Back to New York

A2605 • 2025

Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online

Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online

Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Nader Sayegh
Last action
2026-06-01
Official status
Assembly Floor Calendar
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online

Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online and such results to be sent to the temporary president of the senate, the speaker of the assembly and the chairs of the senate and assembly standing committees on energy.

What This Bill Does

  • Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online and such results to be sent to the temporary president of the senate, the speaker of the assembly and the chairs of the senate and assembly standing committees on energy.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2026-06-01 Assembly

    RECALLED FROM SENATE

  2. 2026-06-01 Senate

    RETURNED TO ASSEMBLY

  3. 2026-06-01 Assembly

    VOTE RECONSIDERED - RESTORED TO THIRD READING

  4. 2026-06-01 Assembly

    AMENDED ON THIRD READING 2605A

  5. 2026-05-13 Assembly

    PASSED ASSEMBLY

  6. 2026-05-13 Assembly

    DELIVERED TO SENATE

  7. 2026-05-13 Senate

    REFERRED TO ENERGY AND TELECOMMUNICATIONS

  8. 2026-05-07 Assembly

    ADVANCED TO THIRD READING CAL.448

  9. 2026-05-05 Assembly

    REPORTED

  10. 2026-01-07 Assembly

    REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS

  11. 2025-01-21 Assembly

    REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS

Official Summary Text

Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online
Requires the results of any outage management system stress test conducted in the state by a utility company to be posted online and such results to be sent to the temporary president of the senate, the speaker of the assembly and the chairs of the senate and assembly standing committees on energy.

Current Bill Text

Read the full stored bill text
S T A T E   O F   N E W   Y O R K
        ________________________________________________________________________

                                          2605

                               2025-2026 Regular Sessions

                                  I N  A S S E M B L Y

                                    January 21, 2025
                                       ___________

        Introduced by M. of A. SAYEGH -- read once and referred to the Committee
          on Corporations, Authorities and Commissions

        AN  ACT  to amend the public service law and the public authorities law,
          in relation to requiring the results of any outage  management  system
          stress  test  conducted in the state by a utility company to be posted
          online

          THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND  ASSEM-
        BLY, DO ENACT AS FOLLOWS:

     1    Section  1.  The public service law is amended by adding a new section
     2  54 to read as follows:
     3    § 54. UTILITY  OUTAGE  MANAGEMENT  SYSTEM  STRESS  TESTING.  1.    FOR
     4  PURPOSES  OF  THIS SECTION, "OUTAGE MANAGEMENT SYSTEM STRESS TEST" SHALL
     5  MEAN A TEST CONDUCTED BY A UTILITY TO  DETERMINE  THE  ABILITY  OF  SUCH
     6  UTILITY  TO  HANDLE AND RESPOND TO LARGE SCALE WEATHER EVENTS OR NATURAL
     7  DISASTERS THAT ARE LIKELY TO RESULT IN THE LOSS OF SERVICE TO CUSTOMERS.
     8    2. (A) THE DEPARTMENT SHALL POST THE RESULTS OF ANY OUTAGE  MANAGEMENT
     9  SYSTEM  STRESS  TEST  CONDUCTED  IN  THE STATE BY A UTILITY CORPORATION,
    10  WATER MUNICIPALITY OR LOCAL PUBLICLY OWNED ELECTRIC OR  GAS  CORPORATION
    11  ON THE DEPARTMENT'S WEBSITE AS SOON AS SUCH RESULTS BECOME AVAILABLE.
    12    (B) THE COMMISSIONER SHALL ALSO SUBMIT A REPORT OF SUCH RESULTS TO THE
    13  TEMPORARY  PRESIDENT  OF THE SENATE, THE SPEAKER OF THE ASSEMBLY AND THE
    14  CHAIRS OF THE SENATE AND ASSEMBLY STANDING COMMITTEES ON ENERGY.
    15    § 2. Title 1-A of article 5 of the public authorities law, as added by
    16  chapter 517 of the laws of 1986, is amended  by  adding  a  new  section
    17  1020-nn to read as follows:
    18    §  1020-NN.   OUTAGE MANAGEMENT SYSTEM STRESS TESTING. 1. FOR PURPOSES
    19  OF THIS SECTION, "OUTAGE MANAGEMENT SYSTEM STRESS  TEST"  SHALL  MEAN  A
    20  TEST  CONDUCTED  BY THE AUTHORITY OR A SERVICE PROVIDER TO DETERMINE THE
    21  ABILITY OF THE AUTHORITY OR SUCH SERVICE PROVIDER TO HANDLE AND  RESPOND
    22  TO  LARGE  SCALE  WEATHER EVENTS OR NATURAL DISASTERS THAT ARE LIKELY TO
    23  RESULT IN THE LOSS OF SERVICE TO CUSTOMERS.

         EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD02711-01-5
        A. 2605                             2

     1    2. (A) THE AUTHORITY SHALL POST THE RESULTS OF ANY  OUTAGE  MANAGEMENT
     2  SYSTEM  STRESS  TEST CONDUCTED BY THE AUTHORITY OR A SERVICE PROVIDER ON
     3  THE AUTHORITY'S WEBSITE AS SOON AS SUCH RESULTS BECOME AVAILABLE.
     4    (B) THE BOARD SHALL ALSO SUBMIT A REPORT OF SUCH RESULTS TO THE TEMPO-
     5  RARY PRESIDENT OF THE SENATE, THE SPEAKER OF THE ASSEMBLY AND THE CHAIRS
     6  OF THE SENATE AND ASSEMBLY STANDING COMMITTEES ON ENERGY.
     7    § 3. This act shall take effect immediately.