Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
SF0047 • 2012
AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
Standing Committee • GEIS
Plain English: Adopted Standing Committee by GEIS
Assigned Chapter Number
Governor SignedSEA0013
H Speaker Signed SEA No. 0013
S President Signed SEA No. 0013
Assigned Number SEA0013
H Passed 3rd Reading
H Passed 2nd Reading
H Passed CoW
H Placed on General File
H02 Recommended Do Pass
H Rereferred to H02
H Placed on General File
H05 Recommended Do Pass
H Introduced and Referred to H05
H Received for Introduction
S Passed 3rd Reading
S Passed 2nd Reading
S Passed CoW
S Amendments Adopted
Amendment Adopted
S Placed on General File
S05 Recommended Amend and Do Pass
S Introduced and Referred to S05
S Received for Introduction
Bill Number Assigned
SF0047 Bill No.: SF0047 Drafter: MQ LSO No.: 12LSO-0189 Effective Date: March 6, 2012 Enrolled Act No.: SEA0013 Chapter No.: CH0014 Prime Sponsor: Select Water Committee Catch Title: Omnibus water bill-construction. Subject: Provides authorization and funding for water development projects approved for final construction. Summary/Major Elements: 2012 New development Projects Big Horn Regional Well Connection Buffalo Northwest Pipeline Casper Poplar Transmission Pipeline Cody West Transmission Pipeline Fort Laramie Storage Tank Gillette Regional Extensions Lander Water Supply Lovell Transmission Pipeline Northwest Rural Northern Expansion Rolling Hills Water Supply Sundance Storage Tank Pavillion East Water Supply Project Rehabilitation Construction Projects Big Horn Canal Rehabilitation 2012 Fayette Irrigation Rehabilitation Lake Hattie Dam Lovell Canal Rehabilitation 2012 Midvale Rehabilitation 2012 Shell Canal Tunnel Rehabilitation Amendments to Prior Projects Big Horn Regional Joint Powers Board Pipeline Project Small Water Development Projects Highline Canal Rehabilitation Project Greybull Valley I.D. Hydroelectric Project Sheridan Northwest/Big Goose Tanks Project Laramie Transmission Pipeline Teton Village Water Supply South Laramie Water Supply Heart Mountain Rehabilitation 2010 Little Snake Diversions GR/RS/SC Raw Water Reservoir Wright Water Supply 2011 Willwood Dam Rehabilitation Comments: See also the companion water bill, HB 41, Omnibus water bill-planning.
WORKING DRAFT ORIGINAL SENATE FILE NO. 0047 ENROLLED ACT NO. 13, SENATE SIXTY-FIRST LEGISLATURE OF THE STATE OF WYOMING 2012 BUDGET SESSION AN ACT relating to water development projects; providing for construction of dams and reservoirs; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing appropriations; modifying project descriptions and terms of appropriations for various specified prior projects; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming : Section 1. W.S. 99 ‑ 3 ‑ 1701 through 99 ‑ 3 ‑ 1704 are created to read: ARTICLE 17 2012 CONSTRUCTION PROJECTS 99 ‑ 3 ‑ 1701. Definitions. The definitions in W.S. 99 ‑ 3 ‑ 101 apply to this article. 99 ‑ 3 ‑ 1702. General authorization. The provisions of W.S. 99 ‑ 3 ‑ 102 apply to this article. 99 ‑ 3 ‑ 1703. Level III construction projects – new development. (a) Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99 ‑ 3 ‑ 103. ( b ) Project – Big Horn Regional Well Connection: (i) Project sponsor: Big Horn Regional Joint Powers Board; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a well connection, pipeline, and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Seven million sixty thousand dollars ($ 7,060 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four million seven hundred thirty thousand two hundred dollars ($4,730,200.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission four million seven hundred thirty thousand two hundred dollars ($4,730,200.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: (A) The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources; (B) The sponsor shall purchase the well drilled during the Level II study for a price not to exceed thirty-three percent (33%) of the well’s actual construction costs. The sponsor shall purchase the well with a lump sum payment. ( c ) Project – Buffalo Northwest Pipeline: (i) Project sponsor: City of Buffalo ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two million six hundred forty thousand dollars ($ 2,640 ,000.00) . Total project phase I budget: Three hundred sixty-five thousand dollars ($ 365 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed two hundred forty-four thousand five hundred fifty dollars ($244,550.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed one hundred twenty thousand four hundred fifty dollars ($120,450.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission three hundred sixty-five thousand dollars ($ 365 ,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017. ( d ) Project – Casper Poplar Transmission Pipeline: (i) Project sponsor: City of Casper; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Two million three hundred thousand dollars ($ 2,300 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million five hundred forty-one thousand dollars ($1,541,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one million five hundred forty-one thousand dollars ($1,541,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( e ) Project – Cody West Transmission Pipeline: (i) Project sponsor: City of Cody; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Six hundred ten thousand dollars ($ 610 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred eight thousand seven hundred dollars ($408,700.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission four hundred eight thousand seven hundred dollars ($408,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( f ) Project – Fort Laramie Storage Tank: (i) Project sponsor: Town of Fort Laramie; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a storage tank and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million two hundred thirty thousand dollars ($ 1,230 ,000.00) . Total project phase I budget: Eighty thousand dollars ($ 80 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed fifty-three thousand six hundred dollars ($53,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission fifty-three thousand six hundred dollars ($53,600.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( g ) Project – Gillette Regional Extensions: (i) Project sponsor: City of Gillette; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Eleven million one hundred thousand dollars ($ 11,100 ,000.00) . Total project phase I budget: One million fifty thousand dollars ($ 1,050 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed seven hundred three thousand five hundred dollars ($703,500.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission seven hundred three thousand five hundred dollars ($703,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( h) Project – Lander Water Supply: (i) Project sponsor: City of Lander; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Six million one hundred thirty-six thousand dollars ($ 6,136 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three million sixty-eight thousand dollars ($3,068,000.00) or fifty percent (50%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission three million sixty-eight thousand dollars ($3,068,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. ( j ) Project – Lovell Transmission Pipeline: (i) Project sponsor: Town of Lovell; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a pipeline and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million two hundred fifty thousand dollars ($ 1 , 250,000 .00) . Total project phase I budget: One hundred thousand dollars ($ 100 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed sixty-seven thousand dollars ($67,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission sixty-seven thousand dollars ($67,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( k ) Project – Northwest Rural Northern Expansion: (i) Project sponsor: Northwest Rural Water District; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project descripti on: Design and construction of pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four million four hundred forty thousand dollars ($ 4,440,000 .00) . Total project phase I budget: Four hundred twenty thousand dollars ($ 420 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed two hundred eighty-one thousand four hundred dollars ($281,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission two hundred eighty-one thousand four hundred dollars ($281,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring thirty-three percent (33%) of the total project budget from other sources. ( m ) Project – Rolling Hills Water Supply: (i) Project sponsor: Town of Rolling Hills ; (ii) Project purpose: Municipal, r ural domestic water supply; (iii) Project description: Design and construction of a storage tank, water delivery system improvements, and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million nine hundred thousand dollars ($ 1,900 ,000.00) . Total project phase I budget: One hundred sixty thousand dollars ($ 160 ,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed one hundred seven thousand two hundred dollars ($107,200.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed fifty-two thousand eight hundred dollars ($52,800.00) or thirty-three percent (33%) of the actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission one hundred sixty thousand dollars ($ 160 ,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017. ( n ) Project – Sundance Storage Tank: (i) Project sponsor: Town of Sundance; (ii) Project purpose: Municipal, rural domestic water supply; (iii) Project description: Design and construction needed to resolve issues relating to the existing Cole Water Storage Tank, and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Nine hundred fifty thousand dollars ($950,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred twelve thousand five hundred dollars ($712,500.00) or seventy-five percent (75%) of actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission seven hundred twelve thousand five hundred dollars ($712,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vii) Special conditions: The sponsor is responsible for acquiring twenty-five percent (25%) of the total project budget from other sources. (o) Project – Pavillion East Water Supply Project : (i) Project sponsor: Wyoming Water Development Commission (Commission); (ii) Project purpose: Rural domestic water supply; (iii) Project description: Design and construction of cistern systems, a water loading station and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Seven hundred fifty thousand dollars ($750,000.00); (v) Appropriation: There is appropriated from water development account I to the commission seven hundred fifty thousand dollars ($750,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2017; (vi) Special conditions: (A) The Commission, in coordination with the governor's office, select water committee, department of environmental quality and the Wyoming oil and gas conservation commission shall develop project operating criteria to include, but not limited to the following: the project area, eligibility of residences in the project area to participate in the project and utilization of water sources which would not impact existing uses; (B) The Commission is authorized to enter into a project agreement with an entity eligible to be a project sponsor; and (C) This project and the financing plan address a unique situation and shall not be considered by the commission as a precedent for any future project unless expressly approved by the governor and the legislature. [REHABILITATION CONSTRUCTION PROJECTS] 9 ‑ 3 ‑ 1704. Level III construction projects – rehabilitation. (a) Authorization is granted for the Level III rehabilitation construction projects identified in this section, subject to the general conditions specified in W.S. 99 ‑ 3 ‑ 104. (b) Project – Big Horn Canal Rehabilitation 2012 : (i) Project sponsor: Big Horn Canal Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of water canal system improvements and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million four hundred forty thousand dollars ($1,440,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project nine hundred sixty-four thousand eight hundred dollars ($964,800.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred seventy-five thousand two hundred dollars ($475,200.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission one million four hundred forty thousand dollars ($1,440,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017. ( c ) Project – Fayette Irrigation Rehabilitation : (i) Project sponsor: Fayette Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of water canal system improvements and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One hundred eighty thousand dollars ($180,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project one hundred twenty thousand six hundred dollars ($120,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed fifty-nine thousand four hundred dollars ($59,400.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission one hundred eighty thousand dollars ($180,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017. ( d ) Project – Lake Hattie Dam : (i) Project sponsor: Pioneer Canal-Lake Hattie Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of dam outlet works improvements and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Eight hundred forty thousand dollars ($840,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project five hundred sixty-two thousand eight hundred dollars ($562,800.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred seventy-seven thousand two hundred dollars ($277,200.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission eight hundred forty thousand dollars ($840,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017. (e) Project – Lovell Canal Rehabilitation 2012 : (i) Project sponsor: Lovell Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of water lateral improvements and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Eight hundred eighty thousand dollars ($880,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed five hundred sixty-five thousand dollars ($565,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission five hundred sixty-five thousand dollars ($565,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (f) Project – Midvale Rehabilitation 2012 : (i) Project sponsor: Midvale Irrigation District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction of water lateral improvements and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million eight hundred fifty-five thousand dollars ($1,855,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed nine hundred forty-five thousand dollars ($945,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission nine hundred forty-five thousand dollars ($945,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017; (vii) Special conditions: (A) The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and approved by the commission; (B) The sponsor is responsible for retaining professional engineering services to design the project, compile materials bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. (g) Project – Shell Canal Tunnel Rehabilitation: (i) Project sponsor: Shell Valley Watershed Improvement District; (ii) Project purpose: Agriculture water supply; (iii) Project description: Design and construction improvements to or replacement of a water supply tunnel and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: One million two hundred twenty thousand dollars ($1,220,000.00); (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed eight hundred seventeen thousand four hundred dollars ($817,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred two thousand six hundred dollars ($402,600.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission one million two hundred twenty thousand dollars ($1,220,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2017. [AMENDMENTS TO PRIOR PROJECTS] Section 2. W.S. 99 ‑ 3 ‑ 703 (c)(iv) through (vi), (j)(iv) through (vi) and (ix), 99 ‑ 3 ‑ 704(g)(ix), 99 ‑ 3 ‑ 804(j)(vii), 99 ‑ 3 ‑ 1106(a)(vii) , (b)(iv) and (vii), 99 ‑ 3 ‑ 1203(d)(iv) through (vi) and (r)(vi), 99 ‑ 3 ‑ 1303(f)(iv) through (vii), 99 ‑ 3 ‑ 1403(p)(iii) through (vii), 99 ‑ 3 ‑ 1503(m)(iv), (v), (vii) and by creating a new paragraph (vi i i), 99 ‑ 3 ‑ 1504(c)(iv) through (vi) and (d)(iv) through (vii), 99 ‑ 3 ‑ 1603(f)(iv), (v), (vii) , (viii) and (n)(iii) through (vi) and 99 ‑ 3 ‑ 1604 (m)(iv) through (vii) are amended to read: 99 ‑ 3 ‑ 703. Level III construction projects - new development. (c) Big Horn Regional Joint Powers Board Pipeline Project: (iv) Total project budget: Thirty-nine million three hundred thirty thousand dollars ($39,330,000.00) Thirty-five million five hundred eighty thousand dollars ($35,580,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering, and construction of the project an amount not to exceed twenty-six million three hundred fifty-one thousand one hundred dollars ($26,351,100.00) twenty-three million eight hundred thirty-eight thousand six hundred dollars ($23,838,600.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission twenty-six million three hundred fifty-one thousand one hundred dollars ($26,351,100.00) twenty-three million eight hundred thirty-eight thousand six hundred dollars ($23,838,600.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2012 2014 ; (j) Project - Small Water Development Projects: (iv) Total project budget: Three million nine hundred thousand dollars ($3,900,000.00) Four million five hundred thousand dollars ($4,500,000.00) ; (v) Project grant: The state of Wyoming shall grant to sponsors from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million nine hundred fifty thousand dollars ($1,950,000.00) two million two hundred fifty thousand dollars ($2,250,000.00) or fifty percent (50%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission one million nine hundred fifty thousand dollars ($1,950,000.00) two million two hundred fifty thousand dollars ($2,250,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall carry over until expended or reverted by the legislature to water development account I; (ix) No new project shall be authorized under this subsection on or after July 1, 2012 2014 . 99 ‑ 3 ‑ 704. Level III construction projects-rehabilitation (g) Project - Small Water Development Projects: (ix) No new project shall be authorized under this subsection on or after July 1, 2012 2014 . 99 ‑ 3 ‑ 804. Level III construction projects-rehabilitation. (j) Project – Highline Canal Rehabilitation Project: (vii) Appropriation: There is appropriated from water development account II to the commission eight hundred eight thousand fifty dollars ($808,050.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2012 2014 ; and 99 ‑ 3 ‑ 1106. Sponsor's inflation funds. There are created the following sponsor's inflations funds: (a) Project – Sponsor's Inflation Fund – New Development: (vii) Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2013 2015 ; and (b) Project – Sponsor's Inflation Fund - Rehabilitation: (iv) Total project budget: Five hundred thousand dollars ($500,000.00) Eight hundred thousand dollars ($800,000.00) ; (vii) Appropriation: There is appropriated from water development account II to the commission five hundred thousand dollars ($500,000.00) eight hundred thousand dollars ($800,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2013 2015 ; and 99 ‑ 3 ‑ 1203. Level III construction projects – new development. (d) Project – Greybull Valley I.D. Hydroelectric Project: (iv) Total project budget: Four hundred seventy-six thousand dollars ($476,000.00) One hundred fifty thousand dollars ($150,000.00) ; (v) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement of the project an amount not to exceed four hundred seventy-six thousand dollars ($476,000.00) one hundred fifty thousand dollars ($150,000.00) or one hundred percent (100%) of the actual engineering costs, whichever is less, for a term of fifty (50) years from the date the commission determines that the engineering design has been completed, at an annual rate of four percent (4%); (vi) Appropriation: There is appropriated from water development account I to the commission four hundred seventy-six thousand dollars ($476,000.00) one hundred fifty thousand dollars ($150,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2012 2014 . (r) Project – Sheridan Northwest/Big Goose Tanks Project: (vi) Appropriation: There is appropriated from water development account I to the commission five million two hundred sixty thousand eight hundred forty dollars ($5,260,840.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2012 2014 ; and 99 ‑ 3 ‑ 1303. Level III construction projects – new development. (f) Project – Laramie Transmission Pipeline: (iv) Total project budget: Seven million seven hundred thirty thousand dollars ($7,730,000.00) Ten million eight hundred fifty thousand dollars ($10,850,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction an amount not to exceed five million one hundred seventy-nine thousand one hundred dollars ($5,179,100.00) seven million two hundred sixty-nine thousand five hundred dollars ($7,269,500.00) or sixty-seven percent (67%) of the actual costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction an amount not to exceed two million five hundred fifty thousand nine hundred dollars ($2,550,900.00) three million five hundred eighty thousand five hundred dollars ($3,580,500.00) or thirty-three percent (33%) of actual costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission seven million seven hundred thirty thousand dollars ($7,730,000.00) ten million eight hundred fifty thousand dollars ($10,850,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014 2017 . 99 ‑ 3 ‑ 1403. Level III construction projects-new development. (p) Project – Teton Village Water Supply: (iii) Project description: Design and construction of a storage tank, well, pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four million eight hundred ninety-five thousand dollars ($4,895,000.00) One hundred six thousand dollars ($106,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million two hundred twenty-three thousand seven hundred fifty dollars ($1,223,750.00) twenty-six thousand five hundred dollars ($26,500.00) or twenty-five percent (25%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million two hundred twenty-three thousand seven hundred fifty dollars ($1,223,750.00) twenty-six thousand five hundred dollars ($26,500.00) or twenty-five percent (25%) of the actual development costs, whichever is less, for a term of thirty (30) five (5) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account I to the commission two million four hundred forty-seven thousand five hundred dollars ($2,447,500.00) fifty-three thousand dollars ($53,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2014 2012 ; 99 ‑ 3 ‑ 1503. Level III construction projects – new development. (m) Project – South Laramie Water Supply: (iv) Total project budget: Three million one hundred thousand dollars ($3,100,000.00) Four million fifty thousand dollars ($4,050,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million seventy-seven thousand dollars ($2,077,000.00) or sixty-seven percent (67%) two million six hundred thirty-eight thousand one hundred seventy dollars ($2,638,170.00) or sixty-five and fourteen hundredths percent (65.14%) of the actual development costs, whichever is less; (vii) Appropriation: There is appropriated from water development account I to the commission three million one hundred thousand dollars ($3,100,000.00) two million six hundred thirty-eight thousand one hundred seventy dollars ($2,638,170.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2015. 2017; (viii) Special condition: The sponsor is responsible for acquiring thirty-four and eighty-six hundredths percent (34.86%) of the total project budget from other sources. 99 ‑ 3 ‑ 1504. Level III construction projects – rehabilitation. (c) Project – Heart Mountain Rehabilitation 2010: (iv) Total project budget: Two million one hundred twenty-two thousand dollars ($2,122,000.00) Three million thirty-six thousand dollars ($3,036,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and approved by the commission an amount not to exceed one million one hundred eighty thousand dollars ($1,180,000.00) one million six hundred sixty-five thousand dollars ($1,665,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less; (vi) Appropriation: There is appropriated from water development account II to the commission one million one hundred eighty thousand dollars ($1,180,000.00) one million six hundred sixty-five thousand dollars ($1,665,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015 2017 ; (d) Project – Little Snake Diversions: (iv) Total project budget: Nine hundred ninety thousand dollars ($990,000.00) Two million three hundred thirteen thousand five hundred dollars ($2,313,500.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred sixty-three thousand three hundred dollars ($663,300.00) one million five hundred fifty thousand forty-five dollars ($1,550,045.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred twenty-six thousand seven hundred dollars ($326,700.00) seven hundred sixty-three thousand four hundred fifty-five dollars ($763,455.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission nine hundred ninety thousand dollars ($990,000.00) two million three hundred thirteen thousand five hundred dollars ($2,313,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2015 2017 . 99 ‑ 3 ‑ 1603. Level III construction projects – new development. (f) Project – GR/RS/SC Raw Water Reservoir : – Phase I: (iv) Total project budget: Fifteen million eight hundred fifty thousand dollars ($15,850,000.00) Sixteen million four hundred thousand dollars ($16,400,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement , and project land procurement , for construction engineering and construction of the project an amount not to exceed six hundred three thousand dollars ($603,000.00) eight million two hundred eighty-two thousand dollars ($8,282,000.00) or fifty and one-half percent (50.5%) of the actual development costs, whichever is less; (vii) Appropriation: There is appropriated from water development account I to the commission nine hundred thousand dollars ($900,000.00) eight million two hundred eighty-two thousand dollars ($8,282,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016 2017 ; (viii) Special condition: The sponsor is responsible for acquiring twenty-five percent (25%) forty-nine and one - half percent (49.5%) of the total project budget from other sources. (n) Project – Wright Water Supply 2011 : – Phase I: (iii) Project description: Design and construction of a telemetry system, reconfiguration of the piping for an existing well, and connection of a new well to the water supply system , pipelines and appurtenances necessary to make the project function in the manner intended; (iv) Total project budget: Four million nine hundred fifty-seven thousand dollars ($4,957,000.00) Two million seven hundred thousand dollars ($2,700,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of a telemetry system and reconfiguration of the piping for an existing well and design, permit procurement and project land procurement for the connection of a new well of the project an amount not to exceed seven hundred thirty-seven thousand dollars ($737,000.00) one million eight hundred nine thousand dollars ($1,809,000.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Appropriation: There is appropriated from water development account I to the commission seven hundred thirty-seven thousand dollars ($737,000.00) one million eight hundred nine thousand dollars ($1,809,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2016 2017 ; 99 ‑ 3 ‑ 1604. Level III construction projects – rehabilitation. (m) Project – Willwood Dam Rehabilitation : – Phase I: (iv) Total project budget: One million six hundred twenty thousand three hundred dollars ($1,620,300.00) One million six hundred twenty thousand dollars ($1,620,000.00) ; (v) Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement , and project land procurement , construction engineering and construction of the project one hundred forty thousand seven hundred dollars ($140,700.00) one million eighty-five thousand four hundred dollars ($1,085,400.00) or sixty-seven percent (67%) of the actual development costs, whichever is less; (vi) Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement , and project land procurement , construction engineering and construction of the project an amount not to exceed sixty-nine thousand three hundred dollars ($69,300.00) five hundred thirty-four thousand six hundred dollars ($534,600.00) or thirty-three percent (33%) of actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines project benefits accrue to the sponsor, at an annual rate of four percent (4%); (vii) Appropriation: There is appropriated from water development account II to the commission two hundred ten thousand dollars ($210,000.00) one million six hundred twenty thousand dollars ($1,620,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2016 2017 . Section 3. W.S. 99 ‑ 3 ‑ 1503(m)(vi) and 99 ‑ 3 ‑ 1603(f)(vi) are repealed. Section 4. This act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the Senate. Chief Clerk 1