Back to Montana

SB365 • 2025

Revise siltation structure capacity at mines

Revise siltation structure capacity at mines

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Barry Usher
Last action
2025-04-18
Official status
Chapter Number Assigned
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Revise siltation structure capacity at mines

Revise siltation structure capacity at mines

What This Bill Does

  • Revise siltation structure capacity at mines

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

COMMITTEE

Plain English: Amendment - 1st Reading-white - Requested by: Barry Usher - (S) Natural Resources - 2025 69th Legislature 2025 Drafter: Toni Henneman, SB0365.001.001 - 1 - Authorized Print Version – SB 365 1 SENATE BILL NO.

  • Amendment - 1st Reading-white - Requested by: Barry Usher - (S) Natural Resources - 2025 69th Legislature 2025 Drafter: Toni Henneman, SB0365.001.001 - 1 - Authorized Print Version – SB 365 1 SENATE BILL NO.
  • 365 2 INTRODUCED BY B.
  • USHER, V.
  • RICCI, W.

Bill History

  1. 2025-04-18 SENATE

    Chapter Number Assigned

  2. 2025-04-17 SENATE

    (S) Signed by Governor

  3. 2025-04-08 HOUSE

    (H) Signed by Speaker

  4. 2025-04-08 SENATE

    (S) Transmitted to Governor

  5. 2025-04-07 SENATE

    (S) Signed by President

  6. 2025-04-02 SENATE

    (S) Returned from Enrolling

  7. 2025-03-31 HOUSE

    (H) Scheduled for 3rd Reading

  8. 2025-03-31 HOUSE

    (H) 3rd Reading Concurred

  9. 2025-03-31 SENATE

    (S) Sent to Enrolling

  10. 2025-03-29 HOUSE

    (H) Scheduled for 2nd Reading

  11. 2025-03-29 HOUSE

    (H) 2nd Reading Concurred

  12. 2025-03-24 HOUSE

    (H) Committee Report--Bill Concurred

  13. 2025-03-21 HOUSE

    (H) Committee Executive Action--Bill Concurred

  14. 2025-03-19 HOUSE

    (H) Hearing

  15. 2025-03-17 HOUSE

    (H) First Reading

  16. 2025-03-07 HOUSE

    (H) Referred to Committee

  17. 2025-03-06 SENATE

    (S) Scheduled for 3rd Reading

  18. 2025-03-06 SENATE

    (S) 3rd Reading Passed

  19. 2025-03-06 SENATE

    (S) Transmitted to House

  20. 2025-03-05 SENATE

    (S) Scheduled for 2nd Reading

  21. 2025-03-05 SENATE

    (S) 2nd Reading Passed

  22. 2025-03-01 SENATE

    (S) Committee Report--Bill Passed as Amended

  23. 2025-02-28 SENATE

    (S) Committee Executive Action--Bill Passed as Amended

  24. 2025-02-21 SENATE

    (S) Referred to Committee

  25. 2025-02-21 SENATE

    (S) Hearing

  26. 2025-02-19 SENATE

    (S) Introduced

  27. 2025-02-19 SENATE

    (S) First Reading

  28. 2025-02-17 HOUSE

    (LC) Draft Delivered to Requester

  29. 2025-02-15 HOUSE

    (LC) Draft Ready for Delivery

  30. 2025-02-14 HOUSE

    (LC) Draft in Final Drafter Review

  31. 2025-02-14 HOUSE

    (LC) Draft in Assembly

  32. 2025-02-12 HOUSE

    (LC) Draft in Input/Proofing

  33. 2025-02-07 HOUSE

    (LC) Draft in Edit

  34. 2025-02-06 HOUSE

    (LC) Draft in Legal Review

  35. 2025-01-24 HOUSE

    (LC) Draft Taken Off Hold

  36. 2025-01-10 HOUSE

    (LC) Draft On Hold

  37. 2024-11-16 HOUSE

    (LC) Drafter Assigned

Official Summary Text

Revise siltation structure capacity at mines

Current Bill Text

Read the full stored bill text
- 2025
69th Legislature 2025 SB 365
- 1 - Authorized Print Version – SB 365
ENROLLED BILL
AN ACT REVISING CAPACITY REQUIREMENTS FOR SILTATION STRUCTURES AT A STRIP MINE OR
UNDERGROUND MINE; PROVIDING RULEMAKING AUTHORITY; AMENDING SECTION 82-4-231, MCA;
PROVIDING FOR CONTINGENT VOIDNESS; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:
Section 1. Section 82-4-231, MCA, is amended to read:
"82-4-231. Submission of and action on reclamation plan. (1) As rapidly, completely, and
effectively as the most modern technology and the most advanced state of the art will allow, each operator
granted a permit under this part shall reclaim and revegetate the land affected by the operation, except that
underground tunnels, shafts, or other subsurface excavations need not be revegetated. Under the provisions of
this part and rules adopted by the department, an operator shall prepare and carry out a method of operation, a
plan of grading, backfilling, highwall reduction, subsidence stabilization, water control, and topsoiling and a
reclamation plan for the area of land affected by the operation. In developing a method of operation and plans
of grading, backfilling, highwall reduction, subsidence stabilization, water control, topsoiling, and reclamation, all
measures must be taken to eliminate damages to landowners and members of the public, their real and
personal property, public roads, streams, and all other public property from soil erosion, subsidence, landslides,
water pollution, and hazards dangerous to life and property.
(2) The reclamation plan must set forth in detail the manner in which the applicant intends to
comply with 82-4-232 through 82-4-234 and this section and the steps to be taken to comply with applicable air
and water quality laws and rules and any applicable health and safety standards.
(3) The application for a permit or major revision of a permit, which must contain the reclamation
plan, must be submitted to the department.
(4) The department shall determine whether the application is administratively complete. An
- 2025
69th Legislature 2025 SB 365
- 2 - Authorized Print Version – SB 365
ENROLLED BILL
application is administratively complete if it contains information addressing each application requirement in 82-
4-222 and the rules implementing that section and all information necessary to initiate processing and public
review. The department shall notify the applicant in writing of its determination no later than 90 days after
submittal of the application. If the department determines that the application is not administratively complete, it
shall specify in the notice those items that the application must address. The application is presumed
administratively complete as to those requirements not specified in the notice.
(5) If the department determines that an environmental impact statement on the application is
required, it shall notify the applicant in writing at the same time it gives the applicant notice pursuant to
subsection (4).
(6) After the applicant receives notice that the application is administratively complete, the
applicant shall publish notice of filing of the application once a week for 4 consecutive weeks in a newspaper of
general circulation in the locality of the proposed operation. The department shall notify various local
governmental bodies, planning agencies, sewage and water treatment authorities, and water companies in the
locality in which the proposed mining will take place of the application and provide a reasonable time for them
to submit written comments. Any person having an interest that is or may be adversely affected or the officer or
head of any federal, state, or local governmental agency or authority may file written objections to the proposed
initial or revised application for permit or major revision within 30 days of the applicant's published notice. If
written objections are filed and an objector requests an informal conference, the department shall hold an
informal conference in the locality of the proposed operation within 30 days of receipt of the request. The
department shall notify the applicant and all parties to the informal conference of its decision and the reasons
for its decision within 60 days of the informal conference. The department may arrange with the applicant upon
request by any party to the administrative proceeding for access to the proposed mining area for the purpose of
gathering information relevant to the proceeding.
(7) The filing of written objections or a request for an informal conference may not preclude the
department from proceeding with its review of the application as specified in subsection (8).
(8) (a) The department shall review each administratively complete application and determine the
acceptability of the application. During the review, the department may propose modifications to the application
or delete areas from the application in accordance with the requirements of 82-4-227. A complete application is
- 2025
69th Legislature 2025 SB 365
- 3 - Authorized Print Version – SB 365
ENROLLED BILL
considered acceptable when the application is in compliance with all of the applicable requirements of this part
and the regulatory program pursuant to this part.
(b) If the applicant significantly modifies the application after the application has been determined
administratively complete in accordance with subsection (4), the department shall under this section either deny
the application or conduct a new review, including an administrative completeness determination, public notice,
and objection period.
(c) If an environmental impact statement is determined to be necessary prior to making a permit
decision, the department shall complete and publish the final environmental impact statement at least 15 days
prior to the date of issuance of the written findings pursuant to subsection (8)(f).
(d) Except as provided in 75-1-205(4) and 75-1-208(4)(b), within 120 days after it determines that
an application is administratively complete, the department shall notify the applicant in writing whether the
application is or is not acceptable. If the application is not acceptable, the department shall set forth the reasons
why it is not acceptable, and it may propose modifications, delete areas, or reject the entire application. All
items not specified as unacceptable in the department's notification are presumed to be acceptable. Except as
provided in 75-1-208(4)(b), if the applicant revises the application in response to a notice of unacceptability, the
department shall review the revised application and notify the applicant in writing within 120 days of the date of
receipt whether the revised application is acceptable. If the revision constitutes a significant modification under
subsection (8)(b), the department shall conduct a new review, beginning with an administrative completeness
determination.
(e) When the application is determined to be acceptable, the department shall publish notice of its
determination once a week for 2 consecutive weeks in a newspaper of general circulation in the locality of the
proposed operation. Any person having an interest that is or may be adversely affected may file a written
objection to the determination within 10 days of the department's last published notice. If a written objection is
filed and an objector requests an informal conference, the department shall hold an informal conference in the
locality of the proposed operation within 20 days of receipt of the request. The department shall notify the
applicant and all parties to the informal conference of its decision and the reasons for the decision within 10
days of the informal conference.
(f) Except as provided in 75-1-205(4) and 75-1-208(4)(b), the department shall prepare written
- 2025
69th Legislature 2025 SB 365
- 4 - Authorized Print Version – SB 365
ENROLLED BILL
findings granting or denying the permit or major revision application in whole or in part not later than 45 days
from the date the application is determined acceptable. However, if lands subject to the federal lands program
are included in the application for permit or major revision, the department shall prepare and submit written
findings to the federal regulatory authority. If the department's decision is to grant the permit, the department
shall issue the permit on the date of its written finding or, if any federal concurrence is necessary, on the date
when the concurrence is obtained. If the application is denied, specific reasons for the denial must be set forth
in the written notification to the applicant.
(g) If the department fails to act within the times specified in this subsection (8), it shall immediately
notify the board in writing of its failure to comply and the reasons for the failure to comply.
(9) The applicant, a landowner, or any person with an interest that is or may be adversely affected
by the department's permit decision may within 30 days of that decision submit a written notice requesting a
hearing. The notice must contain the grounds upon which the requester contends that the decision is in error.
The hearing must be started within 30 days of the request. For purposes of a hearing, the board or its hearings
officer may order site inspections of the area pertinent to the application. The board shall within 20 days of the
hearing notify the person who requested the hearing, by certified mail, and all other persons, by regular mail, of
the findings and decisions. A person who presided at the informal conference may not preside at the hearing or
participate in the decision.
(10) In addition to the method of operation, grading, backfilling, highwall reduction, subsidence
stabilization, water control, topsoiling, and reclamation requirements of this part and rules adopted under this
part, the operator, consistent with the directives of subsection (1), shall:
(a) bury under adequate fill all toxic materials, shale, mineral, or any other material determined by
the department to be acid-producing, toxic, undesirable, or creating a hazard;
(b) as directed by rules, seal off tunnels, shafts, or other openings or any breakthrough of water
creating a hazard;
(c) impound, drain, or treat all runoff or underground mine waters so as to reduce soil erosion,
damage to grazing and agricultural lands, and pollution of surface and subsurface waters;
(d) remove or bury all metal, lumber, and other refuse resulting from the operation;
(e) use explosives in connection with the operation only in accordance with department regulations
- 2025
69th Legislature 2025 SB 365
- 5 - Authorized Print Version – SB 365
ENROLLED BILL
designed to minimize noise, damage to adjacent lands, and water pollution and ensure public safety and for
other purposes;
(f) adopt measures to prevent land subsidence unless the department approves a plan for
inducing subsidence into an abandoned operation in a predictable and controlled manner, with measures for
grading, topsoiling, and revegetating the subsided land surface. In order for a controlled subsidence plan to be
approved, the applicant is required to show that subsidence will not cause a direct or indirect hazard to any
public or private buildings, roads, facilities, or use areas, constitute a hazard to human life or health or to
domestic livestock or a viable agricultural operation, or violate any other restrictions the department may
consider necessary.
(g) stockpile and protect from erosion all mining and processing wastes until these wastes can be
disposed of according to the provisions of this part;
(h) deposit as much stockpiled waste material as possible back into the mine voids upon
abandonment in a manner that will prevent or minimize land subsidence. The remaining waste material must be
disposed of as provided by this part and the rules of the department.
(i) seal all portals, entryways, drifts, shafts, or other openings between the surface and
underground mine workings when no longer needed;
(j) to the extent possible using the best technology currently available, minimize disturbances and
adverse impacts of the operation on fish, wildlife, and related environmental values and achieve enhancement
of those resources when practicable;
(k) minimize the disturbances to the prevailing hydrologic balance at the mine site and in adjacent
areas and to the quality and quantity of water in surface water and ground water systems both during and after
strip- or underground-coal-mining operations and during reclamation by:
(i) avoiding acid or other toxic mine drainage by measures including but not limited to:
(A) preventing or removing water from contact with toxic-producing deposits;
(B) treating drainage to reduce toxic content that adversely affects downstream water upon being
released to watercourses;
(C) casing, sealing, or otherwise managing boreholes, shafts, and wells and keeping acid or other
toxic drainage from entering ground and surface waters;
- 2025
69th Legislature 2025 SB 365
- 6 - Authorized Print Version – SB 365
ENROLLED BILL
(ii) (A) conducting strip- or underground-mining operations so as to prevent, to the extent possible
using the best technology currently available, additional contributions of suspended solids to streamflow or
runoff outside the permit area, but the contributions may not be in excess of requirements set by applicable
state or federal law;
(B) constructing any siltation structures pursuant to subsection (10)(k)(ii)(A) prior to
commencement of strip- or underground-mining operations, with the structures to be certified by a qualified
registered engineer and to be constructed as designed and as approved in the reclamation plan;. The siltation
structures must each be constructed with the design capacity specified in administrative rule to detain the water
inflow or runoff entering the pond from an anticipated precipitation event plus the average inflow from the
underground mine, if applicable. Operation of a siltation structure with this design capacity requirement is
compliant with this part even if the pond capacity is exceeded as a result of water inflow or runoff entering the
pond from a multistorm event consisting of a series of small, consecutive storm events that cumulatively exceed
the anticipated precipitation event and the operator actively undertakes measures to restore pond capacity as
soon as weather and ground conditions permit.
(iii) cleaning out and removing temporary or large settling ponds or other siltation structures from
drainways after disturbed areas are revegetated and stabilized and depositing the silt and debris at a site and in
a manner approved by the department;
(iv) restoring recharge capacity of the mined area to approximate premining conditions;
(v) avoiding channel deepening or enlargement in operations that requires the discharge of water
from mines;
(vi) preserving throughout the mining and reclamation process the essential hydrologic functions of
alluvial valley floors in the arid and semiarid areas of the country;
(vii) designing and constructing reclaimed channels of intermittent streams and perennial streams
to ensure long-term stability; and
(viii) any other actions that the department may prescribe;
(l) conduct strip- or underground-mine operations in accordance with the approved coal
conservation plan;
(m) stabilize and protect all surface areas, including spoil piles, to effectively control air pollution;
- 2025
69th Legislature 2025 SB 365
- 7 - Authorized Print Version – SB 365
ENROLLED BILL
(n) seal all auger holes with an impervious and noncombustible material in order to prevent
drainage except when the department determines that the resulting impoundment of water in the auger holes
may create a hazard to the environment or the public health and safety;
(o) develop contingency plans to prevent sustained combustion;
(p) refrain from construction of roads or other access ways up a streambed or drainage channel or
in proximity to the channel so as to seriously alter the normal flow of water;
(q) meet other criteria that are necessary to achieve reclamation in accordance with the purposes
of this part, taking into consideration the physical, climatological, and other characteristics of the site;
(r) with regard to underground mines, eliminate fire hazards and otherwise eliminate conditions
that constitute a hazard to health and safety of the public;
(s) locate openings for all new drift mines working acid-producing or iron-producing coal seams in
a manner that prevents a gravity discharge of water from the mine.
(11) An operator may not throw, dump, pile, or permit the throwing, dumping, or piling or otherwise
placing of any overburden, stones, rocks, mineral, earth, soil, dirt, debris, trees, wood, logs, or any other
materials or substances of any kind or nature beyond or outside of the area of land that is under permit and for
which a bond has been posted under 82-4-223 or place the materials described in this section in a way that
normal erosion or slides brought about by natural physical causes will permit the materials to go beyond or
outside of that area of land. An operator shall conduct the strip- or underground-mining operation in a manner
that protects areas outside the permit area."
Section 2. Severability. If a part of [this act] is invalid, all valid parts that are severable from the
invalid part remain in effect. If a part of [this act] is invalid in one or more of its applications, the part remains in
effect in all valid applications that are severable from the invalid applications.
Section 3. Contingent voidness. (1) If any provision of [this act] is disapproved by the United
States secretary of the interior pursuant to 30 CFR 732, then that portion of [this act] is void.
(2) Within 15 days of the effective date of the disapproval under subsection (1), the department of
environmental quality shall notify the code commissioner, certifying that the disapproval under subsection (1)
- 2025
69th Legislature 2025 SB 365
- 8 - Authorized Print Version – SB 365
ENROLLED BILL
has occurred.
Section 4. Effective date. [This act] is effective on passage and approval.
- END -
I hereby certify that the within bill,
SB 365, originated in the Senate.
___________________________________________
Secretary of the Senate
___________________________________________
President of the Senate
Signed this _______________________________day
of____________________________________, 2025.
___________________________________________
Speaker of the House
Signed this _______________________________day
of____________________________________, 2025.
SENATE BILL NO. 365
INTRODUCED BY B. USHER, V. RICCI, W. GALT, T. MANZELLA, D. ZOLNIKOV, S. GIST, G. LAMMERS, S.
VINTON, R. MINER, J. SCHILLINGER, G. OBLANDER, J. FITZPATRICK, G. KMETZ, G. PARRY, K.
BOGNER, T. TEZAK
AN ACT REVISING CAPACITY REQUIREMENTS FOR SILTATION STRUCTURES AT A STRIP MINE OR
UNDERGROUND MINE; PROVIDING RULEMAKING AUTHORITY; AMENDING SECTION 82-4-231, MCA;
PROVIDING FOR CONTINGENT VOIDNESS; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE.