HB1621 • 2026

requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Kristine Perez (R), Louise Andrus (R), Jonah Wheeler (D), Susan DeRoy (R), Kat McGhee (D), Wendy Thomas (D), Ron Dunn (R)
Last action
2026-02-19
Official status
HOUSE
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

What This Bill Does

  • requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2026-02-19 H

    Inexpedient to Legislate: MA VV 02/19/2026 HJ 5 P. 17

  2. 2026-02-11 H

    Executive Session: 02/10/2026 10:00 am GP 153

  3. 2026-02-11 H

    Committee Report: Inexpedient to Legislate 02/10/2026 (Vote 16-0; CC) HC 7 P. 12

  4. 2026-02-04 H

    Full Committee Work Session: 02/10/2026 10:00 am GP 153

  5. 2026-02-02 H

    Subcommittee Work Session: 02/10/2026 09:30 am GP 153

  6. 2026-01-27 H

    Full Committee Work Session: 02/03/2026 09:15 am GP 153

  7. 2026-01-21 H

    Full Committee Work Session: 01/27/2026 10:00 am GP 153

  8. 2026-01-21 H

    Subcommittee Work Session: 01/27/2026 02:00 pm GP 153

  9. 2026-01-08 H

    Public Hearing: 01/13/2026 01:00 pm GP 153

  10. 2026-01-08 H

    Full Work Session: 01/20/2026 10:00 am GP153

  11. 2025-12-10 H

    Introduced 01/07/2026 and referred to Environment and Agriculture HJ 1 P. 28

Official Summary Text

requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

Current Bill Text

Read the full stored bill text
HB 1621-FN - AS INTRODUCED

2026 SESSION
26-2518
04/09

HOUSE BILL
1621-FN

AN ACT
requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

SPONSORS: Rep. Perez, Rock. 16; Rep. DeRoy, Straf. 3; Rep. Dunn, Rock. 16; Rep. Andrus, Merr. 5; Rep. McGhee, Hills. 35; Rep. Wheeler, Hills. 33; Rep. W. Thomas, Hills. 12

COMMITTEE: Environment and Agriculture

-----------------------------------------------------------------

ANALYSIS

This bill requires a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Explanation: Matter added to current law appears in
bold italics.
Matter removed from current law appears [
in brackets and struckthrough.
]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
26-2518
04/09

STATE OF NEW HAMPSHIRE

In the Year of Our Lord Two Thousand Twenty-Six

AN ACT
requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

Be it Enacted by the Senate and House of Representatives in General Court convened:

1 New Section; Environmental Impact Study Requirement for Manufacturing and Storage Facilities. Amend RSA 155-A by inserting after section 4 the following new section:
155-A:4-a Environmental Impact Study Requirement for Manufacturing and Storage Facilities.
I. Definitions.
(a) "Baseline environmental study" means a comprehensive assessment of the existing environmental conditions at the time of application. It shall serve as the reference point for evaluating the potential environmental impacts of the proposed development and shall be conducted in accordance with standards established by the department. The study shall include data on water, air, soil, noise, and light.
(b) "Manufacturing facility" means any building, structure, or premises used for the industrial-scale processing, preparation, assembly, packaging, or fabrication of goods, materials, or products, including but not limited to food, chemicals, electronics, or machinery.
(c) "Storage facility" means any building, structure, or premises used for the commercial or industrial storage of goods, materials, equipment, or hazardous substances, including self-service storage units, warehouses, and underground storage tanks, whether for temporary or long-term use.
II. No permit shall be issued under RSA 155-A:4 for the development of any manufacturing or storage facility over 50,000 square feet unless the applicant submits proof of a completed baseline environmental impact study (EIS). The EIS shall:
(a) Be conducted by a qualified environmental professional or agency approved by the New Hampshire department of environmental services.
(b) Be funded by the applicant.
(c) Include analysis of potential impacts on the following:
(1) Water quality and quantity.
(2) Air emissions.
(3) Soil contamination.
(4) Noise and light pollution.
(d) Include a cumulative impact assessment, considering past, present, and reasonably foreseeable future actions.
(e) Evaluate reasonable alternatives to the proposed action, including a no-action alternative.
(f) Identify feasible mitigation measures to avoid or minimize adverse environmental effects.
(g) Be completed prior to the issuance of any permit.
(h) Be updated every 5 years following the initial study.
(i) Be resubmitted upon any change in ownership or change in use of the facility.
III. The department shall not issue a permit unless it determines that the proposed development will not result in unreasonable adverse environmental impacts, and that appropriate mitigation measures have been identified and incorporated.
IV. All environmental impact studies and related documents shall be made available to the public in accordance with RSA 91-A. The department shall provide a public comment period of not less than 30 days prior to final permit approval.

2 New Paragraph; Duties of Commissioner; Administrative Rules. Amend RSA 21-O:3 by inserting after paragraph X the following new paragraph:
XI. Adopt administrative rules pursuant to RSA 541-A regarding the applicant submission process for environmental impact studies for manufacturing and storage facilities pursuant to RSA 155-A:4-a.

3 Effective Date. This act shall take effect 60 days after its passage.

LBA
26-2518
12/4/25

HB 1621-FN- FISCAL NOTE
AS INTRODUCED

AN ACT
requiring a baseline environmental impact study to be completed prior to development of certain manufacturing and storage facilities.

FISCAL IMPACT:

This bill does not provide funding, nor does it authorize new positions.

Estimated State Impact

FY 2026
FY 2027
FY 2028
FY 2029

Revenue
$0
$0
$0
$0

Revenue Fund(s)
None

Expenditures*
$0
$150,000
$196,000
$200,000

Funding Source(s)
Other

Appropriations*
$0
$0
$0
$0

Funding Source(s)
None

*Expenditure = Cost of bill *Appropriation = Authorized funding to cover cost of bill

METHODOLOGY:
This bill requires applicants seeking to develop manufacturing or storage facilities over 50,000 square feet to complete a baseline environmental impact study (EIS) covering air, water, soil, noise, and light impacts. The study must be conducted by a qualified environmental professional or agency approved by the Department of Environmental Services (DES), and the Department may not issue a permit unless it determines the project will not result in unreasonable adverse environmental impacts and appropriate mitigation measures have been incorporated.
The Department of Environmental Services states it does not currently have a program to approve environmental professionals for this purpose, nor does it have existing staff with the combined background necessary to review environmental impact studies addressing air, water, soils, and noise and light pollution. DES notes the criteria for training, practice, and approval of qualified professionals would need to be developed, and the technical review of EIS submissions would require skill sets that do not currently exist within the agency.
To implement the bill, DES indicates that at least two additional full-time Environmental Scientists (19-2040 ENV SCIENTISTS-3 SOC19-06) would be needed. With a September 1, 2026 start date, the estimated cost for both positions in FY 2027 is $150,000, $196,000 in FY 2028 and $200,000 in FY 2029. The Department anticipates these costs would be funded from Other Funds, depending on fee accounts.

The New Hampshire Municipal Association states there will be no impact to municipalities for the EIS preparation costs
as any cost incurred would be borne by the landowner.

AGENCIES CONTACTED:
Department of Environmental Services and New Hampshire Municipal Association