HB2065 • 2025

Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid.

Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid.

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Last action
2025-08-07
Official status
Chapter Number Assigned
Effective date
Not listed

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Bill History

  1. 2025-08-07 House

    Chapter 471, (2025 Laws): Effective date September 26, 2025.

  2. 2025-07-17 House

    Governor signed.

  3. 2025-06-26 House

    Speaker signed.

  4. 2025-06-26 Senate

    President signed.

  5. 2025-06-24 Senate

    Recommendation: Do pass the B-Eng. bill.

  6. 2025-06-24 Senate

    Second reading.

  7. 2025-06-24 Senate

    Rules suspended. Third reading. Carried by Frederick. Passed. Ayes, 26; Nays, 3--Bonham, Linthicum, Robinson; Excused, 1--Thatcher.

  8. 2025-06-23 House

    Third reading. Carried by Lively. Passed. Ayes, 42; Nays, 2--Elmer, Reschke; Absent, 1--Harbick; Excused, 14--Boice, Boshart Davis, Cate, Diehl, Drazan, Edwards, Evans, Nguyen H, Osborne, Scharf, Skarlatos, Wallan, Wright, Yunker; Excused for Business of the House, 1--Helfrich.

  9. 2025-06-23 Senate

    First reading. Referred to President's desk.

  10. 2025-06-23 Senate

    Referred to Ways and Means.

  11. 2025-06-20 House

    Second reading.

  12. 2025-06-19 House

    Recommendation: Do pass with amendments and be printed B-Engrossed.

  13. 2025-06-17 House

    Work Session held.

  14. 2025-06-11 House

    Work Session held.

  15. 2025-06-11 House

    Returned to Full Committee.

  16. 2025-06-10 House

    Assigned to Subcommittee On Natural Resources.

  17. 2025-04-15 House

    Recommendation: Do pass with amendments, be printed A-Engrossed, and be referred to Ways and Means.

  18. 2025-04-15 House

    Referred to Ways and Means by order of Speaker.

  19. 2025-04-08 House

    Work Session held.

  20. 2025-02-06 House

    Public Hearing held.

  21. 2025-01-17 House

    Referred to Climate, Energy, and Environment.

  22. 2025-01-13 House

    First reading. Referred to Speaker's desk.

Official Summary Text

Digest: Allows the use of a third party to study or evaluate a request to connect a microgrid to a power grid. (Flesch Readability Score: 60.6).
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards.
Takes effect on the 91st day following adjournment sine die.
Relating to: Relating to the interconnection process; and prescribing an effective date.
Current location: Chapter Number Assigned