Back to New York

S8512 • 2025

Relates to portable solar generation devices

Relates to portable solar generation devices

Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Liz Krueger
Last action
2026-05-28
Official status
Senate Floor Calendar
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Relates to portable solar generation devices

Relates to portable solar generation devices Defines "portable solar generation device"; exempts portable solar generation devices from interconnection or net metering requirements; requires the state energy conservation construction code to allow for portable solar generation devices to be connected to a building's wiring through an electrical outlet.

What This Bill Does

  • Relates to portable solar generation devices Defines "portable solar generation device"; exempts portable solar generation devices from interconnection or net metering requirements; requires the state energy conservation construction code to allow for portable solar generation devices to be connected to a building's wiring through an electrical outlet.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2026-05-28 Senate

    SUBSTITUTED BY A9111C

  2. 2026-05-14 Senate

    RECALLED FROM ASSEMBLY

  3. 2026-05-14 Assembly

    RETURNED TO SENATE

  4. 2026-05-14 Senate

    VOTE RECONSIDERED - RESTORED TO THIRD READING

  5. 2026-05-14 Senate

    AMENDED ON THIRD READING 8512C

  6. 2026-04-22 Assembly

    REFERRED TO ENERGY

  7. 2026-04-21 Senate

    PASSED SENATE

  8. 2026-04-21 Senate

    DELIVERED TO ASSEMBLY

  9. 2026-04-20 Senate

    COMMITTEE DISCHARGED AND COMMITTED TO RULES

  10. 2026-04-20 Senate

    ORDERED TO THIRD READING CAL.698

  11. 2026-03-20 Senate

    AMEND (T) AND RECOMMIT TO ENERGY AND TELECOMMUNICATIONS

  12. 2026-03-20 Senate

    PRINT NUMBER 8512B

  13. 2026-01-07 Senate

    REFERRED TO ENERGY AND TELECOMMUNICATIONS

  14. 2025-12-10 Senate

    AMEND (T) AND RECOMMIT TO RULES

  15. 2025-12-10 Senate

    PRINT NUMBER 8512A

  16. 2025-09-24 Senate

    REFERRED TO RULES

Official Summary Text

Relates to portable solar generation devices
Defines "portable solar generation device"; exempts portable solar generation devices from interconnection or net metering requirements; requires the state energy conservation construction code to allow for portable solar generation devices to be connected to a building's wiring through an electrical outlet.

Current Bill Text

Read the full stored bill text
S T A T E   O F   N E W   Y O R K
        ________________________________________________________________________

                                          8512

                               2025-2026 Regular Sessions

                                    I N  S E N A T E

                                   September 24, 2025
                                       ___________

        Introduced  by  Sen. KRUEGER -- read twice and ordered printed, and when
          printed to be committed to the Committee on Rules

        AN ACT to amend the public service law, in relation  to  portable  solar
          generation devices

          THE  PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
        BLY, DO ENACT AS FOLLOWS:

     1    Section 1.  Short title. This act shall be known and may be  cited  as
     2  the "Solar UP Now NY Act".
     3    §  2.  Paragraph  (d)  of  subdivision 1 of section 66-j of the public
     4  service law, as amended by chapter 253 of the laws of 2013,  is  amended
     5  and a new paragraph (j) is added to subdivision 1 to read as follows:
     6    (d)  "Solar electric generating equipment" means a photovoltaic system
     7  (i) (A) in the case of a residential customer (other than a farm utiliz-
     8  ing a residential meter), with a rated capacity of not more  than  twen-
     9  ty-five  kilowatts; (B) in the case of a customer who owns or operates a
    10  farm operation as such term is defined in subdivision eleven of  section
    11  three  hundred  one of the agriculture and markets law utilizing a resi-
    12  dential meter with a rated capacity of not more than one  hundred  kilo-
    13  watts;  and  (C) in the case of a non-residential customer, with a rated
    14  capacity of not more than two thousand kilowatts; and (ii) that is manu-
    15  factured, installed, and operated in accordance with applicable  govern-
    16  ment  and  industry  standards, that is connected to the electric system
    17  and operated in conjunction with an electric corporation's  transmission
    18  and distribution facilities, and that is operated in compliance with any
    19  standards  and  requirements established under this section. SOLAR ELEC-
    20  TRIC GENERATING EQUIPMENT SHALL NOT INCLUDE A PORTABLE SOLAR  GENERATION
    21  DEVICE.
    22    (J)  "PORTABLE  SOLAR GENERATION DEVICE" MEANS A MOVEABLE PHOTOVOLTAIC
    23  GENERATION DEVICE THAT:
    24    (I) IS DESIGNED TO BE CONNECTED  TO  A  BUILDING'S  ELECTRICAL  SYSTEM
    25  THROUGH A STANDARD ELECTRICAL OUTLET;

         EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD13786-02-5
        S. 8512                             2

     1    (II)  IS INTENDED PRIMARILY TO OFFSET PART OF THE CUSTOMER'S ELECTRIC-
     2  ITY CONSUMPTION;
     3    (III)  IS LIMITED TO SUPPLYING A MAXIMUM POWER OUTPUT OF NOT MORE THAN
     4  ONE THOUSAND TWO HUNDRED WATTS TO THE UTILITY ELECTRIC GRID; AND
     5    (IV) IS  CERTIFIED  BY  UNDERWRITERS  LABORATORIES  OR  AN  EQUIVALENT
     6  NATIONALLY RECOGNIZED TESTING LABORATORY.
     7    § 3. Subdivision 7 of section 66-j of the public service law is renum-
     8  bered subdivision 8 and a new subdivision 7 is added to read as follows:
     9    7.  PORTABLE  SOLAR GENERATION DEVICE.   (A) NOTWITHSTANDING ANY OTHER
    10  PROVISION OF LAW, A  PORTABLE  SOLAR  GENERATION  DEVICE  SHALL  NOT  BE
    11  SUBJECT TO INTERCONNECTION OR NET METERING REQUIREMENTS.
    12    (B)  AN  ELECTRIC CORPORATION MAY NOT REQUIRE A CUSTOMER USING A PORT-
    13  ABLE SOLAR GENERATION DEVICE TO:
    14    (I) OBTAIN THE ELECTRIC CORPORATION'S APPROVAL  BEFORE  INSTALLING  OR
    15  USING THE DEVICE;
    16    (II) PAY ANY FEE OR CHARGE RELATED TO THE DEVICE OR FOR FEEDING ENERGY
    17  BACK INTO THE UTILITY ELECTRIC GRID; OR
    18    (III)  INSTALL  ANY  ADDITIONAL  CONTROLS  OR EQUIPMENT BEYOND WHAT IS
    19  INTEGRATED INTO THE DEVICE.
    20    (C) AN ELECTRIC CORPORATION SHALL NOT BE  LIABLE  FOR  ANY  DAMAGE  OR
    21  INJURY CAUSED BY A PORTABLE SOLAR GENERATION DEVICE.
    22    § 4. This act shall take effect immediately.