HB4379 • 2026

To enable the Public Service Commission to authorize accelerated rate recovery for advanced transmission technology projects

To enable the Public Service Commission to authorize accelerated rate recovery for advanced transmission technology projects

Technology
Passed Legislature

This bill passed both chambers and reached final enrollment, even if later executive action is not shown here.

Sponsor
Riley
Last action
2026-01-15
Official status
H To House Energy and Public Works 01/15/26
Effective date
Not listed

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Bill History

  1. 2026-01-15 H

    To House Energy and Public Works

  2. 2026-01-15 H

    Introduced in House

  3. 2026-01-15 H

    To Energy and Public Works

  4. 2026-01-15 H

    Filed for introduction

Official Summary Text

To enable the Public Service Commission to authorize accelerated rate recovery for advanced transmission technology projects

Current Bill Text

Read the full stored bill text
HB 4379 Text

skip navigation

SENATE

PRESIDENT

SENATORS

COMMITTEES

VIDEO/AUDIO

DISTRICT MAPS

SENATE CLERK

SENATE RULES

HOUSE

SPEAKER

DELEGATES

COMMITTEES

VIDEO/AUDIO

DISTRICT MAPS

HOUSE CLERK

HOUSE RULES

HOUSE STAFF

JOINT

INTERIM COMMITTEES

LEGISLATIVE ADMINISTRATOR

LEGISLATIVE SERVICES DIVISION

PUBLIC INFORMATION

LEGISLATIVE AUTOMATED SYSTEMS DIVISION

LEGISLATIVE AUDITOR'S OFFICE

PERFORMANCE EVALUATION & RESEARCH DIVISION

POST AUDIT DIVISION

BUDGET DIVISION

REGULATORY AND FISCAL AFFAIRS DIVISION

CLAIMS COMMISSION

CRIME VICTIMS

RULE-MAKING REVIEW

SPECIAL INVESTIGATIONS

JUDICIAL COMP. COMMISSION

JOINT RULES

STAFF INFO

BILL STATUS

BILL STATUS

BILL TRACKING

STATE LAW

WEST VIRGINIA CODE

ACTS OF THE LEGISLATURE

CODE OF 1931

WV CONSTITUTION

US CONSTITUTION

REPORTS

AGENCY REPORTS

AGENCY GRANT AWARDS

PERFORMANCE EVALUATIONS

POST AUDITS

EDUCATIONAL

CITIZEN’S GUIDE

INTERNSHIP PROGRAM

PAGE PROGRAM

PUBLICATIONS

PHOTO GALLERY

CAPITOL HISTORY

HOW A BILL BECOMES LAW

CONTACT

SENATE ROSTER

HOUSE ROSTER

PUBLIC INFO.

NEWS RELEASES

HELPFUL LINKS

Introduced Version

House Bill 4379 History

|
Email

Key:
Green
= existing Code.
Red
= new code to be enacted

WEST VIRGINIA LEGISLATURE
2026
REGULAR SESSION
Introduced
House Bill 4379
By Delegate Riley
[Introduced January 15, 2026; referred to the Committee on Energy and Public Works]
A BILL to amend and reenact §24-2-1e of the Code of West Virginia, 1931, as amended, relating to the Public Service Commission; providing definitions; and authorizing accelerated rate recovery for advanced transmission technology projects.
Be it enacted by the Legislature of West Virginia:

ARTICLE 2. POWERS AND DUTIES OF PUBLIC SERVICE COMMISSION.

§24-2-1e. Rate recovery for construction of electric transmission facilities
and advanced transmission technology programs.

(a) As used in this section, "advanced transmission technology" means all forms of technology that increases the capacity, efficiency, reliability, resiliency, or safety of an existing or new electric transmission infrastructure including, without limitation: (1) advanced conductors that increase the power transfer capacity of transmission lines; (2) dynamic line rating that adjusts the rated capacity of transmission lines based on real-time conditions; (3) advanced power flow controls used to actively control the flow of electricity across transmission lines; (4) topology optimization that enables routing power flows around congestion points through transmission grid configurations; and (5) any other technologies designed to reduce transmission congestion and/or increase the capacity, efficiency, reliability, resiliency, or safety of an existing or new electric transmission facility.
(a)
(b)
In order to encourage the construction of transmission facilities necessary to transmit electric power from generating facilities located in this state to areas where such power can be economically marketed, the commission may allow an electric utility accelerated rate recovery for transmission facilities constructed or upgraded for the purpose of increasing the capacity to transmit electric power to areas outside the utility's service territory where such power can be economically marketed. In allowing accelerated rate recovery, the commission shall include the impact of the investment in transmission facilities on any investment equalization agreement in which the utilities participate.
(c) The public service commission may allow accelerated rate recovery for advanced transmission technology projects for the purpose of improving transmission of electric power to increase capacity, efficiency, reliability, resiliency, or safety when technically feasible and economically reasonable and prudent. In allowing accelerated rate recovery, the commission shall include the impact of the investment in transmission facilities on any investment equalization agreement in which the utilities participate.
(d) Upon commission approval, an electric utility shall be authorized to implement advanced transmission technology projects and to recover related project costs through accelerated rate recovery.
NOTE: The purpose of this bill is to enable the PSC to authorize accelerated rate recovery for advanced transmission technology projects.
Strike-throughs indicate language that would be stricken from a heading or the present law and underscoring indicates new language that would be added.

Bill Status
|

Bill Tracking
|

Legacy WV Code
|

Bulletin Board
|

District Maps
|

Senate Roster
|

House Roster
|

Live
|

Blog
|

Jobs
|

Links
|

Home

This Web site is maintained by the
West Virginia Legislature's Office of Reference & Information.
|
Terms of Use
|

Webmaster
| © 2026 West Virginia Legislature **

Print On Demand

Name:

Email:

Phone: