Back to Montana

SB262 • 2025

Exempt subdivision, water/sewer plans from environmental review

Exempt subdivision, water/sewer plans from environmental review

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Forrest Mandeville
Last action
2025-05-08
Official status
Chapter Number Assigned
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Exempt subdivision, water/sewer plans from environmental review

Exempt subdivision, water/sewer plans from environmental review

What This Bill Does

  • Exempt subdivision, water/sewer plans from environmental review

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

COMMITTEE

Plain English: COMMITTEE 2

  • The official amendment file could not be read automatically during the last sync, so only the official amendment metadata is shown right now.

Bill History

  1. 2025-05-08 SENATE

    Chapter Number Assigned

  2. 2025-05-05 SENATE

    (S) Signed by Governor

  3. 2025-04-25 HOUSE

    (H) Signed by Speaker

  4. 2025-04-25 SENATE

    (S) Transmitted to Governor

  5. 2025-04-21 SENATE

    (S) Signed by President

  6. 2025-04-12 SENATE

    (S) Returned from Enrolling

  7. 2025-04-11 HOUSE

    (H) Scheduled for 3rd Reading

  8. 2025-04-11 HOUSE

    (H) 3rd Reading Concurred

  9. 2025-04-11 SENATE

    (S) Sent to Enrolling

  10. 2025-04-10 HOUSE

    (H) Scheduled for 2nd Reading

  11. 2025-04-10 HOUSE

    (H) 2nd Reading Concurred

  12. 2025-03-28 HOUSE

    (H) Committee Report--Bill Concurred

  13. 2025-03-27 HOUSE

    (H) Committee Executive Action--Bill Concurred

  14. 2025-03-07 HOUSE

    (H) Hearing

  15. 2025-03-06 HOUSE

    (H) Hearing

  16. 2025-02-22 HOUSE

    (H) Referred to Committee

  17. 2025-02-22 HOUSE

    (H) First Reading

  18. 2025-02-21 SENATE

    (S) Scheduled for 3rd Reading

  19. 2025-02-21 SENATE

    (S) 3rd Reading Passed

  20. 2025-02-21 SENATE

    (S) Transmitted to House

  21. 2025-02-20 SENATE

    (S) Scheduled for 2nd Reading

  22. 2025-02-20 SENATE

    (S) 2nd Reading Passed

  23. 2025-02-18 SENATE

    (S) Committee Report--Bill Passed

  24. 2025-02-17 SENATE

    (S) Committee Executive Action--Bill Passed

  25. 2025-02-07 SENATE

    (S) Fiscal Note Received

  26. 2025-02-07 SENATE

    (S) Fiscal Note Unsigned

  27. 2025-02-07 SENATE

    (S) Fiscal Note Unsigned

  28. 2025-02-07 SENATE

    (S) Fiscal Note Printed

  29. 2025-02-07 SENATE

    (S) Hearing

  30. 2025-02-05 SENATE

    (S) Referred to Committee

  31. 2025-02-04 HOUSE

    (LC) Draft Delivered to Requester

  32. 2025-02-04 SENATE

    (S) Introduced

  33. 2025-02-04 SENATE

    (S) First Reading

  34. 2025-01-31 HOUSE

    (LC) Draft in Assembly

  35. 2025-01-31 HOUSE

    (LC) Draft Ready for Delivery

  36. 2025-01-30 HOUSE

    (LC) Draft in Final Drafter Review

  37. 2025-01-29 HOUSE

    (LC) Draft in Input/Proofing

  38. 2025-01-26 HOUSE

    (LC) Draft in Edit

  39. 2025-01-25 HOUSE

    (LC) Draft in Legal Review

  40. 2024-10-21 HOUSE

    (LC) Drafter Assigned

Official Summary Text

Exempt subdivision, water/sewer plans from environmental review

Current Bill Text

Read the full stored bill text
****
69th Legislature 2025 SB 262
- 1 - Authorized Print Version – SB 262
ENROLLED BILL
AN ACT EXEMPTING THE REVIEW OF CERTAIN SUBDIVISION APPLICATIONS AND WATER OR SEWER
PLANS FROM ENVIRONMENTAL REVIEW; PROVIDING AN EXEMPTION TO LOCAL GOVERNMENTS AND
INDEPENDENT REVIEWERS; REVISING RULEMAKING AUTHORITY; AND AMENDING SECTIONS 75-6-
121, 76-4-104, AND 76-4-136, MCA.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
Section 1. Exemption from environmental review. The department is exempt from the provisions
of Title 75, chapter 1, parts 1 and 2 when reviewing water or sewer system plans or specifications under this
part.
Section 2. Section 75-6-121, MCA, is amended to read:
"75-6-121. Delegation of review of small public water and sewer construction. (1) If a local
government requests a delegation and the appropriate division of the local government has established
satisfactory review programs, the department shall delegate to the division of local government the review of:
(a) small public water and sewer systems; and
(b) extensions or alterations of existing public water and sewer systems.
(2) The department shall adopt rules regarding the delegation of review authority to divisions of
local government.
(3) A division of local government conducting a review under this section:
(a) must receive 90% of the review fee, and the department must receive the remaining 10% of the
review fee; and
(b) shall complete documents necessary to complete the review and to comply with:
(i) the Montana Environmental Policy Act provided for in Title 75, chapter 1, parts 1 through 3;
****
69th Legislature 2025 SB 262
- 2 - Authorized Print Version – SB 262
ENROLLED BILL
(ii) real property takings requirements in accordance with Title 70; and
(iii)(ii) determinations of nondegredation and nonsignificance as required in Title 75, chapter 5."
Section 3. Section 76-4-104, MCA, is amended to read:
"76-4-104. Rules for administration and enforcement. (1) The department shall, subject to the
provisions of 76-4-135, adopt reasonable rules, including adoption of sanitary standards, necessary for
administration and enforcement of this part.
(2) The rules and standards must provide the basis for approving subdivisions for various types of
public and private water supplies, sewage disposal facilities, storm water drainage ways, and solid waste
disposal. The rules and standards must be related to:
(a) size of lots;
(b) contour of land;
(c) porosity of soil;
(d) ground water level;
(e) distance from lakes, streams, and wells;
(f) type and construction of private water and sewage facilities; and
(g) other factors affecting public health and the quality of water for uses relating to agriculture,
industry, recreation, and wildlife.
(3) The storm drainage review requirements of this chapter do not apply to divisions or parcels of
land that are exempt from review under 76-3-207(1)(a), (1)(d), (1)(e), or (1)(f) that:
(a) are used for a single-family residential purpose; and
(b) include no more than 25% that is impervious.
(4) (a) Except as provided in subsection (4)(b), the rules must provide for the review of
subdivisions consistent with 76-4-114 by a local department or board of health, as described in Title 50, chapter
2, part 1, if the local department or board of health employs a registered sanitarian or a registered professional
engineer and if the department certifies under subsection (5) that the local department or board is competent to
conduct the review.
(b) (i) Except as provided in 75-6-121 and subsection (4)(b)(ii) of this section, a local department or
****
69th Legislature 2025 SB 262
- 3 - Authorized Print Version – SB 262
ENROLLED BILL
board of health may not review public water supply systems, public sewage systems, or extensions of or
connections to these systems.
(ii) A local department or board of health may be certified by the department to review subdivisions
proposed to connect to existing municipal or county water and/or sewer district water and wastewater systems
previously approved by the department if no extension of the systems is required.
(5) (a) The department shall also adopt standards and procedures for certification and maintaining
certification to ensure that a local department, local board of health, or independent reviewer is competent to
review the subdivisions as described in subsection (4).
(b) On or before December 31, 2023, the department shall develop procedures for certification of
prequalified independent reviewers and develop a training curriculum to ensure compliance with this part.
(6) The department shall review those subdivisions described in subsection (4) if:
(a) a proposed subdivision lies within more than one jurisdictional area and the respective
governing bodies are in disagreement concerning approval of or conditions to be imposed on the proposed
subdivision; or
(b) the local department or board of health elects not to be certified.
(7) The rules must further provide for:
(a) providing the reviewing authority with a copy of the plat or certificate of survey subject to review
under this part and other documentation showing the layout or plan of development, including:
(i) total development area; and
(ii) total number of proposed units and structures requiring facilities for water supply or sewage
disposal;
(b) adequate evidence that a water supply that is sufficient in terms of quality, quantity, and
dependability will be available to ensure an adequate supply of water for the type of subdivision proposed;
(c) evidence concerning the potability of the proposed water supply for the subdivision;
(d) adequate evidence that a sewage disposal facility is sufficient in terms of capacity and
dependability;
(e) standards and technical procedures applicable to storm drainage plans and related designs, in
order to ensure proper drainage ways, except that the rules must provide a basis for not requiring storm water
****
69th Legislature 2025 SB 262
- 4 - Authorized Print Version – SB 262
ENROLLED BILL
review under this part for parcels 5 acres and larger on which the total impervious area does not and will not
exceed 5%. Nothing in this section relieves any person of the duty to comply with the requirements of Title 75,
chapter 5, or rules adopted pursuant to Title 75, chapter 5.
(f) standards and technical procedures applicable to sanitary sewer plans and designs, including
soil testing and site design standards for on-lot sewage disposal systems when applicable;
(g) standards and technical procedures applicable to water systems;
(h) standards and technical procedures applicable to solid waste disposal;
(i) adequate evidence that a proposed drainfield mixing zone and a proposed well isolation zone
are located wholly within the boundaries of the proposed subdivision where the proposed drainfield or well is
located or that an easement or, for public land, other authorization has been obtained from the landowner to
place the proposed drainfield mixing zone or proposed well isolation zone outside the boundaries of the
proposed subdivision where the proposed drainfield or proposed well is located.
(i) A proposed drainfield mixing zone or a proposed well isolation zone for an individual water
system well that is a minimum of 50 feet inside the subdivision boundary may extend outside the boundaries of
the subdivision onto adjoining land that is dedicated for use as a right-of-way for roads, railroads, or utilities.
(ii) This subsection (7)(i) does not apply to the divisions provided for in 76-3-207 except those
under 76-3-207(1)(b). Nothing in this section is intended to prohibit the extension, construction, or
reconstruction of or other improvements to a public sewage system within a well isolation zone that extends
onto land that is dedicated for use as a right-of-way for roads, railroads, or utilities.
(j) criteria for granting waivers and deviations from the standards and technical procedures
adopted under subsections (7)(e) through (7)(i);
(k) evidence to establish that, if a public water supply system or a public sewage system is
proposed, provision has been made for the system and, if other methods of water supply or sewage disposal
are proposed, evidence that the systems will comply with state and local laws and regulations that are in effect
at the time of submission of the subdivision application under this chapter. Evidence that the systems will
comply with local laws and regulations must be in the form of a certification from the local health department as
provided by department rule.
(l) evidence to demonstrate that appropriate easements, covenants, agreements, and
****
69th Legislature 2025 SB 262
- 5 - Authorized Print Version – SB 262
ENROLLED BILL
management entities have been established to ensure the protection of human health and state waters and to
ensure the long-term operation and maintenance of water supply, storm water drainage, and sewage disposal
facilities;
(m) eligibility requirements for municipalities and county water and/or sewer districts to qualify as a
certifying authority under the provisions of 76-4-127;
(n) construction details for individual and shared onsite wastewater systems to be reviewed by the
local board of health at the time of septic permitting, except that the reviewing authority may require additional
construction detail if the wastewater is not residential strength;
(o) simplified methods for storm water reviews, including acceptable minimum storm water
volumes based solely on impervious area for proposed lots with one or two single-family residences; and
(p) a basis for exempting from review facilities previously approved under this chapter or by a local
reviewing authority of the facility is not proposed to be changed, is not affected by a proposed change to
another facility, and meets the design conditions of its existing approval under this chapter or by the local
authority and is operating properly. Existing systems must meet the current setbacks established in rule and
subsection (7)(i), unless the lot was created before the relevant effective dates for mixing zones and isolation
zones.
(8) The requirements of subsection (7)(i) regarding proposed drainfield mixing zones and proposed
well isolation zones apply to all subdivisions or divisions excluded from review under 76-4-125 created after
October 1, 2021, except as provided in subsections (7)(i)(i) and (7)(i)(ii).
(9) The department shall:
(a) conduct a biennial review of experimental wastewater system components that have been
granted a waiver or deviation as provided in subsection (7)(j);
(b) utilize relevant analysis of wastewater system components approved in other states and data
from peer-reviewed third-party studies to conduct the review provided in subsection (9)(a);
(c) propose those experimental wastewater system components that meet the purposes and
provisions of this part for adoption into the rules pursuant to this section; and
(d) report to the local government interim committee biennially, in accordance with 5-11-210, the
number and type of experimental wastewater system components reviewed and the number and type of system
****
69th Legislature 2025 SB 262
- 6 - Authorized Print Version – SB 262
ENROLLED BILL
components approved and provide written findings to explain why a system component was reviewed but not
approved.
(10) Review and certification or denial of certification that a division of land is not subject to sanitary
restrictions under this part may occur only under those rules in effect when a complete application is submitted
to the reviewing authority, except that in cases in which current rules would preclude the use for which the lot
was originally intended, the applicable requirements in effect at the time the lot was recorded must be applied.
In the absence of specific requirements, minimum standards necessary to protect public health and water
quality apply.
(11) The reviewing authority may not deny or condition a certificate of subdivision approval under
this part unless it provides a written statement to the applicant detailing the circumstances of the denial or
condition imposition. The statement must include:
(a) the reason for the denial or condition imposition;
(b) the evidence that justifies the denial or condition imposition; and
(c) information regarding the appeal process for the denial or condition imposition.
(12) (a) Subject to subsection (12)(b), the department may adopt rules that provide technical details
and clarification regarding the water and sanitation information required to be submitted under 76-3-622.
(b) A subdivider may locate a water well anywhere on a lot, parcel, or tract of record if the
subdivider maintains the minimum setback distances adopted in rule. The reviewing authority may not limit a
subdivider to a single proposed well location.
(13) (a) The rules must provide for the review of subdivisions consistent with 76-4-114 by an
independent reviewer if the department certifies under subsection (5) of this section that the independent
reviewer is competent to conduct the review.
(b) (i) Except as provided in subsection (13)(b)(ii), an independent reviewer may not review public
water supply systems, public sewage systems, or extensions of or connections to these systems.
(ii) An independent reviewer may be certified by the department to review subdivisions proposed
to connect to existing municipal or county water and/or sewer district water and wastewater systems previously
approved by the department if no extension of the system is required.
(c) If 110 or more new files are submitted to the department for review in any 1 month, the
****
69th Legislature 2025 SB 262
- 7 - Authorized Print Version – SB 262
ENROLLED BILL
department shall assign applications received in that month to independent reviewers unless an independent
reviewer is not available.
(d) The department shall reimburse independent reviewers at the same rate the department
reimburses local departments or local boards of health certified under subsection (4).
(14) Prior to being assigned an application for review, an independent reviewer shall identify any
conflict of interest related to the project under potential review. If the independent reviewer identifies a conflict
of interest, the application for review must be assigned to a different independent reviewer.
(15) An independent reviewer acting under the requirements of this chapter shall comply with the
provisions of Title 2, chapter 6, for public information requests.
(16) An independent reviewer conducting reviews under this section shall complete documents
necessary to complete the review and to comply with:
(a) the Montana Environmental Policy Act provided for in Title 75, chapter 1, parts 1 through 3; and
(b) real property takings requirements in accordance with Title 70."
Section 4. Section 76-4-136, MCA, is amended to read:
"76-4-136. Exemption from environmental review -- rulemaking. (1) Except as provided in
subsection (2), the The department is exempt from the provisions of Title 75, chapter 1, parts 1 and 2, when
reviewing applications under this part for subdivisions that:
(a) are located 2 or more miles from high-quality waters, as defined in 75-5-103;
(b) include 14 or fewer single-family residential subdivision lots;
(c) include wastewater systems that meet nonsignificance criteria established in rule; and
(d) demonstrate full compliance with the acquisition of necessary water rights and water
availability.
(2) The exemption provided for in subsection (1) does not apply to subdivision applications that
expand or are adjacent to projects exempted from the provisions of Title 75, chapter 1, parts 1 and 2, after May
2, 2023.
(3) The department shall adopt rules to implement this section."
****
69th Legislature 2025 SB 262
- 8 - Authorized Print Version – SB 262
ENROLLED BILL
Section 5. Codification instruction. [Section 1] is intended to be codified as an integral part of Title
75, chapter 6, and the provisions of Title 75, chapter 6, apply to [section 1].
- END -
I hereby certify that the within bill,
SB 262, originated in the Senate.
___________________________________________
Secretary of the Senate
___________________________________________
President of the Senate
Signed this _______________________________day
of____________________________________, 2025.
___________________________________________
Speaker of the House
Signed this _______________________________day
of____________________________________, 2025.
SENATE BILL NO. 262
INTRODUCED BY F. MANDEVILLE
AN ACT EXEMPTING THE REVIEW OF CERTAIN SUBDIVISION APPLICATIONS AND WATER OR SEWER
PLANS FROM ENVIRONMENTAL REVIEW; PROVIDING AN EXEMPTION TO LOCAL GOVERNMENTS AND
INDEPENDENT REVIEWERS; REVISING RULEMAKING AUTHORITY; AND AMENDING SECTIONS 75-6-
121, 76-4-104, AND 76-4-136, MCA.