Back to Wyoming

SF0105 • 2012

School capital construction.

AN ACT relating to school facility projects; providing appropriations for school facility projects for the biennium commencing July 1, 2012, and ending June 30, 2014; providing definitions; imposing conditions upon appropriation expenditures; providing for transfers of funds and carryover of funds during this biennium and for the remainder of the 2010-2012 biennium; and providing for an effective date.

Budget Education
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Appropriations
Last action
2012-03-06
Official status
enrolled
Effective date
3/6/2012

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

SF0105H3001

3rd reading • TEETERS

Failed

Plain English: Failed 3rd reading by TEETERS

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0105HS001

Standing Committee • H02

Failed

Plain English: Failed Standing Committee by H02

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0105S2001

2nd reading • ROTHFUSS

Adopted

Plain English: Adopted 2nd reading by ROTHFUSS

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0105S3001

3rd reading • COE

Adopted

Plain English: Adopted 3rd reading by COE

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.
SF0105S3002

3rd reading • NICHOLAS,P

Adopted

Plain English: Adopted 3rd reading by NICHOLAS,P

  • This amendment summary is using official source text because generated interpretation was skipped for this run.
  • The official amendment text was available, but an easy plain-English summary could not be produced automatically during the last sync.

Bill History

  1. 2012-03-06 LSO

    Assigned Chapter Number

  2. 2012-03-06 Governor

    Governor Signed SEA0009

  3. 2012-03-02 House

    H Speaker Signed SEA No. 0009

  4. 2012-03-01 Senate

    S President Signed SEA No. 0009

  5. 2012-03-01 LSO

    Assigned Number SEA0009

  6. 2012-03-01 House

    H Passed 3rd Reading

  7. 2012-03-01 House

    Amendment Failed

  8. 2012-02-29 House

    H Laid Back Pursuant to HR 9-3

  9. 2012-02-28 House

    H Passed 2nd Reading

  10. 2012-02-27 House

    H Passed CoW

  11. 2012-02-27 House

    Amendment Failed

  12. 2012-02-24 House

    H Placed on General File

  13. 2012-02-24 House

    H02 Recommended Amend and Do Pass

  14. 2012-02-23 House

    H Introduced and Referred to H02

  15. 2012-02-23 House

    H Received for Introduction

  16. 2012-02-23 Senate

    S Passed 3rd Reading

  17. 2012-02-23 Senate

    Amendment Adopted

  18. 2012-02-23 Senate

    Amendment Adopted

  19. 2012-02-22 Senate

    S Passed 2nd Reading

  20. 2012-02-22 Senate

    S Amendments Adopted

  21. 2012-02-22 Senate

    Amendment Adopted

  22. 2012-02-21 Senate

    S Passed CoW

  23. 2012-02-21 Senate

    S Placed on General File

  24. 2012-02-21 Senate

    S02 Recommended Do Pass

  25. 2012-02-17 Senate

    S Introduced and Referred to S02

  26. 2012-02-16 Senate

    S Received for Introduction

  27. 2012-02-15 LSO

    Bill Number Assigned

Official Summary Text

SF0105

Bill No.:
SF0105
Drafter:

TH

LSO No.:
12LSO-0304
Effective Date:
March
6, 2012; July 1, 2012; July
1, 2013

Enrolled Act No.:
SEA0009

Chapter No.:
CH0016

Prime Sponsor:
Joint Appropriations Interim Committee

Catch Title:
School capital construction.

Subject:
Funding for school capital
construction projects addressing facility needs during the 2013‑2014
biennium.

Summary/Major Elements:

Appropriates $467,736,862 to the
school facilities commission for school construction for the biennium, broken
down as follows:

o

$10,753,340 effective immediately
for completion of capital construction projects previously funded under 2011‑2012
biennial budgets;

o

$870,000 effective immediately for
facility planning projects;

o

$6,895,163 effective immediately for
design projects, in addition to $52,428,087 effective July 1, 2012. Design
projects for which there is no capital construction funding in this budget will
be considered for capital construction project funding in the 2013 supplemental
budget, given funding priority over any building capacity issues forwarded by
the commission following study and evaluation;

o

$5,796,000 effective immediately for
component level project funding;

o

$15,322,301 effective immediately for
land acquisitions;

o

$1,412,000 effective immediately
for ancillary building projects;

o

$102,240 effective immediately for
demolition projects;

o

$450,000 effective immediately for
track projects;

o

$10,050,000 effective immediately for
capital construction projects, together with an additional $227,508,001
effective July 1, 2012, and $119,238,308.00 effective July 1, 2013;

o

$16,911,422 for unanticipated
costs associated with planning, design, capital construction and component
projects.

In addition to amounts
appropriated for capital construction in this budget, 5 additional projects are
to be considered by the legislature for funding in the 2013 supplemental budget
in the priority and for the amounts specified, estimated at $114,358,633;

Of total appropriations, $51,651,044
is effective immediately, $296,847,510 is effective July 1, 2012, and $119,238,308
is effective July 1, 2013;

Previous appropriations for the
Natrona county school district no. 1 high school projects of $108,440,000,
combined with amounts appropriated for design and construction in this budget,
forward the following projects in this district:

o

$30,082,554 for the design of 2
high school buildings, a shared facility and an alternative high school
building;

o

$88,763,997 for a high school
building and $27,938,607 for a shared facility, effective the first year of the
2013‑2014 biennium;

o

$119,238,308 for a second high
school building effective the second year of the 2013‑2014 biennium;

o

$16,318,523 estimated for an
alternative high school building, to be considered for funding in the 2013
supplemental budget.

Directs use of the standard
enrollment projection approach of the school facilities department, based upon
a five (5) year projection period commencing on the date of anticipated
completion of project construction, as the basis for developing building square
footage numbers used in projects forwarded in this budget, allows for
adjustment by the department as necessary to reflect more precise analysis;

Requires school boards to
incorporate a collaborative committee process, advisory to the board, in
planning district facility remedies;

Prevents sweep of excess amounts
within capital construction account (including holding account) into the common
school permanent land fund on June 30, 2012, maintains excess amounts within
capital construction account, prevents deposit of any excess school foundation
program account funds on June 30, 2013 into capital construction account, and
appropriates from capital construction account as follows:

o

Amounts into the school foundation
program account as necessary to restore school foundation program account
balance at $100,000,000 on June 30, 2014;

o

Amounts within capital
construction account in excess of legislative appropriations under this budget,
continuously appropriated to a separate holding account through June 30, 2014.

Current Bill Text

Read the full stored bill text
WORKING DRAFT

ORIGINAL SENATE
FILE

NO.
0105

ENROLLED ACT NO. 9, SENATE

SIXTY-FIRST LEGISLATURE OF THE STATE OF WYOMING
2012 BUDGET SESSION

AN ACT relating to school facility projects; providing appropriations for school facility projects for the biennium commencing July 1, 2012, and ending June 30, 2014; providing definitions; imposing conditions upon appropriation expenditures; providing for transfers of funds and carryover of funds during this biennium and for the remainder of the 2010-2012 biennium; and providing for effective dates.

Be It Enacted by the Legislature of the State of Wyoming:

Section 1.

(a)

As used in this section
:

(i)

"N
eeds index priority
" means
the needs index priority used
by the school facilities commission in developing 2013
‑
2014 biennial budget recommendations;

(ii)

"Previous" means continuation of projects prioritized by needs indices in effect prior to the index developed for the 2013
‑
2014 biennial budget recommendation.

(b)

Up to ten million seven hundred fifty-three thousand three hundred forty dollars ($10,753,340.00) is appropriated from the school capital construction account to the school facilities commission for completion of previously funded capital construction projects subject to the following prescribed maximum amounts:

(i)

For capital construction projects funded under 2010 Wyoming Session Laws, Chapter 39, Section 33
3:

Need
Index
School
Maximum
Priority
District
Project
Amount

1
Uinta #4
Middle School
$3,319,461
9
Sublette #9
Elementary School
$ 525,862
12
Natrona #1
Elementary School
$1,811,165
14
Laramie #1
Elementary School
$3,856,038

Total
$9,512,526

(ii)

For capital construction projects funded under 2011 Wyoming Session Laws, Chapter 88, Section 349:

Needs
Index
School
Maximum
Priority
District
Project
Amount

35
Sweetwater #1
Middle School
$ 161,568
86
Converse #1
Elementary School
$ 438,006
233
Johnson #1
Elementary School
$ 641,240

Total
$1,240,814

(
c
)

The following amounts are appropriated from the school capital construction account to the school facilities commission for the 201
3
‑
201
4
biennium for the specified purposes:

(i)

For planning projects:

(A)

Up to eight
hundred
seventy
thousand dollars ($
870
,000.00) for the following planning projects subject to prescribed maximum amounts
:

Needs
Index
School
Maximum
Priority
District
Project
Amount

Previous
Park
#
1
Middle
School
$ 50,000
Previous
Laramie #1
Elementary School
$ 50,000
15
Sheridan
#
2
Elementary
School
$
6
0,000
17
Fremont #14
Elementary School
$135,000
18
Natrona #1
K-12 School
$135,000
23
Sweetwater #1
K-8 School
$ 60,000
27
Sublette #9
Middle School
$135,000
28
Laramie #1
Elementary School
$135,000
189
Crook #1
Elementary School
$ 5,000
60
Fremont #25
High School
$ 5,000
Capacity
Big Horn #2
Elementary Schools
$ 5,000
Capacity
Big Horn #3
Middle School
$ 5,000
Capacity
Campbell #1
Elementary/Junior High/
High Schools
$ 15,000
Capacity
Carbon #1
Elementary School
$ 5,000
Capacity
Fremont #24
K-12 School
$ 5,000
Capacity
Fremont #25
Elementary Schools
$ 5,000
Capacity
Johnson #1
Elementary School
$ 5,000
Capacity
Laramie #1
Elementary Schools
$ 5,000
Capacity
Lincoln #2
High School/Admin Bldg
$ 5,000
Capacity
Park #1
Elementary Schools
$ 5,000
Capacity
Park #6
Elementary School
$ 5,000
Capacity
Sheridan #1
Elementary Schools
$ 5,000
Capacity
Sweetwater #1
Elementary/High Schools
$ 10,000
Capacity
Teton #1
Elementary Schools
$ 10,000
Capacity
Uinta #6
Elementary Schools
$ 5,000
Capacity
Weston #1
Elementary School
$ 5,000

Total
$
870
,000

(B)

As used in subparagraph (c)(i)(A) of this section, "capacity" means capacity issues self-
reported by school districts, to be further evaluated by the school facilities department;

(
C
)

The budget amounts contained in the appropriation for planning projects under this paragraph shall not be construed to be an entitlement or guaranteed amount, nor does a planning project funded under this paragraph guarantee continuation or completion of a building project contained within the scope of the planning project
;

(D)

The appropriation for planning under subparagraph (A) of this paragraph for the previous needs index priority for an elementary school in Laramie county school district no. 1, originating from priority 14 under 2010 Wyoming Session Laws, Chapter 39, Section 333, shall be for the sole purpose of undertaking the necessary planning for site acquisition for the construction of an elementary school within the district's central triad with close proximity to high density population centers.

(ii)

For design projects:

(A)

U
p to
six million eight hundred ninety-five thousand one hundred sixty-three dollars ($6,895,163.00)
for the following design projects subject to prescribed maximum amounts:

Needs
Index
School
Maximum
Priority
District
Project
Amount

Previous (36)
Campbell #1
Alternative High School
$ 328,106*
Previous (?)
Crook #1
K-8 School
$ 1,031,502*
Previous (57)
Park #1
Middle School
$ 1,739,065
1
Carbon #2
Elementary School
$ 1,031,422
7
Carbon #1
High School
$ 2,119,839*
16
Uinta #1
Elementary School
$ 645,229*

Total
$
6,895,163

(B)

In addition to subparagraph (c)(ii)(A) of this section, u
p to
fifty-two million four hundred twenty-eight thousand eighty-seven dollars ($5
2,428,087
.00)
for the following design projects subject to prescribed maximum amounts:

Needs
Index
School
Maximum
Priority
District
Project
Amount

Prev
ious
(42)
Laramie #1
Elementary School
$ 1,454,345
4
Sweetwater #1
Alternative High School
$ 537,165
5
Natrona #1
High School/
Shared Facility
$12,830,287
6
Campbell #1
Elementary School
$ 1,585,024
9
Goshen #1
Elementary School
$ 308,034
10
Fremont #2
High School
$ 200,000
12
Sweetwater #1
K-12 School
$
2,218,102
13
Albany #1
High School
$
5,193,855
14
Fremont #24
K-12 School
$
4,004,682
15
Sheridan #2
Elementary School
$
1,311,302
17
Fremont #14
Elementary School
$
1,241,524
19
Natrona #1
High School/
Shared Facility
$17,252,267
21
Laramie #1
Junior High School
$

450,000
23
Sweetwater #1
K-8 School
$ 482,853
25
Natrona #1
Alternative High School
$ 2,165,390
26
Natrona #1
Elementary School
$ 1,193,257

Total
$
52,428,087

(C)

Appropriations under subparagraphs (c)(ii)(A) and (B) of this section which are asterisked (*), are supplemented by previous appropriations for that specific design project, resulting in total design funding for that project greater than the amount appropriated under this subparagraph;

(D)

The
design projects funded by amounts appropriated under
this paragraph
shall be considered by the legislature for capital construction project funding in the 2013 supplemental budget based upon the priority specified under this paragraph. The order of consideration of projects specified under this subparagraph shall not be affected by the results of the evaluation of capacity issues self-reported by school districts and further evaluated by the school facilities department;

(E)

Amounts appropriated under subparagraph (B) of this paragraph for the design of remedies for needs index priorities 5 and 19 in Natrona county school district no. 1 shall include three million seven hundred seven thousand three hundred twenty-one dollars ($3,707,321.00) for the design of a shared facility, which shall be inclusive of student enrollments and facility square footages originating from both priority 5 and 19 high school projects.

(iii)

For component level projects:

(A)

Up to five million seven hundred ninety-six thousand dollars ($5,796,000.00) subject to prescribed maximum amounts:

Component
Projects
School
Maximum
Category
District
Project
Amount

a., i.
Carbon #2
K-12 School
$ 200,000
c.
Goshen #1
Elementary School
$ 600,000
e.s.
Johnson #1
Middle School
$ 76,000
s.
Johnson #1
Elementary School
$ 150,000
s.
Natrona #1
Elementary School
$ 220,000
c.
Park #16
K-12 School
$ 500,000
s.
Sheridan #1
Elementary School
$ 250,000
c.
Sheridan #1
Middle School
$ 900,000
s.
Sheridan #2
High School
$ 800,000
s.
Uinta #1
High School
$ 450,000
s.
Uinta #1
Elementary School
$1,400,000
s.
Uinta #6
Elementary School
$ 250,000

Total
$5,796,000

(B)

As used in subparagraph (c)(iii)(A) of this section, the following component project categories are defined as follows:

(I)

"a." means air quality building components;

(II)

"c." means a building component with a life expectancy of twenty (20) years or more;

(III)

"e." means the building envelope or protective shell;

(IV)

"i." means illumination building components;

(V)

"s." means components pertaining to building safety, security or health.

(i
v
)

Up to
fifteen
million
three
hundred
twenty-two
thousand
three hundred one
dollars ($
15
,
322
,
3
0
1
.00) for land acquisitions
for the following purposes:

Needs
Index School
Land Acquisition Purpose

3
Natrona #1
Elementary School Site
4
Sweetwater #1
Alternative High School Site
6
Campbell #1
Elementary School Site
13
Albany #1
High School Site
14
Fremont #24
K-12 School Site
21
Laramie #1
Junior High School Site (relocation of athletic field)
26
Natrona #1
Elementary School Site
N/A
Laramie #1
4 Sites for potential new Elementary Schools
N/A
Teton #1
Site for potential new Elementary School

(v)

Up to
one
million
four
hundred
twelve
thousand dollars ($
1
,
412
,000.00) for the following ancillary building projects for the prescribed maximum amounts:

Needs
Index
School
Maximum
Priority
District
Project
Amount

N/A
Teton
#1
Lease cost until
new construction
completed
$
162
,000
N/A
Uinta #6
Admin Building
$
1,250
,000

Total
$
1,412,000

(vi)

Up to
one
hundred
two
thousand two hundred
forty
dollars ($
102
,2
40
.00) for the following demolition projects
subject to prescribed maximum amounts
:

Needs
Index
School
Maximum
Priority
District
Project
Amount

N/A
Big Horn #
4
Demolition of
bus barn
$ 82,080
N/A
Converse #1
Adjacent building
d
emolition
$ 20,160

Total
$102,240

(vii)

Up to four hundred fifty thousand dollars ($450,000.00) for the following track construction project, subject to the prescribed maximum amount:

Needs
Index
School
Maximum
Priority
District
Project
Amount

N/A
Niobrara #1
Reconstruct existing
sports field
area
and track to remedy
drainage issues
$450,000

Total
$450,000

(vii
i
)

For capital construction projects:

(A)

U
p to
ten
million
fifty
thousand dollars ($
10,050,000
.00) for the following capital construction projects subject to prescribed maximum amounts:

Needs
Index
School
Maximum
Priority
District
Project
Amount

Prev
ious
(190)
Big Horn #2
Completion of phases
for High School
$ 5,500,000
Prev
ious
(134)
Carbon #1
Completion of phases
for Middle School
$ 3,000,000
2
Sheridan #2
Elementary School
$ 450,000
8
Carbon #1
Elementary School
$ 1,100,000

Total
$
10,050,000

(B)

In addition to subparagraph (c)(viii)(A) of this section, u
p to
two hundred twenty-seven million five hundred eight thousand one dollars ($227,508,001.00)
for the following capital construction projects subject to prescribed maximum amounts:

Needs
Index
School
Maximum
Priority
District
Project
Amount

Prev
ious
(36)
Campbell #1
Alternative High
School
$8,380,000*
Prev
ious
(?)
Crook #1
K-8 School
$ 13,635,782*
Prev
ious
(42)
Laramie #1
Elementary School
$ 16,402,081
1
Carbon #2
Elementary School
$ 12,431,957
3
Natrona #1
Elementary School
$ 8,424,203
4
Sweetwater #1
Alternative High
School
$ 6,149,905
5
Natrona #1
High School/Shared
Facility
$ 8,262,604*
6
Campbell #1
Elementary School
$ 17,944,593
7
Carbon #1
High School
$ 36,819,524
10
Fremont #2
High School
$ 13,685,000
12
Sweetwater #1
K-12 School
$ 25,207,363
14
Fremont #24
K-12 School
$ 45,256,524
15
Sheridan #2
Elementary School
$ 14,908,465

Total
$
227,508,001

(C)

Appropriations under subparagraph (c)(viii)(B) of this section which are asterisked (*), are supplemented by previous appropriations for that specific construction project, resulting in total construction funding for that project greater than the amount appropriated under this subparagraph;

(D)

In expending amounts appropriated for needs index priority 5 in Natrona county school district no. 1 high school remedies under subparagraph (c)(viii)(B) of this section, under 2010 Wyoming Session Laws, Chapter 39, Section 333(b)(i), under 2011 Wyoming Session Laws, Chapter 88, Section 349(b)(vii) and nine million eight hundred thousand dollars ($9,800,000.00) from previous appropriations designated by the school facilities commission for expenditure on high school remedies in Natrona county school district no. 1, the following shall apply:

(I)

Twenty-seven million nine hundred thirty-eight thousand six hundred seven dollars ($27,938,607.00) shall be expended for the construction of a shared facility predicated upon student enrollments and square footages originating from the design of remedies for needs index priorities 5 and 19 under subparagraph (c)(ii)(B) of this section and shall not duplicate enrollments and square footages contained within these separate high school remedies;

(II)

In combination with the expenditure of amounts appropriated under subsection (d) of this section for needs index priority #19, the school facilities commission shall follow construction schedule timeline recommendations developed by the department in collaboration with Natrona county school district no. 1, local government planning agencies and project design and construction professionals. Construction schedule timeline recommendations shall be developed and reported by the department upon completion of fifty percent (50%) of project design. In developing the construction schedule timelines, the department shall take into consideration academic programming, impacts upon the community, project staging, cost, temporary swing space and safety;

(III)

Excluding the alternative high school project specified under subsection (f) of this section, which shall be designed to serve a student population not to exceed three hundred (300) students, the department shall ensure the functional capacity percentages for the separate projects addressing remedies for needs index priorities 5 and 19 as outlined within the education specifications under scenario 2 in the November 2011 Fanning-Howey report, are maintained and carried forward in the implementation of the remedies funded under subparagraph (c)(viii)(B) and subsection (d) of this section;

(IV)

The projects forwarded under this subparagraph, subparagraph (c)(viii)(B) and subsection (d) of this section shall be funded on the basis of an option allowing for staggered construction. In addition, the option shall provide an opportunity for district participation in planning the acquisition or construction of temporary swing space, provided district participation does not delay the construction schedule and other
department duties related to the projects. The district may augment state funds for optional temporary swing space which is in excess of educational space authorized by law. Any optional temporary swing space augmented with district funds in accordance with this subdivision shall remain the financial obligation of the district consistent with rules and regulations of the commission;

(V)

Prior to expenditure of amounts appropriated under subparagraph (c)(viii)(B) of this section and subdivision (I) of this subparagraph, the district shall agree that the shared facility square footage shall be considered a shared high school facility and shall not be considered a separate school for purposes of facility funding computations by the commission and operational funding computations under the education resource block grant model.

(E)

In expending funds for capital construction projects appropriated under this paragraph, the director of the department, in consultation with the governor, shall develop a construction schedule that:

(I)

Maximizes cost savings at or below project budget amounts specified under this paragraph;

(II)

Optimizes Wyoming workforce opportunities at a predictable and manageable level;

(III)

Provides for construction throughout the state in a manner as uniform as is possible; and

(IV)

Prevents unnecessary delays in initiating and implementing building and facility remedies.

(d)

Effective July 1, 2013, up to one hundred nineteen million two hundred thirty-eight thousand three hundred eight dollars ($119,238,308.00) is appropriated from the school capital construction account to the school facilities commission for the high school construction and renovation project addressing needs index priority 19 in Natrona county school district no. 1.

(e)

An amount equal to sixteen million nine hundred eleven thousand four hundred twenty-two dollars ($16,911,422.00) for unanticipated costs associated with planning, design, capital construction and component level projects funded under this subsection.

(f)

The following capital construction projects shall be considered by the legislature for funding in the 2013
‑
2014 supplemental budget in the priority and for the amounts estimated under this subsection:

Needs
Index
School
Maximum
Priority
District
Project
Amount

13
Albany #1
High School
$ 62,145,234
16
Uinta #1
Elementary School
$
17,739,919
17
Fremont #14
Elementary School
$
14,554,957
21
Laramie #1
Junior High School
$

3,600,000
25
Natrona #1
Alternative High
School
$ 16,318,523

(g)

In expending funds appropriated under this section and commensurate with school district efforts undertaken in facility planning required under W.S. 21
‑
15
‑
116, the school facilities department shall require school district boards of trustees to incorporate a collaborative committee process, advisory to the board,
which assists the school district with planning district remedies for school buildings, ranging from site selection to project planning and design. The collaborative committee process for remedy development shall include project stakeholders comprised of students, parents, teachers, principals, district administration, school board of trustee members, representative legislators, at-large members of the community and others. Although advisory to district boards, the collaborative committee shall assist the boards with informing the respective community and in developing community-based input into project development.

(h)

For all school planning, design and capital construction projects funded under this section excluding capital construction projects funded under subsection (b) of this section, the school facilities commission and the school facilities department shall use the standard Wyoming school facilities department approach adopted under W.S. 21
‑
15
‑
123(f)(ii) for student projections based upon a five (5) year projection period commencing on the date of anticipated completion of project construction. The school facilities commission may adjust projections computed under this approach as necessary to reflect more precise analysis and evaluation of historical, economic, social and other data impacting the community. Adjustments under this subsection shall be reported to the select committee on school facilities and to the joint appropriations interim committee.

(j)

Notwithstanding W.S. 21
‑
15
‑
122 and 2010 Wyoming Session Laws, Chapter 39, Section 333(g)(iii), amounts to be deposited into the common school permanent land fund on June 30, 2012 pursuant to W.S. 21
‑
15
‑
122(a)(ii) and 2010 Wyoming Session Laws, Chapter 39, Section 333(g)(iii), shall not be deposited in accordance with W.S. 21
‑
15
‑
122(a)(ii) and 2010 Wyoming Session Laws, Chapter 39,
Section 333(g)(iii). Those funds and other funds within the school capital construction account shall be subject to the following from the effective date of this subsection through June 30, 2014:

(i)

Notwithstanding W.S. 21
‑
13
‑
306(c), unobligated, unencumbered funds remaining in the school foundation program account on June 30, 2013, shall not be deposited into the school capital construction account, but shall remain in the school foundation program account;

(ii)

An amount necessary to restore the balance within the school foundation program account to one hundred million dollars ($100,000,000.00) on June 30, 2014, shall be deposited into the school foundation program account;

(iii)

Notwithstanding W.S. 9
‑
2
‑
1008, 9
‑
2
‑
1012(e) and 9
‑
4
‑
207(a), any unexpended, unobligated previously appropriated funds remaining within the school capital construction account as of June 30, 2012, shall not revert on June 30, 2012, and any other amounts which would revert to the school capital construction account pursuant to law during the 2013
‑
2014 fiscal biennium, are hereby appropriated for purposes of this section for the period commencing July 1, 2012, and ending June 30, 2014;

(iv)

The common school permanent land fund holding account created under 2010 Wyoming Session Laws, Chapter 39, Section 333(g)(iii) is repealed. Any unappropriated, unexpended, unobligated funds within that holding account, following reduction for the amounts appropriated from the school capital construction account pursuant to this section and reduction for the amounts deposited into the foundation program account pursuant to paragraph (ii) of this section, together with any other unappropriated, unexpended, unobligated funds within the
school capital construction account, shall be continuously deposited into a separate permanent land fund holding account from the effective date of this section through June 30, 2014.

Section 2.

(a)

Except as provided by subsections (b) and (c) of this section, this act is effective July 1, 2012.

(b)

Notwithstanding subsections (a) and (c) of this section, subsection (b), paragraph (c)(i), subparagraphs (c)(ii)(A) and (C), paragraphs (c)(iii) through (vii), subparagraphs (c)(viii)(A) and subsections (
h
) and (j) of this act are effective immediately
upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution.

(c)

Notwithstanding subsections (a) and (b) of this section, subsection (d) of this act is effective July 1, 2013.

(END)

Speaker of the House

President of the Senate

Governor

TIME APPROVED: _________

DATE APPROVED: _________

I hereby certify that this act originated in the Senate.

Chief Clerk

1