Back to Washington

SB5195 • 2026

Capital budget

Concerning the capital budget.

Budget Education
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Senator Trudeau, Senator Schoesler, Senator Chapman, Senator Dozier, Senator Nobles
Last action
2025-04-05
Official status
S subst for
Effective date
Not listed

Plain English Breakdown

Using official source text because the generated explanation was unavailable or could not be confirmed against the official bill text.

Capital budget

Capital budget

What This Bill Does

  • Capital budget

Limits and Unknowns

  • This entry is temporarily using official source text because the generated explanation could not be confirmed against the official bill text during the last sync.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

5195-S AMH THAR H2391.1

1457 • Tharinger

ADOPTED

Plain English: 5195-S AMH THAR H2391.1 SSB 5195 - H AMD 1457 By Representative Tharinger ADOPTED 04/27/2025 Strike everything after the enacting clause and insert the 1 following: 2 "NEW SECTION.

  • 5195-S AMH THAR H2391.1 SSB 5195 - H AMD 1457 By Representative Tharinger ADOPTED 04/27/2025 Strike everything after the enacting clause and insert the 1 following: 2 "NEW SECTION.
  • Sec.
  • 1.
  • (1) A capital budget is hereby adopted 3 and, subject to the provisions set forth in this act, the several 4 dollar amounts hereinafter specified, or so much thereof as shall be 5 sufficient to accomplish the purposes designated, are hereby 6 appropriated and authorized to be incurred for capital projects 7 during the period beginning with the effective date of this act and 8 ending June 30, 2027, out of the several funds specified in this act.9 (2) The definitions in this subsection apply throughout this act 10 unless the context clearly requires otherwise.
5195-S AMS KRIS S2681.1

275 • Krishnadasan

WITHDRAWN

Plain English: 5195-S AMS KRIS S2681.1 SSB 5195 - S AMD 275 By Senator Krishnadasan WITHDRAWN 04/05/2025 On page 133, after line 2, insert the following:1 "NEW SECTION.

  • 5195-S AMS KRIS S2681.1 SSB 5195 - S AMD 275 By Senator Krishnadasan WITHDRAWN 04/05/2025 On page 133, after line 2, insert the following:1 "NEW SECTION.
  • Sec.
  • 5001.
  • FOR THE SUPERINTENDENT OF PUBLIC 2 INSTRUCTION3 West Sound Technical Skills Center Modernization (40000015)4 The appropriations in this section are subject to the following 5 conditions and limitations: The reappropriation is subject to the 6 provisions of section 5003, chapter 296, Laws of 2022.7 Reappropriation:8 Common School Construction Fund— State.

Bill History

  1. 2025-04-05 Senate

    1st substitute bill substituted.

Official Summary Text

Capital budget

Current Bill Text

Read the full stored bill text
AN ACT Relating to the capital budget; amending RCW 79A.25.210, 1
79.22.060, 28B.20.725, 28B.15.210, 28B.15.310, 28B.30.750, 2
28B.35.370, 28B.50.360, 39.35D.030, 43.07.410, and 43.88D.010; 3
amending 2023 c 474 ss 6005, 6014, 6021, 6023, 6024, 6033, 6074, 4
6087, 1044, 1066, 2032, 2036, 3041, 6344, 6345, 3134, 6492, 6505, 5
5080, 5083, and 8019, and 2024 c 375 ss 6012, 1004, 1004, 1005, 1007, 6
1010, 1016, 1018, 1025, 6007, 6018, 1047, 2011, 6023, 3019, 3020, 7
5001, 5004, 5006, 5010, 5012, and 5013 (uncodified); reenacting and 8
amending RCW 43.155.050; adding new sections to 2024 c 375 9
(uncodified); creating new sections; repealing 2023 c 474 ss 6071 and 10
6088 (uncodified); making appropriations; providing contingent 11
effective dates; and declaring an emergency. 12
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF WASHINGTON:13
NEW SECTION. Sec. 1. (1) A capital budget is hereby adopted 14
and, subject to the provisions set forth in this act, the several 15
dollar amounts hereinafter specified, or so much thereof as shall be 16
sufficient to accomplish the purposes designated, are hereby 17
appropriated and authorized to be incurred for capital projects 18
during the period beginning with the effective date of this act and 19
ending June 30, 2027, out of the several funds specified in this act.20
Z-0304.1
SENATE BILL 5195
State of Washington 69th Legislature 2025 Regular Session
By Senators Trudeau, Schoesler, Chapman, Dozier, and Nobles; by
request of Office of Financial Management
Prefiled 01/09/25. Read first time 01/13/25. Referred to Committee
on Ways & Means.
p. 1 SB 5195
(2) The definitions in this subsection apply throughout this act 1
unless the context clearly requires otherwise. 2
(a) "Fiscal year 2026" or "FY 2026" means the period beginning 3
July 1, 2025, and ending June 30, 2026. 4
(b) "Fiscal year 2027" or "FY 2027" means the period beginning 5
July 1, 2026, and ending June 30, 2027. 6
(c) "Lapse" or "revert" means the amount shall return to an 7
unappropriated status. 8
(d) "Provided solely" means the specified amount may be spent 9
only for the specified purpose. 10
(3) Unless otherwise specifically authorized in this act, any 11
portion of an amount provided solely for a specified purpose that is 12
not expended subject to the specified conditions and limitations to 13
fulfill the specified purpose shall lapse. 14
(4) The amounts shown under the headings "Prior Biennia," "Future 15
Biennia," and "Total" in this act are for informational purposes only 16
and do not constitute legislative approval of these amounts. "Prior 17
biennia" typically refers to the immediate prior biennium for 18
reappropriations, but may refer to multiple biennia in the case of 19
specific projects. A "future biennia" amount is an estimate of what 20
may be appropriated for the project or program in the 2027-2029 21
biennium and the following three biennia; an amount of zero does not 22
necessarily constitute legislative intent to not provide funding for 23
the project or program in the future. 24
(5) "Reappropriations" in this act are appropriations and, unless 25
the context clearly provides otherwise, are subject to the relevant 26
conditions and limitations applicable to appropriations. 27
Reappropriations shall be limited to the unexpended balances 28
remaining on June 30, 2025, from the 2023-2025 biennial 29
appropriations for each project. 30
PART 131
GENERAL GOVERNMENT32
NEW SECTION. Sec. 1001. FOR THE SECRETARY OF STATE33
Olympia & Puget Sound Regional Archives HVAC (40000007)34
Appropriation:35
State Building Construction Account— State. . . . . . . $2,430,00036
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $037
p. 2 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,430,0002
NEW SECTION. Sec. 1002. FOR THE DEPARTMENT OF COMMERCE3
Broadband Infrastructure Federal Match Projects (40000290)4
The appropriations in this section are subject to the following 5
conditions and limitations: The reappropriations and appropriations 6
in this section are subject to the provisions of section 7008 of this 7
act. 8
Reappropriation:9
Federal Broadband Account— Federal. . . . . . . . . . $245,560,00010
Federal Broadband Account— State. . . . . . . . . . . $50,000,00011
Subtotal Reappropriation. . . . . . . . . . . . $295,560,00012
Appropriation:13
Federal Broadband Account— Federal. . . . . . . . . . $982,182,00014
Federal Broadband Account— State. . . . . . . . . . . $230,000,00015
Subtotal Appropriation. . . . . . . . . . . . $1,212,182,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,507,742,00019
NEW SECTION. Sec. 1003. FOR THE DEPARTMENT OF COMMERCE20
Broadband Infrastructure Federal Match Projects (40000290)21
The appropriations in this section are subject to the following 22
conditions and limitations: The reappropriations and appropriations 23
in this section are subject to the provisions of section 7009 of this 24
act. 25
Reappropriation:26
General Fund— Federal. . . . . . . . . . . . . . . . $245,560,00027
State Building Construction Account— State. . . . . . $50,000,00028
Subtotal Reappropriation. . . . . . . . . . . . $295,560,00029
Appropriation:30
General Fund— Federal. . . . . . . . . . . . . . . . $982,182,00031
State Building Construction Account— State. . . . . . $230,000,00032
Subtotal Appropriation. . . . . . . . . . . . $1,212,182,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $035
p. 3 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,507,742,0001
NEW SECTION. Sec. 1004. FOR THE DEPARTMENT OF COMMERCE2
2026 FIFA World Cup (40000650)3
The appropriations in this section are subject to the following 4
conditions and limitations: 5
(1) The reappropriations in this section are subject to the 6
provisions of section 1023, chapter 375, Laws of 2024.7
(2) $8,200,000 of the state building construction account — state 8
appropriation is provided solely for stadium security and safety 9
enhancements for lumen field that are required to host the 2026 World 10
Cup in Seattle. 11
(3) $3,600,000 of the state building construction account — state 12
appropriation is provided solely for the following list of projects 13
for capital improvements required to host the 2026 World Cup in 14
Seattle: 15
University of Washington Practice Field. . . . . . . . $2,300,00016
Gonzaga University Practice Field . . . . . . . . . . . $300,00017
Seattle University Practice Field . . . . . . . . . . $1,000,00018
Reappropriation:19
Stadium World Cup Capital Account— State. . . . . . . $10,000,00020
State Building Construction Account— State. . . . . . $10,000,00021
Subtotal Reappropriation. . . . . . . . . . . . . $20,000,00022
Appropriation:23
State Building Construction Account— State. . . . . . $11,800,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,800,00027
NEW SECTION. Sec. 1005. FOR THE DEPARTMENT OF COMMERCE28
2025-27 Early Learning Facilities - Eligible Organizations 29
(40000656)30
The appropriation in this section is subject to the following 31
conditions and limitations: 32
(1) $5,000,000 of the Ruth Lecocq Kagi early learning facilities 33
development account — state appropriation in this section is provided 34
solely for minor renovation grants. 35
p. 4 SB 5195
(2) $45,000,000 of the Ruth Lecocq Kagi early learning facilities 1
development account — state appropriation in this section is provided 2
solely for the early learning facility grant and loan program, 3
subject to the provisions of RCW 43.31.573 through 43.31.583 and 4
43.84.092, to provide state assistance for designing, constructing, 5
purchasing, expanding, or modernizing public or private early 6
learning education facilities for eligible organizations. Up to four 7
percent of the funding in this subsection may be used by the 8
department of children, youth, and families to provide technical 9
assistance to early learning providers interested in applying for the 10
early learning facility grant or loan program. 11
(3) The department of children, youth, and families must develop 12
methodology to identify, at the school district boundary level, the 13
geographic locations of where early childhood education and 14
assistance program slots are needed to meet the entitlement specified 15
in RCW 43.216.556. This methodology must be linked to the caseload 16
forecast produced by the caseload forecast council and must include 17
estimates of the number of slots needed at each school district. This 18
methodology must inform any early learning facilities needs 19
assessment conducted by the department and the department of 20
children, youth, and families. This methodology must be included as 21
part of the budget submittal documentation required by RCW 43.88.030.22
(4) When prioritizing areas with the highest unmet need for23
early childhood education and assistance program slots, the committee 24
of early learning experts convened by the department pursuant to RCW 25
43.31.581 must first consider those areas at risk of not meeting the 26
entitlement specified in RCW 43.216.556. 27
(5) The department must track the number of slots being renovated 28
separately from the number of slots being constructed and, within 29
these categories, must track the number of slots separately by 30
program for the working connections child care program and the early 31
childhood education and assistance program. 32
(6) When prioritizing applications for projects pursuant to RCW 33
43.31.581, the department must award priority points to applications 34
from a rural county or from extreme child care deserts as defined by 35
the department of children, youth, and families. 36
(7) For early learning facilities collocated with affordable or 37
supportive housing developments, the department may remit state 38
funding on a reimbursement basis for 100 percent of eligible project 39
costs, regardless of the project's match amount, once the nonstate 40
p. 5 SB 5195
share of project costs have been either expended or firmly committed 1
in an amount sufficient to complete the entire project or a distinct 2
phase of the project that is useable to the public as an early 3
learning facility. These projects are not subject to section 8015 of 4
this act or RCW 43.88.150. 5
Appropriation:6
Ruth LeCocq Kagi Early Learning Facilities 7
Development Account— State. . . . . . . . . . . . $50,000,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . $127,950,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $177,950,00011
NEW SECTION. Sec. 1006. FOR THE DEPARTMENT OF COMMERCE12
2025-27 Regional Approaches Program (40000657)13
The appropriation in this section is subject to the following 14
conditions and limitations: 15
(1) The appropriation in this section is provided solely for the 16
department to provide planning, technical assistance, and 17
predevelopment grants to local governments and federally recognized 18
tribal governments for projects that would directly benefit 19
overburdened communities, as defined by RCW 70A.02.010, that have 20
been historically underserved by capital grant programs.21
(2) In awarding grants under this section, the department shall 22
prioritize applications that advance community housing, energy, and 23
infrastructure needs. In ranking and sizing grants, the department 24
may consider the financial capacity of the applicant and of the 25
community that the grant would benefit. 26
(3) The department must provide a report to the appropriate 27
committees of the legislature and the governor by October 1, 2026. 28
The report must include: 29
(a) A list and description of the projects approved for funding, 30
including state funding and total project cost; 31
(b) A status report of projects that received funding; and32
(c) A description of the solicitation and evaluation process, 33
including, but not limited to, applications received, the total 34
amount of funding requested, and issues encountered.35
(4) The department may use up to five percent of the 36
appropriation in this section to administer the program, including, 37
but not limited to, providing technical assistance, managing 38
p. 6 SB 5195
contracts, providing community outreach and engagement, reporting, 1
and planning and implementation assistance. 2
Appropriation:3
State Building Construction Account— State. . . . . . . $5,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0007
NEW SECTION. Sec. 1007. FOR THE DEPARTMENT OF COMMERCE8
2025-27 CERB Capital Construction (40000658)9
Appropriation:10
Public Facilities Construction Loan Revolving 11
Account— State. . . . . . . . . . . . . . . . . . $75,000,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,00015
NEW SECTION. Sec. 1008. FOR THE DEPARTMENT OF COMMERCE16
2025-27 Pacific Tower Capital Improvements (40000659)17
Appropriation:18
State Building Construction Account— State. . . . . . . $1,913,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . $6,295,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,208,00022
NEW SECTION. Sec. 1009. FOR THE DEPARTMENT OF COMMERCE23
2025-27 Defense Community Compatibility Account (40000660)24
The appropriation in this section is subject to the following 25
conditions and limitations: The appropriation in this section is 26
provided solely for the following list of projects:27
CKTP Solids Facility (Poulsbo). . . . . . . . . . . . $5,000,00028
Habitat Conservation Land Acquisition (Lacey). . . . . $1,250,00029
North Clear Zone (Lakewood). . . . . . . . . . . . . . $1,000,00030
Oakbrook O3 Well (Lakewood). . . . . . . . . . . . . . $3,451,00031
Appropriation:32
State Building Construction Account— State. . . . . . $10,701,00033
p. 7 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,701,0003
NEW SECTION. Sec. 1010. FOR THE DEPARTMENT OF COMMERCE4
2025-27 Youth Recreational Facilities Program (40000661)5
The appropriation in this section is subject to the following 6
conditions and limitations: 7
(1) The appropriation is subject to the provisions of RCW 8
43.63A.135. 9
(2) Except as directed otherwise before the effective date of 10
this section, the department may not expend the appropriation in this 11
section unless and until the nonstate share of project costs have 12
been either expended or firmly committed, or both, in an amount 13
sufficient to complete the project or a distinct phase of the project 14
that is useable to the public for the purpose intended by this 15
appropriation. This requirement does not apply to projects where a 16
share of the appropriation is for design costs only.17
(3) The appropriation is provided solely for the following list 18
of projects: 19
Camp Robbinswold Lodge Renovation (Tacoma). . . . . . . $453,00020
Chelan Boys & Girls Club (Everett). . . . . . . . . . . $180,00021
ICSVPAC Music Corner & Rehearsal Room (Spokane). . . . $1,200,00022
Lopez Swim Center (Lopez Island). . . . . . . . . . . . $263,00023
Madison House Acquisition (Yakima). . . . . . . . . . . $275,00024
Marysville YMCA Youth Recreation Facility (Everett). . $1,125,00025
OIC Excel Youth Center (Yakima). . . . . . . . . . . . . $475,00026
Outdoor Play Area Renovations (Spokane). . . . . . . . . $25,00027
Prosser Clubhouse (Kennewick). . . . . . . . . . . . . $1,200,00028
Sedro-Woolley Rec Center Remodel (Mount Vernon). . . . . $68,00029
Skagit Y Outdoor Capital Campaign (Mount Vernon). . . . $423,00030
Snoqualmie YMCA Expansion Project (Seattle). . . . . . $1,200,00031
Teen Workforce Development Expansion (Bellevue). . . . . $27,00032
Wenatchee Children's Play, Learning & Recreation Facility33
(Wenatchee). . . . . . . . . . . . . . . . . . . . . $774,00034
Appropriation:35
State Building Construction Account— State. . . . . . . $7,688,00036
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $037
p. 8 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . $32,000,0001
TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,688,0002
NEW SECTION. Sec. 1011. FOR THE DEPARTMENT OF COMMERCE3
2025-27 Library Capital Improvement Program (40000662)4
The appropriation in this section is subject to the following 5
conditions and limitations: 6
(1) The appropriation in this section is provided solely for a 7
local library capital improvement grant program for the following 8
list of projects: 9
Aberdeen Library Renovation (Aberdeen). . . . . . . . $2,000,00010
Central Library Interior Renovation (Bellingham). . . $2,000,00011
Liberty Lake Municipal Library Construction Project12
(Liberty Lake). . . . . . . . . . . . . . . . . . . $937,00013
Lopez Island Library Renovation and Resilience14
Project (Lopez Island). . . . . . . . . . . . . . . $277,00015
Main Library Exterior Envelope Repair (Everett). . . . . $560,00016
Omak Public Library Renovation (Omak). . . . . . . . . . $723,00017
Orcas Island Library Renovation (Orcas Island). . . . . $294,00018
Port Angeles Library Accessible Pathways Project19
(Port Angeles). . . . . . . . . . . . . . . . . . . $313,00020
Port Townsend Public Library HVAC and Elevator21
Modernization (Port Townsend). . . . . . . . . . . . $160,00022
Rosalia Library Donation and Renovation (Rosalia). . . . $75,00023
University Branch Library Improvements (Seattle). . . $2,000,00024
Yakima Central Library Infrastructure Needs for Yakima25
Valley Lib (Yakima). . . . . . . . . . . . . . . . . $611,00026
Yakima Sunnyside Library Infrastructure Needs for Yakima27
Valley L (Sunnyside). . . . . . . . . . . . . . . . . $50,00028
(2) The department must establish a competitive process to 29
solicit proposals for and prioritize projects whose primary objective 30
is to assist libraries operated by governmental units, as defined in 31
RCW 27.12.010, in acquiring, constructing, repairing, or 32
rehabilitating facilities. 33
(3) The department must establish a committee to develop the 34
grant program criteria established under subsection (2) of this 35
section and review proposals. The committee must be composed of five 36
members as provided in this subsection. The committee must include: 37
(a) A representative from the department of commerce; (b) a 38
p. 9 SB 5195
representative from the department of archaeology and historic 1
preservation; (c) the state librarian; (d) a representative from a 2
library district; and (e) a representative from a municipal library.3
(4) The department must conduct a statewide solicitation of 4
project applications. The department must evaluate and rank 5
applications in consultation with the committee established in 6
subsection (3) of this section, using objective criteria. The ranking 7
of projects must prioritize library district facilities listed on a 8
local, state, or federal register of historic places and those 9
located in distressed or rural counties. The evaluation and ranking 10
process must also include an examination of existing assets that 11
applicants propose to apply to projects. Grant assistance under this 12
section may not exceed 50 percent of the total cost of the project. 13
The nonstate portion of the total project cost may include cash, the 14
value of real property when acquired solely for the purpose of the 15
project, and in-kind contributions. 16
(5) The department must submit a prioritized list of recommended 17
projects to the governor and the legislature by October 1, 2026, for 18
inclusion in the department of commerce's 2027-2029 biennial capital 19
budget request. The list must include a description of each project, 20
the amount of recommended state funding, and documentation of 21
nonstate funds to be used for the project. Individual grants may not 22
exceed $2,000,000. The total amount of recommended state funding for 23
the projects on a biennial project list may not exceed $10,000,000.24
(6) In contracts for grants authorized under this section, the 25
department must include provisions that require that capital 26
improvements be held by the grantee for a specified period of time 27
appropriate to the amount of the grant and that facilities be used 28
for the express purpose of the grant. If the grantee is found to be 29
out of compliance with provisions of the contract, the grantee must 30
repay to the state general fund the principal amount of the grant 31
plus interest calculated at the rate of interest on state of 32
Washington general obligation bonds issued on the date most close in 33
time to the date of authorization of the grant. 34
(7) The department must assist grant recipients under this 35
section to apply for applicable competitive federal grant funding 36
and, upon receipt of any such funding, an equal amount of the state 37
building construction account — state appropriation must be placed in 38
unallotted status. 39
p. 10 SB 5195
Appropriation:1
State Building Construction Account— State. . . . . . $10,000,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0005
NEW SECTION. Sec. 1012. FOR THE DEPARTMENT OF COMMERCE6
2025-27 Early Learning Facilities - School Districts (40000663)7
The appropriation in this section is subject to the following 8
conditions and limitations: The appropriation in this section is 9
provided solely for the following list of projects:10
Cle Elum School District . . . . . . . . . . . . . . . . $978,00011
Lind-Ritzville Cooperative Schools . . . . . . . . . . . $823,00012
Medical Lake School . . . . . . . . . . . . . . . . . $1,102,00013
Meridian School District . . . . . . . . . . . . . . . $1,100,00014
Orting School District . . . . . . . . . . . . . . . . $1,102,00015
Prosser School District . . . . . . . . . . . . . . . $1,102,00016
Valley School District Valley Early Learning Center. . $1,102,00017
Walla Walla School District. . . . . . . . . . . . . . . $285,00018
West Valley School District . . . . . . . . . . . . . $1,035,00019
Appropriation:20
Ruth LeCocq Kagi Early Learning Facilities 21
Development Account— State. . . . . . . . . . . . . $8,629,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . $36,000,00024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,629,00025
NEW SECTION. Sec. 1013. FOR THE DEPARTMENT OF COMMERCE26
2025-27 Multifamily Efficiency Grants (40000664)27
The appropriation in this section is subject to the following 28
conditions and limitations: 29
(1) The climate commitment account — state appropriation in this 30
section is provided solely for the department to issue grants or 31
loans to affordable multifamily projects within the housing trust 32
fund portfolio to decarbonize and transition off the direct use of 33
fossil fuels. 34
p. 11 SB 5195
(2) Awards may include, but are not limited to: Conducting 1
benchmarking, technical assistance, energy management, operations and 2
maintenance planning, deep retrofits, energy efficiency upgrades and 3
greenhouse gas emission reductions, renewable energy generation, 4
installation of high-efficiency electric appliances and equipment, 5
including high-efficiency heat pumps, and other decarbonization 6
investments. 7
(3) Individual awards may not exceed $10,000,000. The department 8
must award funding at a sufficient level to complete the financing 9
package necessary for an applicant to accomplish the requested scope 10
of work. The department must prioritize providing meaningful benefits 11
to vulnerable populations in overburdened communities, as defined in 12
RCW 70A.02.010. 13
Appropriation:14
Climate Commitment Account— State. . . . . . . . . . . $25,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . $220,000,00017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $245,000,00018
NEW SECTION. Sec. 1014. FOR THE DEPARTMENT OF COMMERCE19
2025-27 Clean Energy Community Grants (40000665)20
The appropriation in this section is subject to the following 21
conditions and limitations: 22
(1)(a) The appropriation in this section is provided solely for 23
the department to administer noncompetitive grants to nonprofit 24
organizations, local governments, federally recognized tribal 25
governments and tribal entities, state agencies, housing authorities, 26
ports, transit agencies, research organizations, and eligible third-27
party administrators for planning, design, and implementation of 28
capital projects and clean energy technologies that reduce greenhouse 29
gas emissions in vulnerable, overburdened, and tribal communities 30
identified by the department. The department must prioritize grants 31
providing meaningful benefits to vulnerable populations in 32
overburdened communities, as defined in RCW 70A.02.010.33
(b) Eligible uses of grant funds include, but are not limited to, 34
planning for sustainable communities and predesign work, energy 35
efficiency improvements, renewable energy generation, increasing the 36
supply of affordable, energy efficient housing, developing resilient 37
and sustainable infrastructure systems, zero-emission, active 38
p. 12 SB 5195
mobility, and micromobility transportation infrastructure, education 1
and engagement, and workforce development. 2
(2) Up to three percent of the appropriation in this section is 3
for the department to administer the grant program. Administration 4
includes, but is not limited to, identifying eligible communities and 5
eligible third-party administrators, providing technical assistance, 6
managing contracts, reporting, and providing planning and 7
implementation assistance. 8
(3) For the purposes of this section, "eligible third-party 9
administrators" means entities that have sufficient expertise and 10
relationships within the identified community to help plan for, 11
design, or implement capital projects that reduce greenhouse gases or 12
develop clean energy resources for the community. 13
Appropriation:14
State Building Construction Account— State. . . . . . $25,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $225,000,00018
NEW SECTION. Sec. 1015. FOR THE DEPARTMENT OF COMMERCE19
2025-27 High Efficiency Electric Appliance Rebates (HEAR) Program 20
(40000666)21
The appropriation in this section is subject to the following 22
conditions and limitations: 23
(1)(a) $25,000,000 of the climate commitment account — state 24
appropriation is provided solely for the department to administer 25
grants to eligible third-party administrators for heat pump and other 26
high-efficiency electric equipment rebates, with a focus on low/27
moderate income households and small businesses. State incentives and 28
rebates for installation of high-efficiency electric equipment, 29
including electrical panel upgrades, provide a benefit to the public 30
consistent with the state's energy strategy and climate mandates by 31
reducing greenhouse gas emissions from the built environment.32
(b) $5,000,000 of the climate commitment account — state 33
appropriation is provided solely for the department to administer 34
grants to eligible third-party administrators for heat pumps for 35
adult family homes. 36
p. 13 SB 5195
(2) The department shall implement a statewide high-efficiency 1
electric equipment program consistent with the following:2
(a) Aid the transition of residential and commercial buildings 3
away from fossil fuels by providing education and outreach resources 4
for the installation of high-efficiency electric heat pumps and other 5
high-efficiency electric equipment; 6
(b) Provide grants, coordination, and technical assistance to 7
eligible third-party administrators to promote the adoption of high-8
efficiency electric heat pump equipment for space and water heating; 9
and 10
(c) Develop strategies to ensure that the program serves low-11
income households, vulnerable populations, and overburdened 12
communities, including dedicating a portion of the program funding 13
for this purpose. For the purposes of this subsection (2)(c), 14
"overburdened communities" has the same meaning in RCW 70A.65.010.15
(3) For the purposes of this section, "eligible third-party 16
administrators" include, but are not limited to, nonprofits, 17
utilities, housing providers, community action agencies, and 18
community-based organizations. 19
Appropriation:20
Climate Commitment Account— State. . . . . . . . . . . $30,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $230,000,00024
NEW SECTION. Sec. 1016. FOR THE DEPARTMENT OF COMMERCE25
2025-27 Behavioral Health Facilities (40000667)26
The appropriation in this section is subject to the following 27
conditions and limitations: 28
(1) The appropriation in this section is provided solely for the 29
department to issue grants to community hospitals or other community 30
providers to expand and establish new capacity for behavioral health 31
services in communities. The department must consult an advisory 32
group consisting of representatives from the department of social and 33
health services, the health care authority, one representative from a 34
managed care organization, one representative from an accountable 35
care organization, and one representative from the association of 36
county human services. The amounts provided in this section may be 37
used for construction and equipment costs associated with 38
p. 14 SB 5195
establishment or preservation of the facilities. The department may 1
approve funding for the acquisition of a facility if the project will 2
result in increased behavioral health capacity. Amounts provided in 3
this section may not be used for operating costs associated with the 4
treatment of patients using these services. 5
(2) The department must establish criteria for the issuance of 6
the grants, which must include: 7
(a) Evidence that the application was developed in collaboration 8
with one or more regional behavioral health entities that administer 9
the purchasing of services; 10
(b) Evidence that the applicant has assessed and would meet gaps 11
in the geographical availability of behavioral health services in 12
their region; 13
(c) Evidence that the applicant is able to meet applicable 14
licensing and certification requirements in the facility that will be 15
used to provide services; 16
(d) A commitment by applicants to serve persons who are publicly 17
funded and persons detained for involuntary commitment under chapter 18
71.05 RCW; 19
(e) A commitment by the applicant to maintain and operate the 20
beds or facility for a time period commensurate to the state 21
investment, but for at least a 10-year period; 22
(f) The date upon which structural modifications or construction 23
would begin and the anticipated date of completion of the project;24
(g) A detailed estimate of the costs associated with opening the 25
beds; 26
(h) A financial plan demonstrating the applicant's ability to 27
maintain and operate the facility; and 28
(i) The applicant's commitment to work with local courts and 29
prosecutors to ensure that prosecutors and courts in the area served 30
by the hospital or facility will be available to conduct involuntary 31
commitment hearings and proceedings under chapter 71.05 RCW.32
(3) In awarding funding for projects in subsection (6) of this 33
section, the department, in consultation with the advisory group 34
established in subsection (1) of this section, must strive for 35
geographic distribution and to allocate funding based on population 36
and service needs of an area. The department must consider current 37
services available, anticipated services available based on projects 38
underway, and the service delivery needs of an area.39
p. 15 SB 5195
(4) The department must prioritize projects that increase 1
capacity in unserved and underserved areas of the state.2
(5) $10,000,000 of the state building construction account — state 3
appropriation in this section is provided solely for one 16-bed 4
crisis triage and stabilization facility in the King county region 5
consistent with the settlement agreement in A.B, by and through 6
Trueblood, et al., v. DSHS, et al. , No. 15–35462, and that are not 7
subject to federal funding restrictions that apply to institutions of 8
mental disease. 9
(6) $65,000,000 of the state building construction account — state 10
appropriation in this section is provided solely for competitive 11
community behavioral health grants to address the regional needs 12
listed and is subject to the criteria in subsections (1), (2), (3), 13
and (4) of this section: 14
(a) Crisis relief centers and stabilization facilities that offer 15
access to mental health and substance use care for no more than 23 16
hours and 59 minutes per patient, at a time, and are not subject to 17
federal funding restrictions that apply to institutions of mental 18
diseases; 19
(b) Mental health peer respite centers that are not subject to 20
federal funding restrictions that apply to institutions of mental 21
diseases. No more than one mental health peer respite center should 22
be funded in each of the 10 regions; 23
(c) Grants to community providers to increase long-term intensive 24
inpatient psychiatric treatment services and capacity for children 25
and minor youth including, but not limited to, services for substance 26
use disorder treatment, sexual assault and traumatic stress, anxiety, 27
or depression, and interventions for children exhibiting aggressive 28
or depressive behaviors in facilities that are not subject to federal 29
funding restrictions; 30
(d) Grants to community hospitals, freestanding evaluation and 31
treatment providers, or freestanding psychiatric hospitals to develop 32
capacity for beds to serve individuals on 90-day or 180-day civil 33
commitments as an alternative to treatment in the state hospitals. In 34
awarding this funding, the department must coordinate with the 35
department of social and health services, the health care authority, 36
and the department of health and must only select facilities that 37
meet the following conditions: 38
p. 16 SB 5195
(i) The funding must be used to increase capacity related to 1
serving individuals who will be transitioned from or diverted from 2
the state hospitals; 3
(ii) The facility is not subject to federal funding restrictions 4
that apply to institutions of mental diseases; 5
(iii) The provider has submitted a proposal for operating the 6
facility to the health care authority; 7
(iv) The provider has demonstrated to the department of health 8
and the health care authority that it is able to meet the applicable 9
licensing and certification requirements for the facility that will 10
be used to provide services; and 11
(v) The health care authority has confirmed that it intends to 12
contract with the facility for operating costs within funds provided 13
in the operating budget for these purposes; 14
(e) Enhanced adult residential care facilities for long-term 15
dementia placements discharged or diverted from the state psychiatric 16
hospitals and are not subject to federal funding restrictions that 17
apply to institutions of mental diseases; 18
(f) Facilities that provide substance use disorder intervention, 19
assessment, and treatment services with secure withdrawal management 20
and stabilization treatment beds that are not subject to federal 21
funding restrictions that apply to institutions of mental diseases; 22
and 23
(g) Health engagement hubs where behavioral health supportive 24
services, such as harm reduction and physical health services, are 25
offered within the same facility as behavioral health services and 26
that are not subject to federal funding restrictions that apply to 27
institutions of mental diseases. 28
(7) The amounts provided in this subsection are subject to the 29
criteria in subsection (1) of this section, except the projects are 30
not required to establish new capacity. $5,000,000 of the state 31
building construction account — state appropriation in this section is 32
provided solely for grants to community providers to prevent the 33
closure of existing behavioral health facilities. For purposes of 34
this subsection (7), the department must implement necessary 35
procedures to enable rapid commitment of funds on a first-come, 36
first-served basis to qualifying project proposals that satisfy the 37
goal of long-term preservation of behavioral health facilities.38
(8) $27,000,000 of the appropriation in this section is provided 39
solely for the following list of projects: 40
p. 17 SB 5195
Evergreen Treatment Services (Seattle). . . . . . . . $7,000,0001
Suquamish Opioid Treatment Program (Kitsap County). . $20,000,0002
(9) The department shall notify all applicants that they may be 3
required to have a construction review performed by the department of 4
health. 5
(10) To accommodate the emergent need for behavioral health 6
services, the department and the department of health, in 7
collaboration with the health care authority and the department of 8
social and health services, must establish a concurrent and expedited 9
process to assist grant applicants in meeting any applicable 10
regulatory requirements necessary to operate inpatient psychiatric 11
beds, freestanding evaluation and treatment facilities, enhanced 12
services facilities, triage facilities, crisis stabilization 13
facilities, or secure detoxification/secure withdrawal management and 14
stabilization facilities. 15
(11) The department must strive to allocate all of the amounts 16
provided in this section in the manner prescribed in each subsection. 17
However, if upon review of applications, the department determines, 18
in consultation with the advisory group established in subsection (1) 19
of this section, that there are not adequate suitable projects in a 20
category, the department may allocate funding to other project 21
categories listed in this section, prioritizing projects that support 22
serving individuals who will be transitioned from or diverted from 23
the state hospitals. Underserved areas of the state may also be 24
considered. 25
(12) In contracts for grants authorized under this section, the 26
department must include provisions that require that the grantee or 27
successor hold the capital improvements for at least a 10-year 28
period. The provisions must require the facility to be used for 29
behavioral health services, but may allow the facility to change 30
ownership or facility type during the commitment period. The 31
department shall monitor the activities of recipients of grants under 32
this program to determine compliance with the terms and conditions 33
set forth in its contract. 34
(13) The department must provide a progress report to the 35
appropriate committees of the legislature by November 1, 2026. The 36
report must include: 37
(a) The total number of applications and amount of funding 38
requested; 39
p. 18 SB 5195
(b) A list and description of the projects approved for funding 1
including state funding, total project cost, services anticipated to 2
be provided, bed capacity, and anticipated completion date;3
(c) A statewide map of new capacity since 2018, including 4
projected bed capacity and opening dates; 5
(d) A status report of projects that received funding in prior 6
funding rounds, including details about the project completion and 7
the date the facility began providing services; and8
(e) Recommendations for statutory language that would codify the 9
grant program on an ongoing basis including: 10
(i) Evaluation and prioritization criteria; 11
(ii) Monitoring and compliance requirements; 12
(iii) Preconstruction and technical assistance services; and13
(iv) Data needed to determine the service needs by area of the 14
state. 15
(14) The department must coordinate with the health care 16
authority to submit capital budget requests to fund behavioral health 17
community capacity grants for the 2027-2029 biennial budget by the 18
due date established by the office of financial management. 19
Associated state budget operating costs must also be identified and 20
requested. 21
Appropriation:22
State Building Construction Account— State. . . . . . $107,000,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $107,000,00026
NEW SECTION. Sec. 1017. FOR THE DEPARTMENT OF COMMERCE27
2025-27 Building for the Arts Grant Program (40000668)28
The appropriation in this section is subject to the following 29
conditions and limitations: 30
(1) The appropriation is subject to the provisions of RCW 31
43.63A.750. 32
(2) The department may not expend the appropriation in this 33
section unless and until the nonstate share of project costs have 34
been either expended, or firmly committed, or both, in an amount 35
sufficient to complete the project or a distinct phase of the project 36
that is useable to the public for the purpose intended by this 37
p. 19 SB 5195
appropriation. This requirement does not apply to projects where a 1
share of the appropriation is for design costs only.2
(3) The appropriation is provided solely for the following list 3
of projects: 4
American Urban Art & Graffiti Conservation Project5
(Everett). . . . . . . . . . . . . . . . . . . . . . $105,0006
Benaroya Hall Public Spaces Improvements - Phase 17
(Seattle). . . . . . . . . . . . . . . . . . . . . . $878,0008
Cambodian Cultural Hall/Sala Thormaksaphea 9
(Ridgefield). . . . . . . . . . . . . . . . . . . . $217,00010
Centrum Artist Studios (Port Townsend). . . . . . . . . $878,00011
Cherry Street Farm Cultural Arts Center and Lab12
(Seattle). . . . . . . . . . . . . . . . . . . . . . $153,00013
CMT Theatrical Lighting System Renovation (Seattle). . . $290,00014
Columbia Dance Expansion (Seattle). . . . . . . . . . . . $46,00015
Energy Renovation Upgrade (Sequim). . . . . . . . . . . $154,00016
Enhancing Visitor Experience: Security, Lighting and17
Wayfinding S (Everett). . . . . . . . . . . . . . . . $87,00018
Estelita's Freedom House and Cultural Center 19
(Seattle). . . . . . . . . . . . . . . . . . . . . . $878,00020
FCC Hall Renovation: Babaylan Performance & Gathering21
Space (Seattle). . . . . . . . . . . . . . . . . . . $174,00022
Forest Trailhead Exhibit - Trailhead Pavilion 23
(Seattle). . . . . . . . . . . . . . . . . . . . . . $878,00024
Historic Paramount Theatre: Security & Floor Systems25
Improvements (Seattle). . . . . . . . . . . . . . . $270,00026
Hy'shqe Labs (Bellingham). . . . . . . . . . . . . . . . $878,00027
ICSVPAC Box Office Lobby (Spokane) . . . . . . . . . . . $878,00028
Keep Cool Campaign (Mount Vernon). . . . . . . . . . . . $753,00029
Key capital projects at nonprofit theater in Walla30
Walla (Walla Walla). . . . . . . . . . . . . . . . . $22,00031
KPC Capital Project (Kirkland). . . . . . . . . . . . . $152,00032
Little Saigon Vietnamese Cultural & Economic Center33
(Seattle). . . . . . . . . . . . . . . . . . . . . . $878,00034
Living Arts (Mercer Island). . . . . . . . . . . . . . . $230,00035
Main Campus Center Renovations (Seattle). . . . . . . . $878,00036
Meyer Art Center (Stanwood). . . . . . . . . . . . . . . $878,00037
Mini Mart City Park - New Facility Acquisition38
(Seattle). . . . . . . . . . . . . . . . . . . . . . $149,00039
Museum of Glass Renovation - Phase 1 40
p. 20 SB 5195
(Tacoma). . . . . . . . . . . . . . . . . . . . . . $878,0001
Orcas Center Renovation - Phase 3 (Orcas Island). . . . $506,0002
Puyallup Tribe Of Indians (Puyallup). . . . . . . . . . $878,0003
Red Eagle Soaring (Seattle). . . . . . . . . . . . . . . $176,0004
Renovation of Whim W'Him Contemporary Dance Center5
(Seattle). . . . . . . . . . . . . . . . . . . . . . $227,0006
Replacement and upgrade of Hot Shop Infrastructure and7
key capita (Everett). . . . . . . . . . . . . . . . . $46,0008
Restoration of Historic Carriage House (Lakewood). . . . $452,0009
Seattle Aquarium's Ocean Pavilion (Seattle). . . . . . . $878,00010
Tacoma Little Theatre Lobby & Bathroom Renovations11
(Tacoma). . . . . . . . . . . . . . . . . . . . . . $146,00012
TAM Community Gallery and Visual Storage Project13
(Tacoma). . . . . . . . . . . . . . . . . . . . . . $878,00014
The Rhapsody Workshop at King Street Station 15
(Seattle). . . . . . . . . . . . . . . . . . . . . . $200,00016
The Washington State Black Legacy Institute (Seattle). . $878,00017
Totem Star's New Home and Recording Studio at King Street18
Station (Seattle). . . . . . . . . . . . . . . . . . $253,00019
Warehouse Theatre Upgrade (Seattle). . . . . . . . . . . $22,00020
Wenatchee Valley Museum and Cultural Center's Gallery21
Expansion P (Wenatchee). . . . . . . . . . . . . . . $878,00022
Appropriation:23
State Building Construction Account— State. . . . . . $18,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . $72,000,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $90,000,00027
NEW SECTION. Sec. 1018. FOR THE DEPARTMENT OF COMMERCE28
2025-27 Building Communities Fund Program (40000669)29
The appropriation in this section is subject to the following 30
conditions and limitations: 31
(1) The appropriation is subject to the provisions of RCW 32
43.63A.125. 33
(2) The department may not expend the appropriation in this 34
section unless and until the nonstate share of project costs has been 35
either expended or firmly committed, or both, in an amount sufficient 36
to complete the project or a distinct phase of the project that is 37
useable to the public for the purpose intended by this appropriation. 38
p. 21 SB 5195
This requirement does not apply to projects where a share of the 1
appropriation is for design costs only. 2
(3) The appropriation in this section is provided solely for the 3
following list of projects: 4
Alatheia Capacity Building Project (Wenatchee). . . . . $595,0005
Arc Legacy Center (Renton). . . . . . . . . . . . . . . $797,0006
Boys & Girls Clubs of Benton and Franklin Counties7
(Pasco). . . . . . . . . . . . . . . . . . . . . . $1,425,0008
Boys & Girls Clubs of Benton and Franklin Counties - Prosser9
Club (Pasco). . . . . . . . . . . . . . . . . . . . $350,00010
Building What Matters (Wenatchee). . . . . . . . . . . $2,500,00011
Chelan Douglas Community Action Council (Wenatchee). . $2,000,00012
Chelan Douglas County Volunteer Attorney Services - New Home13
(Wenatchee). . . . . . . . . . . . . . . . . . . . . $300,00014
Commercial Space (Seattle). . . . . . . . . . . . . . . $450,00015
Community Services at Pea Patch Lane (Orcas Island). . $2,000,00016
Enhancing Safety and Security (Sequim). . . . . . . . . . $20,00017
Expanded Community Resource Center and Food Bank18
(Bainbridge Island). . . . . . . . . . . . . . . . $2,500,00019
Farm Fresh HUB Facility (Tacoma). . . . . . . . . . . $1,500,00020
Food Bank Warehouse/Delivery Center (Tacoma). . . . . . $500,00021
Healing Headquarters (Tacoma). . . . . . . . . . . . . . $990,00022
Healthy Aging and Wellness Center (Seattle). . . . . . $2,000,00023
Hilltop Family Resource Center - The Cora Whitley Family24
Center (Tacoma). . . . . . . . . . . . . . . . . . . $250,00025
Hoh Highlands Government Center (Forks). . . . . . . . $2,000,00026
HopesCloset (Tacoma). . . . . . . . . . . . . . . . . . . $12,00027
Housing Solutions Center Acquisition and Renovation28
(Vancouver). . . . . . . . . . . . . . . . . . . . $1,188,00029
IACS Kent Community Center (Bellevue). . . . . . . . . $2,000,00030
Inchelium Community Wellness Center (Nespelem). . . . $2,500,00031
Jefferson County Early Learning & Family Support Center32
(Sequim). . . . . . . . . . . . . . . . . . . . . $1,570,00033
Keep the Community Fed (Seattle). . . . . . . . . . . $1,150,00034
Lopez Food Center (Lopez Island). . . . . . . . . . . $1,687,00035
Market and Community Hub (Seattle). . . . . . . . . . . $900,00036
Methow Valley Community Center Clean Air Refuge & Energy37
Retrofit (Twisp). . . . . . . . . . . . . . . . . . $450,00038
Natural Resources Department Renovations Project39
(Darrington). . . . . . . . . . . . . . . . . . . . $100,00040
p. 22 SB 5195
New Puyallup Health Center (Tacoma). . . . . . . . . . . $200,0001
Place for Peace Capital Expansion Project 2
(Kitsap County). . . . . . . . . . . . . . . . . . . $540,0003
Rainier Beach Family Empowerment Center (Seattle). . . $2,000,0004
Room for All Campaign (Seattle). . . . . . . . . . . . . $690,0005
Salish Cultural and Recreation Community Center6
(Spokane). . . . . . . . . . . . . . . . . . . . . $2,500,0007
Skyway Resource Center Acquisition (Seattle). . . . . $1,450,0008
Somali Community & Cultural Innovation Hub 9
(Tukwila). . . . . . . . . . . . . . . . . . . . . $2,500,00010
Vancouver Family Resource Center (Clark county). . . . $1,228,00011
Vashon Food Bank New Building (Vashon Island). . . . . $1,300,00012
Wenatchee Valley Cultural Center (Wenatchee). . . . . $2,500,00013
Youth Community Center (Shelton). . . . . . . . . . . . $640,00014
Appropriation:15
State Building Construction Account— State. . . . . . $49,082,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $249,082,00019
NEW SECTION. Sec. 1019. FOR THE DEPARTMENT OF COMMERCE20
2025-27 Energy Retrofits for Public Buildings Grants (40000670)21
The appropriation in this section is subject to the following 22
conditions and limitations: 23
(1) $17,500,000 of the appropriation in this section is provided 24
solely for grants to local governments, public higher education 25
institutions, school districts, tribal governments, and state 26
agencies for facility improvements and related projects that result 27
in energy and operational cost savings. 28
(a) At least 20 percent of each competitive grant round is 29
designated for awards to eligible projects in small cities or towns 30
with a population of 5,000 or fewer residents. 31
(b) In each competitive round, a higher energy savings to 32
investment ratio must result in a higher project ranking. Priority 33
consideration must be given to applicants that have not received 34
grant awards for this purpose in prior biennia. 35
(c) The department must determine a minimum match ratio to 36
maximize the leverage of nonstate funds. 37
p. 23 SB 5195
(2) $5,000,000 of the appropriation in this section is provided 1
solely for energy efficiency and environmental performance 2
improvements to minor works, stand-alone, and emergency projects at 3
facilities owned by state agencies that repair or replace existing 4
building systems and reduce greenhouse gas emissions from state 5
operations, including, but not limited to, HVAC, lighting, 6
insulation, windows, and other mechanical systems. Eligibility for 7
this funding is dependent on an analysis using the office of 8
financial management's life-cycle cost tool that compares project 9
design alternatives for initial and long-term cost-effectiveness. 10
Assuming a reasonable return on investment, the department shall 11
provide grants in the amount required to improve the project's energy 12
efficiency compared to the original project request.13
(3) The department shall develop metrics that indicate the 14
performance of energy efficiency efforts. 15
(4) If a grant is provided in subsection (1) or (2) of this 16
section to purchase heating devices or systems, the agency must, 17
whenever possible and most cost effective, select devices and systems 18
that do not use fossil fuels. 19
(5) Grants provided in subsections (1) and (2) of this section to 20
state agencies are exempt from the match requirements in this 21
section. 22
Appropriation:23
State Building Construction Account— State. . . . . . $22,500,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . $90,000,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $112,500,00027
NEW SECTION. Sec. 1020. FOR THE DEPARTMENT OF COMMERCE28
2025-27 Weatherization Plus Health Grants (40000671)29
The appropriations in this section are subject to the following 30
conditions and limitations: 31
(1) $5,000,000 of the state building construction account — state 32
appropriation in this section is provided solely for grants for the 33
Washington State University energy extension community energy 34
efficiency program (CEEP) to support homeowners, tenants, and small 35
business owners in making sound energy efficiency investments by 36
providing consumer education and marketing, workforce support through 37
training and lead generation, and direct consumer incentives for 38
p. 24 SB 5195
upgrades to existing homes and small commercial buildings. This is 1
the maximum amount the department may expend for this purpose.2
(2) The department must, to the extent practicable, implement the 3
recommendations in the weatherization plus health 2022 report.4
(3) If funding from these appropriations is used to purchase 5
heating devices or systems, the agency shall, whenever possible and 6
most cost effective, select devices and systems that do not use 7
fossil fuels. 8
(4) The department must: 9
(a) Recruit community energy efficiency program sponsors that are 10
community-based organizations located in geographic areas of the 11
state that have not received funding for low-income weatherization 12
programs, targeting hard-to-reach market segments;13
(b) Leverage funding from community energy efficiency program 14
sponsors in an amount greater than or equal to the amount provided by 15
the state through the weatherization program; 16
(c) Ensure that community energy efficiency program utility 17
sponsors work with nonprofit community-based organizations to deliver 18
community energy efficiency program services; and 19
(d) Identify community energy efficiency program sponsors that 20
support the conversion of space and water heating from fossil fuels 21
to electricity, as part of a set of energy efficiency investments.22
Appropriation:23
State Building Construction Account— State. . . . . . $20,000,00024
Climate Commitment Account— State. . . . . . . . . . . $16,000,00025
Subtotal Appropriation. . . . . . . . . . . . . . $36,000,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . $144,000,00028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $180,000,00029
NEW SECTION. Sec. 1021. FOR THE DEPARTMENT OF COMMERCE30
2025-27 Public Works Board Investment in Essential Infrastructure 31
(40000672)32
Appropriation:33
Public Works Assistance Account— State. . . . . . . . $350,000,00034
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $035
Future Biennia (Projected Costs). . . . . . . . . $1,500,000,00036
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,850,000,00037
p. 25 SB 5195
NEW SECTION. Sec. 1022. FOR THE DEPARTMENT OF COMMERCE1
2025-27 Community EV Charging (40000673)2
The appropriation in this section is subject to the following 3
conditions and limitations: 4
(1) Except as provided in subsection (10) of this section, the 5
appropriation in this section is provided solely for grants for the 6
development of community electric vehicle charging infrastructure.7
(2) Funding provided in this section must be used for projects 8
that provide a benefit to the public through development, 9
demonstration, and deployment of clean energy technologies that save 10
energy and reduce energy costs, reduce harmful air emissions, or 11
increase energy independence for the state. 12
(3) Projects that receive funding under this section must be 13
implemented by, or include partners from, one or more of the 14
following: Local governments, federally recognized tribal 15
governments, or public and private electrical utilities that serve 16
retail customers in the state. 17
(4) Grant funding must be used for level two or higher charging 18
infrastructure and related costs including, but not limited to, 19
construction and site improvements. Projects may include a robust 20
public and private outreach plan that includes engaging with affected 21
parties in conjunction with the new electric vehicle infrastructure.22
(5) The department must prioritize funding for projects in the 23
following order: 24
(a) Multifamily housing; 25
(b) Publicly available charging at any location;26
(c) Schools and school districts; 27
(d) State and local government buildings and office buildings; 28
and 29
(e) All other eligible projects. 30
(6) The department must coordinate with other electrification 31
programs, including projects developed by the department of 32
transportation, to determine the most effective distribution of the 33
systems. The department must also collaborate with the interagency 34
electric vehicle coordinating council established in RCW 43.392.030 35
to implement this section and must work to meet benchmarks 36
established in chapter 182, Laws of 2022. 37
(7) The department may: 38
p. 26 SB 5195
(a) Provide information to applicants about available clean 1
energy tax credits and incentives, including elective pay, that may 2
be applicable to the project for which state funding is being sought;3
(b) Inquire, as part of the application, which tax credits and 4
incentives the applicant plans to seek for the project;5
(c) Prioritize projects seeking any applicable clean energy tax 6
credits and incentives when developing and applying competitive 7
criteria for selecting recipients under this section; and8
(d) Consider the availability of any federal tax credits or other 9
federal or nonfederal grants or incentives that the applicant may 10
benefit from in review of the application. 11
(8) Funding awards made under this section may not exceed 100 12
percent of the cost of the project. 13
(9) Up to three percent of the appropriation in this section is 14
for the department to administer the grant program.15
(10) $3,000,000 of the appropriation in this section is provided 16
solely for the Cowlitz MHD ZEV Depot in Longview. 17
Appropriation:18
Climate Commitment Account— State. . . . . . . . . . . $40,000,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $240,000,00022
NEW SECTION. Sec. 1023. FOR THE DEPARTMENT OF COMMERCE23
2025-27 Supporting Housing Affordability Infrastructure Program 24
(40000674)25
The appropriation in this section is subject to the following 26
conditions and limitations: 27
(1) The appropriation in this section is provided solely for 28
grants or deferred loans to local governments for impact fees or 29
other mitigation required for new affordable housing projects related 30
to transportation, parks, schools or fire facilities that serve and 31
benefit low-income households. Eligible jurisdictions must have 32
adopted proportional impact fees and waivers for affordable housing. 33
Where applicable, the development must be consistent with the 34
approved comprehensive plans under the growth management act and must 35
be within the established boundaries of the urban growth area.36
(2) For purposes of this subsection, the following definitions 37
apply. 38
p. 27 SB 5195
(a) "Affordable housing" has the same meaning as in RCW 1
43.185A.010. 2
(b) "Low-income household" has the same meaning as in RCW 3
43.185A.010. 4
(c) "Impact fees" has the same meaning as in RCW 82.02.090.5
Appropriation:6
State Building Construction Account— State. . . . . . $10,000,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00010
NEW SECTION. Sec. 1024. FOR THE DEPARTMENT OF COMMERCE11
2025-27 Connecting Housing to Infrastructure Program (40000675)12
The appropriation in this section is subject to the following 13
conditions and limitations: 14
(1) The appropriation in this section is provided solely for 15
grants or deferred loans to local governments and public utility 16
districts or their contracted service providers for system 17
development charges and utility improvements for new affordable 18
housing projects that serve and benefit low-income households. Where 19
applicable, the extension must be consistent with the approved 20
comprehensive plans under the growth management act and must be 21
within the established boundaries of the urban growth area.22
(2) $45,000,000 of the state building construction account — state 23
appropriation is provided solely for grants or deferred loans to 24
local governments or public utilities located within a jurisdiction 25
that imposes a sales and use tax under RCW 82.14.530(1) (a)(ii) or 26
(b)(i)(B), 82.14.540, or 84.52.105. 27
(3) $20,000,000 of the state building construction account — state 28
appropriation in this section is provided solely for grants to local 29
governments or public utilities located within: 30
(a) A city or county with a population of 150,000 or less; and31
(b) A jurisdiction that imposes a sales and use tax under RCW 32
82.14.530(1) (a)(ii) or (b)(i)(B). 33
(4) To be eligible for funding under this section, an applicant 34
must demonstrate, at minimum: 35
(a) That affordable housing development will begin construction 36
within 24 months of the grant or loan award; and 37
p. 28 SB 5195
(b) A strong probability of serving the original target group or 1
income level for a period of at least 25 years. 2
(5) For purposes of this section, the following definitions 3
apply. 4
(a) "Affordable housing" has the same meaning as in RCW 5
43.185A.010. 6
(b) "Low-income household" has the same meaning as in RCW 7
43.185A.010. 8
(c) "System development charges" means charges for new drinking 9
water, wastewater, or stormwater connections when a local government 10
or public utility has waived standard fees normally applied to 11
developers for connection charges on affordable housing projects.12
(d) "Utility improvements" means drinking water, wastewater, or 13
stormwater utility improvements. 14
Appropriation:15
State Building Construction Account— State. . . . . . $65,000,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . $260,000,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $325,000,00019
NEW SECTION. Sec. 1025. FOR THE DEPARTMENT OF COMMERCE20
2025-27 Housing Trust Fund (40000677)21
The appropriations in this section are subject to the following 22
conditions and limitations: 23
(1) $78,000,000 of the state building construction account — state 24
and $350,500,000 of the state taxable building construction account — 25
state appropriations are provided solely for the new construction, 26
acquisition, or acquisition and rehabilitation of affordable housing 27
projects that serve and benefit low-income and special needs 28
populations as provided in this section. The department must 29
administer this appropriation in accordance with the affordable 30
housing program, chapter 43.185A RCW, and evaluate projects by giving 31
preference for applications based on some or all of the criteria in 32
RCW 43.185A.140. 33
(a) $50,000,000 of the state building construction account — state 34
and $165,000,000 of the state taxable building construction account — 35
state appropriations are provided solely for multifamily rental 36
housing projects. 37
p. 29 SB 5195
(b) $50,000,000 of the state taxable building construction 1
account— state appropriation is provided solely for affordable housing 2
projects that serve and benefit low-income people with developmental 3
or intellectual disabilities. The department must use a separate 4
application form and evaluation criteria for applications under this 5
subsection. The department must coordinate with the department of 6
social and health services regarding any needed supportive services 7
and make efforts to enact the recommendations of the housing needs 8
study for individuals with intellectual and developmental 9
disabilities, as provided in section 1068 (6), chapter 332, Laws of 10
2021. 11
(c) $100,000,000 of the state taxable building construction 12
account— state appropriation is provided solely for permanent 13
supportive housing projects in accordance with the apple health and 14
homes rapid permanent supportive housing program created in RCW 15
43.330.187. 16
(d)(i) $28,000,000 of the state building construction account — 17
state and $30,000,000 of the state taxable building construction 18
account— state appropriations are provided solely for the development 19
of homeownership projects affordable to first-time low-income 20
households. Projects serving homebuyers whose income is up to 80 21
percent of the area median income, adjusted for household size for 22
the county where the property is located are eligible to apply, 23
except that projects located in rural areas of the state, as defined 24
by the department, serving homebuyers whose income is up to 100 25
percent of the area median income, adjusted for household size for 26
the county where the property is located are eligible to apply. 27
Eligible activities include, but are not limited to, down payment 28
assistance, closing costs, acquisition, rehabilitation costs, and new 29
construction. 30
(ii) $8,000,000 of the state building construction account — state 31
appropriation in this subsection is provided solely for Homestead 32
Community Land Trust. 33
(e)(i) $10,500,000 of the state taxable building construction 34
account— state appropriation is provided solely for investments 35
intended to preserve mobile or manufactured home communities where at 36
least 50 percent of the preserved homes are and will remain occupied 37
by low-income households. The department shall ensure the properties 38
are preserved for the intended low-income households by placing them 39
p. 30 SB 5195
in Washington's housing trust fund portfolio for a minimum of 40 1
years. 2
(ii) $5,000,000 of the state taxable building construction 3
account— state appropriation in this subsection is provided solely for 4
the Northwest Cooperative Development Center for critical 5
improvements, repairs, and infrastructure upgrades for resident-owned 6
manufactured housing community cooperatives in Washington.7
(f) $20,000,000 of the state taxable building construction 8
account— state appropriation is provided solely for eligible 9
organizations under RCW 43.185A.040 to acquire, acquire and renovate, 10
and prepare real property for rapid conversion into enhanced 11
emergency shelters, permanent supportive housing, transitional 12
housing, permanent housing, youth housing, or shelter for extremely 13
low-income people, families, unaccompanied youth, and young people 14
experiencing sheltered and unsheltered homelessness. The department 15
may only approve funding for projects that result in increased 16
shelter or housing capacity for extremely low-income people and 17
households. Acquisition of multifamily housing units is a priority, 18
and the department shall prioritize housing projects that rapidly 19
move people experiencing unsheltered homelessness into housing, 20
including, but not limited to, individuals living in unsanctioned 21
encampments, the public rights-of-way, or other public spaces. 22
Amounts provided in this section may not be used for operating or 23
maintenance costs, supportive services, or debt service.24
(g) $50,000,000 of the state taxable building construction 25
account— state appropriation is provided solely for affordable housing 26
preservation projects, which may include, but are not limited to:27
(i) Projects preserving and extending the affordability 28
commitment period for projects in the housing trust fund portfolio. 29
The funds may be provided for major building improvements, 30
preservation, and system replacements, necessary for the existing 31
housing trust fund portfolio to maintain its long-term viability. The 32
department must require a capital needs assessment be provided before 33
contract execution. Funds may not be used to add or expand the 34
capacity of the property. When allocating funds, the department must 35
prioritize buildings that are older than 15 years and that serve very 36
low-income and extremely low-income populations. 37
(ii) Projects preserving affordable multifamily housing at risk 38
of losing its affordability due to expiration of use restrictions 39
p. 31 SB 5195
that otherwise require affordability including, but not limited to, 1
United States department of agriculture funded multifamily housing. 2
The department must prioritize projects that satisfy the goal of 3
long-term preservation of Washington's affordable multifamily housing 4
stock, particularly in rural areas of the state. Funds may be used 5
for acquisition or for acquisition and rehabilitation of properties 6
to preserve the affordable housing units beyond their existing use 7
restrictions and place them in Washington's housing trust fund 8
portfolio for a minimum of 40 years. 9
(h) $25,000,000 of the state taxable building construction 10
account— state appropriation is provided solely for either affordable 11
multifamily rental housing or homeownership projects, or both, 12
benefiting low-income households in federally recognized Indian 13
tribes in the state of Washington. 14
(2) $4,500,000 of the state taxable building construction account15
— state appropriation is provided solely for the Mary's Place 16
emergency shelter. 17
(3) $3,000,000 of the state building construction account — state 18
appropriation is provided solely for the department to provide 19
preconstruction and technical assistance awards in accordance with 20
RCW 43.185A.170. 21
(4) The department must strive to allocate all of the amounts 22
appropriated in this section within the 2025-2027 fiscal biennium in 23
the manner prescribed in each subsection. However, if upon review of 24
applications the department determines there are not adequate 25
suitable projects in a category, the department may allocate funds to 26
other affordable housing projects serving other low-income and 27
special needs populations, provided those projects are located in an 28
area with an identified need for the type of housing proposed.29
Appropriation:30
State Building Construction Account— State. . . . . . $81,000,00031
State Taxable Building Construction Account— 32
State. . . . . . . . . . . . . . . . . . . . . . $455,000,00033
Subtotal Appropriation. . . . . . . . . . . . . $536,000,00034
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $035
Future Biennia (Projected Costs). . . . . . . . . $2,000,000,00036
TOTAL. . . . . . . . . . . . . . . . . . . . . $2,536,000,00037
NEW SECTION. Sec. 1026. FOR THE DEPARTMENT OF COMMERCE38
p. 32 SB 5195
2025-27 Clean Energy Fund Program (40000679)1
The appropriation in this section is subject to the following 2
conditions and limitations: 3
(1) The appropriation in this section is provided solely for 4
competitive grants to eligible entities for predevelopment, design, 5
and construction of projects that provide a public benefit through 6
research, development, demonstration, or deployment of clean energy 7
technologies that save energy and reduce energy costs, reduce harmful 8
air emissions, or increase energy independence for the state. 9
Priority must be given to projects that benefit vulnerable 10
populations and overburdened communities, including tribes.11
(2) Entities eligible for grant funding under this section 12
include local governments, federally recognized tribal governments 13
and tribes' contracted service providers, public and private 14
utilities that serve retail customers in the state, for-profit 15
entities, research institutions, nonprofit organizations, and state 16
agencies. 17
(3) To be eligible, a project must be consistent with the state 18
energy strategy adopted under chapter 43.21F RCW and policies under 19
chapter 19.405 RCW. To the extent practicable, the department must 20
prioritize projects that build upon Washington's strengths in 21
aerospace, maritime, information and communications technology, grid 22
modernization, advanced materials, and decarbonizing the built 23
environment. 24
(4) The department must invite stakeholders to participate in the 25
design and implementation of grant programs funded under this 26
section. The department must consider equity and environmental 27
justice when developing the program structure and opportunities for 28
applicant participation. 29
(5) When soliciting and evaluating proposals, awarding contracts, 30
and monitoring projects under this section, the department must:31
(a) Ensure that competitive processes, rather than sole source 32
contracting processes, are used to select all projects;33
(b) Ensure that a public benefit results from the use of public 34
funds through due diligence and monitoring of contracted projects, 35
including ensuring compliance with all applicable laws related to the 36
project selection process, project monitoring, and contracting; and37
(c) Prioritize projects for funding that leverage the greatest 38
amount of matching funds, such as local levy funding.39
p. 33 SB 5195
(6)(a) The department must require project applicants to:1
(i) Disclose all sources of public funding invested in a project; 2
and 3
(ii) Identify by name any former or current state of Washington 4
employees employed by the applicant or its governing body in the 24 5
months preceding the application submittal. The identification must 6
include the person's separation date and job title or position held. 7
If the department determines that a conflict of interest or other 8
violation of chapter 42.52 RCW exists, the application must be 9
disqualified from further consideration. 10
(b) If, after a grant has been awarded, the department finds that 11
a grantee has violated chapter 42.52 RCW, either in procuring or 12
performing under the grant, the department in its sole discretion may 13
terminate the grant funding by written notice. If the grant is 14
terminated, the department must reserve its right to pursue all 15
available remedies under law to address the violation.16
(7) The department must specify the requirements in subsections 17
(5) and (6) of this section in funding contracts entered into by the 18
department under this section. 19
(8) $10,000,000 of the appropriation in this section is provided 20
solely for grants to tribes for clean energy development projects. 21
Eligible uses of grant funding include planning, predesign, design, 22
construction, project predevelopment, and deployment of clean energy 23
projects that contribute to achieving the state's greenhouse gas 24
emissions reduction goals and related policies. The department must 25
collaborate with tribes in the design and development of this grant 26
program. 27
Appropriation:28
State Building Construction Account— State. . . . . . $50,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $250,000,00032
NEW SECTION. Sec. 1027. FOR THE DEPARTMENT OF COMMERCE33
2025-27 Communities of Concern (40000680)34
The appropriation in this section is subject to the following 35
conditions and limitations: 36
(1) The department may not expend the appropriation in this 37
section unless and until the nonstate share of project costs have 38
p. 34 SB 5195
been either expended or firmly committed, or both, in an amount 1
sufficient to complete the project or a distinct phase of the project 2
that is useable to the public for the purpose intended by the 3
legislature. This requirement does not apply to projects where a 4
share of the appropriation is for design costs only.5
(2) Before receiving funds, project recipients must demonstrate 6
that the project site is under control for a minimum of 10 years, 7
either through ownership or a long-term lease. This requirement does 8
not apply to appropriations for preconstruction activities or 9
appropriations in which the sole purpose is to purchase real property 10
that does not include a construction or renovation component.11
(3) Projects funded in this section may be required to comply 12
with Washington's high performance building standards under chapter 13
39.35D RCW. 14
(4) Project funds are available on a reimbursement basis only and 15
may not be advanced under any circumstances. 16
(5) In contracts for grants authorized under this section, the 17
department shall include provisions that require that capital 18
improvements be held by the grantee for a specified period of time 19
appropriate to the amount of the grant and that facilities be used 20
for the express purpose of the grant. If the grantee is found to be 21
out of compliance with provisions of the contract, the grantee shall 22
repay to the state general fund the principal amount of the grant 23
plus interest calculated at the rate of interest on state of 24
Washington general obligation bonds issued most closely to the date 25
of authorization of the grant. 26
(6) Projects funded in this section, including those that are 27
owned and operated by nonprofit organizations, are generally required 28
to pay state prevailing wages. 29
(7) The department must comply with the requirements set forth in 30
executive order 21-02 and must consult with the department of 31
archaeology and historic preservation and affected tribes on the 32
potential effects of these projects on cultural resources and 33
historic properties. Consultation with the department of archaeology 34
and historic preservation and affected tribes must be initiated 35
before project funds are made available. 36
(8) The appropriation in this section is provided solely for the 37
following list of projects: 38
Bryant Manor Redevelopment (Seattle). . . . . . . . . $3,000,00039
Skagit Farmworker Led Community Farm project 40
p. 35 SB 5195
(Bellingham). . . . . . . . . . . . . . . . . . . . $750,0001
Intramuros Village and Cultural Community Center2
(Seattle). . . . . . . . . . . . . . . . . . . . . $3,271,0003
Appropriation:4
State Building Construction Account— State. . . . . . . $7,021,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,021,0008
NEW SECTION. Sec. 1028. FOR THE DEPARTMENT OF COMMERCE9
2025-27 Green Jobs and Infrastructure Fund (40000681)10
The appropriation in this section is subject to the following 11
conditions and limitations: 12
(1)(a) The appropriation in this section is provided solely for 13
grants to projects that demonstrate high-wage, clean job creation in 14
Washington, provide risk reduction for investments in public and 15
private infrastructure in order to increase a community's capacity 16
for clean manufacturing, or provide investments in workforce 17
development to attract and train the workforce required to grow the 18
clean energy economy. 19
(b) Grants must be provided to eligible entities to help mitigate 20
and reverse the effects of climate change, help communities meet 21
their energy and climate change regulatory requirements, bring 22
increased federal and private investment to the state, help develop 23
the advanced workforce of the future, and ensure Washington state 24
maintains or grows its position as a world leader in developing the 25
projects and processes that are used to fight climate change 26
globally. Eligible activities under this section include, but are not 27
limited to, planning predevelopment, design, engineering, and 28
construction of clean technology projects. 29
(c) Entities eligible for grants under this section include, but 30
are not limited to, local governments, federally recognized tribal 31
governments and tribes' contracted service providers, public and 32
private utilities, ports, associate development organizations, for-33
profit entities, academic and research institutions, nonprofit 34
organizations, and state agencies. 35
(d) Projects eligible for funding must be physically located in 36
Washington state. Eligible projects must be consistent with the state 37
energy strategy adopted under chapter 43.21F RCW and clean energy 38
p. 36 SB 5195
policies under chapter 19.405 RCW. Projects must further the goals of 1
the climate commitment act as described in RCW 70A.65.260(1)(j).2
(e) The department must consider equity and environmental justice 3
when developing the program structures and opportunities for 4
applicant participation and must follow principles established in its 5
community engagement plan adopted under RCW 70A.02.050.6
(f) When soliciting and evaluating grant application proposals, 7
awarding contracts, and monitoring projects under this section, the 8
department must: 9
(i) Use competitive processes to select all projects, except as 10
otherwise noted in this section. The department must design a 11
competitive process to allow provision of grant awards to projects in 12
a timely manner and consistent with the project timeline. 13
Applications must be accepted on a rolling basis, and final 14
determination must be made by the department; 15
(ii) Ensure compliance with all applicable laws related to the 16
project selection process, project monitoring, and contracting; and17
(iii) Prioritize projects that leverage the greatest amount of 18
matching funds, such as local levy funding or private investment in 19
advanced manufacturing capability. 20
(g) Project applicants must disclose all sources of public 21
funding invested in a project. Grant contracts must provide that if, 22
after a grant has been awarded, the department finds that a grantee 23
has violated chapter 42.52 RCW, either in procuring or performing 24
under the grant, the department in its sole discretion may terminate 25
the grant funding by written notice, and that, if the grant is 26
terminated, the department reserves its right to pursue all available 27
remedies under law to address the violation. 28
(2) Up to four percent of the appropriation in this section is 29
provided solely for the department to support access to and to 30
flexibly administer the program. The department may use these funds 31
to hire full-time equivalent positions within the department, as well 32
as contract for additional capacity and subject matter expertise.33
Appropriation:34
Climate Commitment Account— State. . . . . . . . . . . $5,000,00035
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $036
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $037
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00038
p. 37 SB 5195
NEW SECTION. Sec. 1029. FOR THE DEPARTMENT OF COMMERCE1
2025-27 Solar and Energy Storage Grants (40000682)2
The appropriation in this section is subject to the following 3
conditions and limitations: 4
(1) The appropriation in this section is provided for grants to 5
increase the deployment of distributed solar and battery energy 6
storage systems to enhance grid resilience, provide backup power for 7
critical needs, and reduce energy costs. Projects may be solar energy 8
systems, battery energy storage, or solar paired with battery energy 9
storage. Funding may also be used to enable electric utility demand 10
response programs that include customer-sited solar and battery 11
energy storage systems. Eligible uses of the amounts provided in this 12
section include, but are not limited to, planning and predevelopment 13
work with communities. 14
(2) Entities eligible for grant funding under this section 15
include public higher education institutions, school districts, 16
tribal governments and tribal entities, state and local governments, 17
nonprofit organizations, and entities participating in federally 18
funded solar programs administered by the department.19
(3) For energy storage projects, the department must prioritize 20
facilities that serve community members during power outages or 21
provide critical infrastructure. 22
(4) The department may: 23
(a) Provide information to applicants about available clean 24
energy tax credits and incentives, including elective pay, that may 25
be applicable to the project for which state funding is being sought;26
(b) Inquire, as part of the application, which tax credits and 27
incentives the applicant plans to seek for the project;28
(c) Prioritize projects seeking any applicable clean energy tax 29
credits and incentives when developing and applying competitive 30
criteria for selecting recipients under this section; and31
(d) Consider the availability of any federal tax credits or other 32
federal or nonfederal grants or incentives that the applicant may 33
benefit from in review of the application. 34
(5) Funding awards made under this section may not exceed 100 35
percent of the cost of the project. 36
Appropriation:37
State Building Construction Account— State. . . . . . $50,000,00038
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $039
p. 38 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . $200,000,0001
TOTAL. . . . . . . . . . . . . . . . . . . . . . $250,000,0002
NEW SECTION. Sec. 1030. FOR THE DEPARTMENT OF COMMERCE3
2025-27 Clean Buildings Performance Grants (40000683)4
The appropriation in this section is subject to the following 5
conditions and limitations: 6
(1) $15,000,000 of the appropriation in this section is provided 7
solely for clean building performance grants for tier 1 covered 8
buildings as defined in RCW 19.27A.200. 9
(2) $10,000,000 of the appropriation in this section is provided 10
solely for clean building performance grants for public buildings.11
Appropriation:12
State Building Construction Account— State. . . . . . $25,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00016
NEW SECTION. Sec. 1031. FOR THE DEPARTMENT OF COMMERCE17
2025-27 Low-Income Home Rehabilitation Grant Program (HRGP) 18
(40000684)19
Appropriation:20
State Building Construction Account— State. . . . . . . $6,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $24,000,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,00024
NEW SECTION. Sec. 1032. FOR THE DEPARTMENT OF COMMERCE25
2026 Local and Community Projects (40000709)26
The appropriations in this section are subject to the following 27
conditions and limitations: 28
(1) The department may not expend the appropriation in this 29
section unless and until the nonstate share of project costs have 30
been either expended or firmly committed, or both, in an amount 31
sufficient to complete the project or a distinct phase of the project 32
that is useable to the public for the purpose intended by the 33
legislature. This requirement does not apply to projects where a 34
share of the appropriation is for design costs only.35
p. 39 SB 5195
(2) Before receiving funds, project recipients must demonstrate 1
that the project site is under control for a minimum of 10 years, 2
either through ownership or a long-term lease. This requirement does 3
not apply to appropriations for preconstruction activities or 4
appropriations in which the sole purpose is to purchase real property 5
that does not include a construction or renovation component.6
(3) Projects funded in this section may be required to comply 7
with Washington's high performance building standards under chapter 8
39.35D RCW. 9
(4) Project funds are available on a reimbursement basis only and 10
may not be advanced under any circumstances. 11
(5) In contracts for grants authorized under this section, the 12
department shall include provisions that require that capital 13
improvements be held by the grantee for a specified period of time 14
appropriate to the amount of the grant and that facilities be used 15
for the express purpose of the grant. If the grantee is found to be 16
out of compliance with provisions of the contract, the grantee shall 17
repay to the state general fund the principal amount of the grant 18
plus interest calculated at the rate of interest on state of 19
Washington general obligation bonds issued most closely to the date 20
of authorization of the grant. 21
(6) Projects funded in this section, including those that are 22
owned and operated by nonprofit organizations, are generally required 23
to pay state prevailing wages. 24
(7) The department must comply with the requirements set forth in 25
executive order 21-02 and must consult with the department of 26
archaeology and historic preservation and affected tribes on the 27
potential effects of these projects on cultural resources and 28
historic properties. Consultation with the department of archaeology 29
and historic preservation and affected tribes must be initiated 30
before project funds are made available. 31
(8) The state building construction account — state appropriation 32
in this section is provided solely for the following list of 33
projects: 34
Creole Resources Community Hub (Spokane). . . . . . . $1,500,00035
Friends of Lopez Island Pool (Lopez Island). . . . . . . $523,00036
Hispanic Cultural Center and Business Incubator37
(Yakima). . . . . . . . . . . . . . . . . . . . . $2,000,00038
Junior Achievement of Washington (Auburn). . . . . . . $1,000,00039
Klickitat County Public Hospital District No. 240
p. 40 SB 5195
(White Salmon). . . . . . . . . . . . . . . . . . $2,950,0001
McKinney Center HVAC System (Seattle). . . . . . . . . $2,000,0002
Metropolitan Development Council Facility (Tacoma). . $1,200,0003
Muslim Association of Puget Sound (Redmond). . . . . . $2,500,0004
Nisqually Tribal Vocational Training and Emergency5
Operations Center (Olympia). . . . . . . . . . . . $1,000,0006
Outdoors for All Foundation. . . . . . . . . . . . . . $1,000,0007
Port Angeles Waterfront Center (Port Angeles). . . . . $4,000,0008
Port of Chehalis Hydrogen Fueling Station and Production9
Facility (Centralia). . . . . . . . . . . . . . . $2,000,00010
Ron Chew Healthy Aging and Wellness Center (Seattle). $3,000,00011
Trailer for Remote Location Services and Support12
(Yakima). . . . . . . . . . . . . . . . . . . . . $1,000,00013
Tukwila Health & Wellness Center project (Tukwila). . $1,000,00014
Willard Early Learning Center (Tacoma). . . . . . . . $5,000,00015
Appropriation:16
State Building Construction Account— State. . . . . . $31,673,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,673,00020
NEW SECTION. Sec. 1033. FOR THE DEPARTMENT OF COMMERCE21
2025-27 Tribal Climate Adaptation Pass-through Grants (40000812)22
The appropriation in this section is subject to the following 23
conditions and limitations: 24
(1) The appropriation in this section is provided solely for 25
grants to provide tribal assistance to mitigate and adapt to the 26
effects of climate change, including, but not limited to, supporting 27
relocation for Indian tribes located in areas of heightened risk due 28
to anticipated sea level rise, flooding, or other disturbances caused 29
by climate change. In developing the grant program, the department 30
must collaborate with tribes to determine program parameters for 31
award amounts, distribution, and benchmarks for success. In order to 32
meet the requirements of RCW 70A.65.230(1)(b), tribal applicants are 33
encouraged to include a tribal resolution supporting their request 34
with their application. 35
(2) $3,800,000 of the appropriation is provided solely for the 36
Quinault Indian Nation to continue its relocation efforts.37
p. 41 SB 5195
(3) $5,000,000 of the appropriation is provided solely for the 1
Puyallup Tribe of Indians to purchase strategic aquaculture property, 2
which will allow the property to continue its use as a 3
decarbonization zone due to the continued restoration and expansion 4
of shellfish on-site and also to provide food security of a 5
traditional food to indigenous peoples. 6
Appropriation:7
Climate Commitment Account— State. . . . . . . . . . . $50,000,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $250,000,00011
NEW SECTION. Sec. 1034. FOR THE DEPARTMENT OF COMMERCE12
2025-27 Broadband Infrastructure Federal Match Transfer 13
(40000825)14
The appropriation in this section is subject to the following 15
conditions and limitations: $230,000,000 of the state building 16
construction account— state appropriation in this section is provided 17
solely as match for the statewide broadband office to administer the 18
broadband equity, access, and deployment state grants program in 19
section 60102 of P.L. 117-58 (infrastructure investment and jobs 20
act). $230,000,000 of the appropriation must be transferred into the 21
federal broadband account— state. 22
Appropriation:23
State Building Construction Account— State. . . . . . $230,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $230,000,00027
NEW SECTION. Sec. 1035. FOR THE DEPARTMENT OF COMMERCE28
2025-27 Community Participatory Budgeting (40000829)29
The appropriations in this section are subject to the following 30
conditions and limitations: 31
(1) The appropriations in this section are provided solely for 32
the department to develop and administer a participatory, community-33
driven, noncompetitive grant program to identify and fund either 34
p. 42 SB 5195
decarbonization or resiliency projects, or both, that benefit 1
overburdened communities as defined in RCW 70A.02.010.2
(2)(a) $2,800,000 of the appropriation is provided solely for the 3
department, in consultation with the environmental justice council 4
created in RCW 70A.02.110, to engage with at least two of the six 5
overburdened communities identified by the department of health under 6
section 222(124), chapter 376, Laws of 2024. 7
(b) The department must develop a participatory, community-driven 8
process for identifying projects that mitigate the disproportional 9
impacts of climate change on overburdened communities. The process 10
must allow for full community engagement. 11
(3) $5,500,000 of the appropriation is provided solely for the 12
department to provide grants for projects identified pursuant to 13
subsection (2) of this section. 14
(4) The legislature intends to appropriate a total of $32,000,000 15
over six years for the department to provide grant funds to projects 16
identified through the participatory budgeting process in all six of 17
the communities pursuant to subsection (3) of this section.18
(5) The department shall submit a report to the governor and 19
appropriate committees of the legislature by June 30, 2027, including 20
the work performed in subsections (2) and (3) of this section and 21
summarizing its progress in granting funding through the 22
participatory budgeting process. 23
(6) The department may use up to three percent of amounts 24
appropriated in this section for administrative expenses.25
Appropriation:26
Air Quality Health Disparities Improvement 27
Account— State. . . . . . . . . . . . . . . . . . . $8,300,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $26,620,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,920,00031
NEW SECTION. Sec. 1036. FOR THE OFFICE OF FINANCIAL MANAGEMENT32
Emergency Repairs (30000041)33
The appropriation in this section is subject to the following 34
conditions and limitations: 35
(1) Emergency repair funding is provided solely to address 36
unexpected building or grounds failures that will impact public 37
health and safety and the day-to-day operations of the facility. To 38
p. 43 SB 5195
be eligible for funds from the emergency repair pool, a request 1
letter for emergency funding signed by the affected agency director 2
must be submitted to the office of financial management and the 3
appropriate legislative fiscal committees. The request must include a 4
statement describing the health and safety hazard and impacts to 5
facility operations, the possible cause, the proposed scope of 6
emergency repair work and related cost estimate, and identification 7
of other funding that may be applied to the project.8
(2) For emergencies occurring during a legislative session, an 9
agency must notify the legislative fiscal committees before 10
requesting emergency funds from the office of financial management.11
(3) The office of financial management must notify the 12
legislative evaluation and accountability program committee and the 13
legislative fiscal committees as emergency projects are approved for 14
funding and include what funded level was approved.15
Appropriation:16
State Building Construction Account— State. . . . . . . $5,000,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00020
NEW SECTION. Sec. 1037. FOR THE OFFICE OF FINANCIAL MANAGEMENT21
Construction Cost Forms and Calculations (40000007)22
The appropriation in this section is subject to the following 23
conditions and limitations: 24
(1) The appropriation in this section is provided solely for the 25
office of financial management to contract for a review and update of 26
existing formulas for state agency cost estimating.27
(2) The contract is exempt from the competitive procurement 28
requirements in chapter 39.26 RCW. 29
Appropriation:30
Thurston County Capital Facilities Account— State. . . . $250,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00034
NEW SECTION. Sec. 1038. FOR THE DEPARTMENT OF ENTERPRISE 35
SERVICES36
p. 44 SB 5195
Legislative Building Systems Rehabilitation (30000791)1
The appropriation in this section is subject to the following 2
conditions and limitations: The appropriation is provided solely to 3
upgrade critical fire systems in the legislative building.4
Appropriation:5
State Building Construction Account— State. . . . . . . $3,150,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . $13,975,0008
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,125,0009
NEW SECTION. Sec. 1039. FOR THE DEPARTMENT OF ENTERPRISE 10
SERVICES11
Facility Professional Services Staffing (40000244)12
Appropriation:13
State Building Construction Account— State. . . . . . $30,371,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,251,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $56,622,00017
NEW SECTION. Sec. 1040. FOR THE DEPARTMENT OF ENTERPRISE 18
SERVICES19
East Plaza - Water Infiltration & Elevator Repairs (40000333)20
Appropriation:21
State Building Construction Account— State. . . . . . . . $580,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . $26,537,00024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,117,00025
NEW SECTION. Sec. 1041. FOR THE DEPARTMENT OF ENTERPRISE 26
SERVICES27
Leg - Chamber Restoration (40000337)28
Appropriation:29
Capitol Building Construction Account— State. . . . . . $3,328,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,328,00033
p. 45 SB 5195
NEW SECTION. Sec. 1042. FOR THE DEPARTMENT OF ENTERPRISE 1
SERVICES2
O'Brien - Repair HVAC System (40000339)3
Appropriation:4
Thurston County Capital Facilities Account— State. . . $2,543,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,543,0008
NEW SECTION. Sec. 1043. FOR THE DEPARTMENT OF ENTERPRISE 9
SERVICES10
Legislative Building Centennial Skylights (40000340)11
The appropriations in this section are subject to the following 12
conditions and limitations: The reappropriation is subject to the 13
provisions of section 1056, chapter 474, Laws of 2023.14
Reappropriation:15
Capitol Building Construction Account— State. . . . . . . $988,00016
Thurston County Capital Facilities Account— State. . . $1,329,00017
Subtotal Reappropriation. . . . . . . . . . . . . $2,317,00018
Appropriation:19
State Building Construction Account— State. . . . . . . $7,740,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $379,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,436,00023
NEW SECTION. Sec. 1044. FOR THE DEPARTMENT OF ENTERPRISE 24
SERVICES25
Cherberg-O'Brien - Repair Tunnel (40000341)26
Appropriation:27
Capitol Building Construction Account— State. . . . . . $4,007,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,007,00031
NEW SECTION. Sec. 1045. FOR THE DEPARTMENT OF ENTERPRISE 32
SERVICES33
Capitol Campus Emergency Generator Replacement (40000393)34
p. 46 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $814,0002
Appropriation:3
Thurston County Capital Facilities Account— State. . . $1,211,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $40,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,065,0007
NEW SECTION. Sec. 1046. FOR THE DEPARTMENT OF ENTERPRISE 8
SERVICES9
West Campus - Hillside Stabilization (40000396)10
Appropriation:11
Thurston County Capital Facilities Account— State. . . . $847,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . $13,022,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,869,00015
NEW SECTION. Sec. 1047. FOR THE DEPARTMENT OF ENTERPRISE 16
SERVICES17
Legislative Building Cleaning (40000400)18
Reappropriation:19
Capitol Building Construction Account— State. . . . . . $1,879,00020
Appropriation:21
State Building Construction Account— State. . . . . . . $1,013,00022
Thurston County Capital Facilities Account— State. . . $2,927,00023
Subtotal Appropriation. . . . . . . . . . . . . . $3,940,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $91,00025
Future Biennia (Projected Costs). . . . . . . . . . . $4,043,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,953,00027
NEW SECTION. Sec. 1048. FOR THE DEPARTMENT OF ENTERPRISE 28
SERVICES29
Campus – Arc Flash Study (40000474)30
Appropriation:31
State Building Construction Account— State. . . . . . . $1,354,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 47 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,354,0002
NEW SECTION. Sec. 1049. FOR THE DEPARTMENT OF ENTERPRISE 3
SERVICES4
Capitol Campus Security (40000476)5
Appropriation:6
State Building Construction Account— State. . . . . . $14,455,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $83,901,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $98,356,00010
NEW SECTION. Sec. 1050. FOR THE DEPARTMENT OF ENTERPRISE 11
SERVICES12
Minor Works - Preservation (40000485)13
Appropriation:14
Thurston County Capital Facilities Account— State. . . $1,266,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . $3,165,00017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,431,00018
NEW SECTION. Sec. 1051. FOR THE DEPARTMENT OF ENTERPRISE 19
SERVICES20
Minor Works - Historic & Cultural Asset Preservation (40000499)21
Appropriation:22
State Building Construction Account— State. . . . . . . $1,300,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . $1,675,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,975,00026
NEW SECTION. Sec. 1052. FOR THE DEPARTMENT OF ENTERPRISE 27
SERVICES28
Minor Works - Infrastructure (40000505)29
Appropriation:30
Capitol Building Construction Account— State. . . . . . . $94,00031
State Building Construction Account— State. . . . . . . $1,265,00032
Thurston County Capital Facilities Account— State. . . $1,237,00033
p. 48 SB 5195
Subtotal Appropriation. . . . . . . . . . . . . . $2,596,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . $5,743,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,339,0004
NEW SECTION. Sec. 1053. FOR THE DEPARTMENT OF ENTERPRISE 5
SERVICES6
Minor Works - Divest & Redevelopment (40000524)7
Appropriation:8
State Building Construction Account— State. . . . . . . . $290,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $4,634,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,924,00012
NEW SECTION. Sec. 1054. FOR THE DEPARTMENT OF ENTERPRISE 13
SERVICES14
Minor Works - Clean Buildings (40000527)15
Appropriation:16
State Building Construction Account— State. . . . . . . $7,617,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $11,517,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,134,00020
NEW SECTION. Sec. 1055. FOR THE DEPARTMENT OF ENTERPRISE 21
SERVICES22
Minor Works - Elevator Modernization (40000551)23
Appropriation:24
Capitol Building Construction Account— State. . . . . . $2,848,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $31,131,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,979,00028
NEW SECTION. Sec. 1056. FOR THE DEPARTMENT OF ENTERPRISE 29
SERVICES30
Minor Works - Fire and Life Safety Systems (40000553)31
Appropriation:32
State Building Construction Account— State. . . . . . . $1,587,00033
p. 49 SB 5195
Thurston County Capital Facilities Account— State. . . . $778,0001
Subtotal Appropriation. . . . . . . . . . . . . . $2,365,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . $7,564,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,929,0005
NEW SECTION. Sec. 1057. FOR THE DEPARTMENT OF ENTERPRISE 6
SERVICES7
Deschutes Estuary Restoration (40000607)8
Appropriation:9
State Building Construction Account— State. . . . . . $25,523,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . $452,967,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $478,490,00013
NEW SECTION. Sec. 1058. FOR THE DEPARTMENT OF ENTERPRISE 14
SERVICES15
HB 1390 - District Energy Systems (91000449)16
Reappropriation:17
Climate Commitment Account— State. . . . . . . . . . . . $139,00018
Appropriation:19
State Building Construction Account— State. . . . . . . $9,237,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $311,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,687,00023
NEW SECTION. Sec. 1059. FOR THE DEPARTMENT OF ENTERPRISE 24
SERVICES25
Legislative Campus Modernization (92000020)26
The appropriations in this section are subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 1044, chapter 375, Laws of 2024.29
Reappropriation:30
Climate Commitment Account— State. . . . . . . . . . . . $789,00031
Model Toxics Control Capital Account— State. . . . . . . $142,00032
State Building Construction Account— State. . . . . . $97,935,00033
Subtotal Reappropriation. . . . . . . . . . . . . $98,866,00034
p. 50 SB 5195
Appropriation:1
State Building Construction Account— State. . . . . . $49,501,0002
Prior Biennia (Expenditures). . . . . . . . . . . . $115,186,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $263,553,0005
NEW SECTION. Sec. 1060. FOR THE MILITARY DEPARTMENT6
Moses Lake Readiness Center Renovation (40000194)7
Reappropriation:8
General Fund— Federal. . . . . . . . . . . . . . . . . $2,869,0009
State Building Construction Account— State. . . . . . . $2,282,00010
Subtotal Reappropriation. . . . . . . . . . . . . $5,151,00011
Appropriation:12
General Fund— Federal. . . . . . . . . . . . . . . . . . $576,00013
Military Department Capital Account— State. . . . . . . . $349,00014
Subtotal Appropriation. . . . . . . . . . . . . . . $925,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $391,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,467,00018
NEW SECTION. Sec. 1061. FOR THE MILITARY DEPARTMENT19
Wenatchee Army National Guard Aviation Support Facility 20
(40000305)21
Reappropriation:22
Military Department Capital Account— State. . . . . . . $3,500,00023
Appropriation:24
State Building Construction Account— State. . . . . . . . $450,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $79,717,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $83,667,00028
NEW SECTION. Sec. 1062. FOR THE MILITARY DEPARTMENT29
Yakima Training Center Army NG Combat Fitness Training Facility 30
(40000314)31
Reappropriation:32
General Fund— Federal. . . . . . . . . . . . . . . . . . $600,00033
p. 51 SB 5195
Appropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . $6,000,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,600,0005
NEW SECTION. Sec. 1063. FOR THE MILITARY DEPARTMENT6
Minor Works Program 2025-27 Biennium (40000345)7
Appropriation:8
General Fund— Federal. . . . . . . . . . . . . . . . . $8,444,0009
State Building Construction Account— State. . . . . . . $1,441,00010
Subtotal Appropriation. . . . . . . . . . . . . . $9,885,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,885,00014
NEW SECTION. Sec. 1064. FOR THE MILITARY DEPARTMENT15
Minor Works Preservation 2025-27 Biennium (40000346)16
Appropriation:17
General Fund— Federal. . . . . . . . . . . . . . . . . $10,290,00018
State Building Construction Account— State. . . . . . . $7,502,00019
Subtotal Appropriation. . . . . . . . . . . . . . $17,792,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,792,00023
NEW SECTION. Sec. 1065. FOR THE MILITARY DEPARTMENT24
Camp Murray Mechanical Security Barricade Repair (40000347)25
Appropriation:26
General Fund— Federal. . . . . . . . . . . . . . . . . $2,660,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,660,00030
NEW SECTION. Sec. 1066. FOR THE MILITARY DEPARTMENT31
Joint Base Lewis-McChord Army Aviation Support Facility 1 HVAC 32
(40000348)33
p. 52 SB 5195
Appropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . $4,462,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,462,0005
NEW SECTION. Sec. 1067. FOR THE MILITARY DEPARTMENT6
Moses Lake Readiness Center Stormwater Repairs (40000349)7
Appropriation:8
General Fund— Federal. . . . . . . . . . . . . . . . . . $113,0009
State Building Construction Account— State. . . . . . . . $113,00010
Subtotal Appropriation. . . . . . . . . . . . . . . $226,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . $1,962,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,188,00014
NEW SECTION. Sec. 1068. FOR THE MILITARY DEPARTMENT15
Yakima Readiness Center Repairs (40000350)16
Appropriation:17
General Fund— Federal. . . . . . . . . . . . . . . . . . $223,00018
State Building Construction Account— State. . . . . . . . $193,00019
Subtotal Appropriation. . . . . . . . . . . . . . . $416,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . $3,507,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,923,00023
NEW SECTION. Sec. 1069. FOR THE MILITARY DEPARTMENT24
Yakima Training Center 960 (MATES) HVAC System Replacement 25
(40000351)26
Appropriation:27
General Fund— Federal. . . . . . . . . . . . . . . . . $5,741,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,741,00031
NEW SECTION. Sec. 1070. FOR THE MILITARY DEPARTMENT32
Yakima Training Center Military Vehicle Parking Repair (40000352)33
p. 53 SB 5195
Appropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . $3,623,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,623,0005
NEW SECTION. Sec. 1071. FOR THE MILITARY DEPARTMENT6
Geiger Field 200 Restoration (40000354)7
Appropriation:8
General Fund— Federal. . . . . . . . . . . . . . . . . . $566,0009
State Building Construction Account— State. . . . . . . . $436,00010
Subtotal Appropriation. . . . . . . . . . . . . . $1,002,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . $8,702,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,704,00014
NEW SECTION. Sec. 1072. FOR THE MILITARY DEPARTMENT15
Geiger Field 300 Homeland Response Force (HRF) Alteration 16
(40000355)17
Appropriation:18
State Building Construction Account— State. . . . . . . . $300,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . $29,337,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,637,00022
NEW SECTION. Sec. 1073. FOR THE MILITARY DEPARTMENT23
Geiger Field 402 Renovation (40000356)24
Appropriation:25
General Fund— Federal. . . . . . . . . . . . . . . . . . $537,00026
State Building Construction Account— State. . . . . . . . $465,00027
Subtotal Appropriation. . . . . . . . . . . . . . $1,002,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $8,681,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,683,00031
NEW SECTION. Sec. 1074. FOR THE MILITARY DEPARTMENT32
p. 54 SB 5195
Joint Base Lewis-McChord 9608 (UTES) Interior Modification 1
(40000357)2
Appropriation:3
General Fund— Federal. . . . . . . . . . . . . . . . . . $782,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . $6,791,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,573,0007
NEW SECTION. Sec. 1075. FOR THE MILITARY DEPARTMENT8
Longview Readiness Center Renovation (40000359)9
Appropriation:10
General Fund— Federal. . . . . . . . . . . . . . . . . . $399,00011
State Building Construction Account— State. . . . . . . . $295,00012
Subtotal Appropriation. . . . . . . . . . . . . . . $694,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . $6,025,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,719,00016
NEW SECTION. Sec. 1076. FOR THE MILITARY DEPARTMENT17
Sedro Woolley Field Maintenance Shop Renovation (40000366)18
Appropriation:19
General Fund— Federal. . . . . . . . . . . . . . . . . $5,520,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,520,00023
NEW SECTION. Sec. 1077. FOR THE MILITARY DEPARTMENT24
Tumwater Field Maintenance Shop (40000367)25
Reappropriation:26
General Fund— Federal. . . . . . . . . . . . . . . . . $3,900,00027
State Building Construction Account— State. . . . . . . . $480,00028
Subtotal Reappropriation. . . . . . . . . . . . . $4,380,00029
Appropriation:30
State Building Construction Account— State. . . . . . . $3,700,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . $41,897,00033
p. 55 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,977,0001
NEW SECTION. Sec. 1078. FOR THE MILITARY DEPARTMENT2
Yakima Readiness Center Deep Energy Retrofit and Decarbonization 3
(40000368)4
Appropriation:5
General Fund— Federal. . . . . . . . . . . . . . . . . . $205,0006
State Building Construction Account— State. . . . . . . . $78,0007
Subtotal Appropriation. . . . . . . . . . . . . . . $283,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . $2,305,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,588,00011
NEW SECTION. Sec. 1079. FOR THE MILITARY DEPARTMENT12
Yakima Training Center (MATES) Renovation (40000369)13
Appropriation:14
General Fund— Federal. . . . . . . . . . . . . . . . . $7,950,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,950,00018
NEW SECTION. Sec. 1080. FOR THE MILITARY DEPARTMENT19
Redmond Readiness Center (500 and 501) Renovation (40000403)20
Appropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . . . $649,00022
State Building Construction Account— State. . . . . . . . $127,00023
Subtotal Appropriation. . . . . . . . . . . . . . . $776,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . $13,616,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,392,00027
NEW SECTION. Sec. 1081. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 28
HISTORIC PRESERVATION29
2025-27 Historic Cemetery Capital Grant Program (40000037)30
Appropriation:31
State Building Construction Account— State. . . . . . . . $515,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 56 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . $2,060,0001
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,575,0002
NEW SECTION. Sec. 1082. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 3
HISTORIC PRESERVATION4
2025-27 Heritage Barn Grants (40000038)5
Appropriation:6
State Building Construction Account— State. . . . . . . $1,000,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00010
NEW SECTION. Sec. 1083. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 11
HISTORIC PRESERVATION12
2025-27 Historic Theater Capital Grant Program (40000039)13
Appropriation:14
State Building Construction Account— State. . . . . . . . $515,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $515,00018
NEW SECTION. Sec. 1084. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 19
HISTORIC PRESERVATION20
2025-27 Historic County Courthouse Rehabilitation Grant Program 21
(40000040)22
The appropriation in this section is subject to the following 23
conditions and limitations: The appropriation in this section is 24
provided solely for the following list of projects:25
Chelan County Courthouse. . . . . . . . . . . . . . . . $312,00026
Douglas County Courthouse. . . . . . . . . . . . . . . . $610,00027
Grays Harbor County Courthouse. . . . . . . . . . . . . $467,00028
Klickitat County Courthouse. . . . . . . . . . . . . . . $618,00029
Lewis County Courthouse. . . . . . . . . . . . . . . . . $150,00030
Okanogan County Courthouse. . . . . . . . . . . . . . . $800,00031
Pend Oreille County Courthouse. . . . . . . . . . . . . $125,00032
Spokane County Courthouse. . . . . . . . . . . . . . . . $500,00033
Wahkiakum County Courthouse. . . . . . . . . . . . . . . $365,00034
Appropriation:35
p. 57 SB 5195
State Building Construction Account— State. . . . . . . $3,947,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . $16,000,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,947,0004
(End of part)
p. 58 SB 5195
PART 21
HUMAN SERVICES2
NEW SECTION. Sec. 2001. FOR THE CRIMINAL JUSTICE TRAINING 3
COMMISSION4
Omnibus Minor Works (40000025)5
Appropriation:6
State Building Construction Account— State. . . . . . . $3,990,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,990,00010
NEW SECTION. Sec. 2002. FOR THE CRIMINAL JUSTICE TRAINING 11
COMMISSION12
Restroom and locker room renovation (40000039)13
Appropriation:14
State Building Construction Account— State. . . . . . . $2,793,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,793,00018
NEW SECTION. Sec. 2003. FOR THE CRIMINAL JUSTICE TRAINING 19
COMMISSION20
Critical Infrastructure Upgrades (40000040)21
Appropriation:22
State Building Construction Account— State. . . . . . $38,238,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . $34,905,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $73,143,00026
NEW SECTION. Sec. 2004. FOR THE CRIMINAL JUSTICE TRAINING 27
COMMISSION28
Shooting Range Indoor Ventilation System (40000041)29
Appropriation:30
State Building Construction Account— State. . . . . . . $2,910,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 59 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,910,0001
NEW SECTION. Sec. 2005. FOR THE DEPARTMENT OF LABOR AND 2
INDUSTRIES3
Minor Works Preservation Projects (30000035)4
Reappropriation:5
Accident Account— State. . . . . . . . . . . . . . . . $2,094,0006
Medical Aid Account— State. . . . . . . . . . . . . . . $2,084,0007
Subtotal Reappropriation. . . . . . . . . . . . . $4,178,0008
Appropriation:9
Accident Account— State. . . . . . . . . . . . . . . . $1,117,00010
Medical Aid Account— State. . . . . . . . . . . . . . . . $228,00011
Subtotal Appropriation. . . . . . . . . . . . . . $1,345,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,448,00013
Future Biennia (Projected Costs). . . . . . . . . . . $9,200,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,171,00015
NEW SECTION. Sec. 2006. FOR THE DEPARTMENT OF LABOR AND 16
INDUSTRIES17
Emergency Generator and Building Switchgear Upgrades (40000019)18
Appropriation:19
Accident Account— State. . . . . . . . . . . . . . . . . $896,00020
Medical Aid Account— State. . . . . . . . . . . . . . . . $896,00021
Subtotal Appropriation. . . . . . . . . . . . . . $1,792,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,792,00025
NEW SECTION. Sec. 2007. FOR THE DEPARTMENT OF LABOR AND 26
INDUSTRIES27
Transmission Electron Microscope Workspace Construction 28
(40000023)29
Appropriation:30
Accident Account— State. . . . . . . . . . . . . . . . $1,275,00031
Medical Aid Account— State. . . . . . . . . . . . . . . . $225,00032
Subtotal Appropriation. . . . . . . . . . . . . . $1,500,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
p. 60 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0002
NEW SECTION. Sec. 2008. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 3
SERVICES4
Statewide: Clean Buildings Act (40000960)5
Reappropriation:6
Climate Commitment Account— State. . . . . . . . . . . $3,143,0007
Appropriation:8
State Building Construction Account— State. . . . . . . $7,953,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . $584,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,680,00012
NEW SECTION. Sec. 2009. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 13
SERVICES14
Statewide: Electric Vehicle Charging Stations (40000961)15
Appropriation:16
State Building Construction Account— State. . . . . . . $3,261,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $16,667,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,928,00020
NEW SECTION. Sec. 2010. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 21
SERVICES22
Western State Hospital-Water System: Assessment and Improvements 23
(40001089)24
The appropriations in this section are subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 2003, chapter 375, Laws of 2024.27
Reappropriation:28
State Building Construction Account— State. . . . . . . $2,310,00029
Appropriation:30
State Building Construction Account— State. . . . . . $27,162,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $180,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 61 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,652,0001
NEW SECTION. Sec. 2011. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 2
SERVICES3
Olympic Heritage Behavioral Health – Facility Modernization 4
(40001145)5
Reappropriation:6
Capital Community Assistance Account— State. . . . . . $13,602,0007
State Building Construction Account— State. . . . . . . . $854,0008
Subtotal Reappropriation. . . . . . . . . . . . . $14,456,0009
Appropriation:10
State Building Construction Account— State. . . . . . $11,067,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $99,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,622,00014
NEW SECTION. Sec. 2012. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 15
SERVICES16
Minor Works Programmatic 2025-27 (40001154)17
Appropriation:18
State Building Construction Account— State. . . . . . . $7,266,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . $2,505,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,771,00022
NEW SECTION. Sec. 2013. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 23
SERVICES24
Minor Works Preservation 2025-27 (40001155)25
Appropriation:26
Charitable, Educational, Penal, and Reformatory27
Institutions Account— State. . . . . . . . . . . . . $916,00028
State Building Construction Account— State. . . . . . $17,085,00029
Subtotal Appropriation. . . . . . . . . . . . . . $18,001,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . $121,185,00032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $139,186,00033
p. 62 SB 5195
NEW SECTION. Sec. 2014. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Olympic Heritage Behavioral Health - Joint Commission Compliance 3
(40001175)4
Appropriation:5
State Building Construction Account— State. . . . . . . $8,772,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,772,0009
NEW SECTION. Sec. 2015. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 10
SERVICES11
Statewide - Infrastructure: Emergency Generator Replacement 12
(40001182)13
Appropriation:14
State Building Construction Account— State. . . . . . $22,611,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . $22,532,00017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,143,00018
NEW SECTION. Sec. 2016. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 19
SERVICES20
Statewide-Campus: Pendant Alarm System Replacement (40001183)21
The appropriations in this section are subject to the following 22
conditions and limitations: The appropriations are provided solely to 23
install pendant alarm systems at Eastern State Hospital.24
Appropriation:25
Charitable, Educational, Penal, and Reformatory26
Institutions Account— State. . . . . . . . . . . . $7,460,00027
State Building Construction Account— State. . . . . . . $3,425,00028
Subtotal Appropriation. . . . . . . . . . . . . . $10,885,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,885,00032
NEW SECTION. Sec. 2017. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 33
SERVICES34
p. 63 SB 5195
Western State Hospital - Campus Shower Upgrades (40001186)1
Appropriation:2
State Building Construction Account— State. . . . . $1,775,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . $34,159,0005
TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,934,0006
NEW SECTION. Sec. 2018. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 7
SERVICES8
Western State Hospital - Building 29: CMS Certification 9
(40001291)10
Appropriation:11
Charitable, Educational, Penal, and Reformatory12
Institutions Account— State. . . . . . . . . . . . $3,776,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . $157,739,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $161,515,00016
NEW SECTION. Sec. 2019. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 17
SERVICES18
Western State Hospital - Building 28: CMS Certification 19
(40001292)20
Appropriation:21
Charitable, Educational, Penal, and Reformatory22
Institutions Account— State. . . . . . . . . . . . . $225,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . $104,386,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $104,611,00026
NEW SECTION. Sec. 2020. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 27
SERVICES28
Western State Hospital: New Forensic Hospital (91000067)29
Reappropriation:30
State Building Construction Account— State. . . . . . $598,317,00031
Appropriation:32
State Building Construction Account— State. . . . . . $282,000,00033
p. 64 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $66,683,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $947,000,0003
NEW SECTION. Sec. 2021. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 4
SERVICES5
Maple Lane - Rapid BH Bed Capacity (92000046)6
Reappropriation:7
State Building Construction Account— State. . . . . . $20,155,0008
Appropriation:9
State Building Construction Account— State. . . . . . $22,107,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,715,00011
Future Biennia (Projected Costs). . . . . . . . . . . $6,967,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,944,00013
NEW SECTION. Sec. 2022. FOR THE DEPARTMENT OF HEALTH14
E-wing Remodel to a Molecular Laboratory (40000032)15
Appropriation:16
State Building Construction Account— State. . . . . . . $4,711,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . $209,00018
Future Biennia (Projected Costs). . . . . . . . . . . $34,409,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,329,00020
NEW SECTION. Sec. 2023. FOR THE DEPARTMENT OF HEALTH21
Reroute Existing Water Supply Mains (40000041)22
Appropriation:23
State Building Construction Account— State. . . . . . . $7,409,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,409,00027
NEW SECTION. Sec. 2024. FOR THE DEPARTMENT OF HEALTH28
Minor Works - Facility Preservation (40000078)29
Appropriation:30
State Building Construction Account— State. . . . . . . . $365,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
p. 65 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $365,0002
NEW SECTION. Sec. 2025. FOR THE DEPARTMENT OF HEALTH3
Minor Works - Program (40000080)4
Appropriation:5
State Building Construction Account— State. . . . . . . . $275,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $275,0009
NEW SECTION. Sec. 2026. FOR THE DEPARTMENT OF HEALTH10
2025-27 DWSRF Repayment Appropriation (40000084)11
Appropriation:12
Drinking Water Assistance Account— State. . . . . . . $120,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,000,00016
NEW SECTION. Sec. 2027. FOR THE DEPARTMENT OF HEALTH17
Planning and Engineering Loan (40000085)18
Appropriation:19
Drinking Water Assistance Account— State. . . . . . . . $3,000,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00023
NEW SECTION. Sec. 2028. FOR THE DEPARTMENT OF HEALTH24
WINN ECSD Grant for Drinking Water (40000086)25
Appropriation:26
General Fund— Federal. . . . . . . . . . . . . . . . . $26,000,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,000,00030
NEW SECTION. Sec. 2029. FOR THE DEPARTMENT OF HEALTH31
2025-27 DWSRF State Match (40000088)32
p. 66 SB 5195
The appropriation in this section is subject to the following 1
conditions and limitations: 2
(1) For projects involving repair, replacement, or improvement of 3
a clean water infrastructure facility or other public works facility 4
for which an investment grade efficiency audit is reasonably 5
obtainable, the department shall require as a contract condition that 6
the project sponsor undertake an investment grade efficiency audit. 7
The project sponsor may finance the costs of the audit as part of its 8
drinking water state revolving fund program loan. 9
(2) The department must encourage local government use of 10
federally funded drinking water infrastructure programs operated by 11
the United States department of agriculture rural development agency.12
Appropriation:13
Drinking Water Assistance Account— State. . . . . . . $25,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . $39,000,00016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $64,000,00017
NEW SECTION. Sec. 2030. FOR THE DEPARTMENT OF VETERANS AFFAIRS18
SVH - Skilled Nursing Facility Replacement (40000109)19
The appropriation in this section is subject to the following 20
conditions and limitations: The appropriation in this section is 21
provided solely for the purchase of land for construction of a 22
skilled nursing facility in Spokane. 23
Appropriation:24
State Building Construction Account— State. . . . . . . $8,000,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00028
NEW SECTION. Sec. 2031. FOR THE DEPARTMENT OF VETERANS AFFAIRS29
THP - BLDG 10 Fire Alarm System Replacement (40000110)30
Appropriation:31
Charitable, Educational, Penal, and Reformatory32
Institutions Account— State. . . . . . . . . . . . $1,416,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $035
p. 67 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,416,0001
NEW SECTION. Sec. 2032. FOR THE DEPARTMENT OF VETERANS AFFAIRS2
WSH - Model Toxins - Pollution Remediation (40000112)3
Appropriation:4
State Building Construction Account— State. . . . . . . . $40,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $40,0008
NEW SECTION. Sec. 2033. FOR THE DEPARTMENT OF VETERANS AFFAIRS9
Transitional Housing Program Roosevelt Barracks HVAC Replacement 10
(40000114)11
Appropriation:12
State Building Construction Account— State. . . . . . . $5,576,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,576,00016
NEW SECTION. Sec. 2034. FOR THE DEPARTMENT OF VETERANS AFFAIRS17
Transitional Housing Program Betsy Ross Building HVAC Replacement 18
(40000116)19
Appropriation:20
State Building Construction Account— State. . . . . . . $4,356,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,356,00024
NEW SECTION. Sec. 2035. FOR THE DEPARTMENT OF VETERANS AFFAIRS25
SE Washington Veterans Cemetery (40000119)26
Appropriation:27
State Building Construction Account— State. . . . . . . . $500,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00031
p. 68 SB 5195
NEW SECTION. Sec. 2036. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 1
AND FAMILIES2
Echo Glen Secure Facility Improvements (40000546)3
Reappropriation:4
State Building Construction Account— State. . . . . . $10,927,0005
Appropriation:6
State Building Construction Account— State. . . . . . . . $800,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,627,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,354,00010
NEW SECTION. Sec. 2037. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 11
AND FAMILIES12
Green Hill School HVAC Upgrades (40000584)13
Reappropriation:14
Climate Commitment Account— State. . . . . . . . . . . $3,449,00015
State Building Construction Account— State. . . . . . . $1,996,00016
Subtotal Reappropriation. . . . . . . . . . . . . $5,445,00017
Appropriation:18
State Building Construction Account— State. . . . . . . $1,167,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $1,00020
Future Biennia (Projected Costs). . . . . . . . . . . $9,133,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,746,00022
NEW SECTION. Sec. 2038. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 23
AND FAMILIES24
6yr Statewide Facilities Master Plan (40000587)25
Appropriation:26
Charitable, Educational, Penal, and Reformatory27
Institutions Account— State. . . . . . . . . . . . . $250,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00031
NEW SECTION. Sec. 2039. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 32
AND FAMILIES33
Minor Works Project (40000589)34
p. 69 SB 5195
Appropriation:1
State Building Construction Account— State. . . . . . . $7,440,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . $5,555,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,995,0005
NEW SECTION. Sec. 2040. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 6
AND FAMILIES7
Echo Glen Upper Campus Main Boiler HVAC Replacement (40000593)8
Appropriation:9
State Building Construction Account— State. . . . . . . $8,200,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,200,00013
NEW SECTION. Sec. 2041. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 14
AND FAMILIES15
Green Hill School Visitor Screening & Security Improvements 16
(40000596)17
Appropriation:18
State Building Construction Account— State. . . . . . . $4,500,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,500,00022
NEW SECTION. Sec. 2042. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 23
AND FAMILIES24
Echo Glen Central Family Visiting Center (40000603)25
Appropriation:26
State Building Construction Account— State. . . . . . . . $250,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . $11,800,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,050,00030
NEW SECTION. Sec. 2043. FOR THE DEPARTMENT OF CORRECTIONS31
MCC: WSR Perimeter Wall Renovation (30000117)32
p. 70 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $883,0002
Appropriation:3
State Building Construction Account— State. . . . . . . $3,674,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . $317,0005
Future Biennia (Projected Costs). . . . . . . . . . . $34,540,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,414,0007
NEW SECTION. Sec. 2044. FOR THE DEPARTMENT OF CORRECTIONS8
SW IMU Recreation Yard Improvement (30001123)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $3,934,00011
Appropriation:12
State Building Construction Account— State. . . . . . . $3,614,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,066,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,614,00016
NEW SECTION. Sec. 2045. FOR THE DEPARTMENT OF CORRECTIONS17
SW: Electric Car Chargers (40000178)18
The appropriations in this section are subject to the following 19
conditions and limitations: The reappropriation is subject to the 20
provisions of section 2017, chapter 375, Laws of 2024.21
Reappropriation:22
Climate Commitment Account— State. . . . . . . . . . . . $600,00023
Appropriation:24
State Building Construction Account— State. . . . . . . $6,139,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,739,00028
NEW SECTION. Sec. 2046. FOR THE DEPARTMENT OF CORRECTIONS29
WCCW: MSC Living Unit Bathroom Renovations (40000263)30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $500,00032
p. 71 SB 5195
Appropriation:1
State Building Construction Account— State. . . . . . . $8,448,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,948,0005
NEW SECTION. Sec. 2047. FOR THE DEPARTMENT OF CORRECTIONS6
McNeil Island Transport Barge Replacement (40000419)7
The appropriations in this section are subject to the following 8
conditions and limitations: The appropriation is provided solely to 9
fund the design and construction of one new transport barge.10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $840,00012
Appropriation:13
State Building Construction Account— State. . . . . . . $6,128,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $60,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,028,00017
NEW SECTION. Sec. 2048. FOR THE DEPARTMENT OF CORRECTIONS18
Westside Prison Housing Unit HVAC (40000516)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $349,00021
Appropriation:22
State Building Construction Account— State. . . . . . . $3,500,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $1,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,850,00026
NEW SECTION. Sec. 2049. FOR THE DEPARTMENT OF CORRECTIONS27
SW: Fire Alarm Systems Stabilization Project (40000524)28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $750,00030
Appropriation:31
State Building Construction Account— State. . . . . . . $6,100,00032
p. 72 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,850,0003
NEW SECTION. Sec. 2050. FOR THE DEPARTMENT OF CORRECTIONS4
SW: Perimeter Fence Detection Stabilization Project (40000525)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $750,0007
Appropriation:8
State Building Construction Account— State. . . . . . . $6,445,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,195,00012
NEW SECTION. Sec. 2051. FOR THE DEPARTMENT OF CORRECTIONS13
WCCW: Women's Elder Care Unit (40000527)14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $250,00016
Appropriation:17
State Building Construction Account— State. . . . . . . $6,497,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,747,00021
NEW SECTION. Sec. 2052. FOR THE DEPARTMENT OF CORRECTIONS22
WSP: Add Two Towers in the West Complex (40000542)23
Appropriation:24
State Building Construction Account— State. . . . . . . $2,260,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $8,482,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,742,00028
NEW SECTION. Sec. 2053. FOR THE DEPARTMENT OF CORRECTIONS29
Minor Works - Preservation Projects (40000769)30
Appropriation:31
State Building Construction Account— State. . . . . . . $9,750,00032
p. 73 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . $80,426,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $90,176,0003
NEW SECTION. Sec. 2054. FOR THE DEPARTMENT OF CORRECTIONS4
AHCC: District Energy Decarbonization (40000775)5
Appropriation:6
State Building Construction Account— State. . . . . . . . $300,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $52,864,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $53,164,00010
NEW SECTION. Sec. 2055. FOR THE DEPARTMENT OF CORRECTIONS11
CBCC: District Energy Decarbonization (40000776)12
Appropriation:13
State Building Construction Account— State. . . . . . . . $300,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . $31,625,00016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,925,00017
NEW SECTION. Sec. 2056. FOR THE DEPARTMENT OF CORRECTIONS18
MCC: District Energy Decarbonization (40000777)19
Appropriation:20
State Building Construction Account— State. . . . . . . . $300,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $62,945,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,245,00024
NEW SECTION. Sec. 2057. FOR THE DEPARTMENT OF CORRECTIONS25
WCC: District Energy Decarbonization (40000778)26
Appropriation:27
State Building Construction Account— State. . . . . . . . $300,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $61,063,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $61,363,00031
p. 74 SB 5195
NEW SECTION. Sec. 2058. FOR THE DEPARTMENT OF CORRECTIONS1
WSP: District Energy Decarbonization (40000779)2
Appropriation:3
State Building Construction Account— State. . . . . . . . $300,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . $61,735,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,035,0007
NEW SECTION. Sec. 2059. FOR THE DEPARTMENT OF CORRECTIONS8
McNeil Island Parcel Analysis (40000781)9
The appropriation in this section is subject to the following 10
conditions and limitations: 11
(1) The appropriation in this section is provided solely for the 12
department, in consultation with the department of social and health 13
services and the department of fish and wildlife, to complete a study 14
of McNeil Island, to include each parcel's ownership, restrictions, 15
current use, and options for possible future uses, and to include 16
estimated costs of decommissioning. 17
(a) The report must include a 10-year history of expenditures by 18
the state to support operations and programs on the island, and 19
projected capital costs for the next 10 years. 20
(b) The report must include a 10-year census count of residents 21
and incarcerated individuals served by state programs on the island, 22
and the number of full-time equivalent state employees staffing the 23
operation of programs on the island. 24
(c) The report must include an analysis of effects of relocating 25
or decommissioning services currently offered on McNeil Island in 26
support of the special commitment center. 27
(2) The department must report findings and recommendations to 28
the governor and the appropriate committees of the legislature by 29
August 1, 2026. 30
Appropriation:31
State Building Construction Account— State. . . . . . . . $522,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $522,00035
(End of part)
p. 75 SB 5195
PART 31
NATURAL RESOURCES2
NEW SECTION. Sec. 3001. FOR THE DEPARTMENT OF ECOLOGY3
2025-27 Waste Tire Pile Cleanup and Prevention (40000621)4
Appropriation:5
Waste Tire Removal Account— State. . . . . . . . . . . $1,000,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . $4,000,0008
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0009
NEW SECTION. Sec. 3002. FOR THE DEPARTMENT OF ECOLOGY10
2025-27 Coastal Wetlands Federal Funds (40000622)11
Appropriation:12
General Fund— Federal. . . . . . . . . . . . . . . . . $10,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00016
NEW SECTION. Sec. 3003. FOR THE DEPARTMENT OF ECOLOGY17
2025-27 Freshwater Aquatic Invasive Plants Grant Program 18
(40000623)19
Appropriation:20
Freshwater Aquatic Weeds Account— State. . . . . . . . $1,300,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $4,800,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,100,00024
NEW SECTION. Sec. 3004. FOR THE DEPARTMENT OF ECOLOGY25
2025-27 Freshwater Algae Grant Program (40000624)26
Appropriation:27
Aquatic Algae Control Account— State. . . . . . . . . . . $468,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $2,000,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,468,00031
NEW SECTION. Sec. 3005. FOR THE DEPARTMENT OF ECOLOGY32
p. 76 SB 5195
2025-27 Water Pollution Control Revolving Program (40000625)1
Appropriation:2
Water Pollution Control Revolving Fund— Federal. . . $214,000,0003
Water Pollution Control Revolving Fund— State. . . . $400,000,0004
Subtotal Appropriation. . . . . . . . . . . . . $614,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . $1,600,000,0007
TOTAL. . . . . . . . . . . . . . . . . . . . . $2,214,000,0008
NEW SECTION. Sec. 3006. FOR THE DEPARTMENT OF ECOLOGY9
2025-27 State Match – Water Pollution Control Revolving Program 10
(40000626)11
Appropriation:12
Public Works Assistance Account— State. . . . . . . . $41,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . $48,000,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $89,000,00016
NEW SECTION. Sec. 3007. FOR THE DEPARTMENT OF ECOLOGY17
2025-27 Protect Investments in Cleanup Remedies (40000627)18
Appropriation:19
Model Toxics Control Capital Account— State. . . . . . $4,450,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,450,00023
NEW SECTION. Sec. 3008. FOR THE DEPARTMENT OF ECOLOGY24
2025-27 Eastern Washington Clean Sites Initiative (40000628)25
Appropriation:26
Model Toxics Control Capital Account— State. . . . . . $4,250,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,250,00030
NEW SECTION. Sec. 3009. FOR THE DEPARTMENT OF ECOLOGY31
2025-27 Cleanup Settlement Account Projects (40000629)32
p. 77 SB 5195
Appropriation:1
Cleanup Settlement Account— State. . . . . . . . . . . . $650,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $650,0005
NEW SECTION. Sec. 3010. FOR THE DEPARTMENT OF ECOLOGY6
2025-27 ASARCO Everett Smelter Plume Cleanup (40000641)7
Appropriation:8
Model Toxics Control Capital Account— State. . . . . . $7,239,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $14,939,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,178,00012
NEW SECTION. Sec. 3011. FOR THE DEPARTMENT OF ECOLOGY13
2025-27 Centennial Clean Water Program (40000642)14
Appropriation:15
Model Toxics Control Capital Account— State. . . . . . $22,500,00016
State Building Construction Account— State. . . . . . $17,500,00017
Subtotal Appropriation. . . . . . . . . . . . . . $40,000,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . $160,000,00020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00021
NEW SECTION. Sec. 3012. FOR THE DEPARTMENT OF ECOLOGY22
2025-27 Stormwater Financial Assistance Program (40000643)23
Appropriation:24
Model Toxics Control Stormwater Account— State. . . . $66,781,00025
State Building Construction Account— State. . . . . . . $2,000,00026
Subtotal Appropriation. . . . . . . . . . . . . . $68,781,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . $280,000,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $348,781,00030
NEW SECTION. Sec. 3013. FOR THE DEPARTMENT OF ECOLOGY31
2025-27 Affordable Housing Cleanup Grant Program (40000644)32
p. 78 SB 5195
Appropriation:1
Model Toxics Control Capital Account— State. . . . . . $9,654,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,654,0005
NEW SECTION. Sec. 3014. FOR THE DEPARTMENT OF ECOLOGY6
2025-27 Product Replacement Program (40000651)7
Appropriation:8
Model Toxics Control Capital Account— State. . . . . . $9,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $36,000,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,00012
NEW SECTION. Sec. 3015. FOR THE DEPARTMENT OF ECOLOGY13
2025-27 Reducing Toxic Wood Stove Emissions (40000652)14
The appropriation in this section is subject to the following 15
conditions and limitations: Whenever possible and most cost-16
effective, the agency and local air agency partners must select home 17
heating devices that are certified by the United States environmental 18
protection agency or that do not use natural gas to replace 19
noncompliant devices. 20
Appropriation:21
Model Toxics Control Capital Account— State. . . . . . $4,164,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . $16,656,00024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,820,00025
NEW SECTION. Sec. 3016. FOR THE DEPARTMENT OF ECOLOGY26
2025-27 Clean Up Toxic Sites-Puget Sound Initiative (40000653)27
Appropriation:28
Model Toxics Control Capital Account— State. . . . . . $3,150,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,150,00032
p. 79 SB 5195
NEW SECTION. Sec. 3017. FOR THE DEPARTMENT OF ECOLOGY1
2025-27 Swift Creek Natural Asbestos Flood Control and Cleanup 2
(40000658)3
Appropriation:4
State Building Construction Account— State. . . . . . . $5,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . $10,000,0007
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,0008
NEW SECTION. Sec. 3018. FOR THE DEPARTMENT OF ECOLOGY9
2025-27 Reducing Diesel Greenhouse Gases (GHG) and Toxic Emissions 10
(40000659)11
Appropriation:12
Model Toxics Control Capital Account— State. . . . . . $15,632,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . $64,000,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $79,632,00016
NEW SECTION. Sec. 3019. FOR THE DEPARTMENT OF ECOLOGY17
2025-27 Floodplains by Design (40000660)18
Appropriation:19
State Building Construction Account— State. . . . . . $59,629,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . $240,000,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $299,629,00023
NEW SECTION. Sec. 3020. FOR THE DEPARTMENT OF ECOLOGY24
2025-27 Sunnyside Valley Irrigation District Water Conservation 25
(40000674)26
Appropriation:27
State Building Construction Account— State. . . . . . . $3,320,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $20,280,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,600,00031
NEW SECTION. Sec. 3021. FOR THE DEPARTMENT OF ECOLOGY32
p. 80 SB 5195
2025-27 Columbia River Water Supply Development Program 1
(40000681)2
Appropriation:3
Columbia River Basin Water Supply Revenue 4
Recovery Account— State. . . . . . . . . . . . . . $1,415,0005
State Building Construction Account— State. . . . . . $53,519,0006
Subtotal Appropriation. . . . . . . . . . . . . . $54,934,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . $245,776,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $300,710,00010
NEW SECTION. Sec. 3022. FOR THE DEPARTMENT OF ECOLOGY11
2025-27 Yakima River Basin Water Supply (40000705)12
Appropriation:13
State Building Construction Account— State. . . . . . $49,020,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . $200,000,00016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $249,020,00017
NEW SECTION. Sec. 3023. FOR THE DEPARTMENT OF ECOLOGY18
2025-27 PFAS Response (40000719)19
Appropriation:20
State Building Construction Account— State. . . . . . . $5,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,00024
NEW SECTION. Sec. 3024. FOR THE DEPARTMENT OF ECOLOGY25
2025-27 Puget Sound Nutrient Reduction Grant Program (40000720)26
Appropriation:27
State Building Construction Account— State. . . . . . $15,000,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $60,000,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,00031
NEW SECTION. Sec. 3025. FOR THE DEPARTMENT OF ECOLOGY32
p. 81 SB 5195
2025-27 Stormwater Community-Based Public-Private Partnerships 1
(40000721)2
Appropriation:3
State Building Construction Account— State. . . . . . $10,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0007
NEW SECTION. Sec. 3026. FOR THE DEPARTMENT OF ECOLOGY8
2025-27 Chehalis Basin Strategy (40000724)9
The appropriation in this section is subject to the following 10
conditions and limitations: 11
(1) $64,779,000 of the appropriation in this section is provided 12
solely for Chehalis Basin board-approved projects:13
(a) To protect and restore aquatic species habitat, including: 14
Construction and property acquisition; preconstruction and 15
acquisition planning and project development, feasibility, design, 16
environmental review, and permitting; postconstruction and 17
acquisition monitoring and adaptive management; and engagement of 18
state agencies, tribes, conservation partners, landowners, and other 19
parties; 20
(b) To reduce flood damage, including: Construction and property 21
acquisition; preconstruction and acquisition project planning and 22
development, feasibility, design, environmental review, and 23
permitting; completion of environmental review and endangered species 24
act consultation on the proposed flood protection facility; 25
refinement and evaluation of the local action non-dam alternative; 26
and engagement of state agencies, tribes, project sponsors, 27
landowners, and other parties; and 28
(c) That advance both the habitat restoration and the flood 29
damage reduction goals of the Chehalis Basin strategy using a 30
multibenefit approach, including: Community outreach and education; 31
construction and property acquisition; preconstruction and 32
acquisition planning and project development, feasibility, design, 33
environmental review, and permitting; postconstruction and 34
acquisition monitoring and adaptive management; and engagement of 35
federal, state, and local agencies, tribes, conservation partners, 36
landowners, and other parties. 37
p. 82 SB 5195
(2) $5,250,000 of the appropriation in this section is provided 1
solely for the staffing and operations of the office of Chehalis 2
Basin and Chehalis Basin board to oversee the development, 3
implementation, and amendment of the Chehalis Basin strategy, and 4
this is the maximum amount the board may expend for this purpose. 5
Oversight operations include, but are not limited to: Providing 6
financial accountability, project management, technical assistance of 7
grants and contracts associated with the subprojects funded through 8
this section, and board meeting administration and facilitation.9
(3) Specific projects must be approved by at least six of the 10
seven voting members of the Chehalis Basin board. The Chehalis Basin 11
board has the discretion to allocate the funding between subsections 12
(1)(a), (b), and (c) of this section as needed to meet the objectives 13
of this appropriation and if approved by at least six of the seven 14
voting members of the board. However, $5,250,000 is the maximum 15
amount the department may expend for the purposes of subsection (2) 16
of this section. 17
Appropriation:18
State Building Construction Account— State. . . . . . $70,029,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . $280,000,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $350,029,00022
NEW SECTION. Sec. 3027. FOR THE DEPARTMENT OF ECOLOGY23
2025-27 Streamflow Restoration Program (40000725)24
Appropriation:25
Watershed Restoration and Enhancement Bond 26
Account— State. . . . . . . . . . . . . . . . . . $40,000,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . $160,000,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00030
NEW SECTION. Sec. 3028. FOR THE DEPARTMENT OF ECOLOGY31
2025-27 Remedial Action Grant Program (40000726)32
Appropriation:33
Model Toxics Control Capital Account— State. . . . . . $28,571,00034
State Building Construction Account— State. . . . . . $52,126,00035
Subtotal Appropriation. . . . . . . . . . . . . . $80,697,00036
p. 83 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . $288,888,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $369,585,0003
NEW SECTION. Sec. 3029. FOR THE WASHINGTON POLLUTION LIABILITY 4
INSURANCE PROGRAM5
2025-27 Underground Storage Tank Capital Financial Assistance Pgm 6
(40000005)7
Appropriation:8
Pollution Liability Insurance Agency Underground9
Storage Tank Revolving Account— State. . . . . . . $3,800,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . $48,000,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $51,800,00013
NEW SECTION. Sec. 3030. FOR THE WASHINGTON POLLUTION LIABILITY 14
INSURANCE PROGRAM15
2025-27 Heating Oil Capital Financing Assistance Program 16
(40000007)17
Appropriation:18
Pollution Liability Insurance Agency Underground19
Storage Tank Revolving Account— State. . . . . . . $3,750,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . $32,000,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,750,00023
NEW SECTION. Sec. 3031. FOR THE STATE PARKS AND RECREATION 24
COMMISSION25
Lake Easton - Infrastructure Improvements (30000177)26
Appropriation:27
State Building Construction Account— State. . . . . . . . $780,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $3,922,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,702,00031
NEW SECTION. Sec. 3032. FOR THE STATE PARKS AND RECREATION 32
COMMISSION33
p. 84 SB 5195
Local Grant Authority (30000857)1
Appropriation:2
Parks Renewal and Stewardship Account— 3
Private/Local. . . . . . . . . . . . . . . . . . . $2,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,410,0005
Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,410,0007
NEW SECTION. Sec. 3033. FOR THE STATE PARKS AND RECREATION 8
COMMISSION9
Federal Grant Authority (30000858)10
Appropriation:11
General Fund— Federal. . . . . . . . . . . . . . . . . . $750,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,550,00013
Future Biennia (Projected Costs). . . . . . . . . . . $3,000,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,300,00015
NEW SECTION. Sec. 3034. FOR THE STATE PARKS AND RECREATION 16
COMMISSION17
Parkland Acquisition (30000976)18
Appropriation:19
Parkland Acquisition Account— State. . . . . . . . . . $2,500,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,802,00021
Future Biennia (Projected Costs). . . . . . . . . . . $10,000,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,302,00023
NEW SECTION. Sec. 3035. FOR THE STATE PARKS AND RECREATION 24
COMMISSION25
Mount Spokane Road Improvements Stage 3 Linders - Snowblaze 26
(30000982)27
Appropriation:28
State Building Construction Account— State. . . . . . . . $938,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . $4,104,00031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,042,00032
p. 85 SB 5195
NEW SECTION. Sec. 3036. FOR THE STATE PARKS AND RECREATION 1
COMMISSION2
Klickitat Trail Suburbia Bridges and Trail (30001024)3
Appropriation:4
State Building Construction Account— State. . . . . . . $4,066,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,066,0008
NEW SECTION. Sec. 3037. FOR THE STATE PARKS AND RECREATION 9
COMMISSION10
Statewide - Code/Regulatory Compliance 2025-27 (40000103)11
Appropriation:12
State Building Construction Account— State. . . . . . . $1,500,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00016
NEW SECTION. Sec. 3038. FOR THE STATE PARKS AND RECREATION 17
COMMISSION18
Statewide - ADA Compliance 2025-27 (40000107)19
Appropriation:20
State Building Construction Account— State. . . . . . . $3,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00024
NEW SECTION. Sec. 3039. FOR THE STATE PARKS AND RECREATION 25
COMMISSION26
Statewide - Fish Barrier Removal (40000123)27
Appropriation:28
State Building Construction Account— State. . . . . . . $3,895,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . $4,728,00031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,623,00032
p. 86 SB 5195
NEW SECTION. Sec. 3040. FOR THE STATE PARKS AND RECREATION 1
COMMISSION2
Nisqually New Full Service Park (40000153)3
Reappropriation:4
State Building Construction Account— State. . . . . . $16,600,0005
Appropriation:6
State Building Construction Account— State. . . . . . $18,301,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $23,710,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,611,00010
NEW SECTION. Sec. 3041. FOR THE STATE PARKS AND RECREATION 11
COMMISSION12
Statewide - Facility & Infrastructure Backlog Reduction 2025-27 13
(40000154)14
Appropriation:15
State Building Construction Account— State. . . . . . . $3,000,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00019
NEW SECTION. Sec. 3042. FOR THE STATE PARKS AND RECREATION 20
COMMISSION21
Sun Lakes - Dry Falls Visitor's Center Renovation (40000156)22
Appropriation:23
State Building Construction Account— State. . . . . . . $6,382,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,382,00027
NEW SECTION. Sec. 3043. FOR THE STATE PARKS AND RECREATION 28
COMMISSION29
Nisqually Day Use Improvements (40000202)30
Reappropriation:31
State Building Construction Account— State. . . . . . . $1,500,00032
Appropriation:33
p. 87 SB 5195
State Building Construction Account— State. . . . . . . $2,915,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,351,0002
Future Biennia (Projected Costs). . . . . . . . . . . $32,123,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,889,0004
NEW SECTION. Sec. 3044. FOR THE STATE PARKS AND RECREATION 5
COMMISSION6
Wallace Falls Parking Expansion (40000207)7
Appropriation:8
State Building Construction Account— State. . . . . . . $2,386,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,386,00012
NEW SECTION. Sec. 3045. FOR THE STATE PARKS AND RECREATION 13
COMMISSION14
Twanoh State Park Shoreline Restoration (40000235)15
Appropriation:16
State Building Construction Account— State. . . . . . . . $534,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $534,00020
NEW SECTION. Sec. 3046. FOR THE STATE PARKS AND RECREATION 21
COMMISSION22
Moran Campground Renovation (40000394)23
Appropriation:24
State Building Construction Account— State. . . . . . . $1,275,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $6,844,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,119,00028
NEW SECTION. Sec. 3047. FOR THE STATE PARKS AND RECREATION 29
COMMISSION30
Statewide Electric, Water and Sewer Infrastructure Preserv 25-27 31
(40000403)32
Appropriation:33
p. 88 SB 5195
State Building Construction Account— State. . . . . . . $6,000,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0004
NEW SECTION. Sec. 3048. FOR THE STATE PARKS AND RECREATION 5
COMMISSION6
Twin Harbors South Beach Area Admin and Maint Facility (40000460)7
Appropriation:8
State Building Construction Account— State. . . . . . . $1,366,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $5,213,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,579,00012
NEW SECTION. Sec. 3049. FOR THE STATE PARKS AND RECREATION 13
COMMISSION14
Statewide Historic Facility Energy Efficiency Projects (40000465)15
Appropriation:16
State Building Construction Account— State. . . . . . . $2,500,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00020
NEW SECTION. Sec. 3050. FOR THE STATE PARKS AND RECREATION 21
COMMISSION22
Fort Worden Beach Campground Electrical Upgrades (40000473)23
Appropriation:24
State Building Construction Account— State. . . . . . . $2,864,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $1,872,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,736,00028
NEW SECTION. Sec. 3051. FOR THE STATE PARKS AND RECREATION 29
COMMISSION30
Potlatch Day Use Comfort Station Removal (40000483)31
Appropriation:32
State Building Construction Account— State. . . . . . . . $419,00033
p. 89 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $419,0003
NEW SECTION. Sec. 3052. FOR THE STATE PARKS AND RECREATION 4
COMMISSION5
Statewide Marine Facilities 2025-27 (40000484)6
Appropriation:7
State Building Construction Account— State. . . . . . . $2,000,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00011
NEW SECTION. Sec. 3053. FOR THE STATE PARKS AND RECREATION 12
COMMISSION13
Moran Staff Housing (40000487)14
Appropriation:15
State Building Construction Account— State. . . . . . . . $567,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . $1,662,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,229,00019
NEW SECTION. Sec. 3054. FOR THE STATE PARKS AND RECREATION 20
COMMISSION21
Rasar Day Use Upgrades (40000489)22
Appropriation:23
State Building Construction Account— State. . . . . . . . $324,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . $1,140,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,464,00027
NEW SECTION. Sec. 3055. FOR THE STATE PARKS AND RECREATION 28
COMMISSION29
Statewide Restroom and Comfort Station Replacement 2025-27 30
(40000497)31
Appropriation:32
State Building Construction Account— State. . . . . . . $6,000,00033
p. 90 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0003
NEW SECTION. Sec. 3056. FOR THE STATE PARKS AND RECREATION 4
COMMISSION5
Millersylvania Welcome Center and Entrance Modifications 6
(40000498)7
Appropriation:8
State Building Construction Account— State. . . . . . . . $500,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $2,737,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,237,00012
NEW SECTION. Sec. 3057. FOR THE STATE PARKS AND RECREATION 13
COMMISSION14
Millersylvania Retreat Center Road Fish Barrier Removal 15
(40000499)16
Appropriation:17
State Building Construction Account— State. . . . . . . . $245,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . $821,00020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,066,00021
NEW SECTION. Sec. 3058. FOR THE STATE PARKS AND RECREATION 22
COMMISSION23
Minor Works Preservation 2025-27 (40000504)24
Appropriation:25
State Building Construction Account— State. . . . . . . $5,597,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,597,00029
NEW SECTION. Sec. 3059. FOR THE STATE PARKS AND RECREATION 30
COMMISSION31
Recreational Marine Sewage Disposal Program (CVA) (40000510)32
Appropriation:33
p. 91 SB 5195
General Fund— Federal. . . . . . . . . . . . . . . . . $2,600,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . $10,400,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,0004
NEW SECTION. Sec. 3060. FOR THE RECREATION AND CONSERVATION 5
OFFICE6
2025-27 Washington Wildlife Recreation Program (40000548)7
The appropriations in this section are subject to the following 8
conditions and limitations: The appropriations in this section are 9
provided solely for projects identified in OFM Capital Document No. 10
2025-1, developed December 17, 2024. 11
Appropriation:12
Farm and Forest Account— State. . . . . . . . . . . . $12,000,00013
Habitat Conservation Account— State. . . . . . . . . . $54,000,00014
Outdoor Recreation Account— State. . . . . . . . . . . $54,000,00015
Subtotal Appropriation. . . . . . . . . . . . . $120,000,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . $600,000,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $720,000,00019
NEW SECTION. Sec. 3061. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2025-27 Salmon Recovery Funding Board Grant Programs (40000550)22
The appropriations in this section are subject to the following 23
conditions and limitations: 24
(1) $2,400,000 of the state building construction account — state 25
appropriation is provided solely to maintain the lead entity program 26
as described in chapter 77.85 RCW. 27
(2) $640,000 of the state building construction account — state 28
appropriation is provided solely for regional fisheries enhancement 29
groups created in RCW 77.95.060. 30
Appropriation:31
General Fund— Federal. . . . . . . . . . . . . . . . . $80,000,00032
Natural Climate Solutions Account— State. . . . . . . $20,000,00033
State Building Construction Account— State. . . . . . $25,000,00034
Subtotal Appropriation. . . . . . . . . . . . . $125,000,00035
p. 92 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . $800,000,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $925,000,0003
NEW SECTION. Sec. 3062. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
2025-27 Salmon Recovery Funding Board Riparian Grant Programs 6
(40000552)7
Appropriation:8
State Building Construction Account— State. . . . . . $25,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . $100,000,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $125,000,00012
NEW SECTION. Sec. 3063. FOR THE RECREATION AND CONSERVATION 13
OFFICE14
2025-27 Puget Sound Acquisition and Restoration (40000554)15
The appropriations in this section are subject to the following 16
conditions and limitations: The appropriations in this section are 17
provided solely for projects identified in OFM Capital Document No. 18
2025-2, developed December 17, 2024. 19
Appropriation:20
Natural Climate Solutions Account— State. . . . . . . $10,100,00021
State Building Construction Account— State. . . . . . $50,560,00022
Subtotal Appropriation. . . . . . . . . . . . . . $60,660,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . $240,000,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $300,660,00026
NEW SECTION. Sec. 3064. FOR THE RECREATION AND CONSERVATION 27
OFFICE28
2025-27 Youth Athletics Facilities (40000556)29
The appropriation in this section is subject to the following 30
conditions and limitations: The appropriation in this section is 31
provided solely for projects identified in OFM Capital Document No. 32
2025-3, developed December 17, 2024. 33
Appropriation:34
p. 93 SB 5195
State Building Construction Account— State. . . . . . . $8,454,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . $108,000,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $116,454,0004
NEW SECTION. Sec. 3065. FOR THE RECREATION AND CONSERVATION 5
OFFICE6
2025-27 Community Outdoor Athletic Facilities (40000558)7
The appropriation in this section is subject to the following 8
conditions and limitations: The appropriation in this section is 9
provided solely for a competitive grant program that improves 10
equitable access to community outdoor athletic facilities. Up to four 11
percent of the appropriation may be used by the recreation and 12
conservation office for the costs of administration.13
Appropriation:14
State Building Construction Account— State. . . . . . . $7,500,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,00018
NEW SECTION. Sec. 3066. FOR THE RECREATION AND CONSERVATION 19
OFFICE20
2025-27 Aquatic Lands Enhancement Account (40000560)21
The appropriations in this section are subject to the following 22
conditions and limitations: The appropriations in this section are 23
provided solely for projects identified in OFM Capital Document No. 24
2025-4, developed December 17, 2024. 25
Appropriation:26
Aquatic Lands Enhancement Account— State. . . . . . . . $3,610,00027
State Building Construction Account— State. . . . . . . $3,610,00028
Subtotal Appropriation. . . . . . . . . . . . . . $7,220,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . $28,880,00031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,100,00032
NEW SECTION. Sec. 3067. FOR THE RECREATION AND CONSERVATION 33
OFFICE34
p. 94 SB 5195
2025-27 Community Forest Grant Program (40000562)1
The appropriation in this section is subject to the following 2
conditions and limitations: The appropriation in this section is 3
provided solely for projects identified in OFM Capital Document No. 4
2025-5, developed December 17, 2024. 5
Appropriation:6
State Building Construction Account— State. . . . . . . $3,130,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $4,000,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,130,00010
NEW SECTION. Sec. 3068. FOR THE RECREATION AND CONSERVATION 11
OFFICE12
2025-27 Brian Abbott Fish Barrier Removal Board (40000564)13
The appropriations in this section are subject to the following 14
conditions and limitations: 15
(1) The appropriations in this section are provided solely for 16
projects identified in OFM Capital Document No. 2025-6, developed 17
December 17, 2024. 18
(2) The recreation and conservation funding board may retain a 19
portion of the funds appropriated in this section for the 20
administration of the grants. The portion of the funds retained for 21
administration may not exceed three percent of the appropriation.22
(3) The department of fish and wildlife may retain a portion of 23
the funds appropriated in this section for technical assistance in 24
developing projects for consideration. The portion of the funds 25
retained for technical assistance may not exceed 4.12 percent of the 26
appropriation. 27
Appropriation:28
Natural Climate Solutions Account— State. . . . . . . $15,000,00029
State Building Construction Account— State. . . . . . $31,008,00030
Subtotal Appropriation. . . . . . . . . . . . . . $46,008,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . $360,000,00033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $406,008,00034
p. 95 SB 5195
NEW SECTION. Sec. 3069. FOR THE RECREATION AND CONSERVATION 1
OFFICE2
2025-27 Estuary and Salmon Restoration Program (40000566)3
(1) The appropriations in this section are subject to the 4
following conditions and limitations: The appropriations in this 5
section are provided solely for projects identified in OFM Capital 6
Document No. 2025-7, developed December 17, 2024. 7
(2) The recreation and conservation funding board may retain a 8
portion of the funds appropriated in this section for the 9
administration of the grants. The portion of the funds retained for 10
administration may not exceed three percent of the appropriation.11
(3) The department of fish and wildlife may retain a portion of 12
the funds appropriated in this section for technical assistance in 13
developing projects for consideration. The portion of the funds 14
retained for technical assistance may not exceed 4.12 percent of the 15
appropriation. 16
Appropriation:17
Natural Climate Solutions Account— State. . . . . . . $11,086,00018
State Building Construction Account— State. . . . . . . $6,955,00019
Subtotal Appropriation. . . . . . . . . . . . . . $18,041,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . $110,136,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $128,177,00023
NEW SECTION. Sec. 3070. FOR THE RECREATION AND CONSERVATION 24
OFFICE25
2025-27 Washington Coastal Restoration and Resiliency Initiative 26
(40000568)27
The appropriation in this section is subject to the following 28
conditions and limitations: 29
(1) The appropriation in this section is provided solely for 30
projects identified in OFM Capital Document No. 2025-8, developed 31
December 17, 2024. 32
(2) The recreation and conservation funding board may retain a 33
portion of the funds appropriated in this section for the 34
administration of the grants. The portion of the funding retained for 35
administration may not exceed 4.12 percent of the appropriation.36
Appropriation:37
p. 96 SB 5195
State Building Construction Account— State. . . . . . . $5,812,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . $52,500,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,312,0004
NEW SECTION. Sec. 3071. FOR THE RECREATION AND CONSERVATION 5
OFFICE6
2025-27 Nonhighway and Off-Road Vehicle Activities (40000570)7
Appropriation:8
NOVA Program Account— State. . . . . . . . . . . . . . $12,174,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $48,696,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,870,00012
NEW SECTION. Sec. 3072. FOR THE RECREATION AND CONSERVATION 13
OFFICE14
2025-27 Boating Facilities Program (40000572)15
Appropriation:16
Recreation Resources Account— State. . . . . . . . . . $13,618,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $54,472,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $68,090,00020
NEW SECTION. Sec. 3073. FOR THE RECREATION AND CONSERVATION 21
OFFICE22
2025-27 Firearms and Archery Range Recreation (40000574)23
Appropriation:24
Firearms Range Account— State. . . . . . . . . . . . . . $645,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . $2,580,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,225,00028
NEW SECTION. Sec. 3074. FOR THE RECREATION AND CONSERVATION 29
OFFICE30
2025-27 Recreational Trails Program (40000576)31
Appropriation:32
General Fund— Federal. . . . . . . . . . . . . . . . . $5,000,00033
p. 97 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,0003
NEW SECTION. Sec. 3075. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
2025-27 Boating Infrastructure Grants (40000578)6
Appropriation:7
General Fund— Federal. . . . . . . . . . . . . . . . . $5,000,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00011
NEW SECTION. Sec. 3076. FOR THE RECREATION AND CONSERVATION 12
OFFICE13
2025-27 Land and Water Conservation Fund (40000580)14
Appropriation:15
General Fund— Federal. . . . . . . . . . . . . . . . . $20,000,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . $80,000,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,00019
NEW SECTION. Sec. 3077. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2025-27 Planning for Recreation Access (40000582)22
Appropriation:23
State Building Construction Account— State. . . . . . . $1,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . $4,000,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00027
NEW SECTION. Sec. 3078. FOR THE CONSERVATION COMMISSION28
2025-2027 Regional Conservation Partnership Program Match 29
(40000043)30
Appropriation:31
State Building Construction Account— State. . . . . . . $6,320,00032
p. 98 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $46,320,0003
NEW SECTION. Sec. 3079. FOR THE CONSERVATION COMMISSION4
2025-2027 Farmland Protection and Land Access (40000044)5
Appropriation:6
State Building Construction Account— State. . . . . . . $4,000,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $8,000,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,000,00010
NEW SECTION. Sec. 3080. FOR THE CONSERVATION COMMISSION11
2025-2027 Water Resource Conservation Irrigation Efficiencies 12
(40000045)13
The appropriation in this section is subject to the following 14
conditions and limitations: 15
(1) The appropriation is provided solely for technical assistance 16
and grants to conservation districts for the purpose of implementing 17
water conservation measures and irrigation efficiencies. The state 18
conservation commission shall give preference to projects prioritized 19
locally or regionally through a planning process that includes public 20
and partner input addressing water resource concerns.21
(2) Conservation districts statewide are eligible for grants 22
listed in subsection (1) of this section. A conservation district 23
receiving funds shall manage each grant to ensure that a portion of 24
the water saved by the water conservation measure or irrigation 25
efficiency will be available for other instream and out-of-stream 26
uses and users. The proportion of saved water made available for 27
other uses and users must be equal to the percentage of the public 28
investment in the conservation measure or irrigation efficiency.29
Appropriation:30
State Building Construction Account— State. . . . . . . $7,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,000,00034
NEW SECTION. Sec. 3081. FOR THE CONSERVATION COMMISSION35
p. 99 SB 5195
2025-2027 Natural Resources Investments for the Economy and Envir 1
(40000046)2
Appropriation:3
State Building Construction Account— State. . . . . . . $5,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,0007
NEW SECTION. Sec. 3082. FOR THE CONSERVATION COMMISSION8
2025-2027 Improve Shellfish Growing Areas (40000047)9
Appropriation:10
State Building Construction Account— State. . . . . . . $3,500,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . $16,000,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,500,00014
NEW SECTION. Sec. 3083. FOR THE CONSERVATION COMMISSION15
2025-2027 Voluntary Stewardship Program (VSP) Capital Cost-Share 16
(40000048)17
Appropriation:18
State Building Construction Account— State. . . . . . . $3,000,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . $18,000,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,000,00022
NEW SECTION. Sec. 3084. FOR THE CONSERVATION COMMISSION23
2025-2027 Voluntary Riparian Grant Program (40000049)24
The appropriation in this section is subject to the following 25
conditions and limitations: 26
(1) The appropriation in this section is provided solely for the 27
state conservation commission to provide grants for riparian 28
restoration projects with landowners. 29
(2)(a) Within funds appropriated in this section, the commission 30
shall implement the voluntary riparian grant program to fund 31
protection and restoration of critical riparian management zones 32
developed pursuant to section 3087, chapter 474, Laws of 2023. The 33
commission must ensure that the voluntary grant program criteria 34
p. 100 SB 5195
achieve optimal restoration of functioning riparian ecosystems in 1
priority critical riparian management zones. 2
(b) In adopting program criteria under this section, the 3
commission must: 4
(i) Invite federally recognized tribes to be full participants in 5
development of the program criteria; 6
(ii) Coordinate with private landowners and other interested 7
stakeholders; 8
(iii) Coordinate with the department of ecology, the department 9
of fish and wildlife, conservation districts, and the department of 10
agriculture; 11
(iv) Consider the best available, locally applicable science that 12
is specific to each region of the state where the program criteria 13
will be applied; and 14
(v) Be informed by, consistent with, and aligned with the 15
recommendations and implementation proposals for voluntary riparian 16
restoration and protection provided by the riparian task force 17
convened pursuant to section 117 (3), chapter 475, Laws of 2023, 18
including and in particular recommendations 2.2, 2.2.1-2.2.7, and 19
2.3.1-2.3.4 of the riparian task force final report and 20
recommendations, June 2024. 21
(c) The commission may not provide riparian grant funds 22
appropriated in this section until the commission has finalized grant 23
guidelines that adopt final program criteria that are consistent with 24
the requirements in this section, and that include incorporating 25
where feasible the Washington state department of fish and wildlife 26
Riparian Ecosystems Volume I: Science Synthesis and Management 27
Implications (2020) for achieving fully functioning riparian 28
ecosystems. 29
(3)(a) The commission shall prioritize critical riparian 30
management zones at the watershed or subbasin scale where grant 31
funding under the program created in this section would be primarily 32
targeted. The prioritization must be informed by, consistent with, 33
and aligned with one or more of the following: Watershed plans 34
developed pursuant to chapter 90.82 RCW; the action agenda developed 35
under RCW 90.71.260; regional recovery plans created under RCW 36
77.85.090; the habitat project lists developed pursuant to RCW 37
77.85.050; the prioritization process developed under RCW 77.95.160; 38
priority projects identified for salmon recovery through agency grant 39
programs; or another watershed-based strategy that is consistent 40
p. 101 SB 5195
with, and aligned with the recommendations and implementation 1
proposals provided by the riparian task force convened pursuant to 2
section 117(3), chapter 475, Laws of 2023. 3
(b) The prioritization of critical riparian management projects 4
must be developed in coordination with: 5
(i) Local federally recognized tribes; 6
(ii) Local private landowners who are voluntarily participating 7
in the program; 8
(iii) Local conservation districts; and 9
(iv) The local county, the department of fish and wildlife, the 10
department of ecology, and water resource inventory area planning 11
units organized pursuant to chapter 90.82 RCW. 12
(4) Conditions for awarding funding for projects under this 13
program include, but are not limited to: 14
(a) Consistency with the program criteria and finalized grant 15
guidelines established under subsection (2) of this section;16
(b) Tiered incentive rates tied to improving functionality for 17
riparian areas that provide more than proportionally higher landowner 18
incentive payments for projects that establish the maximum achievable 19
buffer widths; and 20
(c) Other requirements as determined by the commission.21
(5) The commission must distribute riparian grant program funding 22
equitably throughout the state, consistent with received grant 23
applications and benefit to salmon habitat. Funding is intended 24
primarily for projects located in salmon recovery regions, as defined 25
in RCW 77.85.010, but funding may also be distributed to a project 26
not located in a salmon recovery region upon a determination by the 27
commission that the project will provide a unique benefit to salmon 28
habitat. 29
(6) Allowable expenses to a grantee receiving funds under this 30
section include, but are not limited to, labor, equipment, fencing, 31
mulch, seed, seedling trees, manual weed control, and yearly 32
maintenance costs for up to 10 years. 33
(7) Any native woody trees and shrubs planted with funding 34
provided under this section must be maintained for a minimum of five 35
years or as otherwise set by the commission for each grantee. 36
Vegetation must be chosen to prevent invasive weed populations and 37
ensure survival and successful establishment of plantings.38
(8) The commission shall determine appropriate recordkeeping and 39
data collection procedures required for program implementation and 40
p. 102 SB 5195
shall establish a data management system that allows for coordination 1
between the commission and other state agencies. Any data collected 2
or shared under this section may be used only to assess the successes 3
of the riparian grant program in improving the functions of critical 4
riparian habitat. 5
(9) The commission shall develop and implement a framework that 6
includes monitoring, adaptive management, and metrics in order to 7
ensure consistency with the requirements of the riparian grant 8
program. The monitoring and adaptive management framework may 9
include, but is not limited to, consideration of: 10
(a) Acres identified as eligible for restoration within a 11
watershed; 12
(b) Acres planned to be restored; 13
(c) Acres actually planted and maintained; 14
(d) Success in targeting and achieving aggregated project 15
implementation resulting in an increase in linear miles restored;16
(e) Plan review criteria; and 17
(f) Other similar factors as identified by the commission.18
(10) The commission may use up to two percent of any amounts 19
appropriated in this section for targeted outreach activities that 20
focus on critically identified geographic locations for listed salmon 21
species. 22
(11) The commission may use up to four percent of amounts 23
appropriated in this section for administrative expenses.24
(12) For the purposes of this section, "critical riparian 25
management zone" means the area adjacent to freshwaters, wetlands, 26
and marine waters that has been locally or regionally identified as 27
an area where salmon recovery efforts would significantly benefit 28
from enhanced protection or restoration. 29
Appropriation:30
Natural Climate Solutions Account— State. . . . . . . $20,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . $80,000,00033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,00034
NEW SECTION. Sec. 3085. FOR THE CONSERVATION COMMISSION35
2025-2027 Washington Shrubsteppe Restoration and Resiliency 36
(40000050)37
Appropriation:38
p. 103 SB 5195
State Building Construction Account— State. . . . . . . $3,000,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . $16,000,0003
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,000,0004
NEW SECTION. Sec. 3086. FOR THE DEPARTMENT OF FISH AND WILDLIFE5
Minter Hatchery Intakes (30000277)6
Reappropriation:7
State Building Construction Account— State. . . . . . . $6,883,0008
Appropriation:9
State Building Construction Account— State. . . . . . . $4,497,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,469,00011
Future Biennia (Projected Costs). . . . . . . . . . . . $216,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,065,00013
NEW SECTION. Sec. 3087. FOR THE DEPARTMENT OF FISH AND WILDLIFE14
Wallace River Hatchery - Replace Intakes and Ponds (30000660)15
Reappropriation:16
State Building Construction Account— State. . . . . . $19,558,00017
Appropriation:18
State Building Construction Account— State. . . . . . . $4,500,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,975,00020
Future Biennia (Projected Costs). . . . . . . . . . . $9,466,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $46,499,00022
NEW SECTION. Sec. 3088. FOR THE DEPARTMENT OF FISH AND WILDLIFE23
Soos Creek Hatchery Renovation (30000661)24
Appropriation:25
State Building Construction Account— State. . . . . . . $7,726,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $22,095,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,821,00029
NEW SECTION. Sec. 3089. FOR THE DEPARTMENT OF FISH AND WILDLIFE30
Spokane Hatchery Renovation (30000663)31
Reappropriation:32
p. 104 SB 5195
Model Toxics Control Capital Account— State. . . . . . $8,647,0001
State Building Construction Account— State. . . . . . . $8,575,0002
Subtotal Reappropriation. . . . . . . . . . . . . $17,222,0003
Appropriation:4
State Building Construction Account— State. . . . . . $17,978,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,378,0006
Future Biennia (Projected Costs). . . . . . . . . . . $18,369,0007
TOTAL. . . . . . . . . . . . . . . . . . . . . . $55,947,0008
NEW SECTION. Sec. 3090. FOR THE DEPARTMENT OF FISH AND WILDLIFE9
Naselle Hatchery Renovation (30000671)10
Reappropriation:11
State Building Construction Account— State. . . . . . $26,703,00012
Appropriation:13
State Building Construction Account— State. . . . . . . $9,324,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,929,00015
Future Biennia (Projected Costs). . . . . . . . . . . $19,656,00016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $63,612,00017
NEW SECTION. Sec. 3091. FOR THE DEPARTMENT OF FISH AND WILDLIFE18
Samish Hatchery - Adult Pond (30000679)19
Appropriation:20
State Building Construction Account— State. . . . . . . $1,621,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $10,057,00023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,678,00024
NEW SECTION. Sec. 3092. FOR THE DEPARTMENT OF FISH AND WILDLIFE25
Beaver Creek Hatchery - Renovation (30000680)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $2,429,00028
Appropriation:29
State Building Construction Account— State. . . . . . $14,066,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $402,00031
Future Biennia (Projected Costs). . . . . . . . . . . $49,639,00032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,536,00033
p. 105 SB 5195
NEW SECTION. Sec. 3093. FOR THE DEPARTMENT OF FISH AND WILDLIFE1
Kendall Creek Hatchery - Replace Intake (30000831)2
Appropriation:3
State Building Construction Account— State. . . . . . . . $415,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . $6,150,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,565,0007
NEW SECTION. Sec. 3094. FOR THE DEPARTMENT OF FISH AND WILDLIFE8
Samish Hatchery - Friday Creek Intake & Fish Passage (30000843)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $25,00011
Appropriation:12
State Building Construction Account— State. . . . . . . $1,964,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $125,00014
Future Biennia (Projected Costs). . . . . . . . . . . $15,464,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,578,00016
NEW SECTION. Sec. 3095. FOR THE DEPARTMENT OF FISH AND WILDLIFE17
Toutle River Fish Collection Facility - Match (40000021)18
Reappropriation:19
State Building Construction Account— State. . . . . . . $2,111,00020
Appropriation:21
State Building Construction Account— State. . . . . . $15,185,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $898,00023
Future Biennia (Projected Costs). . . . . . . . . . . $9,665,00024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $27,859,00025
NEW SECTION. Sec. 3096. FOR THE DEPARTMENT OF FISH AND WILDLIFE26
SRKW - Sol Duc Hatchery Modifications (40000147)27
Reappropriation:28
State Building Construction Account— State. . . . . . . . $908,00029
Appropriation:30
State Building Construction Account— State. . . . . . $11,316,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $478,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 106 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,702,0001
NEW SECTION. Sec. 3097. FOR THE DEPARTMENT OF FISH AND WILDLIFE2
Sol Duc Barrier and Boat Chute Replacement (40000168)3
Appropriation:4
State Building Construction Account— State. . . . . . . $1,137,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,137,0008
NEW SECTION. Sec. 3098. FOR THE DEPARTMENT OF FISH AND WILDLIFE9
SRKW - Palmer Ponds Expansion (40000175)10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $906,00012
Appropriation:13
State Building Construction Account— State. . . . . . . $5,821,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $44,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,771,00017
NEW SECTION. Sec. 3099. FOR THE DEPARTMENT OF FISH AND WILDLIFE18
Tumwater Falls History and Nature Center Construction (40000176)19
Appropriation:20
State Building Construction Account— State. . . . . . . $1,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00024
NEW SECTION. Sec. 3100. FOR THE DEPARTMENT OF FISH AND WILDLIFE25
SRKW Elwha Hatchery Expansion (40000251)26
Appropriation:27
State Building Construction Account— State. . . . . . . . $162,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . $5,464,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,626,00031
p. 107 SB 5195
NEW SECTION. Sec. 3101. FOR THE DEPARTMENT OF FISH AND WILDLIFE1
Bingham Creek Smolt & Adult Trap Site Repair & Upgrade (40000269)2
Appropriation:3
State Building Construction Account— State. . . . . . . $1,878,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,878,0007
NEW SECTION. Sec. 3102. FOR THE DEPARTMENT OF FISH AND WILDLIFE8
Culvert Court Case Fish Passage Barrier Corrections (40000271)9
Appropriation:10
State Building Construction Account— State. . . . . . . . $817,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . $4,594,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,411,00014
NEW SECTION. Sec. 3103. FOR THE DEPARTMENT OF FISH AND WILDLIFE15
Nemah Hatchery Weir Replacement (40000272)16
Appropriation:17
State Building Construction Account— State. . . . . . . . $381,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,705,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,086,00021
NEW SECTION. Sec. 3104. FOR THE DEPARTMENT OF FISH AND WILDLIFE22
Minor Works Preservation 25-27 (40000278)23
Appropriation:24
State Building Construction Account— State. . . . . . $11,149,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,149,00028
NEW SECTION. Sec. 3105. FOR THE DEPARTMENT OF FISH AND WILDLIFE29
Minor Works Programmatic 25-27 (40000279)30
Appropriation:31
State Building Construction Account— State. . . . . . . $2,788,00032
p. 108 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,788,0003
NEW SECTION. Sec. 3106. FOR THE DEPARTMENT OF FISH AND WILDLIFE4
2025-27 Migratory Waterfowl Habitat (40000345)5
Appropriation:6
Limited Fish and Wildlife Account— State. . . . . . . . . $600,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $1,200,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00010
NEW SECTION. Sec. 3107. FOR THE DEPARTMENT OF FISH AND WILDLIFE11
2025-27 Mitigation Projects and Dedicated Funding (40000347)12
Appropriation:13
General Fund— Federal. . . . . . . . . . . . . . . . . $10,000,00014
General Fund— Private/Local. . . . . . . . . . . . . . $1,000,00015
Limited Fish and Wildlife Account— State. . . . . . . . . $500,00016
Special Wildlife Account— Federal. . . . . . . . . . . $1,000,00017
Special Wildlife Account— Private/Local. . . . . . . . $1,000,00018
Subtotal Appropriation. . . . . . . . . . . . . . $13,500,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . $67,500,00021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $81,000,00022
NEW SECTION. Sec. 3108. FOR THE DEPARTMENT OF NATURAL RESOURCES23
Bridge Remediation (40000442)24
Appropriation:25
State Building Construction Account— State. . . . . . . $1,260,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,260,00029
NEW SECTION. Sec. 3109. FOR THE DEPARTMENT OF NATURAL RESOURCES30
School Seismic Safety Site Class Assessments (40000444)31
Appropriation:32
State Building Construction Account— State. . . . . . . $1,165,00033
p. 109 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . $2,330,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,495,0003
NEW SECTION. Sec. 3110. FOR THE DEPARTMENT OF NATURAL RESOURCES4
2025-27 Forest Riparian Easement Program (40000450)5
Appropriation:6
Natural Climate Solutions Account— State. . . . . . . . $4,900,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,900,00010
NEW SECTION. Sec. 3111. FOR THE DEPARTMENT OF NATURAL RESOURCES11
2025-27 Minor Works Programmatic (40000458)12
Appropriation:13
State Building Construction Account— State. . . . . . . $2,560,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,560,00017
NEW SECTION. Sec. 3112. FOR THE DEPARTMENT OF NATURAL RESOURCES18
2025-27 Safe and Sustainable Recreation (40000459)19
Appropriation:20
State Building Construction Account— State. . . . . . . $2,958,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,958,00024
NEW SECTION. Sec. 3113. FOR THE DEPARTMENT OF NATURAL RESOURCES25
2025-27 Natural Areas Facilities Preservation and Access 26
(40000467)27
Appropriation:28
State Building Construction Account— State. . . . . . . $2,930,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,930,00032
p. 110 SB 5195
NEW SECTION. Sec. 3114. FOR THE DEPARTMENT OF NATURAL RESOURCES1
2025-27 Family Forest Fish Passage Program (40000503)2
Appropriation:3
Natural Climate Solutions Account— State. . . . . . . . $7,904,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,904,0007
NEW SECTION. Sec. 3115. FOR THE DEPARTMENT OF NATURAL RESOURCES8
2025-27 State Forest Land Replacement (40000561)9
Appropriation:10
State Building Construction Account— State. . . . . . . $3,000,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . $12,000,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00014
NEW SECTION. Sec. 3116. FOR THE DEPARTMENT OF NATURAL RESOURCES15
2025-27 Correction of Fish Passage Culverts (40000562)16
Appropriation:17
State Building Construction Account— State. . . . . . . . $246,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $246,00021
NEW SECTION. Sec. 3117. FOR THE DEPARTMENT OF NATURAL RESOURCES22
Derelict Structure Removal Program (40000583)23
Appropriation:24
Model Toxics Control Capital Account— State. . . . . . $4,399,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,399,00028
NEW SECTION. Sec. 3118. FOR THE DEPARTMENT OF NATURAL RESOURCES29
Environmental Mitigation Projects (40000586)30
Appropriation:31
Model Toxics Control Capital Account— State. . . . . . . $997,00032
p. 111 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $997,0003
NEW SECTION. Sec. 3119. FOR THE DEPARTMENT OF NATURAL RESOURCES4
Derelict Vessel Removal Program (40000587)5
Appropriation:6
Model Toxics Control Capital Account— State. . . . . . $6,000,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00010
NEW SECTION. Sec. 3120. FOR THE DEPARTMENT OF NATURAL RESOURCES11
EV Infrastructure (40000597)12
Appropriation:13
State Building Construction Account— State. . . . . . . $3,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . $10,000,00016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,00017
NEW SECTION. Sec. 3121. FOR THE DEPARTMENT OF NATURAL RESOURCES18
Sedro Woolley Fire and Dorm Building (40000598)19
Appropriation:20
State Building Construction Account— State. . . . . . . . $455,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $455,00024
NEW SECTION. Sec. 3122. FOR THE DEPARTMENT OF NATURAL RESOURCES25
2025-27 Federal Land Acquisition Grants (40000600)26
Appropriation:27
General Fund— Federal. . . . . . . . . . . . . . . . . $72,000,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . $288,000,00030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $360,000,00031
p. 112 SB 5195
NEW SECTION. Sec. 3123. FOR THE DEPARTMENT OF NATURAL RESOURCES1
2025-27 Rivers and Habitat Open Space Program (40000601)2
Appropriation:3
Natural Climate Solutions Account— State. . . . . . . . $4,631,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,631,0007
NEW SECTION. Sec. 3124. FOR THE DEPARTMENT OF NATURAL RESOURCES8
Tukes Work Center Storm Water Mitigation (40000618)9
Appropriation:10
State Building Construction Account— State. . . . . . . . $383,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $383,00014
NEW SECTION. Sec. 3125. FOR THE DEPARTMENT OF NATURAL RESOURCES15
Webster Nursery Expansion (40000650)16
Appropriation:17
State Building Construction Account— State. . . . . . . $5,591,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,591,00021
NEW SECTION. Sec. 3126. FOR THE DEPARTMENT OF NATURAL RESOURCES22
Colville Firefighter Housing Project (40000651)23
Appropriation:24
State Building Construction Account— State. . . . . . . . $387,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $387,00028
NEW SECTION. Sec. 3127. FOR THE DEPARTMENT OF NATURAL RESOURCES29
State Trust Land Replacement (40000656)30
Appropriation:31
Community and Technical College Forest Reserve32
p. 113 SB 5195
Account— State. . . . . . . . . . . . . . . . . . . $1,000,0001
Land Bank Account— State. . . . . . . . . . . . . . . $30,000,0002
Natural Resources Real Property Replacement 3
Account— State. . . . . . . . . . . . . . . . . . $100,000,0004
Subtotal Appropriation. . . . . . . . . . . . . $131,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $131,000,0008
NEW SECTION. Sec. 3128. FOR THE DEPARTMENT OF NATURAL RESOURCES9
2025-27 Minor Works Preservation (40000664)10
Appropriation:11
State Building Construction Account— State. . . . . . . $3,173,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,173,00015
NEW SECTION. Sec. 3129. FOR THE DEPARTMENT OF NATURAL RESOURCES16
Trust Land Transfer Program (40000685)17
The appropriation in this section is subject to the following 18
conditions and limitations: The appropriation in this section is 19
provided solely for projects identified in OFM Capital Document No. 20
2025-9, developed December 17, 2024. 21
Appropriation:22
State Building Construction Account— State. . . . . . $19,350,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,350,00026
NEW SECTION. Sec. 3130. FOR THE DEPARTMENT OF NATURAL RESOURCES27
Carbon Sequestration Forest (40000707)28
The appropriation in this section is subject to the following 29
conditions and limitations: 30
(1)(a) $3,000,000 of this appropriation is provided solely to 31
acquire working forestlands in Wahkiakum county to be managed for 32
increased carbon sequestration and carbon storage through sustainable 33
timber harvests. Any land purchased must be managed under the 34
p. 114 SB 5195
department's habitat conservation plan and policy for sustainable 1
forests. Pursuant to (b) of this subsection, it is the intent of the 2
legislature that these lands serve as replacement land for 3
structurally complex, carbon-dense forestlands designated for 4
conservation and for existing encumbered state forestlands. Once 5
purchased, the lands must be part of the land bank created in RCW 6
79.19.020. The property must be purchased before the transfer of any 7
existing trust land is fully executed. 8
(b) If the department acquires land pursuant to this subsection 9
(1), it must use the lands acquired for the following purposes: (i) 10
For the permanent conservation of structurally complex, carbon-dense 11
forestland and (ii) as replacement state forestlands to replace 12
existing encumbered state forestlands in Clallam, Pacific, Skamania, 13
and Wahkiakum counties. 14
(c) The department must designate any lands acquired related to 15
(b)(ii) of this subsection as state forest transfer lands.16
(d) If the department acquires any replacement lands pursuant to 17
this section, it must take the following actions: (i) Designate the 18
lands acquired for management under the department's habitat 19
conservation plan and policy for sustainable forests; (ii) ensure 20
that any acquisition pursuant to this section complies with the 21
allowable purposes of RCW 70A.65.270; and (iii) ensure that any 22
replacement of structurally complex, carbon-dense forested trust land 23
pursuant to (b)(i) of this subsection be of equal value to the land 24
conserved and that replacement land is purchased before the transfer 25
is fully executed. 26
(e) Before conserving any forestland pursuant to (a)(i) of this 27
subsection, the department must receive letters nominating specific 28
parcels issued by the legislative authority of the county in which 29
the forestland is located and the approval of the conservation parcel 30
boundaries by the board of natural resources. County parcel 31
nomination and board approval pursuant to this process must be 32
finalized prior to the transfer of the forestland pursuant to this 33
subsection. 34
(f) The department may designate the structurally complex, 35
carbon-dense forested trust land identified in (a)(i) of this 36
subsection as a natural area preserve or a natural resource 37
conservation area notwithstanding the requirements of chapter 79.70 38
and 79.71 RCW. 39
p. 115 SB 5195
(g) The legislative authority of the county from which the real 1
property was transferred pursuant to (a)(i) of this subsection may 2
not request that the department distribute a percentage of the 3
proceeds associated with the valuable materials to the legislative 4
authority of the county from which the real property was transferred. 5
Before conserving any forestland pursuant to (a)(i) of this 6
subsection, the legislative body of the county must request in 7
writing to participate in a land pool in accordance with RCW 8
79.22.140. 9
(h) The department may use up to $500,000 of the total 10
appropriation in this section for its administrative costs pursuant 11
to this section. 12
(2) $2,000,000 of the appropriation is provided solely for the 13
department to implement climate-smart forest management strategies to 14
enhance carbon storage as well as conservation of carbon-dense, 15
structurally complex mature forests, support timber production and 16
implement the requirements of the department's multispecies habitat 17
conservation plan for state trust lands. 18
Appropriation:19
Natural Climate Solutions Account— State. . . . . . . . $5,000,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00023
(End of part)
p. 116 SB 5195
PART 41
TRANSPORTATION2
NEW SECTION. Sec. 4001. FOR THE WASHINGTON STATE PATROL3
Fire Training Academy (FTA) Maintenance Building Roof Replacement 4
(40000091)5
Appropriation:6
State Building Construction Account— State. . . . . . . . $300,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00010
NEW SECTION. Sec. 4002. FOR THE WASHINGTON STATE PATROL11
Fire Training Academy (FTA) Fuel Farm Refurbishment (40000092)12
Appropriation:13
State Building Construction Account— State. . . . . . . $1,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00017
NEW SECTION. Sec. 4003. FOR THE WASHINGTON STATE PATROL18
Crime Laboratory South Consolidated Facility (40000095)19
The appropriation in this section is subject to the following 20
conditions and limitations: The appropriation is provided solely to 21
design a facility on agency-owned property in Federal Way.22
Appropriation:23
State Building Construction Account— State. . . . . . $13,526,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . $100,000,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $113,526,00027
NEW SECTION. Sec. 4004. FOR THE DEPARTMENT OF TRANSPORTATION28
2025-27 CARB Loans (40000004)29
The appropriation in this section is subject to the following 30
conditions and limitations: The appropriation in this section must be 31
deposited in the public use general aviation airport loan revolving 32
account. 33
p. 117 SB 5195
Appropriation:1
Public Works Assistance Account— State. . . . . . . . . $5,000,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . $5,000,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0005
(End of part)
p. 118 SB 5195
PART 51
EDUCATION2
NEW SECTION. Sec. 5001. FOR THE SUPERINTENDENT OF PUBLIC 3
INSTRUCTION4
2025-27 K-12 Capital Programs Administration (40000142)5
Appropriation:6
Common School Construction Fund— State. . . . . . . . . $6,577,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $31,314,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,891,00010
NEW SECTION. Sec. 5002. FOR THE SUPERINTENDENT OF PUBLIC 11
INSTRUCTION12
2025-27 School Inventory & Condition Data Collection (40000143)13
Appropriation:14
State Building Construction Account— State. . . . . . . $1,700,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . $6,000,00017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,700,00018
NEW SECTION. Sec. 5003. FOR THE SUPERINTENDENT OF PUBLIC 19
INSTRUCTION20
2025-27 Classroom Indoor Air Quality Projects (40000144)21
The appropriation in this section is subject to the following 22
conditions and limitations: 23
(1)(a) $10,000,000 of the climate commitment account — state 24
appropriation in this section is provided solely for grants to school 25
districts with enrollments exceeding 3,000 students for indoor air 26
quality assessment, installation, repair, or replacement of HVAC, air 27
filtration enhancements, and general air quality improvements that 28
improve student health and safety. 29
(b) Grantees under this subsection (1) may: (i) Seek technical 30
assistance from state-funded entities, such as the office of the 31
superintendent of public instruction, the department of commerce, and 32
the department of health; (ii) seek technical assistance from other 33
entities, such as local health jurisdiction school safety programs 34
and the smart buildings center's K-12 ventilation and indoor air 35
p. 119 SB 5195
quality resource team; and (iii) use funding awarded to seek guidance 1
and technical assistance from commercial entities that have 2
specialized knowledge of troubleshooting modern HVAC or smart 3
building systems. 4
(c) Subject to subsection (3) of this section and if applications 5
for assessment grants under this subsection exceed available funding, 6
the office of the superintendent of public instruction must first 7
prioritize grants for school districts: (i) Without existing HVAC 8
systems; (ii) that have documented proof of indoor air quality 9
performance that does not meet current state energy code; (iii) with 10
outdated or underperforming HVAC systems; and (iv) that have the most 11
limited financial capacity. Assessments funded under this subsection 12
(1)(c) must include professional cost estimates for mitigating the 13
indoor air quality deficiencies identified. 14
(2)(a) $15,000,000 of the climate commitment account — state 15
appropriation in this section is provided solely for grants to school 16
districts with enrollments that are less than or equal to 3,000 17
students for assessment, installation, repair, or replacement of 18
HVAC, air filtration enhancements, and general air quality 19
improvements that improve student health and safety.20
(b) Grantees under this subsection may: (i) Seek technical 21
assistance from state funded entities, such as the office of the 22
superintendent of public instruction, the department of commerce, and 23
the department of health; (ii) seek technical assistance from other 24
entities, such as local health jurisdiction school safety programs 25
and the smart buildings center's K-12 ventilation and indoor air 26
quality resource team; and (iii) use funding awarded to seek guidance 27
and technical assistance from commercial entities that have 28
specialized knowledge of troubleshooting modern HVAC or smart 29
building systems. 30
(c) Subject to subsection (3) of this section and if applications 31
grants under this subsection exceed available funding, the office of 32
the superintendent of public instruction must first prioritize grants 33
for school districts: (i) Without existing HVAC systems; (ii) that 34
have documented proof of indoor air quality performance that does not 35
meet current state energy code; (iii) with outdated or 36
underperforming HVAC systems; and (iv) that have the most limited 37
financial capacity. 38
(3) The office of the superintendent of public instruction must 39
first allocate, to the maximum extent feasible, the funding 40
p. 120 SB 5195
appropriated under this section to grants prioritized under 1
subsections (1) and (2) of this section. However, as necessary to 2
award grants using the climate commitment account— state appropriation 3
in this section, the superintendent of public instruction may also 4
prioritize grants under this section that will improve compliance 5
with the state's energy-related building standards in chapter 19.27A 6
RCW by reducing energy use intensity. 7
Appropriation:8
Climate Commitment Account— State. . . . . . . . . . . $25,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . $100,000,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $125,000,00012
NEW SECTION. Sec. 5004. FOR THE SUPERINTENDENT OF PUBLIC 13
INSTRUCTION14
2025-27 School District Health and Safety (40000146)15
The appropriation in this section is subject to the following 16
conditions and limitations: 17
(1) $11,000,000 of the appropriation in this section is provided 18
solely for emergency repair grants to address unexpected and imminent 19
health and safety hazards at K-12 public schools, including skill 20
centers, that will impact the day-to-day operations of the school 21
facility, and this is the maximum amount that may be spent for this 22
purpose. For emergency repair grants only, an emergency declaration 23
must be signed by the school district board of directors and 24
submitted to the superintendent of public instruction for 25
consideration. The emergency declaration must include a description 26
of the imminent health and safety hazard, the possible cause, the 27
proposed scope of emergency repair work and related cost estimate, 28
and identification of local funding to be applied to the project. 29
Grants of emergency repair moneys must be conditioned upon the 30
written commitment and plan of the school district board of directors 31
to repay the grant with any insurance payments or other judgments 32
that may be awarded, if applicable. 33
(2) $20,000,000 of the appropriation in this section is provided 34
solely for health and safety and equal access grants.35
(a) $15,000,000 of the appropriation in this section is provided 36
solely for urgent repair grants to address nonreccurring urgent small 37
repair projects at K-12 public schools, excluding skill centers, that 38
p. 121 SB 5195
could impact the health and safety of students and staff if not 1
completed, and this is the maximum amount that may be spent for this 2
purpose. The office of the superintendent of public instruction, 3
after consulting with maintenance and operations administrators of 4
school districts, shall develop criteria and assurances for providing 5
funding for specific projects through a competitive grant program. 6
The criteria and assurances must include, but are not limited to, the 7
following: (i) Limiting school districts to one grant, not to exceed 8
$600,000, per three-year period; (ii) prioritizing applications based 9
on limited school district financial resources for the project; and 10
(iii) requiring any district receiving funding provided in this 11
section to demonstrate a consistent commitment to addressing school 12
facility needs. The grant applications must include a comprehensive 13
description of the health and safety issues to be addressed, a 14
detailed description of the remedy, including a detailed cost 15
estimate of the repair or replacement work to be performed, and 16
identification of local funding, if any, which will be applied to the 17
project. Grants may be used for, but are not limited to: Repair or 18
replacement of failing building systems, abatement of potentially 19
hazardous materials, and safety-related structural improvements.20
(b) $5,000,000 of the appropriation in this section is provided 21
solely for equal access grants for facility repairs and alterations 22
at K-12 public schools, including skills centers, to improve 23
compliance with the Americans with disabilities act and individuals 24
with disabilities education act, and this is the maximum amount that 25
may be spent for this purpose. The office of the superintendent of 26
public instruction shall develop criteria and assurances for 27
providing funding for specific projects through a competitive grant 28
program. The criteria and assurances must include, but are not 29
limited to, the following: (i) Limiting districts to one grant, not 30
to exceed $150,000, per three-year period; (ii) prioritizing 31
applications based on limited school district financial resources for 32
the project; and (iii) requiring recipient districts to demonstrate a 33
consistent commitment to addressing school facility needs. The grant 34
applications must include a description of the Americans with 35
disabilities act or individuals with disabilities education act 36
compliance deficiency, a comprehensive description of the facility 37
accessibility issues to be addressed, a detailed description of the 38
remedy including a detailed cost estimate of the repair or 39
replacement work to be performed, and identification of local 40
p. 122 SB 5195
funding, if any, which will be applied to the project. Priority for 1
grant funding must be given to school districts that demonstrate a 2
lack of capital resources to address the compliance deficiencies 3
outlined in the grant application. 4
(3) The superintendent of public instruction must notify the 5
office of financial management, the legislative evaluation and 6
accountability program committee, the house capital budget committee, 7
and the senate ways and means committee as projects described in 8
subsection (1) of this section are approved for funding.9
Appropriation:10
State Building Construction Account— State. . . . . . $31,000,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . $124,000,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $155,000,00014
NEW SECTION. Sec. 5005. FOR THE SUPERINTENDENT OF PUBLIC 15
INSTRUCTION16
2025-27 Healthy Kids-Healthy Schools (40000147)17
The appropriation in this section is subject to the following 18
conditions and limitations: 19
(1)(a) $12,000,000 of the common school construction account — 20
state appropriation in this section is provided solely for healthy 21
kids and healthy schools grants for projects that are consistent with 22
the healthiest next generation priorities. 23
(b) The appropriation in this subsection (1) is provided solely 24
for grant funding to school districts for the purchase of equipment 25
or to make repairs to existing equipment that is related to 26
improving: (i) Children's physical health, and may include, but is 27
not limited to, fitness playground equipment, covered play areas, and 28
physical education equipment or related structures or renovation; and 29
(ii) children's nutrition, and may include, but is not limited to, 30
garden related structures and greenhouses to provide students access 31
to fresh produce, and kitchen equipment or upgrades.32
(c) The office of the superintendent of public instruction shall 33
develop criteria for grant funding under this subsection (1) that 34
include, but are not limited to, the following requirements: (i) 35
Districts may apply for grants, but no single district may receive 36
more than $200,000 of the appropriation for grants awarded under this 37
section; (ii) any district receiving funding provided in this section 38
p. 123 SB 5195
must demonstrate a consistent commitment to addressing school 1
facilities' needs; and (iii) applicants with a high percentage of 2
students who are eligible and enrolled in the free and reduced-price 3
meals program may be prioritized. 4
(2) $3,000,000 of the common school construction account — state 5
appropriation in this section is provided solely for grants to school 6
districts, charter schools, and state-tribal education compact 7
schools for the replacement of lead-contaminated pipes, drinking 8
water fixtures, and the purchase of water filters, including the 9
labor costs of remediation design, installation, and construction.10
Appropriation:11
Common School Construction Fund— State. . . . . . . . $15,000,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . $60,000,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,00015
NEW SECTION. Sec. 5006. FOR THE SUPERINTENDENT OF PUBLIC 16
INSTRUCTION17
2025-27 Career Preparation and Launch Grants (40000148)18
The appropriation in this section is subject to the following 19
conditions and limitations: 20
(1) The appropriation in this section is provided solely for the 21
superintendent of public instruction to provide competitive grants to 22
school districts to purchase and install career and technical 23
education equipment that expands career-connected learning and work-24
integrated learning opportunities. 25
(2) The office of the superintendent of public instruction, after 26
consulting with school districts, career connect Washington, and the 27
workforce training and education coordinating board, shall develop 28
criteria and assurances for providing funding and outcomes for 29
specific projects through a competitive grant program to stay within 30
the appropriation level provided in this section consistent with the 31
following priorities. The criteria must include, but is not limited 32
to, the following: 33
(a) Districts or schools must demonstrate that the request 34
provides necessary equipment to deliver career and technical 35
education; and 36
p. 124 SB 5195
(b) Applicants with a high percentage of students who are 1
eligible and enrolled in the free and reduced-price meals program 2
must be prioritized. 3
(3) No single district may receive more than $200,000 of the 4
appropriation. 5
Appropriation:6
State Building Construction Account— State. . . . . . . $5,000,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . $24,000,0009
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,000,00010
NEW SECTION. Sec. 5007. FOR THE SUPERINTENDENT OF PUBLIC 11
INSTRUCTION12
2025-27 Small District and STEC Schools Modernization Program 13
(40000150)14
The appropriations in this section are subject to the following 15
conditions and limitations: 16
(1) $223,690,000 of the state building construction account— state 17
appropriation, $77,091,000 of the common school construction account— 18
state appropriation, and $1,500,000 of the common school construction 19
account— federal appropriation in this section are provided solely for 20
modernization grants for small school districts authorized under RCW 21
28A.525.159. 22
(2) $3,644,000 of the common school construction account — state 23
appropriation in this section is provided solely for planning grants 24
for small school districts authorized under RCW 28A.525.159. Planning 25
grants may not exceed $50,000 per district. Planning grants may only 26
be awarded to school districts with an estimated total project cost 27
of $6,000,000 or less. 28
(3) $27,371,000 of the state building construction account — state 29
appropriation in this section is provided solely for planning grants 30
and modernization grants to state-tribal compact schools. The 31
superintendent of public instruction may prioritize planning grants 32
for state-tribal compact schools with the most serious building 33
deficiencies and the most limited financial capacity.34
(4) The superintendent of public instruction shall submit a list 35
of small school district modernization projects, as prioritized by 36
the advisory committee under RCW 28A.525.159, to the legislature and 37
p. 125 SB 5195
the governor by September 15, 2026. The list must include: (a) A 1
description of the project; (b) the proposed state funding level, not 2
to exceed $6,000,000 per project; (c) estimated total project costs; 3
and (d) local funding resources. 4
(5) In addition to the standard list required in subsection (4) 5
of this section, the superintendent of public instruction shall also 6
submit additional lists for consideration by September 15, 2026, 7
alongside their 2027-2029 request. These additional lists must 8
include the following information: (a) A description of the projects; 9
(b) the proposed state funding level; (c) estimated total project 10
costs; and (d) local funding resources for: 11
(i) Small school districts with 1,000 students or less, with a 12
state funding level not to exceed $12,000,000 per project; and13
(ii) Small school districts with 3,000 students or less, with a 14
state funding level not to exceed $12,000,000 per project.15
Appropriation:16
Common School Construction Fund— State. . . . . . . . $80,735,00017
Common School Construction Fund— Federal. . . . . . . . $1,500,00018
State Building Construction Account— State. . . . . . $251,061,00019
Subtotal Appropriation. . . . . . . . . . . . . $333,296,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . $400,000,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $733,296,00023
NEW SECTION. Sec. 5008. FOR THE SUPERINTENDENT OF PUBLIC 24
INSTRUCTION25
2025-27 School Construction Assistance Program (40000153)26
The appropriations in this section are subject to the following 27
conditions and limitations: 28
(1) $557,132,000 of the state building construction account— state 29
appropriation in this section is provided solely for school 30
construction assistance grants for qualifying public school 31
construction projects. 32
(2) $6,296,000 of the common school construction account — state 33
appropriation in this section is provided solely for study and survey 34
grants and for completing inventory and building condition 35
assessments for public school districts every six years, and for the 36
acquisition of art pursuant to RCW 28A.335.210. 37
p. 126 SB 5195
Appropriation:1
Common School Construction Fund— State. . . . . . . . . $6,296,0002
State Building Construction Account— State. . . . . . $557,132,0003
Subtotal Appropriation. . . . . . . . . . . . . $563,428,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . $2,630,433,0006
TOTAL. . . . . . . . . . . . . . . . . . . . . $3,193,861,0007
NEW SECTION. Sec. 5009. FOR THE SUPERINTENDENT OF PUBLIC 8
INSTRUCTION9
New Market Skills Center - Exterior Preservation Project 10
(40000154)11
Appropriation:12
State Building Construction Account— State. . . . . . . $4,935,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,935,00016
NEW SECTION. Sec. 5010. FOR THE SUPERINTENDENT OF PUBLIC 17
INSTRUCTION18
Sno-Isle Tech Skills Center Marine Tech Preservation Project 19
(40000155)20
Appropriation:21
State Building Construction Account— State. . . . . . . $2,885,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,885,00025
NEW SECTION. Sec. 5011. FOR THE SUPERINTENDENT OF PUBLIC 26
INSTRUCTION27
2025-27 Skills Center Minor Works (40000158)28
Appropriation:29
State Building Construction Account— State. . . . . . . $6,435,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . $25,740,00032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,175,00033
p. 127 SB 5195
NEW SECTION. Sec. 5012. FOR THE SUPERINTENDENT OF PUBLIC 1
INSTRUCTION2
School Seismic Safety Grant Program (40000159)3
The appropriation in this section is subject to the following 4
conditions and limitations: The appropriation in this section is 5
provided solely for seismic planning and remediation project grants 6
to school districts and state-tribal education compact schools 7
authorized under RCW 28A.525.320. 8
Appropriation:9
State Building Construction Account— State. . . . . . $78,540,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . $400,000,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $478,540,00013
NEW SECTION. Sec. 5013. FOR THE STATE SCHOOL FOR THE BLIND14
Dormitory Modernization (40000054)15
Appropriation:16
State Building Construction Account— State. . . . . . . . $350,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $25,000,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,350,00020
NEW SECTION. Sec. 5014. FOR THE STATE SCHOOL FOR THE BLIND21
Minor works projects 2025-27 (40000060)22
Appropriation:23
State Building Construction Account— State. . . . . . . $2,110,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,110,00027
NEW SECTION. Sec. 5015. FOR THE CENTER FOR DEAF AND HARD OF 28
HEARING YOUTH29
Northrop Primary School Building Renovation (40000006)30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $500,00032
Appropriation:33
p. 128 SB 5195
State Building Construction Account— State. . . . . . $16,162,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,600,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,262,0004
NEW SECTION. Sec. 5016. FOR THE CENTER FOR DEAF AND HARD OF 5
HEARING YOUTH6
2025-27 Minor Works (40000012)7
Appropriation:8
State Building Construction Account— State. . . . . . . $2,125,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,125,00012
NEW SECTION. Sec. 5017. FOR THE UNIVERSITY OF WASHINGTON13
UW Major Infrastructure (30000808)14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $238,00016
University of Washington Building Account— State. . . . $7,325,00017
Subtotal Reappropriation. . . . . . . . . . . . . $7,563,00018
Appropriation:19
University of Washington Building Account— State. . . $10,300,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $49,237,00021
Future Biennia (Projected Costs). . . . . . . . . . . $42,300,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $109,400,00023
NEW SECTION. Sec. 5018. FOR THE UNIVERSITY OF WASHINGTON24
Chemical Sciences & Bagley Hall (40000146)25
Reappropriation:26
State Building Construction Account— State. . . . . . . $5,000,00027
Appropriation:28
State Building Construction Account— State. . . . . . $124,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $129,000,00032
p. 129 SB 5195
NEW SECTION. Sec. 5019. FOR THE UNIVERSITY OF WASHINGTON1
Clean Energy Transformation 25-27 (40000148)2
Appropriation:3
State Building Construction Account— State. . . . . . $33,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,000,0007
NEW SECTION. Sec. 5020. FOR THE UNIVERSITY OF WASHINGTON8
Infrastructure Renewal 25-27 (40000159)9
Appropriation:10
University of Washington Building Account— State. . . $29,350,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,350,00014
NEW SECTION. Sec. 5021. FOR THE UNIVERSITY OF WASHINGTON15
UW Tacoma - Campus Power Repairs (Phase 3) (40000160)16
Appropriation:17
State Building Construction Account— State. . . . . . . $3,900,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,900,00021
NEW SECTION. Sec. 5022. FOR THE UNIVERSITY OF WASHINGTON22
UW Bothell - Asset Preservation (Minor Works ) 25-27 (40000161)23
Appropriation:24
University of Washington Building Account— State. . . . $4,530,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,530,00028
NEW SECTION. Sec. 5023. FOR THE UNIVERSITY OF WASHINGTON29
UW Seattle - Asset Preservation (Minor Works) 25-27 (40000163)30
Appropriation:31
University of Washington Building Account— State. . . $22,080,00032
p. 130 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,080,0003
NEW SECTION. Sec. 5024. FOR THE UNIVERSITY OF WASHINGTON4
UW Tacoma - Asset Preservation (Minor Works ) 25-27 (40000164)5
Appropriation:6
University of Washington Building Account— State. . . . $5,415,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,415,00010
NEW SECTION. Sec. 5025. FOR THE UNIVERSITY OF WASHINGTON11
Preventive Facility Maintenance and Building System Repairs 12
(91000029)13
Appropriation:14
University of Washington Building Account— State. . . $25,825,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,825,00018
NEW SECTION. Sec. 5026. FOR THE UNIVERSITY OF WASHINGTON19
UW Tacoma Campus Soil Remediation (92000002)20
Reappropriation:21
Model Toxics Control Capital Account— State. . . . . . $3,957,00022
Appropriation:23
Model Toxics Control Capital Account— State. . . . . . $2,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,829,00025
Future Biennia (Projected Costs). . . . . . . . . . . $8,000,00026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,786,00027
NEW SECTION. Sec. 5027. FOR WASHINGTON STATE UNIVERSITY28
Pullman Sciences Building (40000284)29
Appropriation:30
State Building Construction Account— State. . . . . . $25,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00032
p. 131 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . $50,000,0001
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,500,0002
NEW SECTION. Sec. 5028. FOR WASHINGTON STATE UNIVERSITY3
Clean Building Standard Energy Efficiency Improvements (40000346)4
Appropriation:5
State Building Construction Account— State. . . . . . . $5,000,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,000,0007
Future Biennia (Projected Costs). . . . . . . . . . . $80,000,0008
TOTAL. . . . . . . . . . . . . . . . . . . . . . $90,000,0009
NEW SECTION. Sec. 5029. FOR WASHINGTON STATE UNIVERSITY10
Spokane Team Health Education Building (40000361)11
Reappropriation:12
State Building Construction Account— State. . . . . . . . $750,00013
Appropriation:14
State Building Construction Account— State. . . . . . $58,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,250,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $65,000,00018
NEW SECTION. Sec. 5030. FOR WASHINGTON STATE UNIVERSITY19
Minor Capital Preservation 2025-27 (MCR) (40000367)20
Appropriation:21
Washington State University Building Account— 22
State. . . . . . . . . . . . . . . . . . . . . . $40,000,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . $160,000,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00026
NEW SECTION. Sec. 5031. FOR WASHINGTON STATE UNIVERSITY27
Minor Capital Program 2025-27 (MCI & Omnibus Equip.) (40000368)28
Appropriation:29
State Building Construction Account— State. . . . . . $11,690,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . $80,000,00032
p. 132 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $91,690,0001
NEW SECTION. Sec. 5032. FOR WASHINGTON STATE UNIVERSITY2
Vancouver Central Chiller Plant Upgrades (40000371)3
Appropriation:4
State Building Construction Account— State. . . . . . . $3,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0008
NEW SECTION. Sec. 5033. FOR WASHINGTON STATE UNIVERSITY9
Puyallup Washington Animal Disease Diagnostic Lab Facility 10
(40000372)11
Appropriation:12
State Building Construction Account— State. . . . . . . $3,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,000,00016
NEW SECTION. Sec. 5034. FOR WASHINGTON STATE UNIVERSITY17
Pullman Dairy Modernization (40000373)18
Appropriation:19
State Building Construction Account— State. . . . . . . . $500,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00023
NEW SECTION. Sec. 5035. FOR WASHINGTON STATE UNIVERSITY24
Pullman VCEA Modernization (40000374)25
Appropriation:26
State Building Construction Account— State. . . . . . . . $500,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . $70,000,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,500,00030
NEW SECTION. Sec. 5036. FOR WASHINGTON STATE UNIVERSITY31
p. 133 SB 5195
Wenatchee Tree Fruit Research & Ext. Center Plant Growth Facility 1
(40000376)2
Appropriation:3
State Building Construction Account— State. . . . . . $10,000,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0007
NEW SECTION. Sec. 5037. FOR WASHINGTON STATE UNIVERSITY8
Cougar Energy Initiative (40000377)9
Appropriation:10
State Building Construction Account— State. . . . . . $17,293,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . $782,707,00013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $800,000,00014
NEW SECTION. Sec. 5038. FOR WASHINGTON STATE UNIVERSITY15
Preventive Facility Maintenance and Building System Repairs 16
(91000037)17
Appropriation:18
Washington State University Building Account— 19
State. . . . . . . . . . . . . . . . . . . . . . $10,115,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $30,345,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,460,00023
NEW SECTION. Sec. 5039. FOR EASTERN WASHINGTON UNIVERSITY24
Lucy Covington Center (40000071)25
Reappropriation:26
Eastern Washington University Capital Projects27
Account— State. . . . . . . . . . . . . . . . . . . . $19,00028
Appropriation:29
State Building Construction Account— State. . . . . . . $2,400,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $281,00031
Future Biennia (Projected Costs). . . . . . . . . . . $17,880,00032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,580,00033
p. 134 SB 5195
NEW SECTION. Sec. 5040. FOR EASTERN WASHINGTON UNIVERSITY1
Martin - Williamson Hall (40000113)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $63,0004
Appropriation:5
State Building Construction Account— State. . . . . . $12,415,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . $287,0007
Future Biennia (Projected Costs). . . . . . . . . . $140,558,0008
TOTAL. . . . . . . . . . . . . . . . . . . . . . $153,323,0009
NEW SECTION. Sec. 5041. FOR EASTERN WASHINGTON UNIVERSITY10
Minor Works: Program 2025-27 (40000119)11
Appropriation:12
Eastern Washington University Capital Projects13
Account— State. . . . . . . . . . . . . . . . . . . $3,800,00014
State Building Construction Account— State. . . . . . . $2,000,00015
Subtotal Appropriation. . . . . . . . . . . . . . $5,800,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,800,00019
NEW SECTION. Sec. 5042. FOR EASTERN WASHINGTON UNIVERSITY20
Geothermal Plant - Node 1 (40000158)21
Appropriation:22
State Building Construction Account— State. . . . . . $10,437,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . $153,513,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $163,950,00026
NEW SECTION. Sec. 5043. FOR EASTERN WASHINGTON UNIVERSITY27
Minor Works: Preservation 2025-27 (40000171)28
Appropriation:29
State Building Construction Account— State. . . . . . $15,250,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,250,00033
p. 135 SB 5195
NEW SECTION. Sec. 5044. FOR EASTERN WASHINGTON UNIVERSITY1
Preventative Maintenance/Backlog Reduction (40000222)2
Appropriation:3
Eastern Washington University Capital Projects 4
Account— State. . . . . . . . . . . . . . . . . . . $2,217,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . $8,868,0007
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,085,0008
NEW SECTION. Sec. 5045. FOR EASTERN WASHINGTON UNIVERSITY9
Building Decarbonization Efforts (40000223)10
Appropriation:11
State Building Construction Account— State. . . . . . . $5,000,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00015
NEW SECTION. Sec. 5046. FOR CENTRAL WASHINGTON UNIVERSITY16
Humanities & Social Science Complex (40000081)17
Reappropriation:18
Climate Commitment Account— State. . . . . . . . . . . $7,000,00019
State Building Construction Account— State. . . . . . $59,756,00020
Subtotal Reappropriation. . . . . . . . . . . . . $66,756,00021
Appropriation:22
State Building Construction Account— State. . . . . . $11,158,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,049,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $108,963,00026
NEW SECTION. Sec. 5047. FOR CENTRAL WASHINGTON UNIVERSITY27
Aviation Degree Expansion (40000125)28
Appropriation:29
State Building Construction Account— State. . . . . . . $9,968,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,968,00033
p. 136 SB 5195
NEW SECTION. Sec. 5048. FOR CENTRAL WASHINGTON UNIVERSITY1
Emergency Backup Power System (40000163)2
Appropriation:3
State Building Construction Account— State. . . . . . $11,773,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,773,0007
NEW SECTION. Sec. 5049. FOR CENTRAL WASHINGTON UNIVERSITY8
2025-2027 Decarbonization Package (40000165)9
Appropriation:10
State Building Construction Account— State. . . . . . $12,467,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,467,00014
NEW SECTION. Sec. 5050. FOR CENTRAL WASHINGTON UNIVERSITY15
Institutional Equipment Upgrades (40000166)16
Appropriation:17
Central Washington University Capital Projects18
Account— State. . . . . . . . . . . . . . . . . . . $1,000,00019
State Building Construction Account— State. . . . . . . $1,000,00020
Subtotal Appropriation. . . . . . . . . . . . . . $2,000,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00024
NEW SECTION. Sec. 5051. FOR CENTRAL WASHINGTON UNIVERSITY25
Wildcat Farm Composter (40000167)26
Appropriation:27
State Building Construction Account— State. . . . . . . $1,713,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,713,00031
NEW SECTION. Sec. 5052. FOR CENTRAL WASHINGTON UNIVERSITY32
Minor Works Preservation 2025-27 (40000170)33
p. 137 SB 5195
Appropriation:1
Central Washington University Capital Projects 2
Account— State. . . . . . . . . . . . . . . . . . . $7,000,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,0006
NEW SECTION. Sec. 5053. FOR CENTRAL WASHINGTON UNIVERSITY7
Minor Works Program 2025-27 (40000193)8
Appropriation:9
Central Washington University Capital Projects10
Account— State. . . . . . . . . . . . . . . . . . . $1,000,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00014
NEW SECTION. Sec. 5054. FOR CENTRAL WASHINGTON UNIVERSITY15
Preventive Facility Maintenance and Building System Repairs 16
(91000023)17
Reappropriation:18
Central Washington University Capital Projects19
Account— State. . . . . . . . . . . . . . . . . . . . $885,00020
Appropriation:21
Central Washington University Capital Projects22
Account— State. . . . . . . . . . . . . . . . . . . $2,422,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,537,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,844,00026
NEW SECTION. Sec. 5055. FOR THE EVERGREEN STATE COLLEGE27
Minor Works Preservation 2025-27 (40000103)28
Appropriation:29
State Building Construction Account— State. . . . . . $10,856,00030
The Evergreen State College Capital Projects 31
Account— State. . . . . . . . . . . . . . . . . . . $7,644,00032
Subtotal Appropriation. . . . . . . . . . . . . . $18,500,00033
p. 138 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . $102,046,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,546,0003
NEW SECTION. Sec. 5056. FOR THE EVERGREEN STATE COLLEGE4
Preventive Facility Maintenance and Building System Repairs 5
(40000140)6
Appropriation:7
The Evergreen State College Capital Projects 8
Account— State. . . . . . . . . . . . . . . . . . . . $880,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . $6,100,00011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,980,00012
NEW SECTION. Sec. 5057. FOR THE EVERGREEN STATE COLLEGE13
Evans Hall Decarbonization (40000142)14
Appropriation:15
State Building Construction Account— State. . . . . . . $4,659,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . $43,802,00018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,461,00019
NEW SECTION. Sec. 5058. FOR THE EVERGREEN STATE COLLEGE20
Dormitories Decarbonization (40000143)21
Appropriation:22
State Building Construction Account— State. . . . . . . $7,000,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . $13,287,00025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,287,00026
NEW SECTION. Sec. 5059. FOR THE EVERGREEN STATE COLLEGE27
Labs 1 & 2 Third Floor Renovation (40000145)28
Appropriation:29
State Building Construction Account— State. . . . . . . . $298,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . $18,881,00032
p. 139 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,179,0001
NEW SECTION. Sec. 5060. FOR THE EVERGREEN STATE COLLEGE2
Minor Works Program 2025-27 (40000146)3
Appropriation:4
State Building Construction Account— State. . . . . . . $2,336,0005
The Evergreen State College Capital Projects 6
Account— State. . . . . . . . . . . . . . . . . . . $1,500,0007
Subtotal Appropriation. . . . . . . . . . . . . . $3,836,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . $7,000,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,836,00011
NEW SECTION. Sec. 5061. FOR WESTERN WASHINGTON UNIVERSITY12
Access Control Security Upgrades (30000604)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $5,000,00015
Appropriation:16
State Building Construction Account— State. . . . . . . $9,070,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,765,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,835,00020
NEW SECTION. Sec. 5062. FOR WESTERN WASHINGTON UNIVERSITY21
Heating Conversion Project (40000005)22
Appropriation:23
State Building Construction Account— State. . . . . . $20,050,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,050,00027
NEW SECTION. Sec. 5063. FOR WESTERN WASHINGTON UNIVERSITY28
Preventative Facility Maintenance and Building System Repairs 29
(40000012)30
Appropriation:31
Western Washington University Capital Projects32
Account— State. . . . . . . . . . . . . . . . . . . $3,614,00033
p. 140 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,614,0001
Future Biennia (Projected Costs). . . . . . . . . . . $14,456,0002
TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,684,0003
NEW SECTION. Sec. 5064. FOR WESTERN WASHINGTON UNIVERSITY4
Academic Facilities Renewal - Phase I - V (40000017)5
Appropriation:6
State Building Construction Account— State. . . . . . $14,372,0007
Western Washington University Capital Projects 8
Account— State. . . . . . . . . . . . . . . . . . . $5,524,0009
Subtotal Appropriation. . . . . . . . . . . . . . $19,896,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . $80,000,00012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $99,896,00013
NEW SECTION. Sec. 5065. FOR WESTERN WASHINGTON UNIVERSITY14
Poulsbo Instructional Facility (40000018)15
Appropriation:16
State Building Construction Account— State. . . . . . . $7,213,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . $63,938,00019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $71,151,00020
NEW SECTION. Sec. 5066. FOR WESTERN WASHINGTON UNIVERSITY21
Minor Works - Preservation (2025-27) (40000019)22
Appropriation:23
State Building Construction Account— State. . . . . . . $5,340,00024
Western Washington University Capital Projects25
Account— State. . . . . . . . . . . . . . . . . . . $4,660,00026
Subtotal Appropriation. . . . . . . . . . . . . . $10,000,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . $40,000,00029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00030
NEW SECTION. Sec. 5067. FOR THE WASHINGTON STATE ARTS 31
COMMISSION32
p. 141 SB 5195
2025-27 Creative Districts Capital Construction Projects 1
(30000018)2
Appropriation:3
State Building Construction Account— State. . . . . . . . $416,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $416,0007
NEW SECTION. Sec. 5068. FOR THE WASHINGTON STATE HISTORICAL 8
SOCIETY9
Preservation - Minor Works 2025-27 (40000182)10
Appropriation:11
State Building Construction Account— State. . . . . . . $3,550,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . $25,271,00014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,821,00015
NEW SECTION. Sec. 5069. FOR THE WASHINGTON STATE HISTORICAL 16
SOCIETY17
Permanent Gallery Renovation (40000183)18
Appropriation:19
State Building Construction Account— State. . . . . . . $1,386,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,386,00023
NEW SECTION. Sec. 5070. FOR THE WASHINGTON STATE HISTORICAL 24
SOCIETY25
Heritage Capital Grants 2025-2027 (40000184)26
Appropriation:27
State Building Construction Account— State. . . . . . $10,000,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00031
NEW SECTION. Sec. 5071. FOR THE EASTERN WASHINGTON STATE 32
HISTORICAL SOCIETY33
p. 142 SB 5195
Museum Expansion and Modernization (40000064)1
Appropriation:2
State Building Construction Account— State. . . . . . . . $600,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $600,0006
NEW SECTION. Sec. 5072. FOR THE STATE BOARD FOR COMMUNITY AND 7
TECHNICAL COLLEGES8
Olympic Innovation and Technology Learning Center (40000103)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $1,835,00011
Appropriation:12
State Building Construction Account— State. . . . . . $31,054,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $717,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,606,00016
NEW SECTION. Sec. 5073. FOR THE STATE BOARD FOR COMMUNITY AND 17
TECHNICAL COLLEGES18
Lower Columbia: Center for Vocational and Transitional Studies 19
(40000106)20
Reappropriation:21
State Building Construction Account— State. . . . . . . $1,668,00022
Appropriation:23
State Building Construction Account— State. . . . . . $45,196,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,538,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,402,00027
NEW SECTION. Sec. 5074. FOR THE STATE BOARD FOR COMMUNITY AND 28
TECHNICAL COLLEGES29
Columbia Basin: Performing Arts Building Replacement (40000108)30
Appropriation:31
State Building Construction Account— State. . . . . . $54,548,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 143 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $54,548,0002
NEW SECTION. Sec. 5075. FOR THE STATE BOARD FOR COMMUNITY AND 3
TECHNICAL COLLEGES4
Edmonds: Triton Learning Commons (40000114)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $502,0007
Appropriation:8
State Building Construction Account— State. . . . . . $43,716,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,154,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,372,00012
NEW SECTION. Sec. 5076. FOR THE STATE BOARD FOR COMMUNITY AND 13
TECHNICAL COLLEGES14
Whatcom: Technology and Engineering Center (40000137)15
Appropriation:16
State Building Construction Account— State. . . . . . $51,042,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $51,042,00020
NEW SECTION. Sec. 5077. FOR THE STATE BOARD FOR COMMUNITY AND 21
TECHNICAL COLLEGES22
Cascadia: CC5 Gateway building (40000222)23
Reappropriation:24
State Building Construction Account— State. . . . . . . $1,201,00025
Appropriation:26
State Building Construction Account— State. . . . . . $40,034,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,895,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $43,130,00030
NEW SECTION. Sec. 5078. FOR THE STATE BOARD FOR COMMUNITY AND 31
TECHNICAL COLLEGES32
Minor Works - Program Improvements (25-27) (40001051)33
p. 144 SB 5195
Appropriation:1
Community and Technical College Capital Projects2
Account— State. . . . . . . . . . . . . . . . . . $18,000,0003
State Building Construction Account— State. . . . . . $27,446,0004
Subtotal Appropriation. . . . . . . . . . . . . . $45,446,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,446,0008
NEW SECTION. Sec. 5079. FOR THE STATE BOARD FOR COMMUNITY AND 9
TECHNICAL COLLEGES10
Minor Works - Preservation (25-27) (40001110)11
Appropriation:12
Community and Technical College Capital Projects13
Account— State. . . . . . . . . . . . . . . . . . $31,325,00014
Model Toxics Control Capital Account— State. . . . . . $2,000,00015
Subtotal Appropriation. . . . . . . . . . . . . . $33,325,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,325,00019
NEW SECTION. Sec. 5080. FOR THE STATE BOARD FOR COMMUNITY AND 20
TECHNICAL COLLEGES21
Grays Harbor College: Lake Swano Dam (40001150)22
Appropriation:23
State Building Construction Account— State. . . . . . . $1,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00027
NEW SECTION. Sec. 5081. FOR THE STATE BOARD FOR COMMUNITY AND 28
TECHNICAL COLLEGES29
Minor Works - Roof Repairs (25-27) (40001190)30
Appropriation:31
Community and Technical College Capital Projects32
Account— State. . . . . . . . . . . . . . . . . . $12,153,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
p. 145 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,153,0002
NEW SECTION. Sec. 5082. FOR THE STATE BOARD FOR COMMUNITY AND 3
TECHNICAL COLLEGES4
Minor Works - Site Repairs (25-27) (40001226)5
Appropriation:6
State Building Construction Account— State. . . . . . . $4,771,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,771,00010
NEW SECTION. Sec. 5083. FOR THE STATE BOARD FOR COMMUNITY AND 11
TECHNICAL COLLEGES12
Minor Works - Infrastructure replacement (25-27) (40001262)13
Appropriation:14
State Building Construction Account— State. . . . . . $43,400,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $43,400,00018
NEW SECTION. Sec. 5084. FOR THE STATE BOARD FOR COMMUNITY AND 19
TECHNICAL COLLEGES20
Minor Works - Facility Repairs (25-27) (40001298)21
Appropriation:22
State Building Construction Account— State. . . . . . $47,554,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,554,00026
NEW SECTION. Sec. 5085. FOR THE STATE BOARD FOR COMMUNITY AND 27
TECHNICAL COLLEGES28
Clean Buildings Compliance - Equipment Inventory and Reporting 29
(40001333)30
Appropriation:31
State Building Construction Account— State. . . . . . . $5,490,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 146 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,490,0002
NEW SECTION. Sec. 5086. FOR THE STATE BOARD FOR COMMUNITY AND 3
TECHNICAL COLLEGES4
Preventive Facility Maintenance & Bldg System Repairs (40001334)5
Appropriation:6
Community and Technical College Capital Projects7
Account— State. . . . . . . . . . . . . . . . . . $22,800,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . $91,200,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $114,000,00011
NEW SECTION. Sec. 5087. FOR THE STATE BOARD FOR COMMUNITY AND 12
TECHNICAL COLLEGES13
2025-27 Career Preparation and Launch Grants (40001337)14
The appropriation in this section is subject to the following 15
conditions and limitations: 16
(1) This appropriation is provided solely for the state board for 17
community and technical colleges to provide competitive grants to 18
community and technical colleges to purchase and install equipment 19
that expands career-connected learning opportunities.20
(2) The state board for community and technical colleges shall 21
develop common criteria for providing competitive grant funding and 22
outcomes for specific projects. 23
Appropriation:24
State Building Construction Account— State. . . . . . . $5,000,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00028
(End of part)
p. 147 SB 5195
PART 61
REAPPROPRIATIONS2
NEW SECTION. Sec. 6001. FOR THE SECRETARY OF STATE3
Library-Archives Building (30000033)4
The reappropriation in this section is subject to the following 5
conditions and limitations: No later than September 1, 2025, the 6
secretary of state shall present to the governor, the house capital 7
budget committee, and senate ways and means committee funding options 8
and a proposed construction schedule for construction of the library-9
archives building using anticipated revenue from a certificate of 10
participation and state building construction account bonds.11
Reappropriation:12
Washington State Library-Archives Building 13
Account— State. . . . . . . . . . . . . . . . . . . $6,949,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,351,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,300,00017
NEW SECTION. Sec. 6002. FOR THE DEPARTMENT OF COMMERCE18
Community Economic Revitalization Board (30000097)19
Reappropriation:20
Public Facilities Construction Loan Revolving 21
Account— State. . . . . . . . . . . . . . . . . . . $7,774,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,246,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,020,00025
NEW SECTION. Sec. 6003. FOR THE DEPARTMENT OF COMMERCE26
2017-19 Housing Trust Fund Program (30000872)27
The reappropriations in this section are subject to the following 28
conditions and limitations: The reappropriations are subject to the 29
provisions of section 1004, chapter 296, Laws of 2022.30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $419,00032
State Taxable Building Construction Account— 33
State. . . . . . . . . . . . . . . . . . . . . . . $3,044,00034
p. 148 SB 5195
Washington Housing Trust Account— State. . . . . . . . $1,476,0001
Subtotal Reappropriation. . . . . . . . . . . . . $4,939,0002
Prior Biennia (Expenditures). . . . . . . . . . . . $108,350,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $113,289,0005
NEW SECTION. Sec. 6004. FOR THE DEPARTMENT OF COMMERCE6
Economic Opportunity Grants (30000873)7
Reappropriation:8
Rural Washington Loan Fund— State. . . . . . . . . . . . $312,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,438,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,750,00012
NEW SECTION. Sec. 6005. FOR THE DEPARTMENT OF COMMERCE13
Public Works Assistance Account Construction Loans (30000878)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 6001, chapter 413, Laws of 2019.17
Reappropriation:18
State Taxable Building Construction Account— 19
State. . . . . . . . . . . . . . . . . . . . . . . $5,979,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $71,241,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $77,220,00023
NEW SECTION. Sec. 6006. FOR THE DEPARTMENT OF COMMERCE24
Weatherization Plus Health Matchmaker Program (30000879)25
The reappropriations in this section are subject to the following 26
conditions and limitations: The reappropriations are subject to the 27
provisions of section 1014, chapter 298, Laws of 2018.28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $222,00030
State Taxable Building Construction Account— 31
State. . . . . . . . . . . . . . . . . . . . . . . $3,492,00032
Subtotal Reappropriation. . . . . . . . . . . . . $3,714,00033
p. 149 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $19,786,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,500,0003
NEW SECTION. Sec. 6007. FOR THE DEPARTMENT OF COMMERCE4
2018 Local and Community Projects (40000005)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 6012, chapter 474, Laws of 2023.8
Reappropriation:9
State Building Construction Account— State. . . . . . $13,769,00010
Prior Biennia (Expenditures). . . . . . . . . . . . $114,568,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $128,337,00013
NEW SECTION. Sec. 6008. FOR THE DEPARTMENT OF COMMERCE14
PWAA Preconstruction and Emergency Loan Programs (40000009)15
The reappropriation in this section is subject to the following 16
conditions and limitations: The reappropriation is subject to the 17
provisions of section 6002, chapter 413, Laws of 2019.18
Reappropriation:19
State Taxable Building Construction Account— 20
State. . . . . . . . . . . . . . . . . . . . . . . . $52,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $18,948,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,000,00024
NEW SECTION. Sec. 6009. FOR THE DEPARTMENT OF COMMERCE25
2019-21 Housing Trust Fund Program (40000036)26
The reappropriations in this section are subject to the following 27
conditions and limitations: The reappropriations are subject to the 28
provisions of section 6005, chapter 332, Laws of 2021.29
Reappropriation:30
State Building Construction Account— State. . . . . . . $1,999,00031
State Taxable Building Construction Account— 32
State. . . . . . . . . . . . . . . . . . . . . . $12,311,00033
p. 150 SB 5195
Subtotal Reappropriation. . . . . . . . . . . . . $14,310,0001
Prior Biennia (Expenditures). . . . . . . . . . . . $158,440,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $172,750,0004
NEW SECTION. Sec. 6010. FOR THE DEPARTMENT OF COMMERCE5
Public Works Board (40000038)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 1020, chapter 356, Laws of 2020.9
Reappropriation:10
Public Works Assistance Account— State. . . . . . . . $10,369,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $83,209,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $93,578,00014
NEW SECTION. Sec. 6011. FOR THE DEPARTMENT OF COMMERCE15
2019-21 Community Economic Revitalization Board (40000040)16
Reappropriation:17
Public Facilities Construction Loan Revolving 18
Account— State. . . . . . . . . . . . . . . . . . $18,600,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,600,00022
NEW SECTION. Sec. 6012. FOR THE DEPARTMENT OF COMMERCE23
2019-21 Early Learning Facilities (40000044)24
The reappropriations in this section are subject to the following 25
conditions and limitations: The reappropriations are subject to the 26
provisions of section 6006, chapter 332, Laws of 2021.27
Reappropriation:28
Ruth LeCocq Kagi Early Learning Facilities 29
Revolving Account— State. . . . . . . . . . . . . . . $500,00030
State Building Construction Account— State. . . . . . . $1,616,00031
Subtotal Reappropriation. . . . . . . . . . . . . $2,116,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $32,070,00033
p. 151 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,186,0002
NEW SECTION. Sec. 6013. FOR THE DEPARTMENT OF COMMERCE3
2019-21 Behavioral Health Capacity Grants (40000114)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 6013, chapter 375, Laws of 2024.7
Reappropriation:8
State Building Construction Account— State. . . . . . . $6,400,0009
Prior Biennia (Expenditures). . . . . . . . . . . . $115,831,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $122,231,00012
NEW SECTION. Sec. 6014. FOR THE DEPARTMENT OF COMMERCE13
2020 Local and Community Projects (40000116)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 6010, chapter 375, Laws of 2024.17
Reappropriation:18
State Building Construction Account— State. . . . . . $25,321,00019
Prior Biennia (Expenditures). . . . . . . . . . . . $140,986,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $166,307,00022
NEW SECTION. Sec. 6015. FOR THE DEPARTMENT OF COMMERCE23
Washington Broadband Program (40000117)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 6002, chapter 375, Laws of 2024.27
Reappropriation:28
Statewide Broadband Account— State. . . . . . . . . . $14,684,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,866,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,550,00032
p. 152 SB 5195
NEW SECTION. Sec. 6016. FOR THE DEPARTMENT OF COMMERCE1
2021 Local and Community Projects (40000130)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 6011, chapter 375, Laws of 2024.5
Reappropriation:6
State Building Construction Account— State. . . . . . . $5,706,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,966,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,672,00010
NEW SECTION. Sec. 6017. FOR THE DEPARTMENT OF COMMERCE11
2021-23 Early Learning Facilities-School Districts Grant 12
(40000140)13
The reappropriation in this section is subject to the following 14
conditions and limitations: The reappropriation is subject to the 15
provisions of section 1057, chapter 332, Laws of 2021.16
Reappropriation:17
Ruth LeCocq Kagi Early Learning Facilities 18
Development Account— State. . . . . . . . . . . . . . $326,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,393,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,719,00022
NEW SECTION. Sec. 6018. FOR THE DEPARTMENT OF COMMERCE23
2021-23 Public Works Assistance Account-Construction (40000141)24
Reappropriation:25
Public Works Assistance Account— State. . . . . . . . $141,193,00026
Prior Biennia (Expenditures). . . . . . . . . . . . $107,807,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $249,000,00029
NEW SECTION. Sec. 6019. FOR THE DEPARTMENT OF COMMERCE30
2021-23 Building Communities Fund Grant Program (40000142)31
p. 153 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1059, chapter 332, Laws of 2021.3
Reappropriation:4
State Building Construction Account— State. . . . . . $16,121,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $14,025,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,146,0008
NEW SECTION. Sec. 6020. FOR THE DEPARTMENT OF COMMERCE9
2021-23 Building for the Arts Grant Program (40000143)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 1060, chapter 332, Laws of 2021.13
Reappropriation:14
State Building Construction Account— State. . . . . . . $3,236,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,764,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,000,00018
NEW SECTION. Sec. 6021. FOR THE DEPARTMENT OF COMMERCE19
2021-23 CERB Capital Construction (40000144)20
Reappropriation:21
Capital Community Assistance Account— State. . . . . . $21,647,00022
Public Facilities Construction Loan Revolving 23
Account— State. . . . . . . . . . . . . . . . . . $10,000,00024
Subtotal Reappropriation. . . . . . . . . . . . . $31,647,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $33,353,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $65,000,00028
NEW SECTION. Sec. 6022. FOR THE DEPARTMENT OF COMMERCE29
2021-23 Library Capital Improvement Program (LCIP) Grants 30
(40000147)31
p. 154 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 7018, chapter 474, Laws of 2023.3
Reappropriation:4
State Building Construction Account— State. . . . . . . $4,426,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,418,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,844,0008
NEW SECTION. Sec. 6023. FOR THE DEPARTMENT OF COMMERCE9
2021-23 Weatherization Plus Health (40000150)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 7015, chapter 474, Laws of 2023.13
Reappropriation:14
General Fund— Federal. . . . . . . . . . . . . . . . . $40,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $27,115,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $67,115,00018
NEW SECTION. Sec. 6024. FOR THE DEPARTMENT OF COMMERCE19
2021-23 PWB Broadband Infrastructure (40000152)20
The reappropriations in this section are subject to the following 21
conditions and limitations: The reappropriations are subject to the 22
provisions of section 6003, chapter 375, Laws of 2024.23
Reappropriation:24
Coronavirus Capital Projects Account— Federal. . . . . $33,713,00025
Statewide Broadband Account— State. . . . . . . . . . $13,816,00026
Subtotal Reappropriation. . . . . . . . . . . . . $47,529,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,471,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,000,00030
NEW SECTION. Sec. 6025. FOR THE DEPARTMENT OF COMMERCE31
2021-23 Housing Trust Fund Investment in Affordable Housing 32
(40000153)33
p. 155 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 7006, chapter 474, Laws of 2023.3
Reappropriation:4
Capital Community Assistance Account— State. . . . . . $46,795,0005
Coronavirus State Fiscal Recovery Fund— Federal. . . . $32,846,0006
State Building Construction Account— State. . . . . . $11,774,0007
State Taxable Building Construction Account— 8
State. . . . . . . . . . . . . . . . . . . . . . $20,927,0009
Subtotal Reappropriation. . . . . . . . . . . . $112,342,00010
Prior Biennia (Expenditures). . . . . . . . . . . . $175,349,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $287,691,00013
NEW SECTION. Sec. 6026. FOR THE DEPARTMENT OF COMMERCE14
2021-23 Behavioral Health Community Capacity Grants (40000219)15
The reappropriations in this section are subject to the following 16
conditions and limitations: The reappropriations are subject to the 17
provisions of section 6014, chapter 375, Laws of 2024.18
Reappropriation:19
Capital Community Assistance Account— State. . . . . . $12,300,00020
State Building Construction Account— State. . . . . . $44,783,00021
Subtotal Reappropriation. . . . . . . . . . . . . $57,083,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $63,154,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,237,00025
NEW SECTION. Sec. 6027. FOR THE DEPARTMENT OF COMMERCE26
2019-21 Housing Trust Fund Investment from Operating (40000220)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 1070, chapter 332, Laws of 2021.30
Reappropriation:31
Washington Housing Trust Account— State. . . . . . . . $2,939,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $44,502,00033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
p. 156 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,441,0001
NEW SECTION. Sec. 6028. FOR THE DEPARTMENT OF COMMERCE2
2021-23 Rapid Capital Housing Acquisition (40000222)3
The reappropriations in this section are subject to the following 4
conditions and limitations: The reappropriations are subject to the 5
provisions of section 6004, chapter 375, Laws of 2024.6
Reappropriation:7
Coronavirus State Fiscal Recovery Fund— Federal. . . . . $662,0008
State Building Construction Account— State. . . . . . $23,688,0009
Subtotal Reappropriation. . . . . . . . . . . . . $24,350,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $95,785,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,135,00013
NEW SECTION. Sec. 6029. FOR THE DEPARTMENT OF COMMERCE14
2022 Local & Community Projects (40000230)15
The reappropriation in this section is subject to the following 16
conditions and limitations: The reappropriation is subject to the 17
provisions of section 1001, chapter 375, Laws of 2024.18
Reappropriation:19
State Building Construction Account— State. . . . . . $65,839,00020
Prior Biennia (Expenditures). . . . . . . . . . . . $104,728,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $170,567,00023
NEW SECTION. Sec. 6030. FOR THE DEPARTMENT OF COMMERCE24
Economic Opportunity Grants Authority (40000246)25
Reappropriation:26
Rural Washington Loan Fund— State. . . . . . . . . . . . $903,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $903,00030
NEW SECTION. Sec. 6031. FOR THE DEPARTMENT OF COMMERCE31
2022 Rapid Capital Housing Acquisition (40000260)32
p. 157 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 7009, chapter 474, Laws of 2023.3
Reappropriation:4
Apple Health and Homes Account— State. . . . . . . . . $52,874,0005
Capital Community Assistance Account— State. . . . . . $40,770,0006
Coronavirus State Fiscal Recovery Fund— Federal. . . . $2,994,0007
State Building Construction Account— State. . . . . . $11,401,0008
Subtotal Reappropriation. . . . . . . . . . . . $108,039,0009
Prior Biennia (Expenditures). . . . . . . . . . . . $188,061,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $296,100,00012
NEW SECTION. Sec. 6032. FOR THE DEPARTMENT OF COMMERCE13
2023 Local and Community Projects (40000266)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 6009, chapter 375, Laws of 2024.17
Reappropriation:18
State Building Construction Account— State. . . . . . $20,872,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $32,455,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $53,327,00022
NEW SECTION. Sec. 6033. FOR THE DEPARTMENT OF COMMERCE23
Ports Infrastructure (40000278)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 6006, chapter 375, Laws of 2024.27
Reappropriation:28
State Building Construction Account— State. . . . . . . $9,067,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,979,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,046,00032
NEW SECTION. Sec. 6034. FOR THE DEPARTMENT OF COMMERCE33
p. 158 SB 5195
2023-25 Building Communities Fund Grant Program (40000279)1
The reappropriation in this section is subject to the following 2
conditions and limitations: The reappropriation is subject to the 3
provisions of section 1003, chapter 474, Laws of 2023.4
Reappropriation:5
State Building Construction Account— State. . . . . . $20,891,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,688,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,579,0009
NEW SECTION. Sec. 6035. FOR THE DEPARTMENT OF COMMERCE10
2023-25 Building for the Arts (40000280)11
The reappropriation in this section is subject to the following 12
conditions and limitations: The reappropriation is subject to the 13
provisions of section 1004, chapter 474, Laws of 2023.14
Reappropriation:15
State Building Construction Account— State. . . . . . . $6,084,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,916,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,000,00019
NEW SECTION. Sec. 6036. FOR THE DEPARTMENT OF COMMERCE20
2023-25 CERB Capital Construction (40000281)21
Reappropriation:22
Public Facilities Construction Loan Revolving 23
Account— State. . . . . . . . . . . . . . . . . . $25,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00027
NEW SECTION. Sec. 6037. FOR THE DEPARTMENT OF COMMERCE28
Dig-Once Pilot Project and Enhanced Program Development 29
(40000282)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 1006, chapter 474, Laws of 2023.33
p. 159 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $500,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,0005
NEW SECTION. Sec. 6038. FOR THE DEPARTMENT OF COMMERCE6
2023-25 Energy Retrofits and Solar Power for Public Buildings 7
(40000283)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 1002, chapter 375, Laws of 2024.11
Reappropriation:12
Climate Commitment Account— State. . . . . . . . . . . $30,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,000,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00016
NEW SECTION. Sec. 6039. FOR THE DEPARTMENT OF COMMERCE17
High Efficiency Electric Home Rebate Program (40000284)18
The reappropriations in this section are subject to the following 19
conditions and limitations: The reappropriations are subject to the 20
provisions of section 1008, chapter 474, Laws of 2023.21
Reappropriation:22
Climate Commitment Account— State. . . . . . . . . . . $69,285,00023
General Fund— Federal. . . . . . . . . . . . . . . . . $82,995,00024
Subtotal Reappropriation. . . . . . . . . . . . $152,280,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,720,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $163,000,00028
NEW SECTION. Sec. 6040. FOR THE DEPARTMENT OF COMMERCE29
2023-25 Early Learning Facilities – School Districts (40000285)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 1009, chapter 474, Laws of 2023.33
p. 160 SB 5195
Reappropriation:1
Ruth LeCocq Kagi Early Learning Facilities 2
Development Account— State. . . . . . . . . . . . . $3,500,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,906,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,406,0006
NEW SECTION. Sec. 6041. FOR THE DEPARTMENT OF COMMERCE7
2023-25 Library Capital Improvement Program (40000286)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 1010, chapter 474, Laws of 2023.11
Reappropriation:12
State Building Construction Account— State. . . . . . . $8,173,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,778,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,951,00016
NEW SECTION. Sec. 6042. FOR THE DEPARTMENT OF COMMERCE17
2023-25 Public Works Assistance Account (PWAA) (40000289)18
Reappropriation:19
Public Works Assistance Account— State. . . . . . . . $384,471,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $15,529,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $400,000,00023
NEW SECTION. Sec. 6043. FOR THE DEPARTMENT OF COMMERCE24
2023-25 Weatherization Plus Health (40000291)25
The reappropriations in this section are subject to the following 26
conditions and limitations: The reappropriations are subject to the 27
provisions of section 1014, chapter 474, Laws of 2023.28
Reappropriation:29
Climate Commitment Account— State. . . . . . . . . . . $17,000,00030
State Building Construction Account— State. . . . . . . $3,534,00031
Subtotal Reappropriation. . . . . . . . . . . . . $20,534,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $19,466,00033
p. 161 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0002
NEW SECTION. Sec. 6044. FOR THE DEPARTMENT OF COMMERCE3
2023-25 Youth Recreational Facilities Grant Program (40000292)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 1015, chapter 474, Laws of 2023.7
Reappropriation:8
State Building Construction Account— State. . . . . . . $5,008,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,992,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00012
NEW SECTION. Sec. 6045. FOR THE DEPARTMENT OF COMMERCE13
2023-25 Clean Energy Fund Program (40000294)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 1006, chapter 375, Laws of 2024.17
Reappropriation:18
Climate Commitment Account— State. . . . . . . . . . . $19,000,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,000,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00022
NEW SECTION. Sec. 6046. FOR THE DEPARTMENT OF COMMERCE23
2023-25 Housing Trust Fund (40000295)24
The reappropriations in this section are subject to the following 25
conditions and limitations: The reappropriations are subject to the 26
provisions of section 7011 of this act. 27
Reappropriation:28
State Building Construction Account— State. . . . . . $98,805,00029
State Taxable Building Construction Account— 30
State. . . . . . . . . . . . . . . . . . . . . . $399,343,00031
Washington Housing Trust Account— State. . . . . . . . $8,500,00032
Subtotal Reappropriation. . . . . . . . . . . . $506,648,00033
p. 162 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,891,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $527,539,0003
NEW SECTION. Sec. 6047. FOR THE DEPARTMENT OF COMMERCE4
2023-25 Connecting Housing to Infrastructure (CHIP) (40000296)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 1021, chapter 474, Laws of 2023.8
Reappropriation:9
State Building Construction Account— State. . . . . . $58,341,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,659,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $60,000,00013
NEW SECTION. Sec. 6048. FOR THE DEPARTMENT OF COMMERCE14
Transit Oriented Housing Development Partnership Match (40000298)15
The reappropriations in this section are subject to the following 16
conditions and limitations: The reappropriations are subject to the 17
provisions of section 1008, chapter 375, Laws of 2024.18
Reappropriation:19
General Fund— Private/Local. . . . . . . . . . . . . . $25,000,00020
State Taxable Building Construction Account— 21
State. . . . . . . . . . . . . . . . . . . . . . $25,000,00022
Subtotal Reappropriation. . . . . . . . . . . . . $50,000,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00026
NEW SECTION. Sec. 6049. FOR THE DEPARTMENT OF COMMERCE27
2023-25 Behavioral Health Community Capacity Grants (40000299)28
The reappropriations in this section are subject to the following 29
conditions and limitations: The reappropriations are subject to the 30
provisions of section 1009, chapter 375, Laws of 2024.31
Reappropriation:32
Capital Community Assistance Account— State. . . . . . $1,250,00033
p. 163 SB 5195
State Building Construction Account— State. . . . . . $271,446,0001
Subtotal Reappropriation. . . . . . . . . . . . $272,696,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,030,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $293,726,0005
NEW SECTION. Sec. 6050. FOR THE DEPARTMENT OF COMMERCE6
2023-25 Early Learning Facilities Fund Grant Program (40000300)7
The reappropriations in this section are subject to the following 8
conditions and limitations: The reappropriations are subject to the 9
provisions of section 7012 of this act. 10
Reappropriation:11
Ruth LeCocq Kagi Early Learning Facilities 12
Development Account— State. . . . . . . . . . . . $74,921,00013
Ruth LeCocq Kagi Early Learning Facilities 14
Revolving Account— State. . . . . . . . . . . . . . $6,720,00015
Subtotal Reappropriation. . . . . . . . . . . . . $81,641,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,747,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $90,388,00019
NEW SECTION. Sec. 6051. FOR THE DEPARTMENT OF COMMERCE20
2024 Local and Community Projects (40000301)21
The reappropriation in this section is subject to the following 22
conditions and limitations: The reappropriation is subject to the 23
provisions of section 1011, chapter 375, Laws of 2024.24
Reappropriation:25
State Building Construction Account— State. . . . . . $188,697,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $44,346,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $233,043,00029
NEW SECTION. Sec. 6052. FOR THE DEPARTMENT OF COMMERCE30
Tribal Climate Adaptation Pass-through Grants (40000421)31
The reappropriation in this section is subject to the following 32
conditions and limitations: The reappropriation is subject to the 33
provisions of section 1027, chapter 474, Laws of 2023.34
p. 164 SB 5195
Reappropriation:1
Climate Commitment Account— State. . . . . . . . . . . $47,584,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,416,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0005
NEW SECTION. Sec. 6053. FOR THE DEPARTMENT OF COMMERCE6
DOE Hydrogen Hub -State Match (40000561)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 1029, chapter 474, Laws of 2023.10
Reappropriation:11
Climate Commitment Account— State. . . . . . . . . . . $10,117,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,883,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00015
NEW SECTION. Sec. 6054. FOR THE DEPARTMENT OF COMMERCE16
Inflation Reduction Act HOMES Program (40000564)17
Reappropriation:18
General Fund— Federal. . . . . . . . . . . . . . . . . $82,169,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,031,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $83,200,00022
NEW SECTION. Sec. 6055. FOR THE DEPARTMENT OF COMMERCE23
2023-25 Defense Community Compatibility Projects (40000572)24
The reappropriations in this section are subject to the following 25
conditions and limitations: The reappropriations are subject to the 26
provisions of section 1013, chapter 375, Laws of 2024.27
Reappropriation:28
Model Toxics Control Capital Account— State. . . . . . $3,720,00029
State Building Construction Account— State. . . . . . $22,000,00030
Subtotal Reappropriation. . . . . . . . . . . . . $25,720,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,950,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 165 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,670,0001
NEW SECTION. Sec. 6056. FOR THE DEPARTMENT OF COMMERCE2
Rising Strong Project Grant Pass Through (40000576)3
The reappropriation in this section is subject to the following 4
conditions and limitations: The reappropriation is subject to the 5
provisions of section 1033, chapter 474, Laws of 2023.6
Reappropriation:7
State Building Construction Account— State. . . . . . $13,356,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,356,00011
NEW SECTION. Sec. 6057. FOR THE DEPARTMENT OF COMMERCE12
Crisis Stabilization Facility-Trueblood Phase 3 (40000601)13
Reappropriation:14
Capital Community Assistance Account— State. . . . . . $4,996,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $4,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00018
NEW SECTION. Sec. 6058. FOR THE DEPARTMENT OF COMMERCE19
Communities of Concern (40000603)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 1015, chapter 375, Laws of 2024.23
Reappropriation:24
State Building Construction Account— State. . . . . . . $6,367,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,367,00028
NEW SECTION. Sec. 6059. FOR THE DEPARTMENT OF COMMERCE29
Green Jobs and Infrastructure Catalytic Funds (40000604)30
p. 166 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 7013 of this act. 3
Reappropriation:4
Climate Commitment Account— State. . . . . . . . . . . $24,754,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $246,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,0008
NEW SECTION. Sec. 6060. FOR THE DEPARTMENT OF COMMERCE9
Clean Energy Community Decarbonization (40000606)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 1017, chapter 375, Laws of 2024.13
Reappropriation:14
Climate Commitment Account— State. . . . . . . . . . . $50,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00018
NEW SECTION. Sec. 6061. FOR THE DEPARTMENT OF COMMERCE19
2025 Local and Community Project (40000614)20
The reappropriations in this section are subject to the following 21
conditions and limitations: The reappropriations are subject to the 22
provisions of section 7014 of this act. 23
Reappropriation:24
Climate Commitment Account— State. . . . . . . . . . . . $135,00025
Model Toxics Control Stormwater Account— State. . . . . $5,122,00026
State Building Construction Account— State. . . . . . $23,300,00027
Subtotal Reappropriation. . . . . . . . . . . . . $28,557,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $42,008,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,565,00031
NEW SECTION. Sec. 6062. FOR THE DEPARTMENT OF COMMERCE32
2023-25 Community Solar Resilience Hubs (40000620)33
p. 167 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1019, chapter 375, Laws of 2024.3
Reappropriation:4
Climate Commitment Account— State. . . . . . . . . . . $22,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,000,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,000,0008
NEW SECTION. Sec. 6063. FOR THE DEPARTMENT OF COMMERCE9
2023-25 Community EV Charging (40000622)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 1021, chapter 375, Laws of 2024.13
Reappropriation:14
Climate Commitment Account— State. . . . . . . . . . . $62,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $43,000,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $105,000,00018
NEW SECTION. Sec. 6064. FOR THE DEPARTMENT OF COMMERCE19
Energy Efficiency Revolving Loan Fund Capitalization Program 20
(40000629)21
The reappropriation in this section is subject to the following 22
conditions and limitations: The reappropriation is subject to the 23
provisions of section 1022, chapter 375, Laws of 2024.24
Reappropriation:25
Energy Efficiency Revolving Loan Capitalization26
Account— State. . . . . . . . . . . . . . . . . . . $1,869,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,869,00030
NEW SECTION. Sec. 6065. FOR THE DEPARTMENT OF COMMERCE31
CERB Administered Broadband Infrastructure (91000943)32
p. 168 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 1011, chapter 296, Laws of 2022.3
Reappropriation:4
Coronavirus Capital Projects Account— Federal. . . . . $12,810,0005
Public Works Assistance Account— State. . . . . . . . . $2,484,0006
Subtotal Reappropriation. . . . . . . . . . . . . $15,294,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $23,156,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,450,00010
NEW SECTION. Sec. 6066. FOR THE DEPARTMENT OF COMMERCE11
2019 Local and Community Projects (91001157)12
The reappropriation in this section is subject to the following 13
conditions and limitations: The reappropriation is subject to the 14
provisions of section 6008, chapter 375, Laws of 2024.15
Reappropriation:16
State Building Construction Account— State. . . . . . . $2,922,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $37,608,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,530,00020
NEW SECTION. Sec. 6067. FOR THE DEPARTMENT OF COMMERCE21
Library Capital Improvement Program (91001239)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 1053, chapter 413, Laws of 2019.25
Reappropriation:26
State Building Construction Account— State. . . . . . . $1,263,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,575,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,838,00030
NEW SECTION. Sec. 6068. FOR THE DEPARTMENT OF COMMERCE31
Rapid Response Community Preservation Pilot Program (91001278)32
p. 169 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1018, chapter 356, Laws of 2020.3
Reappropriation:4
Capital Community Assistance Account— State. . . . . . . $907,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,093,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0008
NEW SECTION. Sec. 6069. FOR THE DEPARTMENT OF COMMERCE9
Continuing Affordability in Current Housing (91001659)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 1072, chapter 332, Laws of 2021.13
Reappropriation:14
State Building Construction Account— State. . . . . . . $1,387,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,613,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00018
NEW SECTION. Sec. 6070. FOR THE DEPARTMENT OF COMMERCE19
2021-23 Dental Capacity Grants (91001660)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 1043, chapter 296, Laws of 2022.23
Reappropriation:24
State Building Construction Account— State. . . . . . . $2,724,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,501,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,225,00028
NEW SECTION. Sec. 6071. FOR THE DEPARTMENT OF COMMERCE29
Substance Use Disorder Recovery Housing (91001675)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 1031, chapter 296, Laws of 2022.33
p. 170 SB 5195
Reappropriation:1
State Taxable Building Construction Account— 2
State. . . . . . . . . . . . . . . . . . . . . . . . $149,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $1,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $150,0006
NEW SECTION. Sec. 6072. FOR THE DEPARTMENT OF COMMERCE7
2021-23 Early Learning Facilities (91001677)8
The reappropriations in this section are subject to the following 9
conditions and limitations: The reappropriations are subject to the 10
provisions of section 1037, chapter 296, Laws of 2022.11
Reappropriation:12
Capital Community Assistance Account— State. . . . . . $15,714,00013
Ruth LeCocq Kagi Early Learning Facilities 14
Development Account— State. . . . . . . . . . . . . $9,330,00015
State Building Construction Account— State. . . . . . . . $347,00016
Subtotal Reappropriation. . . . . . . . . . . . . $25,391,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $37,109,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,500,00020
NEW SECTION. Sec. 6073. FOR THE DEPARTMENT OF COMMERCE21
Early Learning COVID-19 Renovation Grants (91001681)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 7014, chapter 474, Laws of 2023.25
Reappropriation:26
State Building Construction Account— State. . . . . . . $8,473,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $27,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,500,00030
NEW SECTION. Sec. 6074. FOR THE DEPARTMENT OF COMMERCE31
2023-25 Youth Shelters and Housing (91001682)32
p. 171 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1024, chapter 375, Laws of 2024.3
Reappropriation:4
State Building Construction Account— State. . . . . . $14,822,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $800,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,622,0008
NEW SECTION. Sec. 6075. FOR THE DEPARTMENT OF COMMERCE9
Grants for Affordable Housing Development Connections (91001685)10
The reappropriations in this section are subject to the following 11
conditions and limitations: The reappropriations are subject to the 12
provisions of section 1032, chapter 296, Laws of 2022.13
Reappropriation:14
Coronavirus State Fiscal Recovery Fund— Federal. . . . $12,812,00015
State Building Construction Account— State. . . . . . $11,117,00016
Subtotal Reappropriation. . . . . . . . . . . . . $23,929,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,371,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,300,00020
NEW SECTION. Sec. 6076. FOR THE DEPARTMENT OF COMMERCE21
Work, Education, Health Monitoring Projects (91001686)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 7013, chapter 474, Laws of 2023.25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $778,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $48,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $826,00030
NEW SECTION. Sec. 6077. FOR THE DEPARTMENT OF COMMERCE31
Infrastructure Projects (91001687)32
p. 172 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 7017 of this act. 3
Reappropriation:4
Capital Community Assistance Account— State. . . . . . $20,218,0005
Coronavirus State Fiscal Recovery Fund. . . . . . . . $50,768,0006
State Building Construction Account— State. . . . . . . $1,600,0007
Subtotal Reappropriation. . . . . . . . . . . . . $72,586,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . $57,806,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $130,392,00011
NEW SECTION. Sec. 6078. FOR THE DEPARTMENT OF COMMERCE12
Capital Grant Program Equity (91001688)13
The reappropriation in this section is subject to the following 14
conditions and limitations: The reappropriation is subject to the 15
provisions of section 6067, chapter 474, Laws of 2023.16
Reappropriation:17
State Building Construction Account— State. . . . . . . $4,348,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . $652,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00021
NEW SECTION. Sec. 6079. FOR THE DEPARTMENT OF COMMERCE22
Food Banks (91001690)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 6016, chapter 375, Laws of 2024.26
Reappropriation:27
State Building Construction Account— State. . . . . . . $1,059,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,527,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,586,00031
NEW SECTION. Sec. 6080. FOR THE DEPARTMENT OF COMMERCE32
Homeless Youth Facilities (91001991)33
p. 173 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1048, chapter 296, Laws of 2022.3
Reappropriation:4
Capital Community Assistance Account— State. . . . . . $8,902,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,993,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,895,0008
NEW SECTION. Sec. 6081. FOR THE DEPARTMENT OF COMMERCE9
2022 Permanent Supportive Housing Remediation (91002160)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 1035, chapter 296, Laws of 2022.13
Reappropriation:14
State Building Construction Account— State. . . . . . . . . $6,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $194,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00018
NEW SECTION. Sec. 6082. FOR THE DEPARTMENT OF COMMERCE19
Local Emission Reduction Projects (91002184)20
The reappropriations in this section are subject to the following 21
conditions and limitations: The reappropriations are subject to the 22
provisions of section 1025, chapter 375, Laws of 2024.23
Reappropriation:24
Climate Commitment Account— State. . . . . . . . . . . $29,459,00025
Natural Climate Solutions Account— State. . . . . . . . $6,974,00026
Subtotal Reappropriation. . . . . . . . . . . . . $36,433,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,237,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,670,00030
NEW SECTION. Sec. 6083. FOR THE DEPARTMENT OF COMMERCE31
2023-25 Rural Rehabilitation Grant Program (91002195)32
Reappropriation:33
p. 174 SB 5195
State Building Construction Account— State. . . . . . . $2,500,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,500,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0004
NEW SECTION. Sec. 6084. FOR THE DEPARTMENT OF COMMERCE5
Health Care Infrastructure (91002197)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 1018, chapter 474, Laws of 2023.9
Reappropriation:10
State Building Construction Account— State. . . . . . $31,748,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,170,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,918,00014
NEW SECTION. Sec. 6085. FOR THE DEPARTMENT OF COMMERCE15
Public Utilities Relocation (91002418)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 1026, chapter 375, Laws of 2024.19
Reappropriation:20
Public Works Assistance Account— State. . . . . . . . . . $226,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $74,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00024
NEW SECTION. Sec. 6086. FOR THE DEPARTMENT OF COMMERCE25
HB 2131 - Thermal Energy Networks (91002447)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 1027, chapter 375, Laws of 2024.29
Reappropriation:30
Climate Commitment Account— State. . . . . . . . . . . $5,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 175 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0001
NEW SECTION. Sec. 6087. FOR THE DEPARTMENT OF COMMERCE2
Multifamily Bldg Efficiency Grants (91002449)3
The reappropriation in this section is subject to the following 4
conditions and limitations: The reappropriation is subject to the 5
provisions of section 1028, chapter 375, Laws of 2024.6
Reappropriation:7
Climate Commitment Account— State. . . . . . . . . . . $55,000,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $55,000,00011
NEW SECTION. Sec. 6088. FOR THE DEPARTMENT OF COMMERCE12
Clean Building Performance Grants (91002451)13
The reappropriation in this section is subject to the following 14
conditions and limitations: The reappropriation is subject to the 15
provisions of section 1029, chapter 375, Laws of 2024.16
Reappropriation:17
Climate Commitment Account— State. . . . . . . . . . . $45,000,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,00021
NEW SECTION. Sec. 6089. FOR THE DEPARTMENT OF COMMERCE22
Harborview (91002471)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 1030, chapter 375, Laws of 2024.26
Reappropriation:27
State Building Construction Account— State. . . . . . . . $542,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,458,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00031
NEW SECTION. Sec. 6090. FOR THE DEPARTMENT OF COMMERCE32
p. 176 SB 5195
Climate Resilience & Environmental Equity Campus (91002476)1
The reappropriation in this section is subject to the following 2
conditions and limitations: The reappropriation is subject to the 3
provisions of section 1031, chapter 375, Laws of 2024.4
Reappropriation:5
State Taxable Building Construction Account— 6
State. . . . . . . . . . . . . . . . . . . . . . . . $250,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00010
NEW SECTION. Sec. 6091. FOR THE DEPARTMENT OF COMMERCE11
The Arc Legacy Center (91002637)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $1,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00017
NEW SECTION. Sec. 6092. FOR THE DEPARTMENT OF COMMERCE18
Hard-to-Decarbonize Sector & Economic Development Grants 19
(91002641)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 1033, chapter 375, Laws of 2024.23
Reappropriation:24
Climate Commitment Account— State. . . . . . . . . . . $49,535,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . $265,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,800,00028
NEW SECTION. Sec. 6093. FOR THE DEPARTMENT OF COMMERCE29
Enhanced Shelter Capacity Grants (92000939)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 7008, chapter 474, Laws of 2023.33
p. 177 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $2,015,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,597,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,612,0005
NEW SECTION. Sec. 6094. FOR THE DEPARTMENT OF COMMERCE6
2021-23 Broadband Office (92000953)7
The reappropriations in this section are subject to the following 8
conditions and limitations: The reappropriations are subject to the 9
provisions of section 1034, chapter 375, Laws of 2024.10
Reappropriation:11
Coronavirus Capital Projects Account— Federal. . . . $116,252,00012
Coronavirus State Fiscal Recovery Fund— Federal. . . $131,601,00013
State Building Construction Account— State. . . . . . $14,636,00014
Subtotal Reappropriation. . . . . . . . . . . . $262,489,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $41,330,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $303,819,00018
NEW SECTION. Sec. 6095. FOR THE DEPARTMENT OF COMMERCE19
2021-23 Community Relief (92000957)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 1044, chapter 296, Laws of 2022.23
Reappropriation:24
State Building Construction Account— State. . . . . . . $4,979,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,771,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,750,00028
NEW SECTION. Sec. 6096. FOR THE DEPARTMENT OF COMMERCE29
Reimann Roads, Telecomm and Utility Relocation (Pasco) (92001004)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 1088, chapter 332, Laws of 2021.33
p. 178 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $5,513,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,987,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,0005
NEW SECTION. Sec. 6097. FOR THE DEPARTMENT OF COMMERCE6
Increasing Housing Inventory (92001122)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 1090, chapter 332, Laws of 2021.10
Reappropriation:11
State Building Construction Account— State. . . . . . . $1,198,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,302,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00015
NEW SECTION. Sec. 6098. FOR THE DEPARTMENT OF COMMERCE16
2022 Dental Capacity Grants (92001175)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 1049, chapter 296, Laws of 2022.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $4,470,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,331,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,801,00025
NEW SECTION. Sec. 6099. FOR THE DEPARTMENT OF COMMERCE26
2022 Broadband Office (92001178)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 7017, chapter 474, Laws of 2023.30
Reappropriation:31
General Fund— Federal. . . . . . . . . . . . . . . . . $27,105,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $22,895,00033
p. 179 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0002
NEW SECTION. Sec. 6100. FOR THE DEPARTMENT OF COMMERCE3
2022 Crisis Stabilization Facilities (92001286)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 1025, chapter 296, Laws of 2022.7
Reappropriation:8
Capital Community Assistance Account— State. . . . . . $27,494,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,808,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,302,00012
NEW SECTION. Sec. 6101. FOR THE DEPARTMENT OF COMMERCE13
Port of Everett (92001364)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 1042, chapter 474, Laws of 2023.17
Reappropriation:18
Climate Commitment Account— State. . . . . . . . . . . $4,948,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $52,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00022
NEW SECTION. Sec. 6102. FOR THE DEPARTMENT OF COMMERCE23
Public Facility Improvement Fund (92001367)24
The reappropriations in this section are subject to the following 25
conditions and limitations: The reappropriations are subject to the 26
provisions of section 1035, chapter 375, Laws of 2024.27
Reappropriation:28
State Building Construction Account— State. . . . . . . $1,463,00029
Youth Athletic Facility Nonappropriated Account— 30
State. . . . . . . . . . . . . . . . . . . . . . $19,990,00031
Subtotal Reappropriation. . . . . . . . . . . . . $21,453,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,069,00033
p. 180 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,522,0002
NEW SECTION. Sec. 6103. FOR THE DEPARTMENT OF COMMERCE3
2023-25 Dental Capacity Grants (92001393)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 1036, chapter 375, Laws of 2024.7
Reappropriation:8
State Building Construction Account— State. . . . . . $20,725,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,807,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,532,00012
NEW SECTION. Sec. 6104. FOR THE DEPARTMENT OF COMMERCE13
Large Scale Solar Innovation Projects (92001669)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 1040, chapter 474, Laws of 2023.17
Reappropriation:18
Climate Commitment Account— State. . . . . . . . . . . $18,000,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,000,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,000,00022
NEW SECTION. Sec. 6105. FOR THE DEPARTMENT OF COMMERCE23
Energy Northwest (92001720)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 1037, chapter 375, Laws of 2024.27
Reappropriation:28
Climate Commitment Account— State. . . . . . . . . . . $25,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00032
p. 181 SB 5195
NEW SECTION. Sec. 6106. FOR THE DEPARTMENT OF COMMERCE1
Geothermal Energy Resources (92001925)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 1038, chapter 375, Laws of 2024.5
Reappropriation:6
Climate Commitment Account— State. . . . . . . . . . . . $542,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $542,00010
NEW SECTION. Sec. 6107. FOR THE OFFICE OF FINANCIAL MANAGEMENT11
Cowlitz River Dredging (20082856)12
The reappropriation in this section is subject to the following 13
conditions and limitations: The reappropriation is subject to the 14
provisions of section 1053, chapter 296, Laws of 2022.15
Reappropriation:16
State Building Construction Account— State. . . . . . . $2,000,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . $700,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,700,00020
NEW SECTION. Sec. 6108. FOR THE DEPARTMENT OF ENTERPRISE 21
SERVICES22
Elevator Modernization (30000786)23
The reappropriations in this section are subject to the following 24
conditions and limitations: The reappropriations are subject to the 25
provisions of section 1044, chapter 474, Laws of 2023.26
Reappropriation:27
Capitol Building Construction Account— State. . . . . . $7,120,00028
State Building Construction Account— State. . . . . . . . $166,00029
Thurston County Capital Facilities Account— State. . . . $704,00030
Subtotal Reappropriation. . . . . . . . . . . . . $7,990,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,094,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,084,00034
p. 182 SB 5195
NEW SECTION. Sec. 6109. FOR THE DEPARTMENT OF ENTERPRISE 1
SERVICES2
Campus Physical Security & Safety Improvements (30000812)3
The reappropriations in this section are subject to the following 4
conditions and limitations: The reappropriations are subject to the 5
provisions of section 6023, chapter 332, Laws of 2021.6
Reappropriation:7
Capitol Building Construction Account— State. . . . . . . $62,0008
State Building Construction Account— State. . . . . . . . . $6,0009
Thurston County Capital Facilities Account— State. . . . . $50,00010
Subtotal Reappropriation. . . . . . . . . . . . . . $118,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,158,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,276,00014
NEW SECTION. Sec. 6110. FOR THE DEPARTMENT OF ENTERPRISE 15
SERVICES16
Capitol Campus Security & Safety Enhancements (40000226)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 1039, chapter 375, Laws of 2024.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $8,419,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,369,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,788,00025
NEW SECTION. Sec. 6111. FOR THE DEPARTMENT OF ENTERPRISE 26
SERVICES27
Campus - Critical Fire System Upgrades (40000245)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 1047, chapter 474, Laws of 2023.31
Reappropriation:32
State Building Construction Account— State. . . . . . . $2,344,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . $421,00034
p. 183 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,765,0002
NEW SECTION. Sec. 6112. FOR THE DEPARTMENT OF ENTERPRISE 3
SERVICES4
B&G Maintenance Facility - Rebuild (40000247)5
Reappropriation:6
Thurston County Capital Facilities Account— State. . . $5,016,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . $566,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,582,00010
NEW SECTION. Sec. 6113. FOR THE DEPARTMENT OF ENTERPRISE 11
SERVICES12
NRB - Replace Piping for Wet Fire Suppression (40000249)13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $246,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $4,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00018
NEW SECTION. Sec. 6114. FOR THE DEPARTMENT OF ENTERPRISE 19
SERVICES20
2023-25 Statewide Minor Works - Preservation (40000250)21
Reappropriation:22
Thurston County Capital Facilities Account— State. . . $1,690,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . $451,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,141,00026
NEW SECTION. Sec. 6115. FOR THE DEPARTMENT OF ENTERPRISE 27
SERVICES28
2023-25 Statewide Minor Works - Programmatic (40000305)29
Reappropriation:30
Capitol Building Construction Account— State. . . . . . . $471,00031
Thurston County Capital Facilities Account— State. . . . . $22,00032
Subtotal Reappropriation. . . . . . . . . . . . . . $493,00033
p. 184 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $143,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $636,0003
NEW SECTION. Sec. 6116. FOR THE DEPARTMENT OF ENTERPRISE 4
SERVICES5
Modular Building - Critical Repairs & Upgrades (40000314)6
Reappropriation:7
State Building Construction Account— State. . . . . . . $2,502,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . $348,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,850,00011
NEW SECTION. Sec. 6117. FOR THE DEPARTMENT OF ENTERPRISE 12
SERVICES13
GA - Building Demolition (40000317)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 1053, chapter 474, Laws of 2023.17
Reappropriation:18
State Building Construction Account— State. . . . . . . $2,945,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,355,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,300,00022
NEW SECTION. Sec. 6118. FOR THE DEPARTMENT OF ENTERPRISE 23
SERVICES24
Washington Building (40000331)25
The reappropriation in this section is subject to the following 26
conditions and limitations: The reappropriation is subject to the 27
provisions of section 1042, chapter 375, Laws of 2024.28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $965,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $36,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,001,00033
p. 185 SB 5195
NEW SECTION. Sec. 6119. FOR THE DEPARTMENT OF ENTERPRISE 1
SERVICES2
Old Cap - Roof Replacement (40000338)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $5,267,0005
Thurston County Capital Facilities Account— State. . . $1,265,0006
Subtotal Reappropriation. . . . . . . . . . . . . $6,532,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . $218,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,750,00010
NEW SECTION. Sec. 6120. FOR THE DEPARTMENT OF ENTERPRISE 11
SERVICES12
Executive Guard Post One (40000448)13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $98,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $642,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $740,00018
NEW SECTION. Sec. 6121. FOR THE DEPARTMENT OF ENTERPRISE 19
SERVICES20
2023-25 Capitol Campus Security (91000450)21
The reappropriations in this section are subject to the following 22
conditions and limitations: The reappropriations are subject to the 23
provisions of section 1060, chapter 474, Laws of 2023.24
Reappropriation:25
Capitol Building Construction Account— State. . . . . . . $340,00026
State Building Construction Account— State. . . . . . . $2,428,00027
Subtotal Reappropriation. . . . . . . . . . . . . $2,768,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $607,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,375,00031
NEW SECTION. Sec. 6122. FOR THE DEPARTMENT OF ENTERPRISE 32
SERVICES33
Temple of Justice HVAC, Lighting & Water Systems (92000040)34
p. 186 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 1045, chapter 375, Laws of 2024.3
Reappropriation:4
Capitol Building Construction Account— State. . . . . . $2,620,0005
State Building Construction Account— State. . . . . . . $1,657,0006
Subtotal Reappropriation. . . . . . . . . . . . . $4,277,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $29,230,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,507,00010
NEW SECTION. Sec. 6123. FOR THE DEPARTMENT OF ENTERPRISE 11
SERVICES12
Cal Anderson Memorial (92000058)13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $31,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $44,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $75,00018
NEW SECTION. Sec. 6124. FOR THE WASHINGTON STATE PATROL19
FTA Emergency Power Generator Replacement (30000171)20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $108,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $767,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $875,00025
NEW SECTION. Sec. 6125. FOR THE WASHINGTON STATE PATROL26
Vancouver Crime Lab - New Roof (30000240)27
Reappropriation:28
State Building Construction Account— State. . . . . . . $1,482,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . $112,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,594,00032
p. 187 SB 5195
NEW SECTION. Sec. 6126. FOR THE WASHINGTON STATE PATROL1
Crime Laboratory I-5 North Corridor Consolidated Facility 2
(30000290)3
The reappropriation in this section is subject to the following 4
conditions and limitations: The reappropriation is subject to the 5
provisions of section 4001, chapter 296, Laws of 2022.6
Reappropriation:7
State Building Construction Account— State. . . . . . . $7,201,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . $332,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,533,00011
NEW SECTION. Sec. 6127. FOR THE WASHINGTON STATE PATROL12
Crime Laboratory South I-5 Corridor Consolidated Facility 13
(40000072)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $8,407,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . $193,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,600,00019
NEW SECTION. Sec. 6128. FOR THE WASHINGTON STATE PATROL20
Fire Training Academy Roof Replacement (40000077)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $282,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . $290,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $572,00026
NEW SECTION. Sec. 6129. FOR THE WASHINGTON STATE PATROL27
Seattle Crime Laboratory Generator Replacement (40000081)28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $450,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,00033
p. 188 SB 5195
NEW SECTION. Sec. 6130. FOR THE WASHINGTON STATE PATROL1
Vancouver Crime Lab Chiller Replacement (40000097)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $988,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $988,0007
NEW SECTION. Sec. 6131. FOR THE CRIMINAL JUSTICE TRAINING 8
COMMISSION9
Cafeteria Water Damage Repairs (40000043)10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $200,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00015
NEW SECTION. Sec. 6132. FOR THE DEPARTMENT OF LABOR AND 16
INDUSTRIES17
Modernize Lab and Training Facility (30000043)18
The reappropriations in this section are subject to the following 19
conditions and limitations: The reappropriations are subject to the 20
provisions of section 2005, chapter 413, Laws of 2019.21
Reappropriation:22
Accident Account— State. . . . . . . . . . . . . . . . . $853,00023
Medical Aid Account— State. . . . . . . . . . . . . . . . $141,00024
Subtotal Reappropriation. . . . . . . . . . . . . . $994,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $52,209,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $53,203,00028
NEW SECTION. Sec. 6133. FOR THE DEPARTMENT OF LABOR AND 29
INDUSTRIES30
Air Handler Retrofit and Cooling Tower Replacement (30000059)31
Reappropriation:32
Accident Account— State. . . . . . . . . . . . . . . . . . $44,00033
Medical Aid Account— State. . . . . . . . . . . . . . . . $44,00034
p. 189 SB 5195
Subtotal Reappropriation. . . . . . . . . . . . . . . $88,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,650,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,738,0004
NEW SECTION. Sec. 6134. FOR THE DEPARTMENT OF LABOR AND 5
INDUSTRIES6
Interior Lighting and Controls Upgrade (40000014)7
Reappropriation:8
Climate Commitment Account— State. . . . . . . . . . . $1,925,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,925,00012
NEW SECTION. Sec. 6135. FOR THE DEPARTMENT OF LABOR AND 13
INDUSTRIES14
Solar Panel Installation - Lab & Training Facility (40000015)15
Reappropriation:16
Climate Commitment Account— State. . . . . . . . . . . $1,825,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,909,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,734,00020
NEW SECTION. Sec. 6136. FOR THE MILITARY DEPARTMENT21
Joint Force Readiness Center: Replacement (30000591)22
Reappropriation:23
General Fund— Federal. . . . . . . . . . . . . . . . . $42,000,00024
State Building Construction Account— State. . . . . . $12,048,00025
Subtotal Reappropriation. . . . . . . . . . . . . $54,048,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $252,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $54,300,00029
NEW SECTION. Sec. 6137. FOR THE MILITARY DEPARTMENT30
King County Area Readiness Center (30000592)31
p. 190 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1116, chapter 332, Laws of 2021.3
Reappropriation:4
State Building Construction Account— State. . . . . . . $6,567,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,488,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,055,0008
NEW SECTION. Sec. 6138. FOR THE MILITARY DEPARTMENT9
Tri-Cities Readiness Center (30000808)10
Reappropriation:11
General Fund— Federal. . . . . . . . . . . . . . . . . . $900,00012
State Building Construction Account— State. . . . . . . . $300,00013
Subtotal Reappropriation. . . . . . . . . . . . . $1,200,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,740,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,940,00017
NEW SECTION. Sec. 6139. FOR THE MILITARY DEPARTMENT18
Snohomish Readiness Center (30000930)19
Reappropriation:20
General Fund— Federal. . . . . . . . . . . . . . . . . $5,773,00021
State Building Construction Account— State. . . . . . . $2,774,00022
Subtotal Reappropriation. . . . . . . . . . . . . $8,547,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,971,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,518,00026
NEW SECTION. Sec. 6140. FOR THE MILITARY DEPARTMENT27
Anacortes Readiness Center Major Renovation (40000004)28
The reappropriations in this section are subject to the following 29
conditions and limitations: The reappropriations are subject to the 30
provisions of section 1100, chapter 413, Laws of 2019.31
Reappropriation:32
General Fund— Federal. . . . . . . . . . . . . . . . . . $368,00033
p. 191 SB 5195
Military Department Capital Account— State. . . . . . . . $35,0001
State Building Construction Account— State. . . . . . . . $152,0002
Subtotal Reappropriation. . . . . . . . . . . . . . $555,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,696,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,251,0006
NEW SECTION. Sec. 6141. FOR THE MILITARY DEPARTMENT7
Stryker Canopies Kent Site (40000073)8
Reappropriation:9
General Fund— Federal. . . . . . . . . . . . . . . . . $1,167,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,833,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00013
NEW SECTION. Sec. 6142. FOR THE MILITARY DEPARTMENT14
Stryker Canopies Bremerton Site (40000077)15
Reappropriation:16
General Fund— Federal. . . . . . . . . . . . . . . . . . $341,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,159,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00020
NEW SECTION. Sec. 6143. FOR THE MILITARY DEPARTMENT21
Field Maintenance Shop Addition-Sedro Woolley FMS (40000104)22
Reappropriation:23
General Fund— Federal. . . . . . . . . . . . . . . . . $1,332,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . $918,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,250,00027
NEW SECTION. Sec. 6144. FOR THE MILITARY DEPARTMENT28
Camp Murray Bldg 47 and 48 Barracks Replacement (40000190)29
Reappropriation:30
General Fund— Federal. . . . . . . . . . . . . . . . . $2,828,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $172,00032
p. 192 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0002
NEW SECTION. Sec. 6145. FOR THE MILITARY DEPARTMENT3
Camp Murray Bldg 65 Barracks Replacement (40000191)4
Reappropriation:5
General Fund— Federal. . . . . . . . . . . . . . . . . $2,696,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . $304,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0009
NEW SECTION. Sec. 6146. FOR THE MILITARY DEPARTMENT10
Camp Murray Bldg 34 Renovation (40000192)11
Reappropriation:12
General Fund— Federal. . . . . . . . . . . . . . . . . $5,329,00013
State Building Construction Account— State. . . . . . . $4,520,00014
Subtotal Reappropriation. . . . . . . . . . . . . $9,849,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $150,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,999,00018
NEW SECTION. Sec. 6147. FOR THE MILITARY DEPARTMENT19
JBLM Non-Organizational (POV) Parking Expansion (40000196)20
Reappropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . . $1,317,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $578,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,895,00025
NEW SECTION. Sec. 6148. FOR THE MILITARY DEPARTMENT26
Minor Works Program 2023-25 Biennium (40000274)27
Reappropriation:28
General Fund— Federal. . . . . . . . . . . . . . . . . $7,035,00029
State Building Construction Account— State. . . . . . . $3,607,00030
Subtotal Reappropriation. . . . . . . . . . . . . $10,642,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,843,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 193 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,485,0001
NEW SECTION. Sec. 6149. FOR THE MILITARY DEPARTMENT2
WA Army National Guard Vehicle Storage Buildings (40000290)3
Reappropriation:4
General Fund— Federal. . . . . . . . . . . . . . . . . $11,053,0005
State Building Construction Account— State. . . . . . . . $750,0006
Subtotal Reappropriation. . . . . . . . . . . . . $11,803,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . $397,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,200,00010
NEW SECTION. Sec. 6150. FOR THE MILITARY DEPARTMENT11
Yakima Training Center 951 Renovation (40000297)12
Reappropriation:13
General Fund— Federal. . . . . . . . . . . . . . . . . $2,875,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . $185,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,060,00017
NEW SECTION. Sec. 6151. FOR THE MILITARY DEPARTMENT18
Central Building Automation System for National Guard Buildings 19
(40000298)20
Reappropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . . $2,227,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,227,00025
NEW SECTION. Sec. 6152. FOR THE MILITARY DEPARTMENT26
Spokane Readiness Center IT Infrastructure Upgrade (40000300)27
Reappropriation:28
General Fund— Federal. . . . . . . . . . . . . . . . . . $723,00029
State Building Construction Account— State. . . . . . . . $384,00030
Subtotal Reappropriation. . . . . . . . . . . . . $1,107,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $743,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 194 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,850,0001
NEW SECTION. Sec. 6153. FOR THE MILITARY DEPARTMENT2
Minor Works Preservation 2023-25 Biennium (40000301)3
Reappropriation:4
General Fund— Federal. . . . . . . . . . . . . . . . . $3,429,0005
State Building Construction Account— State. . . . . . . $2,959,0006
Subtotal Reappropriation. . . . . . . . . . . . . $6,388,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,062,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,450,00010
NEW SECTION. Sec. 6154. FOR THE MILITARY DEPARTMENT11
Kent Readiness Center Water Damage Repairs (40000311)12
Reappropriation:13
General Fund— Federal. . . . . . . . . . . . . . . . . $1,564,00014
State Building Construction Account— State. . . . . . . . $521,00015
Subtotal Reappropriation. . . . . . . . . . . . . $2,085,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . $191,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,276,00019
NEW SECTION. Sec. 6155. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 20
SERVICES21
Fircrest School-Back-Up Power & Electrical Feeders (30000415)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 2005, chapter 3, Laws of 2015 3rd sp. sess.25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $325,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,875,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,200,00030
NEW SECTION. Sec. 6156. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 31
SERVICES32
Eastern State Hospital: New Boiler Plant (30000468)33
p. 195 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $255,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $13,074,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,329,0005
NEW SECTION. Sec. 6157. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 6
SERVICES7
Minor Works Preservation Projects: Statewide (30002235)8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $234,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,451,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,685,00013
NEW SECTION. Sec. 6158. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 14
SERVICES15
Lakeland Village: Code Required Campus Infrastructure Upgrades 16
(30002238)17
Reappropriation:18
Charitable, Educational, Penal, and Reformatory19
Institutions Account— State. . . . . . . . . . . . . $356,00020
State Building Construction Account— State. . . . . . . $3,213,00021
Subtotal Reappropriation. . . . . . . . . . . . . $3,569,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,136,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,705,00025
NEW SECTION. Sec. 6159. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 26
SERVICES27
Rainier School-Multiple Buildings: Roofing Replacement & Repairs 28
(30002752)29
The reappropriation in this section is subject to the following 30
conditions and limitations: The reappropriation is subject to the 31
provisions of section 2005, chapter 356, Laws of 2020.32
Reappropriation:33
State Building Construction Account— State. . . . . . . . $290,00034
p. 196 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,340,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,630,0003
NEW SECTION. Sec. 6160. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 4
SERVICES5
Fircrest School-Nursing Facilities: Replacement (30002755)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 7023, chapter 474, Laws of 2023.9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $642,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,651,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,293,00014
NEW SECTION. Sec. 6161. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 15
SERVICES16
Eastern State Hospital-Westlake: New HVAC DDC Controls (30002759)17
Reappropriation:18
State Building Construction Account— State. . . . . . . $1,456,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,394,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,850,00022
NEW SECTION. Sec. 6162. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 23
SERVICES24
Western State Hospital-Forensic Services: Two Wards Addition 25
(30002765)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $2,978,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $27,522,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,500,00031
NEW SECTION. Sec. 6163. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 32
SERVICES33
p. 197 SB 5195
DOC/DSHS McNeil Island-Infrastructure: Repairs & Upgrades 1
(30003211)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $912,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,043,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,955,0007
NEW SECTION. Sec. 6164. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 8
SERVICES9
DOC/DSHS McNeil Island-Main Dock: Float & Dolphin Replacement 10
(30003234)11
Reappropriation:12
State Building Construction Account— State. . . . . . . . $183,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $67,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00016
NEW SECTION. Sec. 6165. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 17
SERVICES18
Child Study and Treatment Center: CLIP Capacity (30003324)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $13,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,931,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,944,00024
NEW SECTION. Sec. 6166. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 25
SERVICES26
State Psychiatric Hospitals: Compliance with Federal Requirements 27
(30003569)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 2015, chapter 2, Laws of 2018.31
Reappropriation:32
State Building Construction Account— State. . . . . . . . $67,00033
p. 198 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,933,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,0003
NEW SECTION. Sec. 6167. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 4
SERVICES5
Western State Hospital: Master Plan Update (30003571)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 2016, chapter 2, Laws of 2018.9
Reappropriation:10
Charitable, Educational, Penal, and Reformatory11
Institutions Account— State. . . . . . . . . . . . . . $69,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . $456,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $525,00015
NEW SECTION. Sec. 6168. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 16
SERVICES17
Special Commitment Center-Community Facilities: New Capacity 18
(30003577)19
The reappropriations in this section are subject to the following 20
conditions and limitations: The reappropriations are subject to the 21
provisions of section 2023, chapter 332, Laws of 2021.22
Reappropriation:23
Charitable, Educational, Penal, and Reformatory24
Institutions Account— State. . . . . . . . . . . . . . $44,00025
State Building Construction Account— State. . . . . . . $5,945,00026
Subtotal Reappropriation. . . . . . . . . . . . . $5,989,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $511,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,500,00030
NEW SECTION. Sec. 6169. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 31
SERVICES32
Western State Hospital-Multiple Buildings: Fire Suppression 33
(30003579)34
p. 199 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $55,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $945,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0005
NEW SECTION. Sec. 6170. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 6
SERVICES7
Western State Hospital-Multiple Buildings: Elevator Modernization 8
(30003582)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $38,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,062,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,100,00014
NEW SECTION. Sec. 6171. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 15
SERVICES16
Fircrest School: Campus Master Plan & Rezone (30003601)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 2007, chapter 296, Laws of 2022.20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $58,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $435,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $493,00025
NEW SECTION. Sec. 6172. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 26
SERVICES27
Western State Hospital-Forensic Services: Roofing Replacement 28
(30003603)29
Reappropriation:30
State Building Construction Account— State. . . . . . . . $25,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,930,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 200 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,955,0001
NEW SECTION. Sec. 6173. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 2
SERVICES3
Eastern State Hospital: Emergency Electrical System Upgrades 4
(30003616)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $769,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,286,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,055,00010
NEW SECTION. Sec. 6174. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 11
SERVICES12
Behavioral Health: Compliance with Systems Improvement Agreement 13
(30003849)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 2033, chapter 413, Laws of 2019.17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $124,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,776,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,900,00022
NEW SECTION. Sec. 6175. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 23
SERVICES24
Minor Works Preservation Projects: Statewide 2019-21 (40000381)25
Reappropriation:26
Charitable, Educational, Penal, and Reformatory27
Institutions Account— State. . . . . . . . . . . . . $390,00028
State Building Construction Account— State. . . . . . . $2,664,00029
Subtotal Reappropriation. . . . . . . . . . . . . $3,054,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,996,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,050,00033
p. 201 SB 5195
NEW SECTION. Sec. 6176. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Western State Hospital-Multiple Buildings: Fire Doors Replacement 3
(40000392)4
Reappropriation:5
State Building Construction Account— State. . . . . . . $2,701,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,399,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,100,0009
NEW SECTION. Sec. 6177. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 10
SERVICES11
Eastern State Hospital-Eastlake & Westlake: Fire & Smoke Controls 12
(40000404)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $1,621,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $429,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,050,00018
NEW SECTION. Sec. 6178. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 19
SERVICES20
Eastern State Hospital-Westlake: Fire Stops (40000405)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $933,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,197,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,130,00026
NEW SECTION. Sec. 6179. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 27
SERVICES28
Child Study and Treatment Center-Ketron: LSA Expansion (40000411)29
Reappropriation:30
State Building Construction Account— State. . . . . . . $2,739,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $261,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00034
p. 202 SB 5195
NEW SECTION. Sec. 6180. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Eastern State Hospital-EL & WL: HVAC Compliance & Monitoring 3
(40000492)4
Reappropriation:5
State Building Construction Account— State. . . . . . . . $503,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,412,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,915,0009
NEW SECTION. Sec. 6181. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 10
SERVICES11
Eastern State Hospital-Activity Therapy Building: HVAC Upgrades 12
(40000493)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $3,373,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $342,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,715,00018
NEW SECTION. Sec. 6182. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 19
SERVICES20
Child Study & Treatment Center-Gymnasium: Floor Replacement 21
(40000555)22
Reappropriation:23
State Building Construction Account— State. . . . . . . . $772,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,153,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,925,00027
NEW SECTION. Sec. 6183. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 28
SERVICES29
Child Study & Treatment Center-Emergency Power: Replacement 30
(40000559)31
Reappropriation:32
State Building Construction Account— State. . . . . . . . $800,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
p. 203 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,0002
NEW SECTION. Sec. 6184. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 3
SERVICES4
Maple Lane-Columbia Cottage: Behavioral Health Expansion 5
(40000567)6
Reappropriation:7
State Building Construction Account— State. . . . . . . . $253,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,747,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00011
NEW SECTION. Sec. 6185. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 12
SERVICES13
Minor Works Program Projects: Statewide 2021-23 (40000569)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 2046, chapter 332, Laws of 2021.17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $47,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,708,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,755,00022
NEW SECTION. Sec. 6186. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 23
SERVICES24
Minor Works Preservation Projects: Statewide 2021-23 (40000571)25
Reappropriation:26
Charitable, Educational, Penal, and Reformatory27
Institutions Account— State. . . . . . . . . . . . . $608,00028
State Building Construction Account— State. . . . . . . $2,792,00029
Subtotal Reappropriation. . . . . . . . . . . . . $3,400,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,190,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,590,00033
p. 204 SB 5195
NEW SECTION. Sec. 6187. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Lakeland Village-Cottages: Roofing Replacement (40000572)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $1,169,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $131,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,300,0008
NEW SECTION. Sec. 6188. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 9
SERVICES10
Rainier School-Cottages: Roofing Replacement (40000573)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $3,463,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $337,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,800,00016
NEW SECTION. Sec. 6189. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 17
SERVICES18
Transitional Care Center-Main Building: Patient Rooms Cooling 19
(40000574)20
Reappropriation:21
Coronavirus State Fiscal Recovery Fund— Federal. . . . . $321,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,014,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,335,00025
NEW SECTION. Sec. 6190. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 26
SERVICES27
Statewide-Behavioral Health: Patient Safety Improvements 2021-23 28
(40000578)29
Reappropriation:30
State Building Construction Account— State. . . . . . . $4,164,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,836,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00034
p. 205 SB 5195
NEW SECTION. Sec. 6191. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Western State Hospital-Building 29: Roofing Replacement 3
(40000589)4
Reappropriation:5
State Building Construction Account— State. . . . . . . $1,060,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,975,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,035,0009
NEW SECTION. Sec. 6192. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 10
SERVICES11
Western State Hospital-Multiple Bldgs: Sprinkler Head Replacement 12
(40000594)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $1,261,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $133,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,394,00018
NEW SECTION. Sec. 6193. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 19
SERVICES20
Clean Energy Community Decarbonization (40000606)21
Reappropriation:22
Climate Commitment Account— State. . . . . . . . . . . . $959,00023
State Building Construction Account— State. . . . . . . $3,350,00024
Subtotal Reappropriation. . . . . . . . . . . . . $4,309,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . $141,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,450,00028
NEW SECTION. Sec. 6194. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 29
SERVICES30
Western State Hospital-Building 27: Roofing Replacement 31
(40000888)32
Reappropriation:33
State Building Construction Account— State. . . . . . . . $436,00034
p. 206 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $764,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,200,0003
NEW SECTION. Sec. 6195. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 4
SERVICES5
Fircrest School-ICF Cottages: HVAC & Water Heater Improvements 6
(40000946)7
Reappropriation:8
State Building Construction Account— State. . . . . . . $5,452,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . $328,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,780,00012
NEW SECTION. Sec. 6196. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 13
SERVICES14
Western State Hospital-Building 29: CMS Certification (40000948)15
Reappropriation:16
State Building Construction Account— State. . . . . . . . $30,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . $190,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $220,00020
NEW SECTION. Sec. 6197. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 21
SERVICES22
Minor Works Programmatic 2023-25 (40000953)23
Reappropriation:24
Charitable, Educational, Penal, and Reformatory25
Institutions Account— State. . . . . . . . . . . . $2,078,00026
State Building Construction Account— State. . . . . . . $3,360,00027
Subtotal Reappropriation. . . . . . . . . . . . . $5,438,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $557,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,995,00031
NEW SECTION. Sec. 6198. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 32
SERVICES33
p. 207 SB 5195
Minor Works Preservation 2023-25 (40000954)1
Reappropriation:2
Charitable, Educational, Penal, and Reformatory3
Institutions Account— State. . . . . . . . . . . . $2,855,0004
State Building Construction Account— State. . . . . . . $5,832,0005
Subtotal Reappropriation. . . . . . . . . . . . . $8,687,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,461,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,148,0009
NEW SECTION. Sec. 6199. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 10
SERVICES11
DOC/DSHS McNeil Island-Infrastructure: Repairs & Upgrades 2023-25 12
(40000955)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $2,451,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,451,00018
NEW SECTION. Sec. 6200. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 19
SERVICES20
Statewide: Communications Systems Condition Assessment (40000959)21
Reappropriation:22
Charitable, Educational, Penal, and Reformatory23
Institutions Account— State. . . . . . . . . . . . $5,434,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . $858,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,292,00027
NEW SECTION. Sec. 6201. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 28
SERVICES29
Yakima Valley School-Main Building: Exterior Window Replacement 30
(40000962)31
Reappropriation:32
Climate Commitment Account— State. . . . . . . . . . . $5,205,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . $125,00034
p. 208 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,330,0002
NEW SECTION. Sec. 6202. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 3
SERVICES4
Medical Lake-Campus: Electrical Feeder Replacement (40000964)5
Reappropriation:6
Charitable, Educational, Penal, and Reformatory7
Institutions Account— State. . . . . . . . . . . . . $492,0008
State Building Construction Account— State. . . . . . . $1,392,0009
Subtotal Reappropriation. . . . . . . . . . . . . $1,884,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . $193,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,077,00013
NEW SECTION. Sec. 6203. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 14
SERVICES15
Special Commitment Center-Campus: Fire Alarm Replacement 16
(40000965)17
Reappropriation:18
State Building Construction Account— State. . . . . . . $5,115,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,115,00022
NEW SECTION. Sec. 6204. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 23
SERVICES24
Eastern State Hospital-AT Bldg: Electrical & Emerg. Generator 25
(40000969)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $3,022,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $183,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,205,00031
NEW SECTION. Sec. 6205. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 32
SERVICES33
p. 209 SB 5195
Eastern State Hospital-Eastlake: Nursing Station Improvements 1
(40000970)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $1,204,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . $536,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,740,0007
NEW SECTION. Sec. 6206. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 8
SERVICES9
Rainier School-Laundry: Commercial Washing Machines Replacement 10
(40000971)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $1,855,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,855,00016
NEW SECTION. Sec. 6207. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 17
SERVICES18
Diversion and Recovery Community Capacity (40001140)19
The reappropriation in this section is subject to the following 20
conditions and limitations: The reappropriation is subject to the 21
provisions of section 2027, chapter 474, Laws of 2023.22
Reappropriation:23
State Building Construction Account— State. . . . . . . . $160,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . $340,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00027
NEW SECTION. Sec. 6208. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 28
SERVICES29
Western State Hospital-East Campus: Well Replacement (40001149)30
Reappropriation:31
Model Toxics Control Capital Account— State. . . . . . $4,540,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 210 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,540,0002
NEW SECTION. Sec. 6209. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 3
SERVICES4
ESH and WSH-All Wards: Patient Safety Improvements (91000019)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $971,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $17,698,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,669,00010
NEW SECTION. Sec. 6210. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 11
SERVICES12
DSHS & DCYF Fire Alarms (91000066)13
The reappropriation in this section is subject to the following 14
conditions and limitations: The reappropriation is subject to the 15
provisions of section 2036, chapter 332, Laws of 2021.16
Reappropriation:17
State Building Construction Account— State. . . . . . . $1,934,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $14,885,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,819,00021
NEW SECTION. Sec. 6211. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 22
SERVICES23
Eastern State Hospital Elevators (91000068)24
Reappropriation:25
Charitable, Educational, Penal, and Reformatory26
Institutions Account— State. . . . . . . . . . . . . $620,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,080,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,700,00030
NEW SECTION. Sec. 6212. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 31
SERVICES32
Western State Hospital & CSTC Power Upgrades (91000070)33
p. 211 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $35,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,265,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,300,0005
NEW SECTION. Sec. 6213. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 6
SERVICES7
BH: State Operated Community Civil 16-Bed Capacity (91000075)8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $490,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $19,700,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,190,00013
NEW SECTION. Sec. 6214. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 14
SERVICES15
BH: State Owned, Mixed Use Community Civil 48-Bed Capacity 16
(91000077)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 2054, chapter 413, Laws of 2019.20
Reappropriation:21
State Building Construction Account— State. . . . . . $33,233,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $45,521,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $78,754,00025
NEW SECTION. Sec. 6215. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 26
SERVICES27
Rainier School-PATs E,C Cottage Cooling Upgrades (91000078)28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $27,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,973,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00033
p. 212 SB 5195
NEW SECTION. Sec. 6216. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 1
SERVICES2
Western State Hospital Treatment & Recovery Center (91000080)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $5,667,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $18,933,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,600,0008
NEW SECTION. Sec. 6217. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 9
SERVICES10
Child Study & Treatment Center - Youth Housing (91000084)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $5,118,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $293,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,411,00016
NEW SECTION. Sec. 6218. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 17
SERVICES18
BH Rapid Community Capacity (91000090)19
The reappropriation in this section is subject to the following 20
conditions and limitations: The reappropriation is subject to the 21
provisions of section 2030, chapter 474, Laws of 2023.22
Reappropriation:23
State Building Construction Account— State. . . . . . . $5,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00027
NEW SECTION. Sec. 6219. FOR THE DEPARTMENT OF SOCIAL AND HEALTH 28
SERVICES29
Residential Habilitation Center Land Management (92000044)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 2060, chapter 332, Laws of 2021.33
p. 213 SB 5195
Reappropriation:1
Charitable, Educational, Penal, and Reformatory2
Institutions Account— State. . . . . . . . . . . . . $150,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $150,0006
NEW SECTION. Sec. 6220. FOR THE DEPARTMENT OF HEALTH7
Drinking Water Preconstruction Loans (30000334)8
Reappropriation:9
Drinking Water Assistance Account— State. . . . . . . . $3,001,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,999,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00013
NEW SECTION. Sec. 6221. FOR THE DEPARTMENT OF HEALTH14
Public Health Lab South Laboratory Addition (30000379)15
Reappropriation:16
State Building Construction Account— State. . . . . . $54,137,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,490,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,627,00020
NEW SECTION. Sec. 6222. FOR THE DEPARTMENT OF HEALTH21
Drinking Water System Repairs and Consolidation (40000006)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 2035, chapter 2, Laws of 2018.25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $291,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,709,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00030
NEW SECTION. Sec. 6223. FOR THE DEPARTMENT OF HEALTH31
2019-21 Drinking Water Assistance Program (40000025)32
p. 214 SB 5195
Reappropriation:1
Drinking Water Assistance Account— Federal. . . . . . . $2,197,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $32,408,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,605,0005
NEW SECTION. Sec. 6224. FOR THE DEPARTMENT OF HEALTH6
2019-21 Drinking Water System Repairs and Consolidation 7
(40000027)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 2068, chapter 413, Laws of 2019.11
Reappropriation:12
State Building Construction Account— State. . . . . . . . $341,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,159,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00016
NEW SECTION. Sec. 6225. FOR THE DEPARTMENT OF HEALTH17
Small & Disadvantaged Communities DW (40000031)18
The reappropriation in this section is subject to the following 19
conditions and limitations: The reappropriation is subject to the 20
provisions of section 2020, chapter 296, Laws of 2022.21
Reappropriation:22
General Fund— Federal. . . . . . . . . . . . . . . . . $19,261,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,545,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,806,00026
NEW SECTION. Sec. 6226. FOR THE DEPARTMENT OF HEALTH27
Replace Air Handling Unit (AHU) in A/Q-wings (40000034)28
Reappropriation:29
Coronavirus State Fiscal Recovery Fund— Federal. . . . . $447,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,447,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,894,00033
p. 215 SB 5195
NEW SECTION. Sec. 6227. FOR THE DEPARTMENT OF HEALTH1
2021-23 Drinking Water Assistance Program (40000049)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 2023, chapter 296, Laws of 2022.5
Reappropriation:6
Drinking Water Assistance Account— Federal. . . . . . $111,285,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,615,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $112,900,00010
NEW SECTION. Sec. 6228. FOR THE DEPARTMENT OF HEALTH11
Lakewood Water District PFAS Treatment Facility (40000052)12
Reappropriation:13
State Building Construction Account— State. . . . . . . . $117,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,402,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,519,00017
NEW SECTION. Sec. 6229. FOR THE DEPARTMENT OF HEALTH18
New LED lighting and controls in existing laboratory spaces 19
(40000054)20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $190,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $175,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $365,00025
NEW SECTION. Sec. 6230. FOR THE DEPARTMENT OF HEALTH26
Improve Critical Water Infrastructure (40000058)27
Reappropriation:28
Drinking Water Assistance Account— State. . . . . . . . $4,583,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $15,417,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00032
p. 216 SB 5195
NEW SECTION. Sec. 6231. FOR THE DEPARTMENT OF HEALTH1
Increase DWSRF Preconstruction Loans (40000059)2
Reappropriation:3
Drinking Water Assistance Account— State. . . . . . . . . $400,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $400,0007
NEW SECTION. Sec. 6232. FOR THE DEPARTMENT OF HEALTH8
New Deionized Water (DI) Piping at Public Health Laboratories 9
(40000063)10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $710,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . $462,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,172,00015
NEW SECTION. Sec. 6233. FOR THE DEPARTMENT OF HEALTH16
Drinking Water System Rehabilitations and Consolidations 17
(40000065)18
The reappropriation in this section is subject to the following 19
conditions and limitations: The reappropriation is subject to the 20
provisions of section 2009, chapter 375, Laws of 2024.21
Reappropriation:22
State Building Construction Account— State. . . . . . . $5,322,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,322,00026
NEW SECTION. Sec. 6234. FOR THE DEPARTMENT OF HEALTH27
2023-25 DWSRF Construction Loan Program (40000067)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 2037, chapter 474, Laws of 2023.31
Reappropriation:32
Drinking Water Assistance Account— Federal. . . . . . $131,000,00033
p. 217 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $131,000,0003
NEW SECTION. Sec. 6235. FOR THE DEPARTMENT OF HEALTH4
Emergency Generator for Environmental Laboratory Wing (40000072)5
Reappropriation:6
State Building Construction Account— State. . . . . . . $3,149,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $70,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,219,00010
NEW SECTION. Sec. 6236. FOR THE DEPARTMENT OF HEALTH11
Supplemental Repayment Spending Authority (40000087)12
Reappropriation:13
Drinking Water Assistance Account— State. . . . . . . $50,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00017
NEW SECTION. Sec. 6237. FOR THE DEPARTMENT OF HEALTH18
Lower Yakima Valley Groundwater Management Area Water Supply 19
(92000208)20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $520,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $330,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $850,00025
NEW SECTION. Sec. 6238. FOR THE DEPARTMENT OF HEALTH26
Hannah Heights PFAS Contaminated Well and Water Supply (92000210)27
Reappropriation:28
Model Toxics Control Capital Account— State. . . . . . $1,897,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $82,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,979,00032
p. 218 SB 5195
NEW SECTION. Sec. 6239. FOR THE DEPARTMENT OF VETERANS AFFAIRS1
Minor Works Facilities Preservation (30000094)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 2010, chapter 356, Laws of 2020.5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $275,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,845,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,120,00010
NEW SECTION. Sec. 6240. FOR THE DEPARTMENT OF VETERANS AFFAIRS11
WVH HVAC Retrofit (40000006)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $3,833,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . $717,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,550,00017
NEW SECTION. Sec. 6241. FOR THE DEPARTMENT OF VETERANS AFFAIRS18
WSH - Life Safety Grant (40000013)19
Reappropriation:20
General Fund— Federal. . . . . . . . . . . . . . . . . . $139,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $361,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00024
NEW SECTION. Sec. 6242. FOR THE DEPARTMENT OF VETERANS AFFAIRS25
Northwest Washington State Veterans Cemetery Feasibility Study 26
(40000035)27
Reappropriation:28
Charitable, Educational, Penal, and Reformatory29
Institutions Account— State. . . . . . . . . . . . . . $61,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $139,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00033
p. 219 SB 5195
NEW SECTION. Sec. 6243. FOR THE DEPARTMENT OF VETERANS AFFAIRS1
Transitional Housing Capital Improvements (40000066)2
Reappropriation:3
General Fund— Federal. . . . . . . . . . . . . . . . . . $287,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,113,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,400,0007
NEW SECTION. Sec. 6244. FOR THE DEPARTMENT OF VETERANS AFFAIRS8
WSVC - Raise, Realign, and Clean Markers (40000070)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $350,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . $900,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,250,00014
NEW SECTION. Sec. 6245. FOR THE DEPARTMENT OF VETERANS AFFAIRS15
SVH - Skilled Nursing Facility Replacement - Feasibility Study 16
(40000071)17
Reappropriation:18
Charitable, Educational, Penal, and Reformatory19
Institutions Account— State. . . . . . . . . . . . . . $32,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $168,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00023
NEW SECTION. Sec. 6246. FOR THE DEPARTMENT OF VETERANS AFFAIRS24
WSH Master Plan (40000075)25
Reappropriation:26
Charitable, Educational, Penal, and Reformatory27
Institutions Account— State. . . . . . . . . . . . . $102,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $98,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00031
NEW SECTION. Sec. 6247. FOR THE DEPARTMENT OF VETERANS AFFAIRS32
WSVC - Burial and Columbarium Expansion Grant (40000092)33
p. 220 SB 5195
Reappropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . $4,000,0002
State Building Construction Account— State. . . . . . . . $100,0003
Subtotal Reappropriation. . . . . . . . . . . . . $4,100,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,309,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,409,0007
NEW SECTION. Sec. 6248. FOR THE DEPARTMENT OF VETERANS AFFAIRS8
WVH - Fire Alarm Replacement - 240 Building (40000099)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $1,246,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $34,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,280,00014
NEW SECTION. Sec. 6249. FOR THE DEPARTMENT OF VETERANS AFFAIRS15
DVA ARPA Federal Funds & State Match (91000013)16
The reappropriations in this section are subject to the following 17
conditions and limitations: The reappropriations are subject to the 18
provisions of section 2013, chapter 375, Laws of 2024.19
Reappropriation:20
General Fund— Federal. . . . . . . . . . . . . . . . . $24,515,00021
State Building Construction Account— State. . . . . . . $7,000,00022
Subtotal Reappropriation. . . . . . . . . . . . . $31,515,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,694,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,209,00026
NEW SECTION. Sec. 6250. FOR THE DEPARTMENT OF VETERANS AFFAIRS27
HB 1390 -District Energy Systems (91000017)28
Reappropriation:29
Climate Commitment Account— State. . . . . . . . . . . . $400,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $400,00033
p. 221 SB 5195
NEW SECTION. Sec. 6251. FOR THE DEPARTMENT OF VETERANS AFFAIRS1
Extended Care Facilities Construction Grants (92000001)2
Reappropriation:3
General Fund— Federal. . . . . . . . . . . . . . . . . $6,800,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,333,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,133,0007
NEW SECTION. Sec. 6252. FOR THE DEPARTMENT OF VETERANS AFFAIRS8
WSH - Roosevelt Building Restroom Renovation (92000002)9
Reappropriation:10
General Fund— Federal. . . . . . . . . . . . . . . . . $1,609,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,191,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,800,00014
NEW SECTION. Sec. 6253. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 15
AND FAMILIES16
Echo Glen-Housing Unit: Acute Mental Health Unit (30002736)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 2078, chapter 413, Laws of 2019.20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $277,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,323,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,600,00025
NEW SECTION. Sec. 6254. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 26
AND FAMILIES27
Green Hill School-Recreation Building: Replacement (30003237)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 2013, chapter 356, Laws of 2020.31
Reappropriation:32
State Building Construction Account— State. . . . . . . $5,988,00033
p. 222 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $25,774,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $31,762,0003
NEW SECTION. Sec. 6255. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 4
AND FAMILIES5
Green Hill School - Baker North Remodel (40000534)6
Reappropriation:7
State Building Construction Account— State. . . . . . . $1,133,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,491,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,624,00011
NEW SECTION. Sec. 6256. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 12
AND FAMILIES13
Echo Glen Emergency Generator & Fuel Storage Tank (40000547)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 2050, chapter 474, Laws of 2023.17
Reappropriation:18
State Building Construction Account— State. . . . . . . $2,517,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $113,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,630,00022
NEW SECTION. Sec. 6257. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 23
AND FAMILIES24
Green Hill Spruce Living Unit Renovation Minimum Security 25
(40000552)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $1,177,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $93,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,270,00031
NEW SECTION. Sec. 6258. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 32
AND FAMILIES33
p. 223 SB 5195
Statewide Minor Works (40000557)1
Reappropriation:2
State Building Construction Account— State. . . . . . . $2,710,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . $249,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,959,0006
NEW SECTION. Sec. 6259. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 7
AND FAMILIES8
Echo Glen Academic School Walkway Roofing & Lighting (40000586)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $500,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00014
NEW SECTION. Sec. 6260. FOR THE DEPARTMENT OF CHILDREN, YOUTH, 15
AND FAMILIES16
Additional JR Capacity (40000607)17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $800,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00022
NEW SECTION. Sec. 6261. FOR THE DEPARTMENT OF CORRECTIONS23
Washington Corrections Center: Transformers and Switches 24
(30000143)25
Reappropriation:26
State Building Construction Account— State. . . . . . . $1,679,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $18,906,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,585,00030
NEW SECTION. Sec. 6262. FOR THE DEPARTMENT OF CORRECTIONS31
WCC: Paint & Repair 300,000 Gallon Water Storage Tank (30000697)32
p. 224 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 2053, chapter 474, Laws of 2023.3
Reappropriation:4
Model Toxics Control Capital Account— State. . . . . . . $600,0005
State Building Construction Account— State. . . . . . . $2,615,0006
Subtotal Reappropriation. . . . . . . . . . . . . $3,215,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . $291,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,506,00010
NEW SECTION. Sec. 6263. FOR THE DEPARTMENT OF CORRECTIONS11
MCC: TRU Roof Programs and Recreation Building (30000738)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $3,326,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,670,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,996,00017
NEW SECTION. Sec. 6264. FOR THE DEPARTMENT OF CORRECTIONS18
SCCC Roof Replacement (30001128)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $5,809,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $385,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,194,00024
NEW SECTION. Sec. 6265. FOR THE DEPARTMENT OF CORRECTIONS25
ECWR: Foundation and Siding (40000067)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $5,722,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $239,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,961,00031
NEW SECTION. Sec. 6266. FOR THE DEPARTMENT OF CORRECTIONS32
p. 225 SB 5195
MCC: WSR Clinic Roof Replacement (40000180)1
Reappropriation:2
State Building Construction Account— State. . . . . . . $6,369,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,964,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,333,0006
NEW SECTION. Sec. 6267. FOR THE DEPARTMENT OF CORRECTIONS7
MCC: SOU and TRU - Domestic Water and HVAC Piping System 8
(40000246)9
The reappropriation in this section is subject to the following 10
conditions and limitations: The reappropriation is subject to the 11
provisions of section 2026, chapter 356, Laws of 2020.12
Reappropriation:13
State Building Construction Account— State. . . . . . $27,463,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,666,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,129,00017
NEW SECTION. Sec. 6268. FOR THE DEPARTMENT OF CORRECTIONS18
Minor Works - Preservation Projects (40000254)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $2,110,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,213,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,323,00024
NEW SECTION. Sec. 6269. FOR THE DEPARTMENT OF CORRECTIONS25
WCC: Interim Mental Health Building (40000260)26
Reappropriation:27
Capital Community Assistance Account— State. . . . . . . $625,00028
State Building Construction Account— State. . . . . . . . $961,00029
Subtotal Reappropriation. . . . . . . . . . . . . $1,586,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $361,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,947,00033
p. 226 SB 5195
NEW SECTION. Sec. 6270. FOR THE DEPARTMENT OF CORRECTIONS1
CBCC: Fire Pump Replacement (40000324)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $1,332,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $79,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,411,0007
NEW SECTION. Sec. 6271. FOR THE DEPARTMENT OF CORRECTIONS8
MCC: TRU Support Building HVAC Replacement (40000379)9
Reappropriation:10
Coronavirus State Fiscal Recovery Fund— Federal. . . . $2,427,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,219,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,646,00014
NEW SECTION. Sec. 6272. FOR THE DEPARTMENT OF CORRECTIONS15
WCC: Support Buildings Roof Replacement (40000380)16
Reappropriation:17
State Building Construction Account— State. . . . . . . . $797,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,203,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00021
NEW SECTION. Sec. 6273. FOR THE DEPARTMENT OF CORRECTIONS22
Inpatient Psychiatric Unit (40000413)23
Reappropriation:24
State Building Construction Account— State. . . . . . . . $24,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . $326,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $350,00028
NEW SECTION. Sec. 6274. FOR THE DEPARTMENT OF CORRECTIONS29
CRCC Sage Unit Move to AHCC (40000414)30
Reappropriation:31
State Building Construction Account— State. . . . . . . $2,371,00032
p. 227 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $131,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,502,0003
NEW SECTION. Sec. 6275. FOR THE DEPARTMENT OF CORRECTIONS4
AHCC: Modular Building for Health Service Staff (40000415)5
Reappropriation:6
State Building Construction Account— State. . . . . . . $1,124,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $75,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,199,00010
NEW SECTION. Sec. 6276. FOR THE DEPARTMENT OF CORRECTIONS11
CRCC: Modular Building for Health Service Staff (40000416)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $1,137,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $68,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,205,00017
NEW SECTION. Sec. 6277. FOR THE DEPARTMENT OF CORRECTIONS18
McNeil Island Passenger Ferry Replacement (40000418)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $763,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $137,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $900,00024
NEW SECTION. Sec. 6278. FOR THE DEPARTMENT OF CORRECTIONS25
Minor Works Preservation Projects (40000427)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $6,977,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,015,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,992,00031
p. 228 SB 5195
NEW SECTION. Sec. 6279. FOR THE DEPARTMENT OF CORRECTIONS1
SW: Security Electronics Renewal & Adaptation (40000523)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $800,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $05
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,0007
NEW SECTION. Sec. 6280. FOR THE DEPARTMENT OF CORRECTIONS8
WSP: IMU South Fire Protection & Smoke Dampers (40000526)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $4,622,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,622,00014
NEW SECTION. Sec. 6281. FOR THE DEPARTMENT OF CORRECTIONS15
WCC: Medical Intake Tent Replacement (40000528)16
Reappropriation:17
State Building Construction Account— State. . . . . . . $1,200,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,200,00021
NEW SECTION. Sec. 6282. FOR THE DEPARTMENT OF CORRECTIONS22
HB 1390 - District Energy Systems (91000434)23
Reappropriation:24
Climate Commitment Account— State. . . . . . . . . . . $1,595,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $5,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,00028
NEW SECTION. Sec. 6283. FOR THE DEPARTMENT OF CORRECTIONS29
WSP: Unit Six Roof Replacement (92000037)30
Reappropriation:31
State Building Construction Account— State. . . . . . $12,617,00032
p. 229 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,377,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,994,0003
NEW SECTION. Sec. 6284. FOR THE DEPARTMENT OF CORRECTIONS4
Corrections Training Center (92001125)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 2067, chapter 474, Laws of 2023.8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $16,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . $334,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $350,00013
NEW SECTION. Sec. 6285. FOR THE SUPERINTENDENT OF PUBLIC 14
INSTRUCTION15
2013-15 School Construction Assistance Program - Maintenance 16
(30000145)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 5001, chapter 35, Laws of 2016 1st sp. sess.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $1,414,00022
Prior Biennia (Expenditures). . . . . . . . . . . . $385,912,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $387,326,00025
NEW SECTION. Sec. 6286. FOR THE SUPERINTENDENT OF PUBLIC 26
INSTRUCTION27
2015-17 School Construction Assistance Program (30000169)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 5004, chapter 35, Laws of 2016 1st sp. sess.31
Reappropriation:32
Common School Construction Fund— State. . . . . . . . $94,326,00033
p. 230 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . $551,530,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $645,856,0003
NEW SECTION. Sec. 6287. FOR THE SUPERINTENDENT OF PUBLIC 4
INSTRUCTION5
Tri-Tech Skill Center - Core Growth (30000197)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 5004, chapter 2, Laws of 2018.9
Reappropriation:10
State Building Construction Account— State. . . . . . . . . $4,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,803,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,807,00014
NEW SECTION. Sec. 6288. FOR THE SUPERINTENDENT OF PUBLIC 15
INSTRUCTION16
2017-19 School Construction Assistance Program (40000003)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 5003, chapter 298, Laws of 2018.20
Reappropriation:21
Common School Construction Fund— State. . . . . . . . $46,857,00022
State Building Construction Account— State. . . . . . . . $516,00023
Subtotal Reappropriation. . . . . . . . . . . . . $47,373,00024
Prior Biennia (Expenditures). . . . . . . . . . . . $901,377,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $948,750,00027
NEW SECTION. Sec. 6289. FOR THE SUPERINTENDENT OF PUBLIC 28
INSTRUCTION29
2019-21 School Construction Assistance Program - Maintenance Lvl 30
(40000013)31
The reappropriations in this section are subject to the following 32
conditions and limitations: The reappropriations are subject to the 33
provisions of section 6040, chapter 332, Laws of 2021.34
p. 231 SB 5195
Reappropriation:1
Common School Construction Fund— State. . . . . . . . $40,166,0002
State Building Construction Account— State. . . . . . . . $40,0003
Subtotal Reappropriation. . . . . . . . . . . . . $40,206,0004
Prior Biennia (Expenditures). . . . . . . . . . . . $981,636,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,021,842,0007
NEW SECTION. Sec. 6290. FOR THE SUPERINTENDENT OF PUBLIC 8
INSTRUCTION9
West Sound Technical Skills Center Modernization (40000015)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 5003, chapter 296, Laws of 2022.13
Reappropriation:14
State Building Construction Account— State. . . . . . $37,895,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $14,866,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $52,761,00018
NEW SECTION. Sec. 6291. FOR THE SUPERINTENDENT OF PUBLIC 19
INSTRUCTION20
School District Health and Safety 2019-21 (40000019)21
The reappropriation in this section is subject to the following 22
conditions and limitations: The reappropriation is subject to the 23
provisions of section 5016, chapter 413, Laws of 2019.24
Reappropriation:25
State Building Construction Account— State. . . . . . . . $100,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,846,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,946,00029
NEW SECTION. Sec. 6292. FOR THE SUPERINTENDENT OF PUBLIC 30
INSTRUCTION31
Skills Centers Minor Works (40000023)32
Reappropriation:33
p. 232 SB 5195
State Building Construction Account— State. . . . . . . . $216,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,784,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0004
NEW SECTION. Sec. 6293. FOR THE SUPERINTENDENT OF PUBLIC 5
INSTRUCTION6
2021-23 School Construction Assistance Program (40000034)7
The reappropriations in this section are subject to the following 8
conditions and limitations: The reappropriations are subject to the 9
provisions of section 7061, chapter 474, Laws of 2023.10
Reappropriation:11
Common School Construction Fund— Federal. . . . . . . . $2,207,00012
Common School Construction Fund— State. . . . . . . . $13,006,00013
State Building Construction Account— State. . . . . . $67,215,00014
Subtotal Reappropriation. . . . . . . . . . . . . $82,428,00015
Prior Biennia (Expenditures). . . . . . . . . . . . $353,000,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $435,428,00018
NEW SECTION. Sec. 6294. FOR THE SUPERINTENDENT OF PUBLIC 19
INSTRUCTION20
2021-23 Small District and Tribal Compact Schools Modernization 21
(40000039)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 5005, chapter 296, Laws of 2022.25
Reappropriation:26
State Building Construction Account— State. . . . . . . $3,113,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $39,000,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,113,00030
NEW SECTION. Sec. 6295. FOR THE SUPERINTENDENT OF PUBLIC 31
INSTRUCTION32
2021-23 Skills Centers Minor Works (40000040)33
p. 233 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 5006, chapter 296, Laws of 2022.3
Reappropriation:4
State Building Construction Account— State. . . . . . . . $921,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,467,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,388,0008
NEW SECTION. Sec. 6296. FOR THE SUPERINTENDENT OF PUBLIC 9
INSTRUCTION10
Pierce County Skills Center - Evergreen Building Modernization 11
(40000048)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $1,347,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,483,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,830,00017
NEW SECTION. Sec. 6297. FOR THE SUPERINTENDENT OF PUBLIC 18
INSTRUCTION19
Seattle Public Schools Skills Center - Rainier Beach High School 20
(40000050)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $300,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00026
NEW SECTION. Sec. 6298. FOR THE SUPERINTENDENT OF PUBLIC 27
INSTRUCTION28
Puget Sound Skills Center Preservation (40000051)29
Reappropriation:30
State Building Construction Account— State. . . . . . . . $345,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $679,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 234 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,024,0001
NEW SECTION. Sec. 6299. FOR THE SUPERINTENDENT OF PUBLIC 2
INSTRUCTION3
2021-23 School District Health and Safety (40000052)4
The reappropriations in this section are subject to the following 5
conditions and limitations: The reappropriations are subject to the 6
provisions of section 5007, chapter 296, Laws of 2022.7
Reappropriation:8
Common School Construction Fund— State. . . . . . . . . . $134,0009
State Building Construction Account— State. . . . . . . . $483,00010
Subtotal Reappropriation. . . . . . . . . . . . . . $617,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,276,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,893,00014
NEW SECTION. Sec. 6300. FOR THE SUPERINTENDENT OF PUBLIC 15
INSTRUCTION16
2021-23 Career Preparation and Launch Grants (40000056)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 5025, chapter 332, Laws of 2021.20
Reappropriation:21
Common School Construction Fund— State. . . . . . . . . . $161,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,839,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00025
NEW SECTION. Sec. 6301. FOR THE SUPERINTENDENT OF PUBLIC 26
INSTRUCTION27
2023-25 School Construction Assistance Program (40000063)28
The reappropriations in this section are subject to the following 29
conditions and limitations: The reappropriations are subject to the 30
provisions of section 5002, chapter 375, Laws of 2024.31
Reappropriation:32
Common School Construction Fund— Federal. . . . . . . . $1,500,00033
Common School Construction Fund— State. . . . . . . . $172,880,00034
p. 235 SB 5195
State Building Construction Account— State. . . . . . $111,066,0001
Subtotal Reappropriation. . . . . . . . . . . . $285,446,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,204,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $293,650,0005
NEW SECTION. Sec. 6302. FOR THE SUPERINTENDENT OF PUBLIC 6
INSTRUCTION7
2023-25 Small District and State Tribal Compact Schools Mod 8
(40000065)9
The reappropriations in this section are subject to the following 10
conditions and limitations: The reappropriations are subject to the 11
provisions of section 5003, chapter 375, Laws of 2024.12
Reappropriation:13
Climate Commitment Account— State. . . . . . . . . . . $6,668,00014
Common School Construction Fund— State. . . . . . . . $151,508,00015
State Building Construction Account— State. . . . . . $11,281,00016
Subtotal Reappropriation. . . . . . . . . . . . $169,457,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $45,423,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $214,880,00020
NEW SECTION. Sec. 6303. FOR THE SUPERINTENDENT OF PUBLIC 21
INSTRUCTION22
2023-25 School Seismic Safety Grant Program (40000066)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 5004, chapter 474, Laws of 2023.26
Reappropriation:27
State Building Construction Account— State. . . . . . $40,000,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00031
NEW SECTION. Sec. 6304. FOR THE SUPERINTENDENT OF PUBLIC 32
INSTRUCTION33
2023-25 School District Health and Safety (40000067)34
p. 236 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 5004, chapter 375, Laws of 2024.3
Reappropriation:4
State Building Construction Account— State. . . . . . $21,990,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,310,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,300,0008
NEW SECTION. Sec. 6305. FOR THE SUPERINTENDENT OF PUBLIC 9
INSTRUCTION10
2023-25 Healthy Kids-Healthy Schools (40000068)11
The reappropriations in this section are subject to the following 12
conditions and limitations: The reappropriations are subject to the 13
provisions of section 5005, chapter 375, Laws of 2024.14
Reappropriation:15
Common School Construction Fund— State. . . . . . . . . $7,745,00016
State Building Construction Account— State. . . . . . . . $580,00017
Subtotal Reappropriation. . . . . . . . . . . . . $8,325,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,675,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,000,00021
NEW SECTION. Sec. 6306. FOR THE SUPERINTENDENT OF PUBLIC 22
INSTRUCTION23
2023-25 Career Preparation and Launch Capital Grants (40000069)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 5007, chapter 474, Laws of 2023.27
Reappropriation:28
Common School Construction Fund— State. . . . . . . . . $1,466,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,534,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00032
p. 237 SB 5195
NEW SECTION. Sec. 6307. FOR THE SUPERINTENDENT OF PUBLIC 1
INSTRUCTION2
2023-25 Skills Centers Minor Works (40000070)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $4,174,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $961,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,135,0008
NEW SECTION. Sec. 6308. FOR THE SUPERINTENDENT OF PUBLIC 9
INSTRUCTION10
K-12 Capital Programs Administration (40000090)11
Reappropriation:12
Common School Construction Fund— State. . . . . . . . . $2,686,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,153,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,839,00016
NEW SECTION. Sec. 6309. FOR THE SUPERINTENDENT OF PUBLIC 17
INSTRUCTION18
Chief Leschi School HVAC (40000099)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $4,972,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,028,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00024
NEW SECTION. Sec. 6310. FOR THE SUPERINTENDENT OF PUBLIC 25
INSTRUCTION26
Equitable Access to Clean Air & Improving Classroom Air Quality 27
(40000104)28
The reappropriations in this section are subject to the following 29
conditions and limitations: The reappropriations are subject to the 30
provisions of section 5007, chapter 375, Laws of 2024.31
Reappropriation:32
Climate Commitment Account— State. . . . . . . . . . . $30,000,00033
Common School Construction Fund— State. . . . . . . . $15,025,00034
p. 238 SB 5195
Subtotal Reappropriation. . . . . . . . . . . . . $45,025,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,025,0004
NEW SECTION. Sec. 6311. FOR THE SUPERINTENDENT OF PUBLIC 5
INSTRUCTION6
2021-23 Healthy Kids-Healthy Schools: Physical Health & Nutrition 7
(91000464)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 5016, chapter 332, Laws of 2021.11
Reappropriation:12
Common School Construction Fund— State. . . . . . . . . . $262,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,738,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00016
NEW SECTION. Sec. 6312. FOR THE SUPERINTENDENT OF PUBLIC 17
INSTRUCTION18
2021-23 Healthy Kids-Healthy Schools: Remediation of Lead 19
(91000465)20
The reappropriations in this section are subject to the following 21
conditions and limitations: The reappropriations are subject to the 22
provisions of section 5027, chapter 332, Laws of 2021.23
Reappropriation:24
Common School Construction Fund— State. . . . . . . . . . $270,00025
State Building Construction Account— State. . . . . . . $2,965,00026
Subtotal Reappropriation. . . . . . . . . . . . . $3,235,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $363,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,598,00030
NEW SECTION. Sec. 6313. FOR THE SUPERINTENDENT OF PUBLIC 31
INSTRUCTION32
Green Schools: Stormwater Infrastructure Projects (91000466)33
p. 239 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 5011, chapter 474, Laws of 2023.3
Reappropriation:4
Model Toxics Control Stormwater Account— State. . . . . . $263,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $612,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $875,0008
NEW SECTION. Sec. 6314. FOR THE SUPERINTENDENT OF PUBLIC 9
INSTRUCTION10
Healthy Kids/Healthy Schools - T-12 Lighting (91000483)11
The reappropriation in this section is subject to the following 12
conditions and limitations: The reappropriation is subject to the 13
provisions of section 6034, chapter 375, Laws of 2024.14
Reappropriation:15
State Building Construction Account— State. . . . . . . $1,360,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . $140,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00019
NEW SECTION. Sec. 6315. FOR THE SUPERINTENDENT OF PUBLIC 20
INSTRUCTION21
Energy Assessment Grants to School Districts (91000509)22
The reappropriations in this section are subject to the following 23
conditions and limitations: The reappropriations are subject to the 24
provisions of section 5008, chapter 375, Laws of 2024.25
Reappropriation:26
Climate Commitment Account— State. . . . . . . . . . . $4,900,00027
Common School Construction Fund— State. . . . . . . . . . $50,00028
Subtotal Reappropriation. . . . . . . . . . . . . $4,950,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,950,00032
p. 240 SB 5195
NEW SECTION. Sec. 6316. FOR THE SUPERINTENDENT OF PUBLIC 1
INSTRUCTION2
School-based Health and Behavioral Health Clinics (91000519)3
The reappropriation in this section is subject to the following 4
conditions and limitations: The reappropriation is subject to the 5
provisions of section 5009, chapter 375, Laws of 2024.6
Reappropriation:7
State Building Construction Account— State. . . . . . . $2,064,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,064,00011
NEW SECTION. Sec. 6317. FOR THE SUPERINTENDENT OF PUBLIC 12
INSTRUCTION13
Career and Technical Education Projects (91000534)14
The reappropriations in this section are subject to the following 15
conditions and limitations: The reappropriations are subject to the 16
provisions of section 5010, chapter 375, Laws of 2024.17
Reappropriation:18
Common School Construction Fund— State. . . . . . . . $59,565,00019
State Building Construction Account— State. . . . . . . $7,584,00020
Subtotal Reappropriation. . . . . . . . . . . . . $67,149,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,054,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $68,203,00024
NEW SECTION. Sec. 6318. FOR THE SUPERINTENDENT OF PUBLIC 25
INSTRUCTION26
School Construction Revised Assistance Program Planning (SCRAPP) 27
(91000535)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 5011, chapter 375, Laws of 2024.31
Reappropriation:32
Common School Construction Fund— State. . . . . . . . . $1,000,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
p. 241 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0002
NEW SECTION. Sec. 6319. FOR THE SUPERINTENDENT OF PUBLIC 3
INSTRUCTION4
Pierce College at New Bethel High School (92000036)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 5012, chapter 296, Laws of 2022.8
Reappropriation:9
State Building Construction Account— State. . . . . . . $1,600,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,600,00013
NEW SECTION. Sec. 6320. FOR THE SUPERINTENDENT OF PUBLIC 14
INSTRUCTION15
K-3 Class-size Reduction Grants (92000039)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 5023, chapter 413, Laws of 2019.19
Reappropriation:20
State Building Construction Account— State. . . . . . . $3,223,00021
Prior Biennia (Expenditures). . . . . . . . . . . . $231,277,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $234,500,00024
NEW SECTION. Sec. 6321. FOR THE SUPERINTENDENT OF PUBLIC 25
INSTRUCTION26
Distressed Schools (92000041)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 5004, chapter 356, Laws of 2020.30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $143,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $45,343,00033
p. 242 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,486,0002
NEW SECTION. Sec. 6322. FOR THE SUPERINTENDENT OF PUBLIC 3
INSTRUCTION4
2019-21 Small District Modernization Grants (92000139)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 5003, chapter 356, Laws of 2020.8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $175,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $23,208,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $23,383,00013
NEW SECTION. Sec. 6323. FOR THE SUPERINTENDENT OF PUBLIC 14
INSTRUCTION15
2019-21 STEM Grants (92000140)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 5029, chapter 413, Laws of 2019.19
Reappropriation:20
State Building Construction Account— State. . . . . . . . . $4,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,696,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,700,00024
NEW SECTION. Sec. 6324. FOR THE SUPERINTENDENT OF PUBLIC 25
INSTRUCTION26
2019-21 Distressed Schools (92000142)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 5005, chapter 356, Laws of 2020.30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $784,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $25,153,00033
p. 243 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,937,0002
NEW SECTION. Sec. 6325. FOR THE SUPERINTENDENT OF PUBLIC 3
INSTRUCTION4
2019-21 School Seismic Safety Retrofit Program (92000148)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 5006, chapter 356, Laws of 2020.8
Reappropriation:9
State Building Construction Account— State. . . . . . . $1,759,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,481,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,240,00013
NEW SECTION. Sec. 6326. FOR THE SUPERINTENDENT OF PUBLIC 14
INSTRUCTION15
2021-23 Distressed Schools (92000917)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 5010, chapter 296, Laws of 2022.19
Reappropriation:20
State Building Construction Account— State. . . . . . $10,228,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,192,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,420,00024
NEW SECTION. Sec. 6327. FOR THE SUPERINTENDENT OF PUBLIC 25
INSTRUCTION26
2021-23 School Seismic Safety Grant Program (5933) (92000923)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 5008, chapter 296, Laws of 2022.30
Reappropriation:31
State Building Construction Account— State. . . . . . $98,450,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,550,00033
p. 244 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,0002
NEW SECTION. Sec. 6328. FOR THE SUPERINTENDENT OF PUBLIC 3
INSTRUCTION4
2022 Small District and Tribal Compact Schools Modernization 5
(92000925)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 5011, chapter 296, Laws of 2022.9
Reappropriation:10
State Building Construction Account— State. . . . . . . $1,962,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,650,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,612,00014
NEW SECTION. Sec. 6329. FOR THE SUPERINTENDENT OF PUBLIC 15
INSTRUCTION16
2023-25 Distressed Schools (92000928)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 5012, chapter 375, Laws of 2024.20
Reappropriation:21
State Building Construction Account— State. . . . . . $30,524,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,591,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,115,00025
NEW SECTION. Sec. 6330. FOR THE SUPERINTENDENT OF PUBLIC 26
INSTRUCTION27
2023-25 Agricultural Science in Schools Grant to FFA Foundation 28
(92000931)29
Reappropriation:30
State Building Construction Account— State. . . . . . . . . $2,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,998,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00034
p. 245 SB 5195
NEW SECTION. Sec. 6331. FOR THE SUPERINTENDENT OF PUBLIC 1
INSTRUCTION2
2024 School Construction Assistance Program Enhancement 3
(92001066)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 5013, chapter 375, Laws of 2024.7
Reappropriation:8
Common School Construction Fund— State. . . . . . . . $12,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,000,00012
NEW SECTION. Sec. 6332. FOR THE STATE SCHOOL FOR THE BLIND13
2023-25 Campus Preservation (Minor Works) (40000021)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $1,000,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,600,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,600,00019
NEW SECTION. Sec. 6333. FOR THE CENTER FOR DEAF AND HARD OF 20
HEARING YOUTH21
Academic and Physical Education Building (30000036)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 5009, chapter 298, Laws of 2018.25
Reappropriation:26
State Building Construction Account— State. . . . . . . $2,400,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $65,129,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $67,529,00030
NEW SECTION. Sec. 6334. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 31
HISTORIC PRESERVATION32
2021-23 Heritage Barn Grants (40000005)33
p. 246 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $385,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $615,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0005
NEW SECTION. Sec. 6335. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 6
HISTORIC PRESERVATION7
2021-23 Historic County Courthouse Rehabilitation Program 8
(40000006)9
The reappropriation in this section is subject to the following 10
conditions and limitations: The reappropriation is subject to the 11
provisions of section 1144, chapter 332, Laws of 2021.12
Reappropriation:13
State Building Construction Account— State. . . . . . . $1,501,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . $361,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,862,00017
NEW SECTION. Sec. 6336. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 18
HISTORIC PRESERVATION19
2021-23 Historic Cemetery Grant Program (40000007)20
Reappropriation:21
State Building Construction Account— State. . . . . . . . $67,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $233,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00025
NEW SECTION. Sec. 6337. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 26
HISTORIC PRESERVATION27
2021-23 Historic Theater Capital Grant Program (40000012)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 1146, chapter 332, Laws of 2021.31
Reappropriation:32
State Building Construction Account— State. . . . . . . . $62,00033
p. 247 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $238,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,0003
NEW SECTION. Sec. 6338. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 4
HISTORIC PRESERVATION5
2023-25 Historic County Courthouse Rehabilitation Grant Program 6
(40000015)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 1082, chapter 474, Laws of 2023.10
Reappropriation:11
State Building Construction Account— State. . . . . . . $2,981,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . $181,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,162,00015
NEW SECTION. Sec. 6339. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 16
HISTORIC PRESERVATION17
2023-25 Historic Cemetery Grant Program (40000016)18
Reappropriation:19
State Building Construction Account— State. . . . . . . . $482,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $33,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $515,00023
NEW SECTION. Sec. 6340. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 24
HISTORIC PRESERVATION25
2023-25 Historic Theater Capital Grant Program (40000017)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 1084, chapter 474, Laws of 2023.29
Reappropriation:30
State Building Construction Account— State. . . . . . . . $473,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $42,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 248 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $515,0001
NEW SECTION. Sec. 6341. FOR THE DEPARTMENT OF ARCHAEOLOGY AND 2
HISTORIC PRESERVATION3
2023-25 Heritage Barn Grant Program (40000018)4
Reappropriation:5
State Building Construction Account— State. . . . . . . . $941,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $59,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0009
NEW SECTION. Sec. 6342. FOR THE UNIVERSITY OF WASHINGTON10
Anderson Hall Renovation (20091002)11
Reappropriation:12
State Building Construction Account— State. . . . . . $23,455,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,395,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,850,00016
NEW SECTION. Sec. 6343. FOR THE UNIVERSITY OF WASHINGTON17
Magnuson Health Sciences Phase II - Renovation/Replacement 18
(40000049)19
Reappropriation:20
State Building Construction Account— State. . . . . . $48,436,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $15,564,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $64,000,00024
NEW SECTION. Sec. 6344. FOR THE UNIVERSITY OF WASHINGTON25
UW Clean Energy Testbeds (40000098)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 5015, chapter 296, Laws of 2022.29
Reappropriation:30
Climate Commitment Account— State. . . . . . . . . . . $5,936,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,564,00032
p. 249 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,500,0002
NEW SECTION. Sec. 6345. FOR THE UNIVERSITY OF WASHINGTON3
Intellectual House - Phase 2 (40000100)4
Reappropriation:5
State Building Construction Account— State. . . . . . . $9,000,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,0009
NEW SECTION. Sec. 6346. FOR THE UNIVERSITY OF WASHINGTON10
UW Tacoma - Land Acquisition (40000101)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $7,700,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,700,00016
NEW SECTION. Sec. 6347. FOR THE UNIVERSITY OF WASHINGTON17
UW Seattle - Asset Preservation (Minor Works) 23-25 (40000103)18
Reappropriation:19
University of Washington Building Account— State. . . $27,887,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,509,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $37,396,00023
NEW SECTION. Sec. 6348. FOR THE UNIVERSITY OF WASHINGTON24
UW Bothell - Asset Preservation (Minor Works) 23-25 (40000129)25
Reappropriation:26
University of Washington Building Account— State. . . . $3,345,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $550,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,895,00030
NEW SECTION. Sec. 6349. FOR THE UNIVERSITY OF WASHINGTON31
UW Tacoma - Asset Preservation (Minor Works) 23-25 (40000131)32
p. 250 SB 5195
Reappropriation:1
University of Washington Building Account— State. . . . $1,571,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,663,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,234,0005
NEW SECTION. Sec. 6350. FOR THE UNIVERSITY OF WASHINGTON6
Infrastructure Renewal (40000132)7
Reappropriation:8
Climate Commitment Account— State. . . . . . . . . . . $12,342,0009
University of Washington Building Account— State. . . . $9,082,00010
Subtotal Reappropriation. . . . . . . . . . . . . $21,424,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,751,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,175,00014
NEW SECTION. Sec. 6351. FOR THE UNIVERSITY OF WASHINGTON15
FY24 Energy Renewal Program (40000147)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 5019, chapter 375, Laws of 2024.19
Reappropriation:20
Climate Commitment Account— State. . . . . . . . . . . $38,900,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,900,00024
NEW SECTION. Sec. 6352. FOR THE UNIVERSITY OF WASHINGTON25
Ctr for Advanced Materials and Clean Energy Research Test Beds 26
(91000016)27
Reappropriation:28
State Building Construction Account— State. . . . . . $11,693,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $17,307,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,000,00032
p. 251 SB 5195
NEW SECTION. Sec. 6353. FOR THE UNIVERSITY OF WASHINGTON1
UWMC NW - Campus Behavioral Health Renovation (91000027)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 5055, chapter 332, Laws of 2021.5
Reappropriation:6
State Building Construction Account— State. . . . . . $12,039,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,961,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00010
NEW SECTION. Sec. 6354. FOR WASHINGTON STATE UNIVERSITY11
Minor Capital Preservation 2023-25 (MCR) (40000340)12
Reappropriation:13
Washington State University Building Account— 14
State. . . . . . . . . . . . . . . . . . . . . . . $1,000,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $40,000,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,000,00018
NEW SECTION. Sec. 6355. FOR WASHINGTON STATE UNIVERSITY19
New Engineering Student Success Building & Infrastructure 20
(40000342)21
Reappropriation:22
State Building Construction Account— State. . . . . . . $2,500,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $37,500,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00026
NEW SECTION. Sec. 6356. FOR WASHINGTON STATE UNIVERSITY27
Knott Dairy Infrastructure (40000343)28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $250,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,750,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00033
p. 252 SB 5195
NEW SECTION. Sec. 6357. FOR WASHINGTON STATE UNIVERSITY1
Bustad Renovation (SIM for Vet Teaching Anatomy) (40000344)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $250,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,750,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,0007
NEW SECTION. Sec. 6358. FOR WASHINGTON STATE UNIVERSITY8
Eastlick-Abelson Renovation (40000362)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $250,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,750,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $22,000,00014
NEW SECTION. Sec. 6359. FOR WASHINGTON STATE UNIVERSITY15
Decarbonization Planning (91000043)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 5021, chapter 375, Laws of 2024.19
Reappropriation:20
Climate Commitment Account— State. . . . . . . . . . . $2,500,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00024
NEW SECTION. Sec. 6360. FOR WASHINGTON STATE UNIVERSITY25
Knott Dairy Center Digester (92001132)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 5022, chapter 375, Laws of 2024.29
Reappropriation:30
Climate Commitment Account— State. . . . . . . . . . . $9,500,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 253 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0001
NEW SECTION. Sec. 6361. FOR EASTERN WASHINGTON UNIVERSITY2
Science Renovation (30000507)3
Reappropriation:4
State Building Construction Account— State. . . . . . $58,344,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $52,943,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $111,287,0008
NEW SECTION. Sec. 6362. FOR EASTERN WASHINGTON UNIVERSITY9
Infrastructure Renewal III (40000070)10
Reappropriation:11
State Building Construction Account— State. . . . . . . $2,147,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,853,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00015
NEW SECTION. Sec. 6363. FOR EASTERN WASHINGTON UNIVERSITY16
Sports and Recreation Center Energy Improvements (40000112)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 5023, chapter 375, Laws of 2024.20
Reappropriation:21
Climate Commitment Account— State. . . . . . . . . . . $9,998,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,998,00025
NEW SECTION. Sec. 6364. FOR EASTERN WASHINGTON UNIVERSITY26
Infrastructure Renewal IV (40000114)27
Reappropriation:28
State Building Construction Account— State. . . . . . . $9,349,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,651,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,000,00032
p. 254 SB 5195
NEW SECTION. Sec. 6365. FOR EASTERN WASHINGTON UNIVERSITY1
Minor Works: Preservation 2023-25 (40000116)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $3,683,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,692,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,375,0007
NEW SECTION. Sec. 6366. FOR EASTERN WASHINGTON UNIVERSITY8
Minor Works: Program 2023-25 (40000120)9
Reappropriation:10
Eastern Washington University Capital Projects11
Account— State. . . . . . . . . . . . . . . . . . . $3,795,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,205,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00015
NEW SECTION. Sec. 6367. FOR EASTERN WASHINGTON UNIVERSITY16
Preventative Maintenance/Backlog Reduction (40000134)17
Reappropriation:18
Eastern Washington University Capital Projects19
Account— State. . . . . . . . . . . . . . . . . . . . $831,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,386,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,217,00023
NEW SECTION. Sec. 6368. FOR EASTERN WASHINGTON UNIVERSITY24
HB 1390 – District Energy Systems (91000027)25
Reappropriation:26
Climate Commitment Account— State. . . . . . . . . . . . $146,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $54,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00030
NEW SECTION. Sec. 6369. FOR CENTRAL WASHINGTON UNIVERSITY31
Nutrition Science (30000456)32
p. 255 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $217,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $59,363,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $59,580,0005
NEW SECTION. Sec. 6370. FOR CENTRAL WASHINGTON UNIVERSITY6
Arts Education (30000836)7
Reappropriation:8
State Building Construction Account— State. . . . . . . . $41,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . $259,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00012
NEW SECTION. Sec. 6371. FOR CENTRAL WASHINGTON UNIVERSITY13
Health Education (40000009)14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $145,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $62,060,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,205,00019
NEW SECTION. Sec. 6372. FOR CENTRAL WASHINGTON UNIVERSITY20
Electrical Grid Security (40000121)21
Reappropriation:22
Central Washington University Capital Projects23
Account— State. . . . . . . . . . . . . . . . . . . . $60,00024
State Building Construction Account— State. . . . . . . . $60,00025
Subtotal Reappropriation. . . . . . . . . . . . . . $120,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,388,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,508,00029
NEW SECTION. Sec. 6373. FOR CENTRAL WASHINGTON UNIVERSITY30
Multicultural Center (40000123)31
Reappropriation:32
p. 256 SB 5195
State Building Construction Account— State. . . . . . . $5,226,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . $774,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,0004
NEW SECTION. Sec. 6374. FOR CENTRAL WASHINGTON UNIVERSITY5
Minor Works Preservation 2023-2025 (40000128)6
Reappropriation:7
Central Washington University Capital Projects 8
Account— State. . . . . . . . . . . . . . . . . . . $1,777,0009
State Building Construction Account— State. . . . . . . . $400,00010
Subtotal Reappropriation. . . . . . . . . . . . . $2,177,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,452,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,629,00014
NEW SECTION. Sec. 6375. FOR CENTRAL WASHINGTON UNIVERSITY15
Minor Works Program 2023 -2025 (40000145)16
Reappropriation:17
Central Washington University Capital Projects18
Account— State. . . . . . . . . . . . . . . . . . . . $814,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $186,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00022
NEW SECTION. Sec. 6376. FOR CENTRAL WASHINGTON UNIVERSITY23
Secondary Geothermal Module (40000161)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 5025, chapter 375, Laws of 2024.27
Reappropriation:28
Climate Commitment Account— State. . . . . . . . . . . $12,464,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,464,00032
NEW SECTION. Sec. 6377. FOR CENTRAL WASHINGTON UNIVERSITY33
p. 257 SB 5195
Science Building Carbon Reduction (40000162)1
The reappropriation in this section is subject to the following 2
conditions and limitations: The reappropriation is subject to the 3
provisions of section 5026, chapter 375, Laws of 2024.4
Reappropriation:5
Climate Commitment Account— State. . . . . . . . . . . $4,509,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $07
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,509,0009
NEW SECTION. Sec. 6378. FOR CENTRAL WASHINGTON UNIVERSITY10
HB 1390 – District Energy Systems (91000024)11
Reappropriation:12
Climate Commitment Account— State. . . . . . . . . . . . $263,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $537,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00016
NEW SECTION. Sec. 6379. FOR THE EVERGREEN STATE COLLEGE17
Seminar I Renovation (30000125)18
Reappropriation:19
State Building Construction Account— State. . . . . . . $5,500,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $22,939,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,439,00023
NEW SECTION. Sec. 6380. FOR THE EVERGREEN STATE COLLEGE24
Minor Works Preservation 2023-25 (40000085)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $500,00027
The Evergreen State College Capital Projects 28
Account— State. . . . . . . . . . . . . . . . . . . $1,500,00029
Subtotal Reappropriation. . . . . . . . . . . . . $2,000,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,090,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,090,00033
p. 258 SB 5195
NEW SECTION. Sec. 6381. FOR WESTERN WASHINGTON UNIVERSITY1
Coast Salish Longhouse (30000912)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 5105, chapter 332, Laws of 2021.5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $750,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,750,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,500,00010
NEW SECTION. Sec. 6382. FOR WESTERN WASHINGTON UNIVERSITY11
Student Development and Success Center (30000919)12
Reappropriation:13
State Building Construction Account— State. . . . . . $45,000,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,175,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,175,00017
NEW SECTION. Sec. 6383. FOR WESTERN WASHINGTON UNIVERSITY18
Environmental Studies Renovation (40000004)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . . $8,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $492,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00024
NEW SECTION. Sec. 6384. FOR WESTERN WASHINGTON UNIVERSITY25
Minor Works - Preservation 2023-25 (40000006)26
Reappropriation:27
Western Washington University Capital Projects28
Account— State. . . . . . . . . . . . . . . . . . . $3,500,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,888,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,388,00032
p. 259 SB 5195
NEW SECTION. Sec. 6385. FOR WESTERN WASHINGTON UNIVERSITY1
Minor Works - Program 2023-25 (40000007)2
Reappropriation:3
Western Washington University Capital Projects 4
Account— State. . . . . . . . . . . . . . . . . . . $1,500,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,500,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,0008
NEW SECTION. Sec. 6386. FOR WESTERN WASHINGTON UNIVERSITY9
Classroom, Lab, and Collaborative Space Upgrades (40000008)10
Reappropriation:11
State Building Construction Account— State. . . . . . . $1,100,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00015
NEW SECTION. Sec. 6387. FOR THE WASHINGTON STATE ARTS 16
COMMISSION17
Creative Districts Capital Construction Projects (30000002)18
Reappropriation:19
State Building Construction Account— State. . . . . . . . $254,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $158,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $412,00023
NEW SECTION. Sec. 6388. FOR THE WASHINGTON STATE ARTS 24
COMMISSION25
2023-25 Creative Districts Capital Projects Program (30000003)26
Reappropriation:27
State Building Construction Account— State. . . . . . . . $408,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $8,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $416,00031
NEW SECTION. Sec. 6389. FOR THE WASHINGTON STATE ARTS 32
COMMISSION33
p. 260 SB 5195
Preserving State-owned Public Art (30000004)1
Reappropriation:2
State Building Construction Account— State. . . . . . . . $735,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $735,0006
NEW SECTION. Sec. 6390. FOR THE WASHINGTON STATE HISTORICAL 7
SOCIETY8
Heritage Capital Grant Projects 2021-2023 (40000099)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $4,837,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,979,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,816,00014
NEW SECTION. Sec. 6391. FOR THE WASHINGTON STATE HISTORICAL 15
SOCIETY16
Preservation - Minor Works 2021-23 (40000136)17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $615,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,082,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,697,00022
NEW SECTION. Sec. 6392. FOR THE WASHINGTON STATE HISTORICAL 23
SOCIETY24
Great Hall Core Exhibit Renewal (40000145)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $926,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,300,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,226,00030
NEW SECTION. Sec. 6393. FOR THE WASHINGTON STATE HISTORICAL 31
SOCIETY32
HERITAGE CAPITAL GRANT PROJECTS 2023-25 (40000150)33
p. 261 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $8,243,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,757,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0005
NEW SECTION. Sec. 6394. FOR THE WASHINGTON STATE HISTORICAL 6
SOCIETY7
Preservation - Minor Works 2023-25 (40000180)8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $875,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $98,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $973,00013
NEW SECTION. Sec. 6395. FOR THE WASHINGTON STATE HISTORICAL 14
SOCIETY15
PROGRAM - MUSEUM AUDIO VISUAL UPGRADES (40000181)16
Reappropriation:17
State Building Construction Account— State. . . . . . . . $75,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . $362,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $437,00021
NEW SECTION. Sec. 6396. FOR THE EASTERN WASHINGTON STATE 22
HISTORICAL SOCIETY23
Campbell and Carriage House Repairs and Restoration (40000017)24
Reappropriation:25
State Building Construction Account— State. . . . . . . . $691,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,265,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,956,00029
NEW SECTION. Sec. 6397. FOR THE EASTERN WASHINGTON STATE 30
HISTORICAL SOCIETY31
Garage & Emergency Exit Concrete Remediation (40000053)32
p. 262 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $2,260,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $118,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,378,0005
NEW SECTION. Sec. 6398. FOR THE EASTERN WASHINGTON STATE 6
HISTORICAL SOCIETY7
Minor Works: Preservation 2023-25 (40000054)8
Reappropriation:9
State Building Construction Account— State. . . . . . . $1,386,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,096,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,482,00013
NEW SECTION. Sec. 6399. FOR THE DEPARTMENT OF ECOLOGY14
Low-Level Nuclear Waste Disposal Trench Closure (19972012)15
The reappropriation in this section is subject to the following 16
conditions and limitations: The reappropriation is subject to the 17
provisions of section 3002, chapter 3, Laws of 2015 3rd sp. sess.18
Reappropriation:19
Site Closure Account— State. . . . . . . . . . . . . . $1,527,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,375,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,902,00023
NEW SECTION. Sec. 6400. FOR THE DEPARTMENT OF ECOLOGY24
Twin Lake Aquifer Recharge Project (20042951)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $128,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $622,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $750,00030
NEW SECTION. Sec. 6401. FOR THE DEPARTMENT OF ECOLOGY31
Transfer of Water Rights for Cabin Owners (20081951)32
p. 263 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $57,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $393,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,0005
NEW SECTION. Sec. 6402. FOR THE DEPARTMENT OF ECOLOGY6
Remedial Action Grant Program (30000216)7
Reappropriation:8
Model Toxics Control Capital Account— State. . . . . . $12,571,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $50,088,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $62,659,00012
NEW SECTION. Sec. 6403. FOR THE DEPARTMENT OF ECOLOGY13
ASARCO - Tacoma Smelter Plume and Mines (30000280)14
Reappropriation:15
Cleanup Settlement Account— State. . . . . . . . . . . $2,071,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $17,856,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,927,00019
NEW SECTION. Sec. 6404. FOR THE DEPARTMENT OF ECOLOGY20
Watershed Plan Implementation and Flow Achievement (30000331)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $857,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,143,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00026
NEW SECTION. Sec. 6405. FOR THE DEPARTMENT OF ECOLOGY27
Dungeness Water Supply & Mitigation (30000333)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3029, chapter 4, Laws of 2017 3rd sp. sess.31
Reappropriation:32
p. 264 SB 5195
State Building Construction Account— State. . . . . . . . $246,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,804,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,050,0004
NEW SECTION. Sec. 6406. FOR THE DEPARTMENT OF ECOLOGY5
ASARCO Cleanup (30000334)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3001, chapter 296, Laws of 2022.9
Reappropriation:10
Cleanup Settlement Account— State. . . . . . . . . . . . $387,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $35,873,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,260,00014
NEW SECTION. Sec. 6407. FOR THE DEPARTMENT OF ECOLOGY15
Eastern Washington Clean Sites Initiative (30000432)16
Reappropriation:17
Model Toxics Control Capital Account— State. . . . . . . $613,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,195,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,808,00021
NEW SECTION. Sec. 6408. FOR THE DEPARTMENT OF ECOLOGY22
Remedial Action Grants (30000458)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 3010, chapter 356, Laws of 2020.26
Reappropriation:27
State Building Construction Account— State. . . . . . . $8,096,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $35,909,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,005,00031
NEW SECTION. Sec. 6409. FOR THE DEPARTMENT OF ECOLOGY32
p. 265 SB 5195
ASARCO Cleanup (30000538)1
Reappropriation:2
Cleanup Settlement Account— State. . . . . . . . . . . . $173,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,788,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,961,0006
NEW SECTION. Sec. 6410. FOR THE DEPARTMENT OF ECOLOGY7
Cleanup Toxics Sites - Puget Sound (30000542)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 3013, chapter 35, Laws of 2016 1st sp. sess.11
Reappropriation:12
Model Toxics Control Capital Account— State. . . . . . $1,426,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,046,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,472,00016
NEW SECTION. Sec. 6411. FOR THE DEPARTMENT OF ECOLOGY17
Sunnyside Valley Irrigation District Water Conservation 18
(30000589)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $1,125,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,930,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,055,00024
NEW SECTION. Sec. 6412. FOR THE DEPARTMENT OF ECOLOGY25
Yakima River Basin Water Supply (30000590)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 3031, chapter 332, Laws of 2021.29
Reappropriation:30
State Taxable Building Construction Account— 31
State. . . . . . . . . . . . . . . . . . . . . . . . $294,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,456,00033
p. 266 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,750,0002
NEW SECTION. Sec. 6413. FOR THE DEPARTMENT OF ECOLOGY3
Watershed Plan Implementation and Flow Achievement (30000591)4
Reappropriation:5
State Building Construction Account— State. . . . . . . . $875,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,125,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0009
NEW SECTION. Sec. 6414. FOR THE DEPARTMENT OF ECOLOGY10
ASARCO Cleanup (30000670)11
Reappropriation:12
Cleanup Settlement Account— State. . . . . . . . . . . $5,255,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $23,505,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,760,00016
NEW SECTION. Sec. 6415. FOR THE DEPARTMENT OF ECOLOGY17
Sunnyside Valley Irrigation District Water Conservation 18
(30000673)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $1,653,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,031,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,684,00024
NEW SECTION. Sec. 6416. FOR THE DEPARTMENT OF ECOLOGY25
2015-17 Restored Eastern Washington Clean Sites Initiative 26
(30000704)27
Reappropriation:28
State Building Construction Account— State. . . . . . . . $314,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,122,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,436,00032
p. 267 SB 5195
NEW SECTION. Sec. 6417. FOR THE DEPARTMENT OF ECOLOGY1
Columbia River Water Supply Development Program (30000712)2
The reappropriations in this section are subject to the following 3
conditions and limitations: The reappropriations are subject to the 4
provisions of section 3006, chapter 298, Laws of 2018.5
Reappropriation:6
Columbia River Basin Water Supply Development 7
Account— State. . . . . . . . . . . . . . . . . . . $3,833,0008
Columbia River Basin Water Supply Revenue 9
Recovery Account— State. . . . . . . . . . . . . . . $689,00010
State Building Construction Account— State. . . . . . . . $712,00011
Subtotal Reappropriation. . . . . . . . . . . . . $5,234,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $28,566,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $33,800,00015
NEW SECTION. Sec. 6418. FOR THE DEPARTMENT OF ECOLOGY16
Watershed Plan Implementation and Flow Achievement (30000714)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 3017, chapter 2, Laws of 2018.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $3,306,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,694,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00025
NEW SECTION. Sec. 6419. FOR THE DEPARTMENT OF ECOLOGY26
Water Irrigation Efficiencies Program (30000740)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 3007, chapter 298, Laws of 2018.30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $204,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,296,00033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
p. 268 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,500,0001
NEW SECTION. Sec. 6420. FOR THE DEPARTMENT OF ECOLOGY2
2017-19 Eastern Washington Clean Sites Initiative (30000742)3
Reappropriation:4
Model Toxics Control Capital Account— State. . . . . . $1,466,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $274,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,740,0008
NEW SECTION. Sec. 6421. FOR THE DEPARTMENT OF ECOLOGY9
2015-17 Restored Clean Up Toxic Sites – Puget Sound (30000763)10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $698,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,998,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,696,00015
NEW SECTION. Sec. 6422. FOR THE DEPARTMENT OF ECOLOGY16
VW Settlement Funded Projects (40000018)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 3008, chapter 298, Laws of 2018.20
Reappropriation:21
General Fund— Private/Local. . . . . . . . . . . . . . $73,602,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $39,098,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $112,700,00025
NEW SECTION. Sec. 6423. FOR THE DEPARTMENT OF ECOLOGY26
Reduce Air Pollution from Transit/Sch. Buses/State-Owned Vehicles 27
(40000109)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3019, chapter 356, Laws of 2020.31
Reappropriation:32
p. 269 SB 5195
Air Pollution Control Account— State. . . . . . . . . . $2,808,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $25,592,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,400,0004
NEW SECTION. Sec. 6424. FOR THE DEPARTMENT OF ECOLOGY5
2019-21 Sunnyside Valley Irrigation District Water Conservation 6
(40000111)7
Reappropriation:8
State Building Construction Account— State. . . . . . . $2,330,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,904,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,234,00012
NEW SECTION. Sec. 6425. FOR THE DEPARTMENT OF ECOLOGY13
2019-21 ASARCO Cleanup (40000114)14
Reappropriation:15
Cleanup Settlement Account— State. . . . . . . . . . . $5,058,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,742,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,800,00019
NEW SECTION. Sec. 6426. FOR THE DEPARTMENT OF ECOLOGY20
2019-21 Centennial Clean Water Program (40000116)21
The reappropriation in this section is subject to the following 22
conditions and limitations: The reappropriation is subject to the 23
provisions of section 3074, chapter 413, Laws of 2019.24
Reappropriation:25
State Building Construction Account— State. . . . . . . $3,255,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,745,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $30,000,00029
NEW SECTION. Sec. 6427. FOR THE DEPARTMENT OF ECOLOGY30
2019-21 Eastern Washington Clean Sites Initiative (40000117)31
Reappropriation:32
p. 270 SB 5195
Model Toxics Control Capital Account— State. . . . . . $11,535,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . $575,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,110,0004
NEW SECTION. Sec. 6428. FOR THE DEPARTMENT OF ECOLOGY5
Padilla Bay Federal Capital Projects (40000127)6
Reappropriation:7
General Fund— Federal. . . . . . . . . . . . . . . . . . $500,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00011
NEW SECTION. Sec. 6429. FOR THE DEPARTMENT OF ECOLOGY12
2019-21 Floodplains by Design (40000129)13
Reappropriation:14
State Building Construction Account— State. . . . . . . $6,651,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $43,749,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,400,00018
NEW SECTION. Sec. 6430. FOR THE DEPARTMENT OF ECOLOGY19
2019-21 Clean Up Toxics Sites – Puget Sound (40000130)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 3080, chapter 413, Laws of 2019.23
Reappropriation:24
Model Toxics Control Capital Account— State. . . . . . $6,035,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,732,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,767,00028
NEW SECTION. Sec. 6431. FOR THE DEPARTMENT OF ECOLOGY29
2019-21 Stormwater Financial Assistance Program (40000144)30
p. 271 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3020, chapter 356, Laws of 2020.3
Reappropriation:4
Model Toxics Control Stormwater Account— State. . . . $15,554,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $33,452,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,006,0008
NEW SECTION. Sec. 6432. FOR THE DEPARTMENT OF ECOLOGY9
2015 Drought Authority (40000146)10
Reappropriation:11
State Drought Preparedness and Response Account— 12
State. . . . . . . . . . . . . . . . . . . . . . . . $657,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $12,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $669,00016
NEW SECTION. Sec. 6433. FOR THE DEPARTMENT OF ECOLOGY17
2019-21 Columbia River Water Supply Development Program 18
(40000152)19
The reappropriations in this section are subject to the following 20
conditions and limitations: The reappropriations are subject to the 21
provisions of section 3087, chapter 413, Laws of 2019.22
Reappropriation:23
Columbia River Basin Water Supply Revenue 24
Recovery Account— State. . . . . . . . . . . . . . $1,518,00025
State Building Construction Account— State. . . . . . . $9,734,00026
State Taxable Building Construction Account— 27
State. . . . . . . . . . . . . . . . . . . . . . . $9,990,00028
Subtotal Reappropriation. . . . . . . . . . . . . $21,242,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $18,758,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00032
NEW SECTION. Sec. 6434. FOR THE DEPARTMENT OF ECOLOGY33
2019-21 Streamflow Restoration Program (40000177)34
p. 272 SB 5195
Reappropriation:1
Watershed Restoration and Enhancement Bond 2
Account— State. . . . . . . . . . . . . . . . . . $19,057,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $20,943,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0006
NEW SECTION. Sec. 6435. FOR THE DEPARTMENT OF ECOLOGY7
2019-21 Yakima River Basin Water Supply (40000179)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 3072, chapter 332, Laws of 2021.11
Reappropriation:12
State Building Construction Account— State. . . . . . . $7,004,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $29,910,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $36,914,00016
NEW SECTION. Sec. 6436. FOR THE DEPARTMENT OF ECOLOGY17
Zosel Dam Preservation (40000193)18
Reappropriation:19
State Building Construction Account— State. . . . . . . . $78,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $139,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $217,00023
NEW SECTION. Sec. 6437. FOR THE DEPARTMENT OF ECOLOGY24
2019-21 Protect Investments in Cleanup Remedies (40000194)25
The reappropriation in this section is subject to the following 26
conditions and limitations: The reappropriation is subject to the 27
provisions of section 6032, chapter 332, Laws of 2021.28
Reappropriation:29
Model Toxics Control Capital Account— State. . . . . . $2,323,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,881,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,204,00033
p. 273 SB 5195
NEW SECTION. Sec. 6438. FOR THE DEPARTMENT OF ECOLOGY1
2019-21 Remedial Action Grants (40000211)2
Reappropriation:3
Model Toxics Control Capital Account— State. . . . . . $26,648,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $22,234,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,882,0007
NEW SECTION. Sec. 6439. FOR THE DEPARTMENT OF ECOLOGY8
2020 Remedial Action Grants (40000288)9
Reappropriation:10
Model Toxics Control Capital Account— State. . . . . . $11,371,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,285,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $32,656,00014
NEW SECTION. Sec. 6440. FOR THE DEPARTMENT OF ECOLOGY15
2021-23 ASARCO Everett Smelter Plume Cleanup (40000303)16
Reappropriation:17
Model Toxics Control Capital Account— State. . . . . . $10,193,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . $621,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,814,00021
NEW SECTION. Sec. 6441. FOR THE DEPARTMENT OF ECOLOGY22
2021-23 Remedial Action Grant Program (40000304)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 3082, chapter 332, Laws of 2021.26
Reappropriation:27
Model Toxics Control Capital Account— State. . . . . . $61,389,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,805,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $71,194,00031
NEW SECTION. Sec. 6442. FOR THE DEPARTMENT OF ECOLOGY32
p. 274 SB 5195
2021-23 Stormwater Financial Assistance Program (40000336)1
Reappropriation:2
Model Toxics Control Stormwater Account— State. . . . $43,889,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,111,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,0006
NEW SECTION. Sec. 6443. FOR THE DEPARTMENT OF ECOLOGY7
2021-23 Eastern Washington Clean Sites Initiative (40000340)8
Reappropriation:9
Model Toxics Control Capital Account— State. . . . . . $19,512,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,308,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,820,00013
NEW SECTION. Sec. 6444. FOR THE DEPARTMENT OF ECOLOGY14
2021-23 Clean Up Toxic Sites – Puget Sound (40000346)15
Reappropriation:16
Model Toxics Control Capital Account— State. . . . . . $3,488,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,320,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,808,00020
NEW SECTION. Sec. 6445. FOR THE DEPARTMENT OF ECOLOGY21
2021-23 Centennial Clean Water Program (40000359)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 3089, chapter 332, Laws of 2021.25
Reappropriation:26
Model Toxics Control Capital Account— State. . . . . . $21,418,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $18,582,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00030
NEW SECTION. Sec. 6446. FOR THE DEPARTMENT OF ECOLOGY31
2021-23 Protect Investments in Cleanup Remedies (40000360)32
p. 275 SB 5195
Reappropriation:1
Model Toxics Control Capital Account— State. . . . . . $8,389,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,704,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,093,0005
NEW SECTION. Sec. 6447. FOR THE DEPARTMENT OF ECOLOGY6
2021-23 Reducing Toxic Wood Stove Emissions (40000371)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 3091, chapter 332, Laws of 2021.10
Reappropriation:11
Model Toxics Control Capital Account— State. . . . . . . . $15,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,985,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00015
NEW SECTION. Sec. 6448. FOR THE DEPARTMENT OF ECOLOGY16
2021-23 Healthy Housing Remediation Program (40000378)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 7050, chapter 474, Laws of 2023.20
Reappropriation:21
Model Toxics Control Capital Account— State. . . . . . $2,959,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,613,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,572,00025
NEW SECTION. Sec. 6449. FOR THE DEPARTMENT OF ECOLOGY26
2021-23 ASARCO Tacoma Smelter Plume Cleanup (40000386)27
Reappropriation:28
Cleanup Settlement Account— State. . . . . . . . . . . $3,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00032
p. 276 SB 5195
NEW SECTION. Sec. 6450. FOR THE DEPARTMENT OF ECOLOGY1
2021-23 Chehalis Basin Strategy (40000387)2
The reappropriation in this section is subject to the following 3
conditions and limitations: The reappropriation is subject to the 4
provisions of section 3096, chapter 332, Laws of 2021.5
Reappropriation:6
State Building Construction Account— State. . . . . . $40,669,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $29,331,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,000,00010
NEW SECTION. Sec. 6451. FOR THE DEPARTMENT OF ECOLOGY11
2021-23 Coastal Wetlands Federal Funds (40000388)12
Reappropriation:13
General Fund— Federal. . . . . . . . . . . . . . . . . $3,695,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,305,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00017
NEW SECTION. Sec. 6452. FOR THE DEPARTMENT OF ECOLOGY18
2021-23 Floodplains by Design (40000389)19
Reappropriation:20
State Building Construction Account— State. . . . . . $19,695,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,213,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,908,00024
NEW SECTION. Sec. 6453. FOR THE DEPARTMENT OF ECOLOGY25
2021-23 Reducing Diesel GHG & Toxic Emissions (40000390)26
Reappropriation:27
Model Toxics Control Capital Account— State. . . . . . $2,405,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,595,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,00031
NEW SECTION. Sec. 6454. FOR THE DEPARTMENT OF ECOLOGY32
p. 277 SB 5195
2021-23 Sunnyside Valley Irrigation District Water Conservation 1
(40000391)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $3,903,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . $378,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,281,0007
NEW SECTION. Sec. 6455. FOR THE DEPARTMENT OF ECOLOGY8
2021-23 Puget Sound Nutrient Reduction Grant Program (40000396)9
The reappropriation in this section is subject to the following 10
conditions and limitations: The reappropriation is subject to the 11
provisions of section 3101, chapter 332, Laws of 2021.12
Reappropriation:13
State Building Construction Account— State. . . . . . . $5,190,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,810,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,000,00017
NEW SECTION. Sec. 6456. FOR THE DEPARTMENT OF ECOLOGY18
2021-23 Streamflow Restoration Program (40000397)19
Reappropriation:20
Watershed Restoration and Enhancement Bond 21
Account— State. . . . . . . . . . . . . . . . . . $31,327,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,673,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00025
NEW SECTION. Sec. 6457. FOR THE DEPARTMENT OF ECOLOGY26
2021-23 Columbia River Water Supply Development Program 27
(40000399)28
The reappropriations in this section are subject to the following 29
conditions and limitations: The reappropriations are subject to the 30
provisions of section 3103, chapter 332, Laws of 2021.31
Reappropriation:32
Columbia River Basin Water Supply Revenue 33
p. 278 SB 5195
Recovery Account— State. . . . . . . . . . . . . . $1,356,0001
State Building Construction Account— State. . . . . . $33,001,0002
Subtotal Reappropriation. . . . . . . . . . . . . $34,357,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,643,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $45,000,0006
NEW SECTION. Sec. 6458. FOR THE DEPARTMENT OF ECOLOGY7
2021-23 Yakima River Basin Water Supply (40000422)8
Reappropriation:9
State Building Construction Account— State. . . . . . $16,127,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $25,873,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,000,00013
NEW SECTION. Sec. 6459. FOR THE DEPARTMENT OF ECOLOGY14
2021-23 Product Replacement Program (40000436)15
Reappropriation:16
Model Toxics Control Capital Account— State. . . . . . $1,681,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,819,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,500,00020
NEW SECTION. Sec. 6460. FOR THE DEPARTMENT OF ECOLOGY21
Pacific Wood Treating Site Cleanup – Cleanup Settlement Account 22
(40000464)23
Reappropriation:24
Cleanup Settlement Account— State. . . . . . . . . . . $2,017,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . $309,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,326,00028
NEW SECTION. Sec. 6461. FOR THE DEPARTMENT OF ECOLOGY29
2022 Clean Up Toxic Sites – Puget Sound (40000465)30
Reappropriation:31
Model Toxics Control Capital Account— State. . . . . . $3,738,00032
p. 279 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $262,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0003
NEW SECTION. Sec. 6462. FOR THE DEPARTMENT OF ECOLOGY4
2022 Community-Based Public-Private Stormwater Partnership 5
(40000470)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3008, chapter 296, Laws of 2022.9
Reappropriation:10
Model Toxics Control Stormwater Account— State. . . . . . $559,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . $441,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00014
NEW SECTION. Sec. 6463. FOR THE DEPARTMENT OF ECOLOGY15
2022 Water Pollution Control Revolving Program (40000473)16
Reappropriation:17
Water Pollution Control Revolving Fund— State. . . . $200,000,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $200,000,00021
NEW SECTION. Sec. 6464. FOR THE DEPARTMENT OF ECOLOGY22
2023-25 Reducing Diesel Greenhouse Gases (GHG) and Toxic Emissions 23
(40000474)24
Reappropriation:25
Model Toxics Control Capital Account— State. . . . . . $15,210,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $422,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,632,00029
NEW SECTION. Sec. 6465. FOR THE DEPARTMENT OF ECOLOGY30
2023-25 Coastal Wetlands Federal Funds (40000475)31
Reappropriation:32
p. 280 SB 5195
General Fund— Federal. . . . . . . . . . . . . . . . . $14,000,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $02
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,0004
NEW SECTION. Sec. 6466. FOR THE DEPARTMENT OF ECOLOGY5
2023-25 Chehalis Basin Strategy (40000476)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3003, chapter 474, Laws of 2023.9
Reappropriation:10
State Building Construction Account— State. . . . . . $63,433,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,567,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,000,00014
NEW SECTION. Sec. 6467. FOR THE DEPARTMENT OF ECOLOGY15
2023-25 Freshwater Aquatic Invasive Plants Grant Program 16
(40000477)17
Reappropriation:18
Freshwater Aquatic Weeds Account— State. . . . . . . . $1,145,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $555,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,700,00022
NEW SECTION. Sec. 6468. FOR THE DEPARTMENT OF ECOLOGY23
2023-25 Freshwater Algae Grant Program (40000478)24
Reappropriation:25
Aquatic Algae Control Account— State. . . . . . . . . . . $584,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $126,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $710,00029
NEW SECTION. Sec. 6469. FOR THE DEPARTMENT OF ECOLOGY30
2023-25 Reducing Toxic Wood Stove Emissions (40000479)31
p. 281 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3006, chapter 474, Laws of 2023.3
Reappropriation:4
Model Toxics Control Capital Account— State. . . . . . $2,273,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,871,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,144,0008
NEW SECTION. Sec. 6470. FOR THE DEPARTMENT OF ECOLOGY9
2023-25 Affordable Housing Cleanup Grant Program (40000480)10
Reappropriation:11
Model Toxics Control Capital Account— State. . . . . . $8,713,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,546,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,259,00015
NEW SECTION. Sec. 6471. FOR THE DEPARTMENT OF ECOLOGY16
2023-25 Product Replacement Program (40000486)17
Reappropriation:18
Model Toxics Control Capital Account— State. . . . . . $5,610,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $890,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,500,00022
NEW SECTION. Sec. 6472. FOR THE DEPARTMENT OF ECOLOGY23
2023-25 Clean Up Toxic Sites – Puget Sound (40000487)24
Reappropriation:25
Model Toxics Control Capital Account— State. . . . . . $7,455,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,455,00029
NEW SECTION. Sec. 6473. FOR THE DEPARTMENT OF ECOLOGY30
2023-25 Remedial Action Grant Program (40000495)31
Reappropriation:32
p. 282 SB 5195
Model Toxics Control Capital Account— State. . . . . $113,462,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,649,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . $115,111,0004
NEW SECTION. Sec. 6474. FOR THE DEPARTMENT OF ECOLOGY5
2023-25 Protect Investments in Cleanup Remedies (40000526)6
Reappropriation:7
Model Toxics Control Capital Account— State. . . . . . $4,450,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,450,00011
NEW SECTION. Sec. 6475. FOR THE DEPARTMENT OF ECOLOGY12
2023-25 ASARCO Everett Smelter Plume Cleanup (40000529)13
Reappropriation:14
Model Toxics Control Capital Account— State. . . . . . $7,279,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $400,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,679,00018
NEW SECTION. Sec. 6476. FOR THE DEPARTMENT OF ECOLOGY19
2023-25 PFAS Contaminated Drinking Water (40000530)20
The reappropriations in this section are subject to the following 21
conditions and limitations: The reappropriations are subject to the 22
provisions of section 3013, chapter 474, Laws of 2023.23
Reappropriation:24
Model Toxics Control Capital Account— State. . . . . . $7,819,00025
State Building Construction Account— State. . . . . . . $1,500,00026
Subtotal Reappropriation. . . . . . . . . . . . . $9,319,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $38,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,357,00030
NEW SECTION. Sec. 6477. FOR THE DEPARTMENT OF ECOLOGY31
2023-25 Eastern Washington Clean Sites Initiative (40000533)32
p. 283 SB 5195
Reappropriation:1
Model Toxics Control Capital Account— State. . . . . . . $828,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $122,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $950,0005
NEW SECTION. Sec. 6478. FOR THE DEPARTMENT OF ECOLOGY6
2023-25 Swift Creek Natural Asbestos Flood Control and Cleanup 7
(40000538)8
Reappropriation:9
State Building Construction Account— State. . . . . . . $2,000,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,000,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00013
NEW SECTION. Sec. 6479. FOR THE DEPARTMENT OF ECOLOGY14
2023-25 Stormwater Financial Assistance Program (40000539)15
Reappropriation:16
Model Toxics Control Stormwater Account— State. . . . $58,899,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,101,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $68,000,00020
NEW SECTION. Sec. 6480. FOR THE DEPARTMENT OF ECOLOGY21
2023-25 Floodplains by Design (40000540)22
Reappropriation:23
Natural Climate Solutions Account— State. . . . . . . $17,234,00024
State Building Construction Account— State. . . . . . $49,029,00025
Subtotal Reappropriation. . . . . . . . . . . . . $66,263,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,129,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $67,392,00029
NEW SECTION. Sec. 6481. FOR THE DEPARTMENT OF ECOLOGY30
2023-25 Sunnyside Valley Irrigation District Water Conservation 31
(40000559)32
p. 284 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $3,246,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,246,0005
NEW SECTION. Sec. 6482. FOR THE DEPARTMENT OF ECOLOGY6
2023-25 Water Pollution Control Revolving Program (40000563)7
Reappropriation:8
Water Pollution Control Revolving Fund— Federal. . . $155,257,0009
Water Pollution Control Revolving Fund— State. . . . $434,910,00010
Subtotal Reappropriation. . . . . . . . . . . . $590,167,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $44,833,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $635,000,00014
NEW SECTION. Sec. 6483. FOR THE DEPARTMENT OF ECOLOGY15
2023-25 Streamflow Restoration Program (40000565)16
Reappropriation:17
Watershed Restoration and Enhancement Bond 18
Account— State. . . . . . . . . . . . . . . . . . $40,000,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00022
NEW SECTION. Sec. 6484. FOR THE DEPARTMENT OF ECOLOGY23
2023-25 Sewer Overflow & Stormwater Reuse Municipal Grants Prog 24
(40000567)25
Reappropriation:26
General Fund— Federal. . . . . . . . . . . . . . . . . $16,700,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,700,00030
NEW SECTION. Sec. 6485. FOR THE DEPARTMENT OF ECOLOGY31
2023-25 Waste Tire Pile Cleanup and Prevention (40000568)32
p. 285 SB 5195
Reappropriation:1
Waste Tire Removal Account— State. . . . . . . . . . . . $346,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $654,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0005
NEW SECTION. Sec. 6486. FOR THE DEPARTMENT OF ECOLOGY6
2023-25 Stormwater Public Private Partnerships (40000569)7
Reappropriation:8
Model Toxics Control Stormwater Account— State. . . . . $2,983,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $17,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00012
NEW SECTION. Sec. 6487. FOR THE DEPARTMENT OF ECOLOGY13
Elevator Restorations at Ecology Facilities (40000570)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $1,735,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,735,00019
NEW SECTION. Sec. 6488. FOR THE DEPARTMENT OF ECOLOGY20
2023-25 Centennial Clean Water Program (40000571)21
Reappropriation:22
Model Toxics Control Capital Account— State. . . . . . $37,586,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,414,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,00026
NEW SECTION. Sec. 6489. FOR THE DEPARTMENT OF ECOLOGY27
2023-25 Yakima River Basin Water Supply (40000572)28
Reappropriation:29
State Building Construction Account— State. . . . . . $48,319,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $681,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
p. 286 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,000,0001
NEW SECTION. Sec. 6490. FOR THE DEPARTMENT OF ECOLOGY2
2023-25 Columbia River Water Supply Development Program 3
(40000583)4
The reappropriations in this section are subject to the following 5
conditions and limitations: The reappropriations are subject to the 6
provisions of section 3001, chapter 375, Laws of 2024.7
Reappropriation:8
Columbia River Basin Water Supply Revenue 9
Recovery Account— State. . . . . . . . . . . . . . $1,500,00010
State Building Construction Account— State. . . . . . $62,311,00011
Subtotal Reappropriation. . . . . . . . . . . . . $63,811,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,389,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,200,00015
NEW SECTION. Sec. 6491. FOR THE DEPARTMENT OF ECOLOGY16
2023-25 Zosel Dam Preservation (40000605)17
Reappropriation:18
State Building Construction Account— State. . . . . . . $5,225,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $324,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,549,00022
NEW SECTION. Sec. 6492. FOR THE DEPARTMENT OF ECOLOGY23
Improving Air Quality in Overburdened Communities Initiative 24
(40000606)25
Reappropriation:26
Air Quality and Health Disparities Improvement27
Account— State. . . . . . . . . . . . . . . . . . $20,966,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $434,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $21,400,00031
NEW SECTION. Sec. 6493. FOR THE DEPARTMENT OF ECOLOGY32
Landfill Methane Capture (40000611)33
p. 287 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3002, chapter 375, Laws of 2024.3
Reappropriation:4
Climate Commitment Account— State. . . . . . . . . . . $14,647,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $353,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,0008
NEW SECTION. Sec. 6494. FOR THE DEPARTMENT OF ECOLOGY9
Padilla Bay Samish Conservation Area (40000612)10
Reappropriation:11
General Fund— Federal. . . . . . . . . . . . . . . . . . $313,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,020,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,333,00015
NEW SECTION. Sec. 6495. FOR THE DEPARTMENT OF ECOLOGY16
Cleanup Settlement Account Projects (40000613)17
Reappropriation:18
Cleanup Settlement Account— State. . . . . . . . . . . $1,689,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $511,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,00022
NEW SECTION. Sec. 6496. FOR THE DEPARTMENT OF ECOLOGY23
Eastside Fire and Rescue Pilot PFAS Cleanup (40000618)24
Reappropriation:25
Model Toxics Control Capital Account— State. . . . . . $2,000,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00029
NEW SECTION. Sec. 6497. FOR THE DEPARTMENT OF ECOLOGY30
Skagit Water (91000347)31
p. 288 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 6326, chapter 474, Laws of 2023.3
Reappropriation:4
State Building Construction Account— State. . . . . . . $1,521,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $979,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,0008
NEW SECTION. Sec. 6498. FOR THE DEPARTMENT OF ECOLOGY9
2021-23 Water Banking (91000373)10
The reappropriations in this section are subject to the following 11
conditions and limitations: The reappropriations are subject to the 12
provisions of section 6027, chapter 375, Laws of 2024.13
Reappropriation:14
State Building Construction Account— State. . . . . . . $3,707,00015
State Drought Preparedness and Response Account— 16
State. . . . . . . . . . . . . . . . . . . . . . . $8,636,00017
Subtotal Reappropriation. . . . . . . . . . . . . $12,343,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,657,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,000,00021
NEW SECTION. Sec. 6499. FOR THE DEPARTMENT OF ECOLOGY22
PSCAA Ultra-fine Particle Monitoring (91000378)23
Reappropriation:24
Air Quality and Health Disparities Improvement25
Account— State. . . . . . . . . . . . . . . . . . . . $41,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $359,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $400,00029
NEW SECTION. Sec. 6500. FOR THE DEPARTMENT OF ECOLOGY30
DDT Soil Remediation Pilot (91000383)31
p. 289 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3038, chapter 474, Laws of 2023.3
Reappropriation:4
Model Toxics Control Capital Account— State. . . . . . $4,855,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $145,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0008
NEW SECTION. Sec. 6501. FOR THE DEPARTMENT OF ECOLOGY9
City of Ruston Contamination Remediation (91000390)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 3005, chapter 375, Laws of 2024.13
Reappropriation:14
Model Toxics Control Capital Account— State. . . . . . $1,109,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,109,00018
NEW SECTION. Sec. 6502. FOR THE DEPARTMENT OF ECOLOGY19
Storm Water Improvements (92000076)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 3016, chapter 35, Laws of 2016 1st sp. sess.23
Reappropriation:24
State Building Construction Account— State. . . . . . . $6,279,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $90,687,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $96,966,00028
NEW SECTION. Sec. 6503. FOR THE DEPARTMENT OF ECOLOGY29
Drought Response (92000142)30
Reappropriation:31
State Drought Preparedness and Response Account— 32
State. . . . . . . . . . . . . . . . . . . . . . . . $812,00033
p. 290 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,911,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,723,0003
NEW SECTION. Sec. 6504. FOR THE DEPARTMENT OF ECOLOGY4
2022 Stormwater Projects (92000195)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 3011, chapter 296, Laws of 2022.8
Reappropriation:9
Model Toxics Control Stormwater Account— State. . . . . $4,855,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,855,00013
NEW SECTION. Sec. 6505. FOR THE DEPARTMENT OF ECOLOGY14
North Shore Levee (92000200)15
The reappropriation in this section is subject to the following 16
conditions and limitations: The reappropriation is subject to the 17
provisions of section 3036, chapter 474, Laws of 2023.18
Reappropriation:19
State Building Construction Account— State. . . . . . $18,386,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $114,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,500,00023
NEW SECTION. Sec. 6506. FOR THE DEPARTMENT OF ECOLOGY24
2023-25 Drought Response (92000205)25
The reappropriation in this section is subject to the following 26
conditions and limitations: The reappropriation is subject to the 27
provisions of section 3037, chapter 474, Laws of 2023.28
Reappropriation:29
State Building Construction Account— State. . . . . . . $2,720,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $280,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00033
p. 291 SB 5195
NEW SECTION. Sec. 6507. FOR THE DEPARTMENT OF ECOLOGY1
State Parks Relocation to Ecology Headquarters Building 2
(40000718)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $1,608,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $10,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,618,0008
NEW SECTION. Sec. 6508. FOR THE WASHINGTON POLLUTION LIABILITY 9
INSURANCE PROGRAM10
Underground Storage Tank Capital Program Demonstration and Design 11
(30000001)12
The reappropriation in this section is subject to the following 13
conditions and limitations: The reappropriation is subject to the 14
provisions of section 3085, chapter 3, Laws of 2015 3rd sp. sess.15
Reappropriation:16
Pollution Liability Insurance Program Trust 17
Account— State. . . . . . . . . . . . . . . . . . . . $205,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,595,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00021
NEW SECTION. Sec. 6509. FOR THE WASHINGTON POLLUTION LIABILITY 22
INSURANCE PROGRAM23
Underground Storage Tank Capital Financial Assistance Program 24
(30000002)25
Reappropriation:26
Pollution Liability Insurance Agency Underground27
Storage Tank Revolving Account— State. . . . . . . $3,200,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,800,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00031
NEW SECTION. Sec. 6510. FOR THE WASHINGTON POLLUTION LIABILITY 32
INSURANCE PROGRAM33
p. 292 SB 5195
Underground Storage Tank Capital Financing Assistance Pgm 2019-21 1
(30000702)2
Reappropriation:3
Pollution Liability Insurance Agency Underground4
Storage Tank Revolving Account— State. . . . . . . $2,400,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,846,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,246,0008
NEW SECTION. Sec. 6511. FOR THE WASHINGTON POLLUTION LIABILITY 9
INSURANCE PROGRAM10
2021-23 Underground Storage Tank Capital Financial Assistance Pgm 11
(30000705)12
Reappropriation:13
Pollution Liability Insurance Agency Underground14
Storage Tank Revolving Account— State. . . . . . . $5,200,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,067,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,267,00018
NEW SECTION. Sec. 6512. FOR THE WASHINGTON POLLUTION LIABILITY 19
INSURANCE PROGRAM20
2023-25 Underground Storage Tank Capital Financial Assistance Pgm 21
(40000002)22
Reappropriation:23
Pollution Liability Insurance Agency Underground24
Storage Tank Revolving Account— State. . . . . . . $8,000,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,000,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,000,00028
NEW SECTION. Sec. 6513. FOR THE WASHINGTON POLLUTION LIABILITY 29
INSURANCE PROGRAM30
2023-25 Heating Oil Capital Financing Assistance Program 31
(40000003)32
Reappropriation:33
Pollution Liability Insurance Agency Underground34
p. 293 SB 5195
Storage Tank Revolving Account— State. . . . . . . $5,200,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,800,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,0004
NEW SECTION. Sec. 6514. FOR THE WASHINGTON POLLUTION LIABILITY 5
INSURANCE PROGRAM6
Underground Storage Tank Capital Financial Assistance Pgm 2017-19 7
(92000001)8
Reappropriation:9
Pollution Liability Insurance Agency Underground10
Storage Tank Revolving Account— State. . . . . . . $7,000,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,700,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,700,00014
NEW SECTION. Sec. 6515. FOR THE STATE PARKS AND RECREATION 15
COMMISSION16
Fort Flagler - Welcome Center Replacement (30000097)17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $463,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $983,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,446,00022
NEW SECTION. Sec. 6516. FOR THE STATE PARKS AND RECREATION 23
COMMISSION24
Sun Lakes State Park: Dry Falls Campground Renovation (30000305)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $150,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $252,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $402,00030
NEW SECTION. Sec. 6517. FOR THE STATE PARKS AND RECREATION 31
COMMISSION32
Lake Chelan State Park Moorage Dock Pile Replacement (30000416)33
p. 294 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $50,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,317,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,367,0005
NEW SECTION. Sec. 6518. FOR THE STATE PARKS AND RECREATION 6
COMMISSION7
Kopachuck Day Use Development (30000820)8
Reappropriation:9
State Building Construction Account— State. . . . . . . $1,000,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,008,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,008,00013
NEW SECTION. Sec. 6519. FOR THE STATE PARKS AND RECREATION 14
COMMISSION15
Mount Spokane - Maintenance Facility Relocation from Harms Way 16
(30000959)17
Reappropriation:18
State Building Construction Account— State. . . . . . . . $250,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,360,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,610,00022
NEW SECTION. Sec. 6520. FOR THE STATE PARKS AND RECREATION 23
COMMISSION24
Palouse Falls Day Use Area Renovation (30000983)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $200,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $20,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $220,00030
NEW SECTION. Sec. 6521. FOR THE STATE PARKS AND RECREATION 31
COMMISSION32
Statewide New Park (30001019)33
p. 295 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $45,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $268,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $313,0005
NEW SECTION. Sec. 6522. FOR THE STATE PARKS AND RECREATION 6
COMMISSION7
Saltwater - Green Vision Project (40000053)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 3045, chapter 474, Laws of 2023.11
Reappropriation:12
State Building Construction Account— State. . . . . . . . $450,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,00016
NEW SECTION. Sec. 6523. FOR THE STATE PARKS AND RECREATION 17
COMMISSION18
Preservation Minor Works 2019-21 (40000151)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $53,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,394,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,447,00024
NEW SECTION. Sec. 6524. FOR THE STATE PARKS AND RECREATION 25
COMMISSION26
Fort Ebey Replace Campground Restroom (40000186)27
Reappropriation:28
State Building Construction Account— State. . . . . . . . $44,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . $226,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $270,00032
p. 296 SB 5195
NEW SECTION. Sec. 6525. FOR THE STATE PARKS AND RECREATION 1
COMMISSION2
Fort Flagler Historic Theater Restoration (40000188)3
Reappropriation:4
State Building Construction Account— State. . . . . . . . $525,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,038,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,563,0008
NEW SECTION. Sec. 6526. FOR THE STATE PARKS AND RECREATION 9
COMMISSION10
Saint Edward Maintenance Facility (40000218)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $2,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $524,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,524,00016
NEW SECTION. Sec. 6527. FOR THE STATE PARKS AND RECREATION 17
COMMISSION18
Minor Works - Preservation 2021-23 (40000364)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $2,446,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,554,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,00024
NEW SECTION. Sec. 6528. FOR THE STATE PARKS AND RECREATION 25
COMMISSION26
Minor Works - Program 2021-23 (40000365)27
Reappropriation:28
State Building Construction Account— State. . . . . . . . $190,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,746,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,936,00032
p. 297 SB 5195
NEW SECTION. Sec. 6529. FOR THE STATE PARKS AND RECREATION 1
COMMISSION2
Palouse to Cascades Trail - Trail Structure Repairs (40000438)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $1,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $261,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,261,0008
NEW SECTION. Sec. 6530. FOR THE STATE PARKS AND RECREATION 9
COMMISSION10
Fort Worden PDA Energy Efficiency Update (40000457)11
Reappropriation:12
Climate Commitment Account— State. . . . . . . . . . . . $500,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00016
NEW SECTION. Sec. 6531. FOR THE STATE PARKS AND RECREATION 17
COMMISSION18
Lake Sammamish Dock Design & Permitting (40000461)19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $175,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $75,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,00024
NEW SECTION. Sec. 6532. FOR THE STATE PARKS AND RECREATION 25
COMMISSION26
Anderson Lake - New Day Use Facilities and Trail Development 27
(91000441)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3023, chapter 296, Laws of 2022.31
Reappropriation:32
State Building Construction Account— State. . . . . . . . $10,00033
p. 298 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $325,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $335,0003
NEW SECTION. Sec. 6533. FOR THE STATE PARKS AND RECREATION 4
COMMISSION5
2023-25 Capital Preservation Pool (91000443)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3009, chapter 375, Laws of 2024.9
Reappropriation:10
State Building Construction Account— State. . . . . . . $5,000,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $15,382,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,382,00014
NEW SECTION. Sec. 6534. FOR THE STATE PARKS AND RECREATION 15
COMMISSION16
State Parks Capital Preservation Pool (92000014)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 3162, chapter 413, Laws of 2019.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $3,000,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $26,965,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $29,965,00025
NEW SECTION. Sec. 6535. FOR THE STATE PARKS AND RECREATION 26
COMMISSION27
2021-23 State Parks Capital Preservation Pool (92000017)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3025, chapter 296, Laws of 2022.31
Reappropriation:32
State Building Construction Account— State. . . . . . $11,871,00033
p. 299 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $28,379,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,250,0003
NEW SECTION. Sec. 6536. FOR THE STATE PARKS AND RECREATION 4
COMMISSION5
Enhancement of Puget Sound Pump Out Facilities (92001127)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3053, chapter 474, Laws of 2023.9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $500,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . $500,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00014
NEW SECTION. Sec. 6537. FOR THE STATE PARKS AND RECREATION 15
COMMISSION16
2023-25 State Parks Capital Projects Pool (92001128)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3054, chapter 474, Laws of 2023.20
Reappropriation:21
Natural Climate Solutions Account— State. . . . . . . . $1,000,00022
State Building Construction Account— State. . . . . . . $9,877,00023
Subtotal Reappropriation. . . . . . . . . . . . . $10,877,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $14,046,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $24,923,00027
NEW SECTION. Sec. 6538. FOR THE RECREATION AND CONSERVATION 28
OFFICE29
Washington Wildlife Recreation Grants (30000220)30
The reappropriations in this section are subject to the following 31
conditions and limitations: The reappropriations are subject to the 32
provisions of section 3029, chapter 296, Laws of 2022.33
p. 300 SB 5195
Reappropriation:1
Farm and Forest Account— State. . . . . . . . . . . . . . $862,0002
Habitat Conservation Account— State. . . . . . . . . . . $535,0003
Outdoor Recreation Account— State. . . . . . . . . . . $1,099,0004
Riparian Protection Account— State. . . . . . . . . . . . $117,0005
Subtotal Reappropriation. . . . . . . . . . . . . $2,613,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $52,710,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . $55,323,0009
NEW SECTION. Sec. 6539. FOR THE RECREATION AND CONSERVATION 10
OFFICE11
Salmon Recovery Funding Board Programs (30000221)12
The reappropriation in this section is subject to the following 13
conditions and limitations: The reappropriation is subject to the 14
provisions of section 6361, chapter 474, Laws of 2023.15
Reappropriation:16
State Building Construction Account— State. . . . . . . . $982,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $65,363,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,345,00020
NEW SECTION. Sec. 6540. FOR THE RECREATION AND CONSERVATION 21
OFFICE22
Recreational Trails Program (30000229)23
Reappropriation:24
General Fund— Federal. . . . . . . . . . . . . . . . . . $393,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,194,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,587,00028
NEW SECTION. Sec. 6541. FOR THE RECREATION AND CONSERVATION 29
OFFICE30
Salmon Recovery Funding Board Programs (30000408)31
The reappropriations in this section are subject to the following 32
conditions and limitations: The reappropriations are subject to the 33
provisions of section 3070, chapter 2, Laws of 2018.34
p. 301 SB 5195
Reappropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . $14,860,0002
State Building Construction Account— State. . . . . . . . $479,0003
Subtotal Reappropriation. . . . . . . . . . . . . $15,339,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $50,874,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . $66,213,0007
NEW SECTION. Sec. 6542. FOR THE RECREATION AND CONSERVATION 8
OFFICE9
2017-19 Washington Wildlife Recreation Grants (30000409)10
The reappropriations in this section are subject to the following 11
conditions and limitations: The reappropriations are subject to the 12
provisions of section 3034, chapter 296, Laws of 2022.13
Reappropriation:14
Farm and Forest Account— State. . . . . . . . . . . . . $3,769,00015
Habitat Conservation Account— State. . . . . . . . . . $2,889,00016
Outdoor Recreation Account— State. . . . . . . . . . . $3,751,00017
Subtotal Reappropriation. . . . . . . . . . . . . $10,409,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $69,591,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $80,000,00021
NEW SECTION. Sec. 6543. FOR THE RECREATION AND CONSERVATION 22
OFFICE23
Boating Facilities Program (30000410)24
The reappropriation in this section is subject to the following 25
conditions and limitations: The reappropriation is subject to the 26
provisions of section 3072, chapter 2, Laws of 2018.27
Reappropriation:28
Recreation Resources Account— State. . . . . . . . . . $2,127,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,898,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,025,00032
NEW SECTION. Sec. 6544. FOR THE RECREATION AND CONSERVATION 33
OFFICE34
p. 302 SB 5195
Nonhighway Off-Road Vehicle Activities (30000411)1
Reappropriation:2
NOVA Program Account— State. . . . . . . . . . . . . . $2,127,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,068,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,195,0006
NEW SECTION. Sec. 6545. FOR THE RECREATION AND CONSERVATION 7
OFFICE8
Youth Athletic Facilities (30000412)9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $202,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,875,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,077,00014
NEW SECTION. Sec. 6546. FOR THE RECREATION AND CONSERVATION 15
OFFICE16
Aquatic Lands Enhancement Account (30000413)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3037, chapter 296, Laws of 2022.20
Reappropriation:21
Aquatic Lands Enhancement Account— State. . . . . . . . . $498,00022
State Building Construction Account— State. . . . . . . $1,413,00023
Subtotal Reappropriation. . . . . . . . . . . . . $1,911,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,374,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,285,00027
NEW SECTION. Sec. 6547. FOR THE RECREATION AND CONSERVATION 28
OFFICE29
Puget Sound Acquisition and Restoration (30000414)30
Reappropriation:31
State Building Construction Account— State. . . . . . . $2,118,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $37,882,00033
p. 303 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,000,0002
NEW SECTION. Sec. 6548. FOR THE RECREATION AND CONSERVATION 3
OFFICE4
Puget Sound Estuary and Salmon Restoration Program (30000415)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $871,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,129,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,00010
NEW SECTION. Sec. 6549. FOR THE RECREATION AND CONSERVATION 11
OFFICE12
Firearms and Archery Range Recreation (30000416)13
Reappropriation:14
Firearms Range Account— State. . . . . . . . . . . . . . $255,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $558,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $813,00018
NEW SECTION. Sec. 6550. FOR THE RECREATION AND CONSERVATION 19
OFFICE20
Washington Coastal Restoration Initiative (30000420)21
The reappropriation in this section is subject to the following 22
conditions and limitations: The reappropriation is subject to the 23
provisions of section 3082, chapter 2, Laws of 2018.24
Reappropriation:25
State Building Construction Account— State. . . . . . . . $500,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,000,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,500,00029
NEW SECTION. Sec. 6551. FOR THE RECREATION AND CONSERVATION 30
OFFICE31
Family Forest Fish Passage Program (40000001)32
Reappropriation:33
p. 304 SB 5195
State Building Construction Account— State. . . . . . . . $52,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,948,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0004
NEW SECTION. Sec. 6552. FOR THE RECREATION AND CONSERVATION 5
OFFICE6
2019-21 - Washington Wildlife Recreation Grants (40000002)7
The reappropriations in this section are subject to the following 8
conditions and limitations: The reappropriations are subject to the 9
provisions of section 3200, chapter 413, Laws of 2019.10
Reappropriation:11
Farm and Forest Account— State. . . . . . . . . . . . . $3,906,00012
Habitat Conservation Account— State. . . . . . . . . . $10,941,00013
Outdoor Recreation Account— State. . . . . . . . . . . $2,677,00014
Subtotal Reappropriation. . . . . . . . . . . . . $17,524,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $67,476,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $85,000,00018
NEW SECTION. Sec. 6553. FOR THE RECREATION AND CONSERVATION 19
OFFICE20
2019-21 - Salmon Recovery Funding Board Programs (40000004)21
The reappropriations in this section are subject to the following 22
conditions and limitations: The reappropriations are subject to the 23
provisions of section 3201, chapter 413, Laws of 2019.24
Reappropriation:25
General Fund— Federal. . . . . . . . . . . . . . . . . $3,230,00026
State Building Construction Account— State. . . . . . . $3,067,00027
Subtotal Reappropriation. . . . . . . . . . . . . $6,297,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $68,703,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $75,000,00031
NEW SECTION. Sec. 6554. FOR THE RECREATION AND CONSERVATION 32
OFFICE33
2019-21 - Boating Facilities Program (40000005)34
p. 305 SB 5195
Reappropriation:1
Recreation Resources Account— State. . . . . . . . . . $4,864,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $13,008,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,872,0005
NEW SECTION. Sec. 6555. FOR THE RECREATION AND CONSERVATION 6
OFFICE7
2019-21 - Nonhighway Off-Road Vehicle Activities (40000006)8
Reappropriation:9
NOVA Program Account— State. . . . . . . . . . . . . . $1,061,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,350,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,411,00013
NEW SECTION. Sec. 6556. FOR THE RECREATION AND CONSERVATION 14
OFFICE15
2019-21 - Youth Athletic Facilities (40000007)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 3041, chapter 296, Laws of 2022.19
Reappropriation:20
State Building Construction Account— State. . . . . . . $1,905,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,095,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,000,00024
NEW SECTION. Sec. 6557. FOR THE RECREATION AND CONSERVATION 25
OFFICE26
2019-21 - Aquatic Lands Enhancement Account (40000008)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 3202, chapter 332, Laws of 2021.30
Reappropriation:31
State Building Construction Account— State. . . . . . . $1,304,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,296,00033
p. 306 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,600,0002
NEW SECTION. Sec. 6558. FOR THE RECREATION AND CONSERVATION 3
OFFICE4
2019-21 - Puget Sound Acquisition and Restoration (40000009)5
Reappropriation:6
State Building Construction Account— State. . . . . . . $1,598,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $47,909,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $49,507,00010
NEW SECTION. Sec. 6559. FOR THE RECREATION AND CONSERVATION 11
OFFICE12
2019-21 - Puget Sound Estuary and Salmon Restoration Program 13
(40000010)14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $536,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,464,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,00019
NEW SECTION. Sec. 6560. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2019-21 - Washington Coastal Restoration Initiative (40000011)22
The reappropriation in this section is subject to the following 23
conditions and limitations: The reappropriation is subject to the 24
provisions of section 3208, chapter 413, Laws of 2019.25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $267,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,819,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,086,00030
NEW SECTION. Sec. 6561. FOR THE RECREATION AND CONSERVATION 31
OFFICE32
2019-21 - Brian Abbott Fish Barrier Removal Board (40000012)33
p. 307 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3209, chapter 413, Laws of 2019.3
Reappropriation:4
State Building Construction Account— State. . . . . . . $2,115,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $24,376,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,491,0008
NEW SECTION. Sec. 6562. FOR THE RECREATION AND CONSERVATION 9
OFFICE10
2019-21 - Recreational Trails Program (40000014)11
Reappropriation:12
General Fund— Federal. . . . . . . . . . . . . . . . . $1,128,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,872,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00016
NEW SECTION. Sec. 6563. FOR THE RECREATION AND CONSERVATION 17
OFFICE18
2019-21 - Land and Water Conservation Fund (40000016)19
Reappropriation:20
General Fund— Federal. . . . . . . . . . . . . . . . . $1,406,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,594,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00024
NEW SECTION. Sec. 6564. FOR THE RECREATION AND CONSERVATION 25
OFFICE26
2019-21 Family Forest Fish Passage Program (40000017)27
Reappropriation:28
State Building Construction Account— State. . . . . . . . $47,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,953,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00032
p. 308 SB 5195
NEW SECTION. Sec. 6565. FOR THE RECREATION AND CONSERVATION 1
OFFICE2
2021-23 - Washington Wildlife Recreation Grants (40000019)3
The reappropriations in this section are subject to the following 4
conditions and limitations: The reappropriations are subject to the 5
provisions of section 3213, chapter 332, Laws of 2021.6
Reappropriation:7
Farm and Forest Account— State. . . . . . . . . . . . . $7,244,0008
Habitat Conservation Account— State. . . . . . . . . . $22,236,0009
Outdoor Recreation Account— State. . . . . . . . . . . $16,547,00010
Subtotal Reappropriation. . . . . . . . . . . . . $46,027,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $53,973,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $100,000,00014
NEW SECTION. Sec. 6566. FOR THE RECREATION AND CONSERVATION 15
OFFICE16
2021-23 - Salmon Recovery Funding Board Programs (40000021)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3042, chapter 296, Laws of 2022.20
Reappropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . . $32,722,00022
State Building Construction Account— State. . . . . . . $5,424,00023
Subtotal Reappropriation. . . . . . . . . . . . . $38,146,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $56,854,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $95,000,00027
NEW SECTION. Sec. 6567. FOR THE RECREATION AND CONSERVATION 28
OFFICE29
2021-23 - Boating Facilities Program (40000023)30
Reappropriation:31
Recreation Resources Account— State. . . . . . . . . . $6,267,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,683,00033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,950,00035
p. 309 SB 5195
NEW SECTION. Sec. 6568. FOR THE RECREATION AND CONSERVATION 1
OFFICE2
2021-23 - Nonhighway Off-Road Vehicle Activities (40000025)3
Reappropriation:4
NOVA Program Account— State. . . . . . . . . . . . . . $1,677,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,323,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0008
NEW SECTION. Sec. 6569. FOR THE RECREATION AND CONSERVATION 9
OFFICE10
2021-23 - Youth Athletic Facilities (40000027)11
The reappropriation in this section is subject to the following 12
conditions and limitations: The reappropriation is subject to the 13
provisions of section 3217, chapter 332, Laws of 2021.14
Reappropriation:15
State Building Construction Account— State. . . . . . . $2,743,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,484,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,227,00019
NEW SECTION. Sec. 6570. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2021-23 - Aquatic Lands Enhancement Account (40000029)22
The reappropriations in this section are subject to the following 23
conditions and limitations: The reappropriations are subject to the 24
provisions of section 3048, chapter 296, Laws of 2022.25
Reappropriation:26
Aquatic Lands Enhancement Account— State. . . . . . . . . $88,00027
State Building Construction Account— State. . . . . . . $4,294,00028
Subtotal Reappropriation. . . . . . . . . . . . . $4,382,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,136,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,518,00032
NEW SECTION. Sec. 6571. FOR THE RECREATION AND CONSERVATION 33
OFFICE34
p. 310 SB 5195
2021-23 - Puget Sound Acquisition and Restoration (40000031)1
Reappropriation:2
State Building Construction Account— State. . . . . . $25,138,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $27,669,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . $52,807,0006
NEW SECTION. Sec. 6572. FOR THE RECREATION AND CONSERVATION 7
OFFICE8
2021-23 - Washington Coastal Restoration Initiative (40000033)9
The reappropriation in this section is subject to the following 10
conditions and limitations: The reappropriation is subject to the 11
provisions of section 3220, chapter 332, Laws of 2021.12
Reappropriation:13
State Building Construction Account— State. . . . . . . $1,317,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,996,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,313,00017
NEW SECTION. Sec. 6573. FOR THE RECREATION AND CONSERVATION 18
OFFICE19
2021-23 - Brian Abbott Fish Barrier Removal Board (40000035)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 3043, chapter 296, Laws of 2022.23
Reappropriation:24
State Building Construction Account— State. . . . . . $10,672,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,123,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $26,795,00028
NEW SECTION. Sec. 6574. FOR THE RECREATION AND CONSERVATION 29
OFFICE30
2021-23 - Recreational Trails Program (40000039)31
Reappropriation:32
General Fund— Federal. . . . . . . . . . . . . . . . . $1,727,00033
p. 311 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,273,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0003
NEW SECTION. Sec. 6575. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
2021-23 - Boating Infrastructure Grants (40000041)6
Reappropriation:7
General Fund— Federal. . . . . . . . . . . . . . . . . $1,839,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . $361,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,200,00011
NEW SECTION. Sec. 6576. FOR THE RECREATION AND CONSERVATION 12
OFFICE13
2021-23 - Land and Water Conservation Fund (40000043)14
Reappropriation:15
General Fund— Federal. . . . . . . . . . . . . . . . . $10,201,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,799,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00019
NEW SECTION. Sec. 6577. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2021-23 - Puget Sound Estuary and Salmon Restoration Program 22
(40000045)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 3226, chapter 332, Laws of 2021.26
Reappropriation:27
State Building Construction Account— State. . . . . . . $2,412,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $13,296,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,708,00031
NEW SECTION. Sec. 6578. FOR THE RECREATION AND CONSERVATION 32
OFFICE33
p. 312 SB 5195
2021-23 - Community Forest Grant Program (40000047)1
The reappropriation in this section is subject to the following 2
conditions and limitations: The reappropriation is subject to the 3
provisions of section 3227, chapter 332, Laws of 2021.4
Reappropriation:5
State Building Construction Account— State. . . . . . . $4,939,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,360,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . $16,299,0009
NEW SECTION. Sec. 6579. FOR THE RECREATION AND CONSERVATION 10
OFFICE11
2021-23 - Outdoor Recreation Equity (40000049)12
The reappropriation in this section is subject to the following 13
conditions and limitations: The reappropriation is subject to the 14
provisions of section 3203, chapter 332, Laws of 2021.15
Reappropriation:16
State Building Construction Account— State. . . . . . . . $550,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,450,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00020
NEW SECTION. Sec. 6580. FOR THE RECREATION AND CONSERVATION 21
OFFICE22
2023-25 Washington Wildlife Recreation Program (40000053)23
The reappropriations in this section are subject to the following 24
conditions and limitations: The reappropriations are subject to the 25
provisions of section 3018, chapter 375, Laws of 2024.26
Reappropriation:27
Farm and Forest Account— State. . . . . . . . . . . . . $7,349,00028
Habitat Conservation Account— State. . . . . . . . . . $49,763,00029
Outdoor Recreation Account— State. . . . . . . . . . . $40,218,00030
Subtotal Reappropriation. . . . . . . . . . . . . $97,330,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $22,670,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,000,00034
p. 313 SB 5195
NEW SECTION. Sec. 6581. FOR THE RECREATION AND CONSERVATION 1
OFFICE2
2023-25 Salmon Recovery Funding Board Grant Programs (40000054)3
The reappropriations in this section are subject to the following 4
conditions and limitations: The reappropriations are subject to the 5
provisions of section 3012, chapter 375, Laws of 2024.6
Reappropriation:7
General Fund— Federal. . . . . . . . . . . . . . . . . $68,900,0008
Natural Climate Solutions Account— State. . . . . . . $25,000,0009
State Building Construction Account— State. . . . . . $12,830,00010
Subtotal Reappropriation. . . . . . . . . . . . $106,730,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $13,270,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $120,000,00014
NEW SECTION. Sec. 6582. FOR THE RECREATION AND CONSERVATION 15
OFFICE16
2023-25 Boating Facilities Program (40000055)17
Reappropriation:18
Recreation Resources Account— State. . . . . . . . . . $8,791,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,009,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,800,00022
NEW SECTION. Sec. 6583. FOR THE RECREATION AND CONSERVATION 23
OFFICE24
2023-25 Nonhighway and Off-Road Vehicle Activities (40000056)25
Reappropriation:26
NOVA Program Account— State. . . . . . . . . . . . . . $10,077,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,986,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,063,00030
NEW SECTION. Sec. 6584. FOR THE RECREATION AND CONSERVATION 31
OFFICE32
2023-25 Firearms and Archery Range Recreation (40000057)33
Reappropriation:34
p. 314 SB 5195
Firearms Range Account— State. . . . . . . . . . . . . . $547,0001
Prior Biennia (Expenditures). . . . . . . . . . . . . . $160,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $707,0004
NEW SECTION. Sec. 6585. FOR THE RECREATION AND CONSERVATION 5
OFFICE6
2023-25 Youth Athletics Facilities (40000058)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 3017, chapter 375, Laws of 2024.10
Reappropriation:11
Youth Athletic Facility Nonappropriated Account— 12
State. . . . . . . . . . . . . . . . . . . . . . . $8,839,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,601,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,440,00016
NEW SECTION. Sec. 6586. FOR THE RECREATION AND CONSERVATION 17
OFFICE18
2023-25 Aquatic Lands Enhancement Account (40000059)19
The reappropriations in this section are subject to the following 20
conditions and limitations: The reappropriations are subject to the 21
provisions of section 3061, chapter 474, Laws of 2023.22
Reappropriation:23
Aquatic Lands Enhancement Account— State. . . . . . . . $3,117,00024
State Building Construction Account— State. . . . . . . $2,216,00025
Subtotal Reappropriation. . . . . . . . . . . . . $5,333,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $525,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,858,00029
NEW SECTION. Sec. 6587. FOR THE RECREATION AND CONSERVATION 30
OFFICE31
2023-25 Community Forest Grant Program (40000060)32
p. 315 SB 5195
The reappropriations in this section are subject to the following 1
conditions and limitations: The reappropriations are subject to the 2
provisions of section 3013, chapter 375, Laws of 2024.3
Reappropriation:4
Natural Climate Solutions Account— State. . . . . . . . $5,770,0005
State Building Construction Account— State. . . . . . . $3,411,0006
Subtotal Reappropriation. . . . . . . . . . . . . $9,181,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,396,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,577,00010
NEW SECTION. Sec. 6588. FOR THE RECREATION AND CONSERVATION 11
OFFICE12
2023-25 Puget Sound Acquisition and Restoration (40000061)13
The reappropriations in this section are subject to the following 14
conditions and limitations: The reappropriations are subject to the 15
provisions of section 3063, chapter 474, Laws of 2023.16
Reappropriation:17
Natural Climate Solutions Account— State. . . . . . . $10,115,00018
State Building Construction Account— State. . . . . . $21,978,00019
Subtotal Reappropriation. . . . . . . . . . . . . $32,093,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $27,072,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $59,165,00023
NEW SECTION. Sec. 6589. FOR THE RECREATION AND CONSERVATION 24
OFFICE25
2023-25 Estuary and Salmon Restoration Program (40000062)26
The reappropriations in this section are subject to the following 27
conditions and limitations: The reappropriations are subject to the 28
provisions of section 3016, chapter 375, Laws of 2024.29
Reappropriation:30
Natural Climate Solutions Account— State. . . . . . . $11,110,00031
State Building Construction Account— State. . . . . . . $8,337,00032
Subtotal Reappropriation. . . . . . . . . . . . . $19,447,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,972,00034
p. 316 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,419,0002
NEW SECTION. Sec. 6590. FOR THE RECREATION AND CONSERVATION 3
OFFICE4
2023-25 Washington Coastal Restoration and Resiliency Initiative 5
(40000063)6
The reappropriations in this section are subject to the following 7
conditions and limitations: The reappropriations are subject to the 8
provisions of section 3014, chapter 375, Laws of 2024.9
Reappropriation:10
Natural Climate Solutions Account— State. . . . . . . . $7,928,00011
State Building Construction Account— State. . . . . . . $7,275,00012
Subtotal Reappropriation. . . . . . . . . . . . . $15,203,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,859,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $18,062,00016
NEW SECTION. Sec. 6591. FOR THE RECREATION AND CONSERVATION 17
OFFICE18
2023-25 Brian Abbott Fish Barrier Removal Board (40000064)19
The reappropriations in this section are subject to the following 20
conditions and limitations: The reappropriations are subject to the 21
provisions of section 3015, chapter 375, Laws of 2024.22
Reappropriation:23
Natural Climate Solutions Account— State. . . . . . . $36,369,00024
State Building Construction Account— State. . . . . . $21,738,00025
Subtotal Reappropriation. . . . . . . . . . . . . $58,107,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $12,498,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . $70,605,00029
NEW SECTION. Sec. 6592. FOR THE RECREATION AND CONSERVATION 30
OFFICE31
2023-25 Recreational Trails Program (40000065)32
Reappropriation:33
General Fund— Federal. . . . . . . . . . . . . . . . . $4,893,00034
p. 317 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $107,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0003
NEW SECTION. Sec. 6593. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
2023-25 Boating Infrastructure Grants (40000066)6
Reappropriation:7
General Fund— Federal. . . . . . . . . . . . . . . . . $4,281,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . $719,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00011
NEW SECTION. Sec. 6594. FOR THE RECREATION AND CONSERVATION 12
OFFICE13
2023-25 Land and Water Conservation Fund (40000067)14
Reappropriation:15
General Fund— Federal. . . . . . . . . . . . . . . . . $19,785,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . $215,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . $20,000,00019
NEW SECTION. Sec. 6595. FOR THE RECREATION AND CONSERVATION 20
OFFICE21
2023-25 Family Forest Fish Passage Program (40000068)22
Reappropriation:23
Natural Climate Solutions Account— State. . . . . . . . $4,104,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,676,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,780,00027
NEW SECTION. Sec. 6596. FOR THE RECREATION AND CONSERVATION 28
OFFICE29
2021-23 Salmon Recovery Investment from Operating (40000069)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 7053, chapter 474, Laws of 2023.33
p. 318 SB 5195
Reappropriation:1
Salmon Recovery Account— State. . . . . . . . . . . . $33,772,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,228,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,0005
NEW SECTION. Sec. 6597. FOR THE RECREATION AND CONSERVATION 6
OFFICE7
2021-23 Grants For Watershed Projects from Operating (40000070)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 7054, chapter 474, Laws of 2023.11
Reappropriation:12
Salmon Recovery Account— State. . . . . . . . . . . . $13,686,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,314,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00016
NEW SECTION. Sec. 6598. FOR THE RECREATION AND CONSERVATION 17
OFFICE18
2021-23 Duckabush Estuary Restoration Project from Operating 19
(40000071)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 7055, chapter 474, Laws of 2023.23
Reappropriation:24
Salmon Recovery Account— State. . . . . . . . . . . . $25,000,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00028
NEW SECTION. Sec. 6599. FOR THE RECREATION AND CONSERVATION 29
OFFICE30
Planning for Recreation Access Grants (40000503)31
Reappropriation:32
State Building Construction Account— State. . . . . . . $2,739,00033
p. 319 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,261,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,0003
NEW SECTION. Sec. 6600. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
Coastal Restoration Grants (91000448)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3177, chapter 3, Laws of 2015 3rd sp. sess.9
Reappropriation:10
State Building Construction Account— State. . . . . . . . $272,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,913,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,185,00014
NEW SECTION. Sec. 6601. FOR THE RECREATION AND CONSERVATION 15
OFFICE16
Upper Quinault River Restoration Project (91000958)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 3072, chapter 474, Laws of 2023.20
Reappropriation:21
State Building Construction Account— State. . . . . . . $1,105,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,895,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00025
NEW SECTION. Sec. 6602. FOR THE RECREATION AND CONSERVATION 26
OFFICE27
Fish Barrier Removal Projects in Skagit County (91001662)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3046, chapter 296, Laws of 2022.31
Reappropriation:32
State Building Construction Account— State. . . . . . . $1,097,00033
p. 320 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $903,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,0003
NEW SECTION. Sec. 6603. FOR THE RECREATION AND CONSERVATION 4
OFFICE5
Salmon Recovery Funding Board: Riparian Grant Program (91001679)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3074, chapter 474, Laws of 2023.9
Reappropriation:10
Natural Climate Solutions Account— State. . . . . . . $24,650,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . $350,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,000,00014
NEW SECTION. Sec. 6604. FOR THE RECREATION AND CONSERVATION 15
OFFICE16
Recreation & Conservation Office Recreation Grants (92000131)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3049, chapter 356, Laws of 2020.20
Reappropriation:21
Outdoor Recreation Account— State. . . . . . . . . . . . $273,00022
State Building Construction Account— State. . . . . . . $2,966,00023
Subtotal Reappropriation. . . . . . . . . . . . . $3,239,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,542,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . $34,781,00027
NEW SECTION. Sec. 6605. FOR THE RECREATION AND CONSERVATION 28
OFFICE29
Community Outdoor Athletic Facilities Program (92000458)30
The reappropriations in this section are subject to the following 31
conditions and limitations: The reappropriations are subject to the 32
provisions of section 3076, chapter 474, Laws of 2023.33
p. 321 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $5,600,0002
Youth Athletic Facility Nonappropriated Account— 3
State. . . . . . . . . . . . . . . . . . . . . . . $6,443,0004
Subtotal Reappropriation. . . . . . . . . . . . . $12,043,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $457,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,500,0008
NEW SECTION. Sec. 6606. FOR THE RECREATION AND CONSERVATION 9
OFFICE10
City of LaCenter Breezee Creek Culvert Replacement (92000461)11
Reappropriation:12
State Building Construction Account— State. . . . . . . $1,000,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00016
NEW SECTION. Sec. 6607. FOR THE CONSERVATION COMMISSION17
Match for Federal RCPP Program (30000017)18
The reappropriation in this section is subject to the following 19
conditions and limitations: The reappropriation is subject to the 20
provisions of section 3033, chapter 35, Laws of 2016 1st sp. sess.21
Reappropriation:22
General Fund— Federal. . . . . . . . . . . . . . . . . $1,369,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,506,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,875,00026
NEW SECTION. Sec. 6608. FOR THE CONSERVATION COMMISSION27
2019-21 Water Irrigation Efficiencies Program (40000009)28
The reappropriation in this section is subject to the following 29
conditions and limitations: The reappropriation is subject to the 30
provisions of section 3224, chapter 413, Laws of 2019.31
Reappropriation:32
State Building Construction Account— State. . . . . . . . $356,00033
p. 322 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,644,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0003
NEW SECTION. Sec. 6609. FOR THE CONSERVATION COMMISSION4
2021-23 Conservation Reserve Enhancement Program (CREP) 5
(40000013)6
The reappropriation in this section is subject to the following 7
conditions and limitations: The reappropriation is subject to the 8
provisions of section 3241, chapter 332, Laws of 2021.9
Reappropriation:10
State Building Construction Account— State. . . . . . . $2,977,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,023,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00014
NEW SECTION. Sec. 6610. FOR THE CONSERVATION COMMISSION15
2021-23 Water Irrigation Efficiencies Program (40000014)16
Reappropriation:17
State Building Construction Account— State. . . . . . . $2,000,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00021
NEW SECTION. Sec. 6611. FOR THE CONSERVATION COMMISSION22
2021-23 Conservation Reserve Enhancement Program (CREP) PIP Loan 23
(40000015)24
Reappropriation:25
Conservation Assistance Revolving Account— State. . . . . $160,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $160,00029
NEW SECTION. Sec. 6612. FOR THE CONSERVATION COMMISSION30
2021-23 Regional Conservation Partnership Program (RCPP) Match 31
(40000017)32
p. 323 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . $3,849,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,151,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $7,000,0005
NEW SECTION. Sec. 6613. FOR THE CONSERVATION COMMISSION6
2023-25 VSP Project Funding (40000021)7
Reappropriation:8
State Building Construction Account— State. . . . . . . . $46,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,954,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00012
NEW SECTION. Sec. 6614. FOR THE CONSERVATION COMMISSION13
2023-25 Natural Resource Investment for the Economy & Environment 14
(40000022)15
Reappropriation:16
State Building Construction Account— State. . . . . . . $3,425,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . $575,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,00020
NEW SECTION. Sec. 6615. FOR THE CONSERVATION COMMISSION21
2023-25 Conservation Reserve Enhancement Program (CREP) 22
(40000023)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 3019, chapter 375, Laws of 2024.26
Reappropriation:27
State Building Construction Account— State. . . . . . . $6,000,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00031
NEW SECTION. Sec. 6616. FOR THE CONSERVATION COMMISSION32
p. 324 SB 5195
2023-25 Farmland Protection and Land Access (40000024)1
Reappropriation:2
State Building Construction Account— State. . . . . . . $3,934,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $66,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,000,0006
NEW SECTION. Sec. 6617. FOR THE CONSERVATION COMMISSION7
2023-25 Irrigation Efficiencies (40000025)8
The reappropriation in this section is subject to the following 9
conditions and limitations: The reappropriation is subject to the 10
provisions of section 3082, chapter 474, Laws of 2023.11
Reappropriation:12
State Building Construction Account— State. . . . . . . $2,500,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,500,00016
NEW SECTION. Sec. 6618. FOR THE CONSERVATION COMMISSION17
2023-25 Regional Conservation Partnership Program (RCPP) 18
(40000026)19
The reappropriation in this section is subject to the following 20
conditions and limitations: The reappropriation is subject to the 21
provisions of section 3083, chapter 474, Laws of 2023.22
Reappropriation:23
State Building Construction Account— State. . . . . . . $3,000,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00027
NEW SECTION. Sec. 6619. FOR THE CONSERVATION COMMISSION28
2023-25 Conservation Reserve Enhancement Program (CREP) PIP 29
(40000027)30
Reappropriation:31
Conservation Assistance Revolving Account— State. . . . . $100,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $033
p. 325 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $100,0002
NEW SECTION. Sec. 6620. FOR THE CONSERVATION COMMISSION3
2023-25 Washington Shrubsteppe Restoration & Resiliency Initiativ 4
(40000028)5
Reappropriation:6
State Building Construction Account— State. . . . . . . . $448,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,052,0008
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00010
NEW SECTION. Sec. 6621. FOR THE CONSERVATION COMMISSION11
2023-25 Improve Shellfish Growing Areas (40000029)12
Reappropriation:13
State Building Construction Account— State. . . . . . . $2,806,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . . $694,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,500,00017
NEW SECTION. Sec. 6622. FOR THE CONSERVATION COMMISSION18
2021-23 Conservation Reserve Enhancement from Operating 19
(40000038)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 7057, chapter 474, Laws of 2023.23
Reappropriation:24
Salmon Recovery Account— State. . . . . . . . . . . . . $5,000,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00028
NEW SECTION. Sec. 6623. FOR THE CONSERVATION COMMISSION29
2023-25 Alternative Manure Management (40000052)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 7037 of this act. 33
p. 326 SB 5195
Reappropriation:1
Climate Commitment Account— State. . . . . . . . . . . $2,900,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,900,0005
NEW SECTION. Sec. 6624. FOR THE CONSERVATION COMMISSION6
2019-21 CREP Riparian Cost Share - State Match (91000017)7
Reappropriation:8
State Building Construction Account— State. . . . . . . . $279,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,521,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,800,00012
NEW SECTION. Sec. 6625. FOR THE CONSERVATION COMMISSION13
Riparian Restoration with Landowners (91000020)14
The reappropriations in this section are subject to the following 15
conditions and limitations: The reappropriations are subject to the 16
provisions of section 7056, chapter 474, Laws of 2023.17
Reappropriation:18
Natural Climate Solutions Account— State. . . . . . . $24,253,00019
Salmon Recovery Account— State. . . . . . . . . . . . . $1,853,00020
Subtotal Reappropriation. . . . . . . . . . . . . $26,106,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,894,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $35,000,00024
NEW SECTION. Sec. 6626. FOR THE CONSERVATION COMMISSION25
Anaerobic Digester Development (91001830)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 3020, chapter 375, Laws of 2024.29
Reappropriation:30
Climate Commitment Account— State. . . . . . . . . . . $11,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
p. 327 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,000,0001
NEW SECTION. Sec. 6627. FOR THE CONSERVATION COMMISSION2
Natural Resource Investment for the Economy & Environment 2017-19 3
(92000011)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 3090, chapter 2, Laws of 2018.7
Reappropriation:8
General Fund— Federal. . . . . . . . . . . . . . . . . $1,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,00012
NEW SECTION. Sec. 6628. FOR THE CONSERVATION COMMISSION13
Voluntary Stewardship Program (92000016)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $1,357,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,643,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00019
NEW SECTION. Sec. 6629. FOR THE CONSERVATION COMMISSION20
Whitman County Fire Recovery (92000017)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $454,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . $507,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $961,00026
NEW SECTION. Sec. 6630. FOR THE CONSERVATION COMMISSION27
Skagit County Voluntary Stewardship (92001497)28
Reappropriation:29
State Building Construction Account— State. . . . . . . . $826,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . $174,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
p. 328 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0001
NEW SECTION. Sec. 6631. FOR THE DEPARTMENT OF FISH AND WILDLIFE2
Deschutes Watershed Center (20062008)3
Reappropriation:4
State Building Construction Account— State. . . . . . . $1,701,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . $15,994,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $17,695,0008
NEW SECTION. Sec. 6632. FOR THE DEPARTMENT OF FISH AND WILDLIFE9
Migratory Waterfowl Habitat (20082045)10
Reappropriation:11
Limited Fish and Wildlife Account— State. . . . . . . . $1,243,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,194,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,437,00015
NEW SECTION. Sec. 6633. FOR THE DEPARTMENT OF FISH AND WILDLIFE16
Mitigation Projects and Dedicated Funding (20082048)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3236, chapter 413, Laws of 2019.20
Reappropriation:21
Fish, Wildlife, and Conservation Account— State. . . . . $201,00022
General Fund— Federal. . . . . . . . . . . . . . . . . $20,374,00023
General Fund— Private/Local. . . . . . . . . . . . . . $2,999,00024
Limited Fish and Wildlife Account— State. . . . . . . . $1,279,00025
Special Wildlife Account— Federal. . . . . . . . . . . $2,846,00026
Special Wildlife Account— Private/Local. . . . . . . . $3,343,00027
Subtotal Reappropriation. . . . . . . . . . . . . $31,042,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $94,679,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $125,721,00031
NEW SECTION. Sec. 6634. FOR THE DEPARTMENT OF FISH AND WILDLIFE32
Eells Springs Hatchery Renovation (30000214)33
p. 329 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $57,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,436,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,493,0005
NEW SECTION. Sec. 6635. FOR THE DEPARTMENT OF FISH AND WILDLIFE6
Samish Hatchery Intakes (30000276)7
Reappropriation:8
State Building Construction Account— State. . . . . . . . $163,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $8,569,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,732,00012
NEW SECTION. Sec. 6636. FOR THE DEPARTMENT OF FISH AND WILDLIFE13
Wooten Wildlife Area Improve Flood Plain (30000481)14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $324,00016
General Fund— Federal. . . . . . . . . . . . . . . . . $5,700,00017
Subtotal Reappropriation. . . . . . . . . . . . . $6,024,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,676,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,700,00021
NEW SECTION. Sec. 6637. FOR THE DEPARTMENT OF FISH AND WILDLIFE22
2023-25 Cooperative Elk Damage Fencing (30000662)23
The reappropriation in this section is subject to the following 24
conditions and limitations: The reappropriation is subject to the 25
provisions of section 3243, chapter 413, Laws of 2019.26
Reappropriation:27
State Building Construction Account— State. . . . . . . . $293,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,307,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,600,00031
NEW SECTION. Sec. 6638. FOR THE DEPARTMENT OF FISH AND WILDLIFE32
p. 330 SB 5195
Puget Sound and Adjacent Waters Nearshore Restoration - Match 1
(30000753)2
Reappropriation:3
General Fund— Federal. . . . . . . . . . . . . . . . . . $500,0004
State Building Construction Account— State. . . . . . . . $272,0005
Subtotal Reappropriation. . . . . . . . . . . . . . $772,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . $228,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,000,0009
NEW SECTION. Sec. 6639. FOR THE DEPARTMENT OF FISH AND WILDLIFE10
Snow Creek Reconstruct Facility (30000826)11
The reappropriation in this section is subject to the following 12
conditions and limitations: The reappropriation is subject to the 13
provisions of section 3057, chapter 356, Laws of 2020.14
Reappropriation:15
State Building Construction Account— State. . . . . . . . $241,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . $895,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,136,00019
NEW SECTION. Sec. 6640. FOR THE DEPARTMENT OF FISH AND WILDLIFE20
Forks Creek Hatchery - Renovate Intake and Diversion (30000827)21
Reappropriation:22
State Building Construction Account— State. . . . . . . $1,115,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,257,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,372,00026
NEW SECTION. Sec. 6641. FOR THE DEPARTMENT OF FISH AND WILDLIFE27
Hurd Creek - Relocate Facilities out of Floodplain (30000830)28
Reappropriation:29
State Building Construction Account— State. . . . . . . $1,206,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $11,392,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,598,00033
p. 331 SB 5195
NEW SECTION. Sec. 6642. FOR THE DEPARTMENT OF FISH AND WILDLIFE1
Dungeness Hatchery - Replace Main Intake (30000844)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $288,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,114,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,402,0007
NEW SECTION. Sec. 6643. FOR THE DEPARTMENT OF FISH AND WILDLIFE8
PSNERP Match (30000846)9
Reappropriation:10
General Fund— Federal. . . . . . . . . . . . . . . . . $40,563,00011
State Building Construction Account— State. . . . . . . . $369,00012
Subtotal Reappropriation. . . . . . . . . . . . . $40,932,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,155,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,087,00016
NEW SECTION. Sec. 6644. FOR THE DEPARTMENT OF FISH AND WILDLIFE17
Kalama Falls Hatchery Replace Raceways and PA System (30000848)18
Reappropriation:19
State Building Construction Account— State. . . . . . . . $216,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $600,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $816,00023
NEW SECTION. Sec. 6645. FOR THE DEPARTMENT OF FISH AND WILDLIFE24
Wiley Slough Dike Raising (40000004)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $654,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,799,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,453,00030
NEW SECTION. Sec. 6646. FOR THE DEPARTMENT OF FISH AND WILDLIFE31
Elochoman Hatchery Demolition and Restoration (40000024)32
p. 332 SB 5195
Reappropriation:1
General Fund— Federal. . . . . . . . . . . . . . . . . . $250,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $250,0005
NEW SECTION. Sec. 6647. FOR THE DEPARTMENT OF FISH AND WILDLIFE6
Region 1 Office - Construct Secure Storage (40000087)7
Reappropriation:8
State Building Construction Account— State. . . . . . . . $56,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $94,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $150,00012
NEW SECTION. Sec. 6648. FOR THE DEPARTMENT OF FISH AND WILDLIFE13
Minor Works Preservation 21-23 (40000089)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $1,813,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,177,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,990,00019
NEW SECTION. Sec. 6649. FOR THE DEPARTMENT OF FISH AND WILDLIFE20
Fish and Wildlife Health and BioSecurity Facility (40000090)21
Reappropriation:22
State Building Construction Account— State. . . . . . . . $535,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . . $349,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $884,00026
NEW SECTION. Sec. 6650. FOR THE DEPARTMENT OF FISH AND WILDLIFE27
Minor Works Program 21-23 (40000092)28
Reappropriation:29
State Building Construction Account— State. . . . . . . $1,326,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,602,00031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
p. 333 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,928,0001
NEW SECTION. Sec. 6651. FOR THE DEPARTMENT OF FISH AND WILDLIFE2
Ringold Hatchery Replace Ponds (40000101)3
Reappropriation:4
General Fund— Federal. . . . . . . . . . . . . . . . . $10,815,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $19,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,834,0008
NEW SECTION. Sec. 6652. FOR THE DEPARTMENT OF FISH AND WILDLIFE9
SRKW - New Cowlitz River Hatchery (40000145)10
Reappropriation:11
State Building Construction Account— State. . . . . . . . $124,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . $176,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00015
NEW SECTION. Sec. 6653. FOR THE DEPARTMENT OF FISH AND WILDLIFE16
SRKW - Kendall Creek Hatchery Modifications (40000146)17
Reappropriation:18
State Building Construction Account— State. . . . . . . $2,594,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,723,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $4,317,00022
NEW SECTION. Sec. 6654. FOR THE DEPARTMENT OF FISH AND WILDLIFE23
SRKW - Voights Creek Hatchery Modifications (40000148)24
Reappropriation:25
State Building Construction Account— State. . . . . . . $3,275,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . $276,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,551,00029
NEW SECTION. Sec. 6655. FOR THE DEPARTMENT OF FISH AND WILDLIFE30
Klickitat WLA - Simcoe Fencing (40000161)31
p. 334 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . . . $249,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . $201,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $450,0005
NEW SECTION. Sec. 6656. FOR THE DEPARTMENT OF FISH AND WILDLIFE6
Taneum Creek Property Acquisition Post Closing Activities 7
(40000162)8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $136,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $64,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00013
NEW SECTION. Sec. 6657. FOR THE DEPARTMENT OF FISH AND WILDLIFE14
Duckabush Estuary Habitat Restoration (40000163)15
The reappropriations in this section are subject to the following 16
conditions and limitations: The reappropriations are subject to the 17
provisions of section 3101, chapter 474, Laws of 2023.18
Reappropriation:19
General Fund— Federal. . . . . . . . . . . . . . . . . $30,000,00020
State Building Construction Account— State. . . . . . $13,197,00021
Subtotal Reappropriation. . . . . . . . . . . . . $43,197,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $803,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,000,00025
NEW SECTION. Sec. 6658. FOR THE DEPARTMENT OF FISH AND WILDLIFE26
Minor Works Preservation 23-25 (40000164)27
Reappropriation:28
State Building Construction Account— State. . . . . . . $8,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,530,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,530,00032
p. 335 SB 5195
NEW SECTION. Sec. 6659. FOR THE DEPARTMENT OF FISH AND WILDLIFE1
Minor Works Programmatic 23-25 (40000178)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $2,035,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . . $815,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,850,0007
NEW SECTION. Sec. 6660. FOR THE DEPARTMENT OF FISH AND WILDLIFE8
Sekiu Boat Ramp Acquisition (40000255)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $2,703,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,703,00014
NEW SECTION. Sec. 6661. FOR THE DEPARTMENT OF FISH AND WILDLIFE15
Upper Columbia River Salmon Reintroduction from Operating 16
(40000266)17
The reappropriation in this section is subject to the following 18
conditions and limitations: The reappropriation is subject to the 19
provisions of section 7058, chapter 474, Laws of 2023.20
Reappropriation:21
Salmon Recovery Account— State. . . . . . . . . . . . . . $161,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,839,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,000,00025
NEW SECTION. Sec. 6662. FOR THE DEPARTMENT OF FISH AND WILDLIFE26
Western Pond Turtle Nest Hill Restoration (91000161)27
The reappropriation in this section is subject to the following 28
conditions and limitations: The reappropriation is subject to the 29
provisions of section 3061, chapter 296, Laws of 2022.30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $140,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $60,00033
p. 336 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,0002
NEW SECTION. Sec. 6663. FOR THE DEPARTMENT OF FISH AND WILDLIFE3
Cooperative Elk and Deer Damage Fencing (91000162)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 3106, chapter 474, Laws of 2023.7
Reappropriation:8
State Building Construction Account— State. . . . . . . $1,033,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . $367,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,400,00012
NEW SECTION. Sec. 6664. FOR THE DEPARTMENT OF FISH AND WILDLIFE13
Tribal Hatcheries (91000163)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 3108, chapter 474, Laws of 2023.17
Reappropriation:18
State Taxable Building Construction Account— 19
State. . . . . . . . . . . . . . . . . . . . . . . $3,250,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $233,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,483,00023
NEW SECTION. Sec. 6665. FOR THE DEPARTMENT OF FISH AND WILDLIFE24
Naches Rearing Ponds (92000049)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $452,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $148,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $600,00030
NEW SECTION. Sec. 6666. FOR THE DEPARTMENT OF FISH AND WILDLIFE31
Shrubsteppe and Rangeland Cooperative Wildlife Fencing (92000050)32
p. 337 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3294, chapter 332, Laws of 2021.3
Reappropriation:4
State Building Construction Account— State. . . . . . . . $590,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $910,0006
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,0008
NEW SECTION. Sec. 6667. FOR THE DEPARTMENT OF FISH AND WILDLIFE9
Recreational Fishing Access on the Grande Ronde River (92000051)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 3064, chapter 296, Laws of 2022.13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $290,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . $210,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $500,00018
NEW SECTION. Sec. 6668. FOR THE DEPARTMENT OF FISH AND WILDLIFE19
Mitchell Act BiOp Implementation (92001251)20
Reappropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . . . $536,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $536,00025
NEW SECTION. Sec. 6669. FOR THE DEPARTMENT OF FISH AND WILDLIFE26
Washougal Intake Replacement (92001252)27
Reappropriation:28
General Fund— Federal. . . . . . . . . . . . . . . . . $14,262,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $12,00030
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $031
TOTAL. . . . . . . . . . . . . . . . . . . . . . $14,274,00032
p. 338 SB 5195
NEW SECTION. Sec. 6670. FOR THE DEPARTMENT OF NATURAL RESOURCES1
Teanaway (40000038)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $200,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,656,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,856,0007
NEW SECTION. Sec. 6671. FOR THE DEPARTMENT OF NATURAL RESOURCES8
2021-23 Forestry Riparian Easement Program (40000077)9
Reappropriation:10
State Building Construction Account— State. . . . . . . $4,474,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,526,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,000,00014
NEW SECTION. Sec. 6672. FOR THE DEPARTMENT OF NATURAL RESOURCES15
2021-23 Road Maintenance and Abandonment Planning (40000092)16
The reappropriation in this section is subject to the following 17
conditions and limitations: The reappropriation is subject to the 18
provisions of section 3303, chapter 332, Laws of 2021.19
Reappropriation:20
State Building Construction Account— State. . . . . . . . $182,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,696,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,878,00024
NEW SECTION. Sec. 6673. FOR THE DEPARTMENT OF NATURAL RESOURCES25
2023-25 Safe and Sustainable Recreation (40000141)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $1,330,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,585,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,915,00031
NEW SECTION. Sec. 6674. FOR THE DEPARTMENT OF NATURAL RESOURCES32
p. 339 SB 5195
Whiteman Cove Restoration (40000143)1
Reappropriation:2
State Building Construction Account— State. . . . . . . $5,251,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,686,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,937,0006
NEW SECTION. Sec. 6675. FOR THE DEPARTMENT OF NATURAL RESOURCES7
Lakebay Marina UST Cleanup (40000144)8
Reappropriation:9
Model Toxics Control Capital Account— State. . . . . . . $998,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $11,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,009,00013
NEW SECTION. Sec. 6676. FOR THE DEPARTMENT OF NATURAL RESOURCES14
Removal of Aquatic Derelict Structures (40000147)15
The reappropriation in this section is subject to the following 16
conditions and limitations: The reappropriation is subject to the 17
provisions of section 3132, chapter 474, Laws of 2023.18
Reappropriation:19
Model Toxics Control Capital Account— State. . . . . . $7,855,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,795,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $9,650,00023
NEW SECTION. Sec. 6677. FOR THE DEPARTMENT OF NATURAL RESOURCES24
2023-25 Structurally Deficient Bridges (40000150)25
Reappropriation:26
State Building Construction Account— State. . . . . . . $1,000,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,062,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,062,00030
NEW SECTION. Sec. 6678. FOR THE DEPARTMENT OF NATURAL RESOURCES31
p. 340 SB 5195
2023-25 Natural Areas Facilities Preservation and Access 1
(40000151)2
Reappropriation:3
State Building Construction Account— State. . . . . . . $2,785,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,307,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,092,0007
NEW SECTION. Sec. 6679. FOR THE DEPARTMENT OF NATURAL RESOURCES8
Revitalizing Trust Land Transfers (40000152)9
The reappropriation in this section is subject to the following 10
conditions and limitations: The reappropriation is subject to the 11
provisions of section 3027, chapter 375, Laws of 2024.12
Reappropriation:13
Natural Climate Solutions Account— State. . . . . . . $10,804,00014
Prior Biennia (Expenditures). . . . . . . . . . . . . $17,325,00015
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $016
TOTAL. . . . . . . . . . . . . . . . . . . . . . $28,129,00017
NEW SECTION. Sec. 6680. FOR THE DEPARTMENT OF NATURAL RESOURCES18
Webster Nursery Seed Plant Replacement (40000153)19
Reappropriation:20
State Building Construction Account— State. . . . . . . $4,500,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,245,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,745,00024
NEW SECTION. Sec. 6681. FOR THE DEPARTMENT OF NATURAL RESOURCES25
2023-25 Minor Works Preservation (40000154)26
Reappropriation:27
Model Toxics Control Capital Account— State. . . . . . . $600,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,443,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,043,00031
NEW SECTION. Sec. 6682. FOR THE DEPARTMENT OF NATURAL RESOURCES32
p. 341 SB 5195
Correction of Fish Barrier Culverts (40000155)1
Reappropriation:2
State Building Construction Account— State. . . . . . . . $454,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . $296,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $750,0006
NEW SECTION. Sec. 6683. FOR THE DEPARTMENT OF NATURAL RESOURCES7
Omak Consolidation, Expansion and Relocation (40000156)8
Reappropriation:9
State Building Construction Account— State. . . . . . . . $200,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,589,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,789,00013
NEW SECTION. Sec. 6684. FOR THE DEPARTMENT OF NATURAL RESOURCES14
Webster Nursery Production Expansion (40000157)15
Reappropriation:16
State Building Construction Account— State. . . . . . . . $50,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . . $613,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $663,00020
NEW SECTION. Sec. 6685. FOR THE DEPARTMENT OF NATURAL RESOURCES21
2023-25 Emergent Environmental Mitigation Projects (40000158)22
Reappropriation:23
Model Toxics Control Capital Account— State. . . . . . . $200,00024
Prior Biennia (Expenditures). . . . . . . . . . . . . . $520,00025
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $026
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $720,00027
NEW SECTION. Sec. 6686. FOR THE DEPARTMENT OF NATURAL RESOURCES28
2023-25 Minor Works Programmatic (40000162)29
Reappropriation:30
State Building Construction Account— State. . . . . . . . $600,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,632,00032
p. 342 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,232,0002
NEW SECTION. Sec. 6687. FOR THE DEPARTMENT OF NATURAL RESOURCES3
Eatonville Work Center and Fire Station (40000163)4
Reappropriation:5
State Building Construction Account— State. . . . . . . . $870,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $10,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $880,0009
NEW SECTION. Sec. 6688. FOR THE DEPARTMENT OF NATURAL RESOURCES10
Forestry Riparian Easement Program from Operating (40000376)11
Reappropriation:12
Salmon Recovery Account— State. . . . . . . . . . . . . $1,241,00013
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,759,00014
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $015
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00016
NEW SECTION. Sec. 6689. FOR THE DEPARTMENT OF NATURAL RESOURCES17
Port Angeles Fire and Seasonal Employee Housing (40000409)18
Reappropriation:19
State Building Construction Account— State. . . . . . . . $300,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . $188,00021
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $022
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $488,00023
NEW SECTION. Sec. 6690. FOR THE DEPARTMENT OF NATURAL RESOURCES24
Drought Resilience Infrastructure Investments (40000411)25
The reappropriations in this section are subject to the following 26
conditions and limitations: The reappropriations are subject to the 27
provisions of section 3031, chapter 375, Laws of 2024.28
Reappropriation:29
Natural Climate Solutions Account— State. . . . . . . . . $400,00030
State Building Construction Account— State. . . . . . . . $250,00031
Subtotal Reappropriation. . . . . . . . . . . . . . $650,00032
p. 343 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . $100,0001
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $750,0003
NEW SECTION. Sec. 6691. FOR THE DEPARTMENT OF NATURAL RESOURCES4
Recreational Target Shooting Pilot Sites (40000413)5
Reappropriation:6
Firearms Range Account— State. . . . . . . . . . . . . . $515,0007
State Building Construction Account— State. . . . . . . . $800,0008
Subtotal Reappropriation. . . . . . . . . . . . . $1,315,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . . $200,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,515,00012
NEW SECTION. Sec. 6692. FOR THE DEPARTMENT OF NATURAL RESOURCES13
YMCA Camp Colman Investments (40000424)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 3033, chapter 375, Laws of 2024.17
Reappropriation:18
State Building Construction Account— State. . . . . . . $3,670,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,670,00022
NEW SECTION. Sec. 6693. FOR THE DEPARTMENT OF NATURAL RESOURCES23
Port of Willapa Harbor Energy Innovation District Grant 24
(91000099)25
Reappropriation:26
State Building Construction Account— State. . . . . . . $1,400,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . $100,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,500,00030
NEW SECTION. Sec. 6694. FOR THE DEPARTMENT OF NATURAL RESOURCES31
Encumbered Lands - Acquisition (91000323)32
p. 344 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 3034, chapter 375, Laws of 2024.3
Reappropriation:4
Natural Climate Solutions Account— State. . . . . . . $15,000,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $15,000,0008
NEW SECTION. Sec. 6695. FOR THE DEPARTMENT OF NATURAL RESOURCES9
Fallen Firefighter Memorial (SHB 2091) (91000328)10
The reappropriation in this section is subject to the following 11
conditions and limitations: The reappropriation is subject to the 12
provisions of section 3036, chapter 375, Laws of 2024.13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $371,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $371,00018
NEW SECTION. Sec. 6696. FOR THE DEPARTMENT OF NATURAL RESOURCES19
Camp Colman Cabin Preservation and Upgrades (92000039)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 3075, chapter 296, Laws of 2022.23
Reappropriation:24
State Building Construction Account— State. . . . . . . $1,301,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . $99,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,400,00028
NEW SECTION. Sec. 6697. FOR THE DEPARTMENT OF NATURAL RESOURCES29
Wildfire Reforestation Grants (92000063)30
The reappropriation in this section is subject to the following 31
conditions and limitations: The reappropriation is subject to the 32
provisions of section 3035, chapter 375, Laws of 2024.33
p. 345 SB 5195
Reappropriation:1
Natural Climate Solutions Account— State. . . . . . . . $8,356,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,644,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,000,0005
NEW SECTION. Sec. 6698. FOR THE DEPARTMENT OF AGRICULTURE6
Agricultural Carbon Storage and Sequestration (40000001)7
The reappropriation in this section is subject to the following 8
conditions and limitations: The reappropriation is subject to the 9
provisions of section 3038, chapter 375, Laws of 2024.10
Reappropriation:11
Natural Climate Solutions Account— State. . . . . . . . $5,000,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $5,000,00015
NEW SECTION. Sec. 6699. FOR THE DEPARTMENT OF AGRICULTURE16
State Lands Assessment (91000011)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 3039, chapter 375, Laws of 2024.20
Reappropriation:21
Climate Commitment Account— State. . . . . . . . . . . . $100,00022
State Taxable Building Construction Account— 23
State. . . . . . . . . . . . . . . . . . . . . . . . $200,00024
Subtotal Reappropriation. . . . . . . . . . . . . . $300,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $300,00028
NEW SECTION. Sec. 6700. FOR THE DEPARTMENT OF AGRICULTURE29
2021-23 WA State Fairs Health and Safety Grants (92000005)30
Reappropriation:31
State Building Construction Account— State. . . . . . . . $490,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,515,00033
p. 346 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,005,0002
NEW SECTION. Sec. 6701. FOR THE DEPARTMENT OF AGRICULTURE3
2023-25 WA State Fairs Health and Safety Grants (92000006)4
Reappropriation:5
State Building Construction Account— State. . . . . . . $5,496,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,504,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,000,0009
NEW SECTION. Sec. 6702. FOR THE STATE BOARD FOR COMMUNITY AND 10
TECHNICAL COLLEGES11
Grays Harbor College: Student Services and Instructional Building 12
(30000127)13
Reappropriation:14
State Building Construction Account— State. . . . . . . . $618,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $47,559,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . . . $48,177,00018
NEW SECTION. Sec. 6703. FOR THE STATE BOARD FOR COMMUNITY AND 19
TECHNICAL COLLEGES20
Clark College: North County Satellite (30000135)21
Reappropriation:22
State Building Construction Account— State. . . . . . $10,417,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $48,501,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . . . $58,918,00026
NEW SECTION. Sec. 6704. FOR THE STATE BOARD FOR COMMUNITY AND 27
TECHNICAL COLLEGES28
Shoreline: Allied Health, Science & Manufacturing Replacement 29
(30000990)30
Reappropriation:31
State Building Construction Account— State. . . . . . . $1,628,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $45,812,00033
p. 347 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . $47,440,0002
NEW SECTION. Sec. 6705. FOR THE STATE BOARD FOR COMMUNITY AND 3
TECHNICAL COLLEGES4
Walla Walla Science and Technology Building Replacement 5
(30001452)6
Reappropriation:7
State Building Construction Account— State. . . . . . . . $36,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,603,0009
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $10,639,00011
NEW SECTION. Sec. 6706. FOR THE STATE BOARD FOR COMMUNITY AND 12
TECHNICAL COLLEGES13
Spokane Falls: Fine and Applied Arts Replacement (30001458)14
The reappropriation in this section is subject to the following 15
conditions and limitations: The reappropriation is subject to the 16
provisions of section 5027, chapter 356, Laws of 2020.17
Reappropriation:18
State Building Construction Account— State. . . . . . . $5,389,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $36,780,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,169,00022
NEW SECTION. Sec. 6707. FOR THE STATE BOARD FOR COMMUNITY AND 23
TECHNICAL COLLEGES24
Lake Washington: Center for Design (40000102)25
Reappropriation:26
State Building Construction Account— State. . . . . . $34,743,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,366,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,109,00030
NEW SECTION. Sec. 6708. FOR THE STATE BOARD FOR COMMUNITY AND 31
TECHNICAL COLLEGES32
Tacoma: Center for Innovative Learning and Engagement (40000104)33
p. 348 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . $14,179,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $28,419,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,598,0005
NEW SECTION. Sec. 6709. FOR THE STATE BOARD FOR COMMUNITY AND 6
TECHNICAL COLLEGES7
Spokane: Apprenticeship Center (40000107)8
Reappropriation:9
State Building Construction Account— State. . . . . . . $3,007,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . $361,00011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,368,00013
NEW SECTION. Sec. 6710. FOR THE STATE BOARD FOR COMMUNITY AND 14
TECHNICAL COLLEGES15
Centralia: Teacher Education and Family Development Center 16
(40000109)17
Reappropriation:18
State Building Construction Account— State. . . . . . . . . $5,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,263,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,268,00022
NEW SECTION. Sec. 6711. FOR THE STATE BOARD FOR COMMUNITY AND 23
TECHNICAL COLLEGES24
Skagit: Library/Culinary Arts Building (40000110)25
Reappropriation:26
State Building Construction Account— State. . . . . . . . $14,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,243,00028
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $029
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,257,00030
NEW SECTION. Sec. 6712. FOR THE STATE BOARD FOR COMMUNITY AND 31
TECHNICAL COLLEGES32
Bates: Fire Service Training Center (40000130)33
p. 349 SB 5195
Reappropriation:1
State Building Construction Account— State. . . . . . $38,224,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,713,0003
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $04
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,937,0005
NEW SECTION. Sec. 6713. FOR THE STATE BOARD FOR COMMUNITY AND 6
TECHNICAL COLLEGES7
Bellevue: Center for Transdisciplinary Learning and Innovation 8
(40000168)9
Reappropriation:10
State Building Construction Account— State. . . . . . $40,424,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $4,357,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $44,781,00014
NEW SECTION. Sec. 6714. FOR THE STATE BOARD FOR COMMUNITY AND 15
TECHNICAL COLLEGES16
Everett: Baker Hall Replacement (40000190)17
Reappropriation:18
State Building Construction Account— State. . . . . . $38,039,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $140,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $38,179,00022
NEW SECTION. Sec. 6715. FOR THE STATE BOARD FOR COMMUNITY AND 23
TECHNICAL COLLEGES24
Wenatchee: Center for Technical Education and Innovation 25
(40000198)26
Reappropriation:27
State Building Construction Account— State. . . . . . $48,209,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $3,244,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $51,453,00031
NEW SECTION. Sec. 6716. FOR THE STATE BOARD FOR COMMUNITY AND 32
TECHNICAL COLLEGES33
p. 350 SB 5195
Renton: Health Sciences Center (40000204)1
Reappropriation:2
State Building Construction Account— State. . . . . . . $3,028,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . $969,0004
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $05
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $3,997,0006
NEW SECTION. Sec. 6717. FOR THE STATE BOARD FOR COMMUNITY AND 7
TECHNICAL COLLEGES8
Shoreline: STE(A)M Education Center (40000214)9
Reappropriation:10
State Building Construction Account— State. . . . . . $37,057,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,674,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $42,731,00014
NEW SECTION. Sec. 6718. FOR THE STATE BOARD FOR COMMUNITY AND 15
TECHNICAL COLLEGES16
Pierce Puyallup: STEM building (40000293)17
Reappropriation:18
State Building Construction Account— State. . . . . . . $2,665,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . $39,304,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . . . $41,969,00022
NEW SECTION. Sec. 6719. FOR THE STATE BOARD FOR COMMUNITY AND 23
TECHNICAL COLLEGES24
Pierce College Olympic South Asbestos Abatement and Restoration 25
(40000516)26
Reappropriation:27
State Building Construction Account— State. . . . . . . $5,657,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . $7,502,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . . $13,159,00031
NEW SECTION. Sec. 6720. FOR THE STATE BOARD FOR COMMUNITY AND 32
TECHNICAL COLLEGES33
p. 351 SB 5195
Minor Works - Facility Repairs (23-25) (40000595)1
The reappropriations in this section are subject to the following 2
conditions and limitations: The reappropriations are subject to the 3
provisions of section 5031, chapter 375, Laws of 2024.4
Reappropriation:5
Community and Technical College Capital Projects6
Account— State. . . . . . . . . . . . . . . . . . . . $224,0007
State Building Construction Account— State. . . . . . . $7,460,0008
Subtotal Reappropriation. . . . . . . . . . . . . $7,684,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,762,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . . . $39,446,00012
NEW SECTION. Sec. 6721. FOR THE STATE BOARD FOR COMMUNITY AND 13
TECHNICAL COLLEGES14
Minor Works - Roof Repairs (23-25) (40000670)15
Reappropriation:16
State Building Construction Account— State. . . . . . . . $485,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $10,722,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . . . $11,207,00020
NEW SECTION. Sec. 6722. FOR THE STATE BOARD FOR COMMUNITY AND 21
TECHNICAL COLLEGES22
Minor Works - Site Repairs (23-25) (40000698)23
The reappropriations in this section are subject to the following 24
conditions and limitations: The reappropriations are subject to the 25
provisions of section 5032, chapter 375, Laws of 2024.26
Reappropriation:27
Community and Technical College Capital Projects28
Account— State. . . . . . . . . . . . . . . . . . . . $254,00029
State Building Construction Account— State. . . . . . . . $500,00030
Subtotal Reappropriation. . . . . . . . . . . . . . $754,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $5,417,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $6,171,00034
p. 352 SB 5195
NEW SECTION. Sec. 6723. FOR THE STATE BOARD FOR COMMUNITY AND 1
TECHNICAL COLLEGES2
Minor Works - Infrastructure Replacement (23-25) (40000721)3
The reappropriations in this section are subject to the following 4
conditions and limitations: The reappropriations are subject to the 5
provisions of section 5033, chapter 375, Laws of 2024.6
Reappropriation:7
Community and Technical College Capital Projects8
Account— State. . . . . . . . . . . . . . . . . . . $1,246,0009
State Building Construction Account— State. . . . . . . $9,332,00010
Subtotal Reappropriation. . . . . . . . . . . . . $10,578,00011
Prior Biennia (Expenditures). . . . . . . . . . . . . $29,722,00012
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $013
TOTAL. . . . . . . . . . . . . . . . . . . . . . $40,300,00014
NEW SECTION. Sec. 6724. FOR THE STATE BOARD FOR COMMUNITY AND 15
TECHNICAL COLLEGES16
Minor Works - Program Improvements (23-25) (40000754)17
The reappropriations in this section are subject to the following 18
conditions and limitations: The reappropriations are subject to the 19
provisions of section 5034, chapter 375, Laws of 2024.20
Reappropriation:21
Community and Technical College Capital Projects22
Account— State. . . . . . . . . . . . . . . . . . . $1,720,00023
State Building Construction Account— State. . . . . . . $2,572,00024
Subtotal Reappropriation. . . . . . . . . . . . . $4,292,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . $48,908,00026
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $027
TOTAL. . . . . . . . . . . . . . . . . . . . . . $53,200,00028
NEW SECTION. Sec. 6725. FOR THE STATE BOARD FOR COMMUNITY AND 29
TECHNICAL COLLEGES30
CBPS SBCTC Statewide: Utility Submeters for Clean Buildings Act 31
(40000878)32
Reappropriation:33
Climate Commitment Account— State. . . . . . . . . . . $8,099,00034
Prior Biennia (Expenditures). . . . . . . . . . . . . . $445,00035
p. 353 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $8,544,0002
NEW SECTION. Sec. 6726. FOR THE STATE BOARD FOR COMMUNITY AND 3
TECHNICAL COLLEGES4
CTC Energy Efficiency Program (40000880)5
The reappropriation in this section is subject to the following 6
conditions and limitations: The reappropriation is subject to the 7
provisions of section 5036, chapter 375, Laws of 2024.8
Reappropriation:9
Climate Commitment Account— State. . . . . . . . . . . $2,000,00010
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $011
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $012
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,000,00013
NEW SECTION. Sec. 6727. FOR THE STATE BOARD FOR COMMUNITY AND 14
TECHNICAL COLLEGES15
Bellingham Technical College: Campus Center Emergency Repairs 16
(40000916)17
Reappropriation:18
Community and Technical College Capital Projects19
Account— State. . . . . . . . . . . . . . . . . . . $5,000,00020
State Building Construction Account— State. . . . . . $14,165,00021
Subtotal Reappropriation. . . . . . . . . . . . . $19,165,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . $219,00023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . $19,384,00025
NEW SECTION. Sec. 6728. FOR THE STATE BOARD FOR COMMUNITY AND 26
TECHNICAL COLLEGES27
HB 1390 - District Energy Systems (91000443)28
Reappropriation:29
Climate Commitment Account— State. . . . . . . . . . . . $907,00030
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $031
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $032
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $907,00033
p. 354 SB 5195
(End of part)
p. 355 SB 5195
PART 71
SUPPLEMENTAL2
Sec. 7001. 2023 c 474 s 6005 (uncodified) is amended to read as 3
follows: 4
FOR THE DEPARTMENT OF COMMERCE5
2017 Local and Community Projects (30000846)6
The reappropriation in this section is subject to the following 7
conditions and limitations: 8
(1) The reappropriation is subject to the provisions of section 9
6004, chapter 4, Laws of 2017 3rd sp. sess. 10
(2) The reappropriation for any project for which the department 11
has not executed a contract by December 31, 2023, shall lapse. The 12
department shall provide a list of lapsed projects to the legislative 13
fiscal committees no later than January 15, 2024. 14
Reappropriation:15
State Building Construction Account— State. . . . . (($1,229,000))16
$645,00017
Prior Biennia (Expenditures). . . . . . . . . . . . . $9,517,00018
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $019
TOTAL. . . . . . . . . . . . . . . . . . . . (($10,746,000))20
$10,162,00021
Sec. 7002. 2023 c 474 s 6014 (uncodified) is amended to read as 22
follows: 23
FOR THE DEPARTMENT OF COMMERCE24
Dental Clinic Capacity Grants (40000007)25
The reappropriation in this section is subject to the following 26
conditions and limitations: The reappropriation is subject to the 27
provisions of section 1002, chapter 356, Laws of 2020.28
Reappropriation:29
State Building Construction Account— State. . . . . . (($978,000))30
$967,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . $14,556,00032
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $033
TOTAL. . . . . . . . . . . . . . . . . . . . (($15,534,000))34
$15,523,00035
p. 356 SB 5195
Sec. 7003. 2024 c 375 s 6012 (uncodified) is amended to read as 1
follows: 2
FOR THE DEPARTMENT OF COMMERCE3
Behavioral Health Community Capacity (40000018)4
The reappropriation in this section is subject to the following 5
conditions and limitations: The reappropriation is subject to the 6
provisions of section 6004, chapter 413, Laws of 2019, except that 7
$416,000 of the appropriation has been moved to section 1009 of this 8
act. 9
Reappropriation:10
State Building Construction Account— State. . . . (($18,747,000))11
$16,173,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . $63,936,00013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . (($82,683,000))15
$80,109,00016
Sec. 7004. 2023 c 474 s 6021 (uncodified) is amended to read as 17
follows: 18
FOR THE DEPARTMENT OF COMMERCE19
2019-21 Youth Recreational Facilities Grant Program (40000041)20
The reappropriation in this section is subject to the following 21
conditions and limitations: The reappropriation is subject to the 22
provisions of section 1034, chapter 413, Laws of 2019.23
Reappropriation:24
State Building Construction Account— State. . . . . (($3,190,000))25
$2,132,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $2,690,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . (($5,880,000))29
$4,822,00030
Sec. 7005. 2023 c 474 s 6023 (uncodified) is amended to read as 31
follows: 32
FOR THE DEPARTMENT OF COMMERCE33
2019-21 Building Communities Fund Program (40000043)34
p. 357 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1036, chapter 413, Laws of 2019.3
Reappropriation:4
State Building Construction Account— State. . . . (($15,255,000))5
$12,319,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . $21,530,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . (($36,785,000))9
$33,849,00010
Sec. 7006. 2023 c 474 s 6024 (uncodified) is amended to read as 11
follows: 12
FOR THE DEPARTMENT OF COMMERCE13
2019-21 Early Learning Facilities (40000044)14
The reappropriations in this section are subject to the following 15
conditions and limitations: The reappropriations are subject to the 16
provisions of section 1006, chapter 356, Laws of 2020.17
Reappropriation:18
Early Learning Facilities Development Account— 19
State. . . . . . . . . . . . . . . . . . . . . (($1,140,000))20
$306,00021
Early Learning Facilities Revolving Account— 22
State. . . . . . . . . . . . . . . . . . . . . . $13,292,00023
State Building Construction Account— State. . . . . . . $3,767,00024
Subtotal Reappropriation. . . . . . . . . . . (($18,199,000))25
$17,365,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,821,00027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . (($35,020,000))29
$34,186,00030
Sec. 7007. 2023 c 474 s 6033 (uncodified) is amended to read as 31
follows: 32
FOR THE DEPARTMENT OF COMMERCE33
2021-23 Youth Recreational Facilities Grant Program (40000139)34
p. 358 SB 5195
The reappropriation in this section is subject to the following 1
conditions and limitations: The reappropriation is subject to the 2
provisions of section 1056, chapter 332, Laws of 2021.3
Reappropriation:4
State Building Construction Account— State. . . . . (($3,019,000))5
$1,222,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . $670,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . (($3,689,000))9
$1,892,00010
Sec. 7008. 2024 c 375 s 1004 (uncodified) is amended to read as 11
follows: 12
FOR THE DEPARTMENT OF COMMERCE13
((2023-25)) Broadband Infrastructure Federal Match Projects 14
(40000290)15
The appropriations in this section are subject to the following 16
conditions and limitations: 17
(1)(a) $50,000,000 of the ((state building construction account — 18
state)) federal broadband account— state appropriation in this section 19
is provided solely as match for federal authority allocated under 20
this section and section 7017 of this act for the statewide broadband 21
office to administer the broadband equity, access, and deployment 22
state grants program in section 60102 of P.L. 117-58 (infrastructure 23
investment and jobs act). Expenditure of the amount in this 24
subsection is contingent on the receipt of this grant funding.25
(b) To the extent permitted by federal law, the office shall 26
provide state match only for projects where the lead applicant is a 27
public or tribal government entity. The office must allocate state 28
match funds in a manner that prioritizes projects based on 29
affordability, fair labor practices, speed to deployment, open 30
access, local and tribal coordination, and the provision of digital 31
navigation services, as outlined in the scoring criteria contained in 32
the plan submitted by the office to the national telecommunications 33
and information administration. 34
(c) The legislature intends to provide sufficient funds to match 35
federal funds available during the 2025-2027 fiscal biennium. To the 36
extent that sufficient funds are not made available, the department 37
p. 359 SB 5195
must secure from subgrantees cash, in-kind, or other eligible forms 1
of match to provide sufficient funds to match federal funds.2
(2) In addition to scoring and weighting criteria established 3
pursuant to the federal broadband equity, access, and deployment 4
program, the state broadband office must establish additional 5
secondary selection criteria, including, but not limited to, criteria 6
that give weight to projects that: 7
(a) Provide open-access wholesale last-mile broadband service for 8
the useful life of the subsidized networks on fair, equal, and 9
neutral terms to all potential retail providers; and10
(b) Demonstrate support from the local government or any tribal 11
government with oversight over the location or locations to be 12
served. 13
(3) The statewide broadband office must include, in the five-year 14
action plan developed using initial planning funds from the broadband 15
equity, access, and deployment program funded under P.L. 117-58 16
(infrastructure investment and jobs act): 17
(a) Consideration of broadband infrastructure projects that use 18
wireless technology in order to expand access at the lowest cost to 19
the most unserved or underserved residents; and 20
(b) Steps the office will take to promote: The use of existing 21
infrastructure; dig-once policies; streamlined permitting processes; 22
and cost-effective access to poles, conduits, easements, and rights-23
of-way. To the extent permitted under federal law, the office must 24
consider creating a pool of grant funds dedicated to pole costs.25
(4) $300,000 of the ((general fund— ))federal broadband account— 26
federal appropriation provided in this section is for a staff 27
position dedicated to advising the statewide broadband office on the 28
availability and feasibility of deploying new and emerging 29
technologies in broadband internet service. 30
Appropriation:31
((General Fund— Federal. . . . . . . . . . . . . . . $245,560,00032
State Building Construction Account— 33
State. . . . . . . . . . . . . . . . . . . . . $50,000,000))34
Federal Broadband Account— Federal. . . . . . . . . . $245,560,00035
Federal Broadband Account— State. . . . . . . . . . . $50,000,00036
Subtotal Appropriation. . . . . . . . . . . . . $295,560,00037
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $038
Future Biennia (Projected Costs). . . . . . . . . $1,132,194,00039
p. 360 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,427,754,0001
Sec. 7009. 2024 c 375 s 1004 (uncodified) is amended to read as 2
follows: 3
FOR THE DEPARTMENT OF COMMERCE4
((2023-25)) Broadband Infrastructure Federal Match Projects 5
(40000290)6
The appropriations in this section are subject to the following 7
conditions and limitations: 8
(1)(a) $50,000,000 of the state building construction account — 9
state appropriation in this section is provided solely as match for 10
federal authority allocated under this section and section 7017 of 11
this act for the statewide broadband office to administer the 12
broadband equity, access, and deployment state grants program in 13
section 60102 of P.L. 117-58 (infrastructure investment and jobs 14
act). Expenditure of the amount in this subsection is contingent on 15
the receipt of this grant funding. 16
(b) To the extent permitted by federal law, the office shall 17
provide state match only for projects where the lead applicant is a 18
public or tribal government entity. The office must allocate state 19
match funds in a manner that prioritizes projects based on 20
affordability, fair labor practices, speed to deployment, open 21
access, local and tribal coordination, and the provision of digital 22
navigation services, as outlined in the scoring criteria contained in 23
the plan submitted by the office to the national telecommunications 24
and information administration. 25
(c) The legislature intends to provide sufficient funds to match 26
federal funds available during the 2025-2027 fiscal biennium. To the 27
extent that sufficient funds are not made available, the department 28
must secure from subgrantees cash, in-kind, or other eligible forms 29
of match to provide sufficient funds to match federal funds.30
(2) In addition to scoring and weighting criteria established 31
pursuant to the federal broadband equity, access, and deployment 32
program, the state broadband office must establish additional 33
secondary selection criteria, including, but not limited to, criteria 34
that give weight to projects that: 35
(a) Provide open-access wholesale last-mile broadband service for 36
the useful life of the subsidized networks on fair, equal, and 37
neutral terms to all potential retail providers; and38
p. 361 SB 5195
(b) Demonstrate support from the local government or any tribal 1
government with oversight over the location or locations to be 2
served. 3
(3) The statewide broadband office must include, in the five-year 4
action plan developed using initial planning funds from the broadband 5
equity, access, and deployment program funded under P.L. 117-58 6
(infrastructure investment and jobs act): 7
(a) Consideration of broadband infrastructure projects that use 8
wireless technology in order to expand access at the lowest cost to 9
the most unserved or underserved residents; and 10
(b) Steps the office will take to promote: The use of existing 11
infrastructure; dig-once policies; streamlined permitting processes; 12
and cost-effective access to poles, conduits, easements, and rights-13
of-way. To the extent permitted under federal law, the office must 14
consider creating a pool of grant funds dedicated to pole costs.15
(4) $300,000 of the general fund — federal appropriation provided 16
in this section is for a staff position dedicated to advising the 17
statewide broadband office on the availability and feasibility of 18
deploying new and emerging technologies in broadband internet 19
service. 20
Appropriation:21
General Fund— Federal. . . . . . . . . . . . . . . . $245,560,00022
State Building Construction Account— 23
State. . . . . . . . . . . . . . . . . . . . . . $50,000,00024
Subtotal Appropriation. . . . . . . . . . . . . $295,560,00025
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $026
Future Biennia (Projected Costs). . . . . . . . . $1,132,194,00027
TOTAL. . . . . . . . . . . . . . . . . . . . . $1,427,754,00028
Sec. 7010. 2024 c 375 s 1005 (uncodified) is amended to read as 29
follows: 30
FOR THE DEPARTMENT OF COMMERCE31
Capital Pre-Development Funding (40000293)32
The appropriation in this section is subject to the following 33
conditions and limitations: Of the amounts provided in this section, 34
$3,800,000 is provided solely for the LETI Incubator for Family 35
Success project in Everett. 36
Appropriation:37
p. 362 SB 5195
State Taxable Building Construction Account— 1
State. . . . . . . . . . . . . . . . . . . . . (($3,800,000))2
$3,783,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . . $20,000,0005
TOTAL. . . . . . . . . . . . . . . . . . . . (($23,800,000))6
$23,783,0007
Sec. 7011. 2024 c 375 s 1007 (uncodified) is amended to read as 8
follows: 9
FOR THE DEPARTMENT OF COMMERCE10
2023-25 Housing Trust Fund (40000295)11
The appropriations in this section are subject to the following 12
conditions and limitations: 13
(1) $180,663,000 of the state taxable building construction 14
account— state appropriation is provided solely for the new 15
construction, acquisition, or rehabilitation of affordable housing 16
projects that serve and benefit low-income and special needs 17
populations including, but not limited to, people with chronic mental 18
illness or behavioral health conditions, farmworkers, people who are 19
homeless, and people in need of permanent supportive housing. The 20
department shall strive to invest at least 20 percent of the 21
appropriation provided under this subsection with by and for 22
organizations, as defined by the office of equity.23
(2) $35,500,000 of the state taxable building construction 24
account— state appropriation and $8,500,000 of the Washington housing 25
trust fund account — state appropriation are provided solely for 26
affordable housing projects that serve and benefit low-income people 27
with developmental or intellectual disabilities. The department must 28
use a separate application form and evaluation criteria for 29
applications under this subsection. The department must coordinate 30
with the department of social and health services regarding any 31
needed supportive services and make efforts to enact the 32
recommendations of the housing needs study for individuals with 33
intellectual and developmental disabilities, as provided in section 34
1068(6), chapter 332, Laws of 2021. 35
(3) (($100,000,000)) $93,000,000 of the state taxable building 36
construction account — state appropriation is provided solely for the 37
apple health and homes rapid permanent supportive housing program 38
p. 363 SB 5195
created in chapter 216, Laws of 2022. Of the amounts provided in this 1
subsection((:2
(a))), $5,000,000 is provided solely for the St. Agnes Haven 3
project in Spokane((; and4
(b) $7,000,000 is provided solely for the CoLead Northgate 5
project in Seattle)). 6
(4) (($60,000,000)) $46,680,000 of the state building 7
construction account — state and $13,320,000 of the state taxable 8
construction account— state appropriations ((is)) are provided solely 9
for awards to organizations eligible under RCW 43.185A.040 for the 10
development of homeownership projects affordable to first-time low-11
income households throughout the state. Projects serving homebuyers 12
whose income is up to 80 percent of the area median income, adjusted 13
for household size, for the county where the property is located are 14
eligible to apply, except that projects located in rural areas of the 15
state, as defined by the department, serving homebuyers whose income 16
is up to 100 percent of the area median income, adjusted for 17
household size, for the county where the property is located are 18
eligible to apply. Eligible activities include, but are not limited 19
to, down payment assistance, closing costs, acquisition, 20
rehabilitation costs, and new construction. Eligible organizations 21
may include those that plan to provide housing to socially 22
disadvantaged communities as defined in 13 C.F.R. Sec. 124.103. The 23
department shall strive to invest at least 50 percent of these funds 24
with by and for organizations, as defined by the office of equity, 25
and make efforts to enact the recommendations of the homeownership 26
disparities work group created in section 128 (100), chapter 297, Laws 27
of 2022. Of the amount provided in this subsection:28
(a) $1,500,000 of the state building construction account — state 29
appropriation is provided solely for the Boulevard Townhomes project; 30
and 31
(b) $248,000 of the state building construction account — state 32
appropriation is provided solely for the Crail Cottages project.33
(5) $25,000,000 of the state building construction account — state 34
appropriation is provided solely for affordable housing preservation 35
projects, which may include, but are not limited to:36
(a) Projects preserving and extending the affordability 37
commitment period for projects in the housing trust fund portfolio. 38
The funds may be provided for major building improvements, 39
p. 364 SB 5195
preservation, and system replacements, necessary for the existing 1
housing trust fund portfolio to maintain long-term viability. The 2
department must require a capital needs assessment be provided prior 3
to contract execution. Funds may not be used to add or expand the 4
capacity of the property. When allocating funds, the department must 5
prioritize buildings that are older than 15 years and that serve very 6
low-income and extremely low-income populations. 7
(b) Projects preserving affordable multifamily housing at risk of 8
losing its affordability due to expiration of use restrictions that 9
otherwise require affordability including, but not limited to, United 10
States department of agriculture funded multifamily housing. The 11
department must prioritize projects that satisfy the goal of long-12
term preservation of Washington's affordable multifamily housing 13
stock, particularly in rural areas of the state. Funds may be used 14
for acquisition or for acquisition and rehabilitation of properties 15
to preserve the affordable housing units beyond their existing use 16
restrictions and keep them in Washington's housing portfolio for a 17
minimum of 40 years. If a capital needs assessment is required, the 18
department must work with the applicant to ensure that this does not 19
create an unnecessary impediment to rapidly accessing these funds.20
(c) The funding provided under this subsection (5) is not subject 21
to the 90-day application periods in RCW 43.185.070 or 43.185A.050.22
(d) The amount awarded under this subsection (5) may not be 23
calculated in award limitations for other housing trust fund awards.24
(6) $14,000,000 of the state ((taxable)) building construction 25
account— state appropriation is provided solely for a grant to the 26
northwest cooperative development center to provide subgrants for the 27
acquisition and preservation of mobile or manufactured home 28
communities. Funding provided under this subsection may be used to 29
acquire mobile or manufactured home communities for the purpose of 30
avoiding household displacement due to sale or other transactions and 31
ensuring preservation of housing affordability for low-income 32
households for a minimum of 40 years. 33
(7) $7,000,000 of the state ((taxable)) building construction 34
account— state appropriation is provided solely for capital 35
improvements to mobile home or manufactured home communities and 36
includes the following: 37
(a) $5,500,000 is provided solely for a grant to the northwest 38
cooperative development center to provide subgrants to organizations 39
that are "mobile home park cooperatives" or "manufactured housing 40
p. 365 SB 5195
cooperatives" under RCW 59.20.030 for completing capital improvement 1
processes. Subgrants provided under this subsection may be used 2
solely for critical improvements, repairs, and infrastructure 3
upgrades to promote the preservation of mobile or manufactured home 4
communities as affordable housing. The grantee must award subgrants 5
based on needs relating to health, safety, and cost; and6
(b) $1,500,000 is provided solely for the Alpine Ridge Utility 7
Upgrades project. 8
(8) (($71,876,000)) (a) $72,876,000 of the state taxable building 9
construction account — state appropriation is provided solely for the 10
following list of projects: 11
African Diaspora Cultural Anchor Village (SeaTac). . . $4,000,00012
Bringing It Home II 24-Hour Domestic Violence Shelter. $8,720,00013
Broadway Senior Housing. . . . . . . . . . . . . . . . $1,000,00014
Casa MiA: Supporting Housing for Survivors. . . . . . $1,030,00015
Cedar House. . . . . . . . . . . . . . . . . . . . . . . $112,00016
CoLead Northgate project in Seattle. . . . . . . . . . $7,000,00017
Generations Place Workforce Housing. . . . . . . . . . $1,600,00018
Gravelly Lake Commons at LASA (Lakewood). . . . . . . . $500,00019
((Habitat for Humanity. . . . . . . . . . . . . . . $6,000,000))20
KCR Mills Crossing Affordable Housing. . . . . . . . . $2,000,00021
Leavenworth Affordable Workforce Rental Housing22
(Leavenworth). . . . . . . . . . . . . . . . . . $2,300,00023
Lewis County Homeless Shelter (Chehalis). . . . . . . $2,500,00024
Lincoln District Family Housing (Tacoma). . . . . . . $5,050,00025
Mary's Place Shelter Replacement (Burien). . . . . . . $6,000,00026
Mount Baker Housing Association Trenton Apartments. . . $500,00027
Mount Zion Housing (Seattle). . . . . . . . . . . . . $1,000,00028
Multicultural Village Design (Kent). . . . . . . . . . . $550,00029
New Hope Family Housing (Seattle). . . . . . . . . . . . $325,00030
Peninsula Community Health Housing (Bremerton). . . . . $412,00031
Raymond Manor Low-Income Senior Housing. . . . . . . . $1,500,00032
Redmond Supportive Housing. . . . . . . . . . . . . . $3,200,00033
Saint Vincent de Paul. . . . . . . . . . . . . . . . . $1,000,00034
Shiloh Baptist Church New Life Housing (Tacoma). . . . $1,000,00035
Skyway Affordable Housing (Skyway). . . . . . . . . . $3,000,00036
Sky Valley Youth Center. . . . . . . . . . . . . . . . $1,153,00037
Tacoma/Pierce County Habitat Affordable Housing38
(Pierce County). . . . . . . . . . . . . . . . . $14,000,00039
p. 366 SB 5195
The House of Bethlehem. . . . . . . . . . . . . . . . . $424,0001
West Klickitat Assisted Living Facility. . . . . . . . $3,000,0002
(b) $6,000,000 of the state building construction account — state 3
appropriation is provided solely for the following list of projects:4
Habitat for Humanity. . . . . . . . . . . . . . . . . $6,000,0005
(9) $20,000,000 of the state taxable building construction 6
account— state appropriation in this section is provided solely for 7
eligible organizations defined under RCW 43.185A.040 to acquire, 8
renovate, and prepare real property for rapid conversion into 9
enhanced emergency shelters, permanent supportive housing, 10
transitional housing, permanent housing, youth housing, tiny homes, 11
or shelter for extremely low-income people, as well as individuals, 12
families, unaccompanied youth, and young people experiencing 13
sheltered and unsheltered homelessness. Acquisitions completed with 14
temporary financing are eligible for funding provided in this 15
section. The department may only approve funding for projects that 16
result in increased shelter or housing capacity. 17
(a) Acquisition of multifamily housing is a priority, and the 18
department shall prioritize housing projects that rapidly move people 19
experiencing unsheltered homelessness into housing, including, but 20
not limited to, individuals living in unsanctioned encampments, the 21
public rights-of-way, or other public spaces. 22
(b) Amounts provided in this section may not be used for 23
operating or maintenance costs, supportive services, or debt service.24
(c) Awards made to tiny homes under this subsection (9) may be 25
made to noncode compliant structures and may be exempted from the 40-26
year affordability requirement under RCW 43.185A.060.27
(10) $5,000,000 of the state building construction account — state 28
appropriation in this section is provided solely for affordable 29
housing urgent repair grants to be provided on an ongoing basis. 30
Funding is not subject to the 60-day notification requirement in RCW 31
43.185A.150. The funding may be provided to address nonreoccurring 32
repair projects including repair of units or buildings, abatement of 33
potentially hazardous materials, and safety-related structural 34
improvements of affordable housing. Each repair grant award may not 35
exceed $200,000 per award. However, the department may not limit the 36
number of awards or amount received per organization.37
p. 367 SB 5195
(a) For purposes of this subsection (10), "affordable housing" 1
means: 2
(i) Permanent supportive housing as defined in RCW 36.70A.030; 3
and 4
(ii) Multifamily affordable housing projects in the housing trust 5
fund portfolio. 6
(b) If the department receives application requests that exceed 7
the appropriation level in this subsection (10), the department must 8
prioritize projects under (a)(i) of this subsection.9
(11) In evaluating projects in this section, the department must 10
give preference for applications based on some or all of the criteria 11
in RCW 43.185.070(5). 12
(12) The department shall strive to allocate at least 30 percent 13
of the funds provided in this section to projects located in rural 14
areas of the state, as defined by the department. 15
(13) The department must strive to allocate all of the amounts 16
appropriated in this section within the 2023-2025 fiscal biennium in 17
the manner prescribed in each subsection. However, if upon review of 18
applications the department determines there are not adequate 19
suitable projects in a category, the department may allocate funds to 20
other affordable housing projects serving other low-income and 21
special needs populations, provided those projects are located in an 22
area with an identified need for the type of housing proposed.23
Appropriation:24
State Building Construction Account— State. . . . (($90,000,000))25
$103,680,00026
State Taxable Building Construction Account— 27
State. . . . . . . . . . . . . . . . . . . . (($429,039,000))28
$415,359,00029
Washington Housing Trust Account— State. . . . . . . . $8,500,00030
Subtotal Appropriation. . . . . . . . . . . . . $527,539,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . $2,076,156,00033
TOTAL. . . . . . . . . . . . . . . . . . . . . $2,603,695,00034
Sec. 7012. 2024 c 375 s 1010 (uncodified) is amended to read as 35
follows: 36
FOR THE DEPARTMENT OF COMMERCE37
2023-25 Early Learning Facilities Fund Grant Program (40000300)38
p. 368 SB 5195
The appropriation in this section is subject to the following 1
conditions and limitations: 2
(1) $7,350,000 of the Ruth Lecocq Kagi early learning facilities 3
development account — state appropriation in this section is provided 4
solely for minor renovation grants. 5
(2) (($46,550,000)) $39,830,000 of the Ruth Lecocq Kagi early 6
learning facilities development account — state and $6,720,000 of the 7
Ruth LeCocq Kagi early learning facilities revolving account — state 8
appropriations in this section ((is)) are provided solely for the 9
early learning facility grant and loan program, subject to the 10
provisions of RCW 43.31.573 through 43.31.583 and 43.84.092, to 11
provide state assistance for designing, constructing, purchasing, 12
expanding, or modernizing public or private early learning education 13
facilities for eligible organizations. Up to four percent of the 14
funding in this subsection may be used by the department of children, 15
youth, and families to provide technical assistance to early learning 16
providers interested in applying for the early learning facility 17
grant or loan program. 18
(3) The department of children, youth, and families must develop 19
methodology to identify, at the school district boundary level, the 20
geographic locations of where early childhood education and 21
assistance program slots are needed to meet the entitlement specified 22
in RCW 43.216.556. This methodology must be linked to the caseload 23
forecast produced by the caseload forecast council and must include 24
estimates of the number of slots needed at each school district. This 25
methodology must inform any early learning facilities needs 26
assessment conducted by the department and the department of 27
children, youth, and families. This methodology must be included as 28
part of the budget submittal documentation required by RCW 43.88.030.29
(4) When prioritizing areas with the highest unmet need for early 30
childhood education and assistance program slots, the committee of 31
early learning experts convened by the department pursuant to RCW 32
43.31.581 must first consider those areas at risk of not meeting the 33
entitlement specified in RCW 43.216.556. 34
(5) The department must track the number of slots being renovated 35
separately from the number of slots being constructed and, within 36
these categories, must track the number of slots separately by 37
program for the working connections child care program and the early 38
childhood education and assistance program. 39
p. 369 SB 5195
(6) When prioritizing applications for projects pursuant to RCW 1
43.31.581, the department must award priority points to applications 2
from a rural county or from extreme child care deserts as defined by 3
the department of children, youth, and families. 4
(7) For early learning facilities collocated with affordable or 5
supportive housing developments, the department may remit state 6
funding on a reimbursement basis for 100 percent of eligible project 7
costs, regardless of the project's match amount, once the nonstate 8
share of project costs have been either expended or firmly committed 9
in an amount sufficient to complete the entire project or a distinct 10
phase of the project that is useable to the public as an early 11
learning facility. These projects are not subject to section 8015 of 12
this act or RCW 43.88.150. 13
(8) It is the intent of the legislature to reappropriate funding 14
in the 2023-2025 omnibus capital appropriations act for early 15
learning facilities appropriated in this section. 16
(9) (($37,438,000)) $36,138,000 of the Ruth Lecocq Kagi early 17
learning facilities development account — state appropriation in this 18
section is provided solely for the following list of early learning 19
facility projects: 20
Boys and Girls Club of Lewis County. . . . . . . . . . $1,950,00021
Brightonview Childcare Expansion. . . . . . . . . . . $2,305,00022
Cora Whitley Family Center (Tacoma). . . . . . . . . $3,015,00023
Eastside Early Childhood Center (Bellevue). . . . . . $1,100,00024
Lions Park Community Center. . . . . . . . . . . . . . $2,550,00025
Montesano Child Care. . . . . . . . . . . . . . . . . . $515,00026
New Tomorrow's Hope Child Development Center 27
(Everett). . . . . . . . . . . . . . . . . . . . . $1,000,00028
((Northaven Green Space Restoration. . . . . . . . . $1,300,000))29
Northgate Jose Marti Early Learning Center 30
(Seattle). . . . . . . . . . . . . . . . . . . . $2,488,00031
Rainier Valley Early Learning Center (Seattle). . . . $6,000,00032
ReWA MLK Early Learning Center. . . . . . . . . . . . $4,252,00033
Shore Metro Park District Child Care Expansion. . . . . $773,00034
Skyway Affordable Housing and Early Learning 35
Center (Seattle). . . . . . . . . . . . . . . . . $3,000,00036
Step by Step's Early Learning Center. . . . . . . . . . $515,00037
Whatcom Meridian Early Learning. . . . . . . . . . . . $3,000,00038
YMCA Early Learning Center (Port Angeles). . . . . . $2,500,00039
p. 370 SB 5195
Young Child & Family Center, North Thurston PS 1
(Olympia). . . . . . . . . . . . . . . . . . . . . $1,000,0002
YWCA Walla Walla Childcare Center. . . . . . . . . . . . $175,0003
(10) $350,000 of the Ruth Lecocq Kagi early learning facilities 4
development account — state appropriation in this section is provided 5
solely for the early learning facilities capital readiness pilot 6
program. The department, in partnership with the department of 7
children, youth, and families, shall administer the program as part 8
of the early learning facilities program. The early learning 9
facilities capital readiness pilot program must support no more than 10
10 licensed early learning providers that will serve children through 11
working connections child care or through the early childhood 12
education and assistance program to study the feasibility of 13
expanding, remodeling, purchasing, or constructing early learning 14
facilities and classrooms. Participants must receive small grants and 15
project support to conduct capital feasibility studies that cover 16
financing, architectural design, construction, business operations, 17
and other relevant topics. Participants must also have access to 18
professional consultation related to financing, architectural design, 19
construction, and business operations. 20
Appropriation:21
Ruth Lecocq Kagi Early Learning Facilities 22
Development Account— State. . . . . . . . . . (($91,688,000))23
$83,668,00024
Ruth LeCocq Kagi Early Learning Facilities25
Revolving Account— State. . . . . . . . . . . . . . $6,720,00026
Subtotal Appropriation. . . . . . . . . . . . . . $90,388,00027
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $028
Future Biennia (Projected Costs). . . . . . . . . . $366,752,00029
TOTAL. . . . . . . . . . . . . . . . . . . . (($458,440,000))30
$457,140,00031
Sec. 7013. 2024 c 375 s 1016 (uncodified) is amended to read as 32
follows: 33
FOR THE DEPARTMENT OF COMMERCE34
Green Jobs and Infrastructure Grants (40000604)35
The appropriation in this section is subject to the following 36
conditions and limitations: 37
p. 371 SB 5195
(1)(a) (($21,450,000)) $19,650,000 of the appropriation in this 1
section is provided solely for grants to projects that demonstrate 2
high-wage, clean job creation in Washington, provide risk reduction 3
for investments in public and private infrastructure in order to 4
increase a community's capacity for clean manufacturing, or provide 5
investments in workforce development to attract and train the 6
workforce required to grow the clean energy economy.7
(b) Grants must be provided to eligible entities to help mitigate 8
and reverse the effects of climate change, help communities meet 9
their energy and climate change regulatory requirements, bring 10
increased federal and private investment to the state, help develop 11
the advanced workforce of the future, and ensure Washington state 12
maintains or grows its position as a world leader in developing the 13
projects and processes that are used to fight climate change 14
globally. Eligible activities under this section include, but are not 15
limited to, planning predevelopment, design, engineering, and 16
construction of clean technology projects. 17
(c) Entities eligible for grants under this section include, but 18
are not limited to, local governments, federally recognized tribal 19
governments and tribes' contracted service providers, public and 20
private utilities, ports, associate development organizations, for-21
profit entities, academic and research institutions, nonprofit 22
organizations, and state agencies. 23
(d) Projects eligible for funding must be physically located in 24
Washington state. Eligible projects must be consistent with the state 25
energy strategy adopted under chapter 43.21F RCW and clean energy 26
policies under chapter 19.405 RCW. Projects must further the goals of 27
the climate commitment act as described in RCW 70A.65.260(1)(j).28
(e) The department must consider equity and environmental justice 29
when developing the program structures and opportunities for 30
applicant participation and must follow principles established in its 31
community engagement plan adopted under RCW 70A.02.050.32
(f) When soliciting and evaluating grant application proposals, 33
awarding contracts, and monitoring projects under this section, the 34
department must: 35
(i) Use competitive processes to select all projects, except as 36
otherwise noted in this section. The department must design a 37
competitive process to allow provision of grant award to projects in 38
a timely manner and consistent with the project timeline. 39
p. 372 SB 5195
Applications must be accepted on a rolling basis, and final 1
determination must be made by the department; 2
(ii) Ensure compliance with all applicable laws related to the 3
project selection process, project monitoring, and contracting; and4
(iii) Prioritize projects that leverage the greatest amount of 5
matching funds, such as local levy funding or private investment in 6
advanced manufacturing capability. 7
(g) Project applicants must disclose all sources of public 8
funding invested in a project. Grant contracts must provide that if, 9
after a grant has been awarded, the department finds that a grantee 10
has violated chapter 42.52 RCW, either in procuring or performing 11
under the grant, the department in its sole discretion may terminate 12
the grant funding by written notice, and that, if the grant is 13
terminated, the department will reserve its right to pursue all 14
available remedies under law to address the violation.15
(2) $750,000 of the appropriation in this section is provided 16
solely for the department to support access to and to flexibly 17
administer the program. The department may use these funds to hire 18
full-time equivalent positions within the department, as well as 19
contract for additional capacity and subject matter expertise.20
(3) $150,000 of the appropriation in this section is provided 21
solely for the Longview Industrial Symbiosis Park project.22
(4) $150,000 of the appropriation in this section is provided 23
solely for the Pasco Agricultural Symbiosis Industrial Park project.24
(5) $2,500,000 of the appropriation in this section is provided 25
solely for the Myno carbon removal facility. 26
(6)(((a) Subsections (1) through (4) of this section take effect 27
January 1, 2025.28
(b) If the climate commitment account is repealed as of December 29
30, 2024, then subsections (1) through (4) of this section are null 30
and void on December 31, 2024, and the amounts provided for in 31
subsections (1) through (4) of this section shall lapse )) $1,800,000 32
of the appropriation in this section is provided solely for the 33
innovation cluster accelerator program. Funding provided in this 34
subsection may only be used to develop and maintain clusters that aim 35
to reduce and mitigate impacts from greenhouse gases in overburdened 36
communities, deploy renewable energy resources, increase energy 37
efficiency or reduction, or other permissible uses pursuant to RCW 38
70A.65.260. 39
p. 373 SB 5195
Appropriation:1
Climate Commitment Account— State. . . . . . . . . . . $25,000,0002
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $03
Future Biennia (Projected Costs). . . . . . . . . . $100,000,0004
TOTAL. . . . . . . . . . . . . . . . . . . . . . $125,000,0005
Sec. 7014. 2024 c 375 s 1018 (uncodified) is amended to read as 6
follows: 7
FOR THE DEPARTMENT OF COMMERCE8
2025 Local and Community Projects (40000614)9
The appropriations in this section are subject to the following 10
conditions and limitations: 11
(1) The department shall not expend the appropriation in this 12
section unless and until the nonstate share of project costs have 13
been either expended or firmly committed, or both, in an amount 14
sufficient to complete the project or a distinct phase of the project 15
that is useable to the public for the purpose intended by the 16
legislature. This requirement does not apply to projects where a 17
share of the appropriation is for design costs only.18
(2) Prior to receiving funds, project recipients must demonstrate 19
that the project site is under control for a minimum of 10 years, 20
either through ownership or a long-term lease. This requirement does 21
not apply to appropriations for preconstruction activities or 22
appropriations in which the sole purpose is to purchase real property 23
that does not include a construction or renovation component.24
(3) Projects funded in this section may be required to comply 25
with Washington's high performance building standards under chapter 26
39.35D RCW. 27
(4) Project funds are available on a reimbursement basis only and 28
may not be advanced under any circumstances. 29
(5) In contracts for grants authorized under this section, the 30
department shall include provisions that require that capital 31
improvements be held by the grantee for a specified period of time 32
appropriate to the amount of the grant and that facilities be used 33
for the express purpose of the grant. If the grantee is found to be 34
out of compliance with provisions of the contract, the grantee shall 35
repay to the state general fund the principal amount of the grant 36
plus interest calculated at the rate of interest on state of 37
p. 374 SB 5195
Washington general obligation bonds issued most closely to the date 1
of authorization of the grant. 2
(6) Projects funded in this section, including those that are 3
owned and operated by nonprofit organizations, are generally required 4
to pay state prevailing wages. 5
(7) The department must comply with the requirements set forth in 6
executive order 21-02 and must consult with the department of 7
archaeology and historic preservation and affected tribes on the 8
potential effects of these projects on cultural resources and 9
historic properties. Consultation with the department of archaeology 10
and historic preservation and affected tribes must be initiated 11
before project funds are made available. 12
(8) (($58,862,000)) $60,162,000 of the state building 13
construction account— state appropriation in this section is provided 14
solely for the following list of projects: 15
192nd & Hemlock Public Engagement and Design Program. . $129,00016
23rd & Cherry Fellowship Hall Renovation 17
Pre-development. . . . . . . . . . . . . . . . . . . $110,00018
Abu Bakr Youth Center Renovation. . . . . . . . . . . . $350,00019
Adams County Evidence Processing & Public Safety20
Improvements. . . . . . . . . . . . . . . . . . . $1,000,00021
African Business Innovation Center. . . . . . . . . . . . $25,00022
Alatheia Capacity Building Capital Project. . . . . . . $150,00023
Aquatic Center At Martin Luther King Jr. Park. . . . . . $75,00024
Auburn Downtown Plaza Design/Development. . . . . . . . $258,00025
Bainbridge Island Senior/Community Center. . . . . . . . $100,00026
Battle Ground Health Care Clinic. . . . . . . . . . . . $400,00027
Battle Ground Senior Center. . . . . . . . . . . . . . . $309,00028
Benaroya Hall Street Front Poster Boxes. . . . . . . . . $200,00029
BIPOC Farm Fresh HUB. . . . . . . . . . . . . . . . . . $103,00030
Bremerton Mason County Sewer Expansion. . . . . . . . $3,000,00031
Buckley Foothills Trailhead Doc Tait Pavilion. . . . . . $52,00032
Buddhist Temple Arson Restoration. . . . . . . . . . . . $225,00033
California Creek Estuary Park Expansion. . . . . . . . . $185,00034
Chamber of Commerce Historical Archive. . . . . . . . . . $38,00035
Charter Park Master Plan Bathroom. . . . . . . . . . . . $52,00036
Chelan County Hazard Mitigation. . . . . . . . . . . . . $98,00037
Chimacum Grange Hall Roofing Replacement. . . . . . . . . $26,00038
Chinese American Legacy Artwork Project. . . . . . . . . $25,00039
p. 375 SB 5195
City of Bonney Lake ADA Accessible Playground. . . . . . $151,0001
City of Lacey Regional Public Safety Training Center. . . $50,0002
City of Mill Creek Veteran's Monument Expansion &3
Memorial. . . . . . . . . . . . . . . . . . . . . . $258,0004
City of Roy Water Infrastructure. . . . . . . . . . . . $300,0005
City of Sequim Park Acquisition. . . . . . . . . . . . . $171,0006
CLC Childcare Fire Alarm System. . . . . . . . . . . . . $77,0007
Coastal CAP Fire Remodel. . . . . . . . . . . . . . . . $515,0008
Columbia Basin Rodeo Association Bleachers. . . . . . . $258,0009
Columbia Grange #87 Safety Improvements. . . . . . . . . $25,00010
Commercial Platform Lift. . . . . . . . . . . . . . . . . $17,00011
Connections Mental Health. . . . . . . . . . . . . . . . $44,00012
Cougar Mountain Zoo Indoor Educational Exhibit Space. . $206,00013
Council for the Homeless Building Rehabilitation. . . . $200,00014
Coupeville Boy and Girls Club Pathway. . . . . . . . . . $36,00015
Crescent Grange Hall Urgent Roof Repairs. . . . . . . . $103,00016
Crosby Community Center Restoration. . . . . . . . . . . $412,00017
Davenport Senior Center Capital Improvement. . . . . . . $120,00018
Des Moines Marina Electrification. . . . . . . . . . . . $100,00019
District Distributed Antenna System Installation. . . . $258,00020
Douglas Building HVAC Replacement. . . . . . . . . . . . $110,00021
Downtown Camas Lighting Transformation Project. . . . . $300,00022
DV Shelter and Advocacy Center HVAC Upgrade. . . . . . . $100,00023
Eatonville Community Track & Field Restrooms. . . . . . $300,00024
Edmonds BGC Capital Project. . . . . . . . . . . . . . . $300,00025
Elevator Purchase and Installation. . . . . . . . . . . $274,00026
Ellensburg Community Fieldhouse. . . . . . . . . . . . . $72,00027
Emergency Communications Radio Microwave. . . . . . . . $235,00028
Engineering and Surveying of Essential Fire Recovery. . $300,00029
Eritrean Community Center Expansion. . . . . . . . . . . $100,00030
Everest Park Facilities Update. . . . . . . . . . . . . $300,00031
Everett Labor Temple Roof. . . . . . . . . . . . . . . . $500,00032
FACYV and APIC Building. . . . . . . . . . . . . . . . . $103,00033
FareStart Job Training & Social Enterprise Capital34
Improvements. . . . . . . . . . . . . . . . . . . . $300,00035
Fire Station 41 Headquarters. . . . . . . . . . . . . . $300,00036
Fire Station Restoration. . . . . . . . . . . . . . . . $314,00037
Firefighting PPE Decontamination CO2 Demonstration38
Project. . . . . . . . . . . . . . . . . . . . . . . $100,00039
Florence Robison North Park Equipment Replacement. . . . $173,00040
p. 376 SB 5195
Foss Waterway Seaport Esplanade Connector. . . . . . . . $185,0001
Gage Academy of Art South Lake Union Building. . . . . . $100,0002
Garfield Super Block. . . . . . . . . . . . . . . . . $3,000,0003
GCA Dignity Completion. . . . . . . . . . . . . . . . . $112,0004
Glenwood Little League Facility Improvements. . . . . . . $50,0005
Goldsborough Switching Station. . . . . . . . . . . . . . $52,0006
Goodwill Land Acquisition for Redevelopment. . . . . . $3,000,0007
Granger Community Electric Sign. . . . . . . . . . . . . $31,0008
Granite Falls Boys & Girls Club. . . . . . . . . . . . . $103,0009
Green Waste Recycling at Point Roberts. . . . . . . . . . $94,00010
Idylwood Beach Park Accessibility Improvements. . . . . $215,00011
Inclusive Playground at Cirque Park. . . . . . . . . . . $258,00012
Institute for Black Justice. . . . . . . . . . . . . . . $75,00013
Intergenerational Community and Expanded Aquatic14
Center. . . . . . . . . . . . . . . . . . . . . . . $206,00015
Japanese American Exclusion Visitor Center - I. . . . . $300,00016
Kalama Community Building Architectural Survey. . . . . . $62,00017
Kelso Rotary Park. . . . . . . . . . . . . . . . . . . . $72,00018
KidsQuest Children's Museum Stories of Water. . . . . . $350,00019
Kirkland BGC Upgrades and Expansion. . . . . . . . . . . $128,00020
KVH Surgical Services Clinic Remodel. . . . . . . . . . $100,00021
La Center Wheel Club Community Center Remodel. . . . . . $250,00022
Lake Sacajawea Irrigation Pump. . . . . . . . . . . . . $200,00023
Lakebay Marina Renovation and Historic Preservation. . . $206,00024
Latah Valley Fire Station. . . . . . . . . . . . . . . . $350,00025
Latah Water System Rehabilitation Project. . . . . . . . $187,00026
Lincoln Creek Grange #407. . . . . . . . . . . . . . . . $81,00027
Little Saigon Landmark. . . . . . . . . . . . . . . . . $100,00028
Lopez Food Center. . . . . . . . . . . . . . . . . . . . $197,00029
Lynnwood Convention Center Expansion. . . . . . . . . . $400,00030
Main Street. . . . . . . . . . . . . . . . . . . . . . . $42,00031
Manson Grange Hall Improvement Project. . . . . . . . . $193,00032
Maple Valley Permanent Message Boards. . . . . . . . . . $200,00033
Mason PUD No. 1 Lilliwaup Corner Project. . . . . . . $1,800,00034
Matlock Grange Safety & Structure Improvements. . . . . . $90,00035
Medical Equipment Bank - Building. . . . . . . . . . . . $250,00036
Mt View Grange. . . . . . . . . . . . . . . . . . . . . $100,00037
Municipal Services Campus Design & Infrastructure. . . . $103,00038
Murakami Building. . . . . . . . . . . . . . . . . . . . $100,00039
Nespelem Community Park. . . . . . . . . . . . . . . . . $52,00040
p. 377 SB 5195
New Facility for South Kitsap Helpline. . . . . . . . . $250,0001
Next Chapter Maroon Village. . . . . . . . . . . . . . . $315,0002
NEYFS Creativity Project. . . . . . . . . . . . . . . . . $93,0003
North Mason Food Bank Relocation. . . . . . . . . . . . . $47,0004
Northside Flood Reduction and Open Spaces. . . . . . . . $223,0005
Northaven Green Space Restoration. . . . . . . . . . . $1,300,0006
NWYS PAD Shelter Whatcom County. . . . . . . . . . . . . $250,0007
Oak Harbor Recreation Center Feasibility Study. . . . . $200,0008
Ohop Grange Insulation & Electrical Upgrades. . . . . . . $36,0009
Olalla Recovery Centers Facility Improvements. . . . . . $250,00010
Old Swim Hole Revitalization Project. . . . . . . . . . $206,00011
Omak Arena LED Lighting Project. . . . . . . . . . . . . $185,00012
Open Doors for Multicultural Families. . . . . . . . . $5,000,00013
Operation GROW - A Regional Processing Facility for WA. . $42,00014
Oroville Grange Drainage Remediation. . . . . . . . . . . $62,00015
Othello Water Supply. . . . . . . . . . . . . . . . . . $400,00016
Parkwood Community Club Repairs. . . . . . . . . . . . . $232,00017
PAWS Community Support Center. . . . . . . . . . . . . . $250,00018
Pea Patch Community Campus. . . . . . . . . . . . . . . $360,00019
People's Community Center. . . . . . . . . . . . . . . . $400,00020
Perry Tech for Clean Energy Jobs. . . . . . . . . . . $5,000,00021
Pierce Center for Arts & Technology. . . . . . . . . . . $129,00022
Port of Benton Inland. . . . . . . . . . . . . . . . . . $240,00023
Port of Quincy Business & Event Center Upgrade. . . . . $309,00024
Port of Skagit Granary Expansion. . . . . . . . . . . . $125,00025
Preserve and Maintain RTOP Theatre. . . . . . . . . . . . $77,00026
Prosser Clubhouse. . . . . . . . . . . . . . . . . . . . $105,00027
Providence Academy Elevator & Rehabilitation. . . . . . $103,00028
Public Dock Emergency Repair. . . . . . . . . . . . . . . $41,00029
Puget Sound Estuarium Property. . . . . . . . . . . . . $250,00030
Rainier Beach Family Empowerment Center. . . . . . . . . $100,00031
Redmond Academy Renovations. . . . . . . . . . . . . . . $87,00032
Regional Sports Complex-Site Evaluation and 33
Pre-Design. . . . . . . . . . . . . . . . . . . . . $300,00034
Rehab and Care Center Shower Renovation. . . . . . . . . $206,00035
Rejuvenation Community Day Center. . . . . . . . . . . . $500,00036
Renovations for Children's Developmental Center. . . . . $174,00037
Republic Library and Community Center. . . . . . . . . . $315,00038
Resurface and Revitalize Prescott Public Pool. . . . . . $98,00039
Riverwalk Sports and Entertainment Facility. . . . . . . $309,00040
p. 378 SB 5195
Rose Valley Grange Capital Improvement. . . . . . . . . . $40,0001
Roza Drought Funding. . . . . . . . . . . . . . . . . . $200,0002
Ruston Community Center Repairs & ADA Improvements. . . $360,0003
School Playground Renovation. . . . . . . . . . . . . . $258,0004
Seattle Aquarium Ocean Pavilion. . . . . . . . . . . . . $400,0005
Seattle Black Panther Legacy Project. . . . . . . . . . $200,0006
Seattle Storm Center. . . . . . . . . . . . . . . . . . $500,0007
Sheffield Trail. . . . . . . . . . . . . . . . . . . . . $100,0008
Shelton Multi-Use Trail. . . . . . . . . . . . . . . . . $206,0009
Skagit PUD Olsen Creek Waterline Relocation. . . . . . . $300,00010
Skamania County Public Safety Radio System. . . . . . . $200,00011
South Camano Grange #930. . . . . . . . . . . . . . . . $132,00012
South End Community Center. . . . . . . . . . . . . . . $200,00013
South King Cultural Public Market. . . . . . . . . . . . $77,00014
South Seattle Community Food Hub. . . . . . . . . . . . $135,00015
South Yakima Avenue Senior Housing. . . . . . . . . . . $400,00016
Southwest Washington Fair Equestrian Facility. . . . . . $206,00017
Spokane CD Gray and Oregon Road Forest Fire Recovery. . $975,00018
Spokane Scale House Market & Kitchen. . . . . . . . . . $300,00019
Spokane Valley Cross Country Course. . . . . . . . . . . $150,00020
Stanwood Police Station. . . . . . . . . . . . . . . . . $100,00021
Summit Park Sewer Upgrade Project. . . . . . . . . . . . $103,00022
Sunnyside Beach Park Beach Nourishment Project. . . . . $103,00023
Sunnyside Safe Haven Baby Box. . . . . . . . . . . . . . $16,00024
SVE Expansion Equipment & Furnishing. . . . . . . . . . $108,00025
SW Youth & Family Services HVAC Replacement. . . . . . . $165,00026
Tekoa Parks and Recreation. . . . . . . . . . . . . . . $200,00027
Terrain Cultural Hub. . . . . . . . . . . . . . . . . . $207,00028
Town of Index Safety and ADA Access Improvements. . . . . $25,00029
Transload Area Sewer. . . . . . . . . . . . . . . . . . $515,00030
Tristate Health Hospital. . . . . . . . . . . . . . . $1,000,00031
Tukwila Health & Wellness Center. . . . . . . . . . . . . $25,00032
Tumwater Mazama Pocket Gopher Habitat Acquisition and33
Restoration. . . . . . . . . . . . . . . . . . . . $2,000,00034
Uplift Northwest's Beacon of Hope. . . . . . . . . . . . $300,00035
Vancouver Family Resource Center Expansion. . . . . . . $200,00036
Vancouver Waterfront Gateway Event Plaza. . . . . . . . $197,00037
W. Valley Centennial Middle School Field Fences &38
Dugout. . . . . . . . . . . . . . . . . . . . . . . . $32,00039
WA Soldier's Home Cemetery Pavement & Parking 40
p. 379 SB 5195
Extension. . . . . . . . . . . . . . . . . . . . . . $72,0001
Wahkiakum PUD - Puget Island Water Source Project. . . . $309,0002
Waitsburg Childcare Center. . . . . . . . . . . . . . . $100,0003
Wallace Heights Septic Elimination. . . . . . . . . . . $515,0004
Washington Masonic Services Library & Museum Remodel. . . $47,0005
Water Treatment Facility Project. . . . . . . . . . . . $920,0006
Water Valve-Pipeline, Intersection Replacement. . . . . $103,0007
Water Way 18 Dock Replacement. . . . . . . . . . . . . . $250,0008
West Echo Lake Public Engagement and Design Program. . . $129,0009
Western Ranchettes Water Distribution System. . . . . . $150,00010
Wilkeson Town Hall Renovation. . . . . . . . . . . . . . $134,00011
Yakima Trolley Carbarn Fire Suppression System. . . . . $197,00012
Yakima Valley Local Crime Lab Facility. . . . . . . . . $200,00013
Yelm Activated Alleyway. . . . . . . . . . . . . . . . . $46,00014
(9) $5,122,000 of the model toxics control stormwater account — 15
state appropriation in this section is provided solely for the 16
following list of projects: 17
Boat Haven Stormwater Improvement. . . . . . . . . . . $3,100,00018
Silver Bay Logging Property Acquisition. . . . . . . . $1,250,00019
City of Puyallup Stormwater. . . . . . . . . . . . . . . $772,00020
(10) $4,641,000 of the model toxics control capital account— state 21
appropriation in this section is provided solely for the following 22
list of projects: 23
APCC Asbestos Abatement. . . . . . . . . . . . . . . . . $286,00024
Spokane and Pend Oreille County Gray and Oregon25
Road Fire Cleanup. . . . . . . . . . . . . . . . . $3,500,00026
PFAS Treatment at City of DuPont Water Wells. . . . . . $855,00027
(11) $500,000 of the state building construction account — state 28
appropriation and $100,000 of the climate commitment account — state 29
appropriation in this section is provided solely for the Langley 30
Library Historic Preservation project. 31
(12) $40,000 of the climate commitment account — state 32
appropriation in this section is provided solely for the Temple 33
Association Energy Efficiency Improvements project.34
(13) In addition to the requirements in subsection (5) of this 35
section, the contract for the Goodwill Land Acquisition for 36
Redevelopment (Seattle) project must require that the redevelopment 37
p. 380 SB 5195
of the property into affordable housing under subsection (8) of this 1
section be completed within 10 years of the contract execution.2
Appropriation:3
Model Toxics Control Capital Account— 4
State. . . . . . . . . . . . . . . . . . . . . . . $4,641,0005
Model Toxics Control Stormwater Account— 6
State. . . . . . . . . . . . . . . . . . . . . . . $5,122,0007
State Building Construction Account— State. . . . (($59,362,000))8
$60,662,0009
Climate Commitment Account— State. . . . . . . . . . . . $140,00010
Subtotal Appropriation. . . . . . . . . . . . (($69,265,000))11
$70,565,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . $237,448,00014
TOTAL. . . . . . . . . . . . . . . . . . . . (($306,713,000))15
$308,013,00016
NEW SECTION. Sec. 7015. A new section is added to 2024 c 375 17
(uncodified) to read as follows: 18
FOR THE DEPARTMENT OF COMMERCE19
2023-25 Broadband Infrastructure Federal Match Transfer 20
(40000824)21
The appropriation in this section is subject to the following 22
conditions and limitations: $50,000,000 of the state building 23
construction account— state appropriation in this section is provided 24
solely as match for the statewide broadband office to administer the 25
broadband equity, access, and deployment state grants program in 26
section 60102 of P.L. 117-58 (infrastructure investment and jobs 27
act). $50,000,000 of the appropriation must be transferred into the 28
federal broadband account— state. 29
Appropriation:30
State Building Construction Account— State. . . . . . $50,000,00031
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $032
Future Biennia (Projected Costs). . . . . . . . . . $230,000,00033
TOTAL. . . . . . . . . . . . . . . . . . . . . . $280,000,00034
Sec. 7016. 2024 c 375 s 1025 (uncodified) is amended to read as 35
follows: 36
p. 381 SB 5195
FOR THE DEPARTMENT OF COMMERCE1
Local Emission Reduction Projects (91002184)2
The appropriations in this section are subject to the following 3
conditions and limitations: 4
(1) The appropriations in this section are provided solely for 5
the following list of projects: 6
Algae Carbon Sequestration and Regenerative Soils. . . $2,500,0007
((C6 Forest to Farm Biochar Pilot Plant8
(Leavenworth))) Chelan County Processing Facility9
for Wood Biomass / Small Diameter Wood. . . . . . $1,425,00010
College Place Fire Department Energy Efficiency. . . . $1,137,00011
Douglas PUD Storage & Fuel Cell. . . . . . . . . . . . $1,348,00012
Great Northern School District HVAC 13
Installation (Spokane). . . . . . . . . . . . . . $1,613,00014
HAPO Community Center. . . . . . . . . . . . . . . . . $3,000,00015
Kenmore Public Works Geothermal System. . . . . . . . . $464,00016
KVH Hydrogen Storage System. . . . . . . . . . . . . . . $300,00017
Meydenbauer Center Energy Efficiency (Bellevue). . . . $6,000,00018
Outdoor Fields LED Retrofit and Solar Installation19
(Tukwila). . . . . . . . . . . . . . . . . . . . . . $500,00020
Nisqually Indian Tribe Microgrid System. . . . . . . . $8,600,00021
Process Water Reuse Facility (Pasco). . . . . . . . . $5,050,00022
Small Faces Preschool HVAC Upgrades (Seattle). . . . . . $435,00023
Squaxin Island Tribe Blue Carbon Sequestration. . . . $3,050,00024
SW Youth & Family Services HVAC Replacement. . . . . . . $273,00025
Tacoma Power Grid Upgrades & Feasibility Study. . . . $2,875,00026
Waterfront Low Carbon District Energy System 27
(Bellingham). . . . . . . . . . . . . . . . . . . . $100,00028
(2) The department may not expend funding for a project in this 29
section unless and until the nonstate share of that project's costs 30
have been either expended or firmly committed, or both, in an amount 31
sufficient to complete the project or a distinct phase of the 32
project. This requirement does not apply to projects where a share of 33
the appropriation is for design costs only. 34
(3) Prior to receiving funding, grant recipients must demonstrate 35
that the project site is under control for a minimum of 10 years, 36
either through ownership or a long-term lease. This requirement does 37
not apply to grants for preconstruction activities or grants in which 38
p. 382 SB 5195
the sole purpose is to purchase real property that does not include a 1
construction or renovation component. 2
(4) In contracts for grants authorized under this section, the 3
department must include provisions that require that capital 4
improvements be held by the grantee for a specified period of time 5
appropriate to the amount of the grant and that facilities be used 6
for the express purpose of the grant. If the department finds the 7
grantee to be out of compliance with provisions of the contract, the 8
grantee shall repay to the state general fund the principal amount of 9
the grant plus interest calculated at the rate of interest on state 10
of Washington general obligation bonds issued most closely to the 11
date of authorization of the grant. 12
(((5)(a) This section takes effect January 1, 2025.13
(b) If the climate commitment account or the natural climate 14
solutions account is repealed as of December 30, 2024, then this 15
section is null and void on December 31, 2024.))16
Appropriation:17
Climate Commitment Account— State. . . . . . . . . . . $31,695,00018
Natural Climate Solutions Account— State. . . . . . . . $6,975,00019
Subtotal Appropriation. . . . . . . . . . . . . . $38,670,00020
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $021
Future Biennia (Projected Costs). . . . . . . . . . . $87,396,00022
TOTAL. . . . . . . . . . . . . . . . . . . . . . $126,066,00023
Sec. 7017. 2024 c 375 s 6007 (uncodified) is amended to read as 24
follows: 25
FOR THE DEPARTMENT OF COMMERCE26
Infrastructure Projects (91001687)27
The reappropriations in this section are subject to the following 28
conditions and limitations: The reappropriations are subject to the 29
provisions of section 1033, chapter 296, Laws of 2022, except that:30
(1) $618,000 of the reappropriation is for the Port of Mattawa 31
Water Infrastructure (Mattawa) project, and not the Port of Mattawa 32
Wastewater Infrastructure (Mattawa) project; 33
(2) No funding may be directed to the Dryden Wastewater 34
Improvement project; 35
(3) No funding may be directed to the New Well for the Community 36
of Peshastin project; 37
p. 383 SB 5195
(4) The Fall City Waste Management System total appropriation is 1
adjusted from $6,500,000 to $7,536,000; ((and))2
(5) $1,030,000 of the coronavirus state fiscal recovery account — 3
federal appropriation is provided solely for the Skamania PUD Water 4
Tank Replacement project; and5
(6) The coronavirus state fiscal recovery account — federal 6
appropriation for the Packwood sewer system is reduced to $1,607,000.7
Reappropriation:8
Capital Community Assistance Account— State. . . . . . $25,714,0009
Coronavirus State Fiscal Recovery Fund— Federal. . (($94,106,000))10
$87,166,00011
Public Works Assistance Account— State. . . . . . . . . . $485,00012
State Building Construction Account— State. . . . . . $10,087,00013
Subtotal Reappropriation. . . . . . . . . . (($130,392,000))14
$123,452,00015
Prior Biennia (Expenditures). . . . . . . . . . . . . $6,908,00016
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $017
TOTAL. . . . . . . . . . . . . . . . . . . . (($137,300,000))18
$130,360,00019
Sec. 7018. 2024 c 375 s 6018 (uncodified) is amended to read as 20
follows: 21
FOR THE DEPARTMENT OF COMMERCE22
Projects that Strengthen Communities & Quality of Life (92000230)23
The reappropriation in this section is subject to the following 24
conditions and limitations: 25
(1) The reappropriation is subject to the provisions of section 26
6006, chapter 3, Laws of 2015 3rd sp. sess. 27
(2) The reappropriation for any project for which the department 28
has not executed a contract by December 31, 2023, shall lapse. The 29
department shall provide a list of lapsed projects to the legislative 30
fiscal committees no later than January 15, 2024. 31
(3) Pursuant to subsection (2) of this section, funding for the 32
Seabrook Trail project has lapsed. 33
Reappropriation:34
State Building Construction Account— State. . . . . . (($559,000))35
$35,00036
Prior Biennia (Expenditures). . . . . . . . . . . . . $31,102,00037
p. 384 SB 5195
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $01
TOTAL. . . . . . . . . . . . . . . . . . . . (($31,661,000))2
$31,137,0003
Sec. 7019. 2023 c 474 s 6074 (uncodified) is amended to read as 4
follows: 5
FOR THE DEPARTMENT OF COMMERCE6
Local & Community Projects 2016 (92000369)7
The reappropriation in this section is subject to the following 8
conditions and limitations: 9
(1) The reappropriation is subject to the provisions of section 10
1030, chapter 296, Laws of 2022. 11
(2) The reappropriation for any project for which the department 12
has not executed a contract by December 31, 2023, shall lapse. The 13
department shall provide a list of lapsed projects to the legislative 14
fiscal committees no later than January 15, 2024. 15
Reappropriation:16
State Building Construction Account— State. . . . . (($5,917,000))17
$1,829,00018
Prior Biennia (Expenditures). . . . . . . . . . . . $123,002,00019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . (($128,919,000))21
$124,831,00022
Sec. 7020. 2023 c 474 s 6087 (uncodified) is amended to read as 23
follows: 24
FOR THE OFFICE OF FINANCIAL MANAGEMENT25
Fircrest School Land Use Assessment (92000035)26
The reappropriation in this section is subject to the following 27
conditions and limitations: The reappropriation is subject to the 28
provisions of section 1100, chapter 332, Laws of 2021.29
Reappropriation:30
State Building Construction Account— State. . . . . . (($165,000))31
$3,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . . $335,00033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
TOTAL. . . . . . . . . . . . . . . . . . . . . . (($500,000))35
$338,00036
p. 385 SB 5195
Sec. 7021. 2023 c 474 s 1044 (uncodified) is amended to read as 1
follows: 2
FOR THE DEPARTMENT OF ENTERPRISE SERVICES3
Elevator Modernization (30000786)4
The appropriations in this section are subject to the following 5
conditions and limitations: 6
(1) The reappropriations are subject to the provisions of section 7
1075, chapter 413, Laws of 2019. 8
(2) The appropriation in this section is provided solely for the 9
following list of projects: 10
Plaza Garage, Elevator #4. . . . . . . . . . . . . (($1,417,000))11
Insurance - Elevator No. 1. . . . . . . . . . . . . (($932,000))12
Leg - Elevator No. 5. . . . . . . . . . . . . . . (($2,229,000))13
Leg - Elevator No. 6. . . . . . . . . . . . . . . (($2,229,000))14
TOJ - Elevator No. 1. . . . . . . . . . . . . . . . (($886,000))15
Reappropriation:16
State Building Construction Account— State. . . . . . . $1,316,00017
Thurston County Capital Facilities Account— State. . . $1,229,00018
Subtotal Reappropriation. . . . . . . . . . . . . $2,545,00019
Appropriation:20
Capitol Building Construction Account— State. . . . . . $7,693,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,846,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . . $12,084,00024
Sec. 7022. 2024 c 375 s 1047 (uncodified) is amended to read as 25
follows: 26
FOR THE MILITARY DEPARTMENT27
Tri-Cities Readiness Center (30000808)28
Reappropriation:29
General Fund— Federal. . . . . . . . . . . . . . . . . $1,421,00030
State Building Construction Account— State. . . . . . . . $265,00031
Subtotal Reappropriation. . . . . . . . . . . . . $1,686,00032
Appropriation:33
((General Fund— Federal. . . . . . . . . . . . . . . $2,000,000))34
State Building Construction Account— State. . . . . . (($944,000))35
$244,00036
p. 386 SB 5195
((Subtotal Appropriation. . . . . . . . . . . . $2,944,000))1
Prior Biennia (Expenditures). . . . . . . . . . . . . $16,010,0002
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $03
TOTAL. . . . . . . . . . . . . . . . . . . . (($20,640,000))4
$17,940,0005
6
Sec. 7023. 2023 c 474 s 1066 (uncodified) is amended to read as 7
follows: 8
FOR THE MILITARY DEPARTMENT9
Snohomish Readiness Center (30000930)10
Reappropriation:11
General Fund— Federal. . . . . . . . . . . . . . . . . $3,872,00012
State Building Construction Account— State. . . . . . . $1,406,00013
Subtotal Reappropriation. . . . . . . . . . . . . $5,278,00014
Appropriation:15
General Fund— Federal. . . . . . . . . . . . . . . (($2,196,000))16
$4,196,00017
State Building Construction Account— State. . . . . (($1,707,000))18
$2,407,00019
Subtotal Appropriation. . . . . . . . . . . . (($3,903,000))20
$6,603,00021
Prior Biennia (Expenditures). . . . . . . . . . . . . . $637,00022
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $023
TOTAL. . . . . . . . . . . . . . . . . . . . . (($9,818,000))24
$12,518,00025
NEW SECTION. Sec. 7024. A new section is added to 2024 c 375 26
(uncodified) to read as follows: 27
FOR THE MILITARY DEPARTMENT28
Tumwater Field Maintenance Shop (40000367)29
Appropriation:30
General Fund— Federal. . . . . . . . . . . . . . . . . $3,900,00031
State Building Construction Account— State. . . . . . . . $480,00032
Subtotal Appropriation. . . . . . . . . . . . . . $4,380,00033
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
Future Biennia (Projected Costs). . . . . . . . . . . $49,977,00035
p. 387 SB 5195
TOTAL. . . . . . . . . . . . . . . . . . . . . . $54,357,0001
NEW SECTION. Sec. 7025. A new section is added to 2024 c 375 2
(uncodified) to read as follows: 3
FOR THE WASHINGTON STATE CRIMINAL JUSTICE TRAINING COMMISSION4
Cafeteria Water Damage Repairs (40000043)5
Appropriation:6
State Building Construction Account— State. . . . . . . . $200,0007
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $08
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $09
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $200,00010
Sec. 7026. 2023 c 474 s 2032 (uncodified) is amended to read as 11
follows: 12
FOR THE DEPARTMENT OF HEALTH13
Public Health Lab South Laboratory Addition (30000379)14
Reappropriation:15
State Building Construction Account— State. . . . . . . $4,131,00016
Appropriation:17
State Building Construction Account— State. . . . (($53,452,000))18
$53,498,00019
Prior Biennia (Expenditures). . . . . . . . . . . . . . $998,00020
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $021
TOTAL. . . . . . . . . . . . . . . . . . . . (($58,581,000))22
$58,627,00023
Sec. 7027. 2023 c 474 s 2036 (uncodified) is amended to read as 24
follows: 25
FOR THE DEPARTMENT OF HEALTH26
2023-25 DWSRF State Match (40000066)27
The appropriation in this section is subject to the following 28
conditions and limitations: 29
(1) For projects involving repair, replacement, or improvement of 30
a clean water infrastructure facility or other public works facility 31
for which an investment grade efficiency audit is reasonably 32
obtainable, the department shall require as a contract condition that 33
the project sponsor undertake an investment grade efficiency audit. 34
p. 388 SB 5195
The project sponsor may finance the costs of the audit as part of its 1
drinking water state revolving fund program loan. 2
(2) The department must encourage local government use of 3
federally funded drinking water infrastructure programs operated by 4
the United States department of agriculture rural development agency.5
Appropriation:6
Drinking Water Assistance Account— State. . . . . . (($3,500,000))7
$1,468,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . . $69,000,00010
TOTAL. . . . . . . . . . . . . . . . . . . . (($72,500,000))11
$70,468,00012
NEW SECTION. Sec. 7028. A new section is added to 2024 c 375 13
(uncodified) to read as follows: 14
FOR THE DEPARTMENT OF HEALTH15
Supplemental Repayment Spending Authority (40000087)16
Appropriation:17
Drinking Water Assistance Account— State. . . . . . . $50,000,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $50,000,00021
Sec. 7029. 2024 c 375 s 2011 (uncodified) is amended to read as 22
follows: 23
FOR THE DEPARTMENT OF HEALTH24
Hannah Heights PFAS Contaminated Well and Water Supply (92000210)25
Appropriation:26
Model Toxics Control Capital Account— State. . . . (($2,200,000))27
$1,979,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,200,000))31
$1,979,00032
Sec. 7030. 2024 c 375 s 6023 (uncodified) is amended to read as 33
follows: 34
p. 389 SB 5195
FOR THE DEPARTMENT OF VETERANS AFFAIRS1
WVH HVAC Retrofit (40000006)2
Reappropriation:3
State Building Construction Account— State. . . . . . . . $424,0004
Appropriation:5
State Building Construction Account— State. . . . . . . $3,800,0006
Prior Biennia (Expenditures). . . . . . . . . . . . . . $326,0007
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $08
TOTAL. . . . . . . . . . . . . . . . . . . . . . (($750,000))9
$4,550,00010
NEW SECTION. Sec. 7031. A new section is added to 2024 c 375 11
(uncodified) to read as follows: 12
FOR THE DEPARTMENT OF CHILDREN, YOUTH, AND FAMILIES13
Additional JR Capacity (40000607)14
Appropriation:15
State Building Construction Account— State. . . . . . . . $800,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $800,00019
NEW SECTION. Sec. 7032. A new section is added to 2024 c 375 20
(uncodified) to read as follows: 21
FOR THE DEPARTMENT OF ECOLOGY22
State Parks Relocation to Ecology Headquarters Building 23
(40000718)24
Appropriation:25
State Building Construction Account— State. . . . . . . $1,618,00026
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $027
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $028
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $1,618,00029
Sec. 7033. 2023 c 474 s 3041 (uncodified) is amended to read as 30
follows: 31
FOR THE STATE PARKS AND RECREATION COMMISSION32
Lake Chelan State Park Moorage Dock Pile Replacement (30000416)33
Reappropriation:34
p. 390 SB 5195
State Building Construction Account— State. . . . . . . . $72,0001
Appropriation:2
State Building Construction Account— State. . . . . . (($574,000))3
$523,0004
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,772,0005
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $06
TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,418,000))7
$2,367,0008
Sec. 7034. 2023 c 474 s 6344 (uncodified) is amended to read as 9
follows: 10
FOR THE STATE PARKS AND RECREATION COMMISSION11
Field Spring Replace Failed Sewage Syst & Non-ADA Comfort Station 12
(30000951)13
Reappropriation:14
State Building Construction Account— State. . . . . . (($538,000))15
$420,00016
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,210,00017
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $018
TOTAL. . . . . . . . . . . . . . . . . . . . . (($1,748,000))19
$1,630,00020
Sec. 7035. 2023 c 474 s 6345 (uncodified) is amended to read as 21
follows: 22
FOR THE STATE PARKS AND RECREATION COMMISSION23
Mount Spokane - Maintenance Facility Relocation from Harms Way 24
(30000959)25
Reappropriation:26
State Building Construction Account— State. . . . . (($1,750,000))27
$1,919,00028
Prior Biennia (Expenditures). . . . . . . . . . . . . . $691,00029
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $030
TOTAL. . . . . . . . . . . . . . . . . . . . . (($2,441,000))31
$2,610,00032
Sec. 7036. 2024 c 375 s 3019 (uncodified) is amended to read as 33
follows: 34
p. 391 SB 5195
FOR THE STATE CONSERVATION COMMISSION1
2023-25 Conservation Reserve Enhancement Program (CREP) 2
(40000023)3
The appropriations in this section are subject to the following 4
conditions and limitations: The state conservation commission may 5
expend the state building construction account — state appropriation 6
and natural climate solutions account — state appropriation in this 7
section as grants to private land owners who were enrolled in the 8
conservation reserve enhancement program, and whose acreage meets 9
state program goals of providing riparian habitat or hydrologically 10
connected wetland enhancements in salmon-bearing streams as 11
determined by the Washington state department of fish and wildlife, 12
but are now disenrolled due to a contract termination by the United 13
States department of agriculture (USDA) farm service agency, or who 14
voluntary terminated their enrollment as a result of the USDA farm 15
service agency audit. 16
Appropriation:17
((Natural Climate Solutions Account— State. . . . . $11,000,000))18
State Building Construction Account— State. . . . . (($4,000,000))19
$6,000,00020
((Subtotal Appropriation. . . . . . . . . . . . $15,000,000))21
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . . . $60,000,00023
TOTAL. . . . . . . . . . . . . . . . . . . . (($75,000,000))24
$66,000,00025
NEW SECTION. Sec. 7037. A new section is added to 2024 c 375 26
(uncodified) to read as follows: 27
FOR THE STATE CONSERVATION COMMISSION28
2023-25 Alternative Manure Management (40000052)29
The appropriation in this section is subject to the following 30
conditions and limitations: The appropriation in this section is 31
provided solely for the commission to provide financial and technical 32
assistance for alternative manure management project development and 33
implementation. 34
Appropriation:35
Climate Commitment Account— State. . . . . . . . . . . $2,900,00036
p. 392 SB 5195
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $01
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $02
TOTAL. . . . . . . . . . . . . . . . . . . . . . . $2,900,0003
Sec. 7038. 2024 c 375 s 3020 (uncodified) is amended to read as 4
follows: 5
FOR THE STATE CONSERVATION COMMISSION6
Anaerobic Digester Development (91001830)7
The appropriation in this section is subject to the following 8
conditions and limitations: 9
(1)(((a) $22,000,000)) $11,000,000 of the appropriation in this 10
section is provided solely for grants ((to dairy farm owners )) for 11
cost share agreements regarding anaerobic digester development. 12
Grants awarded for anaerobic digester development must have at least 13
a ((50)) 10 percent nonstate match and be awarded through a 14
competitive process that considers: 15
(((i))) (a) The amount of greenhouse gas reduction expected to be 16
achieved by the proposal; and 17
(((ii))) (b) The amount of untreated effluent expected to be 18
reduced by the proposal. 19
(((b))) (2) Recipients of grants under this section must provide 20
a report to the commission within one year of receipt of the grant, 21
detailing the success of the project in meeting the stated criteria 22
in the competitive process. 23
(((2) $2,900,000 of the appropriation in this section is provided 24
solely for the commission to provide financial and technical 25
assistance for project predevelopment.))26
Appropriation:27
Climate Commitment Account— State. . . . . . . . . (($24,900,000))28
$11,000,00029
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $030
Future Biennia (Projected Costs). . . . . . . . . . . $99,600,00031
TOTAL. . . . . . . . . . . . . . . . . . . . (($124,500,000))32
$110,600,00033
Sec. 7039. 2023 c 474 s 3134 (uncodified) is amended to read as 34
follows: 35
FOR THE DEPARTMENT OF NATURAL RESOURCES36
p. 393 SB 5195
Land Appraisals (92000057)1
The appropriation in this section is subject to the following 2
conditions and limitations: The appropriation in this section is 3
provided solely for the department to conduct land appraisals of 4
parcel number 55161.9025 located in the City of Liberty Lake in 5
Spokane county and the Geiger field property operated by the national 6
guard and located at the Spokane international airport. The 7
department shall complete the land appraisals and provide the 8
legislature with findings by December 1, 2023. 9
Appropriation:10
State Building Construction Account— State. . . . . . (($40,000))11
$25,00012
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $013
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $014
TOTAL. . . . . . . . . . . . . . . . . . . . . . (($40,000))15
$25,00016
NEW SECTION. Sec. 7040. A new section is added to 2024 c 375 17
(uncodified) to read as follows: 18
FOR THE WASHINGTON STATE PATROL19
Vancouver Crime Lab Chiller Replacement (40000097)20
Appropriation:21
State Building Construction Account— State. . . . . . . . $988,00022
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $023
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $024
TOTAL. . . . . . . . . . . . . . . . . . . . . . . . $988,00025
Sec. 7041. 2024 c 375 s 5001 (uncodified) is amended to read as 26
follows: 27
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION28
West Sound Technical Skills Center Modernization (40000015)29
The appropriations in this section are subject to the following 30
conditions and limitations: The reappropriation is subject to the 31
provisions of section 5003, chapter 269, Laws of 2022.32
Reappropriation:33
State Building Construction Account— State. . . . . . $10,990,00034
Appropriation:35
p. 394 SB 5195
School Construction and Skill Centers Building 1
Account— State. . . . . . . . . . . . . . . . . . . . $755,0002
((Common School Construction Account— State. . . . . $40,606,000))3
State Building Construction Account— State. . . . . . $40,606,0004
Subtotal Appropriation. . . . . . . . . . . . . . $41,361,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . $410,0006
Future Biennia (Projected Costs). . . . . . . . . . . $44,343,0007
TOTAL. . . . . . . . . . . . . . . . . . . . . . $97,104,0008
Sec. 7042. 2024 c 375 s 5004 (uncodified) is amended to read as 9
follows: 10
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION11
2023-25 School District Health and Safety (40000067)12
The appropriation in this section is subject to the following 13
conditions and limitations: 14
(1) $11,000,000 of the appropriation in this section is provided 15
solely for emergency repair grants to address unexpected and imminent 16
health and safety hazards at K-12 public schools, including skill 17
centers, that will impact the day-to-day operations of the school 18
facility, and this is the maximum amount that may be spent for this 19
purpose. For emergency repair grants only, an emergency declaration 20
must be signed by the school district board of directors and 21
submitted to the superintendent of public instruction for 22
consideration. The emergency declaration must include a description 23
of the imminent health and safety hazard, the possible cause, the 24
proposed scope of emergency repair work and related cost estimate, 25
and identification of local funding to be applied to the project. 26
Grants of emergency repair moneys must be conditioned upon the 27
written commitment and plan of the school district board of directors 28
to repay the grant with any insurance payments or other judgments 29
that may be awarded, if applicable. 30
(2) $12,700,000 of the appropriation in this section is provided 31
solely for urgent repair grants to address nonreccurring urgent small 32
repair projects at K-12 public schools, excluding skill centers, that 33
could impact the health and safety of students and staff if not 34
completed, and this is the maximum amount that may be spent for this 35
purpose. The office of the superintendent of public instruction, 36
after consulting with maintenance and operations administrators of 37
school districts, shall develop criteria and assurances for providing 38
p. 395 SB 5195
funding for specific projects through a competitive grant program. 1
The criteria and assurances must include, but are not limited to, the 2
following: (a) Limiting school districts to one grant, not to exceed 3
$500,000, per three-year period; (b) prioritizing applications based 4
on limited school district financial resources for the project; and 5
(c) requiring any district receiving funding provided in this section 6
to demonstrate a consistent commitment to addressing school facility 7
needs. The grant applications must include a comprehensive 8
description of the health and safety issues to be addressed, a 9
detailed description of the remedy, including a detailed cost 10
estimate of the repair or replacement work to be performed, and 11
identification of local funding, if any, which will be applied to the 12
project. Grants may be used for, but are not limited to: Repair or 13
replacement of failing building systems, abatement of potentially 14
hazardous materials, and safety-related structural improvements.15
(3) $4,600,000 of the appropriation in this section is provided 16
solely for equal access grants for facility repairs and alterations 17
at K-12 public schools, including skills centers, to improve 18
compliance with the Americans with disabilities act and individuals 19
with disabilities education act, and this is the maximum amount that 20
may be spent for this purpose. The office of the superintendent of 21
public instruction shall develop criteria and assurances for 22
providing funding for specific projects through a competitive grant 23
program. The criteria and assurances must include, but are not 24
limited to, the following: (a) Limiting districts to one grant, not 25
to exceed $100,000, per three-year period; (b) prioritizing 26
applications based on limited school district financial resources for 27
the project; and (c) requiring recipient districts to demonstrate a 28
consistent commitment to addressing school facility needs. The grant 29
applications must include a description of the Americans with 30
disabilities act or individuals with disabilities education act 31
compliance deficiency, a comprehensive description of the facility 32
accessibility issues to be addressed, a detailed description of the 33
remedy including a detailed cost estimate of the repair or 34
replacement work to be performed, and identification of local 35
funding, if any, which will be applied to the project. Priority for 36
grant funding must be given to school districts that demonstrate a 37
lack of capital resources to address the compliance deficiencies 38
outlined in the grant application. 39
p. 396 SB 5195
(4) The superintendent of public instruction must notify the 1
office of financial management, the legislative evaluation and 2
accountability program committee, the house capital budget committee, 3
and the senate ways and means committee as projects described in 4
subsection (1) of this section are approved for funding.5
Appropriation:6
((Common School Construction Account— State. . . . . $28,300,000))7
State Building Construction Account— State. . . . . . $28,300,0008
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $09
Future Biennia (Projected Costs). . . . . . . . . . $113,200,00010
TOTAL. . . . . . . . . . . . . . . . . . . . . . $141,500,00011
Sec. 7043. 2024 c 375 s 5006 (uncodified) is amended to read as 12
follows: 13
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION14
2023-25 Skills Centers Minor Works (40000070)15
Appropriation:16
((Common School Construction Account— State. . . . . $5,135,000))17
State Building Construction Account— State. . . . . . . $5,135,00018
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $019
Future Biennia (Projected Costs). . . . . . . . . . . $20,540,00020
TOTAL. . . . . . . . . . . . . . . . . . . . . . $25,675,00021
Sec. 7044. 2024 c 375 s 5010 (uncodified) is amended to read as 22
follows: 23
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION24
Career and Technical Education Projects (91000534)25
The appropriation s in this section ((is)) are subject to the 26
following conditions and limitations: The appropriation is provided 27
solely for the following list of projects: 28
Cascadia Tech: Natural Resource Outdoor Learning29
Collaboration. . . . . . . . . . . . . . . . . . . $1,154,00030
Sequim School District CTE Center of Excellence31
Phase 1. . . . . . . . . . . . . . . . . . . . . . $4,990,00032
Tri-Tech Skills Center. . . . . . . . . . . . . . . . $45,496,00033
Whatcom County Skills Center Preconstruction. . . . . $2,100,00034
Wenatchee Valley Technical Skills Center. . . . . . . $14,463,00035
p. 397 SB 5195
Appropriation:1
Common School Construction Account— State. . . . . (($68,203,000))2
$60,619,0003
State Building Construction Account— State. . . . . . . $7,584,0004
Subtotal Appropriation. . . . . . . . . . . . . . $68,203,0005
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $06
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $07
TOTAL. . . . . . . . . . . . . . . . . . . . . . $68,203,0008
Sec. 7045. 2024 c 375 s 5012 (uncodified) is amended to read as 9
follows: 10
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION11
2023-25 Distressed Schools (92000928)12
The appropriation in this section is subject to the following 13
conditions and limitations: The appropriation is provided solely for 14
the following list of projects: 15
Cascadia Technical Academy (Vancouver). . . . . . . . . $250,00016
Ingraham High School Construction Trades Skills17
Center (Seattle). . . . . . . . . . . . . . . . . . $527,00018
Maritime 253: South Puget Sound Maritime Skills19
Center (Tacoma). . . . . . . . . . . . . . . . . . $8,000,00020
Marysville School District. . . . . . . . . . . . . . $3,600,00021
Quilcene Elementary HVAC. . . . . . . . . . . . . . . . $175,00022
Rainier Beach High School Campus Skills Center. . . . $9,915,00023
Seattle Skills Center (Seattle). . . . . . . . . . . . $2,200,00024
Stevenson-Carson High School (Stevenson). . . . . . . . $750,00025
Washington Middle School (Seattle). . . . . . . . . . . . $98,00026
Wishram School District Portables. . . . . . . . . . . . $975,00027
Whittier Elementary School. . . . . . . . . . . . . . $5,625,00028
Appropriation:29
State Building Construction Account— State. . . . (($21,740,000))30
$32,115,00031
((Common School Construction Account— State. . . . . . $10,375,00032
Subtotal Appropriation. . . . . . . . . . . . . $32,115,000))33
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $034
Future Biennia (Projected Costs). . . . . . . . . . $128,460,00035
TOTAL. . . . . . . . . . . . . . . . . . . . . . $160,575,00036
p. 398 SB 5195
Sec. 7046. 2024 c 375 s 5013 (uncodified) is amended to read as 1
follows: 2
FOR THE SUPERINTENDENT OF PUBLIC INSTRUCTION3
2024 School Construction Assistance Program Enhancement 4
(92001066)5
The appropriation((s)) in this section ((are)) is subject to the 6
following conditions and limitations: The appropriation ((s)) in this 7
section ((are)) is provided solely for increasing the construction 8
cost allocation, which is used to determine the maximum cost per 9
square foot of construction that the state will recognize in the 10
school construction assistance program, from $271.61 per square foot 11
to $375.00 per square foot in fiscal year 2025. It is the intent of 12
the legislature to increase the construction cost allocation by the 13
same inflation rate used by the office of financial management's 14
C-100 form in subsequent years. This inflation rate is the same rate 15
used by all other state agencies for determining future costs.16
Appropriation:17
Common School Construction Fund— State. . . . . . (($24,216,000))18
$12,000,00019
((State Building Construction Account— State. . . . . $55,000,00020
Subtotal Appropriation. . . . . . . . . . . . . $79,216,000))21
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $022
Future Biennia (Projected Costs). . . . . . . . . $1,400,683,00023
TOTAL. . . . . . . . . . . . . . . . . . . (($1,479,899,000))24
$1,412,683,00025
Sec. 7047. 2023 c 474 s 6492 (uncodified) is amended to read as 26
follows: 27
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM28
Wenatchee Valley: Wells Hall Replacement (30000985)29
Reappropriation:30
State Building Construction Account— State. . . . . (($2,974,000))31
$1,258,00032
Prior Biennia (Expenditures). . . . . . . . . . . . . $29,397,00033
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $034
TOTAL. . . . . . . . . . . . . . . . . . . . (($32,371,000))35
$30,655,00036
p. 399 SB 5195
Sec. 7048. 2023 c 474 s 6505 (uncodified) is amended to read as 1
follows: 2
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM3
Bellevue: Center for Transdisciplinary Learning and Innovation 4
(40000168)5
Reappropriation:6
State Building Construction Account— State. . . . . . $41,749,0007
Appropriation:8
Capital Community Assistance Account— State. . . . . . $2,000,0009
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,032,00010
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $011
TOTAL. . . . . . . . . . . . . . . . . . . . (($42,781,000))12
$44,781,00013
Sec. 7049. 2023 c 474 s 5080 (uncodified) is amended to read as 14
follows: 15
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM16
Wenatchee: Center for Technical Education and Innovation 17
(40000198)18
Reappropriation:19
State Building Construction Account— State. . . . . . . $1,949,00020
Appropriation:21
State Building Construction Account— State. . . . (($46,471,000))22
$48,187,00023
Prior Biennia (Expenditures). . . . . . . . . . . . . $1,317,00024
Future Biennia (Projected Costs). . . . . . . . . . . . . . . $025
TOTAL. . . . . . . . . . . . . . . . . . . . (($49,737,000))26
$51,453,00027
Sec. 7050. 2023 c 474 s 5083 (uncodified) is amended to read as 28
follows: 29
FOR THE COMMUNITY AND TECHNICAL COLLEGE SYSTEM30
Minor Works - Preservation (23-25) (40000630)31
Appropriation:32
Model Toxics Control Capital Account— State. . . . . . $2,000,00033
Community and Technical College Capital34
Projects Account— State. . . . . . . . . . . . . . $1,200,00035
p. 400 SB 5195
State Building Construction Account— State. . . . . . $26,724,0001
Subtotal Appropriation. . . . . . . . . . . . (($28,724,000))2
$29,924,0003
Prior Biennia (Expenditures). . . . . . . . . . . . . . . . . $04
Future Biennia (Projected Costs). . . . . . . . . . $114,896,0005
TOTAL. . . . . . . . . . . . . . . . . . . . (($143,620,000))6
$144,820,0007
Sec. 7051. 2023 c 474 s 8019 (uncodified) is amended to read as 8
follows: 9
FOR THE STATE TREASURER— TRANSFERS10
(1) Public Works Assistance Account: For transfer to the11
water pollution control revolving account— state, up to12
$17,500,000 for fiscal year 2024 and up to $17,500,00013
for fiscal year 2025. . . . . . . . . . . . . . . . . . . $35,000,00014
(2) Public Works Assistance Account: For transfer15
to the drinking water assistance account— state, up to16
(($1,750,000)) $1,468,000 for fiscal year 2024 ((and17
up to $1,750,000 for fiscal year 2025)). . . . . . . . (($3,500,000))18
$1,468,00019
NEW SECTION. Sec. 7052. The following acts or parts of acts are 20
each repealed:21
(1) 2023 c 474 s 6071 (uncodified); and 22
(2) 2023 c 474 s 6088 (uncodified). 23
(End of part)
p. 401 SB 5195
PART 81
MISCELLANEOUS PROVISIONS2
NEW SECTION. Sec. 8001. RCW 43.88.031 requires the disclosure 3
of the estimated debt service costs associated with new capital bond 4
appropriations. The estimated debt service costs for the 5
appropriations contained in this act are $72,885,731 for the 6
2025-2027 biennium, $415,019,779 for the 2027-2029 biennium, and 7
$605,041,075 for the 2029-2031 biennium. 8
NEW SECTION. Sec. 8002. ACQUISITION OF PROPERTIES AND 9
FACILITIES THROUGH FINANCIAL CONTRACTS. (1) The following agencies 10
may enter into financial contracts, paid from any funds of an agency, 11
appropriated or nonappropriated, for the purposes indicated and in 12
not more than the principal amounts indicated, plus financing 13
expenses and required reserves pursuant to chapter 39.94 RCW. When 14
securing properties under this section, agencies shall use the most 15
economical financial contract option available, including long-term 16
leases, lease-purchase agreements, lease-development with option to 17
purchase agreements or financial contracts using certificates of 18
participation. Expenditures made by an agency for one of the 19
indicated purposes before the issue date of the authorized financial 20
contract and any certificates of participation therein are intended 21
to be reimbursed from proceeds of the financial contract and any 22
certificates of participation therein to the extent provided in the 23
agency's financing plan approved by the state finance committee.24
(2) Those noninstructional facilities of higher education 25
institutions authorized in this section to enter into financial 26
contracts are not eligible for state funded maintenance and 27
operations. Instructional space that is available for regularly 28
scheduled classes for academic transfer, basic skills, and workforce 29
training programs may be eligible for state funded maintenance and 30
operations. 31
(3) Western Washington University: Enter into a financing 32
contract for up to $3,000,000 plus financing expenses, required 33
reserves, and capitalized interest pursuant to chapter 39.94 RCW to 34
construct a parking lot replacement. 35
(4) Community and technical colleges: 36
(a) Enter into a financing contract on behalf of Columbia Basin 37
College for up to $18,000,000 plus financing expenses, required 38
p. 402 SB 5195
reserves, and capitalized interest pursuant to chapter 39.94 RCW to 1
construct student housing. 2
(b) Enter into a financing contract on behalf of Edmonds College 3
for up to $9,000,000 plus financing expenses, required reserves, and 4
capitalized interest pursuant to chapter 39.94 RCW to construct 5
student housing. 6
(c) Enter into a financing contract on behalf of Clover Park 7
Technical College for up to $15,000,000 plus financing expenses, 8
required reserves, and capitalized interest pursuant to chapter 39.94 9
RCW to construct an eastside training facility. 10
NEW SECTION. Sec. 8003. (1) To ensure that major construction 11
projects are carried out in accordance with legislative and executive 12
intent, agencies must complete a predesign for state construction 13
projects with a total anticipated cost in excess of $10,000,000. For 14
purposes of this section, "total anticipated cost" means the sum of 15
the anticipated cost of the predesign, design, and construction 16
phases of the project.17
(2) Appropriations for design may not be expended or encumbered 18
until the office of financial management has reviewed and approved 19
the agency's predesign. 20
(3) The predesign must explore at least three project 21
alternatives. These alternatives must be both distinctly different 22
and viable solutions to the issue being addressed. The chosen 23
alternative should be the most reasonable and cost-effective 24
solution. The predesign document must include, but not be limited to, 25
program, site, and cost analysis, and an analysis of the life-cycle 26
costs of the alternatives explored, in accordance with the predesign 27
manual adopted by the office of financial management.28
(4) For projects exceeding the $10,000,000 predesign threshold 29
established in this section, the office of financial management may 30
make an exception to some or all of the predesign requirements in 31
this section. The office of financial management shall report any 32
exception to the fiscal committees of the legislature:33
(a) A description of the major capital project for which the 34
predesign waiver is made; 35
(b) An explanation of the reason for the waiver; and36
(c) A rough order of magnitude cost estimate for the project's 37
design and construction. 38
p. 403 SB 5195
(5) In deliberations related to submitting an exception under 1
this section, the office of financial management shall consider the 2
following factors: 3
(a) Whether there is any determination to be made regarding the 4
site of the project; 5
(b) Whether there is any determination to be made regarding 6
whether the project will involve renovation, new construction, or 7
both; 8
(c) Whether, within six years of submitting the request for 9
funding, the agency has completed, or initiated the construction of, 10
a substantially similar project; 11
(d) Whether there is any anticipated change to the project's 12
program or the services to be delivered at the facility;13
(e) Whether the requesting agency indicates that the project may 14
not require some or all of the predesign requirements in this section 15
due to a lack of complexity; and 16
(f) Whether any other factors related to project complexity or 17
risk, as determined by the office of financial management, could 18
reduce the need for, or scope of, a predesign. 19
(6) If under this section, some or all predesign requirements are 20
waived, the office of financial management may instead propose a 21
professional project cost estimate instead of a request for predesign 22
funding. 23
NEW SECTION. Sec. 8004. (1) The legislature finds that use of 24
life-cycle cost analysis will aid public entities, architects, 25
engineers, and contractors in making design and construction 26
decisions that positively impact both the initial construction cost 27
and the ongoing operating and maintenance cost of a project. To 28
ensure that the total cost of a project is accounted for and the most 29
reasonable and cost efficient design is used, agencies shall develop 30
life-cycle costs for any construction project over $10,000,000. The 31
life-cycle costs must represent the present value sum of capital 32
costs, installation costs, operating costs, and maintenance costs 33
over the life expectancy of the project. The legislature further 34
finds the most effective approach to the life-cycle cost analysis is 35
to integrate it into the early part of the design process.36
(2) Agencies must develop a minimum of three project alternatives 37
for use in the life-cycle cost analysis. These alternatives must be 38
both distinctly different and viable solutions to the issue being 39
p. 404 SB 5195
addressed. Agencies must choose the most reasonable and cost-1
effective solution, as supported by the life-cycle cost analysis. A 2
brief description of each project alternative and why it was chosen 3
must be included in the life-cycle cost analysis section of the 4
predesign. 5
(3) The office of financial management shall: (a) Make available 6
a life-cycle cost model to be used for analysis; (b) in consultation 7
with the department of enterprise services, provide assistance in 8
using the life-cycle cost model; and (c) update the life-cycle cost 9
model annually including assumptions for inflation rates, discount 10
rates, and energy rates. 11
(4) Agencies shall consider architectural and engineering firms' 12
and general contractors' experience using life-cycle costs, operating 13
costs, and energy efficiency measures when selecting an architectural 14
and engineering firm, or when selecting contractors using alternative 15
contracting methods. 16
NEW SECTION. Sec. 8005. Agencies administering construction 17
projects with a total anticipated cost in excess of $10,000,000 must 18
submit progress reports to the office of financial management and to 19
the fiscal committees of the house of representatives and senate. 20
"Total anticipated cost" means the sum of the anticipated cost of the 21
predesign, design, and construction phases of the project. Reports 22
must be submitted on July 1st and December 31st of each year in a 23
format determined by the office of financial management. After the 24
project is completed, agencies must also submit a closeout report 25
that identifies the total project cost and any unspent 26
appropriations.27
NEW SECTION. Sec. 8006. (1) Allotments for appropriations in 28
this act shall be provided in accordance with the capital project 29
review requirements adopted by the office of financial management and 30
in compliance with RCW 43.88.110. Projects that will be employing 31
alternative public works construction procedures under chapter 39.10 32
RCW are subject to the allotment procedures defined in this section 33
and RCW 43.88.110.34
(2) Each project is defined as proposed in the legislative budget 35
notes or in the governor's budget document. 36
p. 405 SB 5195
NEW SECTION. Sec. 8007. (1) The office of financial management 1
may authorize a transfer of appropriation authority provided for a 2
capital project that is in excess of the amount required for the 3
completion of such project to another capital project for which the 4
appropriation is insufficient. No such transfer may be used to expand 5
the capacity of any facility beyond that intended in making the 6
appropriation. Such transfers may be effected only between capital 7
appropriations to a specific department, commission, agency, or 8
institution of higher education and only between capital projects 9
that are funded from the same fund or account. No transfers may occur 10
between projects to local government agencies except where the grants 11
are provided within a single omnibus appropriation and where such 12
transfers are specifically authorized by the implementing statutes 13
that govern the grants.14
(2) The office of financial management may find that an amount is 15
in excess of the amount required for the completion of a project only 16
if: (a) The project as defined in the notes to the budget document is 17
substantially complete and there are funds remaining; or (b) bids 18
have been let on a project and it appears to a substantial certainty 19
that the project as defined in the notes to the budget document can 20
be completed within the biennium for less than the amount 21
appropriated in this act. 22
(3) For the purposes of this section, the intent is that each 23
project be defined as proposed to the legislature in the governor's 24
budget document, unless it clearly appears from the legislative 25
history that the legislature intended to define the scope of a 26
project in a different way. 27
(4) A report of any transfer effected under this section, except 28
emergency projects or any transfer under $250,000, shall be filed 29
with the fiscal committees of the legislature by the office of 30
financial management at least 30 days before the date the transfer is 31
effected. The office of financial management shall report all 32
emergency or smaller transfers within 30 days from the date of 33
transfer. 34
NEW SECTION. Sec. 8008. (1) It is expected that projects be 35
ready to proceed in a timely manner depending on the type or phase of 36
the project or program that is the subject of the appropriation in 37
this act. Except for major projects that customarily may take more 38
than two biennia to complete from predesign to the end of 39
p. 406 SB 5195
construction, or large infrastructure grant or loan programs 1
supporting projects that often take more than two biennia to 2
complete, the legislature generally does not intend to reappropriate 3
funds more than once, particularly for smaller grant programs, local/4
community projects, and minor works. 5
(2) Agencies shall expedite the expenditure of reappropriations 6
and appropriations in this act in order to: (a) Rehabilitate 7
infrastructure resources; (b) accelerate environmental rehabilitation 8
and restoration projects for the improvement of the state's natural 9
environment; (c) reduce additional costs associated with acquisition 10
and construction inflationary pressures; and (d) provide additional 11
employment opportunities associated with capital expenditures.12
(3) To the extent feasible, agencies are directed to accelerate 13
expenditure rates at their current level of permanent employees and 14
shall use contracted design and construction services wherever 15
necessary to meet the goals of this section. 16
NEW SECTION. Sec. 8009. Any building project that receives over 17
$10,000,000 in funding from the capital budget must be built to 18
sustainable standards. "Sustainable building" means a building that 19
integrates and optimizes all major high-performance building 20
attributes, including energy efficiency, durability, life-cycle 21
performance, and occupant productivity, and minimizes greenhouse gas 22
emissions. The following design and construction attributes must be 23
integrated into the building project:24
(1) Employ integrated design principles: Use a collaborative, 25
integrated planning and design process that initiates and maintains 26
an integrated project team in all stages of a project's planning and 27
delivery. Establish performance goals for siting, energy, water, 28
materials, and indoor environmental quality along with other 29
comprehensive design goals and ensures incorporation of these goals 30
throughout the design and life-cycle of the building. Consider all 31
stages of the building's life-cycle, including deconstruction.32
(2) Commissioning: Employ commissioning practices tailored to the 33
size and complexity of the building and its system components in 34
order to verify performance of building components and systems and 35
help ensure that design requirements are met. This should include an 36
experienced commissioning provider, inclusion of commissioning 37
requirements in construction documents, a commissioning plan, 38
p. 407 SB 5195
verification of the installation and performance of systems to be 1
commissioned, and a commissioning report. 2
(3) Optimize energy performance: Establish a whole building 3
performance target that takes into account the intended use, 4
occupancy, operations, plug loads, other energy demands, and design 5
to earn the ENERGY STAR targets for new construction and major 6
renovation where applicable. For new construction target low energy 7
use index. For major renovations, target reducing energy use by 50 8
percent below prerenovation baseline. 9
(4) On-site renewable energy: Implement renewable energy 10
generation projects on agency property for agency use, when life-11
cycle cost effective. 12
(5) High-efficiency electric equipment: Use only high-efficiency 13
electric equipment for water and space heating needs not met through 14
on-site renewable energy, when life-cycle cost effective.15
(6) Measurement and verification: For buildings over 50,000 16
square feet, install building level electricity meters in new major 17
construction and renovation projects to track and continuously 18
optimize performance. Include equivalent meters for natural gas and 19
steam, where natural gas and steam are used. Where appropriate, 20
install dashboards inside buildings to display and incentivize 21
occupants on energy use. 22
(7) Benchmarking: Compare performance data from the first year of 23
operation with the energy design target. Verify that the building 24
performance meets or exceeds the design target. For other building 25
and space types, use an equivalent benchmarking tool.26
NEW SECTION. Sec. 8010. State agencies, including institutions 27
of higher education, shall allot and report full-time equivalent 28
staff for capital projects in a manner comparable to staff reporting 29
for operating expenditures.30
NEW SECTION. Sec. 8011. Executive Order No. 21-02, 31
archaeological and cultural resources, was issued effective April 7, 32
2021. Agencies shall comply with the requirements set forth in this 33
executive order and must consult with the department of archaeology 34
and historic preservation and affected tribes on the potential 35
effects of projects on cultural resources and historic properties 36
proposed in state-funded construction or acquisition projects, 37
including grant or pass-through funding that culminates in 38
p. 408 SB 5195
construction or land acquisitions. Consultation with the department 1
of archaeology and historic preservation and affected tribes must be 2
initiated early in the project planning process, prior to 3
construction or taking title. 4
NEW SECTION. Sec. 8012. FOR THE ARTS COMMISSION — ART WORK 5
ALLOWANCE. (1) One-half of one percent of moneys appropriated in this 6
act for original construction of school plant facilities is provided 7
solely for the purposes of RCW 28A.335.210.8
(2) One-half of one percent of moneys appropriated in this act 9
for original construction or any major renovation or remodel work 10
exceeding $200,000 by colleges or universities is provided solely for 11
the purposes of RCW 28B.10.027. 12
(3) One-half of one percent of moneys appropriated in this act 13
for original construction of any public building by a state agency 14
identified in RCW 43.17.200 is provided solely for the purposes of 15
RCW 43.17.200. 16
(4) At least 75 percent of the moneys spent by the Washington 17
state arts commission during the 2025-2027 fiscal biennium for the 18
purposes of RCW 28A.335.210, 28B.10.027, and 43.17.200 must be 19
expended solely for direct acquisition of works of art; 20 percent 20
may be expended for program administration; and 5 percent may be 21
expended to conserve or maintain existing pieces in the state art 22
collection. 23
NEW SECTION. Sec. 8013. To carry out the provisions of this 24
act, the governor may assign responsibility for predesign, design, 25
construction, and other related activities to any appropriate agency.26
NEW SECTION. Sec. 8014. If any federal moneys appropriated by 27
this act for capital projects are not received by the state, the 28
department or agency to which the moneys were appropriated may 29
replace the federal moneys with funds available from private or local 30
sources. No replacement may occur under this section without the 31
prior approval of the director of financial management in 32
consultation with the senate ways and means committee and the house 33
of representatives capital budget committee.34
NEW SECTION. Sec. 8015. (1) Unless otherwise stated, for all 35
appropriations under this act that require a match of nonstate money 36
p. 409 SB 5195
or in-kind contributions, the following requirement, consistent with 1
RCW 43.88.150, shall apply: Expenditures of state money shall be 2
timed so that the state share of project expenditures never exceeds 3
the intended state share of total project costs. 4
(2) Provision of the full amount of required matching funds is 5
not required to permit the expenditure of capital budget 6
appropriations for phased projects if a proportional amount of the 7
required matching funds is provided for each distinct, identifiable 8
phase of the project. 9
NEW SECTION. Sec. 8016. NONTAXABLE AND TAXABLE BOND PROCEEDS. 10
Portions of the appropriation authority granted by this act from the 11
state building construction account, or any other account receiving 12
bond proceeds, may be transferred to the state taxable building 13
construction account as deemed necessary by the state treasurer, on 14
behalf of the state finance committee, to comply with the federal 15
internal revenue service rules and regulations pertaining to the use 16
of nontaxable bond proceeds. Portions of the general obligation bond 17
proceeds authorized by chapter . . ., Laws of 2025 ((Z-0218/25) state 18
general obligation bonds and related accounts) for deposit into the 19
state taxable building construction account that are in excess of 20
amounts required to comply with the federal internal revenue service 21
rules and regulations shall be deposited into the state building 22
construction account. The state treasurer shall submit written 23
notification to the director of financial management and the 24
legislative evaluation and accountability program committee if it is 25
determined that a shift of appropriation authority between the state 26
building construction account, or any other account receiving bond 27
proceeds, and the state taxable building construction account is 28
necessary, or that a shift of appropriation authority from the state 29
taxable building construction account, or any other account receiving 30
taxable bond proceeds, to the state building construction account may 31
be made.32
NEW SECTION. Sec. 8017. (1) Minor works project lists are 33
single line appropriations that include multiple projects of a 34
similar nature and that are valued between $25,000 and $1,500,000 35
each, with the exception of higher education minor works projects 36
that may be valued up to $2,000,000. Funds appropriated in this act 37
for minor works may not be initially allotted until agencies submit 38
p. 410 SB 5195
project lists to the office of financial management for review and 1
approval. 2
(2) Revisions to the project lists, including the addition of 3
projects and the transfer of funds between projects, are allowed but 4
must be submitted to the office of financial management, the house of 5
representatives capital budget committee, and the senate ways and 6
means committee for review and comment, and must include an 7
explanation of variances from prior approved lists. Any project list 8
revisions must be approved by the office of financial management 9
before funds may be expended from the minor works appropriation.10
(3)(a) All minor works projects should be completed within two 11
years of the appropriation with the funding provided.12
(b) Agencies are prohibited from including projects on their 13
minor works lists that are a phase of a larger project, and that if 14
combined over a continuous period of time, would exceed $1,500,000, 15
or $2,000,000 for higher education minor works projects.16
(c) Minor works appropriations may not be used for the following: 17
Studies, except for technical or engineering reviews or designs that 18
lead directly to and support a project on the same minor works list; 19
planning; design outside the scope of work on a minor works list; 20
movable, temporary, and traditionally funded operating equipment not 21
in compliance with the equipment criteria established by the office 22
of financial management; software not dedicated to control of a 23
specialized system; moving expenses; land or facility acquisition; 24
rolling stock; computers; or to supplement funding for projects with 25
funding shortfalls unless expressly authorized. The office of 26
financial management may make an exception to the limitations 27
described in this subsection (3)(c) for exigent circumstances after 28
notifying the legislative fiscal committees and waiting 10 days for 29
comments by the legislature regarding the proposed exception.30
(d) Minor works preservation projects may include program 31
improvements of no more than 25 percent of the individual minor works 32
preservation project cost. 33
(e) Improvements for accessibility in compliance with the 34
Americans with disabilities act may be included in any of the minor 35
works categories. 36
(4) In the 2027-2029 capital budget instructions, the office of 37
financial management shall increase the minor works threshold to 38
$2,000,000, with the exception of higher education minor works 39
projects that may be valued up to $4,000,000. It is the intent of the 40
p. 411 SB 5195
legislature to increase the minor works threshold for the 2027-2029 1
biennial budget to $2,000,000, with the exception of higher education 2
minor works projects that may be valued up to $4,000,000.3
NEW SECTION. Sec. 8018. To the extent that any appropriation 4
authorizes expenditures of state funds from the state building 5
construction account, or from any other capital project account in 6
the state treasury, for a capital project or program that is 7
specified to be funded with proceeds from the sale of bonds, the 8
legislature declares that any such expenditures for that project or 9
program made prior to the issue date of the applicable bonds are 10
intended to be reimbursed from proceeds of those bonds in a maximum 11
amount equal to the amount of such appropriation.12
NEW SECTION. Sec. 8019. FOR THE STATE TREASURER— TRANSFERS13
(1) Public Works Assistance Account: For transfer to the14
water pollution control revolving account— state, up to15
$20,500,000 for fiscal year 2026 and up to $20,500,00016
for fiscal year 2027. . . . . . . . . . . . . . . . $41,000,00017
(2) Public Works Assistance Account: For transfer18
to the drinking water assistance account— state, up to19
$12,500,000 for fiscal year 2026 and up to $12,500,00020
for fiscal year 2027. . . . . . . . . . . . . . . . . $25,000,00021
NEW SECTION. Sec. 8020. The department of natural resources 22
must coordinate with the department of social and health services on 23
any long-term, revenue-generating opportunities it pursues on the 24
Fircrest campus to ensure that the clients served by the residential 25
habilitation center and its daily operations will not be negatively 26
impacted.27
NEW SECTION. Sec. 8021. (1)(a) The director of the office of 28
financial management, or the director's designee, shall collect a 29
list of clean energy projects from state agencies that may qualify 30
for elective payment under P.L. 117-169 (inflation reduction act of 31
2022), such as the purchase of electric vehicle fleets; alternative 32
fuel vehicle refueling and charging; and renewable energy projects 33
including wind, solar, geothermal, electrolytic hydrogen, and energy 34
storage.35
p. 412 SB 5195
(b) For tax years 2025 and 2026, the director or director's 1
designee shall work with agencies, including institutions of higher 2
education, to complete all steps necessary to file an annual tax 3
return with the United States internal revenue service on behalf of 4
the state in order to claim elective payments. 5
(2) The office of financial management shall provide a report to 6
the fiscal committees of the legislature by July 1, 2025, and June 7
30, 2026, that summarizes the state's tax return submitted that year, 8
including the total dollar value of projects included in the tax 9
return and the total dollar amount of direct pay tax credits sought. 10
The report must also include an itemized list of the projects that 11
displays the dollar amounts and types of tax credits sought.12
(3) Funds received by the state pursuant to this section shall be 13
deposited into the inflation reduction elective pay account created 14
in RCW 43.79.572. 15
NEW SECTION. Sec. 8022. In order to accelerate the reduction of 16
embodied carbon and improve the environmental performance of 17
construction materials, agencies shall, whenever possible, review and 18
consider embodied carbon reported in environmental product 19
declarations when evaluating proposed structural materials for 20
construction projects.21
NEW SECTION. Sec. 8023. Any agency receiving appropriations in 22
this act from climate commitment act accounts created in RCW 23
70A.65.240 through 70A.65.280 must report to and coordinate with the 24
department of ecology to track expenditures as described in RCW 25
70A.65.300 and chapter 173-446B WAC.26
Sec. 8024. RCW 79A.25.210 and 2024 c 375 s 8007 are each amended 27
to read as follows: 28
The firearms range account is hereby created in the state general 29
fund. Moneys in the account shall be subject to legislative 30
appropriation and shall be used for purchase and development of land, 31
construction or improvement of range facilities, including fixed 32
structure construction or remodeling, equipment purchase, safety or 33
environmental improvements, noise abatement, and liability protection 34
for public and nonprofit firearm range training and practice 35
facilities. 36
p. 413 SB 5195
Grant funds shall not be used for expendable shooting supplies, 1
or normal operating expenses. In making grants, the board shall give 2
priority to projects for noise abatement or safety improvement. Grant 3
funds shall not supplant funds for other organization programs.4
The funds will be available to nonprofit shooting organizations, 5
school districts, and state, county, or local governments on a match 6
basis. All entities receiving matching funds must be open on a 7
regular basis and usable by law enforcement personnel or the general 8
public who possess Washington concealed pistol licenses or Washington 9
hunting licenses or who are enrolled in a firearm safety class.10
Applicants for a grant from the firearms range account shall 11
provide matching funds in either cash or in-kind contributions. The 12
match must represent one dollar in value for each one dollar of the 13
grant except that in the case of a grant for noise abatement or 14
safety improvements the match must represent one dollar in value for 15
each two dollars of the grant. In-kind contributions include but are 16
not limited to labor, materials, and new property. Existing assets 17
and existing development may not apply to the match.18
Applicants other than school districts or local or state 19
government must be registered as a nonprofit or not-for-profit 20
organization with the Washington secretary of state. The 21
organization's articles of incorporation must contain provisions for 22
the organization's structure, officers, legal address, and registered 23
agent. 24
Organizations requesting grants must provide the hours of range 25
availability for public and law enforcement use. The fee structure 26
will be submitted with the grant application. 27
Any nonprofit organization or agency accepting a grant under this 28
program will be required to pay back the entire grant amount to the 29
firearms range account if the use of the range facility is 30
discontinued less than ten years after the grant is accepted.31
Entities receiving grants must make the facilities for which 32
grant funding is received open for hunter safety education classes 33
and firearm safety classes on a regular basis for no fee.34
Government units or school districts applying for grants must 35
open their range facility on a regular basis for hunter safety 36
education classes and firearm safety classes. 37
The board shall adopt rules to implement chapter 195, Laws of 38
1990, pursuant to chapter 34.05 RCW. During the 2017-2019 and 39
2019-2021 fiscal biennia, expenditures from the firearms range 40
p. 414 SB 5195
account may be used to implement chapter 74, Laws of 2017 (SHB 1100) 1
(concealed pistol licenses) and chapter 282, Laws of 2017 (SB 5268) 2
(concealed pistol license notices). During the 2021-2023 and 3
2023-2025 fiscal biennia, expenditures from the firearms range 4
account may be used to implement chapter 74, Laws of 2017 (SHB 1100) 5
(concealed pistol licenses). 6
During the 2023-2025 and 2025-2027 fiscal ((biennium)) biennia, 7
the legislature may also appropriate moneys in the firearms range 8
account to the department of natural resources for recreational 9
target shooting pilot sites as provided in section 3032, chapter 375, 10
Laws of 2024. 11
During the 2023-2025 and 2025-2027 fiscal ((biennium)) biennia, 12
the application and matching funds requirements of this section do 13
not apply to the recreational target shooting pilot sites in section 14
3032, chapter 375, Laws of 2024. 15
Sec. 8025. RCW 79.22.060 and 2024 c 375 s 8011 are each amended 16
to read as follows: 17
(1) With the approval of the board, the department may directly 18
transfer or dispose of state forestlands without public auction, if 19
the transfers are: 20
(a) In lieu of condemnation or to resolve trespass and property 21
ownership disputes and the lands consist of 10 contiguous acres or 22
less or have a value of $25,000 or less; or 23
(b) To public agencies as defined in RCW 79.17.200.24
(2) Real property to be transferred or disposed of under this 25
section shall be transferred or disposed of only after appraisal and 26
for at least fair market value, and only if the transaction is in the 27
best interest of the state or affected trust. Valuable materials 28
attached to lands to be transferred under subsection (1)(b) of this 29
section must be appraised at the fair market value without 30
consideration of management or regulatory encumbrances associated 31
with wildlife species listed under the federal endangered species 32
act, if any. 33
(3)(a) Except as provided in this subsection, the proceeds from 34
real property transferred or disposed of under this section shall be 35
deposited into the parkland trust revolving fund and be solely used 36
to buy replacement forestland for the benefit of the county from 37
which the property was transferred or disposed and pay for the 38
department's administrative expenses to complete the transfer, 39
p. 415 SB 5195
including the cost of department staff time, appraisals, surveys, 1
environmental reviews, and other similar costs of the transfer. The 2
legislative authority of the county from which the real property was 3
transferred or disposed under subsection (1)(b) of this section may 4
request in writing that the department distribute a percentage of the 5
proceeds associated with valuable materials. Upon such a request, and 6
subject to prior approval by the board, the department shall 7
distribute the requested percentage of proceeds associated with 8
valuable materials as provided in RCW 79.64.110. 9
(b) The proceeds from real property transferred or disposed of 10
under this section for the purpose of participating in the state 11
forestland pool created under RCW 79.22.140 must be deposited into 12
the parkland trust revolving fund and used to buy replacement 13
forestland for the benefit of that county, as provided in RCW 14
79.64.110 and located within any county participating in the land 15
pool or under a county agreement as provided in RCW 79.22.140.16
(c) Except as otherwise provided in this subsection, in counties 17
with a population of 25,000 or less, the portion of the proceeds 18
associated with valuable materials on state forestland transferred 19
under this section must be distributed as provided in RCW 79.64.110. 20
If requested in writing by the legislative authority of a county 21
participating in the state forestland pool created under RCW 22
79.22.140, the portion of the proceeds associated with valuable 23
materials on state forestland transferred under this section must be 24
deposited in the parkland trust revolving fund and used to buy 25
replacement forestland for the benefit of that county, as provided in 26
RCW 79.64.110, and located within any county participating in the 27
land pool or under a county agreement as provided in RCW 79.22.140.28
(4) During the 2023-2025 fiscal biennium, the ability of a 29
legislative authority of a county to request the distribution of 30
proceeds from valuable materials under subsection (3)(a) of this 31
section does not apply to structurally complex, carbon-dense forested 32
trust land transferred under section 3034, chapter 375, Laws of 2024. 33
During the 2025-2027 fiscal biennium, the ability of a legislative 34
authority of a county to request the distribution of proceeds from 35
valuable materials under subsection (3)(a) of this section does not 36
apply to structurally complex, carbon-dense forested trust land 37
transferred under section 3130 of this act.38
p. 416 SB 5195
Sec. 8026. RCW 28B.20.725 and 2023 c 474 s 8023 are each amended 1
to read as follows: 2
The board is hereby empowered: 3
(1) To reserve the right to issue bonds later on a parity with 4
any bonds being issued; 5
(2) To authorize the investing of moneys in the bond retirement 6
fund and any reserve account therein; 7
(3) To authorize the transfer of money from the University of 8
Washington building account to the bond retirement fund when 9
necessary to prevent a default in the payments required to be made 10
out of such fund; 11
(4) To create a reserve account or accounts in the bond 12
retirement fund to secure the payment of the principal of and 13
interest on any bonds; 14
(5) To authorize the transfer to the University of Washington 15
building account of any money on deposit in the bond retirement fund 16
in excess of debt service for a period of three years from the date 17
of such transfer on all outstanding bonds payable out of such fund. 18
((However, during the 2021-2023 fiscal biennium, the legislature may 19
transfer to the University of Washington building account moneys that 20
are in excess of the debt service due within the 2021-2023 fiscal 21
biennium from the date of such transfer on all outstanding bonds 22
payable out of the bond retirement fund. )) However, during the 23
2023-2025 and 2025-2027 fiscal ((biennium)) biennia, the legislature 24
may transfer to the University of Washington building account moneys 25
that are in excess of the debt service due within the ((2023-2025)) 26
respective fiscal biennium from the date of such transfer on all 27
outstanding bonds payable out of the bond retirement fund.28
Sec. 8027. RCW 28B.15.210 and 2023 c 474 s 8024 are each amended 29
to read as follows: 30
Within 35 days from the date of collection thereof, all building 31
fees at the University of Washington, including building fees to be 32
charged students registering in the schools of medicine and 33
dentistry, shall be paid into the state treasury and credited as 34
follows: 35
One-half or such larger portion as may be necessary to prevent a 36
default in the payments required to be made out of the bond 37
retirement fund to the "University of Washington bond retirement 38
fund" and the remainder thereof to the "University of Washington 39
p. 417 SB 5195
building account." The sum so credited to the University of 1
Washington building account shall be used exclusively for the purpose 2
of erecting, altering, maintaining, equipping, or furnishing 3
buildings, and for certificates of participation under chapter 39.94 4
RCW, except for any sums transferred as authorized in RCW 5
28B.20.725(3). The sum so credited to the University of Washington 6
bond retirement fund shall be used for the payment of principal of 7
and interest on bonds outstanding as provided by chapter 28B.20 RCW 8
except for any sums transferred as authorized in RCW 28B.20.725(5). 9
((During the 2021-2023 biennium, sums credited to the University of 10
Washington building account may also be used for routine facility 11
maintenance, utility costs, and facility condition assessments. )) 12
During the 2023-2025 ((biennium)) and 2025-2027 fiscal biennia , sums 13
credited to the University of Washington building account may also be 14
used for routine facility maintenance, utility costs, and facility 15
condition assessments. 16
Sec. 8028. RCW 28B.15.310 and 2023 c 474 s 8025 are each amended 17
to read as follows: 18
Within 35 days from the date of collection thereof, all building 19
fees shall be paid and credited as follows: To the Washington State 20
University bond retirement fund, one-half or such larger portion as 21
may be necessary to prevent a default in the payments required to be 22
made out of such bond retirement fund; and the remainder thereof to 23
the Washington State University building account. 24
The sum so credited to the Washington State University building 25
account shall be expended by the board of regents for buildings, 26
equipment, or maintenance on the campus of Washington State 27
University as may be deemed most advisable and for the best interests 28
of the university, and for certificates of participation under 29
chapter 39.94 RCW, except for any sums transferred as authorized by 30
law. ((During the 2021-2023 biennium, sums credited to the Washington 31
State University building account may also be used for routine 32
facility maintenance, utility costs, and facility condition 33
assessments.)) During the 2023-2025 ((biennium)) and 2025-2027 fiscal 34
biennia, sums credited to the Washington State University building 35
account may also be used for routine facility maintenance, utility 36
costs, and facility condition assessments. Expenditures so made shall 37
be accounted for in accordance with existing law and shall not be 38
expended until appropriated by the legislature. 39
p. 418 SB 5195
The sum so credited to the Washington State University bond 1
retirement fund shall be used to pay and secure the payment of the 2
principal of and interest on building bonds issued by the university, 3
except for any sums which may be transferred out of such fund as 4
authorized by law. 5
Sec. 8029. RCW 28B.30.750 and 2023 c 474 s 8026 are each amended 6
to read as follows: 7
The board is hereby empowered: 8
(1) To reserve the right to issue bonds later on a parity with 9
any bonds being issued; 10
(2) To authorize the investing of moneys in the bond retirement 11
fund and any reserve account therein; 12
(3) To authorize the transfer of money from the Washington State 13
University building account to the bond retirement fund when 14
necessary to prevent a default in the payments required to be made 15
out of such fund; 16
(4) To create a reserve account or accounts in the bond 17
retirement fund to secure the payment of the principal of and 18
interest on any bonds; 19
(5) To authorize the transfer to the Washington State University 20
building account of any money on deposit in the bond retirement fund 21
in excess of debt service for a period of three years from the date 22
of such transfer on all outstanding bonds payable out of such fund. 23
((However, during the 2021-2023 fiscal biennium, the legislature may 24
transfer to the Washington State University building account moneys 25
that are in excess of the debt service due within the 2021-2023 26
fiscal biennium from the date of such transfer on all outstanding 27
bonds payable out of the bond retirement fund. )) However, during the 28
2023-2025 and 2025-2027 fiscal ((biennium)) biennia, the legislature 29
may transfer to the Washington State University building account 30
moneys that are in excess of the debt service due within the 31
((2023-2025)) respective fiscal biennium from the date of such 32
transfer on all outstanding bonds payable out of the bond retirement 33
fund. 34
Sec. 8030. RCW 28B.35.370 and 2023 c 474 s 8027 are each amended 35
to read as follows: 36
Within 35 days from the date of collection thereof all building 37
fees of each regional university and The Evergreen State College 38
p. 419 SB 5195
shall be paid into the state treasury and these together with such 1
normal school fund revenues as provided in RCW 28B.35.751 as are 2
received by the state treasury shall be credited as follows:3
(1) On or before June 30th of each year the board of trustees of 4
each regional university and The Evergreen State College, if issuing 5
bonds payable out of its building fees and above described normal 6
school fund revenues, shall certify to the state treasurer the 7
amounts required in the ensuing 12 months to pay and secure the 8
payment of the principal of and interest on such bonds. The amounts 9
so certified by each regional university and The Evergreen State 10
College shall be a prior lien and charge against all building fees 11
and above described normal school fund revenues of such institution. 12
The state treasurer shall thereupon deposit the amounts so certified 13
in the Eastern Washington University capital projects account, the 14
Central Washington University capital projects account, the Western 15
Washington University capital projects account, or The Evergreen 16
State College capital projects account respectively, which accounts 17
are hereby created in the state treasury. The amounts deposited in 18
the respective capital projects accounts shall be used to pay and 19
secure the payment of the principal of and interest on the building 20
bonds issued by such regional universities and The Evergreen State 21
College as authorized by law. If in any 12-month period it shall 22
appear that the amount certified by any such board of trustees is 23
insufficient to pay and secure the payment of the principal of and 24
interest on the outstanding building and above described normal 25
school fund revenue bonds of its institution, the state treasurer 26
shall notify the board of trustees and such board shall adjust its 27
certificate so that all requirements of moneys to pay and secure the 28
payment of the principal of and interest on all such bonds then 29
outstanding shall be fully met at all times. 30
(2) All normal school fund revenue pursuant to RCW 28B.35.751 31
shall be deposited in the Eastern Washington University capital 32
projects account, the Central Washington University capital projects 33
account, the Western Washington University capital projects account, 34
or The Evergreen State College capital projects account respectively, 35
which accounts are hereby created in the state treasury. The sums 36
deposited in the respective capital projects accounts shall be 37
appropriated and expended to pay and secure the payment of the 38
principal of and interest on bonds payable out of the building fees 39
and normal school revenue and for the construction, reconstruction, 40
p. 420 SB 5195
erection, equipping, maintenance, demolition and major alteration of 1
buildings and other capital assets, and the acquisition of sites, 2
rights-of-way, easements, improvements or appurtenances in relation 3
thereto except for any sums transferred therefrom as authorized by 4
law. ((During the 2021-2023 biennium, sums in the respective capital 5
accounts may also be used for routine facility maintenance, utility 6
costs, and facility condition assessments. )) During the 2023-2025 7
((biennium)) and 2025-2027 fiscal biennia , sums in the respective 8
capital accounts may also be used for routine facility maintenance, 9
utility costs, and facility condition assessments.10
(3) Funds available in the respective capital projects accounts 11
may also be used for certificates of participation under chapter 12
39.94 RCW. 13
Sec. 8031. RCW 28B.50.360 and 2023 c 474 s 8028 are each amended 14
to read as follows: 15
Within 35 days from the date of start of each quarter all 16
collected building fees of each such community and technical college 17
shall be paid into the state treasury, and shall be credited as 18
follows: 19
(1) On or before June 30th of each year the college board, if 20
issuing bonds payable out of building fees, shall certify to the 21
state treasurer the amounts required in the ensuing 12-month period 22
to pay and secure the payment of the principal of and interest on 23
such bonds. The state treasurer shall thereupon deposit the amounts 24
so certified in the community and technical college capital projects 25
account. Such amounts of the funds deposited in the community and 26
technical college capital projects account as are necessary to pay 27
and secure the payment of the principal of and interest on the 28
building bonds issued by the college board as authorized by this 29
chapter shall be devoted to that purpose. If in any 12-month period 30
it shall appear that the amount certified by the college board is 31
insufficient to pay and secure the payment of the principal of and 32
interest on the outstanding building bonds, the state treasurer shall 33
notify the college board and such board shall adjust its certificate 34
so that all requirements of moneys to pay and secure the payment of 35
the principal and interest on all such bonds then outstanding shall 36
be fully met at all times. 37
(2) The community and technical college capital projects account 38
is hereby created in the state treasury. The sums deposited in the 39
p. 421 SB 5195
capital projects account shall be appropriated and expended to pay 1
and secure the payment of the principal of and interest on bonds 2
payable out of the building fees and for the construction, 3
reconstruction, erection, equipping, maintenance, demolition and 4
major alteration of buildings and other capital assets owned by the 5
state board for community and technical colleges in the name of the 6
state of Washington, and the acquisition of sites, rights-of-way, 7
easements, improvements or appurtenances in relation thereto, 8
engineering and architectural services provided by the department of 9
enterprise services, and for the payment of principal of and interest 10
on any bonds issued for such purposes. ((During the 2021-2023 11
biennium, sums in the capital projects account may also be used for 12
routine facility maintenance and utility costs. )) During the 13
2023-2025 ((biennium)) and 2025-2027 fiscal biennia , sums in the 14
capital projects account may also be used for routine facility 15
maintenance and utility costs. 16
(3) Funds available in the community and technical college 17
capital projects account may also be used for certificates of 18
participation under chapter 39.94 RCW. 19
Sec. 8032. RCW 39.35D.030 and 2023 c 474 s 8029 are each amended 20
to read as follows: 21
(1) All major facility projects of public agencies receiving any 22
funding in a state capital budget, or projects financed through a 23
financing contract as defined in RCW 39.94.020, must be designed, 24
constructed, and certified to at least the LEED silver standard. This 25
subsection applies to major facility projects that have not entered 26
the design phase prior to July 24, 2005, and to the extent 27
appropriate LEED silver standards exist for that type of building or 28
facility. 29
(2) All major facility projects of any entity other than a public 30
agency or public school district receiving any funding in a state 31
capital budget must be designed, constructed, and certified to at 32
least the LEED silver standard. This subsection applies to major 33
facility projects that have not entered the grant application process 34
prior to July 24, 2005, and to the extent appropriate LEED silver 35
standards exist for that type of building or facility.36
(3)(a) Public agencies, under this section, shall monitor and 37
document ongoing operating savings resulting from major facility 38
p. 422 SB 5195
projects designed, constructed, and certified as required under this 1
section. 2
(b) Public agencies, under this section, shall report annually to 3
the department on major facility projects and operating savings.4
(4) The department shall consolidate the reports required in 5
subsection (3) of this section into one report and report to the 6
governor and legislature by September 1st of each even-numbered year 7
beginning in 2006 and ending in 2016. In its report, the department 8
shall also report on the implementation of this chapter, including 9
reasons why the LEED standard was not used as required by RCW 10
39.35D.020(5)(b). The department shall make recommendations regarding 11
the ongoing implementation of this chapter, including a discussion of 12
incentives and disincentives related to implementing this chapter.13
(5) For the purposes of determining compliance with the 14
requirement for a project to be designed, constructed, and certified 15
to at least the LEED silver standard, the department must credit one 16
additional point for a project that uses wood products with a 17
credible third-party sustainable forest certification or from forests 18
regulated under chapter 76.09 RCW, the Washington forest practices 19
act. For projects that qualify for this additional point, and for 20
which an additional point would have resulted in formal certification 21
under the LEED silver standard, the project must be deemed to meet 22
the standard under this section. 23
(6) During the ((2021-2023 and )) 2023-2025 and 2025-2027 fiscal 24
biennia, an alternative high-performance building certification, as 25
determined by the legislature, may be used instead of the LEED silver 26
building design, construction, and certification standard required by 27
this section. 28
Sec. 8033. RCW 43.07.410 and 2023 c 474 s 8030 are each amended 29
to read as follows: 30
The Washington state library-archives building account is created 31
in the custody of the state treasurer. All moneys received under RCW 32
36.18.010(12), 36.22.175(3), and 43.07.370(3) must be deposited in 33
the account. Except for during the 2023-2025 fiscal biennium, 34
expenditures from the account may be made only for the purposes of 35
payment of the financing contract entered into by the secretary of 36
state for the Washington state library-archives building. During the 37
((2023-2025)) 2025-2027 fiscal biennium, the secretary of state may 38
spend up to (($8,000,000)) $6,949,000 from the account for costs 39
p. 423 SB 5195
associated with the design and construction of the state library-1
archives building and for costs necessary to prepare the building for 2
occupancy. Only the secretary of state or the secretary of state's 3
designee may authorize expenditures from the account. An 4
appropriation is not required for expenditures, but the account is 5
subject to allotment procedures under chapter 43.88 RCW.6
Sec. 8034. RCW 43.88D.010 and 2023 c 474 s 8034 are each amended 7
to read as follows: 8
(1) By October 1st of each even-numbered year, the office of 9
financial management shall complete an objective analysis and scoring 10
of all capital budget projects proposed by the public four-year 11
institutions of higher education and submit the results of the 12
scoring process to the legislative fiscal committees and the four-13
year institutions. Each project must be reviewed and scored within 14
one of the following categories, according to the project's principal 15
purpose. Each project may be scored in only one category. The 16
categories are: 17
(a) Access-related projects to accommodate enrollment growth at 18
all campuses, at existing or new university centers, or through 19
distance learning. Growth projects should provide significant 20
additional student capacity. Proposed projects must demonstrate that 21
they are based on solid enrollment demand projections, more 22
cost-effectively provide enrollment access than alternatives such as 23
university centers and distance learning, and make cost -effective use 24
of existing and proposed new space; 25
(b) Projects that replace failing permanent buildings. Facilities 26
that cannot be economically renovated are considered replacement 27
projects. New space may be programmed for the same or a different use 28
than the space being replaced and may include additions to improve 29
access and enhance the relationship of program or support space;30
(c) Projects that renovate facilities to restore building life 31
and upgrade space to meet current program requirements. Renovation 32
projects should represent a complete renovation of a total facility 33
or an isolated wing of a facility. A reasonable renovation project 34
should cost between sixty to eighty percent of current replacement 35
value and restore the renovated area to at least twenty-five years of 36
useful life. New space may be programmed for the same or a different 37
use than the space being renovated and may include additions to 38
p. 424 SB 5195
improve access and enhance the relationship of program or support 1
space; 2
(d) Major stand-alone campus infrastructure projects;3
(e) Projects that promote economic growth and innovation through 4
expanded research activity. The acquisition and installation of 5
specialized equipment is authorized under this category; and6
(f) Other project categories as determined by the office of 7
financial management in consultation with the legislative fiscal 8
committees. 9
(2) The office of financial management, in consultation with the 10
legislative fiscal committees, shall establish a scoring system and 11
process for each four-year project category that is based on the 12
framework used in the community and technical college system of 13
prioritization. Staff from the state board for community and 14
technical colleges and the four-year institutions shall provide 15
technical assistance on the development of a scoring system and 16
process. 17
(3) The office of financial management shall consult with the 18
legislative fiscal committees in the scoring of four-year institution 19
project proposals, and may also solicit participation by independent 20
experts. 21
(a) For each four-year project category, the scoring system must, 22
at a minimum, include an evaluation of enrollment trends, 23
reasonableness of cost, the ability of the project to enhance 24
specific strategic master plan goals, age and condition of the 25
facility if applicable, and impact on space utilization.26
(b) Each four-year project category may include projects at the 27
predesign, design, or construction funding phase. 28
(c) To the extent possible, the objective analysis and scoring 29
system of all capital budget projects shall occur within the context 30
of any and all performance agreements between the office of financial 31
management and the governing board of a public, four-year institution 32
of higher education that aligns goals, priorities, desired outcomes, 33
flexibility, institutional mission, accountability, and levels of 34
resources. 35
(4) In evaluating and scoring four-year institution projects, the 36
office of financial management shall take into consideration project 37
schedules that result in realistic, balanced, and predictable 38
expenditure patterns over the ensuing three biennia.39
p. 425 SB 5195
(5) The office of financial management shall distribute common 1
definitions, the scoring system, and other information required for 2
the project proposal and scoring process as part of its biennial 3
budget instructions. The office of financial management, in 4
consultation with the legislative fiscal committees, shall develop 5
common definitions that four-year institutions must use in developing 6
their project proposals and lists under this section.7
(6) In developing any scoring system for capital projects 8
proposed by the four-year institutions, the office of financial 9
management: 10
(a) Shall be provided with all required information by the four-11
year institutions as deemed necessary by the office of financial 12
management; 13
(b) May utilize independent services to verify, sample, or 14
evaluate information provided to the office of financial management 15
by the four-year institutions; and 16
(c) Shall have full access to all data maintained by the joint 17
legislative audit and review committee concerning the condition of 18
higher education facilities. 19
(7) By August 1st of each even-numbered year each public four-20
year higher education institution shall prepare and submit 21
prioritized lists of the individual projects proposed by the 22
institution for the ensuing six-year period in each category. The 23
lists must be submitted to the office of financial management and the 24
legislative fiscal committees. The four-year institutions may 25
aggregate minor works project proposals by primary purpose for 26
ranking purposes. Proposed minor works projects must be prioritized 27
within the aggregated proposal, and supporting documentation, 28
including project descriptions and cost estimates, must be provided 29
to the office of financial management and the legislative fiscal 30
committees. 31
(8) For the 2021-2023 fiscal biennium, pursuant to subsection (1) 32
of this section, by November 1, 2022, the office of financial 33
management must score higher education capital project criteria with 34
a rating scale that assesses how well a particular project satisfies 35
those criteria. The office of financial management may not use a 36
rating scale that weighs the importance of those criteria.37
(9) For the 2021-2023 fiscal biennium, pursuant to subsection 38
(6)(a) of this section and in lieu of the requirements of subsection 39
(7) of this section, by August 15, 2022, the institutions of higher 40
p. 426 SB 5195
education shall prepare and submit or resubmit to the office of 1
financial management and the legislative fiscal committees:2
(a) Individual project proposals developed pursuant to subsection 3
(1) of this section; 4
(b) Individual project proposals scored in prior biennia pursuant 5
to subsection (1) of this section; and 6
(c) A prioritized list of up to five project proposals submitted 7
pursuant to (a) and (b) of this subsection. 8
(10) The requirements of this section are suspended during the 9
2023-2025 and 2025-2027 fiscal ((biennium)) biennia. ((However, 10
instead of these requirements, the public four-year institutions of 11
higher education must submit additional supporting information for 12
major project funding requests for the 2025-2027 fiscal biennium that 13
is equivalent to the information produced for the 2022 higher 14
education scoring process under subsection (9) of this section. 15
Examples of the information required under this subsection include, 16
but are not limited to, measures of: (a) Space efficiency, (b) 17
reasonableness of project cost, (c) facility condition, and (d) 18
anticipated impacts of the requested major projects on projected 19
degree totals. The public four-year institutions of higher education 20
shall consult with the office of financial management and legislative 21
fiscal staff regarding the implementation of this requirement and the 22
content of the additional information.))23
Sec. 8035. RCW 43.155.050 and 2023 c 475 s 932 and 2023 c 474 s 24
8037 are each reenacted and amended to read as follows:25
(1) The public works assistance account is hereby established in 26
the state treasury. Money may be placed in the public works 27
assistance account from the proceeds of bonds when authorized by the 28
legislature or from any other lawful source. Money in the public 29
works assistance account shall be used to make loans and grants and 30
to give financial guarantees to local governments for public works 31
projects. Moneys in the account may also be appropriated or 32
transferred to the water pollution control revolving fund and the 33
drinking water assistance account to provide for state match 34
requirements under federal law. Moneys in the account may be 35
transferred to the move ahead WA account to provide support of public 36
works projects funded in the move ahead WA program. Not more than 20 37
percent of the biennial capital budget appropriation to the public 38
works board from this account may be expended or obligated for 39
p. 427 SB 5195
preconstruction loans and grants, emergency loans and grants, or 1
loans and grants for capital facility planning under this chapter. 2
Not more than 10 percent of the biennial capital budget appropriation 3
to the public works board from this account may be expended or 4
obligated as grants for preconstruction, emergency, capital facility 5
planning, and construction projects. During the 2017-2019 and 6
2019-2021 fiscal biennia, the legislature may appropriate moneys from 7
the account for activities related to rural economic development, the 8
growth management act, the aviation revitalization loan program, the 9
community economic revitalization board broadband program, and the 10
voluntary stewardship program. During the ((2021-2023 and)) 2023-2025 11
and 2025-2027 fiscal biennia, the legislature may appropriate moneys 12
from the account for activities related to the community aviation 13
revitalization board. During the 2019-2021 fiscal biennia, the 14
legislature may direct the state treasurer to make transfers of 15
moneys in the public works assistance account to the education legacy 16
trust account. During the 2019-2021 and 2021-2023 fiscal biennia, the 17
legislature may direct the state treasurer to make transfers of 18
moneys in the public works assistance account to the statewide 19
broadband account. The legislature may appropriate moneys from the 20
public works assistance account for activities related to the 21
voluntary stewardship program, rural economic development, and the 22
growth management act. During the 2021-2023 biennium, the legislature 23
may appropriate moneys from the account for projects identified in 24
section 1033, chapter 296, Laws of 2022. During the 2023-2025 fiscal 25
biennium, the legislature may appropriate moneys from the public 26
works assistance account for an evaluation of the costs of relocating 27
public utilities related to fish barrier removal projects. During the 28
2023-2025 fiscal biennium, the legislature may appropriate moneys 29
from the account for activities related to developing a data 30
dashboard to map investments made by the public works board, the 31
department of commerce, the department of health, the department of 32
ecology, the department of transportation, the transportation 33
improvement board, and by board partners to the system improvement 34
team created in RCW 43.155.150. 35
(2) For fiscal year 2024 through fiscal year 2038, the state 36
treasurer must transfer from the public works assistance account to 37
the move ahead WA account created in RCW 46.68.510 $57,000,000 each 38
fiscal year in four equal quarterly transfers. However, for fiscal 39
p. 428 SB 5195
year 2027, the amount transferred under this subsection (2) must be 1
$69,000,000. 2
NEW SECTION. Sec. 8036. Sections 1002, 1034, 7008, and 7015 of 3
this act take effect only if Z-0150/25 (Accounts) is enacted by June 4
30, 2025.5
NEW SECTION. Sec. 8037. Sections 1003 and 7016 of this act take 6
effect only if Z-0150/25 (Accounts) is not enacted by June 30, 2025.7
NEW SECTION. Sec. 8038. If any provision of this act or its 8
application to any person or circumstance is held invalid, the 9
remainder of the act or the application of the provision to other 10
persons or circumstances is not affected.11
NEW SECTION. Sec. 8039. This act is necessary for the immediate 12
preservation of the public peace, health, or safety, or support of 13
the state government and its existing public institutions, and takes 14
effect immediately.15
(End of Bill)
p. 429 SB 5195
INDEX PAGE #
CENTER FOR DEAF AND HARD OF HEARING YOUTH. . . . . . . . . . 128, 246
CENTRAL WASHINGTON UNIVERSITY. . . . . . . . . . . . . . . . 136, 255
COMMUNITY AND TECHNICAL COLLEGE SYSTEM. . . . . . . . . . . . . . 400
CONSERVATION COMMISSION. . . . . . . . . . . . . . . . . . . 98, 322
CRIMINAL JUSTICE TRAINING COMMISSION. . . . . . . . . . 59, 189, 388
DEPARTMENT OF AGRICULTURE. . . . . . . . . . . . . . . . . . . . 346
DEPARTMENT OF ARCHAEOLOGY AND HISTORIC PRESERVATION. . . . . . . 246
DEPARTMENT OF CHILDREN, YOUTH, AND FAMILIES. . . . . . . 69, 222, 390
DEPARTMENT OF COMMERCE. . . . . . . . . . . . . . . . . . 3, 148, 381
DEPARTMENT OF CORRECTIONS. . . . . . . . . . . . . . . . . . 70, 224
DEPARTMENT OF ECOLOGY. . . . . . . . . . . . . . . . . . 76, 263, 390
DEPARTMENT OF ENTERPRISE SERVICES. . . . . . . . . . . . . . 44, 182
DEPARTMENT OF FISH AND WILDLIFE. . . . . . . . . . . . . . . . . 329
DEPARTMENT OF HEALTH. . . . . . . . . . . . . . . . . . 65, 214, 388
DEPARTMENT OF LABOR AND INDUSTRIES. . . . . . . . . . . . . . 60, 189
DEPARTMENT OF NATURAL RESOURCES. . . . . . . . . . . . . . . . . 339
DEPARTMENT OF SOCIAL AND HEALTH SERVICES. . . . . . . . . . . . . 195
DEPARTMENT OF VETERANS AFFAIRS. . . . . . . . . . . . . 67, 219, 389
EASTERN WASHINGTON STATE HISTORICAL SOCIETY. . . . . . . . . 142, 262
EASTERN WASHINGTON UNIVERSITY. . . . . . . . . . . . . . . . 134, 254
EVERGREEN STATE COLLEGE. . . . . . . . . . . . . . . . . . . 138, 258
MILITARY DEPARTMENT. . . . . . . . . . . . . . . . 51, 190, 386, 387
OFFICE OF FINANCIAL MANAGEMENT. . . . . . . . . . . . . . . . 43, 182
RECREATION AND CONSERVATION OFFICE. . . . . . . . . . . . . . 92, 300
SECRETARY OF STATE. . . . . . . . . . . . . . . . . . . . . . 2, 148
STATE BOARD FOR COMMUNITY AND TECHNICAL COLLEGES. . . . . . 143, 347
STATE CONSERVATION COMMISSION. . . . . . . . . . . . . . . . 391, 392
STATE PARKS AND RECREATION COMMISSION. . . . . . . . . . . . 294, 390
STATE SCHOOL FOR THE BLIND. . . . . . . . . . . . . . . . . 128, 246
STATE TREASURER. . . . . . . . . . . . . . . . . . . . . . . . . 412
TRANSFERS. . . . . . . . . . . . . . . . . . . . . . . . . . 401
SUPERINTENDENT OF PUBLIC INSTRUCTION. . . . . . . . . . 119, 230, 394
UNIVERSITY OF WASHINGTON. . . . . . . . . . . . . . . . . . . . . 129
WASHINGTON POLLUTION LIABILITY INSURANCE PROGRAM. . . . . . . 84, 292
WASHINGTON STATE ARTS COMMISSION. . . . . . . . . . . . . . 141, 260
WASHINGTON STATE HISTORICAL SOCIETY. . . . . . . . . . . . . 142, 261
WASHINGTON STATE PATROL. . . . . . . . . . . . . . . . 117, 187, 394
WASHINGTON STATE UNIVERSITY. . . . . . . . . . . . . . . . . 131, 252
p. 430 SB 5195
WESTERN WASHINGTON UNIVERSITY. . . . . . . . . . . . . . . . 140, 259
--- END ---