HB2065 • 2025
Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
Chapter 471, (2025 Laws): Effective date September 26, 2025.
Governor signed.
Speaker signed.
President signed.
Recommendation: Do pass the B-Eng. bill.
Second reading.
Rules suspended. Third reading. Carried by Frederick. Passed. Ayes, 26; Nays, 3--Bonham, Linthicum, Robinson; Excused, 1--Thatcher.
Third reading. Carried by Lively. Passed. Ayes, 42; Nays, 2--Elmer, Reschke; Absent, 1--Harbick; Excused, 14--Boice, Boshart Davis, Cate, Diehl, Drazan, Edwards, Evans, Nguyen H, Osborne, Scharf, Skarlatos, Wallan, Wright, Yunker; Excused for Business of the House, 1--Helfrich.
First reading. Referred to President's desk.
Referred to Ways and Means.
Second reading.
Recommendation: Do pass with amendments and be printed B-Engrossed.
Work Session held.
Work Session held.
Returned to Full Committee.
Assigned to Subcommittee On Natural Resources.
Recommendation: Do pass with amendments, be printed A-Engrossed, and be referred to Ways and Means.
Referred to Ways and Means by order of Speaker.
Work Session held.
Public Hearing held.
Referred to Climate, Energy, and Environment.
First reading. Referred to Speaker's desk.
Digest: Allows the use of a third party to study or evaluate a request to connect a microgrid to a power grid. (Flesch Readability Score: 60.6). Allows a person to contract with a third-party consultant to conduct a study or engineering evaluation that a public utility requires for an application to interconnect a microgrid or community microgrid. Allows a contracted third-party consultant to receive from a public utility all technical data necessary to conduct the study or engineering evaluation and submit to the public utility a preliminary design for review. Requires a public utility to approve or deny an application based on safety, reliability and compliance with published standards. Takes effect on the 91st day following adjournment sine die. Relating to: Relating to the interconnection process; and prescribing an effective date. Current location: Chapter Number Assigned