HB0042 • 2014
AN ACT relating to school facilities projects; providing appropriations for school facility projects for the biennial period July 1, 2014 through June 30, 2016; providing definitions; requiring reporting; and providing for effective dates.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
Standing Committee • HARSHMAN
Plain English: Adopted Standing Committee by HARSHMAN
2nd reading • NICHOLAS,P
Plain English: Adopted 2nd reading by NICHOLAS,P
Standing Committee • S02
Plain English: Filed Standing Committee by S02
Standing Committee • S02
Plain English: Adopted, Corrected Standing Committee by S02
Standing Committee • S02
Plain English: Failed, Corrected Standing Committee by S02
Assigned Chapter Number
Governor Signed HEA0056
S President Signed HEA No. 0056
H Speaker Signed HEA No. 0056
Assigned Number HEA0056
H Did Concur
H Received for Concurrence
S Passed 3rd Reading
S Passed 2nd Reading
Amendment Adopted
S Passed CoW
Amendment Failed
S Amendments Adopted
Amendment Adopted
S Placed on General File
S02 Recommended Amend and Do Pass
S Introduced and Referred to S02
S Received for Introduction
H Passed 3rd Reading
H Passed 2nd Reading
H Passed CoW
H Amendments Adopted
Amendment Adopted
H Placed on General File
H02 Recommended Amend and Do Pass
H Introduced and Referred to H02
H Received for Introduction
Bill Number Assigned
Bill No.: <billno> Drafter: <drafterinit> Bill No.: HB0042 Drafter: DRN LSO No.: 14LSO-0131 Effective Date: Immediate/ 7/1/2014 Enrolled Act No.: HEA0056 Chapter No.: CH0082 Prime Sponsor: Joint Appropriations Interim Committee Catch Title: School facilities appropriations. Subject: 2015‑2016 biennial appropriations for school facilities projects. Summary/Major Elements: Forwards a biennial budget for school facilities projects, which has previously been funded for an annual budget, and restricts any supplemental budget request to emergency or unanticipated needs; Requires the School Facilities Department to develop an estimated schedule for deployment of appropriations for projects funded for the biennium, together with projects funded by previous appropriations, and to report fund deployment and project progression to the select school facilities committee, the joint education and appropriations committees and to the governor; Appropriates $307,376,540 for the biennium as follows: For Fiscal Year 2014‑2015: $100,000 for project planning; $14,319,722 for design projects; $230,819,144 for capital construction projects, $9,903,883 of which is effective immediately for previously funded projects; $2,683,054 for demolition projects; $6,754,600 for land acquisitions tied to specified projects; $2,000,000 for land acquisitions if opportunities become available to meet design guidelines; $1,092,797 for ancillary building projects; $1,000,000 for track construction projects; $6,210,346 for component level projects; $18,414,096 for unanticipated costs over the biennium; $6,481,277 to reimburse amounts appropriated for unanticipated costs associated with projects funded for fiscal year 2013‑2014. For Fiscal Year 2015‑2016: (Amounts appropriated subject to approval by the School Facilities Commission and authorization by the Legislature.) $250,000 for project planning; $6,001,594 for design projects; $500,000 for demolition projects; $750,000 for land acquisitions; $1,000,000 for ancillary building projects; $9,000,000 for school security projects; Of the total biennial budget appropriation, $16,485,160 is effective immediately; In addition to the biennial appropriation, up to $600,000 is appropriated from the school facility major maintenance program for lease payments to school districts with approved and operating charter schools; In addition to the project deployment report, the School Facilities Department is to report to the Select School Facilities Committee on the following: Specific projects tied to fiscal year 2015‑2016 appropriations; Processes and mechanisms directed at reducing future project cost overages; A refined process used to identify and prioritize school district building component level needs which allows for full consideration of the proper use of major maintenance payments by districts in addressing building facility needs; School security projects tied to the 2015‑2016 appropriation, together with a process to identify and prioritize school security needs.
WORKING DRAFT ORIGINAL HOUSE BILL NO. 0042 ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES SIXTY-SECOND LEGISLATURE OF THE STATE OF WYOMING 2014 BUDGET SESSION AN ACT relating to school facilities projects; providing appropriations for school facility projects for the biennial period J uly 1, 201 4 through June 30, 2016 ; providing definitions; requiring reporting; providing for lease and maintenance payments for specified educational space; and providing for effective date s . Be It Enacted by the Legislature of the State of Wyoming: Section 1. (a) This act shall consist of the 2015 ‑ 2016 biennial school capital construction appropriation. ( b ) As used in this section : (i) " Condition n eeds index priority " means the condition needs index priority used by the school facilitie s commission in developing the remediation schedule for the 2015 ‑ 2016 biennial budget recommendation in accordance with W.S. 21 ‑ 1 5 ‑ 117(a)(i) ; (ii) "Capacity" means building needs as measured by criteria established by the school facilities commission pursuant to W.S. 21 ‑ 1 5 ‑ 117(e); ( iii ) "Previous" means continuation of projects prioritized by condition needs ind ices in effect prior to the index developed for the 20 1 5 ‑ 201 6 biennial budget recommendation ; (iv) "Building adequacy standards" means the uniform statewide standards for the adequacy of school buildings and facilities necessary for providing educational programs prescribed by law for public schools, as adopted by the school facilities commission under W.S. 21 ‑ 15 ‑ 115, except as otherwise provided by this paragraph. The building adequacy standards for those buildings and facilities funded under this section and for those buildings and facilities funded under 2012 Wyoming Session Laws, Chapter 16, and 2013 Wyoming Session Laws, Chapter 129, which at minimum have completed the project value engineering design phase, and in order to meet requirements of the Wyoming high school activities association for competition gymnasiums, shall allow for ceiling height limitations at a minimum of twenty-five (25) feet. ( c ) T he amounts appropriated from the school capital construction account under this act are for the biennial period commencing July 1, 2014, and ending June 30, 2016. A s authorized under W.S. 21 ‑ 15 ‑ 119(a)(iii), the school facilities commission shall submit a supplemental budget request for the period beginning July 1, 2015, and ending June 30, 2016, for any emergency or unanticipated need , or for any refinement or modification of a project funded under this section, subject to any constraints and other requirements imposed by the governor under W.S. 9 ‑ 2 ‑ 1013. (d) A n estimated schedule for deploying projects funded by amounts appropriated under this section and projects funded by previous appropriations, as adopted by the school facilities commission and contained within Appendix A to the 2015 ‑ 2016 biennial budget submitted by the commission under W.S. 21 ‑ 15 ‑ 119, shall be used by the school facilities department in guiding the expendi ture of appropriated funds. The estimated schedule developed under this sub section shall be based upon information, processes, events and expenditures and shall not be binding upon the department or the commission. Amounts appropriated under this section and previous appropriations shall not be construed to be an entitlement or guaranteed amount and shall be expended by the commission and department to ensure adequate, efficient and cost effective school buildings and facilities in accordance with W.S. 21 ‑ 15 ‑ 114(a)(vii). In addition to accounting requirements imposed under W.S. 28 ‑ 11 ‑ 301(c)(iv), the school facilities department shall develop a process for reporting at least once each year, the deployment of amounts funding projects under this section and previous appropriations in accordance with the deployment schedule, depicting project progression and if applicable, the rationale for deviation from the estimated schedule. The reports , as approved by the commission, shall be submitted by the department to the select committee on school facilities, the joint education interim committee, the joint appropriations interim committee and the governor. ( e ) The following amounts are appropriated from the school capital construction account to the school facilities commission for the fiscal biennium beginning July 1, 201 4 , and ending June 30, 201 6 , for the specified purposes: (i) For planning projects: (A) Up to one hundred thousand dollars ($100,000.00 ) , subject to the prescribed maximum amounts : Condition Needs Index School Maximum Priority District Project Amount Capacity Washakie #1 Elementary School $ 50,000 7 Washakie #2 K-12 School $ 50,000 Total $ 100,000 ( B ) I n addition to the amounts appropriated under subparagraph (A) of this paragraph, up to two hundred fifty thousand dollars ($250,000.00) for planning projects approved by the school facilities commission. Except as otherwise specified in this subparagraph, t he amounts appropriated under this subparagraph shall only be available for expenditure as specifically authorized by the legislature. The school facilities commission may through the school facilities department, use the B-11 process as provided under W.S. 9 ‑ 2 ‑ 1005(b) to expend amounts appropriated under this subparagraph prior to legislative authorization required under this subparagraph . In reporting to the legislature proposed expenditures of amounts appropriated under this subparagraph, the commission shall include the evaluation of remedies addressing facility needs for Campbell County School District No. 1, Fremont County School District No. 1, Laramie County School District No. 1, Natrona County School District No. 1, Niobrara County School District No. 1 and Sheridan County School District No. 2 . ( i i) For design projects: (A) Up to four teen million three hundred nineteen thousand seven hundred twenty-two dollars ($ 14 , 319 , 722 .00 ) , subject to the prescribed maximum amounts : Condition Needs Index School Maximum Priority District Project Amount Previous ( 21 ) Lincoln #1 High School $ 104,580 * Capacity Uinta #6 Elementary School $ 308,778 Capacity Park # 6 Elementary School $ 741,623 Capacity Carbon #1 Elementary School s $ 1,202,979 Capacity Sweetwater # 2 Alternative High School $ 627,954 Capacity Natrona # 1 Elementary School $ 563,021 Capacity Laramie #1 Elementary School $ 177,758 1 Big Horn #4 Middle-High School $ 2,650,821 5 Albany #1 Elementary School $ 1,704,640 16 Big Horn #4 Elementary School $ 1,231,041 17 Laramie #1 Junior High School $ 3,921,327 59 Laramie #2 Elementary School $ 1,0 85,200 Total $1 4 , 319 , 722 (B) For the period commencing July 1, 2015, and ending June 30, 2016, and in addition to the amounts appropriated under subparagraph (A) of this paragraph, s ix million one thousand five hundred ninety-four dollars ($ 6 ,0 01 , 594 .00) for design projects approved by the school facilities commission. The amounts appropriated under this subparagraph shall only be available for expenditure as specifically authorized by the legislature. The school facilities commission shall, within its report to the legislature for the proposed e xpenditure of amounts appropriated under this subparagraph, include the design of project remedies addressing the needs of Campbell County School District No. 1, Laramie County School District No. 1 and Washakie County School District No. 2 ; ( C ) Appropriations under subparagraph (A) of this paragraph which are asterisked (*), are supplemented by previous appropriations for that specific design project, resulting in total design funding for that project greater than the amount appropriated under this subparagraph. (i i i) F or capital construction projects: (A) Up to nine million nine hundred three thousand eight hundred eighty-three dollars ($9,903,883.00) for projects funded by previous appropriations addressing building needs as prioritized under the condition needs index, subject to the prescribed maximum amounts: Condition Needs Index School Maximum Priority District Project Amount Previous Albany #1 High School $ 2,587,631* (13) Previous Goshen #1 Elementary School $ 3,316,252* (9) Previous Natrona #1 High School/Shared (5, 19) Facility $ 4,000,000 * Total $ 9,903,883 ( B ) Up to two hundred twenty million nine hundred fifteen thousand two hundred sixty-one d ollars ($ 2 20 , 915 , 261 .00) , subject to the following maximum amounts: Condition Needs Index School Maximum Priority District Project Amount Previous ( 21 ) Lincoln #1 High School $ 1 , 058 , 420 * Previous ( 59 ) Fremont #21 K-8 School $ 2,318,614 * Capacity Campbell #1 Elementary School $ 1,737,147 Capacity Campbell #1 High School $ 30,102,065 Capacity Sweetwater #1 Elementary School $ 1 6, 035,699 Capacity Big Horn # 3 Middle School $ 4,693,706 Capacity Campbell #1 Elementary School $1 6,035,699 Capacity Laramie #1 Elementary School $1 8,357,703 Capacity Natrona #1 Elementary School $13,310,333 Capacity Fremont #25 Elementary School $ 1 3 , 677 , 531 Capacity Sheridan # 1 Elementary School $ 12,998,595 Capacity Lincoln # 2 Elementary School $ 2,788,453 Capacity Weston #1 Elementary School $ 2,338,561 Capacity Sweetwater #2 Elementary School $ 9,726,522 Capacity Fremont #21 High School $16,441,037 Capacity Natrona #1 Elementary School $ 4,092,089 Capacity Laramie #1 Elementary School $ 867,464 Capacity Sweetwater #2 Elementary School $ 6,698,790 Capacity Crook #1 Elementary School $13,604,770 1 Big Horn #4 Middle/High School $17,701,657 4 Natrona #1 Elementary School $ 168,310 6 Sweetwater #2 K-8 School $ 165,710 16 Big Horn #4 Elementary School $ 7,981,998 59 Laramie #2 Elementary School $ 8,014,388 Total $ 2 20 , 915 , 261 ( C ) Appropriations under subparagraph s (A) and ( B ) of this paragraph which are asterisked (*), are supplemented by previous appropriations for that specific construction project, resulting in total construction funding for that project greater than the amount appropriated under th ese subparagraph s ; (D) The school facilities commission, through the department, shall provide for a separate accounting of those projects receiving supplemental appropriations under subparagraph (A ) of this paragraph, and separately report expenditures of these amounts to the select school facilities committee and to the joint appropriations interim committee, together with processes and mechanisms directed at reducing future project cost overages. ( i v ) For demolition projects: (A) Up to two million six hundred eighty-three thousand fifty-four dollars ($ 2, 683,054 .00) , subject to the prescribed maximum amounts : Condition Needs Index School Maximum Priority District Project Amount N/A Natrona # 1 Elementary School $ 5 8,133 N/A Natrona #1 Junior High School $ 2,560,208 N/A Platte #1 Bus Barn $ 64,713 Total $2, 683,054 (B) For the period commencing July 1, 2015, and ending June 30, 2016, and in addition to the amounts appropriated under subparagraph (A) of this paragraph, five hundred thousand dollars ($500,000.00) for demolition projects approved by the school facilities commission. The amounts appropriated under this subparagraph shall only be available for expenditure as specifically authorized by the legislature. Proposed expenditures of amounts appropriated under this subparagraph as reported to the legislature by the school facilities commission shall include remedies for the demolition needs for Campbell County School District No. 1 and Natrona County School District No. 1 . ( v ) For land acquisitions: (A) Up to six million seven hundred fifty-four thousand six hundred d ollars ($ 6,754,6 00 .00) for land acquisitions approved by the school facilities commission. Prior to expenditure of this appropriation, the school facilities department shall report proposed acquisitions to the cochairmen of the joint appropriations interim committee and the joint education interim committee , and the chairman and vice-chairman of the select committee on school facilities. Expenditures under this paragraph shall address the land acquisition needs for future school buildings in Campbell County School District No. 1, Crook County School District No. 1, Fremont County School District No. 25, Laramie County School District No. 1 (two (2) schools), Natrona County School District No. 1, Park County School District No. 1, Sweetwater County School District No. 1 and land leasing expenses for a school building in Laramie County School District No. 1 ; (B) For the period commencing July 1, 2015, and ending June 30, 2016, and in addition to the amounts appropriated under subparagraph (A) of this paragraph, seven hundred fifty thousand dollars ($750,000.00) for land acquisitions approved by the school facilities commission. The amounts appropriated under this subparagraph shall only be available for expenditure as specifically authorized by the legislature. In reporting proposed expenditures of amounts appropriated under this subparagraph to the legislature, the school facilities commission shall include acquisitions addressing the facility needs for Albany County School District No. 1, Campbell County School District No. 1, Laramie County School District No. 1, Park County School District No. 1, Washakie County School District No. 1 and Washakie County School District No. 2 . A separate report of proposed expenditures under this subparagraph shall be submitted by the commission to the cochairmen of the joint education interim committee ; (C) In addition to subparagraph (A) of this section, up to two million dollars ($2,000,000.00) for land acquisitions if opportunities become available to school districts and the land acquisition is used to meet school facility design guidelines established by the school facility commission and the acquisition is approved by the commission. Prior to expenditure of this appropriation, the school facilities department shall report proposed land acquisitions to the cochairmen of the joint appropriations interim committee and the joint education interim committee, and the chairman and vice-chairman of the select committee on school facilities . (v i ) For ancillary building projects: (A) Up to one million ninety-two thousand seven hundred seven dollars ($ 1,092,707 .00) , subject to the prescribed maximum amounts: Condition Needs Index School Maximum Priority District Project Amount N/A Carbon # 2 Bus Barn $ 568,749 N/A Carbon # 2 Bus Barn $ 523,958 Total $ 1,092,707 (B) For the period commencing July 1, 2015, and ending June 30, 2016, and in addition to the amounts appropriated under subparagraph (A) of this paragraph, one million dollars ($ 1,0 00,000.00) for ancillary building projects approved by the school faciliti es commission. The amount appropriated under this subparagraph shall only be available for expenditure as specifically authorized by the legislature. Within its report to the legislature on proposed expenditures of amounts appropriated under this subparagraph , the school facilities commission shall include remedies addressing the ancillary building needs for Campbell County School District No. 1, Crook County School District No. 1, Goshen County School District No. 1, Park County School District No. 6 , Teton County School District No. 1 and Uinta County School District No. 6 . (v i i) For track construction projects: (A) Up to one million dollars ($1, 000,000 .00) , subject to the prescribed maximum amounts: Condition Needs Index School Maximum Priority District Project Amount N/A Converse # 2 Artificial Turf at Maximum State Contribution $ 500,000 N/A Goshen #1 Artificial Turf at Maximum State Contribution $ 500,000 Total $1, 000,000 (vi i i) For component level projects: (A) Up to six million two hundred ten thousand three hundred forty-six dollars ($ 6,210,346 .00) , subject to the following maximum amounts: Component Projects School Maximum Category District Project Amount c . Fremont #25 High School HVAC $ 2,277,298 s. Converse # 2 Parking Lot/Demo $ 296,752 s. Weston # 7 Parking Lot $ 1,165,367 c . Sweetwater #2 Fuel Tanks $ 470, 000 c . Fremont # 25 Bus Barn $ 1, 87 3 , 35 4 c . Campbell #1 Elementary School HVAC $ 127,575 Total $ 6,210,346 ( B ) As used in subparagraph (A) of this paragraph, the following component project categories are defined as follows: (I) "c." means a building component with a life expectancy of twenty (20) years or more; (I I ) "s." means components pertaining to building safety, security or health. ( C ) T he school facilities commission, through the department, shall refine the process used in identifying, reviewing and prioritizing school district building component level needs, giving full consideration to the proper use of major maintenance in addressing building adequacy in the most efficient and cost effective manner. The commission and department shall report progress and recommendations on process refinement to the select committee on school facilities on or before September 1, 2014 . (ix) For the period commencing July 1, 2015, and ending June 30, 2016, u p to nine million dollars ($ 9,000,000 .00) for s ecurity projects approved by the school facilities commission. The amount appropriated under this paragraph shall only be available for expenditure as specifically authorized by the legislature ; ( x ) Upon recommendation of the school facilities commission and approval of the governor, f or t he u nanticipated costs associated with design, construction, demolition, ancillary building, security and component level project s funded under this subsection, eighteen million four hundred fourteen thousand ninety-six dollars ( $18 , 414 , 096 .00) ; (xi) Up to six million four hundred eighty-one thousand two hundred seventy-seven dollars ($6,481,277.00) to reimburse the amounts appropriated for the unanticipated costs associated with the design, construction and component level projects funded under 2013 Wyoming Session Laws, Chapter 129, Section 1(b) (viii) appropriation. The school facilities commission, through the department, shall separately account for the amount s appropriated under this paragraph as used to fund the planning and design costs addressing the remedies of school buildings identified and funded under 2013 Wyoming Session Laws, Chapter 129, Section 1 (b) (ix). Section 2. (a) The school facilities commission, through the school facilities department, shall: (i) Notwithstanding W.S. 21 ‑ 3 ‑ 110(a)(x), from amounts within the school capital construction account for purposes of the major maintenance program , distribute up to three hundred thousand dollars ($300,000.00) each fiscal year of the 2015-2016 fiscal biennium to each school district with a charter school in the district, approved and operating in the 2013 ‑ 2014 school year in accordance with W.S. 21 ‑ 3 ‑ 301 through 21 ‑ 3 ‑ 314, which requires a lease for operation of the charter school's educational program in the applicable school year . Lease payments under this section shall include the total costs of the base rent, additional rent for tenant improvements and any common maintenance costs, if applicable. The amounts to be distributed under this paragraph shall be reduced to the extent the amounts are duplicative of any costs funded or paid for by alternative mechanisms. The funds appropriated under this paragraph shall be distributed to qualifying school districts based upon the proration of the total qualifying costs of all qualifying school districts; (ii) In addition to paragraph (a)(i) of this section and notwithstanding W.S. 21 ‑ 3 ‑ 110(a)(x), the commission shall for each fiscal year of the 2015-2016 fiscal biennium, expend an amount necessary to include the total allowable square footage of each charter school qualifying under paragraph (a)(i) of this section, in the computation of the major maintenance payment under W.S. 21 ‑ 15 ‑ 109 to each district in which a qualifying charter school is operating, as provided by paragraph (a)(i) of this section. The amounts expended under this paragraph shall be reduced to the extent the amounts are duplicative of any maintenance costs included in the lease payments under paragraph (a)(i) of this section or any costs funded or paid for by alternative mechanisms. Section 3 . (a) Except as provided by subsection (b) of this section, t his act is effective July 1, 2014. (b) Notwithstanding subsection (a) of this section, section 1 (e)(i) (A) , (i i i) (A) and (xi) of this act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the House. Chief Clerk 1