Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
HB0236 • 2007
AN ACT relating to water development projects; authorizing specified Level I and Level II studies and providing appropriations; requiring reports; providing for reversion of unexpended funds; authorizing unobligated funds to be used to complete other designated project studies under certain conditions; and providing for an effective date.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
2nd reading • PHILP
Plain English: Adopted 2nd reading by PHILP
Committee of the Whole • STEWARD
Plain English: Adopted, Corrected Committee of the Whole by STEWARD
Standing Committee • H05
Plain English: Adopted, Corrected Standing Committee by H05
Standing Committee • GEIS
Plain English: Adopted Standing Committee by GEIS
Assigned Chapter Number - 85
Governor Signed HEA0052
H Speaker Signed HEA No. 52
S President Signed HEA No. 0052
Assigned Number HEA0052
H Recedes from Nonconcurrence
H Adopted HB0236JC01
S Appointed JCC01 Members
H Appointed JCC01 Members
H Did Not Concur
H Received for Concurrence
S Passed 3rd Reading
S Passed 2nd Reading
S Passed CoW
Amendment Adopted
S Amendments Adopted
S Placed on General File
S05 Recommended Amend and Do Pass
S Introduced and Referred to S05
S Received for Introduction
H Passed 3rd Reading
H Passed 2nd Reading
Amendment Adopted
H Passed CoW
Amendment Adopted
Amendment Adopted
H Amendments Adopted
H Placed on General File
H05 Recommended Amend and Do Pass
H Introduced and Referred to H05
H Received for Introduction
Bill Number Assigned
2007 General Session Summary for HB0236 Bill No.: HB0236 Drafter: MQ LSO No.: 07LSO-0389 Effective Date: 2/21/2007 Enrolled Act No.: HEA0052 Chapter No.: 85 Prime Sponsor: Select Water Committee Catch Title: Omnibus water bill-planning. Subject: Provides authorization and funding for water development projects approved for study and planning. Summary/Major Elements: Authorizes specified reconnaissance and feasibility studies for water development projects. If not expended or transferred to another project at the same level, funds appropriated for Level I and II studies revert to the water development accounts on July 1, 2008. Comments: See also the companion water bill, SF137, Omnibus water bill-construction.
WORKING DRAFT ORIGINAL HOUSE BILL NO. 0236 ENROLLED ACT NO. 52, HOUSE OF REPRESENTATIVES FIFTY-NINTH LEGISLATURE OF THE STATE OF WYOMING 2007 GENERAL SESSION AN ACT relating to water development projects; authorizing specified Level I and Level II studies and providing appropriations; requiring reports; providing for reversion of unexpended funds; authorizing unobligated funds to be used to complete other designated project studies under certain conditions; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming : Section 1. 2006 Wyoming Session Laws, Chapter 99, Sections 1 and 3 through 5 and 6 by creating a new Part II are amended to read: [2006-2007 WATER PROGRAM] [AUTHORIZED LEVEL I AND LEVEL II STUDIES] Section 1. LEVEL I RECONNAISSANCE STUDIES – NEW DEVELOPMENT . The following sums of money are appropriated from water development account I to the commission to be expended to conduct the following reconnaissance studies as defined in W.S. 41 ‑ 2 ‑ 114. Funds appropriated under this section for a particular project which are in excess of the actual amount necessary to complete the study may, subject to the review of the select water committee, be expended by the commission to complete the reconnaissance study for any other project listed in this section. Appropriated funds not expended prior to July 1, 2008, shall revert to water development account I. The commission shall submit a report to the legislature on each of the following studies prior to the 2008 legislative session. [LEVEL I RECONNAISSANCE STUDIES - NEW DEVELOPMENT] Project Location Appropriation Owl Creek Rural Water Supply Hot Springs County $75,000 Statewide Water Research Statewide 300,000 600,000 Wind River Glaciers Fremont , Sublette Counties 225,000 Clearmont CBM Impact Plan Sheridan County 75,000 Green River Basin Plan II Green River Basin 600,000 Green River , Rock Springs, Sweetwater County 220,000 Sweetwater County JPWB Master Plan II Laramie County Aquifer Study Laramie County 300,000 Phase I Lusk Area Ground Water Niobrara County 200,000 Pinedale Master Plan 2007 Sublette County 210,000 Northern Arapaho Master Plan Fremont County 125,000 Star Valley Regional Master Lincoln County 600,000 Plan Total appropriation for Section 1 $600,000 $3,230,000 Section 3. LEVEL II FEASIBILITY STUDIES – NEW DEVELOPMENT . The following sums of money are appropriated from water development account I to the commission to be expended to conduct the following feasibility studies as defined in W.S. 41 ‑ 2 ‑ 114. Funds appropriated under this section for a particular project which are in excess of the actual amount necessary to complete the study may, subject to the review of the select water committee, be expended by the commission to complete the feasibility study for any other project listed in this section. Appropriated funds not expended prior to July 1, 2008, shall revert to water development account I. The commission shall submit a report to the legislature on each of the following studies prior to the 2008 legislative session. [LEVEL II FEASIBILITY STUDIES - NEW DEVELOPMENT] PROJECT LOCATION APPROPRIATION Glendo Water Supply Platte County $625,000 LaBarge Water Supply Lincoln County 400,000 Cheyenne/Laramie Laramie County 450,000 County Water Service Area Sundance Meadows 1. Converse County 50,000 Alpine Master Plan Lincoln County 185,000 Update, Phase II Cheyenne Belvoir Laramie County 450,000 Ranch, Phase II 2. Glenrock Well Phase II Converse County 550,000 Hudson Water Supply Fremont County 575,000 Lysite Test Well Fremont County 545,000 Northern Arapaho Fremont County 605,000 Groundwater, Budget Increase Saratoga Test Well, Carbon County 300,000 Phase II Shoshone Groundwater Fremont County 600,000 Dev., Budget Increase Jon’s Drop Hydropower Carbon County 40,000 Coalbed Methane (CBM) Powder and North 500,000 Water Delivery Platte River Basin Analysis, Powder River Basin to Platte River Basin 3. Hold Projects* Statewide 15,000 Star Valley Ranch Lincoln County 600,000 Groundwater 4. Upton Well No. 6 Weston County 75,000 Cody Canal Hydropower Park County 75,000 Dixon Water Supply II Carbon County 75,000 Dayton Raw Water Sheridan County 100,000 Frannie Raw Water Park County 50,000 Hoback Water Supply Teton County 700,000 Laramie Water Albany County 260,000 Management Plan Total appropriation for Section 3 $5,890,000 $7,825,000 1. The project shall first form a public entity prior to commencement of the study. 2. Surface and groundwater interference issues shall be addressed during the study. 3. The water development commission in consultation with the governor's office, the attorney general's office, the state engineer's office, the department of environmental quality and representatives of the oil and gas industry shall compile a scope of services and request for proposal to secure the needed professional engineering services to conduct the study. 4. The sponsor shall acquire appropriate portions of the existing system prior to commencement of the study. *Hold projects include: Blackwillow, Rock Springs East, Bridger Valley Water Supply Projects, Cheyenne Hydropower, Crow Creek Groundwater Recharge, Goshen Re-regulating Reservoir , Greybull Valley Hydropower, Middle Fork Dam and North Cheyenne . As used in this section, "Hold project" means a project which has had a previous legislative funding authorization for a study at the same level authorized by this act, but has been placed on hold status as a result of outstanding issues which warrant limiting future expenditures until the issues are resolved. Hold status serves to document commission or sponsor interest in a project subject to resolution of issues. Section 4. LEVEL II FEASIBILITY STUDIES – STORAGE . The following sums of money are appropriated from water development account III, as created by W.S. 41 ‑ 2 ‑ 124(a)(iii), to the commission to be expended to conduct the following reconnaissance studies as defined in W.S. 41 ‑ 2 ‑ 114. Funds appropriated under this section for a particular project which are in excess of the actual amount necessary to complete the study may, subject to the review of the select water committee, be expended by the commission to complete the reconnaissance study for any other project listed in this section. Appropriated funds not expended prior to July 1, 2008, shall revert to water development account III. The commission shall submit a report to the legislature on each of the following studies prior to the 2008 legislative session. [LEVEL II FEASIBILITY STUDIES - STORAGE] Project Location Appropriation Middle Piney, Phase I Sublette County $200,000 Viva Naughton Enlargement II Lincoln County 250,000 Bridger Valley Reservoir Uinta County 100,000 Cottonwood Lake Enlargement Lincoln County 80,000 Hopkins Reservoir Study Johnson County 100,000 Rawlins Raw Water Storage Carbon County 100,000 Sublette Creek Reservoir Lincoln County 81,000 Upper Green River Storage Sublette County 200,000 Total appropriation for Section 4 $200,000 $1,111,000 Section 5. LEVEL II FEASIBILITY STUDIES - REHABILITATION . The following sums of money are appropriated from water development account II to the commission to be expended to conduct the following feasibility studies as defined in W.S. 41 ‑ 2 ‑ 114. Funds appropriated under this section for a particular project which are in excess of the actual amount necessary to complete the study may, subject to the review of the select water committee, be expended by the commission to complete the feasibility study for any other project listed in this section. Appropriated funds not expended prior to July 1, 2008, shall revert to water development account II. The commission shall submit a report to the legislature on each of the following studies prior to the 2008 legislative session. [LEVEL II FEASIBILITY STUDIES - REHABILITATION] PROJECT LOCATION APPROPRIATION Casper Alcova ID GIS Natrona County $200,000 Douglas Groundwater Converse County 75,000 Shoshone ID Rehab, GIS Park County 300,000 Washakie Co. Safety Washakie County 50,000 Crowheart/Dinwoody 1. Fremont County 200,000 Gooseberry ID Washakie/Hot Springs 100,000 Conservation, 2006 Counties Heart Mountain ID, Park County 21,000 Budget Increase Riverton/Mountain Fremont County 125,000 View, Budget Increase Wheatland ID, Platte County 300,000 Phase II Conservation Enterprise Conservation Fremont County 100,000 Fort Laramie Supply Goshen County 100,000 Greybull Valley I.D., Big Horn County 100,000 Upper Sunshine Diversion Kirby Irrigation Hot Springs County 200,000 Manville Water Supply Niobrara County 90,000 Willwood Diversion Dam Park County 250,000 Total appropriation for Section 5 $1,371,000 $2,211,000 1. An official letter, minutes from a meeting, or resolution of the business council of the Eastern Shoshone tribe or Northern Arapaho tribe or the joint business council of the Eastern Shoshone and Northern Arapaho tribes, which demonstrates support for the project shall be submitted to the Wyoming water development office prior to commencement of the project. Section 6. Part II. LEVEL I FEASIBILITY STUDY – MITIGATION NORTH PLATTE DRAINAGE SYSTEM . (a) There is appropriated one hundred thousand dollars ($100,000.00) from the water development account I to the Wyoming water development office to be expended to conduct feasibility studies specified in this section. Notwithstanding W.S. 9 ‑ 4 ‑ 207(a), funds appropriated under this section that are not encumbered or obligated prior to June 30, 2008, shall not revert to the general fund, but shall be used by the office to complete the studies authorized under this section. Level I feasibility funds appropriated under this section shall be used as follows: (i) To develop a five (5) year plan to mitigate surface/drain water and groundwater replacement requirements required of the state of Wyoming as defined in the modified North Platte River Decree in an area bounded by Whalen Diversion Dam on the west, the Fort Laramie Canal on the South, the Interstate Canal on the North and the Wyoming-Nebraska state line on the east; (ii) To explore and facilitate the creation of an irrigation district as an alternative for purchasing or otherwise acquiring replacement water as described in paragraph (a)(i) of this section; (iii) To locate and determine the feasibility of development of nonhydrological sources to mitigate the state of Wyoming's water replacement obligations described by the modified North Platte River decree and by paragraph (a)(i) of this section. (b) The office shall report its findings to the select water committee prior to November 1, 2007. (c) Any balance of funds remaining after completion of the level I feasibility study may be used for the acquisition of replacement water as described in paragraph (a)(i) of this section. (d) As used in this section, "modified North Platte River decree" means the North Platte River decree approved by the United States Supreme Court in Nebraska v. Wyoming , 534 U.S. 40 (2001). Section 2. This act is effective immediately upon co m pletion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constit u tion. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the House. Chief Clerk 1