AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.

Budget Energy
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Water
Last action
2010-03-08
Official status
enrolled
Effective date
3/8/2010

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

SF0037S2001

2nd reading • GEIS

Adopted

Plain English: Adopted 2nd reading by GEIS

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0037SS001

Standing Committee • GEIS

Adopted

Plain English: Adopted Standing Committee by GEIS

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.

Bill History

  1. 2010-03-08 LSO

    Assigned Chapter Number - 68

  2. 2010-03-08 Governor

    Governor Signed SEA0021

  3. 2010-03-04 House

    H Speaker Signed SEA No. 0021

  4. 2010-03-04 Senate

    S President Signed SEA No. 0021

  5. 2010-03-02 LSO

    Assigned Number SEA0021

  6. 2010-03-02 House

    H Passed 3rd Reading

  7. 2010-03-01 House

    H Passed 2nd Reading

  8. 2010-02-26 House

    H Passed CoW

  9. 2010-02-23 House

    H Placed on General File

  10. 2010-02-23 House

    H02 Recommended Do Pass

  11. 2010-02-23 House

    H Rereferred to H02

  12. 2010-02-23 House

    H Placed on General File

  13. 2010-02-23 House

    H05 Recommended Do Pass

  14. 2010-02-18 House

    H Introduced and Referred to H05

  15. 2010-02-18 House

    H Received for Introduction

  16. 2010-02-17 Senate

    S Passed 3rd Reading

  17. 2010-02-16 Senate

    S Passed 2nd Reading

  18. 2010-02-16 Senate

    Amendment Adopted

  19. 2010-02-15 Senate

    S Passed CoW

  20. 2010-02-15 Senate

    S Amendments Adopted

  21. 2010-02-15 Senate

    Amendment Adopted

  22. 2010-02-12 Senate

    S Placed on General File

  23. 2010-02-12 Senate

    S05 Recommended Amend and Do Pass

  24. 2010-02-08 Senate

    S Introduced and Referred to S05

  25. 2010-02-08 Senate

    S Received for Introduction

  26. 2010-01-26 LSO

    Bill Number Assigned

Official Summary Text

Bill No.: <billno> Drafter: <drafterinit>

Bill No.:
SF0037
Drafter:

MQ

LSO No.:
10LSO-0204
Effective Date:

Enrolled Act No.:
SEA0021

Chapter No.:

Prime Sponsor:
Select
Water Committee

Catch Title:
Omnibus
water bill-construction.

Subject:
Provides
authorization and funding for water development projects approved for final
construction.

Summary/Major Elements:

2010 New development Projects

Arapahoe
Water Supply

Buffalo
Pipeline

Burns
Storage Tank

Casper
Zone IV Improvements

Cook
Road Well

Farview
Water Supply

Jackson
Storage Tanks

Owl
Creek Water Supply

South
Laramie
Water Supply

South
Thermopolis
Water Supply

Wamsutter
Well 2010

Rehabilitation Construction Projects

Casper
Alcova Rehabilitation 2010

Heart
Mountain
Rehabilitation 2010

Little
Snake Diversions

Midvale
Rehabilitation 2010

Rawlins
Atlantic Rim Reservoir

Willwood
Rehabilitation 2010

Amendments to Prior Projects

Deer
Creek Project

Little
Snake River Valley Dam & Reservoir Project

Byron
Raw Water Supply

Wind
River
Irrigation Project

Pine
Haven Transmission 2006 Project

Midvale
Irrigation Conservation/Automation Project

Pinedale
Pipelines

Rawlins
Atlantic Rim Pipeline

Riverton
Water Supply

Star
Valley

Ranch Water Supply

Big
Horn Canal Rehabilitation 2009

Comments:

See also the companion water
bill, HB 46, Omnibus water bill-planning.

Current Bill Text

Read the full stored bill text
WORKING DRAFT

ORIGINAL SENATE

FILE

NO.
0037

ENROLLED ACT NO. 21, SENATE

SIXTIETH LEGISLATURE OF THE STATE OF
WYOMING
2010 BUDGET SESSION

AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.

Be It Enacted by the Legislature of the State of
Wyoming
:

Section 1.

W.S. 99
‑
3
‑
1501 through 99
‑
3
‑
1504 are created to read:

ARTICLE 15
2010 CONSTRUCTION PROJECTS

99
‑
3
‑
1501.

Definitions.

The definitions in W.S. 99
‑
3
‑
101 apply to this article.

99
‑
3
‑
1502.

General authorization.

The provisions of W.S. 99
‑
3
‑
102 apply to this article.

99
‑
3
‑
1503.

Level III construction projects – new development.

(a)

Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99
‑
3
‑
103.

(
b
)

Project –
Arapahoe Water Supply
:

(i)

Project sponsor:
Northern Arapaho Tribe;

(ii)

Project purpose:
R
ural domestic

water supply;

(iii)

Project description: Design and construction of
a connection of a well to the existing water supply system
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Five hundred seventy-five
thousand dollars ($
575
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred eighty-five thousand two hundred fifty dollars ($385,250.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission three hundred eighty-five thousand two hundred fifty dollars ($385,250.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015
;

(vii)

Special condition
s
:

(A)

The sponsor is responsible for acquiring thirty-three percent (33%) of the total pro
ject budget from other sources;

(B)

The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well
'
s actual construction costs. The sponsor
shall
purchase the well with a lump sum payment.
The sponsor shall make the payment described herein prior to the commencement of the project. The payment shall be deposited by the commission into water development account I.

(
c
)

Project –
Buffalo
Pipeline
:

(i)

Project sponsor: Town of
Buffalo
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a transmission pipeline
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One
million
one hundred eighty-two
thousand dollars ($
1,182
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred ninety-one thousand nine hundred forty dollars ($791,940.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred ninety thousand sixty dollars ($390,060.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission o
ne million
one hundred eighty-two
thousand dollars ($
1,182
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(
d
)

Project –
Burns Storage Tank
:

(i)

Project sponsor: Town of
Burns
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a storage tank
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Nine hundred thirty
thousand dollars ($
930
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred twenty-three thousand one hundred dollars ($623,100.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred six thousand nine hundred dollars ($306,900.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission nine hundred thirty
thousand dollars ($
930
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(
e
)

Project –
Casper Zone IV Improvements
:

(i)

Project sponsor:
City of
Casper
;

(ii)

Project purpose: Municipal, rural domestic water supply;

(iii)

Project description: Design and construction of
a transmission pipeline, storage tank improvements
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Nine hundred ninety
thousand dollars ($
990
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred sixty-three thousand three hundred dollars ($663,300.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission six hundred sixty-three
thousand
three hundred
dollars ($
663,3
00.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water develo
pment account I on July 1, 2015;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(
f
)

Project –
Cook Road
Well
:

(i)

Project sponsor:
Cook Road Water District
;

(ii)

Project purpose:
R
ural domestic
and municipal
water supply;

(iii)

Project description: Design and construction of
a groundwater well, connection of the well to the existing water supply system,
transmission pipeline

and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One million two hundred
ninety
thousand dollars ($
1,2
9
0
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed eight hundred
sixty-
four thousand
three hundred
dollars ($8
6
4,
3
00.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
four hundred twenty-five thousand seven hundred dollars ($425,700.00)
or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission one million two hundred
ninety

thousand dollars ($
1,2
9
0
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(
g
)

Project –
Ethete Water Supply
:

(i)

Project sponsor:
Northern Arapaho Tribe
;

(ii)

Project purpose:
R
ural domestic
and municipal
water supply;

(iii)

Project description: Design and construction of
a well field, transmission pipeline, pump stations, storage tank improvements
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Four million
dollars ($
4,000
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million dollars ($2,
000
,000.00) or
fifty
percent (
50
%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,
000
,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water develo
pment account I on July 1, 2015;

(vii)

Special condition: The sponsor is responsible for acquiring
fifty
percent (
50
%) of the total project budget from other sources.

(
h
)

Project –
Farview Water Supply
:

(i)

Project sponsor:
Farview Water District
;

(ii)

Project purpose:
R
ural domestic

water supply;

(iii)

Project description: Design and construction of
a connection of a well to the existing water supply system
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One hundred
thousand dollars ($
100
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed sixty-seven thousand dollars ($67,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed thirty-three thousand dollars ($33,000.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission one hundred
thousand dollars ($
100
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water develo
pment account I on July 1, 2015;

(viii)

Special condition
s
: The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well
'
s actual construction costs. The sponsor may purchase the well with a lump sum payment or with amortized payments for a term of t
wenty
(
2
0) years from the date the commission determines project benefits accrue to the sponsor at an interest rate of four percent (4%).

(
j
)

Project –
Jackson Storage Tanks
:

(i)

Project sponsor:
Town of
Jackson
;

(ii)

Project purpose:
Municipal and r
ural domestic water supply;

(iii)

Project description: Design and construction of
two (2) storage tanks, connections for the tanks to the existing water supply system
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Four million
dollars ($
4,000
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million six hundred eighty thousand dollars ($2,680,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million three hundred twenty thousand dollars ($1,320,000.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission four million
dollars ($
4,000
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(
k
)

Project –
Owl Creek Water Supply
:

(i)

Project sponsor:
Owl Creek Rural Water District
;

(ii)

Project purpose:
R
ural domestic
and municipal
water supply;

(iii)

Project description: Design and construction of
transmission pipelines, pump stations, connection to the Town of
Thermopolis
'
s water supply system
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Four million seven hundred fifty
thousand dollars ($
4,750,0
00.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three million one hundred eighty-two thousand five hundred dollars ($3,182,500.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission three million one hundred eighty-two thousand five hundred dollars ($3,182,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water develo
pment account I on July 1, 2015;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(
m
)

Project –
South Laramie
Water Supply
:

(i)

Project sponsor:
City of
Laramie
;

(ii)

Project purpose:
Municipal and r
ural domestic water supply;

(iii)

Project description: Design and construction of
transmission pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Three million one hundred thousand
dollars ($
3,100
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million seventy-seven thousand dollars ($2,077,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million twenty-three thousand dollars ($1,023,000.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission three million one hundred thousand
dollars ($
3,100
,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(
n
)

Project –

South Thermopolis
Water Supply
:

(i)

Project sponsor:
South Thermopolis Water and Sewer Water District
;

(ii)

Project purpose:
R
ural domestic
and municipal
water supply;

(iii)

Project description: Design and construction of
transmission pipelines, pump stations
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Three million one hundred sixty
thousand dollars ($
3,160,0
00.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million one hundred seventeen thousand two hundred dollars ($2,117,200.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission two million one hundred seventeen thousand two hundred dollars ($2,117,200.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water develo
pment account I on July 1, 2015;

(vii)

Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(
o
)

Project –
Wamsutter Well 2010
:

(i)

Project sponsor:
Town of
Wamsutter
;

(ii)

Project purpose:
Municipal and r
ural domestic

water supply;

(iii)

Project description: Design and construction of
a connection of a well to the existing water supply system
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
One million one hundred thirty
thousand dollars ($
1,130
,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred fifty-seven thousand one hundred dollars ($757,100.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission seven hundred fifty-seven thousand one hundred dollars ($757,100.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015.

(vii)

Special condition
s
:

(A)

The sponsor is responsible for acquiring thirty-three percent (33%) of the total pr
oject budget from other sources;

(B)

The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well
'
s actual construction costs. The sponsor
shall
purchase the well with a lump sum payment.
The sponsor shall make the payment described herein prior to the commencement of the project. The payment shall be deposited by the commission into water development account I.

[REHABILITATION CONSTRUCTION PROJECTS]

9
‑
3
‑
1504.

Level III construction projects – rehabilitation.

(a)

Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99
‑
3
‑
104.

(b)

Project –
Casper
Alcova Rehabilitation 2010:

(i)

Project sponsor: Casper Alcova Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of lateral improvements and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Seven hundred twelve thousand dollars ($712,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project four hundred seventy-seven thousand forty dollars ($477,040.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation:

There is appropriated from water development account II to the commission four
hundred
seventy-seven
thousand
forty
dollars ($
477,04
0.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources.

(c)

Project –

Heart

Mountain

Rehabilitation
2010
:

(i)

Project sponsor: Heart Mountain Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Two million one hundred twenty-two thousand dollars ($2,122,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed one million one hundred eighty thousand dollars ($1,180,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission one million one hundred eighty
thousand dollars ($
1,180,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(d)

Project –

Little Snake Diversions:

(i)

Project sponsor: Savery-Little Snake Conservancy District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of improvements to diversion structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Nine hundred ninety thousand dollars ($990,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred sixty-three thousand three hundred dollars ($663,300.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred twenty-six thousand seven hundred dollars ($326,700.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission nine hundred ninety thousand dollars ($990,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015.

(e)

Project –

Midvale
Rehabilitation
2010
:

(i)

Project sponsor: Midvale Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four hundred seventy thousand dollars ($470,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed two hundred sixty-three thousand dollars ($263,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission two hundred sixty-three
thousand dollars ($
263,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

(f)

Project –

Rawlins Atlantic Rim Reservoir:

(i)

Project sponsor: City of
Rawlins
;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and construction of improvements to Atlantic Rim Reservoir and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four million dollars ($4,000,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million six hundred eighty thousand dollars ($2,680,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million three hundred twenty thousand dollars ($1,320,000.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission four million dollars ($4,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015.

(g)

Project –

Willwood
Rehabilitation
2010
:

(i)

Project sponsor: Willwood Irrigation District;

(ii)

Project purpose: Agriculture water supply;

(iii)

Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: One million three hundred fifty-two thousand dollars ($1,352,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed seven hundred forty-six thousand dollars ($746,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission seven hundred forty-six
thousand dollars ($
746,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission;
(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures.

[AMENDMENTS TO PRIOR PROJECTS]
Section 2.

W.S.
99
‑
1
‑
105,

99
‑
2
‑
303
(f)
(v)(C),

99
‑
3
‑
703
(f)(xiii)(C)
,
(j)
(iv) th
r
ough (vi) and
(ix),

99
‑
3
‑
704(g)
(iv) through (vi) and
(ix),

99
‑
3
‑
804(d)
(vii) and
(viii) by
creating a new subparagraph (C),
99
‑
3
‑
904(n)(vi),

99
‑
3
‑
1103(m)(vii),

99
‑
3
‑
1104(g)(vi),
99
‑
3
‑
1106(a)(vii) and (b)(vii),

99
‑
3
‑
1403(j)(iii) through (vii), (k)(iii) through (vii), (m)(iii) through (vii)
and
(o)(iii) through (vii),

99
‑
3
‑
1404(b)(iv) through (vii)
and
99
‑
99
‑
1001(a)
by creating a new paragraph
(v
i
i),

(g) and by creating
a
new
subsection

(k) are amended to read:

(Deer Creek Project)

99
‑
1
‑
105.

Project appropriation.

The total project budget is forty-five million dollars ($45,000,000.00).
There is appropriated from that portion of the water development account funded from revenues pursuant to W.S. 39
‑
6
‑
305(g) to the commission
thirteen

million five hundred thousand dollars ($13,500,000.00)

f
ive million two hundred fifty thousand
dollars (
$
5,250
,000
.00)
or as much thereof as is necessary to carry out the purposes of this act.
Un
expended
funds appropriated under this section shall revert to the account established in
W.S.
99
‑
99
‑
1001
(a)
(vii) on July 1, 2010.

99
‑
2
‑
303.

Level III construction projects - new development.

(f)

Project - Little Snake River Valley Dam and Reservoir Project:

(v)

Appropriation:

(C)

Unexpended funds appropriated under this subsection shall revert to
water development account I
the account established in
W.S.
99
‑
99
‑
1001
(a)
(vi)
on July 1,
2005
2010
.

99
‑
3
‑
703.

Level III construction projects - new development.

(f)

Project - Little Snake River Small Dams and Reservoirs Phase II Project:

(xiii)

Special supplemental conditions:

(C)

Supplemental funding shall be limited to the twelve (12) projects identified and recommended for construction in the Little Snake River Basin Small Reservoir Development Project, the Doty Mountain Five Project
,
Coal Gulch Dam Project
and the Grieve Reservoir Project. The sponsor shall obtain the approval of the commission prior to the construction of any individual facility.

(j)

Project - Small Water Development Projects:

(iv)

Total project budget:
Three million five hundred thousand dollars ($3,500,000.00)

Three million nine hundred thousand dollars ($3,900,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to sponsors from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one million seven hundred fifty thousand dollars ($1,750,000.00)

one million nine hundred fifty thousand dollars ($1,950,000.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission
one million seven hundred fifty thousand dollars ($1,750,000.00)

one million nine hundred fifty thousand dollars ($1,950,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall carry over until expended or reverted by the legislature to water development account I;

(ix)

No new project shall be authorized under this subsection on or after
April 1, 2010

July 1, 2012
.

99
‑
3
‑
704
.

Level III construction projects-rehabilitation

(g)

Project - Small Water Development Projects:

(iv)

Total project budget:
Three million five hundred thousand dollars ($3,500,000.00)

Three million one hundred thousand dollars ($3,100,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to sponsors from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one million seven hundred fifty thousand dollars ($1,750,000.00)

one million five hundred fifty thousand dollars ($1,550,000.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
one million seven hundred fifty thousand dollars ($1,750,000.00)

one million five hundred fifty thousand dollars ($1,550,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall carry over until expended or reverted by the legislature to water development account II;

(ix)

No new project shall be authorized under this subsection on or after
April 1, 2010

July 1, 2012
.

99
‑
3
‑
804.

Level III construction projects-rehabilitation.

(d)

Project – Byron Raw Water Supply:

(vii)

Appropriation: There is appropriated from water development account II to the commission one million five hundred sixty-one thousand dollars ($1,561,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2013

2010
; and

(vi
ii
)

Special conditions:

(C)

Notwithstanding the other provisions of this subsection to the contrary, since
the sponsor has abandoned the project, the sponsor sh
all be obligated to pay the
funds disbursed by the commission for project purposes
in the amount of one hundred seventy thousand two hundred fourteen dollars ($170,214.00)
.
The sponsor shall make the payment described herein not later than July 1, 2010.
The
payment
shall
be deposited by the commission into water development account II.

99
‑
3
‑
904
.

Level III construction projects-rehabilitation.

(n)

Project -
Wind River
Irrigation Project:

(vi)

Appropriation: There is appropriated from water development account II to the commission three million five hundred thousand dollars ($3,500,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2010
2015
; and

99
‑
3
‑
1103.

Level III construction projects-new development.

(m)

Project – Pine Haven Transmission 2006 Project:

(vii)

Appropriation: There is appropriated from water development account I to the commission three hundred forty-eight thousand dollars ($348,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2010
2012
.

99
‑
3
‑
1104.

Level III construction projects-rehabilitation.

(g)

Project – Midvale Irrigation District Conservation/Automation Project:

(vi)

Appropriation: There is appropriated from water development account II to the commission five hundred forty-two thousand seven hundred dollars ($542,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2010
2012
; and

9
9
‑
3
‑
1106.

Sponsor's inflation funds.

There are created the following sponsor's inflations funds:

(a)

Project – Sponsor's Inflation Fund – New Development:

(vii)

Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2010

2013
; and

(b)

Project – Sponsor's Inflation Fund - Rehabilitation:

(vii)

Appropriation: There is appropriated from water development account II to the commission five hundred thousand dollars ($500,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account
I
II

on July 1,
2010

2013
; and

99
‑
3
‑
1403.

Level III construction projects-new development.

(j)

Project – Pinedale Pipelines
-Phase I
:

(iii)

Project description: Design, permit procurement, project land procurement
,

for two (2) transmission pipelines and
construction engineering and construction of
one (1)

two (2)
transmission
pipeline

pipelines
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Eleven million six hundred seventy thousand dollars ($11,670,000.00)

Eleven million four hundred seventy thousand dollars ($11,470,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement
,

for two (2) transmission pipelines and
construction engineering and construction of
one (1) transmission pipeline
the project
an amount not to exceed
five million two hundred ninety-three thousand dollars ($5,293,000.00)
seven million six hundred eighty-four thousand nine hundred dollars ($7,684,900.00)
or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement
,

for two (2) transmission pipelines and
construction engineering and construction
of
one (1) transmission pipeline

the project
an amount not to exceed
two million six hundred seven thousand dollars ($2,607,000.00)

three million seven hundred eighty-five thousand one hundred dollars ($3,785,100.00)

or thirty-three percent (33%) of the actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
seven million nine hundred thousand dollars ($7,900,000.00)

eleven million four hundred seventy thousand dollars ($11,470
,000
.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(k)

Project – Rawlins
Reservoir and

Atlantic Rim

Pipeline
-Phase I
:

(iii)

Project description: Design and construction of a
reservoir and

transmission
pipelines

pipeline
,
pump station, outlet works improvements
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Sixteen million four hundred fifteen thousand dollars ($16,415,000.00)

Three million nine hundred thousand dollars ($3,900,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement
, construction engineering
and construction
for the project an amount not to exceed
nine hundred four thousand five hundred dollars ($904,500.00)

two million six hundred thirteen thousand dollars ($2,613,000.00)
or sixty-seven percent (67%) of the actual costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,

and
project land procurement
, const
ruction engineering
and construction
for the project an amount not to exceed
four hundred forty-five thousand five hundred dollars ($445,500.00)
one million two hundred eighty-seven thousand dollars ($1,287,000.00)
or thirty-three percent (33%) of the actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
one million three hundred fifty thousand dollars ($1,350,000.00)

three million nine hundred thousand dollars ($3,900.000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014.

(m)

Project – Riverton Water Supply:

(iii)

Project description: Design and construction of a storage tank, transmission pipelines,
pump stations,
well connection and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Six million four hundred forty thousand dollars ($6,440,000.00)

Nine million two hundred thousand dollars ($9,200,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement
,

and
project land procurement
, construction engineering and construction
for the project an amount not to exceed
four million three hundred fourteen thousand eight hundred dollars ($4,314,800.00)
six million one hundred sixty-four thousand dollars ($6,164,000.00)

or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement
,

and
project land procurement
, construction engineering and construction
for the project an amount not to exceed
six hundred forty-four thousand dollars ($644,000.00)
nine hundred twenty thousand dollars ($920,000.00)

or ten percent (10%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
four million nine hundred fifty-eight thousand eight hundred dollars ($4,958,800.00)
seven million eighty-four thousand dollars ($7,084,000.00)

or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

(o)

Project –
Star

Valley
Ranch Water Supply:

(iii)

Project description: Design and construction of a storage tank,
well,
well
connection

connections
, pipelines,
pump stations, spring development, purchase of a storage tank
and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget:
Two million six hundred twenty thousand dollars ($2,620,000.00)

Four million nine hundred ninety-five thousand dollars
(
$4,995,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one million seven hundred fifty-five thousand four hundred dollars ($1,755,400.00)
three million three hundred forty-six thousand six hundred fifty dollars ($3,346,650.00)
or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
eight hundred sixty-four thousand six hundred dollars ($864,600.00)
one million six hundred forty-eight thousand
three
hundred fifty dollars ($1,648,
3
50.00)
or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account I to the commission
two million six hundred twenty thousand dollars ($2,620,000.00)

four million nine hundred ninety-five thousand dollars ($4,995,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014;

99
‑
3
‑
1404.

Level III construction projects – rehabilitation.

(b)

Project – Big
Horn

Canal
Rehabilitation 2009:

(iv)

Total project budget:
Nine hundred forty-five thousand dollars ($945,000.00)

One million one hundred eighty thousand dollars ($1,180,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
six hundred thirty-three thousand one hundred fifty dollars ($633,150.00)
seven hundred ninety thousand six hundred dollars ($790,600.00)

or sixty-seven percent (67%) of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
three hundred eleven thousand eight hundred fifty dollars ($311,850.00)
three hundred eighty-nine thousand four hundred dollars ($389,400.00)

or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission
nine hundred forty-five thousand dollars ($945,000.00)
one million one hundred eighty thousand dollars ($1,180,000.00)

or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014.

99
‑
99
‑
1001.

C
reation; use of funds; interest.

(a)

The following accounts are created:

(vii)

Pathfinder modification account.

(g)

Revenues received by the state from the lease, sale, assignment or transfer of water from projects funded by the Wyoming water development program or from the lease, sale, assignment or transfer of projects, or any portions thereof, funded by the Wyoming water development program shall be deposited into the account created by paragraph (a)(iv) of this section. The
Wyoming
water development commission shall administer the account and use any monies in the account to meet the contract obligations of the state relative to said leases, sales, assignments or transfers. The account balance shall at no time exceed
fifty thousand dollars ($50,000.00)

one hundred thousand dollars ($100,000.00)
.

(k)

All revenues received by the state from the lease, sale, assignment or transfer of ownership of water resulting from the state
'
s interest in the Pathfinder modification project shall be deposited in the account created by paragraph (a)(vii) of this section. The
Wyoming
water development commission shall use any monies in the account to meet the operation, maintenance, replacement and mitigation obligations of the state related to the Pathfinder modification project. Two million two hundred fifty thousand dollars ($2,250,000.00) from the appropriation from water development account II provided in the 2000 Wyoming Session Laws, Chapter 36, Section 6 is hereby transferred to the account created by paragraph (a)(vii) of this section.

Section
3
.
This act is effective immediately upon co
m
pletion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constit
u
tion.

(END)