Boyle county PL
Total Amounts:
CN
UT
RW
DN 5,580,000
11,960,000 18,300,000
3,480,000 15,870,000 5,360,000
7,305,000 4,000,000 99,390,000 10,560,000
28,325,000 38,170,000 104,750,000 10,560,000
Page 29 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OPERATION OF AUGUSTA FERRY FOR
F
Y 2027 THROUGH FY 2032.(12CCR)
(14CCR) (2020CCR) (2024CCR)
KY-8Bracken 355.2200 PL
DN
RW
UT
CN SPP 338,000 338,000 338,000 338,000
Project Cost: 338,000 338,000 338,000 338,000
R
ECONSTRUCT KY 8 FROM WRANGLING
RUN RD TO OLD KY 19. (2020CCN)
(2022CCR) (2024CCR)
KY-8Bracken 80103 PL
DN SPP 4,550,000
RW SPP 5,350,000
UT SPP 3,050,000
CN SPP 31,633,000
Project Cost:
4,550,000 8,400,000 31,633,000 0
I
MPROVE SAFETY AND MOBILITY AT THE
INTERSECTION OF KY 9 (AA HIGHWAY)
AND KY 1019 (LENNOXBURG FOSTER
ROAD). (2022CCN) (2024CCR)
KY-9Bracken 80250 PL
DN SPP 140,000
RW SPP 20,000
UT SPP 120,000
CN
Project Cost:
140,000 20,000 120,000 0
I
mprove safety and mobility along KY 8
(Mary Ingles Highway) from KY 2228
(Foster Road) to milepoint 2.78. (MP 1.19
to 2.78)
KY-8Bracken 80413 PL
DN SPP 3,000,000
RW SPP 1,500,000
UT SPP 1,000,000
CN SPP 25,000,000
Project Cost:
3,000,000 2,500,000 25,000,000 0
I
mprove safety and mobility along KY 8
(Mary Ingles Highway) from milepoint 2.78
to Willow Creek Road. (MP 2.78 to 3.597)
KY-8Bracken 80414 PL
DN SPP 2,000,000
RW SPP 1,000,000
UT SPP 500,000
CN SPP 13,000,000
Project Cost:
2,000,000 1,000,000 500,000 13,000,000
Page 30 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improvements to KY 10 from Brooksville to
G
ermantown (Delaney Subdivision Road
to Hillsdale Road ) to address the safety
issue as well as the geometric
deficiencies along the roadway (MP 16.5
KY-10Bracken 80415 PL
DN SPP 2,000,000
RW SPP 1,500,000
UT SPP 750,000
CN SPP 13,000,000
Project Cost:
0 2,000,000 2,250,000 13,000,000
T
otal for Bracken county PL
Total Amounts:
CN
UT
RW
DN 9,690,000 2,000,000
7,870,000 1,500,000
4,050,000 1,370,000
338,000 338,000 56,971,000 26,338,000
10,028,000 14,258,000 59,841,000 26,338,000
I
MPROVE KY-205 FROM NORTH OF
KY-1812 TO SOUTH OF PEGGS FORK RD.
(2020CCR)
KY-205Breathitt 375 PL
DN
RW
UT STPF 2,360,000
CN STPF 5,000,000 5,550,000
Project Cost: 2,360,000 5,000,000 5,550,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-1812 OVER BOONE FORK OF
FROZEN CRE (013B00006N)
KY-1812Breathitt 10070 PL
DN BRZ 165,340
RW
UT
CN BRZ 1,102,264
Project Cost:
0 0 1,267,604 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-542 OVER SPRING FK-QUICKSAND
CRK (013B00043N)
KY-542Breathitt 10072 PL
DN BRZ 159,286
RW
UT
CN BRZ 1,061,904
Project Cost:
0 0 1,221,190 0
Page 31 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REPLACE BRIDGE OVER PUNCHEON
C
REEK ON MAX ROARK RD (2020CCN)
CR-1125Breathitt 80107 PL
DN SPP 150,000
RW SPP 10,000
UT SPP 10,000
CN SPP 150,000
Project Cost: 150,000 10,000 10,000 150,000
R
eplace bridge and approaches on Round
Bottom Rd to reduce flooding issues
(013C00054N)
CR-1007Breathitt 80353 PL
DN FBP2 158,545
RW
UT
CN FBP2 1,056,965
Project Cost:
0 1,215,510 0 0
R
econstruction of KY 30 from 0.006 miles
West of KY 3237 to 1.044 miles East of
KY 2469. See KY 30 Planning Study
September 2014 Alternate 2A (MP 5.203
to 6.97)
KY-30Breathitt 80410 PL
DN SPP 900,000
RW SPP 800,000
UT SPP 700,000
CN SPP 9,300,000
Project Cost:
0 900,000 1,500,000 9,300,000
I
mprove reliability of KY 1110 between MP
14 and MP 15.
KY-1110Breathitt 80411 PL
DN
RW SPP 500,000
UT SPP 750,000
CN SPP 14,250,000
Project Cost: 0 500,000 750,000 14,250,000
T
otal for Breathitt county PL
Total Amounts:
CN
UT
RW
DN 150,000 1,058,545 324,626
510,000 800,000
2,360,000 1,460,000
6,056,965 7,714,168 23,700,000
2,510,000 7,625,510 10,298,794 23,700,000
Page 32 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND GEOMETRIC
D
EFICIENCIES ON KY 79 FROM KY 477 TO
KY 144 (12CCN)(14CCR)(18CCN)(2020
CCR) (COMBINED W/ 4-8703) (2022CCR)
(2024CCR)
KY-79Breckinridge 8702 PL
DN
RW SPP 4,200,000
UT SPP 2,430,000
CN SPP 8,700,000
Project Cost:
6,630,000 8,700,000 0 0
M
INOR WIDENING OF KY 992 BETWEEN
ROCK QUARRY AND US 60. (16CCN)
(18CCN) (2024CCN)
KY-992Breckinridge 8904 PL
DN STP2 560,000
RW STP2 900,000
UT STP2 900,000
CN SPP 3,720,000
Project Cost:
560,000 1,800,000 3,720,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CARL NEWBY RD OVER ROCK LICK
CREEK (014C00034N)
CR-1349Breckinridge 10080 PL
DN BRZ 103,141
RW
UT
CN BRZ 687,608
Project Cost:
0 0 0 790,749
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES AND MAINTENANCE ISSUES
ALONG KY 79 FROM MCCOY-ROFF
ROAD TO 600' N OF SAND ROCK PASS
ROAD. (2024CCN)
KY-79B reckinridge 80300 PL
DN SPP 1,400,000
RW SPP 2,190,000
UT SPP 1,500,000
CN SPP 10,000,000
Project Cost: 1,400,000 3,690,000 10,000,000 0
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG KY 261 AT THE S-CURVES JUST
NORTH OF FIRST STREET. SEE 4-8903.00.
(2024CCN)
KY-261Breckinridge 80306 PL
DN SPP 340,000
RW SPP 180,000
UT SPP 190,000
CN
Project Cost:
340,000 180,000 0 190,000
Page 33 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES AND MAINTENANCE ISSUES
ALONG KY 79 FROM 600' NORTH OF
SAND ROCK PASS ROAD TO US 60 AT
HARNED.
KY-79B reckinridge 80408 PL
DN SPP 2,000,000
RW SPP 3,400,000
UT SPP 2,500,000
CN SPP 15,600,000
Project Cost: 2,000,000 5,900,000 15,600,000 0
T
otal for Breckinridge county PL
Total Amounts:
CN
UT
RW
DN 4,300,000 103,141
4,200,000 6,670,000
2,430,000 4,900,000 190,000
8,700,000 29,320,000 687,608
10,930,000 20,270,000 29,320,000 980,749
R
ECONSTRUCT KY 44 FROM KY 1319
KINGS CHURCH HIGHWAY TO SPENCER
COUNTY LINE (2020CCN) (2024CCR)
KY-44Bullitt 43 PL
DN SPP 1,250,000
RW SPP 1,050,000
UT SPP 890,000
CN SPP 5,570,000
Project Cost: 1,250,000 1,050,000 890,000 5,570,000
R
ECONSTRUCT KY 44 FROM I 65 TO
CHIMNEY ROCK DRIVE (MILEPOINT 13.1
TO MILEPOINT 15.1). (2022CCN)
KY-44Bullitt 150.0200 PL
DN
RW SPP 9,170,000
UT SPP 11,360,000
CN SPP 22,540,000
Project Cost:
0 9,170,000 11,360,000 22,540,000
S
ECTION 4 - FROM ARMSTRONG LANE
TO US 31EX
KY-44Bullitt 150.4000 PL
DN SPP 1,140,000
RW SPP 12,280,000
UT SPP 8,160,000
CN SPP 15,290,000
Project Cost: 1,140,000 20,440,000 0 15,290,000
Page 34 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SECTION 5 FROM CS 3316/CS 3628 TO
U
S 31E BYPASS (2008BOPC) (2022CCN)
(2024CCR)
KY-44Bullitt 150.5000 PL
DN
RW
UT
CN SPP 3,140,000
Project Cost: 3,140,000 0 0 0
M
T. WASHINGTON-TAYLORSVILLE RD;
RECONSTRUCT KY 44 FROM US31E
BYPASS TO KY 1319 KINGS CHURCH
HIGHWAY (2020CCN) (2022CCR)
(2024CCR)
KY-44Bullitt 347.5000 PL
DN
RW
UT SPP 1,770,000
CN SPP 13,730,000
Project Cost:
1,770,000 13,730,000 0 0
W
IDEN KY-245 FROM FLAGET HOSPITAL
(MP 7.722) THROUGH COUNTY LINE
(MP12.261 NELSON/MP0.000 BULLITT) TO
HAPPY HOLLOW RD (MP 4.425).
(2022CCN) (2024CCR)
KY-245Bullitt 8307.2000 PL
DN
RW
UT SPP 12,880,000
CN SPP 72,000,000
Project Cost:
12,880,000 72,000,000 0 0
A
DDRESS CONDITION OF KY-480 FROM
MILEPOINT 0 TO MILEPOINT 5.14
(2024CCR)
KY-480Bullitt 20036 PL
DN
RW
UT
CN NHPM 1,060,000
Project Cost:
1,060,000 0 0 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 110.7 TO MILEPOINT 118.58
I -65Bullitt 22067 PL
DN
RW
UT
CN NHPM 42,000,000
Project Cost: 42,000,000 0 0 0
Page 35 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-065 FROM
M
ILEPOINT 118.58 TO MILEPOINT 123.18
I -65Bullitt 22068 PL
DN NHPM 5,000,000
RW
UT
CN NHPM 50,000,000
Project Cost: 0 55,000,000 0 0
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON KY 1450 (BLUE LICK
RD.) BETWEEN THE INTERSECTIONS WITH
KY 1526 (JOHN HARPER HIGHWAY) AND
CR 1512A (JEFFIE LANE) (2020CCN)
KY-1450B ullitt 80101 PL
DN
RW
UT SPP 5,750,000
CN SPP 6,550,000
Project Cost: 5,750,000 0 6,550,000 0
R
ECONSTRUCT KY 44 FROM BOGARD
LANE TO ARMSTRONG LANE (2020CCN)
(2022CCR)
KY-44Bullitt 80103 PL
DN
RW SPP 5,640,000
UT SPP 7,660,000
CN SPP 16,940,000
Project Cost:
0 13,300,000 16,940,000 0
R
AISE THE ROADWAY BY 4 FEET, WIDEN
IT FROM 2 TO 3 LANES (ADDING A
TWO-WAY LEFT TURN), AND REPLACING
BRIDGE ID #015B00020N
KY-44Bullitt 80338 PL
DN FBP 410,093
RW
UT
CN FBP 2,733,952
Project Cost:
0 0 3,144,045 0
R
EDUCE CONGESTION, IMPROVE
SAFETY, AND ENHANCE MOBILITY ON
JOHN HARPER HWY (KY 1526) FROM I-65
(MP 11.4) TO KY 61 (MP 12.9) (2024CCN)
KY-1526Bullitt 80339 PL SPP 260,000
DN
RW
UT
CN
Project Cost:
260,000 0 0 0
Page 36 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve traffic operations and improve
s
afety along US 31E
(Louisville-Bardstown Rd) from the
Bullitt/Nelson County Line to KY 44.
Consider a 2+1 configuration and/or
US-31Bullitt 80354 PL
DN
RW STPF 880,000
UT STPF 860,000
CN STPF 15,150,000
Project Cost:
0 880,000 860,000 15,150,000
I
mprove safety and reduce congestion on
KY 44 between the I-65 interchange and
the KY 61 intersection. Consider access
management.
KY-44Bullitt 80412 PL
DN
RW
UT SPP 800,000
CN SPP 1,300,000
Project Cost:
800,000 1,300,000 0 0
I
mprove safety and reduce congestion at
the intersection of KY 1450 and KY 1526
east of the I-65/KY 1526 interchange.
KY-1450Bullitt 80419 PL
DN SPP 1,000,000
RW SPP 400,000
UT SPP 300,000
CN SPP 5,000,000
Project Cost:
1,000,000 700,000 5,000,000 0
I
mprove safety and reduce congestion on
KY 61 from KY 44 in Shepherdville to KY
245. Project will evaluate widening from 2
to 4 travel lanes and consider other lower
impact alternatives. (MP 9.42-14.5)
KY-61Bullitt 80429 PL
DN SPP 5,670,000
RW SPP 2,130,000
UT SPP 3,270,000
CN SPP 25,605,000
Project Cost:
0 5,670,000 2,130,000 28,875,000
T
otal for Bullitt county PL
Total Amounts:
CN
UT
RW
DN
260,000
3,390,000 10,670,000 410,093
29,420,000 2,130,000
21,200,000 16,120,000 13,110,000 3,270,000
46,200,000 137,030,000 31,223,952 84,155,000
71,050,000 193,240,000 46,874,045 87,425,000
Page 37 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
OPERATION OF REED'S FERRY AT
L
OGANSPORT FOR FY 2027 THROUGH
FY 2032.(12CCR) (2020CCR) (2024CCR)
KY-269Butler 125.1500 PL
DN
RW
UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost: 173,000 173,000 173,000 173,000
O
PERATION OF THE ROCHESTER FERRY
BY THE BUTLER AND OHIO COUNTY
FERRY AUTHORITY FOR FY 2027-2032.
(12CCR) (2020CCR) (2024CCR)
KY-369Butler 8504.1000 PL
DN
RW
UT
CN SPP 173,000 173,000 173,000 173,000
Project Cost:
173,000 173,000 173,000 173,000
B
RIDGE PROJECT IN BUTLER COUNTY ON
(016B00012N) US-231 AT RENFROW
CREEK
US-231Butler 10032 PL
DN BRX 104,535
RW
UT
CN BRX 696,900
Project Cost:
0 0 0 801,435
B
RIDGE PROJECT IN BUTLER COUNTY ON
(016B00016N) KY-70 AT MUDDY CREEK
KY-70Butler 10033 PL
DN BRZ 845,336
RW
UT
CN BRZ 5,635,575
Project Cost: 0 6,480,911 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-165 OVER GREEN RIVER (016B00061N)
I -165Butler 10060 PL
DN BRO 220,000
RW
UT
CN BRO 2,200,000
Project Cost: 0 0 0 2,420,000
Page 38 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-231 FROM
M
ILEPOINT 10.68 TO MILEPOINT 10.94
US-231Butler 22311 PL
DN STP4 88,000
RW
UT
CN STP4 1,012,000
Project Cost: 1,100,000 0 0 0
L
ane departure safety improvements on
KY-79 between the KY-70 crossroads
and the Grayson County line
KY-79Butler 80406 PL
DN
RW SPP 500,000
UT SPP 500,000
CN SPP 2,500,000
Project Cost:
0 1,000,000 2,500,000 0
I
mprove safety and mobility on KY 185
from MP 3 to MP 4.8.
KY-185Butler 80407 PL
DN SPP 1,500,000
RW SPP 1,250,000
UT SPP 500,000
CN SPP 5,250,000
Project Cost: 2,750,000 500,000 5,250,000 0
I
mprove safety and mobility on KY 70 from
US 231 to I 165
KY-70Butler 80408 PL
DN SPP 1,000,000
RW SPP 4,000,000
UT SPP 4,000,000
CN SPP 7,000,000
Project Cost: 1,000,000 4,000,000 4,000,000 7,000,000
W
iden KY-70 to provide turning lanes at
KY 1468 (Gardiner Lane) and new
industrial access road. Extend Industrial
Drive to KY 70 for new access to
industrial park.
KY-70Butler 80412 PL
DN
RW SPP 200,000
UT SPP 1,100,000
CN SPP 2,900,000
Project Cost:
0 1,300,000 2,900,000 0
Page 39 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Butler county P L
Total Amounts:
CN
UT
RW
DN 2,588,000 845,336 324,535
1,250,000 4,700,000
2,100,000 4,000,000
1,358,000 5,981,575 10,996,000 10,242,900
5,196,000 13,626,911 14,996,000 10,567,435
S
TUDY THE I-24 CORRIDOR FROM THE
I-69 INTERCHANGE IN LYON COUNTY TO
THE TENNESSEE STATE LINE.
I -24Caldwell 11 PL NH 750,000
DN
RW
UT
CN
Project Cost: 750,000 0 0 0
R
ELOCATE US-641 FROM SOUTH OF THE
LYON/CALDWELL COUNTY LINE TO
FREDONIA, 4.5 MILES. (2020CCN)
(2022CCR) (2024CCR)
US-641Caldwell 187.6000 PL
DN
RW
UT
CN STPF 5,000,000 17,000,000
Project Cost:
5,000,000 17,000,000 0 0
B
RIDGE PROJECT IN CALDWELL COUNTY
ON (017B00033L and 017B00033R) I-69
AT TRADEWATER RIVER
I -69Caldwell 10062 PL
DN BRO 1,687,179
RW
UT
CN BRO 11,247,863
Project Cost:
0 0 12,935,042 0
B
RIDGE PROJECT IN CALDWELL COUNTY
ON (017B00060N) LEWISTOWN CHURCH
R AT I-69
CR-1011Caldwell 10064 PL
DN BRX 365,223
RW
UT
CN
Project Cost:
0 0 0 365,223
Page 40 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-069 FROM
M
ILEPOINT 77.994 TO MILEPOINT 79.35
I -69Caldwell 22080 PL
DN NHPM 120,000
RW
UT
CN NHPM 1,200,000
Project Cost: 1,320,000 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 79.35 TO MILEPOINT 82.934
I -69Caldwell 22081 PL
DN STP3 320,000
RW
UT
CN STP3 3,201,221
Project Cost: 3,521,221 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 86.344 TO MILEPOINT 89.848
I -69Caldwell 22082 PL
DN STP4 300,000
RW
UT
CN STP4 3,018,190
Project Cost: 3,318,190 0 0 0
R
ECONSTRUCT CS 1006 (JEFF WATSON
RD) FROM KY 91 TO KY 2617. (2024CCN)
CS-1006Caldwell 80304 PL
DN SPP 730,000
RW SPP 860,000
UT SPP 1,680,000
CN SPP 3,330,000
Project Cost: 730,000 860,000 1,680,000 3,330,000
A
DDRESS TRAFFIC CONTROL AT THE
INTERSECTION OF KY2617 AND US62
WEST TO IMPROVE TURN MOVEMENTS
FROM KY 2617. (2024CCN)
US-62Caldwell 80307 PL
DN NH 780,000
RW NH 500,000
UT NH 400,000
CN NH 2,000,000
Project Cost:
780,000 500,000 400,000 2,000,000
Page 41 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND 3 LANE SECTION OF KY 91
(
MARION ROAD) FROM MP 12.9 TO
BECKNER LANE (MP 13.4) (2024CCN)
KY-91Caldwell 80308 PL
DN
RW SPP 600,000
UT SPP 300,000
CN SPP 2,000,000
Project Cost: 900,000 2,000,000 0 0
T
otal for Caldwell county PL
Total Amounts:
CN
UT
RW
DN
750,000
2,250,000 1,687,179 365,223
600,000 1,360,000
300,000 2,080,000
12,419,411 19,000,000 11,247,863 5,330,000
16,319,411 20,360,000 15,015,042 5,695,223
B
RIDGE PROJECT IN CALLOWAY
COUNTY ON (018B00079N) KY-893 AT
BRANCH OF MCCULLOUGH CRE
KY-893Calloway 10103 PL
DN BRZ 189,934
RW
UT
CN BRZ 1,266,225
Project Cost: 0 0 0 1,456,159
P
LANNING STUDY FOR SCENIC BYWAY
ALONG KENTUCKY LAKE (2020CCN)
(2024CCR)
PF-9999Calloway 80100 PL SPP 250,000
DN
RW
UT
CN
Project Cost:
250,000 0 0 0
A
ddress congestion, geometric
deficiencies, and access issues from
KY121 to Utterback Road in Murray.
(2022CCN) (2024CCR)
CS-1047Calloway 80200 PL
DN
RW SPP 3,300,000
UT SPP 3,240,000
CN SPP 8,640,000
Project Cost:
3,300,000 3,240,000 8,640,000 0
Page 42 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT ROADWAY GEOMETRICS AND
A
DDRESS CONGESTION AND SAFETY
ISSUES AT KY 94 AND KY 1660 (JOHNNY
ROBERTSON ROAD) NEAR MURRAY.
(2024CCN)
KY-94Calloway 80316 PL
DN SPP 270,000
RW SPP 320,000
UT SPP 210,000
CN SPP 750,000
Project Cost:
270,000 320,000 210,000 750,000
I
mprove existing alignment to
accommodate addition of right drop lane
and two-way left turn lane for new
entrances to proposed Murray Elementary
School.
KY-1550Calloway 80412 PL
DN
RW SPP 150,000
UT SPP 200,000
CN SPP 750,000
Project Cost:
350,000 750,000 0 0
T
otal for Calloway county PL
Total Amounts:
CN
UT
RW
DN
250,000
270,000 189,934
3,450,000 320,000
200,000 3,240,000 210,000
750,000 8,640,000 2,016,225
4,170,000 4,310,000 8,850,000 2,206,159
A
DD LANE ON RAMP FROM EASTBOUND
I-275 TO NORTHBOUND I-471. (2024CCR)
I -471Campbell 23 PL
DN NH 2,320,000
RW
UT
CN NH 5,000,000 5,000,000
Project Cost: 7,320,000 5,000,000 0 0
R
EDUCE CONGESTION ALONG THE I-471
CORRIDOR FROM US-27 TO OHIO STATE
LINE. (2024CCR)
I -471Campbell 81 PL NH 1,080,000
DN NH 45,000,000
RW NH 35,000,000
UT NH 20,000,000
CN NH 1,750,000,000
Project Cost: 46,080,000 0 55,000,000 1,750,000,000
Page 43 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Extend Pond Creek Road from US 27 to
P
ersimmon Grove, KY 1121. (2024BOP)
PF-9999Campbell 352.1000 PL
DN
RW
UT
CN SPP 10,000,000 12,000,000
Project Cost: 10,000,000 12,000,000 0 0
E
xtend Pond Creek Road from Persimmon
Grove, KY 1121 to AA Highway, KY 9 .
(2024BOP)
PF-9999Campbell 352.2000 PL
DN
RW SPP 22,000,000
UT SPP 8,640,000
CN SPP 46,400,000
Project Cost:
30,640,000 46,400,000 0 0
R
EPLACE 4TH STREET BRIDGE OVER THE
LICKING RIVER BETWEEN COVINGTON
AND NEWPORT; BRIDGE NUMBER
059B00037N
KY-8Campbell 1086 PL
DN
RW
UT
CN BRO 2,450,000
Project Cost:
2,450,000 0 0 0
C
ONSTRUCT NEW I-471 SOUTHBOUND
OFF-RAMP AT KY-8 (SEE ALSO
6-183.00). (02CCN)(06CCN) (2020CCN)
I -471, KY-8Campbell 8104 PL
DN
RW NH 5,750,000
UT NH 1,080,000
CN NH 31,200,000
Project Cost:
0 6,830,000 31,200,000 0
B
RIDGE PROJECT IN CAMPBELL COUNTY
ON (019B00039L) I-471 NC AT OHIO
RIVER
I -471Campbell 10035 PL
DN BRO 1,500,000
RW
UT
CN BRO 15,000,000
Project Cost:
0 16,500,000 0 0
Page 44 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN CAMPBELL COUNTY
O
N (019B00039R) I-471 AT OHIO RIVER
I -471Campbell 10036 PL
DN BRO 1,500,000
RW
UT
CN BRO 15,000,000
Project Cost: 0 16,500,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 WB OVER OHIO RIVER @ BRENT
(019B00040L)
I -275Campbell 10051 PL
DN
RW
UT
CN BRO 40,000,000
Project Cost:
0 0 0 40,000,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-275 EB OVER OHIO RIVER @ BRENT
(019B00040R)
I -275Campbell 10053 PL
DN
RW
UT
CN FBP 40,000,000
Project Cost:
0 0 0 40,000,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-27 OVER OHIO RIVER (019B00076N)
US-27Campbell 10064 PL
DN BRX 1,800,000
RW
UT
CN BRX 18,000,000
Project Cost: 0 19,800,000 0 0
A
DDRESS CONDITION OF I-275 FROM
MILEPOINT 73.061 TO MILEPOINT 77.579
I -275Campbell 20010 PL
DN NHPM 1,070,000
RW
UT
CN NHPM 10,680,000
Project Cost: 0 0 0 11,750,000
Page 45 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-27 FROM
M
ILEPOINT 8.83 TO MILEPOINT 10.52
US-27Campbell 20017 PL
DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE I-275
INTERCHANGE WITH KY-9 (AA HWY.)
(2024CCN)
KY-9Campbell 80311 PL
DN SPP 5,000,000
RW SPP 500,000
UT SPP 2,000,000
CN SPP 50,000,000
Project Cost:
5,000,000 500,000 2,000,000 50,000,000
C
onstruct a roundabout at the intersection
of KY 1892 (Grand Ave) and Highland
Ave (2024CCN)
PF-9999Campbell 80313 PL
DN SPP 810,000
RW SPP 3,300,000
UT SPP 1,160,000
CN SPP 3,100,000
Project Cost:
810,000 4,460,000 3,100,000 0
I
MPROVE CONDITIONS BY
CONSTRUCTING A SOUTHBOUND TRUCK
CLIMBING LANE NORTH OF KY 709, AND
RECONSTRUCT THE INTERSECTION OF
KY 709 AND US 27 TO ALLOW FOR
US-27Campbell 80314 PL
DN SPP 780,000
RW SPP 1,500,000
UT SPP 750,000
CN SPP 7,750,000
Project Cost:
780,000 2,250,000 7,750,000 0
T
otal for Campbell county PL
Total Amounts:
CN
UT
RW
DN
1,080,000
53,910,000 4,920,000 1,070,000
22,000,000 11,050,000 35,000,000
8,640,000 2,990,000 22,000,000
17,450,000 112,780,000 42,050,000 1,890,680,000
103,080,000 131,740,000 99,050,000 1,891,750,000
Page 46 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT GEOMETRIC DEFICIENCIES AT
I
NTERSECTION OF US-51/US-62/FRONT
ST/ELM ST IN BARDWELL TO ADDRESS
FLOW, SAFETY, AND ACCESS ISSUES.
(12CCR)(18CCN)
US-51, US-62Carlisle 333 PL
DN
RW
UT
CN SPP 340,000
Project Cost:
340,000 0 0 0
B
RIDGE PROJECT IN CARLISLE COUNTY
ON (020B00068N) KY-80 AT LONGGEAR
CREEK
KY-80Carlisle 10107 PL
DN BRX 117,079
RW
UT
CN BRX 780,528
Project Cost:
0 897,607 0 0
C
ORRECT SUBSTANDARD ROADWAY
GEOMETRICS ON US-62 FROM KY 1181
TO KY 408 TO ADDRESS ACCESS
ISSUES, SAFETY CONCERNS, FLOOD
PRONE AREA, AND REGIONAL
US-62Carlisle 80302 PL
DN
RW NH 500,000
UT NH 1,000,000
CN NH 6,000,000
Project Cost:
500,000 1,000,000 6,000,000 0
I
MPROVE SAFETY, MOBILITY,
CONNECTIVITY, AND ADDRESS
GEOMETRIC DEFICIENCIES ALONG US-62
BETWEEN HOBBS ROAD/BOSWELL
ROAD TO KY 307. (2024CCN)
US-62Carlisle 80303 PL
DN
RW NH 400,000
UT NH 300,000
CN NH 2,500,000
Project Cost:
0 700,000 2,500,000 0
C
ORRECT ROADWAY GEOMETRICS AND
IMPROVE SAFETY, ACCESS AND
REGIONAL CONNECTIVITY FROM
HICKMAN COUNTY LINE TO KY 1377
SOUTH OF BARDWELL. (2024CCN)
US-51Carlisle 80309 PL
DN NH 900,000
RW NH 400,000
UT NH 2,500,000
CN NH 5,800,000
Project Cost:
900,000 2,900,000 0 5,800,000
Page 47 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT SUBSTANDARD ROADWAY
G
EOMETRICS, TO IMPROVE TRAFFIC
FLOW, SAFETY AND ACCESS
MANAGEMENT ISSUES FROM KY 1377 TO
TRUMAN CREEK BRIDGE IN BARDWELL.
US-51Carlisle 80323 PL
DN
RW NH 1,000,000
UT NH 3,000,000
CN NH 7,000,000
Project Cost:
1,000,000 3,000,000 7,000,000 0
IMPROVE INTERSECTION WITH US 62 AND
K
Y 1628 / PALESTINE RD (CR 1024).
(2024CCN)
US-62C arlisle 80331 PL
DN NH 750,000
RW NH 500,000
UT NH 135,000
CN NH 900,000
Project Cost: 750,000 500,000 135,000 900,000
T
otal for Carlisle county PL
Total Amounts:
CN
UT
RW
DN 1,650,000 117,079
1,500,000 1,300,000
6,800,000 135,000
340,000 780,528 15,500,000 6,700,000
3,490,000 8,997,607 15,635,000 6,700,000
A
DDRESS CONDITION OF KY-467 FROM
MILEPOINT 0 TO MILEPOINT 4.52
KY-467Carroll 20050 PL
DN STP5 64,000
RW
UT
CN STP5 736,000
Project Cost: 0 0 800,000 0
I
mprove safety and mobility and address
geometric deficiencies at the intersection
of KY 36 & KY 1492 (Locust Road).
(2022CCN) (2024CCR)
KY-36Carroll 80219 PL
DN SPP 740,000
RW SPP 450,000
UT SPP 280,000
CN SPP 3,948,000
Project Cost:
740,000 450,000 280,000 3,948,000
Page 48 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY AND
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG US 42 FROM THE WESTERN CITY
LIMIT OF GHENT TO THE GALLATIN
COUNTY LINE. (2024CCN)
US-42Carroll 80301 PL
DN SPP 2,160,000
RW SPP 5,400,000
UT SPP 930,000
CN SPP 25,200,000
Project Cost:
2,160,000 6,330,000 25,200,000 0
I
MPROVE SAFETY AND MOBILITY AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 55 FROM KY 389 TO US 42.
(2024CCN)
KY-55Carroll 80302 PL
DN SPP 4,320,000
RW SPP 3,130,000
UT SPP 1,800,000
CN SPP 51,200,000
Project Cost:
4,320,000 3,130,000 1,800,000 51,200,000
W
iden I-71 to 6 lanes from KY 227 in
Carroll County to KY 1039 in Gallatin
County.
I-71Carroll 80409 PL
DN NH 9,364,253
RW
UT NH 936,425
CN NH 121,735,290
Project Cost:
9,364,253 936,425 0 121,735,290
W
iden I 71 to 6 lanes in Carroll County and
build new structure over KY
227/Kentucky River.
I-71Carroll 80410 PL
DN NH 1,070,200
RW
UT NH 142,693
CN NH 7,000,000 7,269,338
Project Cost:
1,070,200 142,693 7,000,000 7,269,338
I
mprove safety along KY 389 from I 71 to
KY 55.
KY-389Carroll 80411 PL
DN SPP 3,300,000
RW SPP 3,000,000
UT SPP 700,000
CN SPP 27,300,000
Project Cost: 3,300,000 3,000,000 700,000 27,300,000
Page 49 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCTION FROM MILTON TO US
4
2 AT CARROLLTON to increase safety,
ease travel and reduce travel times on KY
36 (MP 0 to 8.132)
KY-36Carroll 80417 PL
DN SPP 11,250,000
RW SPP 18,000,000
UT SPP 7,000,000
CN SPP 150,000,000
Project Cost:
0 0 11,250,000 175,000,000
T
otal for Carroll county PL
Total Amounts:
CN
UT
RW
DN 20,954,453 11,314,000
11,980,000 18,000,000
2,009,118 2,780,000 7,000,000
32,936,000 361,452,628
20,954,453 13,989,118 47,030,000 386,452,628
R
ECONSTRUCT US-60 FROM WEST OF
GLENWOOD HOLLOW ROAD TO EAST OF
KY-3296. THE PROJECT SHALL INCLUDE
12' LANES, WIDE PAVED SHOULDERS,
UNOBSTRUCTED CLEAR ZONES,
US-60Carter 8401 PL
DN STP2 1,040,000
RW SPP 3,450,000
UT SPP 4,480,000
CN SPP 24,000,000
Project Cost:
1,040,000 3,450,000 4,480,000 24,000,000
C
ONSTRUCT TURN LANES AND SAFETY
FEATURES AT PROPOSED NEW HIGH
SCHOOL AND CAREER TECHNOLOGY
CENTER. (2024CCR)
US-60Carter 9021 PL
DN
RW
UT
CN SPP 1,040,000
Project Cost:
1,040,000 0 0 0
BRIDGE PROJECT IN CARTER COUNTY ON
(
022B00033N) KY-174 AT TYGARTS
CREEK
KY-174C arter 10079 PL
DN BRX 329,052
RW
UT
CN BRX 2,193,682
Project Cost: 0 2,522,734 0 0
Page 50 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-064 FROM
M
ILEPOINT 171.2 TO MILEPOINT 180.812
I -64Carter 22055 PL
DN NHPM 780,000
RW
UT
CN NHPM 7,829,870
Project Cost: 0 8,609,870 0 0
I
MPROVE US-60 GEOMETRY BEGINNING
TERMINI AT NEW CONSTRUCTION AT
OLIVE HILL MP 12.4 EXTENDING 1.1 MILES
TO I-64 EXIT 161.(18CCN) (2022CCR)
(2024CCR)
US-60Carter 80050 PL
DN
RW STP1 7,700,000
UT STP1 7,020,000
CN STP1 11,600,000
Project Cost:
7,700,000 7,020,000 11,600,000 0
I
mprove safety and operational efficiency
of KY 3297 near East Carter Middle
School and the new sports complex.
(2022CCN) (2024CCR)
KY-3297Carter 80201 PL
DN
RW SPP 280,000
UT SPP 220,000
CN SPP 710,000
Project Cost:
280,000 220,000 710,000 0
I
mprove connectivity in Grayson between
KY 1 (Carol Malone Blvd) and KY 3297
(Midland Trail). (2024CCN)
PF-9999Carter 80304 PL
DN
RW SPP 6,600,000
UT SPP 4,640,000
CN SPP 8,100,000
Project Cost:
0 11,240,000 8,100,000 0
C
urve correction on KY 174 to improve
horizontal alignment which will include a
bridge replacement. (2024CCN)
KY-174Carter 80305 PL
DN SPP 1,350,000
RW SPP 720,000
UT SPP 700,000
CN SPP 10,540,000
Project Cost:
1,350,000 720,000 700,000 10,540,000
Page 51 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve US 60 by upgrading geometrics to
a
45mph design speed with wider
shoulders and an improved clear zone
(MP 18.2-23.9)
US-60Carter 80409 PL
DN NH 4,000,000
RW NH 7,000,000
UT NH 6,000,000
CN NH 40,000,000
Project Cost:
4,000,000 13,000,000 40,000,000 0
I
mprove US 60 by upgrading geometrics to
a 45mph design speed with wider
shoulders and an improved clear zone
(MP 13.4 to 18.0)
US-60Carter 80410 PL
DN NH 5,000,000
RW NH 10,000,000
UT NH 7,500,000
CN NH 50,000,000
Project Cost:
5,000,000 17,500,000 50,000,000 0
C
onstruct a new interchange between
I-64 and US-60 west of Grayson to
provide better access and connectivity to
the new Carter County School site
I-64Carter 80411 PL
DN NH 8,000,000
RW NH 5,000,000
UT NH 44,000,000
CN NH 40,000,000
Project Cost:
8,000,000 49,000,000 40,000,000 0
T
otal for Carter county PL
Total Amounts:
CN
UT
RW
DN 19,390,000 1,109,052
7,980,000 32,770,000
69,380,000 5,180,000
1,040,000 10,023,552 150,410,000 34,540,000
28,410,000 113,282,604 155,590,000 34,540,000
I
MPROVE SAFETY AND GEOMETRIC
DEFICIENCIES ALONG US 127 AT
DUNNVILLE (2022CCN)
PF-9999,
US-127
Casey 164 PL
DN
RW
UT NH 1,030,000
CN NH 13,500,000
Project Cost:
1,030,000 0 13,500,000 0
Page 52 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NEW ALIGNMENT ON KY-70 FROM MP
1
6.8 TO 19 (12CCN) (2022CCN)
(2024CCR)
KY-70Casey 8701 PL
DN SPP 1,200,000
RW SPP 2,420,000
UT SPP 2,240,000
CN SPP 20,420,000
Project Cost: 3,620,000 2,240,000 20,420,000 0
C
ORRECT VERTICAL ALIGNMENT ON US
127 AND KY 1552 NEAR INTERSECTION.
(12CCN)
(2024CCN)
US-127Casey 8702 PL
DN NH 210,000
RW NH 260,000
UT NH 290,000
CN NH 1,950,000
Project Cost:
210,000 260,000 290,000 1,950,000
R
ECONSTRUCT BELL HILL FROM MP 10.4
TO MP 11.9.(12CCN)(16CCR)(18CCN)
(2020CCR) (2024CCR)
KY-70Casey 8703 PL
DN
RW
UT SPP 1,090,000
CN SPP 14,040,000
Project Cost:
0 1,090,000 14,040,000 0
RECONSTRUCT BRUSH CREEK HILL FROM
M
P 1.8 TO MP 2.8.(12CCN)(16CCR)
(18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-49C asey 8704 PL
DN
RW
UT SPP 1,040,000
CN SPP 12,960,000
Project Cost: 1,040,000 0 12,960,000 0
C
ONSTRUCT A NEW STORM DRAINING
SYSTEM, CURB AND GUTTER FROM
BELDON AVENUE EASTWARD AND
CONSTRUCT A NEW LEFT TURN ONTO
COLLEGE STREET.(12CCN)
KY-70Casey 8706 PL
DN
RW
UT PROT 6,370,000
CN PROT 13,680,000
Project Cost:
6,370,000 0 13,680,000 0
Page 53 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-910 FROM
M
ILEPOINT 1.464 TO MILEPOINT 8.801
KY-910Casey 20019 PL
DN STP5 160,000
RW
UT
CN STP5 1,840,000
Project Cost: 0 0 0 2,000,000
A
DD LANES (TWO PLUS ONE) TO US 127
FROM LIBERTY TO THE LINCOLN CO LINE
(2020CCN) (2024CCR)
US-127Casey 80150 PL
DN
RW NH 3,620,000
UT NH 4,440,000
CN SPP 26,880,000
Project Cost:
3,620,000 0 4,440,000 26,880,000
I
mprove safety by improving the
geometrics along KY 49 (MP 0.114 to 1.8)
KY-49Casey 80415 PL
DN SPP 1,012,000
RW SPP 2,590,000
UT SPP 2,024,000
CN SPP 11,802,000
Project Cost: 1,012,000 4,614,000 11,802,000 0
T
otal for Casey county PL
Total Amounts:
CN
UT
RW
DN 2,422,000 160,000
6,040,000 2,850,000
8,440,000 5,354,000 4,730,000
86,402,000 30,670,000
16,902,000 8,204,000 91,132,000 30,830,000
I
mprove capacity and mobility of the
I-24/KY 115 interchange (Exit 89) in
Christian County, KY (2022BOP).
(2024CCR)
I -24Christian 10 PL
DN
RW
UT NH 2,000,000
CN NH 18,000,000
Project Cost:
2,000,000 18,000,000 0 0
Page 54 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND KY-1682 FROM THE E.T.
BREATHITT PARKWAY TO US-68/KY-80
EAST OF HOPKINSVILLE (HOPKINSVILLE
NORTHEAST BYPASS). (2020CCN)
(2022CCR) (2024CCR)
PF-9999Christian 136 PL
DN
RW SPP 5,170,000
UT SPP 2,710,000
CN SPP 41,010,000
Project Cost:
5,170,000 2,710,000 41,010,000 0
R
ECONSTRUCT KY 1007 FROM US 68 TO
KY 1682 IN HOPKINSVILLE. (INCLUDES
2-227.10)(2020CCR) (2022CCR)
(2024CCR)
KY-1007,
PF-9999
Christian 227 PL
DN
RW SPP 7,250,000
UT SPP 7,400,000
CN SPP 12,320,000
Project Cost:
7,250,000 7,400,000 12,320,000 0
I
MPROVE KY-107 FROM THE BYPASS TO
KY-380.(12CCN)(14CCR) (2020CCR)
(2024CCN)
KY-107Christian 8703 PL
DN
RW
UT SPP 1,800,000
CN SPP 2,530,000
Project Cost:
1,800,000 2,530,000 0 0
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00021N) US-41 AT CSX
RAILROAD
US-41Christian 10066 PL
DN BRX 624,338
RW
UT
CN
Project Cost:
0 0 0 624,338
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00034N) KY-117 AT SINKING
FORK CREEK
KY-117Christian 10067 PL
DN BRX 802,254
RW
UT
CN
Project Cost:
0 0 0 802,254
Page 55 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN CHRISTIAN COUNTY
O
N (024B00062N) KY-1453 AT
MONTGOMERY CREEK
KY-1453Christian 10070 PL
DN BRX 279,575
RW
UT
CN BRX 1,863,831
Project Cost: 0 0 0 2,143,406
B
RIDGE PROJECT IN CHRISTIAN COUNTY
ON (024B00099N) KY-800 AT PENNYRILE
PARKWAY
KY-800Christian 10074 PL
DN BRX 1,257,758
RW
UT
CN
Project Cost:
0 0 0 1,257,758
A
DDRESS CONDITION OF US-41A FROM
MILEPOINT 4 TO MILEPOINT 12.56
US-41Christian 20061 PL
DN STP3 760,000
RW
UT
CN STP3 8,740,000
Project Cost: 760,000 8,740,000 0 0
A
DDRESS CONDITION OF I-024 FROM
MILEPOINT 69.83 TO MILEPOINT 76.142
(75 NON-CARDINAL)
I -24Christian 22012 PL
DN NHPM 3,210,000
RW
UT
CN NHPM 32,095,800
Project Cost:
0 0 0 35,305,800
A
DDRESS CONDITION OF I-024
NON-CARDINAL DIRECTION FROM
MILEPOINT 75 TO MILEPOINT 85.563
I -24Christian 22014 PL
DN
RW
UT
CN NHPM 3,138,790
Project Cost:
3,138,790 0 0 0
Page 56 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-41 FROM
M
ILEPOINT 9.2 TO MILEPOINT 11.39
US-41Christian 22320 PL
DN NHPM 1,200,000
RW
UT
CN NHPM 13,800,000
Project Cost: 0 0 0 15,000,000
U
S 41A NEW TURNING LANE
NORTHBOUND AT EXISTING MEDIAN
CROSSOVER NEAR MILEPOST 11.4. CITY
TO CONSTRUCT AND BE REIMBURSED.
(18CCN) (2020CCR)
US-41Christian 80001 PL
DN SPP 60,000
RW
UT
CN SPP 210,000
Project Cost:
60,000 210,000 0 0
A
DDRESS SAFETY ISSUES BY
INSTALLING INTERCHANGE LIGHTING
(2020CCN)
I -24Christian 80103 PL
DN
RW
UT
CN SPP 820,000
Project Cost:
820,000 0 0 0
IMPROVE SAFETY AND MOBILITY BY
W
IDENING AND CORRECTING GEOMETRIC
DEFICIENCIES ON KY 107 FROM
MILEPOINT 15.0 TO MILEPOINT 15.6
(2022CCN) (2024CCR)
KY-107C hristian 80250 PL
DN
RW
UT
CN SPP 3,100,000
Project Cost: 3,100,000 0 0 0
P
rovide left and right turn lanes and
improve sight distance on KY 107 at the
intersection of KY 107 and Lovers Lane.
KY-107Christian
80250.1000 PL
D
N
RW
UT
CN SPP 1,680,000
Project Cost: 1,680,000 0 0 0
Page 57 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety and congestion issues on
K
Y 115 from KY 911 to KY 400 (State line
road). Consider a roundabout at KY
115/KY 400 (MP 0.2 - 1.2)
KY-115Christian 80417 PL
DN SPP 1,000,000
RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 6,000,000
Project Cost:
1,000,000 2,500,000 1,500,000 6,000,000
A
ddress safety and congestion issues on
KY 115 from KY 911 to I24. (MP 1.261 -
2.663)
KY-115Christian 80418 PL
DN SPP 900,000
RW SPP 1,900,000
UT SPP 1,500,000
CN SPP 10,800,000
Project Cost:
0 900,000 3,400,000 10,800,000
T
otal for Christian county PL
Total Amounts:
CN
UT
RW
DN 1,820,000 900,000 7,373,925
12,420,000 2,500,000 1,900,000
3,800,000 10,110,000 3,000,000
8,738,790 29,480,000 53,330,000 64,559,631
26,778,790 42,990,000 58,230,000 71,933,556
R
EPAIR, RENOVATE, AND PRESERVE THE
HISTORICAL I-64 EB REST AREA
FACILITY IN CLARK COUNTY.
I -64Clark 27 PL
DN
RW
UT
CN SPP 3,140,000
Project Cost: 3,140,000 0 0 0
C
lark County Rest Area Renovation
Located on I-64 at MP 98. (2024BOP)
I -64Clark 3047 PL
DN
RW
UT
CN SPP 4,890,000
Project Cost: 4,890,000 0 0 0
Page 58 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NEW CONSTRUCTION TO EXTEND
V
ETERANS MEMORIAL PARKWAY FROM
IRVINE RD (KY89) TO BOONEWBORO RD
(KY 627)
KY-1958Clark 8401 PL
DN
RW NH 10,000,000
UT NH 12,400,000
CN NH 53,230,000
Project Cost:
22,400,000 53,230,000 0 0
R
ECONSTRUCT US 60 FOR SAFETY
IMPROVEMENTS FROM I-64 IN CLARK
COUNTY (MP 14.210)) TO 500 FEET WEST
OF SEWELL SHOP ROAD (MP 17.032).
(16CCN)(18CCN) (2022CCR) (2024CCR)
US-60Clark 8952 PL
DN SPP 1,730,000
RW SPP 4,840,000
UT SPP 4,370,000
CN SPP 11,150,000
Project Cost:
1,730,000 9,210,000 11,150,000 0
R
ECONSTRUCT US 60 FOR SAFETY
IMPROVEMENTS FROM 500 FEET WEST
OF SEWELL SHOP ROAD (MP 17.032) IN
CLARK COUNTY TO 500 FEET WEST OF
BENTBROOK (MP 2.007) IN
US-60Clark 8953 PL
DN SPP 2,650,000
RW SPP 4,440,000
UT SPP 4,160,000
CN SPP 14,670,000
Project Cost:
2,650,000 8,600,000 14,670,000 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway CARDINAL DIRECTION
FROM MILEPOINT 5.341 TO MILEPOINT
10.227
KY-9000Clark 22155 PL
DN NHPM 500,000
RW
UT
CN NHPM 5,000,000
Project Cost:
0 5,500,000 0 0
M
ODERNIZE AND IMPROVE CAPACITY ON
US 60 FROM KY 859 (HALEY RD) TO KY
1958 (BYPASS RD) IN CLARK COUNTY.
(2020CCN) (2022CCR) (2024CCR)
US-60Clark 80151 PL
DN SPP 4,090,000
RW SPP 11,740,000
UT SPP 8,730,000
CN SPP 34,450,000
Project Cost:
4,090,000 11,740,000 8,730,000 34,450,000
Page 59 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
New construction of KY 1923
(
Waterworks Road) between MP 4.2 and
5.0. This includes a new crossing over
the West Fork of Lower Howard Creek
(2024CCN)
KY-1923Clark 80350 PL
DN SPP 940,000
RW SPP 550,000
UT SPP 450,000
CN SPP 6,100,000
Project Cost:
940,000 550,000 450,000 6,100,000
B
ridge Rehab/Replacement on Red River
Road (CR 1137) at MP 0.19-0.2 over the
CSX Railroad approx. 0.20 miles west of
KY 89 (025R00614N)
CR-1137Clark 80358 PL
DN BRX 210,038
RW
UT
CN BRX 1,400,252
Project Cost:
0 1,610,290 0 0
R
econstruct KY 1927 from 1000ft W of
KY 1923 to Winchester Bypass (MP 0.371
to 6.826)
KY-1927Clark 80426 PL
DN SPP 3,500,000
RW SPP 5,000,000
UT SPP 5,000,000
CN SPP 22,000,000
Project Cost:
0 3,500,000 10,000,000 22,000,000
T
otal for Clark county PL
Total Amounts:
CN
UT
RW
DN 9,410,000 4,210,038
10,000,000 21,570,000 5,000,000
12,400,000 8,530,000 14,180,000
8,030,000 59,630,252 25,820,000 62,550,000
39,840,000 93,940,290 45,000,000 62,550,000
I
MPROVE SAFETY AND SIGHT DISTANCE
ALONG KY 638 (MP 6.7 TO MP 7.1) AND
ITS INTERSECTION WITH KY 3476.
(14CCN)(18CCN) (2020CCR)
KY-638Clay 8861 PL
DN SPP 80,000
RW SPP 160,000
UT SPP 340,000
CN SPP 1,560,000
Project Cost:
80,000 160,000 340,000 1,560,000
Page 60 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE ROUTE FROM SOMERSET TO
H
AZARD TO INTERSTATE STANDARDS: 4
LANE FROM CLAY/LAUREL LINE TO
MANCHESTER (JUST PAST EXIT 20 AT
BRIDGE OVER KY 80/US 421), MP 10.593
HR-9006Clay 8910 PL
DN NH 1,000,000
RW SPP 15,000,000
UT SPP 11,000,000
CN SPP 30,000,000 30,000,000 38,000,000
Project Cost:
27,000,000 30,000,000 30,000,000 38,000,000
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM MANCHESTER TO
CLAY/LESLIE LINE; MP 21.498 TO MP
35.929 (SEGMENT 8) (16CCN)(18CCN)
HR-9006Clay 8911 PL
DN NH 1,000,000
RW SPP 18,000,000
UT SPP 5,000,000
CN
Project Cost:
1,000,000 0 18,000,000 5,000,000
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00057N) KY-2438 AT GOOSE
CREEK & WALK PATH
KY-2438Clay 10179 PL
DN BRX 1,213,977
RW
UT
CN
Project Cost:
0 0 1,213,977 0
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00060N) KY-1482 AT LITTLE
BULLSKIN CREEK
KY-1482Clay 10180 PL
DN BRX 121,086
RW
UT
CN BRX 807,242
Project Cost:
0 0 0 928,328
B
RIDGE PROJECT IN CLAY COUNTY ON
(026B00073N) HR-9006 AT CSX RR-HAM
BR RD-GOOSE C
HR-9006Clay 10181 PL
DN BRO 1,534,312
RW
UT
CN
Project Cost:
0 0 0 1,534,312
Page 61 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN CLAY COUNTY ON
(
026B00102N) KY-3478 AT ROBINSON
CREEK
KY-3478Clay 10183 PL
DN FBP2 179,671
RW
UT
CN FBP2 1,197,806
Project Cost: 0 0 0 1,377,477
B
RIDGE PROJECT IN CLAY COUNTY ON
(026C00016N) FRANK BOWLING ROAD
AT REDBIRD RIVER
CR-1114Clay 10184 PL
DN
RW FBP2 10,000
UT FBP2 10,000
CN FBP2 1,045,350
Project Cost:
0 0 1,065,350 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
27.785 TO MILEPOINT 35.929
HR-9006Clay 20042 PL
DN STP5 180,000
RW
UT
CN STP5 1,780,000
Project Cost:
180,000 1,780,000 0 0
C
ONSTRUCT NEW CONNECTOR ROAD
BETWEEN US 421 AT MP 17.51 TO
RAILROAD AVE. AT MP 0.1. THIS WILL
REQUIRE APPROXIMATELY 300' OF NEW
ROADWAY ALONG THE CONNECTOR, A
US-421Clay 80251 PL
DN
RW
UT
CN SPP 3,830,000
Project Cost:
3,830,000 0 0 0
I
MPROVE GEOMETRIC ALIGNMENT FROM
KY 3472 AT MP 1.7 CONTINUING PAST
THE BERT. T. COMBS PARK TO THE
INTERSECTION OF BEECH CREEK ROAD
AND WHITE OAK ROAD.
KY-3472Clay 80253 PL
DN
RW SPP 2,000,000
UT SPP 12,760,000
CN SPP 14,560,000
Project Cost:
2,000,000 12,760,000 14,560,000 0
Page 62 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE GEOMETRIC ALIGNMENT FROM
T
HE INTERSECTION OF BEECH CREEK
ROAD AND WHITE OAK ROAD TO KY-11
AT MP 14.24. (APPROXIMATELY 4.0
MILES OF ROAD WAY TO IMPROVE)
CR-1004Clay 80254 PL
DN
RW SPP 2,200,000
UT SPP 1,250,000
CN SPP 16,000,000
Project Cost:
2,200,000 1,250,000 16,000,000 0
I
mprove geometrics and drainage, and add
sidewalk. Improve shopping center
intersection.
KY-2076Clay 80411 PL
DN SPP 500,000
RW SPP 1,000,000
UT SPP 600,000
CN SPP 6,000,000
Project Cost:
500,000 1,600,000 6,000,000 0
T
otal for Clay county PL
Total Amounts:
CN
UT
RW
DN 2,760,000 1,213,977 1,835,069
19,200,000 1,160,000 18,010,000
11,000,000 14,610,000 350,000 5,000,000
3,830,000 31,780,000 67,605,350 41,565,048
36,790,000 47,550,000 87,179,327 48,400,117
R
ELOCATION OF US 127 FROM KY 90
INTERSECTION TO AARON RIDGE ROAD
(MP 11.7 TO MP 16.315) (2022CCN)
(2024CCR)
US-127Clinton 8600 PL
DN
RW
UT
CN NH 46,680,000
Project Cost:
0 46,680,000 0 0
R
ELOCATION OF US-127 FROM EAST OF
THE AARON RIDGE RD AND OLD US-127
INTERSECTION, EXTENDING NORTHERLY
TO NORTH OF THE KY-3063 AND OLD
US-127 INTERSECTION. (SEE 8-108 AND
US-127Clinton 8601.3000 PL
DN
RW
UT
CN NH 20,000,000
Project Cost:
20,000,000 0 0 0
Page 63 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility of KY 558
f
rom KY 90 to Russell/Clinton Co line
(2024CCN)
KY-558Clinton 80313 PL SPP 400,000
DN SPP 1,040,000
RW SPP 5,410,000
UT SPP 4,260,000
CN SPP 9,860,000
Project Cost: 1,440,000 5,410,000 4,260,000 9,860,000
R
educe congestion and improve mobility
on US 127X between Ferguson St and
McWhorter Rd.
US-127Clinton 80405 PL
DN SPP 648,000
RW SPP 1,296,000
UT SPP 1,296,000
CN SPP 3,888,000
Project Cost:
648,000 2,592,000 3,888,000 0
T
otal for Clinton county PL
Total Amounts:
CN
UT
RW
DN
400,000
1,688,000
6,706,000
1,296,000 4,260,000
20,000,000 46,680,000 3,888,000 9,860,000
22,088,000 54,682,000 8,148,000 9,860,000
O
PERATION OF CAVE-IN-ROCK FERRY
AT OHIO RIVER FOR FY 2027 THROUGH
FY 2032 USING AUDITED COSTS AS THE
BASIS.(12CCR) (2020CCR) (2022CCR)
(2024CCR). This is Kentucky's share of
KY-91Crittenden 326.1700 PL
DN
RW
UT
CN SPP 831,000 831,000 831,000 831,000
Project Cost:
831,000 831,000 831,000 831,000
R
econstruct and elevate a 0.12 mile
section of KY 295 above the floodplain
from M.P. 1.038 to M.P. 1.605 just south of
Dycusburg (2022CCN)
KY-295Crittenden 80201 PL
DN
RW
UT
CN SPP 560,000
Project Cost:
560,000 0 0 0
Page 64 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE STREET TO ACCOMMODATE
T
RUCK TRAFFIC, ADDRESS SAFETY
CONCERNS, ADDRESS GEOMETRIC
DEFICIENCIES, POSSIBLE BIKE AND PED
PATH. THIS PROJECT WILL EXTEND FROM
CS-1094,
C
S-1095
Crittenden 80334 PL
DN SPP 780,000
RW SPP 500,000
UT SPP 750,000
CN SPP 7,500,000
Project Cost: 780,000 500,000 750,000 7,500,000
O
n KY 120 reconstruct substandard
curve between Herman Travis Rd
Intersection and Piney Creek (2024CCN)
KY-120Crittenden 80335 PL
DN SPP 260,000
RW SPP 300,000
UT SPP 100,000
CN SPP 1,500,000
Project Cost:
260,000 400,000 1,500,000 0
I
mprove safety, truck mobility, and access
at the Intersection of US-60 and US-641/E
Gum St.
US-60Crittenden 80400 PL
DN
RW
UT
CN STP2 1,200,000
Project Cost:
1,200,000 0 0 0
I
mprove safety and substandard
geometrics in curves along US-60 near
Rosebud Church Road
US-60Crittenden 80401 PL
DN
RW STP2 250,000
UT STP2 200,000
CN STP2 900,000
Project Cost:
450,000 900,000 0 0
T
otal for Crittenden county PL
Total Amounts:
CN
UT
RW
DN 1,040,000
250,000 800,000
200,000 100,000 750,000
2,591,000 1,731,000 2,331,000 8,331,000
4,081,000 2,631,000 3,081,000 8,331,000
Page 65 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve KY 90 from Pa Duerson Road
n
ear Marrowbone extending Easterly to
Norris Branch. (14CCN)(18CCR
KY-90Cumberland 8852 PL
DN
RW SPP 5,250,000
UT SPP 5,250,000
CN SPP 47,250,000
Project Cost: 10,500,000 47,250,000 0 0
T
otal for Cumberland county PL
Total Amounts:
CN
UT
RW
DN
5,250,000
5,250,000
47,250,000
10,500,000 47,250,000 0 0
I
MPROVE KY-54 FROM BOLD FORBES
WAY TO KY 1456 (THRUSTON-DERMONT
RD). DESIGN UNDER PARENT 2-8300.00.
(2018BOP) (2022CCN) (2024CCR)
KY-54Daviess 8300.2000 PL
DN
RW SPP 3,900,000
UT SPP 5,710,000
CN SPP 5,460,000
Project Cost:
9,610,000 5,460,000 0 0
I
MPROVE KY-54 FROM COUNTRYSIDE
DRIVE TO JACK HINTON RD. DESIGN
UNDER PARENT 2-8300.00. (2018BOP)
(2022CCR) (2024CCR)
KY-54Daviess 8300.4000 PL
DN
RW
UT SPP 6,920,000
CN SPP 14,070,000
Project Cost:
6,920,000 14,070,000 0 0
A
DDRESS SUBSTANDARD ROADWAY
GEOMETRICS AND SAFETY CONCERNS
ON KY 1456 FROM KY 54 TO HAYDEN
ROAD. MP 2.778 TO 4.714 (SEE
2-8709.00)(14CCN)(16CCR) (2022CCN)
KY-1456Daviess 8801 PL
DN
RW
UT STP1 4,370,000
CN STP1 11,340,000
Project Cost:
0 4,370,000 11,340,000 0
Page 66 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN DAVIESS COUNTY
O
N (030B00138N) KY-662 AT
BLACKFORD CREEK
KY-662Daviess 10082 PL
DN BRZ 649,139
RW
UT
CN BRZ 4,327,594
Project Cost: 0 4,976,733 0 0
A
DDRESS CONDITION OF KY-81 FROM
MILEPOINT 11.89 TO MILEPOINT 13.32
KY-81Daviess 20017 PL
DN STP3 120,000
RW
UT
CN STP3 1,380,000
Project Cost: 0 1,500,000 0 0
A
DDRESS CONDITION OF KY-2155 FROM
MILEPOINT 0 TO MILEPOINT 1.99
KY-2155Daviess 20019 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,300,000
Project Cost: 0 0 0 2,500,000
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 59.474 TO MILEPOINT 64.001
I -165Daviess 20065 PL
DN NHPM 380,000
RW
UT
CN NHPM 3,863,248
Project Cost: 0 4,243,248 0 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 64.001 TO MILEPOINT 70.185
I -165Daviess 20066 PL
DN STP3 520,000
RW
UT
CN STP3 5,207,854
Project Cost: 0 5,727,854 0 0
Page 67 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-165 FROM
M
ILEPOINT 64.001 TO MILEPOINT 70.185
(2024CCR)
I -165Daviess 22138 PL
DN NHPM 560,000
RW
UT
CN NHPM 5,600,000
Project Cost: 0 6,160,000 0 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 15.883 TO
MILEPOINT 23.441
AU-9005Daviess 22195 PL
DN STP5 1,160,000
RW
UT
CN STP5 11,600,000
Project Cost:
12,760,000 0 0 0
A
DDRESS SAFETY, CONGESTION, AND
MOBILITY ISSUES ON KY 144 FROM MP
2.5 TO MP 3.75 INCLUDING 12 FOOT
DRIVING LANES AND TURNING LANES
WHERE NEEDED. (2020CCN) (2022CCR)
KY-144Daviess 80150 PL
DN SPP 720,000
RW SPP 1,680,000
UT SPP 2,240,000
CN SPP 4,320,000
Project Cost:
720,000 1,680,000 2,240,000 4,320,000
O
LD HARTFORD RD - WIDEN TO IMPROVE
TRAFFIC FLOW AND SAFETY. PROJECT
BEGINS AT HARRIET LN (CR 1120H) AND
ENDS AT BURLEW BLVD (KY 1432).
(2024CCN)
KY-298Daviess 80301 PL
DN
RW STP1 2,190,000
UT STP1 2,750,000
CN STP1 11,760,000
Project Cost:
0 2,190,000 2,750,000 11,760,000
R
ECONSTRUCT GOETZ DR FROM
SOUTHTOWN BLVD (KY 2121) TO
FREDERICA ST (US 431). INSTALL TURN
LANES AS NEEDED. (2024CCN)
KY-2699Daviess 80302 PL
DN
RW
UT SPP 580,000
CN SPP 3,250,000
Project Cost:
580,000 3,250,000 0 0
Page 68 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN KY 2127 FROM KELLER ROAD (CR
1
301) TO KY 2121, INCLUDING 10'
MULTIUSE PATH. (2024CCN)
KY-2127Daviess 80305 PL
DN SPP 1,130,000
RW SPP 280,000
UT SPP 870,000
CN SPP 7,020,000
Project Cost: 1,130,000 280,000 870,000 7,020,000
C
ONDUCT A FEASIBILITY STUDY TO
UTILIZE EXISTING ROADWAYS TO
CONSIDER AN ADDITIONAL
INTERCHANGE ON I-165 SOUTH OF
OWENSBORO. (2024CCN)
I-165Daviess 80312 PL
DN STP1 2,000,000
RW STP1 4,000,000
UT STP1 2,500,000
CN STP1 32,000,000
Project Cost:
2,000,000 4,000,000 2,500,000 32,000,000
I
mprove KY 2155 from East Byers to
Burlew Blvd.
KY-2155Daviess 80404 PL
DN SPP 300,000
RW
UT
CN SPP 1,800,000
Project Cost: 300,000 1,800,000 0 0
C
onstruct new exchange on I-165
between MP 59.5 and 68.5.
I-165Daviess 80414 PL
DN
RW STPF 4,000,000
UT STPF 2,500,000
CN STPF 32,000,000
Project Cost: 4,000,000 2,500,000 0 32,000,000
U
pgrade Audubon Parkway to interstate
standards for conversion to I-169.
AU-9005Daviess 80415 PL
DN
RW
UT
CN NH 15,000,000
Project Cost: 15,000,000 0 0 0
Page 69 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve roadway conditions and
h
orizontal alignment on KY-298 from MP 0
to 5.26
KY-298Daviess 80416 PL
DN SPP 500,000
RW SPP 6,575,000
UT SPP 1,500,000
CN SPP 2,100,000
Project Cost: 500,000 6,575,000 1,500,000 2,100,000
T
otal for Daviess county PL
Total Amounts:
CN
UT
RW
DN 5,810,000 2,229,139 200,000
7,900,000 14,725,000
13,210,000 6,870,000 9,860,000
26,600,000 44,958,696 11,340,000 91,500,000
53,520,000 68,782,835 21,200,000 91,700,000
I
MPROVE SAFETY AND MOBILITY ON KY
259 FROM NORTH OF KYROCK ROAD TO
THE GRAYSON COUNTY LINE. (2020CCN)
KY-259Edmonson 80107 PL
DN
RW SPP 370,000
UT SPP 340,000
CN SPP 2,190,000
Project Cost: 710,000 2,190,000 0 0
R
ECONSTRUCTION AND REALIGNMENT
OF KY 259 FROM MP 12.096 TO 15.633/
(2024CCN)
KY-259Edmonson 80317 PL
DN
RW SPP 5,390,000
UT SPP 2,410,000
CN SPP 26,772,000
Project Cost:
0 7,800,000 26,772,000 0
R
ECONSTRUCT KY 2326 (OTTER GAP
ROAD) FROM US 31W IN WARREN CO.
TO NOAH BLEDSOE ROAD IN EDMONSON
CO. (2024CCN)
KY-2326Edmonson 80323 PL
DN SPP 1,300,000
RW SPP 1,500,000
UT SPP 2,000,000
CN SPP 6,000,000
Project Cost:
1,300,000 1,500,000 2,000,000 6,000,000
Page 70 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruction/Widening from KY 2326 to
K
Y 101 (MP 0.0 - 2.455). (2024CCN)
CR-1137Edmonson 80350 PL
DN SPP 1,670,000
RW SPP 1,250,000
UT SPP 3,000,000
CN SPP 6,000,000
Project Cost: 1,670,000 1,250,000 3,000,000 6,000,000
R
econstruction/Widening from KY 743 to
Noah Bledsoe Road (MP 0.0 - 1.254).
(2024CCN)
CR-1139Edmonson 80351 PL
DN SPP 890,000
RW SPP 650,000
UT SPP 1,500,000
CN SPP 350,000
Project Cost:
890,000 650,000 1,500,000 350,000
T
otal for Edmonson county PL
Total Amounts:
CN
UT
RW
DN 3,860,000
370,000 8,790,000
340,000 2,410,000 6,500,000
2,190,000 26,772,000 12,350,000
4,570,000 13,390,000 33,272,000 12,350,000
I
MPROVE KY-32 FROM WEST OF
STEGALL COLD SPRING ROAD TO KY-7
NEAR NEWFOUNDLAND. (PRIORITY
SECTION I)(06CCR) (08CCR) (10CCR)
(12CCR)(14CCR)(16CCR)(18CCR)
KY-32Elliott 192.0100 PL
DN
RW
UT
CN STP2 20,000,000 20,000,000 20,000,000 13,600,000
Project Cost:
20,000,000 20,000,000 20,000,000 13,600,000
R
ECONSTRUCT KY-32 FROM 0.408 MILES
WEST OF STEGALL COLD SPRING ROAD
TO KY-7 NEAR NEWFOUNDLAND.
(PRIORITY SECTION 2). (10CCR)(16CCN)
(18CCN) (2024CCN)
KY-32Elliott 192.0300 PL
DN STP2 4,030,000
RW
UT STP2 7,010,000
CN STP2 15,000,000 23,440,000
Project Cost:
4,030,000 7,010,000 15,000,000 23,440,000
Page 71 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 7 from Sandy Hook to the
M
organ County Line. (2024CCR)
KY-7Elliott 228.4000 PL
DN
RW SPP 8,800,000
UT SPP 6,480,000
CN STP2 80,640,000
Project Cost: 15,280,000 80,640,000 0 0
K
Y-32 FROM 9.2 MILE MARKER TO 10.2
MILE MARKER WIDENING. (14CCN)
(16CCR)(18CCN)(2020CCR) (2022CCR)
KY-32Elliott 8802 PL
DN
RW
UT
CN STP2 10,000,000
Project Cost:
10,000,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 755 OVER SOUTH RUIN CREEK
(032B00030N)
KY-755Elliott 10098 PL
DN BRZ 112,375
RW
UT
CN BRZ 749,168
Project Cost:
0 861,543 0 0
T
otal for Elliott county PL
Total Amounts:
CN
UT
RW
DN 4,030,000 112,375
8,800,000
6,480,000 7,010,000
30,000,000 101,389,168 35,000,000 37,040,000
49,310,000 108,511,543 35,000,000 37,040,000
I
MPROVE LEVEL OF SERVICE, SAFETY,
AND CONNECTIVITY ON KY-82 FROM
KY-89 IN ESTILL CO. TO NEW
CONSTRUCTION LOCATED NORTH OF
HUDSON MILL ROAD IN ESTILL COUNTY.
KY-82Estill 205 PL
DN
RW SPP 6,300,000
UT SPP 4,010,000
CN SPP 37,200,000
Project Cost:
6,300,000 4,010,000 37,200,000 0
Page 72 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY ON KY-2459
(
CARHARTT AVE.) FROM KY-89 TO THE
RAILROAD BRIDGE. (2020CCR)
KY-2459Estill 206 PL
DN
RW SPP 390,000
UT SPP 620,000
CN
Project Cost: 390,000 620,000 0 0
R
eplace bridge on Millers CreekKY-52Estill 80407 PL
DN SPP 600,000
RW SPP 300,000
UT SPP 300,000
CN SPP 4,000,000
Project Cost: 600,000 600,000 4,000,000 0
I
mprove drainage and pedestrian facilities
from Rice Street intersection to the bridge
over the Kentucky River
KY-82Estill 80408 PL
DN SPP 500,000
RW SPP 400,000
UT SPP 500,000
CN SPP 4,000,000
Project Cost:
500,000 900,000 4,000,000 0
I
MPROVE GEOMETRICS AND MOBILITY
ON KY 89 FROM 1500 FEET NORTH OF
LANDFILL ROAD (ACROSS FROM ESTILL
COUNTY HIGH SCHOOL) TO THE KY 82
INTERSECTION
KY-89Estill 80409 PL
DN SPP 2,000,000
RW SPP 3,000,000
UT SPP 1,500,000
CN SPP 20,000,000
Project Cost:
2,000,000 3,000,000 1,500,000 20,000,000
T
otal for Estill county PL
Total Amounts:
CN
UT
RW
DN 3,100,000
6,690,000 3,700,000
5,430,000 1,500,000
45,200,000 20,000,000
9,790,000 9,130,000 46,700,000 20,000,000
Page 73 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Lexington-Georgetown;
R
econstruct/Widen US 25 from Spurr
Road to Kearney Road. (Section 1)
(2024CCR)
US-25Fayette 122.2000 PL
DN
RW
UT
CN STPF 17,380,000
Project Cost:
17,380,000 0 0 0
D
EDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR LEXINGTON
URBANIZED AREA AND SUBJECT TO MPO
CONTROL FOR FY 2026 THROUGH FY
2032. (FUNDING SUBJECT TO FISCAL
CO-0Fayette 227.1400 PL
DN
RW
UT
CN SLX 7,800,000 7,800,000 7,800,000 7,800,000
Project Cost:
7,800,000 7,800,000 7,800,000 7,800,000
O
PERATION OF VALLEY VIEW FERRY AT
KY RIVER FOR FY 2027 THROUGH FY
2032. (12CCR)(18CCR) (2020CCR)
(2024CCR)
KY-169,
PF-9999
Fayette 357.1700 PL
DN
RW
UT
CN SPP 540,000 540,000 540,000 540,000
Project Cost:
540,000 540,000 540,000 540,000
R
EPLACE RJ CORMAN RAILROAD BRIDGE
OVERPASS (MP 8.378) IMPROVE
DRAINAGE AND TYPICAL SECTION ON US
27 (NORTH BROADWAY) (12CCR)
(14CCR)(16CCR)(18CCN)(2020CCR)
US-27Fayette 412 PL
DN
RW
UT
CN NH 13,130,000
Project Cost:
13,130,000 0 0 0
A
CCESS MANAGEMENT ON
NICHOLASVILLE ROAD BETWEEN
NICHOLASVILLE AND MAN-O-WAR
BLVD. (14CCR) (2024CCN)
US-27Fayette 430 PL
DN
RW SPP 11,250,000
UT SPP 7,180,000
CN SPP 30,380,000
Project Cost:
11,250,000 7,180,000 30,380,000 0
Page 74 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NICHOLASVILLE - MAN-O- WAR BLVD;
ACCESS MANAGEMENT ON US-27
(NICHOLASVILLE RD) FROM JUST SOUTH
OF KOHL'S DRIVE TO MAN-O-WAR BLVD.
US-27Fayette 430.2000 PL
DN
RW SPP 4,400,000
UT SPP 1,460,000
CN SPP 50,000,000
Project Cost:
4,400,000 1,460,000 50,000,000 0
R
educe congestion on KY 4 from Trade
Center to Railroad Bridge North of Palumbo
Drive
KY-4Fayette 438.1000 PL
DN
RW
UT NH 6,000,000
CN NH 41,530,000
Project Cost:
6,000,000 41,530,000 0 0
R
educe congestion on KY 4 from Railroad
Bridge North of Palumbo Drive to Woodhill
Drive
KY-4Fayette 438.2000 PL
DN
RW NH 2,140,000
UT NH 2,000,000
CN NH 32,100,000
Project Cost:
2,140,000 0 2,000,000 32,100,000
N
EW CIRCLE RD: IMPROVE SAFETY AND
REDUCE CONGESTION FROM US-68
(HARRODSBURG RD) TO US-60
(VERSAILLES RD). SEE SEGMENTS 2A &
2B IN AUGUST, 1998 ADVANCE
KY-4Fayette 439 PL
DN
RW NH 1,170,000
UT NH 1,760,000
CN NH 45,020,000
Project Cost:
0 2,930,000 45,020,000 0
S
OUND BARRIERS ALONG OUTER LOOP
OF NEW CIRCLE ROAD BETWEEN TATES
CREEK ROAD AND NICHOLASVILLE
ROAD. (14CCN)(18CCN) (2022CCR)
(2024CCR)
KY-4Fayette 8801 PL
DN
RW
UT
CN SPP 6,350,000
Project Cost:
0 0 0 6,350,000
Page 75 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE LIBERTY ROAD FROM
G
RAFTONS MILL LANE TO NEW CIRCLE
ROAD AND IMPROVE INTERSECTION WITH
NEW CIRCLE ROAD. (16CCN)(18CCR)
(2020CCR) (2022CCR) (2024CCR)
KY-1927F ayette 8902 PL
DN
RW
UT
CN STPF 10,000,000
Project Cost: 0 10,000,000 0 0
REDUCE CONGESTION ON I-64/I-75 FROM
N
ORTHERN SPLIT TO NEWTOWN PIKE (MP
115.200 – 117.665). SECTION 1
(2024CCR)
I -75F ayette 8909.1000 PL
DN
RW
UT
CN NH 7,500,000 66,500,000
Project Cost: 0 7,500,000 66,500,000 0
B
RIDGE PROJECT IN FAYETTE COUNTY
ON (034B00022L) W NEW CIRCLE RD NC
AT US 60 -VERSAILLES RD
US-60Fayette 10042 PL
DN BRO 499,840
RW
UT
CN
Project Cost: 0 0 0 499,840
B
RIDGE PROJECT IN FAYETTE COUNTY
ON (034B00022R) NEW CIRCLE ROAD AT
US 60 -VERSAILLES RD
KY-4Fayette 10043 PL
DN BRO 668,794
RW
UT
CN
Project Cost:
0 0 0 668,794
B
RIDGE PROJECT IN FAYETTE COUNTY
ON (034B00139N) KY-3367 AT BR OF
NO. ELKHORN CREEK
KY-3367Fayette 10044 PL
DN BRZ 375,394
RW
UT
CN BRZ 2,502,630
Project Cost:
0 2,878,024 0 0
Page 76 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
U
S-25 OVER I-64 (034B00002N)
US-25Fayette 10075 PL
DN FBP 1,173,574
RW
UT
CN FBP 7,823,824
Project Cost: 8,997,398 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-25 OVER RAMP A OF I-75 & I-64
(034B00003N)
US-25Fayette 10084 PL
DN FBP 593,016
RW
UT
CN FBP 3,953,441
Project Cost:
4,546,457 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
BRYAN AVENUE OVER I-75 & I-64
(034B00048N)
KY-57Fayette 10085 PL
DN BRX 1,099,519
RW
UT
CN BRX 7,330,129
Project Cost:
0 8,429,648 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
NB & SB 75 NON-CARDINAL OVER
RELOCATED KEARNEY ROAD
(034B00078L and 034B00078R)
I -75Fayette 10086 PL
DN FBP 1,444,640
RW
UT
CN BRX 4,815,500
FBP 4,815,500
Project Cost:
6,260,140 4,815,500 0 0
A
DDRESS CONGESTION AND IMPROVE
SAFETY ON US 60 FROM MILEPOINT
12.41 TO MILEPOINT 16.37 BY WIDENING
AND MODERNIZING US 60 FROM THE END
OF THE FOUR-LANE SECTION NEAR
US-60Fayette 80150 PL
DN
RW
UT
CN STPF 20,000,000 27,646,000
Project Cost:
0 20,000,000 27,646,000 0
Page 77 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ACCESS MANAGEMENT IMPROVEMENT
O
N US 27 (NICHOLASVILLE RD) AT KY 4
(NEW CIRCLE) INTERCHANGE. (2022CCN)
(2024CCR)
US-27Fayette 80205 PL
DN NH 1,120,000
RW NH 2,630,000
UT NH 2,500,000
CN NH 7,500,000
Project Cost:
1,120,000 5,130,000 7,500,000 0
P
rovide a safe and efficient connection
with access to I-64 from US 60 near the
Hamburg area. (2022CCN)
KY-1425,
PF-9999,
US-60
Fayette 80207 PL SPP 390,000
DN
RW
UT
CN
Project Cost:
390,000 0 0 0
R
ELIEVE TRAFFIC CONGESTION ON NEW
CIRCLE RD BETWEEN Tates Creek AND
Nicholasville Rd (MP 17.741-19.283) BY
INCREASING CAPACITY (2024CCN)
KY-4Fayette 80303 PL
DN NH 4,500,000
RW NH 1,500,000
UT NH 1,000,000
CN NH 48,000,000
Project Cost:
4,500,000 0 2,500,000 48,000,000
R
egional Corridor Feasibility Study to
evaluate east-west connectivity between
US 127 and I-75. Study region includes the
following counties: Anderson, Fayette,
Franklin, Jessamine, Mercer, Scott &
PF-9999Fayette 80304 PL SPP 540,000
DN
RW
UT
CN
Project Cost:
540,000 0 0 0
A
lumni Drive: Address congestion from
Edgewater DR to MOW Blvd. (2024CCN)
CS-3016Fayette 80305 PL
DN SPP 1,250,000
RW SPP 3,500,000
UT SPP 2,750,000
CN SPP 6,000,000
Project Cost: 1,250,000 6,250,000 6,000,000 0
Page 78 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Modernize roadway, improve
m
ulti-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80306 PL
DN
RW
UT
CN NH 4,940,000
Project Cost:
0 4,940,000 0 0
P
rovide additional capacity and improve
multi-modal access on KY 1425 (Man o'
War Blvd) from I-75 to US 60 (Winchester
Road). (2024CCN)
KY-1425Fayette 80307 PL
DN SPP 780,000
RW SPP 2,070,000
UT SPP 1,600,000
CN SPP 5,000,000
Project Cost:
780,000 2,070,000 1,600,000 5,000,000
I
mprove safety and access management
measures on New Circle Rd. (KY 4): from
Boardwalk to North Limestone Street.
(2024CCN)
KY-4Fayette 80308 PL
DN SPP 1,560,000
RW SPP 5,000,000
UT SPP 1,200,000
CN SPP 15,000,000
Project Cost:
1,560,000 5,000,000 1,200,000 15,000,000
O
perational & multimodal improvements on
US 60 (Winchester Rd) from Midland to
New Circle Rd. (2024CCN)
US-60Fayette 80309 PL
DN NH 370,000
RW NH 500,000
UT NH 500,000
CN NH 1,400,000
Project Cost:
370,000 500,000 500,000 1,400,000
M
odernize roadway, improve
multi-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80311 PL
DN
RW NH 710,000
UT NH 260,000
CN NH 1,560,000
Project Cost:
710,000 260,000 1,560,000 0
Page 79 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Modernize roadway, improve
m
ulti-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80312 PL
DN
RW NH 2,840,000
UT NH 1,060,000
CN NH 6,800,000
Project Cost:
3,900,000 6,800,000 0 0
M
odernize roadway, improve
multi-mobility, and include safety and
capacity improvements at intersections on
US 60 (Versailles Road) from Viley Road
to west end of Norfolk Southern railroad
US-60Fayette 80323 PL
DN NH 180,000
RW NH 770,000
UT NH 320,000
CN NH 1,690,000
Project Cost:
180,000 770,000 320,000 1,690,000
I
mprove safety of the entrance ramp onto
WB New Circle from Tates Creek Road,
extension of the acceleration lane (MP
17.8 - 18.2) (2024CCN)
KY-4Fayette 80352 PL
DN SPP 250,000
RW
UT
CN SPP 900,000
Project Cost:
250,000 900,000 0 0
R
educe congestion on New Circle Road
between Richmond Road and Alumni Drive
(MP 14.851-16.123).(SAME AS 4-80360 IN
SB 91 CHANGES) (2024CCN)
KY-4Fayette 80363 PL
DN SPP 4,000,000
RW SPP 1,500,000
UT SPP 5,000,000
CN SPP 35,000,000
Project Cost:
4,000,000 0 6,500,000 35,000,000
M
AN O WAR BLVD - address congestion
and improve safety from Richmond Rd (US
25) to Alumni Dr (CS 316)
CS-4524Fayette 80401 PL
DN SPP 2,500,000
RW SPP 3,500,000
UT SPP 5,000,000
CN SPP 20,250,000
Project Cost:
2,500,000 0 8,500,000 20,250,000
Page 80 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve Capacity on New Circle Road
b
etween Alumni Drive and Tatescreek
Road
KY-4Fayette 80402 PL
DN SPP 5,500,000
RW SPP 1,500,000
UT SPP 1,000,000
CN SPP 58,000,000
Project Cost: 5,500,000 0 2,500,000 58,000,000
T
o relieve traffic congestion at the New
Circle Road and Tates Creek Road
interchange.
KY-1974Fayette 80403 PL
DN SPP 2,250,000
RW SPP 475,000
UT SPP 850,000
CN SPP 17,500,000
Project Cost:
2,250,000 475,000 850,000 17,500,000
I
mprove capacity & multimodal access on
KY 1974 (Tates Creek Rd) from
Armstrong Mill Rd to Malabu Dr. Revise to
match the Lexington Area MPO 2040
Metropolitan Transportation Plan.
KY-1974Fayette 80404 PL
DN SPP 1,500,000
RW SPP 1,500,000
UT SPP 2,000,000
CN SPP 12,500,000
Project Cost:
1,500,000 1,500,000 14,500,000 0
I
mprove capacity & multimodal access on
KY 1974 (Tates Creek Rd) from Man o
War Blvd to Armstrong Mill
KY-1974Fayette 80405 PL
DN SPP 2,000,000
RW SPP 1,415,000
UT SPP 2,500,000
CN SPP 18,250,000
Project Cost:
2,000,000 1,415,000 2,500,000 18,250,000
R
econstruct Old Todds Rd from Codell Dr
to Liberty Rd.
CS-2690Fayette 80411 PL
DN SPP 2,000,000
RW SPP 3,000,000
UT SPP 3,000,000
CN SPP 14,000,000
Project Cost: 2,000,000 3,000,000 3,000,000 14,000,000
Page 81 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve capacity of KY 859 (Haley Road)
b
etween US 60 and the interchange on
I-64.
KY-859Fayette 80413 PL
DN SPP 3,000,000
RW SPP 500,000
UT SPP 1,500,000
CN SPP 21,450,000
Project Cost: 3,000,000 500,000 1,500,000 21,450,000
R
educe congestion and promote
multi-mobility on US 27 (Nicholasville Road)
from Man o War Blvd to Reynolds Road.
(MP 0.945 - 2.323)
US-27Fayette 80427 PL
DN SPP 2,250,000
RW SPP 8,000,000
UT SPP 5,950,000
CN SPP 22,750,000
Project Cost:
0 2,250,000 13,950,000 22,750,000
T
otal for Fayette county PL
Total Amounts:
CN
UT
RW
DN
930,000
35,971,230 3,724,913 1,168,634
21,340,000 22,530,000 16,000,000
7,060,000 15,910,000 33,420,000
55,442,765 114,658,259 255,446,000 325,080,000
120,743,995 156,823,172 304,866,000 326,248,634
U
PGRADE, WIDEN, AND PROVIDE SPOT
IMPROVEMENTS ON KY-165 TO IMPROVE
SAFETY FROM KY-32 TO US-68. (14CCN)
(2024CCN)
KY-165Fleming 8815 PL
DN SPP 2,000,000
RW SPP 3,850,000
UT SPP 4,320,000
CN SPP 40,600,000
Project Cost:
2,000,000 3,850,000 4,320,000 40,600,000
C
ONSTRUCT LEFT TURN LANES ON KY
11 AT ROSS DRIVE, TAYLOR MILL AND
THE INDUSTRIAL PARK ROAD. (16CCN)
(2024CCN)
KY-11Fleming 8901 PL
DN SPP 810,000
RW SPP 1,440,000
UT SPP 1,510,000
CN SPP 2,400,000
Project Cost:
810,000 1,440,000 1,510,000 2,400,000
Page 82 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SAFETY IMPROVEMENTS AND
P
AVEMENT REHAB EAST OF
FLEMINGSBURG BYPASS TO KY 156.
(2020CCN) (2022CCR) (2024CCR)
KY-32Fleming 8903 PL
DN
RW
UT
CN SPP 16,200,000
Project Cost:
16,200,000 0 0 0
W
IDEN KY 801 FROM NEAR MMRC
REGIONAL PARK TO KY 158 IN FLEMING
CO. (16CCN)(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-801Fleming 8915 PL
DN
RW
UT
CN STP2 13,000,000
Project Cost:
13,000,000 0 0 0
A
DDRESS CONDITION OF KY-32 FROM
MILEPOINT 13 TO MILEPOINT 17.45
KY-32Fleming 22327 PL
DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 4,000,000 0 0 0
I
MPROVE SAFETY AND SIGHT DISTANCE
ON KY-32 BEGINNING AT 0.4 MILES WEST
OF FLEMING/ROWAN CO LINE AND
ENDING 0.3 MILES EAST OF THE LINE.
(18CCN) (2020CCR) (2022CCR)
KY-32Fleming 80051 PL
DN
RW SPP 1,650,000
UT SPP 1,950,000
CN SPP 7,560,000
Project Cost:
1,650,000 1,950,000 7,560,000 0
R
ECONSTRUCT KY 57 TO PROVIDE
BETTER HORIZONTAL AND VERTICAL
ALIGNMENT, WIDER SHOULDERS, AND
EXTEND CLEAR ZONES (2020CCN)
(2022CCR) (2024CCR)
KY-57Fleming 80103 PL
DN
RW SPP 9,900,000
UT SPP 8,400,000
CN SPP 48,000,000
Project Cost:
9,900,000 8,400,000 48,000,000 0
Page 83 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Fleming county P L
Total Amounts:
CN
UT
RW
DN 3,130,000
11,550,000 5,290,000
10,350,000 5,830,000
32,880,000 55,560,000 43,000,000
47,560,000 15,640,000 61,390,000 43,000,000
A
DDRESS ROCKFALL ISSUES ON KY 80
AT MP 8 TO MP 10 IN FLOYD COUNTY.
(2024CCN)
KY-80Floyd 5019 PL
DN
RW
UT
CN SPP 14,200,000
Project Cost: 14,200,000 0 0 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00049N) KY-1210 AT LEFT FK
MIDDLE CREEK
KY-1210Floyd 10092 PL
DN FBP2 276,656
RW
UT
CN FBP2 1,844,370
Project Cost:
0 0 2,121,026 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00060N) KY-1091 AT LEFT FK
BEAVER CREEK
KY-1091Floyd 10093 PL
DN BRX 313,566
RW
UT
CN BRX 2,090,441
Project Cost:
0 2,404,007 0 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036B00087N) KY-194 AT COW CREEK
KY-194Floyd 10094 PL
DN BRX 100,354
RW
UT
CN BRX 669,024
Project Cost: 0 0 0 769,378
Page 84 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN FLOYD COUNTY ON
(
036B00135N) KY-3 AT CSX RR &
LEVISA FORK
KY-3Floyd 10096 PL
DN FBP 1,331,866
RW
UT
CN FBP 8,879,104
Project Cost: 0 0 10,210,970 0
B
RIDGE PROJECT IN FLOYD COUNTY ON
(036C00074N) MARTHA'S VINEYARD AT
BULL CREEK
CR-1655Floyd 10098 PL
DN
RW
UT
CN FBP2 1,150,000
Project Cost:
0 0 1,150,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3385 OVER Buffalo Creek
(036B00122N)
KY-3385Floyd 10161 PL
DN BRZ 103,141
RW
UT
CN BRZ 687,608
Project Cost:
0 0 0 790,749
P
lanning Study to evaluate potential
improvements for KY 680 from MP 13.90
to the intersection of US 23, as well as the
intersection of KY 680 and US 23.
(2024CCN)
KY-680Floyd 80300 PL SPP 620,000
DN
RW
UT
CN
Project Cost:
620,000 0 0 0
C
onstruct a new bridge and approaches
off of KY 1428 near MP 14.1. Provide a
new access route from KY 1428 across
Levisa Fork of the Big Sandy River near
Ball Alley Curve in Prestonsburg
PF-9999Floyd 80353 PL
DN
RW
UT
CN SPP 5,500,000
Project Cost:
5,500,000 0 0 0
Page 85 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Floyd county P L
Total Amounts:
CN
UT
RW
DN
620,000
313,566 1,608,522 203,495
19,700,000 2,090,441 11,873,474 1,356,632
20,320,000 2,404,007 13,481,996 1,560,127
I
MPROVE SAFETY, TRUCK MOBILITY,
AND REDUCE CONGESTION ALONG I-64
FROM DIRECTLY EAST OF US-127 TO
US-60 SOUTH OF FRANKFORT.
(2024CCR)
I -64Franklin 551 PL
DN NH 1,500,000
RW NH 750,000
UT NH 300,000
CN NH 4,000,000 27,500,000 48,500,000
Project Cost:
2,250,000 4,300,000 27,500,000 48,500,000
W
IDEN I-64 TO 6 LANES FROM KY-395 TO
KY-151.
I -64Franklin 2035.4000 PL
DN
RW NH 280,000
UT NH 270,000
CN NH 48,400,000
Project Cost: 550,000 48,400,000 0 0
W
IDEN I-64 TO 6 LANES FROM KY-151 TO
WEST OF THE KY-420 BRIDGE.
(2004BOPC)(DESIGN FUNDED UNDER
5-2035.40)(16CCN)(SEE ITEM NO.
5-2035.80 FOR BRIDGES) (2024CCN)
I -64Franklin 2035.7000 PL
DN
RW NH 150,000
UT NH 150,000
CN NH 65,000,000
Project Cost:
300,000 65,000,000 0 0
B
RIDGE PROJECT IN FRANKLIN COUNTY
ON (037B00008N) US 60 AT RJ CORMAN
RAILROAD
US-60Franklin 10040 PL
DN BRO 2,465,331
RW
UT
CN
Project Cost:
0 0 0 2,465,331
Page 86 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN FRANKLIN COUNTY
O
N (037B00074N) KY 676 (E-W CONN)
AT KENTUCKY RIVER & KY 1263
KY-676Franklin 10045 PL
DN
RW
UT
CN BRO 18,000,000
FBP 18,000,000 21,660,000
Project Cost: 18,000,000 18,000,000 21,660,000 0
A
DDRESS DEFICIENCIES OF "SINGING"
BRIDGE ON US 60X OVER KENTUCKY
RIVER (037B00065N)
US-60Franklin 10139 PL
DN
RW
UT
CN BRZ 17,000,000
STP1 12,000,000
Project Cost:
29,000,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 46.303 TO MILEPOINT 53.118
I -64Franklin 22030 PL
DN NHPM 1,330,000
RW
UT
CN NHPM 13,270,000
Project Cost: 0 14,600,000 0 0
A
DD A TURN LANE AT THE
INTERSECTION OF KY 676 AND US 60
(2020CCN) (2024CCR)
US-60Franklin 80105 PL
DN SPP 190,000
RW SPP 180,000
UT SPP 120,000
CN SPP 1,860,000
Project Cost:
190,000 180,000 120,000 1,860,000
I
mprove safety and reduce congestion on
US 127 in Frankfort from I-64 to US 60
(2022CCN) (2024CCR)
US-127Franklin 80201 PL
DN NH 2,080,000
RW SPP 5,780,000
UT SPP 3,400,000
CN SPP 13,100,000
Project Cost:
11,260,000 0 13,100,000 0
Page 87 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND TRAFFIC FLOW
O
N US 60 (VERSAILLES ROAD) FROM US
460 TO I-64 IN FRANKFORT. (2024CCN)
US-60Franklin 80301 PL
DN
RW NH 3,720,000
UT NH 660,000
CN NH 11,580,000
Project Cost: 0 4,380,000 11,580,000 0
I
mprove safety and level of service on
I-64 from US 60 in Frankfort to the
Woodford County line.
I-64Franklin 80400 PL
DN NH 1,400,000
RW NH 1,100,000
UT NH 1,000,000
CN NH 13,700,000
Project Cost:
1,400,000 2,100,000 13,700,000 0
M
odify/reconstruct the I-64/US 60
(Versailles Road) interchange to address
operations and level of service
I-64Franklin 80401 PL
DN NH 600,000
RW NH 100,000
UT NH 900,000
CN NH 6,000,000
Project Cost:
600,000 100,000 900,000 6,000,000
I
mprove safety and level of service on
Evergreen Road (KY 1665) from US 127
to US 60 in Franklin County. (MP 0.127 -
3.892)
KY-1665Franklin 80431 PL SPP 300,000
DN SPP 820,000
RW SPP 2,200,000
UT SPP 1,200,000
CN SPP 8,200,000
Project Cost:
0 300,000 3,020,000 9,400,000
T
otal for Franklin county PL
Total Amounts:
CN
UT
RW
DN
300,000
5,770,000 1,330,000 820,000 2,465,331
6,960,000 5,100,000 2,200,000
3,820,000 1,960,000 1,020,000 1,200,000
47,000,000 148,670,000 87,540,000 64,560,000
63,550,000 157,360,000 91,580,000 68,225,331
Page 88 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE THE PURCHASE PARKWAY AT
T
HE KENTUCKY/TENNESSEE LINE TO
SOUTHWEST OF THE US-51
INTERCHANGE.(I-69 CORRIDOR
IMPROVEMENT) (2022CCR)
JC-9003Fulton 25 PL
DN
RW
UT
CN NH 6,000,000
Project Cost:
6,000,000 0 0 0
O
PERATION OF HICKMAN FERRY AT
MISSISSIPPI RIVER FOR FY 2027
THROUGH FY 2032. (12CCR) (2020CCR)
(2024CCR)
KY-1354Fulton 320.1700 PL
DN
RW
UT
CN SPP 144,000 144,000 144,000 144,000
Project Cost:
144,000 144,000 144,000 144,000
A
DDRESS ECONOMIC DEVELOPMENT,
AND TRUCK ACCESS ISSUES TO THE
FULTON INDUSTRIAL PARK FROM THE
PURCHASE PARKWAY TO HOLLAND
LANE IN FULTON. (2024CCN)
KY-307Fulton 80304 PL
DN SPP 780,000
RW SPP 500,000
UT SPP 400,000
CN SPP 1,500,000
Project Cost:
780,000 500,000 400,000 1,500,000
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY AND FREIGHT
ACCESS ISSUES FROM KY 166 TO KY
1099 IN HICKMAN. (2024CCN)
KY-125F ulton 80310 PL
DN
RW SPP 1,650,000
UT SPP 2,160,000
CN SPP 11,600,000
Project Cost: 3,810,000 11,600,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY ISSUES AND FREIGHT
ACCESS AT INTERSECTION WITH KY 94
SOUTHWEST. (2024CCN)
KY-94F ulton 80319 PL
DN
RW SPP 150,000
UT SPP 250,000
CN SPP 500,000
Project Cost: 400,000 500,000 0 0
Page 89 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CORRECT SUBSTANDARD INTERSECTION
G
EOMETRICS AND ADDRESS ACCESS
ISSUES AT KY 309 & KY 1099 IN
HICKMAN TO IMPROVE THE LESS THAN
ADEQUATE TRUCK TURNING RADIUS.
KY-1099Fulton 80324 PL
DN
RW SPP 400,000
UT SPP 1,000,000
CN SPP 2,000,000
Project Cost:
1,400,000 2,000,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY ISSUES AND FREIGHT
ACCESS FROM TENNESSEE STATE LINE
TO KY 166. (2024CCN)
KY-125F ulton 80326 PL
DN SPP 1,000,000
RW SPP 750,000
UT SPP 500,000
CN SPP 4,000,000
Project Cost: 1,000,000 1,250,000 4,000,000 0
T
otal for Fulton county PL
Total Amounts:
CN
UT
RW
DN 1,780,000
2,200,000 1,250,000
3,410,000 500,000 400,000
6,144,000 14,244,000 4,144,000 1,644,000
13,534,000 15,994,000 4,544,000 1,644,000
I
MPROVE GEOMETRICS ON I-71 FROM
US-127 TO MP 64. (16CCN)(18CCR)
(2024CCR)
I -71Gallatin 8910 PL
DN
RW
UT
CN NH 22,650,000 20,000,000
Project Cost: 22,650,000 20,000,000 0 0
R
ECONSTRUCT I-71 WITH ADDITIONAL
LANES FROM LITTLE SUGAR ROAD
OVERPASS TO THE BOONE COUNTY
LINE. (2024CCN)
I -71Gallatin 80303 PL
DN SPP 3,780,000
RW SPP 300,000
UT SPP 290,000
CN SPP 78,000,000
Project Cost:
3,780,000 590,000 78,000,000 0
Page 90 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct I-71 from the end of the
6
-lane typical section to Little Sugar Road
Overpass
I-71Gallatin 80402 PL
DN
RW NH 500,000
UT NH 500,000
CN NH 55,000,000
Project Cost: 1,000,000 55,000,000 0 0
W
iden I 71 to 6 lanes from KY 35 to US
127.
I-71Gallatin 80403 PL
DN NH 4,000,000
RW NH 250,000
UT NH 500,000
CN NH 60,000,000
Project Cost: 4,000,000 250,000 500,000 60,000,000
I
mprove safety and mobility along KY 35
from US 127 to the Gallatin County line.
KY-35Gallatin 80404 PL
DN SPP 3,000,000
RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 25,000,000
Project Cost: 3,000,000 2,500,000 1,500,000 25,000,000
T
otal for Gallatin county PL
Total Amounts:
CN
UT
RW
DN 10,780,000
500,000 3,050,000
500,000 290,000 2,000,000
22,650,000 75,000,000 78,000,000 85,000,000
34,430,000 78,340,000 80,000,000 85,000,000
I
MPROVE US-27 FROM WEST
LANCASTER BYPASS TO KY-34.
(2006BOPC) (16CCN)(18CCR) (2020CCR)
(2024CCR)
US-27Garrard 196.3000 PL
DN
RW
UT
CN NH 19,000,000 19,000,000
Project Cost:
19,000,000 19,000,000 0 0
Page 91 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
West Lancaster Bypass from North of
L
ancaster to Bell Street at Stanford, KY.
(2024CCR)
CO-0Garrard 196.5000 PL
DN
RW
UT
CN NH 30,000,000 38,000,000
Project Cost: 30,000,000 38,000,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-563 OVER SCOTT FORK
(040B00019N)
KY-563Garrard 10077 PL
DN BRZ 142,134
RW
UT
CN BRZ 947,560
Project Cost:
0 0 1,089,694 0
I
mprove safety on KY 52 from Boone
Creek Road to KY 1150 in Garrard County
KY-52Garrard 80409 PL
DN
RW SPP 5,750,000
UT SPP 1,000,000
CN SPP 9,500,000
Project Cost: 16,250,000 0 0 0
I
mprove safety on KY 52 from KY 590 in
Boyle County to Martin Lane in Garrard
County.
KY-52Garrard 80410 PL
DN
RW SPP 2,280,000
UT SPP 4,900,000
CN SPP 19,500,000
Project Cost:
7,180,000 19,500,000 0 0
T
otal for Garrard county PL
Total Amounts:
CN
UT
RW
DN 142,134
8,030,000
5,900,000
58,500,000 76,500,000 947,560
72,430,000 76,500,000 1,089,694 0
Page 92 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 162.6 TO MILEPOINT 164.4
I -75Grant 20062 PL
DN NHPM 530,000
RW
UT
CN NHPM 5,270,000
Project Cost: 0 5,800,000 0 0
U
pdate US 25 from KY 2842 to south
intersection of KY 491. (2024BOP)
US-25Grant 80216.1000 PL
D
N
RW
UT SPP 1,560,000
CN SPP 5,000,000 5,000,000
Project Cost: 1,560,000 5,000,000 5,000,000 0
U
pdate US 25 from KY 1994 to KY 2842.
(2024BOP)
US-25Grant 80216.2000 PL
D
N
RW SPP 4,200,000
UT SPP 3,120,000
CN SPP 22,400,000
Project Cost: 4,200,000 3,120,000 22,400,000 0
N
EW CONSTRUCTION ON THE EAST SIDE
OF THE RR FROM SHERMAN-NEWTOWN
ROAD TO LEMON-NORTHCUTT ROAD.
(2024CCN)
US-25Grant 80315 PL
DN STP2 6,380,000
RW STP2 4,550,000
UT STP2 1,860,000
CN STP2 57,120,000
Project Cost:
6,380,000 4,550,000 1,860,000 57,120,000
I
mprove safety, reliability, and mobility by
providing grade separated access over
Norfolk Southern Railroad to access US
25 in the vicinity of Needham Lane to Hyde
Road.
FF-9999Grant 80401 PL
DN SPP 5,000,000
RW SPP 6,000,000
UT SPP 5,000,000
CN SPP 45,000,000
Project Cost:
5,000,000 6,000,000 5,000,000 45,000,000
Page 93 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Grant county P L
Total Amounts:
CN
UT
RW
DN 11,380,000 530,000
4,200,000 10,550,000
1,560,000 3,120,000 6,860,000
10,270,000 27,400,000 102,120,000
17,140,000 24,470,000 34,260,000 102,120,000
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00062N) KY-464 AT MAYFIELD
CREEK
KY-464Graves 10126 PL
DN FBP 706,193
RW
UT
CN FBP 4,707,956
Project Cost: 0 0 0 5,414,149
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00127N) KY-408 AT GOOSE
CREEK
KY-408Graves 10129 PL
DN BRX 312,751
RW
UT
CN BRX 2,085,008
Project Cost:
0 0 2,397,759 0
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00131N) KY-339 AT WEST
MAYFIELD CREEK
KY-339Graves 10132 PL
DN BRX 1,291,059
RW
UT
CN BRX 8,607,060
Project Cost:
0 0 0 9,898,119
B
RIDGE PROJECT IN GRAVES COUNTY
ON (042B00271N) KY-1820 AT BRANCH
OF MAYFEILD CREEK
KY-1820Graves 10142 PL
DN BRZ 222,409
RW
UT
CN BRZ 1,482,730
Project Cost:
0 0 0 1,705,139
Page 94 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-45 FROM
M
ILEPOINT 19.4 TO MILEPOINT 20.6
US-45Graves 20042 PL
DN STP4 708,000
RW
UT
CN STP4 8,142,000
Project Cost: 0 0 8,850,000 0
W
IDEN KY 303 FROM MP 16.034 (EAST
FARTHING ST) TO MP 16.807 (CHARLES
DR) (2020CCN) (2022CCR) (2024CCR)
KY-303Graves 80103 PL
DN
RW
UT
CN SPP 5,600,000
Project Cost:
0 5,600,000 0 0
W
IDEN KY 131 FROM MP 0 (KY 58) TO MP
4.555 (KY 483) (2020CCN) (2022CCR)
(2024CCR)
KY-131Graves 80104 PL
DN
RW SPP 2,100,000
UT SPP 2,600,000
CN SPP 18,720,000
Project Cost:
2,100,000 2,600,000 18,720,000 0
U
pgrade/Widen KY 121 bypass in
Mayfield to four lanes. (2022CCN)
(2024CCR)
KY-121Graves 80202 PL
DN
RW SPP 550,000
UT SPP 540,000
CN SPP 5,000,000 5,000,000
Project Cost:
1,090,000 5,000,000 5,000,000 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY AND TRUCK ACCESS
ISSUES FROM KY 348 IN SYMSONIA TO
MCCRACKEN COUNTY LINE. (2024CCN)
KY-131G raves 80332 PL
DN SPP 1,000,000
RW SPP 1,500,000
UT SPP 1,000,000
CN SPP 5,000,000
Project Cost: 1,000,000 2,500,000 5,000,000 0
Page 95 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS ACCESS, CONGESTION, AND
G
EOMETRIC ALIGNMENT ISSUES FROM
THE EASTERN CITY LIMITS OF MAYFIELD
TO KY 131. (2024CCN)
KY-58Graves 80333 PL
DN SPP 1,000,000
RW SPP 1,000,000
UT SPP 1,500,000
CN SPP 8,500,000
Project Cost:
1,000,000 1,000,000 1,500,000 8,500,000
S
pot improvements and minor widening on
KY 58 from the KY 121 Bypass to KY
131.
KY-58Graves 80403 PL
DN SPP 300,000
RW SPP 400,000
UT SPP 400,000
CN SPP 1,500,000
Project Cost:
300,000 800,000 1,500,000 0
T
otal for Graves county PL
Total Amounts:
CN
UT
RW
DN 2,300,000 1,020,751 2,219,661
2,650,000 2,900,000
540,000 4,000,000 1,500,000
10,600,000 40,447,008 23,297,746
5,490,000 17,500,000 42,967,759 25,517,407
A
DDRESS CONDITION OF Wendell H. Ford
Western KY Parkway FROM MILEPOINT
95.03 TO MILEPOINT 106.08
WK-9001Grayson 22166 PL
DN NHPM 1,360,000
RW
UT
CN NHPM 13,640,000
Project Cost:
1,360,000 13,640,000 0 0
A
DDRESS CONNECTIVITY, MOBILITY,
AND SAFETY CONCERNS ON THE WEST
SIDE OF LEITCHFIELD FROM KY 54 TO
THE NORTHERN INTERSECTION OF KY
259 AND KY 3155 (2020CCN) (2022CCR)
PF-9999Grayson 80100 PL
DN SPP 2,800,000
RW SPP 7,500,000
UT SPP 3,000,000
CN SPP 22,000,000
Project Cost:
2,800,000 0 10,500,000 22,000,000
Page 96 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES, AND MAINTENANCE
ISSUES ALONG KY 259 FROM BEAR
CREEK ROAD (MP 9.217) TO THE
NORTHERN INTERSECTION OF
KY-259Grayson 80101 PL
DN SPP 1,670,000
RW SPP 2,300,000
UT SPP 3,480,000
CN SPP 17,360,000
Project Cost:
7,450,000 17,360,000 0 0
I
MPROVE SAFETY, GEOMETRIC
DEFICIENCIES AND DRAINAGE ALONG US
62 FROM THE PROPOSED LEITCHFIELD
WESTERN BYPASS TO THE SOUTHERN
INTERSECTION OF KY 259 IN
US-62Grayson 80302 PL
DN NH 750,000
RW NH 2,000,000
UT NH 2,000,000
CN NH 5,500,000
Project Cost:
750,000 2,000,000 2,000,000 5,500,000
I
MPROVE SAFETY, GEOMETRIC
DEFICIENCIES AND DRAINAGE ALONG US
62 FROM SCHOOLHOUSE ROAD TO THE
PROPOSED LEITCHFIELD WESTERN
BYPASS. (2024CCN)
US-62Grayson 80307 PL
DN NH 1,680,000
RW NH 3,750,000
UT NH 3,000,000
CN NH 10,000,000
Project Cost:
1,680,000 0 6,750,000 10,000,000
I
MPROVE INTERSECTIONS ALONG THE
LEITCHFIELD BYPASS AT KY 1214, US
62, AND KY 920. (2024CCN)
KY-3155Grayson 80311 PL
DN
RW SPP 250,000
UT SPP 260,000
CN SPP 3,240,000
Project Cost:
0 260,000 250,000 3,240,000
T
otal for Grayson county PL
Total Amounts:
CN
UT
RW
DN 8,260,000
2,300,000 2,000,000 11,500,000
3,480,000 260,000 8,000,000
31,000,000 40,740,000
14,040,000 33,260,000 19,500,000 40,740,000
Page 97 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY, GEOMETRIC
D
EFICIENCIES AND MAINTENANCE ISSUES
ALONG US 68 FROM THE METCALFE
COUNTY LINE (MP 0.000) TO 1600 FEET
WEST OF SOUTH THURLOW ROAD (MP
US-68G reen 397.1100 PL
DN STP2 1,120,000
RW STP2 3,130,000
UT STP2 3,500,000
CN STP2 12,000,000
Project Cost: 1,120,000 3,130,000 3,500,000 12,000,000
C
onstruction of new connector on the
east side of Greensburg beginning at KY
3535 and extending to Taylor Cox Road
(Design under 4-398)
KY-3535Green 398.1000 PL
DN
RW
UT
CN STPF 24,414,000
Project Cost:
24,414,000 0 0 0
C
onstruction of new connector on the
east side of Greensburg beginning near
the US 61 and US 68 intersection south of
town and extending to Taylor Cox Road
(Design under 4-398)
KY-3535Green 398.2000 PL
DN
RW
UT
CN STPF 15,431,000
Project Cost:
0 15,431,000 0 0
S
POT IMPROVEMENTS & IMPROVE
EXISTING ALIGNMENT ON KY 88 FROM
0.20 MILES WEST OF AKIN NARROWS OF
PITMAN RD (MP 8.996) TO KY 61 (MP
11.232). (14CCN)(16CCR)(18CCN)
KY-88Green 8853 PL
DN SPP 1,120,000
RW SPP 2,500,000
UT
CN
Project Cost:
1,120,000 0 2,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
LILETOWN RD OVER GREASY CK
(044C00012N)
CR-1227Green 10082 PL
DN BRZ 224,724
RW
UT
CN BRZ 1,498,162
Project Cost:
1,722,886 0 0 0
Page 98 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY ON KY 210 FROM
M
ORNINGSTAR ROAD (LARUE MP14.23)
TO JUST EAST OF CORINTH CHURCH
(TAYLOR MP0.60) (2024CCN)
KY-210Green
80154.2000 PL
D
N
RW
UT
CN STPF 7,400,000 10,000,000
Project Cost: 0 7,400,000 10,000,000 0
T
otal for Green county PL
Total Amounts:
CN
UT
RW
DN 2,464,724
3,130,000 2,500,000
3,500,000
25,912,162 22,831,000 10,000,000 12,000,000
28,376,886 25,961,000 16,000,000 12,000,000
R
ECONSTRUCT KY-2 FROM MP 13.2 TO
US-23 (MP 17.2)(08CCN)(14CCR)(16CCR)
(18CCN) (2024CCR)
KY-2Greenup 132 PL
DN STP2 750,000
RW SPP 9,350,000
UT SPP 8,100,000
CN SPP 98,600,000
Project Cost:
750,000 9,350,000 8,100,000 98,600,000
I
mprove KY 207 from the intersection with
KY 67 (MP 11) to MP 15 (Design under
9-8509)
KY-207Greenup 8509.1000 PL
DN
RW
UT STPF 3,500,000
CN STPF 25,000,000
Project Cost:
3,500,000 25,000,000 0 0
I
mprove KY 207 from MP 15 to the KY 693
intersection in Flatwoods (Design under
9-8509)
KY-207Greenup 8509.2000 PL
DN
RW SPP 9,000,000
UT SPP 4,000,000
CN SPP 13,000,000
Project Cost:
9,000,000 4,000,000 13,000,000 0
Page 99 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-23 FROM
M
ILEPOINT 0 TO MILEPOINT 4.5
US-23Greenup 20037 PL
DN STP5 440,000
RW
UT
CN STP5 5,060,000
Project Cost: 0 0 5,500,000 0
I
mprove congestion, access and mobility
at the KY 693/KY 1488 intersection by
constructing a traffic signal (MP 3.384 KY
693) (2024CCN)
KY-693Greenup 80352 PL
DN
RW SPP 110,000
UT SPP 210,000
CN SPP 420,000
Project Cost:
110,000 210,000 420,000 0
I
mprove safety and decrease congestion
at the KY 693 (Diederick Blvd.) and KY
1172 (Red Devil Ln.) intersection by
improving signal visibility, adding
advanced signal warning signs and
KY-693Greenup 80401 PL
DN SPP 250,000
RW SPP 250,000
UT SPP 500,000
CN SPP 1,200,000
Project Cost:
250,000 750,000 1,200,000 0
T
otal for Greenup county PL
Total Amounts:
CN
UT
RW
DN 1,000,000 440,000
9,110,000 9,600,000
3,500,000 4,710,000 8,100,000
25,000,000 19,680,000 98,600,000
13,610,000 39,310,000 28,220,000 98,600,000
W
IDEN US-60 FROM MILE 2.2 IN
LEWISPORT TO KY-1957. (2024CCN)
US-60Hancock 80306 PL
DN
RW
UT
CN NH 9,000,000
Project Cost: 0 9,000,000 0 0
Page 100 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety and condition concerns of
K
Y-69 near Tick Ridge Rd.
KY-69Hancock 80407 PL
DN
RW SPP 175,000
UT SPP 400,000
CN NH 9,000,000
Project Cost: 0 175,000 400,000 9,000,000
A
ddress safety concerns on KY 271 from
KY 1847 to US 60 in Hancock County (MP
3.161 - 4.581)
KY-271Hancock 80419 PL
DN SPP 560,000
RW SPP 650,000
UT SPP 750,000
CN SPP 2,300,000
Project Cost:
560,000 1,400,000 2,300,000 0
T
otal for Hancock county PL
Total Amounts:
CN
UT
RW
DN 560,000
825,000
750,000 400,000
9,000,000 2,300,000 9,000,000
560,000 10,575,000 2,700,000 9,000,000
N
EW INTERCHANGE AT I-65/KY 1136
(GILEAD CHURCH ROAD) AT MP 84 IN
HARDIN COUNTY. (2022BOP) (2024CCN)
I -65Hardin 29 PL
DN NH 2,800,000
RW SPP 9,380,000
UT SPP 4,340,000
CN
Project Cost: 2,800,000 0 9,380,000 4,340,000
A
DDRESS CONGESTION, SAFETY, AND
MOBILITY ALONG US 31W FROM
VETERANS WAY IN ELIZABETHTOWN TO
THE NORTH WILSON ROAD OVERPASS IN
RADCLIFF. (2018BOP) (2022CCR)
US-31Hardin 154.3000 PL
DN
RW NH 8,400,000
UT NH 4,960,000
CN NH 52,800,000
Project Cost:
13,360,000 0 0 52,800,000
Page 101 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND RING ROAD FROM THE WESTERN
K
ENTUCKY PARKWAY TO I-65.
(REQUIRES RELOCATION OF I-65
SOUTHBOUND COMMERCIAL VEHICLE
MONITORING STATION, PROJECT
PF-9999H ardin 198 PL
DN
RW STP2 3,000,000
UT STP2 2,080,000
CN STP2 19,000,000 21,440,000
Project Cost: 5,080,000 19,000,000 21,440,000 0
C
ONSTRUCT A BYPASS OF GLENDALE.
(2022BOP) (2024CCN)
PF-9999Hardin 202 PL
DN
RW
UT STP2 1,500,000
CN STP2 8,320,000
Project Cost: 1,500,000 8,320,000 0 0
I
-65 SOUTHBOUND PORT OF ENTRY FOR
A COMMERCIAL VEHICLE MONITORING
STATION. (2022CCR)
I -65Hardin 286.1000 PL
DN
RW
UT
CN NH 21,420,000
Project Cost: 21,420,000 0 0 0
I
MPROVE SAFETY, MOBILITY AND
GEOMETRICS ON US-62 FROM I-65 TO
UPPER COLESBURG ROAD (CR-1038)
(2024CCR)
US-62Hardin 442 PL
DN SPP 2,020,000
RW SPP 4,380,000
UT
CN
Project Cost:
2,020,000 0 4,380,000 0
B
RIDGE PROJECT IN HARDIN COUNTY ON
(047B00059N) KY-86 AT ROUGH RIVER
KY-86Hardin 10053 PL
DN BRX 431,168
RW
UT
CN BRX 2,874,454
Project Cost: 0 0 3,305,622 0
Page 102 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-065 FROM
M
ILEPOINT 90.53 TO MILEPOINT 97.54
I -65Hardin 20047 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
A
DDRESS CONDITION OF Martha Layne
Collins Bluegrass Parkway FROM
MILEPOINT 5.853 TO MILEPOINT 8.837
BG-9002Hardin 20051 PL
DN STP5 120,000
RW
UT
CN STP5 1,192,960
Project Cost:
120,000 1,192,960 0 0
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 82.2 TO MILEPOINT 90.53
I -65Hardin 22064 PL
DN NHPM 200,000
RW
UT
CN NHPM 2,000,000
Project Cost: 0 0 0 2,200,000
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 97.54 TO MILEPOINT 102.1
I -65Hardin 22065 PL
DN NHPM 1,000,000
RW
UT
CN NHPM 10,000,000
Project Cost: 0 11,000,000 0 0
A
ddress safety, mobility, and access
management, along with potentially
reconfiguring the interchange to I 65.
(2022CCN) (2024CCR)
US-62Hardin 80200 PL
DN
RW SPP 6,310,000
UT SPP 1,150,000
CN SPP 10,000,000 14,500,000
Project Cost:
6,310,000 1,150,000 10,000,000 14,500,000
Page 103 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND RING ROAD FROM US 31W TO
K
Y 61 (LINCOLN PARKWAY) (2022CCN)
(2024CCR)
PF-9999Hardin 80250 PL
DN
RW SPP 2,200,000
UT SPP 2,240,000
CN SPP 14,270,000
Project Cost: 2,200,000 2,240,000 14,270,000 0
A
DDRESS GEOMETRIC DEFICIENCIES
ALONG KY 1600 FROM KY 361 TO THE
ROUNDABOUT AT KY 220 IN RINEYVILLE.
(2024CCN)
KY-1600Hardin 80301 PL
DN SPP 730,000
RW SPP 1,880,000
UT SPP 1,600,000
CN SPP 6,000,000
Project Cost:
730,000 3,480,000 6,000,000 0
E
XTEND COMMERCE DRIVE FROM
SPRINGFIELD ROAD TO US 31W AT KY
1136 ON THE SOUTH SIDE OF
ELIZABETHTOWN. (2024CCN)
PF-9999Hardin 80303 PL
DN
RW
UT SPP 1,620,000
CN SPP 5,040,000
Project Cost:
0 1,620,000 5,040,000 0
I
MPROVE THE INTERSECTION OF US 62
AND THE US 31W BYPASS RAMP AT
NICHOLAS STREET IN ELIZABETHTOWN.
(2024CCN)
US-62Hardin 80310 PL
DN SPP 570,000
RW SPP 2,100,000
UT SPP 2,080,000
CN SPP 1,890,000
Project Cost:
570,000 2,100,000 2,080,000 1,890,000
A
DD SHOULDERS AND TURN LANES TO
US 31W BETWEEN KY 1136 AND KY 222
EAST OF GLENDALE. SEE GLENDALE
AREA TRANSPORTATION STUDY.
(2024CCN)
US-31Hardin 80313 PL
DN SPP 1,570,000
RW SPP 3,750,000
UT
CN
Project Cost:
1,570,000 3,750,000 0 0
Page 104 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS GEOMETRIC DEFICIENCIES
A
LONG US 31W FROM KY 222 TO KY 61
(LINCOLN PARKWAY)/WESTERN
KENTUCKY PARKWAY INTERSECTION.
(2024CCN)
US-31Hardin 80314 PL
DN NH 3,780,000
RW NH 4,400,000
UT NH 4,200,000
CN NH 35,000,000
Project Cost:
3,780,000 4,400,000 4,200,000 35,000,000
A
ddress safety along US 31W from the
end of the center barrier wall on
Muldraugh hill in Hardin County (MP 34.65)
to KY 44 in Jefferson County (1.917).
(2024CCN)
US-31Hardin 80364 PL
DN SPP 1,400,000
RW SPP 1,880,000
UT SPP 2,480,000
CN SPP 11,000,000
Project Cost:
1,400,000 1,880,000 2,480,000 11,000,000
R
oad rightsizing and intersection
improvements along US 31W (East Dixie
Avenue) from the Western KY Parkway to
KY 1136 (New Glendale Road)
US-31Hardin 80400 PL
DN SPP 1,565,000
RW SPP 285,000
UT SPP 170,000
CN SPP 8,615,000
Project Cost:
1,565,000 285,000 170,000 8,615,000
O
perational and intersection improvements
to US 62 in Elizabethtown between the
western intersection at KY 3005 and the
Nicholas Street Connector.
US-62Hardin 80401 PL
DN SPP 1,100,000
RW SPP 1,000,000
UT SPP 1,000,000
CN SPP 9,000,000
Project Cost:
1,100,000 2,000,000 9,000,000 0
I
ntersection improvements at the
intersection of KY 1357 (St. John Road)
and US 31WB
US-31Hardin 80402 PL
DN SPP 800,000
RW SPP 150,000
UT SPP 150,000
CN SPP 5,000,000
Project Cost:
800,000 150,000 150,000 5,000,000
Page 105 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Operational and safety improvements at
t
he intersection of College Street Road
and US 31WB
US-31Hardin 80403 PL
DN SPP 380,000
RW
UT
CN SPP 2,500,000
Project Cost: 380,000 2,500,000 0 0
O
perational and safety improvements,
including curve realignment, turn lanes,
and pedestrian facilities, for all users on
College Street Road
CS-1124Hardin 80404 PL
DN SPP 520,000
RW SPP 300,000
UT SPP 150,000
CN SPP 3,000,000
Project Cost:
520,000 300,000 150,000 3,000,000
S
AFETY IMPROVEMENTS ALONG KY 144
IN RADCLIFF FROM KY 1646 TO US 31W
INCLUDING RECONSTRUCTING THE
INTERSECTIONS AT WOODLAND DRIVE
AND AT KY 1646.
KY-144Hardin 80405 PL
DN SPP 800,000
RW SPP 1,100,000
UT SPP 2,700,000
CN SPP 6,000,000
Project Cost:
800,000 3,800,000 6,000,000 0
O
perational and intersection improvements
along KY 3005 in Elizabethtown between
the western intersection of US 62 and US
31W.
KY-3005Hardin 80409 PL
DN SPP 2,750,000
RW SPP 5,000,000
UT SPP 3,000,000
CN SPP 23,500,000
Project Cost:
2,750,000 8,000,000 23,500,000 0
T
otal for Hardin county PL
Total Amounts:
CN
UT
RW
DN 20,905,000 1,000,000 431,168 400,000
19,910,000 21,845,000 13,760,000
8,540,000 13,310,000 9,230,000 4,340,000
21,420,000 41,012,960 98,124,454 135,805,000
70,775,000 77,167,960 121,545,622 140,545,000
Page 106 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address Slide on US 421 in Harlan
C
ounty.
US-421Harlan 5012 PL
DN
RW
UT
CN SPP 5,040,000
Project Cost: 5,040,000 0 0 0
B
RIDGE PROJECT IN HARLAN COUNTY
ON (048B00107N) US-119 AT POOR FK
CUMBERLAND RVR
US-119Harlan 10194 PL
DN FBP 550,000
RW
UT
CN FBP 5,500,000
Project Cost:
0 0 6,050,000 0
A
DDRESS CONDITION OF US-119 FROM
MILEPOINT 6 TO MILEPOINT 7.8
US-119Harlan 20040 PL
DN STP4 272,000
RW
UT
CN STP4 3,128,000
Project Cost: 272,000 3,128,000 0 0
A
DDRESS CONDITION OF US-119 FROM
MILEPOINT 26 TO MILEPOINT 28.066
US-119Harlan 20041 PL
DN STP4 344,000
RW
UT
CN STP4 3,956,000
Project Cost: 0 0 0 4,300,000
E
XTEND KY 72 FROM ALVA/BLACK
STAR NEAR HARLAN /BELL COUNTY
LINE TO LIGGETT WEST OF HARLAN
CITY. APPROXIMATELY 5 MILES OF
RECONSTRUCTION (2022CCN) (2024CCR)
KY-72Harlan 80257 PL
DN SPP 1,750,000
RW SPP 2,000,000
UT SPP 500,000
CN SPP 30,000,000
Project Cost:
1,750,000 2,000,000 500,000 30,000,000
Page 107 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SPOT IMPROVEMENTS TO IMPROVE
G
EOMETRICS AT PARTICULAR
LOCATIONS OF US 421 CROSSING OVER
PINE MOUNTAIN BETWEEN US 119 AND
KY 221 IN HARLAN COUNTY TO
US-421Harlan 80259 PL
DN
RW
UT SPP 800,000
CN SPP 13,520,000
Project Cost:
800,000 13,520,000 0 0
TO
IMPROVE ACCESS, CONNECTIVITY
AND MOBILITY BY EXTENDING KY 72
FROM ALVA/BLACK STAR NEAR
HARLAN/ BELL COUNTY LINE.
RECONSTRUCT EXISTING COAL HAUL
KY-72Harlan 80260 PL
DN SPP 1,000,000
RW SPP 500,000
UT SPP 200,000
CN SPP 8,000,000
Project Cost:
1,000,000 500,000 200,000 8,000,000
S
pot improvements to widen at particular
locations along KY 2010 to improve
mobility and safety (2024CCN)
KY-2010Harlan 80358 PL
DN SPP 520,000
RW SPP 110,000
UT
CN SPP 2,000,000
Project Cost:
520,000 110,000 2,000,000 0
S
pot improvements to improve geometrics
at particular locations of KY 221 to
address safety concerns (MP 10 - 17.5)
(2024CCN)
KY-221Harlan 80359 PL
DN SPP 520,000
RW SPP 200,000
UT SPP 200,000
CN SPP 1,300,000
Project Cost:
520,000 200,000 200,000 1,300,000
I
mprove safety along KY 38, KY 221, KY
987, US 421, and KY 522 by removing
trees (2024CCN)
KY-221,
KY-38,
KY-522,
KY-987,
US-421
Harlan 80365 PL
DN
RW
UT
CN SPP 1,000,000
Project Cost:
1,000,000 0 0 0
Page 108 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct remaining unimproved section
o
f US421 from the end of the progressive
design-build project to Barn Branch
US-421Harlan 80401 PL
DN
RW STP2 2,070,000
UT STP2 2,000,000
CN STP2 14,130,000
Project Cost: 4,070,000 0 14,130,000 0
T
otal for Harlan county PL
Total Amounts:
CN
UT
RW
DN 4,062,000 550,000 344,000
2,070,000 2,810,000
2,800,000 900,000
6,040,000 16,648,000 21,630,000 43,256,000
14,972,000 19,458,000 23,080,000 43,600,000
C
ONSTRUCT WEST US-27 CYNTHIANA
BYPASS: SECTION THREE FROM US-27
NORTH TO US 62 EAST. (06CCN)
(2024CCN)
US-27Harrison 8300 PL
DN SPP 1,080,000
RW SPP 2,900,000
UT SPP 570,000
CN SPP 18,250,000
Project Cost:
0 1,080,000 2,900,000 18,820,000
R
ECONSTRUCT US 27 FROM MP 11.9 TO
MP 12.4. (12CCN)(14CCR)(18CCN)
(2022CCR) (2024CCR)
US-27Harrison 8708 PL
DN
RW SPP 1,050,000
UT SPP 540,000
CN SPP 9,180,000
Project Cost:
1,050,000 540,000 9,180,000 0
B
RIDGE PROJECT IN HARRISON COUNTY
ON (049B00053N) PLEASANT STREET AT
SO.FK. LICKING RIVER
KY-36Harrison 10040 PL
DN BRX 1,067,965
RW
UT
CN
Project Cost:
0 0 0 1,067,965
Page 109 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN HARRISON COUNTY
O
N (049R00603N) NEBO RD AT CSX
RAILWAY
CR-1316Harrison 10042 PL
DN BRX 271,998
RW
UT
CN BRX 1,813,320
Project Cost: 0 0 2,085,318 0
C
ONSTRUCT A CONNECTOR ROAD
BETWEEN OLD LAIR ROAD AND KY 982
(NEW LAIR ROAD) NEAR THE HARRISON
COUNTY HIGH SCHOOL. (2022CCN)
(2024CCR)
CR-1124,
KY-982,
PF-9999,
US-27
Harrison 80251 PL
DN
RW
UT
CN SPP 10,000,000
Project Cost:
0 0 10,000,000 0
C
ONSTRUCT A ROUNDABOUT AT THE
INTERSECTION OF WEBSTER AVENUE
(CS-1071) AND EDUCATION DRIVE.
(2022CCN) (2024CCR)
CS-1159Harrison 80252 PL
DN
RW
UT
CN SPP 650,000
Project Cost:
650,000 0 0 0
P
rovide a two way left turn lane on KY
982 (New Lair Road) (MP 4.4 - 5.1)
(2024CCN)
KY-982Harrison 80353 PL
DN
RW
UT SPP 1,500,000
CN SPP 8,000,000
Project Cost:
1,500,000 0 0 8,000,000
T
otal for Harrison county PL
Total Amounts:
CN
UT
RW
DN 1,080,000 271,998 1,067,965
1,050,000 2,900,000
1,500,000 540,000 570,000
650,000 20,993,320 26,250,000
3,200,000 1,620,000 24,165,318 27,887,965
Page 110 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-218 FROM
M
ILEPOINT 7.245 TO MILEPOINT 11.528
KY-218Hart 20049 PL
DN STP5 264,000
RW
UT
CN STP5 3,036,000
Project Cost: 264,000 3,036,000 0 0
I
MPROVE CONNECTION BETWEEN KY 88
AND US 31W NEAR I-65 IN
MUNFORDVILLE. (2024CCN)
PF-9999Hart 80304 PL
DN STP2 1,400,000
RW STP2 1,888,000
UT STP2 750,000
CN STP2 8,000,000
Project Cost:
1,400,000 2,638,000 0 8,000,000
I
mprove the intersections and access
management along US 31W at KY 88 and
KY 571 near the Hart County High School
US-31Hart 80407 PL
DN
RW STP2 1,500,000
UT STP2 500,000
CN STP2 5,000,000
Project Cost:
1,500,000 500,000 5,000,000 0
T
otal for Hart county PL
Total Amounts:
CN
UT
RW
DN 1,664,000
1,500,000 1,888,000
1,250,000
3,036,000 5,000,000 8,000,000
3,164,000 6,174,000 5,000,000 8,000,000
B
RIDGE PROJECT IN HENDERSON
COUNTY ON ( 051B00002R/051B00007L)
US-41 AT OHIO RIVER
US-41Henderson 2091.1000 PL
DN BRO 405,000
FBP 3,000,000
RW
UT
CN BRO 2,700,000
FBP 20,000,000
Project Cost: 0 26,105,000 0 0
Page 111 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y 2084 OVER BR CANOE CRK
(051B00052N)
KY-2084Henderson 10148 PL
DN FBP 305,183
RW
UT
CN FBP 2,034,551
Project Cost: 0 0 0 2,339,734
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-41 OVER OHIO RIVER (051B00002R)
US-41Henderson 10163 PL
DN BRO 2,613,900
RW
UT
CN BRO 26,139,000
Project Cost: 0 28,752,900 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 137.141 TO MILEPOINT
142.334
I -69Henderson 22093 PL
DN NHPM 1,800,000
RW
UT
CN NHPM 18,000,000
Project Cost:
0 19,800,000 0 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 0 TO
MILEPOINT 8.88
AU-9005Henderson 22193 PL
DN NHPM 1,400,000
RW
UT
CN NHPM 14,000,000
Project Cost:
0 0 15,400,000 0
A
DDRESS CONDITION OF Audubon
Parkway FROM MILEPOINT 8.88 TO
MILEPOINT 15.883
AU-9005Henderson 22194 PL
DN NHPM 1,150,000
RW
UT
CN NHPM 11,550,000
Project Cost:
0 0 12,700,000 0
Page 112 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT A NEW ROUTE INTO THE
P
ARK FROM WATSON LANE. (2024CCN)
PF-9999Henderson 80309 PL
DN
RW SPP 300,000
UT SPP 250,000
CN SPP 2,900,000
Project Cost: 550,000 2,900,000 0 0
I
MPROVE LEVEL OF SERVICE ON KY 425
FROM US60 TO US 41. (2024CCN)
KY-425Henderson 80310 PL
DN SPP 1,740,000
RW SPP 660,000
UT SPP 470,000
CN SPP 30,160,000
Project Cost: 1,740,000 660,000 470,000 30,160,000
IMPROVE EASTERN INTERSECTION OF US
6
0 AND KY 1078. (2024CCN)
US-60H enderson 80311 PL
DN SPP 270,000
RW SPP 390,000
UT SPP 440,000
CN SPP 1,620,000
Project Cost: 270,000 390,000 440,000 1,620,000
I
mprove congestion and mobility on KY
812 in the vicinity of sports complex (MP
5.7-6.11). (2024CCN)
KY-812Henderson 80350 PL
DN SPP 520,000
RW SPP 300,000
UT SPP 500,000
CN SPP 2,500,000
Project Cost:
520,000 300,000 500,000 2,500,000
C
onstruct a new connector between
US-41 and US-60 in Henderson between
MM 11.9 and 12.1 on US-41 N and MM
12.3 and 12.4 on US 60 E.
PF-9999Henderson 80413 PL
DN
RW STPF 2,100,000
UT STPF 1,750,000
CN STPF 13,500,000
Project Cost:
0 3,850,000 13,500,000 0
Page 113 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Henderson county P L
Total Amounts:
CN
UT
RW
DN 2,530,000 7,818,900 2,550,000 305,183
300,000 3,450,000
250,000 1,750,000 1,410,000
69,739,000 39,050,000 36,314,551
3,080,000 82,757,900 43,010,000 36,619,734
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM KY-53 TO
KY-153.
I -71Henry 552 PL
DN
RW NH 1,800,000
UT NH 900,000
CN NH 56,200,000
Project Cost: 2,700,000 56,200,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM KY 153 TO
US 421. (2024CCN)
I -71Henry 572 PL
DN SPP 4,320,000
RW SPP 1,500,000
UT
CN
Project Cost:
4,320,000 1,500,000 0 0
R
EHABILITATION-OVERLAY AND
WIDENING EXISTING KY-55 FROM KY-22
TO CURVE AT MP 2.210 NORTH OF
EMINENCE. INCLUDES REPLACING
EXISTING CURB AND GUTTER AND
KY-55Henry 8820 PL
DN
RW
UT SPP 1,450,000
CN SPP 3,460,000
Project Cost:
1,450,000 0 3,460,000 0
G
EOTECH REPAIRS ON KY-389 IN HENRY
COUNTY ABOVE THE KENTUCKY RIVER
SOUTH OF MARSHALLS BOTTOM ROAD.
(14CCN)(2024CCN)
KY-389Henry 8822 PL
DN SPP 580,000
RW SPP 600,000
UT SPP 290,000
CN SPP 2,320,000
Project Cost:
580,000 890,000 2,320,000 0
Page 114 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y 202 OVER FLAG RUN (052B00011N)
KY-202Henry 10109 PL
DN FBP2 155,757
RW
UT
CN FBP2 1,038,381
Project Cost: 0 0 1,194,138 0
A
DDRESS CONDITION OF I-071 FROM
MILEPOINT 24.727 TO MILEPOINT 29.112
(28.17 CARDINAL)
I -71Henry 20068 PL
DN NHPM 450,000
RW
UT
CN NHPM 4,541,533
Project Cost:
0 4,991,533 0 0
I
mprove safety and traffic operstions on
KY 153 between KY 712 and KY 146. A
total of 80 housing units are scheduled for
construction in 2026, prompting the need
to add road shoulders to enhance safety
KY-153Henry 80413 PL
DN SPP 360,000
RW SPP 90,000
UT SPP 170,000
CN SPP 3,950,000
Project Cost:
360,000 260,000 3,950,000 0
T
otal for Henry county PL
Total Amounts:
CN
UT
RW
DN 5,260,000 450,000 155,757
1,800,000 2,190,000
2,350,000 460,000
60,741,533 10,768,381
9,410,000 63,841,533 10,924,138 0
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00017N) KY-307 AT NORTH
FORK BAYOU DE CHIE
KY-307Hickman 10145 PL
DN BRX 299,943
RW
UT
CN BRX 1,999,620
Project Cost: 0 2,299,563 0 0
Page 115 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN HICKMAN COUNTY
O
N (053B00042N) KY-58 AT OBION
CREEK
KY-58Hickman 10147 PL
DN FBP 830,898
RW
UT
CN FBP 5,539,320
Project Cost: 6,370,218 0 0 0
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00078N) KY-1475 AT
HURRICANE BRANCH
KY-1475Hickman 10149 PL
DN BRX 112,898
RW
UT
CN BRX 752,652
Project Cost:
0 0 0 865,550
B
RIDGE PROJECT IN HICKMAN COUNTY
ON (053B00093N) KY-3061 AT BR OF
BRUSH CREEK (EAST)
KY-3061Hickman 10150 PL
DN BRX 136,244
RW
UT
CN BRX 908,293
Project Cost:
0 0 0 1,044,537
C
orrect geometric deficiencies and
improve safety, access, and regional
connectivity from Clayton Street to
KY-703 in Clinton. (2022CCN) (2024CCR)
US-51Hickman 80203 PL
DN
RW
UT STP2 2,500,000
CN STP2 8,000,000
Project Cost:
2,500,000 8,000,000 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
I
MPROVE SAFETY, ACCESS, AND
REGIONAL CONNECTIVITY FROM KY-703
IN CLINTON TO .160 MILES SOUTH OF
OBION CREEK BRIDGE. (2024CCN)
US-51H ickman 80325 PL
DN NH 1,700,000
RW NH 2,500,000
UT NH 4,000,000
CN NH 18,000,000
Project Cost: 1,700,000 0 6,500,000 18,000,000
Page 116 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY, ACCESS, AND
R
EGIONAL CONNECTIVITY, AND
ADDRESS GEOMETRIC DEFICIENCIES
FROM HICKMAN C/L TO CANE CREEK
BRIDGE. (2024CCN)
US-51Hickman 80327 PL
DN NH 1,000,000
RW NH 1,000,000
UT NH 2,000,000
CN NH 8,000,000
Project Cost:
1,000,000 3,000,000 0 8,000,000
CORRECT GEOMETRIC DEFICIENCIES, AND
I
MPROVE SAFETY, ACCESS AND
REGIONAL CONNECTIVITY FROM BAYOU
DE CHEIN BRIDGE TO MARTIN ROAD.
(2024CCN)
US-51H ickman 80328 PL
DN SPP 1,560,000
RW SPP 1,050,000
UT SPP 1,000,000
CN SPP 6,500,000
Project Cost: 1,560,000 1,050,000 1,000,000 6,500,000
I
MPROVE SAFETY, TRUCK MOBILITY,
AND GEOMETRIC DEFICIENCIES AT THE
ICR RAILROAD OVERPASS. (2024CCN)
KY-307Hickman 80329 PL
DN SPP 800,000
RW SPP 750,000
UT SPP 1,000,000
CN SPP 4,000,000
Project Cost:
800,000 1,750,000 0 4,000,000
I
MPROVE INTERSECTION GEOMETRICS
AND ADDRESS SIGHT DISTANCE ISSUES
WITH ACCESS TO US 51 FROM KY 1301
AND THE ENTRANCE OF HARPERS
COUNTRY HAMS NEAR CLINTON.
US-51Hickman 80330 PL
DN SPP 520,000
RW SPP 150,000
UT SPP 350,000
CN SPP 2,000,000
Project Cost:
520,000 150,000 350,000 2,000,000
I
mprove safety, access, geometric
deficiencies and economic development
issues from Ezell Lane to Clayton Street
US-51Hickman 80410 PL
DN NH 300,000
RW NH 1,000,000
UT NH 400,000
CN NH 2,500,000
Project Cost:
300,000 1,400,000 2,500,000 0
Page 117 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Hickman county P L
Total Amounts:
CN
UT
RW
DN 6,710,898 299,943 249,142
3,950,000 2,500,000
2,500,000 3,400,000 5,350,000
5,539,320 9,999,620 2,500,000 40,160,945
14,750,218 17,649,563 10,350,000 40,410,087
R
emove the median on US 41 (South Main
Street) from the railroad to MP 15.521
(2024CCN)
US-41Hopkins 129 PL
DN NH 925,000
RW NH 700,000
UT NH 1,350,000
CN NH 13,200,000
Project Cost: 925,000 700,000 1,350,000 13,200,000
I
MPROVE KY-281 FROM ISLAND PARK
DRIVE TO 0.25 MI NORTH OF CARRIAGE
LANE (KY-2281).
KY-281Hopkins 384 PL
DN
RW SPP 2,100,000
UT SPP 1,930,000
CN SPP 5,270,000
Project Cost:
2,100,000 1,930,000 5,270,000 0
R
econstruct Whittington Drive beginning
500’ south of Commerce Drive and ending
at the intersection of Whittington Drive and
Island Ford Road (KY 281), including the
reconstruction of the KY 281 intersection.
CS-1287Hopkins 804.4000 PL
DN
RW SPP 2,400,000
UT SPP 1,680,000
CN SPP 3,230,000
Project Cost:
4,080,000 3,230,000 0 0
I
MPROVE NORTH MAIN STREET FROM
HOSPITAL DRIVE TO KY-281. (06CCN)
(12CCR)(18CCR) (2024CCR)
US-41Hopkins 8305 PL
DN
RW
UT
CN SPP 9,470,000
Project Cost:
9,470,000 0 0 0
Page 118 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN HOPKINS COUNTY
O
N (054B00016N) EDWARD T BREATHITT
AT PENNYRILE PARKWAY
I -69Hopkins 10093 PL
DN BRO 1,235,868
RW
UT
CN
Project Cost: 0 0 0 1,235,868
B
RIDGE PROJECT IN HOPKINS COUNTY
ON (054B00076N) KY-109 AT CLEAR
CREEK
KY-109Hopkins 10098 PL
DN BRX 1,149,704
RW
UT
CN BRX 7,664,692
Project Cost:
0 0 0 8,814,396
A
DDRESS CONDITION OF US-41 FROM
MILEPOINT 12.376 TO MILEPOINT 14.53
US-41Hopkins 20067 PL
DN STP3 224,000
RW
UT
CN STP3 2,576,000
Project Cost: 0 2,800,000 0 0
A
DDRESS CONDITION OF Edward T.
Breathitt Pennyrile Parkway FROM
MILEPOINT 29.9 TO MILEPOINT 32.861
EB-9004Hopkins 22192 PL
DN NHPM 910,000
RW
UT
CN NHPM 9,091,115
Project Cost:
10,001,115 0 0 0
I
MPROVE US 41A BEGINNING AT
INDUSTRIAL DR AT HOPKINS CO ENDING
AT PROVIDENCE (2022CCR) (2024CCR)
US-41Hopkins 80105 PL
DN NH 2,500,000
RW NH 2,000,000
UT NH 5,000,000
CN NH 30,000,000
Project Cost:
2,500,000 0 7,000,000 30,000,000
Page 119 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE US41A BEGINNING NEAR NEBO
A
T MP 8.7 AND ENDING AT MP 11.2 IN
HOPKINS COUNTY. (2022BOP)
(2024CCN)
US-41Hopkins
80105.1000 PL
D
N
RW SPP 2,630,000
UT SPP 2,500,000
CN SPP 5,500,000
Project Cost: 2,630,000 2,500,000 5,500,000 0
I
MPROVE US41A BEGINNING NEAR KY
630 AT MP 5.0 AND ENDING AT MP 7.4 IN
HOPKINS COUNTY. (2022BOP)
US-41Hopkins
80105.2000 PL
D
N
RW SPP 1,800,000
UT SPP 1,740,000
CN SPP 4,640,000
Project Cost: 1,800,000 1,740,000 4,640,000 0
I
MPROVE SAFETY AND MOBILITY OF KY
260 FROM THE APPROACHES AT THE
RAILROAD CROSSING IN HANSON TO
THE SOUTHBOUND ON AND OFF RAMPS
OF I69. (2024CCN)
KY-260Hopkins 80300 PL
DN
RW SPP 2,000,000
UT SPP 1,670,000
CN SPP 6,760,000
Project Cost:
0 3,670,000 6,760,000 0
T
otal for Hopkins county PL
Total Amounts:
CN
UT
RW
DN 4,335,000 224,000 2,385,572
8,930,000 2,700,000 2,000,000
1,680,000 7,840,000 6,350,000
18,561,115 5,806,000 22,170,000 50,864,692
33,506,115 16,570,000 30,520,000 53,250,264
A
DDRESS SUBSTANDARD HORIZONTAL
AND VERTICAL ALIGNMENT OF US 421 IN
THE CLOVER BOTTOM AREA NEAR THE
STONE QUARRY. (2020CCN)
US-421Jackson 80104 PL
DN
RW
UT
CN SPP 14,360,000
Project Cost:
0 14,360,000 0 0
Page 120 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve the existing geometric alignments
a
t two spot locations (MP 4.7-6.3 and
8.0-8.5) by realigning curves in high crash
cluster areas and widening. Improve
design speed to 45 mph along these two
KY-290Jackson 80313 PL
DN SPP 1,040,000
RW SPP 1,650,000
UT SPP 1,620,000
CN SPP 5,040,000
Project Cost:
1,040,000 1,650,000 1,620,000 5,040,000
T
otal for Jackson county PL
Total Amounts:
CN
UT
RW
DN 1,040,000
1,650,000
1,620,000
14,360,000 5,040,000
1,040,000 16,010,000 1,620,000 5,040,000
A
DDITION OF NB AND SB AUXILIARY
LANES ON I-71 NEAR KENNEDY,
INCLUDING OPERATIONAL
IMPROVEMENTS TO THE ZORN
INTERCHANGE. (2004BOPC) (2024CCR)
I-71Jefferson 48.1000 PL
DN
RW
UT
CN NH 55,324,500
Project Cost:
55,324,500 0 0 0
W
IDEN GREENWOOD ROAD FROM
GREENBELT HWY TO DIXIE HWY
(US-31W) (3-LANE IMPROVEMENT) FROM
MP 0.54 TO MP 3.148. (98CCR)
(R-04DEOB)(04CCR)(BOP2006P)(10CCR)
KY-1931Jefferson 323.0100 PL
DN
RW
UT
CN SPP 32,940,000
Project Cost:
32,940,000 0 0 0
W
IDEN SOUTHBOUND HURSTBOURNE
LANE TO 3 LANES FROM LINN STATION
RD (CS-1004H) TO EDEN AVE
(CS-1660H). (06CCR) (03KYD)
(2006BOPP)(SEE 5-344.02 FOR KYD C
KY-1747Jefferson 344.0100 PL
DN
RW
UT SPP 2,380,000
CN SPP 3,900,000
Project Cost:
2,380,000 3,900,000 0 0
Page 121 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT AND WIDEN KY 1819
(
WATTERSON TRAIL) - PLANTSIDE DRIVE
TO BLUEGRASS PARKWAY. (98CCR)
(2024CCN)
KY-1819Jefferson 373.2000 PL
DN SPP 470,000
RW
UT SPP 2,110,000
CN SPP 9,000,000
Project Cost:
470,000 2,110,000 9,000,000 0
I
MPROVE DIXIE HIGHWAY BETWEEN
GREENWOOD ROAD (KY 1931) AND
STONESTREET ROAD (CR 1003). (14CCN)
(2024CCN)
US-31Jefferson 478.3000 PL
DN NH 630,000
RW SPP 510,000
UT SPP 1,390,000
CN NH 7,540,000
Project Cost:
630,000 1,900,000 7,540,000 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-265 FROM I-65 TO
US-31E. (2024CCR)
I -265Jefferson 554 PL
DN
RW NH 3,560,000
UT NH 3,010,000
CN NH 76,050,000
Project Cost:
0 3,560,000 3,010,000 76,050,000
R
EDUCE CONGESTION AND IMPROVE
SAFETY ALONG KY-1747
(HURSTBOURNE PARKWAY) FROM
STONY BROOK DRIVE TO I-64.
(2024CCN)
KY-1747Jefferson 555 PL
DN SPP 7,660,000
RW SPP 9,000,000
UT SPP 10,440,000
CN SPP 77,720,000
Project Cost:
7,660,000 9,000,000 10,440,000 77,720,000
I
MPROVE SAFETY AND REDUCE
CONGESTION ON I-71 FROM I-264 TO
I-265. (2024CCR)
I -71Jefferson 557 PL
DN
RW
UT NH 940,000
CN
Project Cost:
0 940,000 0 0
Page 122 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ON I-265 FROM US-31E
(BARDSTOWN RD) TO KY-155
(TAYLORSVILLE RD). (2024CCR)
I -265Jefferson 558 PL
DN NH 7,500,000
RW NH 2,500,000
UT NH 1,500,000
CN NH 75,000,000
Project Cost:
7,500,000 2,500,000 1,500,000 75,000,000
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE I-65/I-264
(WATTERSON EXPRESSWAY)
INTERCHANGE. (2024CCR)
I -65Jefferson 559 PL
DN NH 3,480,000
RW NH 2,000,000
UT NH 2,000,000
CN NH 100,000,000
Project Cost:
3,480,000 2,000,000 2,000,000 100,000,000
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE I-65/I-265 (GENE
SNYDER FREEWAY) INTERCHANGE.
I-65Jefferson 560 PL
DN NH 6,000,000
RW NH 2,000,000
UT NH 2,000,000
CN NH 90,000,000
Project Cost:
6,000,000 4,000,000 90,000,000 0
D
EDICATED FEDERAL AID STP FUNDS
EARMARKED FOR LOUISVILLE
URBANIZED AREA AND SUBJECT TO MPO
CONTROL FOR FY 2026-2032. (FUNDING
SUBJECT TO FISCAL CONSTRAINT
CO-0Jefferson 965.1900 PL
DN
RW
UT
CN SLO 26,800,000 26,800,000 26,800,000 26,800,000
Project Cost:
26,800,000 26,800,000 26,800,000 26,800,000
I
MPROVE AND WIDEN MT WASHINGTON
ROAD FROM PRESTON HIGHWAY TO
PENN RUN CREEK BRIDGE. (10CCN)
(SAME AS 5-8611.00) (2024CCN)
KY-2053Jefferson 8205.1000 PL
DN
RW SPP 5,080,000
UT SPP 9,510,000
CN SPP 13,190,000
Project Cost:
5,080,000 9,510,000 13,190,000 0
Page 123 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
DESIGN AND CONSTRUCT A SOUND
B
ARRIER WALL ON THE NORTH SIDE OF
I-71 FROM MP 7.5 TO MP 8.7 FOR
APPROX. 6400 FEET. (90,893 SF)
I-71Jefferson 8860 PL
DN SPP 350,000
RW
UT
CN SPP 8,200,000
Project Cost:
350,000 8,200,000 0 0
E
XTEND THE LEFT TURN LANE ON
HURSTBOURNE LANE AT INTERSECTION
WITH SIX MILE LANE. (16CCN) (2024CCN)
KY-1747,
PF-9999
Jefferson 8905 PL
DN
RW
UT
CN SPP 210,000
Project Cost:
210,000 0 0 0
I
MPROVE THE HURSTBOURNE PARKWAY
(KY 1747) AT SHELBYVILLE ROAD (US
60) INTERSECTION TO INCREASE
CAPACITY, REDUCE DELAYS, AND
IMPROVE SAFETY. (16CCN)
KY-1747Jefferson 8953 PL
DN
RW SPP 750,000
UT SPP 1,040,000
CN SPP 2,600,000
Project Cost:
1,790,000 2,600,000 0 0
I
mprove safety and traffic operations on
KY 155 from MP 2.0 in Spencer County to
Floyds Fork In Jefferson County (total
length 6.247 miles) (Portion of 5-8954.0).
(2024CCN)
KY-155Jefferson 8954.1000 PL
DN
RW STPF 3,540,000
UT STPF 11,226,000
CN STPF 34,120,000
Project Cost:
0 3,540,000 11,226,000 34,120,000
D
ESIGN AND CONSTRUCT A SOUND
BARRIER WALL ON I-71 NORTHBOUND
FROM NEAR GLENVIEW AVENUE TO
JUST NORTH OF THE LIME KILN
OVERPASS FOR APPROXIMATELY 2,700
I-71Jefferson 8963 PL
DN SPP 250,000
RW
UT
CN SPP 2,300,000
Project Cost:
250,000 2,300,000 0 0
Page 124 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SAFETY IMPROVEMENTS AT CR 1013F
A
T CRUMS LANE ELEMENTARY.
(2020BOP)(2021SCHSAF) (2024CCN)
CR-1013,
KY-1934
Jefferson 9026 PL
DN SPP 420,000
RW
UT
CN
Project Cost:
420,000 0 0 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00039L and 056B00039R) I-64
WB AT TUCKER STATION RD
I -64J efferson 10057 PL
DN FBP 830,898
RW
UT
CN FBP 10,700,000
Project Cost: 830,898 0 10,700,000 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00087R) I-265 NB AT KY 22
(BROWNSBORO RD)
I -265J efferson 10063 PL
DN BRO 1,706,159
RW
UT
CN BRO 11,374,391
Project Cost: 0 0 13,080,550 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00180N) I-65 AT US 60A
(EASTERN PKWY)
I -65J efferson 10065 PL
DN
RW
UT
CN BRO 25,515,595
FBP 10,062,708
Project Cost: 35,578,303 0 0 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00184N) I-65 AT ST CATHERINE
ST
I -65J efferson 10067 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
Page 125 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00205N) I-65 AT NS RAILROAD
(POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson 10070 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00209N) I-65 AT PHILLIPS LN
I -65J efferson 10071 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00210N) I-65 AT MANNING RD
I -65J efferson 10072 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00211N) I-65 AT KFEC GATE 6
DR
I -65J efferson 10073 PL
DN FBP 750,000
RW
UT
CN FBP 5,000,000
Project Cost: 0 0 0 5,750,000
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00269N) I-264 EB AT I-264 WB
OFF RAMP
I -264J efferson 10076 PL
DN BRO 96,734
RW
UT
CN BRO 644,896
Project Cost: 0 0 741,630 0
Page 126 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00273N) I-264 EB ON RAMP AT
P&L RAILWAY
I -264J efferson 10077 PL
DN FBP 1,430,900
RW
UT
CN FBP 9,539,336
Project Cost: 0 0 10,970,236 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00278N) I-64 WB RAMP AT I-64
EB
I -64J efferson 10078 PL
DN BRO 463,096
RW
UT
CN BRO 3,087,310
Project Cost: 0 0 0 3,550,406
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00389N) I-65 AT GRADE LN
I -65J efferson 10082 PL
DN BRO 872,972
RW
UT
CN FBP 5,819,814
Project Cost: 0 0 6,692,786 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00390N) I-65 AT STANDIFORD
LN
I -65J efferson 10083 PL
DN FBP 1,039,935
RW
UT
CN FBP 6,932,898
Project Cost: 0 0 7,972,833 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00186N) I-65 AT OAK STREET.
(POTENTIAL CMGC DELIVERY PROJECT)
I -65J efferson 10103 PL
DN FBP 750,000
RW
UT
CN BRO 5,000,000
Project Cost: 0 0 0 5,750,000
Page 127 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00182N) I-65 AT BRANDIES
AVE. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65J efferson 10104 PL
DN
RW
UT
CN FBP 15,537,793
Project Cost: 15,537,793 0 0 0
BRIDGE PROJECT IN JEFFERSON COUNTY
O
N (056B00181N) I-65 AT UNIVERSITY
BLVD. (POTENTIAL CMGC DELIVERY
PROJECT)
I -65J efferson 10105 PL
DN
RW
UT
CN BRO 17,497,802
Project Cost: 17,497,802 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CR 1002 OVER NS RAILROAD & HIKES LN
(056B00122L)
KY-1703Jefferson 10112 PL
DN BRX 1,129,560
RW
UT
CN BRX 7,530,401
Project Cost: 0 0 8,659,961 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
CR 1002 OVER NS RAILROAD & HIKES LN
(056B00122R)
KY-1703Jefferson 10113 PL
DN BRX 1,129,560
RW
UT
CN BRX 7,530,401
Project Cost:
0 0 8,659,961 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 31 OVER OHIO RIVER (056B00136N)
US-31Jefferson 10115 PL
DN
RW
UT
CN FBP 33,546,500
Project Cost: 33,546,500 0 0 0
Page 128 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-841 FROM
M
ILEPOINT 0 TO MILEPOINT 10.25
KY-841Jefferson 20022 PL
DN NHPM 1,312,000
RW
UT
CN NHPM 15,088,000
Project Cost: 0 0 0 16,400,000
A
DDRESS CONDITION OF KY-1934 FROM
MILEPOINT 0 TO MILEPOINT 4.44
KY-1934Jefferson 20028 PL
DN NHPM 340,000
RW
UT
CN NHPM 3,910,000
Project Cost: 340,000 3,910,000 0 0
A
DDRESS CONDITION OF KY-2048 FROM
MILEPOINT 0 TO MILEPOINT 1.13
KY-2048Jefferson 20030 PL
DN STP5 88,000
RW
UT
CN STP5 1,012,000
Project Cost: 1,100,000 0 0 0
A
DDRESS CONDITION OF KY-2052 FROM
MILEPOINT 0 TO MILEPOINT 4.205
KY-2052Jefferson 20031 PL
DN STP3 336,000
RW
UT
CN STP3 3,864,000
Project Cost: 4,200,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 0.795 (0.828 CARDINAL) TO
MILEPOINT 5.217 (4.935 NON-CARDINAL)
I -64Jefferson 20065 PL
DN NHPM 550,000
RW
UT
CN NHPM 5,455,000
Project Cost:
0 0 6,005,000 0
Page 129 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-065 FROM
M
ILEPOINT 127.57 TO MILEPOINT 131.24
I -65Jefferson 20067 PL
DN NHPM 790,000
RW
UT
CN NHPM 7,910,000
Project Cost: 8,700,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 11.574 TO MILEPOINT 13.206
(13.124 CARDINAL)
I -64Jefferson 22023 PL
DN NHPM 2,500,000
RW
UT
CN STP5 11,000,000
Project Cost:
0 0 0 13,500,000
A
DDRESS CONDITION OF I-065 FROM
MILEPOINT 123.18 TO MILEPOINT 127.57
I -65Jefferson 22069 PL
DN
RW
UT
CN NHPM 76,000,000
Project Cost: 76,000,000 0 0 0
A
DDRESS CONDITION OF I-071 FROM
MILEPOINT 0 TO MILEPOINT 3.66
I -71Jefferson 22096 PL
DN STP5 200,000
RW
UT
CN STP5 2,000,000
Project Cost: 0 2,200,000 0 0
A
DDRESS CONDITION OF I-264 FROM
MILEPOINT 18.41 TO MILEPOINT 20.7
I -264Jefferson 22140 PL
DN NHPM 540,000
RW
UT
CN NHPM 5,449,257
Project Cost: 0 5,989,257 0 0
Page 130 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EASTWOOD FISHERSVILLE CONNECTOR
TO
I-64
KY-1531Jefferson 80000 PL
DN
RW NH 8,000,000
UT NH 2,000,000
CN NH 45,000,000
Project Cost: 0 8,000,000 2,000,000 45,000,000
I
MPROVE OPERATIONS ALONG US-60
FROM OLD SHELBYVILLE ROAD TO
NORTH ENGLISH STATION ROAD.
(18CCN) (2020CCR) (2024CCR)
US-60Jefferson 80001 PL
DN
RW
UT
CN NH 4,680,000
Project Cost:
0 4,680,000 0 0
C
ONSTRUCT NEW INTERCHANGE ON
KY-841 AT THE RENAISSANCE SOUTH
BUSINESS PARK(18CCN) (FUNDED WITH
LOCAL FUNDS) (2024CCN)
I -65,
KY-1065,
KY-841,
PF-9999
Jefferson 80006 PL
DN
RW
UT
CN NH 16,330,000
Project Cost:
16,330,000 0 0 0
W
IDEN AND IMPROVE RANGELAND RD
FROM POLAR LEVEL RD TO
SHEPHERDSVILLE RD (2020CCN)
(2022CCR) (2024CCR)
CR-1015Jefferson 80108 PL
DN
RW SPP 1,380,000
UT SPP 1,150,000
CN SPP 3,500,000
Project Cost:
1,380,000 1,150,000 3,500,000 0
C
ONSTRUCT A SIDEWALK ALONG MT
HOLLY RD FROM CHARLENE DR TO FOX
AVE FOR CORAL RIDGE ELEMENTARY
(2020CCN)
KY-2055Jefferson 80110 PL
DN
RW SPP 40,000
UT SPP 40,000
CN SPP 330,000
Project Cost:
40,000 40,000 330,000 0
Page 131 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce congestion, improve safety, and
e
nhance mobility on KY 2050 (Herr Lane)
from Prince Valiant Drive/Westmar
Terrace to Bedford Lane. (2022CCN)
(2024CCR)
KY-2050Jefferson 80200 PL
DN
RW
UT SPP 2,030,000
CN SPP 2,860,000
Project Cost:
2,030,000 2,860,000 0 0
I
mprove safety and reduce congestion on
KY 1065 (Outer Loop) from I-65 to KY
2052 (Shepherdsville Road). Project will
evaluate the addition of one travel lane in
each direction and consider
KY-1065Jefferson 80203 PL
DN STPF 2,450,000
RW STPF 3,440,000
UT STPF 2,730,000
CN STPF 27,250,000
Project Cost:
2,450,000 3,440,000 2,730,000 27,250,000
I
mprove safety and reduce congestion on
KY 1931 (Manslick Road) from KY 1931
(St. Andrews Church Road) to I-264
(Henry Watterson Expressway). Project
will evaluate 3-lane widening and
KY-1931Jefferson 80204 PL
DN
RW SPP 6,650,000
UT SPP 12,030,000
CN SPP 10,270,000
Project Cost:
6,650,000 12,030,000 10,270,000 0
I
mprove safety, reduce congestion, and
improve multi-modal transportation options
along KY 61 from Commerce Crossings Dr
(BMP 1.395) to Briden Avenue (EMP
8.400) including the I-264 (Watterson
KY-61Jefferson 80205 PL
DN NH 6,570,000
RW NH 10,510,000
UT NH 10,570,000
CN NH 58,850,000
Project Cost:
6,570,000 10,510,000 10,570,000 58,850,000
R
EDUCE CONGESTION, IMPROVE
SAFETY, AND ENHANCE MOBILITY ON
KY 1819 (WATTERSON TRAIL) FROM
BLUEGRASS PARKWAY TO
BLANKENBAKER PARKWAY (KY 913)
KY-1819Jefferson 80258 PL
DN
RW
UT
CN SPP 12,480,000
Project Cost:
12,480,000 0 0 0
Page 132 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce congestion, improve safety and
e
nhance mobility along the US 31E
(Bardstown Road) corridor from the
Bullitt/Jefferson County line to KY 1065
(Beulah Church/Seatonville Road). (MP 0.0
US-31Jefferson 80261 PL
DN NH 5,830,000
RW NH 3,360,000
UT NH 2,800,000
CN NH 138,800,000
Project Cost:
5,830,000 3,360,000 2,800,000 138,800,000
A
dd dedicated turn lanes from Cedar
Creek Rd to Bardstown Rd (US 31E). (2nd
EB left turn and EB right turn lanes) (MP
4.369)
US-31Jefferson
80261.3000 PL
D
N
RW
UT
CN STPF 2,000,000
Project Cost: 2,000,000 0 0 0
T
RANSPORTATION SYSTEM
MANAGEMENT & TRANSPORTATION
DEMAND MANAGEMENT ACTIVITIES ON
US 31E (BARDSTOWN ROAD) BETWEEN
DOUGLASS BOULEVARD & HIKES LANE.
US-31Jefferson 80300 PL
DN SPP 500,000
RW SPP 500,000
UT SPP 500,000
CN SPP 5,000,000
Project Cost:
500,000 500,000 500,000 5,000,000
T
RANSPORTATION SYSTEM
MANAGEMENT IMPROVEMENTS ON US
31W FROM KY 841 TO KY 44 IN
SOUTHERN JEFFERSON COUNTY; TO
INCLUDE THE CONSIDERATION OF
US-31Jefferson 80302 PL
DN
RW SPP 8,350,000
UT SPP 8,690,000
CN SPP 3,330,000
Project Cost:
0 8,350,000 8,690,000 3,330,000
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE KY 1065 AND KY
61 INTERSECTION. PROJECT WILL
CONSIDER ADDING A RIGHT TURN LANE
ON WESTBOUND KY 1065 (OUTER LOOP)
KY-1065Jefferson 80303 PL
DN SPP 200,000
RW SPP 240,000
UT SPP 240,000
CN SPP 2,400,000
Project Cost:
200,000 240,000 240,000 2,400,000
Page 133 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RELOCATE & RECONSTRUCT KY 1531
(
JOHNSON ROAD) WITH IMPROVED
GEOMETRY FROM US 60 (SHELBYVILLE
ROAD) TO AIKEN ROAD. PROJECT WILL
CONSIDER A 2 LANE ROAD (NO
KY-1531Jefferson 80304 PL
DN SPP 970,000
RW SPP 470,000
UT SPP 240,000
CN SPP 10,190,000
Project Cost:
970,000 470,000 240,000 10,190,000
I
MPROVE SAFETY AND REDUCE
CONGESTION ON GRADE LANE FROM KY
1065 (OUTER LOOP) TO KY 1631 (FERN
VALLEY ROAD). PROJECT DESIGN WILL
EVALUATE 3-LANE WIDENING WITH
CR-1001Jefferson 80306 PL SPP 185,000
DN SPP 1,200,000
RW SPP 700,000
UT SPP 300,000
CN SPP 13,500,000
Project Cost:
185,000 1,200,000 1,000,000 13,500,000
I
MPROVE TRAFFIC OPERATIONS ON KY
22 FROM JUST EAST OF MURPHY LANE
TO HAUNZ LANE. PROJECT DESIGN WILL
EVALUATE 3-LANE WIDENING WITH
TWOWAY CENTER TURN LANE.
KY-22Jefferson 80310 PL
DN SPP 650,000
RW SPP 420,000
UT SPP 630,000
CN SPP 4,000,000
Project Cost:
1,070,000 630,000 4,000,000 0
W
EST KENTUCKY STREET (CS 1005)
MASTER PLAN PROJECT FROM 18TH
STREET TO 4TH STREET. PROJECT WILL
CONSIDER SIDEWALK IMPROVEMENTS,
BICYCLE FACILITIES, IMPROVEMENTS TO
CS-1005Jefferson 80311 PL
DN SPP 520,000
RW SPP 300,000
UT SPP 300,000
CN SPP 6,600,000
Project Cost:
520,000 600,000 6,600,000 0
A
DDRESS CONGESTION AND SAFETY
ISSUES IN THE VICINITY OF THE
BRECKENRIDGE LANE (KY 1932) AND
DUTCHMANS LANE INTERSECTION.
(2024CCN)
KY-1932Jefferson 80321 PL
DN NH 500,000
RW NH 300,000
UT NH 400,000
CN NH 2,500,000
Project Cost:
500,000 300,000 400,000 2,500,000
Page 134 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
THIS PROJECT IS A MAJOR COMPLETE
S
TREET RE-DESIGN OF 9TH STREET JUST
WEST OF THE CENTRAL BUSINESS
DISTRICT OF LOUISVILLE FROM THE OHIO
RIVER SOUTH TO ITS INTERSECTION WITH
CS-1046,
C
S-1176
Jefferson 80324 PL
DN SPP 2,990,000
RW SPP 220,000
UT SPP 390,000
CN SPP 17,460,000
Project Cost: 2,990,000 220,000 390,000 17,460,000
I
MPROVE SAFETY AND OPERATIONS ON
ARNOLDTOWN ROAD FROM KY 1931 TO
KY 907. PROJECT DESIGN WILL
EVALUATE 2 LANE ROAD (NO ADDED
LANES).KIPDA ID# 249 (2024CCN)
CR-1003Jefferson 80331 PL SPP 250,000
DN SPP 2,170,000
RW SPP 520,000
UT SPP 190,000
CN SPP 13,640,000
Project Cost:
250,000 2,170,000 710,000 13,640,000
I
MPROVEMENTS WITHIN THE I-64
CORRIDOR FROM THE KENNEDY
INTERCHANGE TO I-264 (WATTERSON
EXPRESSWAY) ADDRESSING SAFETY
AND CONGESTION ISSUES. THE
I -64Jefferson 80334 PL
DN NH 2,550,000
RW NH 1,490,000
UT NH 530,000
CN NH 31,980,000
Project Cost:
2,550,000 0 2,020,000 31,980,000
E
NHANCE MOBILITY AND PROVIDE SAFE
ACCESS TO COMMUNITY FACILITIES
ALONG KY 1819 (WATTERSON TRAIL)
FROM SKYVIEW PARK (MP 10.43) TO
PLANTSIDE DRIVE (MP 10.79). (2024CCN)
KY-1819Jefferson 80340 PL
DN SPP 470,000
RW SPP 40,000
UT SPP 50,000
CN SPP 840,000
Project Cost:
470,000 40,000 50,000 840,000
I
MPROVE SAFETY, REDUCE CONGESTION
AND ENHANCE MOBILITY ALONG THE KY
1934 (GREENBELT HWY/ CANE RUN RD)
CORRIDOR FROM THE KY 841/KY 1934
INTERCHANGE TO RALPH AVE (MP 0.0-
KY-1934Jefferson 80341 PL SPP 400,000
DN NH 3,000,000
RW NH 1,000,000
UT NH 2,000,000
CN NH 29,000,000
Project Cost:
3,400,000 1,000,000 2,000,000 29,000,000
Page 135 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ROADWAY RECONFIGURATION,
O
NE-WAY TO TWO-WAY CONVERSION.
(2024CCN) (POSSIBLE SLO FUNDING)
US-42Jefferson 80342 PL
DN
RW
UT SPP 2,200,000
CN SPP 2,950,000
Project Cost: 0 2,200,000 2,950,000 0
S
afety improvements on KY 1865 (New
Cut Road)/Taylor Boulevard from MP 0.5
(just south of Old New Cut Road) to MP
5.766 (just north of the I-264 ramp).
(2024CCN)
KY-1865Jefferson 80352 PL
DN NH 4,000,000
RW NH 9,000,000
UT NH 8,000,000
CN NH 60,000,000
Project Cost:
4,000,000 9,000,000 8,000,000 60,000,000
I
mprovements from Eastern Parkway
Transportation Study between Bardstown
Road to Cherokee Park entrance (MP 6.82
-0.322) with a Memorandum of Agreement
with the Louisville Metro Government.
US-60Jefferson 80355 PL
DN SPP 1,130,000
RW
UT SPP 450,000
CN SPP 6,780,000
Project Cost:
1,130,000 450,000 6,780,000 0
I
mprovements from Eastern Parkway
Transportation Study between Hahn
Street to Concord Drive (MP 3.84-4.15)
with a Memorandum of Agreement with
the Louisville Metro Government.
US-60Jefferson 80356 PL
DN SPP 990,000
RW SPP 130,000
UT SPP 410,000
CN SPP 6,100,000
Project Cost:
990,000 540,000 6,100,000 0
R
educe congestion using ITS strategies
on the following corridors: US 60
(Shelbyville Road) from US 60A
(Lexington Road) to KY 1747
(Hurstbourne Parkway), US 150/US 31E
US-60Jefferson 80402 PL
DN SPP 3,750,000
RW SPP 300,000
UT SPP 300,000
CN SPP 17,020,000
Project Cost:
3,750,000 300,000 300,000 17,020,000
Page 136 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Imrpove safety and reduce congestion on
K
Y-155 from Tucker Station Road (MP
6.88) to KY 913/Blankenbaker Pkwy (MP
8.25).
KY-155Jefferson 80403 PL
DN SPP 1,800,000
RW SPP 1,500,000
UT SPP 1,500,000
CN SPP 16,500,000
Project Cost:
1,800,000 1,500,000 1,500,000 16,500,000
I
mprove Traffic Operations and Safety on
KY 155 from the Floyds Fork Bridge (MP
4.000) to KY 148 (MP 4.400).
KY-155Jefferson 80404 PL
DN
RW SPP 500,000
UT SPP 150,000
CN SPP 7,000,000
Project Cost:
0 500,000 150,000 7,000,000
R
educe congestion and improve safety on
KY 2049 (Crums Lane) from I-264
underpass to US 31W. Includes
consideration of pedestrian facilities,
consider bike lane, provide access
KY-2049Jefferson 80405 PL SPP 200,000
DN SPP 750,000
RW SPP 1,000,000
UT SPP 1,200,000
CN SPP 6,020,000
Project Cost:
200,000 750,000 2,200,000 6,020,000
O
perational improvements along US 42
from Falls Creek Road (MP 7.5) to
Woodstone Way (MP 7.9)
US-42Jefferson 80406 PL
DN
RW NH 800,000
UT NH 1,320,000
CN NH 7,090,000
Project Cost:
2,120,000 7,090,000 0 0
D
esign and construct a sound barrier wall
on the northbound side of I-265 from MP
35.3 to 35.9 (approx. 3,200 feet)
I-265Jefferson 80407 PL
DN SPP 250,000
RW
UT
CN SPP 4,350,000
Project Cost:
4,600,000 0 0 0
Page 137 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Extend Urton Lane from north of I-64 to
S
eatonville Road. Includes consideration
of facilities for all modes (pedestrian,
bicycle, SOV, and transit).
FF-9999Jefferson 80408 PL
DN SPP 4,000,000
RW SPP 3,000,000
UT SPP 2,500,000
CN SPP 52,000,000
Project Cost:
4,000,000 3,000,000 2,500,000 52,000,000
R
educe congestion and enhance mobility
on KY 2050 (Herr Lane) from Bedford
Lane to Wesboro Road.
KY-2050Jefferson 80418 PL
DN SPP 300,000
RW SPP 300,000
UT SPP 700,000
CN SPP 1,800,000
Project Cost:
300,000 1,000,000 1,800,000 0
I
mprove safety and reduce congestion on
Shepherdsville Road (CR-1008G) from KY
2845 (Manslick Road) to Applegate Lane.
Project design will evaluate a 3 lane road
(third lane will be Two Way Left Turn
CR-1008Jefferson 80420 PL
DN SPP 1,765,000
RW SPP 882,000
UT SPP 882,000
CN SPP 20,471,000
Project Cost:
1,765,000 882,000 882,000 20,471,000
I
mprove safety and reduce congestion on
Mud Lane from KY 1450 (Blue Lick Road)
to Brookley Drive. Project design will
evaluate a 3 lane road and consider
bicycle and pedestrian facilities.
CR-1003Jefferson 80421 PL
DN SPP 809,900
RW SPP 404,400
UT SPP 404,400
CN SPP 9,382,200
Project Cost:
809,900 404,400 404,400 9,382,200
I
mprove safety, improve traffic flow, and
reduce driver confusion along I-264 WB
by modifying/reconstructing the I-264 WB
to I-65 SB loop ramp. (Portion of 5-559.00)
I-264Jefferson 80423 PL
DN NH 3,000,000
RW NH 2,000,000
UT NH 2,000,000
CN NH 100,000,000
Project Cost:
3,000,000 4,000,000 100,000,000 0
Page 138 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and reduce congestion on
I
-264 EB and on both ramps from I-65 to
I-264 EB. (Portion of 5-559.00)
I-264Jefferson 80424 PL
DN NH 3,000,000
RW NH 2,000,000
UT NH 2,000,000
CN NH 100,000,000
Project Cost: 3,000,000 4,000,000 100,000,000 0
R
econfigure I-65 SB ramps to Arthur
Street to improve safety and to improve
ingress/egress to/from the University of
Louisville campus and adjoining
neighborhoods. (MP 133.3 - 133.8)
I-65Jefferson 80432 PL
DN
RW
UT
CN NH 2,330,000
Project Cost:
2,330,000 0 0 0
P
lanning study to extend Blankenbaker
Parkway to the Gene Snyder
KY-913Jefferson 80433 PL
DN SPP 7,050,000
RW SPP 12,430,000
UT SPP 12,760,000
CN SPP 80,940,000
Project Cost: 7,050,000 12,430,000 12,760,000 80,940,000
I
mprove mobility over the CSX Railroad,
construct a new multi-modal structure to
replace existing pedestrian bridge (ID
#056B00343N) on South Preston Street
(CS 1524F) MP 0.13-0.21) (City to
CS-1524Jefferson 80436 PL
DN SPP 600,000
RW SPP 200,000
UT SPP 200,000
CN SPP 6,000,000
Project Cost:
0 600,000 400,000 6,000,000
T
otal for Jefferson county PL
Total Amounts:
CN
UT
RW
DN
1,035,000
88,189,798 5,460,000 7,955,820 8,775,096
15,120,000 92,286,400 3,910,000
6,770,000 37,860,000 87,702,400
343,710,898 69,789,257 454,387,137 1,123,938,510
454,825,696 205,395,657 553,955,357 1,132,713,606
Page 139 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
COMPLETE EAST NICHOLASVILLE
B
YPASS WITH AT GRADE INTERSECTION
AT US 27.
KY-169,
PF-9999,
US-27
Jessamine 87.3500 PL
DN
RW
UT
CN NH 20,000,000
Project Cost:
20,000,000 0 0 0
C
ONSTRUCT NEW INTERCHANGE AT US
27 AND NICHOLASVILLE BYPASS.
US-27Jessamine 87.4000 PL
DN
RW
UT
CN SPP 72,430,000
Project Cost: 0 0 0 72,430,000
N
ICHOLASVILLE - MAN-O-WAR BLVD;
ACCESS MANAGEMENT ON US-27
(NICHOLASVILLE RD) FROM
NICHOLASVILLE BYPASS TO JUST
SOUTH OF KOHL'S DRIVE.
US-27Jessamine 430.1000 PL
DN
RW SPP 4,400,000
UT SPP 1,460,000
CN SPP 29,270,000
Project Cost:
4,400,000 1,460,000 29,270,000 0
I
MPROVE KY-169 FROM NORTH OF
CLEAR CREEK RD IN JESSAMINE COUNTY
TO NORTH OF KY-1967 IN WOODFORD
COUNTY. (2024CCN)
KY-169Jessamine 440 PL
DN SPP 910,000
RW SPP 2,330,000
UT SPP 2,850,000
CN SPP 13,790,000
Project Cost:
910,000 2,330,000 2,850,000 13,790,000
C
ONSTRUCT A NEW 4 LANE CONNECTOR
BETWEEN US-27 AND I-75. (08CCN)
(12CCR)(16CCR)
PF-9999Jessamine 8404 PL
DN STPF 590,000
RW STPF 21,110,000
UT STPF 19,740,000
CN STPF 99,990,000
Project Cost:
590,000 21,110,000 19,740,000 99,990,000
Page 140 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY 169 FROM US 68 TO
0
.54 MILES NORTH OF CLEAR CREEK RD
(MP 14.448 TO MP 19.00). (16CCN)
(2024CCN)
KY-169Jessamine 8906 PL
DN STP2 3,720,000
RW STP2 6,390,000
UT STP2 5,850,000
CN STP2 29,220,000
Project Cost:
3,720,000 12,240,000 29,220,000 0
BRIDGE PROJECT IN MERCER COUNTY ON
(
084B00003N) US-68 AT KENTUCKY
RIVER
US-68J essamine 10054 PL
DN FBP2 1,575,000
RW
UT
CN FBP 10,500,000
FBP2 10,500,000
Project Cost: 12,075,000 0 10,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-3433 OVER BR.JESSAMINE CREEK
(057B00030N)
KY-3433Jessamine 10078 PL
DN BRZ 129,623
RW
UT
CN BRZ 864,156
Project Cost:
0 0 0 993,779
I
MPROVE KY-169 FROM NORTH OF
CLEAR CREEK RD IN JESSAMINE COUNTY
TO NORTH OF KY-1967 IN WOODFORD
COUNTY. (2020CCN) (2024CCR)
KY-169Jessamine 80108 PL
DN
RW
UT SPP 5,550,000
CN SPP 16,800,000
Project Cost:
5,550,000 16,800,000 0 0
I
MPROVE SAFETY AND MOBILITY ON
NORTH 3RD STREET/KEENE ROAD FROM
OAK ST TO US 27 (NICHOLASVILLE
BYPASS) IN NICHOLASVILLE (2024CCN)
KY-169Jessamine 80324 PL
DN SPP 1,250,000
RW SPP 3,750,000
UT SPP 2,750,000
CN SPP 6,500,000
Project Cost:
1,250,000 3,750,000 2,750,000 6,500,000
Page 141 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 169 (Richmond Ave) from
p
roposed East Nicholasville Byp to US 27X
(North Main St). (2024CCN)
KY-169Jessamine 80325 PL
DN SPP 1,250,000
RW SPP 1,200,000
UT SPP 1,500,000
CN SPP 8,000,000
Project Cost: 1,250,000 1,200,000 1,500,000 8,000,000
I
MPROVE THE SAFETY ON US 68 IN
MERCER AND JESSAMINE COUNTIES
NEAR THE KY RIVER. (MP 14.45 IN
MERCER COUNTY TO MP 1.38 IN
JESSAMINE COUNTY
US-68Jessamine 80418 PL
DN
RW STP2 300,000
UT STP2 500,000
CN STP2 10,000,000
Project Cost:
800,000 10,000,000 0 0
T
otal for Jessamine county PL
Total Amounts:
CN
UT
RW
DN 9,295,000 129,623
4,700,000 34,780,000
6,050,000 7,310,000 26,840,000
30,500,000 26,800,000 68,990,000 201,574,156
50,545,000 68,890,000 95,830,000 201,703,779
I
MPROVE ROADWAY GEOMETRICS AND
CAPACITY FROM GARBAGE HOLLOW TO
EAST OF MILL STREET. (2020CCR)
(2022CCR) (2024CCR)
KY-40Johnson 149 PL
DN
RW SPP 1,500,000
UT SPP 1,400,000
CN SPP 7,350,000
Project Cost:
1,500,000 1,400,000 7,350,000 0
B
RIDGE PROJECT IN JOHNSON COUNTY
ON (058B00052) KY-825 AT JENNY
CREEK
KY-825Johnson 10102 PL
DN FBP2 218,473
RW
UT
CN FBP2 1,456,486
Project Cost:
0 1,674,959 0 0
Page 142 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN JOHNSON COUNTY
O
N (058B00054N) KY-469 AT GILLUM
BRANCH
KY-469Johnson 10103 PL
DN FBP2 85,022
RW
UT
CN FBP2 566,812
Project Cost: 0 651,834 0 0
I
MPROVE ROADWAY GEOMETRICS AND
CAPACITY ON KY 40 FROM KY 321 TO
GARBAGE HOLLOW (2020CCN)
(2022CCR) (2024CCR)
KY-40Johnson 80100 PL
DN SPP 910,000
RW SPP 670,000
UT SPP 7,870,000
CN SPP 10,370,000
Project Cost:
910,000 670,000 7,870,000 10,370,000
I
MPROVE US 460 FROM THE
INTERSECTION WITH KY 114 TO THE
INTERCHANGE WITH US 23 (2020CCR)
(2022CCR) (2024CCR)
US-460Johnson 80101 PL
DN
RW
UT NH 540,000
CN NH 43,500,000
Project Cost:
540,000 43,500,000 0 0
A
DDRESS CONGESTION AND SAFETY
ISSUES ON KY 321 FROM THE 6TH
STREET TO THE JUNCTION OF KY 321
AND KY 40 (2020CCN) (SAME AS
12-8102 IN 2020 HIGHWAY PLAN)
KY-321Johnson 80116 PL
DN SPP 220,000
RW SPP 4,920,000
UT SPP 2,475,000
CN SPP 29,078,000
Project Cost:
220,000 4,920,000 2,475,000 29,078,000
T
otal for Johnson county PL
Total Amounts:
CN
UT
RW
DN 1,130,000 303,495
1,500,000 5,590,000
540,000 1,400,000 10,345,000
45,523,298 7,350,000 39,448,000
3,170,000 52,816,793 17,695,000 39,448,000
Page 143 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE THE EXISTING I-71/75 BRENT
S
PENCE BRIDGE CORRIDOR AT THE OHIO
RIVER BETWEEN COVINGTON, KY AND
CINCINNATI, OHIO. (NHPP FUNDING)
(02KYD) (2024CCR)
I -75Kenton 17 PL
DN
RW
UT
CN NH 44,000,000 78,000,000 100,000,000 133,000,000
Project Cost:
44,000,000 78,000,000 100,000,000 133,000,000
C
ONSTRUCTION OF ROADWAY SAFETY
IMPROVEMENTS ON KY 371 AT
CHAMBERS OFFICE PARK AND
BUTTERMILK SQUARE IN KENTON
COUNTY, KENTUCKY. (2024BOP)
KY-371Kenton 392 PL
DN
RW SPP 530,000
UT SPP 210,000
CN SPP 1,200,000
Project Cost:
530,000 210,000 1,200,000 0
I
MPROVE SAFETY AND REDUCE
CONGESTION ON KY-17 AT THE I-275
INTERCHANGE. (18CCR) (2020CCR)
(2024CCR)
KY-17Kenton 449 PL
DN
RW
UT
CN STPF 11,340,000
Project Cost:
0 0 11,340,000 0
R
educe Congestion along KY 1303 from
Dudley Road to I-275. (2024BOP)
KY-1303Kenton 450.1000 PL
DN
RW
UT
CN STPF 6,000,000 6,000,000
Project Cost: 0 6,000,000 6,000,000 0
R
educe Congestion along KY 1303 from
I-275 to US 25. (2024BOP)
KY-1303Kenton 450.2000 PL
DN
RW SPP 1,100,000
UT SPP 540,000
CN SPP 2,320,000
Project Cost: 1,100,000 540,000 2,320,000 0
Page 144 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WEST 15TH STREET; ADDRESS
D
EFICIENCIES OF BRIDGE AND
APPROACHES OVER CSX RR IN
COVINGTON (FUNDS TO BE PROVIDED
BY THE CITY AS PER MEMORANDUM OF
CS-2097Kenton 1070 PL
DN BRX 667,653
RW BRX 200,000
UT BRX 400,000
CN BRX 4,451,018
Project Cost:
0 0 5,718,671 0
I
MPROVE EXISTING ALIGNMENT WITH
BUTTERMILK PIKE, ORPHANAGE ROAD,
AND US 25. FT. MITCHELL WILL PAY
$50,000 TOWARD DESIGN. (16CCN)
(18CCN) (2020CCR) (2022CCR)
US-25Kenton 8951 PL
DN
RW STPF 13,900,000
UT STPF 2,500,000
CN STPF 6,000,000
Project Cost:
13,900,000 2,500,000 6,000,000 0
BRIDGE PROJECT IN KENTON COUNTY ON
(
059B00090N) I-75 RAMP AT 9TH
ST-COVINGTON
I -75K enton 10045 PL
DN BRO 587,194
RW
UT
CN BRO 3,914,629
Project Cost: 0 0 0 4,501,823
A
DDRESS DEFICIENCIES OF BRIDGE ON
I-75 OVER OHIO RIVER (059B00046N)
I -75Kenton 10067 PL
DN BRO 150,000
RW
UT
CN BRO 1,000,000
Project Cost: 0 0 0 1,150,000
A
DDRESS CONDITION OF KY-236 FROM
MILEPOINT 2.13 TO MILEPOINT 2.62
KY-236Kenton 20044 PL
DN STP5 48,000
RW
UT
CN STP5 552,000
Project Cost: 48,000 552,000 0 0
Page 145 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-1072 FROM
M
ILEPOINT 2.49 TO MILEPOINT 2.83
KY-1072Kenton 20045 PL
DN STP3 40,000
RW
UT
CN STP3 460,000
Project Cost: 0 500,000 0 0
A
DDRESS CONDITION OF I-075
NON-CARDINAL DIRECTION FROM
MILEPOINT 190.7 TO MILEPOINT 191.22
I -75Kenton 20064 PL
DN NHPM 70,000
RW
UT
CN NHPM 700,000
Project Cost:
0 770,000 0 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 183.312 TO MILEPOINT
184.708
I -75Kenton 22129 PL
DN STP5 420,000
RW
UT
CN STP5 4,255,000
Project Cost:
0 0 4,675,000 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 186.95 TO MILEPOINT 190.7
I -75Kenton 22131 PL
DN NHPM 3,750,000
RW
UT
CN NHPM 37,500,000
Project Cost: 0 0 41,250,000 0
R
ECONSTRUCT KY 236 (STEVENSON
ROAD) FROM ALICE STREET TO
JACQUELINE DRIVE.(18CCN) (2020CCR)
Kenton Co. government will allocate
$250,000 to sanitary sewer and waterline
KY-236Kenton 80002 PL
DN
RW
UT SPP 5,500,000
CN SPP 20,000,000
Project Cost:
5,500,000 20,000,000 0 0
Page 146 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN KENTON LANDS ROAD FROM US
2
5 TO RIGGS ROAD (2020CCN)
(2022CCR) (2024CCR)
KY-2373Kenton 80105 PL
DN NH 3,360,000
RW NH 18,600,000
UT NH 5,600,000
CN NH 30,000,000
Project Cost: 3,360,000 18,600,000 5,600,000 30,000,000
R
econstruct KY 536 from KY 16 to
Staffordsburg Road. (2024BOP)
KY-536Kenton 80203.1000 PL
D
N
RW
UT STP2 5,600,000
CN STP2 18,000,000
Project Cost: 5,600,000 18,000,000 0 0
R
econstruct KY 536 from Staffordsburg
Road to KY 177. (2024BOP)
KY-536Kenton 80203.2000 PL
D
N
RW STP2 15,530,000
UT STP2 6,160,000
CN SPP 60,000,000
Project Cost: 15,530,000 6,160,000 60,000,000 0
P
rovide connectivity, improve mobility, and
reduce congestion along KY 536 from KY
17 to KY 16; include multi-modes.
(2022CCN) (2024CCR)
KY-536Kenton 80217 PL
DN
RW SPP 6,830,000
UT SPP 1,560,000
CN SPP 34,800,000
Project Cost:
8,390,000 34,800,000 0 0
R
EHABILITATE/RECONSTRUCT US 25
FROM BUTTERMILK PIKE (KY371) TO I-75
(MP 8.58 TO MP 9.86) (2022CCN)
(2024CCR)
US-25Kenton 80254 PL
DN
RW
UT
CN SPP 11,600,000
Project Cost:
0 0 11,600,000 0
Page 147 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION ALONG KY 16 (TAYLOR
MILL RD) FROM KY 2047 (SENOUR RD)
TO KY 536 (HARRIS PIKE); INCLUDE
MULTIMODAL NEEDS. (2024CCN)
KY-16Kenton 80300 PL
DN SPP 5,400,000
RW SPP 24,000,000
UT SPP 3,480,000
CN SPP 60,000,000
Project Cost:
5,400,000 27,480,000 0 60,000,000
A
ddress safety and mobility along KY
2373 from west intersection of
Amsterdam Road to east intersection of
Amsterdam Road. (2024BOP)
KY-2373Kenton
80305.1000 PL
D
N SPP 1,300,000
RW SPP 2,200,000
UT SPP 1,620,000
CN SPP 6,960,000
Project Cost: 1,300,000 2,200,000 1,620,000 6,960,000
A
ddress safety and mobility along KY 273
from east intersection of Amsterdam Road
to Hightower Road. (2024BOP)
KY-2373Kenton
80305.2000 PL
D
N SPP 2,600,000
RW SPP 5,500,000
UT SPP 2,160,000
CN SPP 13,920,000
Project Cost: 2,600,000 5,500,000 2,160,000 13,920,000
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 1501 (HANDS
PIKE) FROM EDWIN DRIVE TO KY 16.
(2024CCN)
KY-1501Kenton 80307 PL
DN SPP 970,000
RW SPP 2,600,000
UT SPP 930,000
CN SPP 10,540,000
Project Cost:
970,000 2,600,000 930,000 10,540,000
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 1501 (HANDS
PIKE) FROM OTTER TO EDWIN DRIVES.
(2024CCN)
KY-1501Kenton 80308 PL
DN SPP 1,380,000
RW SPP 4,200,000
UT SPP 1,320,000
CN SPP 9,900,000
Project Cost:
1,380,000 4,200,000 1,320,000 9,900,000
Page 148 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT I-75 INTERCHANGE AT KY
2
36 (DONALDSON HIGHWAY).
(2024CCN)
I -75Kenton 80309 PL
DN NH 3,240,000
RW NH 10,800,000
UT NH 3,480,000
CN NH 23,560,000
Project Cost: 3,240,000 10,800,000 3,480,000 23,560,000
C
onstruct new DCD interchange on I-75 in
Kenton County at Buttermilk Pike (KY 371)
I-75Kenton 80400 PL
DN
RW NH 6,000,000
UT NH 3,500,000
CN NH 70,000,000
Project Cost: 0 6,000,000 3,500,000 70,000,000
P
rovide connectivity, improve mobility and
reduce congestion along KY 536 from KY
177 in Kenton County to KY 1936 in
Campbell County, providing a new
crossing over the RR and Licking River.
KY-536Kenton 80418 PL
DN SPP 12,500,000
RW SPP 2,500,000
UT SPP 3,000,000
CN SPP 78,000,000
Project Cost:
0 12,500,000 5,500,000 78,000,000
T
otal for Kenton county PL
Total Amounts:
CN
UT
RW
DN 18,298,000 12,610,000 4,837,653 737,194
37,890,000 73,900,000 2,700,000
12,660,000 12,890,000 22,010,000
44,000,000 158,512,000 244,666,018 440,794,629
112,848,000 257,912,000 274,213,671 441,531,823
E
liminate rockfall hazards from KY 2029 to
Rock Fork Road.
KY-80Knott 158 PL
DN
RW
UT
CN PROT 6,090,000
Project Cost: 6,090,000 0 0 0
Page 149 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN KNOTT COUNTY ON
(
060B00025N) KY-1088 AT YELLOW
CREEK
KY-1088Knott 10104 PL
DN BRX 160,984
RW
UT
CN BRX 1,073,226
Project Cost: 0 1,234,210 0 0
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060B00046N) KY-1091 AT RT FRK
BEAVER CREEK
KY-1091Knott 10106 PL
DN FBP2 302,039
RW FBP2 75,000
UT FBP2 130,000
CN FBP2 2,013,592
Project Cost:
0 0 2,520,631 0
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060B00059N) KY-1102 AT
MONTGOMERY CREEK
KY-1102Knott 10107 PL
DN FBP 133,805
RW
UT
CN FBP 892,032
Project Cost:
0 0 1,025,837 0
B
RIDGE PROJECT IN KNOTT COUNTY ON
(060C00032N) BIG DOUBLES BR AT
LITTLE CARR FORK
CR-1141Knott 10108 PL
DN FBP 73,697
RW
UT
CN FBP 491,314
Project Cost:
0 0 565,011 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 15 OVER Carr Fork Lake
(060B00056N)
KY-15Knott 10148 PL
DN BRO 110,550
RW
UT
CN BRO 1,105,500
Project Cost:
0 0 0 1,216,050
Page 150 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF HAL ROGERS
P
ARKWAY FROM MILEPOINT 72.184 TO
MILEPOINT 75.113.
HR-9006Knott 20011 PL
DN STP4 60,000
RW
UT
CN STP4 1,100,000
Project Cost: 60,000 1,100,000 0 0
A
DDRESS CONDITION OF HAL ROGERS
PARKWAY FROM MILEPOINT 80.340 TO
MILEPOINT 83.166.
HR-9006Knott 20012 PL
DN STP4 60,000
RW
UT
CN STP4 1,150,000
Project Cost:
60,000 1,150,000 0 0
E
liminate rockfall hazards 0.2 mile west of
Intersection of KY 1087 & KY 80.
(2024CCN)
KY-80Knott 80301 PL
DN SPP 540,000
RW SPP 180,000
UT SPP 730,000
CN SPP 14,970,000
Project Cost:
540,000 180,000 730,000 14,970,000
I
mprove roadway geometrics along KY
899 from end of prior construction near
Pippa Passes to the bottom of the hill at
Short Branch. (2024CCN)
KY-899Knott 80302 PL
DN
RW SPP 350,000
UT SPP 380,000
CN SPP 5,159,000
Project Cost:
730,000 5,159,000 0 0
I
mprovements to the visibility at the
intersection of KY 15 and KY 1231 (Big
Branch Rd.) around Carr Fork Lake.
(2024CCN)
KY-15Knott 80303 PL
DN SPP 40,000
RW
UT SPP 100,000
CN SPP 100,000
Project Cost:
40,000 100,000 100,000 0
Page 151 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety, congestion, and
g
eometrics from KY 899 to KY 3391.
(2024CCN)
KY-160Knott 80304 PL
DN SPP 1,190,000
RW
UT
CN
Project Cost: 1,190,000 0 0 0
C
urve revision 3.654 miles east of
intersection of KY 3209 & KY 1087.
(2024CCN)
KY-1087Knott 80305 PL
DN SPP 240,000
RW SPP 240,000
UT SPP 120,000
CN SPP 1,125,000
Project Cost:
240,000 240,000 120,000 1,125,000
I
mprove horizontal and vertical roadway
geometry to eliminate the substandard
curve and increase sight distance on KY
1098 (MP 10.5-11.0) (2024CCN)
KY-1098Knott 80350 PL
DN SPP 420,000
RW SPP 100,000
UT SPP 100,000
CN SPP 2,000,000
Project Cost:
420,000 100,000 100,000 2,000,000
E
liminate rockfall hazards along Hal
Rogers Parkway (old KY-80) from MP
78.27 to 79.59. (2024CCN)
HR-9006Knott 80354 PL
DN SPP 500,000
RW SPP 150,000
UT SPP 650,000
CN SPP 12,900,000
Project Cost:
500,000 800,000 0 12,900,000
E
liminate rockfall hazards from MP 5.0 to
5.5.
KY-80Knott 80401 PL
DN SPP 710,000
RW SPP 310,000
UT SPP 300,000
CN SPP 7,100,000
Project Cost: 710,000 310,000 300,000 7,100,000
Page 152 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Eliminate rockfall hazards on KY 15 from
M
P 4.0 to 4.3 near Carr Fork Lake.
KY-15Knott 80402 PL
DN SPP 1,100,000
RW SPP 215,000
UT SPP 100,000
CN SPP 9,100,000
Project Cost: 1,100,000 215,000 100,000 9,100,000
T
otal for Knott county PL
Total Amounts:
CN
UT
RW
DN 4,860,000 160,984 509,541 110,550
350,000 1,195,000 75,000
380,000 750,000 1,480,000
6,090,000 8,482,226 3,496,938 48,300,500
11,680,000 10,588,210 5,561,479 48,411,050
D
rainage Improvements along KY 312
(Master Street) from MP 0 to MP 0.90 in
Know County at Corbin, Kentucky.
(2022BOP) (2024CCN)
KY-312Knox 182 PL
DN
RW STP1 750,000
UT STP1 1,000,000
CN STP1 4,160,000
Project Cost:
750,000 1,000,000 4,160,000 0
B
RIDGE PROJECT IN KNOX COUNTY ON
(061B00056N) KY-223 AT ROAD FK
STINKING CREEK
KY-223Knox 10201 PL
DN BRX 168,705
RW
UT
CN BRX 1,124,700
Project Cost:
0 0 0 1,293,405
B
RIDGE PROJECT IN KNOX COUNTY ON
(061B00093N) KY-3436 AT E.FK.LYNN
CAMP CK
KY-3436Knox 10204 PL
DN BRX 152,956
RW
UT
CN BRX 1,019,710
Project Cost:
0 0 1,172,666 0
Page 153 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND ADDRESS
G
EOMETRIC DEFICIENCIES ALONG N KY
830 FROM US 25E TO KY 1629
INCLUDING WIDENING AND NEW TURNING
LANES (2020CCN) (2024CCR)
KY-830K nox 80156 PL
DN
RW SPP 350,000
UT SPP 1,250,000
CN SPP 2,080,000
Project Cost: 1,600,000 2,080,000 0 0
I
mprove safety and access along KY 11
by raising roadway above Flood X
elevation. (2022CCN) (2024CCR)
KY-11Knox 80203 PL
DN
RW
UT PROT 1,400,000
CN PROT 4,890,000
Project Cost: 1,400,000 4,890,000 0 0
C
onstruct a left turn lane with 350'
storage and 100' taper at MP 18.62
(2024CCN)
US-25Knox 80301 PL
DN
RW
UT
CN NH 70,000
Project Cost:
70,000 0 0 0
C
onstruct one left turn lane with 350'
storage and 100' taper at MP 19.85
(2024CCN)
US-25Knox 80302 PL
DN
RW
UT
CN NH 70,000
Project Cost:
70,000 0 0 0
C
onstruct one left turn lane with 350'
storage and 100' taper at MP 18.41 and
350' storage and 100' taper at US 25 E
(2024CCN)
US-25Knox 80304 PL
DN
RW
UT
CN NH 80,000
Project Cost:
80,000 0 0 0
Page 154 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Widen Richland Creek Road from US 25E a
d
istance of 0.70 miles (2024CCN)
CR-1311Knox 80311 PL
DN SPP 780,000
RW SPP 250,000
UT SPP 1,500,000
CN SPP 2,000,000
Project Cost: 780,000 250,000 1,500,000 2,000,000
C
onstruct a new route north off of CS
2054 (Opportunity Drive) along the former
RR track bed approximately 0.7 miles to
KY 830 (2024CCN)
PF-9999Knox 80361 PL
DN
RW
UT
CN SPP 1,400,000
Project Cost:
1,400,000 0 0 0
I
mprove safety by realigning intersection
and replacing existing bridge
CR-1064Knox 80404 PL
DN SPP 200,000
RW SPP 100,000
UT SPP 150,000
CN SPP 1,500,000
Project Cost: 200,000 250,000 1,500,000 0
T
otal for Knox county PL
Total Amounts:
CN
UT
RW
DN 980,000 152,956 168,705
1,100,000 350,000
2,650,000 1,150,000 1,500,000
1,620,000 6,970,000 6,679,710 3,124,700
6,350,000 8,470,000 8,332,666 3,293,405
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 84 FROM KY
357 TO KY 61 (LINCOLN PARKWAY)
NEAR HODGENVILLE (2020CCR)
(2022CCR) (2024CCR)
KY-84Larue 8909 PL
DN
RW SPP 790,000
UT SPP 1,350,000
CN SPP 7,840,000
Project Cost:
0 2,140,000 0 7,840,000
Page 155 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY ON KY 210 FROM KY
1
618 (6.994) TO MORNINGSTAR ROAD
(MP14.230) IN LARUE COUNTY.
(2024CCN)
KY-210Larue
80154.1000 PL
D
N
RW SPP 1,250,000
UT SPP 2,000,000
CN SPP 20,000,000
Project Cost: 0 0 3,250,000 20,000,000
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 61 FROM NEAR
SOUTH L AND N TPKE (KY 470)(MP
5.152) TO THE INTERSECTION OF
LINCOLN FARM RD (US 31E)(MP 8.031)
KY-61Larue 80258 PL
DN SPP 1,120,000
RW SPP 1,880,000
UT
CN
Project Cost:
1,120,000 0 1,880,000 0
T
otal for Larue county PL
Total Amounts:
CN
UT
RW
DN 1,120,000
790,000 3,130,000
1,350,000 2,000,000
27,840,000
1,120,000 2,140,000 5,130,000 27,840,000
I
mprove Rudy Bear Road and KY 3007
from KY 80 South to KY 3432 West of
I-75. (2022CCR) (2024CCR)
CO-0Laurel 169 PL
DN
RW
UT
CN SPP 7,600,000
Project Cost:
0 0 7,600,000 0
I
MPROVE CONNECTIVITY BETWEEN
CORBIN AND LONDON FROM KY-1006 TO
US-25E. (08CCN) (2024CCR)
US-25Laurel 8515 PL
DN
RW STP1 14,800,000
UT STP1 5,560,000 9,000,000
CN STP1 6,000,000
Project Cost:
14,800,000 5,560,000 9,000,000 6,000,000
Page 156 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REPLACE BRIDGE LOCATED ON LILY
R
OAD (CR 1221) (MP 1.045) (AREA
ADJACENT TO FARISTON INDUSTRIAL
PARK WITH NEW ROADWAY
ALIGNMENT). (14CCN)(18CCN)
CR-1221Laurel 8811 PL
DN
RW
UT
CN SPP 1,830,000
Project Cost:
1,830,000 0 0 0
I
MPROVE THE HAL ROGERS PARKWAY
TO INTERSTATE STANDARDS FROM 4.0
MI EAST OF KY 192 TO LAUREL/CLAY
CO. LINE. (I-75 TO HAZARD) (16CCN)
(18CCR) (2024CCR)
HR-9006Laurel 8909 PL
DN
RW NH 2,680,000
UT NH 1,170,000
CN SPP 32,850,000
Project Cost:
0 3,850,000 0 32,850,000
B
RIDGE PROJECT IN LAUREL COUNTY ON
(063B00062N) KY-472 AT
S.FK.ROCKCASTLE RVR
KY-472Laurel 10209 PL
DN BRX 219,810
RW
UT
CN BRX 1,465,399
Project Cost:
0 0 0 1,685,209
B
RIDGE PROJECT IN LAUREL COUNTY ON
(063B00101N) KY-552 AT LITTLE LAUREL
RIVER
KY-552Laurel 10211 PL
DN BRZ 121,611
RW
UT
CN BRZ 810,738
Project Cost:
0 0 932,349 0
A
DDRESS CONDITION OF KY-192 FROM
MILEPOINT 20.2 TO MILEPOINT 22.041
KY-192Laurel 20038 PL
DN STP4 440,000
RW
UT
CN STP4 5,060,000
Project Cost: 5,500,000 0 0 0
Page 157 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF Hal Rogers
D
aniel Boone Parkway FROM MILEPOINT
4.169 TO MILEPOINT 8.8
HR-9006Laurel 22196 PL
DN STP4 290,000
RW
UT
CN STP4 2,921,514
Project Cost: 0 0 0 3,211,514
A
DDRESS ACCESS AND SAFETY ISSUES
AT THE INTERSECTION OF KY 80 AND
PAYNE TRAIL AND BUSH ELEMENTARY
SCHOOL BY CONSTRUCTING A
CONNECTOR ROAD FROM HAL ROGERS
HR-9006Laurel 80154 PL
DN
RW SPP 890,000
UT SPP 40,000
CN SPP 630,000
Project Cost:
890,000 40,000 630,000 0
I
mprove the geometrics of a curve, widen
a drainage structure, and provide turn
lanes to Johnson Elementary School on
KY 638 (2024CCN)
KY-638Laurel 80312 PL
DN
RW SPP 1,060,000
UT SPP 710,000
CN SPP 2,270,000
Project Cost:
1,770,000 2,270,000 0 0
W
iden KY 192 from Mallard Drive to
Esquire Lane, address horizontal and
vertical alignment as needed (MP 16.61 -
18.08) (2024CCN)
KY-192Laurel 80357 PL
DN
RW SPP 7,000,000
UT SPP 1,750,000
CN SPP 9,000,000
Project Cost:
0 7,000,000 1,750,000 9,000,000
R
econstruct curve and address geometric
deficiencies and safety on KY-1535
KY-1535Laurel 80402 PL
DN
RW
UT
CN SPP 1,250,000
Project Cost: 1,250,000 0 0 0
Page 158 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
New construction to extend KY 3006 from
1
6th Street to the intersection of KY 1006
and Myers Baker Road
KY-3006Laurel 80403 PL
DN SPP 1,500,000
RW SPP 5,000,000
UT SPP 4,000,000
CN SPP 17,500,000
Project Cost: 1,500,000 9,000,000 17,500,000 0
W
iden US25 to a three-lane typical section
with a center two-way left-turn lane.
Access management with sidewalk.
Concept A from the 11-181 planning study
US-25Laurel 80409 PL
DN STP1 1,050,000
RW STP1 3,150,000
UT STP1 1,050,000
CN STP1 10,000,000
Project Cost:
1,050,000 4,200,000 10,000,000 0
R
econstruct and address geometric
deficiencies and safety on KY 363
(Whitley Street) from KY 2391 to Meyers
Baker Road.
KY-363Laurel 80426 PL
DN
RW SPP 3,500,000
UT SPP 2,750,000
CN SPP 3,500,000
Project Cost:
6,250,000 3,500,000 0 0
T
otal for Laurel county PL
Total Amounts:
CN
UT
RW
DN 2,990,000 121,611 509,810
20,250,000 17,830,000
3,460,000 11,820,000 10,750,000
8,140,000 5,770,000 36,540,738 52,236,913
34,840,000 35,420,000 47,412,349 52,746,723
I
mprove KY-32 from Elliott C/L to Yatesville
Lake reconstruction section for better
access to Yatesville Lake and to improve
safety. See Elliott County listing for
continuation of project to KY-7 @ Sandy
KY-32Lawrence 156 PL
DN
RW SPP 3,190,000
UT SPP 1,830,000
CN SPP 5,920,000
Project Cost:
5,020,000 5,920,000 0 0
Page 159 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LAWRENCE COUNTY
O
N (064B00018N) KY-32 AT HOOD
CREEK
KY-32Lawrence 10111 PL
DN BRX 408,579
RW
UT
CN BRX 2,723,861
Project Cost: 0 0 3,132,440 0
B
RIDGE PROJECT IN LAWRENCE COUNTY
ON (064B00019N) KY-32 AT BLAINE
CREEK
KY-32Lawrence 10112 PL
DN FBP2 654,029
RW
UT
CN FBP2 4,360,196
Project Cost:
5,014,225 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
Mill Creek Hollow OVER Rockcastle Creek
(064C00078N)
CR-1149Lawrence 10157 PL
DN BRZ 138,338
RW
UT
CN BRZ 922,254
Project Cost:
0 0 0 1,060,592
R
EPAVE KY 201 FROM MP 5.0 TO 10.9
(2020CCN)
KY-201Lawrence 80103 PL
DN
RW
UT
CN STP4 675,000
Project Cost: 675,000 0 0 0
R
EPAVE KY 32 FROM MP 21.0 TO 23.0
(2020CCN)
KY-32Lawrence 80104 PL
DN
RW
UT
CN STP4 340,000
Project Cost: 340,000 0 0 0
Page 160 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REPAVE ROUTE 3 SOUTH FROM MP 12.58
TO
MP 0 AND PLACE GUARD RAILS ON
FALLS HILL (2020CCN) (2022CCR)
KY-3Lawrence 80105 PL
DN
RW
UT
CN SPP 1,700,000
Project Cost: 1,700,000 0 0 0
R
EPAVE KY 1690 FROM MP 4.3 TO MP 6.3
AND PLACE GUARD RAILS ON
RICHARDSON HILL (2020CCN)
KY-1690Lawrence 80107 PL
DN
RW
UT
CN SPP 200,000
Project Cost:
200,000 0 0 0
P
LACE LIGHTING AT INTERSECTION OF
KY 644 AND KY 2565 (2020CCN)
(2024CCN)
KY-644Lawrence 80108 PL
DN SPP 30,000
RW
UT SPP 20,000
CN SPP 200,000
Project Cost:
30,000 20,000 200,000 0
I
mprove/widen KY-3398 from KY-3 @
Fallsburg to US-23 @ Fullers to improve
safety and to accommodate residential
growth and recreational vehicles in this
area. (2024CCN)
KY-3398Lawrence 80302 PL
DN SPP 800,000
RW SPP 1,300,000
UT SPP 1,750,000
CN SPP 11,350,000
Project Cost:
800,000 1,300,000 1,750,000 11,350,000
I
mprove KY-1 from the Johnson C/L to
KY-3 to eliminate dangerous curves and
address safety. (2024CCN)
KY-1Lawrence 80306 PL
DN SPP 1,000,000
RW SPP 13,650,000
UT SPP 3,240,000
CN SPP 85,120,000
Project Cost:
1,000,000 16,890,000 0 85,120,000
Page 161 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Correct substandard roadway geometrics
a
nd address safety issues on
KY-201/KY-32 from Johnson C/L to KY-1
for safety. (2024CCN)
KY-201Lawrence 80307 PL
DN SPP 7,280,000
RW SPP 12,600,000
UT SPP 6,480,000
CN SPP 84,000,000
Project Cost:
7,280,000 12,600,000 6,480,000 84,000,000
I
MPROVE/WIDEN KY-3398 FROM KY-3 @
FALLSBURG TO US-23 @ FULLERS TO
IMPROVE SAFETY AND TO
ACCOMMODATE RESIDENTIAL GROWTH
AND RECREATIONAL VEHICLES IN THIS
KY-3398Lawrence 80310 PL
DN SPP 840,000
RW SPP 1,430,000
UT
CN
Project Cost:
840,000 1,430,000 0 0
I
mprove intersection traffic movements
along KY 2565 and KY 32 between US 23
and Louisa
KY-2565Lawrence 80400 PL
DN
RW SPP 300,000
UT SPP 150,000
CN SPP 2,000,000
Project Cost:
0 450,000 2,000,000 0
I
mprove roadway geometry and visibility
on Town Hill road between Old KY 32 and
KY 3. (MP 0.117 - 0.596)
CR-1063Lawrence 80409 PL
DN SPP 800,000
RW SPP 800,000
UT SPP 1,000,000
CN SPP 4,000,000
Project Cost:
0 800,000 1,800,000 4,000,000
I
mprove roadway geometry and sight
distance on KY 3395 between US 23 and
KY 32. (MP 0 - 1.658)
ky-3395Lawrence 80410 PL
DN SPP 900,000
RW SPP 2,080,000
UT SPP 2,500,000
CN SPP 5,900,000
Project Cost:
0 900,000 4,580,000 5,900,000
Page 162 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
To upgrade the access to the marina from
K
Y 3 in order to better accommodate
recreational traffic using the road. KY
1185 MP 0.00 to 2.232 at Yatesville Lake
KY-1185Lawrence 80411 PL
DN SPP 1,100,000
RW SPP 2,500,000
UT SPP 2,420,000
CN SPP 10,800,000
Project Cost:
0 1,100,000 2,500,000 13,220,000
T
otal for Lawrence county PL
Total Amounts:
CN
UT
RW
DN 10,604,029 2,800,000 408,579 138,338
3,190,000 29,280,000 5,380,000
1,830,000 3,410,000 11,730,000 2,420,000
7,275,196 5,920,000 4,923,861 202,092,254
22,899,225 41,410,000 22,442,440 204,650,592
I
-75 TO MOUNTAIN PARKWAY;
RECONSTRUCT KY-11 FROM 0.5 MILE
SOUTH OF KY-587 TO 0.65 MILE NORTH
OF KY-52 IN BEATTYVILLE AND
CONSTRUCT BRIDGE OVER KENTUCKY
KY-52Lee 292.4000 PL
DN
RW STP2 6,000,000
UT STP2 2,000,000
CN STP2 30,000,000
Project Cost:
6,000,000 2,000,000 30,000,000 0
R
ockfall Mitigation on KY 52 near
Beattyville from MP 12.8 to MP 13.4 in Lee
County. (To seek future federal Protect
funds)
KY-52Lee 5017 PL
DN
RW
UT
CN PROT 18,750,000
Project Cost:
18,750,000 0 0 0
R
ECONSTRUCT ALONG KY 399 BETWEEN
MP 5.75 AND 6.2 (2020CCN) (2022CCR)
KY-399Lee 80104 PL
DN
RW SPP 220,000
UT SPP 110,000
CN
Project Cost: 220,000 110,000 0 0
Page 163 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 11 from 0.5 miles south of
K
Y 587 to 0.65 miles north of KY 52 in
Beattyville (MP 1.082 - 4.798) (2024CCN)
KY-11Lee 80351 PL
DN
RW STPF 5,750,000
UT STPF 2,320,000
CN STPF 24,000,000
Project Cost: 0 5,750,000 2,320,000 24,000,000
T
otal for Lee county PL
Total Amounts:
CN
UT
RW
DN
6,220,000 5,750,000
2,110,000 2,320,000
18,750,000 30,000,000 24,000,000
24,970,000 7,860,000 32,320,000 24,000,000
A
DDRESS DEFICIENCIES OF BRIDGE
OVER MUNCY CREEK ON US 421 0.5 MILE
SOUTH OF TAYLOR MORGAN ROAD (CR
1090).(066B00006N)
US-421Leslie 1095 PL
DN
RW
UT
CN BRX 1,350,000
Project Cost:
0 0 0 1,350,000
C
ONSTRUCT A NEW APPROACH FROM
KY-1482 ONTO THE HAL ROGERS
PARKWAY AT MP 39. (08CCN)(10CCR)
(2011BOPP)(18CCN) (2020CCR)
(2022CCR) (2024CCR)
KY-1482Leslie 8516 PL
DN SPP 320,000
RW SPP 1,230,000
UT SPP 520,000
CN SPP 7,410,000
Project Cost:
320,000 1,750,000 7,410,000 0
U
PGRADE ROUTE FROM SOMERSET TO
HAZARD TO INTERSTATE STANDARDS: 4
LANE FROM CLAY/LESLIE LINE TO
HYDEN SPUR, MP 35.929 TO MP 44.188
(SEGMENT 9). (16CCN)(18CCN)
HR-9006Leslie 8912 PL
DN NH 1,120,000
RW NH 12,600,000
UT NH 9,360,000
CN NH 30,000,000 30,000,000 34,400,000
Project Cost:
23,080,000 30,000,000 30,000,000 34,400,000
Page 164 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE ROUTE FROM SOMERSET TO
H
AZARD TO INTERSTATE STANDARDS: 4
LANE FROM HYDEN SPUR TO
LESLIE/PERRY LINE (SEGMENT 10).
(16CCN)(18CCN) (2024CCR)
HR-9006Leslie 8913 PL
DN NH 1,120,000
RW SPP 10,500,000
UT SPP 7,280,000
CN SPP 73,920,000
Project Cost:
0 1,120,000 0 91,700,000
C
ONSTRUCT RIGHT TURN LANE ON US
421 AT INTERSECTION WITH KY 80.
(16CCN)(18CCN) (2022CCR)
US-421Leslie 8951 PL
DN
RW SPP 140,000
UT SPP 310,000
CN SPP 1,360,000
Project Cost:
450,000 1,360,000 0 0
B
RIDGE PROJECT IN LESLIE COUNTY ON
(066B00028N) KY-2058 AT BEECH FORK
CREEK
KY-2058Leslie 10212 PL
DN BRX 145,478
RW
UT
CN BRX 969,851
Project Cost:
0 0 0 1,115,329
B
RIDGE PROJECT IN LESLIE COUNTY ON
(066B00033N) KY-699 AT CUTSHIN
CREEK
KY-699Leslie 10213 PL
DN FBP 25,208
RW
UT
CN FBP 168,056
Project Cost:
0 0 0 193,264
B
RIDGE PROJECT IN LESLIE COUNTY ON
(066B00058N) KY-1482 AT HALS FORK
KY-1482Leslie 10215 PL
DN BRX 206,793
RW
UT
CN BRX 1,378,620
Project Cost: 0 0 1,585,413 0
Page 165 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
C
R-1353 OVER Middle Fork Kentucky Rv
(066C00117N)
CR-1353Leslie 10256 PL
DN BRZ 146,773
RW
UT
CN BRZ 978,489
Project Cost: 1,125,262 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
35.929 TO MILEPOINT 44.04
HR-9006Leslie 22201 PL
DN NHPM 600,000
RW
UT
CN NHPM 6,024,768
Project Cost:
6,624,768 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
44.04 TO MILEPOINT 51.026
HR-9006Leslie 22202 PL
DN NHPM 500,000
RW
UT
CN NHPM 4,957,826
Project Cost:
0 0 5,457,826 0
W
iden, resurface, and extend asphalt on
CR-1449 (Leeco Road) in preparation for
development of an RV park, pavilion,
baseball/softball fields, housing
development, and trails along the route
CR-1449Leslie 80412 PL
DN
RW SPP 300,000
UT SPP 200,000
CN SPP 3,000,000
Project Cost:
300,000 200,000 3,000,000 0
T
otal for Leslie county PL
Total Amounts:
CN
UT
RW
DN 2,186,773 1,120,000 706,793 170,686
13,040,000 1,230,000 10,500,000
9,670,000 720,000 7,280,000
7,003,257 31,360,000 46,746,446 110,807,907
31,900,030 34,430,000 47,453,239 128,758,593
Page 166 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE US-119 FROM
K
Y-2034/COUGAR DRIVE TO BRASS
DRIVE (MP 16.731 TO 17.740). THROUGH
MAYKING (MP 19.925 TO 20.6) AND
AUXILIARY LANE (MP 22.0 TO 22.75)
US-119Letcher 199.1500 PL
DN
RW
UT
CN NH 7,400,000
Project Cost:
7,400,000 0 0 0
R
ECONSTRUCT US-119 BY WIDENING TO
4-LANES ALONG A NEW ALIGNMENT
THROUGH THE GATEWAY INDUSTRIAL
PARK TO US-23.(16CCN) (2024CCR)
US-119Letcher 199.5000 PL
DN
RW NH 3,000,000
UT NH 3,000,000
CN SPP 41,040,000
Project Cost:
6,000,000 0 41,040,000 0
R
ECONSTRUCTION OF US-119 FROM 0.15
MILE WEST OF KY-806 TO KY-932.
2012BOP (2024CCN)
PF-9999,
US-119
Letcher 311.8000 PL
DN
RW
UT
CN APD 46,000,000 47,190,000
Project Cost:
46,000,000 47,190,000 0 0
I
MPROVE THE EXISTING ROADWAY TO
MEET CURRENT STANDARDS AND
IMPROVE CONGESTION INTO AND OUT
OF JENKINS BETWEEN MP 8.554 AND MP
9.176. (2024CCN)
KY-805Letcher 8702.1000 PL
DN SPP 250,000
RW SPP 2,090,000
UT SPP 530,000
CN SPP 7,430,000
Project Cost:
250,000 2,620,000 7,430,000 0
B
RIDGE PROJECT IN LETCHER COUNTY
ON (067B00091N) KY-803 AT MILLSTONE
CREEK
KY-803Letcher 10121 PL
DN FBP2 115,685
RW
UT
CN FBP2 771,236
Project Cost:
0 0 0 886,921
Page 167 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
INSTALL A LEFT TURN AT INTERSECTION
OF
KY 15 AND KY 3401 (2020CCN)
(2022CCR)
KY-3401Letcher 80114 PL
DN
RW
UT
CN SPP 1,250,000
Project Cost: 1,250,000 0 0 0
S
pot improvements along KY 113 from KY
2545 to Landfill Rd where the Letcher
County Transfer Station is located.
(2022CCN)
KY-113Letcher 80200 PL
DN
RW STP2 390,000
UT STP2 370,000
CN STP2 1,410,000
Project Cost:
760,000 1,410,000 0 0
I
mprove roadway visibility, access and
geometrics along KY 932 between US 119
and George's Branch Road
KY-932Letcher 80407 PL
DN SPP 2,200,000
RW SPP 920,000
UT SPP 1,200,000
CN SPP 14,700,000
Project Cost:
2,200,000 920,000 1,200,000 14,700,000
T
otal for Letcher county PL
Total Amounts:
CN
UT
RW
DN 2,450,000 115,685
3,390,000 3,010,000
3,370,000 530,000 1,200,000
54,650,000 48,600,000 48,470,000 15,471,236
63,860,000 52,140,000 49,670,000 15,586,921
N
ew route from Vanceburg to KY 59,
new length of 3.4 miles
KY-59Lewis 231 PL
DN
RW STP2 7,000,000
UT STP2 5,500,000
CN STP2 36,000,000
Project Cost: 7,000,000 5,500,000 36,000,000 0
Page 168 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCT KY-8 FROM KY-8C IN
G
ARRISON TO SCAFFOLD LICK ROAD.
(16CCN)(18CCN)
KY-8Lewis 8806.1000 PL
DN SPP 2,800,000
RW
UT
CN
Project Cost: 2,800,000 0 0 0
R
ECONSTRUCT KY-57 FROM KY-9 TO
FLEMING/LEWIS COUNTY LINE (14CCN)
(16CCR) (18CCN) (2020CCR) (2022CCR)
(2024CCR)
KY-57Lewis 8807 PL
DN
RW
UT SPP 4,480,000
CN SPP 48,000,000
Project Cost:
4,480,000 0 48,000,000 0
A
DDRESS CONDITION OF KY-9 FROM
MILEPOINT 0 TO MILEPOINT 8.048
KY-9Lewis 20029 PL
DN STP4 328,000
RW
UT
CN STP4 3,772,000
Project Cost: 0 4,100,000 0 0
C
ONSTRUCT RIGHT AND LEFT TURN
LANES AT THE INTERSECTION OF KY 989
(MP18.553) TO IMPROVE SAFETY AND
DECREASE COLLISIONS. (2022CCN)
KY-9Lewis 80251 PL
DN SPP 270,000
RW SPP 280,000
UT SPP 380,000
CN SPP 1,120,000
Project Cost:
270,000 280,000 380,000 1,120,000
C
onstruct left and right turning lanes from
KY 10 (AA Highway) onto KY 1306 (MP
11.9 - 12.3) (2024CCN)
KY-10Lewis 80354 PL
DN SPP 330,000
RW SPP 240,000
UT
CN SPP 2,100,000
Project Cost:
330,000 240,000 2,100,000 0
Page 169 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
New route to be located between MP
1
6.8-14.8 on KY 9, to MP 3.42-5.2 on KY 8
PF-9999Lewis 80412 PL
DN SPP 5,000,000
RW SPP 4,000,000
UT SPP 5,000,000
CN SPP 65,000,000
Project Cost: 5,000,000 4,000,000 5,000,000 65,000,000
T
otal for Lewis county PL
Total Amounts:
CN
UT
RW
DN 8,400,000 328,000
7,000,000 4,520,000
4,480,000 5,500,000 5,380,000
3,772,000 86,100,000 66,120,000
19,880,000 14,120,000 91,480,000 66,120,000
U
S-27 CORRIDOR FROM SOMERSET TO
LEXINGTON. IMPROVE SAFETY AND
REDUCE CONGESTION ON US-27 FROM
KY-1247 TO EDUCATION WAY.
(2022CCR)
US-27Lincoln 167 PL
DN
RW
UT
CN NH 37,000,000
Project Cost:
37,000,000 0 0 0
N
EW TURNING LANE AT ARCADIA VIEW
DRIVE(18CCN) (2020CCR)
US-127Lincoln 80000 PL
DN
RW
UT
CN SPP 1,520,000
Project Cost: 1,520,000 0 0 0
C
ontinue ongoing improvements to US 27
Corridor from Somerset to Lexington.
Improve Level of Service and safety on
US 27 from KY 328 to KY 501 in Lincoln
County. (2022CCN) (2024CCR)
US-27Lincoln 80201 PL
DN
RW NH 8,380,000
UT NH 4,970,000
CN NH 54,560,000
Project Cost:
13,350,000 0 54,560,000 0
Page 170 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RECONSTRUCTION TO MITIGATE
R
OCKSLIDE DAMAGE ON KY 300
(2022CCN) (2024CCR)
KY-300Lincoln 80202 PL
DN
RW
UT
CN SPP 2,160,000
Project Cost: 2,160,000 0 0 0
I
mprove Safety and Access Control along
US 150 from Danville to Stanford.
(2024CCN)
US-150Lincoln 80300 PL
DN
RW
UT NH 3,780,000
CN NH 11,760,000
Project Cost:
3,780,000 11,760,000 0 0
C
ontinue ongoing improvements to US 27
corridor from Somerset to Lexington.
Improve Level of Service and safety on
US 27 from KY 70 at Eubank in Pulaski to
KY 328 in Lincoln County.
US-27Lincoln 80400 PL
DN
RW
UT NH 3,127,000
CN NH 32,833,500
Project Cost:
3,127,000 32,833,500 0 0
T
otal for Lincoln county PL
Total Amounts:
CN
UT
RW
DN
8,380,000
11,877,000
40,680,000 44,593,500 54,560,000
60,937,000 44,593,500 54,560,000 0
P
ADUCAH-HENDERSON; RELOCATE
US-60 FROM EAST OF THE TENNESSEE
RIVER BRIDGE TO EAST OF RUDD-SPEES
ROAD (00CCR)(12CCR)(14CCR)
(2020CCR) (2024CCR)
US-60Livingston 330 PL
DN
RW
UT SPP 3,240,000
CN SPP 12,960,000
Project Cost:
3,240,000 12,960,000 0 0
Page 171 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LIVINGSTON
C
OUNTY ON (070B00009N) KY-135 AT
BUCK CREEK
KY-135Livingston 10152 PL
DN BRX 55,280
RW
UT
CN BRX 368,536
Project Cost: 0 0 0 423,816
I
mprove safety and substandard
geometrics in curve along KY 453 (Dover
Rd.) from I-24 Exit 31 to Easter Day Rd.
(MP 4.401 - 5.314)
KY-453Livingston 80418 PL
DN
RW
UT
CN SPP 1,400,000
Project Cost:
1,400,000 0 0 0
T
otal for Livingston county PL
Total Amounts:
CN
UT
RW
DN 55,280
3,240,000
1,400,000 12,960,000 368,536
4,640,000 12,960,000 0 423,816
I
MPROVE SAFETY BY IMPROVING SIGHT
LINES CROSSING RAILROAD BETWEEN
STOCKYARDS AND INDUSTRIAL PARK.
(16CCN)(18CCN) (2020CCR)
KY-2349Logan 8908 PL
DN SPP 100,000
RW SPP 120,000
UT SPP 170,000
CN SPP 1,000,000
Project Cost:
100,000 290,000 1,000,000 0
B
RIDGE PROJECT IN LOGAN COUNTY ON
(071B00047N) US-68X AT RJC RAILROAD
US-68Logan 10042 PL
DN FBP 1,262,998
RW
UT
CN FBP 8,419,984
Project Cost: 0 9,682,982 0 0
Page 172 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LOGAN COUNTY ON
(
071B00099N) COOPERSTOWN-QUALIT
AT MUD RIVER
KY-3201Logan 10043 PL
DN BRX 208,307
RW
UT
CN BRX 1,388,711
Project Cost: 0 0 0 1,597,018
I
MPROVE SAFETY AT THE INTERSECTION
OF US 431 AND KY 663. (2024CCN)
US-431Logan 80314 PL
DN SPP 400,000
RW SPP 200,000
UT SPP 250,000
CN SPP 930,000
Project Cost: 400,000 450,000 930,000 0
W
iden US 79 from Todd County line to
Russellville Bypass. (Estimates based on
preliminary engineering. Design funds
allocated under Logan Co. Item No.
03-80050)
US-79Logan 80414 PL
DN
RW
UT NH 12,600,000
CN NH 35,600,000
Project Cost:
12,600,000 35,600,000 0 0
I
mprove safety at the US 68/US 431, US
68/Newtown Road, and US 68/KY 79
intersections. (MP 12.265 - 12.465)
US-68Logan 80415 PL
DN
RW
UT
CN SPP 4,000,000
Project Cost:
4,000,000 0 0 0
T
otal for Logan county PL
Total Amounts:
CN
UT
RW
DN 500,000 1,262,998 208,307
320,000
12,600,000 420,000
4,000,000 44,019,984 1,930,000 1,388,711
17,100,000 46,022,982 1,930,000 1,597,018
Page 173 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADD RESTROOM FACILITY TO I-24
E
ASTBOUND & WESTBOUND WEIGH
STATIONS IN LYON COUNTY (DESIGN
FUNDS AUTHORIZED UNDER ITEM NO.
99-44.00)
I -24Lyon 7 PL
DN
RW
UT
CN NH 2,060,000
Project Cost:
2,060,000 0 0 0
R
ELOCATE US-641 FROM US-62 NEAR
EDDYVILLE TO SOUTH OF THE
LYON/CALDWELL COUNTY LINE
(2020CCR) (2022CCR) (2024CCR)
US-62,
US-641
Lyon 187.5000 PL
DN
RW
UT
CN STPF 17,000,000 12,000,000 6,360,000
Project Cost:
17,000,000 12,000,000 6,360,000 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00038N) KY-295 AT I 24 @ MP
40.720
KY-295Lyon 10155 PL
DN BRX 483,907
RW
UT
CN BRX 3,226,046
Project Cost:
3,709,953 0 0 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00040N) GREGORY ROAD AT I-24
@ MP. 042.048
CS-1047Lyon 10156 PL
DN FBP2 64,109
RW
UT
CN FBP2 427,392
Project Cost:
491,501 0 0 0
B
RIDGE PROJECT IN LYON COUNTY ON
(072B00046N) KY-6020 AT I-24 @ MP.
050.701
KY-6020Lyon 10157 PL
DN FBP2 40,018
RW
UT
CN FBP2 266,784
Project Cost:
306,802 0 0 0
Page 174 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN LYON COUNTY ON
(
072B00058N) KY-6020 AT I-24 @ MP.
050.701
KY-6020Lyon 10161 PL
DN FBP 326,658
RW
UT
CN FBP 2,177,722
Project Cost: 2,504,380 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 68.084 (68.116
NON-CARDINAL) TO MILEPOINT 71.818
(71.786 CARDINAL)
I -69Lyon 22077 PL
DN NHPM 310,000
RW
UT
CN NHPM 3,151,869
Project Cost:
3,461,869 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 71.786 (71.818
NON-CARDINAL) TO MILEPOINT 73.694
I -69Lyon 22078 PL
DN NHPM 410,000
RW
UT
CN NHPM 4,090,000
Project Cost:
4,500,000 0 0 0
O
N US 62 WHERE THE P&L RAIL
OVERPASS MEETS THE TWO (2) KY 810
INTERSECTIONS, RECONSTRUCT US
62/KY 810 (NORTH AND SOUTH)
INTERSECTIONS WITH TURN LANES OR
US-62Lyon 80312 PL
DN
RW NH 450,000
UT NH 500,000
CN NH 2,000,000
Project Cost:
0 950,000 2,000,000 0
I
mprove safety, mobility, and connectivity
by addressing commercial traffic
movements on US-62 from I-24 Exit 40
Interchange ramps to Days Inn Drive. (MP
6.5 - 7.1)
US-62Lyon 80419 PL
DN SPP 750,000
RW SPP 200,000
UT SPP 200,000
CN SPP 3,500,000
Project Cost:
750,000 400,000 3,500,000 0
Page 175 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Lyon county P L
Total Amounts:
CN
UT
RW
DN 2,384,692
650,000
700,000
32,399,813 12,000,000 11,860,000
34,784,505 13,350,000 11,860,000 0
C
ONSTRUCT NEW I-75 INTERCHANGE
BETWEEN BEREA & RICHMOND TO
ACCOMMODATE NEW INDUSTRIAL SITE
BACK ENTRANCE AND POTENTIALLY
MADISON COUNTY AIRPORT. (2024CCR)
I -75Madison 3 PL
DN SPP 2,080,000
RW SPP 3,000,000
UT SPP 2,500,000
CN SPP 30,000,000
Project Cost:
2,080,000 0 5,500,000 30,000,000
B
RIDGE PROJECT IN MADISON COUNTY
ON (076B00070N) KY-1985 AT TATES
CREEK
KY-1985Madison 10050 PL
DN BRZ 237,649
RW
UT
CN BRZ 1,584,326
Project Cost:
0 0 1,821,975 0
E
XTEND BOGGS LN TO CONNECT TO
PAVILION WAY (2020CCN) (2022CCR)
(2024CCR)
CR-1200,
CS-1526
Madison 80110 PL
DN SPP 330,000
RW SPP 1,010,000
UT SPP 330,000
CN SPP 1,270,000
Project Cost:
330,000 1,010,000 330,000 1,270,000
R
econstruct KY 21 from KY 1617 to US
421. (2024CCN)
KY-21Madison 80314 PL
DN SPP 1,560,000
RW SPP 4,000,000
UT SPP 5,000,000
CN SPP 12,000,000
Project Cost: 1,560,000 9,000,000 12,000,000 0
Page 176 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve capacity on Barnes Mill Road
b
etween Goggins Lane and the I-75
interchange. Improvements to also include
the intersection with Goggins Lane
(2024CCN)
KY-876Madison 80315 PL
DN SPP 1,820,000
RW SPP 1,000,000
UT SPP 1,600,000
CN SPP 10,310,000
Project Cost:
4,420,000 0 10,310,000 0
N
ew construction/modification of the I-75
exit 87 interchange as referenced in the
West Richmond Small Urban Area Study
(2024CCN)
I -75Madison 80316 PL
DN
RW
UT
CN NH 21,500,000
Project Cost:
0 0 0 21,500,000
S
COPING STUDY TO EVALUATE THE
FEASIBILITY OF EXTENDING THE BEREA
BYPASS FROM KY 21 IN EASTERN
BEREA TO US 25 SOUTH OF BEREA IN
MADISON COUNTY. (2024CCN)
PF-9999Madison 80356 PL SPP 320,000
DN
RW
UT
CN
Project Cost:
320,000 0 0 0
I
mprove safety on KY 52 from KY 374
(Charlie Norris Rd) to Drowning Creek
Bridge #033B00017N at Estill CL. Break
out section between Charlie Norris Rd (MP
16.354) and Speedwell Road (MP 17.613)
KY-52Madison 80420 PL
DN SPP 950,000
RW SPP 650,000
UT SPP 1,000,000
CN SPP 4,400,000
Project Cost:
950,000 650,000 1,000,000 4,400,000
E
xtend Farristown Industrial Drive at
Menelaus Rd (KY 1983) to the east to
connect to US 25.
FF-9999Madison 80421 PL
DN
RW SPP 500,000
UT SPP 400,000
CN SPP 7,500,000
Project Cost:
900,000 7,500,000 0 0
Page 177 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Provide an additional connection for Union
C
ity Road (KY 1986) to the Robert Martin
Bypass located east of the railroad. (MP
0-0.4)
KY-1986Madison 80429 PL
DN
RW SPP 750,000
UT SPP 500,000
CN SPP 5,400,000
Project Cost:
1,250,000 5,400,000 0 0
I
mprove capacity on KY 52 (Lancaster
Ave) beginning south of Elizabeth
St/Carnes Rd to north of Kit Carson Dr.
(MP 9.997 - 10.346)
KY-52Madison 80430 PL
DN
RW SPP 425,000
UT SPP 850,000
CN SPP 8,850,000
Project Cost:
1,275,000 8,850,000 0 0
T
otal for Madison county PL
Total Amounts:
CN
UT
RW
DN
320,000
6,740,000 237,649
2,675,000 5,660,000 3,000,000
3,350,000 5,000,000 3,830,000
21,750,000 23,894,326 57,170,000
13,085,000 32,410,000 30,961,975 57,170,000
R
OADWAY IMPROVEMENTS AND
SIDEWALK CONSTRUCTION ALONG KY
40 (MP 0.145-0.660) TO BETTER
FACILITATE ALTERNATIVE
TRANSPORTATION METHODS (2018BOP).
KY-40Magoffin 213 PL
DN
RW
UT
CN STPF 3,780,000
Project Cost:
3,780,000 0 0 0
B
RIDGE PROJECT IN MAGOFFIN COUNTY
ON (077B00071N) KY-3333 AT LICK CR.
KY-3333Magoffin 10053 PL
DN FBP2 325,094
RW
UT
CN FBP2 2,167,290
Project Cost: 0 2,492,384 0 0
Page 178 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF Bert T. Combs
M
ountain Parkway FROM MILEPOINT 69.58
TO MILEPOINT 71
KY-9009Magoffin 22210 PL
DN STP4 220,000
RW
UT
CN STP4 2,190,000
Project Cost: 0 0 2,410,000 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway FROM MILEPOINT 71
TO MILEPOINT 73.19
KY-9009Magoffin 22211 PL
DN STP4 220,000
RW
UT
CN STP4 2,227,000
Project Cost:
0 0 2,447,000 0
R
ECONSTRUCT KY 7 FROM WILL BAILEY
BRANCH ROAD TO KY 1090. (2024CCN)
KY-7Magoffin 80302 PL
DN
RW SPP 2,750,000
UT SPP 2,010,000
CN SPP 8,610,000
Project Cost: 0 2,750,000 2,010,000 8,610,000
R
econstruct CR 1265 from the intersection
with KY 3337 (MP 0.0) to KY 3050 (MP
0.547) (2024CCN)
CR-1265Magoffin 80303 PL
DN SPP 730,000
RW SPP 700,000
UT SPP 480,000
CN SPP 5,920,000
Project Cost:
730,000 700,000 480,000 5,920,000
T
otal for Magoffin county PL
Total Amounts:
CN
UT
RW
DN 730,000 325,094 440,000
3,450,000
2,490,000
3,780,000 2,167,290 4,417,000 14,530,000
4,510,000 5,942,384 7,347,000 14,530,000
Page 179 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
EXTEND MARTIN LUTHER KING AVENUE
F
ROM DOWNTOWN LEBANON BYPASS
(VETERANS MEMORIAL HIGHWAY).
ESTIMATED DISTANCE IS 1.5 MILES
(14CCN) (2022CCN) (2024CCR)
PF-9999Marion 8805 PL
DN SPP 1,120,000
RW SPP 3,750,000
UT
CN
Project Cost:
1,120,000 0 3,750,000 0
B
RIDGE PROJECT IN MARION COUNTY ON
(078B00070N) KY-1157 AT ARBUCKLE
CREEK
KY-1157Marion 10061 PL
DN FBP2 122,066
RW
UT
CN FBP2 813,773
Project Cost:
0 0 935,839 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-208 OVER ROLLING FORK OF SALT
RIV (078B00020N)
KY-208Marion 10088 PL
DN BRZ 599,535
RW
UT
CN BRZ 3,996,897
Project Cost:
4,596,432 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-527 OVER ROLLING FORK RIVER
(078B00056N)
KY-527Marion 10089 PL
DN BRZ 448,074
RW
UT
CN BRZ 2,987,160
Project Cost:
0 0 3,435,234 0
E
xtend KY 2154 Bypass from KY208 to
KY49. (2022CCR) (2024CCR)
CO-0Marion 80153 PL
DN
RW SPP 5,750,000
UT SPP 2,800,000
CN
Project Cost: 5,750,000 0 2,800,000 0
Page 180 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REPLACE LOW WATER STRUCTURE ON
S
ILOAM ROAD (CR 1119) OVER NORTH
ROLLING FORK NEAR KY 337
INTERSECTION MP 0.089 TO MP 0.122
(078C00154N)
CR-1119Marion 80252 PL
DN FBP2 220,067
RW
UT
CN FBP2 1,467,113
Project Cost:
0 1,687,180 0 0
I
MPROVE CONNECTIVITY AND
CONGESTION BETWEEN US 68 AND KY
55 ON THE EAST SIDE OF LEBANON
(APPROXIMATELY 2 MILES) (2022CCN)
(2024CCR)
KY-2154,
KY-55,
PF-9999,
US-68
Marion 80259 PL
DN
RW
UT
CN STPF 9,800,000
Project Cost:
9,800,000 0 0 0
W
iden bridge (078B00027N) on KY 84
over Prather Creek just west of Raywick
(MP 4.31-4.36).
KY-84Marion 80359 PL
DN FBP 646,875
RW
UT
CN FBP 4,312,500
Project Cost:
0 4,959,375 0 0
A
dd guardrail on KY 327 (MP 1.210 -
1.552)
KY-327Marion 80413 PL
DN
RW
UT
CN GR 155,000
Project Cost: 155,000 0 0 0
T
otal for Marion county PL
Total Amounts:
CN
UT
RW
DN 1,719,535 866,942 570,140
5,750,000 3,750,000
2,800,000
13,951,897 5,779,613 3,800,933
21,421,432 6,646,555 10,921,073 0
Page 181 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-024 FROM
M
ILEPOINT 17.32 TO MILEPOINT 26.558
I -24Marshall 20013 PL
DN NHPM 1,200,000
RW
UT
CN NHPM 12,000,000
Project Cost: 13,200,000 0 0 0
CORRECT GEOMETRIC DEFICIENCIES AND
A
DDRESS SAFETY, SERVICE, AND
CONGESTION ISSUES FROM BENTON
BAPTIST TEMPLE ROAD / HAPPY
HOLLOW RD TO US 68 IN DRAFFENVILLE.
US-641M arshall 80311 PL
DN
RW NH 1,750,000
UT NH 2,000,000
CN NH 10,000,000
Project Cost: 0 1,750,000 2,000,000 10,000,000
I
MPROVE GEOMETRIC ALIGNMENTS AND
ADDRESS ACCESS ISSUES AND SAFETY
CONCERNS FROM KY 2206 TO THE
ENTRANCE OF MARSHALL COUNTY
HOSPITAL IN BENTON. (2024CCN)
KY-348Marshall 80314 PL
DN SPP 1,040,000
RW SPP 1,000,000
UT SPP 1,500,000
CN SPP 6,000,000
Project Cost:
1,040,000 1,000,000 1,500,000 6,000,000
T
otal for Marshall county PL
Total Amounts:
CN
UT
RW
DN 2,240,000
2,750,000
3,500,000
12,000,000 16,000,000
14,240,000 2,750,000 3,500,000 16,000,000
I
NEZ TO WARFIELD (SECTION 2-1): FROM
LITTLE BLACKLOG TO BOOTH FORK.
[STA. 190+00 TO STA. 298+00
(ENGLISH)] (2002BOP) (12CCR)(AR/W)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.1100 PL
DN
RW
UT SPP 2,320,000
CN SPP 24,230,000 30,000,000
Project Cost:
2,320,000 24,230,000 30,000,000 0
Page 182 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
INEZ TO WARFIELD (SECTION 2-2): FROM
B
OOTH FORK TO KY-2031 [STA. 298+00
TO STA. 382+00 (ENGLISH)] (2002BOP)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.1600 PL
DN
RW
UT
CN SPP 45,660,000
Project Cost:
0 0 45,660,000 0
I
NEZ TO WARFIELD (SECTION 2-3): FROM
KY-2031 TO KY-292 [STA. 382+00 TO
STA. 427+00 (ENGLISH)] (2002BOP)
(16CCR) (2022CCN) (2024CCR)
KY-40,
PF-9999
Martin 154.2100 PL
DN
RW
UT
CN SPP 29,830,000
Project Cost:
0 0 29,830,000 0
I
NEZ TO WARFIELD; BRIDGE OVER TUG
FORK (SECTION III) (R & U IDENTIFIED IN
SECTION II-ITEM NO. 154.10)(16CCR)
(2022CCN) (2024CCR)
PF-9999Martin 154.3000 PL
DN
RW
UT
CN SPP 19,820,000
Project Cost:
0 0 0 19,820,000
B
RIDGE PROJECT IN MARTIN COUNTY ON
(080B00006N) KY-1224 AT ROCKHOUSE
FORK
KY-1224Martin 10128 PL
DN FBP2 138,760
RW
UT
CN FBP2 925,066
Project Cost:
0 0 0 1,063,826
A
ddress safety concerns, substandard
roadway geometrics, and pavement
conditions on KY-908 from Reservoir
Road to Helen Mills Road. 1.5 miles (MP
6.705-8.182)
KY-908Martin 80412 PL
DN
RW
UT
CN SPP 750,000
Project Cost:
750,000 0 0 0
Page 183 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and geometrics of KY 292
f
rom the intersection of KY 40 in Warfield
north to the intersection of KY 908.
(MP13.16 - 23.5)
KY-292Martin 80413 PL
DN SPP 2,000,000
RW SPP 1,115,000
UT SPP 2,200,000
CN SPP 23,800,000
Project Cost:
3,115,000 2,200,000 23,800,000 0
T
otal for Martin county PL
Total Amounts:
CN
UT
RW
DN 2,000,000 138,760
1,115,000
2,320,000 2,200,000
750,000 24,230,000 129,290,000 20,745,066
6,185,000 26,430,000 129,290,000 20,883,826
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-68 OVER OHIO RIVER (081B00069N)
US-68Mason 10013.1000 PL
D
N BRO 300,000
RW
UT
CN BRO 2,000,000
Project Cost: 0 2,300,000 0 0
B
RIDGE PROJECT IN MASON COUNTY ON
(081B00041N) US-62X AT OHIO
RIVER-MYVLLE- CSX R
US-62Mason 10091 PL
DN BRX 4,000,000
RW
UT
CN BRX 40,000,000
Project Cost: 44,000,000 0 0 0
B
RIDGE PROJECT IN MASON COUNTY ON
(081B00047N) KY-1234 AT INDIAN RUN
CREEK
KY-1234Mason 10092 PL
DN BRX 76,747
RW
UT
CN BRX 511,649
Project Cost:
588,396 0 0 0
Page 184 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve the operational efficiency for
n
orthbound traffic on KY-9 (AA Highway)
at the intersection with Kenton Station
Drive (hospital entrance) (MP10.6-10.9)
KY-9Mason 80413 PL
DN
RW
UT
CN SPP 1,000,000
Project Cost:
1,000,000 0 0 0
T
otal for Mason county PL
Total Amounts:
CN
UT
RW
DN 4,076,747 300,000
41,511,649 2,000,000
45,588,396 2,300,000 0 0
A
ddress issues with service, congestion
and safety from US 45 to I-24 in Paducah.
See March, 2002 Paducah-McCracken
County Transportation Study. (2024CCN)
US-62McCracken 142 PL
DN
RW
UT STP1 2,800,000
CN
Project Cost:
2,800,000 0 0 0
I
mprove KY 1286 from US 62(MP 5.000) to
Perkins Creek Bridge (MP 5.896,
B00167N). (Priority Section 3) (2022CCN)
(2024CCR)
KY-1286McCracken 153.3000 PL
DN
RW
UT
CN STP1 4,760,000
Project Cost:
0 4,760,000 0 0
I
mprove KY 1286 from Perkins Creek
Bridge (MP 5.896, B00167N) to KY 998
(MP 6.916). (Priority Section 4) (2022CCN)
(2024CCR)
KY-1286McCracken 153.4000 PL
DN
RW
UT
CN STP1 5,220,000
Project Cost:
0 5,220,000 0 0
Page 185 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
RELOCATION AND MINOR WIDENING OF
U
S-60 FROM CLARKS RIVER TO US-62
JCT.(10CCR)(14CCR)(LET W/ 1-1115.20)
(16CCR)
US-60McCracken 1115.1000 PL
DN NH 500,000
RW NH 3,500,000
UT NH 3,000,000
CN NH 13,000,000
Project Cost:
500,000 6,500,000 13,000,000 0
U
pgrade navigational lighting for the US 45
(Irvin S Cobb) Bridge. 073B00001N
US-45McCracken 4903 PL
DN SPP 70,000
RW
UT
CN SPP 900,000
Project Cost: 70,000 900,000 0 0
B
RIDGE PROJECT IN MCCRACKEN
COUNTY ON (073B00062N) US-62 AT
P&L RAILWAY
US-60McCracken 10163 PL
DN BRO 732,741
RW
UT
CN BRO 4,884,941
Project Cost:
0 0 0 5,617,682
A
DDRESS DEFICIENCIES OF BRIDGE ON
US-45 OVER OHIO RIVER (073B00001N)
US-45McCracken 10198 PL
DN BRX 150,000
RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
P
lanning and Phase I Engineering for the
future expansion or replacement of the
I-24 Ohio River Bridge. (Shared Cost w/
Illinois) (073B00100N)
I -24McCracken 10261 PL
DN
RW
UT
CN BRO 1,375,000 1,375,000
Project Cost:
1,375,000 1,375,000 0 0
Page 186 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF US-60X FROM
M
ILEPOINT 0 TO MILEPOINT 0.7
US-60McCracken 20040 PL
DN STP5 36,000
RW
UT
CN STP5 414,000
Project Cost: 0 0 450,000 0
A
DDRESS SAFETY, CONGESTION, AND
FUTURE CAPACITY ISSUES FROM US 60
TO US 68 IN PADUCAH. SEE MARCH,
2002 PADUCAH-MCCRACKEN COUNTY
TRANSPORTATION STUDY. (2024CCN)
I -24McCracken 80305 PL
DN NH 2,080,000
RW NH 550,000
UT NH 2,240,000
CN NH 39,200,000
Project Cost:
2,080,000 550,000 2,240,000 39,200,000
I
MPROVE MOBILITY, SAFETY AND
ADDRESS GEOMETRIC DEFICIENCIES ON
KY 998 (OLIVET CHURCH ROAD) FROM
KY 1286 (FRIENDSHIP ROAD) TO US 62.
(2024CCN)
KY-998McCracken 80315 PL
DN SPP 1,500,000
RW SPP 2,750,000
UT SPP 3,000,000
CN SPP 10,000,000
Project Cost:
1,500,000 2,750,000 3,000,000 10,000,000
B
ASED ON THE 2019 PADUCAH SUA, ID
"Q". RECONFIGURE THE INTERSECTION
OF KY 731 AND LABELLE AVE. A
ROUNDABOUT SHOULD BE CONSIDERED.
THIS IS BASED ON 33 CRASHES IN 3
KY-731McCracken 80317 PL
DN
RW SPP 2,000,000
UT SPP 3,500,000
CN SPP 5,500,000
Project Cost:
5,500,000 5,500,000 0 0
A
ddress safety, congestion, and future
capacity issues from Exit 3 to Exit 7 on
I-24
I-24McCracken 80404 PL
DN NH 2,000,000
RW NH 1,500,000
UT NH 1,000,000
CN NH 30,000,000
Project Cost:
2,000,000 1,500,000 1,000,000 30,000,000
Page 187 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Widen on KY 998 (Olivet Church Road)
f
rom KY 1286 (Friendship Road) to US 60
to improve level of service and safety.
See 2013 Planning Study
KY-998McCracken 80405 PL
DN SPP 300,000
RW SPP 1,600,000
UT SPP 600,000
CN SPP 2,400,000
Project Cost:
300,000 2,200,000 2,400,000 0
I
mprove safety, congestion, mobility, and
access at the Intersection of US 60 with
Coleman Rd. and James Sanders Blvd.
US-60McCracken 80406 PL
DN
RW NH 750,000
UT NH 750,000
CN NH 2,500,000
Project Cost:
1,500,000 2,500,000 0 0
T
otal for McCracken county PL
Total Amounts:
CN
UT
RW
DN 6,600,000 36,000 732,741
2,750,000 9,900,000
7,050,000 3,600,000 6,240,000
2,375,000 20,255,000 15,814,000 84,084,941
18,775,000 33,755,000 22,090,000 84,817,682
B
RIDGE PROJECT IN MCCREARY COUNTY
ON (074B00007N) KY-92 AT S. FORK OF
CUMBERLAND RI
KY-92McCreary 10057 PL
DN FBP 2,208,703
RW
UT
CN
Project Cost: 0 0 0 2,208,703
B
RIDGE PROJECT IN MCCREARY COUNTY
ON (074C00010N) WIBORG LOOP RD AT
NS (CNO&TP) SYSTEM
CR-1314McCreary 10061 PL
DN FBP2 317,874
RW
UT
CN FBP2 2,119,163
Project Cost:
0 0 2,437,037 0
Page 188 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PRELIMINARY ENGINEERING AND
E
NVIRONMENTAL CORRIDOR STUDY FOR
IMPROVING SAFETY AND MAKING KY-92
A SCENIC ROUTE FROM MONTICELLO TO
STEARNS (FLEXIBLE SOLUTIONS)
KY-92McCreary 80004 PL SPP 500,000
DN
RW
UT
CN
Project Cost:
500,000 0 0 0
I
mprove mobility and safety RR crossing
elimination by constructing bridge and
realigning KY 1470, approx 0.177 miles
west of CR1199A (Dick Wilson Rd) and
extending easterly to US 27. (2020CCN)
CR-1199McCreary 80103 PL
DN
RW
UT SPP 720,000
CN SPP 8,420,000
Project Cost:
720,000 8,420,000 0 0
I
mprove safety and mobility along US27 at
KY2792/ KY1651 and widen approach
routes 1500 feet on each side of US 27 in
Pine Knot
US-27McCreary 80406 PL
DN
RW
UT NH 1,500,000
CN NH 3,200,000
Project Cost:
0 0 1,500,000 3,200,000
T
otal for McCreary county PL
Total Amounts:
CN
UT
RW
DN
500,000
317,874 2,208,703
720,000 1,500,000
8,420,000 2,119,163 3,200,000
1,220,000 8,420,000 3,937,037 5,408,703
R
EPLACE, IMPROVE ALIGNMENTS AND
APPROACHES, AND ADDRESS SAFETY
ISSUES WITH BRIDGES ON KY-136 IN
MCLEAN COUNTY FROM KY-56 TO OHIO
COUNTY LINE. (075B00034N,
KY-136McLean 8812 PL
DN
RW
UT
CN SPP 7,560,000
Project Cost:
7,560,000 0 0 0
Page 189 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN WEBSTER COUNTY
O
N (117B00012N) KY-56 AT GREEN
RIVER
KY-56McLean 10135 PL
DN FBP 1,927,758
RW
UT
CN FBP 12,851,723
Project Cost: 0 0 0 14,779,481
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 140 OVER PORTERS DITCH
(075B00041N)
KY-140McLean 10152 PL
DN BRX 112,724
RW
UT
CN BRX 751,490
Project Cost:
0 0 864,214 0
A
ddress safety concerns of intersection
of KY 140 and KY 815 in McLean County
(MP 7.239-7.259)
KY-140McLean 80420 PL
DN SPP 280,000
RW SPP 350,000
UT SPP 600,000
CN SPP 1,200,000
Project Cost:
0 280,000 950,000 1,200,000
T
otal for McLean county PL
Total Amounts:
CN
UT
RW
DN 280,000 112,724 1,927,758
350,000
600,000
7,560,000 751,490 14,051,723
7,560,000 280,000 1,814,214 15,979,481
A
DDRESS TRAVEL TIME RELIABILITY
AND IMPROVE INTERSECTIONS ALONG
KY 313 FROM HARDIN COUNTY TO KY
1638 IN BRANDENBURG. (2024CCN)
KY-313Meade 80305 PL
DN SPP 2,240,000
RW SPP 940,000
UT
CN
Project Cost:
2,240,000 0 940,000 0
Page 190 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND MOBILITY
A
LONG KY 313 (BRANDENBURG
BYPASS) FROM KY 448 TO KY 228 IN
BRANDENBURG. (2024CCN)
KY-313Meade 80309 PL
DN
RW SPP 830,000
UT SPP 1,460,000
CN SPP 24,000,000
Project Cost:
0 830,000 1,460,000 24,000,000
T
otal for Meade county PL
Total Amounts:
CN
UT
RW
DN 2,240,000
830,000 940,000
1,460,000
24,000,000
2,240,000 830,000 2,400,000 24,000,000
C
omplete spot improvement to modernize
the roadway on KY 713 in the Fagan area
from approximately Milepoint 6.6 to
approximately Milepoint 7.25.
KY-713Menifee 102 PL
DN STP2 600,000
RW STP2 450,000
UT STP2 250,000
CN STP2 2,500,000
Project Cost:
600,000 700,000 2,500,000 0
R
econstruction of US 460 from Lucky
Stop to KY 713 @ Means. (2024CCN)
US-460Menifee 250 PL
DN
RW STP2 3,750,000
UT STP2 12,730,000
CN STP2 15,840,000
Project Cost: 3,750,000 12,730,000 15,840,000 0
W
IDEN EXISTING ROADWAY AND
IMPROVE VERTICAL AND HORIZONTAL
CURVES. NEW CONSTRUCTION.
COMPLETES US 460 UPGRADES IN
MENIFEE COUNTY FROM MP 14.35 TO
US-460Menifee 8805 PL
DN
RW SPP 9,200,000
UT SPP 4,240,000
CN SPP 42,650,000
Project Cost:
0 9,200,000 4,240,000 42,650,000
Page 191 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN MENIFEE COUNTY ON
(
083B00024N) KY-713 AT BEAVER CR
@MENIFEE HISCH
KY-713M enifee 10054 PL
DN FBP2 193,448
RW
UT
CN FBP2 1,289,656
Project Cost: 0 0 0 1,483,104
I
MPROVE SAFETY, CORRECT
GEOMETRICS, AND ENHANCE REGIONAL
CONNECTIVITY ON US 460 FROM THE
INTERSECTION OF KY 1240 TO 0.7 MILES
EAST OF THE MORGAN COUNTY LINE
US-460Menifee 80200 PL
DN
RW SPP 7,500,000
UT SPP 3,600,000
CN SPP 37,120,000
Project Cost:
7,500,000 3,600,000 37,120,000 0
I
mprove safety, correct geometrics, and
enhance regional connectivity on US 460
from the bridge over Dog Trot Fork (MP
3.3) to Rothwell (MP 4.8). (2022CCN)
(2024CCR)
US-460Menifee 80201 PL
DN
RW
UT
CN STPF 13,220,000
Project Cost:
13,220,000 0 0 0
I
mprove safety, correct geometrics, and
enhance regional connectivity on US 460
from the intersection Becraft Rd. (MP 1.3)
to bridge over Dog Trot Fork (MP 3.25)
US-460Menifee 80403 PL
DN NH 1,200,000
RW NH 1,850,000
UT NH 1,350,000
CN NH 12,250,000
Project Cost:
1,200,000 3,200,000 12,250,000 0
I
mprove safety and mobility on KY 36 from
0.1 miles south of Suiter Branch Rd. to the
intersection with US 460 (MP 6.136).
KY-36Menifee 80412 PL
DN SPP 2,000,000
RW SPP 3,250,000
UT SPP 6,500,000
CN SPP 16,500,000
Project Cost:
0 2,000,000 9,750,000 16,500,000
Page 192 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Menifee county P L
Total Amounts:
CN
UT
RW
DN 1,800,000 2,000,000 193,448
11,250,000 11,500,000 3,250,000
17,930,000 10,740,000
13,220,000 67,710,000 60,439,656
26,270,000 31,430,000 81,700,000 60,633,104
I
MPROVE SYSTEM MOBILITY ALONG
MOBERLY ROAD FROM KY 390 TO KY
1989 IN NORTHWEST HARRODSBURG.
(12CCR) (2020CCN) (2024CCR)
CS-1237Mercer 417 PL
DN
RW
UT
CN SPP 2,760,000
Project Cost:
0 0 2,760,000 0
I
mprove safety & access with turn lanes
onto Adams Ln from US127 (2 left & 1 SB
right).
US-127Mercer 80417 PL
DN SPP 150,000
RW
UT
CN SPP 350,000
Project Cost:
500,000 0 0 0
I
mprove access onto US 127 from the
Industrial Park North of the Harrodsburg
Bypass. Consider design/build.
US-127Mercer 80424 PL
DN
RW
UT
CN SPP 1,750,000
Project Cost:
1,750,000 0 0 0
T
otal for Mercer county PL
Total Amounts:
CN
UT
RW
DN 150,000
2,100,000 2,760,000
2,250,000 0 2,760,000 0
Page 193 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SUMMER SHADE BYPASS. (06CCR)
(
2006BOPC)(08CCR)(12CCR)(14CCR)
(2024CCN)
KY-90Metcalfe 112.1000 PL
DN
RW SPP 5,180,000
UT SPP 4,900,000
CN SPP 20,720,000
Project Cost: 10,080,000 0 0 20,720,000
I
MPROVE HIGHWAY SAFETY AND
SYSTEMS MOBILITY IN THE KY 163
CORRIDOR BETWEEN KY 90 (MP 2.907)
AND THE PROPOSED WEST EDMONTON
BYPASS (MP 9.777). (16CCN)(18CCN)
KY-163Metcalfe 8955 PL
DN STP2 2,710,000
RW STP2 12,870,000
UT STP2 10,130,000
CN STP2 43,800,000
Project Cost:
2,710,000 23,000,000 0 43,800,000
I
NTERSECTION IMPROVEMENTS AT US-68
AND KY-80. OPTIONS INCLUDE
REALIGNMENT OF NORTH APPROACH,
WIDENING FOR TURN LANES, AND A
ROUNDABOUT. (2024CCN)
US-68Metcalfe 80306 PL
DN SPP 330,000
RW SPP 310,000
UT SPP 310,000
CN SPP 1,240,000
Project Cost:
330,000 310,000 310,000 1,240,000
I
MPROVE SAFETY AND ADDRESS
GEOMETRIC DEFICIENCIES ON THE LB
NUNN CUMBERLAND EXPRESSWAY AT
EXIT 27 INTERCHANGE. (2024CCN)
LN-9008Metcalfe 80309 PL
DN SPP 1,940,000
RW SPP 330,000
UT SPP 380,000
CN SPP 11,160,000
Project Cost:
1,940,000 330,000 380,000 11,160,000
R
econstruct profile grade of 800 feet
length of roadway to minimize road
closure due to flooding
KY-640Metcalfe 80400 PL
DN SPP 100,000
RW SPP 40,000
UT SPP 130,000
CN SPP 500,000
Project Cost:
100,000 170,000 500,000 0
Page 194 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility on KY 90
b
etween the Barren County Line and KY
640 in Summer Shade. (MP 0-3.283)
KY-90Metcalfe 80416 PL
DN
RW SPP 750,000
UT SPP 750,000
CN SPP 4,000,000
Project Cost: 750,000 750,000 4,000,000 0
I
mprove safety and the alignment on KY
1243 from Wayne Porter Road to Ratliff
Mitchell Road. (MP 6.011-9.09)
KY-1243Metcalfe 80417 PL
DN SPP 900,000
RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 7,000,000
Project Cost:
0 900,000 4,000,000 7,000,000
T
otal for Metcalfe county PL
Total Amounts:
CN
UT
RW
DN 5,080,000 900,000
5,930,000 13,550,000 2,500,000
4,900,000 11,010,000 2,190,000
4,500,000 83,920,000
15,910,000 25,460,000 9,190,000 83,920,000
O
PERATION OF TURKEY NECK BEND
FERRY FOR FY 2027-2032.(12CCR)
(2020CCR) (2024CCR)
KY-214Monroe 128.1100 PL
DN
RW
UT
CN SPP 1,250,000 1,250,000 1,250,000 1,250,000
Project Cost: 1,250,000 1,250,000 1,250,000 1,250,000
R
EPLACE BRIDGE ON KY-100 BETWEEN
MP 14.7 AND 14.9. (18CCN)
KY-100Monroe 80003 PL
DN BRX 204,133
RW
UT
CN BRX 1,360,887
Project Cost: 0 1,565,020 0 0
Page 195 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct or realign KY 163 (Celina
R
oad) from Tennessee State Line to
Tompkinsville Bypass
KY-163Monroe 80401 PL
DN
RW SPP 6,000,000
UT SPP 1,500,000
CN SPP 30,000,000
Project Cost: 0 6,000,000 1,500,000 30,000,000
I
mprove safety and mobility on KY 100 at
the narrow bridge over East Fork Barren
River. (MP 13.5-13.6)
KY-100Monroe 80418 PL
DN SPP 300,000
RW SPP 100,000
UT SPP 200,000
CN SPP 1,500,000
Project Cost:
300,000 100,000 200,000 1,500,000
I
mprove safety and mobility on KY 100 at
the narrow bridge over Spring Creek.
(MP1.72-1.77)
KY-100Monroe 80419 PL
DN
RW
UT
CN SPP 600,000
Project Cost:
600,000 0 0 0
I
mprove safety and mobility on KY 100 at
the narrow bridge over Indian Creek. (MP
4-4.1)
KY-100Monroe 80420 PL
DN
RW
UT
CN SPP 800,000
Project Cost:
800,000 0 0 0
T
otal for Monroe county PL
Total Amounts:
CN
UT
RW
DN 300,000 204,133
6,100,000
1,700,000
2,650,000 2,610,887 1,250,000 32,750,000
2,950,000 8,915,020 2,950,000 32,750,000
Page 196 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
UPGRADE HINKSTON PIKE IN MT.
S
TERLING FROM NEW MIDLAND TRAIL TO
THE NEW INDUSTRIAL PARK ENTRANCE
(INCLUDES EXTENSION OF INDUSTRIAL
ACCESS ROAD TO HINKSTON PIKE).
KY-1991Montgomery 411 PL
DN
RW
UT SPP 980,000
CN SPP 9,050,000
Project Cost:
0 980,000 0 9,050,000
W
IDEN EXISTING PAVEMENT & IMPROVE
VERTICAL & HORIZONTAL CURVES
FROM EXISTING MT STERLING BYPASS
(KY 686) TO 500' W OF BENTBROOK
SUBDIVISION. ADD FULL WIDTH
US-60Montgomery 8810 PL
DN
RW
UT
CN SPP 12,320,000
Project Cost:
0 12,320,000 0 0
B
RIDGE PROJECT IN MONTGOMERY
COUNTY ON (087B00053N) KY-3362 AT
GRASSY LICK CREEK
KY-3362Montgomery 10057 PL
DN FBP2 153,841
RW
UT
CN FBP2 1,025,604
Project Cost:
0 0 0 1,179,445
R
econstruction of KY 2346 (Airport Road)Montgomery 80408 PL
DN SPP 500,000
RW SPP 150,000
UT SPP 250,000
CN SPP 6,250,000
Project Cost: 500,000 150,000 250,000 6,250,000
R
econstruct US-460 from Cardinal Ln to
US-60 in Mount Sterling. This should
include a consistent urban typical and
other geometric improvements.
US-460Montgomery 80423 PL
DN
RW STP1 3,600,000
UT STP1 5,000,000
CN STP1 14,650,000
Project Cost:
3,600,000 5,000,000 0 14,650,000
Page 197 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Montgomery county P L
Total Amounts:
CN
UT
RW
DN 500,000 153,841
3,600,000 150,000
5,980,000 250,000
12,320,000 30,975,604
4,100,000 18,450,000 250,000 31,129,445
W
EST LIBERTY BYPASS - CONSTRUCT
NEW ROUTE FROM US 460 @ KY 2498
TO US 460 @ KY 172. (00CCN)
PF-9999Morgan 8004 PL
DN SPP 1,800,000
RW SPP 4,030,000
UT SPP 1,240,000
CN SPP 21,170,000
Project Cost: 1,800,000 4,030,000 1,240,000 21,170,000
R
ECONSTRUCT KY-7 FROM MILE POST
2.7 TO MILE POST 5.6 (JUNCTION 519 TO
SOUTH SIDE OF WRIGLEY HILL)
KY-7Morgan 8402 PL
DN
RW
UT STP2 1,850,000
CN STP2 14,500,000
Project Cost:
0 1,850,000 14,500,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-437 OVER BIRCH FK OF WILLIAMS
CRK (088B00064N)
KY-437Morgan 10079 PL
DN FBP 138,338
RW
UT
CN FBP 922,254
Project Cost:
1,060,592 0 0 0
A
DDRESS CONDITION OF KY-882 FROM
MILEPOINT 0 TO MILEPOINT 2.468
KY-882Morgan 20031 PL
DN STP4 152,000
RW
UT
CN STP4 1,748,000
Project Cost: 0 1,900,000 0 0
Page 198 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF KY-985 FROM
M
ILEPOINT 0 TO MILEPOINT 2.015
KY-985Morgan 20032 PL
DN STP4 140,000
RW
UT
CN STP4 1,610,000
Project Cost: 0 1,750,000 0 0
A
DDRESS CONDITION OF KY-1260 FROM
MILEPOINT 0 TO MILEPOINT 2.8
KY-1260Morgan 20033 PL
DN STP4 160,000
RW
UT
CN STP4 1,840,000
Project Cost: 2,000,000 0 0 0
I
mprove safety and substandard
geometrics on US 460 from the Menifee
County Line to approximately milepoint 0.8.
(2022CCN) (2024CCR)
US-460Morgan 80202 PL
DN SPP 580,000
RW SPP 500,000
UT SPP 180,000
CN SPP 5,858,000
Project Cost:
580,000 500,000 180,000 5,858,000
I
mprove safety and reliability of US 460
from the intersection of KY 1081 to the
Magoffin County line (2024CCN)
US-460Morgan 80307 PL
DN SPP 1,200,000
RW SPP 500,000
UT SPP 750,000
CN SPP 10,000,000
Project Cost:
1,200,000 500,000 750,000 10,000,000
P
lanning study on US 460 to assess
needs and program future projects from
the Menifee Co. line to Salyersville
US-460Morgan 80400 PL SPP 500,000
DN
RW
UT
CN
Project Cost:
500,000 0 0 0
Page 199 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Morgan county P L
Total Amounts:
CN
UT
RW
DN
500,000
3,878,338 292,000
5,030,000
1,850,000 2,170,000
2,762,254 3,358,000 14,500,000 37,028,000
7,140,592 10,530,000 16,670,000 37,028,000
S
TRAIGHTEN DEAN ROAD INTERSECTION
OF 189 BYPASS TO KY 181 NORTH
NEAR THE INTERSECTION WITH THE WKY
PARKWAY, WENDELL FORD NATIONAL
GUARD CENTER, AND JOB CORP.
KY-2533Muhlenberg 8803 PL
DN
RW SPP 1,730,000
UT SPP 1,120,000
CN SPP 7,590,000
Project Cost:
1,730,000 1,120,000 7,590,000 0
A
DDRESS CONDITION OF Wendell H. Ford
Western KY Parkway FROM MILEPOINT
54.317 TO MILEPOINT 59.92
WK-9001Muhlenberg 22164 PL
DN NHPM 670,000
RW
UT
CN NHPM 6,651,254
Project Cost:
7,321,254 0 0 0
W
ESTERN KENTUCKY PKY -
RECONSTRUCT INTERCHANGE AT US 431
AT CENTRAL CITY (2022CCN) (2024CCR)
WK-9001Muhlenberg 80201 PL
DN
RW
UT SPP 2,090,000
CN SPP 15,600,000
Project Cost:
2,090,000 15,600,000 0 0
R
ECONSTRUCTION FROM GREENVILLE
TO THE MIDDLE SCHOOL
KY-176Muhlenberg 80405 PL
DN SPP 1,000,000
RW SPP 2,300,000
UT SPP 1,800,000
CN SPP 9,800,000
Project Cost: 1,000,000 2,300,000 1,800,000 9,800,000
Page 200 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruction of Rocky Creek Bridge on
U
S 431 and northern approach to the
bridge.
KY-431Muhlenberg 80406 PL
DN SPP 500,000
RW SPP 255,000
UT SPP 450,000
CN SPP 1,300,000
Project Cost: 500,000 705,000 1,300,000 0
I
mprove pavement width and shoulders on
KY-171 to improve traffic flow and
enhance usability for commercial vehicles.
KY-171Muhlenberg 80412 PL
DN SPP 200,000
RW SPP 7,700,000
UT SPP 3,000,000
CN SPP 2,100,000
Project Cost:
200,000 10,700,000 2,100,000 0
T
otal for Muhlenberg county PL
Total Amounts:
CN
UT
RW
DN 2,370,000
1,730,000 10,255,000
2,090,000 4,570,000 1,800,000
6,651,254 15,600,000 10,990,000 9,800,000
12,841,254 30,425,000 12,790,000 9,800,000
I
MPROVE SAFETY, MOBILITY, AND
GEOMETRICS ON US-150 FROM THE
BLUEGRASS PARKWAY TO THE
NELSON/WASHINGTON COUNTY LINE.
(2016BOP)(18CCR)(D-Auth under 4-396)
US-150Nelson 396.1000 PL
DN
RW
UT
CN STPF 15,000,000 15,000,000 15,000,000
Project Cost:
15,000,000 15,000,000 15,000,000 0
W
IDEN US-150 FROM KY-49 TO NEAR
KY-245/WAL-MART WIDENING. (06CCN)
(2022CCN) (2024CCR)
US-150Nelson 8308.1000 PL
DN
RW
UT
CN STP1 21,000,000
Project Cost:
0 0 21,000,000 0
Page 201 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN NELSON COUNTY ON
(
090B00109N) KY-2738 AT EAST FORK
SIMPSON CREEK
KY-2738N elson 10065 PL
DN BRX 78,525
RW
UT
CN BRX 523,503
Project Cost: 0 0 0 602,028
I
MPROVE CONNECTIVITY WEST OF
BARDSTOWN BY CONSTRUCTION NEW
ROUTE FROM THE BLUEGRASS
PARKWAY BEGINNING WEST OF EXIT 21
TO KY245 (2022CCN). (2024CCR)
PF-9999,
US-31
Nelson 80254 PL
DN SPP 7,840,000
RW SPP 12,500,000
UT
CN
Project Cost:
7,840,000 0 12,500,000 0
I
MPROVE MOBILITY AND CONNECTIVITY
WEST OF BARDSTOWN FROM KY 245 TO
US 31E NEAR COX'S CREEK. (2022CCN)
(2024CCR)
PF-9999,
US-31
Nelson 80255 PL
DN
RW STPF 5,000,000
UT STPF 3,000,000
CN STPF 18,000,000
Project Cost:
5,000,000 3,000,000 18,000,000 0
A
ddress geometric deficiencies along KY
55 near pleasant view road in Bloomfield.
(2024CCN)
KY-55Nelson 80356 PL
DN SPP 340,000
RW SPP 1,000,000
UT SPP 200,000
CN SPP 1,500,000
Project Cost:
340,000 1,000,000 200,000 1,500,000
C
onstruct new interchange on BG
Parkway at KY 1858. Partial eligibility for
Interchange only as NH funds. (2024CCN)
PF-9999Nelson 80361 PL
DN NH 3,360,000
RW NH 12,000,000
UT NH 3,000,000
CN SPP 70,000,000
Project Cost:
3,360,000 0 15,000,000 70,000,000
Page 202 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve traffic operations, mobility and
p
assing opportunities along US 31 E
(Louisville - Bardstown Rd) from KY 509
to Bullitt County Line. Consider a 2+1
configuration and/or innovative
US-31Nelson 80363 PL
DN
RW
UT
CN STPF 20,500,000
Project Cost:
0 0 0 20,500,000
A
DDRESS CONGESTION ALONG US 62 IN
BARDSTOWN FROM KY 245 TO KY 605.
(MP 15.894-17.209)
US-62Nelson 80416 PL
DN
RW SPP 1,500,000
UT SPP 1,300,000
CN SPP 6,500,000
Project Cost:
1,500,000 1,300,000 6,500,000 0
B
ridge Replacement (090B00101N) KY
509 (MP 2.220-2.240)
KY-509Nelson 80418 PL
DN FBP 225,000
RW FBP 15,000
UT FBP 50,000
CN FBP 1,500,000
Project Cost: 1,790,000 0 0 0
P
reliminary Engineering, Environmental,
and Design for installation of
approximately 10 miles of priority safety
locations of cable median barrier along the
Bluegrass Parkway (BG9002)
BG-9002Nelson 80419 PL
DN SPP 200,000
RW
UT
CN SPP 5,000,000
Project Cost:
0 200,000 5,000,000 0
T
otal for Nelson county PL
Total Amounts:
CN
UT
RW
DN 11,765,000 200,000 78,525
6,515,000 1,000,000 24,500,000
50,000 4,300,000 3,200,000
16,500,000 15,000,000 65,500,000 92,523,503
34,830,000 20,500,000 93,200,000 92,602,028
Page 203 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE THE KY-36/KY-32
I
NTERSECTION NEAR THE NICHOLAS
COUNTY SCHOOL PROPERTY (12CCR)
(16CCR)(2020CCR) (2022CCR)
(2024CCR)
KY-36Nicholas 205 PL
DN
RW
UT STP2 1,620,000
CN STP2 6,720,000
Project Cost:
1,620,000 6,720,000 0 0
R
ECONSTRUCT KY 36/KY 928
INTERSECTION. (14CCN)(16CCR)(18CCN)
(2024CCR)
KY-36Nicholas 8811 PL
DN
RW SPP 440,000
UT
CN SPP 1,680,000
Project Cost:
440,000 1,680,000 0 0
A
DDRESS CONDITION OF US-68 FROM
MILEPOINT 10.73 TO MILEPOINT 12.13
US-68Nicholas 22360 PL
DN STP4 121,600
RW
UT
CN STP4 1,398,400
Project Cost: 1,520,000 0 0 0
I
mprove safety, geometric deficiencies,
and promote connectivity along KY-36
between US-68 (mile-point 0.864) and
KY-13 (mile-point 3.910). (2024CCN)
KY-36Nicholas 80306 PL
DN SPP 2,430,000
RW SPP 3,600,000
UT SPP 4,640,000
CN SPP 29,760,000
Project Cost:
2,430,000 3,600,000 4,640,000 29,760,000
I
mprove access along KY 386 (Carpenter
Pike) from US 68 to new industrial site.
KY-386Nicholas 80407 PL
DN
RW SPP 625,000
UT SPP 830,000
CN SPP 1,750,000
Project Cost: 0 1,455,000 1,750,000 0
Page 204 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Nicholas county P L
Total Amounts:
CN
UT
RW
DN 2,551,600
440,000 4,225,000
1,620,000 830,000 4,640,000
1,398,400 8,400,000 1,750,000 29,760,000
6,010,000 13,455,000 6,390,000 29,760,000
I
MPROVE SAFETY ON KY 54 BY
UPGRADING MP 7.0 TO MP 8.0 TO THREE
LANES INCLUDING CURB AND GUTTER
AND ADDRESSING TWO SHARP TURNS.
(16CCN)(18CCN) (2020CCR) (2022CCR)
KY-54Ohio 8951 PL
DN
RW SPP 2,020,000
UT SPP 2,640,000
CN SPP 7,300,000
Project Cost:
2,020,000 2,640,000 7,300,000 0
B
RIDGE PROJECT IN OHIO COUNTY ON
(092B00015N) KY-69 AT SMITH CREEK
KY-69Ohio 10123 PL
DN FBP 350,943
RW
UT
CN FBP 2,339,618
Project Cost: 0 0 0 2,690,561
B
RIDGE PROJECT IN OHIO COUNTY ON
(092B00159N) KY-505 AT BR-INDIAN
CAMP CREEK
KY-505Ohio 10131 PL
DN BRX 148,460
RW
UT
CN BRX 989,736
Project Cost:
0 0 1,138,196 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 35.064 TO MILEPOINT 47.221
I -165Ohio 22134 PL
DN NHPM 3,200,000
RW
UT
CN NHPM 32,000,000
Project Cost: 0 0 0 35,200,000
Page 205 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-165 FROM
M
ILEPOINT 47.221 TO MILEPOINT 59.474
I -165Ohio 22136 PL
DN NHPM 1,100,000
RW
UT
CN NHPM 11,000,000
Project Cost: 0 0 12,100,000 0
A
DDRESS LEFT TURN LANE ISSUES ON
US-231 AT BOTH PERDUE ENTRANCES.
(2024CCN)
US-231Ohio 80303 PL
DN NH 850,000
RW NH 910,000
UT NH 980,000
CN NH 3,890,000
Project Cost:
850,000 1,890,000 3,890,000 0
A
ddress the safety concerns of KY-69
from Sunnydale Road to KY-54 at
Fordsville.
KY-69Ohio 80408 PL
DN
RW SPP 4,500,000
UT SPP 5,000,000 5,000,000
CN SPP 2,550,000
Project Cost:
0 9,500,000 5,000,000 2,550,000
R
econstruct KY-69 from KY-85 in
Centertown to KY-276 (Goshen Road).
(This is a breakout of IP20150399.)
KY-69Ohio 80409 PL
DN SPP 1,500,000
RW SPP 3,000,000
UT SPP 5,000,000
CN SPP 15,000,000
Project Cost:
1,500,000 3,000,000 5,000,000 15,000,000
T
otal for Ohio county PL
Total Amounts:
CN
UT
RW
DN 2,350,000 1,248,460 3,550,943
2,020,000 8,410,000
8,620,000 10,000,000
23,179,736 51,889,618
4,370,000 17,030,000 34,428,196 55,440,561
Page 206 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
KY-393 RECONSTRUCT FROM 140FEET
S
OUTH OF RAILROAD CROSSING (CSX)
EXTENDING NORTHWEST TOWARDS KY
146 ENDING AT STATION 12+00 (DESIGN
UNDER 5-230.00). (CONSTRUCTION
KY-146,
KY-393
Oldham 234 PL
DN
RW
UT
CN STPF 12,200,000 10,000,000
Project Cost:
12,200,000 10,000,000 0 0
R
econstruct KY 22 from KY 329 to Abbott
Lane, Including Rail Crossing Improvement
in the vicinity of KY 329 (Railroad Ave)
and CSX Railroad to improve safety and
freight mobility through Crestwood (KY
KY-22Oldham 304.1000 PL
DN
RW SPP 4,335,000
UT SPP 2,875,000
CN SPP 12,130,000
Project Cost:
7,210,000 12,130,000 0 0
W
IDEN I-71 FROM FOUR TO SIX LANES
FROM KY-329 (MP 14.1) TO KY-393 (MP
18.0). (2022CCR) (2024CCR)
I -71Oldham 483.1000 PL
DN
RW
UT
CN NH 37,500,000 27,000,000
Project Cost:
37,500,000 27,000,000 0 0
W
IDEN I-71 FROM FOUR TO SIX LANES
FROM KY-393 (MP 18.0) TO KY-53 (MP
22.4). (16CCN) (2024CCR)
I -71Oldham 483.2000 PL
DN
RW NH 2,420,000
UT NH 1,040,000
CN NH 40,000,000
Project Cost:
3,460,000 40,000,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 1694 OVER HARRODS CREEK
(093B00025N)
KY-1694Oldham 10126 PL
DN FBP2 745,433
RW
UT
CN FBP2 4,969,553
Project Cost:
0 5,714,986 0 0
Page 207 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE THE INTERCHANGE OF I 71 AND
K
Y 329. (18CCN) (2020CCR) (DESIGNED
UNDER 5-483.10) (2022CCR) (2024CCR)
I -71Oldham 80005 PL
DN
RW
UT
CN NH 8,200,000
Project Cost: 8,200,000 0 0 0
I
mprove safety and reduce congestion on
KY 53 from I-71 to Zhale Smith Road.
Includes consideration of a five lane
widening and bike/ ped accommodations.
(2022CCN) (2024CCR)
KY-53Oldham 80209 PL
DN
RW STPF 820,000
UT STPF 350,000
CN STPF 17,400,000
Project Cost:
1,170,000 17,400,000 0 0
I
mprove safety and reduce congestion on
KY 146 (LaGrange Road) from KY 329B
(KY 329 Bypass) to KY 393. Includes
consideration of a four lane widening and
bike/ped accommodations. (2022CCN)
KY-146Oldham 80210 PL
DN
RW SPP 9,425,000
UT SPP 6,925,000
CN SPP 40,600,000
Project Cost:
9,425,000 6,925,000 40,600,000 0
L
andslide repair on Westport Road
(KY-524) from JCT. US-42 West, north 1.0
mile. (2002BOPC)(NOT REQUIRED)
(2022CCN)
KY-524Oldham 80211 PL
DN
RW
UT
CN SPP 4,000,000
Project Cost:
4,000,000 0 0 0
I
MPROVE TRAFFIC FLOW, MINIMIZE
CONGESTION, AND ADDRESS SAFETY
ISSUES ON US 42 BETWEEN RIDGMOOR
DRIVE AND KY 1694 (GUM STREET).
INCLUDES CONSIDERATION OF A THREE
US-42Oldham 80307 PL
DN
RW NH 7,500,000
UT NH 5,000,000
CN NH 30,000,000
Project Cost:
12,500,000 30,000,000 0 0
Page 208 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND REDUCE
C
ONGESTION AT THE I-71/KY 53
(NORTH/SOUTH FIRST AVENUE)
INTERCHANGE. INCLUDES
CONSIDERATION OF AN ADDITIONAL
I-71Oldham 80313 PL
DN
RW
UT
CN NH 6,500,000
Project Cost:
6,500,000 0 0 0
I
MPROVE SAFETY, ACCESS, AND
ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 362 FROM THE
OLDHAM/SHELBY COUNTY LINE TO KY
146 (IN AND SOUTH OF PEWEE VALLEY).
KY-362Oldham 80314 PL
DN
RW SPP 1,820,000
UT SPP 1,500,000
CN SPP 22,420,000
Project Cost:
0 3,320,000 0 22,420,000
R
EDUCE CONGESTION, IMPROVE SAFETY
AND ENHANCE MOBILITY ON KY 146 IN
BUCKNER FROM KY 1817 (NEW CUT
ROAD) (MP 6.81) TO KY 393 (MP 7.42).
(2024CCN)
KY-146Oldham 80325 PL
DN
RW SPP 1,140,000
UT SPP 1,130,000
CN SPP 5,580,000
Project Cost:
2,270,000 5,580,000 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION, ALONG US 22 FROM
HAUNZ LANE TO KY 329. (2024CCN)
KY-22Oldham 80345 PL
DN
RW
UT SPP 1,040,000
CN SPP 4,600,000
Project Cost:
1,040,000 4,600,000 0 0
T
otal for Oldham county PL
Total Amounts:
CN
UT
RW
DN 745,433
25,640,000 1,820,000
11,435,000 8,425,000
68,400,000 151,679,553 40,600,000 22,420,000
105,475,000 162,669,986 40,600,000 22,420,000
Page 209 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN KY 22 FROM INTERSECTION WITH
K
Y 845 TO THE OWEN/GRANT COUNTY
LINE.(12CCN)(14CCR)(16CCR)
(2024CCN)
KY-22Owen 8702 PL
DN
RW SPP 3,300,000
UT SPP 1,350,000
CN SPP 21,600,000
Project Cost:
3,300,000 1,350,000 0 21,600,000
R
ECONSTRUCTION KY 355 FROM KY 22
IN GRATZ TO KY 1982 NEAR PERRY
PARK. (2024CCN)
KY-355Owen 80319 PL
DN SPP 4,860,000
RW SPP 6,250,000
UT SPP 2,400,000
CN SPP 85,800,000
Project Cost:
4,860,000 8,650,000 0 85,800,000
I
mprove safety and mobility and address
geometric deficiencies along KY 330
(Owenton Road) from Canby Lane to KY
607 (New Columbus Road).
KY-330Owen 80412 PL
DN SPP 5,000,000
RW SPP 8,000,000
UT SPP 3,000,000
CN SPP 40,000,000
Project Cost:
5,000,000 8,000,000 3,000,000 40,000,000
R
esurfacing KY 1883 (MP 1.299 - 7.887)KY-1883Owen 80422 PL
DN
RW
UT
CN STP5 870,100
Project Cost: 870,100 0 0 0
I
mprove safety and mobility along KY 35
from US 127 to the Gallatin County line.
(MP 0-4.132)
KY-3548Owen 80423 PL
DN SPP 3,000,000
RW SPP 2,500,000
UT SPP 1,500,000
CN SPP 25,000,000
Project Cost:
0 0 5,500,000 26,500,000
Page 210 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Owen county P L
Total Amounts:
CN
UT
RW
DN 9,860,000 3,000,000
3,300,000 14,250,000 2,500,000
3,750,000 3,000,000 1,500,000
870,100 172,400,000
14,030,100 18,000,000 8,500,000 173,900,000
R
EPLACE BRIDGE OVER MOORES FORK
AND REALIGN ROADWAY.
KY-708Owsley 173 PL
DN BRX 145,000
RW
UT
CN BRX 1,450,000
Project Cost: 0 1,595,000 0 0
A
DDRESS CONDITION OF KY-30 FROM
MILEPOINT 3.45 TO MILEPOINT 8.606
KY-30Owsley 20041 PL
DN STP4 264,000
RW
UT
CN STP4 3,036,000
Project Cost: 0 3,300,000 0 0
T
otal for Owsley county PL
Total Amounts:
CN
UT
RW
DN 409,000
4,486,000
0 4,895,000 0 0
R
ELOCATE KY 22 FROM THE
INTERSECTION OF FRYER ROAD AND KY
330 TO US 27 (ALIGNMENT H FROM 1988
STUDY) (2022CCN) (2024CCR)
KY-22,
PF-9999
Pendleton 8508.1000 PL
DN SPP 3,440,000
RW SPP 11,590,000
UT SPP 2,030,000
CN SPP 64,250,000
Project Cost:
3,440,000 11,590,000 2,030,000 64,250,000
Page 211 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
U
S 27 OVER SO.FK. LICKING RIVER
(096B00021N)
US-27Pendleton 10059 PL
DN FBP 2,349,709
RW
UT
CN
Project Cost: 0 0 0 2,349,709
I
MPROVE SAFETY AND MOBILITY ON US
27 AT THE KY INTERSECTION (MILEPOINT
11.6 TO MILEPOINT 12) (2022CCN)
(2024CCR)
US-27Pendleton 80253 PL
DN STPF 420,000
RW STPF 550,000
UT STPF 190,000
CN STPF 4,060,000
Project Cost:
420,000 740,000 4,060,000 0
R
ECONSTRUCTION FROM KY 3185 IN
BUTLER TO KY 467 (2022CCN)
KY-177Pendleton 80258 PL
DN SPP 2,240,000
RW
UT
CN
Project Cost: 2,240,000 0 0 0
I
MPROVE SAFETY AND MOBILITY ON US
27 AT THE KY 22 INTERSECTION.
(2024CCN)
US-27Pendleton 80306 PL
DN
RW STPF 390,000
UT STPF 650,000
CN STPF 7,800,000
Project Cost:
390,000 650,000 7,800,000 0
R
ECONSTRUCT KY 177 FROM LICKING
RIVER BRIDGE IN BUTLER TO KY 3185.
(2024CCN)
KY-177Pendleton 80310 PL
DN SPP 2,170,000
RW SPP 580,000
UT SPP 1,120,000
CN SPP 26,400,000
Project Cost:
2,170,000 580,000 1,120,000 26,400,000
Page 212 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility and address
g
eometric deficiencies along KY 17 from
US 27 to KY 1853 (Bryan Griffin Road).
KY-17Pendleton 80408 PL
DN SPP 1,000,000
RW SPP 750,000
UT SPP 1,000,000
CN SPP 7,000,000
Project Cost: 1,000,000 750,000 1,000,000 7,000,000
T
otal for Pendleton county PL
Total Amounts:
CN
UT
RW
DN 9,270,000 2,349,709
390,000 13,470,000
840,000 4,150,000
11,860,000 97,650,000
9,660,000 14,310,000 16,010,000 99,999,709
I
MPROVE KY 476 FROM BRIDGE OVER
NORTH FORK KY RIVER (MP. 0.45) TO
NORTH OF WALKER CORNETT ROAD IN
WABACO. (SECTION 1)
KY-476Perry 209.1000 PL
DN SPP 160,000
RW
UT SPP 580,000
CN SPP 3,780,000
Project Cost:
160,000 580,000 3,780,000 0
I
MPROVE KY 476 FROM KY-15X IN
WALKERTOWN TO BRIDGE OVER NORTH
FORK KY RIVER.
KY-476Perry 209.2000 PL
DN SPP 330,000
RW SPP 720,000
UT SPP 700,000
CN SPP 4,200,000
Project Cost:
330,000 720,000 700,000 4,200,000
R
ECONSTRUCTION OF KY 15 FROM
BONNYMAN TO NEAR KY 28. (14CCN)
(2020CCN) (2022CCR) (2024CCR)
KY-15Perry 269.2000 PL
DN
RW SPP 13,750,000
UT SPP 6,050,000
CN SPP 73,080,000
Project Cost:
13,750,000 6,050,000 73,080,000 0
Page 213 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
NEW INTERCHANGE OFF OF A NEW EXIT
5
5 HAL ROGERS PARKWAY. (16CCN)
(18CCN) (2024CCR)
HR-9006Perry 8903 PL
DN
RW
UT
CN NH 12,000,000
Project Cost: 12,000,000 0 0 0
B
RIDGE PROJECT IN PERRY COUNTY ON
(097B00005N) KY-476 AT JAKES CREEK
KY-476Perry 10056 PL
DN BRX 168,143
RW
UT
CN BRX 1,120,951
Project Cost: 1,289,094 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
BRIDGE RD OVER LEATHERWOOD CREEK
(097C00060N)
CR-1540Perry 10084 PL
DN BRZ 127,184
RW
UT
CN BRZ 847,895
Project Cost:
975,079 0 0 0
A
DDRESS CONDITION OF Hal Rogers
Daniel Boone Parkway FROM MILEPOINT
51.026 TO MILEPOINT 56.1
HR-9006Perry 22203 PL
DN STP4 410,000
RW
UT
CN STP4 4,094,627
Project Cost:
0 4,504,627 0 0
R
econstruct roadway to eliminate flooding
beginning at the intersection with KY 550.
(2024CCN)
KY-1440Perry 80305 PL
DN SPP 710,000
RW SPP 830,000
UT SPP 1,180,000
CN SPP 5,760,000
Project Cost:
710,000 830,000 1,180,000 5,760,000
Page 214 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve drainage issues and construct
s
idewalk on KY 550 from MP 1.2 to MP 1.7
near the Galen College of Nursing.
(2024CCN)
KY-550Perry 80306 PL
DN SPP 680,000
RW SPP 1,660,000
UT SPP 1,300,000
CN SPP 2,020,000
Project Cost:
680,000 1,660,000 1,300,000 2,020,000
C
onstruct a new access road to East
Perry Sports Complex development and a
connector to Nautilus Drive (2024CCN)
PF-9999Perry 80308 PL
DN
RW
UT
CN SPP 1,080,000 1,890,000
Project Cost:
0 0 1,080,000 1,890,000
R
econstruction from Woodland Park
Bridge to KY 15X in Hazard.
(MP2.999-3.47)
KY-451Perry 80416 PL
DN SPP 700,000
RW SPP 500,000
UT SPP 1,000,000
CN SPP 5,000,000
Project Cost:
700,000 500,000 1,000,000 5,000,000
T
otal for Perry county PL
Total Amounts:
CN
UT
RW
DN 2,875,327 410,000
13,750,000 3,710,000
6,630,000 4,180,000
13,968,846 4,094,627 77,940,000 18,870,000
30,594,173 14,844,627 82,120,000 18,870,000
M
ITIGATE OR ELIMINATE ROCKFALL
HAZARDS AND IMPROVE ROADWAY
FOR BETTER FLOW AND EFFICIENCY IN
ORDER TO HANDLE THE EXPECTED
CONGESTION ARISING FROM EVENTS AT
KY-1426Pike 147 PL
DN
RW
UT
CN PROT 15,000,000 10,000,000 7,400,000
Project Cost:
15,000,000 10,000,000 7,400,000 0
Page 215 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE KY 194 FROM US 119 RAMP
N
EAR SMITH FARMS BOTTOM (CR 1458)
TO NEAR DESKINS BRANCH CULVERT.
(18CCR) (2020CCR)
KY-194Pike 198 PL
DN
RW
UT
CN STPF 9,000,000
Project Cost:
9,000,000 0 0 0
C
URVE REVISION AND PASSING LANES
ON KY-194 NEAR DESKINS BRANCH
(08CCR)(12CCR)
KY-194Pike 281 PL
DN
RW
UT
CN STP2 12,030,200
Project Cost:
12,030,200 0 0 0
I
MPROVE SAFETY AND REDUCE
CONGESTION AT THE US-460 AND
KY-1460 INTERSECTION. (2020CCR)
(2022CCR) (2024CCR)
US-460Pike 346 PL
DN
RW
UT
CN NH 6,060,000
Project Cost:
0 0 6,060,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 1056 OVER Tug Fork River
(098B00171N) (Border bridge with
WVDOT)
KY-1056Pike 10169 PL
DN BRX 175,000
RW
UT
CN BRX 1,750,000
Project Cost:
0 1,925,000 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 52 OVER Tug Fork, CR 15, NSRR
(098B00263N) (Border bridge with
WVDOT)
US-52Pike 10171 PL
DN FBP 150,000
RW
UT
CN FBP 1,000,000
Project Cost:
1,150,000 0 0 0
Page 216 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
U
S 52 OVER Tug Fork, CR 15, NSRR
(098B00263S) (Border bridge with
WVDOT)
US-52Pike 10172 PL
DN FBP 150,000
RW
UT
CN FBP 1,000,000
Project Cost:
1,150,000 0 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
US 52 OVER Tug Fork, KY 292
(098B00265N) (Border bridge with
WVDOT)
US-52Pike 10173 PL
DN BRX 305,000
RW
UT
CN BRX 3,050,000
Project Cost:
3,355,000 0 0 0
I
mprove substandard geometrics in the
curve near Marshall Branch. (2024CCN)
KY-1469Pike 80308 PL
DN
RW SPP 175,000
UT SPP 250,000
CN SPP 1,910,000
Project Cost: 425,000 1,910,000 0 0
M
ake template changes to improve sight
distance, drainage, and ingress/egress
through this commercial section of US 23
(2024CCN)
US-23Pike 80309 PL
DN
RW NH 230,000
UT NH 1,320,000
CN NH 4,000,000
Project Cost:
0 230,000 1,320,000 4,000,000
R
eplace bridge (098B00064N) on KY 122
(MP 13.45-13.65)
KY-122Pike 80351 PL
DN FBP 430,237
RW
UT
CN FBP 2,868,244
Project Cost: 0 0 3,298,481 0
Page 217 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve geometric and drainage issues
b
etween MP 8.93 and 9.10.
KY-199Pike 80403 PL
DN
RW SPP 150,000
UT SPP 250,000
CN SPP 475,000
Project Cost: 400,000 475,000 0 0
S
tudies for possible road way
realignments, roadway widening, curve
reconfigurations, etc.
KY-1460Pike 80404 PL SPP 1,000,000
DN
RW
UT
CN
Project Cost:
1,000,000 0 0 0
T
otal for Pike county PL
Total Amounts:
CN
UT
RW
DN
1,000,000
605,000 175,000 430,237
325,000 230,000
500,000 1,320,000
41,080,200 14,135,000 16,328,244 4,000,000
43,510,200 14,540,000 18,078,481 4,000,000
I
MPROVE SAFETY, UPGRADE
GEOMETRICS, AND ADDRESS CAPACITY
ISSUES FOR KY 213 FROM KY 615 TO
BOTTOM OF MOUNTAIN. (PRIORITY
SECTION 2)(2018BOP) (2022CCN)
KY-213Powell 163.2000 PL
DN
RW SPP 3,600,000
UT SPP 1,740,000
CN SPP 9,300,000
Project Cost:
3,600,000 1,740,000 9,300,000 0
I
mprove safety and traffic operations
along KY 11/KY 15 in Stanton from east of
Halls Lane to west of Stonegate Drive by
widening and providing a two-way
left-turn lane. (2024CCN)
KY-11Powell 170 PL
DN
RW
UT
CN SPP 3,920,000
Project Cost:
3,920,000 0 0 0
Page 218 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Minor widening to improve redundancy of
R
egional Travel.
KY-15Powell 176 PL
DN
RW
UT
CN PROT 7,200,000
Project Cost: 7,200,000 0 0 0
M
OUNTAIN PARKWAY AT EXIT 16:
INSTALL ROADWAY LIGHTING AS A
SAFETY MEASURE DUE TO FLOODING
CONCERNS.
KY-9000Powell 194 PL
DN NH 110,000
RW
UT
CN NH 1,000,000
Project Cost:
110,000 1,000,000 0 0
A
DDRESS CONDITION OF Bert T. Combs
Mountain Parkway FROM MILEPOINT
11.913 TO MILEPOINT 19.228
KY-9000Powell 20004 PL
DN STP4 630,000
RW
UT
CN STP4 6,297,100
Project Cost:
6,927,100 0 0 0
C
ONSTRUCT A BRIDGE ON KY 11
(CAMPTON RD MP 3.4 TO 3.85) ACROSS
THE BERT T. COMBS MOUNTAIN
PARKWAY
KY-11Powell 80250 PL
DN
RW SPP 5,000,000
UT SPP 5,000,000
CN SPP 12,890,000
Project Cost:
5,000,000 5,000,000 12,890,000 0
I
mprove drainage on KY 11 from
Derickson Lane to Ewen Street
KY-11Powell 80405 PL
DN SPP 300,000
RW SPP 500,000
UT SPP 100,000
CN SPP 1,900,000
Project Cost: 300,000 500,000 100,000 1,900,000
Page 219 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve access to Red River Gorge area
b
y reconstructing ramps and terminals at
Exit 33 of the Mountain Parkway
KY-11Powell 80406 PL
DN SPP 1,500,000
RW SPP 250,000
UT SPP 250,000
CN SPP 7,000,000
Project Cost: 1,500,000 250,000 250,000 7,000,000
T
otal for Powell county PL
Total Amounts:
CN
UT
RW
DN 2,540,000
8,600,000 750,000
6,740,000 350,000
17,417,100 1,000,000 22,190,000 8,900,000
28,557,100 8,490,000 22,540,000 8,900,000
S
omerset Northern Bypass Section 4;
From East of the KY 39 Interchange, to KY
461 / KY 80 Interchange (8-59.25 - BUILD
Grant Project)(Congressional KYD
Earmark - $45M)
KY-80,
PF-9999
Pulaski 59.6000 PL
DN
RW
UT
CN NH 16,000,000 17,000,000
Project Cost:
16,000,000 17,000,000 0 0
H
ORIZONTAL AND VERTICAL
REALIGNMENT OF KY-196 AT WHITE OAK
CREEK FROM 1.0 MILE E OF WARNER
ROAD TO 0.3 MILE W OF SIEVERS ROAD.
(10CCR)(14CCR) (2024CCN)
KY-196Pulaski 121 PL
DN
RW SPP 530,000
UT SPP 520,000
CN SPP 3,450,000
Project Cost:
530,000 520,000 3,450,000 0
I
MPROVE SAFETY AND MOBILITY ALONG
KY 39 BETWEEN KY 80 AND OAK LEAF
LANE. (2020CCR) (2024CCR)
KY-39Pulaski 169 PL
DN STP1 710,000
RW STP1 2,530,000
UT STP1 1,150,000
CN STP1 7,980,000
Project Cost:
710,000 2,530,000 1,150,000 7,980,000
Page 220 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce congestion and improve safety
a
nd mobility along US 27 between General
Burnside Island and Cumberland River
Bridge.
(2024CCN)
US-27Pulaski 272 PL
DN
RW
UT NH 3,000,000
CN NH 15,220,000
Project Cost:
3,000,000 15,220,000 0 0
B
RIDGE PROJECT IN PULASKI COUNTY
ON (100B00015N) KY-1956 AT LINE
CREEK
KY-1956Pulaski 10063 PL
DN BRX 312,402
RW
UT
CN BRX 2,082,679
Project Cost:
0 0 0 2,395,081
B
RIDGE PROJECT IN PULASKI COUNTY
ON (100B00048N) KY-934 AT BRUSHY
CREEK
KY-934Pulaski 10065 PL
DN BRX 31,693
RW
UT
CN BRX 211,288
Project Cost:
0 0 0 242,981
B
RIDGE PROJECT IN PULASKI COUNTY
ON (100B00066N) KENO RD (KY-751) AT
NS (CNO&TP) SYSTEM
CR-1254,
KY-751
Pulaski 10066 PL
DN BRX 641,804
RW
UT
CN BRX 4,278,690
Project Cost:
0 4,920,494 0 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
ED DICK RD OVER ROCK LICK CREEK
(100C00069N)
CR-1622Pulaski 10086 PL
DN BRZ 158,893
RW
UT
CN BRZ 1,059,288
Project Cost:
1,218,181 0 0 0
Page 221 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION AND IMPROVE
S
AFETY, CAPACITY AND MOBILITY
ALONG KY 90 BETWEEN WAYNE
COUNTY LINE AND NEW CUMBERLAND
RIVER BRIDGE (2020CCN) (2022CCR)
KY-90Pulaski 80104 PL
DN
RW SPP 6,300,000
UT SPP 2,270,000
CN SPP 21,280,000
Project Cost:
6,300,000 0 2,270,000 21,280,000
I
mprove safety and reduce congestion
along KY 1642 from 0.178 mile west of
KY 1577 to KY 914 (2024CCN)
KY-1642Pulaski 80301 PL
DN SPP 750,000
RW SPP 1,500,000
UT SPP 2,250,000
CN SPP 3,972,000
Project Cost:
750,000 1,500,000 2,250,000 3,972,000
A
ddress safety, capacity and access
issues along KY-461 from south of Buck
Creek extending northerly to
Pulaski/Rockcastle Line (as a continuation
of 8-59.25). (2024CCN)
KY-461Pulaski 80302 PL
DN
RW SPP 7,640,000
UT SPP 6,670,000
CN SPP 51,240,000
Project Cost:
14,310,000 0 51,240,000 0
M
inor widening along KY-914 by adding
turning lanes and relocating an existing
entrance into adjacent property.
(2024CCN)
KY-914Pulaski 80310 PL
DN
RW
UT
CN SPP 1,100,000
Project Cost:
1,100,000 0 0 0
I
mprove geometrics and safety along KY
3262 from Baker Road to approximately
0.5mi northeast of Baker Road (2024CCN)
KY-3262Pulaski 80312 PL
DN SPP 514,800
RW SPP 640,000
UT SPP 510,000
CN SPP 4,720,000
Project Cost:
514,800 640,000 510,000 4,720,000
Page 222 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and congestion along KY
1
642 at KY 1577 (MP 13.4 -13.7)
(2024CCN)
KY-1642Pulaski 80350 PL
DN
RW
UT SPP 1,500,000
CN SPP 3,640,000
Project Cost: 1,500,000 3,640,000 0 0
I
mprove sight distance at the left turn
lanes along US 27 at KY 635 traffic light
(MP 22.5 -22.8) (2024CCN)
US-27Pulaski 80353 PL
DN SPP 100,000
RW
UT SPP 150,000
CN SPP 780,000
Project Cost:
100,000 150,000 780,000 0
I
mprove safety and horizontal geometrics
along KY 761 from 0.141 miles south of
Bucanan Road to 0.147 miles south of
Hudson Branch Road.
KY-761Pulaski 80402 PL
DN SPP 475,000
RW SPP 300,000
UT SPP 360,000
CN SPP 2,775,000
Project Cost:
475,000 660,000 2,775,000 0
C
onduct Planning Study along US 27 from
Pitman Creek Bridge to KY 2227/KY 3091
(Light #1) to assess access management
and safety.
US-27Pulaski 80403 PL SPP 729,400
DN
RW
UT
CN
Project Cost:
729,400 0 0 0
C
onduct Planning Study along US 27 from
Pitman Creek Bridge to KY 2227/KY 3091
(Light #1) to assess access management
and safety.
US-27Pulaski 80407 PL SPP 729,400
DN
RW
UT
CN
Project Cost:
729,400 0 0 0
Page 223 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Pulaski county P L
Total Amounts:
CN
UT
RW
DN
1,458,800
2,708,693 641,804 344,095
14,470,000 4,970,000
11,170,000 1,030,000 6,180,000
18,159,288 40,138,690 58,245,000 40,245,967
47,966,781 46,780,494 64,425,000 40,590,062
I
MPROVE CURVE ON KY 616 AND
IMPROVE ROADWAY FROM THE NEW
ROBERTSON COUNTY SCHOOL TO MT
OLIVET. (12CCN)(14CCR)(18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-616Robertson 8711 PL
DN
RW
UT
CN SPP 4,480,000
Project Cost:
4,480,000 0 0 0
I
MPROVE THE INTERSECTION OF US 62
AND KY 165 IN MOUNT OLIVET.
(2024CCN)
US-62Robertson 80312 PL
DN
RW SPP 2,100,000
UT SPP 1,040,000
CN SPP 2,800,000
Project Cost:
0 3,140,000 2,800,000 0
T
otal for Robertson county PL
Total Amounts:
CN
UT
RW
DN
2,100,000
1,040,000
4,480,000 2,800,000
4,480,000 3,140,000 2,800,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-1249 OVER W.FK. SKEGG CREEK
(102B00051N)
KY-1249Rockcastle 10088 PL
DN BRZ 222,691
RW
UT
CN BRZ 1,484,604
Project Cost: 0 0 1,707,295 0
Page 224 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-075 FROM
M
ILEPOINT 60.1 TO MILEPOINT 65.22 (64.5
CARDINAL)
I -75Rockcastle 20018 PL
DN NHPM 630,000
RW
UT
CN NHPM 6,339,713
Project Cost: 0 0 6,969,713 0
A
ddress capacity and access issues
along KY-461 from Pulaski/Rockcastle
County Line to KY 1250. (2024CCN)
KY-461Rockcastle 80303 PL
DN
RW SPP 6,960,000
UT SPP 6,610,000
CN SPP 46,310,000
Project Cost:
13,570,000 0 46,310,000 0
A
ddress safety, capacity and access
issues along KY-461 from KY 1250 to US
150. (2024CCN)
KY-461Rockcastle 80304 PL
DN SPP 1,672,000
RW SPP 4,600,000
UT SPP 4,380,000
CN SPP 29,680,000
Project Cost:
6,272,000 4,380,000 29,680,000 0
A
ddress capacity issues from KY-461 to
US-25 in Mt. Vernon to continue corridor
improvements to US 150 as identified in
the 1998 planning study. (2024CCN)
US-150Rockcastle 80306 PL
DN
RW STP1 2,840,000
UT STP1 3,120,000
CN STP1 18,170,000
Project Cost:
5,960,000 0 18,170,000 0
T
otal for Rockcastle county PL
Total Amounts:
CN
UT
RW
DN 1,672,000 852,691
14,400,000
9,730,000 4,380,000
101,984,317
25,802,000 4,380,000 102,837,008 0
Page 225 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Extend KY 801 from its intersection with
K
Y 158 at Sharkey to KY 32 near the
Fleming/Rowan county line. (2024CCR)
KY-801Rowan 234 PL SPP 320,000
DN SPP 3,920,000
RW SPP 9,600,000
UT SPP 5,600,000
CN SPP 50,400,000
Project Cost: 4,240,000 9,600,000 5,600,000 50,400,000
I
MPROVE SAFETY AND CONNECTIVITY
AND REDUCE CONGESTION ON KY-377
FROM KY-32 TO JUST SOUTH OF CLEAR
FORK ROAD. (2022BOP) (2024CCN)
KY-377Rowan 8406.1000 PL
DN
RW
UT
CN STP2 20,760,000 20,000,000
Project Cost:
20,760,000 20,000,000 0 0
I
MPROVE SAFETY AND CONNECTIVITY
AND REDUCE CONGESTION ON KY-377
FROM JUST SOUTH OF CLEARK FORK
ROAD TO JUST NORTH OF KY 799 (BIG
PERRY ROAD). (2024CCN)
KY-377Rowan 8406.2000 PL
DN
RW
UT STP2 11,760,000
CN STP2 39,600,000
Project Cost:
11,760,000 39,600,000 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 134.75 TO MILEPOINT 138.3
I -64Rowan 22048 PL
DN NHPM 800,000
RW
UT
CN NHPM 8,000,000
Project Cost: 8,800,000 0 0 0
A
DDRESS CONDITION OF I-064 FROM
MILEPOINT 147.9 TO MILEPOINT 148.665
I -64Rowan 22050 PL
DN NHPM 230,000
RW
UT
CN NHPM 2,259,115
Project Cost: 2,489,115 0 0 0
Page 226 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN AND SOFTEN CURVE ON CR 1391
(
BRATTON BRANCH RD) AT WALMART
(2020CCN)
CR-1391Rowan 80108 PL
DN SPP 25,000
RW SPP 60,000
UT SPP 80,000
CN SPP 270,000
Project Cost: 25,000 140,000 270,000 0
I
mprove safety and reduce congestion on
KY 32 (Flemingsburg Road) between the
intersections of CS 1203 (Trademore
Drive) and CS1001 (Fraley Drive) and in
the vicinity of the I-64 interchange.
KY-32Rowan 80307 PL
DN
RW NH 3,000,000
UT NH 7,540,000
CN NH 31,000,000
Project Cost:
3,000,000 7,540,000 31,000,000 0
R
educe congestion and improve mobility
on KY 32 (Flemingsburg Road) between
the intersections with KY 3531 (Viking
Drive) and CS1020 (Mabry Drive).
(2024CCN)
KY-32Rowan 80308 PL
DN SPP 1,820,000
RW SPP 2,300,000
UT SPP 3,920,000
CN SPP 18,000,000
Project Cost:
1,820,000 6,220,000 18,000,000 0
I
mprove safety and reduce congestion at
the intersection of US 60 (West Wilkinson
Blvd.) and KY 32 (Flemingsburg Road).
(2024CCN)
KY-32, US-60Rowan 80309 PL
DN
RW STP1 440,000
UT STP1 600,000
CN STP1 4,350,000
Project Cost:
1,040,000 4,350,000 0 0
T
otal for Rowan county PL
Total Amounts:
CN
UT
RW
DN
320,000
6,795,000
3,440,000 11,960,000
12,360,000 11,540,000 5,600,000
31,019,115 63,950,000 49,270,000 50,400,000
53,934,115 87,450,000 54,870,000 50,400,000
Page 227 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce congestion and improve capacity,
s
afety and mobility on US 127 between
the west bypass of Jamestown to the
Cumberland Parkway. See segment 12 in
June 1998 Advance (2024CCR)
US-127Russell 156 PL
DN
RW
UT
CN NH 26,300,000
Project Cost:
26,300,000 0 0 0
R
educe congestion and improve safety,
capacity and mobility along US 127 from
the Cumberland Parkway to Lakeway
drive KY 379 in Russell Springs.
US-127Russell 166 PL
DN
RW NH 1,700,000
UT NH 2,000,000
CN NH 8,500,000
Project Cost:
3,700,000 8,500,000 0 0
A
DDRESS CONDITION OF KY-80 FROM
MILEPOINT 4.1 TO MILEPOINT 6.6
KY-80Russell 20020 PL
DN STP5 224,000
RW
UT
CN STP5 2,576,000
Project Cost: 0 0 2,800,000 0
A
DDRESS CONDITION OF Louie B. Nunn
Cumberland Parkway FROM MILEPOINT
57.791 TO MILEPOINT 62.176
LN-9008Russell 22209 PL
DN NHPM 370,000
RW
UT
CN NHPM 3,667,044
Project Cost:
0 0 4,037,044 0
I
MPROVE CONGESTION AND SAFETY
ALONG US 127 AT KY 1381 (VOILS
ROAD) AND SK LANE IN RUSSELL
SPRINGS (MILEPOINT 17.2 TO MILEPOINT
17.45) (2022CCN)
US-127Russell 80250 PL
DN SPP 260,000
RW SPP 1,050,000
UT SPP 1,040,000
CN SPP 2,080,000
Project Cost:
260,000 1,050,000 1,040,000 2,080,000
Page 228 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE GEOMETRICS ALONG KY 3278.
(
2024CCN)
KY-3278Russell 80316 PL
DN
RW SPP 200,000
UT SPP 400,000
CN SPP 890,000
Project Cost: 0 200,000 400,000 890,000
I
mprove safety, mobility, and congestion
along KY 80 from US 127 to Eastern City
Limit of Russell Springs.
KY-80Russell 80404 PL
DN SPP 771,300
RW SPP 1,285,500
UT SPP 1,028,400
CN SPP 5,142,000
Project Cost:
771,300 1,285,500 1,028,400 5,142,000
T
otal for Russell county PL
Total Amounts:
CN
UT
RW
DN 1,031,300 594,000
1,700,000 2,535,500
2,000,000 2,468,400
26,300,000 8,500,000 6,243,044 8,112,000
31,031,300 11,035,500 9,305,444 8,112,000
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 134.386 TO MILEPOINT
136.758
I -75Scott 20051 PL
DN NHPM 690,000
RW
UT
CN NHPM 6,910,000
Project Cost: 7,600,000 0 0 0
I
MPROVE CAPACITY AND ACCESS ON
KY 2906 FROM US 460 TO US 62
(2020CCN) (2022CCR) (2024CCR)
KY-2906Scott 80102 PL
DN
RW STP1 5,700,000
UT STP1 1,750,000
CN STP1 9,520,000
Project Cost:
7,450,000 9,520,000 0 0
Page 229 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Provide a safe and efficient connection
b
etween KY 32 (Long Lick Pike) and KY
1143 (Georgetown Bypass). (2024CCN)
PF-9999Scott 80318 PL
DN SPP 690,000
RW SPP 650,000
UT SPP 380,000
CN SPP 2,790,000
Project Cost: 690,000 650,000 380,000 2,790,000
A
ddress safety issues on KY 1962
(Lemon's Mill Road) From Military Street in
Georgetown to Lisle Road at I-75.
(2024CCN)
CS-1010,
CS-1115,
KY-1962
Scott 80319 PL
DN SPP 1,000,000
RW SPP 1,430,000
UT SPP 750,000
CN SPP 4,800,000
Project Cost:
1,000,000 1,430,000 750,000 4,800,000
I
mprove roadway capacity & typical
section on US 460 from E Main St to 300ft
W of Cherry Blossom Way
US-460Scott 80414 PL
DN NH 750,000
RW NH 2,000,000
UT NH 1,500,000
CN NH 7,000,000
Project Cost:
750,000 2,000,000 1,500,000 7,000,000
E
XTEND LEXUS WAY (KY 3552) FROM
CHERRY BLOSSOM WAY (US 62) TO
OLD OXFORD ROAD (CS 1414) (NOTE:
$2,043,200 ($1,635,200 FEDERAL
CONGRESSIONAL COMMUNITY PROJECT
PF-9999Scott 80415 PL
DN
RW SPP 429,000
UT SPP 400,000
CN SPP 15,750,000
Project Cost:
0 429,000 400,000 15,750,000
T
otal for Scott county PL
Total Amounts:
CN
UT
RW
DN 3,130,000
5,700,000 4,509,000
1,750,000 3,030,000
6,910,000 9,520,000 30,340,000
17,490,000 14,029,000 3,030,000 30,340,000
Page 230 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
WIDEN KY 55X FROM TWO TO FIVE
L
ANES FROM US 60 (MP 0.0) NORTH TO
KY 43 (MP 1.354).(16CCN) (2024CCN)
KY-55Shelby 8958 PL
DN SPP 1,650,000
RW SPP 220,000
UT SPP 920,000
CN SPP 12,440,000
Project Cost: 1,650,000 220,000 920,000 12,440,000
B
RIDGE PROJECT IN SHELBY COUNTY ON
(106C00007N) CLORE JACKSON RD AT
FOX RUN
CR-1009Shelby 10025 PL
DN BRZ 155,771
RW
UT
CN BRZ 1,038,473
Project Cost:
1,194,244 0 0 0
B
RIDGE PROJECT IN SHELBY COUNTY ON
(106B00017N) KY 148 AT GUIST CREEK
KY-148Shelby 10089 PL
DN BRX 564,722
RW
UT
CN BRX 3,764,812
Project Cost: 0 0 0 4,329,534
A
DDRESS ACCESS MANAGEMENT AND
SAFETY ISSUES ALONG KY 55X FROM
KY 43 TO THE ENTRANCE OF THE
SHELBYVILLE BYPASS (KY 55).
(2024CCN)
KY-55Shelby 80308 PL SPP 250,000
DN SPP 2,090,000
RW SPP 200,000
UT SPP 816,000
CN SPP 16,020,000
Project Cost:
2,340,000 200,000 816,000 16,020,000
IMPROVE CONNECTIVITY FROM KY 53 AT
T
HE OLD SEVEN MILE PIKE INTERSECTION
TO US 60/ROCKET LANE INTERSECTION.
(2024CCN)
PF-9999S helby 80312 PL
DN
RW SPP 2,000,000
UT SPP 1,400,000
CN SPP 13,690,000
Project Cost: 0 2,000,000 1,400,000 13,690,000
Page 231 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY AND IMPROVE
T
RAFFIC FLOW WITH OPERATIONAL
IMPROVEMENTS ON KY 55 AT OLD
BRUNERSTOWN ROAD. THIS PROJECT
WILL CONSIDER A RIGHT-TURN LANE ON
KY-55Shelby 80318 PL
DN
RW
UT SPP 110,000
CN SPP 830,000
Project Cost:
110,000 830,000 0 0
A
DDRESS SAFETY AND IMPROVE
TRAFFIC FLOW AT THE KY 55/US 60
INTERSECTION IN SHELBYVILLE.
PROJECT WILL CONSIDER THE ADDITION
OF A RIGHT-TURN LANE SOUTHBOUND
KY-55Shelby 80319 PL
DN SPP 270,000
RW SPP 110,000
UT SPP 170,000
CN SPP 670,000
Project Cost:
1,220,000 0 0 0
C
ONSTRUCT PEDESTRIAN FACILITIES ON
THE NORTH SIDE OF US 60 FROM THE
MASONIC HOME TO ROCKET LANE.
(2024CCN)
US-60Shelby 80326 PL
DN
RW
UT
CN STP1 1,140,000
Project Cost:
1,140,000 0 0 0
A
ddress safety, improve roadway
geometrics, improve traffic operations,
and consider access management on KY
55 from south of Logan Station Road (MP
5.24) to the I-64 interchange (MP 6.03).
KY-55Shelby 80409 PL
DN
RW SPP 305,000
UT SPP 305,000
CN SPP 6,840,000
Project Cost:
0 305,000 305,000 6,840,000
I
mprove safety, reliability, geometric
deficiencies along KY 1399/Veechdale
Road (CR 1231) from KY 1848 to KY 148.
KY-1399Shelby 80410 PL SPP 350,000
DN SPP 3,000,000
RW SPP 3,000,000
UT SPP 2,100,000
CN SPP 22,050,000
Project Cost:
350,000 3,000,000 5,100,000 22,050,000
Page 232 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce Congestion and Improve Safety
a
long US 60 from Discovery Boulevard
(MP 7.537) to KY 55 (Freedoms Way) (MP
8.324).
US-60Shelby 80411 PL
DN NH 1,240,000
RW NH 620,000
UT NH 620,000
CN NH 13,880,000
Project Cost:
1,240,000 1,240,000 0 13,880,000
I
mprove the intersection of KY 1531
(Aiken Road) and KY 362 (Ash
Avenue/Aiken Road)
KY-362Shelby 80425 PL
DN
RW
UT
CN SPP 2,330,000
Project Cost:
2,330,000 0 0 0
A
ddress safety and traffic operations on
KY 362 (Aiken Road) at Persimmon Ridge
Drive (CR 1339)
KY-362Shelby 80426 PL
DN
RW
UT
CN SPP 590,000
Project Cost:
590,000 0 0 0
T
otal for Shelby county PL
Total Amounts:
CN
UT
RW
DN
600,000
5,405,771 3,000,000 564,722
110,000 3,345,000 3,000,000
280,000 620,000 5,541,000
5,768,473 830,000 88,684,812
12,164,244 7,795,000 8,541,000 89,249,534
I
MPROVE US-31W FROM KY-1008 TO
KY-621. (14CCN)(16CCR) (2020CCR)
(2024CCR)
US-31Simpson 8856 PL
DN
RW STPF 4,200,000
UT STPF 8,880,000
CN STPF 13,760,000
Project Cost: 4,200,000 8,880,000 13,760,000 0
Page 233 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN SIMPSON COUNTY
O
N (107B00033N) KY-664 AT NEELEY
BRANCH
KY-664Simpson 10046 PL
DN BRX 167,953
RW
UT
CN BRX 1,119,686
Project Cost: 0 0 1,287,639 0
I
MPROVE MOBILITY ALONG KY 1171
(NORTH STREET) FROM THE
INTERSECTION WITH US 31W TO THE
INTERSECTION WITH KY 1008 IN
FRANKLIN. (2024CCN)
KY-1171Simpson 80310 PL
DN SPP 1,290,000
RW SPP 1,690,000
UT SPP 1,620,000
CN SPP 5,270,000
Project Cost:
1,290,000 3,310,000 5,270,000 0
I
MPROVE MOBILITY BY COMPLETING THE
KY 1008 BYPASS AROUND FRANKLIN.
(2024CCN)
KY-1008Simpson 80316 PL
DN SPP 3,410,000
RW SPP 13,000,000
UT SPP 3,720,000
CN SPP 21,080,000
Project Cost:
3,410,000 16,720,000 21,080,000 0
I
MPROVE SAFETY ON KY 585 AT LICK
CREEK FROM MP 3.45 TO 3.75.
(2024CCN)
KY-585Simpson 80321 PL
DN SPP 970,000
RW SPP 650,000
UT SPP 620,000
CN SPP 2,480,000
Project Cost:
970,000 1,270,000 2,480,000 0
T
otal for Simpson county PL
Total Amounts:
CN
UT
RW
DN 5,670,000 167,953
4,200,000 15,340,000
14,840,000
43,709,686
9,870,000 30,180,000 43,877,639 0
Page 234 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and traffic operations on
K
Y 55 from KY 1169 to KY 155 and on KY
155 from KY 55 to MP 2.0 (total length
2.71 miles)(Portion of 5-8954.0).
(2024CCN)
KY-155,
KY-55
Spencer 8954.2000 PL
DN SPP 780,000
RW SPP 1,080,000
UT SPP 5,070,000
CN SPP 20,720,000
Project Cost:
780,000 6,150,000 20,720,000 0
I
mprove traffic operations on KY 55 from
KY 1169 to KY 155 (MP 10.5 - 11.3)
(Portion of 5-8954.0). (2024CCN)
KY-55Spencer 8954.3000 PL
DN SPP 440,000
RW SPP 210,000
UT SPP 150,000
CN SPP 2,800,000
Project Cost:
440,000 210,000 150,000 2,800,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY 1795 OVER BEECH CREEK
(108B00024N)
KY-1795Spencer 10162 PL
DN BRZ 668,118
RW
UT
CN BRZ 4,454,122
Project Cost:
0 0 0 5,122,240
R
EDUCE CONGESTION, IMPROVE
SAFETY, AND ENHANCE MOBILITY ON
KY 55 FROM KY 44 TO INDUSTRIAL DR.
(MP 6.610 TO MP 6.838) (2022CCN)
KY-55Spencer 80213 PL
DN SPP 250,000
RW
UT SPP 40,000
CN SPP 620,000
Project Cost:
250,000 40,000 620,000 0
I
MPROVE CAPACITY, RELIEVE
CONGESTION, AND IMPROVE SAFETY
ALONG KY 44 FROM GOOSE CREEK
ROAD (CR 1121) TO OAK TREE WAY (CS
1053) (MILEPOINT 1.202 TO MILEPOINT
KY-44Spencer 80254 PL
DN SPP 8,630,000
RW SPP 6,750,000
UT SPP 5,720,000
CN SPP 36,810,000
Project Cost:
8,630,000 6,750,000 5,720,000 36,810,000
Page 235 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE CAPACITY, RELIEVE
C
ONGESTION, AND IMPROVE SAFETY
ALONG KY 44 FROM COXS LANE (CR
1087) NEAR THE BULLITT/SPENCER CO
LINE TO GOOSE CREEK ROAD (CR 1121)
KY-44Spencer 80255 PL
DN SPP 1,770,000
RW SPP 1,350,000
UT SPP 1,140,000
CN SPP 6,980,000
Project Cost:
1,770,000 1,350,000 1,140,000 6,980,000
I
MPROVE SAFETY AND TRAFFIC
OPERATIONS ON KY 55 FROM KY 44 IN
TAYLORSVILLE TO KY 1169
(NORMANDY ROAD) BY PROVIDING
ADDITIONAL TURNING AND PASSING
KY-55Spencer 80256 PL
DN SPP 1,720,000
RW SPP 40,000
UT SPP 440,000
CN SPP 6,020,000
Project Cost:
1,720,000 480,000 6,020,000 0
I
MPROVE SAFETY AND TRAFFIC
OPERATIONS ON KY 55 FROM KY 155
NEAR ELK CREEK TO KY 148 AT
FINCHVILLE. PROJECT LIMITS ARE ON KY
55 IN SPENCER COUNTY FROM KY 155
KY-55Spencer 80257 PL
DN SPP 3,270,000
RW SPP 2,280,000
UT SPP 1,590,000
CN SPP 24,830,000
Project Cost:
3,270,000 2,280,000 1,590,000 24,830,000
A
DDRESS SAFETY AND GEOMETRIC
ISSUES ON KY 44 AT JUNCTION KY 1251
TO CURVE AFTER HUNTER'S TRACE
ROAD. (2024CCN)
KY-44Spencer 80315 PL
DN SPP 1,020,000
RW SPP 920,000
UT SPP 820,000
CN SPP 5,760,000
Project Cost:
1,020,000 920,000 820,000 5,760,000
I
MPROVE SAFETY AT THE US 31E/KY 523
INTERSECTION. (2024CCN)
US-31Spencer 80327 PL
DN STPF 400,000
RW STPF 400,000
UT STPF 450,000
CN STPF 1,020,000
Project Cost: 400,000 850,000 1,020,000 0
Page 236 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Spencer county P L
Total Amounts:
CN
UT
RW
DN 18,280,000 668,118
13,030,000
6,000,000 9,420,000
28,380,000 81,634,122
18,280,000 19,030,000 37,800,000 82,302,240
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 65.1900 PL
DN
RW
UT
CN BRO 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 65.2000 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS OFF
SYSTEM BRIDGES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 65.2100 PL
DN
RW
UT
CN BRZ 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
B
RIDGE REPAIRS ON VARIOUS BRIDGES
FOR FY 2026-2032. (FBP PROGRAM)
(2024CCR)
CO-0Statewide 65.2200 PL
DN
RW
UT
CN FBP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
Page 237 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE REPAIRS ON VARIOUS BRIDGES
FO
R FY 2026-2032. (FBP2 PROGRAM)
CO-0Statewide 65.2300 PL
DN
RW
UT
CN FBP2 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost: 2,000,000 2,000,000 2,000,000 2,000,000
'
ITS' AND 'TSMO' ACTIVITIES ON VARIOUS
NHS ROUTES IN KENTUCKY FOR FY 2027
THROUGH FY 2032. (2024CCR)
CO-0Statewide 66.1900 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
T
ransportation Systems Management and
Operations (TSMO) activities on various
routes for FY-2022 through FY 2028.
(2024CCR)
CO-0Statewide 66.2100 PL
DN
RW
UT
CN SPP 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
S
TATEWIDE TRANSPORTATION
ALTERNATIVES PROGRAM FOR FY 2026
THROUGH FY 2032 (2024CCR)
CO-0Statewide 195.1600 PL
DN
RW
UT
CN TAP 12,300,000 12,300,000 12,300,000 12,300,000
Project Cost:
12,300,000 12,300,000 12,300,000 12,300,000
N
ON-ATTAINMENT AREAS STATEWIDE
CMAQ FUNDED PROJECTS FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 219.1800 PL
DN
RW
UT
CN CM 8,100,000 8,100,000 8,100,000 8,100,000
Project Cost:
8,100,000 8,100,000 8,100,000 8,100,000
Page 238 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PAVEMENT REHAB ON STATE (NON RS)
S
YSTEM ROUTES IN KENTUCKY FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 224.1400 PL
DN
RW
UT
CN STP5 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
I
NSTALLATION OF HIGH MAST LIGHTING
AT THE I-24 REST AREA IN CHRISTIAN
COUNTY, KENTUCKY. (2024BOP)
CO-0Statewide 233 PL
DN
RW
UT
CN SPP 1,040,000
Project Cost:
1,040,000 0 0 0
PROMOTING RESILIENT OPERATIONS FOR
T
RANSFORMATIVE, EFFICIENT, AND
COST SAVING TRANSPORTATION
(PROTECT) PROGRAM FORMULA FUNDS.
CO-0S tatewide 239 PL
DN
RW
UT
CN PROT 5,000,000 5,000,000
Project Cost: 0 5,000,000 0 5,000,000
S
TATEWIDE CARBON REDUCTION
PROGRAM.
CO-0Statewide 244 PL
DN
RW
UT
CN CARB 14,600,000 14,600,000 14,600,000 14,600,000
Project Cost: 14,600,000 14,600,000 14,600,000 14,600,000
S
TATEWIDE BRIDGE INSPECTION FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 327.1600 PL
DN
RW
UT
CN BRX 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
Page 239 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE I-STATE ROUTES FOR FY
2
026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 337.1500 PL
DN
RW
UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE OFF-SYSTEM BRIDGE
INSPECTION FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 346.1600 PL
DN
RW
UT
CN BRZ 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost:
3,000,000 3,000,000 3,000,000 3,000,000
R
AILWAY-HIGHWAY CROSSINGS
PROGRAM ON VARIOUS ROUTES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 352.1600 PL
DN
RW
UT
CN RRP 3,140,000 4,220,000 4,220,000 4,220,000
Project Cost:
3,140,000 4,220,000 4,220,000 4,220,000
P
AVEMENT REHABILITATION FOR
VARIOUS NHS ROUTES IN KENTUCKY
FOR FY 2026 THROUGH FY 2032.
(2024CCR)
CO-0Statewide 369.1000 PL
DN
RW
UT
CN NHPM 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
O
HIO RIVER BRIDGES FRACTURE
CRITICAL FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 388.1000 PL
DN
RW
UT
CN BRX 4,000,000 4,000,000 4,000,000 4,000,000
Project Cost:
4,000,000 4,000,000 4,000,000 4,000,000
Page 240 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE HIGHWAY PROJECT DESIGN
A
CTIVITIES FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 391.0600 PL
DN STPF 1,000,000 1,000,000 1,000,000 1,000,000
RW
UT
CN
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
S
TATEWIDE HIGHWAY PROJECT DESIGN
ACTIVITIES FOR FY 2022 THROUGH FY
2028. (2024CCR)
CO-0Statewide 391.0700 PL
DN SPP 5,000,000 5,000,000 5,000,000 5,000,000
RW
UT
CN
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
U
PGRADE NAVIGATIONAL LIGHTING FOR
BRIDGES OVER MAJOR STREAMS AND
WATERWAYS FOR FY 2026 THROUGH
FY 2032. (2024CCR)
CO-0Statewide 400.0700 PL
DN
RW
UT
CN BRX 500,000 500,000 500,000 500,000
Project Cost:
500,000 500,000 500,000 500,000
H
ONORING BORDER STATES
COMMITMENTS FOR EXISTING
BRIDGES(CANNOT BE MOVED) FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 510.0500 PL
DN
RW
UT
CN BRX 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
S
TATEWIDE CORRECTIONS OF ROCK
FALL OR EMBANKMENT STABILIZATION
FOR FY 2022 THROUGH FY 2028.
(2024CCR)
CO-0Statewide 511.0400 PL
DN
RW
UT
CN SPP 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
Page 241 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
PREVENTATIVE MAINTENANCE FOR
B
RIDGE STRUCTURES FOR FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 514.0100 PL
DN
RW
UT
CN BRX 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
S
TATEWIDE CORRECTIONS OF
ROCKFALL OR EMBANKMENT
STABILIZATION ON NH ROUTES FOR FY
2026 THROUGH FY 2032. (2020CCR)
(2024CCR)
CO-0Statewide 518.0100 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE CORRECTIONS OF
ROCKFALL OR EMBANKMENT
STABILIZATION ON NON NH ROUTES FOR
FY 2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 518.0300 PL
DN
RW
UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
S
tatewide NHS Rest Area Repairs.
(2024CCR)
CO-0Statewide 600 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
S
TATEWIDE NHS REST AREA / WELCOME
CENTERS / WEIGH STATION REPAIRS.
(2024CCR)
CO-0Statewide 600.1000 PL
DN
RW
UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
Page 242 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Additional Parking at NHS Rest Area and
W
eigh Stations. (2024CCR)
CO-0Statewide 601 PL
DN
RW
UT
CN NH 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost: 5,000,000 5,000,000 5,000,000 5,000,000
A
DDRESS SAFETY IMPROVEMENT NEEDS
FOR STATE-OWNED DAMS
CONSTRUCTED TO FACILIATE
KENTUCKY'S HIGHWAY SYSTEM.
CO-0Statewide 610 PL
DN
RW
UT
CN SPP 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
P
LANNING FUNDS TO SCOPE PROJECTS
FOR CONSIDERATION IN FUTURE
HIGHWAY PLANS.
CO-0Statewide 611 PL SPP 2,500,000 2,500,000 2,500,000 2,500,000
DN
RW
UT
CN
Project Cost:
2,500,000 2,500,000 2,500,000 2,500,000
S
TATEWIDE SAFETY PROGRAM FOR FY
2026 THROUGH FY 2032. (HSIP)
(2024CCR)
CO-0Statewide 911.0900 PL
DN
RW
UT
CN SAF 71,300,000 71,300,000 71,300,000 71,300,000
Project Cost:
71,300,000 71,300,000 71,300,000 71,300,000
S
TATEWIDE SAFETY FUNDING TO BE
USED ALONGSIDE FEDERAL HSIP
FUNDING TO ENHANCE ROADWAY
SAFETY IN KENTUCKY. (2022CCR)
CO-0Statewide 911.5000 PL
DN
RW
UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost:
2,500,000 2,500,000 2,500,000 2,500,000
Page 243 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
STATEWIDE UNDERWATER BRIDGE
I
NSPECTION FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 1063.1600 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost: 1,000,000 1,000,000 1,000,000 1,000,000
S
TATEWIDE PROGRAM TO FUND BRIDGE
SCOUR COUNTER-MEASURES FOR
STATE-MAINTAINED BRIDGES FOR FY
2026 THROUGH FY 2032. (2024CCR)
CO-0Statewide 1071.0800 PL
DN
RW
UT
CN BRX 3,000,000 3,000,000 3,000,000 3,000,000
Project Cost:
3,000,000 3,000,000 3,000,000 3,000,000
S
TATEWIDE BRIDGE REPLACEMENT
PROGRAM FOR FY 2026 THROUGH FY
2032. (2024CCR)
CO-0Statewide 1074.0800 PL
DN
RW
UT
CN BRX 1,000,000 1,000,000 1,000,000 1,000,000
Project Cost:
1,000,000 1,000,000 1,000,000 1,000,000
P
AVEMENT PREVENTATIVE
MAINTENANCE PROGRAM FOR FY 2026
THROUGH FY 2032 STP5 FUNDING.
(2024CCR)
CO-0Statewide 2700.1400 PL
DN
RW
UT
CN STP5 2,000,000 2,000,000 2,000,000 2,000,000
Project Cost:
2,000,000 2,000,000 2,000,000 2,000,000
A
MERICANS WITH DISABILITIES ACT
(ADA) TRANSITION PLAN
IMPLEMENTATION PROJECTS FY 2026
THROUGH FY 2032. (2024CCR)
CO-0Statewide 3011.0100 PL
DN
RW
UT
CN STPF 5,000,000 5,000,000 5,000,000 5,000,000
Project Cost:
5,000,000 5,000,000 5,000,000 5,000,000
Page 244 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SCHOOL TURN LANE PROJECTS FOR
N
EW SCHOOLS FOR FY 2022 THROUGH
FY 2028. (2022CCR) (2024CCR)
CO-0Statewide 8500.1600 PL
DN
RW
UT
CN SPP 2,500,000 2,500,000 2,500,000 2,500,000
Project Cost: 2,500,000 2,500,000 2,500,000 2,500,000
A
DVANCE CONSTRUCTION
COMMITMENTS FOR MOUNTAIN
PARKWAY EXPANSION; I-65 CENTRAL
CORRIDOR; AND OTHER ACTIVE
DESIGN/BUILD PROJECTS.
CO-0Statewide 8601 PL
DN
RW
UT
CN NH 31,000,000 31,000,000 31,000,000 31,000,000
Project Cost:
31,000,000 31,000,000 31,000,000 31,000,000
G
ARVEE BOND DEBT SERVICE
PAYMENTS FOR THE BRENT SPENCE
BRIDGE PROJECT AND THE I-69 ORX
BRIDGE PROJECT.
CO-0Statewide 9660 PL
DN
RW
UT
CN GAR 38,600,000 38,600,000 38,600,000 38,600,000
Project Cost:
38,600,000 38,600,000 38,600,000 38,600,000
T
otal for Statewide county PL
Total Amounts:
CN
UT
RW
DN
2,500,000 2,500,000 2,500,000 2,500,000
6,000,000 6,000,000 6,000,000 6,000,000
281,080,000 286,120,000 281,120,000 286,120,000
289,580,000 294,620,000 289,620,000 294,620,000
I
MPROVE SAFETY, ACCESS,
GEOMETRICS AND DRAINAGE ON KY-70
IN CAMPBELLSVILLE FROM US-68 TO
COUNTRY VIEW COURT (CS-1305)
KY-70Taylor 443 PL
DN SPP 1,680,000
RW SPP 3,130,000
UT
CN
Project Cost:
1,680,000 3,130,000 0 0
Page 245 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS SAFETY ON KY 210 FROM
J
UST EAST OF CORINTH CHURCH
(MP0.60) TO KY 883 (MP14.20) IN
TAYLOR COUNTY. (2024CCN)
KY-210Taylor
80154.3000 PL
D
N
RW SPP 2,880,000
UT SPP 5,520,000
CN SPP 46,000,000
Project Cost: 8,400,000 0 0 46,000,000
A
DDRESS SAFETY AND GEOMETRIC
DEFICIENCIES ALONG KY 70 FROM 0.
MILES EAST OF ROBERTS RD (NEAR
ELKHORN BAPTIST CHURCH) TO NEAR
KY 76 (MILEPOINT 3.1 TO MILEPOINT 4.1)
KY-70Taylor 80256 PL
DN SPP 840,000
RW SPP 1,880,000
UT
CN
Project Cost:
840,000 0 1,880,000 0
E
XTEND KY 3350 (CAMPBELLSVILLE
BYPASS) FROM ky 289 TO US 68 ON THE
EAST SIDE OF CAMPBELLSVILLE.
(2022CCN) (2024CCR)
KY-3350,
PF-9999
Taylor 80257 PL
DN
RW SPP 3,450,000
UT SPP 1,800,000
CN SPP 13,000,000
Project Cost:
0 3,450,000 1,800,000 13,000,000
A
DDRESS CONGESTION AND SAFETY
ALONG KY 658 AND KY 3518 IN
CAMPBELLSVILLE BETWEEN US 68 AND
KY 70 AND IMPROVE THE INTERSECTION
AT US 68. (MP 0-0.665)
KY-658Taylor 80420 PL
DN
RW SPP 3,000,000
UT SPP 1,500,000
CN SPP 6,000,000
Project Cost:
3,000,000 1,500,000 6,000,000 0
A
ddress congestion and improve
intersections along KY 210 in
Campbellsville from Arbor Lane to US 68.
(MP 15.669-16.626)
KY-210Taylor 80421 PL
DN
RW SPP 1,500,000
UT SPP 1,500,000
CN SPP 10,000,000
Project Cost:
0 1,500,000 1,500,000 10,000,000
Page 246 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Total for Taylor county P L
Total Amounts:
CN
UT
RW
DN 2,520,000
5,880,000 8,080,000 1,880,000
5,520,000 1,500,000 3,300,000
6,000,000 69,000,000
13,920,000 9,580,000 11,180,000 69,000,000
U
pgrade connection for new industrial site
on KY 848 (Haddensville Road).
(2024CCR)
KY-848Todd 170 PL
DN
RW
UT
CN SPP 5,220,000
Project Cost: 0 0 0 5,220,000
W
iden US 79 from MP 3.0 to Logan County
line. (Estimates based on preliminary
engineering. Design funds allocated under
Logan Co. Item No. 03-80050)
US-79Todd 80402 PL
DN
RW
UT
CN NH 25,800,000
Project Cost:
25,800,000 0 0 0
I
mprove safety and access on KY 181
from US 421 to Elkton city limits (MP
0.21-10.955)
KY-181Todd 80422 PL
DN
RW SPP 16,000,000
UT SPP 7,900,000
CN SPP 31,600,000
Project Cost:
0 16,000,000 7,900,000 31,600,000
T
otal for Todd county PL
Total Amounts:
CN
UT
RW
DN
16,000,000
7,900,000
25,800,000 36,820,000
25,800,000 16,000,000 7,900,000 36,820,000
Page 247 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS CONDITION OF I-024 FROM
M
ILEPOINT 64.472 TO MILEPOINT 69.83
I -24Trigg 22010 PL
DN NHPM 1,200,000
RW
UT
CN NHPM 12,000,000
Project Cost: 0 0 0 13,200,000
A
DDRESS SAFETY CONCERNS ON
GLENWOOD RD (CR-1005) FROM KY 272
TO US 68/80 FROM MP 0.0 TO MP 2.1
(2024CCN)
CR-1005Trigg 80306 PL
DN
RW SPP 750,000
UT SPP 500,000
CN SPP 7,000,000
Project Cost:
0 750,000 500,000 7,000,000
A
DDRESS SAFETY CONCERNS ON KINGS
CHAPEL RD (CR-1004) FROM KY 272 TO
US 68/80 FROM MP 0.0 TO MP 3.7
(2024CCN)
CR-1014Trigg 80307 PL
DN SPP 1,560,000
RW SPP 2,000,000
UT SPP 1,500,000
CN SPP 10,000,000
Project Cost:
1,560,000 2,000,000 1,500,000 10,000,000
"
IMPROVE KY 276 FROM KY139 (MP 0.00)
TO US68 (MP 14.121). THIS NARROW 2
LANE ROAD SERVES AS A BY-PASS
WHEN I-24 IS SHUTDOWN NEAR CADIZ,
KY. CORRIDOR IMPROVEMENTS,
KY-276Trigg 80313 PL
DN SPP 3,800,000
RW SPP 1,125,000
UT SPP 2,800,000
CN SPP 25,000,000
Project Cost:
3,800,000 3,925,000 0 25,000,000
I
MPROVE KY 276 FROM KY139 (MP 0.00)
TO US68 (MP 14.121). THIS NARROW 2
LANE ROAD SERVES AS A BY-PASS
WHEN I-24 IS SHUTDOWN NEAR CADIZ,
KY. CORRIDOR IMPROVEMENTS,
KY-276Trigg 80318 PL
DN SPP 3,800,000
RW
UT
CN
Project Cost:
3,800,000 0 0 0
Page 248 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
On KY 139 south of US 68 Bypass
a
ddress flooding concerns and narrow
lanes that creates a safety problems for
over size vehicles and farm equipment.
KY-139Trigg 80402 PL
DN SPP 1,500,000
RW SPP 1,000,000
UT SPP 1,500,000
CN SPP 7,000,000
Project Cost:
1,500,000 2,500,000 7,000,000 0
T
otal for Trigg county PL
Total Amounts:
CN
UT
RW
DN 10,660,000 1,200,000
4,875,000
4,300,000 2,000,000
7,000,000 54,000,000
10,660,000 9,175,000 9,000,000 55,200,000
A
DDRESS SAFETY ISSUES AND ACCESS
AT THE INTERSECTION OF
US-421/KY-1226 AT MP 11.5. (12CCR)
(2020CCR) (2024CCR)
US-421Trimble 905 PL
DN STP2 350,000
RW STP2 830,000
UT STP2 640,000
CN STP2 1,250,000
Project Cost:
350,000 1,470,000 1,250,000 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
JOYCE MILLS RD OVER TRIB TO CORN
CREEK (112C00034N)
CR-1301Trimble 10164 PL
DN BRZ 107,000
RW
UT
CN BRZ 711,000
Project Cost:
0 0 0 818,000
IMPROVE SAFETY, TRUCK MOBILITY,
A
ND ADDRESS GEOMETRIC DEFICIENCIES
ALONG KY 36 FROM US 421 TO 250 FEET
EAST OF SCHOOL HOLLOW ROAD IN
MILTON. (2024CCN)
KY-36T rimble 80309 PL
DN SPP 500,000
RW SPP 1,000,000
UT SPP 250,000
CN SPP 1,875,000
Project Cost: 500,000 1,000,000 250,000 1,875,000
Page 249 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
CONSTRUCT PEDESTRIAN FACILITIES
A
LONG US 421 FROM CUTSHAW LANE
TO TRIMBLE COUNTY HIGH SCHOOL/KY
625 AND ALONG KY 625 TO BEDFORD
ELEMENTARY SCHOOL (TOTAL 0.983 MI.)
US-421Trimble 80337 PL
DN
RW SPP 110,000
UT SPP 70,000
CN SPP 1,440,000
Project Cost:
0 110,000 70,000 1,440,000
I
mprove safety and reduce congestion on
I-71 from the Henry/Trimble County line to
the Trimble/Carroll County line.
I-71Trimble 80414 PL
DN
RW NH 100,000
UT NH 100,000
CN NH 7,200,000
Project Cost:
200,000 7,200,000 0 0
C
onstruct a realignment of US 421 through
Milton between the Milton-Madison Bridge
(MP 18.78) and extending south to
reconnect to the existing US 421 near MP
15.45.
US-421Trimble 80415 PL
DN SPP 2,388,000
RW SPP 10,604,000
UT SPP 1,903,000
CN SPP 46,815,000
Project Cost:
2,388,000 10,604,000 1,903,000 46,815,000
T
otal for Trimble county PL
Total Amounts:
CN
UT
RW
DN 3,238,000 107,000
100,000 12,544,000
100,000 640,000 2,223,000
7,200,000 1,250,000 50,841,000
3,438,000 20,384,000 3,473,000 50,948,000
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-56 OVER OHIO RIVER AT
SHAWNEETOW (113B00045N)
KY-56Union 10177 PL
DN BRX 150,000
RW
UT
CN BRX 1,000,000
Project Cost: 1,150,000 0 0 0
Page 250 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety and service concerns of
U
S-60 from the KY-950 to KY-492.
(2022CCN)
US-60Union 80202 PL
DN
RW STP2 3,500,000
UT STP2 8,000,000
CN STP2 10,000,000
Project Cost: 3,500,000 8,000,000 10,000,000 0
A
ddress the service, safety and condition
of KY 56 from Morganfield to KY 141.
(2022CCN) (2024CCR)
KY-56Union 80203 PL
DN
RW SPP 3,680,000
UT SPP 3,800,000
CN SPP 20,237,000
Project Cost:
3,680,000 3,800,000 20,237,000 0
R
econstruct US 60 from Waverly to
Corydon (2024CCN)
US-60Union 80314 PL
DN
RW STP2 2,000,000
UT STP2 2,000,000
CN STP2 7,000,000
Project Cost: 2,000,000 2,000,000 7,000,000 0
R
econstruct US 60 from the Morganfield
Bypass to Waverly. (2024CCN)
US-60Union 80315 PL
DN
RW STP2 3,500,000
UT STP2 3,000,000
CN STP2 12,500,000
Project Cost: 0 3,500,000 3,000,000 12,500,000
T
otal for Union county PL
Total Amounts:
CN
UT
RW
DN 150,000
9,180,000 3,500,000
13,800,000 3,000,000
1,000,000 37,237,000 12,500,000
10,330,000 17,300,000 40,237,000 12,500,000
Page 251 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
COMPLETE I65/US68 (GLASGOW
R
OAD)DIAMOND INTERCHANGE BY
ADDING NORTHBOUND ON-RAMP AND
SOUTHBOUND OFF-RAMP. (2024CCR)
I -65Warren 20 PL
DN
RW NH 530,000
UT NH 1,655,000
CN NH 9,100,000
Project Cost:
530,000 1,655,000 9,100,000 0
I
MPROVE KY 185 FROM 0.32 MILES
SOUTH OF THE AUSTIN RAYMER ROAD
TO 0.08 MILES SOUTH OF THE BRIDGE
OVER IVY CREEK. (2018BOP) (2022CCR)
KY-185Warren 110.4000 PL
DN
RW SPP 800,000
UT SPP 680,000
CN SPP 10,150,000
Project Cost:
1,480,000 10,150,000 0 0
R
ECONSTRUCT KY 622 (PLANO RD) TO
ELIMINATE TWO RIGHT-ANGLE CURVES.
(2022CCR) (2024CCR)
KY-622Warren 182 PL
DN
RW SPP 2,880,000
UT SPP 2,720,000
CN SPP 5,200,000
Project Cost:
2,880,000 2,720,000 0 5,200,000
C
ONSTRUCT A DOUBLE CROSSOVER
DIAMOND (DCD) ON US-31W AT THE
I-165 INTERCHANGE IN BOWLING GREEN.
US-31Warren 212 PL
DN STP1 1,500,000
RW
UT
CN
Project Cost:
1,500,000 0 0 0
M
AJOR WIDENING/RECONSTRUCTION OF
CEMETERY ROAD (KY-234) FROM
FOUNTAIN TRACE TO ROGER PORTER
ROAD (MP 7.878 TO MP 9.625).(14CCN)
(2020CCN) (2022CCR) (2024CCR)
KY-234Warren 8854 PL
DN
RW SPP 5,400,000
UT SPP 4,800,000
CN SPP 6,380,000
Project Cost:
5,400,000 4,800,000 6,380,000 0
Page 252 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
BRIDGE PROJECT IN WARREN COUNTY
O
N (114B00003N) KY-185 AT BARREN
RIVER
KY-185Warren 10049 PL
DN BRX 1,448,144
RW
UT
CN BRX 9,654,291
Project Cost: 0 0 11,102,435 0
B
RIDGE PROJECT IN WARREN COUNTY
ON (114B00076N) KY-880 AT JENNINGS
CREEK
US-68Warren 10051 PL
DN BRX 92,466
RW
UT
CN BRX 924,665
Project Cost:
1,017,131 0 0 0
B
RIDGE PROJECT IN WARREN COUNTY
ON (114B00095N) I-65 AT BARREN RIVER
I -65Warren 10052 PL
DN BRO 2,785,992
RW
UT
CN BRO 18,573,282
Project Cost: 0 0 21,359,274 0
A
DDRESS CONDITION OF I-165 FROM
MILEPOINT 0.521 TO MILEPOINT 7.121
I -165Warren 22132 PL
DN STP5 500,000
RW
UT
CN STP5 5,017,600
Project Cost: 5,517,600 0 0 0
S
AFETY IMPROVEMENTS AND
REHABILITATION ON KY-3225. KEEP
EXISTING FOOTPRINT BY REPLACING
CURBLINE IN SAME LOCATION FROM MP
0 TO MP 1(18CCN) (2022CCR)
KY-3225Warren 80051 PL
DN
RW SPP 1,420,000
UT SPP 130,000
CN SPP 1,460,000
Project Cost:
1,420,000 130,000 1,460,000 0
Page 253 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reduce congestion and increase safety
o
n Cave Mill Road/Dishman Lane from the
end of the three-lane section near
Raintree Drive (MP 0.570) just east of
Grider Pond Road. (2022CCN) (2024CCR)
CR-1704,
CS-1432,
CS-2281
Warren 80201 PL
DN
RW
UT SPP 6,450,000
CN SPP 12,400,000
Project Cost:
0 6,450,000 0 12,400,000
C
onstruct a two-lane roundabout at the
intersection of KY 101 and the I-65
southbound entrance and exit ramps in
Smiths Grove. Widen the existing I-65
southbound exit ramp to two lanes and
KY-101Warren 80214 PL
DN
RW
UT SPP 2,710,000
CN SPP 5,176,000
Project Cost:
2,710,000 5,176,000 0 0
M
INOR WIDENING OF CS-1344/CR1235
(SMALLHOUSE RD) FROM ELROD RD TO
US 231 (CAMPBELL LANE). SCOPE
INCLUDES INTERSECTION
IMPROVEMENTS, CONTINUOUS CENTER
CS-1334Warren 80301 PL
DN
RW SPP 6,500,000
UT SPP 6,200,000
CN SPP 9,920,000
Project Cost:
0 6,500,000 6,200,000 9,920,000
I
MPROVE SAFETY AND MOBILITY ON US
31W FROM FREEPORT ROAD TO KY 101.
(2024CCN)
US-31Warren 80302 PL
DN NH 1,940,000
RW NH 7,150,000
UT NH 7,440,000
CN NH 23,560,000
Project Cost:
1,940,000 0 14,590,000 23,560,000
I
MPROVE SAFETY AND MOBILITY ON KY
101 BETWEEN THE ALLEN COUNTY LINE
AND I 65. (2024CCN)
KY-101Warren 80304 PL
DN SPP 970,000
RW SPP 1,630,000
UT SPP 2,480,000
CN SPP 9,920,000
Project Cost:
970,000 4,110,000 0 9,920,000
Page 254 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY ON KY
6
22 FROM I 165 TO US 231. (2024CCN)
KY-622Warren 80305 PL
DN SPP 1,290,000
RW SPP 2,600,000
UT SPP 3,720,000
CN SPP 6,820,000
Project Cost: 1,290,000 2,600,000 3,720,000 6,820,000
I
MPROVE SAFETY AND MOBILITY ON US
31W FROM KY 3225 TO KY 957,
INCLUDING THE RECONSTRUCTION OF
THE INTERCHANGE WITH KY 446.
(2024CCN)
US-31Warren 80307 PL
DN NH 1,940,000
RW NH 6,500,000
UT NH 7,440,000
CN NH 14,880,000
Project Cost:
1,940,000 13,940,000 0 14,880,000
C
ONSTRUCT DUAL-LANE ROUNDABOUT
AT BROADWAY AVE AND US 31W
BYPASS. (2024CCN)
US-31Warren 80311 PL
DN STP1 3,120,000
RW STP1 10,000,000
UT STP1 5,000,000
CN STP1 5,000,000
Project Cost:
3,120,000 10,000,000 5,000,000 5,000,000
M
ODERNIZE US 68 BETWEEN VICTORIA
STREET AND CLAY STREET. (2024CCN)
US-68Warren 80320 PL
DN
RW NH 330,000
UT NH 1,240,000
CN NH 1,860,000
Project Cost: 330,000 1,240,000 1,860,000 0
I
MPROVE SAFETY AND MOBILITY ON KY
234 AT I 65, INCLUDING THE
RECONSTRUCTION OF THE
INTERCHANGE. (2024CCN)
I -65Warren 80322 PL
DN NH 1,940,000
RW NH 330,000
UT NH 310,000
CN NH 3,720,000
Project Cost:
1,940,000 330,000 310,000 3,720,000
Page 255 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
SCOPING STUDY FOR OUTER BELTLINE
E
XTENDING KY 3145 TO NORTHERN
WARREN COUNTY. (2024CCN)
PF-9999Warren 80326 PL
DN STPF 7,500,000
RW
UT
CN
Project Cost: 7,500,000 0 0 0
M
AJOR WIDENING OF 68X
(RUSSELLVILLE RD) INCLUDING
CONSTRUCTION OF ROUNDABOUTS AT
INTERSECTIONS WITH MORGANTOWN RD
AND UNIVERSITY BLVD. SCOPE
US-68Warren 80327 PL
DN NH 2,600,000
RW NH 3,900,000
UT NH 5,800,000
CN NH 11,160,000
Project Cost:
2,600,000 9,700,000 11,160,000 0
C
ONSTRUCT NEW INTERCHANGE ON
I-165 (NATCHER EXPRESSWAY) AT
ELROD ROAD. INCLUDES NEW
CONSTRUCTION FOR SEGMENTS OF
ELROD ROAD AND MINOR WIDENING OF
CR-1240Warren 80328 PL
DN SPP 1,300,000
RW SPP 11,900,000
UT SPP 10,620,000
CN SPP 31,580,000
Project Cost:
1,300,000 11,900,000 10,620,000 31,580,000
I
mprove safety and mobility on Dillard
Road (CR 1266) from US 31W (Nashville
Road) to Neal Howell Road (CR 1241).
CR-1266Warren 80404 PL
DN SPP 1,146,000
RW SPP 3,766,600
UT SPP 5,850,000
CN SPP 12,540,000
Project Cost:
1,146,000 3,766,600 5,850,000 12,540,000
R
econstruct KY 242 to improve sight
distance at the intersections of Dismon
Stone Rd, Upper Gable Way, and
Southaven Blvd.
KY-242Warren 80410 PL
DN SPP 350,000
RW SPP 200,000
UT SPP 500,000
CN SPP 600,000
Project Cost:
350,000 700,000 600,000 0
Page 256 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Reconstruct KY 240 from US 68 to US
3
1W including intersection improvements
at US 68 and an improved connection to
Tri-County Industrial Park (MP 0.0-4.5)
KY-240Warren 80423 PL
DN SPP 4,200,000
RW SPP 8,000,000
UT SPP 6,000,000
CN SPP 30,000,000
Project Cost:
0 4,200,000 14,000,000 30,000,000
T
otal for Warren county PL
Total Amounts:
CN
UT
RW
DN 26,188,466 4,200,000 4,234,136
11,360,000 47,326,600 15,150,000
3,390,000 33,215,000 45,140,000
5,942,265 15,326,000 58,787,573 165,540,000
46,880,731 100,067,600 123,311,709 165,540,000
I
MPROVE MOBILITY ON THE KY 555
HEARTLAND PARKWAY CORRIDOR
FROM KY 53 TO BLUEGRASS PARKWAY
(2022CCN) (2024CCR)
KY-555Washington 164.2000 PL
DN
RW
UT
CN NH 14,440,000
Project Cost:
14,440,000 0 0 0
A
DDRESS SAFETY, MOBILITY, AND
GEOMETRIC ISSUES ALONG US 150 IN
WASHINGTON COUNTY FROM 0.7 MILES
EAST OF GRUNDY HOME ROAD
(MILEPOINT 2.50) TO US 150X (MP 6.557)
US-150Washington 396.3000 PL
DN
RW
UT
CN STPF 11,520,000
Project Cost:
11,520,000 0 0 0
A
DDRESS CONDITION OF US-150 FROM
MILEPOINT 7.6 TO MILEPOINT 7.9
US-150Washington 20043 PL
DN STP4 60,000
RW
UT
CN STP4 690,000
Project Cost: 0 750,000 0 0
Page 257 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address geometric deficiencies along KY
1
52 from US 150 (MP 8.815) to MP. 9.9 .
(2024CCN)
KY-152Washington 80352 PL
DN SPP 1,400,000
RW SPP 940,000
UT SPP 2,170,000
CN
Project Cost: 1,400,000 0 3,110,000 0
T
otal for Washington county PL
Total Amounts:
CN
UT
RW
DN 1,400,000 60,000
940,000
2,170,000
25,960,000 690,000
27,360,000 750,000 3,110,000 0
B
RIDGE PROJECT IN WAYNE COUNTY ON
(116C00042N) EAST RALEIGH CREEK AT
RALEIGH CREEK
CR-1006Wayne 10073 PL
DN BRZ 113,769
RW
UT
CN BRZ 758,460
Project Cost:
0 0 872,229 0
A
DDRESS CONDITION OF KY-90 FROM
MILEPOINT 12.29 TO MILEPOINT 12.872
KY-90Wayne 20022 PL
DN STP5 240,000
RW
UT
CN STP5 2,760,000
Project Cost: 0 0 0 3,000,000
A
DDRESS CONDITION OF KY-90 FROM
MILEPOINT 12.9 TO MILEPOINT 17.7
KY-90Wayne 22374 PL
DN STP5 320,000
RW
UT
CN STP5 3,680,000
Project Cost: 0 0 4,000,000 0
Page 258 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
REDUCE CONGESTION AND IMPROVES
S
AFETY, CAPACITY AND MOBILITY OF
KY 90 BETWEEN KY 90X/KY 1275 AND
KY 3106 (2020CCN) (2022CCR)
(2024CCR)
KY-90Wayne 80105 PL
DN
RW
UT SPP 2,400,000
CN SPP 17,500,000
Project Cost:
2,400,000 17,500,000 0 0
I
mprove safety and mobility along KY 1765
between KY 1275 and end of state
maintenance near Conley Bottom boat
dock. (2024CCN)
KY-1765Wayne 80308 PL SPP 200,000
DN SPP 630,000
RW SPP 3,520,000
UT SPP 2,020,000
CN SPP 10,210,000
Project Cost:
830,000 3,520,000 2,020,000 10,210,000
M
INOR WIDENING BY ADDING OFFSET
LEFT TURNING LANES INTO KY 1568 AND
FRAZER CHAPEL ROAD. (2024CCN)
KY-90Wayne 80309 PL
DN
RW SPP 180,000
UT SPP 240,000
CN SPP 1,040,000
Project Cost:
420,000 1,040,000 0 0
I
MPROVE VERTICAL GEOMETRICS
ALONG KY 92 NEAR KY 789 TO IMPROVE
SIGHT DISTANCE. ADD TURNING LANES
AND MINOR WIDENING FROM ALONG KY
92 FROM 789 TO KY 90. (2024CCI)
KY-92Wayne 80314 PL
DN
RW SPP 2,150,000
UT SPP 2,020,000
CN SPP 19,720,000
Project Cost:
0 2,150,000 2,020,000 19,720,000
I
mprove mobility and safety along KY 90 at
KY 3284 / KY 90X and widen approach
routes approximately 1500 feet on each
side of KY 90 in Monticello.
KY-90Wayne 80408 PL
DN
RW SPP 200,000
UT SPP 240,000
CN SPP 1,800,000
Project Cost:
440,000 1,800,000 0 0
Page 259 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve mobility, safety and access
m
anagement along KY 90X from Dugan
Street to KY 90 E intersection.
KY-90Wayne 80409 PL SPP 260,000
DN
RW
UT
CN
Project Cost: 260,000 0 0 0
A
ddress mobility and safety along KY 90
From Gregory Street to Hospital Street in
Monticello
KY-90Wayne 80410 PL
DN SPP 294,300
RW SPP 523,200
UT SPP 523,200
CN SPP 2,943,000
Project Cost:
294,300 523,200 523,200 2,943,000
T
otal for Wayne county PL
Total Amounts:
CN
UT
RW
DN
460,000
924,300 433,769 240,000
380,000 6,193,200
2,880,000 4,563,200
20,340,000 4,438,460 35,633,000
4,644,300 26,533,200 9,435,429 35,873,000
R
ECONSTRUCT BETWEEN KY 120 AND
RR BRIDGE AT SLAUGHTERS TO
ALLEVIATE FLOODING. (12CCR)(18CCN)
(2020CCR) (2022CCR) (2024CCR)
KY-138Webster 228 PL
DN
RW SPP 200,000
UT SPP 312,000
CN SPP 1,360,000
Project Cost:
512,000 1,360,000 0 0
B
RIDGE PROJECT IN WEBSTER COUNTY
ON (117B00038N) KY-132 AT UNNAMED
STREAM
KY-132Webster 10138 PL
DN
RW BRX 10,000
UT BRX 10,000
CN BRX 1,190,000
Project Cost:
0 0 0 1,210,000
Page 260 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
ADDRESS DEFICIENCIES OF BRIDGE ON
K
Y-2836 OVER SLOVER CREEK
(117B00122N)
KY-2836Webster 10159 PL
DN BRZ 180,514
RW
UT
CN BRZ 1,203,429
Project Cost: 0 0 1,383,943 0
A
DDRESS DEFICIENCIES OF BRIDGE ON
KY-2839 OVER BR TO JACKSON DITCH
(117B00121N)
KY-2839Webster 10182 PL
DN FBP 212,990
RW
UT
CN FBP 1,419,934
Project Cost:
1,632,924 0 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 134.982 TO MILEPOINT 136.5
I -69Webster 20064 PL
DN NHPM 130,000
RW
UT
CN NHPM 1,307,504
Project Cost: 0 1,437,504 0 0
A
DDRESS CONDITION OF I-069 FROM
MILEPOINT 136.5 TO MILEPOINT 137.141
I -69Webster 22092 PL
DN NHPM 50,000
RW
UT
CN NHPM 554,500
Project Cost: 604,500 0 0 0
A
ddress service concerns of KY 630
from KY 132 in Dixon to the Hopkins
County Line (2024CCN)
KY-630Webster 80316 PL
DN SPP 760,000
RW SPP 2,750,000
UT SPP 1,620,000
CN SPP 8,540,000
Project Cost:
760,000 2,750,000 1,620,000 8,540,000
Page 261 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address right turn issues at entrance to
C
anaan Ridge Park
KY-132Webster 80402 PL
DN SPP 250,000
RW SPP 100,000
UT SPP 300,000
CN SPP 900,000
Project Cost: 250,000 400,000 900,000 0
A
ddress service and safety concern of
KY-56 from US-41 in Sebree to the
McLean County Line. This is a breakout of
Project 02 117 D0056 1.00
KY-56Webster 80403 PL
DN SPP 600,000
RW SPP 660,000
UT SPP 1,100,000
CN SPP 5,500,000
Project Cost:
600,000 660,000 1,100,000 5,500,000
T
otal for Webster county PL
Total Amounts:
CN
UT
RW
DN 1,872,990 130,000 180,514
200,000 3,510,000 10,000
312,000 300,000 2,720,000 10,000
1,974,434 2,667,504 2,103,429 15,230,000
4,359,424 6,607,504 5,003,943 15,250,000
C
ONSTRUCT A NEW ENTRANCE TO THE
UNIVERSITY OF THE CUMBERLANDS
FROM SOUTH 2ND ST UP THE HILL TO TIE
INTO HUTTON WAY. (16CCN) (2024CCN)
PF-9999Whitley 8954 PL
DN SPP 410,000
RW
UT SPP 70,000
CN SPP 2,180,000
Project Cost:
410,000 2,250,000 0 0
A
DDRESS CONDITION OF I-075 FROM
MILEPOINT 11.27 TO MILEPOINT 20.045
I -75Whitley 22107 PL
DN NHPM 2,400,000
RW
UT
CN NHPM 24,000,000
Project Cost: 26,400,000 0 0 0
Page 262 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE SAFETY AND MOBILITY ON US
2
5W (MILEPOINT 13.3 TO MILEPOINT 14.6)
INCLUDED IN THIS RECONSTRUCTION
WILL BE APPROXIMATELY 1.3 MILES OF
ROADWAY TO BE WIDENED/IMPROVED,
US-25Whitley 80107 PL
DN
RW STP1 1,500,000
UT STP1 1,500,000
CN STP1 10,000,000 9,000,000
Project Cost:
1,500,000 1,500,000 10,000,000 9,000,000
R
esurfacing of High Top Road (2024CCN)CR-1412Whitley 80307 PL
DN
RW
UT
CN SPP 380,000
Project Cost: 380,000 0 0 0
W
iden existing South 2nd street to
improve geometric deficiencies along
route (2024CCN)
CS-1132Whitley 80308 PL
DN SPP 1,040,000
RW SPP 3,500,000
UT SPP 1,500,000
CN SPP 3,000,000
Project Cost:
1,040,000 5,000,000 0 3,000,000
I
mprove safety by lowering vertical crest
on US25W and realigning High Top Road
intersection with US25W (2024CCN)
US-25Whitley 80310 PL
DN
RW SPP 210,000
UT SPP 250,000
CN SPP 400,000
Project Cost:
210,000 250,000 400,000 0
W
iden I-75 from MP 19.2 in Whitley County
to MP 23.5 South of Corbin (2024CCN)
I -75Whitley 80353 PL
DN
RW NH 530,000
UT NH 500,000
CN NH 50,000,000
Project Cost: 0 1,030,000 0 50,000,000
Page 263 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Widen I-75 from MP 14.4 in Whitley County
t
o MP 19.2 (2024CCN)
I -75Whitley 80354 PL
DN NH 2,500,000
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 2,500,000 1,000,000 0
W
iden I-75 from MP 10.1 in Whitley county
to MP 14.4 (2024CCN)
I -75Whitley 80355 PL
DN
RW NH 500,000
UT NH 500,000
CN
Project Cost: 0 0 0 1,000,000
C
onstruct southern backage road with
roundabout at KY92 and implement
access management west of Penny Lane.
Concept 1 from the 11-1 planning study
KY-92Whitley 80405 PL
DN SPP 637,000
RW SPP 1,000,000
UT SPP 1,000,000
CN SPP 6,370,000
Project Cost:
637,000 1,000,000 1,000,000 6,370,000
I
mprove mobility and congestion along
US25W from 14th Street to KY312.
Construct roundabouts at each end of the
Main StreetKentucky Avenue couplet.
US-25Whitley 80406 PL
DN SPP 200,000
RW SPP 50,000
UT SPP 50,000
CN SPP 2,363,000
Project Cost:
200,000 50,000 50,000 2,363,000
A
ddress safety and surface condition
issues on KY 727 (West 5th Street) from
Poplar Street to West 4th Street in Corbin.
KY-727Whitley 80407 PL
DN SPP 500,000
RW SPP 1,000,000
UT SPP 2,050,000
CN SPP 5,500,000
Project Cost:
500,000 1,000,000 2,050,000 5,500,000
Page 264 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Address safety concerns and horizontal
a
lignment with curve just passed Brush
Arbor Road, as well as adding sidewalks
to roadway.
KY-296Whitley 80408 PL
DN SPP 300,000
RW SPP 1,000,000
UT SPP 500,000
CN SPP 3,000,000
Project Cost:
300,000 1,000,000 500,000 3,000,000
I
mprove safety by reconstructing
intersection of US-25W and Angel Road
US-25Whitley 80415 PL
DN
RW NH 500,000
UT NH 300,000
CN NH 1,250,000
Project Cost: 800,000 1,250,000 0 0
I
mprove safety by rescontructing
intersection of US-25W and Hightop Road
US-25Whitley 80416 PL
DN NH 400,000
RW NH 500,000
UT NH 300,000
CN NH 1,250,000
Project Cost: 400,000 500,000 300,000 1,250,000
S
afety improvements & congestion relief
on KY92 by providing circulation through
the corridor
CR-1305Whitley 80417 PL
DN
RW SPP 1,357,000
UT SPP 1,000,000
CN SPP 6,370,000
Project Cost:
2,357,000 6,370,000 0 0
I
mprove safety by correcting substandard
geometry
KY-727Whitley 80418 PL
DN SPP 1,000,000
RW SPP 2,000,000
UT SPP 2,250,000
CN SPP 3,500,000
Project Cost: 1,000,000 2,000,000 2,250,000 3,500,000
Page 265 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Intersection Improvements on 18th Street
(
US 25W)
US-25Whitley 80427 PL
DN
RW
UT SPP 295,000
CN SPP 500,000
Project Cost: 795,000 0 0 0
C
onvert Master Street (KY 312) from rural
to urban section with curb, gutter and
storm sewers.
KY-312Whitley 80428 PL
DN SPP 250,000
RW SPP 250,000
UT SPP 1,330,000
CN SPP 1,600,000
Project Cost:
250,000 1,580,000 1,600,000 0
N
orth Hamlin Ave/Roy Kidd Ave
intersection realignment to include curb &
gutter and sidewalks on each side
KY-830Whitley 80429 PL
DN
RW
UT
CN SPP 400,000
Project Cost:
400,000 0 0 0
I
mprove curb and gutter on 7th Street from
Steele Street to Sycamore Avenue
CS-2017Whitley 80432 PL
DN SPP 100,000
RW SPP 25,000
UT SPP 145,000
CN SPP 200,000
Project Cost: 470,000 0 0 0
T
otal for Whitley county PL
Total Amounts:
CN
UT
RW
DN 7,237,000 2,500,000
3,592,000 9,830,000 500,000 500,000
1,740,000 5,150,000 6,650,000 500,000
25,480,000 9,800,000 12,000,000 83,983,000
38,049,000 27,280,000 19,150,000 84,983,000
Page 266 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Minor widening to improve redundancy of
R
egional travel. (2024CCR)
KY-15Wolfe 177 PL
DN
RW
UT
CN PROT 7,430,000
Project Cost: 7,430,000 0 0 0
R
econstruct KY 715 from intersection
with KY 11 (0.0) to the intersection with
KY 15 (MP 5.765). (2024CCN)
KY-715Wolfe 80352 PL
DN SPP 2,600,000
RW
UT
CN
Project Cost:
2,600,000 0 0 0
R
econstruct KY 191 from the Mountain
Parkway Exit/Underpass to KY 3356 (MP
3.096 - 6.808)
KY-191Wolfe 80417 PL
DN SPP 1,140,000
RW SPP 3,985,000
UT SPP 1,560,000
CN SPP 11,400,000
Project Cost:
1,140,000 3,985,000 1,560,000 11,400,000
H
ill and curve correction on KY 191
between Hazel Green and KY 205
(02CCN)(08CCR)(10CCR). THIS PROJECT
REPLACES SYP 10-8102.
KY-191Wolfe 80418 PL
DN
RW SPP 400,000
UT SPP 900,000
CN SPP 2,900,000
Project Cost:
400,000 900,000 0 2,900,000
T
otal for Wolfe county PL
Total Amounts:
CN
UT
RW
DN 3,740,000
400,000 3,985,000
900,000 1,560,000
7,430,000 14,300,000
11,570,000 4,885,000 1,560,000 14,300,000
Page 267 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
IMPROVE US 60 (VERSAILLES ROAD)
F
ROM THE BLUEGRASS
PARKWAY/HUNTERTOWN PIKE TO
PISGAH PIKE.
US-60Woodford 117 PL
DN
RW
UT
CN NH 6,910,000
Project Cost:
0 0 6,910,000 0
A
CCESS MANAGEMENT IMPROVEMENTS
ON US 60 FROM LEXINGTON ROAD AT
WOODFORD FEED TO MARSAILLES
DRIVE (MP 9.38 TO MP 9.70).(16CCN)
(18CCN) (2022CCR) (2024CCR)
US-60Woodford 8905 PL
DN
RW
UT SPP 800,000
CN SPP 910,000
Project Cost:
800,000 910,000 0 0
E
XTEND FALLING SPRINGS BLVD FROM
TYRONE PIKE (US-62) TO CLIFTON ROAD
(KY-1964)
Woodford 8908 PL
DN
RW SPP 3,510,000
UT SPP 5,180,000
CN SPP 9,550,000
Project Cost:
0 8,690,000 9,550,000 0
R
econstruct McCracken Pike (KY-1659)
on a new horizontal alignment to minimize
pedestrian and vehicle conflicts near
Woodford Reserve Distillery (ROW to be
provided by County) (2022CCN)
KY-1659Woodford 80200 PL
DN
RW
UT
CN SPP 1,660,000
Project Cost:
1,660,000 0 0 0
R
ECONSTRUCT INTERSECTION AT US 62
(ROSE HILL AVE & TYRONE PK) AND KY
1964 (CLIFTON RD) IN VERSAILLES
(2022CCN)
US-62Woodford 80252 PL
DN SPP 370,000
RW SPP 500,000
UT SPP 1,000,000
CN SPP 2,000,000
Project Cost:
370,000 500,000 1,000,000 2,000,000
Page 268 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
County FundPhaseDescriptionRouteItem No. FY2029 FY2030 FY2031 FY2032
Improve safety and mobility on KY 341
b
eginning at I-64 to approximately 0.8
miles north. (2024CCN)
KY-341Woodford 80320 PL
DN SPP 650,000
RW SPP 630,000
UT SPP 780,000
CN SPP 3,500,000
Project Cost: 650,000 1,410,000 3,500,000 0
S
afety improvements on US 60X from
Main Street to Maple Street in Versailles
(MP 0.940-1.234). (2024CCN)
US-60Woodford 80357 PL
DN SPP 275,000
RW
UT SPP 6,600,000
CN SPP 3,000,000
Project Cost:
275,000 6,600,000 3,000,000 0
I
ntersection improvements at KY 2113/US
62 and KY2113/KY 33. Consider
design/build.
KY-2113Woodford 80400 PL
DN
RW
UT
CN SPP 2,000,000
Project Cost:
2,000,000 0 0 0
T
otal for Woodford county PL
Total Amounts:
CN
UT
RW
DN 1,295,000
4,640,000
800,000 12,560,000 1,000,000
3,660,000 910,000 22,960,000 2,000,000
5,755,000 18,110,000 23,960,000 2,000,000
Page 269 of 270
2028-2 032 HIGHWAY PRECONSTRUCTION PLAN
Fund Summary
DescriptionFund F Y 2029 FY 2030 FY 2031 FY 2032 Total
APD APD 46,000,000 47,190,000 0 0 93,190,000
BRO BRO 69,838,397 73,532,900 73,789,468 75,665,468 292,826,233
BRO2 BRO2 83,705,000 80,949,000 80,949,000 80,949,000 326,552,000
BRX BRX 76,259,574 74,019,073 75,787,833 69,829,376 295,895,856
BRZ BRZ 33,522,722 19,197,211 17,731,513 18,589,734 89,041,180
CARB CARB 14,600,000 14,600,000 14,600,000 14,600,000 58,400,000
CM CM 8,100,000 8,100,000 8,100,000 8,100,000 32,400,000
FBP FBP 100,440,008 88,142,357 96,917,227 104,475,601 389,975,193
FBP2 FBP2 19,887,528 15,436,853 15,064,489 11,075,690 61,464,560
GAR GAR 38,600,000 38,600,000 38,600,000 38,600,000 154,400,000
GR GR 155,000 0 0 0 155,000
NH NH 980,320,953 1,293,897,618 1,209,475,000 3,940,144,628 7,423,838,199
NHPM NHPM 236,351,411 179,651,412 143,892,049 156,822,232 716,717,104
PROT PROT 62,240,000 19,890,000 21,080,000 5,000,000 108,210,000
RRP RRP 3,140,000 4,220,000 4,220,000 4,220,000 15,800,000
SAF SAF 71,300,000 71,300,000 71,300,000 71,300,000 285,200,000
SAH SAH 1,800,000 1,800,000 1,800,000 1,800,000 7,200,000
SLO SLO 26,800,000 26,800,000 26,800,000 26,800,000 107,200,000
SLX SLX 7,800,000 7,800,000 7,800,000 7,800,000 31,200,000
SNK SNK 8,600,000 8,600,000 8,600,000 8,600,000 34,400,000
SPP SPP 1,414,208,100 2,047,679,700 2,805,780,000 4,858,010,200 11,125,678,000
STP1 STP1 67,120,000 75,380,000 113,430,000 86,390,000 342,320,000
STP2 STP2 210,675,200 352,658,000 230,240,000 170,460,000 964,033,200
STP3 STP3 8,481,221 20,767,854 0 0 29,249,075
STP4 STP4 21,772,290 21,682,627 13,707,000 7,511,514 64,673,431
STP5 STP5 31,859,700 26,760,960 25,225,000 29,000,000 112,845,660
STPF STPF 231,634,000 310,991,000 206,782,000 407,770,000 1,157,177,000
TAP TAP 12,300,000 12,300,000 12,300,000 12,300,000 49,200,000
Total Amount 3,887,511,104 4,941,946,565 5,323,970,579 10,215,813,443 24,369,241,691