HB0093 • 2023

Omnibus water bill-construction.

AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing appropriations; amending the sponsor's contingency fund; amending amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring funds from the general fund to water development account III; clarifying fund limits to the emergency water projects account; repealing obsolete provisions; and providing for an effective date.

Agriculture Budget Children Energy
Enacted

This bill passed the Legislature and reached final enactment based on the latest official action.

Sponsor
Water
Last action
2023-03-10
Official status
enrolled
Effective date
3/10/2023

Plain English Breakdown

The effectiveness of cloud seeding programs and their reliance on external funding are not fully detailed in the official summary.

Water Development Projects Act

This act authorizes the construction of new water projects and rehabilitation of existing ones, provides funding for these projects, and makes changes to previous project appropriations.

What This Bill Does

  • Authorizes the construction of several new water development projects in Wyoming, including cloud seeding programs and pipeline extensions.
  • Provides grants from state funds to help cover costs for design and pre-construction work on approved projects.
  • Transfers money between different accounts within the state's water development system to fund these projects.
  • Clarifies rules about how much funding can be used for emergency water projects.

Who It Names or Affects

  • The State of Wyoming and its agencies involved in water management.
  • Local water districts and municipalities that will benefit from the new construction projects.

Terms To Know

water development account
A fund within Wyoming's budget specifically designated for funding water-related projects.
cloud seeding
The process of dispersing substances into the air to cause rain or snow, used here to increase winter snowpack in mountain ranges.

Limits and Unknowns

  • Some specific details about project funding and conditions are not fully explained in the summary.
  • It is unclear how much additional funding will be needed from sources other than state funds for some projects.

Amendments

These notes stay tied to the official amendment files and metadata from the legislature.

HB0093H3001

3rd reading • Representative Strock

Failed

Plain English: The amendment removes specific sections from the bill related to water development projects and makes minor changes to references within those sections.

  • Removes lines 23 and 24 on page 2 of the bill.
  • Deletes pages 3 through 5 entirely.
  • Eliminates lines 1 through 10 on page 6.
  • Changes a reference from '(d)' to '(b)' on line 12 of page 6.
  • Replaces a reference from '(e)' with '(c)' on line 5 of page 8.
  • Modifies a reference from '(f)' to '(d)' on line 18 of page 9.
  • The amendment text does not provide details about the content removed, so it's unclear what specific projects or provisions are being deleted.
HB0093H3002

3rd reading • Representative Harshman

Failed

Plain English: The amendment removes certain sections from the bill and renumbers other parts of it.

  • Removes specific lines and sections from pages 1, 49, and 53 of the bill.
  • Replaces 'Section 5' with 'Section 4', 'Section 6' with 'Section 5', 'Section 7' with 'Section 6', and 'Section 8' with 'Section 7'.
  • The amendment does not provide details about the content of the deleted sections, so it's unclear what specific information or provisions are being removed.
HB0093H3003

3rd reading • Representative Eklund

Adopted

Plain English: The amendment adds language to repeal outdated sections of the bill.

  • Adds a clause at the beginning of the bill's title to include 'repealing obsolete provisions;'
  • It is unclear which specific provisions will be repealed without further details.
HB0093HW001

Committee of the Whole • Representative Eklund

Adopted

Plain English: The amendment reduces the funding amount for a water project from $50 million to $30 million.

  • Reduces the funding allocation for a specific water development project from fifty million dollars ($50,000,000.00) to thirty million dollars ($30,000,000.00).
HB0093HW002

Committee of the Whole • Representative Hornok

Failed

Plain English: The amendment removes specific sections from the bill related to water development projects, renumbers remaining sections accordingly, and makes minor textual changes.

  • Removes pages 51 and 52 entirely.
  • Deletes lines 1 and 2 on page 53.
  • Changes 'Section 7.' to 'Section 6.' in line 4 of page 53.
  • Changes 'Section 8.' to 'Section 7.' in line 7 of page 53.
  • The exact content removed from pages 51 and 52 is not provided, making it unclear what specific projects or provisions are being deleted.
HB0093JC001

Conference Committee

H Adopted, S Adopted

Plain English: The amendment changes how certain funds are allocated for water projects in Wyoming by specifying that specific amounts should be further appropriated to the Wyoming Water Development Commission from different accounts.

  • Adds language on page 51, line 14, stating that a specified amount shall be further appropriated from water development account I to the Wyoming Water Development Commission.
  • Adds similar language on pages 52, lines 9 and 19, specifying that amounts should be further appropriated from water development account II to the same commission.
  • The exact amounts or conditions for these appropriations are not detailed in the amendment text provided.
  • It is unclear what specific projects or purposes these appropriations will fund without additional context.
HB0093HS001

Standing Committee • House Appropriations Committee

Adopted

Plain English: The amendment reduces the funding amount for a water project from $50 million to $15 million.

  • Changes the funding amount for a designated water project from fifty million dollars ($50,000,000.00) to fifteen million dollars ($15,000,000.00).
HB0093S2001

2nd reading • Senator Steinmetz

Adopted

Plain English: The amendment adds language to ensure that specific amounts of money allocated for water projects are not reduced or moved to other uses by future laws.

  • Adds a new footnote specifying that $24,953.00 and $7,154,367.00 from the general fund cannot be reduced or reallocated by future legislation.
  • The amendment only specifies protection for these two amounts; other appropriations may still be affected by future laws.
HB0093S2002

2nd reading • Senator Biteman

Failed

Plain English: The amendment removes specific lines from the bill and changes certain references within those sections.

  • Removes pages 3 through 5 of the bill entirely.
  • Deletes lines 2 through 11 on page 6 of the bill.
  • Changes '(d)' to '(b)' in line 13 on page 6.
  • Changes '(e)' to '(c)' in line 5 on page 8.
  • Changes '(f)' to '(d)' in line 18 on page 9.
  • The exact content and implications of the deleted sections are not provided, making it difficult to fully understand the amendment's impact.
HB0093S3001

3rd reading • Senator Gierau

Failed

Plain English: The amendment reduces the funding amount for a water project from $75 million to $65 million.

  • Reduces the funding allocation for a specific water development project from seventy-five million dollars ($75,000,000.00) to sixty-five million dollars ($65,000,000.00).
HB0093S3002

3rd reading • Senator Hicks

Adopted

Plain English: The amendment changes the capitalization of certain words in the bill to ensure consistency.

  • Changes 'Mountain' to lowercase on page 3, line 7.
  • Changes 'Ranges' to lowercase on page 3, line 8.
  • Removes 'Mountain' from page 4, line 22.
  • Changes 'Mountain Ranges' to lowercase and separates with a comma on page 4, line 23.
  • The amendment only specifies changes to capitalization and punctuation, so it does not provide information about the broader implications or effects of these changes.
HB0093S3003

3rd reading • Senator Brennan

Adopted

Plain English: The amendment adds a provision to limit the Wyoming water development office from entering into contracts for cloud seeding projects beyond September 30, 2026.

  • Adds language prohibiting the Wyoming water development office from making any contracts related to cloud seeding that would extend past September 30, 2026.
  • States the legislature's intention not to fund or implement future cloud seeding projects.
HB0093SS001

Standing Committee • Senate Agriculture, State and Public Lands & Water

Adopted

Plain English: The amendment changes specific wording and figures in a water development bill, including increasing funding amounts and altering the timing of certain appropriations.

  • Replaces 'an' with no word on page 1, line 11.
  • Changes 'date' to 'dates' on page 1, line 12.
  • Modifies 'condition' to 'conditions' on page 28, line 17.
  • Increases funding from $30 million to $75 million on pages 49-50.
  • The amendment includes detailed financial tables and employee numbers which are not explained in plain English due to complexity.
HB0093SS002

Standing Committee • Senate Appropriations Committee

Adopted

Plain English: The amendment changes the funding allocation for water development projects by adjusting appropriations from various funds to the State Engineer's program.

  • Modifies the general fund appropriation for the State Engineer’s program, specifying that $366,118 is immediately effective.
  • Specifies that future appropriations for administration and the Board of Control Division will come from the general fund starting in fiscal biennium 2025-2026.
  • The amendment text does not provide detailed explanations or impacts beyond funding adjustments, which may limit understanding without additional context.

Bill History

  1. 2023-03-10 LSO

    Assigned Chapter Number 180

  2. 2023-03-10 Governor

    Governor Signed HEA No. 0092

  3. 2023-03-03 Senate

    S President Signed HEA No. 0092

  4. 2023-03-03 House

    H Speaker Signed HEA No. 0092

  5. 2023-03-03 LSO

    Assigned Number HEA No. 0092

  6. 2023-02-22 Senate

    S Appointed JCC01 Members

  7. 2023-02-21 House

    H Appointed JCC01 Members

  8. 2023-02-21 House

    H Concur:Failed 3-59-0-0-0

  9. 2023-02-14 House

    H Received for Concurrence

  10. 2023-02-14 Senate

    S 3rd Reading:Passed 31-0-0-0-0

  11. 2023-02-13 Senate

    S 2nd Reading:Passed

  12. 2023-02-09 Senate

    S COW:Passed

  13. 2023-02-09 Senate

    S Placed on General File

  14. 2023-02-09 Senate

    S02 - Appropriations:Recommend Amend and Do Pass 3-0-2-0-0

  15. 2023-02-08 Senate

    :Rerefer to S02 - Appropriations

  16. 2023-02-08 Senate

    S05 - Agriculture:Recommend Amend and Do Pass 4-1-0-0-0

  17. 2023-01-31 Senate

    S Introduced and Referred to S05 - Agriculture

  18. 2023-01-25 Senate

    S Received for Introduction

  19. 2023-01-25 House

    H 3rd Reading:Passed 56-5-1-0-0

  20. 2023-01-24 House

    H 2nd Reading:Passed

  21. 2023-01-20 House

    H COW:Passed

  22. 2023-01-19 House

    H Placed on General File

  23. 2023-01-19 House

    H02 - Appropriations:Recommend Amend and Do Pass 7-0-0-0-0

  24. 2023-01-17 House

    :Rerefer to H02 - Appropriations

  25. 2023-01-17 House

    H05 - Agriculture:Recommend Do Pass 9-0-0-0-0

  26. 2023-01-12 House

    H Introduced and Referred to H05 - Agriculture

  27. 2023-01-10 House

    H Received for Introduction

  28. 2023-01-09 LSO

    Bill Number Assigned

Official Summary Text

Bill Summary - 23LSO-0377
Bill No.:

HB0093

Effective:

Immediately

LSO No.:

23LSO-0377

Enrolled Act No.:

HEA No. 0092

Chapter No.:

180

Prime Sponsor:

Select Water Committee

Catch Title:

Omnibus water bill-construction.

Subject:

Provides authorization and funding for water development program projects.

Summary/Major Elements:

2023 Construction Projects
Cloud seeding: Medicine Bow and Sierra Madre Mountain Ranges 2024
Cloud seeding: Wind River and Sierra Madre Mountain Ranges 2024
Happy Valley Water Transmission and Storage 2023
Sheridan Northeast Transmission Main Extension 2023
South End Water Users ISD Pipeline 2023

2023 Rehabilitation Projects
CAID Lateral 256 Drop Structure 2023
Enterprise WID Calvert Lateral 2023
Goshen ID 56.0 Pipeline Phase I 2023
Heart Mountain ID Lateral R4S 2023
Interstate I&R ID Canal Phase III 2023
Lakeview ID Rock Creek Siphon 2023
Midvale ID Wyoming Canal Phase I 2023

Amendments to Prior Projects
Sponsor's Contingency Fund (New Development)
Ethete Water Supply
Small Water Development projects 2014
Arapahoe Pipeline and Tank
Broken Wheel Ranch Water Supply 2017
Gillette Regional Extensions 2017
Leavitt Reservoir Expansion
Gillette Regional Extensions Phase IV 2018
Melody Ranch Water System Improvements 2018
Riverton Valley Irrigation District Rehabilitation 2018
GR/RS/SC JPWB Pump Station 2019
Lander Storage Tanks and Pump Station 2019
Shoshone Irrigation District Rehabilitation 2019
Glenrock Transmission Pipeline 2020
Cottonwood Irrigation District Transmission Pipeline 2020
Torrington Well Connection 2021
Shoshone Irrigation District Improvements 2021
Dry Creek Irrigation District Pipeline Replacement 2022
Goshen ID Tunnel Rehabilitation 2022
Fontenelle Reservoir water storage capacity purchase
Goshen Irrigation District Tunnels 1 and 2 rehabilitation
LaPrele Dam rehabilitation

Authorizes the transfer of eleven million two hundred thousand dollars ($11,200,000.00) from water development account I to water development account II.

Appropriates thirty million dollars ($30,000,000.00) from the general fund to water development account III.

Clarifies that the total amount available from the emergency water projects account is per each emergency project.

Comments:

See also the companion bill, Senate File 96, Omnibus water bill-planning and administration.

The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent.

While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill.

Current Bill Text

Read the full stored bill text
23LSO-0377

ORIGINAL House

ENGROSSED
Bill No
.
HB0093

ENROLLED ACT NO. 92,

HOUSE OF REPRESENTATIVES

SIXTY-SEVENTH LEGISLATURE OF THE STATE OF WYOMING
2023 General Session

AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing appropriations; amending the sponsor's contingency fund; amending amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring funds from the general fund to water development account III; clarifying fund limits to the emergency water projects account; repealing obsolete provisions; and providing for an effective date.

Be It Enacted by the Legislature of the State of Wyoming:

Section 1.

W.S. 99
‑
3
‑
2801 through 99
‑
3
‑
2804 are created to read:

ARTICLE 28
2023 CONSTRUCTION PROJECTS

99
‑
3
‑
2801.

Definitions.

The definitions in W.S. 99
‑
3
‑
101 apply to this article.

99
‑
3
‑
2802.

General authorization.

The provisions of W.S. 99
‑
3
‑
102 apply to this article.

99
‑
3
‑
2803.

Level III construction projects – new development.

(a)

Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99
‑
3
‑
103, provided that W.S. 99
‑
3
‑
103(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41
‑
2
‑
121.

(b)

Project – Cloud Seeding: Medicine Bow and Sierra Madre Mountain Ranges 2024 (aerial):

(i)

Project sponsor: The state of Wyoming;

(ii)

Project purpose: To enhance the winter snowpack in the Medicine Bow and Sierra Madre mountain ranges;

(iii)

Project description: Conduct an aerial operational winter snowpack augmentation program during the 2023
‑
2024 season;

(iv)

Total project budget: Eight hundred seventy
‑
five thousand dollars ($875,000.00);

(v)

Appropriation: There is appropriated from water development account I to the Wyoming water development office eight hundred twenty
‑
five thousand dollars ($825,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2025;

(vi)

Special conditions:

(A)

The Wyoming water development office shall acquire funding commitments from Wyoming water users or other interested parties for operational costs which exceed the project appropriation;

(B)

The Wyoming water development office is authorized to enter into contracts with Colorado organizations to extend aerial weather modification efforts into Colorado provided these organizations pay one hundred percent (100%) of the additional costs associated with operations in Colorado.

(c)

Project – Cloud Seeding: Wind River and Sierra Madre Mountain Ranges 2024 (ground based):

(i)

Project sponsor: The state of Wyoming;

(ii)

Project purpose: To enhance the winter snowpack in the Wind River mountain and Sierra Madre mountain ranges;

(iii)

Project description: Conduct a ground
‑
based operational winter snowpack augmentation program during the 2023
‑
2024 season;

(iv)

Total project budget: Eight hundred five thousand dollars ($805,000.00);

(v)

Appropriation: There is appropriated from water development account I to the Wyoming water development office three hundred one thousand dollars ($301,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2025;

(vi)

Special conditions:

(A)

The state of Wyoming shall participate in the project described in this subsection at a rate up to thirty
‑
seven percent (37%) of actual project operations costs not to exceed three hundred one thousand dollars ($301,000.00);

(B)

Prior to commencing project operations, the Wyoming water development office shall acquire funding commitments from other Colorado River basin water users or other interested parties for a minimum of sixty
‑
three percent (63%) of actual project operations costs;

(C)

If the project is cancelled, the Wyoming water development office is authorized to use the appropriated funds to remove weather modification equipment and reclaim project sites.

(d)

Project – Happy Valley Water Transmission and Storage 2023:

(i)

Project sponsor: Happy Valley Water Improvement and Service District;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and pre
‑
construction of water transmission pipelines, storage tanks, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four hundred sixty thousand dollars ($460,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and pre
‑
construction engineering of the project an amount not to exceed three hundred eight thousand two hundred dollars ($308,200.00) or sixty
‑
seven percent (67%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission three hundred eight thousand two hundred dollars ($308,200.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2028;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

(e)

Project – Sheridan Northeast Transmission Main Extension 2023:

(i)

Project sponsor: City of Sheridan;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and pre
‑
construction of water transmission pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Three hundred eighteen thousand dollars ($318,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and pre
‑
construction engineering of the project an amount not to exceed two hundred thirteen thousand sixty dollars ($213,060.00) or sixty
‑
seven percent (67%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission two hundred thirteen thousand sixty dollars ($213,060.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2028;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

(f)

Project – South End Water Users ISD Pipeline 2023:

(i)

Project sponsor: South End Water Users Improvement and Service District;

(ii)

Project purpose: Municipal and rural domestic water supply;

(iii)

Project description: Design and pre
‑
construction of water transmission pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four hundred fifty
‑
nine thousand four hundred three dollars ($459,403.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and pre
‑
construction engineering of the project an amount not to exceed three hundred seven thousand eight hundred dollars ($307,800.00) or sixty
‑
seven percent (67%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission three hundred seven thousand eight hundred dollars ($307,800.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2028;

(vii)

Special conditions: The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources.

99
‑
3
‑
2804.

Level III construction projects – rehabilitation.

(a)

Authorization is granted for the Level III rehabilitation construction projects identified in this section subject to the general conditions specified in W.S. 99
‑
3
‑
104, provided that W.S. 99
‑
3
‑
104(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41
‑
2
‑
121.

(b)

Project – CAID Lateral 256 Drop Structure 2023:

(i)

Project sponsor: Casper Alcova Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of water control structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Seven hundred twelve thousand dollars ($712,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred seventy
‑
seven thousand forty dollars ($477,040.00) or sixty
‑
seven percent (67%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission four hundred seventy
‑
seven thousand forty dollars ($477,040.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring thirty
‑
three percent (33%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

(c)

Project – Enterprise WID Calvert Lateral 2023:

(i)

Project sponsor: Enterprise Watershed Improvement District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Eight hundred seventy thousand dollars ($870,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed four hundred seventeen thousand six hundred dollars ($417,600.00) or forty
‑
eight percent (48%) of these actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred eight thousand eight hundred dollars ($208,800.00) or twenty
‑
four percent (24%) of these actual development costs, whichever is less, for a term of fifty (50) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission six hundred twenty
‑
six thousand four hundred dollars ($626,400.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(viii)

Special Conditions:

(A)

The sponsor is responsible for acquiring twenty
‑
eight percent (28%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

(d)

Project – Goshen ID 56.0 Pipeline Phase I 2023:

(i)

Project sponsor: Goshen Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Two hundred thirty
‑
six thousand three hundred dollars ($236,300.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed one hundred forty
‑
nine thousand six hundred dollars ($149,600.00) or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission one hundred forty
‑
nine thousand six hundred dollars ($149,600.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special conditions:

(A)

The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission;

(B)

The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures;

(C)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or transfer from another funding source.

(e)

Project – Heart Mountain ID Lateral R4S 2023:

(i)

Project sponsor: Heart Mountain Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four million six hundred fifty
‑
six thousand dollars ($4,656,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million one hundred sixty
‑
four thousand dollars ($1,164,000.00) or twenty
‑
five percent (25%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission one million one hundred sixty
‑
four thousand dollars ($1,164,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring seventy
‑
five percent (75%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

(f)

Project – Interstate I&R ID Canal Phase III 2023:

(i)

Project sponsor: Interstate Irrigation and Reservoir Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Five million seven hundred thousand dollars ($5,700,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three million two hundred twenty
‑
six thousand two hundred dollars ($3,226,200.00) or fifty
‑
six and six
‑
tenths percent (56.6%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission three million two hundred twenty
‑
six thousand two hundred dollars ($3,226,200.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring forty
‑
three and four
‑
tenths percent (43.4%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

(g)

Project – Lakeview ID Rock Creek Siphon 2023:

(i)

Project sponsor: Lakeview Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of water control structures and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Two million nine hundred fifty thousand dollars ($2,950,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed one million four hundred seventy
‑
five thousand dollars ($1,475,000.00) or fifty percent (50%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission one million four hundred seventy
‑
five thousand dollars ($1,475,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

(h)

Project – Midvale ID Wyoming Canal Phase I 2023:

(i)

Project sponsor: Midvale Irrigation District;

(ii)

Project purpose: Agricultural water supply;

(iii)

Project description: Design and construction of canal lining and appurtenances necessary to make the project function in the manner intended;

(iv)

Total project budget: Four million two hundred fifty thousand dollars ($4,250,000.00);

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million two hundred fifty thousand dollars ($2,250,000.00) or fifty
‑
three percent (53%) of these actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission two million two hundred fifty thousand dollars ($2,250,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2028;

(vii)

Special Conditions:

(A)

The sponsor is responsible for acquiring forty
‑
seven percent (47%) of the total project budget from other sources;

(B)

The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

[AMENDMENTS TO PRIOR PROJECTS]

Section 2.

W.S. 99
‑
3
‑
1106(a)(iv), (vii), (b)(iv), (vii) and (viii), 99
‑
3
‑
1503(g)(iii) and (vi), 99
‑
3
‑
1903(k)(iv) through (vi), 99
‑
3
‑
2003(b)(iv) through (vii), 99
‑
3
‑
2203(b)(vi) and (e)(vi), 99
‑
3
‑
2205(e)(iv) through (vii), 99
‑
3
‑
2303(b)(vi) and (e)(vi), 99
‑
3
‑
2304(j)(vi), 99
‑
3
‑
2404(e)(vi) and (f)(iv) through (vi), 99
‑
3
‑
2406(o)(iv) through (vi), 99
‑
3
‑
2503(g)(vi), 99
‑
3
‑
2504(c)(iv) through (vii), by creating a new paragraph (viii), (m)(iv) through (vi) and (vii) by creating a new subparagraph (C), 99
‑
3
‑
2603(f)(vi), 99
‑
3
‑
2604(d)(iv) through (vi) and 99
‑
3
‑
2704(e)(vii) and (g)(iv) through (vi) are amended to read:

99
‑
3
‑
1106.

Sponsor's Contingency Funds.

(a)

Project – Sponsor's Contingency Fund – New Development:

(iv)

Total project budget:
Three million dollars ($3,000,000.00)
Seven million dollars ($7,000,000.00)
;

(vii)

Appropriation: There is appropriated from water development account I to the commission
three million dollars ($3,000,000.00)
seven million dollars ($7,000,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2025
2027
; and

(b)

Project – Sponsor's Contingency Fund
‑
Rehabilitation:

(iv)

Total project budget:
Four million five hundred thousand dollars ($4,500,000.00)
Five million seven hundred thousand dollars ($5,700,000.00)
;

(vii)

Appropriation: There is appropriated from water development account II to the commission
four million five hundred thousand dollars ($4,500,000.00)
five million seven hundred thousand dollars ($5,700,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2026
2027
; and

(viii)

Special condition:

(A)

The commission is authorized to consider and approve supplemental funding to complete existing water development program Level III construction projects any time during the calendar year
;
.

(B)

The appropriation of additional funds for this project in the amount of one million two hundred thousand dollars ($1,200,000.00) is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

99
‑
3
‑
1503.

Level III construction projects – new development.

(g)

Project – Ethete Water Supply:

(iii)

Project description: Design and construction of a well field,
transmission pipeline,
pump stations, storage tank improvements and appurtenances necessary to make the project function in the manner intended;

(vi)

Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2023
2025
;

99
‑
3
‑
1903.

Level III construction projects – new development.

(k)

Project
‑
Small Water Development Projects
‑
2014:

(iv)

Total project budget:
Fifteen million three hundred twenty
‑
six thousand dollars ($15,326,000.00)
Seventeen million three hundred twenty
‑
six thousand dollars ($17,326,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to sponsors from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
seven million six hundred sixty
‑
three thousand dollars ($7,663,000.00)
eight million six hundred sixty
‑
three thousand dollars ($8,663,000.00)
or fifty percent (50%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission
seven million six hundred sixty
‑
three thousand dollars ($7,663,000.00)
eight million six hundred sixty
‑
three thousand dollars ($8,663,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. The funds appropriated shall not lapse at the end of any fiscal period but shall carry over until expended or reverted by the legislature to water development account I;

99
‑
3
‑
2003.

Level III construction projects – new development.

(b)

Project – Arapahoe Pipeline and Tank:

(iv)

Total project budget:
Two million eight hundred seventy
‑
six thousand dollars ($2,876,000.00)
Five million five hundred thousand dollars ($5,500,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one million nine hundred twenty
‑
six thousand nine hundred twenty dollars ($1,926,920.00)
two million four hundred twenty thousand dollars ($2,420,000.00)
or
sixty
‑
seven percent (67%)
forty
‑
four percent (44%)
of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission
one million nine hundred twenty
‑
six thousand nine hundred twenty dollars ($1,926,920.00)
two million four hundred twenty thousand dollars ($2,420,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2023
2025
;

(vii)

Special conditions: The sponsor is responsible for acquiring
thirty
‑
three percent (33%)
fifty
‑
six percent (56%)
of the total project budget from other sources.

99
‑
3
‑
2203.

Level III construction projects – new development.

(b)

Project – Broken Wheel Ranch Water Supply 2017:

(vi)

Appropriation: There is appropriated from water development account I to the commission six hundred thirteen thousand fifty dollars ($613,050.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2023
2025
;

(e)

Project – Gillette Regional Extensions 2017:

(vi)

Appropriation: There is appropriated from water development account I to the commission two million seven hundred fifty
‑
three thousand seven hundred dollars ($2,753,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2024
2025
;

99
‑
3
‑
2205.

Level III construction projects – dams and reservoirs.

(e)

Project – Leavitt Reservoir Expansion:

(iv)

Total project budget:
Forty
‑
six million dollars ($46,000,000.00)
Seventy
‑
eight million dollars ($78,000,000.00)
;

(v)

Project Grant: The state of Wyoming shall grant to the sponsor from water development account III through the commission for project land procurement, construction engineering and construction of the project an amount not to exceed
forty
‑
four million three hundred nineteen thousand dollars ($44,319,000.00)
seventy
‑
six million two hundred eighty
‑
four thousand dollars ($76,284,000.00)
or
ninety
‑
six and three tenths percent (96.3%)
ninety
‑
seven and eight-tenths percent (97.8%)
of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account III through the commission for project land procurement, construction engineering and construction of the project an amount not to exceed
one million six hundred eighty
‑
one thousand dollars ($1,681,000.00)
one million seven hundred sixteen thousand dollars ($1,716,000.00)
or
three and seven tenths percent (3.7%)
two and two-tenths percent (2.2%)
of actual development costs, whichever is less, for a term of fifty (50) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);

(vii)

Appropriation
and authorization
: There is appropriated from water development account III to the commission forty
‑
six million dollars ($46,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account III on July 1,
2025
2027
.
There is authorized for expenditure by the commission from the sponsor's contingency fund – account III, created by W.S. 99
‑
3
‑
2505(a), thirty
‑
two million dollars ($32,000,000.00) to carry out the purpose of this subsection.

99
‑
3
‑
2303.

Level III construction projects – new development.

(b)

Project – Gillette Regional Extensions Phase IV
‑
2018:

(vi)

Appropriation: There is appropriated from water development account I to the commission one million five hundred twelve thousand one hundred ninety dollars ($1,512,190.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2023
2025
;

(e)

Project – Melody Ranch Water System Improvements 2018:

(vi)

Appropriation: There is appropriated from water development account I to the commission nine hundred forty
‑
four thousand seven hundred dollars ($944,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2023
2026
;

99
‑
3
‑
2304.

Level III construction projects – rehabilitation.

(j)

Project – Riverton Valley Irrigation District Rehabilitation 2018:

(vi)

Appropriation: There is appropriated from water development account II to the commission five hundred forty
‑
two thousand five hundred dollars ($542,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1,
2023
2025
;

99
‑
3
‑
2404.

Level III construction projects – new development.

(e)

Project – GR/RS/SC JPWB Pump Station 2019:

(vi)

Appropriation: There is appropriated from water development account I to the commission seven million four hundred ninety
‑
seven thousand three hundred dollars ($7,497,300.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2024
2026
;

(f)

Project – Lander Storage Tanks and Pump Station 2019:

(iv)

Total project budget:
Five million four hundred fifty thousand dollars ($5,450,000.00)
Ten million four hundred ninety thousand dollars ($10,490,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
three million six hundred fifty
‑
one thousand five hundred dollars ($3,651,500.00)
seven million twenty
‑
eight thousand three hundred dollars ($7,028,300.00)
or sixty
‑
seven percent (67%) of the actual development costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account I to the commission
three million six hundred fifty
‑
one thousand five hundred dollars ($3,651,500.00)
seven million twenty
‑
eight thousand three hundred dollars ($7,028,300.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2024;

99
‑
3
‑
2406.

Level III construction projects – rehabilitation.

(o)

Project – Shoshone Irrigation District Rehabilitation 2019:

(iv)

Total project budget:
Four hundred seventy
‑
two thousand dollars ($472,000.00)
Five hundred ninety
‑
seven thousand dollars ($597,000.000)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed
one hundred eighty
‑
one thousand dollars ($181,000.00)
two hundred eighty
‑
two thousand dollars ($282,000.00)
or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
one hundred eighty
‑
one thousand dollars ($181,000.00)
two hundred eighty
‑
two thousand dollars ($282,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2024;

99
‑
3
‑
2503.

Level III construction projects – new development.

(g)

Project – Glenrock Transmission Pipeline 2020:

(vi)

Appropriation: There is appropriated from water development account I to the commission nine hundred fifty
‑
eight thousand one hundred dollars ($958,100.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2025
2027
;

99
‑
3
‑
2504.

Level III Construction Projects
‑
rehabilitation.

(c)

Project – Cottonwood Irrigation District Transmission Pipeline 2020:

(iv)

Total project budget:
One million five hundred forty thousand dollars ($1,540,000.00)
Three million one hundred eleven thousand dollars ($3,111,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
one million thirty
‑
one thousand eight hundred dollars ($1,031,800.00)
one million seven hundred eleven thousand fifty dollars ($1,711,050.00)
or
sixty
‑
seven percent (67%)
fifty
‑
five percent (55%)

of the actual development costs, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed
five hundred eight thousand two hundred dollars ($508,200.00)
eight hundred eight thousand eight hundred sixty dollars ($808,860.00)
or
thirty
‑
three percent (33%)
twenty
‑
six percent (26%)
of the actual development costs, whichever is less, for a term of forty (40) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);

(vii)

Appropriation: There is appropriated from water development account II to the commission
one million five hundred forty thousand dollars ($1,540,000.00)
two million five hundred nineteen thousand nine hundred ten dollars ($2,519,910.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2025
;
.

(viii)

Special conditions: The sponsor is responsible for acquiring nineteen percent (19%) of the total project budget from other sources.

(m)

Project – Sidon Irrigation District Sidon Canal 2020:

(iv)

Total project budget:
One million seven hundred fifty
‑
three thousand eight hundred fifty
‑
seven dollars ($1,753,857.00)
Two million five hundred fifty
‑
four thousand dollars ($2,554,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed
one million sixty thousand dollars ($1,060,000.00)
one million seven hundred eleven thousand dollars ($1,711,000.00)
or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
one million sixty thousand dollars ($1,060,000.00)
one million seven hundred eleven thousand dollars ($1,711,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2025;

(vii)

Special conditions:

(C)

The appropriation of additional funds for this project in the amount of six hundred fifty
‑
one thousand dollars ($651,000.00) is contingent upon the transfer of funds to water development account II as described in section 3 of this act or the transfer of funds from another funding source.

99
‑
3
‑
2603.

Level III construction projects – new development.

(f)

Project – Torrington Well Connection 2021:

(vi)

Appropriation: There is appropriated from water development account I to the commission three hundred eighty
‑
nine thousand two hundred seventy dollars ($389,270.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1,
2026
2027
;

99
‑
3
‑
2604.

Level III construction projects – rehabilitation.

(d)

Project – Shoshone Irrigation District Improvements 2021:

(iv)

Total project budget:
Four hundred seventy
‑
seven thousand five hundred dollars ($477,500.00)
Five hundred eighty
‑
five thousand dollars ($585,000.00)
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed
two hundred forty thousand dollars ($240,000.00)
three hundred twenty
‑
nine thousand dollars ($329,000.00)
or one hundred percent (100%) of the approved materials costs, whichever is less;

(vi)

Appropriation: There is appropriated from water development account II to the commission
two hundred forty thousand dollars ($240,000.00)
three hundred twenty
‑
nine thousand dollars ($329,000.00)
or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2026;

99
‑
3
‑
2704.

Level III construction projects – rehabilitation.

(e)

Project – Dry Creek Irrigation District Pipeline Replacement 2022:

(vii)

Appropriation: There is appropriated from water development account II to the commission one million eight hundred fifty thousand dollars ($1,850,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended and unobligated funds appropriated under this subsection shall revert to water development account II on July 1,
2027
2028
;

(g)

Project – Goshen ID Tunnel Rehabilitation 2022:

(iv)

Total project budget:
Two million three hundred fifty thousand dollars ($2,350,000.00)
Four million seven hundred ninety
‑
five thousand nine hundred twenty dollars ($4,795,920.00)
. The sponsor's project budget is
one million one hundred fifty
‑
one thousand five hundred dollars ($1,151,500.00)
two million three hundred fifty thousand dollars ($2,350,000.00)

or forty
‑
nine percent (49%) of the total project budget
, whichever is less
;

(v)

Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the engineering analysis, design, permit procurement, project land procurement, and pre
‑
construction engineering of the project an amount not to exceed
seven hundred seventy
‑
one thousand five hundred five dollars ($771,505.00)
one million five hundred seventy
‑
four thousand five hundred dollars ($1,574,500.00)
or sixty
‑
seven percent (67%) of these actual development costs within the sponsor's project budget, whichever is less;

(vi)

Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the
engineering analysis,
design, permit procurement, project land procurement and pre
‑
construction engineering of the project an amount not to exceed
three hundred seventy
‑
nine thousand nine hundred ninety
‑
five dollars ($379,995.00)
seven hundred seventy
‑
five thousand five hundred dollars ($775,500.00)
or thirty
‑
three percent (33%) of these actual development costs within the sponsor's project budget, whichever is less, for a term of twenty (20) years from the date the commission determines that project benefits accrue to the sponsor or the commission determines the project is not likely to proceed to construction, at an annual interest rate of four percent (4%);

[Transfer of Funds]

Section 3.

The Wyoming water development commission is hereby authorized to transfer eleven million two hundred thousand dollars ($11,200,000.00) from water development account I created by W.S. 41
‑
2
‑
124(a)(i) to water development account II created by W.S. 41
‑
2
‑
124(a)(ii).

Section 4.

There is appropriated thirty million dollars ($30,000,000.00) from the general fund to water development account III, created by W.S. 41
‑
2
‑
124(a)(iii).

Section 5.

W.S. 41-2-124(h) is amended to read:

41
‑
2
‑
124.

Accounts created; unexpended balance.

(h)

The commission shall adopt rules providing for eligibility determination, procedures and criteria for the application and award of funds from the emergency water projects account. The total amount awarded under this subsection
for each emergency project

shall not exceed three million dollars ($3,000,000.00) per fiscal biennium. The maximum grant amount awarded for each emergency project shall not exceed seventy
‑
five percent (75%) of the total emergency project costs, the remaining twenty
‑
five percent (25%) may be funded by the commission in the form of a loan. The term of a loan shall not exceed fifty (50) years and interest shall provide a reasonable return and shall not be less than four percent (4%). The commission shall include the total amount of all emergency water project grant or loan funds provided under this subsection and subtract that total from the maximum allowable grant under W.S. 41
‑
2
‑
121(a)(ii)(E)(I) for a subsequent water development project involving the same entity and project components. All emergency water projects account funds awarded under this subsection shall be approved by the state loan and investment board after review and recommendation by the water development commission prior to the release of funds.

Section 6.

2022 Wyoming Session Laws, Chapter 74, Section 1(a)(i) through (iii) is amended to read:

Section 1.

(a)

The following sums of money are appropriated from the legislative stabilization reserve account to the following accounts for the purposes specified. The governor is authorized to direct up to:

(i)

Twenty
‑
five million dollars ($25,000,000.00) to water development account I created by W.S. 41
‑
2
‑
124(a)(i)
which shall be further appropriated from water development account I to the Wyoming water development commission
for the purpose of acquiring water storage capacity in Fontenelle reservoir. The Wyoming water development office is hereby authorized to negotiate a purchase agreement with the bureau of reclamation to acquire water storage capacity in Fontenelle reservoir. No funds shall be expended from this appropriation until the negotiated purchase agreement is approved by the Wyoming water development commission and the governor and the
legislature
state loan and investment board
authorizes the purchase of water storage capacity as a water development program construction project;

(ii)

Twenty
‑
one million eight hundred ten thousand dollars ($21,810,000.00) to water development account II created by W.S.

41
‑
2
‑
124(a)(ii)
which shall be further appropriated from water development account II to the Wyoming water development commission
for the Goshen irrigation district tunnels 1 and 2 rehabilitation water development project. No funds shall be expended from this appropriation until the
legislature
state loan and investment board
authorizes the project as a water development program construction project;

(iii)

Thirty million dollars ($30,000,000.00) to water development account II created by W.S. 41
‑
2
‑
124(a)(ii)
which shall be further appropriated from water development account II to the Wyoming water development commission
for the purpose of the LaPrele dam rehabilitation water development project. No funds shall be expended from this appropriation until the
legislature
state loan and investment board
authorizes the project as a water development program construction project.

Section 7.

W.S. 99
‑
3
‑
2604(d)(vii)(C) and 99
‑
3
‑
2704(e)(viii), (g)(vii) and (ix) are repealed.

Section 8.

This act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution.

(END)