SB128 • 2025

Requires the Public Utility Commission to study electric power.

Requires the Public Utility Commission to study electric power.

Energy
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Senator Golden
Last action
2025-06-27
Official status
In Senate Committee
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Requires the Public Utility Commission to study electric power.

Digest: Makes the PUC do a study on electric power and submit a report.

What This Bill Does

  • Digest: Makes the PUC do a study on electric power and submit a report.
  • (Flesch Readability Score: 69.9).
  • Requires the Public Utility Commission to study electric power.
  • Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Bill History

  1. 2025-06-27 Senate

    In committee upon adjournment.

  2. 2025-01-17 Senate

    Referred to Energy and Environment.

  3. 2025-01-13 Senate

    Introduction and first reading. Referred to President's desk.

Official Summary Text

Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability Score: 69.9).
Requires the Public Utility Commission to study electric power. Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026.
Sunsets on January 2, 2027.
Relating to: Relating to the transmission of electric power.
Current location: In Senate Committee

Current Bill Text

Read the full stored bill text
1
2
3
4
5
6
7
8
9
83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session
Senate Bill 128
Sponsored by Senator GOLDEN (Presession filed.)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced. The statement includes a measure digest written in compliance with applicable readability
standards.
Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability
Score: 69.9).
Requires the Public Utility Commission to study electric power. Directs the commission to sub-
mit findings to the interim committees of the Legislative Assembly related to energy not later than
September 15, 2026.
Sunsets on January 2, 2027.
A BILL FOR AN ACT
Relating to the transmission of electric power.
Be It Enacted by the People of the State of Oregon:
SECTION 1.
The Public Utility Commission shall study electric power. The commission
shall submit a report in the manner provided by ORS 192.245, and may include recommen-
dations for legislation, to the interim committees of the Legislative Assembly related to en-
ergy no later than September 15, 2026.
SECTION 2. Section 1 of this 2025 Act is repealed on January 2, 2027.