Official Summary Text
Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability Score: 69.9).
Requires the Public Utility Commission to study electric power. Directs the commission to submit findings to the interim committees of the Legislative Assembly related to energy not later than September 15, 2026.
Sunsets on January 2, 2027.
Relating to: Relating to the transmission of electric power.
Current location: In Senate Committee
Current Bill Text
Read the full stored bill text
1
2
3
4
5
6
7
8
9
83rd OREGON LEGISLATIVE ASSEMBLY--2025 Regular Session
Senate Bill 128
Sponsored by Senator GOLDEN (Presession filed.)
SUMMARY
The following summary is not prepared by the sponsors of the measure and is not a part of the body thereof subject
to consideration by the Legislative Assembly. It is an editor’s brief statement of the essential features of the
measure as introduced. The statement includes a measure digest written in compliance with applicable readability
standards.
Digest: Makes the PUC do a study on electric power and submit a report. (Flesch Readability
Score: 69.9).
Requires the Public Utility Commission to study electric power. Directs the commission to sub-
mit findings to the interim committees of the Legislative Assembly related to energy not later than
September 15, 2026.
Sunsets on January 2, 2027.
A BILL FOR AN ACT
Relating to the transmission of electric power.
Be It Enacted by the People of the State of Oregon:
SECTION 1.
The Public Utility Commission shall study electric power. The commission
shall submit a report in the manner provided by ORS 192.245, and may include recommen-
dations for legislation, to the interim committees of the Legislative Assembly related to en-
ergy no later than September 15, 2026.
SECTION 2. Section 1 of this 2025 Act is repealed on January 2, 2027.
NOTE: Matter in boldfaced type in an amended section is new; matter [ italic and bracketed] is existing law to be omitted.
New sections are in boldfaced type.
LC 1332