Plain English Breakdown
The plain English breakdown is still being put together. The official documents below are already here.
Straight-ahead summaries built from the official bill text. We keep the source links front and center and leave the decision up to you.
SF0010 • 2018
AN ACT relating to public utilities; providing for nonpreferential pricing for electrical generation when fixing rates; and providing for an effective date.
This bill passed the Legislature and reached final enactment based on the latest official action.
The plain English breakdown is still being put together. The official documents below are already here.
These notes stay tied to the official amendment files and metadata from the legislature.
Standing Committee • HCorporations
Plain English: Adopted Standing Committee by HCorporations
3rd reading • Scott
Plain English: Adopted 3rd reading by Scott
Standing Committee • SCorporations
Plain English: Adopted Standing Committee by SCorporations
Governor Signed SEA No. 0027
Assigned Chapter Number 57
H Speaker Signed SEA No. 0027
S President Signed SEA No. 0027
Assigned Number SEA No. 0027
S Concur:Passed 30-0-0-0-0
S Received for Concurrence
H 3rd Reading:Passed 60-0-0-0-0
H 2nd Reading:Passed
H COW:Passed
H Placed on General File
H07 - Corporations:Recommend Amend and Do Pass 9-0-0-0-0
H Introduced and Referred to H07 - Corporations
H Received for Introduction
S 3rd Reading:Passed 29-1-0-0-0
S 2nd Reading:Passed
S COW:Passed
S Placed on General File
S07 - Corporations:Recommend Amend and Do Pass 4-0-1-0-0
S Introduced and Referred to S07 - Corporations 29-0-1-0-0
S Received for Introduction
Bill Number Assigned
Bill Summary Bill No.: SF0010 Effective : Immediately LSO No.: 18LSO-0208 Enrolled Act No.: SEA No. 0027 Chapter No.: 57 Prime Sponsor: Joint Corporations, Elections & Political Subdivisions Interim Committee Catch Title: Utilities-rate making. Subject: Matters for the Public Service Commission to consider in setting utility rates. Summary/Major Elements: This act would require the Public Service Commission to consider in setting rates the purchase power cost from a qualifying facility, but only if the cost of the energy or capacity (or both) are less than or equal to the utility's avoided cost considering the cost of energy or capacity from all other available sources and the incremental cost of transporting the energy from a qualifying facility to customers. This act also defines "avoided cost" for the purposes of a distribution cooperative that is an all-requirements power supply customer and defines "qualifying facility" to mean one that meets the qualification standards found in federal regulations. The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent. While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill .
ORIGINAL Senate ENGROSSED File No . SF0010 ENROLLED ACT NO. 27, SENATE SIXTY-FOURTH LEGISLATURE OF THE STATE OF WYOMING 2018 Budget Session AN ACT relating to public utilities; providing for nonpreferential pricing for electrical generation when fixing rates; and providing for an effective date. Be It Enacted by the Legislature of the State of Wyoming: Section 1 . W.S. 37 ‑ 2 ‑ 122 by creating new subsection s (c) and (d) is amended to read: 37 ‑ 2 ‑ 122 . Matters considered in fixing rates; order changing services or facilities ; qualifying facilities contracts . (c) In setting rates, the commission shall allow the inclusion of purchase power cost from a qualifying facility only to the extent that the cost of energy , capacity or both in the transaction are determined by the commission to be less than or equal to the utility ' s avoided cost, considering the cost of energy or capacity from all othe r available generation sources and the incremental cost of transporting the energy from a qualifying facility to customer load . This subsection shall not be interpreted in a manner inconsistent with the requirements of applicable federal statutes and regulations. (d) As used in this section: (i) "Avoided cost" means to the extent that a distribution cooperative is an all ‑ requirements power supply customer of a generation and transmission cooperative or other wholesale power supplier, the distribution cooperative's avoided costs are the generation and transmission cooperative's or wholesale power supplier's avoided cost ; (i i ) " Q ualifying facility " means a facility that meets the qualification standards used in federal regulations promulgated under the federal Public Utility Regulatory Policies Act. Section 2 . This act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution. (END) Speaker of the House President of the Senate Governor TIME APPROVED: _________ DATE APPROVED: _________ I hereby certify that this act originated in the Senate . Chief Clerk 1