AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
Assigned Chapter Number
Governor Signed SEA0035
H Speaker Signed SEA No. 0035
S President Signed SEA No. 0035
Assigned Number SEA0035
H Passed 3rd Reading
H Passed 2nd Reading
H Passed CoW
H Placed on General File
H02 Recommended Do Pass
H Rereferred to H02
H Placed on General File
H05 Recommended Do Pass
H Introduced and Referred to H05
H Received for Introduction
S Passed 3rd Reading
S Passed 2nd Reading
S Passed CoW
S Placed on General File
S05 Recommended Do Pass
S Introduced and Referred to S05
S Received for Introduction
Bill Number Assigned
Bill No.: <billno> Drafter: <drafterinit> Bill No.: SF0081 Drafter: MQ LSO No.: 11LSO-0295 Effective Date: 2/22/2011 Enrolled Act No.: SEA0035 Chapter No.: 63 Prime Sponsor: Select Water Committee Catch Title: Omnibus water bill-construction. Subject: Provides authorization and funding for water development projects approved for final construction. Summary/Major Elements: 2011 New development Projects 33 Mile Pump station Central Wyoming Regional Zone IIB Cheyenne Southern Pipeline Douglas Box Elder Spring Phase I GR/RS/SC Raw Water Reservoir Phase I LaBarge Water Supply Poison Spider Pipelines Reliance Water Supply South Circle Estates Water Supply Ten Sleep Storage Tank Wright Water Supply 2011 Phase I Yoder Water Supply Rehabilitation Construction Projects Cody Canal Chute Cody Canal Drop Structure Eden Valley Rehabilitation 2011 Goshen Rehabilitation 2011 Kirby Rehabilitation 2011 Little Snake Rehabilitation 2011 Midvale Rehabilitation 2011 Shoshone Rehabilitation 2011 Wheatland Rehabilitation 2011 Willwood Dam Rehabilitation Phase I Amendments to Prior Projects Moorcroft Madison Well Water Supply Albin Pipelines and Well Rehabilitation Wardwell Water Supply Improvements Alpine Wells Rehabilitation Deaver Rehabilitation 2009 GVID Upper Sunshine Diversion Rawlins Atlantic Rim Reservoir Willwood Rehabilitation 2010 Comments: See also the companion water bill, HB 61, Omnibus water bill-planning.
WORKING DRAFT ORIGINAL SENATE FILE NO. 0081 ENROLLED ACT NO. 35, SENATE SIXTY-FIRST LEGISLATURE OF THE STATE OF WYOMING 2011 GENERAL SESSION AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming : Section 1. W.S. 99 ‑ 3 ‑ 1601 through 99 ‑ 3 ‑ 1604 are created to read: ARTICLE 16 2011 CONSTRUCTION PROJECTS 99 ‑ 3 ‑ 1601. Definitions. The definitions in W.S. 99 ‑ 3 ‑ 101 apply to this article. 99 ‑ 3 ‑ 1602. General authorization. The provisions of W.S. 99 ‑ 3 ‑ 102 apply to this article. 99 ‑ 3 ‑ 1603. Level III construction projects – new development. (a) Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99 ‑ 3 ‑ 103. ( b ) Project – 33 Mile Pump Station: (i) Project sponsor: 33 Mile Road Improvement and Service District; (ii) Project purpose: R ural domestic water supply; (iii) Project description: Design and construction of a pump station and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One hundred eighty-eight thousand dollars ($ 188 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred twenty-five thousand nine hundred sixty dollars ($125,960.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one hundred twenty-five thousand nine hundred sixty dollars ($125,960.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vii) Special condition s : The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( c ) Project – Central Wyoming Regional Zone IIB: (i) Project sponsor: Central Wyoming Regional Water System Joint Powers Board ; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction of a pump station, transmission pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two million nine hundred twenty-five thousand dollars ($ 2,925,000 .00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million nine hundred fifty-nine thousand seven hundred fifty dollars ($1,959,750.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one million nine hundred fifty-nine thousand seven hundred fifty dollars ($1,959,750.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vii) Special condition s : The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( d ) Project – Cheyenne Southern Pipeline: (i) Project sponsor: City of Cheyenne ; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction of transmission pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Twenty million nine hundred forty thousand dollars ($ 20,940 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed fourteen million twenty-nine thousand eight hundred dollars ($14,029,800.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission fourteen million twenty-nine thousand eight hundred dollars ($14,029,800.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vi i ) Special condition s : The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( e ) Project – Douglas Box Elder Spring – Phase I: (i) Project sponsor: City of Douglas ; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction of improvements to the Box Elder Spring water supply, a transmission pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Eleven million six hundred ninety-five thousand dollars ($ 11,695, 000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the spring improvements and design, permit procurement and land procurement for the transmission pipeline an amount not to exceed one million four hundred eighty-seven thousand four hundred dollars ($1,487,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one million four hundred eighty-seven thousand four hundred dollars ($1,487,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vii) Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( f ) Project – GR/RS/SC Raw Water Reservoir – Phase I: (i) Project sponsor: Green River-Rock Springs-Sweetwater County Joint Powers Water Board ; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction of a raw water reservoir and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Fifteen million eight hundred fifty thousand dollars ($15,850,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement for the project an amount not to exceed six hundred three thousand dollars ($603,000 .00 ) or fifty and one-half percent (50.5%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement for the project an amount not to exceed two hundred ninety-seven thousand dollars ($297,000.00) or twenty-four and one-half percent (24.5%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission nine hundred thousand dollars ($900,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (viii) Special c ondition: The sponsor is responsible for acquiring twenty-five percent (25%) of the total project budget from other sources. ( g ) Project – LaBarge Water Supply: (i) Project sponsor: Town of LaBarge ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a diversion structure and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Three hundred seventy thousand dollars ($ 370 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred forty-seven thousand nine hundred dollars ($247,900.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred twenty-two thousand one hundred dollars ($122,100.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission three hundred seventy thousand dollars ($ 370 ,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016. ( h ) Project – Poison Spider Pipelines: (i) Project sponsor: Poison Spider Improvement and Service District; (ii) Project purpose: R ural domestic water supply; (iii) Project description: Design and construction of transmission pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million thirty - six thousand dollars ($ 1,036 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred ninety-four thousand one hundred twenty dollars ($694,120.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred forty-one thousand eight hundred eighty dollars ($341,880.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission one million thirty-six thousand dollars ($ 1,036 ,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016. ( j ) Project – Reliance Water Supply: (i) Project sponsor: Green River-Rock Springs-Sweetwater County Joint Powers Water Board ; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction of a water storage tank, valve, pump station and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two million six hundred thousand dollars ($ 2,600 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million seven hundred forty-two thousand dollars ($1,742,000 .00 ) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one million seven hundred forty-two thousand dollars ($1,742,000 .00 ) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vii) Special condition: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( k ) Project – South Circle Estates Water Supply: (i) Project sponsor: South Circle Estates Improvement and Service District ; (ii) Project purpose: R ural domestic , municipal water supply; (iii) Project description: Design and construction of a water supply connection with the Town of Ten Sleep and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four hundred eighty thousand dollars ($ 480,0 00.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred twenty-one thousand six hundred dollars ($321,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred fifty-eight thousand four hundred dollars ($158,400.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission four hundred eighty thousand dollars ($480,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016. ( m ) Project – Ten Sleep Storage Tank: (i) Project sponsor: Town of Ten Sleep ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a storage tank and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million five hundred forty thousand dollars ($ 1,540 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million thirty-one thousand eight hundred dollars ($1,031,800.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred eight thousand two hundred dollars ($508,200.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission one million five hundred forty thousand dollars ($ 1,540 ,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016. ( n ) Project – Wright Water Supply 2011 – Phase I: (i) Project sponsor: Wright Water and Sewer Water District ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a telemetry system, reconfiguration of the piping for an existing well, and connection of a new well to the water supply system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four million nine hundred fifty-seven thousand dollars ($ 4,957,0 00.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of a telemetry system and reconfiguration of the piping for an existing well and design, permit procurement and project land procurement for the connection of a new well an amount not to exceed seven hundred thirty-seven thousand dollars ($737,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission seven hundred thirty-seven thousand dollars ($737,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; (vii) Special conditions: (A) The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources; (B) The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor shall purchase the well with a lump sum payment. ( o ) Project – Yoder Water Supply: (i) Project sponsor: Town of Yoder ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a connection of a well to the existing water supply system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One hundred eighty thousand dollars ($ 180 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred twenty thousand six hundred dollars ($120,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed fifty-nine thousand four hundred dollars ($59,400.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vi i ) Appropriation: There is appropriated from water development account I to the commission one hundred eighty thousand dollars ($180,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016; ( vi i i) Special condition s : The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor may purchase the well with a lump sum payment or with amortized payments for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor at an interest rate of four percent (4%). [REHABILITATION CONSTRUCTION PROJECTS] 9 ‑ 3 ‑ 1604. Level III construction projects – rehabilitation. (a) Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99 ‑ 3 ‑ 104. (b) Project – C ody Canal Chute : (i) Project sponsor: Cody Canal Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of a chute and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two hundred twenty-three thousand dollars ($223,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project one hundred forty-nine thousand four hundred ten dollars ($149,410.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seventy-three thousand five hundred ninety dollars ($73,590.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (v i i) Appropriation: There is appropriated from water development account II to the commission two hundred twenty-three thousand dollars ($ 223,00 0.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016. (c) Project – Cody Canal Drop Structure : (i) Project sponsor: Cody Canal Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of a drop structure and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One hundred five thousand dollars ($105,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed fifty thousand dollars ($50,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission fifty thousand dollars ($ 50,000 .00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (d) Project – Eden Valley Rehabilitation 2011: (i) Project sponsor: Eden Valley Irrigation and Drainage District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Three million four hundred twenty-six thousand dollars ($3,426,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million seven hundred thirteen thousand dollars ($1,713,000.00) or fifty percent (50%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission one million seven hundred thirteen thousand dollars ($1,713,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. (e) Project – Goshen Rehabilitation 2011 : (i) Project sponsor: Goshen Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Three million fifty thousand dollars ($3,050,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed one million one hundred thousand dollars ($1,100,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission one million one hundred t housand dollars ($ 1,100,000 .00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (f) Project – Kirby Rehabilitation 2011 : (i) Project sponsor: Kirby Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four hundred twenty thousand dollars ($420,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project two hundred eighty-one thousand four hundred dollars ($281,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one hundred thirty-eight thousand six hundred dollars ($138,600.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vi i ) Appropriation: There is appropriated from water development account II to the commission four hundred twenty thousand dollars ($ 420,00 0.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016. (g) Project – Little Snake Rehabilitation 2011 : (i) Project sponsor: Savery-Little Snake River Water Conservancy District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two hundred thirty thousand dollars ($230,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project one hundred fifty-four thousand one hundred dollars ($154,100.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission one hundred fifty-four thousand one hundred dollars ($ 154,10 0.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. (h) Project – Midvale Rehabilitation 2011 : (i) Project sponsor: Midvale Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Six hundred thirty thousand dollars ($630,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed four hundred fifty thousand dollars ($450,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission four hundred fifty t housand dollars ($ 450,000 .00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (j) Project – Shoshone Rehabilitation 2011 : (i) Project sponsor: Shoshone Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million one hundred seventy thousand dollars ($1,170,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed five hundred eighty-five thousand dollars ($585,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission five hundred eighty-five t housand dollars ($ 585,000 .00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (k) Project – Wheatland Rehabilitation 2011 : (i) Project sponsor: Wheatland Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the irrigation system and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million eighty thousand dollars ($1,080,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project seven hundred twenty-three thousand six hundred dollars ($723,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission seven hundred twenty-three thousand six hundred dollars ($723,600.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( m ) Project – Willwood Dam Rehabilitation – Phase I : (i) Project sponsor: Willwood Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of rehabilitation measures for the diversion structure and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million six hundred twenty thousand three hundred dollars ($1,620,300.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement and project land procurement of the project one hundred forty thousand seven hundred dollars ($140,700.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed sixty-nine thousand three hundred dollars ($69,300.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vi i ) Appropriation: There is appropriated from water development account II to the commission two hundred ten thousand dollars ($ 210,00 0.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016. [AMENDMENTS TO PRIOR PROJECTS] Section 2. W.S. 99 ‑ 3 ‑ 803(e)(vi), 99 ‑ 3 ‑ 904(b)(vi), 99 ‑ 3 ‑ 1103(o)(vi), 99 ‑ 3 ‑ 1104(b)( v i), 99 ‑ 3 ‑ 1404(d)(iv) through (vi) and (g)(iv ) through (vii) and 99 ‑ 3 ‑ 1504(f)(iv) through (v ii) and (g)(iv) through (vi) are amended to read: 99 ‑ 3 ‑ 803. Level III construction projects - new development. (e) Project – Moorcroft Madison Well Water Supply Project: (vi) Appropriation: There is appropriated from water development account I to the commission three million eight hundred sixty-five thousand nine hundred dollars ($3,865,900.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2011 2013 ; and 99 ‑ 3 ‑ 904. Level III construction projects-rehabilitation. (b) Project – Albin Pipelines and Well Rehabilitation: (vi) Appropriation: There is appropriated from water development account II to the commission two hundred fifteen thousand dollars ($215,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2011 2013 ; and 99 ‑ 3 ‑ 1103. Level III construction projects-new development. (o) Project – Wardwell Water Supply Improvements: (vi) Appropriation: There is appropriated from water development account I to the commission four million six hundred two thousand nine hundred dollars ($4,602,900.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2011 2013 ; and 99 ‑ 3 ‑ 1104. Level III construction projects-rehabilitation. (b) Project – Alpine Wells Rehabilitation: (vi) Appropriation: There is appropriated from water development account II to the commission three hundred fifty-nine thousand seven hundred ninety dollars ($359,790.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2010 2013 ; and 99 ‑ 3 ‑ 1404. Level III construction projects – rehabilitation. (d) Project – Deaver Rehabilitation 2009: (iv) Total project budget: One million two hundred eighteen thousand dollars ($1,218,000.00) One million eight hundred twenty-three thousand dollars ($1,823,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed six hundred seventy-three thousand dollars ($673,000.00) one million twenty-three thousand dollars ($1,023,000 .00 ) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission six hundred seventy-three thousand dollars ($673,000.00) one million twenty-three thousand dollars ($1,023,000 .00 ) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014 2015 ; (g) Project – GVID Upper Sunshine Diversion : -Phase I: (iv) Total project budget: Three million three hundred fifty-four thousand dollars ($3,354,000.00) Three million nine hundred thousand dollars ($3,900,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement , and project land procurement , construction engineering and construction an amount not to exceed two hundred one thousand dollars ($201,000.00) two million six hundred thirteen thousand dollars ($2,613,000.00) or sixty-seven percent (67%) of the actual costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement , and project land procurement , construction engineering and construction an amount not to exceed ninety-nine thousand dollars ($99,000.00) one million two hundred eighty-seven thousand dollars ($1,287,000.00) or thirty-three percent (33%) of actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission three hundred thousand dollars ($300,000.00) three million nine hundred thousand dollars ($3,900,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2014 2015 . 9 9 ‑ 3 ‑ 1504. Level III construction projects – rehabilitation. (f) Project – Rawlins Atlantic Rim Reservoir: (iv) Total project budget: Four million dollars ($4,000,000.00) Six million six hundred thousand dollars ($6,600,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million six hundred eighty thousand dollars ($2,680,000.00) four million four hundred twenty-two thousand dollars ($4,422,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million three hundred twenty thousand dollars ($1,320,000.00) two million one hundred seventy-eight thousand dollars ($2,178,000.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission four million dollars ($4,000,000.00) six million six hundred thousand dollars ($6,600,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015. (g) Project – Willwood Rehabilitation 2010: (iv) Total project budget: One million three hundred fifty-two thousand dollars ($1,352,000.00) Two million seven hundred thirty thousand dollars ($2,730,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed seven hundred forty-six thousand dollars ($746,000.00) one million five hundred thousand dollars ($1,500,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission seven hundred forty-six thousand dollars ($746,000.00) one million five hundred thousand dollars ($1,500,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015; Section 3 . This act is effective immediately upon co m pletion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constit u tion. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the Senate. Chief Clerk 1