Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
SB928 • 2025
Requires public bodies that procure electric vehicles and solar photovoltaic energy systems to receive before entering a contract for the electric vehicle or solar photovoltaic energy system a certification from the manufacturer, distributor, vendor or supplier that the production, assembly, transportation or sale of the electric vehicle or solar photovoltaic energy system did not use or involve forced labor or oppressive child labor.
This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.
The plain English breakdown is still being put together. The official documents below are already here.
In committee upon adjournment.
Introduction and first reading. Referred to President's desk.
Referred to Labor and Business.
Digest: Tells a public body that buys electric cars or solar panels that it needs proof from the vendor that no forced labor was used in producing the car or panel. Specifies penalties for lying about the proof. (Flesch Readability Score: 66.8). Requires public bodies that procure electric vehicles and solar photovoltaic energy systems to receive before entering a contract for the electric vehicle or solar photovoltaic energy system a certification from the manufacturer, distributor, vendor or supplier that the production, assembly, transportation or sale of the electric vehicle or solar photovoltaic energy system did not use or involve forced labor or oppressive child labor. Requires probative evidence to accompany the certification. Provides that a person that supplies a certification that is false, materially misleading, illegitimate, untruthful, forged or substantially inaccurate is liable for a civil penalty of not more than $10,000 or half of the price the public body paid for the electric vehicle or solar photovoltaic energy system. Subjects the public body to similar penalties for knowingly or intentionally accepting a certification that the public body knows is false, materially misleading, illegitimate, untruthful, forged or substantially inaccurate. Takes effect on the 91st day following adjournment sine die. Relating to: Relating to ensuring that forced labor is not used for electric products that public bodies procure; prescribing an effective date. Current location: In Senate Committee