Back to Minnesota

HF2928 • 2026

Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.

Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.

Budget Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Acomb, Pursell, Jones
Last action
2026-04-09
Official status
Author added Jones
Effective date
Not listed

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Bill History

  1. 2026-04-09 House

    Author added Jones

  2. 2026-02-17 House

    Author added Pursell

  3. 2025-03-27 House

    Introduction and first reading, referred to Energy Finance and Policy

Official Summary Text

Preapplication filings for large water appropriation projects required, permit application information for large water appropriation projects added, level of environmental review for data centers specified, data centers exempted from making financial contributions to an energy conservation and optimization plan, and other data center provisions modified.

Current Bill Text

Read the full stored bill text
A bill for an act

relating to energy; requiring preapplication filings for large water appropriation

projects; adding information to permit applications for large water appropriation

projects; specifying the level of environmental review for data centers; removing

data centers' energy consumption from the calculation of a utility's energy savings

goal; exempting data centers from making financial contributions to an energy

conservation and optimization plan; depositing fee revenues in an account to be

used for energy conservation; modifying the definition of large energy facility;

establishing energy requirements for data centers; imposing a fee on data centers;

requiring the Public Utilities Commission to establish a new tariff for data centers;

amending Minnesota Statutes 2024, sections 103G.265, by adding a subdivision;

103G.271, by adding a subdivision; 116D.04, by adding a subdivision; 216B.2402,

subdivision 10; 216B.241, subdivisions 1a, 2a; 216B.2421, subdivision 2; proposing

coding for new law in Minnesota Statutes, chapter 216B.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

Section 1.

Minnesota Statutes 2024, section 103G.265, is amended by adding a subdivision

to read:

new text begin

Subd. 5.

new text end

new text begin

Preapplication evaluation of large water appropriation projects.

new text end

new text begin

(a) This

subdivision applies to a project whose proposed consumptive use exceeds 100 million

gallons per year or 250,000 gallons per day, whether under an existing permit, as the result

of a permit amendment, or under a new individual permit.

new text end

new text begin

(b) To ensure that a project is compatible with the needs of other current and future

water users, to help maintain the water allocation priorities established under section

103G.261, to ensure adequate water supply in areas of the state with limited water

availability, and to promote a more efficient and timely permitting process, potential

applicants or persons working on behalf of potential applicants are encouraged to discuss

the project with the department as early in the project development process as possible,

preferably before a final project site has been selected, project design has been finalized,

or land has been acquired.

new text end

new text begin

(c) A city or county employee that has been contacted by a person regarding a project

that is likely to be subject to this subdivision must, even if no final decision has been made

on the project's location, notify the department in writing within ten business days of the

contact, providing the name of and contact information for the person, and potential project

locations.

new text end

new text begin

(d) In response to a contact from a potential applicant, the department may request

preapplication information that is helpful in assisting the department to assess the factors

affecting the ability of a water source to meet a project's water use needs at proposed

locations, including:

new text end

new text begin

(1) a project description, including all potential locations;

new text end

new text begin

(2) the project's estimated maximum daily, seasonal, and annual water use rates and

volumes;

new text end

new text begin

(3) the anticipated source of water; and

new text end

new text begin

(4) water quality or temperature requirements.

new text end

new text begin

The department may request any additional information necessary to assist it to assess the

ability of a water source to meet a project's water use needs.

new text end

new text begin

(e) The commissioner shall evaluate the information supplied by a potential applicant

under this subdivision and shall respond in writing, which may be electronically transmitted,

describing potential water availability constraints at each proposed project site.

new text end

new text begin

(f) In determining the impact of a potential project on water quality and quantity, the

commissioner may consult with the commissioners of health, agriculture, the Pollution

Control Agency, and other state agencies.

new text end

new text begin

(g) Any communication made or information exchanged under this subdivision between

a potential applicant and a government agency, or between government agencies, is nonpublic

data, as defined in section 13.02, until the project is either abandoned or the applicant files

an application for a water use permit under section 103G.285 or 103G.287, after which the

data is public.

new text end

new text begin

(h) None of the discussions, filings, or evaluations made under this subdivision preclude

or supplant environmental review, preliminary well-construction approval, appropriation

permit review, or any other requirements under federal, state, or local law.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 2.

Minnesota Statutes 2024, section 103G.271, is amended by adding a subdivision

to read:

new text begin

Subd. 5b.

new text end

new text begin

Large water appropriation projects; permit conditions.

new text end

new text begin

In issuing water

use permits to applicants that meet the criteria of section 103G.265, subdivision 5, the

department shall ensure that:

new text end

new text begin

(1) water resources of the state are utilized in the public interest and that public health,

safety, and welfare are adequately protected;

new text end

new text begin

(2) technologies that promote water conservation and the efficient use of water are fully

considered; and

new text end

new text begin

(3) water use conflicts are addressed as prescribed in Minnesota Rules, part 6115.0740.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 3.

Minnesota Statutes 2024, section 116D.04, is amended by adding a subdivision to

read:

new text begin

Subd. 18.

new text end

new text begin

Data centers; environmental review.

new text end

new text begin

(a) Notwithstanding any law to the

contrary, the proposed construction of a data center, as defined in section 216B.71, or the

expansion of the average hourly load of an existing data center by 100 megawatts or more,

requires preparation of an environmental impact statement according to the provisions of

subdivision 2a. The responsible governmental unit for the environmental impact statement

is the Public Utilities Commission.

new text end

new text begin

(b) For the purposes of this subdivision, "average hourly load" means the amount of

electricity consumed by a facility each hour, averaged over an entire year.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 4.

Minnesota Statutes 2024, section 216B.2402, subdivision 10, is amended to read:

Subd. 10.

Gross annual retail energy sales.

"Gross annual retail energy sales" means

a utility's annual electric sales to all Minnesota retail customers, or natural gas throughput

to all retail customers, including natural gas transportation customers, on a utility's

distribution system in Minnesota. Gross annual retail energy sales does not include:

(1) gas sales to:

(i) a large energy facility;

(ii) a large customer facility whose natural gas utility has been exempted by the

commissioner under section
216B.241, subdivision 1a
, paragraph (a), with respect to natural

gas sales made to the large customer facility; and

(iii) a commercial gas customer facility whose natural gas utility has been exempted by

the commissioner under section
216B.241, subdivision 1a
, paragraph (b), with respect to

natural gas sales made to the commercial gas customer facility;

(2) electric sales to:

(i) a large customer facility whose electric utility has been exempted by the commissioner

under section
216B.241, subdivision 1a
, paragraph (a), with respect to electric sales made

to the large customer facility;
deleted text begin
and
deleted text end

(ii) a data mining facility, if the facility:

(A) has provided a signed letter to the utility verifying the facility meets the definition

of a data mining facility; and

(B) imposes a peak electrical demand on a consumer-owned utility's system equal to or

greater than 40 percent of the peak electrical demand of the system, measured in the same

manner as the utility that serves the customer facility measures electric demand for billing

purposes;
deleted text begin
or
deleted text end
new text begin
and
new text end

new text begin

(iii) a data center, as defined in section 216B.71; or

new text end

(3) the amount of electric sales prior to December 31, 2032, that are associated with a

utility's program, rate, or tariff for electric vehicle charging based on a methodology and

assumptions developed by the department in consultation with interested stakeholders no

later than December 31, 2021. After December 31, 2032, incremental sales to electric

vehicles must be included in calculating a public utility's gross annual retail sales.

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 5.

Minnesota Statutes 2024, section 216B.241, subdivision 1a, is amended to read:

Subd. 1a.

Large customer facility.

(a) The owner of a large customer facility may

petition the commissioner to exempt both electric and gas utilities serving the large customer

facility from contributing to investments and expenditures made under an energy and

conservation optimization plan filed under subdivision 2 or section
216B.2403, subdivision

3
, with respect to retail revenues attributable to the large customer facility. The filing must

include a discussion of the competitive or economic pressures facing the owner of the facility

and the efforts taken by the owner to identify, evaluate, and implement energy conservation

and efficiency improvements. A filing submitted on or before October 1 of any year must

be approved within 90 days and become effective January 1 of the year following the filing,

unless the commissioner finds that the owner of the large customer facility has failed to

take reasonable measures to identify, evaluate, and implement energy conservation and

efficiency improvements. If a facility qualifies as a large customer facility solely due to its

peak electrical demand or annual natural gas usage, the exemption may be limited to the

qualifying utility if the commissioner finds that the owner of the large customer facility has

failed to take reasonable measures to identify, evaluate, and implement energy conservation

and efficiency improvements with respect to the nonqualifying utility. Once an exemption

is approved, the commissioner may request the owner of a large customer facility to submit,

not more often than once every five years, a report demonstrating the large customer facility's

ongoing commitment to energy conservation and efficiency improvement after the exemption

filing. The commissioner may request such reports for up to ten years after the effective

date of the exemption, unless the majority ownership of the large customer facility changes,

in which case the commissioner may request additional reports for up to ten years after the

change in ownership occurs. The commissioner may, within 180 days of receiving a report

submitted under this paragraph, rescind any exemption granted under this paragraph upon

a determination that the large customer facility is not continuing to make reasonable efforts

to identify, evaluate, and implement energy conservation improvements. A large customer

facility that is, under an order from the commissioner, exempt from the investment and

expenditure requirements of paragraph (a) as of December 31, 2010, is not required to

submit a report to retain its exempt status, except as otherwise provided in this paragraph

with respect to ownership changes. No exempt large customer facility may participate in a

utility conservation improvement program unless the owner of the facility submits a filing

with the commissioner to withdraw its exemption.
new text begin
A data center that pays the required fee

under section 216B.72 is exempt from the requirement to contribute to investments and

expenditures made under an energy conservation optimization plan filed under subdivision

2 or section 216B.2403, subdivision 3, and is not required to comply with the provisions

of this paragraph.
new text end

(b) A commercial gas customer that is not a large customer facility and that purchases

or acquires natural gas from a public utility having fewer than 600,000 natural gas customers

in Minnesota may petition the commissioner to exempt gas utilities serving the commercial

gas customer from contributing to investments and expenditures made under an energy and

conservation optimization plan filed under subdivision 2 or section
216B.2403, subdivision

3
, with respect to retail revenues attributable to the commercial gas customer. The petition

must be supported by evidence demonstrating that the commercial gas customer has acquired

or can reasonably acquire the capability to bypass use of the utility's gas distribution system

by obtaining natural gas directly from a supplier not regulated by the commission. The

commissioner shall grant the exemption if the commissioner finds that the petitioner has

made the demonstration required by this paragraph.

(c) A public utility, consumer-owned utility, or owner of a large customer facility may

appeal a decision of the commissioner under paragraph (a) or (b) to the commission under

subdivision 2. In reviewing a decision of the commissioner under paragraph (a) or (b), the

commission shall rescind the decision if it finds the decision is not in the public interest.

(d) Notwithstanding paragraph (a), a large customer facility or commercial gas customer

that is exempt from the investment and expenditure requirements of this section pursuant

to an order from the commissioner as of December 31, 2020, is not required to submit

additional documentation to maintain the exemption and must not be assessed any costs

related to any energy conservation and optimization plan filed under this section or section

216B.2403
, including but not limited to costs, incentives, or rates of return associated with

investments in programs for efficient fuel-switching improvements.

(e) A public utility is prohibited from spending for or investing in energy conservation

improvements that directly benefit a large energy facility or a large electric customer facility

the commissioner has issued an exemption to under this section.

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 6.

Minnesota Statutes 2024, section 216B.241, subdivision 2a, is amended to read:

Subd. 2a.

Energy and conservation account.

new text begin
(a)
new text end
The energy and conservation account

is established in the special revenue fund in the state treasury.

new text begin

(b)
new text end
The commissioner must deposit money assessed or contributed under subdivisions

1d, 1e, 1f, and 7 in the state treasury and credit it to the energy and conservation account

in the special revenue fund. Money in the account
new text begin
assessed or contributed under subdivisions

1d, 1e, and 1f
new text end
is appropriated to the commissioner for the purposes of subdivisions 1d, 1e,

1f, and 7.

new text begin

(c) The commissioner must deposit money transferred from the fee on data centers

established in section 216B.72 in the state treasury and credit it to the account. Money

transferred from the fee on data centers is appropriated to the commissioner to conduct

energy conservation, weatherization, and associated activities allowed under sections

216B.2403 and 216B.241, and the rules applicable to those sections. The commissioner

may spend money appropriated under this paragraph anywhere in the state, but only:

new text end

new text begin

(1) on low-income programs; and

new text end

new text begin

(2) as the result of a request for proposals process administered by the department.

new text end

new text begin

(d)
new text end
Interest on money in the account accrues to the account.

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 7.

Minnesota Statutes 2024, section 216B.2421, subdivision 2, is amended to read:

Subd. 2.

Large energy facility.

"Large energy facility" means:

(1) any electric power generating plant or combination of plants at a single site with a

combined capacity of 50,000 kilowatts or more and transmission lines directly associated

with the plant that are necessary to interconnect the plant to the transmission system
new text begin
. Large

energy facility includes backup generators designed to provide electricity to a data center,

as defined in section 216B.71, with a combined capacity of 50,000 kilowatts or more
new text end
;

(2) any high-voltage transmission line with a capacity of 300 kilovolts or more and

greater than one mile in length in Minnesota;

(3) any high-voltage transmission line with a capacity of 100 kilovolts or more with

more than ten miles of its length in Minnesota;

(4) any pipeline greater than six inches in diameter and having more than 50 miles of

its length in Minnesota used for the transportation of coal, crude petroleum or petroleum

fuels or oil, or their derivatives;

(5) any pipeline for transporting natural or synthetic gas at pressures in excess of 200

pounds per square inch with more than 50 miles of its length in Minnesota;

(6) any facility designed for or capable of storing on a single site more than 100,000

gallons of liquefied natural gas or synthetic gas;

(7) any underground gas storage facility requiring a permit pursuant to section
103I.681
;

(8) any nuclear fuel processing or nuclear waste storage or disposal facility; and

(9) any facility intended to convert any material into any other combustible fuel and

having the capacity to process in excess of 75 tons of the material per hour.

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 8.

new text begin

[216B.71] DATA CENTERS; ENERGY REQUIREMENTS.

new text end

new text begin

Subdivision 1.

new text end

new text begin

Definitions.

new text end

new text begin

(a) For purposes of this section, the following terms have

the meanings given.

new text end

new text begin

(b) "Carbon-free" has the meaning given in section 216B.1691, subdivision 1.

new text end

new text begin

(c) "Data center" means a facility whose primary purpose is the storage, management,

and processing of digital data via the interconnection and operation of information technology

and network telecommunications equipment, including all related facilities and infrastructure

for power distribution, environmental control, cooling, and security, and whose average

hourly electrical load is 100 megawatts or greater.

new text end

new text begin

(d) "Political subdivision" means a county, statutory or home rule charter city, town, the

Metropolitan Council, a port authority, economic development authority, redevelopment

agency established under chapter 469, or regional development commission.

new text end

new text begin

Subd. 2.

new text end

new text begin

Carbon-free energy.

new text end

new text begin

(a) A data center must, prior to December 31, 2030,

arrange to generate or procure carbon-free energy equal to at least 65 percent of its electricity

consumption, measured on an hourly basis.

new text end

new text begin

(b) After December 31, 2030, a data center must generate or purchase carbon-free energy

equal to 100 percent of its electricity requirements, measured on an hourly basis.

new text end

new text begin

(c) Tracking and verification of compliance with this subdivision shall be determined

by the Minnesota Renewable Energy Tracking System or another qualified entity approved

by the commission.

new text end

new text begin

(d) Each data center shall, before beginning operations in this state, submit a plan to the

commission describing the actions it intends to take to comply with the requirement of

paragraph (b), and shall make additional filings as required by the commission.

new text end

new text begin

(e) The commission may delay or modify a data center's compliance with the requirements

of paragraph (a) or (b) if it determines that technical constraints impair the ability to

accurately track and verify carbon-free energy transactions at an hourly level so as to enable

compliance with those requirements.

new text end

new text begin

Subd. 3.

new text end

new text begin

State energy targets; modification.

new text end

new text begin

If a utility determines that providing

electric service to a data center may, in whole or in part, contribute to the utility's inability

to achieve a standard mandated under section 216B.1691, the utility must, no later than two

years before the standard is required to be met, submit a filing to the commission containing

a plan describing actions the utility intends to implement in order to achieve the standard

in a timely manner. The commission shall review and may accept, reject, or modify the plan

and may issue an order requiring implementation of an approved plan. The commission

shall require a utility whose plan was approved under this subdivision to file reports with

the commission describing actions taken and progress made in achieving the standard, on

a schedule determined by the commission.

new text end

new text begin

Subd. 4.

new text end

new text begin

Prevailing wage.

new text end

new text begin

A contractor or subcontractor that constructs any portion of

a data center:

new text end

new text begin

(1) must pay no less than the prevailing wage rate, as defined in section 177.42; and

new text end

new text begin

(2) is subject to the requirements and enforcement provisions under sections 177.27,

177.30, 177.32, 177.41 to 177.435, and 177.45.

new text end

new text begin

Subd. 5.

new text end

new text begin

Reporting.

new text end

new text begin

(a) Within one year of being placed in service, and annually

thereafter on a schedule determined by the commissioner, a data center owner must report

the following information to the commissioner on a form and on a schedule prescribed by

the commissioner of commerce:

new text end

new text begin

(1) energy consumption during the most recently completed year and during each of the

past five years, if applicable, and projections of energy consumption for the coming year;

new text end

new text begin

(2) efforts made to reduce energy consumption;

new text end

new text begin

(3) efforts made to reduce waste heat and to utilize it as thermal energy or electricity;

and

new text end

new text begin

(4) the amount, type, and country of origin of metals used to construct the data center,

and the percentage of metals used that were recycled.

new text end

new text begin

(b) Within one year of being placed in service, and annually thereafter on a schedule

determined by the commissioner of natural resources, a data center owner must report the

following information to the commissioner of natural resources, on a form and on a schedule

prescribed by the commissioner of natural resources:

new text end

new text begin

(1) the amount of water withdrawn under the data center's water use permit;

new text end

new text begin

(2) the amount of water discharged by the data center to groundwater or surface waters;

and

new text end

new text begin

(3) the amount of water evaporated when used for cooling data center equipment.

new text end

new text begin

Subd. 6.

new text end

new text begin

Noncompliance; ineligibility for financial assistance.

new text end

new text begin

Notwithstanding any

other law, a data center that fails to comply with any of the requirements of this section is

ineligible to receive any financial incentives provided by this state for which it is otherwise

eligible, including tax incentives, until it has submitted documentation of compliance to the

commissioner of commerce and has received written notice from the commissioner of

commerce that it is in compliance with all the provisions of this section.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 9.

new text begin

[216B.72] DATA CENTER FEE.

new text end

new text begin

(a) A fee of $....... is imposed on a data center, as defined in section 216B.71, for each

megawatt of the data center's peak demand. The fee must be collected monthly by the utility

providing electric service to the data center and deposited in the energy and conservation

account established in section 216B.241, subdivision 2a.

new text end

new text begin

(b) For the purposes of this section, "peak demand" means the largest demand a data

center imposes on an electric utility's system, expressed in megawatts, during a 30-minute

period within the most recent month.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end

Sec. 10.
new text begin
CLEAN ENERGY TARIFF.
new text end

new text begin

(a) No later than January 1, 2026, the Public Utilities Commission shall develop and

establish a clean energy tariff and terms and conditions for energy supply agreements under

which a separate customer class composed solely of all data centers receiving electric service

from a public utility located in this state must operate. The tariff and energy supply agreement

must be designed to insulate the utility's other customers from the energy costs attributable

to data centers and to ensure that arrangements made to provide electric service to a data

center will:

new text end

new text begin

(1) not interfere with or jeopardize a utility's achieving the mandated renewable energy

and carbon-free standards established under Minnesota Statutes, sections 216B.1691 and

216B.71, subdivision 2;

new text end

new text begin

(2) not impair a utility's system reliability or its ability to provide electric service to its

other customers;

new text end

new text begin

(3) require payment of the data center's full portion of the utility's cost to procure

electricity, and for the full transmission and distribution costs necessary to deliver that

electricity to the data center, including any construction or upgrading of transmission,

distribution, or other utility infrastructure; and

new text end

new text begin

(4) ensure that ratepayers are fully protected from bearing any portion of the cost resulting

from:

new text end

new text begin

(i) a data center's failure to meet its projected level of electricity demand;

new text end

new text begin

(ii) a data center's termination of its operations in this state earlier than agreed to in an

energy supply agreement;

new text end

new text begin

(iii) an electricity supplier's failure to fully meet the terms of its supply contract with

the utility; or

new text end

new text begin

(iv) early termination of an energy supply agreement.

new text end

new text begin

(b) The Public Utilities Commission may require a data center to post a bond of sufficient

magnitude to guarantee performance under the tariff and energy supply agreement.

new text end

new text begin

(c) For purposes of this section, the following terms have the meanings given:

new text end

new text begin

(1) "data center" has the meaning given in Minnesota Statutes, section 216B.71,

subdivision 1; and

new text end

new text begin

(2) "energy supply agreement" means an agreement between a data center and a utility

providing electric service to a data center governing the transfer of electricity from a generator

to the data center under a clean energy tariff.

new text end

new text begin

EFFECTIVE DATE.

new text end

new text begin

This section is effective the day following final enactment.

new text end