Omnibus water bill-construction.

AN ACT relating to water development projects; authorizing a transfer of water as specified; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.

Agriculture Budget Energy
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Water
Last action
2009-02-25
Official status
enrolled
Effective date
2/25/2009

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

SF0068H2001

2nd reading • MADDEN

Adopted

Plain English: Adopted 2nd reading by MADDEN

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0068H3001

3rd reading • STEWARD

Withdrawn

Plain English: Withdrawn 3rd reading by STEWARD

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0068HW001

Committee of the Whole • STEWARD

Failed

Plain English: Failed Committee of the Whole by STEWARD

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0068HS001

Standing Committee • H05

Adopted

Plain English: Adopted Standing Committee by H05

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0068SW001

Committee of the Whole • BEBOUT

Adopted

Plain English: Adopted Committee of the Whole by BEBOUT

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0068SS001

Standing Committee • GEIS

Adopted

Plain English: Adopted Standing Committee by GEIS

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.

Bill History

  1. 2009-02-25 LSO

    Assigned Chapter Number - 38

  2. 2009-02-25 Governor

    Governor Signed SEA No. 0025

  3. 2009-02-23 House

    H Speaker Signed SEA No. 0025

  4. 2009-02-23 Senate

    S President Signed SEA No. 0025

  5. 2009-02-20 LSO

    Assigned Number SEA No. 0025

  6. 2009-02-20 Senate

    S Did Concur

  7. 2009-02-20 Senate

    S Received for Concurrence

  8. 2009-02-20 House

    H Passed 3rd Reading

  9. 2009-02-19 House

    H Passed 2nd Reading

  10. 2009-02-19 House

    Amendment Adopted

  11. 2009-02-18 House

    H Passed CoW

  12. 2009-02-18 House

    Amendment Failed

  13. 2009-02-18 House

    H Amendments Adopted

  14. 2009-02-18 House

    Amendment Adopted

  15. 2009-02-17 House

    H Placed on General File

  16. 2009-02-17 House

    H02 Recommended Do Pass

  17. 2009-02-13 House

    H Rereferred to H02

  18. 2009-02-13 House

    H Placed on General File

  19. 2009-02-13 House

    H05 Recommended Amend and Do Pass

  20. 2009-02-03 House

    H Introduced and Referred to H05

  21. 2009-01-30 House

    H Received for Introduction

  22. 2009-01-28 Senate

    S Passed 3rd Reading

  23. 2009-01-27 Senate

    S Passed 2nd Reading

  24. 2009-01-26 Senate

    S Passed CoW

  25. 2009-01-26 Senate

    Amendment Adopted

  26. 2009-01-26 Senate

    S Amendments Adopted

  27. 2009-01-26 Senate

    Amendment Adopted

  28. 2009-01-26 Senate

    S Placed on General File

  29. 2009-01-26 Senate

    S05 Recommended Amend and Do Pass

  30. 2009-01-13 Senate

    S Introduced and Referred to S05

  31. 2009-01-13 Senate

    S Received for Introduction

  32. 2009-01-05 LSO

    Bill Number Assigned

Official Summary Text

Bill No.: <billno> Drafter: <drafterinit>

Bill No.:
SF0068
Drafter:

MQ

LSO No.:
09LSO-0334
Effective Date:

2/25/2009

Enrolled Act No.:
SEA0025

Chapter No.:
38

Prime Sponsor:
Select
Water Committee

Catch Title:
Omnibus
water bill-construction.

Subject:
Provides
authorization and funding for water development projects approved for final
construction.

Summary/Major Elements:

Authorizes
the water development office to transfer up to 33,000 acres feet of storage
water per year from the Pathfinder reservoir to the Wyoming-Nebraska state line
for the purpose of providing regulatory certainty under the Endangered Species
Act for the use of Wyoming water in the Platte River basin.

Also
authorizes the transfer of 9600 acre feet of storage water per year from the
Pathfinder reservoir to the Wyoming-Nebraska state line if not needed by the
state of Wyoming as a municipal water supply.

Above
authorized transfers are to fulfill the state's obligations in the
Nebraska
v. Wyoming
settlement agreement.

2009 New development Projects

Basin
Storage Tank

Casper
Paradise Valley
Pipeline

Dubois
Water Supply

Hudson
Water Supply

Laramie
County Archer
Water Supply

Mile-Hi
Water Supply

Pine
Bluffs Deep Well 2009

Pinedale
Pipelines-Phase I

Rawlins
Reservoir and Pipeline-Phase I

Riverton
Water Supply

Shoshone
Municipal Pipeline 2009

Star
Valley

Ranch Water Supply

Teton
Village

Water Supply

Upton
Well

Wamsutter
Well

Rehabilitation Construction Projects

Big
Horn Canal Rehabilitation 2009

Casper
Alcova Rehabilitation 2009

Deaver
Rehabilitation 2009

Eden
Valley

Rehabilitation 2009

Goshen
Rehabilitation 2009

GVID
Upper Sunshine Division-Phase I

Lovell
Rehabilitation 2009

Riverton
Valley

Rehabilitation 2009

Shoshone
Rehabilitation 2009

Willwood
Rehabilitation 2009

Riverton
Valley

Pipeline Relocation

Amendments to Prior Projects

Washakie
Rural Water Supply Project

Riverton
Raw Water Supply Rehabilitation Project

LeClair
Laterals Rehabilitation Project

Gillette
Madison Pipeline Joint Bonding

Green
River
Supply Canal
Rehabilitation

Lake
DeSmet

Rehabilitation

Worland
Eastside Transmission Line

Pathfinder
Modification Project

Sundance
Well Project

Glendo
Well

Midvale
Canal

Rehabilitation

Glenrock
Well

Laramie
Transmission Pipeline

Sidon
Rehabilitation

Comments:

See also the companion water bill, HB 100, Omnibus water bill-planning.

Current Bill Text

Read the full stored bill text
WORKING DRAFT

ORIGINAL SENATE

FILE

NO.
0068

ENROLLED ACT NO. 25, SENATE

SIXTIETH LEGISLATURE OF THE STATE OF
WYOMING
2009 GENERAL SESSION

AN ACT relating to water development projects;
authorizing a transfer of water as specified;
authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.

Be It Enacted by the Legislature of the State of
Wyoming
:

Section 1.

W.S. 41
‑
2
‑
1301 and 99
‑
3
‑
1401 through 99
‑
3
‑
1404 are created to read:

ARTICLE 13
TRANSFER OF WATER

41
‑
2
‑
1301.

Transfer of water authorized; conditions.

(a)

Pursuant to W.S. 41
‑
3
‑
115, t
he United States Bureau of Reclamation and the Wyoming water development office are hereby authorized to transfer a maximum of thirty-three thousand four hundred ninety-three (33,493) acre feet of storage water per year from the environmental account in
the
Pathfinder Modification Project within

Pathfinder
r
eservoir to the
Wyoming-
Nebraska
state line
for the purpose of providing regulatory certainty under the Endangered Species Act for the use of Wyoming water in the Platte River basin
.

(b)

Pursuant to W.S. 41
‑
3
‑
115,
and the Wyoming water development office is hereby authorized to transfer a maximum of nine thousand six hundred (9,600) acre feet of storage water per year from the Wyoming account in
the
Pathfinder Modification Project within
Pathfinder r
eservoir to the
Wyoming-Nebraska state line
through annual temporary water use agreements with the Platte River Recovery Implementation Program in
any year
the storage water in the Wyoming account is not needed

by the state of Wyoming as a municipal water supply or a replacement water supply to meet the state of Wyoming's obligations in the
Nebraska v. Wyoming
settlement agreement and the Platte River Recovery Implementation Program.

(c)

The authorizations granted under subsections (a) and (b) of this section shall terminate if the state of
Wyoming
withdraws from the Platte River Recovery Implementation Program or any successor programs approved by the governor.

(d)

If the director of the
Wyoming
water development office determines that
Wyoming
water users are not receiving the regulatory certainty under the endangered species act as provided for in the
Platte

River
recovery implementation program, he shall submit a report to the select water committee outlining the inadequacy of the regulatory certainty.

(e)

If the state engineer determines that the transfers authorized under subsections (a) and (b) of this section cause injury to Wyoming water users beyond those identified in the final opinion and recommendations provided to the legislature pursuant to W.S. 41
‑
3
‑
115(q), then the state engineer shall report the injury to the select water committee.

(f)

Any revenue generated through the annual temporary water use agreements for storage water from the
Wyoming
account shall be deposited in the account
created
by W.S. 41
‑
2
‑
1001(a)(iv).

ARTICLE 14
2009 CONSTRUCTION PROJECTS

99
‑
3
‑
1401.

Definitions.

The definitions in W.S. 99
‑
3
‑
101 apply to this article.

99
‑
3
‑
1402.

General authorization.

The provisions of W.S. 99
‑
3
‑
102 apply to this article.

99
‑
3
‑
1403.

Level III construction projects – new development.

(a)

Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99
‑
3
‑
103.

(b)

Project –
Basin Storage Tank
:

(i)

Project sponsor: Town of
Basin
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One
million
six hundred thirty-four
thousand dollars ($
1,634
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million ninety-four thousand seven hundred eighty dollars ($1,094,780.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,
project land procurement, construction engineering and construction of the project an amount not to exceed five hundred thirty-nine thousand two hundred twenty dollars ($539,220.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission o
ne million six hundred thirty-four thousand dollars ($1,634,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
c
)

Project –
Casper

Paradise

Valley
Pipeline
:

(i)

Project sponsor:
City of
Casper
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a transmission pipeline
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One
million
seven hundred
thousand dollars ($
1,700
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million one hundred thirty-nine thousand dollars ($1,139,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission o
ne million
one hundred thirty-nine
thousand dollars ($1,
139
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(
d
)

Project –
Dubois Water Supply
:

(i)

Project sponsor: Town of
Dubois
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank, well modifications, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Two
million
one hundred thirty
thousand dollars ($
2,130
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million four hundred twenty-seven thousand one hundred dollars ($1,427,100.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,
project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred two thousand nine hundred dollars ($702,900.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission two
million
one
hundred thirty

thousand dollars ($
2
,
130
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
e
)

Project –
Hudson
Water Supply
:

(i)

Project sponsor: Town of
Hudson
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank, well field, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One
million
five hundred twenty
thousand dollars ($
1,520
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million eighteen thousand four hundred dollars ($1,018,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,
project land procurement, construction engineering and construction of the project an amount not to exceed five hundred one thousand six hundred dollars ($501,600.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission o
ne million
five
hundred
twenty
thousand dollars ($1,
520
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
f
)

Project –
Laramie

County

Archer
Water Supply
:

(i)

Project sponsor:
Laramie

County
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a groundwater well
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Three hundred
thousand dollars ($
300
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred one thousand dollars ($201,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission two hundred one
thousand dollars ($
201
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2012;

(vii)

Special conditions:

(A)

The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources;

(B)

The sponsor shall purchase the well
s
drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the wells
’
actual construction costs. The sponsor
shall
purchase the well
s
with a lump sum payment
.

(
g
)

Project –
Mile-Hi Water Supply
:

(i)

Project sponsor:
Mile-Hi Improvement and service district
;

(ii)

Project purpose:
R
ural domestic water supply;

(iii)

Project description: Design and construction of
pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One
million
two hundred sixteen
thousand dollars ($
1,216
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed eight hundred fourteen thousand seven hundred twenty dollars ($814,720.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement project land procurement, construction engineering and construction of the project an amount not to exceed two hundred thousand six hundred forty dollars ($200,640.00) or sixteen and one-half percent (16.5%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission o
ne million
fifteen
thousand
three hundred sixty
dollars
(
$1,
015,360
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(viii)

Special condition: The sponsor is responsible for acquiring sixteen and one-half percent (16.5%) of the total project budget from other sources.

(h
)

Project –
Pine Bluffs Deep Well 2009
:

(i)

Project sponsor:
Town of
Pine Bluffs
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a groundwater well, pipeline
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Eight hundred seventy-one
thousand dollars ($
871
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred eighty-three thousand five hundred seventy dollars ($583,570.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission five hundred eighty-three
thousand
five hundred seventy
dollars ($
583,570
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(
j
)

Project –
Pinedale Pipelines-Phase I
:

(i)

Project sponsor: Town of
Pinedale
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description:
Design, permit procurement, project land procurement for two (2) transmission pipelines and construction engineering and construction of one (1) transmission pipeline
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Eleven
million
six hundred seventy
thousand dollars ($
11,670
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement for two (2) transmission pipelines and construction engineering and construction of one (1) transmission pipeline an amount not to exceed five million two hundred ninety-three thousand dollars ($5,293,000.00) or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement for two (2) transmission pipelines and construction engineering and construction of one (1) transmission pipeline an amount not to exceed two million six hundred seven thousand dollars ($2,607,000.00) or thirty-three percent (33%) of the actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission seven
million
nine
hundred thousand dollars ($
7,900
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
k
)

Project –
Rawlins Reservoir and Pipeline-Phase I
:

(i)

Project sponsor:
City of
Rawlins
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design

and construction of
a reservoir and transmission pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Sixteen
million
four hundred fifteen
thousand dollars ($
16,415
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement for the project an amount not to exceed nine hundred four thousand five hundred dollars ($904,500.00) or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement for the project an amount not to exceed four hundred forty-five thousand five hundred dollars ($445,500.00) or thirty-three percent (33%) of the actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission one
million
three
hundred
fifty
thousand dollars ($
1,350
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
m
)

Project –
Riverton Water Supply
:

(i)

Project sponsor:
City of
Riverton
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design

and construction of
a storage tank, transmission pipelines, well connection
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Six
million
four hundred forty
thousand dollars ($
6,440
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement for the project an amount not to exceed four million three hundred fourteen thousand eight hundred dollars ($4,314,800.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement for the project an amount not to exceed six hundred forty-four thousand dollars ($644,000.00) or ten percent (10%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission four
million
nine
hundred
fifty-eight
thousand
eight hundred
dollars ($
4,958,8
00.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(viii)

Special condition
s
:

(A)

T
he sponsor is responsible for acquiring twenty-three percent (23%) of the total project budget from other sources;

(B)

The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor may purchase the well with a lump sum payment or with amortized payments for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor at an interest rate of four percent (4%).

(
n
)

Project –
Shoshone Municipal Pipeline-2009
:

(i)

Project sponsor:
Shoshone Municipal Water Supply Joint Powers Board
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a transmission pipeline relocation
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Seven
million
three hundred sixty thousand
dollars ($
7,360
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million four hundred twenty-eight thousand eight hundred dollars ($2,428,800.00) or thirty-three percent (33%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission two million four hundred twenty-eight thousand eight hundred dollars ($2,428,800.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(vii)

Special condition: The sponsor is responsible for acquiring sixty-seven percent (67%) of the total project budget from other sources.

(
o
)

Project –

Star

Valley
Ranch Water Supply
:

(i)

Project sponsor: Town of
Star Valley Ranch
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank, well connection, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Two
million
six hundred twenty
thousand dollars ($
2,620
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million seven hundred fifty-five thousand four hundred dollars ($1,755,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,
project land procurement, construction engineering and construction of the project an amount not to exceed eight hundred sixty-four thousand six hundred dollars ($864,600.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission two
million
six
hundred
twenty
thousand dollars ($
2,620
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(viii)

Special condition: The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor may purchase the well with a lump sum payment or with amortized payments for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor at an interest rate of four percent (4%).

(
p
)

Project –

Teton

Village
Water Supply
:

(i)

Project sponsor:
Teton Village Water and Sewer District
;

(ii)

Project purpose:
R
ural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank, well, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Four
million
eight hundred ninety-five
thousand dollars ($
4,895
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million two hundred twenty-three thousand seven hundred fifty dollars ($1,223,750.00) or twenty-five percent (25%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,
project land procurement, construction engineering and construction of the project an amount not to exceed one million two hundred twenty-three thousand seven hundred fifty dollars ($1,223,750.00) or twenty-five percent (25%)

of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission two
million
four
hundred
forty-seven
thousand
five hundred
dollars ($
2,447
,
5
00.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(viii)

Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

(
q
)

Project –
Upton Well
:

(i)

Project sponsor: Town of
Upton
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a well connection, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Three hundred ninety-five
thousand dollars ($
395
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred sixty-four thousand six hundred fifty dollars ($264,650.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement project land procurement, construction engineering and construction of the project an amount not to exceed one hundred thirty thousand three hundred fifty dollars ($130,350.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission three
hundred
ninety-five
thousand dollars ($
395
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(
r
)

Project –
Wamsutter Well
:

(i)

Project sponsor: Town of
Wamsutter
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description:
Purchase of an existing well, d
esign and construction of
a well connection, pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Eight hundred ten
thousand dollars ($
810
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the purchase of a well, design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred forty-two thousand seven hundred dollars ($542,700.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission five hundred

forty-two
thousand
seven hundred
dollars ($
542,7
00.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

[REHABILITATION CONSTRUCTION PROJECTS]

9
9
‑
3
‑
1404.

Level III construction projects – rehabilitation.

(a)

Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99
‑
3
‑
104.

(b)

Project – Big
Horn

Canal
Rehabilitation 2009:

(i)

Project sponsor: Big Horn Canal Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of improvements to an existing headgate and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Nine hundred forty-five thousand dollars ($945,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred thirty-three thousand one hundred fifty dollars ($633,150.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred eleven thousand eight hundred fifty dollars ($311,850.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission nine hundred forty-five thousand dollars ($945,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014.

(c)

Project –

Casper
Alcova
Rehabilitation
2009
:

(i)

Project sponsor: Casper Alcova Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Two hundred seventy-six thousand dollars ($276,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project one hundred eighty-four thousand nine hundred twenty dollars ($184,920.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
one hundred eighty-four thousand nine hundred twenty dollars ($184,920.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(d)

Project –
Deaver
Rehabilitation
2009
:

(i)

Project sponsor: Deaver Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: One million two hundred eighteen thousand dollars ($1,218,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed six hundred seventy-three thousand dollars ($673,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission six
hundred
seventy-three
thousand dollars ($
673,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(e)

Project –

Eden

Valley

Rehabilitation
2009
:

(i)

Project sponsor: Eden Valley Irrigation and Drainage District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Thirteen million one hundred sixty thousand dollars ($13,160,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six million five hundred eighty thousand dollars ($6,580,000.00) or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission six million five hundred

eighty
thousand dollars ($
6,580,0
00.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(vii)

Special condition: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources.

(f)

Project –

Goshen

Rehabilitation
2009
:

(i)

Project sponsor: Goshen Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Three million two hundred sixteen thousand dollars ($3,216,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed one million two hundred thousand dollars ($1,200,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission one million two
hundred thousand dollars ($
1,200,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(g)

Project – GVID Upper Sunshine Diversion-Phase I:

(i)

Project sponsor: Greybull Valley Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of improvements to an existing diversion structure and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Three million three hundred fifty-four thousand dollars ($3,354,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement and project land procurement an amount not to exceed two hundred one thousand dollars ($201,000.00) or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement and project land procurement an amount not to exceed ninety-nine thousand dollars ($99,000.00) or thirty-three percent (33%) of actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission three hundred thousand dollars ($300,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014.

(h)

Project –

Lovell
Rehabilitation
2009
:

(i)

Project sponsor: Lovell Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Six hundred thirty-four thousand dollars ($634,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed four hundred thirty-two thousand dollars ($432,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission four hundred thirty-two
thousand dollars ($
432,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(j)

Project –

Riverton

Valley

Rehabilitation
2009
:

(i)

Project sponsor: Riverton Valley Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: One hundred twenty thousand dollars ($120,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed seventy-nine thousand dollars ($79,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission seventy-nine
thousand dollars ($
79,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(k)

Project –
Shoshone
Rehabilitation
2009
:

(i)

Project sponsor: Shoshone Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Seven hundred fifty-nine thousand dollars ($759,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed three hundred thirty-nine thousand dollars ($339,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission three
hundred
thirty-nine
thousand dollars ($
339,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(
m
)

Project –
Willwood
Rehabilitation
2009
:

(i)

Project sponsor: Willwood Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four hundred eighty thousand dollars ($480,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed two hundred eighty-four thousand dollars ($284,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission two
hundred
eighty-four
thousand dollars ($
284,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(n)

Project –
Riverton

Valley
Pipeline Relocation:

(i)

Project sponsor: Riverton Valley Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of a pipeline relocation;

(iv)

Total project budget: One million three hundred thousand dollars ($1,300,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed five hundred twenty-five thousand dollars ($525,000.00) or eighty-seven and one-half percent (87.5%) of the approved materials costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed seventy-five thousand dollars ($75,000.00) or twelve and one-half percent (12.5%) of the approved material costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission six hundred thousand dollars ($600,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014;

(viii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

[AMENDMENTS TO PRIOR PROJECTS]

Section 2.
W.S. 99
‑
3
‑
303(k)(vi), 99
‑
3
‑
504(n)(vi), 99
‑
3
‑
804(m)(vi), 99
‑
3
‑
1004(c)(viii) through (x), (d)(iv) through (vii), (e)(iii) through (vii) and by creating a new paragraph (viii), 99
‑
3
‑
1104(n)(iv) through (vi), 99
‑
3
‑
1105(b)(iii), (vi)(A)(I) and (II), 99
‑
3
‑
1203(n)(iv) through (vii) and (p)(iv) through (viii), 99
‑
3
‑
1204(f)(iii) through (v), (vii) and by creating a new paragraph (viii), 99
‑
3
‑
1303(d)(iii) through (vii) and (f)(iii) through (vii), 99
‑
3
‑
1304(g)(iv), (v), (vii) and by creating a new paragraph (viii) are amended to read:

99
‑
3
‑
303.

Level III construction projects – new development.

(k)

Project - Washakie Rural Water Supply Project:

(vi)

Appropriation: There is appropriated from water development account I to the commission eleven million two hundred sixty-three thousand dollars ($11,263,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2010
2009
;

99
‑
3
‑
504.

Level III construction projects – rehabilitation.

(n)

Project – Riverton Raw Water Supply Rehabilitation Project:

(vi)

Appropriation: There is appropriated from water development account II to the commission one million eighty-six thousand five hundred dollars ($1,086,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2010
2009
;

99
‑
3
‑
804.

Level III construction projects rehabilitation.

(m)

Project – LeClair Laterals Rehabilitation Project:

(vi)

Appropriation: There is appropriated from water development account II to the commission five hundred sixty-five thousand dollars ($565,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2008
2012
; and

99
‑
3
‑
1004.

Level III construction projects – rehabilitation.

(c)

Project – Gillette Madison Pipeline Joint Bonding:

(viii)

Supplemental project budget:
Two million five hundred thousand dollars ($2,500,000.00)
Five million seven hundred fifty thousand dollars ($5,750,000.00)
;

(ix)

Supplemental project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission an amount not to exceed
one million six hundred seventy-five thousand dollars ($1,675,000.00)
three million eight hundred fifty-two thousand five hundred dollars ($3,852,500.00)
or sixty-seven percent (67%) of the additional funds needed to complete the project, whichever is less. Supplemental grant funds may be used for design, construction engineering and construction of the project;

(x)

Supplemental appropriation: There is appropriated from water development account II to the commission an additional
one million six hundred seventy-five thousand dollars ($1,675,000.00)
three million eight hundred fifty-two thousand five hundred dollars ($3,852,500.00)
, which when combined with the original appropriation, as described in paragraphs (iv) through (vi) of this subsection, total
two million nine hundred thousand dollars ($2,900,000.00)
five million seventy-seven thousand five hundred dollars ($5,077,500.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2010

2014
; and

(d)

Project –
Green River

Supply

Canal
Rehabilitation:

(iv)

Total project budget:
Two hundred thousand dollars ($200,000.00)
Three hundred fifty thousand dollars ($350,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
one hundred thousand dollars ($100,000.00)
two hundred thirty-four thousand five hundred dollars ($234,500.00)
or
fifty percent (50%)
sixty-seven percent (67%)
of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
one hundred thousand dollars ($100,000.00)
one hundred fifteen thousand five hundred dollars ($115,500.00)
or
fifty percent (50%)
thirty-three percent (33%)
of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of
six percent (6%)
four percent (4%)
; and

(vii)

Appropriation: There is appropriated from water development account II to the commission
two hundred thousand dollars ($200,000.00)
three hundred fifty thousand dollars ($350,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2009
2013
.

Source notes for subsection (d): (Laws 2005, Ch. 147, § 1.)

(e)

Project –
Lake

DeSmet
Rehabilitation:

(iii)

Project description: To repair and replace outlet gates at the north dam, fabricate and install a top grate on the tunnel outlet shaft, install piezometers in the north dam
, install riprap
and inclusion of appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One hundred sixty-five thousand dollars ($165,000.00)
One million four hundred thirty thousand dollars ($1,430,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
eighty-two thousand five hundred dollars ($82,500.00)
nine hundred fifty-eight thousand one hundred dollars ($958,100.00)
or
fifty percent (50%)
sixty-seven percent (67%)
of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
eighty-two thousand five hundred dollars ($82,500.00)
four hundred seventy-one thousand nine hundred dollars ($471,900.00)
or
fifty percent (50%)
thirty-three percent (33%)
of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of
six percent (6%)
four percent (4%)
; and

(vii)

Appropriation: There is appropriated from water development account II to the commission
one hundred sixty-five thousand dollars ($165,000.00)
one million four hundred thirty thousand dollars ($1,430,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2009.
2013;

(viii)

Special conditions:

(A)

If the sponsor enters into any agreement for the lease, sale, assignment or transfer of ownership of water from Lake DeSmet Dam and Reservoir for uses other than municipal, environmental, recreation or fish and wildlife uses, or any agreement for the lease, sale, assignment or transfer of ownership for all or part of Lake DeSmet Dam and Reservoir, the revenues from any such lease, sale, assignment or transfer of ownership shall be used for the following purposes in order of the following priorities:

(I)

Operation, maintenance and replacement costs as needed by the sponsor for Lake DeSmet Dam and Reservoir as approved by the commission;

(II)

A reserve account totaling one hundred thousand dollars ($100,000.00) to be earmarked for extraordinary operation, maintenance and replacement costs as needed by the sponsor for Lake DeSmet Dam and Reservoir;

(III)

Retirement of any outstanding principal on the project loan;

(IV)

Reimbursement to the commission for the project grant; and

(V)

After the project loan has been retired and the project grant has been reimbursed, any remaining revenues shall be the property of the sponsor.

(B)

Revenues received by the state from any such lease, sale, assignment or transfer of ownership shall be deposited into water development account II.

Source notes for subsection (e): (Laws 2005, Ch. 147, § 1.)

99
‑
3
‑
1104.

Level III construction projects –rehabilitation.

(n)

Project – Worland Eastside Transmission Line:

(iv)

Total project budget:
Three million six hundred fifteen thousand dollars ($3,615,000.00)
Five million three hundred thousand dollars ($5,300,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
one million eight hundred seven thousand five hundred dollars ($1,807,500.00)
two million six hundred fifty thousand dollars ($2,650,000.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
one million eight hundred seven thousand five hundred dollars ($1,807,500.00)
two million six hundred fifty thousand dollars ($2,650,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2010
2014
; and

99
‑
3
‑
1105.

Level III construction projects – dams and reservoirs.

(b)

Project – Pathfinder Modification Project:

(iii)

Project description: Modification
and raising
of the spillway
of Pathfinder Dam to recover approximately fifty-three thousand four hundred ninety-three (53,493) acre-feet of space that has been lost to sediment accumulation and appurtenances necessary to make the project function in the manner intended;

(vi)

Special conditions:

(A)

The
Wyoming
water development office is hereby authorized to contract with the United States Bureau of Reclamation for the construction, operation and maintenance of the project. Items to be included in the contract are, but are not limited to:

(I)

The
requirement for the United States Bureau of Reclamation to obtain a
partial change of use
of
obtained by the United States Bureau of Reclamation on
its water right for the Pathfinder Reservoir for the fifty-three thousand four hundred ninety-three (53,493) acre-feet of space allocated to the project purposes; and

(II)

The
requirement to obtain
legislative authority to deliver water to the Wyoming/Nebraska state line for the purpose of enhancing the regulatory certainty under the Endangered Species Act for the use of
Wyoming
water in the
Platte

River basin

provided in W.S.
41-2-1301
.

99
‑
3
‑
1203.

Level III construction projects – new development.

(n)

Project – Sundance Well Project:

(iv)

Total project budget:
Five hundred ninety-five thousand dollars ($595,000.00)
Six hundred eighty-five thousand dollars ($685,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed
three hundred ninety-eight thousand six hundred fifty dollars ($398,650.00)
four hundred fifty-eight thousand nine hundred fifty dollars ($458,950.00)
or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
one hundred ninety-six thousand three hundred fifty dollars ($196,350.00)
two hundred twenty-six thousand fifty dollars ($226,050.00)
or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
five hundred ninety-five thousand dollars ($595,000.00)
six hundred eighty-five thousand dollars ($685,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2012
2014
.

Source notes for subsection (n): (Laws 2007, Ch. 121, § 1.)

(p)

Project – Glendo Well:

(iv)

Total project budget:
Five hundred ninety thousand dollars ($590,000.00)
Nine hundred eighty thousand dollars ($980,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, construction engineering, and project land procurement of the project an amount not to exceed
three hundred ninety-five thousand three hundred dollars ($395,300.00)
six hundred fifty-six thousand six hundred dollars ($656,600.00)
or sixty
-
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, construction engineering, project land procurement and construction of the project an amount not to exceed
one hundred ninety-four thousand seven hundred dollars ($194,700.00)
one hundred twenty-three thousand four hundred dollars ($123,400.00)
or
thirty-three percent (33%)
twelve and six-tenths percent (12.6%)
of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
five hundred ninety thousand dollars ($590,000.00)
seven hundred eighty thousand dollars ($780,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2012
2013
; and

(viii)

Special
condition
conditions
:

(A)

The sponsor is responsible for acquiring twenty and four
-
tenths percent (20.4%) of the total project budget from other sources;

(B)

The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor may purchase the well with a lump sum payment or with amortized payments for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor at an interest rate of four percent (4%).

Source notes for subsection (p): (Laws 2007, Ch. 121, § 1.)

99
‑
3
‑
1204.

Level III construction projects rehabilitation.

(f)

Project –
Midvale

Canal
Rehabilitation:

(iii)

Project description:
Professional engineering design services to
D
esign
and construction of
rehabilitation measures for canals and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Four hundred two thousand dollars ($402,000.00)
Four hundred thousand dollars ($400,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the
engineering design and permit procurement
purchase of project materials as supported by vendor invoices and approved by the commission

an amount not to exceed
two hundred sixty-nine thousand three hundred forty dollars ($269,340.00)
two hundred thirty thousand dollars ($230,000.00)
or
sixty-seven percent (67%) of the actual engineering design and permit procurement
one hundred percent (100%) of the approved materials
costs, whichever is less;

(vii)

Appropriation: There is appropriated from water development account II to the commission
four hundred two thousand dollars ($402,000.00)
two hundred thirty thousand dollars ($230,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2012.
2013;

(viii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

Source notes for subsection (f): (Laws 2007, Ch. 121, § 1.)

99
‑
3
‑
1303.

Level III construction projects – new development.

(d)

Project – Glenrock Well:

(iii)

Project description: Design and construction of pump, motor, controls, piping
, control building
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Five hundred twenty thousand dollars ($520,000.00)
Seven hundred thousand dollars ($700,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
three hundred forty-eight thousand four hundred dollars ($348,400.00)
four hundred sixty-nine thousand dollars ($469,000.00)
or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one hundred seventy-one thousand six hundred dollars ($171,600.00)
two hundred thirty-one thousand dollars ($231,000.00)
or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
five hundred twenty thousand dollars ($520,000.00)
seven hundred thousand dollars ($700,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2013;

(f)

Project –
Laramie
Transmission Pipeline:

(iii)

Project description: Design
and construction
of a transmission pipeline and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Eight hundred eighty thousand dollars ($880,000.00)
Seven million seven hundred thirty thousand dollars ($7,730,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement
,

and
project land procurement
, construction engineering and construction
an amount not to exceed
five hundred eighty-nine thousand six hundred dollars ($589,600.00)
five million one hundred seventy-nine thousand one hundred dollars ($5,179,100.00)
or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,

and
project land procurement
, construction engineering and construction
an amount not to exceed
two hundred ninety thousand four hundred dollars ($290,400.00)
two million five hundred fifty thousand nine hundred dollars ($2,550,900.00)
or thirty-three percent (33%) of actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
eight hundred eighty thousand dollars ($880,000.00)
seven million seven hundred thirty thousand dollars ($7,730,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2013
2014
.

Source notes for subsection (f): (Laws 2008, Ch. 75, § 1.)

99
‑
3
‑
1304.

Level III construction projects – rehabilitation.

(g)

Project –
Sidon
Rehabilitation:

(iv)

Total project budget:
Four hundred five thousand dollars ($405,000.00)
Five hundred fifty thousand dollars ($550,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the
engineering design, permit procurement, project land procurement, construction engineering and construction of the project
purchase of project materials as supported by vendor invoices and approved by the commission
an amount not to exceed
two hundred seventy-one thousand three hundred fifty dollars ($271,350.00)
two hundred ninety-five thousand dollars ($295,000.00)
or
sixty-seven percent (67%) of the actual development
one hundred
percent (100%) of the approved materials

costs, whichever is less;

(vii)

Appropriation: There is appropriated from water development account II to the commission
four hundred five thousand dollars ($405,000.00)
two hundred ninety-five thousand dollars ($295,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2012.
2013;

(viii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

Source notes for subsection (g): (Laws 2008, Ch. 75, § 1.)

Section
3.

W.S. 99
‑
3
‑
1
204(f)(vi)
,
99
‑
3
‑
1
304(g)(vi)
and
2002 Wyoming Session Laws, Chapter 7, Section 5, Footnote 1
are
repealed.

Section 4.

This
act is effective immediately upon co
m
pletion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constit
u
tion.

(END)

Speaker of the House

President of the Senate

Governor

TIME APPROVED: _________

DATE APPROVED: _________

I hereby certify that this act originated in the Senate.

Chief Clerk

1