Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
SF0077 • 2007
AN ACT relating to liens by cooperative utilities; providing for a lien for materials or services; specifying filing procedures and timelines; and providing for an effective date.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
2nd reading • ZWONITZ,DV
Plain English: Failed 2nd reading by ZWONITZ,DV
2nd reading • LUBNAU
Plain English: Adopted 2nd reading by LUBNAU
3rd reading • LUBNAU
Plain English: Adopted 3rd reading by LUBNAU
3rd reading • ZWONITZ,DV
Plain English: Withdrawn 3rd reading by ZWONITZ,DV
Standing Committee • H09
Plain English: Adopted Standing Committee by H09
3rd reading • PERKINS
Plain English: Adopted 3rd reading by PERKINS
Assigned Chapter Number - 193
Governor Signed SEA0072
H Speaker Signed SEA No. 72
S President Signed SEA No. 0072
Assigned Number SEA0072
S Did Concur
H Passed 3rd Reading
Amendment Adopted
H Passed 2nd Reading
Amendment Adopted
Amendment Failed
H Laid Back Pursuant to HR 9-3
H Passed CoW
Amendment Adopted
H Amendments Adopted
H Placed on General File
H09 Recommended Amend and Do Pass
H Introduced and Referred to H09
H Received for Introduction
S Passed 3rd Reading
Amendment Adopted
S Amendments Adopted
S Passed 2nd Reading
S Passed CoW
S Placed on General File
S09 Recommended Do Pass
S Introduced and Referred to S09
S Received for Introduction
Bill Number Assigned
2007 General Session Summary for SF0077 Bill No.: SF0077 Drafter: MRW LSO No.: 07LSO-0394 Effective Date: 7/1/2007 Enrolled Act No.: SEA0072 Chapter No.: Prime Sponsor: Senator Larson Catch Title: Liens for electrical services. Subject: Liens for electrical services. Summary/Major Elements: Establishes a lien for a cooperative utility if the utility is owed more than $5,000.00 and that amount has been unpaid for more than 90 days. Establishes the priority for a perfected lien for a cooperative utility to be the date and time the lien statement is filed. Prevents the lien from having priority over other perfected liens or mortgages on the same property which have been perfected prior to the filing date of this lien. Specifies filing procedures and provides for an extension for filing the lien.
WORKING DRAFT ORIGINAL SENATE FILE NO. 0077 ENROLLED ACT NO. 72, SENATE FIFTY-NINTH LEGISLATURE OF THE STATE OF WYOMING 2007 GENERAL SESSION AN ACT relating to liens by cooperative utilities; providing for a lien for materials or services; specifying filing procedures and timelines; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming : Section 1. W.S. 29 ‑ 1 ‑ 305 by creating a new subsection (e), 29 ‑ 2 ‑ 101 by creating a new subsection (d) and 29 ‑ 2 ‑ 106 by creating a new subsection (d) are amended to read: 29-1-305. Priority of liens. (e) The priority of a perfected lien for a cooperative utility provided in W.S. 29 ‑ 2 ‑ 101(d) shall be determined by the date and time the lien statement is filed and shall not have priority over other perfected liens or mortgages on the same property which have been perfected prior to the filing date. 29 ‑ 2 ‑ 101. Persons entitled to liens; extent of lien on realty; exceptions. (d) A cooperative utility, as defined by W.S. 17 ‑ 20 ‑ 140(a)(i), shall have a lien for the materials or services provided to a member. The lien shall attach to the real property of the member at the location where the materials or services were provided, if the amount due to the utility: (i) Is greater than five thousand dollars ($5,000.00); and (ii) Has been unpaid for more than ninety (90) days. 29 ‑ 2 ‑ 106. When statement lien to be filed; rights of subcontractor not abridged by contract between owner and contractor; agreement to extend filing period. (d) A cooperative utility claiming a lien under W.S. 29 ‑ 2 ‑ 101(d) shall file its lien statement within one hundred eighty (180) days after the first date the provisions of W.S. 29 ‑ 2 ‑ 101(d)(i) and (ii) were met. The cooperative utility and its member may agree to an extension of the time in which the lien may be filed, but the agreement may not exceed a total time for filing the lien statement beyond three hundred sixty (360) days. Any agreement for an extension under this subsection shall otherwise comply with the requirements of subsection (c) of this section. Section 2. This act is effective July 1, 2007. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the Senate. Chief Clerk 1