Back to Oregon

HB3895 • 2025

Requires the Public Utility Commission to study utilities.

Requires the Public Utility Commission to study utilities.

Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Representative Ruiz
Last action
2025-06-27
Official status
In House Committee
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Requires the Public Utility Commission to study utilities.

Digest: Makes the PUC do a study on utilities and submit a report on its findings.

What This Bill Does

  • Digest: Makes the PUC do a study on utilities and submit a report on its findings.
  • (Flesch Readability Score: 67.5).
  • Requires the Public Utility Commission to study utilities.
  • Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2025-06-27 House

    In committee upon adjournment.

  2. 2025-03-04 House

    Referred to Climate, Energy, and Environment.

  3. 2025-02-27 House

    First reading. Referred to Speaker's desk.

Official Summary Text

Digest: Makes the PUC do a study on utilities and submit a report on its findings. (Flesch Readability Score: 67.5).
Requires the Public Utility Commission to study utilities. Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026.
Sunsets on January 2, 2027.
Relating to: Relating to utilities.
Current location: In House Committee

Current Bill Text

Read the full stored bill text
1
2
3
4
5
6
7
8
9
83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session
House Bill 3895
Sponsored by Representative RUIZ
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced. The statement includes a measure digest written in compliance with applicable readability
standards.
Digest: Makes the PUC do a study on utilities and submit a report on its findings. (Flesch
Readability Score: 67.5).
Requires the Public Utility Commission to study utilities. Directs the commission to submit
findings to the interim committees of the Legislative Assembly related to energy not later than
September 15, 2026.
Sunsets on January 2, 2027.
A BILL FOR AN ACT
Relating to utilities.
Be It Enacted by the People of the State of Oregon:
SECTION 1.
The Public Utility Commission shall study utilities. The commission shall
submit a report in the manner provided by ORS 192.245, and may include recommendations
for legislation, to the interim committees of the Legislative Assembly related to energy no
later than September 15, 2026.
SECTION 2. Section 1 of this 2025 Act is repealed on January 2, 2027.
NOTE: Matter in boldfaced type in an amended section is new; matter [ italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 2619