Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
HB0048 • 2011
AN ACT relating to wind energy siting; prohibiting the placement of wind energy facilities and equipment as specified; and providing for an effective date.
Wyoming marks this bill as inactive, which usually means it is no longer moving in the current session.
The plain English breakdown is still being put together. The official documents below are already here.
H Committee Returned Bill Pursuant to HR 4-3(c)
H Introduced and Referred to H09; No Report Prior to CoW Cutoff
H Received for Introduction
Bill Number Assigned
WORKING DRAFT 2011 STATE OF WYOMING 11LSO-0307 HOUSE BILL NO. HB0048 Placement of wind energy facilities. Sponsored by: Representative(s) Cannady A BILL for AN ACT relating to wind energy siting; prohibiting the placement of wind energy facilities and equipment as specified; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming : Section 1 . W.S. 35 ‑ 1 ‑ 107 is created to read: 35 ‑ 1 ‑ 107. Placement of wind energy facilities and equipment . (a) Unless const ructed or permitted , if required, prior to March 31, 2011, no collector system nor any equipment or facility used for the commercial generation of electricity from wind shall be constructed or permitted for construction within one (1) mile of any: (i) City, county or state park; (ii) Church; (iii) Cemetery; (iv) Public school; (v) Historic landmark or historic site; or (vi) Native American religious ground, as designated by the department of state parks and cultural resources or its designee. (b) For purposes of this section, "collector system" means as defined in W.S. 35 ‑ 12 ‑ 102(a)(xiv). Section 2. W.S. 18 ‑ 5 ‑ 502 by creating new subsection (e) and 35 ‑ 12 ‑ 106(a) are amended to read: 18 ‑ 5 ‑ 502. County regulation of wind energy projects; exceptions. (e) No wind energy facility shall be permitted or constr ucted in violation of W.S. 35 ‑ 1 ‑ 107 . 35 ‑ 12 ‑ 106. Permit from council required prior to commencing construction of facility; electronic permitting; amendments; exceptions. (a) Subject to W.S. 35 ‑ 1 ‑ 107, n o person shall commence to construct a facility, as defined in this chapter, in this state without first obtaining a permit for that facility from the council. Any facility, for which a permit is required, shall be constructed, operated and maintained in conformity with the permit and any terms, conditions and modifications contained in the permit. A permit may only be issued pursuant to this chapter or pursuant to the provisions of W.S. 18 ‑ 5 ‑ 501 through 18 ‑ 5 ‑ 513 for facilities referred to the council. Section 3 . This act is effective immediately upon co m pletion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constit u tion. (END) 1 HB0048