Back to Wyoming

HB0077 • 2018

Instream flow consultant.

AN ACT relating to water; providing that consultant and other associated costs related to feasibility studies on instream flows shall be borne by the game and fish commission; and providing for an effective date.

Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Water
Last action
2018-03-12
Official status
enrolled
Effective date
7/1/2018

Plain English Breakdown

The plain English breakdown is still being put together. The official documents below are already here.

Bill History

  1. 2018-03-12 Governor

    Governor Signed HEA No. 0014

  2. 2018-03-12 LSO

    Assigned Chapter Number 34

  3. 2018-03-07 Senate

    S President Signed HEA No. 0014

  4. 2018-03-07 House

    H Speaker Signed HEA No. 0014

  5. 2018-03-06 LSO

    Assigned Number HEA No. 0014

  6. 2018-03-06 Senate

    S 3rd Reading:Passed 22-8-0-0-0

  7. 2018-03-05 Senate

    S 2nd Reading:Passed

  8. 2018-03-02 Senate

    S COW:Passed

  9. 2018-03-02 Senate

    S Placed on General File

  10. 2018-03-02 Senate

    S05 - Agriculture:Recommend Do Pass 5-0-0-0-0

  11. 2018-02-28 Senate

    S Introduced and Referred to S05 - Agriculture

  12. 2018-02-27 Senate

    S Received for Introduction

  13. 2018-02-27 House

    H 3rd Reading:Passed 58-0-2-0-0

  14. 2018-02-23 House

    H 2nd Reading:Passed

  15. 2018-02-22 House

    H COW:Passed

  16. 2018-02-16 House

    H Placed on General File

  17. 2018-02-16 House

    H02 - Appropriations:Recommend Do Pass 7-0-0-0-0

  18. 2018-02-15 House

    H05 - Agriculture:Rerefer to H01 - Appropriations

  19. 2018-02-15 House

    H05 - Agriculture:Recommend Do Pass 9-0-0-0-0

  20. 2018-02-13 House

    H Introduced and Referred to H05 - Agriculture 60-0-0-0-0

  21. 2018-02-09 House

    H Received for Introduction

  22. 2018-01-31 LSO

    Bill Number Assigned

Official Summary Text

Bill Summary

Bill No.:
HB0077
Effective
:
7/1/2018

LSO No.:
18LSO-0231

Enrolled Act No.:
HEA No. 0014

Chapter No.:
34

Prime Sponsor:
Select Water Committee

Catch Title:
Instream flow consultant.

Subject:
Instream flow study costs
.

Summary/Major Elements:

Current law requires an instream flow
feasibility
study to be conducted
by the Water Development C
ommission following an application for an instream flow right.

This bill provides that any costs associated with an instream flow study, including the consultant hired to conduct th
e study, shall be borne by the Game and Fish C
ommission.

Th
is
bill requires
that the Water Development C
ommission
consult with the Game and Fish Co
mmission prior to entering into any contract related to an instream flow study.

The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent. While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill
.

Current Bill Text

Read the full stored bill text
ORIGINAL
House
Bill No
.
HB0077

ENROLLED ACT NO. 14,

HOUSE OF REPRESENTATIVES

SIXTY-FOURTH LEGISLATURE OF THE STATE OF WYOMING
2018 Budget Session

AN ACT relating to water; providing that consultant and other associated costs related to feasibility studies on instream flows shall be borne by the game and fish commission; and providing for an effective date.

Be It Enacted by the Legislature of the State of Wyoming:

Section 1
.

W.S. 41
‑
3
‑
1004(a) is amended to read:

41
‑
3
‑
1004
.

Water development commission to determine storage feasibility; report to the game and fish commission and the legislature.

(a)

Immediately after permits have been applied for under W.S. 41
‑
3
‑
1003(c), the water development commission shall determine the feasibility of providing instream flows for the recommended segments of streams from unappropriated direct flows or from existing storage facilities or from new facilities. The feasibility study shall include a determination of water necessary to maintain or improve existing fisheries for water rights under W.S. 41
‑
3
‑
1001(b) or of water necessary to provide fisheries for water rights under W.S. 41
‑
3
‑
1001(a). The feasibility study shall also include the availability of storage sites, the estimated cost of providing any required storage and such other findings and conclusions as the water development commission deems appropriate.

The cost of any consultant and any associated costs that the water development commission determines are necessary to complete a feasibility study under this section shall be
borne by
the game and fish commission. The water development commission shall consult with the game and fish commission prior to entering into any contract related to a
feasibility
study under this section.

Section 2
.

This act is effective July 1, 201
8
.

(END)

Speaker of the House

President of the Senate

Governor

TIME APPROVED: _________

DATE APPROVED: _________

I hereby certify that this act originated in the
House
.

Chief Clerk

1