Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
HB0047 • 2007
AN ACT relating to the prevailing wage for public works contracts; increasing minimum value of contracts covered under prevailing wage act; providing for a single statewide wage district for certain state-funded contracts;
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
2nd reading • GENTILE
Plain English: Adopted 2nd reading by GENTILE
3rd reading • LUBNAU
Plain English: Adopted 3rd reading by LUBNAU
Standing Committee • H10
Plain English: Adopted Standing Committee by H10
3rd reading • JENNINGS
Plain English: Withdrawn 3rd reading by JENNINGS
Committee of the Whole • FECHT
Plain English: Failed Committee of the Whole by FECHT
Standing Committee • LARSON
Plain English: Adopted Standing Committee by LARSON
Assigned Chapter Number - 109
Governor Signed HEA0065
S President Signed HEA No. 0065
H Speaker Signed HEA No. 65
Assigned Number HEA0065
S Adopted HB0047JC01
H Adopted HB0047JC01
S Appointed JCC01 Members
H Appointed JCC01 Members
H Did Not Concur
H Received for Concurrence
S Passed 3rd Reading
S Laid Back Without Prejudice
S Passed 2nd Reading
S Passed CoW
Amendment Failed
Amendment Adopted
S Amendments Adopted
S Placed on General File
S09 Recommended Amend and Do Pass
S Introduced and Referred to S09
S Received for Introduction
H Passed 3rd Reading
Amendment Adopted
H Passed 2nd Reading
Amendment Adopted
H Passed CoW
Amendment Adopted
H Amendments Adopted
H Placed on General File
H10 Recommended Amend and Do Pass
H Introduced and Referred to H10
H Received for Introduction
Bill Number Assigned
2007 General Session Summary for HB0047 Bill No.: HB0047 Drafter: JWL LSO No.: 07LSO-0096 Effective Date: 7/1/2007 Enrolled Act No.: HEA0065 Chapter No.: Prime Sponsor: Joint Labor, Health and Social Services Interim Committee Catch Title: Prevailing wage amendments. Subject: Miscellaneous amendments to the Wyoming Prevailing Wage Act. Summary/Major Elements: Current law requires that prevailing wages, as determined by the Department of Employment, be paid to workers on specified public works construction projects. This act: Raises the threshold level of projects for which prevailing wages must be paid from $25,000 to $100,000; Authorizes a single statewide statistical district for calculation of prevailing wage rates for state-funded projects; Authorizes the Department of Employment to investigate violation of the act on its own volition, without a complaint having been filed; Limits an existing 5% bid preference for resident contractors to those contractors who participate in the Department of Employment's prevailing wage survey.
WORKING DRAFT ORIGINAL HOUSE BILL NO. 0047 ENROLLED ACT NO. 65, HOUSE OF REPRESENTATIVES FIFTY-NINTH LEGISLATURE OF THE STATE OF WYOMING 2007 GENERAL SESSION AN ACT relating to the prevailing wage for public works contracts; increasing minimum value of contracts covered under prevailing wage act; providing for a single statewide wage district for certain state-funded contracts; authorizing the department of employment to investigate prevailing wage violations upon reasonable suspicion of a violation; removing a requirement that prevailing wage determinations utilize employment security law wage reports; providing a bid preference for contractors participating in the department's prevailing wage survey; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming: Section 1. W.S. 27 ‑ 4 ‑ 402(a)(i) and (ix)(A) through (C), 27 ‑ 4 ‑ 404 and 27 ‑ 4 ‑ 405(a) are amended to read: 27 ‑ 4 ‑ 402. Definitions. (a) As used in this act: (i) "Construction" includes construction, reconstruction, improvement, enlargement, alteration or repair of any public improvement fairly estimated to cost twenty-five thousand dollars ($25,000.00) one hundred thousand dollars ($100,000.00) or more; (ix) "Locality" for public heavy, highway projects and public building projects means the following districts wherein the physical work is performed: (A) For federal highway and construction projects: (I) The entire state of Wyoming excluding Laramie and Natrona counties any area defined as a metropolitan statistical area pursuant to 44 U.S.C. 3504(e)(3) and 31 U.S.C. 1104(d) ; (II) Any area defined as a metropolitan statistical area pursuant to 44 U.S.C. 3504(e)(3) and 31 U.S.C. 1104(d). (B) Laramie county For state only heavy and highway projects, the entire state of Wyoming ; (C) Natrona county For public building projects, the entire state of Wyoming . 27 ‑ 4 ‑ 404. Director to investigate complaints; rules and regulations. Upon complaint of violation of this act or upon reasonable suspicion that a violation of this act has occurred , the director shall investigate, and shall institute actions for penalties herein prescribed when proven violations are considered by him to be intentional and willful in nature. The director may establish rules and regulations for the purpose of carrying out the purposes of this act. 27 ‑ 4 ‑ 405. Duty of public authority to ascertain wage rate for public works; requirement as to call for bids. (a) Before any public body awards a contract for public works, it shall obtain from the department the prevailing hourly rate of wages in the locality in which the work is to be performed, for each craft or type of workman needed to execute the contract or project. The public body shall specify in the resolution or ordinance and in the call for bids for the contract, what the prevailing hourly rate of wages in the locality is for each craft or type of workman needed to execute the contract, and it shall be mandatory upon the contractor to whom the contract is awarded and upon any subcontractor under him, to pay not less than the specified rates to all workmen employed by them in the execution of the contract. The public body awarding the contract shall cause to be inserted in the contract a stipulation to the effect that not less than the prevailing hourly rate of wages as determined by the department pursuant to W.S. 27 ‑ 4 ‑ 406, or determined by the court on review, shall be paid to all workmen performing work under the contract. It shall also require in all the contractor's bonds that the contractor include such provision as will guarantee the faithful performance of the prevailing hourly wage clause as provided by the contract. The finding of the department specifying the prevailing hourly rate of wages in accordance with this subsection, shall be final for all purposes of the contract then being considered, unless reviewed under the provisions of this act. A public body doing public works directly shall comply with the prevailing hourly rate of wages portion of this subsection for each craft or type of workman so employed. In reviewing bids for public works contracts, the public body shall only award a bid preference in the percentage specified in W.S. 16 ‑ 6 ‑ 102(a) to any prospective contractor who participated, as certified by the department, in the department's wage survey for the period applicable to the contract being awarded. Section 2. W.S. 27 ‑ 4 ‑ 406(a)(i) is repealed. Section 3. This act is effective July 1, 2007. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the House. Chief Clerk 1