Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
HB3874 • 2025
Increases from 50 megawatts to 100 megawatts the minimum size that a wind energy facility needs to be before a wind energy facility is required to obtain a site certificate from the Energy Facility Siting Council.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
Chapter 162, (2025 Laws): Effective date January 1, 2026.
Governor signed.
Speaker signed.
President signed.
House concurred in Senate amendments and repassed bill. Ayes, 38; Nays, 15--Boice, Boshart Davis, Breese-Iverson, Cate, Diehl, Drazan, Elmer, Harbick, Lewis, Osborne, Reschke, Scharf, Skarlatos, Wright, Yunker; Excused, 5--Evans, Levy E, McIntire, Nguyen H, Wallan; Excused for Business of the House, 1--Javadi.
Third reading. Carried by Golden. Passed. Ayes, 28; Nays, 1--Anderson; Excused, 1--Gelser Blouin.
Carried over to 05-13 by unanimous consent.
Carried over to 05-12 by unanimous consent.
Second reading.
Recommendation: Do pass with amendments. (Printed A-Eng.)
Work Session held.
Public Hearing held.
First reading. Referred to President's desk.
Referred to Energy and Environment.
Third reading. Carried by Helm. Passed. Ayes, 41; Nays, 14--Boice, Boshart Davis, Breese-Iverson, Diehl, Drazan, Elmer, Harbick, Helfrich, Osborne, Reschke, Scharf, Skarlatos, Wallan, Yunker; Excused, 4--Cate, Evans, Nguyen H, Walters; Excused for Business of the House, 1--McIntire.
Rules suspended. Carried over to April 14, 2025 Calendar.
Rules suspended. Carried over to April 10, 2025 Calendar.
Second reading.
Recommendation: Do pass.
Work Session held.
Public Hearing held.
Referred to Climate, Energy, and Environment.
First reading. Referred to Speaker's desk.
Digest: Raises to 100 MW the smallest size that a wind power plant needs to be before a site certificate from EFSC is required. (Flesch Readability Score: 62.1). Increases from 50 megawatts to 100 megawatts the minimum size that a wind energy facility needs to be before a wind energy facility is required to obtain a site certificate from the Energy Facility Siting Council. <b>Requires an applicant for a county land use permit to provide a decommissioning plan if the application is to establish a wind energy facility with an average electric generating capacity of at least 50 megawatts but less than 100 megawatts.</b> Relating to: Relating to the jurisdiction of the Energy Facility Siting Council over wind energy facilities. Current location: Chapter Number Assigned