Small Solar Energy Generating System Incentive Program - Eligibility and Generating Capacity

Small Solar Energy Generating System Incentive Program - Eligibility and Generating Capacity

Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Senators Harris and Brooks
Last action
2026-02-10
Official status
In the Senate - Hearing 2/26 at 1:00 p.m.
Effective date
2026-10-01

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Small Solar Energy Generating System Incentive Program - Eligibility and Generating Capacity

Extending the deadline by which a solar energy generating system must be placed in service to be eligible for certification under the Small Solar Energy Generating System Incentive Program from January 1, 2028, to January 1, 2031; and increasing the total amount of in-State generating capacity for certain solar energy generating systems from 270 megawatts to 540 megawatts.

What This Bill Does

  • Extending the deadline by which a solar energy generating system must be placed in service to be eligible for certification under the Small Solar Energy Generating System Incentive Program from January 1, 2028, to January 1, 2031; and increasing the total amount of in-State generating capacity for certain solar energy generating systems from 270 megawatts to 540 megawatts.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2026-02-10 Senate

    Hearing 2/26 at 1:00 p.m.

  2. 2026-02-06 Senate

    First Reading Education, Energy, and the Environment

  3. Maryland General Assembly

    Text - First - Small Solar Energy Generating System Incentive Program - Eligibility and Generating Capacity

Official Summary Text

Extending the deadline by which a solar energy generating system must be placed in service to be eligible for certification under the Small Solar Energy Generating System Incentive Program from January 1, 2028, to January 1, 2031; and increasing the total amount of in-State generating capacity for certain solar energy generating systems from 270 megawatts to 540 megawatts.

Current Bill Text

Read the full stored bill text
EXPLANATION: CAPITALS INDICATE MATTER ADDED TO EXISTING LAW.
[Brackets] indicate matter deleted from existing law.
*sb0669*

SENATE BILL 669
C5, M5 6lr2647
CF HB 990
By: Senators Harris and Brooks
Introduced and read first time: February 6, 2026
Assigned to: Education, Energy, and the Environment

A BILL ENTITLED

AN ACT concerning 1

Small Solar Energy Generating System Incentive Program – Eligibility and 2
Generating Capacity 3

FOR the purpose of extending the deadline by which a solar energy generating system must 4
be placed in service to be eligible for certification under the Small Solar Energy 5
Generating System Incentive Program; increasing the total amount of in –State 6
generating capacity for certain solar energy generating systems; and generally 7
relating to the Small Solar Energy Generating System Incentive Program. 8

BY repealing and reenacting, without amendments, 9
Article – Public Utilities 10
Section 7–709.1(a) 11
Annotated Code of Maryland 12
(2025 Replacement Volume and 2025 Supplement) 13

BY repealing and reenacting, with amendments, 14
Article – Public Utilities 15
Section 7–709.1(d) and (g) 16
Annotated Code of Maryland 17
(2025 Replacement Volume and 2025 Supplement) 18

SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 19
That the Laws of Maryland read as follows: 20

Article – Public Utilities 21

7–709.1. 22

(a) (1) In this section the following words have the meanings indicated. 23

(2) “Brownfield” has the meaning stated in § 7–207 of this title. 24
2 SENATE BILL 669

(3) “Certified SREC” means a solar renewable energy credit generated by 1
a certified system. 2

(4) “Certified system” means a solar energy generating system certified by 3
the Commission under the Program to generate certified SRECs with the compliance value 4
specified in subsection (c) of this section. 5

(5) “Program” means the Small Solar Energy Generating System Incentive 6
Program. 7

(d) To be eligible for certification under the Program, a solar energy generating 8
system shall: 9

(1) be located in the State; 10

(2) be eligible for inclusion in meeting the renewable energy portfolio 11
standard; 12

(3) have a generating capacity of 5 megawatts or less, as measured by the 13
alternating current rating of the system’s inverter; 14

(4) be placed in service between July 1, 2024, and January 1, [2028] 2031, 15
inclusive; and 16

(5) be one of the following types of systems: 17

(i) a system with a generating capacity of 20 kilowatts or less, as 18
measured by the alternating current rating of the system’s inverter; 19

(ii) a system with a generating capacity of 2 megawatts or less, as 20
measured by the alternating current rating of the system’s inverter, if the system is used 21
for aggregate net metering; or 22

(iii) a system with a generating capacity of between 20 kilowatts and 23
5 megawatts, as measured by the alternating current rating of the system’s inverter, if the 24
system is located on or over: 25

1. a rooftop; 26

2. a parking canopy; 27

3. a brownfield; or 28

4. a water retention pond or quarry currently or previously 29
designated for industrial use. 30

SENATE BILL 669 3

(g) The total amount of in –State generating capacity for certified systems, as 1
measured by the alternating current rating of the systems’ inverters, under the Program 2
may not exceed: 3

(1) 300 megawatts for systems with a generating capacity of less than 20 4
kilowatts, as measured by the alternating current rating of the system’s inverter; and 5

(2) [270] 540 megawatts for systems with a generating capacity of between 6
20 kilowatts and 5 megawatt s, as measured by the alternating current rating of the 7
system’s inverter. 8

SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 9
October 1, 2026. 10