Omnibus water bill - construction.

AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing appropriations; amending the sponsor's contingency fund; amending project descriptions, amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring funds and a project; and providing for an effective date.

Energy
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Water
Last action
2021-02-08
Official status
enrolled
Effective date
2/8/2021

Plain English Breakdown

The bill's full text is extensive and includes detailed conditions for each project that are not summarized here.

Omnibus Water Bill - Construction

This bill authorizes the construction of several water development projects, provides funding for these projects, amends previous project descriptions and terms, and transfers funds between accounts.

What This Bill Does

  • Authorizes the construction of designated water projects including cloud seeding programs in Medicine Bow Mountains and Wind River Mountains, a well connection and transmission pipeline in Lander, improvements to the Northwest Rural Water System, and a well connection in Torrington.
  • Provides grants from Water Development Account I for design, permit procurement, land acquisition, engineering, and construction of these projects.
  • Specifies that unspent funds will revert back to Water Development Account I on set dates.
  • Amends previous project descriptions and funding terms for rehabilitation projects.
  • Transfers seven million five hundred thousand dollars ($7,500,000) from Water Development Account I to Water Development Account II.

Who It Names or Affects

  • The state of Wyoming, which sponsors several water development projects.
  • Local communities and districts that will benefit from improved water supply infrastructure.
  • Water users who may participate in funding operational costs for cloud seeding programs.

Terms To Know

Cloud Seeding
A process to increase precipitation by dispersing substances into clouds.
Transmission Pipeline
A pipeline used to transport water from one location to another.

Limits and Unknowns

  • The bill does not specify how the transferred funds will be used in Water Development Account II.
  • Some projects require additional funding commitments from sponsors or other interested parties beyond what is appropriated by the state.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

HB0044H3001

3rd reading • Representative Baker

Withdrawn

Plain English: This amendment removes specific lines and pages from an existing bill related to water development projects.

  • Deletes lines 22 and 23 on page 2 of the bill.
  • Removes all content from pages 3 through 5 of the bill.
  • Eliminates lines 1 through 7 on page 6 of the bill.
  • The exact impact of these deletions is not specified, so it's unclear what specific projects or funding details are being removed.
HB0044H3002

3rd reading • Representative Baker

Withdrawn

Plain English: The amendment changes the funding amount for a water project, modifies percentages related to that project's funding requirements, and makes other textual adjustments.

  • Reduces the specified grant amount from $215,000 to $25,000.
  • Removes certain lines of text on page 5.
  • Changes a percentage requirement from 63% to 100%.
  • Adjusts lettering in sections for clarity.
  • The exact impact and purpose of the removed lines are not specified, so their removal's effect is unclear.
HB0044HS001

Standing Committee • House Agriculture, State and Public Lands & Water

Adopted

Plain English: The amendment adds a new clause that allows the Wyoming Water Development Commission to manage and sell excess water from Stage II of a project in Cheyenne for up to 2036 or until it's no longer needed.

  • Adds a new section (99-99-210(e)) allowing the Wyoming Water Development Commission to market excess water produced by Stage II of the project in Cheyenne, with conditions and timelines specified.
  • The amendment text does not provide details on how much water is considered 'excess' or what specific terms apply to the sale of this water beyond the general framework provided.
HB0044SW001

Committee of the Whole • Senator Boner

Adopted

Plain English: The amendment changes references to '16-6-101(ix)' to '16-6-101(a)(ix)' in two specific places of the bill.

  • Changes '16-6-101(ix)' to '16-6-101(a)(ix)' on page 23, line 10 of the bill.
  • Changes '16-6-101(ix)' to '16-6-101(a)(ix)' on page 25, line 13 of the bill.
  • The amendment does not provide context about what these legal references mean or why they are being changed.
  • It is unclear how this change will affect the overall meaning and implementation of the bill.
HB0044SS001

Standing Committee • Senate Agriculture, State and Public Lands & Water

Adopted

Plain English: The amendment removes the word 'Improvements' from a specific line in the bill.

  • Removes the word 'Improvements' at page 11, line 22 of the bill.
  • It is unclear what removing this single word will change in the context of the overall bill.

Bill History

  1. 2021-02-08 LSO

    Assigned Chapter Number 12

  2. 2021-02-08 Governor

    Governor Signed HEA No. 0014

  3. 2021-02-05 Senate

    S President Signed HEA No. 0014

  4. 2021-02-05 House

    H Speaker Signed HEA No. 0014

  5. 2021-02-04 LSO

    Assigned Number HEA No. 0014

  6. 2021-02-04 House

    H Concur:Passed 57-1-2-0-0

  7. 2021-02-04 House

    H Received for Concurrence

  8. 2021-02-04 Senate

    S 3rd Reading:Passed 30-0-0-0-0

  9. 2021-02-03 Senate

    S 2nd Reading:Passed

  10. 2021-02-03 Senate

    S Suspension of Rules and Accelerated to 2nd Reading

  11. 2021-02-03 Senate

    S COW:Passed

  12. 2021-02-03 Senate

    S Placed on General File

  13. 2021-02-03 Senate

    S02 - Appropriations:Recommend Do Pass 5-0-0-0-0

  14. 2021-02-02 Senate

    :Rerefer to S02 - Appropriations

  15. 2021-02-02 Senate

    S05 - Agriculture:Recommend Amend and Do Pass 5-0-0-0-0

  16. 2021-01-29 Senate

    S Introduced and Referred to S05 - Agriculture

  17. 2021-01-29 Senate

    S Received for Introduction

  18. 2021-01-29 House

    H 3rd Reading:Passed 56-4-0-0-0

  19. 2021-01-28 House

    H 2nd Reading:Passed

  20. 2021-01-27 House

    H COW:Passed

  21. 2021-01-27 House

    H Placed on General File

  22. 2021-01-27 House

    H02 - Appropriations:Recommend Do Pass 7-0-0-0-0

  23. 2021-01-27 House

    H05 - Agriculture:Rerefer to H02 - Appropriations

  24. 2021-01-27 House

    H05 - Agriculture:Recommend Amend and Do Pass 9-0-0-0-0

  25. 2021-01-12 House

    H Introduced and Referred to H05 - Agriculture

  26. 2021-01-12 House

    H Received for Introduction

  27. 2021-01-06 LSO

    Bill Number Assigned

Official Summary Text

Bill Summary - 21LSO-0310
Bill No.:

HB0044

Effective:

Immediately

LSO No.:

21LSO-0310

Enrolled Act No.:

HEA No. 0014

Chapter No.:

12

Prime Sponsor:

Select Water Committee

Catch Title:

Omnibus water bill - construction.

Subject:

Provides authorization and funding for water development program projects.

Summary/Major Elements:

2021 Construction Projects
Cloud Seeding Medicine Bow Mountains 2021-2022
Cloud Seeding Wind River Mountains 2021-2022
Lander Well and Transmission Pipeline 2021
Northwest Rural Water System Improvements 2021
Torrington Well Connection 2021
2021 Rehabilitation Projects
Interstate Irrigation and Reservoir Irrigation District Improvements 2021
Salt Creek Transmission Pipeline 2021
Shoshone Irrigation District Improvements 2021
Sidon Irrigation District Rehabilitation 2021
Amendments to Prior Projects
Sponsor’s Contingency Fund – Rehabilitation
Ethete Water Supply
Small Water Development Projects – 2014 (new construction)
Small Water Development Projects – 2014 (rehabilitation)
Arapahoe Water Supply 2016
Sheridan Area Water Supply Transmission 2020
The bill authorizes the transfer of seven million five hundred thousand dollars ($7,500,000) from Water Development Account I to Water Development Account II.
The bill authorizes the transfer of a test well developed as part of a Level II feasibility study to the Lance Creek water and Sewer District.

Comments:

See also the companion water bill, Senate File 0037, Omnibus water bill – planning.
The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent.

While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill.

Current Bill Text

Read the full stored bill text
21LSO-0310

ORIGINAL House

ENGROSSED
Bill No
.
HB0044

ENROLLED ACT NO. 14,

HOUSE OF REPRESENTATIVES

SIXTY-SIXTH LEGISLATURE OF THE STATE OF WYOMING
2021 General Session

AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing appropriations; amending the sponsor's contingency fund; amending project descriptions, amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring funds and a project; and providing for an effective date.

Be It Enacted by the Legislature of the State of Wyoming:

Section 1.

W.S. 99
‑
3
‑
2601 through 99
‑
3
‑
2604 are created to read:

ARTICLE 26
2021 CONSTRUCTION PROJECTS

99
‑
3
‑
2601.

Definitions.

The definitions in W.S. 99
‑
3
‑
101 apply to this article.

99
‑
3
‑
2602.

General authorization.

The provisions of W.S. 99
‑
3
‑
102 apply to this article.

99
‑
3
‑
2603.

Level III construction projects – new development.

(a)

Authorization is granted for the Level III new development construction projects identified in this
section subject to the general conditions specified in W.S. 99
‑
3
‑
103, provided that W.S. 99
‑
3
‑
103(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41
‑
2
‑
121.

(b)

Project – Cloud Seeding Medicine Bow Mountains 2021
‑
2022:

(i)

Project sponsor: The state of Wyoming;

(ii)

Project purpose: To enhance the winter snowpack in the Medicine Bow, Sierra Madre and Laramie Mountain Ranges;

(iii)

Project description: Conduct an operational winter snowpack augmentation program during the 2021
‑
2022 fall, winter and spring seasons;

(iv)

Total project budget: Seven hundred seventy
‑
eight thousand dollars ($778,000.00);

(v)

Appropriation: There is appropriated from water development account I to the Wyoming water development office seven hundred twenty
‑
eight thousand dollars ($728,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2023;

(vi)

Special conditions:

(A)

The Wyoming water development office shall acquire funding commitments from Wyoming water users or other interested parties for operational costs which exceed project appropriation;

(B)

The Wyoming water development office is authorized to enter into contracts with Colorado organizations to extend aerial weather modification efforts into Colorado provided these organizations pay one hundred percent (100%) of the additional costs associated with operations in Colorado.

(c)

Project – Cloud Seeding Wind River Mountains 2021
‑
2022:

(i)

Project sponsor: The state of Wyoming;

(ii)

Project purpose: To enhance the winter snowpack in the Wind River Mountain Range;

(iii)

Project description: Conduct an operational winter snowpack augmentation program during the 2021
‑
2022 fall, winter and spring seasons;

(iv)

Total project budget: Five hundred seventy
‑
one thousand dollars ($571,000.00);

(v)

Appropriation: There is appropriated from water development account I to the Wyoming water development office two hundred fifteen thousand dollars ($215,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2023;

(vi)

Special conditions:

(A)

The state of Wyoming shall participate at a rate up to thirty
‑
seven percent (37%) of actual
project operations costs not to exceed two hundred ten thousand dollars ($210,000.00);

(B)

Prior to commencing project operations, the Wyoming water development office shall acquire funding commitments from other Colorado River basin water users or other interested parties for a minimum of sixty
‑
three percent (63%) of actual project operations costs;

(C)

If the project is cancelled, the Wyoming water development office is authorized to use the appropriated funds to remove weather modification equipment and reclaim project sites.

(d)

Project – Lander Well and Transmission Pipeline 2021:

(i)

Project sponsor: City of Lander;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and construction of well connections, pumping facilities, transmission pipelines and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: One million three hundred twenty thousand dollars ($1,320,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed eight
hundred eighty
‑
four thousand four hundred dollars ($884,400.00) or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission eight hundred eighty
‑
four thousand four hundred dollars ($884,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2026;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

(e)

Project – Northwest Rural Water System Improvements 2021:

(i)

Project sponsor: Northwest Rural Water District;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and construction of pumping facility upgrades, storage tanks and transmission pipelines and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Two million one hundred ten thousand dollars ($2,110,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I
through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million four hundred thirteen thousand seven hundred dollars ($1,413,700.00) or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission one million four hundred thirteen thousand seven hundred dollars ($1,413,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2026;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

(f)

Project – Torrington Well Connection 2021:

(i)

Project sponsor: City of Torrington;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and construction of a well connection, pumping facilities, transmission pipelines and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Five hundred eighty
‑
one thousand dollars ($581,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred eighty
‑
nine thousand two hundred seventy dollars ($389,270.00) or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission three hundred eighty
‑
nine thousand two hundred seventy dollars ($389,270.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2026;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

99
‑
3
‑
2604.

Level III construction projects – rehabilitation.

(a)

Authorization is granted for the Level III rehabilitation construction projects identified in this section subject to the general conditions specified in W.S. 99
‑
3
‑
104, provided that W.S. 99
‑
3
‑
104(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41
‑
2
‑
121.

(b)

Project – Interstate Irrigation and Reservoir Irrigation District Improvements 2021:

(i)

Project sponsor: Interstate Irrigation and Reservoir Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of pipelines and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four million two hundred twenty thousand dollars ($4,220,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million eight hundred twenty
‑
seven thousand four hundred dollars ($2,827,400.00) or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission two million eight hundred twenty
‑
seven thousand four hundred dollars ($2,827,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2026;

(vii)

Special Conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

(c)

Project – Salt Creek Transmission Pipeline 2021:

(i)

Project sponsor: Salt Creek Joint Powers Board;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and construction of replacement transmission pipelines and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Ten million nine hundred twenty thousand dollars ($10,920,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seven million three hundred sixteen thousand four hundred dollars ($7,316,400.00) or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission seven million three hundred sixteen thousand four hundred dollars ($7,316,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2026;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act.

(d)

Project – Shoshone Irrigation District Improvements 2021:

(i)

Project sponsor: Shoshone Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of lateral pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four hundred seventy
‑
seven thousand five hundred dollars ($477,500.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed two hundred forty thousand dollars ($240,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission two hundred forty thousand dollars ($240,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2026;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures;

(C)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act.

(e)

Project – Sidon Irrigation District Rehabilitation 2021:

(i)

Project sponsor: Sidon Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of structures, gates and appurtenances
necessary to make the project function in the manner intended;

(iv)

Total project budget: Seven hundred fifty
‑
five thousand four hundred seventy
‑
five dollars ($755,475.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed five hundred seventy
‑
six thousand dollars ($576,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission five hundred seventy
‑
six thousand dollars ($576,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2026;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and
monitor construction activities including the installation of project components and the tracking of project expenditures.

Section 2.

W.S. 99
‑
3
‑
1106(b)(iv) and (vii), 99
‑
3
‑
1503(g)(vi), 99
‑
3
‑
1903(k)(iv) through (vi), (viii)(F) and by creating a new subparagraph (G), 99
‑
3
‑
1904 (m)(iv) through (vi), (viii)(F) and by creating a new subparagraph (G), 99
‑
3
‑
2103(b)(vi), 99
‑
3
‑
2503(m)(i) and 99
‑
99
‑
210(e) are amended to read:

99
‑
3
‑
1106.

Sponsor's contingency funds.

(b)

Project – Sponsor's Contingency Fund – Rehabilitation:

(iv)

Total project budget:

Three million dollars ($3,000,000.00)
Four million five hundred thousand dollars ($4,500,000.00)
;

(vii)

Appropriation: There is appropriated from water development account II to the commission
three million dollars ($3,000,000.00)
four million five hundred thousand dollars ($4,500,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection.

Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2025
2026
; and

99
‑
3
‑
1503.

Level III construction projects – new development.

(g)

Project – Ethete Water Supply:

(vi)

Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection.

Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2021
2023
;

99
‑
3
‑
1903.

Level III construction projects – new development.

(k)

Project
‑
Small Water Development Projects
‑
2014:

(iv)

Total project budget:
Eleven million three hundred twenty
‑
six thousand dollars ($11,326,000.00)
Thirteen million three hundred twenty
‑
six thousand dollars ($13,326,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to sponsors from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
five million six hundred sixty
‑
three thousand dollars ($5,663,000.00)
six million six hundred sixty
‑
three thousand dollars ($6,663,000.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission
five million six hundred sixty
‑
three thousand dollars ($5,663,000.00)
six million six hundred sixty
‑
three thousand dollars ($6,663,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall
carry over until expended or reverted by the legislature to water development account I;

(viii)

Special conditions:

(F)

The establishment of criteria and administrative procedures for the development of small projects under this subsection and decisions of the commission relating to the recommendations, prioritization or disqualification of small projects are specifically exempt from the provisions of the Wyoming Administrative Procedure Act including judicial review under W.S. 16
‑
3
‑
114 and 16
‑
3
‑
115
;
.

(G)

W.S. 16
‑
6
‑
116 shall not apply to a small project unless the project sponsor determines the small project meets the definition of a "public work" as defined in W.S. 16
‑
6
‑
101(a)(ix).

99
‑
3
‑
1904.

Level III construction projects – rehabilitation.

(m)

Project
‑
Small Water Development Projects
‑
2014:

(iv)

Total project budget:
Five million three thousand five hundred ninety dollars ($5,003,590.00)
Six million three thousand five hundred ninety dollars ($6,003,590.00)
;

(v)

Project grant: The state of Wyoming shall grant to sponsors from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
two million five
hundred one thousand seven hundred ninety
‑
five dollars ($2,501,795.00)
three million one thousand seven hundred ninety
‑
five dollars ($3,001,795.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
two million five hundred one thousand seven hundred ninety
‑
five dollars ($2,501,795.00)
three million one thousand seven hundred ninety
‑
five dollars ($3,001,795.00)
or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall carry over until expended or reverted by the legislature to water development account II;

(viii)

Special conditions:

(F)

The establishment of criteria and administrative procedures for the development of small projects under this subsection and decisions of the commission relating to the recommendations, prioritization or disqualification of small projects are specifically exempt from the provisions of the Wyoming Administrative Procedure Act including judicial review under W.S. 16
‑
3
‑
114 and 16
‑
3
‑
115
;
.

(G)

W.S. 16
‑
6
‑
116 shall not apply to a small project unless the project sponsor determines the small project meets the definition of a "public work" as defined in W.S. 16
‑
6
‑
101(a)(ix).

99
‑
3
‑
2103.

Level III construction projects – new development.

(b)

Project – Arapahoe Water Supply 2016:

(vi)

Appropriation: There is appropriated from water development account I to the commission two million two hundred forty
‑
seven thousand eight hundred fifty dollars ($2,247,850.00) or as much thereof as is necessary to carry out the purpose of this subsection.

Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2021
2024
.

99
‑
3
‑
2503.

Level III construction projects – new development.

(m)

Project – Sheridan Area Water Supply Transmission 2020:

(i)

Project sponsor:
Sheridan Area Water Supply Joint Powers Board
City of Sheridan
;

99
‑
99
‑
210.

Projects authorized; financing; excess water.

(e)

All water in excess of the needs of the city of Cheyenne within the service area of the city produced by Stage II of the project shall be assigned to and marketed by the Wyoming water development commission for as long as the excess water is available or until July 1, 2036, whichever is earlier
,
.

or until the Wyoming water development commission determines that the excess water is no longer needed because the water has not been contracted for during the previous ten (10) years. Upon a determination by the commission that the excess water is not needed and has not been contracted for during the previous ten (10) years, the commission may renegotiate or seek to terminate any existing contract with the city of
Cheyenne entered into pursuant to this subsection and subsection (g) of this section. Upon termination of any existing contract entered into pursuant to this subsection and subsection (g) of this section, the excess water shall no longer be assigned to and marketed by the Wyoming water development commission.

The first option to purchase not more than eighty percent (80%) of the surplus water shall be extended to cities, towns and special districts within the North Platte basin for the benefit of their inhabitants at a negotiated cost. Sales contracts entered into by the commission shall be administered by the commission. To optimize the amount of excess Stage II water available for marketing without jeopardizing water supplies necessary to meet the city of Cheyenne's municipal needs, the city shall develop a Stage II management plan acceptable to the water development commission and the state engineer. The board shall transfer thirty
‑
seven and three
‑
tenths percent (37.3%) of the proceeds from the sale of excess Stage II water to the city of Cheyenne which it shall apply to the repayment of the loan provided by subsection (c) of this section until the loan is repaid.

Section 3.

(a)

The Wyoming water development commission is hereby authorized to transfer seven million five hundred thousand dollars ($7,500,000.00) from water development account I created by W.S. 41
‑
2
‑
124(a)(i) to water development account II created by W.S. 41
‑
2
‑
124(a)(ii).

(b)

In accordance with W.S. 41
‑
2
‑
115(c), upon a finding that the transfer of the test well developed as part of the level II feasibility study authorized under 2011 Wyoming Session Laws Chapter 1, Section 2, to the Lance Creek Water and Sewer District is desirable and in
the public interest and that the District is capable of constructing, operating and maintaining the project and accomplishing the public interest, the water development commission shall transfer to the Lance Creek Water and Sewer District the test well developed as part of a level II feasibility study for further development by the District, provided the Lance Creek Water and Sewer District agrees to terms outlined by the commission for reimbursement of the expense of predevelopment costs, an amount which shall be not less than thirty
‑
three thousand dollars ($33,000.00), payment for property and assurances of construction, operation and maintenance of the test well in compliance with all applicable state and federal laws.

Section 4.

This act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution.