Back to Virginia

HB711 • 2026

Solar facilities; local regulation, permits, special exceptions.

An Act to amend and reenact §§ 15.2-2241.2, 15.2-2288.7, and 15.2-2288.8 of the Code of Virginia, relating to local regulation of solar facilities; special exceptions.

Energy
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Herring
Last action
2026-04-22
Official status
Acts of Assembly Chapter
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Solar facilities; local regulation, permits, special exceptions.

Local regulation of solar facilities; special exceptions.

What This Bill Does

  • Local regulation of solar facilities; special exceptions.
  • Provides that a ground-mounted solar energy generation facility to be located on property zoned agricultural, commercial, industrial, or institutional shall be considered pursuant to various criteria to be included in a local ordinance, such as specifications for setbacks, fencing, solar panel height, visual impacts, grading, and a decommissioning plan for solar energy equipment and facilities, unless otherwise permitted by right.
  • The bill requires localities to furnish the State Corporation Commission with a record of special exception decisions reached pursuant to these provisions that includes (i) the reason for any adverse decision, (ii) any finding of nonconformity with the local comprehensive plan, and (iii) the date of the last revision to the comprehensive plan.
  • The bill further requires the State Corporation Commission to compile and maintain on the Commission's public website a searchable database of all solar special exception decisions and the reasons for any adverse decisions made over a period of not less than five years.

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

HB711G

2026-04-13 • Governor

Governor's Recommendation

Plain English: (HB711) GOVERNOR'S RECOMMENDATION 1.

  • (HB711) GOVERNOR'S RECOMMENDATION 1.
  • Line 132, enrolled, after federal strike permits and insert laws, 2.
  • Line 132, enrolled, after regulations, insert and permits, 3.
  • Line 158, enrolled, after means the strike the remainder of line 158 and through production on line 159 insert same as that term is defined in § 10.1-1197.5 

Bill History

  1. 2026-04-22 Governor

    Governor's recommendation adopted

  2. 2026-04-22 House

    Signed by Speaker

  3. 2026-04-22 Senate

    Signed by President

  4. 2026-04-22 Governor

    Approved by Governor-Chapter 1068 (effective 7/1/2026)

  5. 2026-04-22 House

    Reenrolled

  6. 2026-04-22 House

    Reenrolled bill text (HB711ER2)

  7. 2026-04-22 Governor

    Acts of Assembly Chapter text (CHAP1068)

  8. 2026-04-22 House

    House concurred in Governor's recommendation (64-Y 35-N 0-A)

  9. 2026-04-22 Senate

    Senate concurred in Governor's recommendation (20-Y 18-N 0-A)

  10. 2026-04-13 Governor

    Governor's recommendation received by House

  11. 2026-04-06 House

    Fiscal Impact Statement from State Corporation Commission (HB711)

  12. 2026-03-14 House

    Enrolled Bill communicated to Governor on March 14, 2026

  13. 2026-03-14 Governor

    Governor's Action Deadline 11:59 p.m., April 13, 2026

  14. 2026-03-12 House

    Signed by Speaker

  15. 2026-03-11 Senate

    Signed by President

  16. 2026-03-11 House

    Enrolled

  17. 2026-03-11 House

    Bill text as passed House and Senate (HB711ER)

  18. 2026-03-04 Senate

    Read third time

  19. 2026-03-04 Senate

    Read third time

  20. 2026-03-04 Senate

    Passed Senate (22-Y 18-N 0-A)

  21. 2026-03-03 Senate

    Rules suspended

  22. 2026-03-03 Senate

    Passed by for the day

  23. 2026-03-03 Senate

    Constitutional reading dispensed Block Vote (on 2nd reading) (40-Y 0-N 0-A)

  24. 2026-03-03 Senate

    Passed by for the day Block Vote (Voice Vote)

  25. 2026-03-02 Local Government

    Reported from Local Government (9-Y 6-N)

  26. 2026-02-06 Senate

    Constitutional reading dispensed (on 1st reading)

  27. 2026-02-06 Local Government

    Referred to Committee on Local Government

  28. 2026-02-05 House

    Read third time and passed House (63-Y 33-N 0-A)

  29. 2026-02-05 Counties, Cities and Towns

    Fiscal Impact Statement from State Corporation Commission (HB711)

  30. 2026-02-04 House

    Read second time

  31. 2026-02-04 House

    committee substitute agreed to

  32. 2026-02-04 House

    Engrossed by House - committee substitute

  33. 2026-02-03 House

    Read first time

  34. 2026-01-30 Counties, Cities and Towns

    Reported from Counties, Cities and Towns with substitute (15-Y 5-N)

  35. 2026-01-30 Counties, Cities and Towns

    Committee substitute printed 26106588D-H1

  36. 2026-01-29 Subcommittee #2

    Subcommittee recommends reporting with substitute (7-Y 1-N)

  37. 2026-01-29 Subcommittee #2

    House subcommittee offered

  38. 2026-01-29 Subcommittee #2

    House subcommittee offered

  39. 2026-01-29 Subcommittee #2

    House subcommittee offered

  40. 2026-01-28 Subcommittee #2

    Assigned HCCT sub: Subcommittee #2

  41. 2026-01-13 House

    Prefiled and ordered printed; Offered 01-14-2026 26104367D

  42. 2026-01-13 Counties, Cities and Towns

    Referred to Committee on Counties, Cities and Towns

Official Summary Text

Local regulation of solar facilities; special exceptions.
Provides that a ground-mounted solar energy generation facility to be located on property zoned agricultural, commercial, industrial, or institutional shall be considered pursuant to various criteria to be included in a local ordinance, such as specifications for setbacks, fencing, solar panel height, visual impacts, grading, and a decommissioning plan for solar energy equipment and facilities, unless otherwise permitted by right. The bill requires localities to furnish the State Corporation Commission with a record of special exception decisions reached pursuant to these provisions that includes (i) the reason for any adverse decision, (ii) any finding of nonconformity with the local comprehensive plan, and (iii) the date of the last revision to the comprehensive plan. The bill further requires the State Corporation Commission to compile and maintain on the Commission's public website a searchable database of all solar special exception decisions and the reasons for any adverse decisions made over a period of not less than five years. Finally, the bill states that its provisions shall apply to any ground-mounted solar facility with a generating capacity of one megawatt or more for which an application for local approval is filed on or after July 1, 2026, and any such project shall not be governed by any local ordinances inconsistent with the bill; however, any application for a solar energy facility that has been received and accepted by the relevant authority prior to July 1, 2026, shall be subject to any applicable local ordinances in place at the time the initial application was filed. As introduced, this bill was a recommendation of the Commission on Electric Utility Regulation. This bill is identical to SB 347.

Current Bill Text

Read the full stored bill text
An Act to amend and reenact §§
15.2-2241.2
,
15.2-2288.7
, and
15.2-2288.8
of the Code of Virginia, relating to local regulation of solar facilities; special exceptions.
Be it enacted by the General Assembly of Virginia:
1. That §§
15.2-2241.2
,
15.2-2288.7
, and
15.2-2288.8
of the Code of Virginia are amended and reenacted as follows:
§
15.2-2241.2
. Bonding provisions for decommissioning of solar energy equipment, facilities, or devices.
A. As used in this section, unless the context requires a different meaning:
"Decommission" means the removal and proper disposal of solar energy equipment, facilities, or devices on real property that has been determined by the locality to be subject to §
15.2-2232
and therefore subject to this section. "Decommission" includes the reasonable restoration of the real property upon which such solar equipment, facilities, or devices are located, including (i) soil stabilization and (ii) revegetation of the ground cover of the real property disturbed by the installation of such equipment, facilities, or devices.
"Solar energy equipment, facilities, or devices" means any personal property designed and used primarily for the purpose of collecting, generating, or transferring electric energy from sunlight.
B. As part of the local legislative approval process or as a condition of approval of a site plan, a locality shall require an owner, lessee, or developer of real property subject to this section to enter into a written agreement to decommission solar energy equipment, facilities, or devices upon the following terms and conditions: (i) if the party that enters into such written agreement with the locality defaults in the obligation to decommission such equipment, facilities, or devices in the timeframe set out in such agreement, the locality has the right to enter the real property of the record title owner of such property without further consent of such owner and to engage in decommissioning, and (ii) such owner, lessee, or developer provides financial assurance of such performance to the locality in the form of certified funds, cash escrow, bond, letter of credit, or parent guarantee, based upon an estimate of a professional engineer licensed in the Commonwealth, who is engaged by the applicant, with experience in preparing decommissioning estimates and approved by the locality; such estimate shall not exceed the total of the projected cost of decommissioning, which may include the net salvage value of such equipment, facilities, or devices, plus a reasonable allowance for estimated administrative costs related to a default of the owner, lessee, or developer, and an annual inflation factor.
C. The owner, lessee, or operator shall hire a professional engineer licensed in the Commonwealth to update the decommissioning plan cost estimate and corresponding approved financial instrument every five years after the approval of the first decommissioning plan to adjust for inflation, account for advancements in technologies and processes for decommissioning, salvaging, or re-powering of renewable energy facilities, and make any other necessary changes. The decommissioning plan shall provide for the removal of the facility's equipment from the landowner's property and return of the property to a useful condition similar to the preconstruction condition unless otherwise agreed to by the landowner. After the decommissioning process is complete, the facility shall comply with all stormwater provisions in state law. The project shall provide an up-to-date decommissioning plan to the locality any time there is project ownership outside of the current developer. Notice shall be provided to the local government within 30 days of the sale or transfer of the lease or property, and a new financial guarantee shall be provided by the new leaseholder or property owner.
§
15.2-2288.7
. Local regulation of solar facilities.
A. An owner of a residential dwelling unit may install a solar facility on the roof of such dwelling to serve the electricity or thermal needs of that dwelling, provided that such installation is (i) in compliance with any height and setback requirements in the zoning district where such property is located and (ii) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located. Unless a local ordinance provides otherwise, a ground-mounted solar energy generation facility to be located on property zoned residential shall be permitted, provided that such installation is (a) in compliance with any height and setback requirements in the zoning district where such property is located and (b) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located. Except as provided herein, any other solar facility proposed on property zoned residential, including any solar facility that is designed to serve, or serves, the electricity or thermal needs of any property other than the property where such facilities are located, shall be subject to any applicable zoning regulations of the locality.
B. An owner of real property zoned agricultural may install a solar facility on the roof of a residential dwelling on such property, or on the roof of another building or structure on such property, to serve the electricity or thermal needs of that property upon which such facilities are located, provided that such installation is (i) in compliance with any height and setback requirements in the zoning district where such property is located and (ii) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located.
Unless a local ordinance provides otherwise, a
A
ground-mounted solar energy generation facility to be located on property zoned agricultural and to be operated under §
56-594
or
56-594.2
shall be permitted, provided that such installation is (a) in compliance with any height and setback requirements in the zoning district where such property is located and (b) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located. Except as otherwise provided herein, any other solar facility proposed on property zoned agricultural, including any solar facility that is designed to serve, or serves, the electricity or thermal needs of any property other than the property where such facilities are located, shall be
subject to any applicable zoning regulations of the locality
considered pursuant to §
15.2-2288.8
unless otherwise permitted by right
.
C. An owner of real property zoned commercial, industrial, or institutional may install a solar facility on the roof of one or more buildings located on such property to serve the electricity or thermal needs of that property upon which such facilities are located, provided that such installation is (i) in compliance with any height and setback requirements in the zoning district where such property is located and (ii) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located.
Unless a local ordinance provides otherwise, a
A
ground-mounted solar energy generation facility to be located on property zoned commercial, industrial, or institutional shall be permitted, provided that such installation is (a) in compliance with any height and setback requirements in the zoning district where such property is located and (b) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located. Except as otherwise provided herein, any other solar facility proposed on property zoned commercial, industrial, or institutional, including any solar facility that is designed to serve, or serves, the electricity or thermal needs of any property other than the property where such facilities are located, shall be
subject to any applicable zoning regulations of the locality
considered pursuant to §
15.2-2288.8
unless otherwise permitted by right
.
D. An owner of real property zoned mixed-use may install a solar facility on the roof of one or more buildings located on such property to serve the electricity or thermal needs of that property upon which such facilities are located, provided that such installation is (i) in compliance with any height and setback requirements in the zoning district where such property is located and (ii) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located.
Unless a local ordinance provides otherwise, a
A
ground-mounted solar energy generation facility to be located on property zoned mixed-use shall be permitted, provided that such installation is (a) in compliance with any height and setback requirements in the zoning district where such property is located and (b) in compliance with any provisions pertaining to any local historic, architectural preservation, or corridor protection district adopted pursuant to §
15.2-2306
where such property is located. Except as provided herein, any other solar facility proposed on property zoned mixed-use, including any solar facility that is designed to serve, or serves, the electricity or thermal needs of any property other than the property where such facilities are located, shall be subject to any applicable zoning regulations of the locality.
E. Nothing in this section shall be construed to supersede or limit contracts or agreements between or among individuals or private entities related to the use of real property, including recorded declarations and covenants, the provisions of condominium instruments of a condominium created pursuant to the Virginia Condominium Act (§
55.1-1900
et seq.), the declaration of a common interest community as defined in §
54.1-2345
, the cooperative instruments of a cooperative created pursuant to the Virginia Real Estate Cooperative Act (§
55.1-2100
et seq.), or any declaration of a property owners' association created pursuant to the Property Owners' Association Act (§
55.1-1800
et seq.).
F. A locality, by ordinance, may provide by-right authority for installation of solar facilities in any zoning classification in addition to that provided in this section. A locality may also, by ordinance, require a property owner or an applicant for a permit pursuant to the Uniform Statewide Building Code (§
36-97
et seq.) who removes solar panels to dispose of such panels in accordance with such ordinance in addition to other applicable laws and regulations affecting such disposal.
§
15.2-2288.8
. Special exceptions for solar photovoltaic projects.
A.
Any
Unless otherwise provided by right, each
locality
may grant
shall require
a special exception pursuant to
§
§§
15.2-2204
,

15.2-2286
,
and
15.2-2288.7
or a siting agreement pursuant to §
15.2-2316.7
and include in its zoning ordinance
reasonable
regulations and provisions
consistent with this section
for a special exception as defined in §
15.2-2201
, for any solar photovoltaic
(electric energy)
project
or energy storage project
. For the purposes of this section,
"energy storage project" means energy storage equipment and technology within an energy storage project that is capable of absorbing energy, storing such energy for a period of time, and redelivering such energy after it has been stored
"solar photovoltaic project" means a ground-mounted solar facility with a generating capacity of one megawatt or more that is designed to serve, or serves, the electricity or thermal needs of any property other than the property where such facility is located
.
Any special exception granted pursuant to this section is an amendment to the zoning ordinance pursuant to subdivision A 7 of §
15.2-2286
and shall comply with the following criteria. Where numerical ranges are attached to criteria, localities may choose to establish an ordinance that specifies any number within the applicable range that they deem appropriate for their community. In the issuance of a special exception, a variance from these ordinance criteria may be implemented only with a written agreement of the locality, the property owner or their agent, and the applicant. Nothing in this section shall (i) be construed to relieve projects of the responsibility to comply with all relevant state and federal
laws,
regulations,
and permits,
including those related to tree canopy; (ii) require a locality to approve a special exception application considered pursuant to this section; (iii) be construed to prohibit a locality from permitting a solar photovoltaic project or energy storage project by right; or (iv) prohibit the owner of a proposed solar photovoltaic project and a locality from entering into a siting agreement that provides less stringent restrictions than those specified under this subsection.
1. Setback distances shall be measured from the nearest edge of the equipment as follows: (i) between 150 and 200 feet from the nearest point on the outer wall of existing occupied community buildings and dwellings on nonparticipating properties; (ii) between 50 and 100 feet from the outside edge of the roadbed of any road abutting the property; (iii) for projects not greater than 25 megawatts, 50 feet from the edge, and for projects greater than 25 megawatts, 100 feet from the edge, of tidal wetlands or nontidal wetlands, as defined in 9VAC25-830, or from the top of bank of perennial streams, as defined in §
62.1-44.122
; (iv) for projects of any capacity within Chesapeake Bay Preservation Areas, between 100 and 125 feet from the edge of tidal wetlands, nontidal wetlands, or from the top of bank of perennial streams; and (v) between 50 and 75 feet measured from the nearest shared property line for nonparticipating properties. Nothing in this subdivison shall preclude the owner of a nonparticipating property from waiving the foregoing setback requirements by written agreement. Setbacks shall not be required for internal boundaries between adjacent participating parcels. For purposes of clauses (iii) and (iv), “equipment” is limited to solar panels, racking equipment, and inverters.
2. Fencing for the facility shall comply with §
55.1-2804
, the latest version of the National Electrical Safety Code or any applicable successor standard regarding requirements for limiting access to facilities, and the Uniform Statewide Building Code (§
36-97
et seq.). Vegetative visual screening requirements shall not be required to exceed three feet at planting, shall be between 25 and 50 feet wide, and shall allow for consideration of preexisting natural or manmade visual barriers.
3. The height of solar panels shall not exceed 25 feet above ground when the arrays are at full tilt, except in cases where a height variance is necessary to allow for agrivoltaics activity below or in proximity to the panels. For purposes of this section, "agrivoltaics" means the
same as that term is defined in §
10.1-1197.5
.
4. Visual impacts of facilities on public parks, scenic rivers and byways, and historic structures or sites listed on or eligible for the National Register of Historic Places or a county register of historic places shall be minimized. A locality may request a viewshed analysis as part of the special exception application to assure that visual impacts are minimized through solar panel placement, height, landscaping, and screening. Such analysis shall account for existing vegetation and planned visual buffers. Such screening may be accomplished on any property with the consent of the property owner.
5. The facility shall implement light intensity dimming solution technology that provides a means of tailoring the intensity level of lights according to surrounding visibility.
6. The facility shall comply with all Department of Environmental Quality stormwater regulations as established in 9VAC25-880.
7. The facility shall minimize new impervious surface on the site and under its solar panels.
8. Land disturbance, including site grading, construction, and landscaping, shall be conducted in compliance with a stormwater pollution prevention plan. Topsoil shall not be removed from the project site. Topsoil shall be returned to disturbed areas from stockpiles as quickly as site conditions allow, unless returning soil would cause adverse impacts to topsoil integrity or is otherwise not practicable for construction activities. Site stabilization shall occur as the site is developed, following appropriate stabilization timelines as identified in the General VPDES Permit for Discharges of Stormwater from Construction Activities, and shall not be delayed until site construction is completed. The facility shall decompact soil as necessary and feasible for re-vegetation after construction has concluded.
9. When all land-disturbing activities at the construction site have been completed, the facility shall initiate permanent stabilization to provide vegetative ground cover that provides a minimum level of coverage over the project site. An ordinance may require up to 75 percent vegetative cover with no significant bare areas that is mature enough to survive and will inhibit erosion. The use of native and naturalized plants shall be encouraged and invasive plants as established pursuant to §
10.1-104.6:2
shall be prohibited. For projects or portions of projects not used for animal grazing, co-located crop production, native and naturalized pollinator plant species, or native and naturalized meadow species shall be planted, except for in the area directly beneath panels, and maintained throughout the solar project's life. The seed mix shall include a diversity of species with varied bloom times. Mowing shall be limited and performed on a schedule that promotes the establishment of the native plantings, controls invasive species, and minimizes impacts to wildlife. All trees and shrubs at the time of planting shall accommodate adequate screening or buffering at the end of five years of planting. Vegetation used to establish a visual screen shall not be trimmed to stunt upward and outward growth or to otherwise limit the effectiveness of the visual screen.
10. The facility shall provide for wildlife passage where needed by limiting fencing to the areas in reasonable proximity to arrays and interconnection equipment to the extent practicable and consistent with safety and security requirements. The facility shall prioritize open wildlife access to riparian areas, wetlands, streams, and other areas not in proximity to panels.
11. The facility shall comply with all applicable state and federal labor and employment laws, including apprenticeships and labor standards necessary to achieve any available tax credit bonuses found in 26 U.S.C. §§ 45Y and 48E.
12. A locality shall require an applicant to enter into a written agreement to decommission equipment, facilities, or devices pursuant to §
15.2-2241.2
.
B. Any locality may grant a special exception pursuant to §
15.2-2286
, and include in its zoning ordinance reasonable regulations and provisions for a special exception as defined in §
15.2-2201
, for an energy storage project. For the purposes of this section, "energy storage project" includes energy storage equipment and technology within an energy storage project that is capable of absorbing energy, storing such energy for a period of time, and redelivering such energy after it has been stored.
B.
C.
The governing body of such locality may grant a condition that includes (i) dedication of real property of substantial value or (ii) substantial cash payments for or construction of substantial public improvements, the need for which is not generated solely by the granting of a conditional use permit, so long as such conditions are reasonably related to the project.
C.
D.
Once a condition is granted pursuant to subsection
B
C
, such condition shall continue in effect until a subsequent amendment changes the zoning on the property for which the conditions were granted. However, such conditions shall continue if the subsequent amendment is part of a comprehensive implementation of a new or substantially revised zoning ordinance.
E. The governing body of such locality shall furnish the State Corporation Commission a record of special exception decisions reached pursuant to this section not more than 60 days after such decision is made. The record shall include (i) the reason for any adverse decision, (ii) any finding of nonconformity with the local comprehensive plan, and (iii) the date of the last revision to the comprehensive plan.
2. That the State Corporation Commission shall compile and maintain on the Commission's public website a searchable database of all solar photovoltaic project special exception decisions and the reasons for any adverse decisions made over a period of not less than five years. The Commission shall furnish to each locality a standardized form for submitting decision records by July 1, 2026.
3. That the provisions of this act shall apply to any ground-mounted solar facility with a generating capacity of one megawatt or more for which an application for local approval is filed on or after July 1, 2026, and any such project shall not be governed by any local ordinances inconsistent with this act. Any application for a solar energy facility that has been received and accepted by the relevant authority prior to July 1, 2026, shall be subject to any applicable local ordinances in place at the time the initial application was filed.